id sid tid token lemma pos 42149 1 1 Transcribers Transcribers NNP 42149 1 2 ' ' POS 42149 1 3 notes note NNS 42149 1 4 : : : 42149 1 5 Some some DT 42149 1 6 tables table NNS 42149 1 7 do do VBP 42149 1 8 n't not RB 42149 1 9 sum sum VB 42149 1 10 to to IN 42149 1 11 the the DT 42149 1 12 numbers number NNS 42149 1 13 indicated indicate VBN 42149 1 14 ; ; : 42149 1 15 no no DT 42149 1 16 corrections correction NNS 42149 1 17 have have VBP 42149 1 18 been be VBN 42149 1 19 made make VBN 42149 1 20 . . . 42149 2 1 All all DT 42149 2 2 numbers number NNS 42149 2 3 are be VBP 42149 2 4 from from IN 42149 2 5 the the DT 42149 2 6 original original NN 42149 2 7 . . . 42149 3 1 Minor minor JJ 42149 3 2 inconsistencies inconsistency NNS 42149 3 3 in in IN 42149 3 4 hyphenation hyphenation NN 42149 3 5 have have VBP 42149 3 6 been be VBN 42149 3 7 retained retain VBN 42149 3 8 . . . 42149 4 1 Subscripts subscript NNS 42149 4 2 are be VBP 42149 4 3 represented represent VBN 42149 4 4 by by IN 42149 4 5 underscore underscore NN 42149 4 6 and and CC 42149 4 7 curly curly RB 42149 4 8 braces brace NNS 42149 4 9 e.g. e.g. RB 42149 4 10 , , , 42149 4 11 CO_{2 CO_{2 NNP 42149 4 12 } } -RRB- 42149 4 13 . . . 42149 5 1 Italics italic NNS 42149 5 2 are be VBP 42149 5 3 represented represent VBN 42149 5 4 by by IN 42149 5 5 underscores underscore NNS 42149 5 6 before before IN 42149 5 7 and and CC 42149 5 8 after after IN 42149 5 9 e.g. e.g. RB 42149 5 10 , , , 42149 5 11 _ _ NNP 42149 5 12 italics italic NNS 42149 5 13 _ _ NNP 42149 5 14 . . . 42149 6 1 Bold Bold NNP 42149 6 2 is be VBZ 42149 6 3 represented represent VBN 42149 6 4 by by IN 42149 6 5 equal equal JJ 42149 6 6 signs sign NNS 42149 6 7 before before RB 42149 6 8 and and CC 42149 6 9 after after IN 42149 6 10 e.g. e.g. RB 42149 6 11 , , , 42149 6 12 = = XX 42149 6 13 bold=. bold=. XX 42149 7 1 Small small JJ 42149 7 2 caps cap NNS 42149 7 3 have have VBP 42149 7 4 been be VBN 42149 7 5 replaced replace VBN 42149 7 6 with with IN 42149 7 7 ALL all DT 42149 7 8 CAPS CAPS NNP 42149 7 9 . . . 42149 7 10 ] ] -RRB- 42149 8 1 AMERICAN AMERICAN NNP 42149 8 2 SOCIETY SOCIETY NNP 42149 8 3 OF of IN 42149 8 4 CIVIL CIVIL NNP 42149 8 5 ENGINEERS engineer NNS 42149 8 6 INSTITUTED institute VBD 42149 8 7 1852 1852 CD 42149 8 8 TRANSACTIONS TRANSACTIONS NNP 42149 8 9 Paper Paper NNP 42149 8 10 No no NN 42149 8 11 . . . 42149 9 1 1155 1155 CD 42149 9 2 THE the DT 42149 9 3 NEW NEW NNP 42149 9 4 YORK YORK NNP 42149 9 5 TUNNEL TUNNEL NNP 42149 9 6 EXTENSION EXTENSION NNP 42149 9 7 OF of IN 42149 9 8 THE the DT 42149 9 9 PENNSYLVANIA PENNSYLVANIA NNP 42149 9 10 RAILROAD RAILROAD NNP 42149 9 11 . . . 42149 10 1 THE the DT 42149 10 2 NORTH NORTH NNP 42149 10 3 RIVER river NN 42149 10 4 TUNNELS tunnel NNS 42149 10 5 . . . 42149 11 1 [ [ -LRB- 42149 11 2 A a NN 42149 11 3 ] ] -RRB- 42149 11 4 BY BY NNP 42149 11 5 B. B. NNP 42149 11 6 H. H. NNP 42149 11 7 M. M. NNP 42149 11 8 HEWETT HEWETT NNP 42149 11 9 AND and CC 42149 11 10 W. W. NNP 42149 11 11 L. L. NNP 42149 11 12 BROWN BROWN NNP 42149 11 13 , , , 42149 11 14 MEMBERS MEMBERS NNP 42149 11 15 , , , 42149 11 16 AM AM NNP 42149 11 17 . . . 42149 12 1 SOC SOC NNP 42149 12 2 . . . 42149 13 1 C. C. NNP 42149 13 2 E. E. NNP 42149 13 3 [ [ -LRB- 42149 13 4 A a NN 42149 13 5 ] ] -RRB- 42149 13 6 Presented present VBN 42149 13 7 at at IN 42149 13 8 the the DT 42149 13 9 meeting meeting NN 42149 13 10 of of IN 42149 13 11 June June NNP 42149 13 12 1st 1st NN 42149 13 13 , , , 42149 13 14 1910 1910 CD 42149 13 15 . . . 42149 14 1 INTRODUCTION INTRODUCTION NNP 42149 14 2 . . . 42149 15 1 The the DT 42149 15 2 section section NN 42149 15 3 of of IN 42149 15 4 the the DT 42149 15 5 Pennsylvania Pennsylvania NNP 42149 15 6 Railroad Railroad NNP 42149 15 7 Tunnel Tunnel NNP 42149 15 8 work work NN 42149 15 9 described describe VBN 42149 15 10 in in IN 42149 15 11 this this DT 42149 15 12 paper paper NN 42149 15 13 is be VBZ 42149 15 14 that that IN 42149 15 15 lying lie VBG 42149 15 16 between between IN 42149 15 17 Tenth Tenth NNP 42149 15 18 Avenue Avenue NNP 42149 15 19 , , , 42149 15 20 New New NNP 42149 15 21 York York NNP 42149 15 22 City City NNP 42149 15 23 , , , 42149 15 24 and and CC 42149 15 25 the the DT 42149 15 26 large large JJ 42149 15 27 shaft shaft NN 42149 15 28 built build VBN 42149 15 29 by by IN 42149 15 30 the the DT 42149 15 31 Company Company NNP 42149 15 32 at at IN 42149 15 33 Weehawken Weehawken NNP 42149 15 34 , , , 42149 15 35 N. N. NNP 42149 15 36 J. J. NNP 42149 15 37 , , , 42149 15 38 and and CC 42149 15 39 thus thus RB 42149 15 40 comprises comprise VBZ 42149 15 41 the the DT 42149 15 42 crossing crossing NN 42149 15 43 of of IN 42149 15 44 the the DT 42149 15 45 North North NNP 42149 15 46 or or CC 42149 15 47 Hudson Hudson NNP 42149 15 48 River River NNP 42149 15 49 , , , 42149 15 50 the the DT 42149 15 51 barrier barrier NN 42149 15 52 which which WDT 42149 15 53 has have VBZ 42149 15 54 stood stand VBN 42149 15 55 for for IN 42149 15 56 such such PDT 42149 15 57 a a DT 42149 15 58 long long JJ 42149 15 59 time time NN 42149 15 60 between between IN 42149 15 61 the the DT 42149 15 62 railroads railroad NNS 42149 15 63 and and CC 42149 15 64 their -PRON- PRP$ 42149 15 65 possession possession NN 42149 15 66 of of IN 42149 15 67 terminal terminal JJ 42149 15 68 stations station NNS 42149 15 69 in in IN 42149 15 70 New New NNP 42149 15 71 York York NNP 42149 15 72 City City NNP 42149 15 73 . . . 42149 16 1 The the DT 42149 16 2 general general JJ 42149 16 3 plan plan NN 42149 16 4 and and CC 42149 16 5 section section NN 42149 16 6 , , , 42149 16 7 Plate Plate NNP 42149 16 8 XXVIII XXVIII NNP 42149 16 9 , , , 42149 16 10 shows show VBZ 42149 16 11 the the DT 42149 16 12 work work NN 42149 16 13 included include VBD 42149 16 14 . . . 42149 17 1 This this DT 42149 17 2 paper paper NN 42149 17 3 is be VBZ 42149 17 4 written write VBN 42149 17 5 from from IN 42149 17 6 the the DT 42149 17 7 point point NN 42149 17 8 of of IN 42149 17 9 view view NN 42149 17 10 of of IN 42149 17 11 those those DT 42149 17 12 engaged engage VBN 42149 17 13 by by IN 42149 17 14 the the DT 42149 17 15 Chief Chief NNP 42149 17 16 Engineer Engineer NNP 42149 17 17 of of IN 42149 17 18 the the DT 42149 17 19 Railroad Railroad NNP 42149 17 20 Company Company NNP 42149 17 21 to to TO 42149 17 22 look look VB 42149 17 23 after after IN 42149 17 24 the the DT 42149 17 25 work work NN 42149 17 26 of of IN 42149 17 27 construction construction NN 42149 17 28 in in IN 42149 17 29 the the DT 42149 17 30 field field NN 42149 17 31 . . . 42149 18 1 The the DT 42149 18 2 history history NN 42149 18 3 of of IN 42149 18 4 the the DT 42149 18 5 undertaking undertaking NN 42149 18 6 is be VBZ 42149 18 7 not not RB 42149 18 8 included include VBN 42149 18 9 , , , 42149 18 10 the the DT 42149 18 11 various various JJ 42149 18 12 phases phase NNS 42149 18 13 through through IN 42149 18 14 which which WDT 42149 18 15 many many JJ 42149 18 16 of of IN 42149 18 17 the the DT 42149 18 18 designs design NNS 42149 18 19 and and CC 42149 18 20 plans plan NNS 42149 18 21 passed pass VBN 42149 18 22 are be VBP 42149 18 23 not not RB 42149 18 24 followed follow VBN 42149 18 25 , , , 42149 18 26 nor nor CC 42149 18 27 are be VBP 42149 18 28 the the DT 42149 18 29 considerations consideration NNS 42149 18 30 regarding regard VBG 42149 18 31 foundations foundation NNS 42149 18 32 under under IN 42149 18 33 the the DT 42149 18 34 subaqueous subaqueous JJ 42149 18 35 portions portion NNS 42149 18 36 of of IN 42149 18 37 the the DT 42149 18 38 tunnels tunnel NNS 42149 18 39 and and CC 42149 18 40 the the DT 42149 18 41 various various JJ 42149 18 42 tests test NNS 42149 18 43 made make VBN 42149 18 44 in in IN 42149 18 45 connection connection NN 42149 18 46 with with IN 42149 18 47 this this DT 42149 18 48 subject subject NN 42149 18 49 set set VBN 42149 18 50 out out RP 42149 18 51 , , , 42149 18 52 as as IN 42149 18 53 all all PDT 42149 18 54 these these DT 42149 18 55 matters matter NNS 42149 18 56 will will MD 42149 18 57 be be VB 42149 18 58 found find VBN 42149 18 59 in in IN 42149 18 60 other other JJ 42149 18 61 papers paper NNS 42149 18 62 on on IN 42149 18 63 these these DT 42149 18 64 tunnels tunnel NNS 42149 18 65 . . . 42149 19 1 This this DT 42149 19 2 paper paper NN 42149 19 3 only only RB 42149 19 4 aims aim VBZ 42149 19 5 to to TO 42149 19 6 describe describe VB 42149 19 7 , , , 42149 19 8 as as RB 42149 19 9 briefly briefly RB 42149 19 10 as as IN 42149 19 11 possible possible JJ 42149 19 12 , , , 42149 19 13 the the DT 42149 19 14 actual actual JJ 42149 19 15 designs design NNS 42149 19 16 which which WDT 42149 19 17 were be VBD 42149 19 18 finally finally RB 42149 19 19 adopted adopt VBN 42149 19 20 , , , 42149 19 21 the the DT 42149 19 22 actual actual JJ 42149 19 23 conditions condition NNS 42149 19 24 met meet VBD 42149 19 25 on on IN 42149 19 26 the the DT 42149 19 27 ground ground NN 42149 19 28 , , , 42149 19 29 and and CC 42149 19 30 the the DT 42149 19 31 methods method NNS 42149 19 32 of of IN 42149 19 33 construction construction NN 42149 19 34 adopted adopt VBN 42149 19 35 by by IN 42149 19 36 the the DT 42149 19 37 contractors contractor NNS 42149 19 38 . . . 42149 20 1 For for IN 42149 20 2 easy easy JJ 42149 20 3 reference reference NN 42149 20 4 , , , 42149 20 5 and and CC 42149 20 6 to to TO 42149 20 7 keep keep VB 42149 20 8 the the DT 42149 20 9 descriptions description NNS 42149 20 10 of of IN 42149 20 11 work work NN 42149 20 12 of of IN 42149 20 13 a a DT 42149 20 14 similar similar JJ 42149 20 15 character character NN 42149 20 16 together together RB 42149 20 17 , , , 42149 20 18 the the DT 42149 20 19 subject subject NN 42149 20 20 will will MD 42149 20 21 be be VB 42149 20 22 treated treat VBN 42149 20 23 under under IN 42149 20 24 the the DT 42149 20 25 four four CD 42149 20 26 main main JJ 42149 20 27 headings heading NNS 42149 20 28 , , , 42149 20 29 viz viz NN 42149 20 30 . . . 42149 21 1 : : : 42149 21 2 Shafts Shafts NNP 42149 21 3 , , , 42149 21 4 Plant Plant NNP 42149 21 5 , , , 42149 21 6 Land Land NNP 42149 21 7 Tunnels Tunnels NNPS 42149 21 8 , , , 42149 21 9 and and CC 42149 21 10 River River NNP 42149 21 11 Tunnels Tunnels NNPS 42149 21 12 . . . 42149 22 1 SHAFTS SHAFTS NNP 42149 22 2 . . . 42149 23 1 It -PRON- PRP 42149 23 2 is be VBZ 42149 23 3 not not RB 42149 23 4 intended intend VBN 42149 23 5 to to TO 42149 23 6 give give VB 42149 23 7 much much JJ 42149 23 8 length length NN 42149 23 9 to to IN 42149 23 10 the the DT 42149 23 11 description description NN 42149 23 12 of of IN 42149 23 13 the the DT 42149 23 14 Shafts Shafts NNPS 42149 23 15 or or CC 42149 23 16 the the DT 42149 23 17 Land Land NNP 42149 23 18 Tunnels Tunnels NNPS 42149 23 19 , , , 42149 23 20 as as IN 42149 23 21 more more JJR 42149 23 22 interest interest NN 42149 23 23 will will MD 42149 23 24 probably probably RB 42149 23 25 center center VB 42149 23 26 in in IN 42149 23 27 the the DT 42149 23 28 River River NNP 42149 23 29 Tunnels Tunnels NNPS 42149 23 30 . . . 42149 24 1 The the DT 42149 24 2 shafts shaft NNS 42149 24 3 did do VBD 42149 24 4 not not RB 42149 24 5 form form VB 42149 24 6 part part NN 42149 24 7 of of IN 42149 24 8 the the DT 42149 24 9 regular regular JJ 42149 24 10 tunnel tunnel NN 42149 24 11 contract contract NN 42149 24 12 , , , 42149 24 13 but but CC 42149 24 14 were be VBD 42149 24 15 built build VBN 42149 24 16 under under IN 42149 24 17 contract contract NN 42149 24 18 by by IN 42149 24 19 the the DT 42149 24 20 United United NNP 42149 24 21 Engineering Engineering NNP 42149 24 22 and and CC 42149 24 23 Contracting Contracting NNP 42149 24 24 Company Company NNP 42149 24 25 while while IN 42149 24 26 the the DT 42149 24 27 contract contract NN 42149 24 28 plans plan VBZ 42149 24 29 for for IN 42149 24 30 the the DT 42149 24 31 tunnel tunnel NN 42149 24 32 were be VBD 42149 24 33 being be VBG 42149 24 34 prepared prepare VBN 42149 24 35 . . . 42149 25 1 In in IN 42149 25 2 this this DT 42149 25 3 way way NN 42149 25 4 , , , 42149 25 5 when when WRB 42149 25 6 the the DT 42149 25 7 tunnel tunnel NN 42149 25 8 contracts contract NNS 42149 25 9 were be VBD 42149 25 10 let let VBN 42149 25 11 , , , 42149 25 12 the the DT 42149 25 13 contractor contractor NN 42149 25 14 found find VBD 42149 25 15 the the DT 42149 25 16 shafts shaft NNS 42149 25 17 ready ready JJ 42149 25 18 , , , 42149 25 19 and and CC 42149 25 20 he -PRON- PRP 42149 25 21 could could MD 42149 25 22 get get VB 42149 25 23 at at IN 42149 25 24 his -PRON- PRP$ 42149 25 25 work work NN 42149 25 26 at at IN 42149 25 27 once once RB 42149 25 28 . . . 42149 26 1 Two two CD 42149 26 2 shafts shaft NNS 42149 26 3 were be VBD 42149 26 4 provided provide VBN 42149 26 5 , , , 42149 26 6 one one CD 42149 26 7 on on IN 42149 26 8 the the DT 42149 26 9 New New NNP 42149 26 10 York York NNP 42149 26 11 side side NN 42149 26 12 and and CC 42149 26 13 one one CD 42149 26 14 on on IN 42149 26 15 the the DT 42149 26 16 New New NNP 42149 26 17 Jersey Jersey NNP 42149 26 18 side side NN 42149 26 19 . . . 42149 27 1 Their -PRON- PRP$ 42149 27 2 exact exact JJ 42149 27 3 situation situation NN 42149 27 4 is be VBZ 42149 27 5 shown show VBN 42149 27 6 on on IN 42149 27 7 Plate Plate NNP 42149 27 8 XXVIII XXVIII NNP 42149 27 9 . . . 42149 28 1 They -PRON- PRP 42149 28 2 were be VBD 42149 28 3 placed place VBN 42149 28 4 as as RB 42149 28 5 near near RB 42149 28 6 as as IN 42149 28 7 possible possible JJ 42149 28 8 to to IN 42149 28 9 the the DT 42149 28 10 point point NN 42149 28 11 at at IN 42149 28 12 which which WDT 42149 28 13 the the DT 42149 28 14 disappearance disappearance NN 42149 28 15 of of IN 42149 28 16 the the DT 42149 28 17 rock rock NN 42149 28 18 from from IN 42149 28 19 the the DT 42149 28 20 tunnels tunnel NNS 42149 28 21 made make VBD 42149 28 22 it -PRON- PRP 42149 28 23 necessary necessary JJ 42149 28 24 to to TO 42149 28 25 start start VB 42149 28 26 the the DT 42149 28 27 shield shield NN 42149 28 28 - - HYPH 42149 28 29 driven drive VBN 42149 28 30 portion portion NN 42149 28 31 of of IN 42149 28 32 the the DT 42149 28 33 work work NN 42149 28 34 . . . 42149 29 1 The the DT 42149 29 2 details detail NNS 42149 29 3 of of IN 42149 29 4 the the DT 42149 29 5 shafts shaft NNS 42149 29 6 will will MD 42149 29 7 now now RB 42149 29 8 be be VB 42149 29 9 described describe VBN 42149 29 10 briefly briefly RB 42149 29 11 . . . 42149 30 1 _ _ NNP 42149 30 2 The the DT 42149 30 3 Manhattan Manhattan NNP 42149 30 4 Shaft._--The Shaft._--The NNP 42149 30 5 Manhattan Manhattan NNP 42149 30 6 Shaft Shaft NNP 42149 30 7 is be VBZ 42149 30 8 located locate VBN 42149 30 9 about about RB 42149 30 10 100 100 CD 42149 30 11 ft ft NN 42149 30 12 . . NN 42149 30 13 north north RB 42149 30 14 of of IN 42149 30 15 the the DT 42149 30 16 tunnel tunnel NNP 42149 30 17 center center NNP 42149 30 18 ; ; : 42149 30 19 there there EX 42149 30 20 was be VBD 42149 30 21 nothing nothing NN 42149 30 22 noticeable noticeable JJ 42149 30 23 about about IN 42149 30 24 its -PRON- PRP$ 42149 30 25 construction construction NN 42149 30 26 . . . 42149 31 1 General general JJ 42149 31 2 figures figure NNS 42149 31 3 relating relate VBG 42149 31 4 to to IN 42149 31 5 both both DT 42149 31 6 shafts shaft NNS 42149 31 7 are be VBP 42149 31 8 given give VBN 42149 31 9 in in IN 42149 31 10 Table table NN 42149 31 11 1 1 CD 42149 31 12 . . . 42149 32 1 _ _ NNP 42149 32 2 The the DT 42149 32 3 Weehawken Weehawken NNP 42149 32 4 Shaft._--The Shaft._--The NNP 42149 32 5 Weehawken Weehawken NNP 42149 32 6 Shaft Shaft NNP 42149 32 7 is be VBZ 42149 32 8 shown show VBN 42149 32 9 in in IN 42149 32 10 Fig Fig NNP 42149 32 11 . . . 42149 33 1 1 1 LS 42149 33 2 . . . 42149 34 1 This this DT 42149 34 2 , , , 42149 34 3 as as IN 42149 34 4 will will MD 42149 34 5 be be VB 42149 34 6 seen see VBN 42149 34 7 from from IN 42149 34 8 Table table NN 42149 34 9 1 1 CD 42149 34 10 , , , 42149 34 11 was be VBD 42149 34 12 a a DT 42149 34 13 comparatively comparatively RB 42149 34 14 large large JJ 42149 34 15 piece piece NN 42149 34 16 of of IN 42149 34 17 work work NN 42149 34 18 . . . 42149 35 1 The the DT 42149 35 2 shaft shaft NN 42149 35 3 is be VBZ 42149 35 4 over over IN 42149 35 5 the the DT 42149 35 6 tunnels tunnel NNS 42149 35 7 , , , 42149 35 8 and and CC 42149 35 9 includes include VBZ 42149 35 10 both both DT 42149 35 11 of of IN 42149 35 12 them -PRON- PRP 42149 35 13 . . . 42149 36 1 In in IN 42149 36 2 the the DT 42149 36 3 original original JJ 42149 36 4 design design NN 42149 36 5 the the DT 42149 36 6 wall wall NN 42149 36 7 of of IN 42149 36 8 the the DT 42149 36 9 shaft shaft NN 42149 36 10 was be VBD 42149 36 11 intended intend VBN 42149 36 12 to to TO 42149 36 13 follow follow VB 42149 36 14 in in IN 42149 36 15 plan plan NN 42149 36 16 the the DT 42149 36 17 property property NN 42149 36 18 line line NN 42149 36 19 shown show VBN 42149 36 20 in in IN 42149 36 21 Fig Fig NNP 42149 36 22 . . . 42149 37 1 2 2 CD 42149 37 2 , , , 42149 37 3 and and CC 42149 37 4 merely merely RB 42149 37 5 to to TO 42149 37 6 extend extend VB 42149 37 7 down down RP 42149 37 8 to to IN 42149 37 9 the the DT 42149 37 10 surface surface NN 42149 37 11 of of IN 42149 37 12 the the DT 42149 37 13 rock rock NN 42149 37 14 , , , 42149 37 15 which which WDT 42149 37 16 , , , 42149 37 17 as as IN 42149 37 18 disclosed disclose VBN 42149 37 19 by by IN 42149 37 20 the the DT 42149 37 21 preliminary preliminary JJ 42149 37 22 borings boring NNS 42149 37 23 , , , 42149 37 24 was be VBD 42149 37 25 here here RB 42149 37 26 about about RB 42149 37 27 15 15 CD 42149 37 28 ft ft NN 42149 37 29 . . . 42149 37 30 below below IN 42149 37 31 the the DT 42149 37 32 surface surface NN 42149 37 33 . . . 42149 38 1 However however RB 42149 38 2 , , , 42149 38 3 as as IN 42149 38 4 the the DT 42149 38 5 excavation excavation NN 42149 38 6 proceeded proceed VBD 42149 38 7 , , , 42149 38 8 it -PRON- PRP 42149 38 9 was be VBD 42149 38 10 found find VBN 42149 38 11 that that IN 42149 38 12 this this DT 42149 38 13 plan plan NN 42149 38 14 would would MD 42149 38 15 not not RB 42149 38 16 do do VB 42149 38 17 , , , 42149 38 18 as as IN 42149 38 19 the the DT 42149 38 20 depth depth NN 42149 38 21 to to IN 42149 38 22 the the DT 42149 38 23 rock rock NN 42149 38 24 surface surface NN 42149 38 25 varied vary VBD 42149 38 26 greatly greatly RB 42149 38 27 , , , 42149 38 28 and and CC 42149 38 29 was be VBD 42149 38 30 often often RB 42149 38 31 much much RB 42149 38 32 lower low JJR 42149 38 33 than than IN 42149 38 34 expected expect VBN 42149 38 35 ; ; : 42149 38 36 the the DT 42149 38 37 rock rock NN 42149 38 38 itself -PRON- PRP 42149 38 39 , , , 42149 38 40 moreover moreover RB 42149 38 41 , , , 42149 38 42 was be VBD 42149 38 43 very very RB 42149 38 44 treacherous treacherous JJ 42149 38 45 , , , 42149 38 46 the the DT 42149 38 47 cause cause NN 42149 38 48 being be VBG 42149 38 49 that that IN 42149 38 50 the the DT 42149 38 51 line line NN 42149 38 52 of of IN 42149 38 53 junction junction NN 42149 38 54 between between IN 42149 38 55 the the DT 42149 38 56 triassic triassic NN 42149 38 57 sandstone sandstone NN 42149 38 58 , , , 42149 38 59 which which WDT 42149 38 60 is be VBZ 42149 38 61 here here RB 42149 38 62 the the DT 42149 38 63 country country NN 42149 38 64 rock rock NN 42149 38 65 , , , 42149 38 66 and and CC 42149 38 67 the the DT 42149 38 68 intrusive intrusive JJ 42149 38 69 trap trap NN 42149 38 70 of of IN 42149 38 71 the the DT 42149 38 72 Bergen Bergen NNP 42149 38 73 Hill Hill NNP 42149 38 74 ridge ridge NN 42149 38 75 , , , 42149 38 76 occurs occur VBZ 42149 38 77 about about RB 42149 38 78 one one CD 42149 38 79 - - HYPH 42149 38 80 third third NN 42149 38 81 of of IN 42149 38 82 the the DT 42149 38 83 length length NN 42149 38 84 of of IN 42149 38 85 the the DT 42149 38 86 shaft shaft NN 42149 38 87 from from IN 42149 38 88 its -PRON- PRP$ 42149 38 89 western western JJ 42149 38 90 end end NN 42149 38 91 , , , 42149 38 92 causing cause VBG 42149 38 93 more more JJR 42149 38 94 or or CC 42149 38 95 less less JJR 42149 38 96 disintegration disintegration NN 42149 38 97 of of IN 42149 38 98 both both DT 42149 38 99 kinds kind NNS 42149 38 100 of of IN 42149 38 101 rock rock NN 42149 38 102 . . . 42149 39 1 Therefore therefore RB 42149 39 2 it -PRON- PRP 42149 39 3 was be VBD 42149 39 4 decided decide VBN 42149 39 5 to to TO 42149 39 6 line line VB 42149 39 7 the the DT 42149 39 8 shaft shaft NN 42149 39 9 with with IN 42149 39 10 concrete concrete NN 42149 39 11 throughout throughout IN 42149 39 12 its -PRON- PRP$ 42149 39 13 entire entire JJ 42149 39 14 depth depth NN 42149 39 15 , , , 42149 39 16 the the DT 42149 39 17 shape shape NN 42149 39 18 being be VBG 42149 39 19 changed change VBN 42149 39 20 to to IN 42149 39 21 a a DT 42149 39 22 rectangular rectangular JJ 42149 39 23 plan plan NN 42149 39 24 , , , 42149 39 25 as as IN 42149 39 26 shown show VBN 42149 39 27 in in IN 42149 39 28 the the DT 42149 39 29 drawings drawing NNS 42149 39 30 . . . 42149 40 1 At at IN 42149 40 2 the the DT 42149 40 3 same same JJ 42149 40 4 time time NN 42149 40 5 that that WDT 42149 40 6 the the DT 42149 40 7 shaft shaft NN 42149 40 8 was be VBD 42149 40 9 excavated excavate VBN 42149 40 10 , , , 42149 40 11 a a DT 42149 40 12 length length NN 42149 40 13 of of IN 42149 40 14 40 40 CD 42149 40 15 ft ft NN 42149 40 16 . . NN 42149 40 17 of of IN 42149 40 18 tunnels tunnel NNS 42149 40 19 at at IN 42149 40 20 each each DT 42149 40 21 end end NN 42149 40 22 of of IN 42149 40 23 it -PRON- PRP 42149 40 24 was be VBD 42149 40 25 taken take VBN 42149 40 26 out out RP 42149 40 27 , , , 42149 40 28 also also RB 42149 40 29 on on IN 42149 40 30 account account NN 42149 40 31 of of IN 42149 40 32 the the DT 42149 40 33 treacherous treacherous JJ 42149 40 34 nature nature NN 42149 40 35 of of IN 42149 40 36 the the DT 42149 40 37 ground ground NN 42149 40 38 , , , 42149 40 39 thus thus RB 42149 40 40 avoiding avoid VBG 42149 40 41 risk risk NN 42149 40 42 of of IN 42149 40 43 injury injury NN 42149 40 44 to to IN 42149 40 45 the the DT 42149 40 46 shaft shaft NN 42149 40 47 when when WRB 42149 40 48 the the DT 42149 40 49 tunnel tunnel NN 42149 40 50 contractors contractor NNS 42149 40 51 commenced commence VBD 42149 40 52 work work NN 42149 40 53 . . . 42149 41 1 There there EX 42149 41 2 was be VBD 42149 41 3 much much JJ 42149 41 4 trouble trouble NN 42149 41 5 with with IN 42149 41 6 floods flood NNS 42149 41 7 during during IN 42149 41 8 the the DT 42149 41 9 fall fall NN 42149 41 10 of of IN 42149 41 11 1903 1903 CD 42149 41 12 , , , 42149 41 13 and and CC 42149 41 14 numerous numerous JJ 42149 41 15 heavy heavy JJ 42149 41 16 falls fall NNS 42149 41 17 of of IN 42149 41 18 ground ground NN 42149 41 19 occurred occur VBD 42149 41 20 , , , 42149 41 21 in in IN 42149 41 22 spite spite NN 42149 41 23 of of IN 42149 41 24 extreme extreme JJ 42149 41 25 care care NN 42149 41 26 and and CC 42149 41 27 much much JJ 42149 41 28 heavy heavy JJ 42149 41 29 timbering timbering NN 42149 41 30 . . . 42149 42 1 The the DT 42149 42 2 greatest great JJS 42149 42 3 care care NN 42149 42 4 was be VBD 42149 42 5 also also RB 42149 42 6 taken take VBN 42149 42 7 in in RP 42149 42 8 placing place VBG 42149 42 9 the the DT 42149 42 10 concrete concrete JJ 42149 42 11 lining lining NN 42149 42 12 , , , 42149 42 13 and and CC 42149 42 14 the the DT 42149 42 15 framing framing NN 42149 42 16 to to TO 42149 42 17 support support VB 42149 42 18 the the DT 42149 42 19 forms form NNS 42149 42 20 was be VBD 42149 42 21 carefully carefully RB 42149 42 22 designed design VBN 42149 42 23 and and CC 42149 42 24 of of IN 42149 42 25 heavy heavy JJ 42149 42 26 construction construction NN 42149 42 27 ; ; : 42149 42 28 the the DT 42149 42 29 forms form NNS 42149 42 30 were be VBD 42149 42 31 of of IN 42149 42 32 first first JJ 42149 42 33 - - HYPH 42149 42 34 class class NN 42149 42 35 workmanship workmanship NN 42149 42 36 , , , 42149 42 37 and and CC 42149 42 38 great great JJ 42149 42 39 care care NN 42149 42 40 was be VBD 42149 42 41 taken take VBN 42149 42 42 to to TO 42149 42 43 keep keep VB 42149 42 44 them -PRON- PRP 42149 42 45 true true JJ 42149 42 46 to to IN 42149 42 47 line line NN 42149 42 48 . . . 42149 43 1 A a DT 42149 43 2 smooth smooth JJ 42149 43 3 surface surface NN 42149 43 4 was be VBD 42149 43 5 given give VBN 42149 43 6 to to IN 42149 43 7 the the DT 42149 43 8 concrete concrete NN 42149 43 9 by by IN 42149 43 10 placing place VBG 42149 43 11 a a DT 42149 43 12 3-in 3-in NN 42149 43 13 . . . 42149 44 1 layer layer NN 42149 44 2 of of IN 42149 44 3 mortar mortar NN 42149 44 4 at at IN 42149 44 5 the the DT 42149 44 6 front front NN 42149 44 7 of of IN 42149 44 8 the the DT 42149 44 9 walls wall NNS 42149 44 10 and and CC 42149 44 11 tamping tamp VBG 42149 44 12 this this DT 42149 44 13 dry dry JJ 42149 44 14 facing facing NN 42149 44 15 mixture mixture NN 42149 44 16 well well RB 42149 44 17 down down RB 42149 44 18 with with IN 42149 44 19 the the DT 42149 44 20 rest rest NN 42149 44 21 of of IN 42149 44 22 the the DT 42149 44 23 concrete concrete NN 42149 44 24 . . . 42149 45 1 The the DT 42149 45 2 east east JJ 42149 45 3 and and CC 42149 45 4 west west NNP 42149 45 5 walls wall NNS 42149 45 6 act act VBP 42149 45 7 as as IN 42149 45 8 retaining retain VBG 42149 45 9 walls wall NNS 42149 45 10 , , , 42149 45 11 while while IN 42149 45 12 those those DT 42149 45 13 on on IN 42149 45 14 the the DT 42149 45 15 north north NN 42149 45 16 and and CC 42149 45 17 south south NN 42149 45 18 are be VBP 42149 45 19 facing face VBG 42149 45 20 walls wall NNS 42149 45 21 , , , 42149 45 22 and and CC 42149 45 23 are be VBP 42149 45 24 tied tie VBN 42149 45 25 to to IN 42149 45 26 the the DT 42149 45 27 rock rock NN 42149 45 28 with with IN 42149 45 29 steel steel NN 42149 45 30 rods rod NNS 42149 45 31 embedded embed VBN 42149 45 32 and and CC 42149 45 33 grouted grout VBN 42149 45 34 into into IN 42149 45 35 the the DT 42149 45 36 rock rock NN 42149 45 37 and and CC 42149 45 38 into into IN 42149 45 39 the the DT 42149 45 40 concrete concrete NN 42149 45 41 . . . 42149 46 1 Ample ample JJ 42149 46 2 drainage drainage NN 42149 46 3 for for IN 42149 46 4 water water NN 42149 46 5 at at IN 42149 46 6 the the DT 42149 46 7 back back NN 42149 46 8 of of IN 42149 46 9 the the DT 42149 46 10 wall wall NN 42149 46 11 was be VBD 42149 46 12 provided provide VBN 42149 46 13 by by IN 42149 46 14 upright upright JJ 42149 46 15 , , , 42149 46 16 open open JJ 42149 46 17 - - HYPH 42149 46 18 joint joint JJ 42149 46 19 , , , 42149 46 20 vitrified vitrified JJ 42149 46 21 drains drain NNS 42149 46 22 at at IN 42149 46 23 frequent frequent JJ 42149 46 24 intervals interval NNS 42149 46 25 , , , 42149 46 26 with with IN 42149 46 27 dry dry RB 42149 46 28 - - HYPH 42149 46 29 laid lay VBN 42149 46 30 stone stone NN 42149 46 31 drains drain NNS 42149 46 32 leading lead VBG 42149 46 33 to to IN 42149 46 34 them -PRON- PRP 42149 46 35 from from IN 42149 46 36 all all DT 42149 46 37 wet wet JJ 42149 46 38 spots spot NNS 42149 46 39 in in IN 42149 46 40 the the DT 42149 46 41 ground ground NN 42149 46 42 . . . 42149 47 1 A a DT 42149 47 2 general general JJ 42149 47 3 view view NN 42149 47 4 of of IN 42149 47 5 the the DT 42149 47 6 finished finished JJ 42149 47 7 work work NN 42149 47 8 is be VBZ 42149 47 9 shown show VBN 42149 47 10 in in IN 42149 47 11 Fig Fig NNP 42149 47 12 . . . 42149 48 1 1 1 LS 42149 48 2 , , , 42149 48 3 Plate Plate NNP 42149 48 4 XXIX XXIX NNP 42149 48 5 , , , 42149 48 6 and and CC 42149 48 7 Table table NN 42149 48 8 1 1 CD 42149 48 9 gives give VBZ 42149 48 10 the the DT 42149 48 11 most most RBS 42149 48 12 important important JJ 42149 48 13 dates date NNS 42149 48 14 and and CC 42149 48 15 figures figure NNS 42149 48 16 relating relate VBG 42149 48 17 to to IN 42149 48 18 this this DT 42149 48 19 shaft shaft NN 42149 48 20 . . . 42149 49 1 TABLE TABLE NNP 42149 49 2 1.--PARTICULARS 1.--particulars CD 42149 49 3 OF of IN 42149 49 4 SHAFTS SHAFTS NNP 42149 49 5 ON on IN 42149 49 6 THE the DT 42149 49 7 NORTH NORTH NNP 42149 49 8 RIVER river NN 42149 49 9 TUNNELS tunnel NNS 42149 49 10 OF of IN 42149 49 11 THE the DT 42149 49 12 PENNSYLVANIA pennsylvania JJ 42149 49 13 RAILROAD RAILROAD VBD 42149 49 14 TUNNELS tunnel NNS 42149 49 15 INTO into VBP 42149 49 16 NEW NEW NNP 42149 49 17 YORK YORK NNP 42149 49 18 CITY CITY NNP 42149 49 19 . . . 42149 50 1 + + NFP 42149 50 2 = = SYM 42149 50 3 = = SYM 42149 50 4 = = SYM 42149 50 5 = = SYM 42149 50 6 = = SYM 42149 50 7 = = SYM 42149 50 8 = = SYM 42149 50 9 = = SYM 42149 50 10 = = SYM 42149 50 11 = = NFP 42149 50 12 = = SYM 42149 50 13 + + SYM 42149 50 14 = = SYM 42149 50 15 = = SYM 42149 50 16 = = SYM 42149 50 17 = = NFP 42149 50 18 = = SYM 42149 50 19 + + SYM 42149 50 20 = = SYM 42149 50 21 = = SYM 42149 50 22 = = SYM 42149 50 23 = = SYM 42149 50 24 = = NFP 42149 50 25 = = SYM 42149 50 26 + + SYM 42149 50 27 = = SYM 42149 50 28 = = SYM 42149 50 29 = = SYM 42149 50 30 = = SYM 42149 50 31 = = NFP 42149 50 32 = = SYM 42149 50 33 + + SYM 42149 50 34 = = SYM 42149 50 35 = = SYM 42149 50 36 = = SYM 42149 50 37 = = SYM 42149 50 38 = = SYM 42149 50 39 = = SYM 42149 50 40 = = SYM 42149 50 41 = = SYM 42149 50 42 = = NFP 42149 50 43 = = SYM 42149 50 44 + + SYM 42149 50 45 = = SYM 42149 50 46 = = SYM 42149 50 47 = = SYM 42149 50 48 = = SYM 42149 50 49 = = SYM 42149 50 50 = = SYM 42149 50 51 = = NFP 42149 50 52 = = SYM 42149 50 53 + + SYM 42149 50 54 = = SYM 42149 50 55 = = SYM 42149 50 56 = = SYM 42149 50 57 = = SYM 42149 50 58 = = SYM 42149 50 59 = = SYM 42149 50 60 = = SYM 42149 50 61 = = SYM 42149 50 62 = = SYM 42149 50 63 = = NFP 42149 50 64 = = SYM 42149 50 65 + + SYM 42149 50 66 = = SYM 42149 50 67 = = SYM 42149 50 68 = = SYM 42149 50 69 = = SYM 42149 50 70 = = SYM 42149 50 71 = = SYM 42149 50 72 = = SYM 42149 50 73 = = SYM 42149 50 74 + + CC 42149 50 75 |Location |location CD 42149 50 76 . . . 42149 51 1 |Depth| |Depth| NNP 42149 51 2 Width|Length|Excavation|Concrete| Width|Length|Excavation|Concrete| NNP 42149 51 3 Date| Date| NNP 42149 51 4 Date| Date| NNP 42149 51 5 | | NNP 42149 51 6 | | NNP 42149 51 7 in| in| NNP 42149 51 8 in| in| NNP 42149 51 9 in|(including|in in|(including|in NNP 42149 51 10 cubic|commenced.|finished.| cubic|commenced.|finished.| NNP 42149 51 11 | | NNP 42149 51 12 |feet.| |feet.| NNP 42149 51 13 feet.| feet.| NNP 42149 51 14 feet.| feet.| NNP 42149 51 15 drifts),| drifts),| NNP 42149 51 16 yards.| yards.| NNP 42149 51 17 | | NNP 42149 51 18 | | NNP 42149 51 19 | | CD 42149 51 20 | | CD 42149 51 21 | | CD 42149 51 22 | | CD 42149 51 23 | | CD 42149 51 24 in in IN 42149 51 25 cubic| cubic| NNP 42149 51 26 | | NNP 42149 51 27 | | NNP 42149 51 28 | | CD 42149 51 29 | | CD 42149 51 30 | | CD 42149 51 31 | | CD 42149 51 32 | | CD 42149 51 33 | | CD 42149 51 34 yards yard NNS 42149 51 35 . . . 42149 52 1 | | NNP 42149 52 2 | | CD 42149 52 3 | | CD 42149 52 4 | | CD 42149 52 5 + + CC 42149 52 6 -----------+-----+------+------+----------+--------+----------+---------+ -----------+-----+------+------+----------+--------+----------+---------+ NFP 42149 52 7 |Manhattan |Manhattan NNP 42149 52 8 : : : 42149 52 9 | | CD 42149 52 10 55| 55| CD 42149 52 11 22| 22| CD 42149 52 12 32| 32| CD 42149 52 13 2,010| 2,010| CD 42149 52 14 209|June 209|june CD 42149 52 15 10th,| 10th,| CD 42149 52 16 December| december| NN 42149 52 17 |11th |11th CD 42149 52 18 Avenue| avenue| CD 42149 52 19 | | NNP 42149 52 20 | | NNP 42149 52 21 | | CD 42149 52 22 | | CD 42149 52 23 | | CD 42149 52 24 1903.| 1903.| CD 42149 52 25 11th,| 11th,| NNP 42149 52 26 |and |and NNP 42149 52 27 32d 32d NNPS 42149 52 28 | | NNP 42149 52 29 | | CD 42149 52 30 | | CD 42149 52 31 | | CD 42149 52 32 | | CD 42149 52 33 | | CD 42149 52 34 | | CD 42149 52 35 1903.| 1903.| CD 42149 52 36 |Street |Street NNS 42149 52 37 . . . 42149 53 1 | | NNP 42149 53 2 | | CD 42149 53 3 | | CD 42149 53 4 | | CD 42149 53 5 | | CD 42149 53 6 | | CD 42149 53 7 | | CD 42149 53 8 | | CD 42149 53 9 | | CD 42149 53 10 | | CD 42149 53 11 | | CD 42149 53 12 | | CD 42149 53 13 | | CD 42149 53 14 | | CD 42149 53 15 | | CD 42149 53 16 | | CD 42149 53 17 | | CD 42149 53 18 |Weehawken |weehawken CD 42149 53 19 : : : 42149 53 20 | | CD 42149 53 21 76| 76| CD 42149 53 22 At| At| NNP 42149 53 23 At| At| NNP 42149 53 24 55,315| 55,315| NNP 42149 53 25 9,810|June 9,810|june CD 42149 53 26 11th,|September| 11th,|september| NN 42149 53 27 |Baldwin |baldwin CD 42149 53 28 | | CD 42149 53 29 |bottom|bottom| |bottom|bottom| NNP 42149 53 30 | | NNP 42149 53 31 | | NNP 42149 53 32 1903.|1st 1903.|1st CD 42149 53 33 , , , 42149 53 34 | | NN 42149 53 35 |Avenue |avenue NN 42149 53 36 . . . 42149 54 1 | | NNP 42149 54 2 |56 |56 NNS 42149 54 3 , , , 42149 54 4 at|115.75| at|115.75| NNP 42149 54 5 | | NNP 42149 54 6 | | NNP 42149 54 7 |1904 |1904 NNP 42149 54 8 . . . 42149 55 1 | | NNP 42149 55 2 | | NNP 42149 55 3 | | CD 42149 55 4 | | NNS 42149 55 5 top|at top|at NNS 42149 55 6 top| top| NNP 42149 55 7 | | NNP 42149 55 8 | | NNP 42149 55 9 | | CD 42149 55 10 | | CD 42149 55 11 | | CD 42149 55 12 | | CD 42149 55 13 | | CD 42149 55 14 100.| 100.| CD 42149 55 15 154.| 154.| CD 42149 55 16 | | CD 42149 55 17 | | CD 42149 55 18 | | CD 42149 55 19 | | CD 42149 55 20 |===========+=====+======+======+==========+========+==========+=========+ |===========+=====+======+======+==========+========+==========+=========+ NN 42149 55 21 + + SYM 42149 55 22 = = SYM 42149 55 23 = = SYM 42149 55 24 = = SYM 42149 55 25 = = SYM 42149 55 26 = = SYM 42149 55 27 = = SYM 42149 55 28 = = SYM 42149 55 29 = = SYM 42149 55 30 = = NFP 42149 55 31 = = SYM 42149 55 32 + + SYM 42149 55 33 = = SYM 42149 55 34 = = SYM 42149 55 35 = = SYM 42149 55 36 = = SYM 42149 55 37 = = SYM 42149 55 38 = = SYM 42149 55 39 = = SYM 42149 55 40 = = SYM 42149 55 41 = = SYM 42149 55 42 = = SYM 42149 55 43 = = SYM 42149 55 44 = = SYM 42149 55 45 = = SYM 42149 55 46 = = SYM 42149 55 47 = = SYM 42149 55 48 = = SYM 42149 55 49 = = SYM 42149 55 50 = = SYM 42149 55 51 = = NFP 42149 55 52 = = SYM 42149 55 53 + + SYM 42149 55 54 = = SYM 42149 55 55 = = SYM 42149 55 56 = = SYM 42149 55 57 = = SYM 42149 55 58 = = SYM 42149 55 59 = = SYM 42149 55 60 = = SYM 42149 55 61 = = SYM 42149 55 62 = = SYM 42149 55 63 = = SYM 42149 55 64 = = SYM 42149 55 65 = = NFP 42149 55 66 = = SYM 42149 55 67 + + SYM 42149 55 68 = = SYM 42149 55 69 = = SYM 42149 55 70 = = SYM 42149 55 71 = = SYM 42149 55 72 = = SYM 42149 55 73 = = SYM 42149 55 74 = = SYM 42149 55 75 = = SYM 42149 55 76 = = SYM 42149 55 77 = = SYM 42149 55 78 = = NFP 42149 55 79 = = SYM 42149 55 80 + + SYM 42149 55 81 = = SYM 42149 55 82 = = SYM 42149 55 83 = = SYM 42149 55 84 = = SYM 42149 55 85 = = SYM 42149 55 86 = = SYM 42149 55 87 = = SYM 42149 55 88 = = SYM 42149 55 89 = = SYM 42149 55 90 = = SYM 42149 55 91 = = SYM 42149 55 92 + + CC 42149 55 93 |Location |location CD 42149 55 94 . . . 42149 56 1 |Ground |Ground NNS 42149 56 2 met meet VBD 42149 56 3 : : : 42149 56 4 |Lined |line VBN 42149 56 5 with with IN 42149 56 6 : : : 42149 56 7 | | NNS 42149 56 8 Cost cost NN 42149 56 9 to to IN 42149 56 10 | | CD 42149 56 11 Cost cost NN 42149 56 12 per per IN 42149 56 13 | | NNP 42149 56 14 | | CD 42149 56 15 | | CD 42149 56 16 | | CD 42149 56 17 | | NNP 42149 56 18 Railroad Railroad NNP 42149 56 19 |cubic |cubic CD 42149 56 20 foot.| foot.| NNP 42149 56 21 | | CD 42149 56 22 | | NNP 42149 56 23 | | NNP 42149 56 24 | | NNP 42149 56 25 Company Company NNP 42149 56 26 . . . 42149 57 1 | | NNS 42149 57 2 | | NNS 42149 57 3 + + SYM 42149 57 4 ----------+--------------------+-------------+------------+-----------+ ----------+--------------------+-------------+------------+-----------+ NN 42149 57 5 |Manhattan:|Top |manhattan:|top CD 42149 57 6 13 13 CD 42149 57 7 ft ft NN 42149 57 8 . . NN 42149 57 9 filled fill VBN 42149 57 10 ; ; : 42149 57 11 |Concrete |concrete CD 42149 57 12 | | CD 42149 57 13 $ $ $ 42149 57 14 12,943.75 12,943.75 CD 42149 57 15 | | CD 42149 57 16 $ $ $ 42149 57 17 0.335 0.335 CD 42149 57 18 | | CD 42149 57 19 |11th |11th NNP 42149 57 20 |red |red JJ 42149 57 21 mica mica NNP 42149 57 22 schist schist NN 42149 57 23 and and CC 42149 57 24 |reinforced |reinforced DT 42149 57 25 | | CD 42149 57 26 | | CD 42149 57 27 | | CD 42149 57 28 |Avenue |avenue NN 42149 57 29 and|granite and|granite JJ 42149 57 30 . . . 42149 58 1 |with |with CD 42149 58 2 steel steel NN 42149 58 3 | | CD 42149 58 4 | | CD 42149 58 5 | | CD 42149 58 6 |32d |32d CD 42149 58 7 | | CD 42149 58 8 |beams |beams NN 42149 58 9 down down IN 42149 58 10 to| to| NNP 42149 58 11 | | CD 42149 58 12 | | CD 42149 58 13 |Street |Street NNS 42149 58 14 . . . 42149 59 1 | | NNP 42149 59 2 |rock |rock CD 42149 59 3 . . . 42149 60 1 | | NNP 42149 60 2 | | CD 42149 60 3 | | CD 42149 60 4 | | CD 42149 60 5 | | CD 42149 60 6 | | CD 42149 60 7 | | CD 42149 60 8 | | CD 42149 60 9 | | CD 42149 60 10 |Weehawken:|Top |weehawken:|top CD 42149 60 11 6 6 CD 42149 60 12 ft ft NN 42149 60 13 . . NN 42149 60 14 filled fill VBN 42149 60 15 , , , 42149 60 16 30|Concrete 30|concrete CD 42149 60 17 with| with| NNP 42149 60 18 166,162,98 166,162,98 CD 42149 60 19 | | CD 42149 60 20 0.337 0.337 CD 42149 60 21 | | CD 42149 60 22 |Baldwin |Baldwin NNP 42149 60 23 |ft |ft CD 42149 60 24 . . . 42149 61 1 sand sand NN 42149 61 2 and and CC 42149 61 3 |steel |steel CD 42149 61 4 | | NNP 42149 61 5 | | CD 42149 61 6 | | CD 42149 61 7 |Avenue |avenue NN 42149 61 8 . . . 42149 62 1 |hardpan |hardpan NNP 42149 62 2 , , , 42149 62 3 decomposed decompose VBD 42149 62 4 |tie |tie NN 42149 62 5 - - HYPH 42149 62 6 rods rod NNS 42149 62 7 in in IN 42149 62 8 | | NNP 42149 62 9 | | NNP 42149 62 10 | | CD 42149 62 11 | | CD 42149 62 12 |rock |rock CD 42149 62 13 ( ( -LRB- 42149 62 14 trap trap NN 42149 62 15 and and CC 42149 62 16 |rock |rock CD 42149 62 17 . . . 42149 63 1 | | NNP 42149 63 2 | | CD 42149 63 3 | | CD 42149 63 4 | | CD 42149 63 5 |sandstone |sandstone CD 42149 63 6 ) ) -RRB- 42149 63 7 below below RB 42149 63 8 . . . 42149 64 1 | | NNP 42149 64 2 | | CD 42149 64 3 | | CD 42149 64 4 | | NNS 42149 64 5 + + NNS 42149 64 6 = = SYM 42149 64 7 = = SYM 42149 64 8 = = SYM 42149 64 9 = = SYM 42149 64 10 = = SYM 42149 64 11 = = SYM 42149 64 12 = = SYM 42149 64 13 = = SYM 42149 64 14 = = NFP 42149 64 15 = = SYM 42149 64 16 + + SYM 42149 64 17 = = SYM 42149 64 18 = = SYM 42149 64 19 = = SYM 42149 64 20 = = SYM 42149 64 21 = = SYM 42149 64 22 = = SYM 42149 64 23 = = SYM 42149 64 24 = = SYM 42149 64 25 = = SYM 42149 64 26 = = SYM 42149 64 27 = = SYM 42149 64 28 = = SYM 42149 64 29 = = SYM 42149 64 30 = = SYM 42149 64 31 = = SYM 42149 64 32 = = SYM 42149 64 33 = = SYM 42149 64 34 = = SYM 42149 64 35 = = NFP 42149 64 36 = = SYM 42149 64 37 + + SYM 42149 64 38 = = SYM 42149 64 39 = = SYM 42149 64 40 = = SYM 42149 64 41 = = SYM 42149 64 42 = = SYM 42149 64 43 = = SYM 42149 64 44 = = SYM 42149 64 45 = = SYM 42149 64 46 = = SYM 42149 64 47 = = SYM 42149 64 48 = = SYM 42149 64 49 = = NFP 42149 64 50 = = SYM 42149 64 51 + + SYM 42149 64 52 = = SYM 42149 64 53 = = SYM 42149 64 54 = = SYM 42149 64 55 = = SYM 42149 64 56 = = SYM 42149 64 57 = = SYM 42149 64 58 = = SYM 42149 64 59 = = SYM 42149 64 60 = = SYM 42149 64 61 = = SYM 42149 64 62 = = NFP 42149 64 63 = = SYM 42149 64 64 + + SYM 42149 64 65 = = SYM 42149 64 66 = = SYM 42149 64 67 = = SYM 42149 64 68 = = SYM 42149 64 69 = = SYM 42149 64 70 = = SYM 42149 64 71 = = SYM 42149 64 72 = = SYM 42149 64 73 = = SYM 42149 64 74 = = NFP 42149 64 75 = = NFP 42149 64 76 + + CC 42149 64 77 [ [ -LRB- 42149 64 78 Illustration illustration NN 42149 64 79 : : : 42149 64 80 FINAL final JJ 42149 64 81 DESIGN design NN 42149 64 82 OF of IN 42149 64 83 WEEHAWKEN WEEHAWKEN NNP 42149 64 84 SHAFT SHAFT NNP 42149 64 85 PLAN plan NN 42149 64 86 LONGITUDINAL LONGITUDINAL VBN 42149 64 87 SECTION section NN 42149 64 88 TRANSVERSE transverse NN 42149 64 89 SECTION section NN 42149 64 90 FIG FIG NNP 42149 64 91 . . . 42149 65 1 1 1 LS 42149 65 2 . . . 42149 65 3 ] ] -RRB- 42149 66 1 After after IN 42149 66 2 the the DT 42149 66 3 tunnel tunnel NN 42149 66 4 work work NN 42149 66 5 was be VBD 42149 66 6 finished finish VBN 42149 66 7 , , , 42149 66 8 both both DT 42149 66 9 shafts shaft NNS 42149 66 10 were be VBD 42149 66 11 provided provide VBN 42149 66 12 with with IN 42149 66 13 stairs stair NNS 42149 66 14 leading lead VBG 42149 66 15 to to IN 42149 66 16 the the DT 42149 66 17 surface surface NN 42149 66 18 , , , 42149 66 19 a a DT 42149 66 20 protective protective JJ 42149 66 21 head head NN 42149 66 22 - - HYPH 42149 66 23 house house NN 42149 66 24 was be VBD 42149 66 25 placed place VBN 42149 66 26 over over IN 42149 66 27 the the DT 42149 66 28 New New NNP 42149 66 29 York York NNP 42149 66 30 Shaft Shaft NNP 42149 66 31 , , , 42149 66 32 and and CC 42149 66 33 a a DT 42149 66 34 reinforced reinforce VBN 42149 66 35 concrete concrete JJ 42149 66 36 fence fence NN 42149 66 37 , , , 42149 66 38 8 8 CD 42149 66 39 ft ft NN 42149 66 40 . . NNP 42149 66 41 high high JJ 42149 66 42 , , , 42149 66 43 was be VBD 42149 66 44 built build VBN 42149 66 45 around around IN 42149 66 46 the the DT 42149 66 47 Weehawken Weehawken NNP 42149 66 48 Shaft Shaft NNP 42149 66 49 on on IN 42149 66 50 the the DT 42149 66 51 Company company NN 42149 66 52 's 's POS 42149 66 53 property property NN 42149 66 54 line line NN 42149 66 55 , , , 42149 66 56 that that RB 42149 66 57 is is RB 42149 66 58 , , , 42149 66 59 following follow VBG 42149 66 60 the the DT 42149 66 61 outline outline NN 42149 66 62 of of IN 42149 66 63 the the DT 42149 66 64 shaft shaft NN 42149 66 65 as as RB 42149 66 66 originally originally RB 42149 66 67 designed design VBN 42149 66 68 . . . 42149 67 1 PLANT PLANT NNP 42149 67 2 . . . 42149 68 1 Working Working NNP 42149 68 2 Sites Sites NNPS 42149 68 3 . . . 42149 69 1 Before before IN 42149 69 2 beginning begin VBG 42149 69 3 a a DT 42149 69 4 description description NN 42149 69 5 of of IN 42149 69 6 the the DT 42149 69 7 tunnel tunnel NN 42149 69 8 work work NN 42149 69 9 , , , 42149 69 10 it -PRON- PRP 42149 69 11 may may MD 42149 69 12 be be VB 42149 69 13 well well JJ 42149 69 14 to to TO 42149 69 15 set set VB 42149 69 16 out out RP 42149 69 17 in in IN 42149 69 18 some some DT 42149 69 19 detail detail NN 42149 69 20 the the DT 42149 69 21 arrangements arrangement NNS 42149 69 22 made make VBN 42149 69 23 on on IN 42149 69 24 the the DT 42149 69 25 surface surface NN 42149 69 26 for for IN 42149 69 27 conducting conduct VBG 42149 69 28 the the DT 42149 69 29 work work NN 42149 69 30 underground underground RB 42149 69 31 . . . 42149 70 1 All all PDT 42149 70 2 the the DT 42149 70 3 work work NN 42149 70 4 was be VBD 42149 70 5 carried carry VBN 42149 70 6 on on RP 42149 70 7 from from IN 42149 70 8 two two CD 42149 70 9 shafts shaft NNS 42149 70 10 , , , 42149 70 11 one one CD 42149 70 12 at at IN 42149 70 13 Eleventh Eleventh NNP 42149 70 14 Avenue Avenue NNP 42149 70 15 and and CC 42149 70 16 32d 32d NNP 42149 70 17 Street Street NNP 42149 70 18 , , , 42149 70 19 New New NNP 42149 70 20 York York NNP 42149 70 21 City City NNP 42149 70 22 -- -- : 42149 70 23 called call VBN 42149 70 24 the the DT 42149 70 25 Manhattan Manhattan NNP 42149 70 26 Shaft Shaft NNP 42149 70 27 -- -- : 42149 70 28 and and CC 42149 70 29 one one CD 42149 70 30 at at IN 42149 70 31 Baldwin Baldwin NNP 42149 70 32 Avenue Avenue NNP 42149 70 33 , , , 42149 70 34 Weehawken Weehawken NNP 42149 70 35 , , , 42149 70 36 N. N. NNP 42149 71 1 J.--called j.--calle VBD 42149 71 2 the the DT 42149 71 3 Weehawken Weehawken NNP 42149 71 4 Shaft Shaft NNP 42149 71 5 . . . 42149 72 1 [ [ -LRB- 42149 72 2 Illustration illustration NN 42149 72 3 : : : 42149 72 4 WEEHAWKEN WEEHAWKEN NNP 42149 72 5 SHAFT SHAFT NNS 42149 72 6 . . . 42149 73 1 EXCAVATION excavation NN 42149 73 2 FIG FIG NNP 42149 73 3 . . . 42149 74 1 2 2 LS 42149 74 2 . . . 42149 74 3 ] ] -RRB- 42149 75 1 The the DT 42149 75 2 characteristics characteristic NNS 42149 75 3 of of IN 42149 75 4 the the DT 42149 75 5 two two CD 42149 75 6 sites site NNS 42149 75 7 were be VBD 42149 75 8 radically radically RB 42149 75 9 different different JJ 42149 75 10 , , , 42149 75 11 and and CC 42149 75 12 called call VBD 42149 75 13 for for IN 42149 75 14 different different JJ 42149 75 15 methods method NNS 42149 75 16 of of IN 42149 75 17 handling handle VBG 42149 75 18 the the DT 42149 75 19 transportation transportation NN 42149 75 20 problem problem NN 42149 75 21 . . . 42149 76 1 The the DT 42149 76 2 shaft shaft NN 42149 76 3 site site NN 42149 76 4 at at IN 42149 76 5 Manhattan Manhattan NNP 42149 76 6 is be VBZ 42149 76 7 shown show VBN 42149 76 8 on on IN 42149 76 9 Plate Plate NNP 42149 76 10 XXX XXX NNP 42149 76 11 . . . 42149 77 1 It -PRON- PRP 42149 77 2 will will MD 42149 77 3 be be VB 42149 77 4 seen see VBN 42149 77 5 that that IN 42149 77 6 there there EX 42149 77 7 was be VBD 42149 77 8 not not RB 42149 77 9 much much JJ 42149 77 10 room room NN 42149 77 11 , , , 42149 77 12 in in IN 42149 77 13 fact fact NN 42149 77 14 , , , 42149 77 15 the the DT 42149 77 16 site site NN 42149 77 17 was be VBD 42149 77 18 too too RB 42149 77 19 cramped cramp VBN 42149 77 20 for for IN 42149 77 21 comfort comfort NN 42149 77 22 ; ; : 42149 77 23 the the DT 42149 77 24 total total JJ 42149 77 25 area area NN 42149 77 26 , , , 42149 77 27 including include VBG 42149 77 28 the the DT 42149 77 29 space space NN 42149 77 30 occupied occupy VBN 42149 77 31 by by IN 42149 77 32 the the DT 42149 77 33 old old JJ 42149 77 34 foundry foundry NN 42149 77 35 , , , 42149 77 36 used use VBN 42149 77 37 for for IN 42149 77 38 power power NN 42149 77 39 - - HYPH 42149 77 40 houses house NNS 42149 77 41 , , , 42149 77 42 offices office NNS 42149 77 43 , , , 42149 77 44 etc etc FW 42149 77 45 . . . 42149 77 46 , , , 42149 77 47 was be VBD 42149 77 48 about about RB 42149 77 49 3,250 3,250 CD 42149 77 50 sq sq NN 42149 77 51 . . . 42149 78 1 yd yd NNP 42149 78 2 . . . 42149 79 1 This this DT 42149 79 2 made make VBD 42149 79 3 it -PRON- PRP 42149 79 4 necessary necessary JJ 42149 79 5 to to TO 42149 79 6 have have VB 42149 79 7 two two CD 42149 79 8 stages stage NNS 42149 79 9 , , , 42149 79 10 one one CD 42149 79 11 on on IN 42149 79 12 the the DT 42149 79 13 ground ground NN 42149 79 14 level level NN 42149 79 15 for for IN 42149 79 16 handling handle VBG 42149 79 17 materials material NNS 42149 79 18 into into IN 42149 79 19 the the DT 42149 79 20 yard yard NN 42149 79 21 , , , 42149 79 22 and and CC 42149 79 23 an an DT 42149 79 24 overhead overhead JJ 42149 79 25 gantry gantry NN 42149 79 26 on on IN 42149 79 27 which which WDT 42149 79 28 the the DT 42149 79 29 excavated excavate VBN 42149 79 30 materials material NNS 42149 79 31 were be VBD 42149 79 32 handled handle VBN 42149 79 33 off off IN 42149 79 34 the the DT 42149 79 35 premises premise NNS 42149 79 36 . . . 42149 80 1 The the DT 42149 80 2 yard yard NN 42149 80 3 at at IN 42149 80 4 Weehawken Weehawken NNP 42149 80 5 was be VBD 42149 80 6 much much RB 42149 80 7 larger large JJR 42149 80 8 ; ; : 42149 80 9 it -PRON- PRP 42149 80 10 is be VBZ 42149 80 11 also also RB 42149 80 12 shown show VBN 42149 80 13 on on IN 42149 80 14 Plate Plate NNP 42149 80 15 XXX XXX NNP 42149 80 16 . . . 42149 81 1 Its -PRON- PRP$ 42149 81 2 area area NN 42149 81 3 was be VBD 42149 81 4 about about RB 42149 81 5 15,400 15,400 CD 42149 81 6 sq sq NN 42149 81 7 . . . 42149 82 1 yd yd NNP 42149 82 2 . . . 42149 83 1 in in IN 42149 83 2 the the DT 42149 83 3 yard yard NN 42149 83 4 proper proper JJ 42149 83 5 , , , 42149 83 6 and and CC 42149 83 7 there there EX 42149 83 8 was be VBD 42149 83 9 an an DT 42149 83 10 additional additional JJ 42149 83 11 space space NN 42149 83 12 of of IN 42149 83 13 about about RB 42149 83 14 750 750 CD 42149 83 15 sq sq NN 42149 83 16 . . . 42149 84 1 yd yd NNP 42149 84 2 . . . 42149 85 1 alongside alongside IN 42149 85 2 the the DT 42149 85 3 wharf wharf NN 42149 85 4 at at IN 42149 85 5 the the DT 42149 85 6 " " `` 42149 85 7 North North NNP 42149 85 8 Slip Slip NNP 42149 85 9 , , , 42149 85 10 " " '' 42149 85 11 on on IN 42149 85 12 the the DT 42149 85 13 river river NN 42149 85 14 front front NN 42149 85 15 , , , 42149 85 16 connected connect VBN 42149 85 17 with with IN 42149 85 18 the the DT 42149 85 19 main main JJ 42149 85 20 portion portion NN 42149 85 21 of of IN 42149 85 22 the the DT 42149 85 23 yard yard NN 42149 85 24 by by IN 42149 85 25 an an DT 42149 85 26 overhead overhead JJ 42149 85 27 trestle trestle NN 42149 85 28 . . . 42149 86 1 All all PDT 42149 86 2 the the DT 42149 86 3 cars car NNS 42149 86 4 at at IN 42149 86 5 Manhattan Manhattan NNP 42149 86 6 were be VBD 42149 86 7 moved move VBN 42149 86 8 by by IN 42149 86 9 hand hand NN 42149 86 10 , , , 42149 86 11 but but CC 42149 86 12 at at IN 42149 86 13 Weehawken Weehawken NNP 42149 86 14 two two CD 42149 86 15 electric electric JJ 42149 86 16 locomotives locomotive NNS 42149 86 17 with with IN 42149 86 18 overhead overhead JJ 42149 86 19 transmission transmission NN 42149 86 20 were be VBD 42149 86 21 used use VBN 42149 86 22 . . . 42149 87 1 Power Power NNP 42149 87 2 - - HYPH 42149 87 3 House House NNP 42149 87 4 Plant Plant NNP 42149 87 5 . . . 42149 88 1 At at IN 42149 88 2 the the DT 42149 88 3 Manhattan Manhattan NNP 42149 88 4 Shaft Shaft NNP 42149 88 5 the the DT 42149 88 6 power power NN 42149 88 7 - - HYPH 42149 88 8 house house NN 42149 88 9 plant plant NN 42149 88 10 was be VBD 42149 88 11 installed instal VBN 42149 88 12 on on IN 42149 88 13 the the DT 42149 88 14 ground ground NN 42149 88 15 floor floor NN 42149 88 16 of of IN 42149 88 17 the the DT 42149 88 18 old old JJ 42149 88 19 foundry foundry JJ 42149 88 20 building building NN 42149 88 21 which which WDT 42149 88 22 occupied occupy VBD 42149 88 23 the the DT 42149 88 24 north north NN 42149 88 25 side side NN 42149 88 26 of of IN 42149 88 27 the the DT 42149 88 28 leased lease VBN 42149 88 29 area area NN 42149 88 30 . . . 42149 89 1 This this DT 42149 89 2 was be VBD 42149 89 3 a a DT 42149 89 4 brick brick NN 42149 89 5 building building NN 42149 89 6 , , , 42149 89 7 quite quite RB 42149 89 8 old old JJ 42149 89 9 , , , 42149 89 10 and and CC 42149 89 11 in in IN 42149 89 12 rather rather RB 42149 89 13 a a DT 42149 89 14 tumble tumble NN 42149 89 15 - - HYPH 42149 89 16 down down RP 42149 89 17 condition condition NN 42149 89 18 when when WRB 42149 89 19 the the DT 42149 89 20 Company Company NNP 42149 89 21 took take VBD 42149 89 22 possession possession NN 42149 89 23 , , , 42149 89 24 and and CC 42149 89 25 in in IN 42149 89 26 consequence consequence NNP 42149 89 27 it -PRON- PRP 42149 89 28 required require VBD 42149 89 29 quite quite PDT 42149 89 30 a a DT 42149 89 31 good good JJ 42149 89 32 deal deal NN 42149 89 33 of of IN 42149 89 34 repair repair NN 42149 89 35 and and CC 42149 89 36 strengthening strengthen VBG 42149 89 37 work work NN 42149 89 38 . . . 42149 90 1 The the DT 42149 90 2 first first JJ 42149 90 3 floor floor NN 42149 90 4 of of IN 42149 90 5 the the DT 42149 90 6 building building NN 42149 90 7 was be VBD 42149 90 8 used use VBN 42149 90 9 by by IN 42149 90 10 the the DT 42149 90 11 contractor contractor NN 42149 90 12 as as IN 42149 90 13 offices office NNS 42149 90 14 , , , 42149 90 15 men man NNS 42149 90 16 's 's POS 42149 90 17 quarters quarter NNS 42149 90 18 , , , 42149 90 19 doctor doctor NN 42149 90 20 's 's POS 42149 90 21 offices office NNS 42149 90 22 , , , 42149 90 23 and and CC 42149 90 24 so so RB 42149 90 25 on on RB 42149 90 26 , , , 42149 90 27 and and CC 42149 90 28 on on IN 42149 90 29 the the DT 42149 90 30 next next JJ 42149 90 31 one one NN 42149 90 32 above above RB 42149 90 33 , , , 42149 90 34 which which WDT 42149 90 35 was be VBD 42149 90 36 the the DT 42149 90 37 top top JJ 42149 90 38 floor floor NN 42149 90 39 , , , 42149 90 40 were be VBD 42149 90 41 the the DT 42149 90 42 offices office NNS 42149 90 43 occupied occupy VBN 42149 90 44 by by IN 42149 90 45 the the DT 42149 90 46 Railroad Railroad NNP 42149 90 47 Company Company NNP 42149 90 48 's 's POS 42149 90 49 field field NN 42149 90 50 engineering engineering NN 42149 90 51 staff staff NN 42149 90 52 . . . 42149 91 1 On on IN 42149 91 2 the the DT 42149 91 3 Weehawken Weehawken NNP 42149 91 4 side side NN 42149 91 5 , , , 42149 91 6 the the DT 42149 91 7 plant plant NN 42149 91 8 was be VBD 42149 91 9 housed house VBN 42149 91 10 in in IN 42149 91 11 a a DT 42149 91 12 wooden wooden JJ 42149 91 13 - - HYPH 42149 91 14 frame frame NN 42149 91 15 , , , 42149 91 16 single single JJ 42149 91 17 - - HYPH 42149 91 18 story story NN 42149 91 19 structure structure NN 42149 91 20 , , , 42149 91 21 covered cover VBN 42149 91 22 with with IN 42149 91 23 corrugated corrugate VBN 42149 91 24 iron iron NN 42149 91 25 . . . 42149 92 1 It -PRON- PRP 42149 92 2 was be VBD 42149 92 3 rectangular rectangular JJ 42149 92 4 in in IN 42149 92 5 plan plan NN 42149 92 6 , , , 42149 92 7 measuring measure VBG 42149 92 8 80 80 CD 42149 92 9 by by IN 42149 92 10 130 130 CD 42149 92 11 ft ft NN 42149 92 12 . . . 42149 92 13 At at IN 42149 92 14 both both DT 42149 92 15 sides side NNS 42149 92 16 of of IN 42149 92 17 the the DT 42149 92 18 river river NN 42149 92 19 the the DT 42149 92 20 engines engine NNS 42149 92 21 were be VBD 42149 92 22 bedded bed VBN 42149 92 23 on on IN 42149 92 24 solid solid JJ 42149 92 25 concrete concrete NN 42149 92 26 on on IN 42149 92 27 a a DT 42149 92 28 rock rock NN 42149 92 29 foundation foundation NN 42149 92 30 . . . 42149 93 1 The the DT 42149 93 2 installation installation NN 42149 93 3 of of IN 42149 93 4 the the DT 42149 93 5 plant plant NN 42149 93 6 on on IN 42149 93 7 the the DT 42149 93 8 Manhattan Manhattan NNP 42149 93 9 side side NN 42149 93 10 occupied occupy VBN 42149 93 11 from from IN 42149 93 12 May May NNP 42149 93 13 , , , 42149 93 14 1904 1904 CD 42149 93 15 , , , 42149 93 16 to to IN 42149 93 17 April April NNP 42149 93 18 , , , 42149 93 19 1905 1905 CD 42149 93 20 , , , 42149 93 21 and and CC 42149 93 22 on on IN 42149 93 23 the the DT 42149 93 24 Weehawken Weehawken NNP 42149 93 25 side side NN 42149 93 26 from from IN 42149 93 27 September September NNP 42149 93 28 , , , 42149 93 29 1904 1904 CD 42149 93 30 , , , 42149 93 31 to to IN 42149 93 32 April April NNP 42149 93 33 , , , 42149 93 34 1905 1905 CD 42149 93 35 . . . 42149 94 1 Air air NN 42149 94 2 pressure pressure NN 42149 94 3 was be VBD 42149 94 4 on on IN 42149 94 5 the the DT 42149 94 6 tunnels tunnel NNS 42149 94 7 at at IN 42149 94 8 the the DT 42149 94 9 New New NNP 42149 94 10 York York NNP 42149 94 11 side side NN 42149 94 12 on on IN 42149 94 13 June June NNP 42149 94 14 25th 25th NN 42149 94 15 , , , 42149 94 16 1905 1905 CD 42149 94 17 , , , 42149 94 18 and and CC 42149 94 19 on on IN 42149 94 20 the the DT 42149 94 21 Weehawken Weehawken NNP 42149 94 22 side side NN 42149 94 23 on on IN 42149 94 24 the the DT 42149 94 25 29th 29th NN 42149 94 26 of of IN 42149 94 27 the the DT 42149 94 28 same same JJ 42149 94 29 month month NN 42149 94 30 . . . 42149 95 1 [ [ -LRB- 42149 95 2 Illustration illustration NN 42149 95 3 : : : 42149 95 4 PLATE PLATE NNP 42149 95 5 XXIX XXIX NNP 42149 95 6 . . . 42149 96 1 TRANS trans UH 42149 96 2 . . . 42149 97 1 AM AM NNP 42149 97 2 . . . 42149 98 1 SOC SOC NNP 42149 98 2 . . . 42149 99 1 CIV CIV NNP 42149 99 2 . . . 42149 100 1 ENGRS ENGRS NNP 42149 100 2 . . . 42149 101 1 VOL VOL NNP 42149 101 2 . . . 42149 102 1 LXVIII LXVIII NNP 42149 102 2 , , , 42149 102 3 No no UH 42149 102 4 . . . 42149 103 1 1155 1155 CD 42149 103 2 . . . 42149 104 1 HEWETT HEWETT NNP 42149 104 2 AND and CC 42149 104 3 BROWN BROWN NNP 42149 104 4 ON ON NNP 42149 104 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 104 6 R. R. NNP 42149 104 7 R. R. NNP 42149 104 8 TUNNELS TUNNELS NNP 42149 104 9 : : : 42149 104 10 NORTH NORTH NNP 42149 104 11 RIVER river NN 42149 104 12 TUNNELS tunnel NNS 42149 104 13 . . . 42149 105 1 FIG FIG NNP 42149 105 2 . . . 42149 106 1 1 1 LS 42149 106 2 . . . 42149 107 1 FIG FIG NNP 42149 107 2 . . . 42149 108 1 2 2 LS 42149 108 2 . . . 42149 108 3 ] ] -RRB- 42149 109 1 The the DT 42149 109 2 plants plant NNS 42149 109 3 contained contain VBD 42149 109 4 in in IN 42149 109 5 the the DT 42149 109 6 two two CD 42149 109 7 power power NN 42149 109 8 - - HYPH 42149 109 9 houses house NNS 42149 109 10 were be VBD 42149 109 11 almost almost RB 42149 109 12 identical identical JJ 42149 109 13 , , , 42149 109 14 there there EX 42149 109 15 being be VBG 42149 109 16 only only RB 42149 109 17 slight slight JJ 42149 109 18 differences difference NNS 42149 109 19 in in IN 42149 109 20 the the DT 42149 109 21 details detail NNS 42149 109 22 of of IN 42149 109 23 arrangement arrangement NN 42149 109 24 due due IN 42149 109 25 to to IN 42149 109 26 local local JJ 42149 109 27 conditions condition NNS 42149 109 28 . . . 42149 110 1 A a DT 42149 110 2 list list NN 42149 110 3 of of IN 42149 110 4 the the DT 42149 110 5 main main JJ 42149 110 6 items item NNS 42149 110 7 of of IN 42149 110 8 the the DT 42149 110 9 plant plant NN 42149 110 10 at at IN 42149 110 11 one one CD 42149 110 12 power power NN 42149 110 13 - - HYPH 42149 110 14 house house NN 42149 110 15 is be VBZ 42149 110 16 shown show VBN 42149 110 17 in in IN 42149 110 18 Table Table NNP 42149 110 19 2 2 CD 42149 110 20 . . . 42149 111 1 TABLE TABLE NNP 42149 111 2 2.--PLANT 2.--plant CD 42149 111 3 AT at IN 42149 111 4 ONE one CD 42149 111 5 POWER power NN 42149 111 6 - - HYPH 42149 111 7 HOUSE HOUSE NNP 42149 111 8 . . . 42149 112 1 + + NFP 42149 112 2 = = SYM 42149 112 3 = = SYM 42149 112 4 = = SYM 42149 112 5 = = SYM 42149 112 6 = = NFP 42149 112 7 = = SYM 42149 112 8 + + SYM 42149 112 9 = = SYM 42149 112 10 = = SYM 42149 112 11 = = SYM 42149 112 12 = = SYM 42149 112 13 = = SYM 42149 112 14 = = SYM 42149 112 15 = = SYM 42149 112 16 = = SYM 42149 112 17 = = SYM 42149 112 18 = = SYM 42149 112 19 = = SYM 42149 112 20 = = SYM 42149 112 21 = = SYM 42149 112 22 = = SYM 42149 112 23 = = SYM 42149 112 24 = = SYM 42149 112 25 = = SYM 42149 112 26 = = SYM 42149 112 27 = = SYM 42149 112 28 = = SYM 42149 112 29 = = SYM 42149 112 30 = = SYM 42149 112 31 = = SYM 42149 112 32 = = SYM 42149 112 33 = = SYM 42149 112 34 = = SYM 42149 112 35 = = SYM 42149 112 36 = = SYM 42149 112 37 = = SYM 42149 112 38 = = SYM 42149 112 39 = = SYM 42149 112 40 = = SYM 42149 112 41 = = SYM 42149 112 42 = = SYM 42149 112 43 = = SYM 42149 112 44 = = SYM 42149 112 45 = = SYM 42149 112 46 = = SYM 42149 112 47 = = SYM 42149 112 48 = = SYM 42149 112 49 = = SYM 42149 112 50 = = SYM 42149 112 51 = = SYM 42149 112 52 = = SYM 42149 112 53 = = SYM 42149 112 54 = = SYM 42149 112 55 = = SYM 42149 112 56 = = SYM 42149 112 57 = = SYM 42149 112 58 = = SYM 42149 112 59 = = SYM 42149 112 60 = = SYM 42149 112 61 = = NFP 42149 112 62 = = SYM 42149 112 63 + + SYM 42149 112 64 = = SYM 42149 112 65 = = SYM 42149 112 66 = = SYM 42149 112 67 = = SYM 42149 112 68 = = SYM 42149 112 69 = = SYM 42149 112 70 = = NFP 42149 112 71 = = SYM 42149 112 72 + + SYM 42149 112 73 |No |No NNP 42149 112 74 . . . 42149 113 1 of| of| NNP 42149 113 2 | | NNP 42149 113 3 | | NNP 42149 113 4 |items.|Description |items.|Description NNP 42149 113 5 of of IN 42149 113 6 item item NN 42149 113 7 . . . 42149 114 1 | | NNP 42149 114 2 Cost.| Cost.| NNP 42149 114 3 |------+------------------------------------------------------+--------| |------+------------------------------------------------------+--------| NNP 42149 114 4 |Three |three CD 42149 114 5 |500-h.p |500-h.p UH 42149 114 6 . . . 42149 115 1 water water NN 42149 115 2 - - HYPH 42149 115 3 tube tube NN 42149 115 4 Sterling Sterling NNP 42149 115 5 boilers boiler NNS 42149 115 6 | | VB 42149 115 7 $ $ $ 42149 115 8 15,186| 15,186| NN 42149 115 9 |Two |two JJ 42149 115 10 |Feed |feed NN 42149 115 11 pumps pump NNS 42149 115 12 , , , 42149 115 13 George George NNP 42149 115 14 F. F. NNP 42149 115 15 Blake Blake NNP 42149 115 16 Manufacturing Manufacturing NNP 42149 115 17 Company Company NNP 42149 115 18 | | VBD 42149 115 19 740| 740| CD 42149 115 20 |One |one JJ 42149 115 21 |Henry |Henry : 42149 115 22 R. R. NNP 42149 115 23 Worthington Worthington NNP 42149 115 24 surface surface NN 42149 115 25 condenser condenser NN 42149 115 26 | | CD 42149 115 27 6,539| 6,539| CD 42149 115 28 |Two |Two NNP 42149 115 29 |Electrically |electrically RB 42149 115 30 - - HYPH 42149 115 31 driven drive VBN 42149 115 32 circulating circulate VBG 42149 115 33 pumps pump NNS 42149 115 34 on on IN 42149 115 35 river river NN 42149 115 36 front front JJ 42149 115 37 | | CD 42149 115 38 5,961| 5,961| CD 42149 115 39 |Three |three CD 42149 115 40 |Low |low NN 42149 115 41 - - HYPH 42149 115 42 pressure pressure NN 42149 115 43 compressors compressor NNS 42149 115 44 , , , 42149 115 45 Ingersoll Ingersoll NNP 42149 115 46 - - HYPH 42149 115 47 Sergeant Sergeant NNP 42149 115 48 Drill Drill NNP 42149 115 49 | | NNP 42149 115 50 33,780| 33,780| NNP 42149 115 51 | | NNP 42149 115 52 |Company |Company NNP 42149 115 53 | | CD 42149 115 54 | | CD 42149 115 55 |One |one JJ 42149 115 56 |High |high JJ 42149 115 57 - - HYPH 42149 115 58 pressure pressure NN 42149 115 59 compressor compressor NN 42149 115 60 , , , 42149 115 61 Ingersoll Ingersoll NNP 42149 115 62 - - HYPH 42149 115 63 Sergeant Sergeant NNP 42149 115 64 Drill Drill NNP 42149 115 65 | | CD 42149 115 66 6,665| 6,665| CD 42149 115 67 | | NNP 42149 115 68 |Company |Company NNP 42149 115 69 | | CD 42149 115 70 | | CD 42149 115 71 |Three |three CD 42149 115 72 |Hydraulic |hydraulic JJ 42149 115 73 power power NN 42149 115 74 pumps pump NNS 42149 115 75 , , , 42149 115 76 George George NNP 42149 115 77 F. F. NNP 42149 115 78 Blake Blake NNP 42149 115 79 Manufacturing Manufacturing NNP 42149 115 80 | | NNP 42149 115 81 3,075| 3,075| CD 42149 115 82 | | NNP 42149 115 83 |Company |Company NNP 42149 115 84 | | CD 42149 115 85 | | CD 42149 115 86 |Two |two NN 42149 115 87 |General |General NNP 42149 115 88 Electric Electric NNP 42149 115 89 Company Company NNP 42149 115 90 's 's POS 42149 115 91 generators generator NNS 42149 115 92 coupled couple VBN 42149 115 93 to to IN 42149 115 94 Ball Ball NNP 42149 115 95 | | NNP 42149 115 96 7,626| 7,626| CD 42149 115 97 | | NNP 42149 115 98 |and |and NNP 42149 115 99 Wood Wood NNP 42149 115 100 engines engine NNS 42149 115 101 | | CD 42149 115 102 | | NNP 42149 115 103 |------+------------------------------------------------------+--------| |------+------------------------------------------------------+--------| NNP 42149 115 104 | | CD 42149 115 105 |Total |total JJ 42149 115 106 cost cost NN 42149 115 107 of of IN 42149 115 108 main main JJ 42149 115 109 items item NNS 42149 115 110 of of IN 42149 115 111 plant plant NN 42149 115 112 | | VBD 42149 115 113 $ $ $ 42149 115 114 79,572| 79,572| NNP 42149 115 115 |------+------------------------------------------------------+--------| |------+------------------------------------------------------+--------| NNP 42149 115 116 | | CD 42149 115 117 SUMMARY summary NN 42149 115 118 OF of IN 42149 115 119 COST COST NNS 42149 115 120 OF of IN 42149 115 121 ONE one CD 42149 115 122 PLANT PLANT NNP 42149 115 123 . . . 42149 116 1 |-------------------------------------------------------------+--------+ |-------------------------------------------------------------+--------+ NNP 42149 116 2 |Total |Total NNP 42149 116 3 cost cost NN 42149 116 4 of of IN 42149 116 5 main main JJ 42149 116 6 items item NNS 42149 116 7 of of IN 42149 116 8 plant plant NN 42149 116 9 | | VBD 42149 116 10 $ $ $ 42149 116 11 79,572| 79,572| NNP 42149 116 12 | | CD 42149 116 13 | | NNP 42149 116 14 | | NNP 42149 116 15 |Cost |cost NN 42149 116 16 of of IN 42149 116 17 four four CD 42149 116 18 shields shield NNS 42149 116 19 ( ( -LRB- 42149 116 20 including include VBG 42149 116 21 installation installation NN 42149 116 22 , , , 42149 116 23 demolition demolition NN 42149 116 24 , , , 42149 116 25 | | NNP 42149 116 26 103,560| 103,560| CD 42149 116 27 |large |large CD 42149 116 28 additions addition NNS 42149 116 29 and and CC 42149 116 30 renewals renewal NNS 42149 116 31 , , , 42149 116 32 piping piping NN 42149 116 33 , , , 42149 116 34 pumps pump NNS 42149 116 35 , , , 42149 116 36 etc etc FW 42149 116 37 . . . 42149 116 38 ) ) -RRB- 42149 117 1 | | NNP 42149 117 2 | | NNP 42149 117 3 | | CD 42149 117 4 | | CD 42149 117 5 | | NNS 42149 117 6 |Cost |cost PRP 42149 117 7 of of IN 42149 117 8 piping piping NN 42149 117 9 , , , 42149 117 10 connections connection NNS 42149 117 11 , , , 42149 117 12 drills drill NNS 42149 117 13 , , , 42149 117 14 derricks derrick NNS 42149 117 15 , , , 42149 117 16 installation installation NN 42149 117 17 | | CD 42149 117 18 101,818| 101,818| CD 42149 117 19 |of |of CD 42149 117 20 offices office NNS 42149 117 21 and and CC 42149 117 22 all all DT 42149 117 23 miscellaneous miscellaneous JJ 42149 117 24 plant plant NN 42149 117 25 | | NNP 42149 117 26 | | NNP 42149 117 27 | | CD 42149 117 28 | | CD 42149 117 29 | | NNS 42149 117 30 |Cost |cost NN 42149 117 31 of of IN 42149 117 32 installation installation NN 42149 117 33 , , , 42149 117 34 including include VBG 42149 117 35 preparation preparation NN 42149 117 36 of of IN 42149 117 37 site site NN 42149 117 38 | | NNP 42149 117 39 39,534| 39,534| NNP 42149 117 40 |-------------------------------------------------------------+--------| |-------------------------------------------------------------+--------| VB 42149 117 41 |Total |total JJ 42149 117 42 prime prime JJ 42149 117 43 cost cost NN 42149 117 44 of of IN 42149 117 45 one one CD 42149 117 46 power power NN 42149 117 47 - - HYPH 42149 117 48 house house NN 42149 117 49 plant plant NN 42149 117 50 |$324,484| |$324,484| -RRB- 42149 117 51 |=============================================================+========| |=============================================================+========| NNP 42149 117 52 The the DT 42149 117 53 following follow VBG 42149 117 54 is be VBZ 42149 117 55 a a DT 42149 117 56 short short JJ 42149 117 57 description description NN 42149 117 58 of of IN 42149 117 59 each each DT 42149 117 60 item item NN 42149 117 61 of of IN 42149 117 62 plant plant NN 42149 117 63 in in IN 42149 117 64 Table table NN 42149 117 65 2 2 CD 42149 117 66 : : : 42149 117 67 _ _ NNP 42149 117 68 Boilers._--At boilers._--at NN 42149 117 69 each each DT 42149 117 70 shaft shaft NN 42149 117 71 there there EX 42149 117 72 were be VBD 42149 117 73 three three CD 42149 117 74 500-h.p 500-h.p CD 42149 117 75 . . CD 42149 117 76 , , , 42149 117 77 water water NN 42149 117 78 - - HYPH 42149 117 79 tube tube NN 42149 117 80 boilers boiler NNS 42149 117 81 , , , 42149 117 82 Class Class NNP 42149 117 83 F F NNP 42149 117 84 ( ( -LRB- 42149 117 85 made make VBN 42149 117 86 by by IN 42149 117 87 Sterling Sterling NNP 42149 117 88 and and CC 42149 117 89 Company Company NNP 42149 117 90 , , , 42149 117 91 Chicago Chicago NNP 42149 117 92 , , , 42149 117 93 Ill. Illinois NNP 42149 117 94 ) ) -RRB- 42149 117 95 . . . 42149 118 1 They -PRON- PRP 42149 118 2 had have VBD 42149 118 3 independent independent JJ 42149 118 4 steel steel NN 42149 118 5 stacks stack NNS 42149 118 6 , , , 42149 118 7 54 54 CD 42149 118 8 in in IN 42149 118 9 . . . 42149 119 1 in in IN 42149 119 2 diameter diameter NN 42149 119 3 and and CC 42149 119 4 100 100 CD 42149 119 5 ft ft NN 42149 119 6 . . NN 42149 119 7 above above IN 42149 119 8 grate grate VB 42149 119 9 level level NN 42149 119 10 ; ; : 42149 119 11 each each DT 42149 119 12 had have VBD 42149 119 13 5,000 5,000 CD 42149 119 14 sq sq NN 42149 119 15 . . . 42149 120 1 ft ft NNP 42149 120 2 . . NNP 42149 120 3 of of IN 42149 120 4 heating heating NN 42149 120 5 surface surface NN 42149 120 6 and and CC 42149 120 7 116 116 CD 42149 120 8 sq sq NN 42149 120 9 . . . 42149 121 1 ft ft NNP 42149 121 2 . . NNP 42149 121 3 of of IN 42149 121 4 grate grate NNP 42149 121 5 area area NN 42149 121 6 . . . 42149 122 1 The the DT 42149 122 2 firing firing NN 42149 122 3 was be VBD 42149 122 4 by by IN 42149 122 5 hand hand NN 42149 122 6 , , , 42149 122 7 and and CC 42149 122 8 there there EX 42149 122 9 were be VBD 42149 122 10 shaking shake VBG 42149 122 11 grates grate NNS 42149 122 12 and and CC 42149 122 13 four four CD 42149 122 14 doors door NNS 42149 122 15 to to IN 42149 122 16 each each DT 42149 122 17 furnace furnace NN 42149 122 18 . . . 42149 123 1 Under under IN 42149 123 2 normal normal JJ 42149 123 3 conditions condition NNS 42149 123 4 of of IN 42149 123 5 work work NN 42149 123 6 , , , 42149 123 7 two two CD 42149 123 8 boilers boiler NNS 42149 123 9 at at IN 42149 123 10 each each DT 42149 123 11 plant plant NN 42149 123 12 were be VBD 42149 123 13 able able JJ 42149 123 14 to to TO 42149 123 15 supply supply VB 42149 123 16 all all PDT 42149 123 17 the the DT 42149 123 18 steam steam NN 42149 123 19 required require VBN 42149 123 20 . . . 