id author title date pages extension mime words sentences flesch summary cache txt 35344 Nunn, Herbert Third Biennial Report of the Oregon State Highway Commission Covering the Period December 1st, 1916 to November 30th, 1918 .txt text/plain 64470 7425 87 funds be set aside for engineering work handled by the State Highway State Highway Department has worked a rather large engineering force of those sections of State roads which are so located that the counties constructed at a total cost to State and Counties of $617,388.09. Of the structures paid for by the counties, the State Highway Department Roads and Rural Engineering, the State Highway Department simply The cost of work completed on the Columbia River Highway between Astoria COUNTY FUNDS EXPENDED BY STATE HIGHWAY DEPARTMENT--DECEMBER 1, 1916 TO and the Lane County Line; and that the State would grade 12.8 miles During 1918 the State Highway Commission surveyed a six mile section of This County work was contracted under State Highway Department The work of the State Highway Department in Polk County during 1917 and The State Highway Department has made a location survey of 45.26 miles ./cache/35344.txt ./txt/35344.txt