id author title date pages extension mime words sentences flesch summary cache txt 40709 Piper, John J. Facts and Figures Concerning the Hoosac Tunnel .txt text/plain 18647 675 62 of the Hoosac Tunnel, and the opening of another great route to the incapacity of these lines of New England railroads to do the work that west of Greenfield, within ten miles of the Tunnel line on the same power of the Western Road, which a few years before, had only obtained policy of the Western Railroad Company in regard to the Tunnel line, the Deerfield river, in order to secure power to operate the tunneling commissioners to examine the road and tunnel, and if the report to Cost and Time required to Complete the Tunnel. Hoosac Tunnel been completed twelve years ago, we have reason to Tunnel line, which is now a greater necessity than the Western road was The Hoosac Tunnel will be about four and a half miles long, a pneumatic drill, by means of which our great tunnel will be completed ./cache/40709.txt ./txt/40709.txt