42149 124 1 The the DT 42149 124 2 average average JJ 42149 124 3 working working NN 42149 124 4 pressure pressure NN 42149 124 5 of of IN 42149 124 6 the the DT 42149 124 7 steam steam NN 42149 124 8 was be VBD 42149 124 9 135 135 CD 42149 124 10 lb lb IN 42149 124 11 . . . 42149 125 1 per per IN 42149 125 2 sq sq NNP 42149 125 3 . . . 42149 126 1 in in IN 42149 126 2 . . . 42149 127 1 The the DT 42149 127 2 steam steam NN 42149 127 3 piping piping NN 42149 127 4 system system NN 42149 127 5 was be VBD 42149 127 6 on on IN 42149 127 7 the the DT 42149 127 8 loop loop NN 42149 127 9 or or CC 42149 127 10 by by IN 42149 127 11 - - HYPH 42149 127 12 pass pass NN 42149 127 13 plan plan NN 42149 127 14 . . . 42149 128 1 The the DT 42149 128 2 diameter diameter NN 42149 128 3 of of IN 42149 128 4 the the DT 42149 128 5 pipes pipe NNS 42149 128 6 varied vary VBD 42149 128 7 from from IN 42149 128 8 14 14 CD 42149 128 9 in in IN 42149 128 10 . . . 42149 129 1 in in IN 42149 129 2 the the DT 42149 129 3 main main JJ 42149 129 4 header header NN 42149 129 5 to to IN 42149 129 6 10 10 CD 42149 129 7 in in RB 42149 129 8 . . . 42149 130 1 in in IN 42149 130 2 the the DT 42149 130 3 body body NN 42149 130 4 of of IN 42149 130 5 the the DT 42149 130 6 loop loop NN 42149 130 7 . . . 42149 131 1 The the DT 42149 131 2 diameter diameter NN 42149 131 3 of of IN 42149 131 4 the the DT 42149 131 5 exhaust exhaust NN 42149 131 6 steam steam NN 42149 131 7 main main RB 42149 131 8 increased increase VBD 42149 131 9 from from IN 42149 131 10 8 8 CD 42149 131 11 in in IN 42149 131 12 . . . 42149 132 1 at at IN 42149 132 2 the the DT 42149 132 3 remote remote JJ 42149 132 4 machines machine NNS 42149 132 5 to to IN 42149 132 6 20 20 CD 42149 132 7 in in RB 42149 132 8 . . . 42149 132 9 , , , 42149 132 10 and and CC 42149 132 11 then then RB 42149 132 12 to to IN 42149 132 13 30 30 CD 42149 132 14 in in IN 42149 132 15 . . NNP 42149 132 16 , , , 42149 132 17 at at IN 42149 132 18 the the DT 42149 132 19 steam steam NN 42149 132 20 separator separator NN 42149 132 21 , , , 42149 132 22 which which WDT 42149 132 23 in in IN 42149 132 24 turn turn NN 42149 132 25 was be VBD 42149 132 26 connected connect VBN 42149 132 27 with with IN 42149 132 28 the the DT 42149 132 29 condensers condenser NNS 42149 132 30 . . . 42149 133 1 A a DT 42149 133 2 pipe pipe NN 42149 133 3 with with IN 42149 133 4 an an DT 42149 133 5 automatic automatic JJ 42149 133 6 relief relief NN 42149 133 7 valve valve NN 42149 133 8 from from IN 42149 133 9 the the DT 42149 133 10 exhaust exhaust NN 42149 133 11 to to IN 42149 133 12 the the DT 42149 133 13 atmosphere atmosphere NN 42149 133 14 was be VBD 42149 133 15 used use VBN 42149 133 16 when when WRB 42149 133 17 the the DT 42149 133 18 condensers condenser NNS 42149 133 19 were be VBD 42149 133 20 shut shut VBN 42149 133 21 down down RP 42149 133 22 . . . 42149 134 1 All all DT 42149 134 2 piping piping NN 42149 134 3 was be VBD 42149 134 4 of of IN 42149 134 5 the the DT 42149 134 6 standard standard JJ 42149 134 7 , , , 42149 134 8 flanged flange VBD 42149 134 9 extra extra RB 42149 134 10 - - HYPH 42149 134 11 heavy heavy JJ 42149 134 12 type type NN 42149 134 13 , , , 42149 134 14 with with IN 42149 134 15 bronze bronze NN 42149 134 16 - - HYPH 42149 134 17 seated seat VBN 42149 134 18 gate gate NN 42149 134 19 - - HYPH 42149 134 20 valves valve NNS 42149 134 21 on on IN 42149 134 22 the the DT 42149 134 23 principal principal JJ 42149 134 24 lines line NNS 42149 134 25 , , , 42149 134 26 and and CC 42149 134 27 globe globe NN 42149 134 28 - - HYPH 42149 134 29 valves valve NNS 42149 134 30 on on IN 42149 134 31 some some DT 42149 134 32 of of IN 42149 134 33 the the DT 42149 134 34 auxiliary auxiliary JJ 42149 134 35 ones one NNS 42149 134 36 . . . 42149 135 1 There there EX 42149 135 2 was be VBD 42149 135 3 an an DT 42149 135 4 8-in 8-in NN 42149 135 5 . . . 42149 136 1 water water NN 42149 136 2 leg leg NN 42149 136 3 on on IN 42149 136 4 the the DT 42149 136 5 main main JJ 42149 136 6 header header NN 42149 136 7 fitted fit VBN 42149 136 8 with with IN 42149 136 9 a a DT 42149 136 10 Mason Mason NNP 42149 136 11 - - HYPH 42149 136 12 Kelly Kelly NNP 42149 136 13 trap trap NN 42149 136 14 , , , 42149 136 15 and and CC 42149 136 16 other other JJ 42149 136 17 smaller small JJR 42149 136 18 water water NN 42149 136 19 traps trap NNS 42149 136 20 were be VBD 42149 136 21 set set VBN 42149 136 22 at at IN 42149 136 23 suitable suitable JJ 42149 136 24 intervals interval NNS 42149 136 25 . . . 42149 137 1 Each each DT 42149 137 2 boiler boiler NN 42149 137 3 was be VBD 42149 137 4 fitted fit VBN 42149 137 5 with with IN 42149 137 6 safety safety NN 42149 137 7 valves valve NNS 42149 137 8 , , , 42149 137 9 and and CC 42149 137 10 there there EX 42149 137 11 were be VBD 42149 137 12 automatic automatic JJ 42149 137 13 release release NN 42149 137 14 valves valve NNS 42149 137 15 on on IN 42149 137 16 the the DT 42149 137 17 high high JJ 42149 137 18 - - HYPH 42149 137 19 and and CC 42149 137 20 low low JJ 42149 137 21 - - HYPH 42149 137 22 pressure pressure NN 42149 137 23 cylinders cylinder NNS 42149 137 24 of of IN 42149 137 25 each each DT 42149 137 26 compressor compressor NN 42149 137 27 , , , 42149 137 28 as as RB 42149 137 29 well well RB 42149 137 30 as as IN 42149 137 31 on on IN 42149 137 32 each each DT 42149 137 33 air air NN 42149 137 34 receiver receiver NN 42149 137 35 . . . 42149 138 1 Buckwheat buckwheat JJ 42149 138 2 coal coal NN 42149 138 3 was be VBD 42149 138 4 used use VBN 42149 138 5 , , , 42149 138 6 and and CC 42149 138 7 was be VBD 42149 138 8 delivered deliver VBN 42149 138 9 to to IN 42149 138 10 the the DT 42149 138 11 bins bin NNS 42149 138 12 on on IN 42149 138 13 the the DT 42149 138 14 Manhattan Manhattan NNP 42149 138 15 side side NN 42149 138 16 by by IN 42149 138 17 teams team NNS 42149 138 18 and and CC 42149 138 19 on on IN 42149 138 20 the the DT 42149 138 21 Weehawken Weehawken NNP 42149 138 22 side side NN 42149 138 23 by by IN 42149 138 24 railroad railroad NN 42149 138 25 cars car NNS 42149 138 26 or or CC 42149 138 27 in in IN 42149 138 28 barges barge NNS 42149 138 29 , , , 42149 138 30 whence whence IN 42149 138 31 it -PRON- PRP 42149 138 32 was be VBD 42149 138 33 taken take VBN 42149 138 34 to to IN 42149 138 35 the the DT 42149 138 36 power power NN 42149 138 37 - - HYPH 42149 138 38 house house NN 42149 138 39 by by IN 42149 138 40 2-ft 2-ft CD 42149 138 41 . . . 42149 138 42 gauge gauge NN 42149 138 43 cars car NNS 42149 138 44 . . . 42149 139 1 An an DT 42149 139 2 average average NN 42149 139 3 of of IN 42149 139 4 20 20 CD 42149 139 5 tons ton NNS 42149 139 6 of of IN 42149 139 7 coal coal NN 42149 139 8 in in IN 42149 139 9 each each DT 42149 139 10 24 24 CD 42149 139 11 hours hour NNS 42149 139 12 was be VBD 42149 139 13 used use VBN 42149 139 14 by by IN 42149 139 15 each each DT 42149 139 16 plant plant NN 42149 139 17 . . . 42149 140 1 The the DT 42149 140 2 water water NN 42149 140 3 was be VBD 42149 140 4 taken take VBN 42149 140 5 directly directly RB 42149 140 6 from from IN 42149 140 7 the the DT 42149 140 8 public public JJ 42149 140 9 service service NN 42149 140 10 supply supply NN 42149 140 11 main main JJ 42149 140 12 . . . 42149 141 1 The the DT 42149 141 2 daily daily JJ 42149 141 3 quantity quantity NN 42149 141 4 used use VBN 42149 141 5 was be VBD 42149 141 6 approximately approximately RB 42149 141 7 4,000 4,000 CD 42149 141 8 gal gal NN 42149 141 9 . . . 42149 142 1 for for IN 42149 142 2 boiler boiler NN 42149 142 3 purposes purpose NNS 42149 142 4 and and CC 42149 142 5 4,400 4,400 CD 42149 142 6 gal gal NNP 42149 142 7 . . . 42149 143 1 for for IN 42149 143 2 general general JJ 42149 143 3 plant plant NN 42149 143 4 use use NN 42149 143 5 . . . 42149 144 1 Wooden wooden JJ 42149 144 2 overhead overhead JJ 42149 144 3 tanks tank NNS 42149 144 4 having have VBG 42149 144 5 a a DT 42149 144 6 capacity capacity NN 42149 144 7 of of IN 42149 144 8 14,000 14,000 CD 42149 144 9 gal gal NN 42149 144 10 . . . 42149 145 1 at at IN 42149 145 2 each each DT 42149 145 3 plant plant NN 42149 145 4 served serve VBD 42149 145 5 as as IN 42149 145 6 a a DT 42149 145 7 12-hour 12-hour CD 42149 145 8 emergency emergency NN 42149 145 9 supply supply NN 42149 145 10 . . . 42149 146 1 _ _ NNP 42149 146 2 Feed Feed NNP 42149 146 3 Pumps._--There pumps._--there RB 42149 146 4 were be VBD 42149 146 5 two two CD 42149 146 6 feed feed NN 42149 146 7 pumps pump NNS 42149 146 8 at at IN 42149 146 9 each each DT 42149 146 10 plant plant NN 42149 146 11 . . . 42149 147 1 They -PRON- PRP 42149 147 2 had have VBD 42149 147 3 a a DT 42149 147 4 capacity capacity NN 42149 147 5 of of IN 42149 147 6 700 700 CD 42149 147 7 cu cu NNS 42149 147 8 . . . 42149 148 1 ft ft NNP 42149 148 2 . . NNP 42149 148 3 per per IN 42149 148 4 min min NNP 42149 148 5 . . NNP 42149 148 6 , , , 42149 148 7 free free JJ 42149 148 8 discharge discharge NN 42149 148 9 . . . 42149 149 1 The the DT 42149 149 2 plungers plunger NNS 42149 149 3 were be VBD 42149 149 4 double double JJ 42149 149 5 , , , 42149 149 6 of of IN 42149 149 7 6-in 6-in CD 42149 149 8 . . . 42149 150 1 diameter diameter NN 42149 150 2 , , , 42149 150 3 and and CC 42149 150 4 10-in 10-in NNP 42149 150 5 . . . 42149 151 1 stroke stroke NN 42149 151 2 , , , 42149 151 3 the the DT 42149 151 4 steam steam NN 42149 151 5 cylinders cylinder NNS 42149 151 6 were be VBD 42149 151 7 of of IN 42149 151 8 10-in 10-in CD 42149 151 9 . . . 42149 152 1 diameter diameter NN 42149 152 2 and and CC 42149 152 3 10-in 10-in NNP 42149 152 4 . . . 42149 153 1 stroke stroke NN 42149 153 2 . . . 42149 154 1 An an DT 42149 154 2 injector injector NN 42149 154 3 of of IN 42149 154 4 the the DT 42149 154 5 " " `` 42149 154 6 Metropolitan Metropolitan NNP 42149 154 7 Double double JJ 42149 154 8 - - HYPH 42149 154 9 Tube Tube NNP 42149 154 10 " " '' 42149 154 11 type type NN 42149 154 12 , , , 42149 154 13 with with IN 42149 154 14 a a DT 42149 154 15 capacity capacity NN 42149 154 16 of of IN 42149 154 17 700 700 CD 42149 154 18 cu cu NNS 42149 154 19 . . . 42149 155 1 ft ft NNP 42149 155 2 . . NNP 42149 155 3 per per IN 42149 155 4 min min NNP 42149 155 5 . . NNP 42149 155 6 , , , 42149 155 7 was be VBD 42149 155 8 fitted fit VBN 42149 155 9 to to IN 42149 155 10 each each DT 42149 155 11 boiler boiler NN 42149 155 12 for for IN 42149 155 13 use use NN 42149 155 14 in in IN 42149 155 15 emergencies emergency NNS 42149 155 16 . . . 42149 156 1 The the DT 42149 156 2 feed feed NN 42149 156 3 - - HYPH 42149 156 4 water water NN 42149 156 5 heater heater NN 42149 156 6 was be VBD 42149 156 7 a a DT 42149 156 8 " " `` 42149 156 9 No no UH 42149 156 10 . . . 42149 157 1 9 9 CD 42149 157 2 Cochrane Cochrane NNP 42149 157 3 , , , 42149 157 4 " " '' 42149 157 5 guaranteed guarantee VBN 42149 157 6 to to TO 42149 157 7 heat heat VB 42149 157 8 45,000 45,000 CD 42149 157 9 lb lb IN 42149 157 10 . . . 42149 158 1 of of IN 42149 158 2 water water NN 42149 158 3 per per IN 42149 158 4 hour hour NN 42149 158 5 , , , 42149 158 6 and and CC 42149 158 7 had have VBD 42149 158 8 a a DT 42149 158 9 total total JJ 42149 158 10 capacity capacity NN 42149 158 11 of of IN 42149 158 12 85.7 85.7 CD 42149 158 13 cu cu NNS 42149 158 14 . . . 42149 159 1 ft ft IN 42149 159 2 . . . 42149 160 1 It -PRON- PRP 42149 160 2 was be VBD 42149 160 3 heated heat VBN 42149 160 4 by by IN 42149 160 5 the the DT 42149 160 6 exhaust exhaust NN 42149 160 7 steam steam NN 42149 160 8 from from IN 42149 160 9 the the DT 42149 160 10 non non JJ 42149 160 11 - - JJ 42149 160 12 condensing condensing JJ 42149 160 13 auxiliary auxiliary JJ 42149 160 14 plant plant NN 42149 160 15 . . . 42149 161 1 _ _ NNP 42149 161 2 Condenser Condenser NNP 42149 161 3 Plant._--There Plant._--There NNP 42149 161 4 were be VBD 42149 161 5 two two CD 42149 161 6 surface surface NN 42149 161 7 condensers condenser NNS 42149 161 8 at at IN 42149 161 9 each each DT 42149 161 10 plant plant NN 42149 161 11 . . . 42149 162 1 Each each DT 42149 162 2 had have VBD 42149 162 3 a a DT 42149 162 4 cooling cool VBG 42149 162 5 surface surface NN 42149 162 6 sufficient sufficient JJ 42149 162 7 to to TO 42149 162 8 condense condense VB 42149 162 9 22,500 22,500 CD 42149 162 10 lb lb IN 42149 162 11 . . . 42149 163 1 of of IN 42149 163 2 steam steam NN 42149 163 3 per per IN 42149 163 4 hour hour NN 42149 163 5 , , , 42149 163 6 with with IN 42149 163 7 water water NN 42149 163 8 at at IN 42149 163 9 a a DT 42149 163 10 temperature temperature NN 42149 163 11 of of IN 42149 163 12 70 70 NNP 42149 163 13 ° ° , 42149 163 14 Fahr Fahr NNS 42149 163 15 . . . 42149 164 1 and and CC 42149 164 2 barometer barometer NNP 42149 164 3 at at IN 42149 164 4 30 30 CD 42149 164 5 in in IN 42149 164 6 . . NNP 42149 164 7 , , , 42149 164 8 maintaining maintain VBG 42149 164 9 a a DT 42149 164 10 vacuum vacuum NN 42149 164 11 of of IN 42149 164 12 26 26 CD 42149 164 13 in in IN 42149 164 14 . . . 42149 165 1 in in IN 42149 165 2 the the DT 42149 165 3 condenser condenser NN 42149 165 4 . . . 42149 166 1 Each each DT 42149 166 2 was be VBD 42149 166 3 fitted fit VBN 42149 166 4 with with IN 42149 166 5 a a DT 42149 166 6 Blake Blake NNP 42149 166 7 , , , 42149 166 8 horizontal horizontal JJ 42149 166 9 , , , 42149 166 10 direct direct JJ 42149 166 11 - - HYPH 42149 166 12 acting act VBG 42149 166 13 , , , 42149 166 14 vacuum vacuum NN 42149 166 15 pump pump NN 42149 166 16 . . . 42149 167 1 _ _ NNP 42149 167 2 Circulating Circulating NNP 42149 167 3 - - HYPH 42149 167 4 Water Water NNP 42149 167 5 Pumps._--Two Pumps._--Two NNP 42149 167 6 circulating circulate VBG 42149 167 7 - - HYPH 42149 167 8 water water NN 42149 167 9 pumps pump NNS 42149 167 10 , , , 42149 167 11 supplying supply VBG 42149 167 12 salt salt NN 42149 167 13 water water NN 42149 167 14 directly directly RB 42149 167 15 from from IN 42149 167 16 the the DT 42149 167 17 Hudson Hudson NNP 42149 167 18 River River NNP 42149 167 19 , , , 42149 167 20 were be VBD 42149 167 21 placed place VBN 42149 167 22 on on IN 42149 167 23 the the DT 42149 167 24 wharf wharf NN 42149 167 25 . . . 42149 168 1 They -PRON- PRP 42149 168 2 were be VBD 42149 168 3 8-in 8-in CD 42149 168 4 . . . 42149 169 1 centrifugal centrifugal JJ 42149 169 2 pumps pump NNS 42149 169 3 , , , 42149 169 4 each each DT 42149 169 5 driven drive VBN 42149 169 6 by by IN 42149 169 7 a a DT 42149 169 8 36-h.p 36-h.p NNP 42149 169 9 . . . 42149 169 10 , , , 42149 169 11 General General NNP 42149 169 12 Electric Electric NNP 42149 169 13 Company Company NNP 42149 169 14 's 's POS 42149 169 15 direct direct JJ 42149 169 16 - - HYPH 42149 169 17 current current JJ 42149 169 18 motor motor NN 42149 169 19 ( ( -LRB- 42149 169 20 220 220 CD 42149 169 21 volts volt NNS 42149 169 22 and and CC 42149 169 23 610 610 CD 42149 169 24 rev rev NNP 42149 169 25 . . . 42149 170 1 per per IN 42149 170 2 min min NNP 42149 170 3 . . . 42149 171 1 ) ) -RRB- 42149 171 2 , , , 42149 171 3 the the DT 42149 171 4 current current JJ 42149 171 5 being be VBG 42149 171 6 supplied supply VBN 42149 171 7 from from IN 42149 171 8 the the DT 42149 171 9 contractor contractor NN 42149 171 10 's 's POS 42149 171 11 power power NN 42149 171 12 - - HYPH 42149 171 13 house house NN 42149 171 14 generators generator NNS 42149 171 15 . . . 42149 172 1 The the DT 42149 172 2 pumps pump NNS 42149 172 3 were be VBD 42149 172 4 run run VBN 42149 172 5 alternately alternately RB 42149 172 6 24 24 CD 42149 172 7 hours hour NNS 42149 172 8 each each DT 42149 172 9 at at IN 42149 172 10 a a DT 42149 172 11 time time NN 42149 172 12 . . . 42149 173 1 Those those DT 42149 173 2 on on IN 42149 173 3 the the DT 42149 173 4 Manhattan Manhattan NNP 42149 173 5 side side NN 42149 173 6 were be VBD 42149 173 7 1,300 1,300 CD 42149 173 8 ft ft NN 42149 173 9 . . . 42149 173 10 from from IN 42149 173 11 the the DT 42149 173 12 power power NN 42149 173 13 - - HYPH 42149 173 14 house house NN 42149 173 15 , , , 42149 173 16 and and CC 42149 173 17 delivered deliver VBD 42149 173 18 their -PRON- PRP$ 42149 173 19 water water NN 42149 173 20 through through IN 42149 173 21 a a DT 42149 173 22 16-in 16-in XX 42149 173 23 . . . 42149 174 1 pipe pipe NN 42149 174 2 ; ; : 42149 174 3 those those DT 42149 174 4 on on IN 42149 174 5 the the DT 42149 174 6 Weehawken Weehawken NNP 42149 174 7 side side NN 42149 174 8 were be VBD 42149 174 9 450 450 CD 42149 174 10 ft ft NN 42149 174 11 . . NN 42149 174 12 away away RB 42149 174 13 , , , 42149 174 14 and and CC 42149 174 15 delivered deliver VBD 42149 174 16 through through IN 42149 174 17 a a DT 42149 174 18 14-in 14-in CD 42149 174 19 . . . 42149 175 1 pipe pipe NN 42149 175 2 . . . 42149 176 1 There there EX 42149 176 2 was be VBD 42149 176 3 also also RB 42149 176 4 a a DT 42149 176 5 direct direct JJ 42149 176 6 connection connection NN 42149 176 7 with with IN 42149 176 8 the the DT 42149 176 9 city city NN 42149 176 10 mains main NNS 42149 176 11 , , , 42149 176 12 in in IN 42149 176 13 case case NN 42149 176 14 of of IN 42149 176 15 an an DT 42149 176 16 accident accident NN 42149 176 17 to to IN 42149 176 18 the the DT 42149 176 19 salt salt NN 42149 176 20 - - HYPH 42149 176 21 water water NN 42149 176 22 pumps pump NNS 42149 176 23 . . . 42149 177 1 _ _ NNP 42149 177 2 Low Low NNP 42149 177 3 - - HYPH 42149 177 4 Pressure Pressure NNP 42149 177 5 Compressors._--At compressors._--at VBP 42149 177 6 each each DT 42149 177 7 plant plant NN 42149 177 8 there there EX 42149 177 9 were be VBD 42149 177 10 three three CD 42149 177 11 low low JJ 42149 177 12 - - HYPH 42149 177 13 pressure pressure NN 42149 177 14 compressors compressor NNS 42149 177 15 . . . 42149 178 1 These these DT 42149 178 2 were be VBD 42149 178 3 for for IN 42149 178 4 the the DT 42149 178 5 supply supply NN 42149 178 6 of of IN 42149 178 7 compressed compress VBN 42149 178 8 air air NN 42149 178 9 to to IN 42149 178 10 the the DT 42149 178 11 working work VBG 42149 178 12 chambers chamber NNS 42149 178 13 of of IN 42149 178 14 the the DT 42149 178 15 subaqueous subaqueous JJ 42149 178 16 shield shield NN 42149 178 17 - - HYPH 42149 178 18 driven drive VBN 42149 178 19 tunnels tunnel NNS 42149 178 20 . . . 42149 179 1 They -PRON- PRP 42149 179 2 were be VBD 42149 179 3 also also RB 42149 179 4 used use VBN 42149 179 5 on on IN 42149 179 6 occasions occasion NNS 42149 179 7 to to TO 42149 179 8 supply supply VB 42149 179 9 compressed compress VBN 42149 179 10 air air NN 42149 179 11 to to IN 42149 179 12 the the DT 42149 179 13 cylinders cylinder NNS 42149 179 14 of of IN 42149 179 15 the the DT 42149 179 16 high high JJ 42149 179 17 - - HYPH 42149 179 18 pressure pressure NN 42149 179 19 compressors compressor NNS 42149 179 20 , , , 42149 179 21 thus thus RB 42149 179 22 largely largely RB 42149 179 23 increasing increase VBG 42149 179 24 the the DT 42149 179 25 capacity capacity NN 42149 179 26 of of IN 42149 179 27 the the DT 42149 179 28 latter latter JJ 42149 179 29 when when WRB 42149 179 30 hard hard RB 42149 179 31 pressed press VBN 42149 179 32 by by IN 42149 179 33 an an DT 42149 179 34 unusual unusual JJ 42149 179 35 call call NN 42149 179 36 on on IN 42149 179 37 account account NN 42149 179 38 of of IN 42149 179 39 heavy heavy JJ 42149 179 40 drilling drilling NN 42149 179 41 work work NN 42149 179 42 in in IN 42149 179 43 the the DT 42149 179 44 rock rock NN 42149 179 45 tunnels tunnel NNS 42149 179 46 . . . 42149 180 1 They -PRON- PRP 42149 180 2 were be VBD 42149 180 3 of of IN 42149 180 4 a a DT 42149 180 5 new new JJ 42149 180 6 design design NN 42149 180 7 , , , 42149 180 8 of of IN 42149 180 9 duplex duplex NNP 42149 180 10 Corliss Corliss NNP 42149 180 11 type type NN 42149 180 12 , , , 42149 180 13 having have VBG 42149 180 14 cross cross JJ 42149 180 15 - - JJ 42149 180 16 compound compound JJ 42149 180 17 steam steam NN 42149 180 18 cylinders cylinder NNS 42149 180 19 , , , 42149 180 20 designed design VBN 42149 180 21 to to TO 42149 180 22 operate operate VB 42149 180 23 condensing condensing NN 42149 180 24 , , , 42149 180 25 but but CC 42149 180 26 capable capable JJ 42149 180 27 of of IN 42149 180 28 working work VBG 42149 180 29 non non JJ 42149 180 30 - - JJ 42149 180 31 condensing condensing JJ 42149 180 32 ; ; : 42149 180 33 the the DT 42149 180 34 air air NN 42149 180 35 cylinders cylinder NNS 42149 180 36 were be VBD 42149 180 37 simple simple JJ 42149 180 38 duplex duplex NN 42149 180 39 . . . 42149 181 1 The the DT 42149 181 2 steam steam NN 42149 181 3 cylinder cylinder NN 42149 181 4 valves valve NNS 42149 181 5 were be VBD 42149 181 6 of of IN 42149 181 7 the the DT 42149 181 8 Corliss Corliss NNP 42149 181 9 release release NN 42149 181 10 type type NN 42149 181 11 , , , 42149 181 12 with with IN 42149 181 13 vacuum vacuum NN 42149 181 14 dash dash NN 42149 181 15 - - HYPH 42149 181 16 pots pot NNS 42149 181 17 . . . 42149 182 1 The the DT 42149 182 2 valves valve NNS 42149 182 3 in in IN 42149 182 4 the the DT 42149 182 5 air air NN 42149 182 6 cylinders cylinder NNS 42149 182 7 were be VBD 42149 182 8 mechanically mechanically RB 42149 182 9 - - HYPH 42149 182 10 operated operate VBN 42149 182 11 piston piston NN 42149 182 12 valves valve NNS 42149 182 13 , , , 42149 182 14 with with IN 42149 182 15 end end NN 42149 182 16 inlet inlet NN 42149 182 17 and and CC 42149 182 18 discharge discharge NN 42149 182 19 . . . 42149 183 1 The the DT 42149 183 2 engines engine NNS 42149 183 3 used use VBD 42149 183 4 steam steam NN 42149 183 5 at at IN 42149 183 6 135 135 CD 42149 183 7 lb lb RB 42149 183 8 . . . 42149 184 1 pressure pressure NN 42149 184 2 . . . 42149 185 1 The the DT 42149 185 2 high high JJ 42149 185 3 - - HYPH 42149 185 4 and and CC 42149 185 5 low low JJ 42149 185 6 - - HYPH 42149 185 7 pressure pressure NN 42149 185 8 steam steam NN 42149 185 9 cylinders cylinder NNS 42149 185 10 were be VBD 42149 185 11 14 14 CD 42149 185 12 in in IN 42149 185 13 . . . 42149 186 1 and and CC 42149 186 2 30 30 CD 42149 186 3 in in IN 42149 186 4 . . . 42149 187 1 in in IN 42149 187 2 diameter diameter NN 42149 187 3 , , , 42149 187 4 respectively respectively RB 42149 187 5 , , , 42149 187 6 with with IN 42149 187 7 a a DT 42149 187 8 stroke stroke NN 42149 187 9 of of IN 42149 187 10 36 36 CD 42149 187 11 in in IN 42149 187 12 . . . 42149 188 1 and and CC 42149 188 2 a a DT 42149 188 3 maximum maximum JJ 42149 188 4 speed speed NN 42149 188 5 of of IN 42149 188 6 135 135 CD 42149 188 7 rev rev NNP 42149 188 8 . . . 42149 189 1 per per IN 42149 189 2 min min NNP 42149 189 3 . . . 42149 190 1 The the DT 42149 190 2 two two CD 42149 190 3 air air NN 42149 190 4 cylinders cylinder NNS 42149 190 5 were be VBD 42149 190 6 23½ 23â½ CD 42149 190 7 in in IN 42149 190 8 . . . 42149 191 1 in in IN 42149 191 2 diameter diameter NN 42149 191 3 , , , 42149 191 4 and and CC 42149 191 5 had have VBD 42149 191 6 a a DT 42149 191 7 combined combine VBN 42149 191 8 capacity capacity NN 42149 191 9 of of IN 42149 191 10 35.1 35.1 CD 42149 191 11 cu cu NNS 42149 191 12 . . . 42149 192 1 ft ft NNP 42149 192 2 . . NNP 42149 192 3 of of IN 42149 192 4 free free JJ 42149 192 5 air air NN 42149 192 6 per per IN 42149 192 7 revolution revolution NN 42149 192 8 , , , 42149 192 9 and and CC 42149 192 10 , , , 42149 192 11 when when WRB 42149 192 12 running run VBG 42149 192 13 at at IN 42149 192 14 125 125 CD 42149 192 15 rev rev NNP 42149 192 16 . . . 42149 193 1 per per IN 42149 193 2 min min NNP 42149 193 3 . . NNP 42149 193 4 , , , 42149 193 5 each each DT 42149 193 6 machine machine NN 42149 193 7 had have VBD 42149 193 8 an an DT 42149 193 9 actual actual JJ 42149 193 10 capacity capacity NN 42149 193 11 of of IN 42149 193 12 4,389 4,389 CD 42149 193 13 cu cu NNS 42149 193 14 . . . 42149 194 1 ft ft NNP 42149 194 2 . . NNP 42149 194 3 of of IN 42149 194 4 free free JJ 42149 194 5 air air NN 42149 194 6 per per IN 42149 194 7 min min NNP 42149 194 8 . . NNP 42149 194 9 , , , 42149 194 10 or or CC 42149 194 11 263,340 263,340 CD 42149 194 12 cu cu NNS 42149 194 13 . . . 42149 195 1 ft ft NNP 42149 195 2 . . NNP 42149 195 3 per per IN 42149 195 4 hour hour NN 42149 195 5 . . . 42149 196 1 The the DT 42149 196 2 air air NN 42149 196 3 cylinders cylinder NNS 42149 196 4 were be VBD 42149 196 5 covered cover VBN 42149 196 6 by by IN 42149 196 7 water water NN 42149 196 8 - - HYPH 42149 196 9 jackets jacket NNS 42149 196 10 through through IN 42149 196 11 which which WDT 42149 196 12 salt salt NN 42149 196 13 water water NN 42149 196 14 from from IN 42149 196 15 the the DT 42149 196 16 circulating circulate VBG 42149 196 17 pumps pump NNS 42149 196 18 flowed flow VBD 42149 196 19 . . . 42149 197 1 A a DT 42149 197 2 gauge gauge NN 42149 197 3 pressure pressure NN 42149 197 4 of of IN 42149 197 5 50 50 CD 42149 197 6 lb lb XX 42149 197 7 . . . 42149 198 1 of of IN 42149 198 2 air air NN 42149 198 3 could could MD 42149 198 4 be be VB 42149 198 5 obtained obtain VBN 42149 198 6 . . . 42149 199 1 Each each DT 42149 199 2 compressor compressor NN 42149 199 3 was be VBD 42149 199 4 fitted fit VBN 42149 199 5 with with IN 42149 199 6 an an DT 42149 199 7 automatic automatic JJ 42149 199 8 speed speed NN 42149 199 9 and and CC 42149 199 10 air air NN 42149 199 11 - - HYPH 42149 199 12 pressure pressure NN 42149 199 13 regulator regulator NN 42149 199 14 , , , 42149 199 15 designed design VBN 42149 199 16 to to TO 42149 199 17 vary vary VB 42149 199 18 the the DT 42149 199 19 cut cut NN 42149 199 20 - - HYPH 42149 199 21 off off RP 42149 199 22 according accord VBG 42149 199 23 to to IN 42149 199 24 the the DT 42149 199 25 volume volume NN 42149 199 26 of of IN 42149 199 27 air air NN 42149 199 28 required require VBN 42149 199 29 , , , 42149 199 30 and and CC 42149 199 31 was be VBD 42149 199 32 provided provide VBN 42149 199 33 with with IN 42149 199 34 an an DT 42149 199 35 after after IN 42149 199 36 - - HYPH 42149 199 37 cooler cooler NN 42149 199 38 fitted fit VBN 42149 199 39 with with IN 42149 199 40 tinned tinned JJ 42149 199 41 - - HYPH 42149 199 42 brass brass NN 42149 199 43 tube tube NN 42149 199 44 and and CC 42149 199 45 eight eight CD 42149 199 46 Tobin Tobin NNP 42149 199 47 - - HYPH 42149 199 48 bronze bronze NN 42149 199 49 tube tube NN 42149 199 50 - - HYPH 42149 199 51 plates plate NNS 42149 199 52 having have VBG 42149 199 53 809 809 CD 42149 199 54 sq sq NNS 42149 199 55 . . . 42149 200 1 ft ft NNP 42149 200 2 . . NNP 42149 200 3 of of IN 42149 200 4 cooling cool VBG 42149 200 5 surface surface NN 42149 200 6 ; ; : 42149 200 7 each each DT 42149 200 8 one one NN 42149 200 9 was be VBD 42149 200 10 capable capable JJ 42149 200 11 of of IN 42149 200 12 reducing reduce VBG 42149 200 13 the the DT 42149 200 14 temperature temperature NN 42149 200 15 of of IN 42149 200 16 the the DT 42149 200 17 air air NN 42149 200 18 delivered deliver VBN 42149 200 19 by by IN 42149 200 20 it -PRON- PRP 42149 200 21 to to IN 42149 200 22 within within IN 42149 200 23 10 10 NNP 42149 200 24 ° ° , 42149 200 25 Fahr Fahr NNPS 42149 200 26 . . . 42149 201 1 of of IN 42149 201 2 the the DT 42149 201 3 temperature temperature NN 42149 201 4 of of IN 42149 201 5 the the DT 42149 201 6 cooling cool VBG 42149 201 7 water water NN 42149 201 8 when when WRB 42149 201 9 its -PRON- PRP$ 42149 201 10 compressor compressor NN 42149 201 11 was be VBD 42149 201 12 operated operate VBN 42149 201 13 at at IN 42149 201 14 its -PRON- PRP$ 42149 201 15 fullest full JJS 42149 201 16 capacity capacity NN 42149 201 17 . . . 42149 202 1 From from IN 42149 202 2 the the DT 42149 202 3 after after IN 42149 202 4 - - HYPH 42149 202 5 cooler cooler NN 42149 202 6 the the DT 42149 202 7 air air NN 42149 202 8 passed pass VBD 42149 202 9 into into IN 42149 202 10 a a DT 42149 202 11 vertical vertical JJ 42149 202 12 receiver receiver NN 42149 202 13 , , , 42149 202 14 4 4 CD 42149 202 15 ft ft NN 42149 202 16 . . NNP 42149 202 17 6 6 CD 42149 202 18 in in IN 42149 202 19 . . . 42149 203 1 in in IN 42149 203 2 diameter diameter NN 42149 203 3 and and CC 42149 203 4 12 12 CD 42149 203 5 ft ft NN 42149 203 6 . . NNP 42149 203 7 high high JJ 42149 203 8 , , , 42149 203 9 there there EX 42149 203 10 being be VBG 42149 203 11 one one CD 42149 203 12 such such JJ 42149 203 13 receiver receiver NN 42149 203 14 for for IN 42149 203 15 each each DT 42149 203 16 compressor compressor NN 42149 203 17 . . . 42149 204 1 The the DT 42149 204 2 receivers receiver NNS 42149 204 3 were be VBD 42149 204 4 tested test VBN 42149 204 5 to to IN 42149 204 6 a a DT 42149 204 7 pressure pressure NN 42149 204 8 of of IN 42149 204 9 100 100 CD 42149 204 10 lb lb RB 42149 204 11 . . . 42149 205 1 per per IN 42149 205 2 sq sq NNP 42149 205 3 . . . 42149 206 1 in in IN 42149 206 2 . . . 42149 207 1 The the DT 42149 207 2 after after NN 42149 207 3 - - HYPH 42149 207 4 coolers cooler NNS 42149 207 5 were be VBD 42149 207 6 provided provide VBN 42149 207 7 with with IN 42149 207 8 traps trap NNS 42149 207 9 to to TO 42149 207 10 collect collect VB 42149 207 11 precipitated precipitate VBN 42149 207 12 moisture moisture NN 42149 207 13 and and CC 42149 207 14 oil oil NN 42149 207 15 . . . 42149 208 1 The the DT 42149 208 2 coolers cooler NNS 42149 208 3 and and CC 42149 208 4 receivers receiver NNS 42149 208 5 were be VBD 42149 208 6 fitted fit VBN 42149 208 7 with with IN 42149 208 8 safety safety NN 42149 208 9 valves valve NNS 42149 208 10 set set VBN 42149 208 11 to to TO 42149 208 12 blow blow VB 42149 208 13 off off RP 42149 208 14 at at IN 42149 208 15 1 1 CD 42149 208 16 lb lb IN 42149 208 17 . . . 42149 209 1 above above IN 42149 209 2 the the DT 42149 209 3 working working NN 42149 209 4 pressure pressure NN 42149 209 5 . . . 42149 210 1 The the DT 42149 210 2 air air NN 42149 210 3 supply supply NN 42149 210 4 was be VBD 42149 210 5 taken take VBN 42149 210 6 from from IN 42149 210 7 without without IN 42149 210 8 , , , 42149 210 9 and and CC 42149 210 10 above above IN 42149 210 11 the the DT 42149 210 12 power power NN 42149 210 13 - - HYPH 42149 210 14 house house NN 42149 210 15 roof roof NN 42149 210 16 , , , 42149 210 17 but but CC 42149 210 18 in in IN 42149 210 19 very very RB 42149 210 20 cold cold JJ 42149 210 21 weather weather NN 42149 210 22 it -PRON- PRP 42149 210 23 could could MD 42149 210 24 be be VB 42149 210 25 taken take VBN 42149 210 26 from from IN 42149 210 27 within within IN 42149 210 28 doors door NNS 42149 210 29 . . . 42149 211 1 _ _ NNP 42149 211 2 High High NNP 42149 211 3 - - HYPH 42149 211 4 Pressure Pressure NNP 42149 211 5 Compressors._--There Compressors._--There NNP 42149 211 6 was be VBD 42149 211 7 one one CD 42149 211 8 high high JJ 42149 211 9 - - HYPH 42149 211 10 pressure pressure NN 42149 211 11 compressor compressor NN 42149 211 12 at at IN 42149 211 13 each each DT 42149 211 14 plant plant NN 42149 211 15 . . . 42149 212 1 Each each DT 42149 212 2 consisted consist VBD 42149 212 3 of of IN 42149 212 4 two two CD 42149 212 5 duplex duplex NNP 42149 212 6 air air NN 42149 212 7 cylinders cylinder NNS 42149 212 8 fitted fit VBD 42149 212 9 to to IN 42149 212 10 a a DT 42149 212 11 cross cross JJ 42149 212 12 - - NN 42149 212 13 compound compound JJ 42149 212 14 , , , 42149 212 15 Corliss Corliss NNP 42149 212 16 - - HYPH 42149 212 17 Bass Bass NNP 42149 212 18 , , , 42149 212 19 steam steam NN 42149 212 20 engine engine NN 42149 212 21 . . . 42149 213 1 The the DT 42149 213 2 two two CD 42149 213 3 steam steam NN 42149 213 4 cylinders cylinder NNS 42149 213 5 were be VBD 42149 213 6 14 14 CD 42149 213 7 and and CC 42149 213 8 26 26 CD 42149 213 9 in in IN 42149 213 10 . . . 42149 214 1 in in IN 42149 214 2 diameter diameter NN 42149 214 3 , , , 42149 214 4 respectively respectively RB 42149 214 5 , , , 42149 214 6 and and CC 42149 214 7 the the DT 42149 214 8 air air NN 42149 214 9 cylinders cylinder NNS 42149 214 10 were be VBD 42149 214 11 14¼ 14â¼ CD 42149 214 12 in in IN 42149 214 13 . . . 42149 215 1 in in IN 42149 215 2 diameter diameter NN 42149 215 3 and and CC 42149 215 4 had have VBD 42149 215 5 a a DT 42149 215 6 36-in 36-in NNP 42149 215 7 . . . 42149 216 1 stroke stroke NN 42149 216 2 . . . 42149 217 1 The the DT 42149 217 2 air air NN 42149 217 3 cylinder cylinder NN 42149 217 4 was be VBD 42149 217 5 water water NN 42149 217 6 - - HYPH 42149 217 7 jacketed jacket VBN 42149 217 8 with with IN 42149 217 9 salt salt NN 42149 217 10 water water NN 42149 217 11 supplied supply VBN 42149 217 12 from from IN 42149 217 13 the the DT 42149 217 14 circulating circulate VBG 42149 217 15 water water NN 42149 217 16 pumps pump NNS 42149 217 17 . . . 42149 218 1 The the DT 42149 218 2 capacity capacity NN 42149 218 3 was be VBD 42149 218 4 about about RB 42149 218 5 1,100 1,100 CD 42149 218 6 cu cu NNS 42149 218 7 . . . 42149 219 1 ft ft NNP 42149 219 2 . . NNP 42149 219 3 of of IN 42149 219 4 free free JJ 42149 219 5 air air NN 42149 219 6 per per IN 42149 219 7 min min NN 42149 219 8 . . . 42149 220 1 when when WRB 42149 220 2 running run VBG 42149 220 3 at at IN 42149 220 4 85 85 CD 42149 220 5 rev rev NNP 42149 220 6 . . . 42149 221 1 per per IN 42149 221 2 min min NNP 42149 221 3 . . . 42149 222 1 and and CC 42149 222 2 using use VBG 42149 222 3 intake intake JJ 42149 222 4 air air NN 42149 222 5 at at IN 42149 222 6 normal normal JJ 42149 222 7 pressure pressure NN 42149 222 8 , , , 42149 222 9 but but CC 42149 222 10 , , , 42149 222 11 when when WRB 42149 222 12 receiving receive VBG 42149 222 13 air air NN 42149 222 14 from from IN 42149 222 15 the the DT 42149 222 16 low low JJ 42149 222 17 - - HYPH 42149 222 18 pressure pressure NN 42149 222 19 compressors compressor NNS 42149 222 20 at at IN 42149 222 21 a a DT 42149 222 22 pressure pressure NN 42149 222 23 of of IN 42149 222 24 30 30 CD 42149 222 25 lb lb NN 42149 222 26 . . . 42149 223 1 per per IN 42149 223 2 sq sq NNP 42149 223 3 . . . 42149 224 1 in in IN 42149 224 2 . . NNP 42149 224 3 , , , 42149 224 4 the the DT 42149 224 5 capacity capacity NN 42149 224 6 was be VBD 42149 224 7 3,305 3,305 CD 42149 224 8 cu cu NN 42149 224 9 . . . 42149 225 1 ft ft NNP 42149 225 2 . . NNP 42149 225 3 of of IN 42149 225 4 free free JJ 42149 225 5 air air NN 42149 225 6 per per IN 42149 225 7 min min NN 42149 225 8 . . . 42149 226 1 ; ; : 42149 226 2 receiving receive VBG 42149 226 3 air air NN 42149 226 4 at at IN 42149 226 5 50 50 CD 42149 226 6 lb lb IN 42149 226 7 . . . 42149 227 1 per per IN 42149 227 2 sq sq NNP 42149 227 3 . . . 42149 228 1 in in IN 42149 228 2 . . NNP 42149 228 3 , , , 42149 228 4 the the DT 42149 228 5 capacity capacity NN 42149 228 6 would would MD 42149 228 7 have have VB 42149 228 8 been be VBN 42149 228 9 4,847 4,847 CD 42149 228 10 cu cu NNS 42149 228 11 . . . 42149 229 1 ft ft NNP 42149 229 2 . . NNP 42149 229 3 of of IN 42149 229 4 free free JJ 42149 229 5 air air NN 42149 229 6 per per IN 42149 229 7 min min NN 42149 229 8 . . . 42149 230 1 This this DT 42149 230 2 latter latter JJ 42149 230 3 arrangement arrangement NN 42149 230 4 , , , 42149 230 5 however however RB 42149 230 6 , , , 42149 230 7 called call VBD 42149 230 8 for for IN 42149 230 9 more more JJR 42149 230 10 air air NN 42149 230 11 than than IN 42149 230 12 the the DT 42149 230 13 low low JJ 42149 230 14 - - HYPH 42149 230 15 pressure pressure NN 42149 230 16 compressors compressor NNS 42149 230 17 could could MD 42149 230 18 deliver deliver VB 42149 230 19 . . . 42149 231 1 With with IN 42149 231 2 the the DT 42149 231 3 low low JJ 42149 231 4 - - HYPH 42149 231 5 pressure pressure NN 42149 231 6 compressor compressor NN 42149 231 7 running run VBG 42149 231 8 at at IN 42149 231 9 125 125 CD 42149 231 10 rev rev NNP 42149 231 11 . . . 42149 232 1 per per IN 42149 232 2 min min NNP 42149 232 3 . . . 42149 233 1 ( ( -LRB- 42149 233 2 its -PRON- PRP$ 42149 233 3 maximum maximum JJ 42149 233 4 speed speed NN 42149 233 5 ) ) -RRB- 42149 233 6 , , , 42149 233 7 it -PRON- PRP 42149 233 8 could could MD 42149 233 9 furnish furnish VB 42149 233 10 enough enough JJ 42149 233 11 air air NN 42149 233 12 at at IN 42149 233 13 43.8 43.8 CD 42149 233 14 lb lb IN 42149 233 15 . . . 42149 234 1 per per IN 42149 234 2 sq sq NNP 42149 234 3 . . . 42149 235 1 in in IN 42149 235 2 . . . 42149 236 1 to to TO 42149 236 2 supply supply VB 42149 236 3 the the DT 42149 236 4 high high JJ 42149 236 5 - - HYPH 42149 236 6 pressure pressure NN 42149 236 7 compressor compressor NN 42149 236 8 running run VBG 42149 236 9 at at IN 42149 236 10 85 85 CD 42149 236 11 rev rev NNP 42149 236 12 . . . 42149 237 1 per per IN 42149 237 2 min min NNP 42149 237 3 . . . 42149 238 1 ( ( -LRB- 42149 238 2 its -PRON- PRP$ 42149 238 3 maximum maximum JJ 42149 238 4 speed speed NN 42149 238 5 ) ) -RRB- 42149 238 6 ; ; : 42149 238 7 and and CC 42149 238 8 , , , 42149 238 9 with with IN 42149 238 10 the the DT 42149 238 11 high high JJ 42149 238 12 - - HYPH 42149 238 13 pressure pressure NN 42149 238 14 compressor compressor NN 42149 238 15 delivering deliver VBG 42149 238 16 compressed compress VBN 42149 238 17 air air NN 42149 238 18 at at IN 42149 238 19 150 150 CD 42149 238 20 lb lb RB 42149 238 21 . . . 42149 238 22 , , , 42149 238 23 the the DT 42149 238 24 combined combine VBN 42149 238 25 capacity capacity NN 42149 238 26 of of IN 42149 238 27 the the DT 42149 238 28 arrangement arrangement NN 42149 238 29 would would MD 42149 238 30 have have VB 42149 238 31 been be VBN 42149 238 32 4,389 4,389 CD 42149 238 33 cu cu NNS 42149 238 34 . . . 42149 239 1 ft ft NNP 42149 239 2 . . NNP 42149 239 3 of of IN 42149 239 4 free free JJ 42149 239 5 air air NN 42149 239 6 per per IN 42149 239 7 min min NN 42149 239 8 . . . 42149 240 1 The the DT 42149 240 2 air air NN 42149 240 3 passed pass VBD 42149 240 4 through through IN 42149 240 5 a a DT 42149 240 6 receiver receiver NN 42149 240 7 , , , 42149 240 8 4 4 CD 42149 240 9 ft ft NN 42149 240 10 . . NNP 42149 240 11 6 6 CD 42149 240 12 in in IN 42149 240 13 . . . 42149 241 1 in in IN 42149 241 2 diameter diameter NN 42149 241 3 and and CC 42149 241 4 12 12 CD 42149 241 5 ft ft NN 42149 241 6 . . NNP 42149 241 7 high high JJ 42149 241 8 , , , 42149 241 9 tested test VBN 42149 241 10 under under IN 42149 241 11 a a DT 42149 241 12 water water NN 42149 241 13 pressure pressure NN 42149 241 14 of of IN 42149 241 15 225 225 CD 42149 241 16 lb lb RB 42149 241 17 . . . 42149 242 1 per per IN 42149 242 2 sq sq NNP 42149 242 3 . . . 42149 243 1 in in IN 42149 243 2 . . NNP 42149 243 3 , , , 42149 243 4 before before IN 42149 243 5 being be VBG 42149 243 6 sent send VBN 42149 243 7 through through IN 42149 243 8 the the DT 42149 243 9 distributing distribute VBG 42149 243 10 pipes pipe NNS 42149 243 11 . . . 42149 244 1 _ _ NNP 42149 244 2 Hydraulic Hydraulic NNP 42149 244 3 Power Power NNP 42149 244 4 Pumps._--At pumps._--at NN 42149 244 5 each each DT 42149 244 6 power power NN 42149 244 7 - - HYPH 42149 244 8 house house NN 42149 244 9 there there EX 42149 244 10 were be VBD 42149 244 11 three three CD 42149 244 12 hydraulic hydraulic JJ 42149 244 13 power power NN 42149 244 14 pumps pump NNS 42149 244 15 to to TO 42149 244 16 operate operate VB 42149 244 17 the the DT 42149 244 18 tunneling tunneling NN 42149 244 19 shields shield NNS 42149 244 20 . . . 42149 245 1 One one CD 42149 245 2 pump pump NN 42149 245 3 was be VBD 42149 245 4 used use VBN 42149 245 5 for for IN 42149 245 6 each each DT 42149 245 7 tunnel tunnel NN 42149 245 8 , , , 42149 245 9 leaving leave VBG 42149 245 10 the the DT 42149 245 11 third third JJ 42149 245 12 as as IN 42149 245 13 a a DT 42149 245 14 stand stand NN 42149 245 15 - - HYPH 42149 245 16 by by NN 42149 245 17 . . . 42149 246 1 The the DT 42149 246 2 duplex duplex NN 42149 246 3 steam steam NN 42149 246 4 cylinders cylinder NNS 42149 246 5 were be VBD 42149 246 6 15 15 CD 42149 246 7 in in IN 42149 246 8 . . . 42149 247 1 in in IN 42149 247 2 diameter diameter NN 42149 247 3 , , , 42149 247 4 with with IN 42149 247 5 a a DT 42149 247 6 10-in 10-in NN 42149 247 7 . . . 42149 248 1 stroke stroke NN 42149 248 2 ; ; : 42149 248 3 the the DT 42149 248 4 duplex duplex NNP 42149 248 5 water water NN 42149 248 6 rams ram NNS 42149 248 7 were be VBD 42149 248 8 2 2 CD 42149 248 9 - - SYM 42149 248 10 1/8 1/8 CD 42149 248 11 in in IN 42149 248 12 . . . 42149 249 1 in in IN 42149 249 2 diameter diameter NN 42149 249 3 with with IN 42149 249 4 a a DT 42149 249 5 10-in 10-in NNP 42149 249 6 . . . 42149 250 1 stroke stroke NN 42149 250 2 . . . 42149 251 1 The the DT 42149 251 2 pumps pump NNS 42149 251 3 were be VBD 42149 251 4 designed design VBN 42149 251 5 to to TO 42149 251 6 work work VB 42149 251 7 up up IN 42149 251 8 to to IN 42149 251 9 6,000 6,000 CD 42149 251 10 lb lb RB 42149 251 11 . . . 42149 252 1 per per IN 42149 252 2 sq sq NNP 42149 252 3 . . . 42149 253 1 in in IN 42149 253 2 . . NNP 42149 253 3 , , , 42149 253 4 but but CC 42149 253 5 the the DT 42149 253 6 usual usual JJ 42149 253 7 working working NN 42149 253 8 pressure pressure NN 42149 253 9 was be VBD 42149 253 10 about about RB 42149 253 11 4,500 4,500 CD 42149 253 12 lb lb RB 42149 253 13 . . . 42149 254 1 The the DT 42149 254 2 piping piping NN 42149 254 3 , , , 42149 254 4 which which WDT 42149 254 5 was be VBD 42149 254 6 extra extra RB 42149 254 7 heavy heavy JJ 42149 254 8 hydraulic hydraulic NNP 42149 254 9 , , , 42149 254 10 was be VBD 42149 254 11 connected connect VBN 42149 254 12 by by IN 42149 254 13 heavy heavy JJ 42149 254 14 cast cast NN 42149 254 15 - - HYPH 42149 254 16 steel steel NN 42149 254 17 screw screw NN 42149 254 18 couplings coupling NNS 42149 254 19 having have VBG 42149 254 20 a a DT 42149 254 21 hexagonal hexagonal JJ 42149 254 22 cross cross JJ 42149 254 23 - - NN 42149 254 24 section section NN 42149 254 25 in in IN 42149 254 26 the the DT 42149 254 27 middle middle NN 42149 254 28 to to TO 42149 254 29 enable enable VB 42149 254 30 tightening tighten VBG 42149 254 31 to to TO 42149 254 32 be be VB 42149 254 33 done do VBN 42149 254 34 with with IN 42149 254 35 a a DT 42149 254 36 bolt bolt NN 42149 254 37 wrench wrench NN 42149 254 38 . . . 42149 255 1 The the DT 42149 255 2 piping piping NN 42149 255 3 was be VBD 42149 255 4 designed design VBN 42149 255 5 to to TO 42149 255 6 withstand withstand VB 42149 255 7 a a DT 42149 255 8 pressure pressure NN 42149 255 9 of of IN 42149 255 10 5,500 5,500 CD 42149 255 11 lb lb XX 42149 255 12 . . . 42149 256 1 per per IN 42149 256 2 sq sq NNP 42149 256 3 . . . 42149 257 1 in in IN 42149 257 2 . . . 42149 258 1 _ _ NNP 42149 258 2 Electric Electric NNP 42149 258 3 Generators._--At generators._--at NN 42149 258 4 each each DT 42149 258 5 plant plant NN 42149 258 6 there there EX 42149 258 7 were be VBD 42149 258 8 two two CD 42149 258 9 electric electric JJ 42149 258 10 generators generator NNS 42149 258 11 supplying supply VBG 42149 258 12 direct direct JJ 42149 258 13 current current NN 42149 258 14 for for IN 42149 258 15 both both CC 42149 258 16 lighting lighting NN 42149 258 17 and and CC 42149 258 18 power power NN 42149 258 19 , , , 42149 258 20 at at IN 42149 258 21 240 240 CD 42149 258 22 volts volt NNS 42149 258 23 , , , 42149 258 24 through through IN 42149 258 25 a a DT 42149 258 26 two two CD 42149 258 27 - - HYPH 42149 258 28 wire wire NN 42149 258 29 system system NN 42149 258 30 of of IN 42149 258 31 mains main NNS 42149 258 32 . . . 42149 259 1 They -PRON- PRP 42149 259 2 were be VBD 42149 259 3 of of IN 42149 259 4 Type Type NNP 42149 259 5 M M NNP 42149 259 6 - - HYPH 42149 259 7 P P NNP 42149 259 8 , , , 42149 259 9 Class Class NNP 42149 259 10 6 6 CD 42149 259 11 , , , 42149 259 12 100 100 CD 42149 259 13 kw kw NN 42149 259 14 . . . 42149 259 15 , , , 42149 259 16 400 400 CD 42149 259 17 amperes ampere NNS 42149 259 18 , , , 42149 259 19 250 250 CD 42149 259 20 rev rev NNP 42149 259 21 . . . 42149 260 1 per per IN 42149 260 2 min min NNP 42149 260 3 . . NNP 42149 260 4 , , , 42149 260 5 240 240 CD 42149 260 6 volts volt NNS 42149 260 7 no no DT 42149 260 8 load load NN 42149 260 9 and and CC 42149 260 10 250 250 CD 42149 260 11 volts volt NNS 42149 260 12 full full JJ 42149 260 13 load load NN 42149 260 14 . . . 42149 261 1 They -PRON- PRP 42149 261 2 were be VBD 42149 261 3 connected connect VBN 42149 261 4 direct direct RB 42149 261 5 to to IN 42149 261 6 10 10 CD 42149 261 7 by by IN 42149 261 8 20 20 CD 42149 261 9 by by IN 42149 261 10 14-in 14-in NNP 42149 261 11 . . . 42149 261 12 , , , 42149 261 13 center center NN 42149 261 14 - - HYPH 42149 261 15 crank crank NNP 42149 261 16 , , , 42149 261 17 tandem tandem NNP 42149 261 18 - - HYPH 42149 261 19 compound compound NNP 42149 261 20 , , , 42149 261 21 engines engine NNS 42149 261 22 of of IN 42149 261 23 150 150 CD 42149 261 24 h.p h.p NNP 42149 261 25 . . . 42149 262 1 at at IN 42149 262 2 250 250 CD 42149 262 3 rev rev NNP 42149 262 4 . . . 42149 263 1 per per IN 42149 263 2 min min NNP 42149 263 3 . . . 42149 264 1 A a DT 42149 264 2 switch switch NN 42149 264 3 - - HYPH 42149 264 4 board board NN 42149 264 5 , , , 42149 264 6 with with IN 42149 264 7 all all PDT 42149 264 8 the the DT 42149 264 9 necessary necessary JJ 42149 264 10 fuses fuse NNS 42149 264 11 , , , 42149 264 12 switches switch NNS 42149 264 13 , , , 42149 264 14 and and CC 42149 264 15 meters meter NNS 42149 264 16 , , , 42149 264 17 was be VBD 42149 264 18 provided provide VBN 42149 264 19 at at IN 42149 264 20 each each DT 42149 264 21 plant plant NN 42149 264 22 . . . 42149 265 1 _ _ NNP 42149 265 2 Lubrication._--In lubrication._--in NN 42149 265 3 the the DT 42149 265 4 lubricating lubricating NN 42149 265 5 system system NN 42149 265 6 three three CD 42149 265 7 distinct distinct JJ 42149 265 8 systems system NNS 42149 265 9 were be VBD 42149 265 10 used use VBN 42149 265 11 , , , 42149 265 12 each each DT 42149 265 13 requiring require VBG 42149 265 14 its -PRON- PRP$ 42149 265 15 own own JJ 42149 265 16 special special JJ 42149 265 17 grade grade NN 42149 265 18 of of IN 42149 265 19 oil oil NN 42149 265 20 . . . 42149 266 1 The the DT 42149 266 2 journals journal NNS 42149 266 3 and and CC 42149 266 4 bearings bearing NNS 42149 266 5 were be VBD 42149 266 6 lubricated lubricate VBN 42149 266 7 with with IN 42149 266 8 ordinary ordinary JJ 42149 266 9 engine engine NN 42149 266 10 oil oil NN 42149 266 11 by by IN 42149 266 12 a a DT 42149 266 13 gravity gravity NN 42149 266 14 system system NN 42149 266 15 ; ; : 42149 266 16 the the DT 42149 266 17 oil oil NN 42149 266 18 after after IN 42149 266 19 use use NN 42149 266 20 passed pass VBD 42149 266 21 through through IN 42149 266 22 a a DT 42149 266 23 " " `` 42149 266 24 White White NNP 42149 266 25 Star Star NNP 42149 266 26 " " '' 42149 266 27 filter filter NN 42149 266 28 , , , 42149 266 29 and and CC 42149 266 30 was be VBD 42149 266 31 pumped pump VBN 42149 266 32 into into IN 42149 266 33 a a DT 42149 266 34 tank tank NN 42149 266 35 about about RB 42149 266 36 15 15 CD 42149 266 37 ft ft NN 42149 266 38 . . NN 42149 266 39 above above IN 42149 266 40 the the DT 42149 266 41 engine engine NN 42149 266 42 - - HYPH 42149 266 43 room room NN 42149 266 44 floor floor NN 42149 266 45 . . . 42149 267 1 The the DT 42149 267 2 low low JJ 42149 267 3 - - HYPH 42149 267 4 pressure pressure NN 42149 267 5 air air NN 42149 267 6 cylinders cylinder NNS 42149 267 7 were be VBD 42149 267 8 lubricated lubricate VBN 42149 267 9 with with IN 42149 267 10 " " `` 42149 267 11 High high JJ 42149 267 12 Test test NN 42149 267 13 " " '' 42149 267 14 oil oil NN 42149 267 15 , , , 42149 267 16 having have VBG 42149 267 17 a a DT 42149 267 18 flash flash NN 42149 267 19 point point NN 42149 267 20 of of IN 42149 267 21 600 600â CD 42149 267 22 ° ° NNS 42149 267 23 Fahr Fahr NNS 42149 267 24 . . . 42149 268 1 The the DT 42149 268 2 oil oil NN 42149 268 3 was be VBD 42149 268 4 forced force VBN 42149 268 5 from from IN 42149 268 6 a a DT 42149 268 7 receiving receive VBG 42149 268 8 tank tank NN 42149 268 9 into into IN 42149 268 10 an an DT 42149 268 11 elevated elevated JJ 42149 268 12 tank tank NN 42149 268 13 by by IN 42149 268 14 high high JJ 42149 268 15 - - HYPH 42149 268 16 pressure pressure NN 42149 268 17 air air NN 42149 268 18 . . . 42149 269 1 When when WRB 42149 269 2 the the DT 42149 269 3 tank tank NN 42149 269 4 was be VBD 42149 269 5 full full JJ 42149 269 6 the the DT 42149 269 7 high high JJ 42149 269 8 - - HYPH 42149 269 9 pressure pressure NN 42149 269 10 air air NN 42149 269 11 was be VBD 42149 269 12 turned turn VBN 42149 269 13 off off RP 42149 269 14 and and CC 42149 269 15 the the DT 42149 269 16 low low JJ 42149 269 17 - - HYPH 42149 269 18 pressure pressure NN 42149 269 19 air air NN 42149 269 20 was be VBD 42149 269 21 turned turn VBN 42149 269 22 on on RP 42149 269 23 , , , 42149 269 24 in in IN 42149 269 25 this this DT 42149 269 26 way way NN 42149 269 27 the the DT 42149 269 28 air air NN 42149 269 29 pressure pressure NN 42149 269 30 in in IN 42149 269 31 the the DT 42149 269 32 oil oil NN 42149 269 33 tank tank NN 42149 269 34 equalled equal VBD 42149 269 35 that that IN 42149 269 36 in in IN 42149 269 37 the the DT 42149 269 38 air air NN 42149 269 39 cylinder cylinder NN 42149 269 40 being be VBG 42149 269 41 lubricated lubricate VBN 42149 269 42 , , , 42149 269 43 thus thus RB 42149 269 44 allowing allow VBG 42149 269 45 a a DT 42149 269 46 perfect perfect JJ 42149 269 47 gravity gravity NN 42149 269 48 system system NN 42149 269 49 to to TO 42149 269 50 exist exist VB 42149 269 51 . . . 42149 270 1 The the DT 42149 270 2 steam steam NN 42149 270 3 cylinders cylinder NNS 42149 270 4 and and CC 42149 270 5 the the DT 42149 270 6 high high JJ 42149 270 7 - - HYPH 42149 270 8 pressure pressure NN 42149 270 9 air air NN 42149 270 10 cylinders cylinder NNS 42149 270 11 were be VBD 42149 270 12 fed feed VBN 42149 270 13 with with IN 42149 270 14 oil oil NN 42149 270 15 from from IN 42149 270 16 hand hand NN 42149 270 17 - - HYPH 42149 270 18 fed feed VBN 42149 270 19 automatic automatic JJ 42149 270 20 lubricators lubricator NNS 42149 270 21 made make VBN 42149 270 22 by by IN 42149 270 23 the the DT 42149 270 24 Detroit Detroit NNP 42149 270 25 Lubrication Lubrication NNP 42149 270 26 Company Company NNP 42149 270 27 , , , 42149 270 28 Detroit Detroit NNP 42149 270 29 , , , 42149 270 30 Mich. Michigan NNP 42149 270 31 " " `` 42149 270 32 Steam Steam NNP 42149 270 33 Cylinder Cylinder NNP 42149 270 34 " " '' 42149 270 35 oil oil NN 42149 270 36 was be VBD 42149 270 37 used use VBN 42149 270 38 for for IN 42149 270 39 the the DT 42149 270 40 steam steam NN 42149 270 41 cylinders cylinder NNS 42149 270 42 and and CC 42149 270 43 " " `` 42149 270 44 High high JJ 42149 270 45 Test Test NNP 42149 270 46 " " '' 42149 270 47 oil oil NN 42149 270 48 ( ( -LRB- 42149 270 49 the the DT 42149 270 50 same same JJ 42149 270 51 as as IN 42149 270 52 used use VBN 42149 270 53 for for IN 42149 270 54 the the DT 42149 270 55 low low JJ 42149 270 56 - - HYPH 42149 270 57 pressure pressure NN 42149 270 58 air air NN 42149 270 59 cylinders cylinder NNS 42149 270 60 ) ) -RRB- 42149 270 61 for for IN 42149 270 62 the the DT 42149 270 63 high high JJ 42149 270 64 - - HYPH 42149 270 65 pressure pressure NN 42149 270 66 air air NN 42149 270 67 cylinders cylinder NNS 42149 270 68 . . . 42149 271 1 The the DT 42149 271 2 air air NN 42149 271 3 cylinder cylinder NN 42149 271 4 and and CC 42149 271 5 steam steam NN 42149 271 6 cylinder cylinder NN 42149 271 7 lubricators lubricator NNS 42149 271 8 were be VBD 42149 271 9 of of IN 42149 271 10 the the DT 42149 271 11 same same JJ 42149 271 12 kind kind NN 42149 271 13 , , , 42149 271 14 except except IN 42149 271 15 that that IN 42149 271 16 no no DT 42149 271 17 condensers condenser NNS 42149 271 18 were be VBD 42149 271 19 necessary necessary JJ 42149 271 20 . . . 42149 272 1 The the DT 42149 272 2 steam steam NN 42149 272 3 cylinder cylinder NN 42149 272 4 and and CC 42149 272 5 engine engine NN 42149 272 6 oil oil NN 42149 272 7 was be VBD 42149 272 8 caught catch VBN 42149 272 9 on on IN 42149 272 10 drip drip NN 42149 272 11 pans pan NNS 42149 272 12 , , , 42149 272 13 and and CC 42149 272 14 , , , 42149 272 15 after after IN 42149 272 16 being be VBG 42149 272 17 filtered filter VBN 42149 272 18 , , , 42149 272 19 was be VBD 42149 272 20 used use VBN 42149 272 21 again again RB 42149 272 22 as as IN 42149 272 23 engine engine NN 42149 272 24 oil oil NN 42149 272 25 in in IN 42149 272 26 the the DT 42149 272 27 bearings bearing NNS 42149 272 28 . . . 42149 273 1 The the DT 42149 273 2 oil oil NN 42149 273 3 from from IN 42149 273 4 the the DT 42149 273 5 air air NN 42149 273 6 cylinders cylinder NNS 42149 273 7 was be VBD 42149 273 8 not not RB 42149 273 9 saved save VBN 42149 273 10 , , , 42149 273 11 nor nor CC 42149 273 12 was be VBD 42149 273 13 that that DT 42149 273 14 from from IN 42149 273 15 the the DT 42149 273 16 steam steam NN 42149 273 17 cylinders cylinder NNS 42149 273 18 caught catch VBN 42149 273 19 at at IN 42149 273 20 the the DT 42149 273 21 separator separator NN 42149 273 22 . . . 42149 274 1 _ _ NNP 42149 274 2 Cost cost NN 42149 274 3 of of IN 42149 274 4 Operating operate VBG 42149 274 5 the the DT 42149 274 6 Power Power NNP 42149 274 7 - - HYPH 42149 274 8 House House NNP 42149 274 9 Plants._--In plants._--in NN 42149 274 10 order order NN 42149 274 11 to to TO 42149 274 12 give give VB 42149 274 13 an an DT 42149 274 14 idea idea NN 42149 274 15 of of IN 42149 274 16 the the DT 42149 274 17 general general JJ 42149 274 18 cost cost NN 42149 274 19 of of IN 42149 274 20 running run VBG 42149 274 21 these these DT 42149 274 22 plants plant NNS 42149 274 23 , , , 42149 274 24 Tables table NNS 42149 274 25 3 3 CD 42149 274 26 and and CC 42149 274 27 4 4 CD 42149 274 28 are be VBP 42149 274 29 given give VBN 42149 274 30 as as IN 42149 274 31 typical typical JJ 42149 274 32 of of IN 42149 274 33 the the DT 42149 274 34 force force NN 42149 274 35 employed employ VBN 42149 274 36 and and CC 42149 274 37 the the DT 42149 274 38 general general JJ 42149 274 39 supplies supply NNS 42149 274 40 needed need VBN 42149 274 41 for for IN 42149 274 42 a a DT 42149 274 43 24-hour 24-hour CD 42149 274 44 run run NN 42149 274 45 of of IN 42149 274 46 one one CD 42149 274 47 plant plant NN 42149 274 48 . . . 42149 275 1 Table table NN 42149 275 2 3 3 CD 42149 275 3 gives give VBZ 42149 275 4 a a DT 42149 275 5 typical typical JJ 42149 275 6 run run NN 42149 275 7 during during IN 42149 275 8 the the DT 42149 275 9 period period NN 42149 275 10 of of IN 42149 275 11 driving drive VBG 42149 275 12 the the DT 42149 275 13 shields shield NNS 42149 275 14 , , , 42149 275 15 and and CC 42149 275 16 Table table NN 42149 275 17 4 4 CD 42149 275 18 is be VBZ 42149 275 19 typical typical JJ 42149 275 20 of of IN 42149 275 21 the the DT 42149 275 22 period period NN 42149 275 23 of of IN 42149 275 24 concrete concrete JJ 42149 275 25 construction construction NN 42149 275 26 . . . 42149 276 1 In in IN 42149 276 2 the the DT 42149 276 3 latter latter JJ 42149 276 4 case case NN 42149 276 5 the the DT 42149 276 6 tunnels tunnel NNS 42149 276 7 were be VBD 42149 276 8 under under IN 42149 276 9 normal normal JJ 42149 276 10 air air NN 42149 276 11 pressure pressure NN 42149 276 12 . . . 42149 277 1 Before before IN 42149 277 2 the the DT 42149 277 3 junction junction NN 42149 277 4 of of IN 42149 277 5 the the DT 42149 277 6 shields shield NNS 42149 277 7 , , , 42149 277 8 both both DT 42149 277 9 plants plant NNS 42149 277 10 were be VBD 42149 277 11 running run VBG 42149 277 12 continuously continuously RB 42149 277 13 ; ; : 42149 277 14 after after IN 42149 277 15 the the DT 42149 277 16 junction junction NN 42149 277 17 , , , 42149 277 18 but but CC 42149 277 19 while while IN 42149 277 20 the the DT 42149 277 21 tunnels tunnel NNS 42149 277 22 were be VBD 42149 277 23 still still RB 42149 277 24 under under IN 42149 277 25 compressed compress VBN 42149 277 26 air air NN 42149 277 27 , , , 42149 277 28 only only RB 42149 277 29 one one CD 42149 277 30 power power NN 42149 277 31 - - HYPH 42149 277 32 house house NN 42149 277 33 plant plant NN 42149 277 34 was be VBD 42149 277 35 operated operate VBN 42149 277 36 . . . 42149 278 1 TABLE TABLE NNP 42149 278 2 3.--COST 3.--cost CD 42149 278 3 OF of IN 42149 278 4 OPERATING operate VBG 42149 278 5 ONE one CD 42149 278 6 POWER POWER NNP 42149 278 7 - - HYPH 42149 278 8 HOUSE house NN 42149 278 9 FOR for IN 42149 278 10 24 24 CD 42149 278 11 HOURS hour NNS 42149 278 12 DURING during IN 42149 278 13 EXCAVATION excavation NN 42149 278 14 AND and CC 42149 278 15 METAL metal NN 42149 278 16 LINING LINING NNP 42149 278 17 . . . 42149 279 1 = = NFP 42149 279 2 = = NFP 42149 279 3 = = SYM 42149 279 4 + + SYM 42149 279 5 = = SYM 42149 279 6 = = SYM 42149 279 7 = = SYM 42149 279 8 = = SYM 42149 279 9 = = SYM 42149 279 10 = = SYM 42149 279 11 = = SYM 42149 279 12 = = SYM 42149 279 13 = = SYM 42149 279 14 = = SYM 42149 279 15 = = SYM 42149 279 16 = = SYM 42149 279 17 = = SYM 42149 279 18 = = SYM 42149 279 19 = = SYM 42149 279 20 = = SYM 42149 279 21 = = SYM 42149 279 22 = = NFP 42149 279 23 = = SYM 42149 279 24 + + SYM 42149 279 25 = = SYM 42149 279 26 = = SYM 42149 279 27 = = SYM 42149 279 28 = = SYM 42149 279 29 = = SYM 42149 279 30 = = SYM 42149 279 31 = = SYM 42149 279 32 = = SYM 42149 279 33 = = SYM 42149 279 34 = = SYM 42149 279 35 = = SYM 42149 279 36 = = SYM 42149 279 37 = = SYM 42149 279 38 = = SYM 42149 279 39 = = SYM 42149 279 40 = = SYM 42149 279 41 = = SYM 42149 279 42 = = SYM 42149 279 43 = = NFP 42149 279 44 = = SYM 42149 279 45 + + SYM 42149 279 46 = = SYM 42149 279 47 = = SYM 42149 279 48 = = SYM 42149 279 49 = = SYM 42149 279 50 = = SYM 42149 279 51 = = SYM 42149 279 52 = = SYM 42149 279 53 = = SYM 42149 279 54 = = SYM 42149 279 55 = = SYM 42149 279 56 = = SYM 42149 279 57 = = NFP 42149 279 58 = = SYM 42149 279 59 No.| No.| NNP 42149 279 60 Labor Labor NNP 42149 279 61 . . . 42149 280 1 | | NNS 42149 280 2 Rate rate NN 42149 280 3 per per IN 42149 280 4 day day NN 42149 280 5 . . . 42149 281 1 | | NNP 42149 281 2 Amount Amount NNP 42149 281 3 . . . 42149 282 1 ---+-------------------+--------------------+------------- ---+-------------------+--------------------+------------- NNP 42149 282 2 6 6 CD 42149 282 3 |Engineers |engineer NNS 42149 282 4 | | VBD 42149 282 5 $ $ $ 42149 282 6 3.00 3.00 CD 42149 282 7 | | CD 42149 282 8 $ $ $ 42149 282 9 18.00 18.00 CD 42149 282 10 6 6 CD 42149 282 11 |Firemen |fireman NNS 42149 282 12 | | CD 42149 282 13 2.50 2.50 CD 42149 282 14 | | CD 42149 282 15 15.00 15.00 CD 42149 282 16 2 2 CD 42149 282 17 |Oilers |oiler NNS 42149 282 18 | | CD 42149 282 19 2.00 2.00 CD 42149 282 20 | | CD 42149 282 21 4.00 4.00 CD 42149 282 22 2 2 CD 42149 282 23 |Laborers |laborer NNS 42149 282 24 | | CD 42149 282 25 2.00 2.00 CD 42149 282 26 | | CD 42149 282 27 4.00 4.00 CD 42149 282 28 4 4 CD 42149 282 29 |Pumpmen |pumpman NNS 42149 282 30 | | CD 42149 282 31 2.75 2.75 CD 42149 282 32 | | CD 42149 282 33 11.00 11.00 CD 42149 282 34 2 2 CD 42149 282 35 |Electricians |electrician NNS 42149 282 36 | | CD 42149 282 37 3.50 3.50 CD 42149 282 38 | | CD 42149 282 39 7.00 7.00 CD 42149 282 40 1 1 CD 42149 282 41 |Helper |helper CD 42149 282 42 | | CD 42149 282 43 3.00 3.00 CD 42149 282 44 | | CD 42149 282 45 3.00 3.00 CD 42149 282 46 ---+-------------------+--------------------+------------- ---+-------------------+--------------------+------------- NNPS 42149 282 47 Total total NN 42149 282 48 per per IN 42149 282 49 day day NN 42149 282 50 | | CD 42149 282 51 $ $ $ 42149 282 52 62.00 62.00 CD 42149 282 53 --------------------------------------------+------------- --------------------------------------------+------------- NN 42149 282 54 Total total NN 42149 282 55 for for IN 42149 282 56 30 30 CD 42149 282 57 days day NNS 42149 282 58 | | CD 42149 282 59 $ $ $ 42149 282 60 1,860.00 1,860.00 CD 42149 282 61 --------------------------------------------+------------- --------------------------------------------+------------- HYPH 42149 282 62 Supplies supply NNS 42149 282 63 . . . 42149 283 1 -----------------------+--------------------+------------- -----------------------+--------------------+------------- NFP 42149 283 2 Coal coal NN 42149 283 3 ( ( -LRB- 42149 283 4 14 14 CD 42149 283 5 tons ton NNS 42149 283 6 per per IN 42149 283 7 day day NN 42149 283 8 ) ) -RRB- 42149 283 9 | | POS 42149 283 10 $ $ $ 42149 283 11 3.25 3.25 CD 42149 283 12 | | CD 42149 283 13 $ $ $ 42149 283 14 45.50 45.50 CD 42149 283 15 Water Water NNP 42149 283 16 | | NNP 42149 283 17 7.00 7.00 CD 42149 283 18 | | CD 42149 283 19 7.00 7.00 CD 42149 283 20 Oil oil NN 42149 283 21 ( ( -LRB- 42149 283 22 4 4 CD 42149 283 23 gal gal NN 42149 283 24 . . . 42149 284 1 per per IN 42149 284 2 day day NN 42149 284 3 ) ) -RRB- 42149 284 4 | | CD 42149 284 5 0.50 0.50 CD 42149 284 6 | | CD 42149 284 7 2.00 2.00 CD 42149 284 8 Waste Waste NNP 42149 284 9 ( ( -LRB- 42149 284 10 4 4 CD 42149 284 11 lb lb IN 42149 284 12 . . . 42149 285 1 per per IN 42149 285 2 day day NN 42149 285 3 ) ) -RRB- 42149 285 4 | | NNP 42149 285 5 0.07 0.07 CD 42149 285 6 | | CD 42149 285 7 0.28 0.28 CD 42149 285 8 Other other JJ 42149 285 9 supplies supply NNS 42149 285 10 | | CD 42149 285 11 1.00 1.00 CD 42149 285 12 | | CD 42149 285 13 1.00 1.00 CD 42149 285 14 -----------------------+--------------------+------------- -----------------------+--------------------+------------- NFP 42149 285 15 Total total NN 42149 285 16 per per IN 42149 285 17 day day NN 42149 285 18 | | CD 42149 285 19 $ $ $ 42149 285 20 55.78 55.78 CD 42149 285 21 --------------------------------------------+------------- --------------------------------------------+------------- NFP 42149 285 22 Total total NN 42149 285 23 for for IN 42149 285 24 30 30 CD 42149 285 25 days day NNS 42149 285 26 | | CD 42149 285 27 $ $ $ 42149 285 28 1,673.00 1,673.00 CD 42149 285 29 --------------------------------------------+------------- --------------------------------------------+------------- NN 42149 285 30 Total total JJ 42149 285 31 cost cost NN 42149 285 32 of of IN 42149 285 33 labor labor NN 42149 285 34 and and CC 42149 285 35 supplies supply NNS 42149 285 36 for for IN 42149 285 37 30 30 CD 42149 285 38 days| days| CD 42149 285 39 $ $ $ 42149 285 40 3,533.00 3,533.00 CD 42149 285 41 = = SYM 42149 285 42 = = NFP 42149 285 43 = = SYM 42149 285 44 = = SYM 42149 285 45 = = SYM 42149 285 46 = = SYM 42149 285 47 = = SYM 42149 285 48 = = SYM 42149 285 49 = = SYM 42149 285 50 = = SYM 42149 285 51 = = SYM 42149 285 52 = = SYM 42149 285 53 = = SYM 42149 285 54 = = SYM 42149 285 55 = = SYM 42149 285 56 = = SYM 42149 285 57 = = SYM 42149 285 58 = = SYM 42149 285 59 = = SYM 42149 285 60 = = SYM 42149 285 61 = = SYM 42149 285 62 = = SYM 42149 285 63 = = SYM 42149 285 64 = = SYM 42149 285 65 = = SYM 42149 285 66 = = SYM 42149 285 67 = = SYM 42149 285 68 = = SYM 42149 285 69 = = SYM 42149 285 70 = = SYM 42149 285 71 = = SYM 42149 285 72 = = SYM 42149 285 73 = = SYM 42149 285 74 = = SYM 42149 285 75 = = SYM 42149 285 76 = = SYM 42149 285 77 = = SYM 42149 285 78 = = SYM 42149 285 79 = = SYM 42149 285 80 = = SYM 42149 285 81 = = SYM 42149 285 82 = = SYM 42149 285 83 = = NFP 42149 285 84 = = SYM 42149 285 85 + + SYM 42149 285 86 = = SYM 42149 285 87 = = SYM 42149 285 88 = = SYM 42149 285 89 = = SYM 42149 285 90 = = SYM 42149 285 91 = = SYM 42149 285 92 = = SYM 42149 285 93 = = SYM 42149 285 94 = = SYM 42149 285 95 = = SYM 42149 285 96 = = SYM 42149 285 97 = = NFP 42149 285 98 = = NFP 42149 285 99 _ _ NNP 42149 285 100 Stone Stone NNP 42149 285 101 - - HYPH 42149 285 102 Crusher Crusher NNP 42149 285 103 Plant._--A plant._--a IN 42149 285 104 short short JJ 42149 285 105 description description NN 42149 285 106 of of IN 42149 285 107 the the DT 42149 285 108 stone stone NN 42149 285 109 - - HYPH 42149 285 110 crusher crusher NN 42149 285 111 plant plant NN 42149 285 112 will will MD 42149 285 113 be be VB 42149 285 114 given give VBN 42149 285 115 , , , 42149 285 116 as as IN 42149 285 117 it -PRON- PRP 42149 285 118 played play VBD 42149 285 119 an an DT 42149 285 120 important important JJ 42149 285 121 part part NN 42149 285 122 in in IN 42149 285 123 the the DT 42149 285 124 economy economy NN 42149 285 125 of of IN 42149 285 126 the the DT 42149 285 127 concrete concrete JJ 42149 285 128 work work NN 42149 285 129 . . . 42149 286 1 In in IN 42149 286 2 order order NN 42149 286 3 to to TO 42149 286 4 provide provide VB 42149 286 5 crushed crushed JJ 42149 286 6 stone stone NN 42149 286 7 for for IN 42149 286 8 the the DT 42149 286 9 concrete concrete NN 42149 286 10 , , , 42149 286 11 the the DT 42149 286 12 contractor contractor NN 42149 286 13 bought buy VBD 42149 286 14 ( ( -LRB- 42149 286 15 from from IN 42149 286 16 the the DT 42149 286 17 contractor contractor NN 42149 286 18 who who WP 42149 286 19 built build VBD 42149 286 20 the the DT 42149 286 21 Bergen Bergen NNP 42149 286 22 Hill Hill NNP 42149 286 23 Tunnels Tunnels NNP 42149 286 24 ) ) -RRB- 42149 286 25 the the DT 42149 286 26 pile pile NN 42149 286 27 of of IN 42149 286 28 trap trap NN 42149 286 29 rock rock NN 42149 286 30 excavated excavate VBN 42149 286 31 from from IN 42149 286 32 these these DT 42149 286 33 tunnels tunnel NNS 42149 286 34 , , , 42149 286 35 which which WDT 42149 286 36 had have VBD 42149 286 37 been be VBN 42149 286 38 dumped dump VBN 42149 286 39 on on IN 42149 286 40 the the DT 42149 286 41 piece piece NN 42149 286 42 of of IN 42149 286 43 waste waste NN 42149 286 44 ground ground NN 42149 286 45 to to IN 42149 286 46 the the DT 42149 286 47 north north NN 42149 286 48 of of IN 42149 286 49 Baldwin Baldwin NNP 42149 286 50 Avenue Avenue NNP 42149 286 51 , , , 42149 286 52 Weehawken Weehawken NNP 42149 286 53 , , , 42149 286 54 N. N. NNP 42149 286 55 J. J. NNP 42149 287 1 The the DT 42149 287 2 general general JJ 42149 287 3 layout layout NN 42149 287 4 of of IN 42149 287 5 the the DT 42149 287 6 plant plant NN 42149 287 7 is be VBZ 42149 287 8 shown show VBN 42149 287 9 on on IN 42149 287 10 Plate Plate NNP 42149 287 11 XXX XXX NNP 42149 287 12 . . . 42149 288 1 It -PRON- PRP 42149 288 2 consisted consist VBD 42149 288 3 of of IN 42149 288 4 a a DT 42149 288 5 No no NN 42149 288 6 . . . 42149 289 1 6 6 CD 42149 289 2 and and CC 42149 289 3 a a DT 42149 289 4 No no NN 42149 289 5 . . . 42149 290 1 8 8 CD 42149 290 2 Austin Austin NNP 42149 290 3 crusher crusher NN 42149 290 4 , , , 42149 290 5 driven drive VBN 42149 290 6 by by IN 42149 290 7 an an DT 42149 290 8 Amex Amex NNP 42149 290 9 , , , 42149 290 10 single single JJ 42149 290 11 - - HYPH 42149 290 12 cylinder cylinder NN 42149 290 13 , , , 42149 290 14 horizontal horizontal JJ 42149 290 15 , , , 42149 290 16 steam steam NN 42149 290 17 engine engine NN 42149 290 18 of of IN 42149 290 19 120 120 CD 42149 290 20 h.p h.p NNP 42149 290 21 . . NNP 42149 290 22 , , , 42149 290 23 and and CC 42149 290 24 was be VBD 42149 290 25 capable capable JJ 42149 290 26 of of IN 42149 290 27 crushing crush VBG 42149 290 28 about about RB 42149 290 29 225 225 CD 42149 290 30 cu cu NNS 42149 290 31 . . . 42149 291 1 yd yd NNP 42149 291 2 . . . 42149 292 1 of of IN 42149 292 2 stone stone NNP 42149 292 3 per per IN 42149 292 4 10-hour 10-hour CD 42149 292 5 day day NN 42149 292 6 . . . 42149 293 1 The the DT 42149 293 2 crushers crusher NNS 42149 293 3 and and CC 42149 293 4 conveyors conveyor NNS 42149 293 5 were be VBD 42149 293 6 driven drive VBN 42149 293 7 from from IN 42149 293 8 a a DT 42149 293 9 countershaft countershaft NN 42149 293 10 , , , 42149 293 11 in in IN 42149 293 12 turn turn NN 42149 293 13 driven drive VBN 42149 293 14 from from IN 42149 293 15 the the DT 42149 293 16 engine engine NN 42149 293 17 by by IN 42149 293 18 an an DT 42149 293 19 18-in 18-in NNP 42149 293 20 . . . 42149 294 1 belt belt NN 42149 294 2 . . . 42149 295 1 TABLE table NN 42149 295 2 4.--COST 4.--cost CD 42149 295 3 OF of IN 42149 295 4 OPERATING operate VBG 42149 295 5 THE the DT 42149 295 6 ONE one CD 42149 295 7 PLANT PLANT NNP 42149 295 8 FOR for IN 42149 295 9 24 24 CD 42149 295 10 HOURS hour NNS 42149 295 11 DURING during IN 42149 295 12 CONCRETE concrete NN 42149 295 13 LINING LINING NNP 42149 295 14 . . . 