id author title date pages extension mime words sentences flesch summary cache txt 16440 Campbell, J. L. The Water Supply of the El Paso and Southwestern Railway from Carrizozo to Santa Rosa, N. Mex. American Society of Civil Engineers: Transactions, No. 1170 .txt text/plain 9802 782 83 solids per gallon; and a branch pipe line takes water from the creek water to Luna Reservoir and the pumps at Mile 171, and the latter lift Where the pipe line passes a water tank on the railway, a 4-in. air-chambers, and open stand-pipes on the line, too numerous to mention _Cast-iron Pipe_.--Beginning at the first pumping plant at Coyote, at specifications of the New England Water-Works Association, the pipe was pipe 21 miles long, a large air-chamber in the form of a closed steel The supply pipe from Bonito Creek delivers water into the basin over the If the pipe line is delivering water faster than the leakage on the wood pipe, between Coyote and Bonito Creek, from the _Velocities_.--The pipe line from Bonito Creek to the Nogal Reservoir line, near the reservoir, as indicated on Fig. 2, which shows the hydraulic grades and the pipe diameters of this ./cache/16440.txt ./txt/16440.txt