42149 296 1 = = NFP 42149 296 2 = = NFP 42149 296 3 = = SYM 42149 296 4 + + SYM 42149 296 5 = = SYM 42149 296 6 = = SYM 42149 296 7 = = SYM 42149 296 8 = = SYM 42149 296 9 = = SYM 42149 296 10 = = SYM 42149 296 11 = = SYM 42149 296 12 = = SYM 42149 296 13 = = SYM 42149 296 14 = = SYM 42149 296 15 = = SYM 42149 296 16 = = SYM 42149 296 17 = = SYM 42149 296 18 = = SYM 42149 296 19 = = SYM 42149 296 20 = = SYM 42149 296 21 = = SYM 42149 296 22 = = NFP 42149 296 23 = = SYM 42149 296 24 + + SYM 42149 296 25 = = SYM 42149 296 26 = = SYM 42149 296 27 = = SYM 42149 296 28 = = SYM 42149 296 29 = = SYM 42149 296 30 = = SYM 42149 296 31 = = SYM 42149 296 32 = = SYM 42149 296 33 = = SYM 42149 296 34 = = SYM 42149 296 35 = = SYM 42149 296 36 = = SYM 42149 296 37 = = SYM 42149 296 38 = = SYM 42149 296 39 = = SYM 42149 296 40 = = SYM 42149 296 41 = = SYM 42149 296 42 = = SYM 42149 296 43 = = NFP 42149 296 44 = = SYM 42149 296 45 + + SYM 42149 296 46 = = SYM 42149 296 47 = = SYM 42149 296 48 = = SYM 42149 296 49 = = SYM 42149 296 50 = = SYM 42149 296 51 = = SYM 42149 296 52 = = SYM 42149 296 53 = = SYM 42149 296 54 = = SYM 42149 296 55 = = SYM 42149 296 56 = = SYM 42149 296 57 = = NFP 42149 296 58 = = SYM 42149 296 59 No.| No.| NNP 42149 296 60 Labor Labor NNP 42149 296 61 . . . 42149 297 1 | | NNS 42149 297 2 Rate rate NN 42149 297 3 per per IN 42149 297 4 day day NN 42149 297 5 . . . 42149 298 1 | | NNP 42149 298 2 Amount Amount NNP 42149 298 3 . . . 42149 299 1 ---+-------------------+--------------------+------------- ---+-------------------+--------------------+------------- NNP 42149 299 2 2 2 CD 42149 299 3 |Engineers |engineer NNS 42149 299 4 | | VBD 42149 299 5 $ $ $ 42149 299 6 3.00 3.00 CD 42149 299 7 | | CD 42149 299 8 $ $ $ 42149 299 9 6.00 6.00 CD 42149 299 10 2 2 CD 42149 299 11 |Firemen |firemen CD 42149 299 12 | | CD 42149 299 13 2.50 2.50 CD 42149 299 14 | | CD 42149 299 15 5.00 5.00 CD 42149 299 16 2 2 CD 42149 299 17 |Pumpmen |pumpman NNS 42149 299 18 | | CD 42149 299 19 3.00 3.00 CD 42149 299 20 | | CD 42149 299 21 6.00 6.00 CD 42149 299 22 1 1 CD 42149 299 23 |Foreman |foreman CD 42149 299 24 Electrician| electrician| VB 42149 299 25 6.00 6.00 CD 42149 299 26 | | CD 42149 299 27 6.00 6.00 CD 42149 299 28 1 1 CD 42149 299 29 |Electrician |electrician CD 42149 299 30 | | CD 42149 299 31 3.00 3.00 CD 42149 299 32 | | CD 42149 299 33 3.00 3.00 CD 42149 299 34 1 1 CD 42149 299 35 |Laborer |Laborer NNP 42149 299 36 | | CD 42149 299 37 2.00 2.00 CD 42149 299 38 | | CD 42149 299 39 2.00 2.00 CD 42149 299 40 ---+-------------------+--------------------+------------- ---+-------------------+--------------------+------------- NNPS 42149 299 41 Total total NN 42149 299 42 per per IN 42149 299 43 day day NN 42149 299 44 | | CD 42149 299 45 $ $ $ 42149 299 46 28.00 28.00 CD 42149 299 47 --------------------------------------------+------------- --------------------------------------------+------------- NN 42149 299 48 Total total NN 42149 299 49 for for IN 42149 299 50 30 30 CD 42149 299 51 days day NNS 42149 299 52 | | CD 42149 299 53 $ $ $ 42149 299 54 840.00 840.00 CD 42149 299 55 --------------------------------------------+------------- --------------------------------------------+------------- NFP 42149 299 56 Supplies supply NNS 42149 299 57 . . . 42149 300 1 -----------------------+--------------------+------------- -----------------------+--------------------+------------- NFP 42149 300 2 Coal coal NN 42149 300 3 ( ( -LRB- 42149 300 4 14 14 CD 42149 300 5 tons ton NNS 42149 300 6 per per IN 42149 300 7 day day NN 42149 300 8 ) ) -RRB- 42149 300 9 | | POS 42149 300 10 $ $ $ 42149 300 11 3.15 3.15 CD 42149 300 12 | | CD 42149 300 13 $ $ $ 42149 300 14 44.10 44.10 CD 42149 300 15 Oil oil NN 42149 300 16 ( ( -LRB- 42149 300 17 4 4 CD 42149 300 18 gal gal NN 42149 300 19 . . . 42149 301 1 per per IN 42149 301 2 day day NN 42149 301 3 ) ) -RRB- 42149 301 4 | | CD 42149 301 5 0.50 0.50 CD 42149 301 6 | | CD 42149 301 7 2.00 2.00 CD 42149 301 8 Water Water NNP 42149 301 9 | | CD 42149 301 10 13.00 13.00 CD 42149 301 11 | | CD 42149 301 12 13.00 13.00 CD 42149 301 13 Other other JJ 42149 301 14 supplies supply NNS 42149 301 15 | | CD 42149 301 16 2.00 2.00 CD 42149 301 17 | | CD 42149 301 18 2.00 2.00 CD 42149 301 19 -----------------------+--------------------+------------- -----------------------+--------------------+------------- NFP 42149 301 20 Total total NN 42149 301 21 per per IN 42149 301 22 day day NN 42149 301 23 | | CD 42149 301 24 $ $ $ 42149 301 25 61.10 61.10 CD 42149 301 26 --------------------------------------------+------------- --------------------------------------------+------------- NN 42149 301 27 Total total NN 42149 301 28 for for IN 42149 301 29 30 30 CD 42149 301 30 days day NNS 42149 301 31 | | CD 42149 301 32 $ $ $ 42149 301 33 1,833.00 1,833.00 CD 42149 301 34 --------------------------------------------+------------- --------------------------------------------+------------- NN 42149 301 35 Total total JJ 42149 301 36 cost cost NN 42149 301 37 of of IN 42149 301 38 labor labor NN 42149 301 39 and and CC 42149 301 40 supplies supply NNS 42149 301 41 for for IN 42149 301 42 30 30 CD 42149 301 43 days| days| CD 42149 301 44 $ $ $ 42149 301 45 2,673.00 2,673.00 CD 42149 301 46 = = SYM 42149 301 47 = = SYM 42149 301 48 = = SYM 42149 301 49 = = SYM 42149 301 50 = = SYM 42149 301 51 = = SYM 42149 301 52 = = SYM 42149 301 53 = = SYM 42149 301 54 = = SYM 42149 301 55 = = SYM 42149 301 56 = = SYM 42149 301 57 = = SYM 42149 301 58 = = SYM 42149 301 59 = = SYM 42149 301 60 = = SYM 42149 301 61 = = SYM 42149 301 62 = = SYM 42149 301 63 = = SYM 42149 301 64 = = SYM 42149 301 65 = = SYM 42149 301 66 = = SYM 42149 301 67 = = SYM 42149 301 68 = = SYM 42149 301 69 = = SYM 42149 301 70 = = SYM 42149 301 71 = = SYM 42149 301 72 = = SYM 42149 301 73 = = SYM 42149 301 74 = = SYM 42149 301 75 = = SYM 42149 301 76 = = SYM 42149 301 77 = = SYM 42149 301 78 = = SYM 42149 301 79 = = SYM 42149 301 80 = = SYM 42149 301 81 = = SYM 42149 301 82 = = SYM 42149 301 83 = = SYM 42149 301 84 = = SYM 42149 301 85 = = SYM 42149 301 86 = = SYM 42149 301 87 = = SYM 42149 301 88 = = NFP 42149 301 89 = = SYM 42149 301 90 + + SYM 42149 301 91 = = SYM 42149 301 92 = = SYM 42149 301 93 = = SYM 42149 301 94 = = SYM 42149 301 95 = = SYM 42149 301 96 = = SYM 42149 301 97 = = SYM 42149 301 98 = = SYM 42149 301 99 = = SYM 42149 301 100 = = SYM 42149 301 101 = = SYM 42149 301 102 = = NFP 42149 301 103 = = NFP 42149 301 104 The the DT 42149 301 105 process process NN 42149 301 106 of of IN 42149 301 107 crushing crushing NN 42149 301 108 was be VBD 42149 301 109 as as IN 42149 301 110 follows follow VBZ 42149 301 111 : : : 42149 301 112 The the DT 42149 301 113 stone stone NN 42149 301 114 from from IN 42149 301 115 the the DT 42149 301 116 pile pile NN 42149 301 117 was be VBD 42149 301 118 loaded load VBN 42149 301 119 by by IN 42149 301 120 hand hand NN 42149 301 121 into into IN 42149 301 122 scale scale NN 42149 301 123 - - HYPH 42149 301 124 boxes box NNS 42149 301 125 which which WDT 42149 301 126 were be VBD 42149 301 127 lifted lift VBN 42149 301 128 by by IN 42149 301 129 two two CD 42149 301 130 derricks derrick NNS 42149 301 131 into into IN 42149 301 132 the the DT 42149 301 133 chute chute NN 42149 301 134 above above IN 42149 301 135 the the DT 42149 301 136 No no NN 42149 301 137 . . . 42149 302 1 6 6 CD 42149 302 2 crusher crusher NN 42149 302 3 . . . 42149 303 1 One one CD 42149 303 2 derrick derrick NN 42149 303 3 had have VBD 42149 303 4 a a DT 42149 303 5 34-ft 34-ft NNP 42149 303 6 . . . 42149 303 7 mast mast NNP 42149 303 8 and and CC 42149 303 9 a a DT 42149 303 10 56-ft 56-ft NNP 42149 303 11 . . . 42149 303 12 boom boom NN 42149 303 13 , , , 42149 303 14 and and CC 42149 303 15 was be VBD 42149 303 16 worked work VBN 42149 303 17 by by IN 42149 303 18 a a DT 42149 303 19 Lidgerwood Lidgerwood NNP 42149 303 20 steam steam NN 42149 303 21 hoister hoister NN 42149 303 22 ; ; : 42149 303 23 the the DT 42149 303 24 other other JJ 42149 303 25 had have VBD 42149 303 26 a a DT 42149 303 27 23-ft 23-ft NNP 42149 303 28 . . . 42149 303 29 mast mast NNP 42149 303 30 and and CC 42149 303 31 a a DT 42149 303 32 45-ft 45-ft CD 42149 303 33 . . . 42149 303 34 boom boom NN 42149 303 35 , , , 42149 303 36 and and CC 42149 303 37 was be VBD 42149 303 38 worked work VBN 42149 303 39 by by IN 42149 303 40 a a DT 42149 303 41 " " `` 42149 303 42 General General NNP 42149 303 43 Electric Electric NNP 42149 303 44 " " '' 42149 303 45 hoist hoist NN 42149 303 46 . . . 42149 304 1 All all PDT 42149 304 2 the the DT 42149 304 3 stone stone NN 42149 304 4 passed pass VBD 42149 304 5 first first RB 42149 304 6 through through IN 42149 304 7 the the DT 42149 304 8 No no NN 42149 304 9 . . . 42149 305 1 6 6 CD 42149 305 2 crusher crusher NN 42149 305 3 , , , 42149 305 4 after after IN 42149 305 5 which which WDT 42149 305 6 it -PRON- PRP 42149 305 7 was be VBD 42149 305 8 lifted lift VBN 42149 305 9 by by IN 42149 305 10 a a DT 42149 305 11 bucket bucket NN 42149 305 12 conveyor conveyor NN 42149 305 13 to to IN 42149 305 14 a a DT 42149 305 15 screen screen NN 42149 305 16 , , , 42149 305 17 placed place VBN 42149 305 18 about about RB 42149 305 19 60 60 CD 42149 305 20 ft ft NN 42149 305 21 . . NN 42149 305 22 higher high JJR 42149 305 23 than than IN 42149 305 24 and and CC 42149 305 25 above above IN 42149 305 26 the the DT 42149 305 27 stone stone NN 42149 305 28 bin bin NN 42149 305 29 . . . 42149 306 1 The the DT 42149 306 2 screen screen NN 42149 306 3 was be VBD 42149 306 4 a a DT 42149 306 5 steel steel NN 42149 306 6 chute chute NN 42149 306 7 pierced pierce VBN 42149 306 8 by by IN 42149 306 9 2½-in 2â½-in CD 42149 306 10 . . . 42149 307 1 circular circular JJ 42149 307 2 holes hole NNS 42149 307 3 , , , 42149 307 4 and and CC 42149 307 5 was be VBD 42149 307 6 on on IN 42149 307 7 a a DT 42149 307 8 slope slope NN 42149 307 9 of of IN 42149 307 10 about about IN 42149 307 11 45 45â CD 42149 307 12 ° ° NNS 42149 307 13 ; ; , 42149 307 14 in in IN 42149 307 15 order order NN 42149 307 16 to to TO 42149 307 17 prevent prevent VB 42149 307 18 the the DT 42149 307 19 screen screen NN 42149 307 20 from from IN 42149 307 21 choking choke VBG 42149 307 22 , , , 42149 307 23 it -PRON- PRP 42149 307 24 was be VBD 42149 307 25 necessary necessary JJ 42149 307 26 to to TO 42149 307 27 have have VB 42149 307 28 two two CD 42149 307 29 men man NNS 42149 307 30 continually continually RB 42149 307 31 scraping scrape VBG 42149 307 32 the the DT 42149 307 33 stone stone NN 42149 307 34 over over IN 42149 307 35 it -PRON- PRP 42149 307 36 with with IN 42149 307 37 hoes hoe NNS 42149 307 38 . . . 42149 308 1 All all PDT 42149 308 2 the the DT 42149 308 3 stone stone NN 42149 308 4 passing pass VBG 42149 308 5 the the DT 42149 308 6 screen screen NN 42149 308 7 was be VBD 42149 308 8 discharged discharge VBN 42149 308 9 into into IN 42149 308 10 a a DT 42149 308 11 bin bin NN 42149 308 12 below below RB 42149 308 13 with with IN 42149 308 14 a a DT 42149 308 15 capacity capacity NN 42149 308 16 of of IN 42149 308 17 about about RB 42149 308 18 220 220 CD 42149 308 19 cu cu NNS 42149 308 20 . . . 42149 309 1 yd yd NNP 42149 309 2 . . . 42149 310 1 The the DT 42149 310 2 stone stone NN 42149 310 3 not not RB 42149 310 4 passing pass VBG 42149 310 5 the the DT 42149 310 6 screen screen NN 42149 310 7 passed pass VBN 42149 310 8 down down RP 42149 310 9 a a DT 42149 310 10 diagonal diagonal JJ 42149 310 11 chute chute NN 42149 310 12 to to IN 42149 310 13 a a DT 42149 310 14 No no NN 42149 310 15 . . . 42149 311 1 8 8 CD 42149 311 2 crusher crusher NN 42149 311 3 , , , 42149 311 4 from from IN 42149 311 5 which which WDT 42149 311 6 , , , 42149 311 7 after after IN 42149 311 8 crushing crush VBG 42149 311 9 , , , 42149 311 10 it -PRON- PRP 42149 311 11 was be VBD 42149 311 12 carried carry VBN 42149 311 13 back back RB 42149 311 14 by by IN 42149 311 15 a a DT 42149 311 16 second second JJ 42149 311 17 bucket bucket NN 42149 311 18 conveyor conveyor NN 42149 311 19 to to IN 42149 311 20 the the DT 42149 311 21 bin bin NN 42149 311 22 , , , 42149 311 23 into into IN 42149 311 24 which which WDT 42149 311 25 it -PRON- PRP 42149 311 26 was be VBD 42149 311 27 dumped dump VBN 42149 311 28 without without IN 42149 311 29 passing pass VBG 42149 311 30 a a DT 42149 311 31 screen screen NN 42149 311 32 . . . 42149 312 1 The the DT 42149 312 2 No no NN 42149 312 3 . . . 42149 313 1 8 8 CD 42149 313 2 crusher crusher NN 42149 313 3 was be VBD 42149 313 4 arranged arrange VBN 42149 313 5 so so IN 42149 313 6 that that IN 42149 313 7 it -PRON- PRP 42149 313 8 could could MD 42149 313 9 , , , 42149 313 10 when when WRB 42149 313 11 necessary necessary JJ 42149 313 12 , , , 42149 313 13 receive receive VB 42149 313 14 stone stone NN 42149 313 15 direct direct RB 42149 313 16 from from IN 42149 313 17 the the DT 42149 313 18 stone stone NN 42149 313 19 pile pile NN 42149 313 20 . . . 42149 314 1 The the DT 42149 314 2 cars car NNS 42149 314 3 in in IN 42149 314 4 which which WDT 42149 314 5 the the DT 42149 314 6 stone stone NN 42149 314 7 was be VBD 42149 314 8 removed remove VBN 42149 314 9 could could MD 42149 314 10 be be VB 42149 314 11 run run VBN 42149 314 12 under under IN 42149 314 13 the the DT 42149 314 14 bin bin NN 42149 314 15 and and CC 42149 314 16 filled fill VBN 42149 314 17 by by IN 42149 314 18 opening open VBG 42149 314 19 a a DT 42149 314 20 sliding slide VBG 42149 314 21 door door NN 42149 314 22 in in IN 42149 314 23 the the DT 42149 314 24 bottom bottom NN 42149 314 25 of of IN 42149 314 26 the the DT 42149 314 27 bin bin NN 42149 314 28 . . . 42149 315 1 A a DT 42149 315 2 track track NN 42149 315 3 was be VBD 42149 315 4 laid lay VBN 42149 315 5 from from IN 42149 315 6 the the DT 42149 315 7 bin bin NNP 42149 315 8 to to TO 42149 315 9 connect connect VB 42149 315 10 with with IN 42149 315 11 the the DT 42149 315 12 contractor contractor NN 42149 315 13 's 's POS 42149 315 14 surface surface NN 42149 315 15 railway railway NN 42149 315 16 in in IN 42149 315 17 the the DT 42149 315 18 Weehawken Weehawken NNP 42149 315 19 Shaft Shaft NNP 42149 315 20 yard yard NN 42149 315 21 , , , 42149 315 22 and and CC 42149 315 23 on on IN 42149 315 24 this this DT 42149 315 25 track track NN 42149 315 26 the the DT 42149 315 27 stone stone NN 42149 315 28 could could MD 42149 315 29 be be VB 42149 315 30 transported transport VBN 42149 315 31 either either CC 42149 315 32 to to IN 42149 315 33 the the DT 42149 315 34 Weehawken Weehawken NNP 42149 315 35 Shaft Shaft NNP 42149 315 36 direct direct RB 42149 315 37 , , , 42149 315 38 for for IN 42149 315 39 use use NN 42149 315 40 on on IN 42149 315 41 that that DT 42149 315 42 side side NN 42149 315 43 of of IN 42149 315 44 the the DT 42149 315 45 river river NN 42149 315 46 , , , 42149 315 47 or or CC 42149 315 48 to to IN 42149 315 49 the the DT 42149 315 50 wharf wharf NN 42149 315 51 , , , 42149 315 52 where where WRB 42149 315 53 it -PRON- PRP 42149 315 54 could could MD 42149 315 55 be be VB 42149 315 56 dumped dump VBN 42149 315 57 into into IN 42149 315 58 scows scow NNS 42149 315 59 for for IN 42149 315 60 transportation transportation NN 42149 315 61 to to IN 42149 315 62 New New NNP 42149 315 63 York York NNP 42149 315 64 . . . 42149 316 1 The the DT 42149 316 2 cars car NNS 42149 316 3 used use VBN 42149 316 4 were be VBD 42149 316 5 3-cu 3-cu CD 42149 316 6 . . . 42149 317 1 yd yd NNP 42149 317 2 . . . 42149 318 1 side side NN 42149 318 2 - - HYPH 42149 318 3 dump dump NN 42149 318 4 , , , 42149 318 5 with with IN 42149 318 6 flap flap NN 42149 318 7 - - HYPH 42149 318 8 doors door NNS 42149 318 9 , , , 42149 318 10 and and CC 42149 318 11 were be VBD 42149 318 12 hauled haul VBN 42149 318 13 by by IN 42149 318 14 two two CD 42149 318 15 steam steam NN 42149 318 16 Dinky Dinky NNP 42149 318 17 locomotives locomotive NNS 42149 318 18 . . . 42149 319 1 The the DT 42149 319 2 average average JJ 42149 319 3 force force NN 42149 319 4 employed employ VBN 42149 319 5 was be VBD 42149 319 6 : : : 42149 319 7 1 1 CD 42149 319 8 foreman foreman NN 42149 319 9 @ @ NFP 42149 319 10 $ $ $ 42149 319 11 3.00 3.00 CD 42149 319 12 per per IN 42149 319 13 day day NN 42149 319 14 . . . 42149 320 1 Supervising supervise VBG 42149 320 2 . . . 42149 321 1 24 24 CD 42149 321 2 laborers laborer NNS 42149 321 3 " " `` 42149 321 4 1.75 1.75 CD 42149 321 5 " " '' 42149 321 6 " " `` 42149 321 7 Loading load VBG 42149 321 8 scale scale NN 42149 321 9 - - HYPH 42149 321 10 boxes box NNS 42149 321 11 for for IN 42149 321 12 derricks derrick NNS 42149 321 13 . . . 42149 322 1 4 4 CD 42149 322 2 laborers laborer NNS 42149 322 3 " " `` 42149 322 4 1.75 1.75 CD 42149 322 5 " " '' 42149 322 6 " " `` 42149 322 7 Feeding feeding NN 42149 322 8 crushers crusher NNS 42149 322 9 . . . 42149 323 1 2 2 CD 42149 323 2 laborers laborer NNS 42149 323 3 " " `` 42149 323 4 1.75 1.75 CD 42149 323 5 " " '' 42149 323 6 " " `` 42149 323 7 Watching watch VBG 42149 323 8 screens screen NNS 42149 323 9 to to TO 42149 323 10 prevent prevent VB 42149 323 11 clogging clogging NN 42149 323 12 . . . 42149 324 1 1 1 CD 42149 324 2 engineer engineer NN 42149 324 3 " " `` 42149 324 4 4.00 4.00 CD 42149 324 5 " " '' 42149 324 6 " " `` 42149 324 7 Driving drive VBG 42149 324 8 steam steam NN 42149 324 9 engine engine NN 42149 324 10 . . . 42149 325 1 2 2 CD 42149 325 2 engineers engineer NNS 42149 325 3 " " `` 42149 325 4 3.50 3.50 CD 42149 325 5 " " '' 42149 325 6 " " '' 42149 325 7 On on IN 42149 325 8 the the DT 42149 325 9 derricks derrick NNS 42149 325 10 . . . 42149 326 1 1 1 CD 42149 326 2 night night NN 42149 326 3 watchman watchman NN 42149 326 4 . . . 42149 327 1 Watching watch VBG 42149 327 2 the the DT 42149 327 3 plant plant NN 42149 327 4 at at IN 42149 327 5 night night NN 42149 327 6 . . . 42149 328 1 Owing owe VBG 42149 328 2 to to IN 42149 328 3 the the DT 42149 328 4 constant constant JJ 42149 328 5 break break NN 42149 328 6 - - HYPH 42149 328 7 down down NN 42149 328 8 of of IN 42149 328 9 machinery machinery NN 42149 328 10 , , , 42149 328 11 chutes chute NNS 42149 328 12 , , , 42149 328 13 etc etc FW 42149 328 14 . . FW 42149 328 15 , , , 42149 328 16 inseparable inseparable JJ 42149 328 17 from from IN 42149 328 18 stone stone NN 42149 328 19 - - HYPH 42149 328 20 crushing crush VBG 42149 328 21 work work NN 42149 328 22 , , , 42149 328 23 there there EX 42149 328 24 was be VBD 42149 328 25 always always RB 42149 328 26 at at IN 42149 328 27 work work NN 42149 328 28 a a DT 42149 328 29 repair repair NN 42149 328 30 gang gang NN 42149 328 31 consisting consist VBG 42149 328 32 of of IN 42149 328 33 either either DT 42149 328 34 three three CD 42149 328 35 carpenters carpenter NNS 42149 328 36 or or CC 42149 328 37 three three CD 42149 328 38 machinists machinist NNS 42149 328 39 , , , 42149 328 40 according accord VBG 42149 328 41 to to IN 42149 328 42 the the DT 42149 328 43 nature nature NN 42149 328 44 of of IN 42149 328 45 the the DT 42149 328 46 break break NN 42149 328 47 - - HYPH 42149 328 48 down down NN 42149 328 49 . . . 42149 329 1 The the DT 42149 329 2 approximate approximate JJ 42149 329 3 cost cost NN 42149 329 4 of of IN 42149 329 5 the the DT 42149 329 6 plant plant NN 42149 329 7 was be VBD 42149 329 8 : : : 42149 329 9 Machinery machinery NN 42149 329 10 $ $ $ 42149 329 11 5,850 5,850 CD 42149 329 12 Lumber lumber NN 42149 329 13 3,305 3,305 CD 42149 329 14 Erection erection NN 42149 329 15 labor labor NN 42149 329 16 3,999 3,999 CD 42149 329 17 ------ ------ NN 42149 329 18 Total total JJ 42149 329 19 $ $ $ 42149 329 20 13,154 13,154 CD 42149 329 21 The the DT 42149 329 22 cost cost NN 42149 329 23 of of IN 42149 329 24 the the DT 42149 329 25 crushed crush VBN 42149 329 26 stone stone NN 42149 329 27 at at IN 42149 329 28 Weehawken Weehawken NNP 42149 329 29 amounted amount VBD 42149 329 30 to to IN 42149 329 31 about about IN 42149 329 32 $ $ $ 42149 329 33 0.91 0.91 CD 42149 329 34 per per IN 42149 329 35 cu cu XX 42149 329 36 . . . 42149 330 1 yd yd NNP 42149 330 2 . . NNP 42149 330 3 , , , 42149 330 4 and and CC 42149 330 5 was be VBD 42149 330 6 made make VBN 42149 330 7 up up RP 42149 330 8 as as IN 42149 330 9 follows follow VBZ 42149 330 10 : : : 42149 330 11 Cost cost NN 42149 330 12 of of IN 42149 330 13 stone stone NN 42149 330 14 $ $ $ 42149 330 15 0.22 0.22 CD 42149 330 16 Labor labor NN 42149 330 17 in in IN 42149 330 18 operation operation NN 42149 330 19 of of IN 42149 330 20 plant plant NN 42149 330 21 0.31 0.31 CD 42149 330 22 Plant Plant NNP 42149 330 23 supplies supply NNS 42149 330 24 0.11 0.11 CD 42149 330 25 [ [ -LRB- 42149 330 26 B]Plant b]plant NN 42149 330 27 depreciation depreciation NN 42149 330 28 0.27 0.27 CD 42149 330 29 ----- ----- NFP 42149 330 30 Total total JJ 42149 330 31 $ $ $ 42149 330 32 0.91 0.91 CD 42149 330 33 [ [ -LRB- 42149 330 34 B b NN 42149 330 35 ] ] -RRB- 42149 330 36 Assuming assume VBG 42149 330 37 that that IN 42149 330 38 the the DT 42149 330 39 scrap scrap NN 42149 330 40 value value NN 42149 330 41 of of IN 42149 330 42 derricks derrick NNS 42149 330 43 and and CC 42149 330 44 engines engine NNS 42149 330 45 is be VBZ 42149 330 46 one one CD 42149 330 47 - - HYPH 42149 330 48 half half NN 42149 330 49 the the DT 42149 330 50 cost cost NN 42149 330 51 , , , 42149 330 52 crushers crusher NNS 42149 330 53 one one CD 42149 330 54 - - HYPH 42149 330 55 third third NN 42149 330 56 the the DT 42149 330 57 cost cost NN 42149 330 58 , , , 42149 330 59 and and CC 42149 330 60 other other JJ 42149 330 61 items item NNS 42149 330 62 nothing nothing NN 42149 330 63 . . . 42149 331 1 The the DT 42149 331 2 crushed crushed JJ 42149 331 3 stone stone NN 42149 331 4 at at IN 42149 331 5 the the DT 42149 331 6 Manhattan Manhattan NNP 42149 331 7 Shaft Shaft NNP 42149 331 8 cost cost VBD 42149 331 9 about about RB 42149 331 10 $ $ $ 42149 331 11 1.04 1.04 CD 42149 331 12 per per IN 42149 331 13 cu cu XX 42149 331 14 . . . 42149 332 1 yd yd NNP 42149 332 2 . . NNP 42149 332 3 , , , 42149 332 4 the the DT 42149 332 5 difference difference NN 42149 332 6 of of IN 42149 332 7 $ $ $ 42149 332 8 0.13 0.13 CD 42149 332 9 from from IN 42149 332 10 the the DT 42149 332 11 Weehawken Weehawken NNP 42149 332 12 cost cost NN 42149 332 13 being be VBG 42149 332 14 made make VBN 42149 332 15 up up RP 42149 332 16 of of IN 42149 332 17 the the DT 42149 332 18 cost cost NN 42149 332 19 of of IN 42149 332 20 transfer transfer NN 42149 332 21 across across IN 42149 332 22 the the DT 42149 332 23 river river NN 42149 332 24 , , , 42149 332 25 $ $ $ 42149 332 26 0.08 0.08 CD 42149 332 27 , , , 42149 332 28 and and CC 42149 332 29 transport transport NN 42149 332 30 from from IN 42149 332 31 the the DT 42149 332 32 dock dock NN 42149 332 33 to to IN 42149 332 34 the the DT 42149 332 35 shaft shaft NN 42149 332 36 , , , 42149 332 37 $ $ $ 42149 332 38 0.05 0.05 CD 42149 332 39 . . . 42149 333 1 _ _ NNP 42149 333 2 Miscellaneous Miscellaneous NNP 42149 333 3 Plant._--The plant._--the CD 42149 333 4 various various JJ 42149 333 5 pieces piece NNS 42149 333 6 of of IN 42149 333 7 plant plant NN 42149 333 8 used use VBN 42149 333 9 directly directly RB 42149 333 10 in in IN 42149 333 11 the the DT 42149 333 12 construction construction NN 42149 333 13 work work NN 42149 333 14 , , , 42149 333 15 such such JJ 42149 333 16 as as IN 42149 333 17 derricks derrick NNS 42149 333 18 , , , 42149 333 19 hauling haul VBG 42149 333 20 engines engine NNS 42149 333 21 , , , 42149 333 22 pumps pump NNS 42149 333 23 , , , 42149 333 24 concrete concrete JJ 42149 333 25 mixers mixer NNS 42149 333 26 , , , 42149 333 27 and and CC 42149 333 28 forms form NNS 42149 333 29 , , , 42149 333 30 will will MD 42149 333 31 be be VB 42149 333 32 found find VBN 42149 333 33 described describe VBN 42149 333 34 or or CC 42149 333 35 at at IN 42149 333 36 least least JJS 42149 333 37 mentioned mention VBN 42149 333 38 in in IN 42149 333 39 connection connection NN 42149 333 40 with with IN 42149 333 41 the the DT 42149 333 42 methods method NNS 42149 333 43 used use VBN 42149 333 44 in in IN 42149 333 45 construction construction NN 42149 333 46 . . . 42149 334 1 The the DT 42149 334 2 tunneling tunneling NN 42149 334 3 shields shield NNS 42149 334 4 , , , 42149 334 5 however however RB 42149 334 6 , , , 42149 334 7 will will MD 42149 334 8 be be VB 42149 334 9 described describe VBN 42149 334 10 now now RB 42149 334 11 , , , 42149 334 12 as as IN 42149 334 13 much much JJ 42149 334 14 of of IN 42149 334 15 the the DT 42149 334 16 explanation explanation NN 42149 334 17 of of IN 42149 334 18 the the DT 42149 334 19 shield shield NN 42149 334 20 - - HYPH 42149 334 21 driven drive VBN 42149 334 22 work work NN 42149 334 23 will will MD 42149 334 24 not not RB 42149 334 25 be be VB 42149 334 26 clear clear JJ 42149 334 27 unless unless IN 42149 334 28 preceded precede VBN 42149 334 29 by by IN 42149 334 30 a a DT 42149 334 31 good good JJ 42149 334 32 idea idea NN 42149 334 33 of of IN 42149 334 34 their -PRON- PRP$ 42149 334 35 design design NN 42149 334 36 . . . 42149 335 1 Tunneling Tunneling NNP 42149 335 2 Shields Shields NNP 42149 335 3 . . . 42149 336 1 During during IN 42149 336 2 the the DT 42149 336 3 period period NN 42149 336 4 in in IN 42149 336 5 which which WDT 42149 336 6 the the DT 42149 336 7 original original JJ 42149 336 8 contract contract NN 42149 336 9 drawings drawing NNS 42149 336 10 were be VBD 42149 336 11 being be VBG 42149 336 12 made make VBN 42149 336 13 , , , 42149 336 14 namely namely RB 42149 336 15 , , , 42149 336 16 in in IN 42149 336 17 the the DT 42149 336 18 latter latter JJ 42149 336 19 part part NN 42149 336 20 of of IN 42149 336 21 1903 1903 CD 42149 336 22 and and CC 42149 336 23 the the DT 42149 336 24 early early JJ 42149 336 25 part part NN 42149 336 26 of of IN 42149 336 27 1904 1904 CD 42149 336 28 , , , 42149 336 29 considerable considerable JJ 42149 336 30 attention attention NN 42149 336 31 was be VBD 42149 336 32 given give VBN 42149 336 33 to to IN 42149 336 34 working work VBG 42149 336 35 out out RP 42149 336 36 detailed detailed JJ 42149 336 37 studies study NNS 42149 336 38 for for IN 42149 336 39 a a DT 42149 336 40 type type NN 42149 336 41 of of IN 42149 336 42 shield shield NN 42149 336 43 which which WDT 42149 336 44 would would MD 42149 336 45 be be VB 42149 336 46 suitable suitable JJ 42149 336 47 for for IN 42149 336 48 dealing deal VBG 42149 336 49 with with IN 42149 336 50 the the DT 42149 336 51 various various JJ 42149 336 52 kinds kind NNS 42149 336 53 of of IN 42149 336 54 ground ground NN 42149 336 55 through through IN 42149 336 56 which which WDT 42149 336 57 the the DT 42149 336 58 shield shield NN 42149 336 59 - - HYPH 42149 336 60 driven drive VBN 42149 336 61 tunnels tunnel NNS 42149 336 62 had have VBD 42149 336 63 to to TO 42149 336 64 pass pass VB 42149 336 65 . . . 42149 337 1 This this DT 42149 337 2 was be VBD 42149 337 3 done do VBN 42149 337 4 in in IN 42149 337 5 order order NN 42149 337 6 that that IN 42149 337 7 , , , 42149 337 8 when when WRB 42149 337 9 the the DT 42149 337 10 contract contract NN 42149 337 11 was be VBD 42149 337 12 let let VBN 42149 337 13 , , , 42149 337 14 the the DT 42149 337 15 engineer engineer NN 42149 337 16 's 's POS 42149 337 17 ideas idea NNS 42149 337 18 of of IN 42149 337 19 the the DT 42149 337 20 requirements requirement NNS 42149 337 21 of of IN 42149 337 22 the the DT 42149 337 23 shields shield NNS 42149 337 24 should should MD 42149 337 25 be be VB 42149 337 26 thoroughly thoroughly RB 42149 337 27 crystallized crystallize VBN 42149 337 28 , , , 42149 337 29 and and CC 42149 337 30 so so IN 42149 337 31 that that IN 42149 337 32 the the DT 42149 337 33 contractor contractor NN 42149 337 34 might may MD 42149 337 35 take take VB 42149 337 36 advantage advantage NN 42149 337 37 of of IN 42149 337 38 this this DT 42149 337 39 long long JJ 42149 337 40 - - HYPH 42149 337 41 thought think VBN 42149 337 42 - - HYPH 42149 337 43 out out RP 42149 337 44 design design NN 42149 337 45 , , , 42149 337 46 instead instead RB 42149 337 47 of of IN 42149 337 48 being be VBG 42149 337 49 under under IN 42149 337 50 the the DT 42149 337 51 necessity necessity NN 42149 337 52 of of IN 42149 337 53 placing place VBG 42149 337 54 a a DT 42149 337 55 hurried hurried JJ 42149 337 56 order order NN 42149 337 57 for for IN 42149 337 58 a a DT 42149 337 59 piece piece NN 42149 337 60 of of IN 42149 337 61 plant plant NN 42149 337 62 on on IN 42149 337 63 which which WDT 42149 337 64 so so RB 42149 337 65 much much JJ 42149 337 66 of of IN 42149 337 67 the the DT 42149 337 68 safety safety NN 42149 337 69 as as RB 42149 337 70 well well RB 42149 337 71 as as IN 42149 337 72 of of IN 42149 337 73 the the DT 42149 337 74 speed speed NN 42149 337 75 of of IN 42149 337 76 his -PRON- PRP$ 42149 337 77 work work NN 42149 337 78 depended depend VBD 42149 337 79 . . . 42149 338 1 Eventually eventually RB 42149 338 2 , , , 42149 338 3 the the DT 42149 338 4 contractor contractor NN 42149 338 5 took take VBD 42149 338 6 over over RP 42149 338 7 these these DT 42149 338 8 designs design NNS 42149 338 9 as as IN 42149 338 10 they -PRON- PRP 42149 338 11 stood stand VBD 42149 338 12 , , , 42149 338 13 with with IN 42149 338 14 certain certain JJ 42149 338 15 minor minor JJ 42149 338 16 modifications modification NNS 42149 338 17 , , , 42149 338 18 and and CC 42149 338 19 the the DT 42149 338 20 shields shield NNS 42149 338 21 as as IN 42149 338 22 built build VBN 42149 338 23 and and CC 42149 338 24 worked work VBD 42149 338 25 gave give VBD 42149 338 26 entire entire JJ 42149 338 27 satisfaction satisfaction NN 42149 338 28 . . . 42149 339 1 The the DT 42149 339 2 chief chief JJ 42149 339 3 points point NNS 42149 339 4 held hold VBN 42149 339 5 in in IN 42149 339 6 view view NN 42149 339 7 were be VBD 42149 339 8 ample ample JJ 42149 339 9 strength strength NN 42149 339 10 , , , 42149 339 11 easy easy JJ 42149 339 12 access access NN 42149 339 13 to to IN 42149 339 14 the the DT 42149 339 15 working work VBG 42149 339 16 face face NN 42149 339 17 combined combine VBN 42149 339 18 with with IN 42149 339 19 ease ease NN 42149 339 20 and and CC 42149 339 21 quickness quickness NN 42149 339 22 of of IN 42149 339 23 closing close VBG 42149 339 24 the the DT 42149 339 25 diaphragm diaphragm NN 42149 339 26 , , , 42149 339 27 and and CC 42149 339 28 general general JJ 42149 339 29 simplicity simplicity NN 42149 339 30 . . . 42149 340 1 A a DT 42149 340 2 clear clear JJ 42149 340 3 idea idea NN 42149 340 4 of of IN 42149 340 5 the the DT 42149 340 6 main main JJ 42149 340 7 features feature NNS 42149 340 8 of of IN 42149 340 9 the the DT 42149 340 10 design design NN 42149 340 11 can can MD 42149 340 12 be be VB 42149 340 13 gathered gather VBN 42149 340 14 from from IN 42149 340 15 Fig Fig NNP 42149 340 16 . . . 42149 341 1 3 3 LS 42149 341 2 and and CC 42149 341 3 Plate Plate NNP 42149 341 4 XXXI XXXI NNP 42149 341 5 . . . 42149 342 1 [ [ -LRB- 42149 342 2 A]The a]the JJ 42149 342 3 interior interior JJ 42149 342 4 diameter diameter NN 42149 342 5 of of IN 42149 342 6 the the DT 42149 342 7 skin skin NN 42149 342 8 was be VBD 42149 342 9 2 2 CD 42149 342 10 in in IN 42149 342 11 . . . 42149 343 1 greater great JJR 42149 343 2 than than IN 42149 343 3 the the DT 42149 343 4 external external JJ 42149 343 5 diameter diameter NN 42149 343 6 of of IN 42149 343 7 the the DT 42149 343 8 metal metal NN 42149 343 9 lining lining NN 42149 343 10 of of IN 42149 343 11 the the DT 42149 343 12 tunnel tunnel NN 42149 343 13 , , , 42149 343 14 which which WDT 42149 343 15 was be VBD 42149 343 16 23 23 CD 42149 343 17 ft ft NN 42149 343 18 . . . 42149 344 1 The the DT 42149 344 2 skin skin NN 42149 344 3 was be VBD 42149 344 4 made make VBN 42149 344 5 up up RP 42149 344 6 of of IN 42149 344 7 three three CD 42149 344 8 thicknesses thickness NNS 42149 344 9 of of IN 42149 344 10 steel steel NN 42149 344 11 plate plate NN 42149 344 12 , , , 42149 344 13 a a DT 42149 344 14 ¾-in ¾-in NNP 42149 344 15 . . . 42149 345 1 plate plate VB 42149 345 2 outside outside IN 42149 345 3 and and CC 42149 345 4 inside inside RB 42149 345 5 , , , 42149 345 6 with with IN 42149 345 7 a a DT 42149 345 8 5/8-in 5/8-in NNP 42149 345 9 . . . 42149 346 1 plate plate NN 42149 346 2 between between IN 42149 346 3 ; ; : 42149 346 4 thus thus RB 42149 346 5 the the DT 42149 346 6 external external JJ 42149 346 7 diameter diameter NN 42149 346 8 of of IN 42149 346 9 the the DT 42149 346 10 skin skin NN 42149 346 11 was be VBD 42149 346 12 23 23 CD 42149 346 13 ft ft NN 42149 346 14 . . NN 42149 346 15 6¼ 6â¼ CD 42149 346 16 in in IN 42149 346 17 . . . 42149 347 1 The the DT 42149 347 2 length length NN 42149 347 3 over over RB 42149 347 4 all all DT 42149 347 5 ( ( -LRB- 42149 347 6 exclusive exclusive JJ 42149 347 7 of of IN 42149 347 8 the the DT 42149 347 9 hood hood NN 42149 347 10 , , , 42149 347 11 to to TO 42149 347 12 be be VB 42149 347 13 described describe VBN 42149 347 14 later later RB 42149 347 15 ) ) -RRB- 42149 347 16 was be VBD 42149 347 17 15 15 CD 42149 347 18 ft ft NN 42149 347 19 . . NNP 42149 347 20 11 11 CD 42149 347 21 - - SYM 42149 347 22 7/16 7/16 CD 42149 347 23 in in RB 42149 347 24 . . . 42149 348 1 The the DT 42149 348 2 maximum maximum JJ 42149 348 3 overlap overlap NN 42149 348 4 of of IN 42149 348 5 the the DT 42149 348 6 skin skin NN 42149 348 7 over over IN 42149 348 8 the the DT 42149 348 9 erected erect VBN 42149 348 10 metal metal NN 42149 348 11 lining lining NN 42149 348 12 was be VBD 42149 348 13 6 6 CD 42149 348 14 ft ft NN 42149 348 15 . . . 42149 348 16 4½ 4â½ CD 42149 348 17 in in IN 42149 348 18 . . NNP 42149 348 19 , , , 42149 348 20 and and CC 42149 348 21 the the DT 42149 348 22 minimum minimum JJ 42149 348 23 overlap overlap NN 42149 348 24 , , , 42149 348 25 2 2 CD 42149 348 26 ft ft NN 42149 348 27 . . . 42149 349 1 There there EX 42149 349 2 were be VBD 42149 349 3 no no DT 42149 349 4 inside inside NN 42149 349 5 or or CC 42149 349 6 outside outside JJ 42149 349 7 cover cover NN 42149 349 8 - - HYPH 42149 349 9 plates plate NNS 42149 349 10 , , , 42149 349 11 the the DT 42149 349 12 joints joint NNS 42149 349 13 of of IN 42149 349 14 the the DT 42149 349 15 various various JJ 42149 349 16 pieces piece NNS 42149 349 17 of of IN 42149 349 18 skin skin NN 42149 349 19 plates plate NNS 42149 349 20 being be VBG 42149 349 21 butt butt NN 42149 349 22 - - HYPH 42149 349 23 joints joint NNS 42149 349 24 covered cover VBN 42149 349 25 by by IN 42149 349 26 the the DT 42149 349 27 overlap overlap NN 42149 349 28 of of IN 42149 349 29 adjoining adjoining JJ 42149 349 30 plates plate NNS 42149 349 31 . . . 42149 350 1 All all DT 42149 350 2 riveting riveting JJ 42149 350 3 was be VBD 42149 350 4 flush flush JJ 42149 350 5 , , , 42149 350 6 both both CC 42149 350 7 inside inside IN 42149 350 8 and and CC 42149 350 9 outside outside RB 42149 350 10 . . . 42149 351 1 The the DT 42149 351 2 whole whole JJ 42149 351 3 circumference circumference NN 42149 351 4 of of IN 42149 351 5 each each DT 42149 351 6 skin skin NN 42149 351 7 plate plate NN 42149 351 8 was be VBD 42149 351 9 made make VBN 42149 351 10 up up RP 42149 351 11 of of IN 42149 351 12 eight eight CD 42149 351 13 pieces piece NNS 42149 351 14 , , , 42149 351 15 each each DT 42149 351 16 of of IN 42149 351 17 which which WDT 42149 351 18 extended extend VBD 42149 351 19 the the DT 42149 351 20 entire entire JJ 42149 351 21 length length NN 42149 351 22 of of IN 42149 351 23 the the DT 42149 351 24 shield shield NN 42149 351 25 , , , 42149 351 26 the the DT 42149 351 27 only only JJ 42149 351 28 circumferential circumferential JJ 42149 351 29 joint joint NN 42149 351 30 on on IN 42149 351 31 the the DT 42149 351 32 outside outside NN 42149 351 33 being be VBG 42149 351 34 at at IN 42149 351 35 the the DT 42149 351 36 junction junction NN 42149 351 37 of of IN 42149 351 38 the the DT 42149 351 39 removable removable JJ 42149 351 40 cutting cutting NN 42149 351 41 edge edge NN 42149 351 42 ( ( -LRB- 42149 351 43 or or CC 42149 351 44 of of IN 42149 351 45 the the DT 42149 351 46 hood hood NN 42149 351 47 when when WRB 42149 351 48 the the DT 42149 351 49 latter latter NN 42149 351 50 was be VBD 42149 351 51 in in IN 42149 351 52 position position NN 42149 351 53 ) ) -RRB- 42149 351 54 with with IN 42149 351 55 the the DT 42149 351 56 shield shield NN 42149 351 57 proper proper JJ 42149 351 58 . . . 42149 352 1 Forward forward RB 42149 352 2 of of IN 42149 352 3 the the DT 42149 352 4 back back NN 42149 352 5 ends end NNS 42149 352 6 of of IN 42149 352 7 the the DT 42149 352 8 jacks jack NNS 42149 352 9 , , , 42149 352 10 the the DT 42149 352 11 shield shield NN 42149 352 12 was be VBD 42149 352 13 stiffened stiffen VBN 42149 352 14 by by IN 42149 352 15 an an DT 42149 352 16 annular annular NN 42149 352 17 girder girder NN 42149 352 18 supporting support VBG 42149 352 19 the the DT 42149 352 20 skin skin NN 42149 352 21 , , , 42149 352 22 and and CC 42149 352 23 in in IN 42149 352 24 the the DT 42149 352 25 space space NN 42149 352 26 between between IN 42149 352 27 the the DT 42149 352 28 stiffeners stiffener NNS 42149 352 29 of of IN 42149 352 30 which which WDT 42149 352 31 were be VBD 42149 352 32 set set VBN 42149 352 33 the the DT 42149 352 34 24 24 CD 42149 352 35 propelling propelling NN 42149 352 36 rams ram NNS 42149 352 37 used use VBN 42149 352 38 to to TO 42149 352 39 shove shove VB 42149 352 40 the the DT 42149 352 41 shield shield NN 42149 352 42 ahead ahead RB 42149 352 43 by by IN 42149 352 44 pressure pressure NN 42149 352 45 exerted exert VBN 42149 352 46 on on IN 42149 352 47 the the DT 42149 352 48 last last JJ 42149 352 49 erected erected JJ 42149 352 50 ring ring NN 42149 352 51 of of IN 42149 352 52 metal metal NN 42149 352 53 lining lining NN 42149 352 54 , , , 42149 352 55 as as IN 42149 352 56 shown show VBN 42149 352 57 on on IN 42149 352 58 Plate Plate NNP 42149 352 59 XXXI XXXI NNP 42149 352 60 . . . 42149 353 1 To to TO 42149 353 2 assist assist VB 42149 353 3 in in IN 42149 353 4 taking take VBG 42149 353 5 the the DT 42149 353 6 thrust thrust NN 42149 353 7 of of IN 42149 353 8 these these DT 42149 353 9 rams ram NNS 42149 353 10 , , , 42149 353 11 gusset gusset NN 42149 353 12 - - HYPH 42149 353 13 plates plate NNS 42149 353 14 were be VBD 42149 353 15 placed place VBN 42149 353 16 against against IN 42149 353 17 the the DT 42149 353 18 end end NN 42149 353 19 of of IN 42149 353 20 each each DT 42149 353 21 ram ram NN 42149 353 22 cylinder cylinder NN 42149 353 23 , , , 42149 353 24 and and CC 42149 353 25 were be VBD 42149 353 26 carried carry VBN 42149 353 27 forward forward RB 42149 353 28 to to TO 42149 353 29 form form VB 42149 353 30 level level NN 42149 353 31 brackets bracket NNS 42149 353 32 supporting support VBG 42149 353 33 the the DT 42149 353 34 cast cast VBN 42149 353 35 - - HYPH 42149 353 36 steel steel NN 42149 353 37 cutting cut VBG 42149 353 38 - - HYPH 42149 353 39 edge edge NN 42149 353 40 segments segment NNS 42149 353 41 . . . 42149 354 1 The the DT 42149 354 2 stiffening stiffen VBG 42149 354 3 gussets gusset NNS 42149 354 4 , , , 42149 354 5 between between IN 42149 354 6 which which WDT 42149 354 7 were be VBD 42149 354 8 placed place VBN 42149 354 9 the the DT 42149 354 10 rams ram NNS 42149 354 11 , , , 42149 354 12 were be VBD 42149 354 13 also also RB 42149 354 14 carried carry VBN 42149 354 15 forward forward RB 42149 354 16 as as IN 42149 354 17 level level NN 42149 354 18 brackets bracket NNS 42149 354 19 , , , 42149 354 20 for for IN 42149 354 21 the the DT 42149 354 22 same same JJ 42149 354 23 purpose purpose NN 42149 354 24 . . . 42149 355 1 The the DT 42149 355 2 cast cast VBN 42149 355 3 - - HYPH 42149 355 4 steel steel NN 42149 355 5 segmental segmental JJ 42149 355 6 cutting cutting NN 42149 355 7 edge edge NN 42149 355 8 was be VBD 42149 355 9 attached attach VBN 42149 355 10 to to IN 42149 355 11 the the DT 42149 355 12 front front NN 42149 355 13 of of IN 42149 355 14 the the DT 42149 355 15 last last JJ 42149 355 16 mentioned mention VBN 42149 355 17 plates plate NNS 42149 355 18 . . . 42149 356 1 The the DT 42149 356 2 interior interior JJ 42149 356 3 structural structural JJ 42149 356 4 framing framing NN 42149 356 5 consisted consist VBD 42149 356 6 of of IN 42149 356 7 two two CD 42149 356 8 floors floor NNS 42149 356 9 and and CC 42149 356 10 three three CD 42149 356 11 vertical vertical JJ 42149 356 12 partitions partition NNS 42149 356 13 , , , 42149 356 14 giving give VBG 42149 356 15 nine nine CD 42149 356 16 openings opening NNS 42149 356 17 or or CC 42149 356 18 pockets pocket NNS 42149 356 19 for for IN 42149 356 20 access access NN 42149 356 21 to to IN 42149 356 22 the the DT 42149 356 23 face face NN 42149 356 24 ; ; : 42149 356 25 these these DT 42149 356 26 pockets pocket NNS 42149 356 27 were be VBD 42149 356 28 2 2 CD 42149 356 29 ft ft NN 42149 356 30 . . NN 42149 356 31 7 7 CD 42149 356 32 in in IN 42149 356 33 . . . 42149 357 1 wide wide JJ 42149 357 2 , , , 42149 357 3 the the DT 42149 357 4 height height NN 42149 357 5 varying vary VBG 42149 357 6 from from IN 42149 357 7 2 2 CD 42149 357 8 ft ft NN 42149 357 9 . . NNP 42149 357 10 2 2 CD 42149 357 11 in in IN 42149 357 12 . . . 42149 358 1 to to IN 42149 358 2 3 3 CD 42149 358 3 ft ft NN 42149 358 4 . . NNP 42149 358 5 4 4 CD 42149 358 6 in in IN 42149 358 7 . . NNP 42149 358 8 , , , 42149 358 9 according accord VBG 42149 358 10 to to IN 42149 358 11 their -PRON- PRP$ 42149 358 12 location location NN 42149 358 13 . . . 42149 359 1 The the DT 42149 359 2 openings opening NNS 42149 359 3 were be VBD 42149 359 4 provided provide VBN 42149 359 5 with with IN 42149 359 6 pivoted pivot VBN 42149 359 7 segmental segmental JJ 42149 359 8 doors door NNS 42149 359 9 , , , 42149 359 10 which which WDT 42149 359 11 were be VBD 42149 359 12 adopted adopt VBN 42149 359 13 because because IN 42149 359 14 they -PRON- PRP 42149 359 15 could could MD 42149 359 16 be be VB 42149 359 17 shut shut VBN 42149 359 18 without without IN 42149 359 19 having have VBG 42149 359 20 to to TO 42149 359 21 displace displace VB 42149 359 22 any any DT 42149 359 23 ground ground NN 42149 359 24 which which WDT 42149 359 25 might may MD 42149 359 26 be be VB 42149 359 27 flowing flow VBG 42149 359 28 into into IN 42149 359 29 the the DT 42149 359 30 tunnel tunnel NN 42149 359 31 , , , 42149 359 32 and and CC 42149 359 33 while while IN 42149 359 34 open open JJ 42149 359 35 their -PRON- PRP$ 42149 359 36 own own JJ 42149 359 37 weight weight NN 42149 359 38 tended tend VBD 42149 359 39 to to TO 42149 359 40 close close VB 42149 359 41 them -PRON- PRP 42149 359 42 , , , 42149 359 43 being be VBG 42149 359 44 held hold VBN 42149 359 45 from from IN 42149 359 46 doing do VBG 42149 359 47 so so RB 42149 359 48 by by IN 42149 359 49 a a DT 42149 359 50 simple simple JJ 42149 359 51 catch catch NN 42149 359 52 . . . 42149 360 1 [ [ -LRB- 42149 360 2 Illustration illustration NN 42149 360 3 : : : 42149 360 4 PROPOSED proposed VB 42149 360 5 SHIELD SHIELD NNP 42149 360 6 FOR for IN 42149 360 7 SUBAQUEOUS subaqueous NN 42149 360 8 TUNNELING TUNNELING NNP 42149 360 9 GENERAL GENERAL NNP 42149 360 10 ELEVATION elevation NN 42149 360 11 FIG fig NN 42149 360 12 . . . 42149 361 1 3 3 LS 42149 361 2 . . . 42149 361 3 ] ] -RRB- 42149 362 1 For for IN 42149 362 2 passing pass VBG 42149 362 3 through through IN 42149 362 4 the the DT 42149 362 5 varied varied JJ 42149 362 6 assortment assortment NN 42149 362 7 of of IN 42149 362 8 ground ground NN 42149 362 9 before before IN 42149 362 10 entering enter VBG 42149 362 11 on on IN 42149 362 12 the the DT 42149 362 13 true true JJ 42149 362 14 sub sub JJ 42149 362 15 - - JJ 42149 362 16 river river JJ 42149 362 17 silt silt NN 42149 362 18 , , , 42149 362 19 it -PRON- PRP 42149 362 20 was be VBD 42149 362 21 decided decide VBN 42149 362 22 to to TO 42149 362 23 adopt adopt VB 42149 362 24 the the DT 42149 362 25 forward forward JJ 42149 362 26 detachable detachable JJ 42149 362 27 extension extension NN 42149 362 28 , , , 42149 362 29 or or CC 42149 362 30 hood hood NN 42149 362 31 , , , 42149 362 32 which which WDT 42149 362 33 has have VBZ 42149 362 34 so so RB 42149 362 35 often often RB 42149 362 36 proved prove VBN 42149 362 37 its -PRON- PRP$ 42149 362 38 worth worth NN 42149 362 39 in in IN 42149 362 40 ground ground NN 42149 362 41 needing need VBG 42149 362 42 timber timber NN 42149 362 43 for for IN 42149 362 44 its -PRON- PRP$ 42149 362 45 support support NN 42149 362 46 , , , 42149 362 47 as as IN 42149 362 48 shown show VBN 42149 362 49 in in IN 42149 362 50 Fig Fig NNP 42149 362 51 . . . 42149 363 1 2 2 LS 42149 363 2 , , , 42149 363 3 Plate Plate NNP 42149 363 4 XXIX XXIX NNP 42149 363 5 . . . 42149 364 1 This this DT 42149 364 2 hood hood NN 42149 364 3 extended extend VBD 42149 364 4 2 2 CD 42149 364 5 ft ft NN 42149 364 6 . . NN 42149 364 7 1 1 CD 42149 364 8 in in IN 42149 364 9 . . . 42149 365 1 beyond beyond IN 42149 365 2 the the DT 42149 365 3 cutting cutting NN 42149 365 4 edge edge NN 42149 365 5 , , , 42149 365 6 and and CC 42149 365 7 from from IN 42149 365 8 the the DT 42149 365 9 top top NN 42149 365 10 down down RP 42149 365 11 to to IN 42149 365 12 the the DT 42149 365 13 level level NN 42149 365 14 of of IN 42149 365 15 the the DT 42149 365 16 upper upper JJ 42149 365 17 platform platform NN 42149 365 18 . . . 42149 366 1 Additional additional JJ 42149 366 2 pieces piece NNS 42149 366 3 were be VBD 42149 366 4 provided provide VBN 42149 366 5 by by IN 42149 366 6 which which WDT 42149 366 7 the the DT 42149 366 8 hood hood NN 42149 366 9 might may MD 42149 366 10 have have VB 42149 366 11 been be VBN 42149 366 12 brought bring VBN 42149 366 13 down down RP 42149 366 14 as as RB 42149 366 15 far far RB 42149 366 16 as as IN 42149 366 17 the the DT 42149 366 18 lower low JJR 42149 366 19 platform platform NN 42149 366 20 , , , 42149 366 21 but but CC 42149 366 22 they -PRON- PRP 42149 366 23 were be VBD 42149 366 24 not not RB 42149 366 25 used use VBN 42149 366 26 . . . 42149 367 1 Special special JJ 42149 367 2 trapezoidal trapezoidal JJ 42149 367 3 steel steel NN 42149 367 4 castings casting NNS 42149 367 5 formed form VBD 42149 367 6 the the DT 42149 367 7 junction junction NN 42149 367 8 between between IN 42149 367 9 the the DT 42149 367 10 hood hood NN 42149 367 11 and and CC 42149 367 12 the the DT 42149 367 13 cutting cut VBG 42149 367 14 edge edge NN 42149 367 15 . . . 42149 368 1 The the DT 42149 368 2 hood hood NN 42149 368 3 was be VBD 42149 368 4 in in IN 42149 368 5 nine nine CD 42149 368 6 sections section NNS 42149 368 7 , , , 42149 368 8 built build VBN 42149 368 9 up up IN 42149 368 10 of of IN 42149 368 11 two two CD 42149 368 12 ¾-in ¾-in NNS 42149 368 13 . . . 42149 369 1 and and CC 42149 369 2 one one CD 42149 369 3 5/8-in 5/8-in NNP 42149 369 4 . . . 42149 370 1 skin skin NN 42149 370 2 plates plate NNS 42149 370 3 , , , 42149 370 4 as as IN 42149 370 5 in in IN 42149 370 6 the the DT 42149 370 7 main main JJ 42149 370 8 body body NN 42149 370 9 of of IN 42149 370 10 the the DT 42149 370 11 skin skin NN 42149 370 12 , , , 42149 370 13 and and CC 42149 370 14 was be VBD 42149 370 15 supported support VBN 42149 370 16 by by IN 42149 370 17 bracket bracket NN 42149 370 18 plates plate NNS 42149 370 19 attached attach VBN 42149 370 20 to to IN 42149 370 21 the the DT 42149 370 22 forward forward JJ 42149 370 23 ends end NNS 42149 370 24 of of IN 42149 370 25 the the DT 42149 370 26 ram ram NN 42149 370 27 chambers chamber NNS 42149 370 28 . . . 42149 371 1 The the DT 42149 371 2 hoods hood NNS 42149 371 3 were be VBD 42149 371 4 bolted bolt VBN 42149 371 5 in in IN 42149 371 6 place place NN 42149 371 7 , , , 42149 371 8 and and CC 42149 371 9 were be VBD 42149 371 10 removed remove VBN 42149 371 11 and and CC 42149 371 12 replaced replace VBN 42149 371 13 by by IN 42149 371 14 regular regular JJ 42149 371 15 cutting cut VBG 42149 371 16 - - HYPH 42149 371 17 edge edge NN 42149 371 18 steel steel NN 42149 371 19 castings casting NNS 42149 371 20 after after IN 42149 371 21 the the DT 42149 371 22 shields shield NNS 42149 371 23 had have VBD 42149 371 24 passed pass VBN 42149 371 25 the the DT 42149 371 26 river river NN 42149 371 27 lines line NNS 42149 371 28 . . . 42149 372 1 The the DT 42149 372 2 floors floor NNS 42149 372 3 of of IN 42149 372 4 the the DT 42149 372 5 two two CD 42149 372 6 platforms platform NNS 42149 372 7 , , , 42149 372 8 of of IN 42149 372 9 which which WDT 42149 372 10 there there EX 42149 372 11 were be VBD 42149 372 12 eight eight CD 42149 372 13 , , , 42149 372 14 formed form VBN 42149 372 15 by by IN 42149 372 16 the the DT 42149 372 17 division division NN 42149 372 18 of of IN 42149 372 19 the the DT 42149 372 20 platforms platform NNS 42149 372 21 by by IN 42149 372 22 the the DT 42149 372 23 upright upright JJ 42149 372 24 framing framing NN 42149 372 25 , , , 42149 372 26 could could MD 42149 372 27 be be VB 42149 372 28 extended extend VBN 42149 372 29 forward forward RB 42149 372 30 2 2 CD 42149 372 31 ft ft NN 42149 372 32 . . NNP 42149 372 33 9 9 CD 42149 372 34 in in IN 42149 372 35 . . . 42149 373 1 in in IN 42149 373 2 front front NN 42149 373 3 of of IN 42149 373 4 the the DT 42149 373 5 cutting cutting NN 42149 373 6 edge edge NN 42149 373 7 , , , 42149 373 8 or or CC 42149 373 9 8 8 CD 42149 373 10 in in IN 42149 373 11 . . . 42149 374 1 in in IN 42149 374 2 front front NN 42149 374 3 of of IN 42149 374 4 the the DT 42149 374 5 hood hood NN 42149 374 6 . . . 42149 375 1 This this DT 42149 375 2 motion motion NN 42149 375 3 was be VBD 42149 375 4 given give VBN 42149 375 5 by by IN 42149 375 6 hydraulic hydraulic JJ 42149 375 7 jacks jack NNS 42149 375 8 . . . 42149 376 1 The the DT 42149 376 2 sliding slide VBG 42149 376 3 platform platform NN 42149 376 4 could could MD 42149 376 5 hold hold VB 42149 376 6 a a DT 42149 376 7 load load NN 42149 376 8 of of IN 42149 376 9 7,900 7,900 CD 42149 376 10 lb lb NN 42149 376 11 . . . 42149 377 1 per per IN 42149 377 2 sq sq NNP 42149 377 3 . . . 42149 378 1 ft ft NNP 42149 378 2 . . NNP 42149 378 3 , , , 42149 378 4 which which WDT 42149 378 5 was be VBD 42149 378 6 equal equal JJ 42149 378 7 to to IN 42149 378 8 the the DT 42149 378 9 maximum maximum JJ 42149 378 10 head head NN 42149 378 11 of of IN 42149 378 12 ground ground NN 42149 378 13 and and CC 42149 378 14 water water NN 42149 378 15 combined combine VBN 42149 378 16 . . . 42149 379 1 The the DT 42149 379 2 uses use NNS 42149 379 3 of of IN 42149 379 4 these these DT 42149 379 5 platforms platform NNS 42149 379 6 will will MD 42149 379 7 be be VB 42149 379 8 described describe VBN 42149 379 9 under under IN 42149 379 10 the the DT 42149 379 11 heading heading NN 42149 379 12 " " `` 42149 379 13 Construction construction NN 42149 379 14 . . . 42149 379 15 " " '' 42149 380 1 The the DT 42149 380 2 weight weight NN 42149 380 3 of of IN 42149 380 4 the the DT 42149 380 5 structural structural JJ 42149 380 6 portion portion NN 42149 380 7 of of IN 42149 380 8 each each DT 42149 380 9 shield shield NN 42149 380 10 was be VBD 42149 380 11 about about RB 42149 380 12 135 135 CD 42149 380 13 tons ton NNS 42149 380 14 . . . 42149 381 1 The the DT 42149 381 2 remainder remainder NN 42149 381 3 of of IN 42149 381 4 the the DT 42149 381 5 shield shield NN 42149 381 6 was be VBD 42149 381 7 the the DT 42149 381 8 hydraulic hydraulic JJ 42149 381 9 part part NN 42149 381 10 , , , 42149 381 11 which which WDT 42149 381 12 provided provide VBD 42149 381 13 its -PRON- PRP$ 42149 381 14 motive motive JJ 42149 381 15 force force NN 42149 381 16 and and CC 42149 381 17 gave give VBD 42149 381 18 the the DT 42149 381 19 power power NN 42149 381 20 to to IN 42149 381 21 the the DT 42149 381 22 segment segment NN 42149 381 23 erector erector NN 42149 381 24 . . . 42149 382 1 The the DT 42149 382 2 hydraulic hydraulic JJ 42149 382 3 fittings fitting NNS 42149 382 4 weighed weigh VBD 42149 382 5 about about RB 42149 382 6 58 58 CD 42149 382 7 tons ton NNS 42149 382 8 per per IN 42149 382 9 shield shield NN 42149 382 10 , , , 42149 382 11 so so IN 42149 382 12 that that IN 42149 382 13 the the DT 42149 382 14 total total JJ 42149 382 15 weight weight NN 42149 382 16 of of IN 42149 382 17 each each DT 42149 382 18 shield shield NN 42149 382 19 was be VBD 42149 382 20 about about RB 42149 382 21 193 193 CD 42149 382 22 tons ton NNS 42149 382 23 . . . 42149 383 1 The the DT 42149 383 2 hydraulic hydraulic JJ 42149 383 3 apparatus apparatus NN 42149 383 4 was be VBD 42149 383 5 designed design VBN 42149 383 6 for for IN 42149 383 7 a a DT 42149 383 8 maximum maximum JJ 42149 383 9 pressure pressure NN 42149 383 10 of of IN 42149 383 11 5,000 5,000 CD 42149 383 12 lb lb IN 42149 383 13 . . . 42149 384 1 per per IN 42149 384 2 sq sq NNP 42149 384 3 . . . 42149 385 1 in in IN 42149 385 2 . . NNP 42149 385 3 , , , 42149 385 4 a a DT 42149 385 5 minimum minimum JJ 42149 385 6 pressure pressure NN 42149 385 7 of of IN 42149 385 8 2,000 2,000 CD 42149 385 9 lb lb XX 42149 385 10 . . . 42149 385 11 , , , 42149 385 12 and and CC 42149 385 13 a a DT 42149 385 14 test test NN 42149 385 15 pressure pressure NN 42149 385 16 of of IN 42149 385 17 6,000 6,000 CD 42149 385 18 lb lb RB 42149 385 19 . . . 42149 386 1 The the DT 42149 386 2 actual actual JJ 42149 386 3 average average JJ 42149 386 4 pressure pressure NN 42149 386 5 used use VBN 42149 386 6 was be VBD 42149 386 7 about about RB 42149 386 8 3,500 3,500 CD 42149 386 9 lb lb RB 42149 386 10 . . . 42149 387 1 per per IN 42149 387 2 sq sq NNP 42149 387 3 . . . 42149 388 1 in in IN 42149 388 2 . . . 42149 389 1 There there EX 42149 389 2 were be VBD 42149 389 3 24 24 CD 42149 389 4 shoving shove VBG 42149 389 5 rams ram NNS 42149 389 6 , , , 42149 389 7 with with IN 42149 389 8 a a DT 42149 389 9 diameter diameter NN 42149 389 10 of of IN 42149 389 11 8½ 8½ NNP 42149 389 12 in in RP 42149 389 13 . . . 42149 390 1 and and CC 42149 390 2 stroke stroke NN 42149 390 3 of of IN 42149 390 4 38 38 CD 42149 390 5 in in IN 42149 390 6 . . . 42149 391 1 The the DT 42149 391 2 main main JJ 42149 391 3 ram ram NN 42149 391 4 was be VBD 42149 391 5 single single RB 42149 391 6 - - HYPH 42149 391 7 acting act VBG 42149 391 8 . . . 42149 392 1 The the DT 42149 392 2 packings packing NNS 42149 392 3 could could MD 42149 392 4 be be VB 42149 392 5 tightened tighten VBN 42149 392 6 up up RP 42149 392 7 from from IN 42149 392 8 the the DT 42149 392 9 outside outside NN 42149 392 10 without without IN 42149 392 11 removing remove VBG 42149 392 12 the the DT 42149 392 13 ram ram NN 42149 392 14 , , , 42149 392 15 a a DT 42149 392 16 thing thing NN 42149 392 17 which which WDT 42149 392 18 is be VBZ 42149 392 19 of of IN 42149 392 20 the the DT 42149 392 21 greatest great JJS 42149 392 22 convenience convenience NN 42149 392 23 , , , 42149 392 24 and and CC 42149 392 25 can can MD 42149 392 26 not not RB 42149 392 27 be be VB 42149 392 28 done do VBN 42149 392 29 with with IN 42149 392 30 the the DT 42149 392 31 differential differential NN 42149 392 32 plunger plunger NN 42149 392 33 type type NN 42149 392 34 . . . 42149 393 1 Some some DT 42149 393 2 of of IN 42149 393 3 the the DT 42149 393 4 chief chief JJ 42149 393 5 figures figure NNS 42149 393 6 relating relate VBG 42149 393 7 to to IN 42149 393 8 the the DT 42149 393 9 shield shield NN 42149 393 10 rams ram NNS 42149 393 11 , , , 42149 393 12 with with IN 42149 393 13 a a DT 42149 393 14 water water NN 42149 393 15 pressure pressure NN 42149 393 16 of of IN 42149 393 17 5,000 5,000 CD 42149 393 18 lb lb IN 42149 393 19 . . . 42149 394 1 per per IN 42149 394 2 sq sq NNP 42149 394 3 . . . 42149 395 1 in in IN 42149 395 2 . . NNP 42149 395 3 , , , 42149 395 4 are be VBP 42149 395 5 : : : 42149 395 6 Forward forward RB 42149 395 7 force force NN 42149 395 8 of of IN 42149 395 9 one one CD 42149 395 10 ram ram NNP 42149 395 11 275,000 275,000 CD 42149 395 12 lb lb IN 42149 395 13 . . . 42149 396 1 Forward forward RB 42149 396 2 force force NN 42149 396 3 of of IN 42149 396 4 24 24 CD 42149 396 5 rams ram NNS 42149 396 6 ( ( -LRB- 42149 396 7 all all DT 42149 396 8 ) ) -RRB- 42149 396 9 6,600,000 6,600,000 CD 42149 396 10 " " `` 42149 396 11 Forward forward JJ 42149 396 12 force force NN 42149 396 13 of of IN 42149 396 14 24 24 CD 42149 396 15 rams ram NNS 42149 396 16 3,300 3,300 CD 42149 396 17 tons ton NNS 42149 396 18 of of IN 42149 396 19 2,000 2,000 CD 42149 396 20 lb lb XX 42149 396 21 . . . 42149 397 1 Equivalent equivalent JJ 42149 397 2 pressure pressure NN 42149 397 3 per per IN 42149 397 4 square square JJ 42149 397 5 inch inch NN 42149 397 6 of of IN 42149 397 7 face face NN 42149 397 8 105 105 CD 42149 397 9 lb lb IN 42149 397 10 . . . 42149 398 1 Equivalent equivalent JJ 42149 398 2 pressure pressure NN 42149 398 3 per per IN 42149 398 4 square square JJ 42149 398 5 foot foot NN 42149 398 6 of of IN 42149 398 7 face face NN 42149 398 8 15,200 15,200 CD 42149 398 9 " " `` 42149 398 10 Pull pull VB 42149 398 11 - - HYPH 42149 398 12 back back RP 42149 398 13 force force NN 42149 398 14 of of IN 42149 398 15 one one CD 42149 398 16 ram ram VB 42149 398 17 26,400 26,400 CD 42149 398 18 " " `` 42149 398 19 Pull pull VB 42149 398 20 - - HYPH 42149 398 21 back back RP 42149 398 22 pressure pressure NN 42149 398 23 on on IN 42149 398 24 full full JJ 42149 398 25 area area NN 42149 398 26 of of IN 42149 398 27 ram ram NNP 42149 398 28 480 480 CD 42149 398 29 " " `` 42149 398 30 per per IN 42149 398 31 sq sq NNP 42149 398 32 . . . 42149 399 1 in in IN 42149 399 2 . . . 42149 400 1 The the DT 42149 400 2 rams ram NNS 42149 400 3 developed develop VBD 42149 400 4 a a DT 42149 400 5 tendency tendency NN 42149 400 6 to to TO 42149 400 7 bend bend VB 42149 400 8 , , , 42149 400 9 under under IN 42149 400 10 the the DT 42149 400 11 severe severe JJ 42149 400 12 test test NN 42149 400 13 of of IN 42149 400 14 shoving shove VBG 42149 400 15 the the DT 42149 400 16 shield shield NN 42149 400 17 all all DT 42149 400 18 closed closed JJ 42149 400 19 , , , 42149 400 20 or or CC 42149 400 21 nearly nearly RB 42149 400 22 so so RB 42149 400 23 , , , 42149 400 24 through through IN 42149 400 25 the the DT 42149 400 26 river river NN 42149 400 27 silt silt NN 42149 400 28 , , , 42149 400 29 and and CC 42149 400 30 it -PRON- PRP 42149 400 31 is be VBZ 42149 400 32 probable probable JJ 42149 400 33 that that IN 42149 400 34 it -PRON- PRP 42149 400 35 would would MD 42149 400 36 have have VB 42149 400 37 been be VBN 42149 400 38 better well JJR 42149 400 39 to to TO 42149 400 40 make make VB 42149 400 41 the the DT 42149 400 42 pistons piston NNS 42149 400 43 10 10 CD 42149 400 44 in in IN 42149 400 45 . . . 42149 401 1 in in IN 42149 401 2 diameter diameter NN 42149 401 3 instead instead RB 42149 401 4 of of IN 42149 401 5 8½ 8½ NNP 42149 401 6 in in RP 42149 401 7 . . . 42149 402 1 Each each DT 42149 402 2 sliding slide VBG 42149 402 3 platform platform NN 42149 402 4 was be VBD 42149 402 5 actuated actuate VBN 42149 402 6 by by IN 42149 402 7 two two CD 42149 402 8 single single JJ 42149 402 9 - - HYPH 42149 402 10 acting act VBG 42149 402 11 rams ram NNS 42149 402 12 , , , 42149 402 13 3½ 3½ NNP 42149 402 14 in in IN 42149 402 15 . . . 42149 403 1 in in IN 42149 403 2 diameter diameter NN 42149 403 3 and and CC 42149 403 4 having have VBG 42149 403 5 a a DT 42149 403 6 stroke stroke NN 42149 403 7 of of IN 42149 403 8 2 2 CD 42149 403 9 ft ft NN 42149 403 10 . . NNP 42149 403 11 9 9 CD 42149 403 12 in in IN 42149 403 13 . . . 42149 404 1 The the DT 42149 404 2 rams ram NNS 42149 404 3 were be VBD 42149 404 4 attached attach VBN 42149 404 5 to to IN 42149 404 6 the the DT 42149 404 7 rear rear JJ 42149 404 8 face face NN 42149 404 9 of of IN 42149 404 10 the the DT 42149 404 11 shield shield NN 42149 404 12 diaphragm diaphragm VBN 42149 404 13 inside inside IN 42149 404 14 the the DT 42149 404 15 box box NN 42149 404 16 floors floor NNS 42149 404 17 , , , 42149 404 18 and and CC 42149 404 19 the the DT 42149 404 20 cylinders cylinder NNS 42149 404 21 were be VBD 42149 404 22 movable movable JJ 42149 404 23 , , , 42149 404 24 sliding slide VBG 42149 404 25 freely freely RB 42149 404 26 on on IN 42149 404 27 bearings bearing NNS 42149 404 28 in in IN 42149 404 29 the the DT 42149 404 30 floor floor NN 42149 404 31 . . . 42149 405 1 The the DT 42149 405 2 front front JJ 42149 405 3 ends end VBZ 42149 405 4 of of IN 42149 405 5 the the DT 42149 405 6 cylinders cylinder NNS 42149 405 7 were be VBD 42149 405 8 fixed fix VBN 42149 405 9 to to IN 42149 405 10 the the DT 42149 405 11 front front JJ 42149 405 12 ends end NNS 42149 405 13 of of IN 42149 405 14 the the DT 42149 405 15 sliding slide VBG 42149 405 16 platforms platform NNS 42149 405 17 . . . 42149 406 1 The the DT 42149 406 2 cylinder cylinder NN 42149 406 3 thus thus RB 42149 406 4 supported support VBD 42149 406 5 the the DT 42149 406 6 front front JJ 42149 406 7 end end NN 42149 406 8 of of IN 42149 406 9 the the DT 42149 406 10 sliding slide VBG 42149 406 11 platform platform NN 42149 406 12 , , , 42149 406 13 and and CC 42149 406 14 was be VBD 42149 406 15 designed design VBN 42149 406 16 to to TO 42149 406 17 carry carry VB 42149 406 18 its -PRON- PRP$ 42149 406 19 half half NN 42149 406 20 of of IN 42149 406 21 the the DT 42149 406 22 load load NN 42149 406 23 on on IN 42149 406 24 the the DT 42149 406 25 platform platform NN 42149 406 26 . . . 42149 407 1 Some some DT 42149 407 2 of of IN 42149 407 3 the the DT 42149 407 4 leading lead VBG 42149 407 5 figures figure NNS 42149 407 6 in in IN 42149 407 7 connection connection NN 42149 407 8 with with IN 42149 407 9 the the DT 42149 407 10 platform platform NN 42149 407 11 rams ram NNS 42149 407 12 , , , 42149 407 13 at at IN 42149 407 14 a a DT 42149 407 15 working work VBG 42149 407 16 pressure pressure NN 42149 407 17 of of IN 42149 407 18 5,000 5,000 CD 42149 407 19 lb lb IN 42149 407 20 . . . 42149 408 1 per per IN 42149 408 2 sq sq NNP 42149 408 3 . . . 42149 409 1 in in IN 42149 409 2 . . NNP 42149 409 3 , , , 42149 409 4 are be VBP 42149 409 5 : : : 42149 409 6 Forward forward RB 42149 409 7 force force NN 42149 409 8 of of IN 42149 409 9 each each DT 42149 409 10 pair pair NN 42149 409 11 of of IN 42149 409 12 rams ram NNS 42149 409 13 ( ( -LRB- 42149 409 14 in in IN 42149 409 15 each each DT 42149 409 16 platform platform NN 42149 409 17 ) ) -RRB- 42149 409 18 96,000 96,000 CD 42149 409 19 lb lb IN 42149 409 20 . . . 42149 410 1 Total total JJ 42149 410 2 area area NN 42149 410 3 of of IN 42149 410 4 nose nose NN 42149 410 5 of of IN 42149 410 6 sliding slide VBG 42149 410 7 platform platform NN 42149 410 8 1,060 1,060 CD 42149 410 9 sq sq NN 42149 410 10 . . . 42149 411 1 in in IN 42149 411 2 . . . 42149 412 1 Maximum maximum JJ 42149 412 2 reaction reaction NN 42149 412 3 per per IN 42149 412 4 square square JJ 42149 412 5 inch inch NN 42149 412 6 on on IN 42149 412 7 nose nose NN 42149 412 8 90 90 CD 42149 412 9 lb lb IN 42149 412 10 . . . 42149 413 1 Maximum maximum JJ 42149 413 2 reaction reaction NN 42149 413 3 per per IN 42149 413 4 square square JJ 42149 413 5 foot foot NN 42149 413 6 on on IN 42149 413 7 nose nose NN 42149 413 8 13,040 13,040 CD 42149 413 9 " " `` 42149 413 10 Each each DT 42149 413 11 shield shield NN 42149 413 12 was be VBD 42149 413 13 fitted fit VBN 42149 413 14 with with IN 42149 413 15 a a DT 42149 413 16 single single JJ 42149 413 17 erector erector NN 42149 413 18 mounted mount VBN 42149 413 19 on on IN 42149 413 20 the the DT 42149 413 21 rear rear NN 42149 413 22 of of IN 42149 413 23 the the DT 42149 413 24 diaphragm diaphragm NN 42149 413 25 . . . 42149 414 1 The the DT 42149 414 2 erector erector NN 42149 414 3 consisted consist VBD 42149 414 4 of of IN 42149 414 5 a a DT 42149 414 6 box box NN 42149 414 7 - - HYPH 42149 414 8 shaped shaped JJ 42149 414 9 frame frame NN 42149 414 10 mounted mount VBN 42149 414 11 on on IN 42149 414 12 a a DT 42149 414 13 central central JJ 42149 414 14 shaft shaft NN 42149 414 15 revolving revolve VBG 42149 414 16 on on IN 42149 414 17 bearings bearing NNS 42149 414 18 attached attach VBN 42149 414 19 to to IN 42149 414 20 the the DT 42149 414 21 shield shield NN 42149 414 22 . . . 42149 415 1 Inside inside IN 42149 415 2 of of IN 42149 415 3 this this DT 42149 415 4 frame frame NN 42149 415 5 there there EX 42149 415 6 was be VBD 42149 415 7 a a DT 42149 415 8 differential differential JJ 42149 415 9 hydraulic hydraulic JJ 42149 415 10 plunger plunger NN 42149 415 11 , , , 42149 415 12 4 4 CD 42149 415 13 in in IN 42149 415 14 . . . 42149 416 1 and and CC 42149 416 2 3 3 CD 42149 416 3 in in IN 42149 416 4 . . . 42149 417 1 in in IN 42149 417 2 diameter diameter NN 42149 417 3 and and CC 42149 417 4 of of IN 42149 417 5 48-in 48-in CD 42149 417 6 . . . 42149 418 1 stroke stroke NN 42149 418 2 . . . 42149 419 1 To to IN 42149 419 2 the the DT 42149 419 3 plunger plung JJR 42149 419 4 head head NN 42149 419 5 were be VBD 42149 419 6 attached attach VBN 42149 419 7 two two CD 42149 419 8 channels channel NNS 42149 419 9 sliding slide VBG 42149 419 10 inside inside IN 42149 419 11 the the DT 42149 419 12 box box NN 42149 419 13 frame frame NN 42149 419 14 , , , 42149 419 15 and and CC 42149 419 16 to to IN 42149 419 17 the the DT 42149 419 18 projecting projecting NN 42149 419 19 ends end NNS 42149 419 20 of of IN 42149 419 21 these these DT 42149 419 22 the the DT 42149 419 23 grip grip NN 42149 419 24 was be VBD 42149 419 25 attached attach VBN 42149 419 26 . . . 42149 420 1 At at IN 42149 420 2 the the DT 42149 420 3 opposite opposite JJ 42149 420 4 end end NN 42149 420 5 of of IN 42149 420 6 the the DT 42149 420 7 box box NN 42149 420 8 frame frame NN 42149 420 9 a a DT 42149 420 10 counterweight counterweight NN 42149 420 11 was be VBD 42149 420 12 attached attach VBN 42149 420 13 which which WDT 42149 420 14 balanced balanced JJ 42149 420 15 about about IN 42149 420 16 700 700 CD 42149 420 17 lb lb RB 42149 420 18 . . . 42149 421 1 of of IN 42149 421 2 the the DT 42149 421 3 tunnel tunnel NN 42149 421 4 segment segment NN 42149 421 5 at at IN 42149 421 6 11 11 CD 42149 421 7 ft ft NN 42149 421 8 . . NNP 42149 421 9 radius radius NNP 42149 421 10 . . . 42149 422 1 The the DT 42149 422 2 erector erector NN 42149 422 3 was be VBD 42149 422 4 revolved revolve VBN 42149 422 5 by by IN 42149 422 6 two two CD 42149 422 7 single single JJ 42149 422 8 - - HYPH 42149 422 9 acting act VBG 42149 422 10 rams ram NNS 42149 422 11 fixed fix VBN 42149 422 12 horizontally horizontally RB 42149 422 13 to to IN 42149 422 14 the the DT 42149 422 15 back back NN 42149 422 16 of of IN 42149 422 17 the the DT 42149 422 18 shield shield NN 42149 422 19 above above IN 42149 422 20 the the DT 42149 422 21 erector erector NN 42149 422 22 pivot pivot NN 42149 422 23 through through IN 42149 422 24 double double JJ 42149 422 25 chains chain NNS 42149 422 26 and and CC 42149 422 27 chain chain NN 42149 422 28 wheels wheel NNS 42149 422 29 keyed key VBD 42149 422 30 to to IN 42149 422 31 the the DT 42149 422 32 erector erector NN 42149 422 33 shaft shaft NN 42149 422 34 . . . 42149 423 1 The the DT 42149 423 2 principal principal JJ 42149 423 3 figures figure NNS 42149 423 4 connected connect VBN 42149 423 5 with with IN 42149 423 6 the the DT 42149 423 7 erector erector NN 42149 423 8 , , , 42149 423 9 assuming assume VBG 42149 423 10 a a DT 42149 423 11 water water NN 42149 423 12 pressure pressure NN 42149 423 13 of of IN 42149 423 14 5,000 5,000 CD 42149 423 15 lb lb IN 42149 423 16 . . . 42149 424 1 per per IN 42149 424 2 sq sq NNP 42149 424 3 . . . 42149 425 1 in in IN 42149 425 2 . . NNP 42149 425 3 , , , 42149 425 4 are be VBP 42149 425 5 : : : 42149 425 6 Weight Weight NNP 42149 425 7 of of IN 42149 425 8 heaviest heavy JJS 42149 425 9 tunnel tunnel NN 42149 425 10 segment segment NN 42149 425 11 2,584 2,584 CD 42149 425 12 lb lb IN 42149 425 13 . . . 42149 426 1 Weight weight NN 42149 426 2 of of IN 42149 426 3 erector erector NN 42149 426 4 plunger plunger NN 42149 426 5 and and CC 42149 426 6 grip grip NN 42149 426 7 616 616 CD 42149 426 8 " " `` 42149 426 9 Total total JJ 42149 426 10 weight weight NN 42149 426 11 to to TO 42149 426 12 be be VB 42149 426 13 handled handle VBN 42149 426 14 by by IN 42149 426 15 the the DT 42149 426 16 erector erector NN 42149 426 17 ram ram VB 42149 426 18 3,200 3,200 CD 42149 426 19 " " `` 42149 426 20 Total total JJ 42149 426 21 force force NN 42149 426 22 in in IN 42149 426 23 erector erector NN 42149 426 24 ram ram NN 42149 426 25 moving move VBG 42149 426 26 from from IN 42149 426 27 center center NN 42149 426 28 of of IN 42149 426 29 shield shield NN 42149 426 30 35,000 35,000 CD 42149 426 31 " " `` 42149 426 32 Total total JJ 42149 426 33 force force NN 42149 426 34 in in IN 42149 426 35 erector erector NN 42149 426 36 ram ram NNP 42149 426 37 moving move VBG 42149 426 38 toward toward IN 42149 426 39 center center NN 42149 426 40 of of IN 42149 426 41 shield shield NN 42149 426 42 27,500 27,500 CD 42149 426 43 " " `` 42149 426 44 Weight Weight NNP 42149 426 45 at at IN 42149 426 46 11-ft 11-ft NNP 42149 426 47 . . . 42149 426 48 radius radius NN 42149 426 49 which which WDT 42149 426 50 is be VBZ 42149 426 51 balanced balance VBN 42149 426 52 by by IN 42149 426 53 counterweight counterweight JJ 42149 426 54 700 700 CD 42149 426 55 " " `` 42149 426 56 Maximum maximum JJ 42149 426 57 net net JJ 42149 426 58 weight weight NN 42149 426 59 at at IN 42149 426 60 11-ft 11-ft NNP 42149 426 61 . . . 42149 426 62 radius radius NN 42149 426 63 to to TO 42149 426 64 be be VB 42149 426 65 handled handle VBN 42149 426 66 by by IN 42149 426 67 turning turn VBG 42149 426 68 rams ram NNS 42149 426 69 1,884 1,884 CD 42149 426 70 " " `` 42149 426 71 Total total JJ 42149 426 72 force force NN 42149 426 73 of of IN 42149 426 74 each each DT 42149 426 75 rotating rotate VBG 42149 426 76 ram ram NN 42149 426 77 , , , 42149 426 78 at at IN 42149 426 79 5,000 5,000 CD 42149 426 80 lb lb IN 42149 426 81 . . . 42149 427 1 per per IN 42149 427 2 sq sq NNP 42149 427 3 . . . 42149 428 1 in in IN 42149 428 2 . . . 42149 429 1 80,000 80,000 CD 42149 429 2 " " `` 42149 429 3 Load Load NNP 42149 429 4 at at IN 42149 429 5 11-ft 11-ft NNP 42149 429 6 . . . 42149 429 7 radius radius NN 42149 429 8 , , , 42149 429 9 equivalent equivalent JJ 42149 429 10 to to IN 42149 429 11 above above IN 42149 429 12 3,780 3,780 CD 42149 429 13 " " `` 42149 429 14 When when WRB 42149 429 15 the the DT 42149 429 16 shield shield NN 42149 429 17 was be VBD 42149 429 18 designed design VBN 42149 429 19 , , , 42149 429 20 a a DT 42149 429 21 grip grip NN 42149 429 22 was be VBD 42149 429 23 also also RB 42149 429 24 designed design VBN 42149 429 25 by by IN 42149 429 26 which which WDT 42149 429 27 the the DT 42149 429 28 erector erector NN 42149 429 29 could could MD 42149 429 30 handle handle VB 42149 429 31 segments segment NNS 42149 429 32 without without IN 42149 429 33 any any DT 42149 429 34 special special JJ 42149 429 35 lugs lug NNS 42149 429 36 being be VBG 42149 429 37 cast cast VBN 42149 429 38 on on IN 42149 429 39 them -PRON- PRP 42149 429 40 . . . 42149 430 1 A a DT 42149 430 2 bolt bolt NN 42149 430 3 was be VBD 42149 430 4 passed pass VBN 42149 430 5 through through IN 42149 430 6 two two CD 42149 430 7 opposite opposite JJ 42149 430 8 bolt bolt NN 42149 430 9 holes hole NNS 42149 430 10 in in IN 42149 430 11 the the DT 42149 430 12 circumferential circumferential JJ 42149 430 13 flanges flange NNS 42149 430 14 of of IN 42149 430 15 a a DT 42149 430 16 plate plate NN 42149 430 17 . . . 42149 431 1 The the DT 42149 431 2 grip grip NN 42149 431 3 jaws jaw NNS 42149 431 4 closed close VBD 42149 431 5 over over IN 42149 431 6 this this DT 42149 431 7 bolt bolt NN 42149 431 8 and and CC 42149 431 9 locked lock VBD 42149 431 10 themselves -PRON- PRP 42149 431 11 . . . 42149 432 1 The the DT 42149 432 2 projecting projecting NN 42149 432 3 fixed fix VBN 42149 432 4 ends end NNS 42149 432 5 of of IN 42149 432 6 the the DT 42149 432 7 grip grip NN 42149 432 8 were be VBD 42149 432 9 for for IN 42149 432 10 taking take VBG 42149 432 11 the the DT 42149 432 12 direct direct JJ 42149 432 13 thrust thrust NN 42149 432 14 on on IN 42149 432 15 the the DT 42149 432 16 grip grip NN 42149 432 17 caused cause VBN 42149 432 18 by by IN 42149 432 19 the the DT 42149 432 20 erector erector NN 42149 432 21 ram ram NN 42149 432 22 when when WRB 42149 432 23 placing place VBG 42149 432 24 a a DT 42149 432 25 segment segment NN 42149 432 26 . . . 42149 433 1 It -PRON- PRP 42149 433 2 happened happen VBD 42149 433 3 , , , 42149 433 4 however however RB 42149 433 5 , , , 42149 433 6 that that IN 42149 433 7 there there EX 42149 433 8 was be VBD 42149 433 9 delay delay NN 42149 433 10 in in IN 42149 433 11 delivering deliver VBG 42149 433 12 these these DT 42149 433 13 grips grip NNS 42149 433 14 , , , 42149 433 15 and and CC 42149 433 16 , , , 42149 433 17 when when WRB 42149 433 18 the the DT 42149 433 19 shield shield NN 42149 433 20 was be VBD 42149 433 21 ready ready JJ 42149 433 22 to to TO 42149 433 23 start start VB 42149 433 24 , , , 42149 433 25 and and CC 42149 433 26 the the DT 42149 433 27 grip grip NN 42149 433 28 was be VBD 42149 433 29 not not RB 42149 433 30 forthcoming forthcoming JJ 42149 433 31 , , , 42149 433 32 Mr. Mr. NNP 42149 433 33 Patrick Patrick NNP 42149 433 34 Fitzgerald Fitzgerald NNP 42149 433 35 , , , 42149 433 36 the the DT 42149 433 37 Contractor Contractor NNP 42149 433 38 's 's POS 42149 433 39 Superintendent Superintendent NNP 42149 433 40 , , , 42149 433 41 overcame overcome VBD 42149 433 42 this this DT 42149 433 43 trouble trouble NN 42149 433 44 by by IN 42149 433 45 having have VBG 42149 433 46 another another DT 42149 433 47 grip grip NN 42149 433 48 made make VBN 42149 433 49 . . . 42149 434 1 In in IN 42149 434 2 this this DT 42149 434 3 design design NN 42149 434 4 , , , 42149 434 5 also also RB 42149 434 6 , , , 42149 434 7 a a DT 42149 434 8 self self NN 42149 434 9 - - HYPH 42149 434 10 catching catch VBG 42149 434 11 bolt bolt NN 42149 434 12 is be VBZ 42149 434 13 placed place VBN 42149 434 14 through through IN 42149 434 15 the the DT 42149 434 16 segment segment NN 42149 434 17 and and CC 42149 434 18 the the DT 42149 434 19 grip grip NN 42149 434 20 catches catch VBZ 42149 434 21 the the DT 42149 434 22 bolt bolt NN 42149 434 23 . . . 42149 435 1 In in IN 42149 435 2 simplicity simplicity NN 42149 435 3 and and CC 42149 435 4 effectiveness effectiveness NN 42149 435 5 in in IN 42149 435 6 working work VBG 42149 435 7 , , , 42149 435 8 this this DT 42149 435 9 new new JJ 42149 435 10 design design NN 42149 435 11 eventually eventually RB 42149 435 12 proved prove VBD 42149 435 13 a a DT 42149 435 14 decided decide VBN 42149 435 15 advance advance NN 42149 435 16 on on IN 42149 435 17 the the DT 42149 435 18 original original JJ 42149 435 19 one one NN 42149 435 20 , , , 42149 435 21 and and CC 42149 435 22 , , , 42149 435 23 as as IN 42149 435 24 a a DT 42149 435 25 result result NN 42149 435 26 , , , 42149 435 27 all all PDT 42149 435 28 the the DT 42149 435 29 shields shield NNS 42149 435 30 were be VBD 42149 435 31 fitted fit VBN 42149 435 32 with with IN 42149 435 33 the the DT 42149 435 34 new new JJ 42149 435 35 grip grip NN 42149 435 36 , , , 42149 435 37 and and CC 42149 435 38 the the DT 42149 435 39 original original JJ 42149 435 40 design design NN 42149 435 41 was be VBD 42149 435 42 discarded discard VBN 42149 435 43 . . . 42149 436 1 The the DT 42149 436 2 great great JJ 42149 436 3 drawback drawback NN 42149 436 4 to to IN 42149 436 5 the the DT 42149 436 6 original original JJ 42149 436 7 grip grip NN 42149 436 8 was be VBD 42149 436 9 that that IN 42149 436 10 the the DT 42149 436 11 plate plate NN 42149 436 12 swung swing VBN 42149 436 13 on on IN 42149 436 14 the the DT 42149 436 15 lifting lift VBG 42149 436 16 bolt bolt NN 42149 436 17 , , , 42149 436 18 and and CC 42149 436 19 thus thus RB 42149 436 20 brought bring VBD 42149 436 21 a a DT 42149 436 22 great great JJ 42149 436 23 strain strain NN 42149 436 24 on on IN 42149 436 25 the the DT 42149 436 26 bolt bolt NN 42149 436 27 when when WRB 42149 436 28 held hold VBN 42149 436 29 rigidly rigidly RB 42149 436 30 at at IN 42149 436 31 right right JJ 42149 436 32 angles angle NNS 42149 436 33 to to IN 42149 436 34 the the DT 42149 436 35 erector erector NN 42149 436 36 arm arm NN 42149 436 37 . . . 42149 437 1 The the DT 42149 437 2 original original JJ 42149 437 3 design design NN 42149 437 4 was be VBD 42149 437 5 able able JJ 42149 437 6 to to TO 42149 437 7 handle handle VB 42149 437 8 both both DT 42149 437 9 _ _ NNP 42149 437 10 A A NNP 42149 437 11 _ _ NNP 42149 437 12 and and CC 42149 437 13 _ _ NNP 42149 437 14 B B NNP 42149 437 15 _ _ NNP 42149 437 16 segments segment NNS 42149 437 17 , , , 42149 437 18 and and CC 42149 437 19 key key JJ 42149 437 20 segments segment NNS 42149 437 21 , , , 42149 437 22 without without IN 42149 437 23 alteration alteration NN 42149 437 24 ; ; : 42149 437 25 in in IN 42149 437 26 the the DT 42149 437 27 new new JJ 42149 437 28 design design NN 42149 437 29 , , , 42149 437 30 an an DT 42149 437 31 auxiliary auxiliary JJ 42149 437 32 head head NN 42149 437 33 had have VBD 42149 437 34 to to TO 42149 437 35 be be VB 42149 437 36 swung swing VBN 42149 437 37 into into IN 42149 437 38 position position NN 42149 437 39 to to TO 42149 437 40 handle handle VB 42149 437 41 the the DT 42149 437 42 key key NN 42149 437 43 , , , 42149 437 44 but but CC 42149 437 45 this this DT 42149 437 46 objection objection NN 42149 437 47 did do VBD 42149 437 48 not not RB 42149 437 49 amount amount VB 42149 437 50 to to IN 42149 437 51 a a DT 42149 437 52 practical practical JJ 42149 437 53 drawback drawback NN 42149 437 54 . . . 42149 438 1 The the DT 42149 438 2 operating operating NN 42149 438 3 floor floor NN 42149 438 4 from from IN 42149 438 5 which which WDT 42149 438 6 the the DT 42149 438 7 shield shield NN 42149 438 8 was be VBD 42149 438 9 controlled control VBN 42149 438 10 , , , 42149 438 11 and and CC 42149 438 12 at at IN 42149 438 13 which which WDT 42149 438 14 the the DT 42149 438 15 valves valve NNS 42149 438 16 were be VBD 42149 438 17 situated situate VBN 42149 438 18 , , , 42149 438 19 was be VBD 42149 438 20 placed place VBN 42149 438 21 above above IN 42149 438 22 the the DT 42149 438 23 rams ram NNS 42149 438 24 which which WDT 42149 438 25 rotate rotate VBP 42149 438 26 the the DT 42149 438 27 erector erector NN 42149 438 28 , , , 42149 438 29 and and CC 42149 438 30 formed form VBD 42149 438 31 a a DT 42149 438 32 protection protection NN 42149 438 33 for for IN 42149 438 34 them -PRON- PRP 42149 438 35 . . . 42149 439 1 The the DT 42149 439 2 control control NN 42149 439 3 of of IN 42149 439 4 the the DT 42149 439 5 shield shield NN 42149 439 6 rams ram NNS 42149 439 7 was be VBD 42149 439 8 divided divide VBN 42149 439 9 into into IN 42149 439 10 four four CD 42149 439 11 groups group NNS 42149 439 12 : : : 42149 439 13 the the DT 42149 439 14 seven seven CD 42149 439 15 lower low JJR 42149 439 16 rams ram NNS 42149 439 17 constituted constitute VBD 42149 439 18 one one CD 42149 439 19 group group NN 42149 439 20 , , , 42149 439 21 the the DT 42149 439 22 upper upper JJ 42149 439 23 five five CD 42149 439 24 , , , 42149 439 25 another another DT 42149 439 26 , , , 42149 439 27 and and CC 42149 439 28 the the DT 42149 439 29 six six CD 42149 439 30 remaining remain VBG 42149 439 31 on on IN 42149 439 32 each each DT 42149 439 33 side side NN 42149 439 34 , , , 42149 439 35 the the DT 42149 439 36 other other JJ 42149 439 37 two two CD 42149 439 38 . . . 42149 440 1 Each each DT 42149 440 2 group group NN 42149 440 3 was be VBD 42149 440 4 controlled control VBN 42149 440 5 by by IN 42149 440 6 its -PRON- PRP$ 42149 440 7 own own JJ 42149 440 8 stop stop NN 42149 440 9 and and CC 42149 440 10 release release VB 42149 440 11 valve valve NN 42149 440 12 . . . 42149 441 1 Individual individual JJ 42149 441 2 rams ram NNS 42149 441 3 were be VBD 42149 441 4 controlled control VBN 42149 441 5 by by IN 42149 441 6 stop stop NN 42149 441 7 - - HYPH 42149 441 8 cocks cock NNS 42149 441 9 . . . 42149 442 1 The the DT 42149 442 2 control control NN 42149 442 3 of of IN 42149 442 4 the the DT 42149 442 5 sliding slide VBG 42149 442 6 platform platform NN 42149 442 7 rams ram NNS 42149 442 8 was be VBD 42149 442 9 divided divide VBN 42149 442 10 into into IN 42149 442 11 two two CD 42149 442 12 groups group NNS 42149 442 13 , , , 42149 442 14 of of IN 42149 442 15 which which WDT 42149 442 16 all all PDT 42149 442 17 the the DT 42149 442 18 rams ram NNS 42149 442 19 on on IN 42149 442 20 the the DT 42149 442 21 upper upper JJ 42149 442 22 floor floor NN 42149 442 23 made make VBD 42149 442 24 one one CD 42149 442 25 , , , 42149 442 26 and and CC 42149 442 27 all all PDT 42149 442 28 those those DT 42149 442 29 in in IN 42149 442 30 the the DT 42149 442 31 lower low JJR 42149 442 32 floor floor NN 42149 442 33 , , , 42149 442 34 the the DT 42149 442 35 other other JJ 42149 442 36 ; ; : 42149 442 37 here here RB 42149 442 38 , , , 42149 442 39 again again RB 42149 442 40 , , , 42149 442 41 each each DT 42149 442 42 group group NN 42149 442 43 had have VBD 42149 442 44 its -PRON- PRP$ 42149 442 45 own own JJ 42149 442 46 stop stop NN 42149 442 47 and and CC 42149 442 48 release release VB 42149 442 49 valve valve NN 42149 442 50 , , , 42149 442 51 and and CC 42149 442 52 individual individual JJ 42149 442 53 platforms platform NNS 42149 442 54 were be VBD 42149 442 55 controlled control VBN 42149 442 56 by by IN 42149 442 57 stop stop NN 42149 442 58 - - HYPH 42149 442 59 cocks cock NNS 42149 442 60 arranged arrange VBN 42149 442 61 in in IN 42149 442 62 blocks block NNS 42149 442 63 from from IN 42149 442 64 which which WDT 42149 442 65 the the DT 42149 442 66 pipes pipe NNS 42149 442 67 were be VBD 42149 442 68 carried carry VBN 42149 442 69 to to IN 42149 442 70 the the DT 42149 442 71 rams ram NNS 42149 442 72 . . . 42149 443 1 The the DT 42149 443 2 in in IN 42149 443 3 - - HYPH 42149 443 4 and and CC 42149 443 5 - - HYPH 42149 443 6 out out RP 42149 443 7 movements movement NNS 42149 443 8 of of IN 42149 443 9 the the DT 42149 443 10 erector erector NN 42149 443 11 ram ram NNP 42149 443 12 were be VBD 42149 443 13 controlled control VBN 42149 443 14 by by IN 42149 443 15 a a DT 42149 443 16 two two CD 42149 443 17 - - HYPH 42149 443 18 spindle spindle NN 42149 443 19 , , , 42149 443 20 balanced balanced JJ 42149 443 21 , , , 42149 443 22 stop stop VB 42149 443 23 and and CC 42149 443 24 release release VB 42149 443 25 valve valve NN 42149 443 26 , , , 42149 443 27 controlled control VBN 42149 443 28 by by IN 42149 443 29 a a DT 42149 443 30 hand hand NN 42149 443 31 - - HYPH 42149 443 32 wheel wheel NN 42149 443 33 . . . 42149 444 1 The the DT 42149 444 2 erector erector NN 42149 444 3 rotating rotate VBG 42149 444 4 rams ram NNS 42149 444 5 were be VBD 42149 444 6 controlled control VBN 42149 444 7 by by IN 42149 444 8 a a DT 42149 444 9 similar similar JJ 42149 444 10 valve valve NN 42149 444 11 , , , 42149 444 12 with with IN 42149 444 13 four four CD 42149 444 14 spindles spindle NNS 42149 444 15 , , , 42149 444 16 also also RB 42149 444 17 operated operate VBN 42149 444 18 by by IN 42149 444 19 a a DT 42149 444 20 single single JJ 42149 444 21 hand hand NN 42149 444 22 - - HYPH 42149 444 23 wheel wheel NN 42149 444 24 . . . 42149 445 1 Both both DT 42149 445 2 wheels wheel NNS 42149 445 3 were be VBD 42149 445 4 placed place VBN 42149 445 5 inside inside IN 42149 445 6 the the DT 42149 445 7 top top JJ 42149 445 8 shield shield NN 42149 445 9 pockets pocket NNS 42149 445 10 , , , 42149 445 11 and and CC 42149 445 12 within within IN 42149 445 13 easy easy JJ 42149 445 14 reach reach NN 42149 445 15 of of IN 42149 445 16 the the DT 42149 445 17 operating operating NN 42149 445 18 platform platform NN 42149 445 19 . . . 42149 446 1 The the DT 42149 446 2 hydraulic hydraulic JJ 42149 446 3 pressure pressure NN 42149 446 4 was be VBD 42149 446 5 brought bring VBN 42149 446 6 through through IN 42149 446 7 the the DT 42149 446 8 tunnel tunnel NN 42149 446 9 by by IN 42149 446 10 a a DT 42149 446 11 2-in 2-in CD 42149 446 12 . . . 42149 447 1 hydraulic hydraulic NNP 42149 447 2 pipe pipe NNP 42149 447 3 . . . 42149 448 1 Connection connection NN 42149 448 2 with with IN 42149 448 3 the the DT 42149 448 4 shield shield NN 42149 448 5 was be VBD 42149 448 6 made make VBN 42149 448 7 by by IN 42149 448 8 a a DT 42149 448 9 flexible flexible JJ 42149 448 10 copper copper NN 42149 448 11 pipe pipe NN 42149 448 12 , , , 42149 448 13 the the DT 42149 448 14 2-in 2-in CD 42149 448 15 . . . 42149 449 1 line line NN 42149 449 2 being be VBG 42149 449 3 extended extend VBN 42149 449 4 as as IN 42149 449 5 the the DT 42149 449 6 shield shield NN 42149 449 7 advanced advance VBD 42149 449 8 . . . 42149 450 1 LAND land NN 42149 450 2 TUNNELS tunnel NNS 42149 450 3 . . . 42149 451 1 General General NNP 42149 451 2 . . . 42149 452 1 The the DT 42149 452 2 following follow VBG 42149 452 3 is be VBZ 42149 452 4 a a DT 42149 452 5 brief brief JJ 42149 452 6 account account NN 42149 452 7 of of IN 42149 452 8 the the DT 42149 452 9 main main JJ 42149 452 10 features feature NNS 42149 452 11 of of IN 42149 452 12 the the DT 42149 452 13 " " `` 42149 452 14 Land Land NNP 42149 452 15 Tunnel Tunnel NNP 42149 452 16 " " '' 42149 452 17 work work NN 42149 452 18 , , , 42149 452 19 by by IN 42149 452 20 which which WDT 42149 452 21 is be VBZ 42149 452 22 meant mean VBN 42149 452 23 all all PDT 42149 452 24 the the DT 42149 452 25 part part NN 42149 452 26 of of IN 42149 452 27 the the DT 42149 452 28 structure structure NN 42149 452 29 built build VBN 42149 452 30 without without IN 42149 452 31 using use VBG 42149 452 32 tunneling tunnel VBG 42149 452 33 shields shield NNS 42149 452 34 . . . 42149 453 1 The the DT 42149 453 2 Land Land NNP 42149 453 3 Tunnels Tunnels NNPS 42149 453 4 consist consist VBP 42149 453 5 of of IN 42149 453 6 about about RB 42149 453 7 977 977 CD 42149 453 8 ft ft NN 42149 453 9 . . NN 42149 453 10 of of IN 42149 453 11 double double JJ 42149 453 12 tunnel tunnel NN 42149 453 13 on on IN 42149 453 14 the the DT 42149 453 15 New New NNP 42149 453 16 York York NNP 42149 453 17 side side NN 42149 453 18 and and CC 42149 453 19 230 230 CD 42149 453 20 ft ft NN 42149 453 21 . . NN 42149 453 22 on on IN 42149 453 23 the the DT 42149 453 24 New New NNP 42149 453 25 Jersey Jersey NNP 42149 453 26 side side NN 42149 453 27 , , , 42149 453 28 or or CC 42149 453 29 a a DT 42149 453 30 total total NN 42149 453 31 of of IN 42149 453 32 1,207 1,207 CD 42149 453 33 lin lin NN 42149 453 34 . . . 42149 454 1 ft ft NNP 42149 454 2 . . NNP 42149 454 3 of of IN 42149 454 4 double double JJ 42149 454 5 tunnel tunnel NN 42149 454 6 . . . 42149 455 1 The the DT 42149 455 2 general general JJ 42149 455 3 design design NN 42149 455 4 of of IN 42149 455 5 the the DT 42149 455 6 cross cross JJ 42149 455 7 - - NN 42149 455 8 section section NN 42149 455 9 consists consist VBZ 42149 455 10 of of IN 42149 455 11 a a DT 42149 455 12 semi semi JJ 42149 455 13 - - JJ 42149 455 14 circular circular JJ 42149 455 15 arch arch JJ 42149 455 16 , , , 42149 455 17 vertical vertical JJ 42149 455 18 side side NN 42149 455 19 - - HYPH 42149 455 20 walls wall NNS 42149 455 21 and and CC 42149 455 22 a a DT 42149 455 23 flat flat JJ 42149 455 24 invert invert NN 42149 455 25 . . . 42149 456 1 The the DT 42149 456 2 tunnel tunnel NN 42149 456 3 is be VBZ 42149 456 4 adapted adapt VBN 42149 456 5 for for IN 42149 456 6 two two CD 42149 456 7 lines line NNS 42149 456 8 of of IN 42149 456 9 track track NN 42149 456 10 , , , 42149 456 11 each each DT 42149 456 12 being be VBG 42149 456 13 contained contain VBN 42149 456 14 in in IN 42149 456 15 its -PRON- PRP$ 42149 456 16 compartment compartment NN 42149 456 17 or or CC 42149 456 18 tunnel tunnel NN 42149 456 19 . . . 42149 457 1 The the DT 42149 457 2 span span NN 42149 457 3 of of IN 42149 457 4 the the DT 42149 457 5 arch arch NN 42149 457 6 is be VBZ 42149 457 7 wider wide JJR 42149 457 8 than than IN 42149 457 9 is be VBZ 42149 457 10 absolutely absolutely RB 42149 457 11 necessary necessary JJ 42149 457 12 to to TO 42149 457 13 take take VB 42149 457 14 the the DT 42149 457 15 rolling roll VBG 42149 457 16 stock stock NN 42149 457 17 , , , 42149 457 18 and and CC 42149 457 19 the the DT 42149 457 20 extra extra JJ 42149 457 21 space space NN 42149 457 22 is be VBZ 42149 457 23 utilized utilize VBN 42149 457 24 by by IN 42149 457 25 the the DT 42149 457 26 provision provision NN 42149 457 27 of of IN 42149 457 28 a a DT 42149 457 29 sidewalk sidewalk NN 42149 457 30 or or CC 42149 457 31 " " `` 42149 457 32 bench bench NN 42149 457 33 " " '' 42149 457 34 forming form VBG 42149 457 35 by by IN 42149 457 36 its -PRON- PRP$ 42149 457 37 upper upper JJ 42149 457 38 surface surface NN 42149 457 39 a a DT 42149 457 40 gangway gangway NN 42149 457 41 , , , 42149 457 42 out out IN 42149 457 43 of of IN 42149 457 44 the the DT 42149 457 45 way way NN 42149 457 46 of of IN 42149 457 47 traffic traffic NN 42149 457 48 , , , 42149 457 49 for for IN 42149 457 50 persons person NNS 42149 457 51 walking walk VBG 42149 457 52 in in IN 42149 457 53 the the DT 42149 457 54 tunnels tunnel NNS 42149 457 55 , , , 42149 457 56 and and CC 42149 457 57 embedded embed VBN 42149 457 58 in in IN 42149 457 59 its -PRON- PRP$ 42149 457 60 mass mass NN 42149 457 61 are be VBP 42149 457 62 a a DT 42149 457 63 number number NN 42149 457 64 of of IN 42149 457 65 vitrified vitrified JJ 42149 457 66 earthenware earthenware NN 42149 457 67 ducts duct NNS 42149 457 68 , , , 42149 457 69 for for IN 42149 457 70 high high JJ 42149 457 71 - - HYPH 42149 457 72 and and CC 42149 457 73 low low JJ 42149 457 74 - - HYPH 42149 457 75 tension tension NN 42149 457 76 electric electric JJ 42149 457 77 cables cable NNS 42149 457 78 . . . 42149 458 1 The the DT 42149 458 2 provision provision NN 42149 458 3 of of IN 42149 458 4 this this DT 42149 458 5 bench bench NN 42149 458 6 enables enable VBZ 42149 458 7 its -PRON- PRP$ 42149 458 8 vertical vertical JJ 42149 458 9 wall wall NN 42149 458 10 to to TO 42149 458 11 be be VB 42149 458 12 brought bring VBN 42149 458 13 much much JJ 42149 458 14 nearer nearer RB 42149 458 15 to to IN 42149 458 16 the the DT 42149 458 17 side side NN 42149 458 18 of of IN 42149 458 19 the the DT 42149 458 20 rolling roll VBG 42149 458 21 stock stock NN 42149 458 22 than than IN 42149 458 23 is be VBZ 42149 458 24 usually usually RB 42149 458 25 possible possible JJ 42149 458 26 , , , 42149 458 27 thus thus RB 42149 458 28 minimizing minimize VBG 42149 458 29 the the DT 42149 458 30 effects effect NNS 42149 458 31 of of IN 42149 458 32 a a DT 42149 458 33 derailment derailment NN 42149 458 34 or or CC 42149 458 35 other other JJ 42149 458 36 accident accident NN 42149 458 37 . . . 42149 459 1 Refuge refuge NN 42149 459 2 niches niche NNS 42149 459 3 for for IN 42149 459 4 trackmen trackman NNS 42149 459 5 , , , 42149 459 6 and and CC 42149 459 7 ladders ladder NNS 42149 459 8 to to IN 42149 459 9 the the DT 42149 459 10 top top NN 42149 459 11 of of IN 42149 459 12 the the DT 42149 459 13 bench bench NN 42149 459 14 are be VBP 42149 459 15 provided provide VBN 42149 459 16 at at IN 42149 459 17 frequent frequent JJ 42149 459 18 intervals interval NNS 42149 459 19 . . . 42149 460 1 In in IN 42149 460 2 cases case NNS 42149 460 3 where where WRB 42149 460 4 a a DT 42149 460 5 narrow narrow JJ 42149 460 6 street street NN 42149 460 7 limits limit VBZ 42149 460 8 the the DT 42149 460 9 width width NN 42149 460 10 of of IN 42149 460 11 the the DT 42149 460 12 structure structure NN 42149 460 13 , , , 42149 460 14 as as IN 42149 460 15 on on IN 42149 460 16 the the DT 42149 460 17 New New NNP 42149 460 18 York York NNP 42149 460 19 side side NN 42149 460 20 , , , 42149 460 21 the the DT 42149 460 22 two two CD 42149 460 23 tunnels tunnel NNS 42149 460 24 are be VBP 42149 460 25 separated separate VBN 42149 460 26 by by IN 42149 460 27 a a DT 42149 460 28 medial medial JJ 42149 460 29 wall wall NN 42149 460 30 of of IN 42149 460 31 masonry masonry NN 42149 460 32 , , , 42149 460 33 thus thus RB 42149 460 34 involving involve VBG 42149 460 35 excavation excavation NN 42149 460 36 over over IN 42149 460 37 the the DT 42149 460 38 entire entire JJ 42149 460 39 width width NN 42149 460 40 of of IN 42149 460 41 both both DT 42149 460 42 tunnels tunnel NNS 42149 460 43 , , , 42149 460 44 and and CC 42149 460 45 in in IN 42149 460 46 such such JJ 42149 460 47 case case NN 42149 460 48 the the DT 42149 460 49 tunnels tunnel NNS 42149 460 50 are be VBP 42149 460 51 spoken speak VBN 42149 460 52 of of IN 42149 460 53 as as IN 42149 460 54 " " `` 42149 460 55 Twin Twin NNP 42149 460 56 Tunnels Tunnels NNPS 42149 460 57 " " '' 42149 460 58 ; ; : 42149 460 59 where where WRB 42149 460 60 the the DT 42149 460 61 exigencies exigency NNS 42149 460 62 of of IN 42149 460 63 width width NN 42149 460 64 are be VBP 42149 460 65 not not RB 42149 460 66 so so RB 42149 460 67 severe severe JJ 42149 460 68 , , , 42149 460 69 the the DT 42149 460 70 two two CD 42149 460 71 tunnels tunnel NNS 42149 460 72 are be VBP 42149 460 73 entirely entirely RB 42149 460 74 distinct distinct JJ 42149 460 75 , , , 42149 460 76 and and CC 42149 460 77 are be VBP 42149 460 78 separated separate VBN 42149 460 79 by by IN 42149 460 80 a a DT 42149 460 81 wall wall NN 42149 460 82 of of IN 42149 460 83 rock rock NN 42149 460 84 . . . 42149 461 1 This this DT 42149 461 2 type type NN 42149 461 3 is be VBZ 42149 461 4 found find VBN 42149 461 5 on on IN 42149 461 6 the the DT 42149 461 7 Weehawken Weehawken NNP 42149 461 8 side side NN 42149 461 9 . . . 42149 462 1 The the DT 42149 462 2 arches arch NNS 42149 462 3 are be VBP 42149 462 4 of of IN 42149 462 5 brick brick NN 42149 462 6 , , , 42149 462 7 the the DT 42149 462 8 remainder remainder NN 42149 462 9 of of IN 42149 462 10 the the DT 42149 462 11 tunnel tunnel NN 42149 462 12 lining line VBG 42149 462 13 being being NN 42149 462 14 of of IN 42149 462 15 concrete concrete NN 42149 462 16 . . . 42149 463 1 New New NNP 42149 463 2 York York NNP 42149 463 3 Land Land NNP 42149 463 4 Tunnels Tunnels NNPS 42149 463 5 . . . 42149 464 1 The the DT 42149 464 2 work work NN 42149 464 3 on on IN 42149 464 4 the the DT 42149 464 5 Land Land NNP 42149 464 6 Tunnels Tunnels NNPS 42149 464 7 on on IN 42149 464 8 the the DT 42149 464 9 Manhattan Manhattan NNP 42149 464 10 side side NN 42149 464 11 was be VBD 42149 464 12 carried carry VBN 42149 464 13 on on RP 42149 464 14 from from IN 42149 464 15 the the DT 42149 464 16 shaft shaft NN 42149 464 17 at at IN 42149 464 18 11th 11th NNP 42149 464 19 Avenue Avenue NNP 42149 464 20 and and CC 42149 464 21 32d 32d NNP 42149 464 22 Street Street NNP 42149 464 23 . . . 42149 465 1 The the DT 42149 465 2 plans plan NNS 42149 465 3 and and CC 42149 465 4 designs design NNS 42149 465 5 for for IN 42149 465 6 these these DT 42149 465 7 tunnels tunnel NNS 42149 465 8 are be VBP 42149 465 9 shown show VBN 42149 465 10 on on IN 42149 465 11 Plate Plate NNP 42149 465 12 XXXII XXXII NNP 42149 465 13 . . . 42149 466 1 In in IN 42149 466 2 this this DT 42149 466 3 short short JJ 42149 466 4 length length NN 42149 466 5 of of IN 42149 466 6 about about RB 42149 466 7 977 977 CD 42149 466 8 ft ft NN 42149 466 9 . . . 42149 466 10 there there EX 42149 466 11 are be VBP 42149 466 12 no no RB 42149 466 13 less less JJR 42149 466 14 than than IN 42149 466 15 nine nine CD 42149 466 16 different different JJ 42149 466 17 kinds kind NNS 42149 466 18 of of IN 42149 466 19 cross cross JJ 42149 466 20 - - NN 42149 466 21 section section NN 42149 466 22 . . . 42149 467 1 The the DT 42149 467 2 reason reason NN 42149 467 3 for for IN 42149 467 4 these these DT 42149 467 5 changes change NNS 42149 467 6 is be VBZ 42149 467 7 the the DT 42149 467 8 fact fact NN 42149 467 9 that that IN 42149 467 10 the the DT 42149 467 11 two two CD 42149 467 12 lines line NNS 42149 467 13 of of IN 42149 467 14 track track NN 42149 467 15 are be VBP 42149 467 16 here here RB 42149 467 17 not not RB 42149 467 18 straight straight JJ 42149 467 19 and and CC 42149 467 20 parallel parallel JJ 42149 467 21 to to IN 42149 467 22 the the DT 42149 467 23 center center NN 42149 467 24 line line NN 42149 467 25 between between IN 42149 467 26 the the DT 42149 467 27 tunnels tunnel NNS 42149 467 28 , , , 42149 467 29 but but CC 42149 467 30 are be VBP 42149 467 31 curved curved JJ 42149 467 32 , , , 42149 467 33 although although IN 42149 467 34 symmetrical symmetrical JJ 42149 467 35 about about IN 42149 467 36 this this DT 42149 467 37 center center NN 42149 467 38 line line NN 42149 467 39 . . . 42149 468 1 The the DT 42149 468 2 various various JJ 42149 468 3 changes change NNS 42149 468 4 of of IN 42149 468 5 section section NN 42149 468 6 are be VBP 42149 468 7 to to TO 42149 468 8 enable enable VB 42149 468 9 the the DT 42149 468 10 tunnels tunnel NNS 42149 468 11 to to TO 42149 468 12 be be VB 42149 468 13 built build VBN 42149 468 14 in in IN 42149 468 15 straight straight JJ 42149 468 16 lengths length NNS 42149 468 17 , , , 42149 468 18 thus thus RB 42149 468 19 avoiding avoid VBG 42149 468 20 the the DT 42149 468 21 disadvantages disadvantage NNS 42149 468 22 attending attend VBG 42149 468 23 the the DT 42149 468 24 use use NN 42149 468 25 of of IN 42149 468 26 curved curved JJ 42149 468 27 forms form NNS 42149 468 28 , , , 42149 468 29 and and CC 42149 468 30 at at IN 42149 468 31 the the DT 42149 468 32 same same JJ 42149 468 33 time time NN 42149 468 34 minimizing minimize VBG 42149 468 35 the the DT 42149 468 36 quantity quantity NN 42149 468 37 of of IN 42149 468 38 excavation excavation NN 42149 468 39 , , , 42149 468 40 an an DT 42149 468 41 item item NN 42149 468 42 which which WDT 42149 468 43 accounts account VBZ 42149 468 44 for for IN 42149 468 45 from from IN 42149 468 46 60 60 CD 42149 468 47 to to TO 42149 468 48 70 70 CD 42149 468 49 % % NN 42149 468 50 of of IN 42149 468 51 the the DT 42149 468 52 total total JJ 42149 468 53 cost cost NN 42149 468 54 of of IN 42149 468 55 tunnels tunnel NNS 42149 468 56 of of IN 42149 468 57 this this DT 42149 468 58 type type NN 42149 468 59 . . . 42149 469 1 Of of RB 42149 469 2 course course RB 42149 469 3 , , , 42149 469 4 there there EX 42149 469 5 are be VBP 42149 469 6 corresponding correspond VBG 42149 469 7 and and CC 42149 469 8 obvious obvious JJ 42149 469 9 disadvantages disadvantage NNS 42149 469 10 in in IN 42149 469 11 the the DT 42149 469 12 adoption adoption NN 42149 469 13 of of IN 42149 469 14 many many JJ 42149 469 15 short short JJ 42149 469 16 lengths length NNS 42149 469 17 of of IN 42149 469 18 different different JJ 42149 469 19 cross cross NN 42149 469 20 - - NNS 42149 469 21 sections section NNS 42149 469 22 , , , 42149 469 23 and and CC 42149 469 24 these these DT 42149 469 25 disadvantages disadvantage NNS 42149 469 26 were be VBD 42149 469 27 well well RB 42149 469 28 brought bring VBN 42149 469 29 out out RP 42149 469 30 in in IN 42149 469 31 the the DT 42149 469 32 course course NN 42149 469 33 of of IN 42149 469 34 the the DT 42149 469 35 work work NN 42149 469 36 ; ; : 42149 469 37 on on IN 42149 469 38 the the DT 42149 469 39 whole whole NN 42149 469 40 , , , 42149 469 41 however however RB 42149 469 42 , , , 42149 469 43 they -PRON- PRP 42149 469 44 may may MD 42149 469 45 be be VB 42149 469 46 said say VBN 42149 469 47 to to TO 42149 469 48 have have VB 42149 469 49 justified justify VBN 42149 469 50 their -PRON- PRP$ 42149 469 51 adoption adoption NN 42149 469 52 . . . 42149 470 1 These these DT 42149 470 2 New New NNP 42149 470 3 York York NNP 42149 470 4 Land Land NNP 42149 470 5 Tunnels Tunnels NNPS 42149 470 6 were be VBD 42149 470 7 divided divide VBN 42149 470 8 into into IN 42149 470 9 three three CD 42149 470 10 contracts contract NNS 42149 470 11 , , , 42149 470 12 viz viz NN 42149 470 13 . . . 42149 471 1 : : : 42149 471 2 From from IN 42149 471 3 Station Station NNP 42149 471 4 190 190 CD 42149 471 5 + + SYM 42149 471 6 15 15 CD 42149 471 7 ( ( -LRB- 42149 471 8 the the DT 42149 471 9 Portal Portal NNP 42149 471 10 to to IN 42149 471 11 the the DT 42149 471 12 open open JJ 42149 471 13 work work NN 42149 471 14 of of IN 42149 471 15 the the DT 42149 471 16 Terminal Terminal NNP 42149 471 17 Station Station NNP 42149 471 18 at at IN 42149 471 19 the the DT 42149 471 20 east east JJ 42149 471 21 side side NN 42149 471 22 of of IN 42149 471 23 Tenth Tenth NNP 42149 471 24 Avenue Avenue NNP 42149 471 25 , , , 42149 471 26 New New NNP 42149 471 27 York York NNP 42149 471 28 City City NNP 42149 471 29 ) ) -RRB- 42149 471 30 to to IN 42149 471 31 Station Station NNP 42149 471 32 197 197 CD 42149 471 33 + + SYM 42149 471 34 60 60 CD 42149 471 35 , , , 42149 471 36 called call VBN 42149 471 37 " " `` 42149 471 38 Section Section NNP 42149 471 39 Gy Gy NNP 42149 471 40 - - HYPH 42149 471 41 East East NNP 42149 471 42 . . . 42149 471 43 " " '' 42149 472 1 The the DT 42149 472 2 next next JJ 42149 472 3 contract contract NN 42149 472 4 , , , 42149 472 5 called call VBN 42149 472 6 " " `` 42149 472 7 Section Section NNP 42149 472 8 Gy Gy NNP 42149 472 9 - - HYPH 42149 472 10 West West NNP 42149 472 11 Supplementary Supplementary NNP 42149 472 12 , , , 42149 472 13 " " '' 42149 472 14 extended extend VBN 42149 472 15 from from IN 42149 472 16 Station Station NNP 42149 472 17 197 197 CD 42149 472 18 + + SYM 42149 472 19 60 60 CD 42149 472 20 to to TO 42149 472 21 Station Station NNP 42149 472 22 199 199 CD 42149 472 23 + + SYM 42149 472 24 20 20 CD 42149 472 25 , , , 42149 472 26 which which WDT 42149 472 27 is be VBZ 42149 472 28 the the DT 42149 472 29 east east JJ 42149 472 30 side side NN 42149 472 31 of of IN 42149 472 32 Eleventh Eleventh NNP 42149 472 33 Avenue Avenue NNP 42149 472 34 . . . 42149 473 1 The the DT 42149 473 2 third third JJ 42149 473 3 contract contract NN 42149 473 4 was be VBD 42149 473 5 called call VBN 42149 473 6 " " `` 42149 473 7 Section Section NNP 42149 473 8 Gy Gy NNP 42149 473 9 - - HYPH 42149 473 10 West West NNP 42149 473 11 , , , 42149 473 12 " " '' 42149 473 13 and and CC 42149 473 14 extended extend VBN 42149 473 15 from from IN 42149 473 16 Station Station NNP 42149 473 17 199 199 CD 42149 473 18 + + SYM 42149 473 19 20 20 CD 42149 473 20 to to IN 42149 473 21 Station Station NNP 42149 473 22 231 231 CD 42149 473 23 + + SYM 42149 473 24 78 78 CD 42149 473 25 ( ( -LRB- 42149 473 26 the the DT 42149 473 27 dividing divide VBG 42149 473 28 line line NN 42149 473 29 between between IN 42149 473 30 the the DT 42149 473 31 States States NNP 42149 473 32 of of IN 42149 473 33 New New NNP 42149 473 34 York York NNP 42149 473 35 and and CC 42149 473 36 New New NNP 42149 473 37 Jersey Jersey NNP 42149 473 38 ) ) -RRB- 42149 473 39 . . . 42149 474 1 Thus thus RB 42149 474 2 , , , 42149 474 3 for for IN 42149 474 4 nearly nearly RB 42149 474 5 all all PDT 42149 474 6 its -PRON- PRP$ 42149 474 7 length length NN 42149 474 8 , , , 42149 474 9 this this DT 42149 474 10 contract contract NN 42149 474 11 consists consist VBZ 42149 474 12 of of IN 42149 474 13 shield shield NN 42149 474 14 - - HYPH 42149 474 15 driven drive VBN 42149 474 16 tunnel tunnel NN 42149 474 17 . . . 42149 475 1 The the DT 42149 475 2 portion portion NN 42149 475 3 between between IN 42149 475 4 Stations station NNS 42149 475 5 199 199 CD 42149 475 6 + + SYM 42149 475 7 20 20 CD 42149 475 8 and and CC 42149 475 9 199 199 CD 42149 475 10 + + SYM 42149 475 11 91.5 91.5 CD 42149 475 12 , , , 42149 475 13 however however RB 42149 475 14 , , , 42149 475 15 was be VBD 42149 475 16 of of IN 42149 475 17 the the DT 42149 475 18 Land Land NNP 42149 475 19 Tunnel Tunnel NNP 42149 475 20 type type NN 42149 475 21 , , , 42149 475 22 and and CC 42149 475 23 therefore therefore RB 42149 475 24 will will MD 42149 475 25 be be VB 42149 475 26 included include VBN 42149 475 27 here here RB 42149 475 28 . . . 42149 476 1 A a DT 42149 476 2 fourth fourth JJ 42149 476 3 contract contract NN 42149 476 4 extended extend VBN 42149 476 5 from from IN 42149 476 6 Station Station NNP 42149 476 7 231 231 CD 42149 476 8 + + SYM 42149 476 9 78 78 CD 42149 476 10 to to IN 42149 476 11 the the DT 42149 476 12 Weehawken Weehawken NNP 42149 476 13 Shaft Shaft NNP 42149 476 14 at at IN 42149 476 15 Station Station NNP 42149 476 16 263 263 CD 42149 476 17 + + SYM 42149 476 18 50 50 CD 42149 476 19 , , , 42149 476 20 and and CC 42149 476 21 of of IN 42149 476 22 this this DT 42149 476 23 all all DT 42149 476 24 but but CC 42149 476 25 230 230 CD 42149 476 26 ft ft NN 42149 476 27 . . NN 42149 476 28 was be VBD 42149 476 29 of of IN 42149 476 30 the the DT 42149 476 31 shield shield NN 42149 476 32 - - HYPH 42149 476 33 driven drive VBN 42149 476 34 type type NN 42149 476 35 , , , 42149 476 36 only only RB 42149 476 37 the the DT 42149 476 38 portion portion NN 42149 476 39 next next RB 42149 476 40 to to IN 42149 476 41 the the DT 42149 476 42 Weehawken Weehawken NNP 42149 476 43 Shaft Shaft NNP 42149 476 44 being being NN 42149 476 45 of of IN 42149 476 46 the the DT 42149 476 47 Land Land NNP 42149 476 48 Tunnel Tunnel NNP 42149 476 49 type type NN 42149 476 50 . . . 42149 477 1 The the DT 42149 477 2 four four CD 42149 477 3 contracts contract NNS 42149 477 4 were be VBD 42149 477 5 let let VBN 42149 477 6 to to IN 42149 477 7 one one CD 42149 477 8 contractor contractor NN 42149 477 9 ( ( -LRB- 42149 477 10 The the DT 42149 477 11 O'Rourke O'Rourke NNP 42149 477 12 Engineering Engineering NNP 42149 477 13 Construction Construction NNP 42149 477 14 Company Company NNP 42149 477 15 ) ) -RRB- 42149 477 16 , , , 42149 477 17 and and CC 42149 477 18 the the DT 42149 477 19 work work NN 42149 477 20 was be VBD 42149 477 21 carried carry VBN 42149 477 22 on on IN 42149 477 23 simultaneously simultaneously RB 42149 477 24 in in IN 42149 477 25 all all DT 42149 477 26 four four CD 42149 477 27 , , , 42149 477 28 so so IN 42149 477 29 that that IN 42149 477 30 the the DT 42149 477 31 division division NN 42149 477 32 into into IN 42149 477 33 contracts contract NNS 42149 477 34 had have VBD 42149 477 35 no no DT 42149 477 36 bearing bearing NN 42149 477 37 on on IN 42149 477 38 the the DT 42149 477 39 methods method NNS 42149 477 40 of of IN 42149 477 41 work work NN 42149 477 42 adopted adopt VBN 42149 477 43 , , , 42149 477 44 and and CC 42149 477 45 these these DT 42149 477 46 will will MD 42149 477 47 now now RB 42149 477 48 be be VB 42149 477 49 described describe VBN 42149 477 50 as as IN 42149 477 51 a a DT 42149 477 52 whole whole NN 42149 477 53 and and CC 42149 477 54 with with IN 42149 477 55 no no DT 42149 477 56 further further JJ 42149 477 57 reference reference NN 42149 477 58 to to IN 42149 477 59 the the DT 42149 477 60 different different JJ 42149 477 61 sections section NNS 42149 477 62 . . . 42149 478 1 Excavation excavation NN 42149 478 2 . . . 42149 479 1 Work work NN 42149 479 2 was be VBD 42149 479 3 started start VBN 42149 479 4 on on IN 42149 479 5 the the DT 42149 479 6 New New NNP 42149 479 7 York York NNP 42149 479 8 side side NN 42149 479 9 on on IN 42149 479 10 April April NNP 42149 479 11 18th 18th NN 42149 479 12 , , , 42149 479 13 1904 1904 CD 42149 479 14 , , , 42149 479 15 the the DT 42149 479 16 Weehawken Weehawken NNP 42149 479 17 shaft shaft NN 42149 479 18 being be VBG 42149 479 19 at at IN 42149 479 20 that that DT 42149 479 21 date date NN 42149 479 22 still still RB 42149 479 23 under under IN 42149 479 24 construction construction NN 42149 479 25 . . . 42149 480 1 As as IN 42149 480 2 will will MD 42149 480 3 have have VB 42149 480 4 been be VBN 42149 480 5 noted note VBN 42149 480 6 in in IN 42149 480 7 the the DT 42149 480 8 description description NN 42149 480 9 of of IN 42149 480 10 the the DT 42149 480 11 shafts shaft NNS 42149 480 12 , , , 42149 480 13 the the DT 42149 480 14 contractor contractor NN 42149 480 15 found find VBD 42149 480 16 a a DT 42149 480 17 shaft shaft NN 42149 480 18 already already RB 42149 480 19 prepared prepared JJ 42149 480 20 for for IN 42149 480 21 his -PRON- PRP$ 42149 480 22 use use NN 42149 480 23 , , , 42149 480 24 and and CC 42149 480 25 cross cross NN 42149 480 26 - - NNS 42149 480 27 drifts drift NNS 42149 480 28 at at IN 42149 480 29 grade grade NN 42149 480 30 and and CC 42149 480 31 at at IN 42149 480 32 right right JJ 42149 480 33 angles angle NNS 42149 480 34 to to IN 42149 480 35 the the DT 42149 480 36 future future JJ 42149 480 37 tunnels tunnel NNS 42149 480 38 , , , 42149 480 39 and and CC 42149 480 40 extending extend VBG 42149 480 41 across across IN 42149 480 42 their -PRON- PRP$ 42149 480 43 entire entire JJ 42149 480 44 width width NN 42149 480 45 . . . 42149 481 1 The the DT 42149 481 2 first first JJ 42149 481 3 essential essential NN 42149 481 4 was be VBD 42149 481 5 to to TO 42149 481 6 get get VB 42149 481 7 access access NN 42149 481 8 to to IN 42149 481 9 the the DT 42149 481 10 shield shield NN 42149 481 11 chambers chamber NNS 42149 481 12 , , , 42149 481 13 which which WDT 42149 481 14 were be VBD 42149 481 15 to to TO 42149 481 16 lie lie VB 42149 481 17 about about RB 42149 481 18 330 330 CD 42149 481 19 ft ft NN 42149 481 20 . . . 42149 481 21 to to IN 42149 481 22 the the DT 42149 481 23 west west NN 42149 481 24 of of IN 42149 481 25 the the DT 42149 481 26 shaft shaft NN 42149 481 27 , , , 42149 481 28 so so IN 42149 481 29 that that IN 42149 481 30 the the DT 42149 481 31 construction construction NN 42149 481 32 of of IN 42149 481 33 these these DT 42149 481 34 enlargements enlargement NNS 42149 481 35 in in IN 42149 481 36 which which WDT 42149 481 37 the the DT 42149 481 38 shields shield NNS 42149 481 39 for for IN 42149 481 40 the the DT 42149 481 41 subaqueous subaqueous JJ 42149 481 42 tunnels tunnel NNS 42149 481 43 were be VBD 42149 481 44 to to TO 42149 481 45 be be VB 42149 481 46 built build VBN 42149 481 47 might may MD 42149 481 48 be be VB 42149 481 49 finished finish VBN 42149 481 50 as as RB 42149 481 51 soon soon RB 42149 481 52 as as IN 42149 481 53 possible possible JJ 42149 481 54 and and CC 42149 481 55 thus thus RB 42149 481 56 allow allow VB 42149 481 57 the the DT 42149 481 58 earliest early JJS 42149 481 59 possible possible JJ 42149 481 60 start start NN 42149 481 61 to to TO 42149 481 62 be be VB 42149 481 63 made make VBN 42149 481 64 with with IN 42149 481 65 the the DT 42149 481 66 shield shield NN 42149 481 67 - - HYPH 42149 481 68 driven drive VBN 42149 481 69 tunnels tunnel NNS 42149 481 70 . . . 42149 482 1 With with IN 42149 482 2 this this DT 42149 482 3 in in IN 42149 482 4 view view NN 42149 482 5 , , , 42149 482 6 two two CD 42149 482 7 bottom bottom JJ 42149 482 8 headings heading NNS 42149 482 9 , , , 42149 482 10 on on IN 42149 482 11 the the DT 42149 482 12 center center NN 42149 482 13 line line NN 42149 482 14 of of IN 42149 482 15 each each DT 42149 482 16 of of IN 42149 482 17 the the DT 42149 482 18 two two CD 42149 482 19 tracks track NNS 42149 482 20 , , , 42149 482 21 were be VBD 42149 482 22 driven drive VBN 42149 482 23 westward westward RB 42149 482 24 from from IN 42149 482 25 the the DT 42149 482 26 western western JJ 42149 482 27 cross cross NN 42149 482 28 - - NN 42149 482 29 heading heading NN 42149 482 30 at at IN 42149 482 31 the the DT 42149 482 32 foot foot NN 42149 482 33 of of IN 42149 482 34 the the DT 42149 482 35 shaft shaft NN 42149 482 36 . . . 42149 483 1 When when WRB 42149 483 2 about about IN 42149 483 3 138 138 CD 42149 483 4 ft ft NN 42149 483 5 . . NNP 42149 483 6 had have VBD 42149 483 7 been be VBN 42149 483 8 made make VBN 42149 483 9 in in IN 42149 483 10 this this DT 42149 483 11 way way NN 42149 483 12 , , , 42149 483 13 the the DT 42149 483 14 two two CD 42149 483 15 headings heading NNS 42149 483 16 were be VBD 42149 483 17 brought bring VBN 42149 483 18 together together RB 42149 483 19 and and CC 42149 483 20 a a DT 42149 483 21 break break NN 42149 483 22 - - HYPH 42149 483 23 up up NN 42149 483 24 was be VBD 42149 483 25 made make VBN 42149 483 26 to to IN 42149 483 27 the the DT 42149 483 28 crown crown NN 42149 483 29 level level NN 42149 483 30 of of IN 42149 483 31 the the DT 42149 483 32 tunnel tunnel NN 42149 483 33 , , , 42149 483 34 as as IN 42149 483 35 the the DT 42149 483 36 depth depth NN 42149 483 37 of of IN 42149 483 38 rock rock NN 42149 483 39 cover cover NN 42149 483 40 was be VBD 42149 483 41 doubtful doubtful JJ 42149 483 42 . . . 42149 484 1 From from IN 42149 484 2 this this DT 42149 484 3 break break NN 42149 484 4 - - HYPH 42149 484 5 up up RP 42149 484 6 a a DT 42149 484 7 top top JJ 42149 484 8 heading heading NN 42149 484 9 was be VBD 42149 484 10 driven drive VBN 42149 484 11 westward westward RB 42149 484 12 to to IN 42149 484 13 Station Station NNP 42149 484 14 200 200 CD 42149 484 15 + + SYM 42149 484 16 30 30 CD 42149 484 17 . . . 42149 485 1 While while IN 42149 485 2 widening widen VBG 42149 485 3 the the DT 42149 485 4 heading heading NN 42149 485 5 out out RP 42149 485 6 at at IN 42149 485 7 Station station NN 42149 485 8 200 200 CD 42149 485 9 + + SYM 42149 485 10 20 20 CD 42149 485 11 the the DT 42149 485 12 rock rock NN 42149 485 13 was be VBD 42149 485 14 penetrated penetrate VBN 42149 485 15 on on IN 42149 485 16 the the DT 42149 485 17 south south JJ 42149 485 18 side side NN 42149 485 19 . . . 42149 486 1 The the DT 42149 486 2 exposed exposed JJ 42149 486 3 wet wet JJ 42149 486 4 sand sand NN 42149 486 5 and and CC 42149 486 6 gravel gravel NN 42149 486 7 started start VBD 42149 486 8 to to TO 42149 486 9 run run VB 42149 486 10 , , , 42149 486 11 and and CC 42149 486 12 , , , 42149 486 13 as as IN 42149 486 14 a a DT 42149 486 15 consequence consequence NN 42149 486 16 , , , 42149 486 17 a a DT 42149 486 18 change change NN 42149 486 19 in in IN 42149 486 20 design design NN 42149 486 21 was be VBD 42149 486 22 made make VBN 42149 486 23 , , , 42149 486 24 the the DT 42149 486 25 shield shield NN 42149 486 26 chambers chamber NNS 42149 486 27 ( ( -LRB- 42149 486 28 and and CC 42149 486 29 consequently consequently RB 42149 486 30 the the DT 42149 486 31 start start NN 42149 486 32 of of IN 42149 486 33 the the DT 42149 486 34 shield shield NN 42149 486 35 - - HYPH 42149 486 36 driven drive VBN 42149 486 37 tunnels tunnel NNS 42149 486 38 ) ) -RRB- 42149 486 39 being be VBG 42149 486 40 moved move VBN 42149 486 41 eastward eastward RB 42149 486 42 from from IN 42149 486 43 their -PRON- PRP$ 42149 486 44 original original JJ 42149 486 45 location location NN 42149 486 46 133 133 CD 42149 486 47 ft ft NN 42149 486 48 . . . 42149 486 49 to to IN 42149 486 50 their -PRON- PRP$ 42149 486 51 present present JJ 42149 486 52 location location NN 42149 486 53 . . . 42149 487 1 A a DT 42149 487 2 certain certain JJ 42149 487 3 amount amount NN 42149 487 4 of of IN 42149 487 5 time time NN 42149 487 6 was be VBD 42149 487 7 necessarily necessarily RB 42149 487 8 spent spend VBN 42149 487 9 in in IN 42149 487 10 making make VBG 42149 487 11 these these DT 42149 487 12 changes change NNS 42149 487 13 of of IN 42149 487 14 design design NN 42149 487 15 , , , 42149 487 16 which which WDT 42149 487 17 involved involve VBD 42149 487 18 a a DT 42149 487 19 rearrangement rearrangement NN 42149 487 20 of of IN 42149 487 21 the the DT 42149 487 22 whole whole JJ 42149 487 23 layout layout NN 42149 487 24 from from IN 42149 487 25 the the DT 42149 487 26 Terminal Terminal NNP 42149 487 27 Station Station NNP 42149 487 28 to to IN 42149 487 29 the the DT 42149 487 30 start start NN 42149 487 31 of of IN 42149 487 32 the the DT 42149 487 33 River River NNP 42149 487 34 Tunnels Tunnels NNPS 42149 487 35 . . . 42149 488 1 On on IN 42149 488 2 July July NNP 42149 488 3 5th 5th NN 42149 488 4 , , , 42149 488 5 1904 1904 CD 42149 488 6 , , , 42149 488 7 however however RB 42149 488 8 , , , 42149 488 9 the the DT 42149 488 10 new new JJ 42149 488 11 design design NN 42149 488 12 was be VBD 42149 488 13 formally formally RB 42149 488 14 approved approve VBN 42149 488 15 . . . 42149 489 1 No no RB 42149 489 2 sooner soon RBR 42149 489 3 had have VBD 42149 489 4 this this DT 42149 489 5 been be VBN 42149 489 6 decided decide VBN 42149 489 7 than than IN 42149 489 8 a a DT 42149 489 9 strike strike NN 42149 489 10 arose arise VBD 42149 489 11 on on IN 42149 489 12 the the DT 42149 489 13 work work NN 42149 489 14 , , , 42149 489 15 and and CC 42149 489 16 this this DT 42149 489 17 was be VBD 42149 489 18 not not RB 42149 489 19 settled settle VBN 42149 489 20 until until IN 42149 489 21 August August NNP 42149 489 22 1st 1st NN 42149 489 23 , , , 42149 489 24 1904 1904 CD 42149 489 25 , , , 42149 489 26 but but CC 42149 489 27 from from IN 42149 489 28 that that DT 42149 489 29 time time NN 42149 489 30 the the DT 42149 489 31 work work NN 42149 489 32 progressed progress VBN 42149 489 33 without without IN 42149 489 34 delay delay NN 42149 489 35 . . . 42149 490 1 No no DT 42149 490 2 further further JJ 42149 490 3 reference reference NN 42149 490 4 will will MD 42149 490 5 be be VB 42149 490 6 made make VBN 42149 490 7 to to IN 42149 490 8 the the DT 42149 490 9 work work NN 42149 490 10 in in IN 42149 490 11 the the DT 42149 490 12 shield shield NN 42149 490 13 chambers chamber NNS 42149 490 14 , , , 42149 490 15 as as IN 42149 490 16 that that DT 42149 490 17 will will MD 42149 490 18 come come VB 42149 490 19 under under IN 42149 490 20 the the DT 42149 490 21 heading heading NN 42149 490 22 of of IN 42149 490 23 " " `` 42149 490 24 River River NNP 42149 490 25 Tunnels Tunnels NNPS 42149 490 26 , , , 42149 490 27 " " '' 42149 490 28 being be VBG 42149 490 29 of of IN 42149 490 30 the the DT 42149 490 31 segmental segmental JJ 42149 490 32 , , , 42149 490 33 cast cast NN 42149 490 34 - - HYPH 42149 490 35 iron iron NN 42149 490 36 lined lined JJ 42149 490 37 type type NN 42149 490 38 . . . 42149 491 1 A a DT 42149 491 2 top top JJ 42149 491 3 heading heading NN 42149 491 4 was be VBD 42149 491 5 now now RB 42149 491 6 driven drive VBN 42149 491 7 over over IN 42149 491 8 the the DT 42149 491 9 original original JJ 42149 491 10 bottom bottom NN 42149 491 11 heading heading NN 42149 491 12 west west NN 42149 491 13 of of IN 42149 491 14 the the DT 42149 491 15 shaft shaft NN 42149 491 16 , , , 42149 491 17 and and CC 42149 491 18 at at IN 42149 491 19 the the DT 42149 491 20 same same JJ 42149 491 21 time time NN 42149 491 22 the the DT 42149 491 23 original original JJ 42149 491 24 cross cross NN 42149 491 25 - - NNS 42149 491 26 drifts drift NNS 42149 491 27 from from IN 42149 491 28 the the DT 42149 491 29 shaft shaft NN 42149 491 30 were be VBD 42149 491 31 amalgamated amalgamate VBN 42149 491 32 with with IN 42149 491 33 and and CC 42149 491 34 broken break VBN 42149 491 35 down down RP 42149 491 36 by by IN 42149 491 37 a a DT 42149 491 38 heading heading NN 42149 491 39 driven drive VBN 42149 491 40 at at IN 42149 491 41 the the DT 42149 491 42 crown crown NN 42149 491 43 level level NN 42149 491 44 of of IN 42149 491 45 the the DT 42149 491 46 " " `` 42149 491 47 Intercepting intercept VBG 42149 491 48 Arch Arch NNP 42149 491 49 " " '' 42149 491 50 which which WDT 42149 491 51 here here RB 42149 491 52 cuts cut VBZ 42149 491 53 across across IN 42149 491 54 the the DT 42149 491 55 ordinary ordinary JJ 42149 491 56 run run NN 42149 491 57 of of IN 42149 491 58 tunnel tunnel NN 42149 491 59 at at IN 42149 491 60 right right JJ 42149 491 61 angles angle NNS 42149 491 62 and and CC 42149 491 63 affords afford NNS 42149 491 64 access access NN 42149 491 65 to to IN 42149 491 66 the the DT 42149 491 67 tunnels tunnel NNS 42149 491 68 from from IN 42149 491 69 the the DT 42149 491 70 shafts shaft NNS 42149 491 71 . . . 42149 492 1 The the DT 42149 492 2 excavation excavation NN 42149 492 3 of of IN 42149 492 4 the the DT 42149 492 5 upper upper JJ 42149 492 6 portion portion NN 42149 492 7 of of IN 42149 492 8 the the DT 42149 492 9 intercepting intercept VBG 42149 492 10 arch arch NN 42149 492 11 at at IN 42149 492 12 its -PRON- PRP$ 42149 492 13 southern southern JJ 42149 492 14 end end NN 42149 492 15 gave give VBD 42149 492 16 some some DT 42149 492 17 trouble trouble NN 42149 492 18 , , , 42149 492 19 and and CC 42149 492 20 caused cause VBD 42149 492 21 some some DT 42149 492 22 anxiety anxiety NN 42149 492 23 , , , 42149 492 24 as as IN 42149 492 25 the the DT 42149 492 26 rock rock NN 42149 492 27 cover cover NN 42149 492 28 was be VBD 42149 492 29 penetrated penetrate VBN 42149 492 30 and and CC 42149 492 31 the the DT 42149 492 32 wet wet JJ 42149 492 33 sand sand NN 42149 492 34 and and CC 42149 492 35 gravel gravel NN 42149 492 36 were be VBD 42149 492 37 exposed expose VBN 42149 492 38 . . . 42149 493 1 This this DT 42149 493 2 made make VBD 42149 493 3 it -PRON- PRP 42149 493 4 necessary necessary JJ 42149 493 5 to to TO 42149 493 6 timber timber VB 42149 493 7 all all PDT 42149 493 8 this this DT 42149 493 9 section section NN 42149 493 10 heavily heavily RB 42149 493 11 , , , 42149 493 12 and and CC 42149 493 13 the the DT 42149 493 14 tracks track NNS 42149 493 15 of of IN 42149 493 16 the the DT 42149 493 17 New New NNP 42149 493 18 York York NNP 42149 493 19 Central Central NNP 42149 493 20 Railroad Railroad NNP 42149 493 21 directly directly RB 42149 493 22 above above RB 42149 493 23 were be VBD 42149 493 24 successfully successfully RB 42149 493 25 supported support VBN 42149 493 26 . . . 42149 494 1 The the DT 42149 494 2 general general JJ 42149 494 3 way way NN 42149 494 4 in in IN 42149 494 5 which which WDT 42149 494 6 this this DT 42149 494 7 timbering timbering NN 42149 494 8 was be VBD 42149 494 9 carried carry VBN 42149 494 10 out out RP 42149 494 11 will will MD 42149 494 12 be be VB 42149 494 13 described describe VBN 42149 494 14 under under IN 42149 494 15 the the DT 42149 494 16 head head NN 42149 494 17 of of IN 42149 494 18 " " `` 42149 494 19 Timbering Timbering NNP 42149 494 20 . . . 42149 494 21 " " '' 42149 495 1 Meanwhile meanwhile RB 42149 495 2 , , , 42149 495 3 the the DT 42149 495 4 excavation excavation NN 42149 495 5 of of IN 42149 495 6 the the DT 42149 495 7 tunnels tunnel NNS 42149 495 8 west west RB 42149 495 9 of of IN 42149 495 10 the the DT 42149 495 11 intercepting intercept VBG 42149 495 12 arch arch NN 42149 495 13 was be VBD 42149 495 14 continued continue VBN 42149 495 15 until until IN 42149 495 16 the the DT 42149 495 17 North North NNP 42149 495 18 and and CC 42149 495 19 South South NNP 42149 495 20 Tunnels Tunnels NNPS 42149 495 21 were be VBD 42149 495 22 taken take VBN 42149 495 23 out out RP 42149 495 24 to to IN 42149 495 25 their -PRON- PRP$ 42149 495 26 full full JJ 42149 495 27 outlines outline NNS 42149 495 28 , , , 42149 495 29 leaving leave VBG 42149 495 30 a a DT 42149 495 31 core core NN 42149 495 32 of of IN 42149 495 33 rock rock NN 42149 495 34 between between IN 42149 495 35 them -PRON- PRP 42149 495 36 . . . 42149 496 1 This this DT 42149 496 2 core core NN 42149 496 3 was be VBD 42149 496 4 gradually gradually RB 42149 496 5 removed remove VBN 42149 496 6 , , , 42149 496 7 and and CC 42149 496 8 timbering timbere VBG 42149 496 9 supporting support VBG 42149 496 10 the the DT 42149 496 11 rock rock NN 42149 496 12 above above IN 42149 496 13 the the DT 42149 496 14 middle middle JJ 42149 496 15 wall wall NN 42149 496 16 was be VBD 42149 496 17 put put VBN 42149 496 18 in in RP 42149 496 19 as as IN 42149 496 20 excavation excavation NN 42149 496 21 went go VBD 42149 496 22 on on RP 42149 496 23 . . . 42149 497 1 The the DT 42149 497 2 ground ground NN 42149 497 3 , , , 42149 497 4 which which WDT 42149 497 5 was be VBD 42149 497 6 entirely entirely RB 42149 497 7 of of IN 42149 497 8 micaceous micaceous JJ 42149 497 9 schist schist NN 42149 497 10 , , , 42149 497 11 typical typical JJ 42149 497 12 of of IN 42149 497 13 this this DT 42149 497 14 part part NN 42149 497 15 of of IN 42149 497 16 Manhattan Manhattan NNP 42149 497 17 , , , 42149 497 18 seamed seam VBD 42149 497 19 with with IN 42149 497 20 veins vein NNS 42149 497 21 of of IN 42149 497 22 granite granite NN 42149 497 23 , , , 42149 497 24 was be VBD 42149 497 25 rather rather RB 42149 497 26 heavy heavy JJ 42149 497 27 at at IN 42149 497 28 the the DT 42149 497 29 west west NNP 42149 497 30 end end NN 42149 497 31 , , , 42149 497 32 or or CC 42149 497 33 adjacent adjacent JJ 42149 497 34 to to IN 42149 497 35 the the DT 42149 497 36 shield shield NN 42149 497 37 chambers chamber NNS 42149 497 38 , , , 42149 497 39 and and CC 42149 497 40 required require VBD 42149 497 41 complete complete JJ 42149 497 42 segmental segmental JJ 42149 497 43 timbering timbering NN 42149 497 44 across across IN 42149 497 45 the the DT 42149 497 46 whole whole JJ 42149 497 47 span span NN 42149 497 48 . . . 42149 498 1 One one CD 42149 498 2 heavy heavy JJ 42149 498 3 fall fall NN 42149 498 4 of of IN 42149 498 5 rock rock NN 42149 498 6 in in IN 42149 498 7 the the DT 42149 498 8 corewall corewall NN 42149 498 9 between between IN 42149 498 10 the the DT 42149 498 11 North North NNP 42149 498 12 and and CC 42149 498 13 South South NNP 42149 498 14 Tunnels Tunnels NNPS 42149 498 15 took take VBD 42149 498 16 place place NN 42149 498 17 on on IN 42149 498 18 November November NNP 42149 498 19 2d 2d CD 42149 498 20 , , , 42149 498 21 but but CC 42149 498 22 fortunately fortunately RB 42149 498 23 did do VBD 42149 498 24 not not RB 42149 498 25 extend extend VB 42149 498 26 beyond beyond IN 42149 498 27 the the DT 42149 498 28 limits limit NNS 42149 498 29 of of IN 42149 498 30 the the DT 42149 498 31 permanent permanent JJ 42149 498 32 work work NN 42149 498 33 . . . 42149 499 1 On on IN 42149 499 2 November November NNP 42149 499 3 7th 7th NN 42149 499 4 , , , 42149 499 5 1904 1904 CD 42149 499 6 , , , 42149 499 7 the the DT 42149 499 8 excavation excavation NN 42149 499 9 east east NN 42149 499 10 of of IN 42149 499 11 the the DT 42149 499 12 intercepting intercept VBG 42149 499 13 arch arch NN 42149 499 14 was be VBD 42149 499 15 begun begin VBN 42149 499 16 by by IN 42149 499 17 driving drive VBG 42149 499 18 a a DT 42149 499 19 bottom bottom NN 42149 499 20 heading heading NN 42149 499 21 in in IN 42149 499 22 the the DT 42149 499 23 South South NNP 42149 499 24 Tunnel Tunnel NNP 42149 499 25 . . . 42149 500 1 This this DT 42149 500 2 was be VBD 42149 500 3 continued continue VBN 42149 500 4 to to IN 42149 500 5 Station Station NNP 42149 500 6 197 197 CD 42149 500 7 + + SYM 42149 500 8 14 14 CD 42149 500 9 and and CC 42149 500 10 then then RB 42149 500 11 was be VBD 42149 500 12 taken take VBN 42149 500 13 up up RP 42149 500 14 to to IN 42149 500 15 the the DT 42149 500 16 crown crown NN 42149 500 17 level level NN 42149 500 18 and and CC 42149 500 19 worked work VBD 42149 500 20 as as IN 42149 500 21 a a DT 42149 500 22 top top JJ 42149 500 23 heading heading NN 42149 500 24 with with IN 42149 500 25 the the DT 42149 500 26 view view NN 42149 500 27 of of IN 42149 500 28 keeping keep VBG 42149 500 29 track track NN 42149 500 30 , , , 42149 500 31 by by IN 42149 500 32 making make VBG 42149 500 33 exploratory exploratory JJ 42149 500 34 borings boring NNS 42149 500 35 upward upward RB 42149 500 36 from from IN 42149 500 37 the the DT 42149 500 38 roof roof NN 42149 500 39 at at IN 42149 500 40 frequent frequent JJ 42149 500 41 intervals interval NNS 42149 500 42 , , , 42149 500 43 of of IN 42149 500 44 the the DT 42149 500 45 rock rock NN 42149 500 46 surface surface NN 42149 500 47 , , , 42149 500 48 which which WDT 42149 500 49 was be VBD 42149 500 50 here here RB 42149 500 51 irregular irregular JJ 42149 500 52 and and CC 42149 500 53 not not RB 42149 500 54 known know VBN 42149 500 55 with with IN 42149 500 56 any any DT 42149 500 57 degree degree NN 42149 500 58 of of IN 42149 500 59 certainty certainty NN 42149 500 60 . . . 42149 501 1 The the DT 42149 501 2 work work NN 42149 501 3 was be VBD 42149 501 4 not not RB 42149 501 5 pressed press VBN 42149 501 6 with with IN 42149 501 7 any any DT 42149 501 8 vigor vigor NN 42149 501 9 , , , 42149 501 10 because because IN 42149 501 11 all all DT 42149 501 12 efforts effort NNS 42149 501 13 were be VBD 42149 501 14 then then RB 42149 501 15 being be VBG 42149 501 16 bent bent JJ 42149 501 17 toward toward IN 42149 501 18 excavating excavating NN 42149 501 19 from from IN 42149 501 20 the the DT 42149 501 21 River River NNP 42149 501 22 Tunnels Tunnels NNPS 42149 501 23 as as RB 42149 501 24 much much JJ 42149 501 25 rock rock NN 42149 501 26 as as IN 42149 501 27 possible possible JJ 42149 501 28 . . . 42149 502 1 In in IN 42149 502 2 Section Section NNP 42149 502 3 Gy Gy NNP 42149 502 4 - - HYPH 42149 502 5 East East NNP 42149 502 6 the the DT 42149 502 7 conditions condition NNS 42149 502 8 were be VBD 42149 502 9 exceptionally exceptionally RB 42149 502 10 variable variable JJ 42149 502 11 , , , 42149 502 12 as as IN 42149 502 13 the the DT 42149 502 14 rock rock NN 42149 502 15 was be VBD 42149 502 16 subject subject JJ 42149 502 17 to to IN 42149 502 18 sudden sudden JJ 42149 502 19 changes change NNS 42149 502 20 from from IN 42149 502 21 a a DT 42149 502 22 soft soft JJ 42149 502 23 crumbling crumble VBG 42149 502 24 mica mica NN 42149 502 25 schist schist NN 42149 502 26 to to IN 42149 502 27 broad broad JJ 42149 502 28 bands band NNS 42149 502 29 of of IN 42149 502 30 hard hard JJ 42149 502 31 granite granite NN 42149 502 32 , , , 42149 502 33 and and CC 42149 502 34 , , , 42149 502 35 in in IN 42149 502 36 addition addition NN 42149 502 37 , , , 42149 502 38 the the DT 42149 502 39 rock rock NN 42149 502 40 surface surface NN 42149 502 41 was be VBD 42149 502 42 very very RB 42149 502 43 irregular irregular JJ 42149 502 44 , , , 42149 502 45 and and CC 42149 502 46 , , , 42149 502 47 for for IN 42149 502 48 a a DT 42149 502 49 good good JJ 42149 502 50 length length NN 42149 502 51 of of IN 42149 502 52 this this DT 42149 502 53 section section NN 42149 502 54 , , , 42149 502 55 was be VBD 42149 502 56 below below IN 42149 502 57 the the DT 42149 502 58 crown crown NN 42149 502 59 of of IN 42149 502 60 the the DT 42149 502 61 tunnel tunnel NN 42149 502 62 , , , 42149 502 63 a a DT 42149 502 64 condition condition NN 42149 502 65 which which WDT 42149 502 66 led lead VBD 42149 502 67 to to IN 42149 502 68 the the DT 42149 502 69 adoption adoption NN 42149 502 70 of of IN 42149 502 71 the the DT 42149 502 72 cut cut VBN 42149 502 73 - - HYPH 42149 502 74 and and CC 42149 502 75 - - HYPH 42149 502 76 cover cover NN 42149 502 77 method method NN 42149 502 78 for for IN 42149 502 79 part part NN 42149 502 80 of of IN 42149 502 81 the the DT 42149 502 82 work work NN 42149 502 83 . . . 42149 503 1 The the DT 42149 503 2 irregularity irregularity NN 42149 503 3 in in IN 42149 503 4 conditions condition NNS 42149 503 5 called call VBN 42149 503 6 for for IN 42149 503 7 varying vary VBG 42149 503 8 methods method NNS 42149 503 9 of of IN 42149 503 10 procedure procedure NN 42149 503 11 , , , 42149 503 12 but but CC 42149 503 13 in in IN 42149 503 14 general general JJ 42149 503 15 the the DT 42149 503 16 methods method NNS 42149 503 17 were be VBD 42149 503 18 as as IN 42149 503 19 shown show VBN 42149 503 20 on on IN 42149 503 21 Plate Plate NNP 42149 503 22 XXXIII XXXIII NNP 42149 503 23 , , , 42149 503 24 and and CC 42149 503 25 described describe VBN 42149 503 26 as as IN 42149 503 27 follows follow VBZ 42149 503 28 : : : 42149 503 29 _ _ NNP 42149 503 30 In in IN 42149 503 31 Solid Solid NNP 42149 503 32 Rock._--Where Rock._--Where NNP 42149 503 33 there there EX 42149 503 34 was be VBD 42149 503 35 plenty plenty NN 42149 503 36 of of IN 42149 503 37 good good JJ 42149 503 38 rock rock NN 42149 503 39 cover cover NN 42149 503 40 , , , 42149 503 41 a a DT 42149 503 42 top top JJ 42149 503 43 middle middle NN 42149 503 44 heading heading NN 42149 503 45 was be VBD 42149 503 46 driven drive VBN 42149 503 47 , , , 42149 503 48 which which WDT 42149 503 49 was be VBD 42149 503 50 afterward afterward RB 42149 503 51 widened widen VBN 42149 503 52 out out RP 42149 503 53 to to IN 42149 503 54 the the DT 42149 503 55 full full JJ 42149 503 56 cross cross JJ 42149 503 57 - - NN 42149 503 58 section section NN 42149 503 59 of of IN 42149 503 60 the the DT 42149 503 61 twin twin JJ 42149 503 62 tunnel tunnel NN 42149 503 63 arches arch NNS 42149 503 64 . . . 42149 504 1 If if IN 42149 504 2 necessary necessary JJ 42149 504 3 , , , 42149 504 4 a a DT 42149 504 5 few few JJ 42149 504 6 lengths length NNS 42149 504 7 of of IN 42149 504 8 segmental segmental JJ 42149 504 9 timbering timbering NN 42149 504 10 were be VBD 42149 504 11 put put VBN 42149 504 12 in in RP 42149 504 13 before before IN 42149 504 14 taking take VBG 42149 504 15 down down RP 42149 504 16 the the DT 42149 504 17 bench bench NN 42149 504 18 , , , 42149 504 19 which which WDT 42149 504 20 was be VBD 42149 504 21 generally generally RB 42149 504 22 kept keep VBN 42149 504 23 some some DT 42149 504 24 40 40 CD 42149 504 25 or or CC 42149 504 26 50 50 CD 42149 504 27 ft ft NN 42149 504 28 . . NN 42149 504 29 behind behind IN 42149 504 30 the the DT 42149 504 31 breast breast NN 42149 504 32 of of IN 42149 504 33 the the DT 42149 504 34 heading heading NN 42149 504 35 . . . 42149 505 1 After after IN 42149 505 2 the the DT 42149 505 3 bench bench NN 42149 505 4 was be VBD 42149 505 5 down down RB 42149 505 6 , , , 42149 505 7 the the DT 42149 505 8 middle middle NNP 42149 505 9 conduit conduit NNP 42149 505 10 trench trench NN 42149 505 11 was be VBD 42149 505 12 excavated excavate VBN 42149 505 13 and and CC 42149 505 14 the the DT 42149 505 15 trimming trim VBG 42149 505 16 done do VBN 42149 505 17 . . . 42149 506 1 _ _ NNP 42149 506 2 In in IN 42149 506 3 Soft Soft NNP 42149 506 4 Rock._--Where Rock._--Where NNP 42149 506 5 there there EX 42149 506 6 was be VBD 42149 506 7 not not RB 42149 506 8 enough enough JJ 42149 506 9 rock rock NN 42149 506 10 cover cover NN 42149 506 11 , , , 42149 506 12 or or CC 42149 506 13 where where WRB 42149 506 14 there there EX 42149 506 15 was be VBD 42149 506 16 actual actual JJ 42149 506 17 soft soft JJ 42149 506 18 ground ground NN 42149 506 19 in in IN 42149 506 20 the the DT 42149 506 21 roof roof NN 42149 506 22 , , , 42149 506 23 wall wall NN 42149 506 24 - - HYPH 42149 506 25 plate plate NN 42149 506 26 headings heading NNS 42149 506 27 at at IN 42149 506 28 the the DT 42149 506 29 springing springing NN 42149 506 30 line line NN 42149 506 31 level level NN 42149 506 32 were be VBD 42149 506 33 driven drive VBN 42149 506 34 ahead ahead RB 42149 506 35 of of IN 42149 506 36 the the DT 42149 506 37 remainder remainder NN 42149 506 38 of of IN 42149 506 39 the the DT 42149 506 40 work work NN 42149 506 41 . . . 42149 507 1 The the DT 42149 507 2 wall wall NN 42149 507 3 - - HYPH 42149 507 4 plates plate NNS 42149 507 5 were be VBD 42149 507 6 laid lay VBN 42149 507 7 in in IN 42149 507 8 these these DT 42149 507 9 , , , 42149 507 10 the the DT 42149 507 11 roof roof NN 42149 507 12 was be VBD 42149 507 13 taken take VBN 42149 507 14 out out RP 42149 507 15 in in IN 42149 507 16 short short JJ 42149 507 17 lengths length NNS 42149 507 18 , , , 42149 507 19 and and CC 42149 507 20 segmental segmental JJ 42149 507 21 timbering timbering NN 42149 507 22 spanning span VBG 42149 507 23 from from IN 42149 507 24 wall wall NN 42149 507 25 - - HYPH 42149 507 26 plate plate NN 42149 507 27 to to IN 42149 507 28 wall wall NN 42149 507 29 - - HYPH 42149 507 30 plate plate NN 42149 507 31 was be VBD 42149 507 32 put put VBN 42149 507 33 in in RB 42149 507 34 . . . 42149 508 1 The the DT 42149 508 2 roof roof NN 42149 508 3 being be VBG 42149 508 4 thus thus RB 42149 508 5 held hold VBN 42149 508 6 , , , 42149 508 7 the the DT 42149 508 8 bench bench NN 42149 508 9 excavation excavation NN 42149 508 10 proceeded proceed VBD 42149 508 11 without without IN 42149 508 12 trouble trouble NN 42149 508 13 . . . 42149 509 1 Where where WRB 42149 509 2 the the DT 42149 509 3 rock rock NN 42149 509 4 was be VBD 42149 509 5 penetrated penetrate VBN 42149 509 6 and and CC 42149 509 7 soft soft JJ 42149 509 8 ground ground NN 42149 509 9 showed show VBD 42149 509 10 in in IN 42149 509 11 the the DT 42149 509 12 roof roof NN 42149 509 13 , , , 42149 509 14 poling pole VBG 42149 509 15 boards board NNS 42149 509 16 were be VBD 42149 509 17 driven drive VBN 42149 509 18 ahead ahead RB 42149 509 19 over over IN 42149 509 20 the the DT 42149 509 21 crown crown NN 42149 509 22 - - HYPH 42149 509 23 bars bar NNS 42149 509 24 , , , 42149 509 25 as as IN 42149 509 26 shown show VBN 42149 509 27 in in IN 42149 509 28 Fig Fig NNP 42149 509 29 . . . 42149 510 1 4 4 LS 42149 510 2 . . . 42149 511 1 _ _ NNP 42149 511 2 Cut Cut NNP 42149 511 3 - - HYPH 42149 511 4 and and CC 42149 511 5 - - HYPH 42149 511 6 Cover Cover NNP 42149 511 7 Work._--After Work._--After NNP 42149 511 8 some some DT 42149 511 9 225 225 CD 42149 511 10 ft ft NN 42149 511 11 . . NN 42149 511 12 had have VBD 42149 511 13 been be VBN 42149 511 14 driven drive VBN 42149 511 15 from from IN 42149 511 16 the the DT 42149 511 17 intercepting intercept VBG 42149 511 18 arch arch NN 42149 511 19 , , , 42149 511 20 it -PRON- PRP 42149 511 21 was be VBD 42149 511 22 found find VBN 42149 511 23 that that IN 42149 511 24 the the DT 42149 511 25 crown crown NN 42149 511 26 of of IN 42149 511 27 the the DT 42149 511 28 tunnel tunnel NN 42149 511 29 was be VBD 42149 511 30 continually continually RB 42149 511 31 in in IN 42149 511 32 soft soft JJ 42149 511 33 ground ground NN 42149 511 34 . . . 42149 512 1 To to TO 42149 512 2 ascertain ascertain VB 42149 512 3 the the DT 42149 512 4 extent extent NN 42149 512 5 of of IN 42149 512 6 this this DT 42149 512 7 condition condition NN 42149 512 8 the the DT 42149 512 9 contractor contractor NN 42149 512 10 decided decide VBD 42149 512 11 to to TO 42149 512 12 make make VB 42149 512 13 soundings sounding NNS 42149 512 14 as as RB 42149 512 15 far far RB 42149 512 16 as as IN 42149 512 17 Tenth Tenth NNP 42149 512 18 Avenue Avenue NNP 42149 512 19 , , , 42149 512 20 which which WDT 42149 512 21 was be VBD 42149 512 22 done do VBN 42149 512 23 by by IN 42149 512 24 sinking sink VBG 42149 512 25 trial trial NN 42149 512 26 pits pit NNS 42149 512 27 and and CC 42149 512 28 making make VBG 42149 512 29 wash wash NN 42149 512 30 - - HYPH 42149 512 31 borings boring NNS 42149 512 32 in in IN 42149 512 33 the the DT 42149 512 34 street street NN 42149 512 35 . . . 42149 513 1 These these DT 42149 513 2 soundings sounding NNS 42149 513 3 showed show VBD 42149 513 4 that that IN 42149 513 5 there there EX 42149 513 6 would would MD 42149 513 7 be be VB 42149 513 8 soft soft JJ 42149 513 9 ground ground NN 42149 513 10 in in IN 42149 513 11 the the DT 42149 513 12 crown crown NN 42149 513 13 from from IN 42149 513 14 Station Station NNP 42149 513 15 194 194 CD 42149 513 16 + + SYM 42149 513 17 75 75 CD 42149 513 18 to to TO 42149 513 19 Station Station NNP 42149 513 20 194 194 CD 42149 513 21 + + SYM 42149 513 22 25 25 CD 42149 513 23 ( ( -LRB- 42149 513 24 at at IN 42149 513 25 one one CD 42149 513 26 point point NN 42149 513 27 to to IN 42149 513 28 a a DT 42149 513 29 depth depth NN 42149 513 30 of of IN 42149 513 31 12 12 CD 42149 513 32 ft ft NN 42149 513 33 . . . 42149 513 34 below below IN 42149 513 35 the the DT 42149 513 36 crown crown NN 42149 513 37 ) ) -RRB- 42149 513 38 , , , 42149 513 39 and and CC 42149 513 40 on on IN 42149 513 41 each each DT 42149 513 42 side side NN 42149 513 43 of of IN 42149 513 44 this this DT 42149 513 45 section section NN 42149 513 46 the the DT 42149 513 47 cover cover NN 42149 513 48 was be VBD 42149 513 49 insufficient insufficient JJ 42149 513 50 from from IN 42149 513 51 Station Station NNP 42149 513 52 193 193 CD 42149 513 53 + + SYM 42149 513 54 58 58 CD 42149 513 55 to to IN 42149 513 56 Station Station NNP 42149 513 57 195 195 CD 42149 513 58 + + SYM 42149 513 59 30 30 CD 42149 513 60 . . . 42149 514 1 This this DT 42149 514 2 condition condition NN 42149 514 3 being be VBG 42149 514 4 known know VBN 42149 514 5 , , , 42149 514 6 it -PRON- PRP 42149 514 7 was be VBD 42149 514 8 decided decide VBN 42149 514 9 to to TO 42149 514 10 adopt adopt VB 42149 514 11 cut cut VB 42149 514 12 - - HYPH 42149 514 13 and and CC 42149 514 14 - - HYPH 42149 514 15 cover cover NN 42149 514 16 work work NN 42149 514 17 for for IN 42149 514 18 this this DT 42149 514 19 length length NN 42149 514 20 , , , 42149 514 21 the the DT 42149 514 22 principal principal JJ 42149 514 23 reasons reason NNS 42149 514 24 being be VBG 42149 514 25 that that IN 42149 514 26 repairs repair NNS 42149 514 27 to to IN 42149 514 28 sewers sewer NNS 42149 514 29 , , , 42149 514 30 streets street NNS 42149 514 31 , , , 42149 514 32 and and CC 42149 514 33 drains drain NNS 42149 514 34 would would MD 42149 514 35 be be VB 42149 514 36 no no DT 42149 514 37 more more JJR 42149 514 38 , , , 42149 514 39 and and CC 42149 514 40 probably probably RB 42149 514 41 less less RBR 42149 514 42 , , , 42149 514 43 expensive expensive JJ 42149 514 44 than than IN 42149 514 45 with with IN 42149 514 46 the the DT 42149 514 47 tunnel tunnel NN 42149 514 48 method method NN 42149 514 49 ; ; : 42149 514 50 the the DT 42149 514 51 underpinning underpinning NN 42149 514 52 of of IN 42149 514 53 a a DT 42149 514 54 heavy heavy JJ 42149 514 55 brick brick NN 42149 514 56 brewery brewery NN 42149 514 57 building build VBG 42149 514 58 adjoining adjoin VBG 42149 514 59 the the DT 42149 514 60 works work NNS 42149 514 61 on on IN 42149 514 62 the the DT 42149 514 63 north north NN 42149 514 64 side side NN 42149 514 65 would would MD 42149 514 66 be be VB 42149 514 67 facilitated facilitate VBN 42149 514 68 , , , 42149 514 69 and and CC 42149 514 70 the the DT 42149 514 71 opening opening NN 42149 514 72 in in IN 42149 514 73 the the DT 42149 514 74 street street NN 42149 514 75 , , , 42149 514 76 through through IN 42149 514 77 which which WDT 42149 514 78 muck muck NN 42149 514 79 and and CC 42149 514 80 materials material NNS 42149 514 81 could could MD 42149 514 82 be be VB 42149 514 83 handled handle VBN 42149 514 84 , , , 42149 514 85 would would MD 42149 514 86 relieve relieve VB 42149 514 87 the the DT 42149 514 88 congested congested JJ 42149 514 89 shaft shaft NN 42149 514 90 , , , 42149 514 91 through through IN 42149 514 92 which which WDT 42149 514 93 the the DT 42149 514 94 large large JJ 42149 514 95 volume volume NN 42149 514 96 of of IN 42149 514 97 muck muck NN 42149 514 98 from from IN 42149 514 99 the the DT 42149 514 100 River River NNP 42149 514 101 Tunnels Tunnels NNPS 42149 514 102 was be VBD 42149 514 103 then then RB 42149 514 104 being be VBG 42149 514 105 conveyed convey VBN 42149 514 106 . . . 42149 515 1 On on IN 42149 515 2 the the DT 42149 515 3 other other JJ 42149 515 4 hand hand NN 42149 515 5 , , , 42149 515 6 the the DT 42149 515 7 cut cut VBN 42149 515 8 - - HYPH 42149 515 9 and and CC 42149 515 10 - - HYPH 42149 515 11 cover cover NN 42149 515 12 method method NN 42149 515 13 was be VBD 42149 515 14 adversely adversely RB 42149 515 15 affected affect VBN 42149 515 16 by by IN 42149 515 17 the the DT 42149 515 18 presence presence NN 42149 515 19 of of IN 42149 515 20 a a DT 42149 515 21 heavy heavy JJ 42149 515 22 timber timber NN 42149 515 23 trestle trestle NN 42149 515 24 built build VBN 42149 515 25 down down IN 42149 515 26 the the DT 42149 515 27 south south JJ 42149 515 28 side side NN 42149 515 29 of of IN 42149 515 30 the the DT 42149 515 31 street street NN 42149 515 32 and and CC 42149 515 33 over over IN 42149 515 34 which which WDT 42149 515 35 passed pass VBD 42149 515 36 all all PDT 42149 515 37 the the DT 42149 515 38 excavation excavation NN 42149 515 39 from from IN 42149 515 40 the the DT 42149 515 41 Terminal Terminal NNP 42149 515 42 Station Station NNP 42149 515 43 , , , 42149 515 44 amounting amount VBG 42149 515 45 to to IN 42149 515 46 a a DT 42149 515 47 very very RB 42149 515 48 heavy heavy JJ 42149 515 49 traffic traffic NN 42149 515 50 . . . 42149 516 1 As as IN 42149 516 2 this this DT 42149 516 3 trestle trestle NN 42149 516 4 had have VBD 42149 516 5 to to TO 42149 516 6 be be VB 42149 516 7 supported support VBN 42149 516 8 , , , 42149 516 9 it -PRON- PRP 42149 516 10 complicated complicate VBD 42149 516 11 the the DT 42149 516 12 situation situation NN 42149 516 13 considerably considerably RB 42149 516 14 . . . 42149 517 1 Very very RB 42149 517 2 little little JJ 42149 517 3 active active JJ 42149 517 4 progress progress NN 42149 517 5 was be VBD 42149 517 6 made make VBN 42149 517 7 between between IN 42149 517 8 June June NNP 42149 517 9 , , , 42149 517 10 1905 1905 CD 42149 517 11 , , , 42149 517 12 and and CC 42149 517 13 April April NNP 42149 517 14 , , , 42149 517 15 1906 1906 CD 42149 517 16 , , , 42149 517 17 as as IN 42149 517 18 the the DT 42149 517 19 contractor contractor NN 42149 517 20 's 's POS 42149 517 21 energies energy NNS 42149 517 22 during during IN 42149 517 23 that that DT 42149 517 24 time time NN 42149 517 25 were be VBD 42149 517 26 much much RB 42149 517 27 taken take VBN 42149 517 28 up up RP 42149 517 29 with with IN 42149 517 30 the the DT 42149 517 31 progress progress NN 42149 517 32 of of IN 42149 517 33 the the DT 42149 517 34 shield shield NN 42149 517 35 - - HYPH 42149 517 36 driven drive VBN 42149 517 37 tunnels tunnel NNS 42149 517 38 . . . 42149 518 1 In in IN 42149 518 2 April April NNP 42149 518 3 , , , 42149 518 4 1906 1906 CD 42149 518 5 , , , 42149 518 6 preparations preparation NNS 42149 518 7 were be VBD 42149 518 8 made make VBN 42149 518 9 to to TO 42149 518 10 start start VB 42149 518 11 a a DT 42149 518 12 50-ft 50-ft NNP 42149 518 13 . . . 42149 518 14 length length NN 42149 518 15 of of IN 42149 518 16 open open JJ 42149 518 17 cut cut NN 42149 518 18 , , , 42149 518 19 rangers ranger NNS 42149 518 20 being be VBG 42149 518 21 fixed fix VBN 42149 518 22 and and CC 42149 518 23 sheathing sheathing JJ 42149 518 24 driven drive VBN 42149 518 25 ; ; : 42149 518 26 and and CC 42149 518 27 the the DT 42149 518 28 sewer sewer NN 42149 518 29 which which WDT 42149 518 30 ran run VBD 42149 518 31 down down IN 42149 518 32 the the DT 42149 518 33 middle middle NN 42149 518 34 of of IN 42149 518 35 this this DT 42149 518 36 street street NN 42149 518 37 was be VBD 42149 518 38 diverted divert VBN 42149 518 39 to to IN 42149 518 40 the the DT 42149 518 41 outside outside NN 42149 518 42 of of IN 42149 518 43 the the DT 42149 518 44 open open RB 42149 518 45 - - HYPH 42149 518 46 cut cut NN 42149 518 47 length length NN 42149 518 48 . . . 42149 519 1 April April NNP 42149 519 2 and and CC 42149 519 3 May May NNP 42149 519 4 were be VBD 42149 519 5 occupied occupy VBN 42149 519 6 in in IN 42149 519 7 driving drive VBG 42149 519 8 the the DT 42149 519 9 sheathing sheathe VBG 42149 519 10 down down RP 42149 519 11 to to IN 42149 519 12 rock rock NN 42149 519 13 , , , 42149 519 14 supporting support VBG 42149 519 15 the the DT 42149 519 16 trestle trestle NN 42149 519 17 , , , 42149 519 18 underpinning underpin VBG 42149 519 19 the the DT 42149 519 20 adjoining adjoining JJ 42149 519 21 brewery brewery NN 42149 519 22 , , , 42149 519 23 and and CC 42149 519 24 excavating excavate VBG 42149 519 25 the the DT 42149 519 26 soft soft JJ 42149 519 27 material material NN 42149 519 28 above above IN 42149 519 29 the the DT 42149 519 30 rock rock NN 42149 519 31 . . . 42149 520 1 On on IN 42149 520 2 June June NNP 42149 520 3 2d 2d CD 42149 520 4 , , , 42149 520 5 1906 1906 CD 42149 520 6 , , , 42149 520 7 rock rock NN 42149 520 8 was be VBD 42149 520 9 reached reach VBN 42149 520 10 , , , 42149 520 11 and and CC 42149 520 12 , , , 42149 520 13 by by IN 42149 520 14 July July NNP 42149 520 15 31st 31st NN 42149 520 16 , , , 42149 520 17 the the DT 42149 520 18 excavation excavation NN 42149 520 19 was be VBD 42149 520 20 down down RB 42149 520 21 to to TO 42149 520 22 subgrade subgrade VB 42149 520 23 over over RP 42149 520 24 nearly nearly RB 42149 520 25 the the DT 42149 520 26 whole whole JJ 42149 520 27 50 50 CD 42149 520 28 ft ft NN 42149 520 29 . . . 42149 520 30 in in IN 42149 520 31 the the DT 42149 520 32 first first JJ 42149 520 33 length length NN 42149 520 34 . . . 42149 521 1 In in IN 42149 521 2 the the DT 42149 521 3 meantime meantime NN 42149 521 4 another another DT 42149 521 5 length length NN 42149 521 6 was be VBD 42149 521 7 opened open VBN 42149 521 8 up up RP 42149 521 9 , , , 42149 521 10 and and CC 42149 521 11 eventually eventually RB 42149 521 12 a a DT 42149 521 13 third third NN 42149 521 14 . . . 42149 522 1 The the DT 42149 522 2 surface surface NN 42149 522 3 of of IN 42149 522 4 the the DT 42149 522 5 rock rock NN 42149 522 6 now now RB 42149 522 7 seemed seem VBD 42149 522 8 to to TO 42149 522 9 be be VB 42149 522 10 rising rise VBG 42149 522 11 , , , 42149 522 12 and and CC 42149 522 13 the the DT 42149 522 14 heavy heavy JJ 42149 522 15 buildings building NNS 42149 522 16 had have VBD 42149 522 17 been be VBN 42149 522 18 passed pass VBN 42149 522 19 , , , 42149 522 20 so so IN 42149 522 21 that that IN 42149 522 22 tunneling tunneling NN 42149 522 23 was be VBD 42149 522 24 reverted revert VBN 42149 522 25 to to IN 42149 522 26 for for IN 42149 522 27 the the DT 42149 522 28 rest rest NN 42149 522 29 of of IN 42149 522 30 the the DT 42149 522 31 work work NN 42149 522 32 , , , 42149 522 33 though though IN 42149 522 34 many many JJ 42149 522 35 difficulties difficulty NNS 42149 522 36 were be VBD 42149 522 37 caused cause VBN 42149 522 38 by by IN 42149 522 39 soft soft JJ 42149 522 40 rock rock NN 42149 522 41 in in IN 42149 522 42 the the DT 42149 522 43 roof roof NN 42149 522 44 from from IN 42149 522 45 time time NN 42149 522 46 to to IN 42149 522 47 time time NN 42149 522 48 . . . 42149 523 1 [ [ -LRB- 42149 523 2 Illustration illustration NN 42149 523 3 : : : 42149 523 4 METHOD METHOD NNP 42149 523 5 OF of IN 42149 523 6 DRIVING DRIVING NNP 42149 523 7 ROOF ROOF NNP 42149 523 8 LAGGING LAGGING NNP 42149 523 9 IN in IN 42149 523 10 SOFT soft JJ 42149 523 11 GROUND ground NN 42149 523 12 . . . 42149 524 1 FIG FIG NNP 42149 524 2 . . . 42149 525 1 4 4 LS 42149 525 2 . . . 42149 525 3 ] ] -RRB- 42149 526 1 When when WRB 42149 526 2 the the DT 42149 526 3 excavation excavation NN 42149 526 4 for for IN 42149 526 5 the the DT 42149 526 6 open open RB 42149 526 7 - - HYPH 42149 526 8 cut cut NN 42149 526 9 work work NN 42149 526 10 of of IN 42149 526 11 the the DT 42149 526 12 Terminal Terminal NNP 42149 526 13 Station Station NNP 42149 526 14 had have VBD 42149 526 15 advanced advance VBN 42149 526 16 to to IN 42149 526 17 the the DT 42149 526 18 line line NN 42149 526 19 of of IN 42149 526 20 Tenth Tenth NNP 42149 526 21 Avenue Avenue NNP 42149 526 22 , , , 42149 526 23 the the DT 42149 526 24 contractor contractor NN 42149 526 25 started start VBD 42149 526 26 a a DT 42149 526 27 heading heading NN 42149 526 28 from from IN 42149 526 29 this this DT 42149 526 30 point point NN 42149 526 31 and and CC 42149 526 32 drove drive VBD 42149 526 33 westward westward RB 42149 526 34 under under IN 42149 526 35 Tenth Tenth NNP 42149 526 36 Avenue Avenue NNP 42149 526 37 until until IN 42149 526 38 the the DT 42149 526 39 headings heading NNS 42149 526 40 driven drive VBN 42149 526 41 eastward eastward RB 42149 526 42 from from IN 42149 526 43 the the DT 42149 526 44 cut cut VBN 42149 526 45 - - HYPH 42149 526 46 and and CC 42149 526 47 - - HYPH 42149 526 48 cover cover NN 42149 526 49 portion portion NN 42149 526 50 , , , 42149 526 51 were be VBD 42149 526 52 met meet VBN 42149 526 53 . . . 42149 527 1 This this DT 42149 527 2 was be VBD 42149 527 3 done do VBN 42149 527 4 to to TO 42149 527 5 expedite expedite VB 42149 527 6 the the DT 42149 527 7 work work NN 42149 527 8 under under IN 42149 527 9 Tenth Tenth NNP 42149 527 10 Avenue Avenue NNP 42149 527 11 , , , 42149 527 12 where where WRB 42149 527 13 the the DT 42149 527 14 ground ground NN 42149 527 15 was be VBD 42149 527 16 not not RB 42149 527 17 very very RB 42149 527 18 good good JJ 42149 527 19 , , , 42149 527 20 where where WRB 42149 527 21 there there EX 42149 527 22 were be VBD 42149 527 23 several several JJ 42149 527 24 important important JJ 42149 527 25 gas gas NN 42149 527 26 and and CC 42149 527 27 water water NN 42149 527 28 mains main NNS 42149 527 29 in in IN 42149 527 30 the the DT 42149 527 31 street street NN 42149 527 32 , , , 42149 527 33 and and CC 42149 527 34 where where WRB 42149 527 35 , , , 42149 527 36 moreover moreover RB 42149 527 37 , , , 42149 527 38 the the DT 42149 527 39 tunnels tunnel NNS 42149 527 40 were be VBD 42149 527 41 of of IN 42149 527 42 exceptionally exceptionally RB 42149 527 43 large large JJ 42149 527 44 span span NN 42149 527 45 ( ( -LRB- 42149 527 46 24 24 CD 42149 527 47 ft ft NN 42149 527 48 . . NNP 42149 527 49 6 6 CD 42149 527 50 in in IN 42149 527 51 . . . 42149 528 1 ) ) -RRB- 42149 528 2 , , , 42149 528 3 making make VBG 42149 528 4 a a DT 42149 528 5 total total JJ 42149 528 6 width width NN 42149 528 7 of of IN 42149 528 8 some some DT 42149 528 9 60 60 CD 42149 528 10 ft ft NN 42149 528 11 . . . 42149 528 12 for for IN 42149 528 13 the the DT 42149 528 14 excavation excavation NN 42149 528 15 . . . 42149 529 1 The the DT 42149 529 2 excavation excavation NN 42149 529 3 for for IN 42149 529 4 the the DT 42149 529 5 New New NNP 42149 529 6 York York NNP 42149 529 7 Tunnels Tunnels NNP 42149 529 8 was be VBD 42149 529 9 practically practically RB 42149 529 10 finished finish VBN 42149 529 11 in in IN 42149 529 12 January January NNP 42149 529 13 , , , 42149 529 14 1908 1908 CD 42149 529 15 . . . 42149 530 1 _ _ NNP 42149 530 2 Drilling Drilling NNP 42149 530 3 and and CC 42149 530 4 Blasting._--The Blasting._--The NNP 42149 530 5 foregoing forego VBG 42149 530 6 short short JJ 42149 530 7 description description NN 42149 530 8 will will MD 42149 530 9 serve serve VB 42149 530 10 to to TO 42149 530 11 show show VB 42149 530 12 in in IN 42149 530 13 a a DT 42149 530 14 general general JJ 42149 530 15 way way NN 42149 530 16 the the DT 42149 530 17 scheme scheme NN 42149 530 18 adopted adopt VBN 42149 530 19 in in IN 42149 530 20 making make VBG 42149 530 21 the the DT 42149 530 22 excavation excavation NN 42149 530 23 . . . 42149 531 1 A a DT 42149 531 2 few few JJ 42149 531 3 details detail NNS 42149 531 4 on on IN 42149 531 5 drilling drill VBG 42149 531 6 and and CC 42149 531 7 blasting blasting NN 42149 531 8 methods method NNS 42149 531 9 may may MD 42149 531 10 not not RB 42149 531 11 be be VB 42149 531 12 out out IN 42149 531 13 of of IN 42149 531 14 place place NN 42149 531 15 . . . 42149 532 1 Percussive percussive JJ 42149 532 2 drills drill NNS 42149 532 3 run run VBN 42149 532 4 by by IN 42149 532 5 air air NN 42149 532 6 pressure pressure NN 42149 532 7 were be VBD 42149 532 8 used use VBN 42149 532 9 . . . 42149 533 1 They -PRON- PRP 42149 533 2 were be VBD 42149 533 3 Ingersoll Ingersoll NNP 42149 533 4 - - HYPH 42149 533 5 Sergeant Sergeant NNP 42149 533 6 , , , 42149 533 7 Nos Nos NNP 42149 533 8 . . . 42149 534 1 3½ 3½ NNP 42149 534 2 , , , 42149 534 3 A-86 a-86 CD 42149 534 4 , , , 42149 534 5 C-24 c-24 CD 42149 534 6 , , , 42149 534 7 and and CC 42149 534 8 F-24 f-24 CD 42149 534 9 . . . 42149 535 1 The the DT 42149 535 2 air air NN 42149 535 3 came come VBD 42149 535 4 from from IN 42149 535 5 the the DT 42149 535 6 high high JJ 42149 535 7 - - HYPH 42149 535 8 pressure pressure NN 42149 535 9 compressor compressor NN 42149 535 10 previously previously RB 42149 535 11 described describe VBN 42149 535 12 . . . 42149 536 1 This this DT 42149 536 2 compressor compressor NN 42149 536 3 , , , 42149 536 4 without without IN 42149 536 5 assistance assistance NN 42149 536 6 , , , 42149 536 7 could could MD 42149 536 8 supply supply VB 42149 536 9 air air NN 42149 536 10 for for IN 42149 536 11 nine nine CD 42149 536 12 drills drill NNS 42149 536 13 , , , 42149 536 14 but but CC 42149 536 15 , , , 42149 536 16 when when WRB 42149 536 17 fed feed VBN 42149 536 18 by by IN 42149 536 19 compressed compress VBN 42149 536 20 air air NN 42149 536 21 from from IN 42149 536 22 the the DT 42149 536 23 lower low JJR 42149 536 24 pressure pressure NN 42149 536 25 , , , 42149 536 26 its -PRON- PRP$ 42149 536 27 capacity capacity NN 42149 536 28 was be VBD 42149 536 29 increased increase VBN 42149 536 30 three three CD 42149 536 31 or or CC 42149 536 32 four four CD 42149 536 33 times time NNS 42149 536 34 . . . 42149 537 1 The the DT 42149 537 2 air air NN 42149 537 3 was be VBD 42149 537 4 compressed compress VBN 42149 537 5 to to IN 42149 537 6 100 100 CD 42149 537 7 lb lb RB 42149 537 8 . . . 42149 538 1 per per IN 42149 538 2 sq sq NNP 42149 538 3 . . . 42149 539 1 in in IN 42149 539 2 . . . 42149 540 1 in in IN 42149 540 2 the the DT 42149 540 3 power power NN 42149 540 4 - - HYPH 42149 540 5 house house NN 42149 540 6 , , , 42149 540 7 and and CC 42149 540 8 was be VBD 42149 540 9 delivered deliver VBN 42149 540 10 at at IN 42149 540 11 about about RB 42149 540 12 80 80 CD 42149 540 13 lb lb RB 42149 540 14 . . . 42149 541 1 per per IN 42149 541 2 sq sq NNP 42149 541 3 . . . 42149 542 1 in in IN 42149 542 2 . . . 42149 543 1 at at IN 42149 543 2 the the DT 42149 543 3 drills drill NNS 42149 543 4 . . . 42149 544 1 A a DT 42149 544 2 3-in 3-in NN 42149 544 3 . . . 42149 545 1 air air NN 42149 545 2 line line NN 42149 545 3 was be VBD 42149 545 4 used use VBN 42149 545 5 . . . 42149 546 1 The the DT 42149 546 2 drill drill NN 42149 546 3 steel steel NN 42149 546 4 was be VBD 42149 546 5 1 1 CD 42149 546 6 - - SYM 42149 546 7 1/8-to 1/8-to NNP 42149 546 8 1 1 CD 42149 546 9 - - HYPH 42149 546 10 3/8-in 3/8-in NNP 42149 546 11 . . . 42149 547 1 octagonal octagonal JJ 42149 547 2 . . . 42149 548 1 The the DT 42149 548 2 holes hole NNS 42149 548 3 were be VBD 42149 548 4 about about RB 42149 548 5 3¼ 3â¼ CD 42149 548 6 in in RB 42149 548 7 . . . 42149 549 1 in in IN 42149 549 2 diameter diameter NN 42149 549 3 at at IN 42149 549 4 starting start VBG 42149 549 5 and and CC 42149 549 6 2 2 CD 42149 549 7 - - SYM 42149 549 8 5/8 5/8 CD 42149 549 9 in in IN 42149 549 10 . . . 42149 550 1 at at IN 42149 550 2 the the DT 42149 550 3 full full JJ 42149 550 4 depth depth NN 42149 550 5 of of IN 42149 550 6 10 10 CD 42149 550 7 ft ft NN 42149 550 8 . . . 42149 551 1 The the DT 42149 551 2 powder powder NN 42149 551 3 used use VBN 42149 551 4 on on IN 42149 551 5 the the DT 42149 551 6 New New NNP 42149 551 7 York York NNP 42149 551 8 side side NN 42149 551 9 was be VBD 42149 551 10 40 40 CD 42149 551 11 % % NN 42149 551 12 Forcite Forcite NNP 42149 551 13 , , , 42149 551 14 the the DT 42149 551 15 near near JJ 42149 551 16 presence presence NN 42149 551 17 of of IN 42149 551 18 heavy heavy JJ 42149 551 19 buildings building NNS 42149 551 20 and and CC 42149 551 21 lack lack NN 42149 551 22 of of IN 42149 551 23 much much JJ 42149 551 24 rock rock NN 42149 551 25 cover cover NN 42149 551 26 necessitating necessitate VBG 42149 551 27 light light JJ 42149 551 28 charges charge NNS 42149 551 29 and and CC 42149 551 30 many many JJ 42149 551 31 holes hole NNS 42149 551 32 spaced space VBN 42149 551 33 close close RB 42149 551 34 together together RB 42149 551 35 . . . 42149 552 1 To to TO 42149 552 2 compensate compensate VB 42149 552 3 the the DT 42149 552 4 contractor contractor NN 42149 552 5 for for IN 42149 552 6 the the DT 42149 552 7 inevitable inevitable JJ 42149 552 8 excavation excavation NN 42149 552 9 done do VBN 42149 552 10 outside outside IN 42149 552 11 the the DT 42149 552 12 neat neat JJ 42149 552 13 lines line NNS 42149 552 14 of of IN 42149 552 15 the the DT 42149 552 16 masonry masonry NN 42149 552 17 lining lining NN 42149 552 18 , , , 42149 552 19 the the DT 42149 552 20 excavation excavation NN 42149 552 21 was be VBD 42149 552 22 paid pay VBN 42149 552 23 for for IN 42149 552 24 to to IN 42149 552 25 the the DT 42149 552 26 " " `` 42149 552 27 Standard Standard NNP 42149 552 28 Section Section NNP 42149 552 29 Line Line NNP 42149 552 30 " " '' 42149 552 31 which which WDT 42149 552 32 was be VBD 42149 552 33 12 12 CD 42149 552 34 in in IN 42149 552 35 . . . 42149 553 1 outside outside IN 42149 553 2 the the DT 42149 553 3 neat neat JJ 42149 553 4 lines line NNS 42149 553 5 on on IN 42149 553 6 top top NN 42149 553 7 and and CC 42149 553 8 sides side NNS 42149 553 9 and and CC 42149 553 10 6 6 CD 42149 553 11 in in RB 42149 553 12 . . . 42149 554 1 outside outside RB 42149 554 2 at at IN 42149 554 3 the the DT 42149 554 4 bottom bottom NN 42149 554 5 of of IN 42149 554 6 the the DT 42149 554 7 cross cross JJ 42149 554 8 - - NN 42149 554 9 section section NN 42149 554 10 . . . 42149 555 1 The the DT 42149 555 2 actual actual JJ 42149 555 3 amount amount NN 42149 555 4 of of IN 42149 555 5 excavation excavation NN 42149 555 6 done do VBN 42149 555 7 was be VBD 42149 555 8 about about RB 42149 555 9 11 11 CD 42149 555 10 % % NN 42149 555 11 greater great JJR 42149 555 12 than than IN 42149 555 13 that that DT 42149 555 14 paid pay VBN 42149 555 15 for for IN 42149 555 16 . . . 42149 556 1 The the DT 42149 556 2 distance distance NN 42149 556 3 excavated excavate VBD 42149 556 4 beyond beyond IN 42149 556 5 the the DT 42149 556 6 neat neat JJ 42149 556 7 line line NN 42149 556 8 , , , 42149 556 9 because because IN 42149 556 10 of of IN 42149 556 11 the the DT 42149 556 12 very very RB 42149 556 13 heavy heavy JJ 42149 556 14 timbering timbering NN 42149 556 15 necessary necessary JJ 42149 556 16 , , , 42149 556 17 was be VBD 42149 556 18 about about RB 42149 556 19 2.1 2.1 CD 42149 556 20 ft ft NN 42149 556 21 . . . 42149 556 22 instead instead RB 42149 556 23 of of IN 42149 556 24 the the DT 42149 556 25 1 1 CD 42149 556 26 ft ft NN 42149 556 27 . . NNP 42149 556 28 allowed allow VBN 42149 556 29 , , , 42149 556 30 and and CC 42149 556 31 at at IN 42149 556 32 the the DT 42149 556 33 bottom bottom NN 42149 556 34 about about RB 42149 556 35 0.85 0.85 CD 42149 556 36 ft ft NN 42149 556 37 . . . 42149 556 38 instead instead RB 42149 556 39 of of IN 42149 556 40 the the DT 42149 556 41 0.50 0.50 CD 42149 556 42 ft ft NNP 42149 556 43 . . NNP 42149 556 44 paid pay VBN 42149 556 45 for for IN 42149 556 46 . . . 42149 557 1 For for IN 42149 557 2 a a DT 42149 557 3 period period NN 42149 557 4 of of IN 42149 557 5 5 5 CD 42149 557 6 months month NNS 42149 557 7 detailed detailed JJ 42149 557 8 records record NNS 42149 557 9 were be VBD 42149 557 10 kept keep VBN 42149 557 11 of of IN 42149 557 12 the the DT 42149 557 13 drilling drilling NN 42149 557 14 and and CC 42149 557 15 blasting blasting NN 42149 557 16 . . . 42149 558 1 About about IN 42149 558 2 12,900 12,900 CD 42149 558 3 cu cu NNS 42149 558 4 . . . 42149 559 1 yd yd NNP 42149 559 2 . . . 42149 560 1 of of IN 42149 560 2 excavation excavation NN 42149 560 3 are be VBP 42149 560 4 included include VBN 42149 560 5 . . . 42149 561 1 A a DT 42149 561 2 sketch sketch NN 42149 561 3 and and CC 42149 561 4 table table NN 42149 561 5 showing show VBG 42149 561 6 the the DT 42149 561 7 method method NN 42149 561 8 of of IN 42149 561 9 driving drive VBG 42149 561 10 the the DT 42149 561 11 heading heading NN 42149 561 12 , , , 42149 561 13 the the DT 42149 561 14 number number NN 42149 561 15 and and CC 42149 561 16 location location NN 42149 561 17 of of IN 42149 561 18 the the DT 42149 561 19 holes hole NNS 42149 561 20 drilled drill VBD 42149 561 21 , , , 42149 561 22 and and CC 42149 561 23 the the DT 42149 561 24 amount amount NN 42149 561 25 of of IN 42149 561 26 powder powder NN 42149 561 27 used use VBN 42149 561 28 , , , 42149 561 29 is be VBZ 42149 561 30 given give VBN 42149 561 31 in in IN 42149 561 32 Fig Fig NNP 42149 561 33 . . . 42149 562 1 5 5 CD 42149 562 2 . . . 42149 563 1 From from IN 42149 563 2 this this DT 42149 563 3 and and CC 42149 563 4 similar similar JJ 42149 563 5 figures figure NNS 42149 563 6 the the DT 42149 563 7 information information NN 42149 563 8 in in IN 42149 563 9 Table table NN 42149 563 10 5 5 CD 42149 563 11 is be VBZ 42149 563 12 derived derive VBN 42149 563 13 . . . 42149 564 1 TABLE TABLE NNP 42149 564 2 5 5 CD 42149 564 3 . . . 42149 565 1 + + NFP 42149 565 2 = = SYM 42149 565 3 = = SYM 42149 565 4 = = SYM 42149 565 5 = = SYM 42149 565 6 = = SYM 42149 565 7 = = SYM 42149 565 8 = = SYM 42149 565 9 = = SYM 42149 565 10 = = SYM 42149 565 11 = = SYM 42149 565 12 = = SYM 42149 565 13 = = SYM 42149 565 14 = = SYM 42149 565 15 = = SYM 42149 565 16 = = SYM 42149 565 17 = = SYM 42149 565 18 = = SYM 42149 565 19 = = SYM 42149 565 20 = = SYM 42149 565 21 = = SYM 42149 565 22 = = SYM 42149 565 23 = = SYM 42149 565 24 = = NFP 42149 565 25 = = SYM 42149 565 26 + + SYM 42149 565 27 = = SYM 42149 565 28 = = SYM 42149 565 29 = = SYM 42149 565 30 = = SYM 42149 565 31 = = SYM 42149 565 32 = = NFP 42149 565 33 = = SYM 42149 565 34 + + SYM 42149 565 35 = = SYM 42149 565 36 = = SYM 42149 565 37 = = SYM 42149 565 38 = = SYM 42149 565 39 = = SYM 42149 565 40 = = NFP 42149 565 41 = = SYM 42149 565 42 + + SYM 42149 565 43 = = SYM 42149 565 44 = = SYM 42149 565 45 = = SYM 42149 565 46 = = SYM 42149 565 47 = = SYM 42149 565 48 = = NFP 42149 565 49 = = SYM 42149 565 50 + + SYM 42149 565 51 = = SYM 42149 565 52 = = SYM 42149 565 53 = = SYM 42149 565 54 = = SYM 42149 565 55 = = NFP 42149 565 56 = = SYM 42149 565 57 + + SYM 42149 565 58 = = SYM 42149 565 59 = = SYM 42149 565 60 = = SYM 42149 565 61 = = SYM 42149 565 62 = = SYM 42149 565 63 = = NFP 42149 565 64 = = SYM 42149 565 65 + + SYM 42149 565 66 = = SYM 42149 565 67 = = SYM 42149 565 68 = = SYM 42149 565 69 = = SYM 42149 565 70 = = SYM 42149 565 71 =| =| ADD 42149 565 72 | | CD 42149 565 73 | | NNS 42149 565 74 FEET foot NNS 42149 565 75 OF of IN 42149 565 76 HOLE HOLE NNP 42149 565 77 | | NNP 42149 565 78 POUNDS pound NNS 42149 565 79 OF of IN 42149 565 80 POWDER POWDER NNP 42149 565 81 | | NNP 42149 565 82 | | CD 42149 565 83 |DRILLED |drille VBN 42149 565 84 PER per IN 42149 565 85 CUBIC CUBIC VBD 42149 565 86 YARD yard NN 42149 565 87 | | CD 42149 565 88 USED USED NNS 42149 565 89 PER per IN 42149 565 90 CUBIC CUBIC VBD 42149 565 91 YARD YARD NNP 42149 565 92 | | CD 42149 565 93 | | CD 42149 565 94 | | CD 42149 565 95 OF of IN 42149 565 96 EXCAVATION excavation NN 42149 565 97 . . . 42149 566 1 | | NNS 42149 566 2 OF of IN 42149 566 3 EXCAVATION excavation NN 42149 566 4 . . . 42149 567 1 | | NNP 42149 567 2 | | CD 42149 567 3 + + SYM 42149 567 4 -------+-------+-------+------+-------+------| -------+-------+-------+------+-------+------| NNP 42149 567 5 |Portion |portion NN 42149 567 6 of of IN 42149 567 7 excavation excavation NN 42149 567 8 . . . 42149 568 1 |15-ft |15-ft NNP 42149 568 2 . . . 42149 568 3 |19-ft |19-ft NNP 42149 568 4 . . . 42149 568 5 |24-ft |24-ft NNP 42149 568 6 . . . 42149 568 7 | | NNP 42149 568 8 | | NNP 42149 568 9 | | CD 42149 568 10 | | CD 42149 568 11 | | CD 42149 568 12 | | CD 42149 568 13 4-in 4-in CD 42149 568 14 . . . 42149 569 1 | | NNP 42149 569 2 6-in 6-in CD 42149 569 3 . . . 42149 570 1 | | NNP 42149 570 2 6-in 6-in CD 42149 570 3 . . . 42149 571 1 |15-ft.|19-ft |15-ft.|19-ft NNP 42149 571 2 . . . 42149 571 3 |24-ft.| |24-ft.| NNPS 42149 571 4 | | CD 42149 571 5 |span-- |span-- NNP 42149 571 6 |span-- |span-- NNP 42149 571 7 |span-- |span-- NNP 42149 571 8 |4-in |4-in CD 42149 571 9 . . . 42149 572 1 | | NNP 42149 572 2 6-in 6-in CD 42149 572 3 . . . 42149 573 1 | | CD 42149 573 2 6-in.| 6-in.| CD 42149 573 3 | | CD 42149 573 4 | | CD 42149 573 5 twin twin JJ 42149 573 6 | | HYPH 42149 573 7 twin twin JJ 42149 573 8 | | CD 42149 573 9 twin twin JJ 42149 573 10 | | CD 42149 573 11 | | CD 42149 573 12 | | CD 42149 573 13 | | CD 42149 573 14 | | CD 42149 573 15 |tunnel.|tunnel.|tunnel.| |tunnel.|tunnel.|tunnel.| CD 42149 573 16 | | CD 42149 573 17 | | CD 42149 573 18 | | CD 42149 573 19 |------------------------+-------+-------+-------+------+-------+------+ |------------------------+-------+-------+-------+------+-------+------+ NNP 42149 573 20 |Wall |Wall , 42149 573 21 - - HYPH 42149 573 22 plate plate NN 42149 573 23 heading[C heading[c NN 42149 573 24 ] ] -RRB- 42149 573 25 | | CD 42149 573 26 13.0 13.0 CD 42149 573 27 | | CD 42149 573 28 10.97 10.97 CD 42149 573 29 | | CD 42149 573 30 10.97 10.97 CD 42149 573 31 |3.77 |3.77 CD 42149 573 32 | | CD 42149 573 33 2.85 2.85 CD 42149 573 34 | | CD 42149 573 35 2.85 2.85 CD 42149 573 36 | | CD 42149 573 37 | | CD 42149 573 38 | | CD 42149 573 39 | | CD 42149 573 40 | | CD 42149 573 41 | | CD 42149 573 42 | | CD 42149 573 43 | | CD 42149 573 44 | | CD 42149 573 45 |Total |total JJ 42149 573 46 heading[C heading[c NN 42149 573 47 ] ] -RRB- 42149 573 48 | | CD 42149 573 49 7.87 7.87 CD 42149 573 50 | | CD 42149 573 51 8.17 8.17 CD 42149 573 52 | | CD 42149 573 53 7.81 7.81 CD 42149 573 54 |2.31 |2.31 CD 42149 573 55 | | CD 42149 573 56 2.02 2.02 CD 42149 573 57 | | CD 42149 573 58 1.78 1.78 CD 42149 573 59 | | CD 42149 573 60 | | CD 42149 573 61 | | CD 42149 573 62 | | CD 42149 573 63 | | CD 42149 573 64 | | CD 42149 573 65 | | CD 42149 573 66 | | CD 42149 573 67 | | CD 42149 573 68 |Bench |Bench NNS 42149 573 69 and and CC 42149 573 70 raker raker NN 42149 573 71 bench[C]| bench[C]| NNP 42149 573 72 5.97 5.97 CD 42149 573 73 | | CD 42149 573 74 6.15 6.15 CD 42149 573 75 | | CD 42149 573 76 7.56 7.56 CD 42149 573 77 |0.94 |0.94 CD 42149 573 78 | | CD 42149 573 79 0.93 0.93 CD 42149 573 80 | | CD 42149 573 81 1.13 1.13 CD 42149 573 82 | | CD 42149 573 83 | | CD 42149 573 84 | | CD 42149 573 85 | | CD 42149 573 86 | | CD 42149 573 87 | | CD 42149 573 88 | | CD 42149 573 89 | | CD 42149 573 90 | | CD 42149 573 91 |Trench[C |trench[c JJ 42149 573 92 ] ] -RRB- 42149 573 93 | | CD 42149 573 94 9.82 9.82 CD 42149 573 95 | | CD 42149 573 96 15.96 15.96 CD 42149 573 97 | | CD 42149 573 98 18.10 18.10 CD 42149 573 99 |1.84 |1.84 CD 42149 573 100 | | NNP 42149 573 101 2.49 2.49 CD 42149 573 102 | | CD 42149 573 103 2.73 2.73 CD 42149 573 104 | | NNS 42149 573 105 |------------------------+-------+-------+-------+------+-------+------+ |------------------------+-------+-------+-------+------+-------+------+ NNP 42149 573 106 |Average |average NN 42149 573 107 for for IN 42149 573 108 section[C section[c NN 42149 573 109 ] ] -RRB- 42149 573 110 | | NNP 42149 573 111 6.69 6.69 CD 42149 573 112 | | CD 42149 573 113 7.43 7.43 CD 42149 573 114 | | CD 42149 573 115 8.95 8.95 CD 42149 573 116 |1.28 |1.28 CD 42149 573 117 | | CD 42149 573 118 1.30 1.30 CD 42149 573 119 | | CD 42149 573 120 1.45 1.45 CD 42149 573 121 | | CD 42149 573 122 |------------------------+-------+-------+-------+------+-------+------| |------------------------+-------+-------+-------+------+-------+------| CD 42149 573 123 |Actual |actual JJ 42149 573 124 amount[D amount[d NN 42149 573 125 ] ] -RRB- 42149 573 126 | | CD 42149 573 127 6.82 6.82 CD 42149 573 128 | | CD 42149 573 129 7.27 7.27 CD 42149 573 130 | | CD 42149 573 131 8.95 8.95 CD 42149 573 132 |1.22 |1.22 CD 42149 573 133 | | NNP 42149 573 134 1.24 1.24 CD 42149 573 135 | | CD 42149 573 136 1.27 1.27 CD 42149 573 137 | | CD 42149 573 138 + + NNS 42149 573 139 = = SYM 42149 573 140 = = SYM 42149 573 141 = = SYM 42149 573 142 = = SYM 42149 573 143 = = SYM 42149 573 144 = = SYM 42149 573 145 = = SYM 42149 573 146 = = SYM 42149 573 147 = = SYM 42149 573 148 = = SYM 42149 573 149 = = SYM 42149 573 150 = = SYM 42149 573 151 = = SYM 42149 573 152 = = SYM 42149 573 153 = = SYM 42149 573 154 = = SYM 42149 573 155 = = SYM 42149 573 156 = = SYM 42149 573 157 = = SYM 42149 573 158 = = SYM 42149 573 159 = = SYM 42149 573 160 = = SYM 42149 573 161 = = NFP 42149 573 162 = = SYM 42149 573 163 + + SYM 42149 573 164 = = SYM 42149 573 165 = = SYM 42149 573 166 = = SYM 42149 573 167 = = SYM 42149 573 168 = = SYM 42149 573 169 = = NFP 42149 573 170 = = SYM 42149 573 171 + + SYM 42149 573 172 = = SYM 42149 573 173 = = SYM 42149 573 174 = = SYM 42149 573 175 = = SYM 42149 573 176 = = SYM 42149 573 177 = = NFP 42149 573 178 = = SYM 42149 573 179 + + SYM 42149 573 180 = = SYM 42149 573 181 = = SYM 42149 573 182 = = SYM 42149 573 183 = = SYM 42149 573 184 = = SYM 42149 573 185 = = NFP 42149 573 186 = = SYM 42149 573 187 + + SYM 42149 573 188 = = SYM 42149 573 189 = = SYM 42149 573 190 = = SYM 42149 573 191 = = SYM 42149 573 192 = = NFP 42149 573 193 = = SYM 42149 573 194 + + SYM 42149 573 195 = = SYM 42149 573 196 = = SYM 42149 573 197 = = SYM 42149 573 198 = = SYM 42149 573 199 = = SYM 42149 573 200 = = NFP 42149 573 201 = = SYM 42149 573 202 + + SYM 42149 573 203 = = SYM 42149 573 204 = = SYM 42149 573 205 = = SYM 42149 573 206 = = SYM 42149 573 207 = = NFP 42149 573 208 = = NFP 42149 573 209 + + CC 42149 573 210 [ [ -LRB- 42149 573 211 C C NNP 42149 573 212 ] ] -RRB- 42149 573 213 Figures figure NNS 42149 573 214 taken take VBN 42149 573 215 from from IN 42149 573 216 typical typical JJ 42149 573 217 cross cross NN 42149 573 218 - - NNS 42149 573 219 sections section NNS 42149 573 220 . . . 42149 574 1 [ [ -LRB- 42149 574 2 D d NN 42149 574 3 ] ] -RRB- 42149 574 4 This this DT 42149 574 5 gives give VBZ 42149 574 6 the the DT 42149 574 7 actual actual JJ 42149 574 8 amount amount NN 42149 574 9 of of IN 42149 574 10 drilling drill VBG 42149 574 11 done do VBN 42149 574 12 and and CC 42149 574 13 powder powder NN 42149 574 14 used use VBN 42149 574 15 per per IN 42149 574 16 cubic cubic JJ 42149 574 17 yard yard NN 42149 574 18 for for IN 42149 574 19 the the DT 42149 574 20 whole whole JJ 42149 574 21 period period NN 42149 574 22 of of IN 42149 574 23 5 5 CD 42149 574 24 months month NNS 42149 574 25 of of IN 42149 574 26 observation observation NN 42149 574 27 , , , 42149 574 28 but but CC 42149 574 29 as as IN 42149 574 30 this this DT 42149 574 31 length length NN 42149 574 32 included include VBD 42149 574 33 280 280 CD 42149 574 34 ft ft NN 42149 574 35 . . NN 42149 574 36 of of IN 42149 574 37 heading heading NN 42149 574 38 and and CC 42149 574 39 only only RB 42149 574 40 220 220 CD 42149 574 41 ft ft NN 42149 574 42 . . NNP 42149 574 43 of of IN 42149 574 44 bench bench NNP 42149 574 45 , , , 42149 574 46 the the DT 42149 574 47 average average JJ 42149 574 48 figures figure NNS 42149 574 49 ( ( -LRB- 42149 574 50 for for IN 42149 574 51 powder powder NN 42149 574 52 especially especially RB 42149 574 53 ) ) -RRB- 42149 574 54 are be VBP 42149 574 55 too too RB 42149 574 56 low low JJ 42149 574 57 . . . 42149 575 1 Table table NN 42149 575 2 6 6 CD 42149 575 3 gives give VBZ 42149 575 4 the the DT 42149 575 5 rate rate NN 42149 575 6 and and CC 42149 575 7 cost cost NN 42149 575 8 of of IN 42149 575 9 drilling drilling NN 42149 575 10 , , , 42149 575 11 and and CC 42149 575 12 the the DT 42149 575 13 cost cost NN 42149 575 14 of of IN 42149 575 15 powder powder NN 42149 575 16 . . . 42149 576 1 It -PRON- PRP 42149 576 2 will will MD 42149 576 3 be be VB 42149 576 4 seen see VBN 42149 576 5 that that IN 42149 576 6 the the DT 42149 576 7 average average JJ 42149 576 8 rate rate NN 42149 576 9 of of IN 42149 576 10 drilling drilling NN 42149 576 11 was be VBD 42149 576 12 2.71 2.71 CD 42149 576 13 ft ft NN 42149 576 14 . . NN 42149 576 15 per per IN 42149 576 16 hour hour NN 42149 576 17 per per IN 42149 576 18 drill drill NN 42149 576 19 or or CC 42149 576 20 27.1 27.1 CD 42149 576 21 ft ft NN 42149 576 22 . . NN 42149 576 23 per per IN 42149 576 24 drill drill NN 42149 576 25 per per IN 42149 576 26 shift shift NN 42149 576 27 . . . 42149 577 1 Table table NN 42149 577 2 7 7 CD 42149 577 3 shows show VBZ 42149 577 4 the the DT 42149 577 5 result result NN 42149 577 6 of of IN 42149 577 7 observation observation NN 42149 577 8 as as IN 42149 577 9 to to IN 42149 577 10 the the DT 42149 577 11 time time NN 42149 577 12 taken take VBN 42149 577 13 in in IN 42149 577 14 various various JJ 42149 577 15 subdivisions subdivision NNS 42149 577 16 of of IN 42149 577 17 the the DT 42149 577 18 drilling drilling NN 42149 577 19 operations operation NNS 42149 577 20 . . . 42149 578 1 These these DT 42149 578 2 observations observation NNS 42149 578 3 were be VBD 42149 578 4 not not RB 42149 578 5 carried carry VBN 42149 578 6 on on RP 42149 578 7 for for IN 42149 578 8 a a DT 42149 578 9 long long JJ 42149 578 10 enough enough JJ 42149 578 11 period period NN 42149 578 12 to to TO 42149 578 13 give give VB 42149 578 14 correct correct JJ 42149 578 15 results result NNS 42149 578 16 , , , 42149 578 17 but but CC 42149 578 18 the the DT 42149 578 19 percentages percentage NNS 42149 578 20 of of IN 42149 578 21 time time NN 42149 578 22 spent spend VBN 42149 578 23 on on IN 42149 578 24 each each DT 42149 578 25 division division NN 42149 578 26 of of IN 42149 578 27 the the DT 42149 578 28 operation operation NN 42149 578 29 are be VBP 42149 578 30 believed believe VBN 42149 578 31 to to TO 42149 578 32 be be VB 42149 578 33 about about RB 42149 578 34 right right JJ 42149 578 35 . . . 42149 579 1 The the DT 42149 579 2 headings heading NNS 42149 579 3 of of IN 42149 579 4 this this DT 42149 579 5 table table NN 42149 579 6 are be VBP 42149 579 7 self self NN 42149 579 8 - - HYPH 42149 579 9 explanatory explanatory JJ 42149 579 10 . . . 42149 580 1 The the DT 42149 580 2 necessary necessary JJ 42149 580 3 delays delay NNS 42149 580 4 include include VBP 42149 580 5 all all DT 42149 580 6 time time NN 42149 580 7 spent spend VBN 42149 580 8 in in IN 42149 580 9 changing change VBG 42149 580 10 bits bit NNS 42149 580 11 , , , 42149 580 12 making make VBG 42149 580 13 air air NN 42149 580 14 - - HYPH 42149 580 15 line line NN 42149 580 16 connections connection NNS 42149 580 17 , , , 42149 580 18 etc etc FW 42149 580 19 . . . 42149 581 1 The the DT 42149 581 2 unnecessary unnecessary JJ 42149 581 3 delays delay NNS 42149 581 4 are be VBP 42149 581 5 stoppages stoppage NNS 42149 581 6 caused cause VBN 42149 581 7 by by IN 42149 581 8 lack lack NN 42149 581 9 of of IN 42149 581 10 supplies supply NNS 42149 581 11 or or CC 42149 581 12 insufficient insufficient JJ 42149 581 13 air air NN 42149 581 14 pressure pressure NN 42149 581 15 . . . 42149 582 1 By by IN 42149 582 2 Table table NN 42149 582 3 6 6 CD 42149 582 4 it -PRON- PRP 42149 582 5 will will MD 42149 582 6 be be VB 42149 582 7 noticed notice VBN 42149 582 8 that that IN 42149 582 9 the the DT 42149 582 10 cost cost NN 42149 582 11 of of IN 42149 582 12 labor labor NN 42149 582 13 for for IN 42149 582 14 drilling drilling NN 42149 582 15 and and CC 42149 582 16 sharpening sharpen VBG 42149 582 17 steels steel NNS 42149 582 18 was be VBD 42149 582 19 about about RB 42149 582 20 $ $ $ 42149 582 21 0.29 0.29 CD 42149 582 22 per per IN 42149 582 23 lin lin NNP 42149 582 24 . . . 42149 583 1 ft ft NNP 42149 583 2 . . NNP 42149 583 3 of of IN 42149 583 4 hole hole NNP 42149 583 5 drilled drill VBD 42149 583 6 . . . 42149 584 1 The the DT 42149 584 2 total total JJ 42149 584 3 cost cost NN 42149 584 4 , , , 42149 584 5 including include VBG 42149 584 6 repairs repair NNS 42149 584 7 , , , 42149 584 8 supply supply NN 42149 584 9 of of IN 42149 584 10 air air NN 42149 584 11 , , , 42149 584 12 etc etc FW 42149 584 13 . . . 42149 584 14 , , , 42149 584 15 came come VBD 42149 584 16 to to IN 42149 584 17 about about IN 42149 584 18 $ $ $ 42149 584 19 0.38 0.38 CD 42149 584 20 , , , 42149 584 21 as as IN 42149 584 22 will will MD 42149 584 23 be be VB 42149 584 24 seen see VBN 42149 584 25 from from IN 42149 584 26 Table table NN 42149 584 27 8 8 CD 42149 584 28 . . . 42149 585 1 _ _ NNP 42149 585 2 Timbering._--On Timbering._--On NNS 42149 585 3 the the DT 42149 585 4 New New NNP 42149 585 5 York York NNP 42149 585 6 side side NN 42149 585 7 nearly nearly RB 42149 585 8 the the DT 42149 585 9 whole whole JJ 42149 585 10 length length NN 42149 585 11 of of IN 42149 585 12 the the DT 42149 585 13 excavation excavation NN 42149 585 14 needed need VBN 42149 585 15 timbering timbere VBG 42149 585 16 , , , 42149 585 17 to to IN 42149 585 18 a a DT 42149 585 19 greater great JJR 42149 585 20 or or CC 42149 585 21 less less JJR 42149 585 22 extent extent NN 42149 585 23 , , , 42149 585 24 and and CC 42149 585 25 for for IN 42149 585 26 the the DT 42149 585 27 most most JJS 42149 585 28 part part NN 42149 585 29 required require VBN 42149 585 30 timbering timbere VBG 42149 585 31 of of IN 42149 585 32 quite quite PDT 42149 585 33 a a DT 42149 585 34 heavy heavy JJ 42149 585 35 type type NN 42149 585 36 . . . 42149 586 1 TABLE TABLE NNP 42149 586 2 6.--ROCK 6.--rock CD 42149 586 3 TUNNEL tunnel NN 42149 586 4 EXCAVATION excavation NN 42149 586 5 UNDER under IN 42149 586 6 32D 32D NNP 42149 586 7 STREET STREET NNP 42149 586 8 , , , 42149 586 9 EAST EAST NNP 42149 586 10 OF of IN 42149 586 11 CUT CUT NNP 42149 586 12 - - HYPH 42149 586 13 AND and CC 42149 586 14 - - HYPH 42149 586 15 COVER COVER NNP 42149 586 16 SECTION section NN 42149 586 17 . . . 42149 587 1 DRILLING drilling NN 42149 587 2 AND and CC 42149 587 3 BLASTING.--DETAILED blasting.--detailed NN 42149 587 4 COST COST NNS 42149 587 5 OF of IN 42149 587 6 LABOR labor NN 42149 587 7 IN in IN 42149 587 8 DRILLING drilling NN 42149 587 9 , , , 42149 587 10 ALSO also RB 42149 587 11 QUANTITY QUANTITY NNP 42149 587 12 AND and CC 42149 587 13 COST COST NNS 42149 587 14 OF of IN 42149 587 15 POWDER POWDER NNP 42149 587 16 USED USED NNP 42149 587 17 . . . 42149 588 1 + + NFP 42149 588 2 = = SYM 42149 588 3 = = SYM 42149 588 4 = = SYM 42149 588 5 = = SYM 42149 588 6 = = SYM 42149 588 7 = = SYM 42149 588 8 = = SYM 42149 588 9 = = SYM 42149 588 10 = = SYM 42149 588 11 = = SYM 42149 588 12 = = SYM 42149 588 13 = = SYM 42149 588 14 = = SYM 42149 588 15 = = SYM 42149 588 16 = = SYM 42149 588 17 = = SYM 42149 588 18 = = SYM 42149 588 19 = = SYM 42149 588 20 = = SYM 42149 588 21 = = SYM 42149 588 22 = = SYM 42149 588 23 = = SYM 42149 588 24 = = SYM 42149 588 25 = = SYM 42149 588 26 = = SYM 42149 588 27 = = SYM 42149 588 28 = = SYM 42149 588 29 = = SYM 42149 588 30 = = SYM 42149 588 31 = = SYM 42149 588 32 = = SYM 42149 588 33 = = SYM 42149 588 34 = = SYM 42149 588 35 = = SYM 42149 588 36 = = SYM 42149 588 37 = = SYM 42149 588 38 = = SYM 42149 588 39 = = SYM 42149 588 40 = = SYM 42149 588 41 = = SYM 42149 588 42 = = SYM 42149 588 43 = = SYM 42149 588 44 = = SYM 42149 588 45 = = SYM 42149 588 46 = = SYM 42149 588 47 = = SYM 42149 588 48 = = SYM 42149 588 49 = = SYM 42149 588 50 = = SYM 42149 588 51 = = SYM 42149 588 52 = = SYM 42149 588 53 = = SYM 42149 588 54 = = SYM 42149 588 55 = = SYM 42149 588 56 = = SYM 42149 588 57 = = SYM 42149 588 58 = = SYM 42149 588 59 = = SYM 42149 588 60 = = SYM 42149 588 61 = = SYM 42149 588 62 = = SYM 42149 588 63 = = SYM 42149 588 64 = = SYM 42149 588 65 = = SYM 42149 588 66 = = SYM 42149 588 67 = = SYM 42149 588 68 = = SYM 42149 588 69 = = NFP 42149 588 70 = = SYM 42149 588 71 + + CC 42149 588 72 | | NNS 42149 588 73 DRILLING drilling NN 42149 588 74 AND and CC 42149 588 75 BLASTING blasting NN 42149 588 76 . . . 42149 589 1 | | NNP 42149 589 2 |-----+-----+------+------+------+-----+-----+------+-----+-----+-----| |-----+-----+------+------+------+-----+-----+------+-----+-----+-----| NNP 42149 589 3 |Type.|Date.|Total |Type.|Date.|Total , 42149 589 4 feet foot NNS 42149 589 5 drilled drill VBD 42149 589 6 . . . 42149 590 1 | | NNS 42149 590 2 No no NN 42149 590 3 . . . 42149 591 1 drill drill VB 42149 591 2 shifts| shifts| NNP 42149 591 3 Feet foot NNS 42149 591 4 drilled drill VBD 42149 591 5 | | CD 42149 591 6 | | NNP 42149 591 7 | | CD 42149 591 8 | | CD 42149 591 9 | | CD 42149 591 10 | | CD 42149 591 11 | | NNS 42149 591 12 of of IN 42149 591 13 ( ( -LRB- 42149 591 14 10-hour 10-hour CD 42149 591 15 . . . 42149 591 16 ) ) -RRB- 42149 592 1 |per |per JJ 42149 592 2 man man NN 42149 592 3 per per IN 42149 592 4 hour.| hour.| NNP 42149 592 5 | | NNP 42149 592 6 + + CC 42149 592 7 -----+------+------+------+-----+-----+------+-----+-----+-----+ -----+------+------+------+-----+-----+------+-----+-----+-----+ NN 42149 592 8 | | NNP 42149 592 9 |1907 |1907 NNP 42149 592 10 |Head- |Head- NNS 42149 592 11 |Bench |bench CD 42149 592 12 |Total |total JJ 42149 592 13 |Head-|Bench|Total |head-|bench|total JJ 42149 592 14 |Head-|Bench|Total| |head-|bench|total| CD 42149 592 15 | | NNP 42149 592 16 | | NNP 42149 592 17 | | CD 42149 592 18 ing ing NNP 42149 592 19 | | CD 42149 592 20 | | CD 42149 592 21 | | NNP 42149 592 22 ing ing NNP 42149 592 23 | | CD 42149 592 24 | | CD 42149 592 25 | | NNP 42149 592 26 ing ing NNP 42149 592 27 | | NNP 42149 592 28 | | NNP 42149 592 29 | | NNP 42149 592 30 |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ NNP 42149 592 31 |_Ke._|May |_Ke._|May NNP 42149 592 32 | | CD 42149 592 33 2,971| 2,971| CD 42149 592 34 5,578| 5,578| CD 42149 592 35 8,549| 8,549| CD 42149 592 36 98 98 CD 42149 592 37 | | CD 42149 592 38 204 204 CD 42149 592 39 | | CD 42149 592 40 302 302 CD 42149 592 41 |3.031|2.734|2.831| |3.031|2.734|2.831| NNP 42149 592 42 | | CD 42149 592 43 |June |june CD 42149 592 44 | | CD 42149 592 45 2,093| 2,093| CD 42149 592 46 6,194| 6,194| CD 42149 592 47 8,287| 8,287| CD 42149 592 48 85 85 CD 42149 592 49 | | CD 42149 592 50 223 223 CD 42149 592 51 | | CD 42149 592 52 308 308 CD 42149 592 53 |2.462|2.777|2.691| |2.462|2.777|2.691| NNP 42149 592 54 | | CD 42149 592 55 |July |july CD 42149 592 56 | | CD 42149 592 57 | | CD 42149 592 58 7,627| 7,627| CD 42149 592 59 7,627| 7,627| CD 42149 592 60 | | CD 42149 592 61 268 268 CD 42149 592 62 | | CD 42149 592 63 268 268 CD 42149 592 64 | | CD 42149 592 65 |2.845|2.845| |2.845|2.845| NNP 42149 592 66 | | HYPH 42149 592 67 |Aug |aug NN 42149 592 68 . . . 42149 593 1 | | CD 42149 593 2 | | CD 42149 593 3 2,552| 2,552| CD 42149 593 4 2,552| 2,552| CD 42149 593 5 | | CD 42149 593 6 95 95 CD 42149 593 7 | | CD 42149 593 8 95 95 CD 42149 593 9 | | CD 42149 593 10 |2.688|2.688| |2.688|2.688| CD 42149 593 11 | | CD 42149 593 12 |Sept.| |sept.| CD 42149 593 13 | | CD 42149 593 14 2,133| 2,133| CD 42149 593 15 2,133| 2,133| CD 42149 593 16 | | CD 42149 593 17 79 79 CD 42149 593 18 | | CD 42149 593 19 79 79 CD 42149 593 20 | | NNP 42149 593 21 |2.700|2.700| |2.700|2.700| NNP 42149 593 22 | | NNP 42149 593 23 + + CC 42149 593 24 -----+------+------+------+-----+-----+------+-----+-----+-----+ -----+------+------+------+-----+-----+------+-----+-----+-----+ NN 42149 593 25 | | CD 42149 593 26 |Total| |total| CD 42149 593 27 5,064|24,084|29,148| 5,064|24,084|29,148| CD 42149 593 28 183 183 CD 42149 593 29 | | CD 42149 593 30 869 869 CD 42149 593 31 |1,052 |1,052 NN 42149 593 32 |2.767|2.77 |2.767|2.77 ADD 42149 593 33 |2.77 |2.77 NNP 42149 593 34 | | NNP 42149 593 35 |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ NNP 42149 593 36 |_Ki._|May |_Ki._|May NNP 42149 593 37 | | CD 42149 593 38 6,976| 6,976| CD 42149 593 39 | | CD 42149 593 40 6,976| 6,976| CD 42149 593 41 216 216 CD 42149 593 42 | | CD 42149 593 43 | | CD 42149 593 44 216 216 CD 42149 593 45 |3.229| |3.229| NN 42149 593 46 |3.229| |3.229| NN 42149 593 47 | | CD 42149 593 48 |June |june CD 42149 593 49 | | CD 42149 593 50 4,089| 4,089| CD 42149 593 51 | | CD 42149 593 52 4,089| 4,089| CD 42149 593 53 135 135 CD 42149 593 54 | | CD 42149 593 55 | | CD 42149 593 56 135 135 CD 42149 593 57 |3.029| |3.029| CD 42149 593 58 |3.029| |3.029| NNP 42149 593 59 | | CD 42149 593 60 |July |july CD 42149 593 61 | | CD 42149 593 62 | | CD 42149 593 63 3,733| 3,733| CD 42149 593 64 3,733| 3,733| CD 42149 593 65 | | CD 42149 593 66 140 140 CD 42149 593 67 | | CD 42149 593 68 140 140 CD 42149 593 69 | | CD 42149 593 70 |2.666|2.666| |2.666|2.666| NN 42149 593 71 | | HYPH 42149 593 72 |Aug |Aug NNS 42149 593 73 . . . 42149 594 1 | | CD 42149 594 2 | | CD 42149 594 3 6,715| 6,715| CD 42149 594 4 6,715| 6,715| CD 42149 594 5 | | CD 42149 594 6 249 249 CD 42149 594 7 | | CD 42149 594 8 249 249 CD 42149 594 9 | | CD 42149 594 10 |2.769|2.769| |2.769|2.769| NN 42149 594 11 | | CD 42149 594 12 |Estim| |estim| NN 42149 594 13 |14,742|14,742| |14,742|14,742| NNP 42149 594 14 | | CD 42149 594 15 46 46 CD 42149 594 16 | | CD 42149 594 17 546 546 CD 42149 594 18 | | CD 42149 594 19 |2.700|2.700| |2.700|2.700| NNP 42149 594 20 | | NNP 42149 594 21 + + CC 42149 594 22 -----+------+------+------+-----+-----+------+-----+-----+-----+ -----+------+------+------+-----+-----+------+-----+-----+-----+ : 42149 594 23 | | NNP 42149 594 24 |Total|11,065|25,190|36,255| |Total|11,065|25,190|36,255| NNP 42149 594 25 351 351 CD 42149 594 26 | | CD 42149 594 27 935|1,286 935|1,286 CD 42149 594 28 |3.152|2.694|2.819| |3.152|2.694|2.819| NNP 42149 594 29 |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ NNP 42149 594 30 |_Ko._|May |_Ko._|May NNP 42149 594 31 | | CD 42149 594 32 | | CD 42149 594 33 1,617| 1,617| CD 42149 594 34 1,617| 1,617| CD 42149 594 35 | | CD 42149 594 36 55| 55| CD 42149 594 37 55 55 CD 42149 594 38 | | CD 42149 594 39 |2.921|2.921| |2.921|2.921| NNP 42149 594 40 | | HYPH 42149 594 41 |June |June NNP 42149 594 42 | | CD 42149 594 43 | | CD 42149 594 44 2,948| 2,948| CD 42149 594 45 2,948| 2,948| CD 42149 594 46 | | CD 42149 594 47 107| 107| CD 42149 594 48 107 107 CD 42149 594 49 | | NNP 42149 594 50 |2.755|2.755| |2.755|2.755| NNP 42149 594 51 | | NNP 42149 594 52 |July |july CD 42149 594 53 | | CD 42149 594 54 | | CD 42149 594 55 3,734| 3,734| CD 42149 594 56 3,734| 3,734| CD 42149 594 57 | | CD 42149 594 58 131| 131| CD 42149 594 59 131 131 CD 42149 594 60 | | CD 42149 594 61 |2.850|2.850| |2.850|2.850| VBN 42149 594 62 | | HYPH 42149 594 63 |Aug |aug NN 42149 594 64 . . . 42149 595 1 | | CD 42149 595 2 | | CD 42149 595 3 8,260| 8,260| CD 42149 595 4 8,260| 8,260| CD 42149 595 5 | | CD 42149 595 6 290| 290| CD 42149 595 7 290 290 CD 42149 595 8 | | CD 42149 595 9 |2.848|2.848| |2.848|2.848| NNP 42149 595 10 | | CD 42149 595 11 |Estim| |estim| CD 42149 595 12 | | CD 42149 595 13 4,787| 4,787| CD 42149 595 14 4,787| 4,787| CD 42149 595 15 | | CD 42149 595 16 285| 285| CD 42149 595 17 285 285 CD 42149 595 18 | | CD 42149 595 19 |1.180|1.680| |1.180|1.680| RB 42149 595 20 | | CD 42149 595 21 + + CC 42149 595 22 -----+------+------+------+-----+-----+------+-----+-----+-----+ -----+------+------+------+-----+-----+------+-----+-----+-----+ NN 42149 595 23 | | CD 42149 595 24 |Total| |total| JJ 42149 595 25 |21,346|21,346| |21,346|21,346| NNP 42149 595 26 | | NNP 42149 595 27 868| 868| NNP 42149 595 28 868 868 CD 42149 595 29 | | NNP 42149 595 30 |2.460|2.460| |2.460|2.460| NNP 42149 595 31 |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ |-----+-----+------+------+------+-----+-----+------+-----+-----+-----+ NNP 42149 595 32 |Grand|Total|16,129|70,620|86,749| |Grand|Total|16,129|70,620|86,749| NNP 42149 595 33 534 534 CD 42149 595 34 |2,672|3,206 |2,672|3,206 NN 42149 595 35 |3.020|2.710|2.710| |3.020|2.710|2.710| NNPS 42149 595 36 + + SYM 42149 595 37 = = SYM 42149 595 38 = = SYM 42149 595 39 = = SYM 42149 595 40 = = NFP 42149 595 41 = = SYM 42149 595 42 + + SYM 42149 595 43 = = SYM 42149 595 44 = = SYM 42149 595 45 = = SYM 42149 595 46 = = NFP 42149 595 47 = = SYM 42149 595 48 + + SYM 42149 595 49 = = SYM 42149 595 50 = = SYM 42149 595 51 = = SYM 42149 595 52 = = SYM 42149 595 53 = = NFP 42149 595 54 = = SYM 42149 595 55 + + SYM 42149 595 56 = = SYM 42149 595 57 = = SYM 42149 595 58 = = SYM 42149 595 59 = = SYM 42149 595 60 = = NFP 42149 595 61 = = SYM 42149 595 62 + + SYM 42149 595 63 = = SYM 42149 595 64 = = SYM 42149 595 65 = = SYM 42149 595 66 = = SYM 42149 595 67 = = NFP 42149 595 68 = = SYM 42149 595 69 + + SYM 42149 595 70 = = SYM 42149 595 71 = = SYM 42149 595 72 = = SYM 42149 595 73 = = NFP 42149 595 74 = = SYM 42149 595 75 + + SYM 42149 595 76 = = SYM 42149 595 77 = = SYM 42149 595 78 = = SYM 42149 595 79 = = NFP 42149 595 80 = = SYM 42149 595 81 + + SYM 42149 595 82 = = SYM 42149 595 83 = = SYM 42149 595 84 = = SYM 42149 595 85 = = SYM 42149 595 86 = = NFP 42149 595 87 = = SYM 42149 595 88 + + SYM 42149 595 89 = = SYM 42149 595 90 = = SYM 42149 595 91 = = SYM 42149 595 92 = = NFP 42149 595 93 = = SYM 42149 595 94 + + SYM 42149 595 95 = = SYM 42149 595 96 = = SYM 42149 595 97 = = SYM 42149 595 98 = = NFP 42149 595 99 = = SYM 42149 595 100 + + SYM 42149 595 101 = = SYM 42149 595 102 = = SYM 42149 595 103 = = SYM 42149 595 104 = = NFP 42149 595 105 = = SYM 42149 595 106 + + SYM 42149 595 107 + + SYM 42149 595 108 = = SYM 42149 595 109 = = SYM 42149 595 110 = = SYM 42149 595 111 = = SYM 42149 595 112 = = SYM 42149 595 113 = = SYM 42149 595 114 = = SYM 42149 595 115 = = SYM 42149 595 116 = = SYM 42149 595 117 = = SYM 42149 595 118 = = SYM 42149 595 119 = = SYM 42149 595 120 = = SYM 42149 595 121 = = SYM 42149 595 122 = = SYM 42149 595 123 = = SYM 42149 595 124 = = SYM 42149 595 125 = = SYM 42149 595 126 = = SYM 42149 595 127 = = SYM 42149 595 128 = = SYM 42149 595 129 = = SYM 42149 595 130 = = SYM 42149 595 131 = = SYM 42149 595 132 = = SYM 42149 595 133 = = SYM 42149 595 134 = = SYM 42149 595 135 = = SYM 42149 595 136 = = SYM 42149 595 137 = = SYM 42149 595 138 = = SYM 42149 595 139 = = SYM 42149 595 140 = = SYM 42149 595 141 = = SYM 42149 595 142 = = SYM 42149 595 143 = = SYM 42149 595 144 = = SYM 42149 595 145 = = SYM 42149 595 146 = = SYM 42149 595 147 = = SYM 42149 595 148 = = SYM 42149 595 149 = = SYM 42149 595 150 = = SYM 42149 595 151 = = SYM 42149 595 152 = = SYM 42149 595 153 = = SYM 42149 595 154 = = SYM 42149 595 155 = = SYM 42149 595 156 = = NFP 42149 595 157 = = SYM 42149 595 158 + + SYM 42149 595 159 = = SYM 42149 595 160 = = SYM 42149 595 161 = = SYM 42149 595 162 = = SYM 42149 595 163 = = SYM 42149 595 164 = = SYM 42149 595 165 = = SYM 42149 595 166 = = SYM 42149 595 167 = = SYM 42149 595 168 = = SYM 42149 595 169 = = SYM 42149 595 170 = = SYM 42149 595 171 = = SYM 42149 595 172 = = SYM 42149 595 173 = = SYM 42149 595 174 = = SYM 42149 595 175 = = SYM 42149 595 176 = = SYM 42149 595 177 = = SYM 42149 595 178 = = NFP 42149 595 179 = = SYM 42149 595 180 + + CC 42149 595 181 | | NNS 42149 595 182 DRILLING DRILLING NNS 42149 595 183 AND and CC 42149 595 184 BLASTING BLASTING NNP 42149 595 185 | | NNP 42149 595 186 POWDER POWDER NNP 42149 595 187 USED USED NNP 42149 595 188 . . . 42149 596 1 | | NNP 42149 596 2 |-----+----------+------+--------------------------+--------+-------+----+ |-----+----------+------+--------------------------+--------+-------+----+ NNP 42149 596 3 | | HYPH 42149 596 4 | | NNP 42149 596 5 | | CD 42149 596 6 | | CD 42149 596 7 Cost cost NN 42149 596 8 of of IN 42149 596 9 labor labor NN 42149 596 10 only only RB 42149 596 11 . . . 42149 597 1 | | NNP 42149 597 2 | | CD 42149 597 3 | | CD 42149 597 4 | | CD 42149 597 5 | | CD 42149 597 6 | | CD 42149 597 7 | | CD 42149 597 8 | | NNS 42149 597 9 Drilling drilling NN 42149 597 10 and and CC 42149 597 11 sharpening sharpening NN 42149 597 12 . . . 42149 598 1 | | NNP 42149 598 2 | | CD 42149 598 3 | | CD 42149 598 4 | | CD 42149 598 5 | | CD 42149 598 6 | | CD 42149 598 7 | | CD 42149 598 8 + + CC 42149 598 9 ------+------+-------+----+ ------+------+-------+----+ HYPH 42149 598 10 | | NNP 42149 598 11 | | NNP 42149 598 12 | | CD 42149 598 13 | | CD 42149 598 14 | | CD 42149 598 15 | | CD 42149 598 16 | | CD 42149 598 17 | | CD 42149 598 18 | | CD 42149 598 19 Per per IN 42149 598 20 | | CD 42149 598 21 | | NNP 42149 598 22 | | NNP 42149 598 23 Cost Cost VBD 42149 598 24 | | CD 42149 598 25 | | CD 42149 598 26 | | CD 42149 598 27 | | CD 42149 598 28 | | CD 42149 598 29 | | CD 42149 598 30 | | CD 42149 598 31 | | CD 42149 598 32 cubic cubic JJ 42149 598 33 | | CD 42149 598 34 | | CD 42149 598 35 | | CD 42149 598 36 per per IN 42149 598 37 | | NNP 42149 598 38 | | NNP 42149 598 39 | | CD 42149 598 40 | | CD 42149 598 41 | | CD 42149 598 42 | | CD 42149 598 43 | | CD 42149 598 44 | | CD 42149 598 45 yard yard NN 42149 598 46 . . . 42149 599 1 | | NNP 42149 599 2 | | CD 42149 599 3 | | CD 42149 599 4 cubic cubic JJ 42149 599 5 | | CD 42149 599 6 | | CD 42149 599 7 | | CD 42149 599 8 | | CD 42149 599 9 | | CD 42149 599 10 | | CD 42149 599 11 | | CD 42149 599 12 | | CD 42149 599 13 | | CD 42149 599 14 | | CD 42149 599 15 |yard |yard CD 42149 599 16 at| at| NNP 42149 599 17 | | CD 42149 599 18 | | NNP 42149 599 19 | | CD 42149 599 20 | | CD 42149 599 21 | | CD 42149 599 22 | | CD 42149 599 23 | | CD 42149 599 24 | | CD 42149 599 25 | | CD 42149 599 26 | | CD 42149 599 27 11 11 CD 42149 599 28 | | CD 42149 599 29 | | CD 42149 599 30 | | CD 42149 599 31 | | CD 42149 599 32 | | CD 42149 599 33 | | CD 42149 599 34 | | CD 42149 599 35 | | CD 42149 599 36 | | CD 42149 599 37 | | CD 42149 599 38 | | CD 42149 599 39 cents cent NNS 42149 599 40 | | CD 42149 599 41 | | CD 42149 599 42 | | CD 42149 599 43 | | CD 42149 599 44 | | CD 42149 599 45 | | CD 42149 599 46 | | CD 42149 599 47 | | CD 42149 599 48 | | CD 42149 599 49 | | CD 42149 599 50 | | CD 42149 599 51 per per IN 42149 599 52 | | NNP 42149 599 53 | | NNP 42149 599 54 | | CD 42149 599 55 | | CD 42149 599 56 | | CD 42149 599 57 | | CD 42149 599 58 | | CD 42149 599 59 | | CD 42149 599 60 | | CD 42149 599 61 | | CD 42149 599 62 |pound |pound CD 42149 599 63 . . . 42149 600 1 | | NNP 42149 600 2 | | CD 42149 600 3 | | CD 42149 600 4 + + SYM 42149 600 5 ----------+------+------+------+-------+----+--------+-------+----+ ----------+------+------+------+-------+----+--------+-------+----+ . 42149 600 6 |Type.| |Type.| NNP 42149 600 7 Quantity quantity NN 42149 600 8 | | NNP 42149 600 9 |Total.| |Total.| NNS 42149 600 10 Per per IN 42149 600 11 |Actual.|Paid| |actual.|paid| CD 42149 600 12 Total total JJ 42149 600 13 |Actual.|Paid| |actual.|paid| CD 42149 600 14 | | CD 42149 600 15 | | CD 42149 600 16 of of IN 42149 600 17 | | NNP 42149 600 18 | | NNP 42149 600 19 |linear| |linear| NNPS 42149 600 20 |for |for IN 42149 600 21 |Quantity| |quantity| JJ 42149 600 22 |for.| |for.| NNP 42149 600 23 | | NNP 42149 600 24 |excavation| |excavation| NNP 42149 600 25 | | NNP 42149 600 26 |feet |feet CD 42149 600 27 . . . 42149 601 1 | | NNP 42149 601 2 | | CD 42149 601 3 | | CD 42149 601 4 | | CD 42149 601 5 | | CD 42149 601 6 | | CD 42149 601 7 | | CD 42149 601 8 | | NNS 42149 601 9 in in IN 42149 601 10 cubic cubic JJ 42149 601 11 | | CD 42149 601 12 | | CD 42149 601 13 | | CD 42149 601 14 | | CD 42149 601 15 | | CD 42149 601 16 | | CD 42149 601 17 | | CD 42149 601 18 | | CD 42149 601 19 | | CD 42149 601 20 | | CD 42149 601 21 | | CD 42149 601 22 yards yard NNS 42149 601 23 . . . 42149 602 1 | | NNP 42149 602 2 | | CD 42149 602 3 | | CD 42149 602 4 | | CD 42149 602 5 | | CD 42149 602 6 | | CD 42149 602 7 | | CD 42149 602 8 | | CD 42149 602 9 | | CD 42149 602 10 | | CD 42149 602 11 + + CC 42149 602 12 ----------+------+------+------+-------+----+--------+-------+----+ ----------+------+------+------+-------+----+--------+-------+----+ NNP 42149 602 13 | | NNP 42149 602 14 | | NNP 42149 602 15 Actual Actual NNP 42149 602 16 . . . 42149 603 1 | | NNP 42149 603 2 Paid Paid NNP 42149 603 3 | | CD 42149 603 4 $ $ $ 42149 603 5 | | CD 42149 603 6 $ $ $ 42149 603 7 | | CD 42149 603 8 $ $ $ 42149 603 9 | | CD 42149 603 10 |Pounds |pound NNS 42149 603 11 . . . 42149 604 1 | | NNP 42149 604 2 $ $ $ 42149 604 3 | | CD 42149 604 4 $ $ $ 42149 604 5 | | CD 42149 604 6 | | CD 42149 604 7 | | CD 42149 604 8 [ [ -LRB- 42149 604 9 E e NN 42149 604 10 ] ] -RRB- 42149 604 11 | | NNP 42149 604 12 for for IN 42149 604 13 | | CD 42149 604 14 | | NNP 42149 604 15 | | CD 42149 604 16 | | CD 42149 604 17 | | CD 42149 604 18 | | CD 42149 604 19 | | CD 42149 604 20 | | CD 42149 604 21 | | CD 42149 604 22 | | CD 42149 604 23 | | CD 42149 604 24 [ [ -LRB- 42149 604 25 F F NNP 42149 604 26 ] ] -RRB- 42149 604 27 | | NNP 42149 604 28 | | NNP 42149 604 29 | | CD 42149 604 30 | | CD 42149 604 31 | | CD 42149 604 32 | | CD 42149 604 33 | | CD 42149 604 34 | | CD 42149 604 35 |-----+----------+------+------+------+-------+----+--------+-------+----+ |-----+----------+------+------+------+-------+----+--------+-------+----+ CD 42149 604 36 |_Ke._| |_ke._| CD 42149 604 37 1,736 1,736 CD 42149 604 38 | | CD 42149 604 39 1,664| 1,664| CD 42149 604 40 2,331| 2,331| CD 42149 604 41 0.27 0.27 CD 42149 604 42 | | CD 42149 604 43 1.34 1.34 CD 42149 604 44 |1.40| |1.40| NNP 42149 604 45 1,595 1,595 CD 42149 604 46 | | CD 42149 604 47 0.10 0.10 CD 42149 604 48 |0.10| |0.10| NNP 42149 604 49 | | NNP 42149 604 50 | | NNP 42149 604 51 809 809 CD 42149 604 52 | | CD 42149 604 53 698| 698| CD 42149 604 54 2,440| 2,440| CD 42149 604 55 0.29 0.29 CD 42149 604 56 | | CD 42149 604 57 3.01 3.01 CD 42149 604 58 |3.49| |3.49| NNP 42149 604 59 1,960 1,960 CD 42149 604 60 | | CD 42149 604 61 0.27 0.27 CD 42149 604 62 |0.31| |0.31| NNPS 42149 604 63 | | NNP 42149 604 64 | | CD 42149 604 65 1,022 1,022 CD 42149 604 66 | | CD 42149 604 67 960| 960| CD 42149 604 68 2,031| 2,031| CD 42149 604 69 0.26 0.26 CD 42149 604 70 | | CD 42149 604 71 1.98 1.98 CD 42149 604 72 |2.11| |2.11| NNP 42149 604 73 966 966 CD 42149 604 74 | | CD 42149 604 75 0.10 0.10 CD 42149 604 76 |0.11| |0.11| NNP 42149 604 77 | | NNP 42149 604 78 | | NNP 42149 604 79 743 743 CD 42149 604 80 | | CD 42149 604 81 716| 716| CD 42149 604 82 640| 640| CD 42149 604 83 0.25 0.25 CD 42149 604 84 | | CD 42149 604 85 0.86 0.86 CD 42149 604 86 |0.89| |0.89| NNP 42149 604 87 430 430 CD 42149 604 88 | | CD 42149 604 89 0.06 0.06 CD 42149 604 90 |0.07| |0.07| NNP 42149 604 91 | | CD 42149 604 92 | | POS 42149 604 93 238 238 CD 42149 604 94 | | CD 42149 604 95 238| 238| CD 42149 604 96 533| 533| CD 42149 604 97 0.25 0.25 CD 42149 604 98 | | CD 42149 604 99 2.24 2.24 CD 42149 604 100 |2.24| |2.24| NNP 42149 604 101 280 280 CD 42149 604 102 | | CD 42149 604 103 0.13 0.13 CD 42149 604 104 |0.13| |0.13| NNP 42149 604 105 | | NNP 42149 604 106 |----------+------+------+------+-------+----+--------+-------+----+ |----------+------+------+------+-------+----+--------+-------+----+ CD 42149 604 107 | | CD 42149 604 108 | | CD 42149 604 109 4,548 4,548 CD 42149 604 110 | | CD 42149 604 111 4,276| 4,276| CD 42149 604 112 7,975| 7,975| CD 42149 604 113 0.27 0.27 CD 42149 604 114 | | CD 42149 604 115 1.75 1.75 CD 42149 604 116 |1.87| |1.87| NNP 42149 604 117 5,231 5,231 CD 42149 604 118 | | CD 42149 604 119 0.13 0.13 CD 42149 604 120 |0.13| |0.13| NN 42149 604 121 |-----+----------+------+------+------+-------+----+--------+-------+----+ |-----+----------+------+------+------+-------+----+--------+-------+----+ PRP 42149 604 122 |_Ki._| |_ki._| CD 42149 604 123 614 614 CD 42149 604 124 | | CD 42149 604 125 527| 527| CD 42149 604 126 1,604| 1,604| CD 42149 604 127 0.23 0.23 CD 42149 604 128 | | CD 42149 604 129 2.61 2.61 CD 42149 604 130 |3.04| |3.04| VBN 42149 604 131 1,230 1,230 CD 42149 604 132 | | CD 42149 604 133 0.22 0.22 CD 42149 604 134 |0.26| |0.26| NNP 42149 604 135 | | CD 42149 604 136 | | CD 42149 604 137 357 357 CD 42149 604 138 | | CD 42149 604 139 259| 259| CD 42149 604 140 1,234| 1,234| CD 42149 604 141 0.30 0.30 CD 42149 604 142 | | CD 42149 604 143 3.45 3.45 CD 42149 604 144 |4.76| |4.76| NNP 42149 604 145 1,036 1,036 CD 42149 604 146 | | CD 42149 604 147 0.32 0.32 CD 42149 604 148 |0.44| |0.44| NNP 42149 604 149 | | CD 42149 604 150 | | CD 42149 604 151 530 530 CD 42149 604 152 | | CD 42149 604 153 404| 404| CD 42149 604 154 1,084| 1,084| CD 42149 604 155 0.29 0.29 CD 42149 604 156 | | CD 42149 604 157 2.04 2.04 CD 42149 604 158 |2.68| |2.68| NNP 42149 604 159 550 550 CD 42149 604 160 | | CD 42149 604 161 0.11 0.11 CD 42149 604 162 |0.15| |0.15| NNP 42149 604 163 | | NNP 42149 604 164 | | NNP 42149 604 165 925 925 CD 42149 604 166 | | CD 42149 604 167 890| 890| CD 42149 604 168 1,901| 1,901| CD 42149 604 169 0.28 0.28 CD 42149 604 170 | | CD 42149 604 171 2.05 2.05 CD 42149 604 172 |2.13| |2.13| NNP 42149 604 173 905 905 CD 42149 604 174 | | CD 42149 604 175 0.10 0.10 CD 42149 604 176 |0.11| |0.11| NNP 42149 604 177 | | NNP 42149 604 178 | | NNP 42149 604 179 3,254 3,254 CD 42149 604 180 | | CD 42149 604 181 2,908| 2,908| CD 42149 604 182 4,570| 4,570| CD 42149 604 183 0.31 0.31 CD 42149 604 184 | | CD 42149 604 185 1.40 1.40 CD 42149 604 186 |1.57| |1.57| VBG 42149 604 187 2,470 2,470 CD 42149 604 188 | | CD 42149 604 189 0.08 0.08 CD 42149 604 190 |0.09| |0.09| NNP 42149 604 191 | | NNP 42149 604 192 |----------+------+------+------+-------+----+--------+-------+----+ |----------+------+------+------+-------+----+--------+-------+----+ NNP 42149 604 193 | | NNP 42149 604 194 | | CD 42149 604 195 5,680 5,680 CD 42149 604 196 | | CD 42149 604 197 4,988|10,393| 4,988|10,393| CD 42149 604 198 0.29 0.29 CD 42149 604 199 | | CD 42149 604 200 1.83 1.83 CD 42149 604 201 |2.08| |2.08| NNP 42149 604 202 6,191 6,191 CD 42149 604 203 | | CD 42149 604 204 0.12 0.12 CD 42149 604 205 |0.14| |0.14| NNP 42149 604 206 |-----+----------+------+------+------+-------+----+--------+-------+----+ |-----+----------+------+------+------+-------+----+--------+-------+----+ NNP 42149 604 207 |_Ko._| |_ko._| CD 42149 604 208 250 250 CD 42149 604 209 | | CD 42149 604 210 188| 188| CD 42149 604 211 471| 471| CD 42149 604 212 0.29 0.29 CD 42149 604 213 | | CD 42149 604 214 1.88 1.88 CD 42149 604 215 |2.50| |2.50| NNP 42149 604 216 376 376 CD 42149 604 217 | | CD 42149 604 218 0.17 0.17 CD 42149 604 219 |0.22| |0.22| NNP 42149 604 220 | | HYPH 42149 604 221 | | NNP 42149 604 222 496 496 CD 42149 604 223 | | CD 42149 604 224 347| 347| CD 42149 604 225 883| 883| CD 42149 604 226 0.29 0.29 CD 42149 604 227 | | CD 42149 604 228 1.78 1.78 CD 42149 604 229 |2.54| |2.54| NNS 42149 604 230 357 357 CD 42149 604 231 | | CD 42149 604 232 0.08 0.08 CD 42149 604 233 |0.11| |0.11| NNP 42149 604 234 | | NNP 42149 604 235 | | NNP 42149 604 236 626 626 CD 42149 604 237 | | CD 42149 604 238 606| 606| JJ 42149 604 239 1,003| 1,003| CD 42149 604 240 0.27 0.27 CD 42149 604 241 | | CD 42149 604 242 1.60 1.60 CD 42149 604 243 |1.65| |1.65| NNP 42149 604 244 609 609 CD 42149 604 245 | | CD 42149 604 246 0.11 0.11 CD 42149 604 247 |0.11| |0.11| NNP 42149 604 248 | | NNP 42149 604 249 | | NNP 42149 604 250 718 718 CD 42149 604 251 | | CD 42149 604 252 709| 709| CD 42149 604 253 2,161| 2,161| CD 42149 604 254 0.26 0.26 CD 42149 604 255 | | CD 42149 604 256 3.00 3.00 CD 42149 604 257 |3.04| |3.04| NNP 42149 604 258 918 918 CD 42149 604 259 | | CD 42149 604 260 0.14 0.14 CD 42149 604 261 |0.14| |0.14| NNP 42149 604 262 | | HYPH 42149 604 263 | | NNP 42149 604 264 605 605 CD 42149 604 265 | | CD 42149 604 266 535| 535| CD 42149 604 267 2,397| 2,397| CD 42149 604 268 0.50 0.50 CD 42149 604 269 | | CD 42149 604 270 3.96 3.96 CD 42149 604 271 |4.48| |4.48| NNP 42149 604 272 762 762 CD 42149 604 273 | | CD 42149 604 274 0.14 0.14 CD 42149 604 275 |0.16| |0.16| NNP 42149 604 276 | | CD 42149 604 277 |----------+------+------+------+-------+----+--------+-------+----+ |----------+------+------+------+-------+----+--------+-------+----+ NNP 42149 604 278 | | NNP 42149 604 279 | | CD 42149 604 280 2,695 2,695 CD 42149 604 281 | | CD 42149 604 282 2,385| 2,385| CD 42149 604 283 6,915| 6,915| CD 42149 604 284 0.32 0.32 CD 42149 604 285 | | CD 42149 604 286 2.57 2.57 CD 42149 604 287 |2.90| |2.90| NNP 42149 604 288 3,022 3,022 CD 42149 604 289 | | CD 42149 604 290 0.12 0.12 CD 42149 604 291 |0.14| |0.14| NNP 42149 604 292 | | NNP 42149 604 293 |---------+-------+------+------+-------+----+--------+-------+----+ |---------+-------+------+------+-------+----+--------+-------+----+ NNP 42149 604 294 | | NNP 42149 604 295 |12,923 |12,923 NNP 42149 604 296 |11,649|25,283| |11,649|25,283| NNP 42149 604 297 0.29 0.29 CD 42149 604 298 | | CD 42149 604 299 1.96 1.96 CD 42149 604 300 |2.17|14,444 |2.17|14,444 CD 42149 604 301 | | CD 42149 604 302 0.12 0.12 CD 42149 604 303 |0.14| |0.14| NNP 42149 604 304 + + SYM 42149 604 305 = = SYM 42149 604 306 = = SYM 42149 604 307 = = SYM 42149 604 308 = = NFP 42149 604 309 = = SYM 42149 604 310 + + SYM 42149 604 311 = = SYM 42149 604 312 = = SYM 42149 604 313 = = SYM 42149 604 314 = = SYM 42149 604 315 = = SYM 42149 604 316 = = SYM 42149 604 317 = = SYM 42149 604 318 = = SYM 42149 604 319 = = NFP 42149 604 320 = = SYM 42149 604 321 + + SYM 42149 604 322 = = SYM 42149 604 323 = = SYM 42149 604 324 = = SYM 42149 604 325 = = SYM 42149 604 326 = = NFP 42149 604 327 = = SYM 42149 604 328 + + SYM 42149 604 329 = = SYM 42149 604 330 = = SYM 42149 604 331 = = SYM 42149 604 332 = = SYM 42149 604 333 = = NFP 42149 604 334 = = SYM 42149 604 335 + + SYM 42149 604 336 = = SYM 42149 604 337 = = SYM 42149 604 338 = = SYM 42149 604 339 = = SYM 42149 604 340 = = NFP 42149 604 341 = = SYM 42149 604 342 + + SYM 42149 604 343 = = SYM 42149 604 344 = = SYM 42149 604 345 = = SYM 42149 604 346 = = SYM 42149 604 347 = = SYM 42149 604 348 = = NFP 42149 604 349 = = SYM 42149 604 350 + + SYM 42149 604 351 = = SYM 42149 604 352 = = SYM 42149 604 353 = = NFP 42149 604 354 = = SYM 42149 604 355 + + SYM 42149 604 356 = = SYM 42149 604 357 = = SYM 42149 604 358 = = SYM 42149 604 359 = = SYM 42149 604 360 = = SYM 42149 604 361 = = SYM 42149 604 362 = = NFP 42149 604 363 = = SYM 42149 604 364 + + SYM 42149 604 365 = = SYM 42149 604 366 = = SYM 42149 604 367 = = SYM 42149 604 368 = = SYM 42149 604 369 = = SYM 42149 604 370 = = NFP 42149 604 371 = = SYM 42149 604 372 + + SYM 42149 604 373 = = SYM 42149 604 374 = = SYM 42149 604 375 = = SYM 42149 604 376 = = NFP 42149 604 377 + + CC 42149 604 378 The the DT 42149 604 379 work work NN 42149 604 380 done do VBN 42149 604 381 during during IN 42149 604 382 the the DT 42149 604 383 5 5 CD 42149 604 384 months month NNS 42149 604 385 when when WRB 42149 604 386 these these DT 42149 604 387 analyzed analyze VBN 42149 604 388 cost cost NN 42149 604 389 figures figure NNS 42149 604 390 were be VBD 42149 604 391 kept keep VBN 42149 604 392 includes include VBZ 42149 604 393 280 280 CD 42149 604 394 ft ft NN 42149 604 395 . . NN 42149 604 396 of of IN 42149 604 397 bench bench NNP 42149 604 398 and and CC 42149 604 399 220 220 CD 42149 604 400 ft ft NN 42149 604 401 . . NN 42149 604 402 of of IN 42149 604 403 heading head VBG 42149 604 404 . . . 42149 605 1 This this DT 42149 605 2 excess excess NN 42149 605 3 of of IN 42149 605 4 bench bench NN 42149 605 5 over over IN 42149 605 6 heading heading NN 42149 605 7 causes cause NNS 42149 605 8 the the DT 42149 605 9 general general JJ 42149 605 10 average average JJ 42149 605 11 amounts amount NNS 42149 605 12 per per IN 42149 605 13 cubic cubic JJ 42149 605 14 yard yard NN 42149 605 15 to to TO 42149 605 16 be be VB 42149 605 17 too too RB 42149 605 18 low low JJ 42149 605 19 . . . 42149 606 1 [ [ -LRB- 42149 606 2 E e NN 42149 606 3 ] ] -RRB- 42149 606 4 Actual actual JJ 42149 606 5 amount amount NN 42149 606 6 of of IN 42149 606 7 excavation excavation NN 42149 606 8 . . . 42149 607 1 [ [ -LRB- 42149 607 2 F F NNP 42149 607 3 ] ] -RRB- 42149 607 4 Amount Amount NNP 42149 607 5 of of IN 42149 607 6 excavation excavation NN 42149 607 7 paid pay VBN 42149 607 8 for for IN 42149 607 9 . . . 42149 608 1 [ [ -LRB- 42149 608 2 Illustration illustration NN 42149 608 3 : : : 42149 608 4 24 24 CD 42149 608 5 ' ' CD 42149 608 6 6 6 CD 42149 608 7 " " `` 42149 608 8 SPAN SPAN NNP 42149 608 9 TWIN twin NN 42149 608 10 TUNNELS TUNNELS NNP 42149 608 11 DETAILS detail NNS 42149 608 12 OF of IN 42149 608 13 METHOD METHOD NNP 42149 608 14 OF of IN 42149 608 15 DRILLING DRILLING NNP 42149 608 16 AND and CC 42149 608 17 BLASTING blast VBG 42149 608 18 IN in IN 42149 608 19 A a NN 42149 608 20 TYPICAL typical NN 42149 608 21 ( ( -LRB- 42149 608 22 NOT not RB 42149 608 23 EXACT exact JJ 42149 608 24 AVERAGE average NN 42149 608 25 ) ) -RRB- 42149 608 26 SECTION section NN 42149 608 27 ] ] -RRB- 42149 608 28 + + CC 42149 608 29 ---------+--------+--------+-----+-----+------+------+-------+ ---------+--------+--------+-----+-----+------+------+-------+ NFP 42149 608 30 | | NNP 42149 608 31 Drilling drilling NN 42149 608 32 and and CC 42149 608 33 Firing Firing NNP 42149 608 34 Data Data NNP 42149 608 35 for for IN 42149 608 36 | | CD 42149 608 37 | | NNS 42149 608 38 Each each DT 42149 608 39 Sub sub NN 42149 608 40 - - HYPH 42149 608 41 division division NN 42149 608 42 of of IN 42149 608 43 Section Section NNP 42149 608 44 | | NNP 42149 608 45 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 608 46 | | NNP 42149 608 47 Sub Sub NNP 42149 608 48 | | NNP 42149 608 49 Volume Volume NNP 42149 608 50 | | NNP 42149 608 51 No no NN 42149 608 52 . . . 42149 609 1 of of IN 42149 609 2 | | NNP 42149 609 3 No no NN 42149 609 4 . . . 42149 610 1 | | NNS 42149 610 2 No no NN 42149 610 3 . . . 42149 611 1 |Total |total JJ 42149 611 2 |Linear| |Linear| NNS 42149 611 3 Total total JJ 42149 611 4 | | CD 42149 611 5 |divisions|of |divisions|of CC 42149 611 6 each each DT 42149 611 7 |sets |sets CD 42149 611 8 of of IN 42149 611 9 | | NNP 42149 611 10 of of IN 42149 611 11 | | NNP 42149 611 12 of of IN 42149 611 13 | | NNP 42149 611 14 lbs lb NNS 42149 611 15 . . . 42149 612 1 | | JJ 42149 612 2 feet foot NNS 42149 612 3 |length |length CD 42149 612 4 | | CD 42149 612 5 | | CD 42149 612 6 | | CD 42149 612 7 sub- sub- JJ 42149 612 8 | | CD 42149 612 9 holes hole NNS 42149 612 10 |holes|times| |holes|times| NN 42149 612 11 of of IN 42149 612 12 | | CD 42149 612 13 of of IN 42149 612 14 |drilled| |drilled| NNP 42149 612 15 | | NNP 42149 612 16 |division| |division| NNP 42149 612 17 | | NNP 42149 612 18 in in IN 42149 612 19 |fired|powder|tunnel| |fired|powder|tunnel| NNP 42149 612 20 | | NNP 42149 612 21 | | CD 42149 612 22 |paid |paid CD 42149 612 23 for| for| NNP 42149 612 24 | | CD 42149 612 25 set set VBN 42149 612 26 | | CD 42149 612 27 | | NNS 42149 612 28 per per IN 42149 612 29 |broken| |broken| NNP 42149 612 30 | | NNP 42149 612 31 | | NNP 42149 612 32 | | CD 42149 612 33 | | CD 42149 612 34 | | CD 42149 612 35 | | CD 42149 612 36 | | CD 42149 612 37 hole hole NN 42149 612 38 | | CD 42149 612 39 | | CD 42149 612 40 | | CD 42149 612 41 | | CD 42149 612 42 | | CD 42149 612 43 | | CD 42149 612 44 | | CD 42149 612 45 | | CD 42149 612 46 |fired |fired CD 42149 612 47 | | CD 42149 612 48 | | CD 42149 612 49 | | NNP 42149 612 50 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 51 | | NNP 42149 612 52 _ _ NNP 42149 612 53 a a DT 42149 612 54 _ _ NNP 42149 612 55 | | NNP 42149 612 56 _ _ NNP 42149 612 57 b b NNP 42149 612 58 _ _ NNP 42149 612 59 | | NNP 42149 612 60 _ _ NNP 42149 612 61 c c NNP 42149 612 62 _ _ NNP 42149 612 63 | | NNP 42149 612 64 _ _ NNP 42149 612 65 d d NNP 42149 612 66 _ _ NNP 42149 612 67 | | NNP 42149 612 68 _ _ NNP 42149 612 69 e e NNP 42149 612 70 _ _ NNP 42149 612 71 | | NNP 42149 612 72 _ _ NNP 42149 612 73 f f NNP 42149 612 74 _ _ NNP 42149 612 75 | | NNP 42149 612 76 _ _ NNP 42149 612 77 g g NNP 42149 612 78 _ _ NNP 42149 612 79 | | NNP 42149 612 80 _ _ NNP 42149 612 81 h h NNP 42149 612 82 _ _ NNP 42149 612 83 | | NNP 42149 612 84 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 85 | | NNP 42149 612 86 _ _ NNP 42149 612 87 A A NNP 42149 612 88 _ _ NNP 42149 612 89 | | NNP 42149 612 90 17.775 17.775 CD 42149 612 91 | | NNS 42149 612 92 { { -LRB- 42149 612 93 [ [ -LRB- 42149 612 94 G g NN 42149 612 95 ] ] -RRB- 42149 612 96 1 1 CD 42149 612 97 | | CD 42149 612 98 6 6 CD 42149 612 99 | | CD 42149 612 100 3 3 CD 42149 612 101 | | CD 42149 612 102 4.50 4.50 CD 42149 612 103 | | CD 42149 612 104 | | CD 42149 612 105 | | CD 42149 612 106 | | CD 42149 612 107 | | CD 42149 612 108 | | CD 42149 612 109 { { -LRB- 42149 612 110 [ [ -LRB- 42149 612 111 H h NN 42149 612 112 ] ] -RRB- 42149 612 113 1 1 CD 42149 612 114 | | CD 42149 612 115 9 9 CD 42149 612 116 | | CD 42149 612 117 1 1 CD 42149 612 118 | | CD 42149 612 119 1.50 1.50 CD 42149 612 120 | | CD 42149 612 121 | | CD 42149 612 122 | | CD 42149 612 123 | | CD 42149 612 124 | | CD 42149 612 125 | | CD 42149 612 126 { { -LRB- 42149 612 127 [ [ -LRB- 42149 612 128 I i NN 42149 612 129 ] ] -RRB- 42149 612 130 1 1 CD 42149 612 131 | | CD 42149 612 132 6 6 CD 42149 612 133 | | CD 42149 612 134 1 1 CD 42149 612 135 | | CD 42149 612 136 1.00 1.00 CD 42149 612 137 | | CD 42149 612 138 | | CD 42149 612 139 | | CD 42149 612 140 | | CD 42149 612 141 | | CD 42149 612 142 | | CD 42149 612 143 { { -LRB- 42149 612 144 [ [ -LRB- 42149 612 145 J J NNP 42149 612 146 ] ] -RRB- 42149 612 147 1 1 CD 42149 612 148 | | CD 42149 612 149 6 6 CD 42149 612 150 | | CD 42149 612 151 1 1 CD 42149 612 152 | | CD 42149 612 153 0.75 0.75 CD 42149 612 154 | | CD 42149 612 155 6.0 6.0 CD 42149 612 156 | | CD 42149 612 157 195 195 CD 42149 612 158 | | CD 42149 612 159 | | CD 42149 612 160 | | CD 42149 612 161 | | CD 42149 612 162 | | CD 42149 612 163 | | CD 42149 612 164 | | CD 42149 612 165 | | CD 42149 612 166 | | CD 42149 612 167 | | CD 42149 612 168 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NN 42149 612 169 | | NNP 42149 612 170 _ _ NNP 42149 612 171 A A NNP 42149 612 172 ' ' '' 42149 612 173 _ _ NNP 42149 612 174 | | NNP 42149 612 175 1.00 1.00 CD 42149 612 176 | | CD 42149 612 177 2 2 CD 42149 612 178 | | CD 42149 612 179 3 3 CD 42149 612 180 - - SYM 42149 612 181 4 4 CD 42149 612 182 | | CD 42149 612 183 1 1 CD 42149 612 184 | | CD 42149 612 185 0.25 0.25 CD 42149 612 186 | | CD 42149 612 187 5.0 5.0 CD 42149 612 188 | | CD 42149 612 189 21 21 CD 42149 612 190 | | CD 42149 612 191 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 192 | | NNP 42149 612 193 _ _ NNP 42149 612 194 B B NNP 42149 612 195 _ _ NNP 42149 612 196 | | NNP 42149 612 197 5.925 5.925 CD 42149 612 198 | | CD 42149 612 199 { { -LRB- 42149 612 200 [ [ -LRB- 42149 612 201 G g NN 42149 612 202 ] ] -RRB- 42149 612 203 2 2 CD 42149 612 204 | | CD 42149 612 205 3 3 CD 42149 612 206 - - SYM 42149 612 207 4 4 CD 42149 612 208 | | CD 42149 612 209 1 1 CD 42149 612 210 | | CD 42149 612 211 1.00 1.00 CD 42149 612 212 | | CD 42149 612 213 4.0 4.0 CD 42149 612 214 | | CD 42149 612 215 35 35 CD 42149 612 216 | | CD 42149 612 217 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 218 | | NNP 42149 612 219 _ _ NNP 42149 612 220 C C NNP 42149 612 221 _ _ NNP 42149 612 222 | | NNP 42149 612 223 | | CD 42149 612 224 { { -LRB- 42149 612 225 [ [ -LRB- 42149 612 226 K k NN 42149 612 227 ] ] -RRB- 42149 612 228 1 1 CD 42149 612 229 | | CD 42149 612 230 3 3 CD 42149 612 231 | | CD 42149 612 232 2 2 CD 42149 612 233 | | CD 42149 612 234 1.125| 1.125| CD 42149 612 235 | | CD 42149 612 236 | | CD 42149 612 237 | | CD 42149 612 238 | | CD 42149 612 239 33.33 33.33 CD 42149 612 240 | | CD 42149 612 241 4 4 CD 42149 612 242 | | CD 42149 612 243 7 7 CD 42149 612 244 | | CD 42149 612 245 1 1 CD 42149 612 246 | | CD 42149 612 247 1.125| 1.125| CD 42149 612 248 5.0 5.0 CD 42149 612 249 | | CD 42149 612 250 186 186 CD 42149 612 251 | | CD 42149 612 252 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NN 42149 612 253 | | NNP 42149 612 254 _ _ NNP 42149 612 255 D D NNP 42149 612 256 _ _ NNP 42149 612 257 | | NNP 42149 612 258 6.665 6.665 CD 42149 612 259 | | CD 42149 612 260 2 2 CD 42149 612 261 | | CD 42149 612 262 5 5 CD 42149 612 263 - - SYM 42149 612 264 6 6 CD 42149 612 265 | | CD 42149 612 266 1 1 CD 42149 612 267 | | CD 42149 612 268 0.75 0.75 CD 42149 612 269 | | CD 42149 612 270 3.0 3.0 CD 42149 612 271 | | CD 42149 612 272 33 33 CD 42149 612 273 | | CD 42149 612 274 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 275 | | NNP 42149 612 276 | | NNP 42149 612 277 | | CD 42149 612 278 | | CD 42149 612 279 | | CD 42149 612 280 | | CD 42149 612 281 | | CD 42149 612 282 | | CD 42149 612 283 |=========+========+========+=====+=====+======+======+=======| |=========+========+========+=====+=====+======+======+=======| NNP 42149 612 284 | | NNP 42149 612 285 _ _ NNP 42149 612 286 E E NNP 42149 612 287 _ _ NNP 42149 612 288 | | NNP 42149 612 289 50.00 50.00 CD 42149 612 290 | | CD 42149 612 291 | | CD 42149 612 292 5 5 CD 42149 612 293 | | CD 42149 612 294 1 1 CD 42149 612 295 | | CD 42149 612 296 1.50 1.50 CD 42149 612 297 | | CD 42149 612 298 5.0 5.0 CD 42149 612 299 | | CD 42149 612 300 405 405 CD 42149 612 301 | | CD 42149 612 302 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NN 42149 612 303 | | NNP 42149 612 304 _ _ NNP 42149 612 305 F F NNP 42149 612 306 _ _ NNP 42149 612 307 | | NNP 42149 612 308 88.88 88.88 CD 42149 612 309 | | CD 42149 612 310 { { -LRB- 42149 612 311 10.5| 10.5| CD 42149 612 312 4 4 CD 42149 612 313 | | CD 42149 612 314 2 2 CD 42149 612 315 | | CD 42149 612 316 1.50 1.50 CD 42149 612 317 | | CD 42149 612 318 | | CD 42149 612 319 | | CD 42149 612 320 | | CD 42149 612 321 | | CD 42149 612 322 |{[L |{[L NNS 42149 612 323 ] ] -RRB- 42149 612 324 5.0| 5.0| NNP 42149 612 325 4 4 CD 42149 612 326 | | CD 42149 612 327 1 1 CD 42149 612 328 | | CD 42149 612 329 1.50 1.50 CD 42149 612 330 | | CD 42149 612 331 4.0 4.0 CD 42149 612 332 | | CD 42149 612 333 682 682 CD 42149 612 334 | | NNP 42149 612 335 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 336 | | NNP 42149 612 337 _ _ NNP 42149 612 338 G G NNP 42149 612 339 _ _ NNP 42149 612 340 | | NNP 42149 612 341 22.22 22.22 CD 42149 612 342 | | CD 42149 612 343 5.5| 5.5| CD 42149 612 344 4 4 CD 42149 612 345 | | CD 42149 612 346 2 2 CD 42149 612 347 | | CD 42149 612 348 1.00 1.00 CD 42149 612 349 | | CD 42149 612 350 5.0 5.0 CD 42149 612 351 | | CD 42149 612 352 132 132 CD 42149 612 353 | | CD 42149 612 354 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 355 | | NNP 42149 612 356 | | NNP 42149 612 357 | | CD 42149 612 358 | | CD 42149 612 359 | | CD 42149 612 360 | | CD 42149 612 361 | | CD 42149 612 362 | | CD 42149 612 363 |=========+========+========+=====+=====+======+======+=======| |=========+========+========+=====+=====+======+======+=======| NNP 42149 612 364 | | NNP 42149 612 365 _ _ NNP 42149 612 366 H H NNP 42149 612 367 _ _ NNP 42149 612 368 | | NNP 42149 612 369 9.77 9.77 CD 42149 612 370 | | CD 42149 612 371 { { -LRB- 42149 612 372 5 5 CD 42149 612 373 | | CD 42149 612 374 3 3 CD 42149 612 375 | | CD 42149 612 376 1 1 CD 42149 612 377 | | CD 42149 612 378 0.50 0.50 CD 42149 612 379 | | CD 42149 612 380 | | CD 42149 612 381 | | CD 42149 612 382 | | CD 42149 612 383 | | CD 42149 612 384 | | CD 42149 612 385 { { -LRB- 42149 612 386 4 4 CD 42149 612 387 | | CD 42149 612 388 6 6 CD 42149 612 389 | | CD 42149 612 390 1 1 CD 42149 612 391 | | CD 42149 612 392 0.50 0.50 CD 42149 612 393 | | CD 42149 612 394 6.0 6.0 CD 42149 612 395 | | CD 42149 612 396 156 156 CD 42149 612 397 | | CD 42149 612 398 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NN 42149 612 399 | | NNP 42149 612 400 _ _ NNP 42149 612 401 I I NNP 42149 612 402 _ _ NNP 42149 612 403 | | NNP 42149 612 404 26.66 26.66 CD 42149 612 405 | | CD 42149 612 406 8 8 CD 42149 612 407 | | CD 42149 612 408 5 5 CD 42149 612 409 | | CD 42149 612 410 1 1 CD 42149 612 411 | | CD 42149 612 412 1.00 1.00 CD 42149 612 413 | | CD 42149 612 414 6.0 6.0 CD 42149 612 415 | | CD 42149 612 416 252 252 CD 42149 612 417 | | CD 42149 612 418 |---------+--------+--------+-----+-----+------+------+-------| |---------+--------+--------+-----+-----+------+------+-------| NNP 42149 612 419 | | NNP 42149 612 420 | | NNP 42149 612 421 | | CD 42149 612 422 | | CD 42149 612 423 | | CD 42149 612 424 | | CD 42149 612 425 | | CD 42149 612 426 | | CD 42149 612 427 | | CD 42149 612 428 | | NNP 42149 612 429 |========+=====+=====+======+======+=======| |========+=====+=====+======+======+=======| NNP 42149 612 430 | | NNP 42149 612 431 | | NNP 42149 612 432 | | NNP 42149 612 433 | | CD 42149 612 434 | | CD 42149 612 435 | | CD 42149 612 436 | | CD 42149 612 437 | | CD 42149 612 438 | | CD 42149 612 439 | | CD 42149 612 440 | | CD 42149 612 441 | | CD 42149 612 442 | | CD 42149 612 443 | | NNP 42149 612 444 |========+=====+=====+======+======+=======| |========+=====+=====+======+======+=======| NNP 42149 612 445 | | NNP 42149 612 446 | | NNP 42149 612 447 | | CD 42149 612 448 | | CD 42149 612 449 + + NNS 42149 612 450 ---------+--------+--------+-----+-----+------+------+-------+ ---------+--------+--------+-----+-----+------+------+-------+ NN 42149 612 451 + + CC 42149 612 452 ---------+------+-------+------+------+---------+-------+------+ ---------+------+-------+------+------+---------+-------+------+ NFP 42149 612 453 | | NNP 42149 612 454 Drilling Drilling NNP 42149 612 455 and and CC 42149 612 456 Firing Firing NNP 42149 612 457 Data Data NNP 42149 612 458 for for IN 42149 612 459 | | CD 42149 612 460 | | NNP 42149 612 461 Total Total NNP 42149 612 462 Sections Sections NNPS 42149 612 463 | | NNP 42149 612 464 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 612 465 | | NNP 42149 612 466 Sub Sub NNP 42149 612 467 |Total |Total NNP 42149 612 468 |Length |length NN 42149 612 469 | | NNP 42149 612 470 Cu cu NN 42149 612 471 . . . 42149 613 1 | | NNS 42149 613 2 Cu Cu NNP 42149 613 3 . . . 42149 614 1 | | NNP 42149 614 2 Total Total NNP 42149 614 3 | | NNP 42149 614 4 Total Total NNP 42149 614 5 | | NNP 42149 614 6 Total| Total| NNP 42149 614 7 |divisions|length|drilled| |divisions|length|drilled| CD 42149 614 8 yds yds NNP 42149 614 9 . . . 42149 615 1 | | NNP 42149 615 2 yds yds NNP 42149 615 3 . . . 42149 616 1 | | NNS 42149 616 2 lbs lbs NN 42149 616 3 . . . 42149 617 1 of of IN 42149 617 2 |lbs |lbs NNP 42149 617 3 . . . 42149 618 1 of| of| NNP 42149 618 2 lbs lbs NNP 42149 618 3 . . . 42149 619 1 | | NNP 42149 619 2 | | CD 42149 619 3 | | CD 42149 619 4 of of IN 42149 619 5 | | CD 42149 619 6 per per IN 42149 619 7 | | CD 42149 619 8 per per IN 42149 619 9 | | CD 42149 619 10 per per IN 42149 619 11 | | CD 42149 619 12 powder powder NN 42149 619 13 | | NNP 42149 619 14 powder| powder| NNP 42149 619 15 of of IN 42149 619 16 | | NNP 42149 619 17 | | NNS 42149 619 18 |simi- |simi- NNP 42149 619 19 |linear |linear CD 42149 619 20 |linear|linear| |linear|linear| NNS 42149 619 21 per per IN 42149 619 22 | | CD 42149 619 23 per per IN 42149 619 24 |powder| |powder| NNP 42149 619 25 | | NNP 42149 619 26 |lar |lar NNP 42149 619 27 |foot |foot CD 42149 619 28 of| of| NNP 42149 619 29 foot foot NN 42149 619 30 | | HYPH 42149 619 31 foot foot NN 42149 619 32 | | CD 42149 619 33 linear linear JJ 42149 619 34 | | HYPH 42149 619 35 foot foot NN 42149 619 36 | | NNP 42149 619 37 per per IN 42149 619 38 | | NNP 42149 619 39 | | NNP 42149 619 40 |head- |head- NNP 42149 619 41 |tunnel |tunnel CD 42149 619 42 | | CD 42149 619 43 of of IN 42149 619 44 | | NNP 42149 619 45 of of IN 42149 619 46 | | CD 42149 619 47 foot foot NN 42149 619 48 of of IN 42149 619 49 |drilled|cubic |drilled|cubic NNP 42149 619 50 | | NNP 42149 619 51 | | NNP 42149 619 52 |ings |ings CD 42149 619 53 | | NNP 42149 619 54 |tunnel|tunnel| |tunnel|tunnel| NNP 42149 619 55 tunnel tunnel NN 42149 619 56 | | NNP 42149 619 57 | | CD 42149 619 58 yard yard NN 42149 619 59 | | NNP 42149 619 60 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 61 | | NNP 42149 619 62 _ _ NNP 42149 619 63 a a DT 42149 619 64 _ _ NNP 42149 619 65 | | NNP 42149 619 66 _ _ NNP 42149 619 67 i i PRP 42149 619 68 _ _ NNP 42149 619 69 | | NNP 42149 619 70 _ _ NNP 42149 619 71 j j NNP 42149 619 72 _ _ NNP 42149 619 73 | | NNP 42149 619 74 _ _ NNP 42149 619 75 k k NNP 42149 619 76 _ _ NNP 42149 619 77 | | NNP 42149 619 78 _ _ NNP 42149 619 79 l l NNP 42149 619 80 _ _ NNP 42149 619 81 | | NNP 42149 619 82 _ _ NNP 42149 619 83 m m NNP 42149 619 84 _ _ NNP 42149 619 85 | | NNP 42149 619 86 _ _ NNP 42149 619 87 n n CC 42149 619 88 _ _ NNP 42149 619 89 | | NNP 42149 619 90 _ _ NNP 42149 619 91 o o NNP 42149 619 92 _ _ NNP 42149 619 93 | | NNP 42149 619 94 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 95 | | NNP 42149 619 96 _ _ NNP 42149 619 97 A A NNP 42149 619 98 _ _ NNP 42149 619 99 | | NNP 42149 619 100 |Sigma |Sigma NNP 42149 619 101 | | NNP 42149 619 102 | | NNP 42149 619 103 | | CD 42149 619 104 | | CD 42149 619 105 | | CD 42149 619 106 | | CD 42149 619 107 | | CD 42149 619 108 | | CD 42149 619 109 | | CD 42149 619 110 c c NN 42149 619 111 + + SYM 42149 619 112 d d NN 42149 619 113 |b |b NNP 42149 619 114 + + CC 42149 619 115 i i PRP 42149 619 116 | | VBD 42149 619 117 j j NNP 42149 619 118 |c |c NN 42149 619 119 + + SYM 42149 619 120 d d NN 42149 619 121 + + SYM 42149 619 122 f| f| NN 42149 619 123 m m NNP 42149 619 124 | | NNP 42149 619 125 m m NNP 42149 619 126 | | NNP 42149 619 127 | | NNP 42149 619 128 | | CD 42149 619 129 | | CD 42149 619 130 ----- ----- NFP 42149 619 131 |------| |------| NNP 42149 619 132 --- --- : 42149 619 133 | | NNP 42149 619 134 ----- ----- CD 42149 619 135 | | NNP 42149 619 136 --- --- : 42149 619 137 | | CD 42149 619 138 --- --- : 42149 619 139 | | CD 42149 619 140 | | CD 42149 619 141 | | CD 42149 619 142 | | NNP 42149 619 143 g g NN 42149 619 144 | | NNP 42149 619 145 g g NNP 42149 619 146 | | NNP 42149 619 147 k k NNP 42149 619 148 | | NNP 42149 619 149 g g NNP 42149 619 150 | | NNP 42149 619 151 j j NNP 42149 619 152 | | NNP 42149 619 153 k k NNP 42149 619 154 | | NNP 42149 619 155 | | CD 42149 619 156 | | CD 42149 619 157 2 2 CD 42149 619 158 | | CD 42149 619 159 65.00 65.00 CD 42149 619 160 | | NNS 42149 619 161 5.925|10.97 5.925|10.97 CD 42149 619 162 | | CD 42149 619 163 17.00 17.00 CD 42149 619 164 | | CD 42149 619 165 0.261 0.261 CD 42149 619 166 |2.848 |2.848 CD 42149 619 167 | | CD 42149 619 168 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 169 | | NNP 42149 619 170 _ _ NNP 42149 619 171 A A NNP 42149 619 172 ' ' '' 42149 619 173 _ _ NNP 42149 619 174 | | NNP 42149 619 175 2 2 CD 42149 619 176 | | CD 42149 619 177 8.40 8.40 CD 42149 619 178 | | CD 42149 619 179 0.400|21.00 0.400|21.00 CD 42149 619 180 | | CD 42149 619 181 0.70 0.70 CD 42149 619 182 | | CD 42149 619 183 0.166 0.166 CD 42149 619 184 |1.750 |1.750 SYM 42149 619 185 | | CD 42149 619 186 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 187 | | NNP 42149 619 188 _ _ NNP 42149 619 189 B B NNP 42149 619 190 _ _ NNP 42149 619 191 | | NNP 42149 619 192 2 2 CD 42149 619 193 | | CD 42149 619 194 17.50 17.50 CD 42149 619 195 | | CD 42149 619 196 2.962| 2.962| CD 42149 619 197 5.90 5.90 CD 42149 619 198 | | CD 42149 619 199 3.50 3.50 CD 42149 619 200 | | CD 42149 619 201 0.200 0.200 CD 42149 619 202 |1.181 |1.181 CD 42149 619 203 | | CD 42149 619 204 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 205 | | NNP 42149 619 206 _ _ NNP 42149 619 207 C C NNP 42149 619 208 _ _ NNP 42149 619 209 | | NNP 42149 619 210 | | NNP 42149 619 211 | | CD 42149 619 212 | | CD 42149 619 213 | | CD 42149 619 214 | | CD 42149 619 215 | | CD 42149 619 216 | | CD 42149 619 217 | | CD 42149 619 218 | | CD 42149 619 219 1 1 CD 42149 619 220 | | CD 42149 619 221 37.20 37.20 CD 42149 619 222 | | CD 42149 619 223 6.666| 6.666| NNP 42149 619 224 5.58 5.58 CD 42149 619 225 | | CD 42149 619 226 6.975 6.975 CD 42149 619 227 | | CD 42149 619 228 0.187 0.187 CD 42149 619 229 |1.046 |1.046 NNS 42149 619 230 | | CD 42149 619 231 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 232 | | NNP 42149 619 233 _ _ NNP 42149 619 234 D D NNP 42149 619 235 _ _ NNP 42149 619 236 | | NNP 42149 619 237 2 2 CD 42149 619 238 | | CD 42149 619 239 22.00 22.00 CD 42149 619 240 | | CD 42149 619 241 4.444| 4.444| CD 42149 619 242 4.95 4.95 CD 42149 619 243 | | CD 42149 619 244 5.500 5.500 CD 42149 619 245 | | CD 42149 619 246 0.250 0.250 CD 42149 619 247 |1.237 |1.237 CD 42149 619 248 | | CD 42149 619 249 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| JJ 42149 619 250 |Total |total JJ 42149 619 251 for| for| NN 42149 619 252 |150.10 |150.10 CD 42149 619 253 |20.397| |20.397| JJ 42149 619 254 7.81 7.81 CD 42149 619 255 | | CD 42149 619 256 33.675 33.675 CD 42149 619 257 | | CD 42149 619 258 0.227 0.227 CD 42149 619 259 |1.778 |1.778 CD 42149 619 260 | | CD 42149 619 261 | | CD 42149 619 262 Heading Heading NNP 42149 619 263 | | NNP 42149 619 264 | | NNP 42149 619 265 | | CD 42149 619 266 | | CD 42149 619 267 | | CD 42149 619 268 | | CD 42149 619 269 | | CD 42149 619 270 | | NNP 42149 619 271 |=========+======+=======+======+======+=========+=======+======| |=========+======+=======+======+======+=========+=======+======| NNP 42149 619 272 | | HYPH 42149 619 273 _ _ NNP 42149 619 274 E E NNP 42149 619 275 _ _ NNP 42149 619 276 | | NNP 42149 619 277 1 1 CD 42149 619 278 | | CD 42149 619 279 81.00 81.00 CD 42149 619 280 |10.000| |10.000| NN 42149 619 281 8.10 8.10 CD 42149 619 282 | | CD 42149 619 283 13.500 13.500 CD 42149 619 284 | | CD 42149 619 285 0.167 0.167 CD 42149 619 286 |1.350 |1.350 CD 42149 619 287 | | CD 42149 619 288 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 289 | | NNP 42149 619 290 _ _ NNP 42149 619 291 F F NNP 42149 619 292 _ _ NNP 42149 619 293 | | NNP 42149 619 294 | | NNP 42149 619 295 | | CD 42149 619 296 | | CD 42149 619 297 | | CD 42149 619 298 | | CD 42149 619 299 | | CD 42149 619 300 | | CD 42149 619 301 | | CD 42149 619 302 | | CD 42149 619 303 1 1 CD 42149 619 304 |170.50 |170.50 CD 42149 619 305 |22.222| |22.222| JJ 42149 619 306 7.67 7.67 CD 42149 619 307 | | CD 42149 619 308 23.230 23.230 CD 42149 619 309 | | CD 42149 619 310 0.136 0.136 CD 42149 619 311 |1.046 |1.046 SYM 42149 619 312 | | CD 42149 619 313 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 314 | | NNP 42149 619 315 _ _ NNP 42149 619 316 G G NNP 42149 619 317 _ _ NNP 42149 619 318 | | NNP 42149 619 319 1 1 CD 42149 619 320 | | CD 42149 619 321 26.40 26.40 CD 42149 619 322 | | CD 42149 619 323 4.444| 4.444| CD 42149 619 324 5.94 5.94 CD 42149 619 325 | | CD 42149 619 326 4.400 4.400 CD 42149 619 327 | | CD 42149 619 328 0.166 0.166 CD 42149 619 329 |0.990 |0.990 CD 42149 619 330 | | CD 42149 619 331 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 332 |Total |total JJ 42149 619 333 for| for| CD 42149 619 334 |277.90 |277.90 CD 42149 619 335 |36.666| |36.666| NN 42149 619 336 7.56 7.56 CD 42149 619 337 | | CD 42149 619 338 41.150 41.150 CD 42149 619 339 | | CD 42149 619 340 0.150 0.150 CD 42149 619 341 |1.133 |1.133 NN 42149 619 342 | | CD 42149 619 343 | | NNP 42149 619 344 Bench Bench NNP 42149 619 345 | | NNP 42149 619 346 | | NNP 42149 619 347 | | CD 42149 619 348 | | CD 42149 619 349 | | CD 42149 619 350 | | CD 42149 619 351 | | CD 42149 619 352 | | NNP 42149 619 353 |=========+======+=======+======+======+=========+=======+======| |=========+======+=======+======+======+=========+=======+======| NNP 42149 619 354 | | HYPH 42149 619 355 _ _ NNP 42149 619 356 H H NNP 42149 619 357 _ _ NNP 42149 619 358 | | NNP 42149 619 359 | | NNP 42149 619 360 | | CD 42149 619 361 | | CD 42149 619 362 | | CD 42149 619 363 | | CD 42149 619 364 | | CD 42149 619 365 | | CD 42149 619 366 | | CD 42149 619 367 | | CD 42149 619 368 1 1 CD 42149 619 369 | | CD 42149 619 370 26.00 26.00 CD 42149 619 371 | | CD 42149 619 372 1.628|15.96 1.628|15.96 CD 42149 619 373 | | CD 42149 619 374 3.250 3.250 CD 42149 619 375 | | CD 42149 619 376 0.125 0.125 CD 42149 619 377 |1.995 |1.995 CD 42149 619 378 | | CD 42149 619 379 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNP 42149 619 380 | | NNP 42149 619 381 _ _ NNP 42149 619 382 I I NNP 42149 619 383 _ _ NNP 42149 619 384 | | NNP 42149 619 385 2 2 CD 42149 619 386 | | CD 42149 619 387 84.00 84.00 CD 42149 619 388 | | CD 42149 619 389 4.444|18.90 4.444|18.90 CD 42149 619 390 | | CD 42149 619 391 13.333 13.333 CD 42149 619 392 | | CD 42149 619 393 0.158 0.158 CD 42149 619 394 |3.000 |3.000 CD 42149 619 395 | | CD 42149 619 396 |---------+------+-------+------+------+---------+-------+------| |---------+------+-------+------+------+---------+-------+------| NNS 42149 619 397 |Total |Total NNP 42149 619 398 of of IN 42149 619 399 | | CD 42149 619 400 |110.00 |110.00 CD 42149 619 401 | | NNP 42149 619 402 6.072|18.10 6.072|18.10 CD 42149 619 403 | | NNP 42149 619 404 16.583 16.583 CD 42149 619 405 | | CD 42149 619 406 0.151 0.151 CD 42149 619 407 |2.731 |2.731 CD 42149 619 408 | | CD 42149 619 409 | | NNP 42149 619 410 Trench Trench NNP 42149 619 411 | | NNP 42149 619 412 | | NNP 42149 619 413 | | CD 42149 619 414 | | CD 42149 619 415 | | CD 42149 619 416 | | CD 42149 619 417 | | CD 42149 619 418 | | CD 42149 619 419 |=========+======+=======+======+======+=========+=======+======| |=========+======+=======+======+======+=========+=======+======| NN 42149 619 420 |Total |total JJ 42149 619 421 for| for| NN 42149 619 422 |548.00 |548.00 CD 42149 619 423 |63.135| |63.135| NNP 42149 619 424 8.95 8.95 CD 42149 619 425 | | CD 42149 619 426 91.408 91.408 CD 42149 619 427 | | CD 42149 619 428 0.172 0.172 CD 42149 619 429 |1.446 |1.446 CD 42149 619 430 | | CD 42149 619 431 | | NNP 42149 619 432 Whole Whole NNP 42149 619 433 | | NNP 42149 619 434 | | CD 42149 619 435 | | CD 42149 619 436 | | CD 42149 619 437 | | CD 42149 619 438 | | CD 42149 619 439 | | CD 42149 619 440 | | CD 42149 619 441 |Section |section CD 42149 619 442 | | NNP 42149 619 443 | | CD 42149 619 444 | | CD 42149 619 445 | | CD 42149 619 446 | | CD 42149 619 447 | | CD 42149 619 448 | | CD 42149 619 449 | | CD 42149 619 450 |=========+======+=======+======+======+=========+=======+======| |=========+======+=======+======+======+=========+=======+======| NN 42149 619 451 |Powder |Powder NNS 42149 619 452 taken take VBN 42149 619 453 at at IN 42149 619 454 0.5 0.5 CD 42149 619 455 lb lb IN 42149 619 456 . . . 42149 620 1 per per IN 42149 620 2 stick stick NN 42149 620 3 | | CD 42149 620 4 + + NNS 42149 620 5 ---------+------+-------+------+------+---------+-------+------+ ---------+------+-------+------+------+---------+-------+------+ . 42149 620 6 [ [ -LRB- 42149 620 7 G g NN 42149 620 8 ] ] -RRB- 42149 620 9 6 6 CD 42149 620 10 Cut Cut NNP 42149 620 11 Holes-8 Holes-8 NNP 42149 620 12 feet foot NNS 42149 620 13 ( ( -LRB- 42149 620 14 Black black JJ 42149 620 15 circle circle NN 42149 620 16 ) ) -RRB- 42149 620 17 [ [ -LRB- 42149 620 18 H h NN 42149 620 19 ] ] -RRB- 42149 620 20 9 9 CD 42149 620 21 First first JJ 42149 620 22 Side side NN 42149 620 23 Rd rd NN 42149 620 24 . . . 42149 621 1 and and CC 42149 621 2 Bottom-7 Bottom-7 NNP 42149 621 3 feet foot NNS 42149 621 4 ( ( -LRB- 42149 621 5 Circle circle NN 42149 621 6 with with IN 42149 621 7 dot dot NN 42149 621 8 in in IN 42149 621 9 it -PRON- PRP 42149 621 10 ) ) -RRB- 42149 621 11 [ [ -LRB- 42149 621 12 I i NN 42149 621 13 ] ] -RRB- 42149 621 14 6 6 CD 42149 621 15 Back back NN 42149 621 16 Round-7 Round-7 NNP 42149 621 17 feet foot NNS 42149 621 18 ( ( -LRB- 42149 621 19 Circle Circle NNP 42149 621 20 with with IN 42149 621 21 line line NN 42149 621 22 in in IN 42149 621 23 it -PRON- PRP 42149 621 24 ) ) -RRB- 42149 621 25 [ [ -LRB- 42149 621 26 J J NNP 42149 621 27 ] ] -RRB- 42149 621 28 6 6 CD 42149 621 29 Top Top NNP 42149 621 30 Back back RP 42149 621 31 Round-7 Round-7 NNP 42149 621 32 feet foot NNS 42149 621 33 ( ( -LRB- 42149 621 34 Circle Circle NNP 42149 621 35 with with IN 42149 621 36 x x NNS 42149 621 37 in in IN 42149 621 38 it -PRON- PRP 42149 621 39 ) ) -RRB- 42149 621 40 [ [ -LRB- 42149 621 41 K K NNP 42149 621 42 ] ] -RRB- 42149 621 43 A a NN 42149 621 44 ' ' '' 42149 621 45 7 7 CD 42149 621 46 Holes-3 Holes-3 NNP 42149 621 47 feet foot NNS 42149 621 48 ( ( -LRB- 42149 621 49 Open open JJ 42149 621 50 circle circle NN 42149 621 51 ) ) -RRB- 42149 621 52 [ [ -LRB- 42149 621 53 L l NN 42149 621 54 ] ] -RRB- 42149 621 55 line line NN 42149 621 56 holes hole NNS 42149 621 57 ( ( -LRB- 42149 621 58 Plus plus CC 42149 621 59 sign sign VB 42149 621 60 ) ) -RRB- 42149 621 61 TABLE TABLE VBZ 42149 621 62 7.--Analysis 7.--analysis CD 42149 621 63 of of IN 42149 621 64 Drilling Drilling NNP 42149 621 65 Time Time NNP 42149 621 66 on on IN 42149 621 67 Section Section NNP 42149 621 68 Gy Gy NNP 42149 621 69 - - HYPH 42149 621 70 East East NNP 42149 621 71 . . . 42149 622 1 + + NFP 42149 622 2 = = SYM 42149 622 3 = = SYM 42149 622 4 = = SYM 42149 622 5 = = SYM 42149 622 6 = = SYM 42149 622 7 = = SYM 42149 622 8 = = NFP 42149 622 9 = = SYM 42149 622 10 + + SYM 42149 622 11 = = SYM 42149 622 12 = = SYM 42149 622 13 = = SYM 42149 622 14 = = SYM 42149 622 15 = = NFP 42149 622 16 = = SYM 42149 622 17 + + SYM 42149 622 18 = = SYM 42149 622 19 = = SYM 42149 622 20 = = SYM 42149 622 21 = = SYM 42149 622 22 = = SYM 42149 622 23 = = SYM 42149 622 24 = = NFP 42149 622 25 = = SYM 42149 622 26 + + SYM 42149 622 27 = = SYM 42149 622 28 = = SYM 42149 622 29 = = SYM 42149 622 30 = = NFP 42149 622 31 = = SYM 42149 622 32 + + SYM 42149 622 33 = = SYM 42149 622 34 = = SYM 42149 622 35 = = SYM 42149 622 36 = = NFP 42149 622 37 = = SYM 42149 622 38 + + SYM 42149 622 39 = = SYM 42149 622 40 = = SYM 42149 622 41 = = SYM 42149 622 42 = = SYM 42149 622 43 = = SYM 42149 622 44 = = NFP 42149 622 45 = = SYM 42149 622 46 + + SYM 42149 622 47 = = SYM 42149 622 48 = = SYM 42149 622 49 = = SYM 42149 622 50 = = SYM 42149 622 51 = = SYM 42149 622 52 = = SYM 42149 622 53 = = NFP 42149 622 54 = = SYM 42149 622 55 + + SYM 42149 622 56 = = SYM 42149 622 57 = = SYM 42149 622 58 = = SYM 42149 622 59 = = SYM 42149 622 60 = = SYM 42149 622 61 = = SYM 42149 622 62 = = NFP 42149 622 63 = = SYM 42149 622 64 + + SYM 42149 622 65 = = SYM 42149 622 66 = = SYM 42149 622 67 = = SYM 42149 622 68 = = SYM 42149 622 69 = = SYM 42149 622 70 = = NFP 42149 622 71 = = SYM 42149 622 72 + + CC 42149 622 73 | | NNP 42149 622 74 | | NNP 42149 622 75 | | CD 42149 622 76 | | CD 42149 622 77 AVERAGE average NN 42149 622 78 TIME time NN 42149 622 79 TAKEN TAKEN NNS 42149 622 80 : : : 42149 622 81 | | CD 42149 622 82 |Position|Nature| |Position|Nature| NNP 42149 622 83 No no NN 42149 622 84 . . . 42149 623 1 of of IN 42149 623 2 |-----+-----+-------+--------+--------+-------| |-----+-----+-------+--------+--------+-------| NNP 42149 623 3 | | NNP 42149 623 4 in in IN 42149 623 5 | | NNP 42149 623 6 of of IN 42149 623 7 | | NNP 42149 623 8 Drill Drill NNP 42149 623 9 | | NNP 42149 623 10 | | NNP 42149 623 11 | | CD 42149 623 12 | | CD 42149 623 13 | | CD 42149 623 14 | | CD 42149 623 15 | | CD 42149 623 16 |Section.|Rock |section.|rock NN 42149 623 17 . . . 42149 624 1 | | NNS 42149 624 2 Shifts shift NNS 42149 624 3 |Set- |Set- NNPS 42149 624 4 |Dril-|Neces- |dril-|neces- XX 42149 624 5 |Unneces-| |unneces-| XX 42149 624 6 Taking Taking NNP 42149 624 7 |Loading| |Loading| NNP 42149 624 8 | | CD 42149 624 9 | | CD 42149 624 10 |observed|ting |observed|ting NNP 42149 624 11 |ling.| |ling.| NNP 42149 624 12 sary sary JJ 42149 624 13 | | NNP 42149 624 14 sary sary NN 42149 624 15 | | HYPH 42149 624 16 down down RP 42149 624 17 | | NNP 42149 624 18 and and CC 42149 624 19 | | NNP 42149 624 20 | | NNP 42149 624 21 | | CD 42149 624 22 | | NNS 42149 624 23 for for IN 42149 624 24 | | CD 42149 624 25 up up RP 42149 624 26 . . . 42149 625 1 | | NNP 42149 625 2 |delays.|delays |delays.|delays NNP 42149 625 3 . . . 42149 626 1 |machine.|firing.| |machine.|firing.| NNP 42149 626 2 | | CD 42149 626 3 | | NNP 42149 626 4 |average.| |average.| NNP 42149 626 5 | | HYPH 42149 626 6 | | NNP 42149 626 7 | | CD 42149 626 8 | | CD 42149 626 9 | | CD 42149 626 10 | | NNP 42149 626 11 |--------+------+--------+-----+-----+-------+--------+--------+-------| |--------+------+--------+-----+-----+-------+--------+--------+-------| NNP 42149 626 12 | | NNP 42149 626 13 | | NNP 42149 626 14 | | NNP 42149 626 15 |h |h NN 42149 626 16 . . . 42149 627 1 m.|h m.|h NNP 42149 627 2 . . . 42149 628 1 m.| m.| NNP 42149 628 2 h. h. NNP 42149 628 3 m. m. NNP 42149 628 4 | | NNP 42149 628 5 h. h. NNP 42149 628 6 m. m. NNP 42149 628 7 | | NNP 42149 628 8 h. h. NNP 42149 628 9 m. m. NNP 42149 628 10 | | NNP 42149 628 11 h. h. NNP 42149 628 12 m. m. NNP 42149 628 13 | | NNP 42149 628 14 | | NNP 42149 628 15 | | NNP 42149 628 16 | | CD 42149 628 17 |-----+-----+-------+--------+--------+-------| |-----+-----+-------+--------+--------+-------| NNP 42149 628 18 |Heading |heading NN 42149 628 19 |Quartz| |quartz| JJ 42149 628 20 8 8 CD 42149 628 21 |0:38 |0:38 NN 42149 628 22 |4:52 |4:52 NNP 42149 628 23 | | CD 42149 628 24 1:40 1:40 CD 42149 628 25 | | CD 42149 628 26 | | CD 42149 628 27 0:05 0:05 CD 42149 628 28 | | CD 42149 628 29 0:04 0:04 CD 42149 628 30 | | CD 42149 628 31 | | CD 42149 628 32 | | CD 42149 628 33 | | CD 42149 628 34 | | CD 42149 628 35 | | CD 42149 628 36 | | CD 42149 628 37 | | CD 42149 628 38 | | CD 42149 628 39 | | CD 42149 628 40 | | CD 42149 628 41 |Heading |heading CD 42149 628 42 | | CD 42149 628 43 Hard Hard NNP 42149 628 44 | | CD 42149 628 45 1 1 CD 42149 628 46 |0:15 |0:15 JJ 42149 628 47 |8:00 |8:00 JJ 42149 628 48 | | NNP 42149 628 49 1:45 1:45 CD 42149 628 50 | | CD 42149 628 51 | | CD 42149 628 52 | | CD 42149 628 53 | | CD 42149 628 54 | | CD 42149 628 55 | | NNP 42149 628 56 mica mica JJ 42149 628 57 | | CD 42149 628 58 | | NNP 42149 628 59 | | CD 42149 628 60 | | CD 42149 628 61 | | CD 42149 628 62 | | CD 42149 628 63 | | CD 42149 628 64 | | CD 42149 628 65 | | NNP 42149 628 66 |schist| |schist| NNP 42149 628 67 | | NNP 42149 628 68 | | NNP 42149 628 69 | | CD 42149 628 70 | | CD 42149 628 71 | | CD 42149 628 72 | | CD 42149 628 73 | | CD 42149 628 74 | | CD 42149 628 75 | | CD 42149 628 76 | | CD 42149 628 77 | | CD 42149 628 78 | | CD 42149 628 79 | | CD 42149 628 80 | | CD 42149 628 81 | | CD 42149 628 82 | | CD 42149 628 83 | | CD 42149 628 84 | | NNP 42149 628 85 Bench Bench NNP 42149 628 86 |Quartz| |quartz| CD 42149 628 87 23 23 CD 42149 628 88 |1:23 |1:23 NNS 42149 628 89 |5:57 |5:57 JJ 42149 628 90 | | CD 42149 628 91 2:23 2:23 CD 42149 628 92 | | CD 42149 628 93 0:05 0:05 CD 42149 628 94 | | CD 42149 628 95 0:05 0:05 CD 42149 628 96 | | CD 42149 628 97 0:07 0:07 CD 42149 628 98 | | CD 42149 628 99 | | CD 42149 628 100 | | CD 42149 628 101 | | CD 42149 628 102 | | CD 42149 628 103 | | CD 42149 628 104 | | CD 42149 628 105 | | CD 42149 628 106 | | CD 42149 628 107 | | CD 42149 628 108 | | CD 42149 628 109 | | NNP 42149 628 110 Bench Bench NNP 42149 628 111 |Medium| |Medium| NNP 42149 628 112 16 16 CD 42149 628 113 |1:10 |1:10 NN 42149 628 114 |6:08 |6:08 JJ 42149 628 115 | | NNP 42149 628 116 1:50 1:50 CD 42149 628 117 | | CD 42149 628 118 0:12 0:12 CD 42149 628 119 | | CD 42149 628 120 0:07 0:07 CD 42149 628 121 | | CD 42149 628 122 0:07 0:07 CD 42149 628 123 | | CD 42149 628 124 | | NNP 42149 628 125 | | NNP 42149 628 126 mica mica JJ 42149 628 127 | | CD 42149 628 128 | | NNP 42149 628 129 | | CD 42149 628 130 | | CD 42149 628 131 | | CD 42149 628 132 | | CD 42149 628 133 | | CD 42149 628 134 | | CD 42149 628 135 | | NNP 42149 628 136 |schist| |schist| NNP 42149 628 137 | | NNP 42149 628 138 | | NNP 42149 628 139 | | CD 42149 628 140 | | CD 42149 628 141 | | CD 42149 628 142 | | CD 42149 628 143 | | CD 42149 628 144 | | CD 42149 628 145 | | CD 42149 628 146 | | CD 42149 628 147 | | CD 42149 628 148 | | CD 42149 628 149 | | CD 42149 628 150 | | CD 42149 628 151 | | CD 42149 628 152 | | CD 42149 628 153 | | NNP 42149 628 154 | | NNP 42149 628 155 Center Center NNP 42149 628 156 |Medium| |Medium| NNP 42149 628 157 10 10 CD 42149 628 158 |0:58 |0:58 JJ 42149 628 159 |5:53 |5:53 CD 42149 628 160 | | CD 42149 628 161 1:33 1:33 CD 42149 628 162 | | CD 42149 628 163 0:06 0:06 CD 42149 628 164 | | CD 42149 628 165 0:12 0:12 CD 42149 628 166 | | CD 42149 628 167 0:30 0:30 CD 42149 628 168 | | HYPH 42149 628 169 | | CD 42149 628 170 trench trench NN 42149 628 171 | | NNP 42149 628 172 mica mica NNP 42149 628 173 | | NNP 42149 628 174 | | NNP 42149 628 175 | | CD 42149 628 176 | | CD 42149 628 177 | | CD 42149 628 178 | | CD 42149 628 179 | | CD 42149 628 180 | | CD 42149 628 181 | | NNP 42149 628 182 |schist| |schist| NNP 42149 628 183 | | NNP 42149 628 184 | | NNP 42149 628 185 | | CD 42149 628 186 | | CD 42149 628 187 | | CD 42149 628 188 | | CD 42149 628 189 | | CD 42149 628 190 | | CD 42149 628 191 | | CD 42149 628 192 | | CD 42149 628 193 | | CD 42149 628 194 | | CD 42149 628 195 | | CD 42149 628 196 | | CD 42149 628 197 | | CD 42149 628 198 | | CD 42149 628 199 | | NNP 42149 628 200 | | NNP 42149 628 201 Center Center NNP 42149 628 202 | | NNP 42149 628 203 Soft Soft NNP 42149 628 204 | | NNP 42149 628 205 9 9 CD 42149 628 206 |1:10 |1:10 NN 42149 628 207 |6:40 |6:40 NN 42149 628 208 | | NNP 42149 628 209 1:17 1:17 CD 42149 628 210 | | CD 42149 628 211 0:10 0:10 CD 42149 628 212 | | CD 42149 628 213 0:20 0:20 CD 42149 628 214 | | CD 42149 628 215 0:23 0:23 CD 42149 628 216 | | CD 42149 628 217 | | CD 42149 628 218 trench trench NN 42149 628 219 | | NNP 42149 628 220 mica mica NNP 42149 628 221 | | NNP 42149 628 222 | | NNP 42149 628 223 | | CD 42149 628 224 | | CD 42149 628 225 | | CD 42149 628 226 | | CD 42149 628 227 | | CD 42149 628 228 | | CD 42149 628 229 | | NNP 42149 628 230 |schist| |schist| NNP 42149 628 231 | | NNP 42149 628 232 | | NNP 42149 628 233 | | CD 42149 628 234 | | CD 42149 628 235 | | CD 42149 628 236 | | CD 42149 628 237 | | NNP 42149 628 238 |--------+------+--------+-----+-----+-------+--------+--------+-------| |--------+------+--------+-----+-----+-------+--------+--------+-------| NNP 42149 628 239 |General |General NNP 42149 628 240 | | CD 42149 628 241 | | CD 42149 628 242 67 67 CD 42149 628 243 |1:08 |1:08 JJ 42149 628 244 |5:58 |5:58 NNP 42149 628 245 | | NNP 42149 628 246 1:53 1:53 CD 42149 628 247 | | CD 42149 628 248 0:07 0:07 CD 42149 628 249 | | CD 42149 628 250 0:09 0:09 CD 42149 628 251 | | CD 42149 628 252 0:12 0:12 CD 42149 628 253 | | CD 42149 628 254 |average |average NNP 42149 628 255 | | CD 42149 628 256 | | CD 42149 628 257 | | CD 42149 628 258 | | CD 42149 628 259 | | CD 42149 628 260 | | CD 42149 628 261 | | CD 42149 628 262 | | CD 42149 628 263 | | NNP 42149 628 264 |--------+------+--------+-----+-----+-------+--------+--------+-------| |--------+------+--------+-----+-----+-------+--------+--------+-------| NNP 42149 628 265 | | NNP 42149 628 266 Per- Per- NNP 42149 628 267 | | HYPH 42149 628 268 | | CD 42149 628 269 |11.3%|59.7%| |11.3%|59.7%| NNP 42149 628 270 18.9 18.9 CD 42149 628 271 % % NN 42149 628 272 | | CD 42149 628 273 1.1 1.1 CD 42149 628 274 % % NN 42149 628 275 | | CD 42149 628 276 1.5 1.5 CD 42149 628 277 % % NN 42149 628 278 | | CD 42149 628 279 2 2 CD 42149 628 280 % % NN 42149 628 281 | | CD 42149 628 282 |centage |centage CD 42149 628 283 | | CD 42149 628 284 | | CD 42149 628 285 | | CD 42149 628 286 | | CD 42149 628 287 | | CD 42149 628 288 | | CD 42149 628 289 | | CD 42149 628 290 | | CD 42149 628 291 | | NNS 42149 628 292 + + NNS 42149 628 293 = = SYM 42149 628 294 = = SYM 42149 628 295 = = SYM 42149 628 296 = = SYM 42149 628 297 = = SYM 42149 628 298 = = SYM 42149 628 299 = = NFP 42149 628 300 = = SYM 42149 628 301 + + SYM 42149 628 302 = = SYM 42149 628 303 = = SYM 42149 628 304 = = SYM 42149 628 305 = = SYM 42149 628 306 = = NFP 42149 628 307 = = SYM 42149 628 308 + + SYM 42149 628 309 = = SYM 42149 628 310 = = SYM 42149 628 311 = = SYM 42149 628 312 = = SYM 42149 628 313 = = SYM 42149 628 314 = = SYM 42149 628 315 = = NFP 42149 628 316 = = SYM 42149 628 317 + + SYM 42149 628 318 = = SYM 42149 628 319 = = SYM 42149 628 320 = = SYM 42149 628 321 = = NFP 42149 628 322 = = SYM 42149 628 323 + + SYM 42149 628 324 = = SYM 42149 628 325 = = SYM 42149 628 326 = = SYM 42149 628 327 = = NFP 42149 628 328 = = SYM 42149 628 329 + + SYM 42149 628 330 = = SYM 42149 628 331 = = SYM 42149 628 332 = = SYM 42149 628 333 = = SYM 42149 628 334 = = SYM 42149 628 335 = = NFP 42149 628 336 = = SYM 42149 628 337 + + SYM 42149 628 338 = = SYM 42149 628 339 = = SYM 42149 628 340 = = SYM 42149 628 341 = = SYM 42149 628 342 = = SYM 42149 628 343 = = SYM 42149 628 344 = = NFP 42149 628 345 = = SYM 42149 628 346 + + SYM 42149 628 347 = = SYM 42149 628 348 = = SYM 42149 628 349 = = SYM 42149 628 350 = = SYM 42149 628 351 = = SYM 42149 628 352 = = SYM 42149 628 353 = = NFP 42149 628 354 = = SYM 42149 628 355 + + SYM 42149 628 356 = = SYM 42149 628 357 = = SYM 42149 628 358 = = SYM 42149 628 359 = = SYM 42149 628 360 = = SYM 42149 628 361 = = NFP 42149 628 362 = = SYM 42149 628 363 + + SYM 42149 628 364 + + SYM 42149 628 365 = = SYM 42149 628 366 = = SYM 42149 628 367 = = SYM 42149 628 368 = = SYM 42149 628 369 = = SYM 42149 628 370 = = SYM 42149 628 371 = = NFP 42149 628 372 = = SYM 42149 628 373 + + SYM 42149 628 374 = = SYM 42149 628 375 = = SYM 42149 628 376 = = SYM 42149 628 377 = = SYM 42149 628 378 = = NFP 42149 628 379 = = SYM 42149 628 380 + + SYM 42149 628 381 = = SYM 42149 628 382 = = SYM 42149 628 383 = = SYM 42149 628 384 = = SYM 42149 628 385 = = SYM 42149 628 386 = = SYM 42149 628 387 = = SYM 42149 628 388 = = NFP 42149 628 389 = = SYM 42149 628 390 + + SYM 42149 628 391 = = SYM 42149 628 392 = = SYM 42149 628 393 = = SYM 42149 628 394 = = SYM 42149 628 395 = = SYM 42149 628 396 = = SYM 42149 628 397 = = NFP 42149 628 398 = = SYM 42149 628 399 + + SYM 42149 628 400 = = SYM 42149 628 401 = = SYM 42149 628 402 = = SYM 42149 628 403 = = SYM 42149 628 404 = = NFP 42149 628 405 = = SYM 42149 628 406 + + SYM 42149 628 407 = = SYM 42149 628 408 = = SYM 42149 628 409 = = SYM 42149 628 410 = = SYM 42149 628 411 = = NFP 42149 628 412 = = SYM 42149 628 413 + + SYM 42149 628 414 = = SYM 42149 628 415 = = SYM 42149 628 416 = = SYM 42149 628 417 = = SYM 42149 628 418 = = SYM 42149 628 419 = = SYM 42149 628 420 = = NFP 42149 628 421 = = SYM 42149 628 422 + + CC 42149 628 423 | | NNP 42149 628 424 | | NNP 42149 628 425 | | CD 42149 628 426 AVERAGE average NN 42149 628 427 TIME time NN 42149 628 428 TAKEN TAKEN NNS 42149 628 429 : : : 42149 628 430 | | NNS 42149 628 431 FEET FEET NNP 42149 628 432 DRILLED DRILLED NNP 42149 628 433 . . . 42149 629 1 | | NNP 42149 629 2 |Position|Nature|---------+--------+------+------+--------| |Position|Nature|---------+--------+------+------+--------| NNP 42149 629 3 | | NNP 42149 629 4 in in IN 42149 629 5 | | NNP 42149 629 6 of of IN 42149 629 7 | | NNP 42149 629 8 | | NNP 42149 629 9 | | CD 42149 629 10 | | CD 42149 629 11 | | CD 42149 629 12 | | CD 42149 629 13 |Section.|Rock |section.|rock NN 42149 629 14 . . . 42149 630 1 | | JJ 42149 630 2 Total total JJ 42149 630 3 |Mucking.|Total.| |mucking.|total.| NN 42149 630 4 Per per IN 42149 630 5 | | CD 42149 630 6 Per per IN 42149 630 7 | | NNP 42149 630 8 | | NNP 42149 630 9 | | NNP 42149 630 10 |drilling.| |drilling.| NNP 42149 630 11 | | NNP 42149 630 12 |shift.|working |shift.|working NNP 42149 630 13 | | NNP 42149 630 14 | | CD 42149 630 15 | | CD 42149 630 16 | | CD 42149 630 17 | | CD 42149 630 18 | | CD 42149 630 19 | | CD 42149 630 20 | | CD 42149 630 21 hour hour NN 42149 630 22 . . . 42149 631 1 | | NNP 42149 631 2 | | CD 42149 631 3 | | CD 42149 631 4 | | CD 42149 631 5 | | CD 42149 631 6 | | CD 42149 631 7 | | CD 42149 631 8 | | CD 42149 631 9 | | CD 42149 631 10 |--------+------+---------+--------+------+------+--------| |--------+------+---------+--------+------+------+--------| NNP 42149 631 11 | | CD 42149 631 12 | | NNP 42149 631 13 | | CD 42149 631 14 h. h. NNP 42149 631 15 m. m. NNP 42149 631 16 | | NNP 42149 631 17 h. h. NNP 42149 631 18 m. m. NNP 42149 631 19 |h |h NNP 42149 631 20 . . . 42149 632 1 m. m. NNP 42149 632 2 | | NNP 42149 632 3 | | NNP 42149 632 4 | | NNP 42149 632 5 | | CD 42149 632 6 | | CD 42149 632 7 |---------+--------+------+------+--------| |---------+--------+------+------+--------| NNP 42149 632 8 |Heading |heading NN 42149 632 9 |Quartz| |quartz| CD 42149 632 10 7:19 7:19 CD 42149 632 11 | | CD 42149 632 12 2:41 2:41 CD 42149 632 13 |10:00 |10:00 NNP 42149 632 14 | | CD 42149 632 15 22.0 22.0 CD 42149 632 16 | | CD 42149 632 17 2.86 2.86 CD 42149 632 18 | | CD 42149 632 19 | | CD 42149 632 20 | | CD 42149 632 21 | | CD 42149 632 22 | | CD 42149 632 23 | | CD 42149 632 24 | | CD 42149 632 25 | | CD 42149 632 26 | | CD 42149 632 27 |Heading |heading CD 42149 632 28 | | CD 42149 632 29 Hard hard JJ 42149 632 30 | | CD 42149 632 31 10:00 10:00 CD 42149 632 32 | | NNP 42149 632 33 |10:00 |10:00 NNP 42149 632 34 | | HYPH 42149 632 35 42.0 42.0 CD 42149 632 36 | | CD 42149 632 37 4.20 4.20 CD 42149 632 38 | | CD 42149 632 39 | | CD 42149 632 40 | | NNP 42149 632 41 mica mica JJ 42149 632 42 | | CD 42149 632 43 | | NNP 42149 632 44 | | CD 42149 632 45 | | CD 42149 632 46 | | CD 42149 632 47 | | CD 42149 632 48 | | NNP 42149 632 49 |schist| |schist| NNP 42149 632 50 | | NNP 42149 632 51 | | NNP 42149 632 52 | | CD 42149 632 53 | | CD 42149 632 54 | | CD 42149 632 55 | | CD 42149 632 56 | | CD 42149 632 57 | | CD 42149 632 58 | | CD 42149 632 59 | | CD 42149 632 60 | | CD 42149 632 61 | | CD 42149 632 62 | | CD 42149 632 63 | | NNP 42149 632 64 Bench Bench NNP 42149 632 65 |Quartz| |quartz| CD 42149 632 66 10:00 10:00 CD 42149 632 67 | | CD 42149 632 68 |10:00 |10:00 NNP 42149 632 69 | | HYPH 42149 632 70 25.9 25.9 CD 42149 632 71 | | CD 42149 632 72 2.59 2.59 CD 42149 632 73 | | CD 42149 632 74 | | CD 42149 632 75 | | CD 42149 632 76 | | CD 42149 632 77 | | CD 42149 632 78 | | CD 42149 632 79 | | CD 42149 632 80 | | CD 42149 632 81 | | CD 42149 632 82 | | NNP 42149 632 83 Bench Bench NNP 42149 632 84 |Medium| |Medium| NNP 42149 632 85 9:34 9:34 CD 42149 632 86 | | CD 42149 632 87 0:26 0:26 NNP 42149 632 88 |10:00 |10:00 NNP 42149 632 89 | | CD 42149 632 90 22.22| 22.22| CD 42149 632 91 2.32 2.32 CD 42149 632 92 | | CD 42149 632 93 | | CD 42149 632 94 | | NNP 42149 632 95 mica mica JJ 42149 632 96 | | CD 42149 632 97 | | NNP 42149 632 98 | | CD 42149 632 99 | | CD 42149 632 100 | | CD 42149 632 101 | | CD 42149 632 102 | | NNP 42149 632 103 |schist| |schist| NNP 42149 632 104 | | NNP 42149 632 105 | | NNP 42149 632 106 | | CD 42149 632 107 | | CD 42149 632 108 | | CD 42149 632 109 | | CD 42149 632 110 | | CD 42149 632 111 | | CD 42149 632 112 | | CD 42149 632 113 | | CD 42149 632 114 | | CD 42149 632 115 | | CD 42149 632 116 | | NNP 42149 632 117 | | NNP 42149 632 118 Center Center NNP 42149 632 119 |Medium| |Medium| NNP 42149 632 120 9:12 9:12 CD 42149 632 121 | | CD 42149 632 122 0:48 0:48 CD 42149 632 123 |10:00 |10:00 NNP 42149 632 124 | | CD 42149 632 125 22.0 22.0 CD 42149 632 126 | | CD 42149 632 127 2.39 2.39 CD 42149 632 128 | | CD 42149 632 129 | | CD 42149 632 130 trench trench NN 42149 632 131 | | NNP 42149 632 132 mica mica NNP 42149 632 133 | | NNP 42149 632 134 | | NNP 42149 632 135 | | CD 42149 632 136 | | CD 42149 632 137 | | CD 42149 632 138 | | CD 42149 632 139 | | NNP 42149 632 140 |schist| |schist| NNP 42149 632 141 | | NNP 42149 632 142 | | NNP 42149 632 143 | | CD 42149 632 144 | | CD 42149 632 145 | | CD 42149 632 146 | | CD 42149 632 147 | | CD 42149 632 148 | | CD 42149 632 149 | | CD 42149 632 150 | | CD 42149 632 151 | | CD 42149 632 152 | | CD 42149 632 153 | | NNP 42149 632 154 | | NNP 42149 632 155 Center Center NNP 42149 632 156 | | NNP 42149 632 157 Soft Soft NNP 42149 632 158 | | CD 42149 632 159 10:00 10:00 CD 42149 632 160 | | CD 42149 632 161 |10:00 |10:00 NNP 42149 632 162 | | CD 42149 632 163 26.44| 26.44| CD 42149 632 164 2.64 2.64 CD 42149 632 165 | | CD 42149 632 166 | | CD 42149 632 167 trench trench NN 42149 632 168 | | NNP 42149 632 169 mica mica NNP 42149 632 170 | | NNP 42149 632 171 | | NNP 42149 632 172 | | CD 42149 632 173 | | CD 42149 632 174 | | CD 42149 632 175 | | CD 42149 632 176 | | NNP 42149 632 177 |schist| |schist| NNP 42149 632 178 | | NNP 42149 632 179 | | NNP 42149 632 180 | | CD 42149 632 181 | | CD 42149 632 182 | | CD 42149 632 183 |--------+------+---------+--------+------+------+--------| |--------+------+---------+--------+------+------+--------| NNP 42149 632 184 |General |General NNP 42149 632 185 | | CD 42149 632 186 | | CD 42149 632 187 9:27 9:27 CD 42149 632 188 | | CD 42149 632 189 0:33 0:33 CD 42149 632 190 |10:00 |10:00 NNP 42149 632 191 | | CD 42149 632 192 24.1 24.1 CD 42149 632 193 | | CD 42149 632 194 2.54 2.54 CD 42149 632 195 | | NNP 42149 632 196 |average |average CD 42149 632 197 | | CD 42149 632 198 | | CD 42149 632 199 | | CD 42149 632 200 | | CD 42149 632 201 | | CD 42149 632 202 | | CD 42149 632 203 | | CD 42149 632 204 |--------+------+---------+--------+------+------+--------| |--------+------+---------+--------+------+------+--------| NNP 42149 632 205 | | NNP 42149 632 206 Per- Per- NNP 42149 632 207 | | CD 42149 632 208 | | CD 42149 632 209 94.5 94.5 CD 42149 632 210 % % NN 42149 632 211 | | CD 42149 632 212 5.5 5.5 CD 42149 632 213 % % NN 42149 632 214 | | CD 42149 632 215 100 100 CD 42149 632 216 % % NN 42149 632 217 | | CD 42149 632 218 | | CD 42149 632 219 | | CD 42149 632 220 |centage |centage CD 42149 632 221 | | CD 42149 632 222 | | CD 42149 632 223 | | CD 42149 632 224 | | CD 42149 632 225 | | CD 42149 632 226 | | CD 42149 632 227 | | NNS 42149 632 228 + + NNS 42149 632 229 = = SYM 42149 632 230 = = SYM 42149 632 231 = = SYM 42149 632 232 = = SYM 42149 632 233 = = SYM 42149 632 234 = = SYM 42149 632 235 = = NFP 42149 632 236 = = SYM 42149 632 237 + + SYM 42149 632 238 = = SYM 42149 632 239 = = SYM 42149 632 240 = = SYM 42149 632 241 = = SYM 42149 632 242 = = NFP 42149 632 243 = = SYM 42149 632 244 + + SYM 42149 632 245 = = SYM 42149 632 246 = = SYM 42149 632 247 = = SYM 42149 632 248 = = SYM 42149 632 249 = = SYM 42149 632 250 = = SYM 42149 632 251 = = SYM 42149 632 252 = = NFP 42149 632 253 = = SYM 42149 632 254 + + SYM 42149 632 255 = = SYM 42149 632 256 = = SYM 42149 632 257 = = SYM 42149 632 258 = = SYM 42149 632 259 = = SYM 42149 632 260 = = SYM 42149 632 261 = = NFP 42149 632 262 = = SYM 42149 632 263 + + SYM 42149 632 264 = = SYM 42149 632 265 = = SYM 42149 632 266 = = SYM 42149 632 267 = = SYM 42149 632 268 = = NFP 42149 632 269 = = SYM 42149 632 270 + + SYM 42149 632 271 = = SYM 42149 632 272 = = SYM 42149 632 273 = = SYM 42149 632 274 = = SYM 42149 632 275 = = NFP 42149 632 276 = = SYM 42149 632 277 + + SYM 42149 632 278 = = SYM 42149 632 279 = = SYM 42149 632 280 = = SYM 42149 632 281 = = SYM 42149 632 282 = = SYM 42149 632 283 = = SYM 42149 632 284 = = NFP 42149 632 285 = = NFP 42149 632 286 + + CC 42149 632 287 TABLE TABLE NNS 42149 632 288 8.--ANALYZED 8.--analyzed CD 42149 632 289 COST COST NNS 42149 632 290 OF of IN 42149 632 291 DRILLING drilling NN 42149 632 292 . . . 42149 633 1 + + NFP 42149 633 2 = = SYM 42149 633 3 = = SYM 42149 633 4 = = SYM 42149 633 5 = = SYM 42149 633 6 = = SYM 42149 633 7 = = SYM 42149 633 8 = = SYM 42149 633 9 = = SYM 42149 633 10 = = SYM 42149 633 11 = = SYM 42149 633 12 = = SYM 42149 633 13 = = NFP 42149 633 14 = = SYM 42149 633 15 + + SYM 42149 633 16 = = SYM 42149 633 17 = = SYM 42149 633 18 = = SYM 42149 633 19 = = SYM 42149 633 20 = = SYM 42149 633 21 = = SYM 42149 633 22 = = SYM 42149 633 23 = = SYM 42149 633 24 = = SYM 42149 633 25 = = SYM 42149 633 26 = = SYM 42149 633 27 = = SYM 42149 633 28 = = SYM 42149 633 29 = = SYM 42149 633 30 = = SYM 42149 633 31 = = SYM 42149 633 32 = = SYM 42149 633 33 = = SYM 42149 633 34 = = SYM 42149 633 35 = = SYM 42149 633 36 = = SYM 42149 633 37 = = SYM 42149 633 38 = = SYM 42149 633 39 = = SYM 42149 633 40 = = SYM 42149 633 41 = = NFP 42149 633 42 = = SYM 42149 633 43 + + SYM 42149 633 44 = = SYM 42149 633 45 = = SYM 42149 633 46 = = SYM 42149 633 47 = = SYM 42149 633 48 = = SYM 42149 633 49 = = SYM 42149 633 50 = = SYM 42149 633 51 = = SYM 42149 633 52 = = SYM 42149 633 53 = = SYM 42149 633 54 = = SYM 42149 633 55 = = SYM 42149 633 56 = = SYM 42149 633 57 = = SYM 42149 633 58 = = SYM 42149 633 59 = = SYM 42149 633 60 = = SYM 42149 633 61 = = SYM 42149 633 62 = = SYM 42149 633 63 = = SYM 42149 633 64 = = SYM 42149 633 65 = = SYM 42149 633 66 = = SYM 42149 633 67 = = SYM 42149 633 68 = = SYM 42149 633 69 = = NFP 42149 633 70 = = SYM 42149 633 71 + + CC 42149 633 72 | | CD 42149 633 73 | | CD 42149 633 74 COST COST NNS 42149 633 75 PER per IN 42149 633 76 FOOT FOOT NNP 42149 633 77 OF of IN 42149 633 78 HOLE HOLE NNP 42149 633 79 | | CD 42149 633 80 COST COST NNS 42149 633 81 PER per IN 42149 633 82 DRILL DRILL NNP 42149 633 83 SHIFT SHIFT NNP 42149 633 84 | | NNP 42149 633 85 |Item |Item NNP 42149 633 86 of of IN 42149 633 87 Cost.| Cost.| NNP 42149 633 88 DRILLED DRILLED NNP 42149 633 89 . . . 42149 634 1 | | NNP 42149 634 2 | | CD 42149 634 3 | | CD 42149 634 4 + + CC 42149 634 5 -------+-----+-----+-------+-----+------+------+-------+ -------+-----+-----+-------+-----+------+------+-------+ NNP 42149 634 6 | | NNP 42149 634 7 | | NNP 42149 634 8 15 15 CD 42149 634 9 ft ft NN 42149 634 10 | | NNP 42149 634 11 9 9 CD 42149 634 12 ft|24 ft|24 NN 42149 634 13 ft|Average|15 ft|Average|15 NNP 42149 634 14 ft|19 ft|19 NNP 42149 634 15 ft ft IN 42149 634 16 |24 |24 CD 42149 634 17 ft ft NN 42149 634 18 |Average| |average| CD 42149 634 19 | | NNP 42149 634 20 | | CD 42149 634 21 4 4 CD 42149 634 22 in in IN 42149 634 23 | | NNP 42149 634 24 6 6 CD 42149 634 25 in| in| NNP 42149 634 26 6 6 CD 42149 634 27 in| in| NNP 42149 634 28 | | CD 42149 634 29 4 4 CD 42149 634 30 in| in| NNP 42149 634 31 6 6 CD 42149 634 32 in in IN 42149 634 33 | | CD 42149 634 34 6 6 CD 42149 634 35 in in IN 42149 634 36 | | CD 42149 634 37 | | CD 42149 634 38 |-------------+-------+-----+-----+-------+-----+------+------+-------+ |-------------+-------+-----+-----+-------+-----+------+------+-------+ CD 42149 634 39 |Drilling |drille VBG 42149 634 40 | | CD 42149 634 41 $ $ $ 42149 634 42 0.25 0.25 CD 42149 634 43 |$0.28|$0.31| |$0.28|$0.31| CD 42149 634 44 $ $ $ 42149 634 45 0.28 0.28 CD 42149 634 46 |$6.95| |$6.95| NNS 42149 634 47 $ $ $ 42149 634 48 7.75| 7.75| CD 42149 634 49 $ $ $ 42149 634 50 7.60| 7.60| CD 42149 634 51 $ $ $ 42149 634 52 7.45 7.45 CD 42149 634 53 | | CD 42149 634 54 |labor |labor CD 42149 634 55 | | CD 42149 634 56 | | CD 42149 634 57 | | CD 42149 634 58 | | CD 42149 634 59 | | CD 42149 634 60 | | CD 42149 634 61 | | CD 42149 634 62 | | CD 42149 634 63 | | CD 42149 634 64 | | CD 42149 634 65 | | CD 42149 634 66 | | CD 42149 634 67 | | CD 42149 634 68 | | CD 42149 634 69 | | CD 42149 634 70 | | CD 42149 634 71 | | CD 42149 634 72 | | CD 42149 634 73 | | CD 42149 634 74 |Sharpening |sharpening CD 42149 634 75 | | CD 42149 634 76 0.02 0.02 CD 42149 634 77 | | NNS 42149 634 78 0.02| 0.02| NNS 42149 634 79 0.01| 0.01| NFP 42149 634 80 0.016| 0.016| NN 42149 634 81 0.58| 0.58| CD 42149 634 82 0.42| 0.42| NNS 42149 634 83 0.34| 0.34| CD 42149 634 84 0.43 0.43 CD 42149 634 85 | | CD 42149 634 86 | | CD 42149 634 87 | | CD 42149 634 88 | | CD 42149 634 89 | | CD 42149 634 90 | | CD 42149 634 91 | | CD 42149 634 92 | | CD 42149 634 93 | | CD 42149 634 94 | | CD 42149 634 95 | | CD 42149 634 96 |Drill |Drill NNP 42149 634 97 steel steel NN 42149 634 98 | | CD 42149 634 99 0.007|0.007|0.006| 0.007|0.007|0.006| CD 42149 634 100 0.007| 0.007| CD 42149 634 101 0.19| 0.19| NNS 42149 634 102 0.20| 0.20| CD 42149 634 103 0.15| 0.15| CD 42149 634 104 0.19 0.19 CD 42149 634 105 | | NNS 42149 634 106 |(5 |(5 ADD 42149 634 107 in in RB 42149 634 108 . . . 42149 635 1 per per IN 42149 635 2 | | NNP 42149 635 3 | | NNP 42149 635 4 | | CD 42149 635 5 | | CD 42149 635 6 | | CD 42149 635 7 | | CD 42149 635 8 | | CD 42149 635 9 | | CD 42149 635 10 | | CD 42149 635 11 |drill |drill CD 42149 635 12 shift shift NN 42149 635 13 ) ) -RRB- 42149 635 14 | | NNP 42149 635 15 | | CD 42149 635 16 | | CD 42149 635 17 | | CD 42149 635 18 | | CD 42149 635 19 | | CD 42149 635 20 | | CD 42149 635 21 | | CD 42149 635 22 | | CD 42149 635 23 | | CD 42149 635 24 | | CD 42149 635 25 | | CD 42149 635 26 | | CD 42149 635 27 | | CD 42149 635 28 | | CD 42149 635 29 | | CD 42149 635 30 | | CD 42149 635 31 | | CD 42149 635 32 | | CD 42149 635 33 |Drill |drill CD 42149 635 34 repairs| repairs| CD 42149 635 35 0.02 0.02 CD 42149 635 36 | | NNS 42149 635 37 0.02| 0.02| CD 42149 635 38 0.02| 0.02| NFP 42149 635 39 0.02 0.02 CD 42149 635 40 | | CD 42149 635 41 0.61| 0.61| CD 42149 635 42 0.59| 0.59| NNS 42149 635 43 0.42| 0.42| NNP 42149 635 44 0.54 0.54 CD 42149 635 45 | | NNP 42149 635 46 | | NNP 42149 635 47 | | CD 42149 635 48 | | CD 42149 635 49 | | CD 42149 635 50 | | CD 42149 635 51 | | CD 42149 635 52 | | CD 42149 635 53 | | CD 42149 635 54 | | CD 42149 635 55 | | CD 42149 635 56 |High |high NN 42149 635 57 - - HYPH 42149 635 58 pressure|[M]0.05| pressure|[m]0.05| NN 42149 635 59 0.04| 0.04| CD 42149 635 60 0.07| 0.07| CD 42149 635 61 0.07 0.07 CD 42149 635 62 | | CD 42149 635 63 1.39| 1.39| CD 42149 635 64 1.86| 1.86| CD 42149 635 65 1.67| 1.67| CD 42149 635 66 1.82 1.82 CD 42149 635 67 | | NNP 42149 635 68 |air |air NNP 42149 635 69 | | NNP 42149 635 70 | | NNP 42149 635 71 | | NNP 42149 635 72 | | CD 42149 635 73 | | CD 42149 635 74 | | CD 42149 635 75 | | CD 42149 635 76 | | CD 42149 635 77 | | CD 42149 635 78 |-------------+-------+-----+-----+-------+-----+------+------+-------+ |-------------+-------+-----+-----+-------+-----+------+------+-------+ CD 42149 635 79 |Totals |total NNS 42149 635 80 | | CD 42149 635 81 $ $ $ 42149 635 82 0.35 0.35 CD 42149 635 83 |$0.38|$0.41| |$0.38|$0.41| CD 42149 635 84 $ $ $ 42149 635 85 0.385|$9.67|$10.82|$10.18|$10.43 0.385|$9.67|$10.82|$10.18|$10.43 CD 42149 635 86 | | NNS 42149 635 87 + + NNS 42149 635 88 = = SYM 42149 635 89 = = SYM 42149 635 90 = = SYM 42149 635 91 = = SYM 42149 635 92 = = SYM 42149 635 93 = = SYM 42149 635 94 = = SYM 42149 635 95 = = SYM 42149 635 96 = = SYM 42149 635 97 = = SYM 42149 635 98 = = SYM 42149 635 99 = = NFP 42149 635 100 = = SYM 42149 635 101 + + SYM 42149 635 102 = = SYM 42149 635 103 = = SYM 42149 635 104 = = SYM 42149 635 105 = = SYM 42149 635 106 = = SYM 42149 635 107 = = NFP 42149 635 108 = = SYM 42149 635 109 + + SYM 42149 635 110 = = SYM 42149 635 111 = = SYM 42149 635 112 = = SYM 42149 635 113 = = NFP 42149 635 114 = = SYM 42149 635 115 + + SYM 42149 635 116 = = SYM 42149 635 117 = = SYM 42149 635 118 = = SYM 42149 635 119 = = NFP 42149 635 120 = = SYM 42149 635 121 + + SYM 42149 635 122 = = SYM 42149 635 123 = = SYM 42149 635 124 = = SYM 42149 635 125 = = SYM 42149 635 126 = = SYM 42149 635 127 = = NFP 42149 635 128 = = SYM 42149 635 129 + + SYM 42149 635 130 = = SYM 42149 635 131 = = SYM 42149 635 132 = = SYM 42149 635 133 = = NFP 42149 635 134 = = SYM 42149 635 135 + + SYM 42149 635 136 = = SYM 42149 635 137 = = SYM 42149 635 138 = = SYM 42149 635 139 = = SYM 42149 635 140 = = NFP 42149 635 141 = = SYM 42149 635 142 + + SYM 42149 635 143 = = SYM 42149 635 144 = = SYM 42149 635 145 = = SYM 42149 635 146 = = SYM 42149 635 147 = = NFP 42149 635 148 = = SYM 42149 635 149 + + SYM 42149 635 150 = = SYM 42149 635 151 = = SYM 42149 635 152 = = SYM 42149 635 153 = = SYM 42149 635 154 = = SYM 42149 635 155 = = NFP 42149 635 156 = = NFP 42149 635 157 + + CC 42149 635 158 [ [ -LRB- 42149 635 159 M m NN 42149 635 160 ] ] -RRB- 42149 635 161 This this DT 42149 635 162 is be VBZ 42149 635 163 an an DT 42149 635 164 estimated estimate VBN 42149 635 165 figure figure NN 42149 635 166 , , , 42149 635 167 ascertained ascertain VBN 42149 635 168 by by IN 42149 635 169 taking take VBG 42149 635 170 a a DT 42149 635 171 proportion proportion NN 42149 635 172 of of IN 42149 635 173 the the DT 42149 635 174 whole whole JJ 42149 635 175 charge charge NN 42149 635 176 for for IN 42149 635 177 plant plant NN 42149 635 178 running running NN 42149 635 179 . . . 42149 636 1 _ _ NNP 42149 636 2 General General NNP 42149 636 3 Methods._--Whenever Methods._--Whenever VBZ 42149 636 4 any any DT 42149 636 5 considerable considerable JJ 42149 636 6 support support NN 42149 636 7 was be VBD 42149 636 8 needed need VBN 42149 636 9 for for IN 42149 636 10 the the DT 42149 636 11 ground ground NN 42149 636 12 , , , 42149 636 13 segmental segmental JJ 42149 636 14 timbering timbering NN 42149 636 15 was be VBD 42149 636 16 used use VBN 42149 636 17 . . . 42149 637 1 In in IN 42149 637 2 most most JJS 42149 637 3 cases case NNS 42149 637 4 , , , 42149 637 5 this this DT 42149 637 6 was be VBD 42149 637 7 supported support VBN 42149 637 8 by by IN 42149 637 9 wall wall NN 42149 637 10 - - HYPH 42149 637 11 plates plate NNS 42149 637 12 at at IN 42149 637 13 the the DT 42149 637 14 springing springing NN 42149 637 15 line line NN 42149 637 16 , , , 42149 637 17 and and CC 42149 637 18 was be VBD 42149 637 19 set set VBN 42149 637 20 with with IN 42149 637 21 an an DT 42149 637 22 allowance allowance NN 42149 637 23 for for IN 42149 637 24 settlement settlement NN 42149 637 25 , , , 42149 637 26 so so IN 42149 637 27 that that IN 42149 637 28 it -PRON- PRP 42149 637 29 would would MD 42149 637 30 be be VB 42149 637 31 clear clear JJ 42149 637 32 of of IN 42149 637 33 the the DT 42149 637 34 work work NN 42149 637 35 when when WRB 42149 637 36 the the DT 42149 637 37 masonry masonry NN 42149 637 38 lining lining NN 42149 637 39 was be VBD 42149 637 40 put put VBN 42149 637 41 in in RP 42149 637 42 . . . 42149 638 1 As as IN 42149 638 2 the the DT 42149 638 3 twin twin JJ 42149 638 4 - - HYPH 42149 638 5 tunnel tunnel NN 42149 638 6 section section NN 42149 638 7 involved involve VBD 42149 638 8 the the DT 42149 638 9 excavation excavation NN 42149 638 10 of of IN 42149 638 11 the the DT 42149 638 12 North North NNP 42149 638 13 and and CC 42149 638 14 South South NNP 42149 638 15 Tunnels Tunnels NNPS 42149 638 16 at at IN 42149 638 17 the the DT 42149 638 18 same same JJ 42149 638 19 time time NN 42149 638 20 , , , 42149 638 21 the the DT 42149 638 22 cross cross NN 42149 638 23 - - NN 42149 638 24 section section NN 42149 638 25 of of IN 42149 638 26 the the DT 42149 638 27 upper upper JJ 42149 638 28 part part NN 42149 638 29 of of IN 42149 638 30 the the DT 42149 638 31 excavation excavation NN 42149 638 32 consisted consist VBD 42149 638 33 of of IN 42149 638 34 two two CD 42149 638 35 quadrants quadrant NNS 42149 638 36 rising rise VBG 42149 638 37 from from IN 42149 638 38 the the DT 42149 638 39 springing springing NN 42149 638 40 line line NN 42149 638 41 and and CC 42149 638 42 connected connect VBN 42149 638 43 at at IN 42149 638 44 the the DT 42149 638 45 top top NN 42149 638 46 by by IN 42149 638 47 a a DT 42149 638 48 horizontal horizontal JJ 42149 638 49 piece piece NN 42149 638 50 from from IN 42149 638 51 19 19 CD 42149 638 52 to to TO 42149 638 53 28 28 CD 42149 638 54 ft ft NN 42149 638 55 . . NN 42149 638 56 in in IN 42149 638 57 length length NN 42149 638 58 . . . 42149 639 1 This this DT 42149 639 2 made make VBD 42149 639 3 a a DT 42149 639 4 rather rather RB 42149 639 5 flat flat JJ 42149 639 6 arch arch NN 42149 639 7 to to TO 42149 639 8 support support VB 42149 639 9 by by IN 42149 639 10 timbering timbere VBG 42149 639 11 . . . 42149 640 1 The the DT 42149 640 2 timber timber NN 42149 640 3 for for IN 42149 640 4 the the DT 42149 640 5 segmental segmental JJ 42149 640 6 work work NN 42149 640 7 was be VBD 42149 640 8 12 12 CD 42149 640 9 by by IN 42149 640 10 12-in 12-in CD 42149 640 11 . . . 42149 641 1 yellow yellow JJ 42149 641 2 pine pine NN 42149 641 3 . . . 42149 642 1 In in IN 42149 642 2 light light JJ 42149 642 3 ground ground NN 42149 642 4 the the DT 42149 642 5 bents bent NNS 42149 642 6 were be VBD 42149 642 7 spaced space VBN 42149 642 8 at at IN 42149 642 9 5-ft 5-ft CD 42149 642 10 . . . 42149 642 11 centers center NNS 42149 642 12 , , , 42149 642 13 in in IN 42149 642 14 heavy heavy JJ 42149 642 15 ground ground NN 42149 642 16 2-ft 2-ft NN 42149 642 17 . . . 42149 642 18 6-in 6-in CD 42149 642 19 . . . 42149 643 1 centers center NNS 42149 643 2 . . . 42149 644 1 When when WRB 42149 644 2 the the DT 42149 644 3 soft soft JJ 42149 644 4 ground ground NN 42149 644 5 in in IN 42149 644 6 the the DT 42149 644 7 roof roof NN 42149 644 8 was be VBD 42149 644 9 struck strike VBN 42149 644 10 , , , 42149 644 11 posts post NNS 42149 644 12 had have VBD 42149 644 13 to to TO 42149 644 14 be be VB 42149 644 15 used use VBN 42149 644 16 in in IN 42149 644 17 the the DT 42149 644 18 heading heading NN 42149 644 19 to to TO 42149 644 20 support support VB 42149 644 21 the the DT 42149 644 22 caps cap NNS 42149 644 23 . . . 42149 645 1 When when WRB 42149 645 2 the the DT 42149 645 3 bench bench NN 42149 645 4 was be VBD 42149 645 5 removed remove VBN 42149 645 6 , , , 42149 645 7 the the DT 42149 645 8 posts post NNS 42149 645 9 were be VBD 42149 645 10 replaced replace VBN 42149 645 11 by by IN 42149 645 12 others other NNS 42149 645 13 down down RB 42149 645 14 to to IN 42149 645 15 the the DT 42149 645 16 bottom bottom NN 42149 645 17 of of IN 42149 645 18 the the DT 42149 645 19 excavation excavation NN 42149 645 20 . . . 42149 646 1 These these DT 42149 646 2 long long JJ 42149 646 3 posts post NNS 42149 646 4 were be VBD 42149 646 5 a a DT 42149 646 6 great great JJ 42149 646 7 hindrance hindrance NN 42149 646 8 to to IN 42149 646 9 all all PDT 42149 646 10 the the DT 42149 646 11 work work NN 42149 646 12 , , , 42149 646 13 and and CC 42149 646 14 each each DT 42149 646 15 replacement replacement NN 42149 646 16 of of IN 42149 646 17 short short JJ 42149 646 18 posts post NNS 42149 646 19 by by IN 42149 646 20 long long JJ 42149 646 21 ones one NNS 42149 646 22 meant mean VBD 42149 646 23 a a DT 42149 646 24 settlement settlement NN 42149 646 25 of of IN 42149 646 26 the the DT 42149 646 27 caps cap NNS 42149 646 28 ; ; : 42149 646 29 consequently consequently RB 42149 646 30 , , , 42149 646 31 it -PRON- PRP 42149 646 32 was be VBD 42149 646 33 decided decide VBN 42149 646 34 to to TO 42149 646 35 use use VB 42149 646 36 in in IN 42149 646 37 the the DT 42149 646 38 section section NN 42149 646 39 east east NN 42149 646 40 of of IN 42149 646 41 the the DT 42149 646 42 cut cut VB 42149 646 43 - - HYPH 42149 646 44 and and CC 42149 646 45 - - HYPH 42149 646 46 cover cover NN 42149 646 47 , , , 42149 646 48 where where WRB 42149 646 49 all all PDT 42149 646 50 the the DT 42149 646 51 ground ground NN 42149 646 52 was be VBD 42149 646 53 heavy heavy JJ 42149 646 54 , , , 42149 646 55 a a DT 42149 646 56 temporary temporary JJ 42149 646 57 inner inner JJ 42149 646 58 bent bent NN 42149 646 59 of of IN 42149 646 60 segmental segmental JJ 42149 646 61 timber timber NN 42149 646 62 , , , 42149 646 63 within within RB 42149 646 64 and and CC 42149 646 65 reinforcing reinforce VBG 42149 646 66 the the DT 42149 646 67 permanent permanent JJ 42149 646 68 bent bent NN 42149 646 69 , , , 42149 646 70 and and CC 42149 646 71 resting rest VBG 42149 646 72 on on IN 42149 646 73 separate separate JJ 42149 646 74 wall wall NN 42149 646 75 - - HYPH 42149 646 76 plates plate NNS 42149 646 77 . . . 42149 647 1 This this DT 42149 647 2 is be VBZ 42149 647 3 shown show VBN 42149 647 4 by by IN 42149 647 5 Fig Fig NNP 42149 647 6 . . . 42149 648 1 6 6 CD 42149 648 2 . . . 42149 649 1 These these DT 42149 649 2 temporary temporary JJ 42149 649 3 bents bent NNS 42149 649 4 were be VBD 42149 649 5 inside inside IN 42149 649 6 the the DT 42149 649 7 work work NN 42149 649 8 , , , 42149 649 9 and and CC 42149 649 10 were be VBD 42149 649 11 removed remove VBN 42149 649 12 as as IN 42149 649 13 the the DT 42149 649 14 arch arch NN 42149 649 15 was be VBD 42149 649 16 built build VBN 42149 649 17 . . . 42149 650 1 However however RB 42149 650 2 , , , 42149 650 3 the the DT 42149 650 4 caps cap NNS 42149 650 5 settled settle VBD 42149 650 6 considerably considerably RB 42149 650 7 in in IN 42149 650 8 some some DT 42149 650 9 cases case NNS 42149 650 10 , , , 42149 650 11 so so IN 42149 650 12 that that IN 42149 650 13 it -PRON- PRP 42149 650 14 was be VBD 42149 650 15 not not RB 42149 650 16 possible possible JJ 42149 650 17 to to TO 42149 650 18 do do VB 42149 650 19 away away RB 42149 650 20 with with IN 42149 650 21 posting post VBG 42149 650 22 entirely entirely RB 42149 650 23 . . . 42149 651 1 In in IN 42149 651 2 heavy heavy JJ 42149 651 3 ground ground NN 42149 651 4 the the DT 42149 651 5 caps cap NNS 42149 651 6 were be VBD 42149 651 7 set set VBN 42149 651 8 about about RB 42149 651 9 1 1 CD 42149 651 10 ft ft NN 42149 651 11 . . . 42149 651 12 above above IN 42149 651 13 the the DT 42149 651 14 neat neat JJ 42149 651 15 line line NN 42149 651 16 of of IN 42149 651 17 the the DT 42149 651 18 crown crown NN 42149 651 19 of of IN 42149 651 20 the the DT 42149 651 21 brick brick NN 42149 651 22 arch arch NN 42149 651 23 , , , 42149 651 24 in in IN 42149 651 25 some some DT 42149 651 26 cases case NNS 42149 651 27 they -PRON- PRP 42149 651 28 were be VBD 42149 651 29 set set VBN 42149 651 30 only only RB 42149 651 31 6 6 CD 42149 651 32 in in IN 42149 651 33 . . . 42149 652 1 above above RB 42149 652 2 , , , 42149 652 3 but but CC 42149 652 4 the the DT 42149 652 5 settlement settlement NN 42149 652 6 was be VBD 42149 652 7 often often RB 42149 652 8 more more JJR 42149 652 9 than than IN 42149 652 10 this this DT 42149 652 11 , , , 42149 652 12 causing cause VBG 42149 652 13 great great JJ 42149 652 14 trouble trouble NN 42149 652 15 in in IN 42149 652 16 cutting cut VBG 42149 652 17 out out RP 42149 652 18 the the DT 42149 652 19 encroaching encroach VBG 42149 652 20 timber timber NN 42149 652 21 when when WRB 42149 652 22 the the DT 42149 652 23 arch arch NN 42149 652 24 had have VBD 42149 652 25 to to TO 42149 652 26 be be VB 42149 652 27 built build VBN 42149 652 28 . . . 42149 653 1 [ [ -LRB- 42149 653 2 Illustration illustration NN 42149 653 3 : : : 42149 653 4 DETAILS DETAILS NNP 42149 653 5 OF of IN 42149 653 6 LONGITUDINAL LONGITUDINAL NNP 42149 653 7 SECTIONAL SECTIONAL NNP 42149 653 8 SHOWING show VBD 42149 653 9 METHOD METHOD NNP 42149 653 10 OF of IN 42149 653 11 PLACING PLACING NNP 42149 653 12 LAGGING LAGGING NNP 42149 653 13 IN in IN 42149 653 14 CROWN crown NN 42149 653 15 WITH with IN 42149 653 16 SOFT soft JJ 42149 653 17 ROOF roof NN 42149 653 18 TYPICAL TYPICAL NNP 42149 653 19 SECTION SECTION NNP 42149 653 20 LOOKING LOOKING NNP 42149 653 21 EAST EAST NNPS 42149 653 22 FIG FIG NNP 42149 653 23 . . . 42149 654 1 6 6 LS 42149 654 2 . . . 42149 654 3 ] ] -RRB- 42149 655 1 In in IN 42149 655 2 the the DT 42149 655 3 tunnels tunnel NNS 42149 655 4 east east RB 42149 655 5 of of IN 42149 655 6 the the DT 42149 655 7 cut cut VB 42149 655 8 - - HYPH 42149 655 9 and and CC 42149 655 10 - - HYPH 42149 655 11 cover cover NN 42149 655 12 portion portion NN 42149 655 13 , , , 42149 655 14 wall wall NN 42149 655 15 - - HYPH 42149 655 16 plate plate NN 42149 655 17 headings heading NNS 42149 655 18 were be VBD 42149 655 19 driven drive VBN 42149 655 20 ( ( -LRB- 42149 655 21 shown show VBN 42149 655 22 by by IN 42149 655 23 areas area NNS 42149 655 24 marked mark VBN 42149 655 25 _ _ NNP 42149 655 26 A A NNP 42149 655 27 _ _ NNP 42149 655 28 on on IN 42149 655 29 Fig Fig NNP 42149 655 30 . . . 42149 656 1 5 5 LS 42149 656 2 ) ) -RRB- 42149 656 3 , , , 42149 656 4 and and CC 42149 656 5 , , , 42149 656 6 when when WRB 42149 656 7 a a DT 42149 656 8 length length NN 42149 656 9 of of IN 42149 656 10 wall wall NN 42149 656 11 - - HYPH 42149 656 12 plate plate NN 42149 656 13 had have VBD 42149 656 14 been be VBN 42149 656 15 set set VBN 42149 656 16 , , , 42149 656 17 the the DT 42149 656 18 full full JJ 42149 656 19 - - HYPH 42149 656 20 width width NN 42149 656 21 heading heading NN 42149 656 22 was be VBD 42149 656 23 advanced advance VBN 42149 656 24 a a DT 42149 656 25 foot foot NN 42149 656 26 or or CC 42149 656 27 two two CD 42149 656 28 at at IN 42149 656 29 a a DT 42149 656 30 time time NN 42149 656 31 , , , 42149 656 32 the the DT 42149 656 33 timber timber NN 42149 656 34 segmental segmental JJ 42149 656 35 bents bent NNS 42149 656 36 being be VBG 42149 656 37 set set VBN 42149 656 38 up up RP 42149 656 39 as as RB 42149 656 40 soon soon RB 42149 656 41 as as IN 42149 656 42 possible possible JJ 42149 656 43 ; ; , 42149 656 44 lagging lagging JJ 42149 656 45 was be VBD 42149 656 46 then then RB 42149 656 47 driven drive VBN 42149 656 48 over over IN 42149 656 49 the the DT 42149 656 50 cap cap NN 42149 656 51 into into IN 42149 656 52 the the DT 42149 656 53 soft soft JJ 42149 656 54 ground ground NN 42149 656 55 . . . 42149 657 1 Fig fig NN 42149 657 2 . . . 42149 658 1 6 6 CD 42149 658 2 shows show VBZ 42149 658 3 the the DT 42149 658 4 double double JJ 42149 658 5 set set NN 42149 658 6 of of IN 42149 658 7 segmental segmental JJ 42149 658 8 bents bent NNS 42149 658 9 adopted adopt VBN 42149 658 10 in in IN 42149 658 11 the the DT 42149 658 12 15-ft 15-ft NNP 42149 658 13 . . . 42149 658 14 4-in 4-in CD 42149 658 15 . . . 42149 659 1 twin twin JJ 42149 659 2 tunnels tunnel NNS 42149 659 3 east east RB 42149 659 4 of of IN 42149 659 5 the the DT 42149 659 6 cut cut VB 42149 659 7 - - HYPH 42149 659 8 and and CC 42149 659 9 - - HYPH 42149 659 10 cover cover VB 42149 659 11 section section NN 42149 659 12 . . . 42149 660 1 When when WRB 42149 660 2 the the DT 42149 660 3 soft soft JJ 42149 660 4 ground ground NN 42149 660 5 came come VBD 42149 660 6 down down RP 42149 660 7 so so RB 42149 660 8 low low RB 42149 660 9 as as IN 42149 660 10 to to TO 42149 660 11 interfere interfere VB 42149 660 12 with with IN 42149 660 13 the the DT 42149 660 14 excavation excavation NN 42149 660 15 of of IN 42149 660 16 the the DT 42149 660 17 wall wall NN 42149 660 18 - - HYPH 42149 660 19 plate plate NN 42149 660 20 headings heading NNS 42149 660 21 , , , 42149 660 22 a a DT 42149 660 23 small small JJ 42149 660 24 heading heading NN 42149 660 25 was be VBD 42149 660 26 driven drive VBN 42149 660 27 into into IN 42149 660 28 the the DT 42149 660 29 soft soft JJ 42149 660 30 ground ground NN 42149 660 31 on on IN 42149 660 32 the the DT 42149 660 33 line line NN 42149 660 34 of of IN 42149 660 35 the the DT 42149 660 36 ends end NNS 42149 660 37 of of IN 42149 660 38 the the DT 42149 660 39 caps cap NNS 42149 660 40 , , , 42149 660 41 and and CC 42149 660 42 lagging lagging NNP 42149 660 43 was be VBD 42149 660 44 driven drive VBN 42149 660 45 down down RP 42149 660 46 from from IN 42149 660 47 this this DT 42149 660 48 to to IN 42149 660 49 the the DT 42149 660 50 wall wall NN 42149 660 51 - - HYPH 42149 660 52 plate plate NN 42149 660 53 heading heading NN 42149 660 54 , , , 42149 660 55 as as IN 42149 660 56 illustrated illustrate VBN 42149 660 57 in in IN 42149 660 58 Fig Fig NNP 42149 660 59 . . . 42149 661 1 4 4 LS 42149 661 2 . . . 42149 662 1 In in IN 42149 662 2 the the DT 42149 662 3 19-ft 19-ft NNP 42149 662 4 . . . 42149 662 5 6-in 6-in CD 42149 662 6 . . . 42149 663 1 tunnels tunnel NNS 42149 663 2 the the DT 42149 663 3 wall wall NN 42149 663 4 - - HYPH 42149 663 5 plate plate NN 42149 663 6 for for IN 42149 663 7 the the DT 42149 663 8 inner inner JJ 42149 663 9 bent bent NN 42149 663 10 was be VBD 42149 663 11 supported support VBN 42149 663 12 by by IN 42149 663 13 a a DT 42149 663 14 side side NN 42149 663 15 - - HYPH 42149 663 16 bench bench NN 42149 663 17 , , , 42149 663 18 termed term VBD 42149 663 19 the the DT 42149 663 20 " " `` 42149 663 21 Raker Raker NNP 42149 663 22 " " '' 42149 663 23 bench bench NN 42149 663 24 . . . 42149 664 1 This this DT 42149 664 2 was be VBD 42149 664 3 left leave VBN 42149 664 4 in in IN 42149 664 5 position position NN 42149 664 6 until until IN 42149 664 7 the the DT 42149 664 8 rest rest NN 42149 664 9 of of IN 42149 664 10 the the DT 42149 664 11 bench bench NN 42149 664 12 and and CC 42149 664 13 the the DT 42149 664 14 middle middle JJ 42149 664 15 subgrade subgrade NN 42149 664 16 conduit conduit NNP 42149 664 17 trench trench NN 42149 664 18 had have VBD 42149 664 19 been be VBN 42149 664 20 excavated excavate VBN 42149 664 21 ; ; : 42149 664 22 it -PRON- PRP 42149 664 23 was be VBD 42149 664 24 then then RB 42149 664 25 possible possible JJ 42149 664 26 to to TO 42149 664 27 support support VB 42149 664 28 the the DT 42149 664 29 caps cap NNS 42149 664 30 by by IN 42149 664 31 two two CD 42149 664 32 rows row NNS 42149 664 33 of of IN 42149 664 34 posts post NNS 42149 664 35 from from IN 42149 664 36 subgrade subgrade NN 42149 664 37 level level NN 42149 664 38 , , , 42149 664 39 take take VB 42149 664 40 out out RP 42149 664 41 the the DT 42149 664 42 inner inner JJ 42149 664 43 bents bent NNS 42149 664 44 , , , 42149 664 45 and and CC 42149 664 46 excavate excavate VB 42149 664 47 the the DT 42149 664 48 raker raker NN 42149 664 49 bench bench NN 42149 664 50 . . . 42149 665 1 The the DT 42149 665 2 24-ft 24-ft CD 42149 665 3 . . . 42149 665 4 6-in 6-in CD 42149 665 5 . . . 42149 666 1 twin twin JJ 42149 666 2 tunnels tunnel NNS 42149 666 3 , , , 42149 666 4 which which WDT 42149 666 5 are be VBP 42149 666 6 at at IN 42149 666 7 the the DT 42149 666 8 extreme extreme JJ 42149 666 9 eastern eastern JJ 42149 666 10 end end NN 42149 666 11 of of IN 42149 666 12 this this DT 42149 666 13 section section NN 42149 666 14 , , , 42149 666 15 adjoining adjoin VBG 42149 666 16 the the DT 42149 666 17 open open RB 42149 666 18 - - HYPH 42149 666 19 cut cut NN 42149 666 20 work work NN 42149 666 21 of of IN 42149 666 22 the the DT 42149 666 23 Terminal Terminal NNP 42149 666 24 Station Station NNP 42149 666 25 , , , 42149 666 26 and and CC 42149 666 27 under under IN 42149 666 28 Tenth Tenth NNP 42149 666 29 Avenue Avenue NNP 42149 666 30 , , , 42149 666 31 were be VBD 42149 666 32 driven drive VBN 42149 666 33 from from IN 42149 666 34 the the DT 42149 666 35 Terminal Terminal NNP 42149 666 36 Station Station NNP 42149 666 37 - - HYPH 42149 666 38 West West NNP 42149 666 39 , , , 42149 666 40 and and CC 42149 666 41 the the DT 42149 666 42 timbering timbering NN 42149 666 43 had have VBD 42149 666 44 to to TO 42149 666 45 be be VB 42149 666 46 made make VBN 42149 666 47 very very RB 42149 666 48 secure secure JJ 42149 666 49 on on IN 42149 666 50 account account NN 42149 666 51 of of IN 42149 666 52 the the DT 42149 666 53 pipes pipe NNS 42149 666 54 and and CC 42149 666 55 sewers sewer NNS 42149 666 56 in in IN 42149 666 57 the the DT 42149 666 58 street street NN 42149 666 59 above above RB 42149 666 60 . . . 42149 667 1 Detailed detailed JJ 42149 667 2 records record NNS 42149 667 3 were be VBD 42149 667 4 kept keep VBN 42149 667 5 of of IN 42149 667 6 the the DT 42149 667 7 amount amount NN 42149 667 8 of of IN 42149 667 9 timber timber NN 42149 667 10 used use VBN 42149 667 11 and and CC 42149 667 12 the the DT 42149 667 13 cost cost NN 42149 667 14 of of IN 42149 667 15 labor labor NN 42149 667 16 and and CC 42149 667 17 material material NN 42149 667 18 expended expend VBN 42149 667 19 in in IN 42149 667 20 timbering timbere VBG 42149 667 21 . . . 42149 668 1 These these DT 42149 668 2 records record NNS 42149 668 3 cover cover VBP 42149 668 4 the the DT 42149 668 5 same same JJ 42149 668 6 portion portion NN 42149 668 7 of of IN 42149 668 8 tunnel tunnel NN 42149 668 9 as as IN 42149 668 10 that that DT 42149 668 11 for for IN 42149 668 12 which which WDT 42149 668 13 the the DT 42149 668 14 detailed detailed JJ 42149 668 15 records record NNS 42149 668 16 of of IN 42149 668 17 drilling drilling NN 42149 668 18 costs cost NNS 42149 668 19 , , , 42149 668 20 previously previously RB 42149 668 21 referred refer VBD 42149 668 22 to to IN 42149 668 23 , , , 42149 668 24 were be VBD 42149 668 25 kept keep VBN 42149 668 26 . . . 42149 669 1 These these DT 42149 669 2 records record NNS 42149 669 3 are be VBP 42149 669 4 shown show VBN 42149 669 5 in in IN 42149 669 6 Tables Tables NNP 42149 669 7 9 9 CD 42149 669 8 and and CC 42149 669 9 10 10 CD 42149 669 10 . . . 42149 670 1 It -PRON- PRP 42149 670 2 will will MD 42149 670 3 be be VB 42149 670 4 noted note VBN 42149 670 5 that that IN 42149 670 6 the the DT 42149 670 7 timber timber NN 42149 670 8 used use VBN 42149 670 9 in in IN 42149 670 10 blocking blocking NN 42149 670 11 , , , 42149 670 12 that that RB 42149 670 13 is is RB 42149 670 14 , , , 42149 670 15 filling fill VBG 42149 670 16 up up RP 42149 670 17 voids void NNS 42149 670 18 outside outside IN 42149 670 19 the the DT 42149 670 20 main main JJ 42149 670 21 timbering timbering NN 42149 670 22 , , , 42149 670 23 amounted amount VBD 42149 670 24 to to IN 42149 670 25 more more JJR 42149 670 26 than than IN 42149 670 27 two two CD 42149 670 28 - - HYPH 42149 670 29 thirds third NNS 42149 670 30 of of IN 42149 670 31 the the DT 42149 670 32 total total JJ 42149 670 33 timber timber NN 42149 670 34 , , , 42149 670 35 and and CC 42149 670 36 that that IN 42149 670 37 the the DT 42149 670 38 cost cost NN 42149 670 39 of of IN 42149 670 40 labor labor NN 42149 670 41 in in IN 42149 670 42 erecting erect VBG 42149 670 43 the the DT 42149 670 44 timbering timbering NN 42149 670 45 exceeds exceed VBZ 42149 670 46 the the DT 42149 670 47 prime prime JJ 42149 670 48 cost cost NN 42149 670 49 of of IN 42149 670 50 the the DT 42149 670 51 timber timber NN 42149 670 52 by by IN 42149 670 53 about about RB 42149 670 54 one one CD 42149 670 55 - - HYPH 42149 670 56 third third NN 42149 670 57 . . . 42149 671 1 The the DT 42149 671 2 following follow VBG 42149 671 3 distinction distinction NN 42149 671 4 is be VBZ 42149 671 5 made make VBN 42149 671 6 between between IN 42149 671 7 permanent permanent JJ 42149 671 8 and and CC 42149 671 9 temporary temporary JJ 42149 671 10 timbering timbering NN 42149 671 11 : : : 42149 671 12 The the DT 42149 671 13 permanent permanent JJ 42149 671 14 timbering timbering NN 42149 671 15 is be VBZ 42149 671 16 that that DT 42149 671 17 which which WDT 42149 671 18 is be VBZ 42149 671 19 concreted concrete VBN 42149 671 20 in in IN 42149 671 21 when when WRB 42149 671 22 the the DT 42149 671 23 masonry masonry NN 42149 671 24 is be VBZ 42149 671 25 built build VBN 42149 671 26 ; ; : 42149 671 27 the the DT 42149 671 28 temporary temporary JJ 42149 671 29 consists consist NNS 42149 671 30 of of IN 42149 671 31 the the DT 42149 671 32 lower low JJR 42149 671 33 bents bent NNS 42149 671 34 and and CC 42149 671 35 posts post NNS 42149 671 36 , , , 42149 671 37 which which WDT 42149 671 38 have have VBP 42149 671 39 to to TO 42149 671 40 be be VB 42149 671 41 removed remove VBN 42149 671 42 when when WRB 42149 671 43 the the DT 42149 671 44 masonry masonry NN 42149 671 45 is be VBZ 42149 671 46 built build VBN 42149 671 47 . . . 42149 672 1 _ _ NNP 42149 672 2 Force Force NNP 42149 672 3 Employed Employed NNP 42149 672 4 in in IN 42149 672 5 Excavation._--A Excavation._--A NNP 42149 672 6 typical typical JJ 42149 672 7 day day NN 42149 672 8 's 's POS 42149 672 9 working work VBG 42149 672 10 force force NN 42149 672 11 for for IN 42149 672 12 drilling drilling NN 42149 672 13 , , , 42149 672 14 blasting blasting NN 42149 672 15 , , , 42149 672 16 mucking mucking NN 42149 672 17 , , , 42149 672 18 and and CC 42149 672 19 timbering timbering NN 42149 672 20 is be VBZ 42149 672 21 shown show VBN 42149 672 22 in in IN 42149 672 23 Table table NN 42149 672 24 11 11 CD 42149 672 25 . . . 42149 673 1 Where where WRB 42149 673 2 there there EX 42149 673 3 was be VBD 42149 673 4 any any DT 42149 673 5 large large JJ 42149 673 6 quantity quantity NN 42149 673 7 of of IN 42149 673 8 soft soft JJ 42149 673 9 ground ground NN 42149 673 10 in in IN 42149 673 11 the the DT 42149 673 12 roof roof NN 42149 673 13 , , , 42149 673 14 the the DT 42149 673 15 timber timber NN 42149 673 16 gang gang NN 42149 673 17 was be VBD 42149 673 18 much much RB 42149 673 19 larger large JJR 42149 673 20 than than IN 42149 673 21 shown show VBN 42149 673 22 in in IN 42149 673 23 Table table NN 42149 673 24 11 11 CD 42149 673 25 , , , 42149 673 26 and and CC 42149 673 27 was be VBD 42149 673 28 helped help VBN 42149 673 29 by by IN 42149 673 30 the the DT 42149 673 31 mucking mucking NN 42149 673 32 gang gang NN 42149 673 33 . . . 42149 674 1 The the DT 42149 674 2 drillers driller NNS 42149 674 3 did do VBD 42149 674 4 most most JJS 42149 674 5 of of IN 42149 674 6 the the DT 42149 674 7 mucking mucking NN 42149 674 8 out out IN 42149 674 9 of of IN 42149 674 10 the the DT 42149 674 11 heading heading NN 42149 674 12 before before IN 42149 674 13 setting set VBG 42149 674 14 up up RP 42149 674 15 the the DT 42149 674 16 drills drill NNS 42149 674 17 . . . 42149 675 1 _ _ NNP 42149 675 2 Excavation Excavation NNP 42149 675 3 of of IN 42149 675 4 Weehawken Weehawken NNP 42149 675 5 Rock Rock NNP 42149 675 6 Tunnels._--This tunnels._--this DT 42149 675 7 subject subject NN 42149 675 8 may may MD 42149 675 9 be be VB 42149 675 10 dismissed dismiss VBN 42149 675 11 in in IN 42149 675 12 a a DT 42149 675 13 few few JJ 42149 675 14 words word NNS 42149 675 15 , , , 42149 675 16 as as IN 42149 675 17 very very RB 42149 675 18 few few JJ 42149 675 19 features feature NNS 42149 675 20 of of IN 42149 675 21 interest interest NN 42149 675 22 were be VBD 42149 675 23 called call VBN 42149 675 24 into into IN 42149 675 25 play play NN 42149 675 26 . . . 42149 676 1 The the DT 42149 676 2 rock rock NN 42149 676 3 was be VBD 42149 676 4 of of IN 42149 676 5 good good JJ 42149 676 6 quality quality NN 42149 676 7 , , , 42149 676 8 being be VBG 42149 676 9 the the DT 42149 676 10 sandstone sandstone NN 42149 676 11 typical typical JJ 42149 676 12 of of IN 42149 676 13 this this DT 42149 676 14 part part NN 42149 676 15 of of IN 42149 676 16 the the DT 42149 676 17 country country NN 42149 676 18 . . . 42149 677 1 Little little JJ 42149 677 2 or or CC 42149 677 3 no no DT 42149 677 4 timbering timbering NN 42149 677 5 was be VBD 42149 677 6 needed need VBN 42149 677 7 , , , 42149 677 8 there there EX 42149 677 9 were be VBD 42149 677 10 no no DT 42149 677 11 buildings building NNS 42149 677 12 above above IN 42149 677 13 the the DT 42149 677 14 tunnel tunnel NN 42149 677 15 to to TO 42149 677 16 be be VB 42149 677 17 taken take VBN 42149 677 18 care care NN 42149 677 19 of of IN 42149 677 20 , , , 42149 677 21 and and CC 42149 677 22 large large JJ 42149 677 23 charges charge NNS 42149 677 24 of of IN 42149 677 25 powder powder NN 42149 677 26 could could MD 42149 677 27 be be VB 42149 677 28 used use VBN 42149 677 29 . . . 42149 678 1 TABLE TABLE NNS 42149 678 2 9.--SUPPLEMENTARY 9.--supplementary CD 42149 678 3 ANALYSIS analysis NN 42149 678 4 OF of IN 42149 678 5 TIMBERING TIMBERING NNP 42149 678 6 , , , 42149 678 7 ROCK ROCK NNP 42149 678 8 TUNNEL TUNNEL NNP 42149 678 9 EXCAVATION excavation NN 42149 678 10 UNDER under IN 42149 678 11 32D 32D NNP 42149 678 12 STREET STREET NNP 42149 678 13 , , , 42149 678 14 EAST EAST NNP 42149 678 15 OF of IN 42149 678 16 CUT CUT NNP 42149 678 17 - - HYPH 42149 678 18 AND and CC 42149 678 19 - - HYPH 42149 678 20 COVER COVER NNP 42149 678 21 SECTION section NN 42149 678 22 . . . 42149 679 1 ANALYZED analyzed JJ 42149 679 2 COST COST NNS 42149 679 3 OF of IN 42149 679 4 TIMBERING timbering NN 42149 679 5 , , , 42149 679 6 PER PER NNP 42149 679 7 FOOT FOOT NNP 42149 679 8 RUN run VBP 42149 679 9 AND and CC 42149 679 10 PER per NN 42149 679 11 BENT BENT NNP 42149 679 12 . . . 42149 680 1 + + NFP 42149 680 2 = = SYM 42149 680 3 = = SYM 42149 680 4 = = SYM 42149 680 5 = = SYM 42149 680 6 = = SYM 42149 680 7 = = SYM 42149 680 8 = = SYM 42149 680 9 = = SYM 42149 680 10 = = SYM 42149 680 11 = = SYM 42149 680 12 = = SYM 42149 680 13 = = SYM 42149 680 14 = = SYM 42149 680 15 = = SYM 42149 680 16 = = SYM 42149 680 17 = = SYM 42149 680 18 = = SYM 42149 680 19 = = SYM 42149 680 20 = = SYM 42149 680 21 = = SYM 42149 680 22 = = SYM 42149 680 23 = = SYM 42149 680 24 = = SYM 42149 680 25 = = SYM 42149 680 26 = = SYM 42149 680 27 = = SYM 42149 680 28 = = SYM 42149 680 29 = = NFP 42149 680 30 = = SYM 42149 680 31 + + SYM 42149 680 32 = = SYM 42149 680 33 = = SYM 42149 680 34 = = SYM 42149 680 35 = = SYM 42149 680 36 = = SYM 42149 680 37 = = SYM 42149 680 38 = = SYM 42149 680 39 = = SYM 42149 680 40 = = SYM 42149 680 41 = = SYM 42149 680 42 = = SYM 42149 680 43 = = SYM 42149 680 44 = = SYM 42149 680 45 = = SYM 42149 680 46 = = SYM 42149 680 47 = = SYM 42149 680 48 = = SYM 42149 680 49 = = SYM 42149 680 50 = = SYM 42149 680 51 = = SYM 42149 680 52 = = SYM 42149 680 53 = = SYM 42149 680 54 = = SYM 42149 680 55 = = SYM 42149 680 56 = = SYM 42149 680 57 = = SYM 42149 680 58 = = SYM 42149 680 59 = = SYM 42149 680 60 = = SYM 42149 680 61 = = SYM 42149 680 62 = = SYM 42149 680 63 = = SYM 42149 680 64 | | NNP 42149 680 65 | | NNP 42149 680 66 _ _ NNP 42149 680 67 Ke Ke NNP 42149 680 68 _ _ NNP 42149 680 69 | | NNP 42149 680 70 |--------+------------+---------- |--------+------------+---------- CD 42149 680 71 | | CD 42149 680 72 |Per |per NN 42149 680 73 foot|Per foot|per NN 42149 680 74 bent bent NN 42149 680 75 , , , 42149 680 76 |Per |Per NNP 42149 680 77 cubic cubic JJ 42149 680 78 | | NNP 42149 680 79 |run |run NNP 42149 680 80 of of IN 42149 680 81 |3 |3 NNP 42149 680 82 ft ft NNP 42149 680 83 , , , 42149 680 84 6 6 CD 42149 680 85 in in IN 42149 680 86 . . . 42149 680 87 ,|yard ,|yard , 42149 680 88 | | NNP 42149 680 89 |tunnel |tunnel CD 42149 680 90 |center |center CD 42149 680 91 to to IN 42149 680 92 |excavation |excavation CD 42149 680 93 | | CD 42149 680 94 | | CD 42149 680 95 |center |center CD 42149 680 96 | | CD 42149 680 97 |-----------------------------+--------+------------+---------- |-----------------------------+--------+------------+---------- NNS 42149 680 98 |PERMANENT |permanent DT 42149 680 99 TIMBERING timbering NN 42149 680 100 . . . 42149 681 1 | | NNP 42149 681 2 | | CD 42149 681 3 | | CD 42149 681 4 |Lumber |Lumber NNS 42149 681 5 in in IN 42149 681 6 feet foot NNS 42149 681 7 , , , 42149 681 8 B. B. NNP 42149 681 9 M. M. NNP 42149 681 10 | | NNP 42149 681 11 | | NNP 42149 681 12 | | CD 42149 681 13 | | NNP 42149 681 14 Upper Upper NNP 42149 681 15 Bent Bent NNP 42149 681 16 . . . 42149 682 1 | | NNP 42149 682 2 274 274 CD 42149 682 3 | | CD 42149 682 4 685 685 CD 42149 682 5 | | CD 42149 682 6 7.8 7.8 CD 42149 682 7 | | CD 42149 682 8 Blocking blocking NN 42149 682 9 . . . 42149 683 1 | | NNP 42149 683 2 294 294 CD 42149 683 3 | | CD 42149 683 4 735 735 CD 42149 683 5 | | CD 42149 683 6 8.3 8.3 CD 42149 683 7 | | NNP 42149 683 8 Total total NN 42149 683 9 . . . 42149 684 1 | | NNP 42149 684 2 568 568 CD 42149 684 3 | | CD 42149 684 4 1,420 1,420 CD 42149 684 5 | | CD 42149 684 6 16.1 16.1 CD 42149 684 7 |Cost |Cost NNP 42149 684 8 , , , 42149 684 9 in in IN 42149 684 10 dollars dollar NNS 42149 684 11 . . . 42149 685 1 | | NNP 42149 685 2 | | NNP 42149 685 3 | | CD 42149 685 4 | | NNP 42149 685 5 Lumber Lumber NNP 42149 685 6 . . . 42149 686 1 | | NNP 42149 686 2 23.75| 23.75| CD 42149 686 3 59.38 59.38 CD 42149 686 4 | | CD 42149 686 5 0.67 0.67 CD 42149 686 6 | | NNS 42149 686 7 Labor labor NN 42149 686 8 . . . 42149 687 1 | | CD 42149 687 2 37.50| 37.50| CD 42149 687 3 93.75 93.75 CD 42149 687 4 | | CD 42149 687 5 1.06 1.06 CD 42149 687 6 | | CD 42149 687 7 Total total NN 42149 687 8 . . . 42149 688 1 | | NNP 42149 688 2 61.25| 61.25| CD 42149 688 3 153.13 153.13 CD 42149 688 4 | | CD 42149 688 5 1.73 1.73 CD 42149 688 6 | | CD 42149 688 7 | | CD 42149 688 8 | | CD 42149 688 9 | | CD 42149 688 10 |TEMPORARY |TEMPORARY NNP 42149 688 11 TIMBERING timbering NN 42149 688 12 . . . 42149 689 1 | | NNP 42149 689 2 | | CD 42149 689 3 | | CD 42149 689 4 |Lumber |Lumber NNS 42149 689 5 in in IN 42149 689 6 feet foot NNS 42149 689 7 , , , 42149 689 8 B. B. NNP 42149 689 9 M. M. NNP 42149 689 10 | | NNP 42149 689 11 | | NNP 42149 689 12 | | CD 42149 689 13 | | NN 42149 689 14 Lower Lower NNP 42149 689 15 Bent Bent NNP 42149 689 16 . . . 42149 690 1 | | NNP 42149 690 2 479 479 CD 42149 690 3 | | CD 42149 690 4 11.97 11.97 CD 42149 690 5 | | CD 42149 690 6 13.6 13.6 CD 42149 690 7 | | CD 42149 690 8 Blocking blocking NN 42149 690 9 . . . 42149 691 1 | | NNP 42149 691 2 193 193 CD 42149 691 3 | | CD 42149 691 4 483 483 CD 42149 691 5 | | CD 42149 691 6 5.5 5.5 CD 42149 691 7 | | CD 42149 691 8 Total total NN 42149 691 9 . . . 42149 692 1 | | NNP 42149 692 2 672 672 CD 42149 692 3 | | CD 42149 692 4 16.80 16.80 CD 42149 692 5 | | CD 42149 692 6 19.1 19.1 CD 42149 692 7 |Cost |cost NN 42149 692 8 , , , 42149 692 9 in in IN 42149 692 10 dollars dollar NNS 42149 692 11 . . . 42149 693 1 | | NNP 42149 693 2 | | NNP 42149 693 3 | | CD 42149 693 4 | | NNP 42149 693 5 Lumber Lumber NNP 42149 693 6 . . . 42149 694 1 | | NNP 42149 694 2 29.13| 29.13| CD 42149 694 3 72.81 72.81 CD 42149 694 4 | | CD 42149 694 5 0.82 0.82 CD 42149 694 6 | | NNP 42149 694 7 Erection Erection NNP 42149 694 8 labor labor NN 42149 694 9 . . . 42149 695 1 | | NNP 42149 695 2 28.85| 28.85| CD 42149 695 3 72.13 72.13 CD 42149 695 4 | | CD 42149 695 5 0.82 0.82 CD 42149 695 6 | | NNP 42149 695 7 Removal Removal NNP 42149 695 8 labor labor NN 42149 695 9 . . . 42149 696 1 | | CD 42149 696 2 8.29| 8.29| CD 42149 696 3 20.73 20.73 CD 42149 696 4 | | CD 42149 696 5 0.23 0.23 CD 42149 696 6 | | NNP 42149 696 7 Total total JJ 42149 696 8 labor labor NN 42149 696 9 . . . 42149 697 1 | | NNP 42149 697 2 37.14| 37.14| CD 42149 697 3 92.86 92.86 CD 42149 697 4 | | CD 42149 697 5 1.05 1.05 CD 42149 697 6 | | NNP 42149 697 7 Total Total NNP 42149 697 8 . . . 42149 698 1 | | NNP 42149 698 2 66.27| 66.27| CD 42149 698 3 165.67 165.67 CD 42149 698 4 | | CD 42149 698 5 1.87 1.87 CD 42149 698 6 | | CD 42149 698 7 | | CD 42149 698 8 | | CD 42149 698 9 | | CD 42149 698 10 |GRAND |GRAND NNS 42149 698 11 TOTAL total NN 42149 698 12 . . . 42149 699 1 | | NNP 42149 699 2 | | CD 42149 699 3 | | CD 42149 699 4 |Lumber |Lumber NNS 42149 699 5 in in IN 42149 699 6 feet foot NNS 42149 699 7 , , , 42149 699 8 B. B. NNP 42149 699 9 M. M. NNP 42149 699 10 |1,240 |1,240 NNP 42149 699 11 | | NNP 42149 699 12 3,100 3,100 CD 42149 699 13 | | CD 42149 699 14 35.2 35.2 CD 42149 699 15 |Cost |Cost NNP 42149 699 16 , , , 42149 699 17 in in IN 42149 699 18 dollars dollar NNS 42149 699 19 . . . 42149 700 1 | | NNP 42149 700 2 | | NNP 42149 700 3 | | CD 42149 700 4 | | NNP 42149 700 5 Lumber Lumber NNP 42149 700 6 . . . 42149 701 1 | | CD 42149 701 2 52.88| 52.88| CD 42149 701 3 132.19 132.19 CD 42149 701 4 | | CD 42149 701 5 1.49 1.49 CD 42149 701 6 | | NNS 42149 701 7 Labor labor NN 42149 701 8 . . . 42149 702 1 | | NNP 42149 702 2 74.64| 74.64| NNP 42149 702 3 186.61 186.61 CD 42149 702 4 | | CD 42149 702 5 3.60 3.60 CD 42149 702 6 | | CD 42149 702 7 Total total NN 42149 702 8 . . . 42149 703 1 | | NNP 42149 703 2 127.52| 127.52| CD 42149 703 3 318.80 318.80 CD 42149 703 4 | | CD 42149 703 5 |-----------------------------+--------+------------+---------- |-----------------------------+--------+------------+---------- VBZ 42149 703 6 | | CD 42149 703 7 | | CD 42149 703 8 _ _ NNP 42149 703 9 Ki Ki NNP 42149 703 10 _ _ NNP 42149 703 11 | | NNP 42149 703 12 |--------+------------+---------- |--------+------------+---------- CD 42149 703 13 | | CD 42149 703 14 |Per |per NN 42149 703 15 foot|Per foot|per NN 42149 703 16 bent bent NN 42149 703 17 , , , 42149 703 18 |Per |Per NNP 42149 703 19 cubic cubic JJ 42149 703 20 | | NNP 42149 703 21 |run |run NNP 42149 703 22 of of IN 42149 703 23 |3 |3 NNP 42149 703 24 ft ft NNP 42149 703 25 , , , 42149 703 26 6 6 CD 42149 703 27 in in IN 42149 703 28 . . . 42149 703 29 ,|yard ,|yard , 42149 703 30 | | NNP 42149 703 31 |tunnel |tunnel CD 42149 703 32 |center |center CD 42149 703 33 to to IN 42149 703 34 |excavation |excavation CD 42149 703 35 | | CD 42149 703 36 | | CD 42149 703 37 |center |center CD 42149 703 38 | | CD 42149 703 39 |-----------------------------+--------+------------+---------- |-----------------------------+--------+------------+---------- NNS 42149 703 40 |PERMANENT |permanent DT 42149 703 41 TIMBERING timbering NN 42149 703 42 . . . 42149 704 1 | | NNP 42149 704 2 | | CD 42149 704 3 | | CD 42149 704 4 |Lumber |Lumber NNS 42149 704 5 in in IN 42149 704 6 feet foot NNS 42149 704 7 , , , 42149 704 8 B. B. NNP 42149 704 9 M. M. NNP 42149 704 10 | | NNP 42149 704 11 | | NNP 42149 704 12 | | CD 42149 704 13 | | NNP 42149 704 14 Upper Upper NNP 42149 704 15 Bent Bent NNP 42149 704 16 . . . 42149 705 1 | | NNP 42149 705 2 227 227 CD 42149 705 3 | | CD 42149 705 4 830 830 CD 42149 705 5 | | CD 42149 705 6 5.3 5.3 CD 42149 705 7 | | NNS 42149 705 8 Blocking blocking NN 42149 705 9 . . . 42149 706 1 | | NNP 42149 706 2 164 164 CD 42149 706 3 | | CD 42149 706 4 601 601 CD 42149 706 5 | | CD 42149 706 6 3.8 3.8 CD 42149 706 7 | | CD 42149 706 8 Total Total NNP 42149 706 9 . . . 42149 707 1 | | NNP 42149 707 2 391 391 CD 42149 707 3 | | CD 42149 707 4 1,431 1,431 CD 42149 707 5 | | CD 42149 707 6 9.1 9.1 CD 42149 707 7 |Cost |cost CD 42149 707 8 , , , 42149 707 9 in in IN 42149 707 10 dollars dollar NNS 42149 707 11 . . . 42149 708 1 | | NNP 42149 708 2 | | NNP 42149 708 3 | | CD 42149 708 4 | | NNP 42149 708 5 Lumber Lumber NNP 42149 708 6 . . . 42149 709 1 | | CD 42149 709 2 16.84| 16.84| CD 42149 709 3 61.56 61.56 CD 42149 709 4 | | CD 42149 709 5 0.39 0.39 CD 42149 709 6 | | NNS 42149 709 7 Labor labor NN 42149 709 8 . . . 42149 710 1 | | CD 42149 710 2 12.82| 12.82| CD 42149 710 3 46.88 46.88 CD 42149 710 4 | | CD 42149 710 5 0.30 0.30 CD 42149 710 6 | | NNP 42149 710 7 Total total NN 42149 710 8 . . . 42149 711 1 | | NNP 42149 711 2 29.66| 29.66| CD 42149 711 3 108.44 108.44 CD 42149 711 4 | | CD 42149 711 5 0.69 0.69 CD 42149 711 6 | | CD 42149 711 7 | | CD 42149 711 8 | | CD 42149 711 9 | | CD 42149 711 10 |TEMPORARY |TEMPORARY NNP 42149 711 11 TIMBERING timbering NN 42149 711 12 . . . 42149 712 1 | | NNP 42149 712 2 | | CD 42149 712 3 | | CD 42149 712 4 |Lumber |Lumber NNS 42149 712 5 in in IN 42149 712 6 feet foot NNS 42149 712 7 , , , 42149 712 8 B. B. NNP 42149 712 9 M. M. NNP 42149 712 10 | | NNP 42149 712 11 | | NNP 42149 712 12 | | CD 42149 712 13 | | NN 42149 712 14 Lower Lower NNP 42149 712 15 Bent Bent NNP 42149 712 16 . . . 42149 713 1 | | NNP 42149 713 2 186.33| 186.33| CD 42149 713 3 681.25 681.25 CD 42149 713 4 | | CD 42149 713 5 4.33 4.33 CD 42149 713 6 | | NNS 42149 713 7 Blocking blocking NN 42149 713 8 . . . 42149 714 1 | | CD 42149 714 2 42.80 42.80 CD 42149 714 3 156.50 156.50 CD 42149 714 4 | | CD 42149 714 5 0.99 0.99 CD 42149 714 6 | | NNP 42149 714 7 Total Total NNP 42149 714 8 . . . 42149 715 1 | | NNP 42149 715 2 229.13| 229.13| CD 42149 715 3 837.75 837.75 CD 42149 715 4 | | CD 42149 715 5 5.32 5.32 CD 42149 715 6 |Cost |cost CD 42149 715 7 , , , 42149 715 8 in in IN 42149 715 9 dollars dollar NNS 42149 715 10 . . . 42149 716 1 | | NNP 42149 716 2 | | NNP 42149 716 3 | | CD 42149 716 4 | | NNP 42149 716 5 Lumber Lumber NNP 42149 716 6 . . . 42149 717 1 | | CD 42149 717 2 9.65| 9.65| CD 42149 717 3 35.31 35.31 CD 42149 717 4 | | CD 42149 717 5 0.22 0.22 CD 42149 717 6 | | NNP 42149 717 7 Erection Erection NNP 42149 717 8 labor labor NN 42149 717 9 . . . 42149 718 1 | | NNP 42149 718 2 10.38| 10.38| CD 42149 718 3 37.97 37.97 CD 42149 718 4 | | CD 42149 718 5 0.24 0.24 CD 42149 718 6 | | NNP 42149 718 7 Removal Removal NNP 42149 718 8 labor labor NN 42149 718 9 . . . 42149 719 1 | | CD 42149 719 2 9.74| 9.74| CD 42149 719 3 34.09 34.09 CD 42149 719 4 | | CD 42149 719 5 0.23 0.23 CD 42149 719 6 | | NNP 42149 719 7 Total total JJ 42149 719 8 labor labor NN 42149 719 9 . . . 42149 720 1 | | NNP 42149 720 2 20.12| 20.12| CD 42149 720 3 72.06 72.06 CD 42149 720 4 | | CD 42149 720 5 0.47 0.47 CD 42149 720 6 | | NNP 42149 720 7 Total Total NNP 42149 720 8 . . . 42149 721 1 | | NNP 42149 721 2 29.77| 29.77| CD 42149 721 3 107.37 107.37 CD 42149 721 4 | | CD 42149 721 5 0.69 0.69 CD 42149 721 6 | | CD 42149 721 7 | | CD 42149 721 8 | | CD 42149 721 9 | | CD 42149 721 10 |GRAND |GRAND NNS 42149 721 11 TOTAL total NN 42149 721 12 . . . 42149 722 1 | | NNP 42149 722 2 | | CD 42149 722 3 | | CD 42149 722 4 |Lumber |Lumber NNS 42149 722 5 in in IN 42149 722 6 feet foot NNS 42149 722 7 , , , 42149 722 8 B. B. NNP 42149 722 9 M. M. NNP 42149 722 10 | | NNP 42149 722 11 6.20| 6.20| CD 42149 722 12 22.69 22.69 CD 42149 722 13 | | CD 42149 722 14 14.4 14.4 CD 42149 722 15 |Cost |cost PRP 42149 722 16 , , , 42149 722 17 in in IN 42149 722 18 dollars dollar NNS 42149 722 19 . . . 42149 723 1 | | NNP 42149 723 2 | | NNP 42149 723 3 | | CD 42149 723 4 | | NNP 42149 723 5 Lumber Lumber NNP 42149 723 6 . . . 42149 724 1 | | CD 42149 724 2 26.49| 26.49| CD 42149 724 3 96.87 96.87 CD 42149 724 4 | | CD 42149 724 5 0.61 0.61 CD 42149 724 6 | | NNS 42149 724 7 Labor labor NN 42149 724 8 . . . 42149 725 1 | | NNP 42149 725 2 32.94| 32.94| NNP 42149 725 3 118.94 118.94 CD 42149 725 4 | | CD 42149 725 5 0.77 0.77 CD 42149 725 6 | | NNP 42149 725 7 Total Total NNP 42149 725 8 . . . 42149 726 1 | | NNP 42149 726 2 59.43| 59.43| NNP 42149 726 3 215.81 215.81 CD 42149 726 4 | | CD 42149 726 5 1.38 1.38 CD 42149 726 6 |-----------------------------+--------+----------------------- |-----------------------------+--------+----------------------- CD 42149 726 7 | | CD 42149 726 8 | | CD 42149 726 9 _ _ NNP 42149 726 10 Ko Ko NNP 42149 726 11 _ _ NNP 42149 726 12 | | NNP 42149 726 13 |--------+------------+---------- |--------+------------+---------- CD 42149 726 14 | | CD 42149 726 15 |Per |per NN 42149 726 16 foot|Per foot|per NN 42149 726 17 bent bent NN 42149 726 18 , , , 42149 726 19 |Per |Per NNP 42149 726 20 cubic cubic JJ 42149 726 21 | | NNP 42149 726 22 |run |run NNP 42149 726 23 of of IN 42149 726 24 |3 |3 NNP 42149 726 25 ft ft NNP 42149 726 26 , , , 42149 726 27 6 6 CD 42149 726 28 in in IN 42149 726 29 . . . 42149 726 30 ,|yard ,|yard , 42149 726 31 | | NNP 42149 726 32 |tunnel |tunnel CD 42149 726 33 |center |center CD 42149 726 34 to to IN 42149 726 35 |excavation |excavation CD 42149 726 36 | | CD 42149 726 37 | | CD 42149 726 38 |center |center CD 42149 726 39 | | CD 42149 726 40 |-----------------------------+--------+------------+---------- |-----------------------------+--------+------------+---------- NNS 42149 726 41 |PERMANENT |permanent DT 42149 726 42 TIMBERING timbering NN 42149 726 43 . . . 42149 727 1 | | NNP 42149 727 2 | | CD 42149 727 3 | | CD 42149 727 4 |Lumber |Lumber NNS 42149 727 5 in in IN 42149 727 6 feet foot NNS 42149 727 7 , , , 42149 727 8 B. B. NNP 42149 727 9 M. M. NNP 42149 727 10 | | NNP 42149 727 11 | | NNP 42149 727 12 | | CD 42149 727 13 | | NNP 42149 727 14 Upper Upper NNP 42149 727 15 Bent Bent NNP 42149 727 16 . . . 42149 728 1 | | NNP 42149 728 2 261 261 CD 42149 728 3 | | CD 42149 728 4 962 962 CD 42149 728 5 | | CD 42149 728 6 4.1 4.1 CD 42149 728 7 | | CD 42149 728 8 Blocking blocking NN 42149 728 9 . . . 42149 729 1 | | NNP 42149 729 2 408 408 CD 42149 729 3 | | CD 42149 729 4 1,508 1,508 CD 42149 729 5 | | CD 42149 729 6 6.5 6.5 CD 42149 729 7 | | CD 42149 729 8 Total total NN 42149 729 9 . . . 42149 730 1 | | NNP 42149 730 2 669 669 CD 42149 730 3 | | CD 42149 730 4 24.70 24.70 CD 42149 730 5 | | CD 42149 730 6 10.5 10.5 CD 42149 730 7 |Cost |Cost NNS 42149 730 8 , , , 42149 730 9 in in IN 42149 730 10 dollars dollar NNS 42149 730 11 . . . 42149 731 1 | | NNP 42149 731 2 | | NNP 42149 731 3 | | CD 42149 731 4 | | NNP 42149 731 5 Lumber Lumber NNP 42149 731 6 . . . 42149 732 1 | | NNP 42149 732 2 28.00| 28.00| CD 42149 732 3 103.38 103.38 CD 42149 732 4 | | CD 42149 732 5 0.44 0.44 CD 42149 732 6 | | NNS 42149 732 7 Labor Labor NNP 42149 732 8 . . . 42149 733 1 | | NNP 42149 733 2 29.79| 29.79| CD 42149 733 3 110.00 110.00 CD 42149 733 4 | | CD 42149 733 5 0.47 0.47 CD 42149 733 6 | | NNP 42149 733 7 Total total NN 42149 733 8 . . . 42149 734 1 | | NNP 42149 734 2 57.79| 57.79| CD 42149 734 3 213.38 213.38 CD 42149 734 4 | | CD 42149 734 5 0.91 0.91 CD 42149 734 6 | | CD 42149 734 7 | | NNP 42149 734 8 | | CD 42149 734 9 | | CD 42149 734 10 |TEMPORARY |TEMPORARY NNP 42149 734 11 TIMBERING timbering NN 42149 734 12 . . . 42149 735 1 | | NNP 42149 735 2 | | CD 42149 735 3 | | CD 42149 735 4 |Lumber |Lumber NNS 42149 735 5 in in IN 42149 735 6 feet foot NNS 42149 735 7 , , , 42149 735 8 B. B. NNP 42149 735 9 M. M. NNP 42149 735 10 | | NNP 42149 735 11 | | NNP 42149 735 12 | | CD 42149 735 13 | | NN 42149 735 14 Lower Lower NNP 42149 735 15 Bent Bent NNP 42149 735 16 . . . 42149 736 1 | | NNP 42149 736 2 350 350 CD 42149 736 3 | | CD 42149 736 4 1,291 1,291 CD 42149 736 5 | | CD 42149 736 6 5.5 5.5 CD 42149 736 7 | | CD 42149 736 8 Blocking blocking NN 42149 736 9 . . . 42149 737 1 | | NNP 42149 737 2 61 61 CD 42149 737 3 | | CD 42149 737 4 227 227 CD 42149 737 5 | | CD 42149 737 6 1.0 1.0 CD 42149 737 7 | | CD 42149 737 8 Total total NN 42149 737 9 . . . 42149 738 1 | | NNP 42149 738 2 411 411 CD 42149 738 3 | | CD 42149 738 4 1,518 1,518 CD 42149 738 5 | | CD 42149 738 6 6.5 6.5 CD 42149 738 7 |Cost |cost PRP 42149 738 8 , , , 42149 738 9 in in IN 42149 738 10 dollars dollar NNS 42149 738 11 . . . 42149 739 1 | | NNP 42149 739 2 | | NNP 42149 739 3 | | CD 42149 739 4 | | NNP 42149 739 5 Lumber Lumber NNP 42149 739 6 . . . 42149 740 1 | | NNP 42149 740 2 18.45| 18.45| CD 42149 740 3 68.16 68.16 CD 42149 740 4 | | CD 42149 740 5 0.29 0.29 CD 42149 740 6 | | NNP 42149 740 7 Erection Erection NNP 42149 740 8 labor labor NN 42149 740 9 . . . 42149 741 1 | | NNP 42149 741 2 20.83| 20.83| CD 42149 741 3 76.92 76.92 CD 42149 741 4 | | CD 42149 741 5 0.33 0.33 CD 42149 741 6 | | NNP 42149 741 7 Removal Removal NNP 42149 741 8 labor labor NN 42149 741 9 . . . 42149 742 1 | | NNP 42149 742 2 12.16| 12.16| CD 42149 742 3 44.59 44.59 CD 42149 742 4 | | CD 42149 742 5 0.19 0.19 CD 42149 742 6 | | JJ 42149 742 7 Total total JJ 42149 742 8 labor labor NN 42149 742 9 . . . 42149 743 1 | | NNP 42149 743 2 32.99| 32.99| CD 42149 743 3 121.51 121.51 CD 42149 743 4 | | CD 42149 743 5 0.52 0.52 CD 42149 743 6 | | NNP 42149 743 7 Total Total NNP 42149 743 8 . . . 42149 744 1 | | NNP 42149 744 2 51.44| 51.44| CD 42149 744 3 189.67 189.67 CD 42149 744 4 | | CD 42149 744 5 0.81 0.81 CD 42149 744 6 | | CD 42149 744 7 | | CD 42149 744 8 | | CD 42149 744 9 | | CD 42149 744 10 |GRAND |GRAND NNS 42149 744 11 TOTAL total NN 42149 744 12 . . . 42149 745 1 | | NNP 42149 745 2 | | CD 42149 745 3 | | CD 42149 745 4 |Lumber |Lumber NNS 42149 745 5 in in IN 42149 745 6 feet foot NNS 42149 745 7 , , , 42149 745 8 B. B. NNP 42149 745 9 M. M. NNP 42149 745 10 |1,080 |1,080 NNP 42149 745 11 | | NNP 42149 745 12 3,988 3,988 CD 42149 745 13 | | CD 42149 745 14 17.1 17.1 CD 42149 745 15 |Cost |Cost NNS 42149 745 16 , , , 42149 745 17 in in IN 42149 745 18 dollars dollar NNS 42149 745 19 . . . 42149 746 1 | | NNP 42149 746 2 | | NNP 42149 746 3 | | CD 42149 746 4 | | NNP 42149 746 5 Lumber Lumber NNP 42149 746 6 . . . 42149 747 1 | | NNP 42149 747 2 46.45| 46.45| CD 42149 747 3 171.54 171.54 CD 42149 747 4 | | CD 42149 747 5 0.73 0.73 CD 42149 747 6 | | NNS 42149 747 7 Labor labor NN 42149 747 8 . . . 42149 748 1 | | NNP 42149 748 2 62.78| 62.78| CD 42149 748 3 231.50 231.50 CD 42149 748 4 | | CD 42149 748 5 0.99 0.99 CD 42149 748 6 | | NNP 42149 748 7 Total Total NNP 42149 748 8 . . . 42149 749 1 | | NNP 42149 749 2 109.23| 109.23| CD 42149 749 3 403.04 403.04 CD 42149 749 4 | | CD 42149 749 5 1.72 1.72 CD 42149 749 6 + + SYM 42149 749 7 = = SYM 42149 749 8 = = SYM 42149 749 9 = = SYM 42149 749 10 = = SYM 42149 749 11 = = SYM 42149 749 12 = = SYM 42149 749 13 = = SYM 42149 749 14 = = SYM 42149 749 15 = = SYM 42149 749 16 = = SYM 42149 749 17 = = SYM 42149 749 18 = = SYM 42149 749 19 = = SYM 42149 749 20 = = SYM 42149 749 21 = = SYM 42149 749 22 = = SYM 42149 749 23 = = SYM 42149 749 24 = = SYM 42149 749 25 = = SYM 42149 749 26 = = SYM 42149 749 27 = = SYM 42149 749 28 = = SYM 42149 749 29 = = SYM 42149 749 30 = = SYM 42149 749 31 = = SYM 42149 749 32 = = SYM 42149 749 33 = = SYM 42149 749 34 = = NFP 42149 749 35 = = SYM 42149 749 36 + + SYM 42149 749 37 = = SYM 42149 749 38 = = SYM 42149 749 39 = = SYM 42149 749 40 = = SYM 42149 749 41 = = SYM 42149 749 42 = = SYM 42149 749 43 = = NFP 42149 749 44 = = SYM 42149 749 45 + + SYM 42149 749 46 = = SYM 42149 749 47 = = SYM 42149 749 48 = = SYM 42149 749 49 = = SYM 42149 749 50 = = SYM 42149 749 51 = = SYM 42149 749 52 = = SYM 42149 749 53 = = SYM 42149 749 54 = = SYM 42149 749 55 = = SYM 42149 749 56 = = NFP 42149 749 57 = = SYM 42149 749 58 + + SYM 42149 749 59 = = SYM 42149 749 60 = = SYM 42149 749 61 = = SYM 42149 749 62 = = SYM 42149 749 63 = = SYM 42149 749 64 = = SYM 42149 749 65 = = SYM 42149 749 66 = = NFP 42149 749 67 = = SYM 42149 749 68 TABLE TABLE NNS 42149 749 69 10.--TIMBERING:--DETAILED 10.--timbering:--detailed CD 42149 749 70 COST cost NN 42149 749 71 OF of IN 42149 749 72 TIMBER timber NN 42149 749 73 , , , 42149 749 74 LABOR labor NN 42149 749 75 , , , 42149 749 76 AND and CC 42149 749 77 SUPERINTENDENCE SUPERINTENDENCE NNP 42149 749 78 . . . 42149 750 1 ROCK ROCK NNP 42149 750 2 TUNNEL TUNNEL NNP 42149 750 3 EXCAVATION excavation NN 42149 750 4 UNDER under IN 42149 750 5 32D 32D NNP 42149 750 6 STREET STREET NNP 42149 750 7 , , , 42149 750 8 EAST EAST NNP 42149 750 9 OF of IN 42149 750 10 CUT CUT NNP 42149 750 11 - - HYPH 42149 750 12 AND and CC 42149 750 13 - - HYPH 42149 750 14 COVER COVER NNP 42149 750 15 SECTION section NN 42149 750 16 . . . 42149 751 1 + + NFP 42149 751 2 = = SYM 42149 751 3 = = SYM 42149 751 4 = = SYM 42149 751 5 = = SYM 42149 751 6 + + SYM 42149 751 7 = = SYM 42149 751 8 = = SYM 42149 751 9 = = SYM 42149 751 10 = = SYM 42149 751 11 = = SYM 42149 751 12 = = NFP 42149 751 13 = = SYM 42149 751 14 + + SYM 42149 751 15 = = SYM 42149 751 16 = = SYM 42149 751 17 = = SYM 42149 751 18 = = SYM 42149 751 19 = = SYM 42149 751 20 = = SYM 42149 751 21 = = SYM 42149 751 22 = = SYM 42149 751 23 = = SYM 42149 751 24 = = SYM 42149 751 25 = = SYM 42149 751 26 = = SYM 42149 751 27 = = SYM 42149 751 28 = = SYM 42149 751 29 = = SYM 42149 751 30 = = SYM 42149 751 31 = = SYM 42149 751 32 = = SYM 42149 751 33 = = SYM 42149 751 34 = = SYM 42149 751 35 = = SYM 42149 751 36 = = SYM 42149 751 37 = = SYM 42149 751 38 = = SYM 42149 751 39 = = SYM 42149 751 40 = = SYM 42149 751 41 = = SYM 42149 751 42 = = SYM 42149 751 43 = = SYM 42149 751 44 = = SYM 42149 751 45 = = SYM 42149 751 46 = = SYM 42149 751 47 = = SYM 42149 751 48 = = SYM 42149 751 49 = = SYM 42149 751 50 = = SYM 42149 751 51 = = NFP 42149 751 52 = = SYM 42149 751 53 + + SYM 42149 751 54 = = SYM 42149 751 55 = = SYM 42149 751 56 = = SYM 42149 751 57 = = SYM 42149 751 58 = = SYM 42149 751 59 = = SYM 42149 751 60 = = SYM 42149 751 61 = = SYM 42149 751 62 = = SYM 42149 751 63 = = SYM 42149 751 64 = = SYM 42149 751 65 = = SYM 42149 751 66 = = SYM 42149 751 67 = = SYM 42149 751 68 = = SYM 42149 751 69 = = SYM 42149 751 70 = = SYM 42149 751 71 = = SYM 42149 751 72 = = NFP 42149 751 73 = = SYM 42149 751 74 + + CC 42149 751 75 | | NNP 42149 751 76 | | CD 42149 751 77 | | CD 42149 751 78 | | CD 42149 751 79 EXCAVATION EXCAVATION NNP 42149 751 80 | | NNP 42149 751 81 | | NNP 42149 751 82 | | CD 42149 751 83 | | CD 42149 751 84 | | CD 42149 751 85 TIMBER timber NN 42149 751 86 USED use VBN 42149 751 87 , , , 42149 751 88 IN in IN 42149 751 89 | | CD 42149 751 90 IN in IN 42149 751 91 CUBIC CUBIC VBN 42149 751 92 | | CD 42149 751 93 COST COST NNS 42149 751 94 OF of IN 42149 751 95 | | CD 42149 751 96 | | NNP 42149 751 97 | | CD 42149 751 98 | | CD 42149 751 99 FEET foot NNS 42149 751 100 , , , 42149 751 101 B. B. NNP 42149 751 102 M. M. NNP 42149 751 103 | | NNP 42149 751 104 YARDS YARDS NNP 42149 751 105 | | NNP 42149 751 106 TIMBER TIMBER NNP 42149 751 107 | | HYPH 42149 751 108 | | CD 42149 751 109 | | CD 42149 751 110 |------------------------+-------------+--------------------+ |------------------------+-------------+--------------------+ NNP 42149 751 111 | | CD 42149 751 112 | | NNP 42149 751 113 | | CD 42149 751 114 Main Main NNP 42149 751 115 |Blocking| |blocking| NN 42149 751 116 Total Total NNP 42149 751 117 | | NNP 42149 751 118 | | NNP 42149 751 119 Paid Paid NNP 42149 751 120 | | NNP 42149 751 121 | | NNP 42149 751 122 | | CD 42149 751 123 | | CD 42149 751 124 | | CD 42149 751 125 |Date |date VB 42149 751 126 |timber.|timber |timber.|timber CD 42149 751 127 . . . 42149 752 1 |timber.|Actual| |timber.|Actual| NNP 42149 752 2 for for IN 42149 752 3 . . . 42149 753 1 | | JJ 42149 753 2 Main Main NNP 42149 753 3 |Block.|Total.| |block.|total.| NN 42149 753 4 | | CD 42149 753 5 |-------+-------+--------+-------+------+------+------+------+------+ |-------+-------+--------+-------+------+------+------+------+------+ CD 42149 753 6 | | NNP 42149 753 7 |1907 |1907 NNP 42149 753 8 | | NNP 42149 753 9 _ _ NNP 42149 753 10 a a DT 42149 753 11 _ _ NNP 42149 753 12 | | NNP 42149 753 13 _ _ NNP 42149 753 14 b b NNP 42149 753 15 _ _ NNP 42149 753 16 | | NNP 42149 753 17 _ _ NNP 42149 753 18 c c NNP 42149 753 19 _ _ NNP 42149 753 20 | | NNP 42149 753 21 _ _ NNP 42149 753 22 d d NNP 42149 753 23 _ _ NNP 42149 753 24 | | NNP 42149 753 25 _ _ NNP 42149 753 26 e e NNP 42149 753 27 _ _ NNP 42149 753 28 | | NNP 42149 753 29 _ _ NNP 42149 753 30 f f NNP 42149 753 31 _ _ NNP 42149 753 32 | | NNP 42149 753 33 _ _ NNP 42149 753 34 g g NNP 42149 753 35 _ _ NNP 42149 753 36 | | NNP 42149 753 37 _ _ NNP 42149 753 38 h h NNP 42149 753 39 _ _ NNP 42149 753 40 | | NNP 42149 753 41 | | CD 42149 753 42 |-------+-------+--------+-------+------+------+------+------+------+ |-------+-------+--------+-------+------+------+------+------+------+ CD 42149 753 43 |_Ke_|May |_Ke_|May NNP 42149 753 44 | | NNP 42149 753 45 18,016| 18,016| NNP 42149 753 46 15,234 15,234 CD 42149 753 47 | | CD 42149 753 48 33,250| 33,250| NNP 42149 753 49 1,736| 1,736| CD 42149 753 50 1,664| 1,664| CD 42149 753 51 $ $ $ 42149 753 52 810| 810| CD 42149 753 53 $ $ $ 42149 753 54 565|$1,375| 565|$1,375| CD 42149 753 55 | | CD 42149 753 56 |June |june CD 42149 753 57 | | CD 42149 753 58 14,048| 14,048| CD 42149 753 59 11,528 11,528 CD 42149 753 60 | | CD 42149 753 61 25,576| 25,576| CD 42149 753 62 809| 809| CD 42149 753 63 698| 698| CD 42149 753 64 680| 680| CD 42149 753 65 457| 457| CD 42149 753 66 1,087| 1,087| CD 42149 753 67 | | CD 42149 753 68 |July |july CD 42149 753 69 | | CD 42149 753 70 20,092| 20,092| NNP 42149 753 71 7,339 7,339 CD 42149 753 72 | | NNP 42149 753 73 27,431| 27,431| NNP 42149 753 74 1,022| 1,022| CD 42149 753 75 960| 960| CD 42149 753 76 900| 900| CD 42149 753 77 300| 300| CD 42149 753 78 1,200| 1,200| CD 42149 753 79 | | NNP 42149 753 80 |August |august NN 42149 753 81 | | CD 42149 753 82 6,485| 6,485| CD 42149 753 83 2,632 2,632 CD 42149 753 84 | | CD 42149 753 85 9,117| 9,117| CD 42149 753 86 743| 743| CD 42149 753 87 716| 716| CD 42149 753 88 290| 290| CD 42149 753 89 110| 110| CD 42149 753 90 400| 400| CD 42149 753 91 | | CD 42149 753 92 |Sept |sept NN 42149 753 93 . . . 42149 754 1 | | CD 42149 754 2 1,632| 1,632| CD 42149 754 3 2,224 2,224 CD 42149 754 4 | | CD 42149 754 5 3,856| 3,856| CD 42149 754 6 238| 238| CD 42149 754 7 238| 238| CD 42149 754 8 73| 73| CD 42149 754 9 94| 94| CD 42149 754 10 167| 167| CD 42149 754 11 | | CD 42149 754 12 |Removal| |removal| CD 42149 754 13 | | CD 42149 754 14 | | NNP 42149 754 15 | | CD 42149 754 16 | | CD 42149 754 17 | | CD 42149 754 18 | | CD 42149 754 19 | | CD 42149 754 20 | | CD 42149 754 21 | | CD 42149 754 22 |-------+-------+--------+-------+------+------+------+------+------+ |-------+-------+--------+-------+------+------+------+------+------+ CD 42149 754 23 | | NNP 42149 754 24 |Total |Total NNP 42149 754 25 | | NNP 42149 754 26 60,273| 60,273| NNP 42149 754 27 38,957 38,957 CD 42149 754 28 | | NNP 42149 754 29 99,230| 99,230| NNP 42149 754 30 4,548| 4,548| CD 42149 754 31 4,276|$2,703|$1,526|$4,229| 4,276|$2,703|$1,526|$4,229| CD 42149 754 32 |----+-------+-------+--------+-------+------+------+------+------+------+ |----+-------+-------+--------+-------+------+------+------+------+------+ NNP 42149 754 33 |_Ki_|May |_Ki_|May NNP 42149 754 34 | | NNP 42149 754 35 | | CD 42149 754 36 3,537 3,537 CD 42149 754 37 | | CD 42149 754 38 3,537| 3,537| CD 42149 754 39 614| 614| CD 42149 754 40 527| 527| CD 42149 754 41 | | CD 42149 754 42 $ $ $ 42149 754 43 150| 150| CD 42149 754 44 $ $ $ 42149 754 45 150| 150| CD 42149 754 46 | | CD 42149 754 47 |June |june CD 42149 754 48 | | CD 42149 754 49 300| 300| RB 42149 754 50 | | CD 42149 754 51 300| 300| CD 42149 754 52 357| 357| CD 42149 754 53 259| 259| CD 42149 754 54 $ $ $ 42149 754 55 14| 14| CD 42149 754 56 | | CD 42149 754 57 14| 14| CD 42149 754 58 | | CD 42149 754 59 |July |july CD 42149 754 60 | | CD 42149 754 61 7,776| 7,776| CD 42149 754 62 5,811 5,811 CD 42149 754 63 | | CD 42149 754 64 13,587| 13,587| NNP 42149 754 65 530| 530| CD 42149 754 66 404| 404| CD 42149 754 67 350| 350| CD 42149 754 68 233| 233| CD 42149 754 69 583| 583| CD 42149 754 70 | | NNP 42149 754 71 |August |august NN 42149 754 72 | | NNP 42149 754 73 19,712| 19,712| NNP 42149 754 74 5,702 5,702 CD 42149 754 75 | | CD 42149 754 76 25,414| 25,414| NNP 42149 754 77 925| 925| CD 42149 754 78 890| 890| CD 42149 754 79 887| 887| CD 42149 754 80 220| 220| CD 42149 754 81 1,107| 1,107| CD 42149 754 82 | | NNP 42149 754 83 |Sept |sept NN 42149 754 84 . . . 42149 755 1 | | NNP 42149 755 2 20,556| 20,556| NN 42149 755 3 9,218 9,218 CD 42149 755 4 | | CD 42149 755 5 29,774| 29,774| NNP 42149 755 6 1,585| 1,585| CD 42149 755 7 1,501| 1,501| CD 42149 755 8 925| 925| CD 42149 755 9 325| 325| CD 42149 755 10 1,250| 1,250| CD 42149 755 11 | | CD 42149 755 12 |Removal| |removal| CD 42149 755 13 | | CD 42149 755 14 | | CD 42149 755 15 | | CD 42149 755 16 1,669| 1,669| CD 42149 755 17 1,407| 1,407| CD 42149 755 18 | | CD 42149 755 19 | | CD 42149 755 20 | | CD 42149 755 21 | | CD 42149 755 22 |-------+-------+--------+-------+------+------+------+------+------+ |-------+-------+--------+-------+------+------+------+------+------+ CD 42149 755 23 | | NNP 42149 755 24 |Total |Total NNP 42149 755 25 | | NNP 42149 755 26 48,344| 48,344| NNP 42149 755 27 24,268 24,268 CD 42149 755 28 | | NNP 42149 755 29 72,612| 72,612| NNP 42149 755 30 5,680| 5,680| CD 42149 755 31 4,988|$2,176| 4,988|$2,176| CD 42149 755 32 $ $ $ 42149 755 33 928|$3,104| 928|$3,104| CD 42149 755 34 |----+-------+-------+--------+-------+------+------+------+------+------+ |----+-------+-------+--------+-------+------+------+------+------+------+ NNP 42149 755 35 |_Ko_|May |_Ko_|May NNP 42149 755 36 | | NNP 42149 755 37 4,332| 4,332| CD 42149 755 38 8,788 8,788 CD 42149 755 39 | | NNP 42149 755 40 13,120| 13,120| NNP 42149 755 41 250| 250| CD 42149 755 42 188| 188| CD 42149 755 43 $ $ $ 42149 755 44 175| 175| CD 42149 755 45 $ $ $ 42149 755 46 366| 366| CD 42149 755 47 $ $ $ 42149 755 48 561| 561| CD 42149 755 49 | | CD 42149 755 50 |June |june CD 42149 755 51 | | CD 42149 755 52 7,132| 7,132| CD 42149 755 53 10,017 10,017 CD 42149 755 54 | | CD 42149 755 55 17,149| 17,149| NNP 42149 755 56 496| 496| CD 42149 755 57 347| 347| CD 42149 755 58 324| 324| CD 42149 755 59 396| 396| CD 42149 755 60 720| 720| CD 42149 755 61 | | CD 42149 755 62 |July |july CD 42149 755 63 | | CD 42149 755 64 3,070| 3,070| CD 42149 755 65 200 200 CD 42149 755 66 | | CD 42149 755 67 3,270| 3,270| CD 42149 755 68 626| 626| CD 42149 755 69 606| 606| JJ 42149 755 70 134| 134| CD 42149 755 71 10| 10| CD 42149 755 72 144| 144| CD 42149 755 73 | | NNP 42149 755 74 |August |August NNS 42149 755 75 | | NNP 42149 755 76 10,704| 10,704| CD 42149 755 77 2,102 2,102 CD 42149 755 78 | | CD 42149 755 79 12,806| 12,806| NNP 42149 755 80 718| 718| NNP 42149 755 81 709| 709| CD 42149 755 82 481| 481| CD 42149 755 83 80| 80| CD 42149 755 84 561| 561| CD 42149 755 85 | | CD 42149 755 86 |Sept |sept NN 42149 755 87 . . . 42149 756 1 | | CD 42149 756 2 2,400| 2,400| CD 42149 756 3 245 245 CD 42149 756 4 | | CD 42149 756 5 2,645| 2,645| CD 42149 756 6 396| 396| CD 42149 756 7 324| 324| CD 42149 756 8 108| 108| CD 42149 756 9 8| 8| CD 42149 756 10 116| 116| CD 42149 756 11 | | CD 42149 756 12 |Removal| |removal| CD 42149 756 13 | | NNP 42149 756 14 | | CD 42149 756 15 | | CD 42149 756 16 209| 209| CD 42149 756 17 211| 211| CD 42149 756 18 | | CD 42149 756 19 | | CD 42149 756 20 | | CD 42149 756 21 |----|-------+-------+--------+-------+------+------+------+------+------+ |----|-------+-------+--------+-------+------+------+------+------+------+ CD 42149 756 22 | | CD 42149 756 23 |Total |Total NNP 42149 756 24 | | NNP 42149 756 25 27,638| 27,638| NNP 42149 756 26 21,352 21,352 CD 42149 756 27 |48,990 |48,990 CD 42149 756 28 | | CD 42149 756 29 2,695| 2,695| CD 42149 756 30 2,385|$1,242| 2,385|$1,242| CD 42149 756 31 $ $ $ 42149 756 32 860|$2,102| 860|$2,102| CD 42149 756 33 |----|-------+-------+--------+-------+------+------+------+------+------+ |----|-------+-------+--------+-------+------+------+------+------+------+ CD 42149 756 34 | | CD 42149 756 35 |Grand |grand CD 42149 756 36 |136,255| |136,255| NNS 42149 756 37 84,577 84,577 CD 42149 756 38 |220,832|12,923|11,649|$6,121|$3,314|$9,435| |220,832|12,923|11,649|$6,121|$3,314|$9,435| NNP 42149 756 39 | | CD 42149 756 40 |total |total CD 42149 756 41 | | CD 42149 756 42 | | CD 42149 756 43 | | CD 42149 756 44 | | CD 42149 756 45 | | CD 42149 756 46 | | CD 42149 756 47 | | CD 42149 756 48 | | CD 42149 756 49 | | NNS 42149 756 50 + + NNS 42149 756 51 = = SYM 42149 756 52 = = SYM 42149 756 53 = = NFP 42149 756 54 = = SYM 42149 756 55 + + SYM 42149 756 56 = = SYM 42149 756 57 = = SYM 42149 756 58 = = SYM 42149 756 59 = = SYM 42149 756 60 = = SYM 42149 756 61 = = NFP 42149 756 62 = = SYM 42149 756 63 + + SYM 42149 756 64 = = SYM 42149 756 65 = = SYM 42149 756 66 = = SYM 42149 756 67 = = SYM 42149 756 68 = = SYM 42149 756 69 = = NFP 42149 756 70 = = SYM 42149 756 71 + + SYM 42149 756 72 = = SYM 42149 756 73 = = SYM 42149 756 74 = = SYM 42149 756 75 = = SYM 42149 756 76 = = SYM 42149 756 77 = = SYM 42149 756 78 = = NFP 42149 756 79 = = SYM 42149 756 80 + + SYM 42149 756 81 = = SYM 42149 756 82 = = SYM 42149 756 83 = = SYM 42149 756 84 = = SYM 42149 756 85 = = SYM 42149 756 86 = = NFP 42149 756 87 = = SYM 42149 756 88 + + SYM 42149 756 89 = = SYM 42149 756 90 = = SYM 42149 756 91 = = SYM 42149 756 92 = = SYM 42149 756 93 = = NFP 42149 756 94 = = SYM 42149 756 95 + + SYM 42149 756 96 = = SYM 42149 756 97 = = SYM 42149 756 98 = = SYM 42149 756 99 = = SYM 42149 756 100 = = NFP 42149 756 101 = = SYM 42149 756 102 + + SYM 42149 756 103 = = SYM 42149 756 104 = = SYM 42149 756 105 = = SYM 42149 756 106 = = SYM 42149 756 107 = = NFP 42149 756 108 = = SYM 42149 756 109 + + SYM 42149 756 110 = = SYM 42149 756 111 = = SYM 42149 756 112 = = SYM 42149 756 113 = = SYM 42149 756 114 = = NFP 42149 756 115 = = SYM 42149 756 116 + + SYM 42149 756 117 = = SYM 42149 756 118 = = SYM 42149 756 119 = = SYM 42149 756 120 = = SYM 42149 756 121 = = NFP 42149 756 122 = = SYM 42149 756 123 + + SYM 42149 756 124 + + SYM 42149 756 125 = = SYM 42149 756 126 = = SYM 42149 756 127 = = NFP 42149 756 128 = = SYM 42149 756 129 + + SYM 42149 756 130 = = SYM 42149 756 131 = = SYM 42149 756 132 = = SYM 42149 756 133 = = SYM 42149 756 134 = = SYM 42149 756 135 = = NFP 42149 756 136 = = SYM 42149 756 137 + + SYM 42149 756 138 = = SYM 42149 756 139 = = SYM 42149 756 140 = = SYM 42149 756 141 = = SYM 42149 756 142 = = SYM 42149 756 143 = = NFP 42149 756 144 = = SYM 42149 756 145 + + SYM 42149 756 146 = = SYM 42149 756 147 = = SYM 42149 756 148 = = SYM 42149 756 149 = = SYM 42149 756 150 = = SYM 42149 756 151 = = NFP 42149 756 152 = = SYM 42149 756 153 + + SYM 42149 756 154 = = SYM 42149 756 155 = = SYM 42149 756 156 = = SYM 42149 756 157 = = SYM 42149 756 158 = = SYM 42149 756 159 = = NFP 42149 756 160 = = SYM 42149 756 161 + + SYM 42149 756 162 = = SYM 42149 756 163 = = SYM 42149 756 164 = = SYM 42149 756 165 = = SYM 42149 756 166 = = SYM 42149 756 167 = = NFP 42149 756 168 = = SYM 42149 756 169 + + SYM 42149 756 170 = = SYM 42149 756 171 = = SYM 42149 756 172 = = SYM 42149 756 173 = = SYM 42149 756 174 = = NFP 42149 756 175 = = SYM 42149 756 176 + + SYM 42149 756 177 = = SYM 42149 756 178 = = SYM 42149 756 179 = = SYM 42149 756 180 = = SYM 42149 756 181 = = SYM 42149 756 182 = = NFP 42149 756 183 = = SYM 42149 756 184 + + SYM 42149 756 185 = = SYM 42149 756 186 = = SYM 42149 756 187 = = SYM 42149 756 188 = = NFP 42149 756 189 = = SYM 42149 756 190 + + SYM 42149 756 191 = = SYM 42149 756 192 = = SYM 42149 756 193 = = SYM 42149 756 194 = = SYM 42149 756 195 =| =| ADD 42149 756 196 | | CD 42149 756 197 | | CD 42149 756 198 | | CD 42149 756 199 | | CD 42149 756 200 | | CD 42149 756 201 COST COST NNS 42149 756 202 PER per IN 42149 756 203 | | CD 42149 756 204 COST COST NNS 42149 756 205 PER per IN 42149 756 206 | | NNP 42149 756 207 | | NNP 42149 756 208 | | CD 42149 756 209 | | CD 42149 756 210 | | CD 42149 756 211 | | CD 42149 756 212 CUBIC CUBIC VBD 42149 756 213 YARD YARD NNP 42149 756 214 | | CD 42149 756 215 CUBIC CUBIC VBD 42149 756 216 YARD YARD NNP 42149 756 217 | | CD 42149 756 218 | | NNP 42149 756 219 | | CD 42149 756 220 |COST |COST NNS 42149 756 221 OF| of| IN 42149 756 222 TOTAL total NN 42149 756 223 | | NNS 42149 756 224 ( ( -LRB- 42149 756 225 ACTUAL actual NN 42149 756 226 ) ) -RRB- 42149 756 227 . . . 42149 757 1 | | NNP 42149 757 2 ( ( -LRB- 42149 757 3 PAID PAID NNP 42149 757 4 FOR for IN 42149 757 5 ) ) -RRB- 42149 757 6 . . . 42149 758 1 | | NNP 42149 758 2 | | CD 42149 758 3 | | CD 42149 758 4 | | NNP 42149 758 5 Labor Labor NNP 42149 758 6 | | NNP 42149 758 7 Cost Cost NNP 42149 758 8 . . . 42149 759 1 |-------+-------+------+-------+-----+-----+ |-------+-------+------+-------+-----+-----+ NNP 42149 759 2 | | NNP 42149 759 3 |DATE |DATE NNP 42149 759 4 | | CD 42149 759 5 | | CD 42149 759 6 |Timber.|Labor |timber.|labor NN 42149 759 7 . . . 42149 760 1 |Total.|Timber.|Labor|Total| |total.|timber.|labor|total| ADD 42149 760 2 | | CD 42149 760 3 |-------+-------+-------+-------+-------+------+-------+-----+-----+ |-------+-------+-------+-------+-------+------+-------+-----+-----+ CD 42149 760 4 | | CD 42149 760 5 | | NNP 42149 760 6 | | CD 42149 760 7 | | CD 42149 760 8 | | NNP 42149 760 9 _ _ NNP 42149 760 10 h h NNP 42149 760 11 _ _ NNP 42149 760 12 | | NNP 42149 760 13 _ _ NNP 42149 760 14 i i PRP 42149 760 15 _ _ NNP 42149 760 16 | | NNP 42149 760 17 _ _ NNP 42149 760 18 j j NNP 42149 760 19 _ _ NNP 42149 760 20 | | NNP 42149 760 21 _ _ NNP 42149 760 22 h h NNP 42149 760 23 _ _ NNP 42149 760 24 | | NNP 42149 760 25 _ _ NNP 42149 760 26 i i PRP 42149 760 27 _ _ NNP 42149 760 28 | | NNP 42149 760 29 _ _ NNP 42149 760 30 j j NNP 42149 760 31 _ _ NNP 42149 760 32 | | NNP 42149 760 33 | | NNP 42149 760 34 | | CD 42149 760 35 | | CD 42149 760 36 | | CD 42149 760 37 | | CD 42149 760 38 --- --- : 42149 760 39 | | CD 42149 760 40 --- --- : 42149 760 41 | | CD 42149 760 42 --- --- : 42149 760 43 | | CD 42149 760 44 --- --- : 42149 760 45 | | CD 42149 760 46 --- --- : 42149 760 47 | | CD 42149 760 48 --- --- : 42149 760 49 | | CD 42149 760 50 | | NNP 42149 760 51 |1907 |1907 NNP 42149 760 52 | | NNP 42149 760 53 _ _ NNP 42149 760 54 i i PRP 42149 760 55 _ _ NNP 42149 760 56 | | NNP 42149 760 57 _ _ NNP 42149 760 58 j j NNP 42149 760 59 _ _ NNP 42149 760 60 | | NNP 42149 760 61 _ _ NNP 42149 760 62 d d NNP 42149 760 63 _ _ NNP 42149 760 64 | | NNP 42149 760 65 _ _ NNP 42149 760 66 d d NNP 42149 760 67 _ _ NNP 42149 760 68 | | NNP 42149 760 69 _ _ NNP 42149 760 70 d d NNP 42149 760 71 _ _ NNP 42149 760 72 | | NNP 42149 760 73 _ _ NNP 42149 760 74 e e NNP 42149 760 75 _ _ NNP 42149 760 76 | | NNP 42149 760 77 _ _ NNP 42149 760 78 e e NNP 42149 760 79 _ _ NNP 42149 760 80 | | NNP 42149 760 81 _ _ NNP 42149 760 82 e e NNP 42149 760 83 _ _ NNP 42149 760 84 | | NNP 42149 760 85 |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ NNP 42149 760 86 |_Ke_|May |_Ke_|May NNP 42149 760 87 | | NNP 42149 760 88 $ $ $ 42149 760 89 1,792| 1,792| CD 42149 760 90 $ $ $ 42149 760 91 3,167| 3,167| CD 42149 760 92 $ $ $ 42149 760 93 0.79 0.79 CD 42149 760 94 | | CD 42149 760 95 $ $ $ 42149 760 96 1.03 1.03 CD 42149 760 97 | | CD 42149 760 98 $ $ $ 42149 760 99 1.82| 1.82| IN 42149 760 100 $ $ $ 42149 760 101 0.82 0.82 CD 42149 760 102 |$1.07|$1.90| |$1.07|$1.90| CD 42149 760 103 | | CD 42149 760 104 |June |june CD 42149 760 105 | | CD 42149 760 106 1,576| 1,576| CD 42149 760 107 2,663| 2,663| CD 42149 760 108 1.34 1.34 CD 42149 760 109 | | CD 42149 760 110 1.95 1.95 CD 42149 760 111 | | CD 42149 760 112 3.29| 3.29| CD 42149 760 113 1.55 1.55 CD 42149 760 114 | | CD 42149 760 115 2.25| 2.25| CD 42149 760 116 3.81| 3.81| CD 42149 760 117 | | NNP 42149 760 118 |July |july CD 42149 760 119 | | CD 42149 760 120 1,580| 1,580| CD 42149 760 121 2,780| 2,780| CD 42149 760 122 1.16 1.16 CD 42149 760 123 | | CD 42149 760 124 1.55 1.55 CD 42149 760 125 | | CD 42149 760 126 2.72| 2.72| CD 42149 760 127 1.25 1.25 CD 42149 760 128 | | CD 42149 760 129 1.64| 1.64| CD 42149 760 130 2.89| 2.89| CD 42149 760 131 | | NNP 42149 760 132 |August |august NN 42149 760 133 | | CD 42149 760 134 300| 300| VB 42149 760 135 700| 700| CD 42149 760 136 0.53 0.53 CD 42149 760 137 | | CD 42149 760 138 0.40 0.40 CD 42149 760 139 | | CD 42149 760 140 0.94| 0.94| CD 42149 760 141 0.57 0.57 CD 42149 760 142 | | CD 42149 760 143 0.41| 0.41| CD 42149 760 144 0.98| 0.98| NNS 42149 760 145 | | CD 42149 760 146 |Sept |sept NN 42149 760 147 . . . 42149 761 1 | | CD 42149 761 2 60| 60| CD 42149 761 3 227| 227| CD 42149 761 4 0.70 0.70 CD 42149 761 5 | | CD 42149 761 6 0.25 0.25 CD 42149 761 7 | | CD 42149 761 8 0.95| 0.95| CD 42149 761 9 0.70 0.70 CD 42149 761 10 | | CD 42149 761 11 0.25| 0.25| CD 42149 761 12 0.95| 0.95| CD 42149 761 13 | | NNP 42149 761 14 |Removal| |removal| CD 42149 761 15 663| 663| CD 42149 761 16 663| 663| CD 42149 761 17 | | NNP 42149 761 18 | | CD 42149 761 19 | | CD 42149 761 20 | | CD 42149 761 21 | | CD 42149 761 22 | | CD 42149 761 23 | | CD 42149 761 24 |-------+-------+-------+-------+-------+------+-------+-----+-----+ |-------+-------+-------+-------+-------+------+-------+-----+-----+ CD 42149 761 25 | | NNP 42149 761 26 |Total |Total NNP 42149 761 27 | | CD 42149 761 28 $ $ $ 42149 761 29 5,971|$10,200| 5,971|$10,200| CD 42149 761 30 $ $ $ 42149 761 31 0.91 0.91 CD 42149 761 32 | | CD 42149 761 33 $ $ $ 42149 761 34 1.51 1.51 CD 42149 761 35 | | CD 42149 761 36 $ $ $ 42149 761 37 2.22| 2.22| CD 42149 761 38 $ $ $ 42149 761 39 1.00 1.00 CD 42149 761 40 |$1.40|$2.40| |$1.40|$2.40| NNP 42149 761 41 |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ NNP 42149 761 42 |_Ki_|May |_Ki_|May NNP 42149 761 43 | | NNP 42149 761 44 $ $ $ 42149 761 45 100| 100| CD 42149 761 46 $ $ $ 42149 761 47 250| 250| CD 42149 761 48 $ $ $ 42149 761 49 0.24 0.24 CD 42149 761 50 | | CD 42149 761 51 $ $ $ 42149 761 52 0.16 0.16 CD 42149 761 53 | | CD 42149 761 54 $ $ $ 42149 761 55 0.40| 0.40| CD 42149 761 56 $ $ $ 42149 761 57 0.28 0.28 CD 42149 761 58 |$0.19|$0.47| |$0.19|$0.47| CD 42149 761 59 | | CD 42149 761 60 |June |june CD 42149 761 61 | | CD 42149 761 62 44| 44| CD 42149 761 63 58| 58| CD 42149 761 64 0.04 0.04 CD 42149 761 65 | | CD 42149 761 66 0.12 0.12 CD 42149 761 67 | | HYPH 42149 761 68 0.16| 0.16| CD 42149 761 69 0.05 0.05 CD 42149 761 70 | | NNS 42149 761 71 0.17| 0.17| CD 42149 761 72 0.22| 0.22| CD 42149 761 73 | | CD 42149 761 74 |July |july CD 42149 761 75 | | CD 42149 761 76 525| 525| CD 42149 761 77 7,108| 7,108| CD 42149 761 78 1.10 1.10 CD 42149 761 79 | | CD 42149 761 80 0.99 0.99 CD 42149 761 81 | | CD 42149 761 82 2.09| 2.09| CD 42149 761 83 1.44 1.44 CD 42149 761 84 | | CD 42149 761 85 1.30| 1.30| CD 42149 761 86 2.74| 2.74| CD 42149 761 87 | | NNP 42149 761 88 |August |august NN 42149 761 89 | | CD 42149 761 90 1,018| 1,018| CD 42149 761 91 2,125| 2,125| CD 42149 761 92 1.20 1.20 CD 42149 761 93 | | CD 42149 761 94 1.10 1.10 CD 42149 761 95 | | CD 42149 761 96 2.30| 2.30| CD 42149 761 97 1.24 1.24 CD 42149 761 98 | | CD 42149 761 99 1.14| 1.14| NNS 42149 761 100 2.38| 2.38| NNP 42149 761 101 | | CD 42149 761 102 |Sept |sept NN 42149 761 103 . . . 42149 762 1 | | CD 42149 762 2 1,028| 1,028| CD 42149 762 3 2,278| 2,278| CD 42149 762 4 0.79 0.79 CD 42149 762 5 | | CD 42149 762 6 0.65 0.65 CD 42149 762 7 | | CD 42149 762 8 1.44| 1.44| CD 42149 762 9 0.83 0.83 CD 42149 762 10 | | CD 42149 762 11 0.68| 0.68| CD 42149 762 12 1.51| 1.51| CD 42149 762 13 | | NNP 42149 762 14 |Removal| |removal| JJ 42149 762 15 1,139| 1,139| CD 42149 762 16 1,139| 1,139| CD 42149 762 17 | | CD 42149 762 18 0.68 0.68 CD 42149 762 19 | | NNP 42149 762 20 0.68| 0.68| CD 42149 762 21 | | CD 42149 762 22 0.81| 0.81| CD 42149 762 23 0.81| 0.81| CD 42149 762 24 | | NNP 42149 762 25 |-------+-------+-------+-------+-------+------+-------+-----+-----+ |-------+-------+-------+-------+-------+------+-------+-----+-----+ CD 42149 762 26 | | NNP 42149 762 27 |Total |Total NNP 42149 762 28 | | CD 42149 762 29 $ $ $ 42149 762 30 3,854| 3,854| CD 42149 762 31 $ $ $ 42149 762 32 6,958| 6,958| CD 42149 762 33 $ $ $ 42149 762 34 0.55 0.55 CD 42149 762 35 | | CD 42149 762 36 $ $ $ 42149 762 37 0.68 0.68 CD 42149 762 38 | | CD 42149 762 39 $ $ $ 42149 762 40 1.23| 1.23| CD 42149 762 41 $ $ $ 42149 762 42 0.63 0.63 CD 42149 762 43 |$0.77|$1.40| |$0.77|$1.40| CD 42149 762 44 |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ NNP 42149 762 45 |_Ko_|May |_Ko_|May NNP 42149 762 46 | | NNP 42149 762 47 $ $ $ 42149 762 48 303| 303| CD 42149 762 49 $ $ $ 42149 762 50 864| 864| CD 42149 762 51 $ $ $ 42149 762 52 2.24 2.24 CD 42149 762 53 | | CD 42149 762 54 $ $ $ 42149 762 55 1.21 1.21 CD 42149 762 56 | | CD 42149 762 57 $ $ $ 42149 762 58 3.45| 3.45| CD 42149 762 59 $ $ $ 42149 762 60 3.00 3.00 CD 42149 762 61 |$1.61|$4.61| |$1.61|$4.61| CD 42149 762 62 | | CD 42149 762 63 |June |june CD 42149 762 64 | | CD 42149 762 65 562| 562| CD 42149 762 66 1,282| 1,282| CD 42149 762 67 1.45 1.45 CD 42149 762 68 | | CD 42149 762 69 1.18 1.18 CD 42149 762 70 | | CD 42149 762 71 2.58| 2.58| CD 42149 762 72 2.07 2.07 CD 42149 762 73 | | CD 42149 762 74 1.61| 1.61| CD 42149 762 75 3.68| 3.68| CD 42149 762 76 | | CD 42149 762 77 |July |july CD 42149 762 78 | | CD 42149 762 79 156| 156| CD 42149 762 80 300| 300| CD 42149 762 81 0.23 0.23 CD 42149 762 82 | | CD 42149 762 83 0.25 0.25 CD 42149 762 84 | | CD 42149 762 85 0.48| 0.48| CD 42149 762 86 0.23 0.23 CD 42149 762 87 | | NNP 42149 762 88 0.26| 0.26| NN 42149 762 89 0.49| 0.49| NFP 42149 762 90 | | NNP 42149 762 91 |August |August VBZ 42149 762 92 | | CD 42149 762 93 727| 727| CD 42149 762 94 1,288| 1,288| CD 42149 762 95 0.78 0.78 CD 42149 762 96 | | CD 42149 762 97 1.01 1.01 CD 42149 762 98 | | CD 42149 762 99 1.79| 1.79| CD 42149 762 100 0.80 0.80 CD 42149 762 101 | | CD 42149 762 102 1.02| 1.02| CD 42149 762 103 1.82| 1.82| CD 42149 762 104 | | CD 42149 762 105 |Sept |sept NN 42149 762 106 . . . 42149 763 1 | | CD 42149 763 2 400| 400| CD 42149 763 3 516| 516| CD 42149 763 4 0.29 0.29 CD 42149 763 5 | | CD 42149 763 6 1.01 1.01 CD 42149 763 7 | | CD 42149 763 8 1.30| 1.30| CD 42149 763 9 0.36 0.36 CD 42149 763 10 | | CD 42149 763 11 1.23| 1.23| CD 42149 763 12 1.59| 1.59| CD 42149 763 13 | | CD 42149 763 14 |Removal| |removal| CD 42149 763 15 535| 535| CD 42149 763 16 535| 535| CD 42149 763 17 | | CD 42149 763 18 2.56 2.56 CD 42149 763 19 | | CD 42149 763 20 2.56| 2.56| CD 42149 763 21 | | CD 42149 763 22 2.54| 2.54| CD 42149 763 23 2.54| 2.54| CD 42149 763 24 | | CD 42149 763 25 |-------+-------+-------+-------+-------+------+-------+-----+-----+ |-------+-------+-------+-------+-------+------+-------+-----+-----+ CD 42149 763 26 | | NNP 42149 763 27 |Total |Total NNP 42149 763 28 | | CD 42149 763 29 $ $ $ 42149 763 30 2,683| 2,683| CD 42149 763 31 $ $ $ 42149 763 32 4,785| 4,785| CD 42149 763 33 $ $ $ 42149 763 34 0.78 0.78 CD 42149 763 35 | | CD 42149 763 36 $ $ $ 42149 763 37 1.00 1.00 CD 42149 763 38 | | CD 42149 763 39 $ $ $ 42149 763 40 1.78| 1.78| IN 42149 763 41 $ $ $ 42149 763 42 0.88 0.88 CD 42149 763 43 |$1.12|$2.00| |$1.12|$2.00| CD 42149 763 44 |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ |----+-------+-------+-------+-------+-------+------+-------+-----+-----+ CD 42149 763 45 | | NNP 42149 763 46 |Grand |Grand NNS 42149 763 47 |$12,508|$21,943| |$12,508|$21,943| CD 42149 763 48 $ $ $ 42149 763 49 0.73 0.73 CD 42149 763 50 | | CD 42149 763 51 $ $ $ 42149 763 52 0.97 0.97 CD 42149 763 53 | | CD 42149 763 54 $ $ $ 42149 763 55 1.70| 1.70| CD 42149 763 56 $ $ $ 42149 763 57 0.81 0.81 CD 42149 763 58 |$1.07|$1.88| |$1.07|$1.88| CD 42149 763 59 | | CD 42149 763 60 |total |total CD 42149 763 61 | | CD 42149 763 62 | | CD 42149 763 63 | | CD 42149 763 64 | | CD 42149 763 65 | | CD 42149 763 66 | | CD 42149 763 67 | | CD 42149 763 68 | | CD 42149 763 69 | | NNS 42149 763 70 + + NNS 42149 763 71 = = SYM 42149 763 72 = = SYM 42149 763 73 = = NFP 42149 763 74 = = SYM 42149 763 75 + + SYM 42149 763 76 = = SYM 42149 763 77 = = SYM 42149 763 78 = = SYM 42149 763 79 = = SYM 42149 763 80 = = SYM 42149 763 81 = = NFP 42149 763 82 = = SYM 42149 763 83 + + SYM 42149 763 84 = = SYM 42149 763 85 = = SYM 42149 763 86 = = SYM 42149 763 87 = = SYM 42149 763 88 = = SYM 42149 763 89 = = NFP 42149 763 90 = = SYM 42149 763 91 + + SYM 42149 763 92 = = SYM 42149 763 93 = = SYM 42149 763 94 = = SYM 42149 763 95 = = SYM 42149 763 96 = = SYM 42149 763 97 = = NFP 42149 763 98 = = SYM 42149 763 99 + + SYM 42149 763 100 = = SYM 42149 763 101 = = SYM 42149 763 102 = = SYM 42149 763 103 = = SYM 42149 763 104 = = SYM 42149 763 105 = = NFP 42149 763 106 = = SYM 42149 763 107 + + SYM 42149 763 108 = = SYM 42149 763 109 = = SYM 42149 763 110 = = SYM 42149 763 111 = = SYM 42149 763 112 = = SYM 42149 763 113 = = NFP 42149 763 114 = = SYM 42149 763 115 + + SYM 42149 763 116 = = SYM 42149 763 117 = = SYM 42149 763 118 = = SYM 42149 763 119 = = SYM 42149 763 120 = = NFP 42149 763 121 = = SYM 42149 763 122 + + SYM 42149 763 123 = = SYM 42149 763 124 = = SYM 42149 763 125 = = SYM 42149 763 126 = = SYM 42149 763 127 = = SYM 42149 763 128 = = NFP 42149 763 129 = = SYM 42149 763 130 + + SYM 42149 763 131 = = SYM 42149 763 132 = = SYM 42149 763 133 = = SYM 42149 763 134 = = NFP 42149 763 135 = = SYM 42149 763 136 + + SYM 42149 763 137 = = SYM 42149 763 138 = = SYM 42149 763 139 = = SYM 42149 763 140 = = NFP 42149 763 141 = = SYM 42149 763 142 + + SYM 42149 763 143 + + SYM 42149 763 144 = = SYM 42149 763 145 = = SYM 42149 763 146 = = NFP 42149 763 147 = = SYM 42149 763 148 + + SYM 42149 763 149 = = SYM 42149 763 150 = = SYM 42149 763 151 = = SYM 42149 763 152 = = SYM 42149 763 153 = = SYM 42149 763 154 = = SYM 42149 763 155 = = SYM 42149 763 156 = = SYM 42149 763 157 = = SYM 42149 763 158 = = NFP 42149 763 159 = = SYM 42149 763 160 + + SYM 42149 763 161 = = SYM 42149 763 162 = = SYM 42149 763 163 = = SYM 42149 763 164 = = SYM 42149 763 165 = = SYM 42149 763 166 = = SYM 42149 763 167 = = SYM 42149 763 168 = = SYM 42149 763 169 = = SYM 42149 763 170 = = SYM 42149 763 171 = = SYM 42149 763 172 = = SYM 42149 763 173 = = SYM 42149 763 174 = = SYM 42149 763 175 = = SYM 42149 763 176 = = SYM 42149 763 177 = = SYM 42149 763 178 = = SYM 42149 763 179 = = SYM 42149 763 180 = = SYM 42149 763 181 = = NFP 42149 763 182 = = SYM 42149 763 183 + + CC 42149 763 184 | | NNP 42149 763 185 | | CD 42149 763 186 | | CD 42149 763 187 COST COST NNS 42149 763 188 , , , 42149 763 189 PER per IN 42149 763 190 1,000 1,000 CD 42149 763 191 | | CD 42149 763 192 | | CD 42149 763 193 | | CD 42149 763 194 | | NNP 42149 763 195 FT FT NNP 42149 763 196 . . NNP 42149 763 197 , , , 42149 763 198 B. B. NNP 42149 763 199 M. M. NNP 42149 763 200 , , , 42149 763 201 OF of IN 42149 763 202 | | NNP 42149 763 203 | | NNP 42149 763 204 | | CD 42149 763 205 | | NNP 42149 763 206 TOTAL total NN 42149 763 207 TIMBER timber NN 42149 763 208 . . . 42149 764 1 | | NNP 42149 764 2 | | NNP 42149 764 3 | | NNP 42149 764 4 |-------+------+-------| |-------+------+-------| NNP 42149 764 5 | | NNP 42149 764 6 | | NNP 42149 764 7 | | NNP 42149 764 8 Total Total NNP 42149 764 9 | | NNP 42149 764 10 | | NNP 42149 764 11 | | CD 42149 764 12 | | CD 42149 764 13 | | NNS 42149 764 14 Date Date NNP 42149 764 15 |timber.|Labor.|Total |timber.|labor.|total NN 42149 764 16 . . . 42149 765 1 | | NNP 42149 765 2 | | NNP 42149 765 3 |-----------+-------+------+-------| |-----------+-------+------+-------| CD 42149 765 4 | | CD 42149 765 5 | | NNP 42149 765 6 | | NNP 42149 765 7 _ _ NNP 42149 765 8 h h NNP 42149 765 9 _ _ NNP 42149 765 10 | | NNP 42149 765 11 _ _ NNP 42149 765 12 i i PRP 42149 765 13 _ _ NNP 42149 765 14 | | NNP 42149 765 15 _ _ NNP 42149 765 16 j j NNP 42149 765 17 _ _ NNP 42149 765 18 | | NNP 42149 765 19 | | NNP 42149 765 20 | | CD 42149 765 21 | | CD 42149 765 22 --- --- : 42149 765 23 | | CD 42149 765 24 --- --- : 42149 765 25 | | CD 42149 765 26 --- --- : 42149 765 27 | | CD 42149 765 28 | | CD 42149 765 29 | | CD 42149 765 30 1907 1907 CD 42149 765 31 | | NNP 42149 765 32 _ _ NNP 42149 765 33 c c NNP 42149 765 34 _ _ NNP 42149 765 35 | | NNP 42149 765 36 _ _ NNP 42149 765 37 c c NNP 42149 765 38 _ _ NNP 42149 765 39 | | NNP 42149 765 40 _ _ NNP 42149 765 41 c c NNP 42149 765 42 _ _ NNP 42149 765 43 | | NNP 42149 765 44 |----+-----------+-------+------+-------| |----+-----------+-------+------+-------| NNP 42149 765 45 |_Ke_|May |_Ke_|May NNP 42149 765 46 |$41.35 |$41.35 . 42149 765 47 |$53.89| |$53.89| NNP 42149 765 48 $ $ $ 42149 765 49 95.24| 95.24| CD 42149 765 50 | | CD 42149 765 51 |June |june CD 42149 765 52 | | CD 42149 765 53 42.50 42.50 CD 42149 765 54 | | CD 42149 765 55 61.62| 61.62| CD 42149 765 56 104.12| 104.12| CD 42149 765 57 | | CD 42149 765 58 |July |july CD 42149 765 59 | | CD 42149 765 60 43.74 43.74 CD 42149 765 61 | | CD 42149 765 62 57.60| 57.60| CD 42149 765 63 101.34| 101.34| CD 42149 765 64 | | NNP 42149 765 65 |August |August VBZ 42149 765 66 | | CD 42149 765 67 43.87 43.87 CD 42149 765 68 | | CD 42149 765 69 32.90| 32.90| CD 42149 765 70 76.77| 76.77| CD 42149 765 71 | | CD 42149 765 72 |Sept |sept NN 42149 765 73 . . . 42149 766 1 | | CD 42149 766 2 43.31 43.31 CD 42149 766 3 | | CD 42149 766 4 15.56| 15.56| CD 42149 766 5 58.87| 58.87| CD 42149 766 6 | | CD 42149 766 7 |Removal |removal CD 42149 766 8 | | CD 42149 766 9 | | CD 42149 766 10 | | CD 42149 766 11 | | CD 42149 766 12 | | CD 42149 766 13 |-----------+-------+------+-------| |-----------+-------+------+-------| CD 42149 766 14 | | CD 42149 766 15 |Total |total NN 42149 766 16 |$42.62 |$42.62 . 42149 766 17 |$60.19|$102.81| |$60.19|$102.81| NNP 42149 766 18 |----+-----------+-------+------+-------| |----+-----------+-------+------+-------| NNP 42149 766 19 |_Ki_|May |_Ki_|May . 42149 766 20 |$42.41 |$42.41 . 42149 766 21 |$28.27| |$28.27| IN 42149 766 22 $ $ $ 42149 766 23 70.68| 70.68| CD 42149 766 24 | | CD 42149 766 25 |June |june CD 42149 766 26 | | CD 42149 766 27 46.66 46.66 CD 42149 766 28 |146.33| |146.33| NN 42149 766 29 193.33| 193.33| CD 42149 766 30 | | CD 42149 766 31 |July |july CD 42149 766 32 | | CD 42149 766 33 42.91 42.91 CD 42149 766 34 | | CD 42149 766 35 38.64| 38.64| CD 42149 766 36 81.54| 81.54| NNP 42149 766 37 | | CD 42149 766 38 |August |august NN 42149 766 39 | | NNP 42149 766 40 43.56 43.56 CD 42149 766 41 | | CD 42149 766 42 40.06| 40.06| CD 42149 766 43 83.61| 83.61| CD 42149 766 44 | | CD 42149 766 45 |Sept |sept NN 42149 766 46 . . . 42149 767 1 | | NNP 42149 767 2 41.98 41.98 CD 42149 767 3 | | CD 42149 767 4 34.53| 34.53| CD 42149 767 5 76.51| 76.51| CD 42149 767 6 | | CD 42149 767 7 |Removal |removal CD 42149 767 8 | | CD 42149 767 9 | | CD 42149 767 10 | | CD 42149 767 11 | | CD 42149 767 12 | | CD 42149 767 13 |-----------+-------+------+-------| |-----------+-------+------+-------| CD 42149 767 14 | | CD 42149 767 15 |Total |total CD 42149 767 16 |$42.75 |$42.75 ADD 42149 767 17 |$53.09| |$53.09| NNP 42149 767 18 $ $ $ 42149 767 19 95.84| 95.84| CD 42149 767 20 |----+-----------+-------+------+-------| |----+-----------+-------+------+-------| NNP 42149 767 21 |_Ko_|May |_ko_|may JJ 42149 767 22 |$42.76 |$42.76 ADD 42149 767 23 |$23.10| |$23.10| FW 42149 767 24 $ $ $ 42149 767 25 65.86| 65.86| CD 42149 767 26 | | CD 42149 767 27 |June |june CD 42149 767 28 | | CD 42149 767 29 41.98 41.98 CD 42149 767 30 | | CD 42149 767 31 32.77| 32.77| CD 42149 767 32 74.75| 74.75| CD 42149 767 33 | | CD 42149 767 34 |July |july CD 42149 767 35 | | CD 42149 767 36 44.04 44.04 CD 42149 767 37 | | CD 42149 767 38 47.70| 47.70| CD 42149 767 39 91.74| 91.74| CD 42149 767 40 | | CD 42149 767 41 |August |august NN 42149 767 42 | | NNP 42149 767 43 43.80 43.80 CD 42149 767 44 | | CD 42149 767 45 56.77| 56.77| CD 42149 767 46 100.57| 100.57| CD 42149 767 47 | | CD 42149 767 48 |Sept |sept NN 42149 767 49 . . . 42149 768 1 | | CD 42149 768 2 43.85 43.85 CD 42149 768 3 |151.23| |151.23| NNP 42149 768 4 195.08| 195.08| CD 42149 768 5 | | NNP 42149 768 6 |Removal |removal CD 42149 768 7 | | CD 42149 768 8 | | CD 42149 768 9 | | CD 42149 768 10 | | CD 42149 768 11 | | CD 42149 768 12 |-----------+-------+------+-------| |-----------+-------+------+-------| NNP 42149 768 13 | | CD 42149 768 14 |Total |total NN 42149 768 15 |$42.91 |$42.91 . 42149 768 16 |$54.75| |$54.75| NNS 42149 768 17 $ $ $ 42149 768 18 97.65| 97.65| CD 42149 768 19 |----+-----------+-------+------+-------| |----+-----------+-------+------+-------| NNP 42149 768 20 | | HYPH 42149 768 21 |Grand |Grand NNP 42149 768 22 total|$42.73 total|$42.73 NN 42149 768 23 |$56.65| |$56.65| NN 42149 768 24 $ $ $ 42149 768 25 99.38| 99.38| CD 42149 768 26 + + SYM 42149 768 27 = = SYM 42149 768 28 = = SYM 42149 768 29 = = SYM 42149 768 30 = = SYM 42149 768 31 + + SYM 42149 768 32 = = SYM 42149 768 33 = = SYM 42149 768 34 = = SYM 42149 768 35 = = SYM 42149 768 36 = = SYM 42149 768 37 = = SYM 42149 768 38 = = SYM 42149 768 39 = = SYM 42149 768 40 = = SYM 42149 768 41 = = NFP 42149 768 42 = = SYM 42149 768 43 + + SYM 42149 768 44 = = SYM 42149 768 45 = = SYM 42149 768 46 = = SYM 42149 768 47 = = SYM 42149 768 48 = = SYM 42149 768 49 = = NFP 42149 768 50 = = SYM 42149 768 51 + + SYM 42149 768 52 = = SYM 42149 768 53 = = SYM 42149 768 54 = = SYM 42149 768 55 = = SYM 42149 768 56 = = NFP 42149 768 57 = = SYM 42149 768 58 + + SYM 42149 768 59 = = SYM 42149 768 60 = = SYM 42149 768 61 = = SYM 42149 768 62 = = SYM 42149 768 63 = = SYM 42149 768 64 = = NFP 42149 768 65 = = SYM 42149 768 66 + + NFP 42149 768 67 Work work NN 42149 768 68 was be VBD 42149 768 69 begun begin VBN 42149 768 70 on on IN 42149 768 71 September September NNP 42149 768 72 1st 1st NN 42149 768 73 , , , 42149 768 74 1904 1904 CD 42149 768 75 , , , 42149 768 76 immediately immediately RB 42149 768 77 on on IN 42149 768 78 the the DT 42149 768 79 completion completion NN 42149 768 80 of of IN 42149 768 81 the the DT 42149 768 82 work work NN 42149 768 83 on on IN 42149 768 84 the the DT 42149 768 85 shaft shaft NN 42149 768 86 . . . 42149 769 1 The the DT 42149 769 2 North North NNP 42149 769 3 and and CC 42149 769 4 South South NNP 42149 769 5 Tunnels Tunnels NNPS 42149 769 6 in in IN 42149 769 7 this this DT 42149 769 8 case case NN 42149 769 9 are be VBP 42149 769 10 completely completely RB 42149 769 11 independent independent JJ 42149 769 12 , , , 42149 769 13 as as IN 42149 769 14 will will MD 42149 769 15 be be VB 42149 769 16 seen see VBN 42149 769 17 from from IN 42149 769 18 Plate Plate NNP 42149 769 19 XXXIV XXXIV NNP 42149 769 20 . . . 42149 770 1 The the DT 42149 770 2 procedure procedure NN 42149 770 3 adopted adopt VBN 42149 770 4 was be VBD 42149 770 5 to to TO 42149 770 6 drive drive VB 42149 770 7 a a DT 42149 770 8 top top JJ 42149 770 9 heading heading NN 42149 770 10 on on IN 42149 770 11 the the DT 42149 770 12 center center NN 42149 770 13 line line NN 42149 770 14 of of IN 42149 770 15 each each DT 42149 770 16 tunnel tunnel NN 42149 770 17 and and CC 42149 770 18 to to TO 42149 770 19 break break VB 42149 770 20 down down RP 42149 770 21 the the DT 42149 770 22 bench bench NN 42149 770 23 from from IN 42149 770 24 this this DT 42149 770 25 . . . 42149 771 1 The the DT 42149 771 2 drilling drilling NN 42149 771 3 was be VBD 42149 771 4 at at IN 42149 771 5 first first RB 42149 771 6 supplied supply VBN 42149 771 7 with with IN 42149 771 8 steam steam NN 42149 771 9 power power NN 42149 771 10 from from IN 42149 771 11 a a DT 42149 771 12 temporary temporary JJ 42149 771 13 plant plant NN 42149 771 14 , , , 42149 771 15 as as IN 42149 771 16 the the DT 42149 771 17 contractor contractor NN 42149 771 18 was be VBD 42149 771 19 at at IN 42149 771 20 that that DT 42149 771 21 time time NN 42149 771 22 installing instal VBG 42149 771 23 his -PRON- PRP$ 42149 771 24 permanent permanent JJ 42149 771 25 plant plant NN 42149 771 26 , , , 42149 771 27 which which WDT 42149 771 28 was be VBD 42149 771 29 finished finish VBN 42149 771 30 at at IN 42149 771 31 the the DT 42149 771 32 end end NN 42149 771 33 of of IN 42149 771 34 November November NNP 42149 771 35 , , , 42149 771 36 1904 1904 CD 42149 771 37 . . . 42149 772 1 At at IN 42149 772 2 this this DT 42149 772 3 time time NN 42149 772 4 the the DT 42149 772 5 rate rate NN 42149 772 6 of of IN 42149 772 7 advance advance NN 42149 772 8 averaged average VBN 42149 772 9 3½ 3½ NNP 42149 772 10 lin lin NN 42149 772 11 . . . 42149 773 1 ft ft NNP 42149 773 2 . . NNP 42149 773 3 of of IN 42149 773 4 full full JJ 42149 773 5 section section NN 42149 773 6 per per IN 42149 773 7 day day NN 42149 773 8 of of IN 42149 773 9 24 24 CD 42149 773 10 hours hour NNS 42149 773 11 . . . 42149 774 1 By by IN 42149 774 2 the the DT 42149 774 3 end end NN 42149 774 4 of of IN 42149 774 5 January January NNP 42149 774 6 the the DT 42149 774 7 Weehawken Weehawken NNP 42149 774 8 rock rock NN 42149 774 9 tunnels tunnel NNS 42149 774 10 were be VBD 42149 774 11 completely completely RB 42149 774 12 excavated excavate VBN 42149 774 13 , , , 42149 774 14 and and CC 42149 774 15 by by IN 42149 774 16 the the DT 42149 774 17 middle middle NN 42149 774 18 of of IN 42149 774 19 April April NNP 42149 774 20 , , , 42149 774 21 1905 1905 CD 42149 774 22 , , , 42149 774 23 the the DT 42149 774 24 excavation excavation NN 42149 774 25 for for IN 42149 774 26 the the DT 42149 774 27 shield shield NN 42149 774 28 chambers chamber NNS 42149 774 29 was be VBD 42149 774 30 finished finish VBN 42149 774 31 ; ; : 42149 774 32 the the DT 42149 774 33 erection erection NN 42149 774 34 of of IN 42149 774 35 the the DT 42149 774 36 shields shield NNS 42149 774 37 was be VBD 42149 774 38 started start VBN 42149 774 39 at at IN 42149 774 40 the the DT 42149 774 41 end end NN 42149 774 42 of of IN 42149 774 43 that that DT 42149 774 44 month month NN 42149 774 45 . . . 42149 775 1 TABLE TABLE NNS 42149 775 2 11 11 CD 42149 775 3 . . . 42149 776 1 = = NFP 42149 776 2 = = NFP 42149 776 3 = = SYM 42149 776 4 = = SYM 42149 776 5 = = SYM 42149 776 6 = = SYM 42149 776 7 = = SYM 42149 776 8 = = SYM 42149 776 9 = = SYM 42149 776 10 = = SYM 42149 776 11 = = SYM 42149 776 12 = = SYM 42149 776 13 = = SYM 42149 776 14 = = SYM 42149 776 15 = = SYM 42149 776 16 = = SYM 42149 776 17 = = NFP 42149 776 18 = = SYM 42149 776 19 + + SYM 42149 776 20 = = SYM 42149 776 21 = = SYM 42149 776 22 = = SYM 42149 776 23 = = SYM 42149 776 24 = = SYM 42149 776 25 = = SYM 42149 776 26 = = SYM 42149 776 27 = = NFP 42149 776 28 = = SYM 42149 776 29 + + SYM 42149 776 30 = = SYM 42149 776 31 = = SYM 42149 776 32 = = SYM 42149 776 33 = = SYM 42149 776 34 = = SYM 42149 776 35 = = SYM 42149 776 36 = = NFP 42149 776 37 = = SYM 42149 776 38 + + SYM 42149 776 39 = = SYM 42149 776 40 = = SYM 42149 776 41 = = SYM 42149 776 42 = = SYM 42149 776 43 = = SYM 42149 776 44 = = SYM 42149 776 45 = = SYM 42149 776 46 = = SYM 42149 776 47 = = SYM 42149 776 48 = = SYM 42149 776 49 = = SYM 42149 776 50 = = NFP 42149 776 51 = = SYM 42149 776 52 + + SYM 42149 776 53 = = SYM 42149 776 54 = = SYM 42149 776 55 = = SYM 42149 776 56 = = SYM 42149 776 57 = = SYM 42149 776 58 = = SYM 42149 776 59 = = NFP 42149 776 60 = = SYM 42149 776 61 + + SYM 42149 776 62 = = SYM 42149 776 63 = = SYM 42149 776 64 = = SYM 42149 776 65 = = SYM 42149 776 66 = = SYM 42149 776 67 = = SYM 42149 776 68 = = SYM 42149 776 69 = = SYM 42149 776 70 = = NFP 42149 776 71 = = NFP 42149 776 72 Grade Grade NNP 42149 776 73 . . . 42149 777 1 |Total |total JJ 42149 777 2 No.|Rate no.|rate JJ 42149 777 3 per|Drilling per|drilling NN 42149 777 4 and and CC 42149 777 5 |Mucking:|Timbering |mucking:|timbering NN 42149 777 6 : : : 42149 777 7 | | CD 42149 777 8 | | CD 42149 777 9 day day NN 42149 777 10 . . . 42149 778 1 |blasting |blasting LS 42149 778 2 : : : 42149 778 3 No.| No.| NNP 42149 778 4 No no UH 42149 778 5 . . . 42149 779 1 | | NNS 42149 779 2 No no NN 42149 779 3 . . . 42149 780 1 ------------------+---------+--------+-------------+--------+---------- ------------------+---------+--------+-------------+--------+---------- NNP 42149 780 2 Superintendent Superintendent NNP 42149 780 3 | | NNP 42149 780 4 1 1 CD 42149 780 5 | | CD 42149 780 6 $ $ $ 42149 780 7 7.70 7.70 CD 42149 780 8 | | CD 42149 780 9 ½ ½ NNP 42149 780 10 | | NNP 42149 780 11 1/8 1/8 CD 42149 780 12 | | CD 42149 780 13 3/8 3/8 CD 42149 780 14 Assistant Assistant NNP 42149 780 15 engineer| engineer| NNP 42149 780 16 1 1 CD 42149 780 17 | | CD 42149 780 18 5.80 5.80 CD 42149 780 19 | | NNP 42149 780 20 ½ ½ NNP 42149 780 21 | | NNP 42149 780 22 1/8 1/8 CD 42149 780 23 | | CD 42149 780 24 3/8 3/8 CD 42149 780 25 Electrician Electrician NNP 42149 780 26 | | NNP 42149 780 27 1 1 CD 42149 780 28 | | CD 42149 780 29 3.50 3.50 CD 42149 780 30 | | NNP 42149 780 31 ½ ½ NNP 42149 780 32 | | NNP 42149 780 33 1/8 1/8 CD 42149 780 34 | | CD 42149 780 35 3/8 3/8 CD 42149 780 36 Engineer Engineer NNP 42149 780 37 | | NNP 42149 780 38 1 1 CD 42149 780 39 | | CD 42149 780 40 3.50 3.50 CD 42149 780 41 | | CD 42149 780 42 | | CD 42149 780 43 1 1 CD 42149 780 44 | | NNP 42149 780 45 Signalman Signalman NNP 42149 780 46 | | NNP 42149 780 47 1 1 CD 42149 780 48 | | CD 42149 780 49 2.00 2.00 CD 42149 780 50 | | CD 42149 780 51 | | CD 42149 780 52 1 1 CD 42149 780 53 | | NNP 42149 780 54 Foreman Foreman NNP 42149 780 55 | | NNP 42149 780 56 3 3 CD 42149 780 57 | | CD 42149 780 58 4.00 4.00 CD 42149 780 59 | | CD 42149 780 60 1 1 CD 42149 780 61 | | CD 42149 780 62 1 1 CD 42149 780 63 | | CD 42149 780 64 1 1 CD 42149 780 65 Driller Driller NNP 42149 780 66 | | NNP 42149 780 67 5 5 CD 42149 780 68 | | CD 42149 780 69 3.00 3.00 CD 42149 780 70 | | CD 42149 780 71 5 5 CD 42149 780 72 | | CD 42149 780 73 | | NNP 42149 780 74 Driller Driller NNP 42149 780 75 's 's POS 42149 780 76 helper helper NN 42149 780 77 | | CD 42149 780 78 5 5 CD 42149 780 79 | | CD 42149 780 80 2.00 2.00 CD 42149 780 81 | | CD 42149 780 82 5 5 CD 42149 780 83 | | CD 42149 780 84 | | NNP 42149 780 85 Laborers Laborers NNPS 42149 780 86 | | POS 42149 780 87 14 14 CD 42149 780 88 | | CD 42149 780 89 2.00 2.00 CD 42149 780 90 | | CD 42149 780 91 | | CD 42149 780 92 14 14 CD 42149 780 93 | | NNP 42149 780 94 Timbermen Timbermen NNP 42149 780 95 | | NNP 42149 780 96 3 3 CD 42149 780 97 | | CD 42149 780 98 3.00 3.00 CD 42149 780 99 | | CD 42149 780 100 | | CD 42149 780 101 | | CD 42149 780 102 3 3 CD 42149 780 103 " " '' 42149 780 104 helpers helper NNS 42149 780 105 | | CD 42149 780 106 4 4 CD 42149 780 107 | | CD 42149 780 108 2.00 2.00 CD 42149 780 109 | | CD 42149 780 110 | | CD 42149 780 111 | | CD 42149 780 112 4 4 CD 42149 780 113 Machinist Machinist NNP 42149 780 114 | | NNP 42149 780 115 1 1 CD 42149 780 116 | | CD 42149 780 117 4.00 4.00 CD 42149 780 118 | | CD 42149 780 119 1 1 CD 42149 780 120 | | CD 42149 780 121 | | NNP 42149 780 122 Blacksmith Blacksmith NNP 42149 780 123 | | NNP 42149 780 124 2 2 CD 42149 780 125 | | CD 42149 780 126 3.50 3.50 CD 42149 780 127 | | CD 42149 780 128 2 2 CD 42149 780 129 | | CD 42149 780 130 | | CD 42149 780 131 " " '' 42149 780 132 helper helper NN 42149 780 133 | | NNP 42149 780 134 2 2 CD 42149 780 135 | | CD 42149 780 136 2.00 2.00 CD 42149 780 137 | | CD 42149 780 138 2 2 CD 42149 780 139 | | CD 42149 780 140 | | NNP 42149 780 141 Nipper Nipper NNP 42149 780 142 | | NNP 42149 780 143 2 2 CD 42149 780 144 | | CD 42149 780 145 2.00 2.00 CD 42149 780 146 | | CD 42149 780 147 2 2 CD 42149 780 148 | | CD 42149 780 149 | | NNS 42149 780 150 Waterboy Waterboy NNP 42149 780 151 | | NNP 42149 780 152 1 1 CD 42149 780 153 | | CD 42149 780 154 2.00 2.00 CD 42149 780 155 | | CD 42149 780 156 1 1 CD 42149 780 157 | | CD 42149 780 158 | | NNP 42149 780 159 ------------------+---------+--------+-------------+--------+--------- ------------------+---------+--------+-------------+--------+--------- NNP 42149 780 160 Total Total NNP 42149 780 161 | | NNP 42149 780 162 47 47 CD 42149 780 163 | | CD 42149 780 164 | | CD 42149 780 165 20½ 20â½ CD 42149 780 166 | | CD 42149 780 167 17 17 CD 42149 780 168 - - HYPH 42149 780 169 3/8 3/8 CD 42149 780 170 | | CD 42149 780 171 9 9 CD 42149 780 172 - - HYPH 42149 780 173 1/8 1/8 CD 42149 780 174 = = SYM 42149 780 175 = = SYM 42149 780 176 = = SYM 42149 780 177 = = SYM 42149 780 178 = = SYM 42149 780 179 = = SYM 42149 780 180 = = SYM 42149 780 181 = = SYM 42149 780 182 = = SYM 42149 780 183 = = SYM 42149 780 184 = = SYM 42149 780 185 = = SYM 42149 780 186 = = SYM 42149 780 187 = = SYM 42149 780 188 = = SYM 42149 780 189 = = SYM 42149 780 190 = = NFP 42149 780 191 = = SYM 42149 780 192 + + SYM 42149 780 193 = = SYM 42149 780 194 = = SYM 42149 780 195 = = SYM 42149 780 196 = = SYM 42149 780 197 = = SYM 42149 780 198 = = SYM 42149 780 199 = = SYM 42149 780 200 = = NFP 42149 780 201 = = SYM 42149 780 202 + + SYM 42149 780 203 = = SYM 42149 780 204 = = SYM 42149 780 205 = = SYM 42149 780 206 = = SYM 42149 780 207 = = SYM 42149 780 208 = = SYM 42149 780 209 = = NFP 42149 780 210 = = SYM 42149 780 211 + + SYM 42149 780 212 = = SYM 42149 780 213 = = SYM 42149 780 214 = = SYM 42149 780 215 = = SYM 42149 780 216 = = SYM 42149 780 217 = = SYM 42149 780 218 = = SYM 42149 780 219 = = SYM 42149 780 220 = = SYM 42149 780 221 = = SYM 42149 780 222 = = SYM 42149 780 223 = = NFP 42149 780 224 = = SYM 42149 780 225 + + SYM 42149 780 226 = = SYM 42149 780 227 = = SYM 42149 780 228 = = SYM 42149 780 229 = = SYM 42149 780 230 = = SYM 42149 780 231 = = SYM 42149 780 232 = = NFP 42149 780 233 = = SYM 42149 780 234 + + SYM 42149 780 235 = = SYM 42149 780 236 = = SYM 42149 780 237 = = SYM 42149 780 238 = = SYM 42149 780 239 = = SYM 42149 780 240 = = SYM 42149 780 241 = = SYM 42149 780 242 = = NFP 42149 780 243 = = NFP 42149 780 244 The the DT 42149 780 245 general general JJ 42149 780 246 scheme scheme NN 42149 780 247 of of IN 42149 780 248 excavation excavation NN 42149 780 249 is be VBZ 42149 780 250 shown show VBN 42149 780 251 by by IN 42149 780 252 Plate Plate NNP 42149 780 253 XXXIII XXXIII NNP 42149 780 254 . . . 42149 781 1 The the DT 42149 781 2 bench bench NN 42149 781 3 was be VBD 42149 781 4 kept keep VBN 42149 781 5 50 50 CD 42149 781 6 or or CC 42149 781 7 60 60 CD 42149 781 8 ft ft NN 42149 781 9 . . NN 42149 781 10 behind behind IN 42149 781 11 the the DT 42149 781 12 face face NN 42149 781 13 of of IN 42149 781 14 the the DT 42149 781 15 heading heading NN 42149 781 16 . . . 42149 782 1 The the DT 42149 782 2 powder powder NN 42149 782 3 used use VBN 42149 782 4 was be VBD 42149 782 5 60 60 CD 42149 782 6 % % NN 42149 782 7 Forcite Forcite NNP 42149 782 8 . . . 42149 783 1 The the DT 42149 783 2 general general JJ 42149 783 3 system system NN 42149 783 4 of of IN 42149 783 5 drilling drilling NN 42149 783 6 was be VBD 42149 783 7 as as RB 42149 783 8 shown show VBN 42149 783 9 in in IN 42149 783 10 Fig Fig NNP 42149 783 11 . . . 42149 784 1 7 7 LS 42149 784 2 . . . 42149 785 1 The the DT 42149 785 2 average average JJ 42149 785 3 length length NN 42149 785 4 of of IN 42149 785 5 hole hole NN 42149 785 6 drilled drill VBN 42149 785 7 per per IN 42149 785 8 cubic cubic JJ 42149 785 9 yard yard NN 42149 785 10 of of IN 42149 785 11 excavation excavation NN 42149 785 12 was be VBD 42149 785 13 2.9 2.9 CD 42149 785 14 ft ft NN 42149 785 15 . . NNP 42149 785 16 , , , 42149 785 17 as as IN 42149 785 18 against against IN 42149 785 19 7.70 7.70 CD 42149 785 20 ft ft NN 42149 785 21 . . . 42149 785 22 at at IN 42149 785 23 Manhattan Manhattan NNP 42149 785 24 ; ; : 42149 785 25 and and CC 42149 785 26 the the DT 42149 785 27 amount amount NN 42149 785 28 of of IN 42149 785 29 powder powder NN 42149 785 30 used use VBN 42149 785 31 was be VBD 42149 785 32 1.96 1.96 CD 42149 785 33 lb lb IN 42149 785 34 . . . 42149 786 1 per per IN 42149 786 2 cu cu NNP 42149 786 3 . . . 42149 787 1 yd yd NNP 42149 787 2 . . NNP 42149 787 3 , , , 42149 787 4 as as IN 42149 787 5 against against IN 42149 787 6 1.24 1.24 CD 42149 787 7 lb lb IN 42149 787 8 . . . 42149 788 1 at at IN 42149 788 2 Manhattan Manhattan NNP 42149 788 3 . . . 42149 789 1 There there EX 42149 789 2 was be VBD 42149 789 3 little little JJ 42149 789 4 timbering timbering JJ 42149 789 5 . . . 42149 790 1 A a DT 42149 790 2 length length NN 42149 790 3 of of IN 42149 790 4 about about RB 42149 790 5 30 30 CD 42149 790 6 or or CC 42149 790 7 40 40 CD 42149 790 8 ft ft NN 42149 790 9 . . . 42149 790 10 adjoining adjoin VBG 42149 790 11 the the DT 42149 790 12 Weehawken Weehawken NNP 42149 790 13 shaft shaft NN 42149 790 14 was be VBD 42149 790 15 timbered timbere VBN 42149 790 16 , , , 42149 790 17 and and CC 42149 790 18 also also RB 42149 790 19 a a DT 42149 790 20 shattered shatter VBN 42149 790 21 seam seam NN 42149 790 22 of of IN 42149 790 23 about about RB 42149 790 24 17 17 CD 42149 790 25 ft ft NN 42149 790 26 . . NN 42149 790 27 in in IN 42149 790 28 width width NN 42149 790 29 between between IN 42149 790 30 Stations station NNS 42149 790 31 262 262 CD 42149 790 32 + + SYM 42149 790 33 10 10 CD 42149 790 34 and and CC 42149 790 35 262 262 CD 42149 790 36 + + SYM 42149 790 37 27 27 CD 42149 790 38 . . . 42149 791 1 [ [ -LRB- 42149 791 2 Illustration illustration NN 42149 791 3 : : : 42149 791 4 LAND land NN 42149 791 5 TUNNELS TUNNELS NNP 42149 791 6 TYPICAL typical NN 42149 791 7 METHOD method NN 42149 791 8 OF of IN 42149 791 9 DRILLING DRILLING NNP 42149 791 10 USED use VBN 42149 791 11 IN in IN 42149 791 12 THE the DT 42149 791 13 WEEHAWKEN WEEHAWKEN NNP 42149 791 14 TUNNELS TUNNELS NNP 42149 791 15 FIG FIG NNP 42149 791 16 . . . 42149 792 1 7 7 LS 42149 792 2 ] ] -RRB- 42149 792 3 The the DT 42149 792 4 two two CD 42149 792 5 entirely entirely RB 42149 792 6 separate separate JJ 42149 792 7 tunnels tunnel NNS 42149 792 8 gave give VBD 42149 792 9 a a DT 42149 792 10 cross cross JJ 42149 792 11 - - NN 42149 792 12 section section NN 42149 792 13 which which WDT 42149 792 14 was be VBD 42149 792 15 much much RB 42149 792 16 more more RBR 42149 792 17 easily easily RB 42149 792 18 timbered timbere VBN 42149 792 19 than than IN 42149 792 20 the the DT 42149 792 21 wide wide JJ 42149 792 22 flat flat JJ 42149 792 23 span span NN 42149 792 24 at at IN 42149 792 25 Manhattan Manhattan NNP 42149 792 26 , , , 42149 792 27 and and CC 42149 792 28 the the DT 42149 792 29 segmental segmental JJ 42149 792 30 timbering timbering NN 42149 792 31 was be VBD 42149 792 32 amply amply RB 42149 792 33 strong strong JJ 42149 792 34 without without IN 42149 792 35 posts post NNS 42149 792 36 or or CC 42149 792 37 other other JJ 42149 792 38 reinforcement reinforcement NN 42149 792 39 . . . 42149 793 1 Table table NN 42149 793 2 12 12 CD 42149 793 3 is be VBZ 42149 793 4 a a DT 42149 793 5 summary summary NN 42149 793 6 of of IN 42149 793 7 the the DT 42149 793 8 cost cost NN 42149 793 9 of of IN 42149 793 10 excavating excavate VBG 42149 793 11 the the DT 42149 793 12 Land Land NNP 42149 793 13 Tunnels Tunnels NNPS 42149 793 14 , , , 42149 793 15 based base VBN 42149 793 16 on on IN 42149 793 17 actual actual JJ 42149 793 18 records record NNS 42149 793 19 carefully carefully RB 42149 793 20 kept keep VBN 42149 793 21 throughout throughout IN 42149 793 22 the the DT 42149 793 23 work work NN 42149 793 24 . . . 42149 794 1 TABLE table NN 42149 794 2 12.--COST 12.--cost CD 42149 794 3 OF of IN 42149 794 4 EXCAVATION excavation NN 42149 794 5 OF of IN 42149 794 6 LAND land NN 42149 794 7 TUNNELS tunnel NNS 42149 794 8 , , , 42149 794 9 IN in IN 42149 794 10 DOLLARS DOLLARS NNP 42149 794 11 PER per IN 42149 794 12 CUBIC CUBIC VBD 42149 794 13 YARD YARD NNP 42149 794 14 . . . 42149 795 1 = = NFP 42149 795 2 = = NFP 42149 795 3 = = SYM 42149 795 4 = = SYM 42149 795 5 = = SYM 42149 795 6 = = SYM 42149 795 7 = = SYM 42149 795 8 = = SYM 42149 795 9 = = SYM 42149 795 10 = = SYM 42149 795 11 = = SYM 42149 795 12 = = SYM 42149 795 13 = = SYM 42149 795 14 = = SYM 42149 795 15 = = SYM 42149 795 16 = = SYM 42149 795 17 = = SYM 42149 795 18 = = SYM 42149 795 19 = = SYM 42149 795 20 = = SYM 42149 795 21 = = SYM 42149 795 22 = = SYM 42149 795 23 = = SYM 42149 795 24 = = SYM 42149 795 25 = = SYM 42149 795 26 = = SYM 42149 795 27 = = SYM 42149 795 28 = = SYM 42149 795 29 = = SYM 42149 795 30 = = SYM 42149 795 31 = = SYM 42149 795 32 = = SYM 42149 795 33 = = SYM 42149 795 34 = = SYM 42149 795 35 = = SYM 42149 795 36 = = SYM 42149 795 37 = = NFP 42149 795 38 = = SYM 42149 795 39 + + SYM 42149 795 40 = = SYM 42149 795 41 = = SYM 42149 795 42 = = SYM 42149 795 43 = = SYM 42149 795 44 = = SYM 42149 795 45 = = SYM 42149 795 46 = = SYM 42149 795 47 = = NFP 42149 795 48 = = SYM 42149 795 49 + + SYM 42149 795 50 = = SYM 42149 795 51 = = SYM 42149 795 52 = = SYM 42149 795 53 = = SYM 42149 795 54 = = SYM 42149 795 55 = = SYM 42149 795 56 = = SYM 42149 795 57 = = NFP 42149 795 58 = = SYM 42149 795 59 + + SYM 42149 795 60 = = SYM 42149 795 61 = = SYM 42149 795 62 = = SYM 42149 795 63 = = SYM 42149 795 64 = = SYM 42149 795 65 = = SYM 42149 795 66 = = SYM 42149 795 67 = = SYM 42149 795 68 = = SYM 42149 795 69 = = SYM 42149 795 70 = = SYM 42149 795 71 = = SYM 42149 795 72 = = SYM 42149 795 73 | | CD 42149 795 74 | | CD 42149 795 75 |Total |total JJ 42149 795 76 yardage yardage NN 42149 795 77 | | CD 42149 795 78 | | CD 42149 795 79 | | CD 42149 795 80 and and CC 42149 795 81 |Manhattan|Weehawken|average |manhattan|weehawken|average NN 42149 795 82 cost cost NN 42149 795 83 . . . 42149 796 1 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- : 42149 796 2 Cubic cubic JJ 42149 796 3 yards yard NNS 42149 796 4 excavated excavate VBD 42149 796 5 |43,289 |43,289 CD 42149 796 6 | | CD 42149 796 7 8,311 8,311 CD 42149 796 8 | | CD 42149 796 9 51,600 51,600 CD 42149 796 10 _ _ NNP 42149 796 11 Labor Labor NNP 42149 796 12 . . . 42149 796 13 _ _ NNP 42149 796 14 | | NNP 42149 796 15 | | NNP 42149 796 16 | | NNP 42149 796 17 Surface Surface NNP 42149 796 18 transport transport NN 42149 796 19 | | VBD 42149 796 20 $ $ $ 42149 796 21 0.49| 0.49| CD 42149 796 22 $ $ $ 42149 796 23 0.87| 0.87| CD 42149 796 24 $ $ $ 42149 796 25 0.55 0.55 CD 42149 796 26 Drilling drilling NN 42149 796 27 and and CC 42149 796 28 blasting blast VBG 42149 796 29 | | CD 42149 796 30 2.37| 2.37| CD 42149 796 31 1.55| 1.55| CD 42149 796 32 2.24 2.24 CD 42149 796 33 Mucking Mucking NNP 42149 796 34 | | NNP 42149 796 35 2.49| 2.49| CD 42149 796 36 2.08| 2.08| CD 42149 796 37 2.42 2.42 CD 42149 796 38 Timbering Timbering NNP 42149 796 39 | | NNP 42149 796 40 0.87| 0.87| NNS 42149 796 41 0.18| 0.18| NFP 42149 796 42 0.76 0.76 CD 42149 796 43 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NN 42149 796 44 Total total JJ 42149 796 45 labor labor NN 42149 796 46 | | CD 42149 796 47 $ $ $ 42149 796 48 6.22| 6.22| CD 42149 796 49 $ $ $ 42149 796 50 4.68| 4.68| CD 42149 796 51 $ $ $ 42149 796 52 5.97 5.97 CD 42149 796 53 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NFP 42149 796 54 _ _ NNP 42149 796 55 Material Material NNP 42149 796 56 . . . 42149 796 57 _ _ NNP 42149 796 58 | | NNP 42149 796 59 | | NNP 42149 796 60 | | NNP 42149 796 61 Drilling Drilling NNP 42149 796 62 | | CD 42149 796 63 $ $ $ 42149 796 64 0.15| 0.15| CD 42149 796 65 $ $ $ 42149 796 66 0.15| 0.15| CD 42149 796 67 $ $ $ 42149 796 68 0.15 0.15 CD 42149 796 69 Blasting Blasting NNP 42149 796 70 | | CD 42149 796 71 0.21| 0.21| CD 42149 796 72 0.21| 0.21| NFP 42149 796 73 0.21 0.21 CD 42149 796 74 Timber Timber NNP 42149 796 75 | | NNP 42149 796 76 0.39| 0.39| CD 42149 796 77 0.20| 0.20| CD 42149 796 78 0.36 0.36 CD 42149 796 79 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- HYPH 42149 796 80 Total total JJ 42149 796 81 material material NN 42149 796 82 | | CD 42149 796 83 $ $ $ 42149 796 84 0.75| 0.75| IN 42149 796 85 $ $ $ 42149 796 86 0.56| 0.56| CD 42149 796 87 $ $ $ 42149 796 88 0.72 0.72 CD 42149 796 89 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NFP 42149 796 90 Plant plant NN 42149 796 91 running run VBG 42149 796 92 | | CD 42149 796 93 $ $ $ 42149 796 94 0.76| 0.76| CD 42149 796 95 $ $ $ 42149 796 96 0.65| 0.65| CD 42149 796 97 $ $ $ 42149 796 98 0.74 0.74 CD 42149 796 99 Surface surface NN 42149 796 100 labor labor NN 42149 796 101 , , , 42149 796 102 repairs repair NNS 42149 796 103 and and CC 42149 796 104 maintenance| maintenance| NN 42149 796 105 0.15| 0.15| NNS 42149 796 106 0.08| 0.08| CD 42149 796 107 0.14 0.14 CD 42149 796 108 Field Field NNP 42149 796 109 office office NNP 42149 796 110 administration administration NN 42149 796 111 | | CD 42149 796 112 1.05| 1.05| CD 42149 796 113 1.18| 1.18| CD 42149 796 114 1.07 1.07 CD 42149 796 115 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NNS 42149 796 116 Total total JJ 42149 796 117 field field NN 42149 796 118 charges charge NNS 42149 796 119 | | CD 42149 796 120 $ $ $ 42149 796 121 8.96| 8.96| CD 42149 796 122 $ $ $ 42149 796 123 7.15| 7.15| CD 42149 796 124 $ $ $ 42149 796 125 8.64 8.64 CD 42149 796 126 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NNP 42149 796 127 Chief Chief NNP 42149 796 128 office office NN 42149 796 129 administration administration NN 42149 796 130 | | VBD 42149 796 131 $ $ $ 42149 796 132 0.34| 0.34| CD 42149 796 133 $ $ $ 42149 796 134 0.38| 0.38| CD 42149 796 135 $ $ $ 42149 796 136 0.34 0.34 CD 42149 796 137 Plant plant NN 42149 796 138 depreciation depreciation NN 42149 796 139 | | NNP 42149 796 140 0.66| 0.66| NNS 42149 796 141 1.01| 1.01| CD 42149 796 142 0.72 0.72 CD 42149 796 143 Street street NN 42149 796 144 and and CC 42149 796 145 building building NN 42149 796 146 repairs repair NNS 42149 796 147 | | CD 42149 796 148 0.27| 0.27| CD 42149 796 149 | | CD 42149 796 150 0.23 0.23 CD 42149 796 151 --------------------------------------+---------+---------+------------- --------------------------------------+---------+---------+------------- NNS 42149 796 152 Total total JJ 42149 796 153 average average JJ 42149 796 154 cost cost NN 42149 796 155 per per IN 42149 796 156 cubic cubic JJ 42149 796 157 yard yard NN 42149 796 158 | | CD 42149 796 159 $ $ $ 42149 796 160 10.23| 10.23| CD 42149 796 161 $ $ $ 42149 796 162 8.54| 8.54| CD 42149 796 163 $ $ $ 42149 796 164 9.93 9.93 CD 42149 796 165 = = SYM 42149 796 166 = = SYM 42149 796 167 = = SYM 42149 796 168 = = SYM 42149 796 169 = = SYM 42149 796 170 = = SYM 42149 796 171 = = SYM 42149 796 172 = = SYM 42149 796 173 = = SYM 42149 796 174 = = SYM 42149 796 175 = = SYM 42149 796 176 = = SYM 42149 796 177 = = SYM 42149 796 178 = = SYM 42149 796 179 = = SYM 42149 796 180 = = SYM 42149 796 181 = = SYM 42149 796 182 = = SYM 42149 796 183 = = SYM 42149 796 184 = = SYM 42149 796 185 = = SYM 42149 796 186 = = SYM 42149 796 187 = = SYM 42149 796 188 = = SYM 42149 796 189 = = SYM 42149 796 190 = = SYM 42149 796 191 = = SYM 42149 796 192 = = SYM 42149 796 193 = = SYM 42149 796 194 = = SYM 42149 796 195 = = SYM 42149 796 196 = = SYM 42149 796 197 = = SYM 42149 796 198 = = SYM 42149 796 199 = = SYM 42149 796 200 = = SYM 42149 796 201 = = NFP 42149 796 202 = = SYM 42149 796 203 + + SYM 42149 796 204 = = SYM 42149 796 205 = = SYM 42149 796 206 = = SYM 42149 796 207 = = SYM 42149 796 208 = = SYM 42149 796 209 = = SYM 42149 796 210 = = SYM 42149 796 211 = = NFP 42149 796 212 = = SYM 42149 796 213 + + SYM 42149 796 214 = = SYM 42149 796 215 = = SYM 42149 796 216 = = SYM 42149 796 217 = = SYM 42149 796 218 = = SYM 42149 796 219 = = SYM 42149 796 220 = = SYM 42149 796 221 = = NFP 42149 796 222 = = SYM 42149 796 223 + + SYM 42149 796 224 = = SYM 42149 796 225 = = SYM 42149 796 226 = = SYM 42149 796 227 = = SYM 42149 796 228 = = SYM 42149 796 229 = = SYM 42149 796 230 = = SYM 42149 796 231 = = SYM 42149 796 232 = = SYM 42149 796 233 = = SYM 42149 796 234 = = SYM 42149 796 235 = = NFP 42149 796 236 = = NFP 42149 796 237 Masonry Masonry NNP 42149 796 238 Lining Lining NNP 42149 796 239 of of IN 42149 796 240 Land Land NNP 42149 796 241 Tunnels Tunnels NNPS 42149 796 242 . . . 42149 797 1 Plates plate NNS 42149 797 2 XXXII XXXII NNP 42149 797 3 and and CC 42149 797 4 XXXIV xxxiv NN 42149 797 5 show show VBP 42149 797 6 in in IN 42149 797 7 detail detail NN 42149 797 8 the the DT 42149 797 9 tunnels tunnel NNS 42149 797 10 as as IN 42149 797 11 they -PRON- PRP 42149 797 12 were be VBD 42149 797 13 actually actually RB 42149 797 14 built build VBN 42149 797 15 . . . 42149 798 1 It -PRON- PRP 42149 798 2 will will MD 42149 798 3 be be VB 42149 798 4 seen see VBN 42149 798 5 that that IN 42149 798 6 in in IN 42149 798 7 all all DT 42149 798 8 work work NN 42149 798 9 , , , 42149 798 10 except except IN 42149 798 11 in in IN 42149 798 12 the the DT 42149 798 13 Gy Gy NNP 42149 798 14 - - HYPH 42149 798 15 East East NNP 42149 798 16 contract contract NN 42149 798 17 , , , 42149 798 18 there there EX 42149 798 19 was be VBD 42149 798 20 a a DT 42149 798 21 bench bench NN 42149 798 22 at at IN 42149 798 23 each each DT 42149 798 24 side side NN 42149 798 25 of of IN 42149 798 26 each each DT 42149 798 27 tunnel tunnel NN 42149 798 28 in in IN 42149 798 29 which which WDT 42149 798 30 the the DT 42149 798 31 cable cable NN 42149 798 32 conduits conduit NNS 42149 798 33 were be VBD 42149 798 34 embedded embed VBN 42149 798 35 . . . 42149 799 1 In in IN 42149 799 2 Gy Gy NNP 42149 799 3 - - HYPH 42149 799 4 East East NNP 42149 799 5 the the DT 42149 799 6 bank bank NN 42149 799 7 of of IN 42149 799 8 ducts duct NNS 42149 799 9 which which WDT 42149 799 10 came come VBD 42149 799 11 next next RB 42149 799 12 to to IN 42149 799 13 the the DT 42149 799 14 middle middle JJ 42149 799 15 wall wall NN 42149 799 16 was be VBD 42149 799 17 carried carry VBN 42149 799 18 below below IN 42149 799 19 subgrade subgrade NN 42149 799 20 , , , 42149 799 21 and and CC 42149 799 22 the the DT 42149 799 23 inner inner JJ 42149 799 24 benches bench NNS 42149 799 25 were be VBD 42149 799 26 omitted omit VBN 42149 799 27 . . . 42149 800 1 The the DT 42149 800 2 side side NN 42149 800 3 - - HYPH 42149 800 4 walls wall NNS 42149 800 5 and and CC 42149 800 6 subgrade subgrade NN 42149 800 7 electric electric JJ 42149 800 8 conduits conduit NNS 42149 800 9 were be VBD 42149 800 10 water water NN 42149 800 11 - - HYPH 42149 800 12 proofed proof VBN 42149 800 13 with with IN 42149 800 14 felt felt NN 42149 800 15 and and CC 42149 800 16 pitch pitch NN 42149 800 17 . . . 42149 801 1 The the DT 42149 801 2 water water NN 42149 801 3 - - HYPH 42149 801 4 proofing proofing NN 42149 801 5 was be VBD 42149 801 6 placed place VBN 42149 801 7 on on IN 42149 801 8 the the DT 42149 801 9 outside outside NN 42149 801 10 of of IN 42149 801 11 the the DT 42149 801 12 side side NN 42149 801 13 - - HYPH 42149 801 14 walls wall NNS 42149 801 15 ( ( -LRB- 42149 801 16 that that RB 42149 801 17 is is RB 42149 801 18 , , , 42149 801 19 on on IN 42149 801 20 the the DT 42149 801 21 neat neat JJ 42149 801 22 line line NN 42149 801 23 ) ) -RRB- 42149 801 24 , , , 42149 801 25 and and CC 42149 801 26 the the DT 42149 801 27 space space NN 42149 801 28 between between IN 42149 801 29 the the DT 42149 801 30 rock rock NN 42149 801 31 and and CC 42149 801 32 the the DT 42149 801 33 water water NN 42149 801 34 - - HYPH 42149 801 35 proofing proofing NN 42149 801 36 was be VBD 42149 801 37 filled fill VBN 42149 801 38 with with IN 42149 801 39 concrete concrete NN 42149 801 40 . . . 42149 802 1 This this DT 42149 802 2 concrete concrete NN 42149 802 3 was be VBD 42149 802 4 called call VBN 42149 802 5 the the DT 42149 802 6 " " `` 42149 802 7 Sand Sand NNP 42149 802 8 - - HYPH 42149 802 9 Wall Wall NNP 42149 802 10 . . . 42149 802 11 " " '' 42149 803 1 The the DT 42149 803 2 general general JJ 42149 803 3 sequence sequence NN 42149 803 4 of of IN 42149 803 5 building build VBG 42149 803 6 the the DT 42149 803 7 masonry masonry NN 42149 803 8 lining lining NN 42149 803 9 is be VBZ 42149 803 10 shown show VBN 42149 803 11 in in IN 42149 803 12 Fig Fig NNP 42149 803 13 . . . 42149 804 1 8 8 LS 42149 804 2 . . . 42149 805 1 The the DT 42149 805 2 operations operation NNS 42149 805 3 were be VBD 42149 805 4 as as IN 42149 805 5 follows follow VBZ 42149 805 6 : : : 42149 805 7 1.--Laying 1.--laying CD 42149 805 8 concrete concrete NN 42149 805 9 for for IN 42149 805 10 the the DT 42149 805 11 whole whole JJ 42149 805 12 height height NN 42149 805 13 of of IN 42149 805 14 the the DT 42149 805 15 sand sand NN 42149 805 16 - - HYPH 42149 805 17 walls wall NNS 42149 805 18 , , , 42149 805 19 and and CC 42149 805 20 for for IN 42149 805 21 the the DT 42149 805 22 floor floor NN 42149 805 23 and and CC 42149 805 24 foundations foundation NNS 42149 805 25 for for IN 42149 805 26 walls wall NNS 42149 805 27 and and CC 42149 805 28 benches bench NNS 42149 805 29 up up IN 42149 805 30 to to IN 42149 805 31 the the DT 42149 805 32 level level NN 42149 805 33 of of IN 42149 805 34 the the DT 42149 805 35 base base NN 42149 805 36 of of IN 42149 805 37 the the DT 42149 805 38 conduits conduit NNS 42149 805 39 ; ; : 42149 805 40 2.--Water 2.--water CD 42149 805 41 - - : 42149 805 42 proofing proof VBG 42149 805 43 the the DT 42149 805 44 side side NN 42149 805 45 - - HYPH 42149 805 46 walls wall NNS 42149 805 47 , , , 42149 805 48 and and CC 42149 805 49 , , , 42149 805 50 where where WRB 42149 805 51 there there EX 42149 805 52 was be VBD 42149 805 53 a a DT 42149 805 54 middle middle JJ 42149 805 55 trench trench NN 42149 805 56 containing contain VBG 42149 805 57 subgrade subgrade NN 42149 805 58 conduits conduit NNS 42149 805 59 , , , 42149 805 60 laying laying NN 42149 805 61 and and CC 42149 805 62 water water NN 42149 805 63 - - HYPH 42149 805 64 proofing proof VBG 42149 805 65 these these DT 42149 805 66 conduits conduit NNS 42149 805 67 ; ; : 42149 805 68 3.--Building 3.--builde VBG 42149 805 69 concrete concrete JJ 42149 805 70 wall wall NN 42149 805 71 for for IN 42149 805 72 conduits conduit NNS 42149 805 73 to to TO 42149 805 74 be be VB 42149 805 75 laid lay VBN 42149 805 76 against against IN 42149 805 77 , , , 42149 805 78 and and CC 42149 805 79 , , , 42149 805 80 where where WRB 42149 805 81 there there EX 42149 805 82 was be VBD 42149 805 83 a a DT 42149 805 84 middle middle JJ 42149 805 85 trench trench NN 42149 805 86 , , , 42149 805 87 filling fill VBG 42149 805 88 up up RP 42149 805 89 with with IN 42149 805 90 concrete concrete NN 42149 805 91 between between IN 42149 805 92 the the DT 42149 805 93 conduits conduit NNS 42149 805 94 ; ; : 42149 805 95 4.--Laying 4.--laying NN 42149 805 96 conduits conduit NNS 42149 805 97 ; ; : 42149 805 98 5.--Laying 5.--laye VBG 42149 805 99 concrete concrete NN 42149 805 100 for for IN 42149 805 101 benches bench NNS 42149 805 102 and and CC 42149 805 103 middle middle NN 42149 805 104 - - HYPH 42149 805 105 wall wall NN 42149 805 106 ; ; : 42149 805 107 6.--Building 6.--building NN 42149 805 108 haunches haunche VBZ 42149 805 109 from from IN 42149 805 110 top top NN 42149 805 111 of of IN 42149 805 112 bench bench NN 42149 805 113 to to IN 42149 805 114 springing springing NN 42149 805 115 of of IN 42149 805 116 brick brick NN 42149 805 117 arch arch NN 42149 805 118 ; ; : 42149 805 119 7.--Building 7.--builde VBG 42149 805 120 brick brick NN 42149 805 121 arch arch NN 42149 805 122 and and CC 42149 805 123 part part NN 42149 805 124 of of IN 42149 805 125 concrete concrete JJ 42149 805 126 back back RB 42149 805 127 - - HYPH 42149 805 128 filling filling NN 42149 805 129 ; ; : 42149 805 130 8.--Finishing 8.--finishe VBG 42149 805 131 back back RB 42149 805 132 - - HYPH 42149 805 133 filling filling NN 42149 805 134 . . . 42149 806 1 The the DT 42149 806 2 whole whole JJ 42149 806 3 work work NN 42149 806 4 will will MD 42149 806 5 be be VB 42149 806 6 generally generally RB 42149 806 7 described describe VBN 42149 806 8 under under IN 42149 806 9 the the DT 42149 806 10 headings heading NNS 42149 806 11 of of IN 42149 806 12 Concrete Concrete NNP 42149 806 13 , , , 42149 806 14 Brickwork Brickwork NNP 42149 806 15 , , , 42149 806 16 Water Water NNP 42149 806 17 - - HYPH 42149 806 18 proofing proofing NN 42149 806 19 , , , 42149 806 20 and and CC 42149 806 21 Electric Electric NNP 42149 806 22 Conduits conduit NNS 42149 806 23 . . . 42149 807 1 _ _ NNP 42149 807 2 Concrete._--The Concrete._--The NNP 42149 807 3 number number NN 42149 807 4 of of IN 42149 807 5 types type NNS 42149 807 6 and and CC 42149 807 7 the the DT 42149 807 8 obstructions obstruction NNS 42149 807 9 caused cause VBN 42149 807 10 by by IN 42149 807 11 the the DT 42149 807 12 heavy heavy JJ 42149 807 13 posting posting NN 42149 807 14 of of IN 42149 807 15 the the DT 42149 807 16 timbering timbering NN 42149 807 17 made make VBD 42149 807 18 it -PRON- PRP 42149 807 19 inadvisable inadvisable JJ 42149 807 20 to to TO 42149 807 21 use use VB 42149 807 22 built build VBN 42149 807 23 - - HYPH 42149 807 24 up up RP 42149 807 25 traveling travel VBG 42149 807 26 forms form NNS 42149 807 27 at at IN 42149 807 28 the the DT 42149 807 29 Manhattan Manhattan NNP 42149 807 30 side side NN 42149 807 31 , , , 42149 807 32 though though IN 42149 807 33 they -PRON- PRP 42149 807 34 were be VBD 42149 807 35 used use VBN 42149 807 36 in in IN 42149 807 37 the the DT 42149 807 38 Weehawken Weehawken NNP 42149 807 39 Rock Rock NNP 42149 807 40 Tunnels Tunnels NNP 42149 807 41 . . . 42149 808 1 The the DT 42149 808 2 specifications specification NNS 42149 808 3 required require VBD 42149 808 4 a a DT 42149 808 5 facing face VBG 42149 808 6 mixture mixture NN 42149 808 7 of of IN 42149 808 8 mortar mortar NN 42149 808 9 to to TO 42149 808 10 be be VB 42149 808 11 deposited deposit VBN 42149 808 12 against against IN 42149 808 13 the the DT 42149 808 14 forms form NNS 42149 808 15 simultaneously simultaneously RB 42149 808 16 with with IN 42149 808 17 the the DT 42149 808 18 placing placing NN 42149 808 19 of of IN 42149 808 20 the the DT 42149 808 21 concrete concrete NN 42149 808 22 . . . 42149 809 1 This this DT 42149 809 2 facing face VBG 42149 809 3 mixture mixture NN 42149 809 4 was be VBD 42149 809 5 dry dry JJ 42149 809 6 , , , 42149 809 7 about about RB 42149 809 8 2 2 CD 42149 809 9 in in IN 42149 809 10 . . . 42149 810 1 thick thick JJ 42149 810 2 , , , 42149 810 3 and and CC 42149 810 4 was be VBD 42149 810 5 kept keep VBN 42149 810 6 separate separate JJ 42149 810 7 from from IN 42149 810 8 the the DT 42149 810 9 concrete concrete NN 42149 810 10 during during IN 42149 810 11 the the DT 42149 810 12 placing placing NN 42149 810 13 by by IN 42149 810 14 a a DT 42149 810 15 steel steel NN 42149 810 16 diaphragm diaphragm VBN 42149 810 17 . . . 42149 811 1 The the DT 42149 811 2 diaphragm diaphragm NN 42149 811 3 was be VBD 42149 811 4 removed remove VBN 42149 811 5 when when WRB 42149 811 6 the the DT 42149 811 7 concrete concrete NN 42149 811 8 reached reach VBD 42149 811 9 the the DT 42149 811 10 top top NN 42149 811 11 of of IN 42149 811 12 each each DT 42149 811 13 successive successive JJ 42149 811 14 layer layer NN 42149 811 15 , , , 42149 811 16 and and CC 42149 811 17 the the DT 42149 811 18 facing face VBG 42149 811 19 mixture mixture NN 42149 811 20 and and CC 42149 811 21 concrete concrete NN 42149 811 22 were be VBD 42149 811 23 then then RB 42149 811 24 tamped tamp VBN 42149 811 25 down down RP 42149 811 26 together together RB 42149 811 27 . . . 42149 812 1 This this DT 42149 812 2 method method NN 42149 812 3 was be VBD 42149 812 4 at at IN 42149 812 5 first first RB 42149 812 6 followed follow VBN 42149 812 7 and and CC 42149 812 8 gave give VBD 42149 812 9 good good JJ 42149 812 10 results result NNS 42149 812 11 , , , 42149 812 12 which which WDT 42149 812 13 was be VBD 42149 812 14 indeed indeed RB 42149 812 15 a a DT 42149 812 16 foregone foregone JJ 42149 812 17 conclusion conclusion NN 42149 812 18 , , , 42149 812 19 as as IN 42149 812 20 the the DT 42149 812 21 Weehawken Weehawken NNP 42149 812 22 shaft shaft NN 42149 812 23 had have VBD 42149 812 24 been be VBN 42149 812 25 built build VBN 42149 812 26 in in IN 42149 812 27 this this DT 42149 812 28 way way NN 42149 812 29 . . . 42149 813 1 However however RB 42149 813 2 , , , 42149 813 3 it -PRON- PRP 42149 813 4 was be VBD 42149 813 5 found find VBN 42149 813 6 that that IN 42149 813 7 as as IN 42149 813 8 good good JJ 42149 813 9 results result NNS 42149 813 10 , , , 42149 813 11 in in IN 42149 813 12 the the DT 42149 813 13 way way NN 42149 813 14 of of IN 42149 813 15 smooth smooth JJ 42149 813 16 finish finish NN 42149 813 17 , , , 42149 813 18 were be VBD 42149 813 19 to to TO 42149 813 20 be be VB 42149 813 21 obtained obtain VBN 42149 813 22 without without IN 42149 813 23 the the DT 42149 813 24 facing face VBG 42149 813 25 mixture mixture NN 42149 813 26 by by IN 42149 813 27 spading spade VBG 42149 813 28 the the DT 42149 813 29 concrete concrete NN 42149 813 30 back back RB 42149 813 31 from from IN 42149 813 32 the the DT 42149 813 33 forms form NNS 42149 813 34 , , , 42149 813 35 so so IN 42149 813 36 that that IN 42149 813 37 the the DT 42149 813 38 stone stone NN 42149 813 39 was be VBD 42149 813 40 forced force VBN 42149 813 41 back back RB 42149 813 42 and and CC 42149 813 43 the the DT 42149 813 44 finer fine JJR 42149 813 45 portion portion NN 42149 813 46 of of IN 42149 813 47 the the DT 42149 813 48 mixture mixture NN 42149 813 49 came come VBD 42149 813 50 against against IN 42149 813 51 the the DT 42149 813 52 forms form NNS 42149 813 53 ; ; : 42149 813 54 this this DT 42149 813 55 method method NN 42149 813 56 was be VBD 42149 813 57 followed follow VBN 42149 813 58 for for IN 42149 813 59 the the DT 42149 813 60 rest rest NN 42149 813 61 of of IN 42149 813 62 the the DT 42149 813 63 work work NN 42149 813 64 . . . 42149 814 1 All all DT 42149 814 2 corners corner NNS 42149 814 3 were be VBD 42149 814 4 rounded round VBN 42149 814 5 off off RP 42149 814 6 on on IN 42149 814 7 a a DT 42149 814 8 1-in 1-in CD 42149 814 9 . . . 42149 815 1 radius radius NN 42149 815 2 by by IN 42149 815 3 mouldings moulding NNS 42149 815 4 tacked tack VBN 42149 815 5 to to IN 42149 815 6 the the DT 42149 815 7 forms form NNS 42149 815 8 . . . 42149 816 1 The the DT 42149 816 2 side side NN 42149 816 3 - - HYPH 42149 816 4 bench bench NN 42149 816 5 forms form NNS 42149 816 6 were be VBD 42149 816 7 used use VBN 42149 816 8 about about IN 42149 816 9 four four CD 42149 816 10 times time NNS 42149 816 11 , , , 42149 816 12 and and CC 42149 816 13 were be VBD 42149 816 14 carefully carefully RB 42149 816 15 scraped scrape VBN 42149 816 16 , , , 42149 816 17 planed plane VBN 42149 816 18 , , , 42149 816 19 filled fill VBN 42149 816 20 at at IN 42149 816 21 open open JJ 42149 816 22 joints joint NNS 42149 816 23 , , , 42149 816 24 and and CC 42149 816 25 oiled oil VBN 42149 816 26 with with IN 42149 816 27 soap soap NN 42149 816 28 grease grease NN 42149 816 29 each each DT 42149 816 30 time time NN 42149 816 31 they -PRON- PRP 42149 816 32 were be VBD 42149 816 33 set set VBN 42149 816 34 up up RP 42149 816 35 . . . 42149 817 1 When when WRB 42149 817 2 too too RB 42149 817 3 rough rough JJ 42149 817 4 for for IN 42149 817 5 face face NN 42149 817 6 work work NN 42149 817 7 they -PRON- PRP 42149 817 8 were be VBD 42149 817 9 used use VBN 42149 817 10 for for IN 42149 817 11 sand sand NN 42149 817 12 - - HYPH 42149 817 13 wall wall NN 42149 817 14 and and CC 42149 817 15 other other JJ 42149 817 16 rough rough JJ 42149 817 17 work work NN 42149 817 18 . . . 42149 818 1 The the DT 42149 818 2 mixing mixing NN 42149 818 3 was be VBD 42149 818 4 done do VBN 42149 818 5 by by IN 42149 818 6 a a DT 42149 818 7 No no NN 42149 818 8 . . . 42149 819 1 4 4 CD 42149 819 2 Ransome Ransome NNP 42149 819 3 mixer mixer NN 42149 819 4 , , , 42149 819 5 driven drive VBN 42149 819 6 by by IN 42149 819 7 30-h.p 30-h.p NNS 42149 819 8 . . . 42149 820 1 electric electric NNP 42149 820 2 motors motor NNS 42149 820 3 . . . 42149 821 1 The the DT 42149 821 2 mixer mixer NN 42149 821 3 at at IN 42149 821 4 Manhattan Manhattan NNP 42149 821 5 was be VBD 42149 821 6 set set VBN 42149 821 7 on on IN 42149 821 8 an an DT 42149 821 9 elevated elevated JJ 42149 821 10 platform platform NN 42149 821 11 at at IN 42149 821 12 the the DT 42149 821 13 north north JJ 42149 821 14 end end NN 42149 821 15 of of IN 42149 821 16 the the DT 42149 821 17 intercepting intercept VBG 42149 821 18 arch arch NN 42149 821 19 ; ; : 42149 821 20 that that IN 42149 821 21 at at IN 42149 821 22 Weehawken Weehawken NNP 42149 821 23 was be VBD 42149 821 24 placed place VBN 42149 821 25 at at IN 42149 821 26 the the DT 42149 821 27 entrance entrance NN 42149 821 28 to to IN 42149 821 29 the the DT 42149 821 30 tunnels tunnel NNS 42149 821 31 . . . 42149 822 1 The the DT 42149 822 2 sand sand NN 42149 822 3 and and CC 42149 822 4 stone stone NN 42149 822 5 were be VBD 42149 822 6 stored store VBN 42149 822 7 in in IN 42149 822 8 bins bin NNS 42149 822 9 above above IN 42149 822 10 the the DT 42149 822 11 mixers mixer NNS 42149 822 12 , , , 42149 822 13 and and CC 42149 822 14 were be VBD 42149 822 15 led lead VBN 42149 822 16 to to IN 42149 822 17 the the DT 42149 822 18 hoppers hopper NNS 42149 822 19 of of IN 42149 822 20 the the DT 42149 822 21 mixers mixer NNS 42149 822 22 through through IN 42149 822 23 chutes chute NNS 42149 822 24 . . . 42149 823 1 The the DT 42149 823 2 hoppers hopper NNS 42149 823 3 were be VBD 42149 823 4 divided divide VBN 42149 823 5 into into IN 42149 823 6 two two CD 42149 823 7 sections section NNS 42149 823 8 , , , 42149 823 9 which which WDT 42149 823 10 gave give VBD 42149 823 11 the the DT 42149 823 12 correct correct JJ 42149 823 13 quantities quantity NNS 42149 823 14 of of IN 42149 823 15 sand sand NN 42149 823 16 and and CC 42149 823 17 stone stone NN 42149 823 18 , , , 42149 823 19 respectively respectively RB 42149 823 20 , , , 42149 823 21 for for IN 42149 823 22 one one CD 42149 823 23 batch batch NN 42149 823 24 . . . 42149 824 1 The the DT 42149 824 2 water water NN 42149 824 3 was be VBD 42149 824 4 measured measure VBN 42149 824 5 in in IN 42149 824 6 a a DT 42149 824 7 small small JJ 42149 824 8 tank tank NN 42149 824 9 alongside alongside RB 42149 824 10 . . . 42149 825 1 A a DT 42149 825 2 " " `` 42149 825 3 four four CD 42149 825 4 - - HYPH 42149 825 5 bag bag NN 42149 825 6 " " '' 42149 825 7 batch batch NN 42149 825 8 was be VBD 42149 825 9 the the DT 42149 825 10 amount amount NN 42149 825 11 mixed mix VBN 42149 825 12 at at IN 42149 825 13 one one CD 42149 825 14 time time NN 42149 825 15 , , , 42149 825 16 that that RB 42149 825 17 is is RB 42149 825 18 , , , 42149 825 19 it -PRON- PRP 42149 825 20 consisted consist VBD 42149 825 21 of of IN 42149 825 22 4 4 CD 42149 825 23 bags bag NNS 42149 825 24 of of IN 42149 825 25 cement cement NN 42149 825 26 , , , 42149 825 27 8¾ 8â¾ CD 42149 825 28 cu cu XX 42149 825 29 . . . 42149 826 1 ft ft NNP 42149 826 2 . . NNP 42149 826 3 of of IN 42149 826 4 sand sand NN 42149 826 5 , , , 42149 826 6 and and CC 42149 826 7 17½ 17â½ CD 42149 826 8 cu cu NNS 42149 826 9 . . . 42149 827 1 ft ft NNP 42149 827 2 . . NNP 42149 827 3 of of IN 42149 827 4 broken broken JJ 42149 827 5 stone stone NN 42149 827 6 , , , 42149 827 7 and and CC 42149 827 8 was be VBD 42149 827 9 called call VBN 42149 827 10 a a DT 42149 827 11 1 1 CD 42149 827 12 : : : 42149 827 13 2½ 2â½ CD 42149 827 14 : : : 42149 827 15 5 5 CD 42149 827 16 mixture mixture NN 42149 827 17 . . . 42149 828 1 It -PRON- PRP 42149 828 2 measured measure VBD 42149 828 3 when when WRB 42149 828 4 mixed mix VBN 42149 828 5 about about IN 42149 828 6 ¾ ¾ NNP 42149 828 7 cu cu NNP 42149 828 8 . . . 42149 829 1 yd yd NNP 42149 829 2 . . . 42149 830 1 The the DT 42149 830 2 cement cement NN 42149 830 3 was be VBD 42149 830 4 furnished furnish VBN 42149 830 5 to to IN 42149 830 6 the the DT 42149 830 7 contractor contractor NN 42149 830 8 by by IN 42149 830 9 the the DT 42149 830 10 Railroad Railroad NNP 42149 830 11 Company Company NNP 42149 830 12 , , , 42149 830 13 which which WDT 42149 830 14 undertook undertake VBD 42149 830 15 all all PDT 42149 830 16 the the DT 42149 830 17 purchasing purchasing NN 42149 830 18 from from IN 42149 830 19 the the DT 42149 830 20 manufacturer manufacturer NN 42149 830 21 , , , 42149 830 22 as as RB 42149 830 23 well well RB 42149 830 24 as as IN 42149 830 25 the the DT 42149 830 26 sampling sampling NN 42149 830 27 , , , 42149 830 28 testing testing NN 42149 830 29 , , , 42149 830 30 and and CC 42149 830 31 storing store VBG 42149 830 32 until until IN 42149 830 33 the the DT 42149 830 34 contractor contractor NN 42149 830 35 needed need VBD 42149 830 36 it -PRON- PRP 42149 830 37 . . . 42149 831 1 The the DT 42149 831 2 Railroad Railroad NNP 42149 831 3 Company Company NNP 42149 831 4 charged charge VBD 42149 831 5 the the DT 42149 831 6 contractor contractor NN 42149 831 7 $ $ $ 42149 831 8 2 2 CD 42149 831 9 a a DT 42149 831 10 barrel barrel NN 42149 831 11 for for IN 42149 831 12 this this DT 42149 831 13 material material NN 42149 831 14 . . . 42149 832 1 The the DT 42149 832 2 sand sand NN 42149 832 3 was be VBD 42149 832 4 required require VBN 42149 832 5 by by IN 42149 832 6 the the DT 42149 832 7 specifications specification NNS 42149 832 8 to to TO 42149 832 9 be be VB 42149 832 10 coarse coarse JJ 42149 832 11 , , , 42149 832 12 sharp sharp JJ 42149 832 13 , , , 42149 832 14 and and CC 42149 832 15 silicious silicious JJ 42149 832 16 , , , 42149 832 17 and and CC 42149 832 18 to to TO 42149 832 19 contain contain VB 42149 832 20 not not RB 42149 832 21 more more JJR 42149 832 22 than than IN 42149 832 23 0.5 0.5 CD 42149 832 24 % % NN 42149 832 25 of of IN 42149 832 26 mica mica NNP 42149 832 27 , , , 42149 832 28 loam loam NNP 42149 832 29 , , , 42149 832 30 dirt dirt NN 42149 832 31 , , , 42149 832 32 or or CC 42149 832 33 clay clay NN 42149 832 34 . . . 42149 833 1 All all DT 42149 833 2 sand sand NN 42149 833 3 was be VBD 42149 833 4 carefully carefully RB 42149 833 5 tested test VBN 42149 833 6 before before IN 42149 833 7 being be VBG 42149 833 8 used use VBN 42149 833 9 . . . 42149 834 1 The the DT 42149 834 2 stone stone NN 42149 834 3 was be VBD 42149 834 4 to to TO 42149 834 5 be be VB 42149 834 6 a a DT 42149 834 7 sound sound JJ 42149 834 8 trap trap NN 42149 834 9 or or CC 42149 834 10 limestone limestone NN 42149 834 11 , , , 42149 834 12 passing pass VBG 42149 834 13 a a DT 42149 834 14 1½-in 1â½-in NN 42149 834 15 . . . 42149 835 1 mesh mesh NNP 42149 835 2 and and CC 42149 835 3 being be VBG 42149 835 4 retained retain VBN 42149 835 5 on on IN 42149 835 6 3/8-in 3/8-in NNP 42149 835 7 . . . 42149 836 1 mesh mesh FW 42149 836 2 . . . 42149 837 1 The the DT 42149 837 2 contractor contractor NN 42149 837 3 was be VBD 42149 837 4 allowed allow VBN 42149 837 5 to to TO 42149 837 6 use use VB 42149 837 7 a a DT 42149 837 8 coarser coarser NN 42149 837 9 stone stone NN 42149 837 10 than than IN 42149 837 11 this this DT 42149 837 12 , , , 42149 837 13 namely namely RB 42149 837 14 , , , 42149 837 15 one one NN 42149 837 16 that that WDT 42149 837 17 had have VBD 42149 837 18 passed pass VBN 42149 837 19 a a DT 42149 837 20 2-in 2-in CD 42149 837 21 . . . 42149 838 1 and and CC 42149 838 2 was be VBD 42149 838 3 retained retain VBN 42149 838 4 on on IN 42149 838 5 a a DT 42149 838 6 1½-in 1â½-in NN 42149 838 7 . . . 42149 839 1 mesh mesh FW 42149 839 2 . . . 42149 840 1 The the DT 42149 840 2 concrete concrete NN 42149 840 3 was be VBD 42149 840 4 to to TO 42149 840 5 be be VB 42149 840 6 machine machine NN 42149 840 7 - - HYPH 42149 840 8 mixed mixed JJ 42149 840 9 , , , 42149 840 10 except except IN 42149 840 11 in in IN 42149 840 12 cases case NNS 42149 840 13 of of IN 42149 840 14 local local JJ 42149 840 15 necessity necessity NN 42149 840 16 . . . 42149 841 1 The the DT 42149 841 2 quantity quantity NN 42149 841 3 of of IN 42149 841 4 water water NN 42149 841 5 used use VBN 42149 841 6 in in IN 42149 841 7 the the DT 42149 841 8 mixture mixture NN 42149 841 9 was be VBD 42149 841 10 to to TO 42149 841 11 be be VB 42149 841 12 such such JJ 42149 841 13 that that IN 42149 841 14 the the DT 42149 841 15 concrete concrete NN 42149 841 16 would would MD 42149 841 17 quake quake VB 42149 841 18 on on IN 42149 841 19 being be VBG 42149 841 20 deposited deposit VBN 42149 841 21 , , , 42149 841 22 but but CC 42149 841 23 the the DT 42149 841 24 engineer engineer NN 42149 841 25 was be VBD 42149 841 26 to to TO 42149 841 27 use use VB 42149 841 28 his -PRON- PRP$ 42149 841 29 discretion discretion NN 42149 841 30 on on IN 42149 841 31 this this DT 42149 841 32 point point NN 42149 841 33 . . . 42149 842 1 Concrete Concrete NNP 42149 842 2 was be VBD 42149 842 3 to to TO 42149 842 4 be be VB 42149 842 5 deposited deposit VBN 42149 842 6 in in IN 42149 842 7 such such PDT 42149 842 8 a a DT 42149 842 9 manner manner NN 42149 842 10 that that IN 42149 842 11 the the DT 42149 842 12 aggregates aggregate NNS 42149 842 13 would would MD 42149 842 14 not not RB 42149 842 15 separate separate VB 42149 842 16 . . . 42149 843 1 It -PRON- PRP 42149 843 2 was be VBD 42149 843 3 to to TO 42149 843 4 be be VB 42149 843 5 laid lay VBN 42149 843 6 in in IN 42149 843 7 layers layer NNS 42149 843 8 , , , 42149 843 9 not not RB 42149 843 10 exceeding exceed VBG 42149 843 11 9 9 CD 42149 843 12 in in IN 42149 843 13 . . . 42149 844 1 in in IN 42149 844 2 thickness thickness NN 42149 844 3 , , , 42149 844 4 and and CC 42149 844 5 thoroughly thoroughly RB 42149 844 6 rammed ram VBD 42149 844 7 . . . 42149 845 1 When when WRB 42149 845 2 placing place VBG 42149 845 3 was be VBD 42149 845 4 suspended suspend VBN 42149 845 5 , , , 42149 845 6 a a DT 42149 845 7 joint joint NN 42149 845 8 was be VBD 42149 845 9 to to TO 42149 845 10 be be VB 42149 845 11 formed form VBN 42149 845 12 in in IN 42149 845 13 a a DT 42149 845 14 manner manner NN 42149 845 15 satisfactory satisfactory JJ 42149 845 16 to to IN 42149 845 17 the the DT 42149 845 18 engineer engineer NN 42149 845 19 . . . 42149 846 1 Before before IN 42149 846 2 depositing deposit VBG 42149 846 3 fresh fresh JJ 42149 846 4 concrete concrete NN 42149 846 5 , , , 42149 846 6 the the DT 42149 846 7 entire entire JJ 42149 846 8 surface surface NN 42149 846 9 on on IN 42149 846 10 which which WDT 42149 846 11 it -PRON- PRP 42149 846 12 was be VBD 42149 846 13 to to TO 42149 846 14 be be VB 42149 846 15 laid lay VBN 42149 846 16 was be VBD 42149 846 17 to to TO 42149 846 18 be be VB 42149 846 19 cleaned clean VBN 42149 846 20 , , , 42149 846 21 washed wash VBN 42149 846 22 and and CC 42149 846 23 brushed brush VBN 42149 846 24 , , , 42149 846 25 and and CC 42149 846 26 slushed slush VBD 42149 846 27 over over RP 42149 846 28 with with IN 42149 846 29 neat neat JJ 42149 846 30 cement cement NN 42149 846 31 grout grout NN 42149 846 32 . . . 42149 847 1 Concrete Concrete NNP 42149 847 2 which which WDT 42149 847 3 had have VBD 42149 847 4 begun begin VBN 42149 847 5 to to TO 42149 847 6 set set VB 42149 847 7 was be VBD 42149 847 8 not not RB 42149 847 9 to to TO 42149 847 10 be be VB 42149 847 11 used use VBN 42149 847 12 , , , 42149 847 13 and and CC 42149 847 14 retempering retempering NN 42149 847 15 was be VBD 42149 847 16 not not RB 42149 847 17 to to TO 42149 847 18 be be VB 42149 847 19 allowed allow VBN 42149 847 20 . . . 42149 848 1 [ [ -LRB- 42149 848 2 Illustration illustration NN 42149 848 3 : : : 42149 848 4 MANHATTAN MANHATTAN NNP 42149 848 5 TYPES TYPES NNP 42149 848 6 FIG FIG NNP 42149 848 7 . . . 42149 849 1 8 8 LS 42149 849 2 . . . 42149 849 3 ] ] -RRB- 42149 850 1 The the DT 42149 850 2 forms form NNS 42149 850 3 were be VBD 42149 850 4 to to TO 42149 850 5 be be VB 42149 850 6 substantial substantial JJ 42149 850 7 and and CC 42149 850 8 hold hold VB 42149 850 9 their -PRON- PRP$ 42149 850 10 shape shape NN 42149 850 11 until until IN 42149 850 12 the the DT 42149 850 13 concrete concrete NN 42149 850 14 had have VBD 42149 850 15 set set VBN 42149 850 16 . . . 42149 851 1 The the DT 42149 851 2 face face NN 42149 851 3 forms form NNS 42149 851 4 were be VBD 42149 851 5 to to TO 42149 851 6 be be VB 42149 851 7 of of IN 42149 851 8 matched match VBN 42149 851 9 and and CC 42149 851 10 dressed dressed JJ 42149 851 11 planking planking NN 42149 851 12 , , , 42149 851 13 finished finish VBD 42149 851 14 to to IN 42149 851 15 true true JJ 42149 851 16 lines line NNS 42149 851 17 and and CC 42149 851 18 surfaces surface NNS 42149 851 19 ; ; , 42149 851 20 adequate adequate JJ 42149 851 21 measures measure NNS 42149 851 22 were be VBD 42149 851 23 to to TO 42149 851 24 be be VB 42149 851 25 taken take VBN 42149 851 26 to to TO 42149 851 27 prevent prevent VB 42149 851 28 concrete concrete NN 42149 851 29 from from IN 42149 851 30 adhering adhere VBG 42149 851 31 to to IN 42149 851 32 the the DT 42149 851 33 forms form NNS 42149 851 34 . . . 42149 852 1 Warped warped JJ 42149 852 2 or or CC 42149 852 3 distorted distorted JJ 42149 852 4 forms form NNS 42149 852 5 were be VBD 42149 852 6 to to TO 42149 852 7 be be VB 42149 852 8 replaced replace VBN 42149 852 9 . . . 42149 853 1 Plastering plaster VBG 42149 853 2 the the DT 42149 853 3 face face NN 42149 853 4 was be VBD 42149 853 5 not not RB 42149 853 6 allowed allow VBN 42149 853 7 . . . 42149 854 1 Rock rock NN 42149 854 2 surfaces surface NNS 42149 854 3 were be VBD 42149 854 4 to to TO 42149 854 5 be be VB 42149 854 6 thoroughly thoroughly RB 42149 854 7 washed wash VBN 42149 854 8 and and CC 42149 854 9 cleaned clean VBN 42149 854 10 before before IN 42149 854 11 the the DT 42149 854 12 concrete concrete NN 42149 854 13 was be VBD 42149 854 14 deposited deposit VBN 42149 854 15 . . . 42149 855 1 These these DT 42149 855 2 specifications specification NNS 42149 855 3 were be VBD 42149 855 4 followed follow VBN 42149 855 5 quite quite RB 42149 855 6 closely closely RB 42149 855 7 . . . 42149 856 1 A a DT 42149 856 2 typical typical JJ 42149 856 3 working working NN 42149 856 4 gang gang NN 42149 856 5 , , , 42149 856 6 as as IN 42149 856 7 divided divide VBN 42149 856 8 among among IN 42149 856 9 the the DT 42149 856 10 various various JJ 42149 856 11 operations operation NNS 42149 856 12 , , , 42149 856 13 is be VBZ 42149 856 14 shown show VBN 42149 856 15 below below IN 42149 856 16 : : : 42149 856 17 _ _ NNP 42149 856 18 Superintendence Superintendence NNP 42149 856 19 . . . 42149 856 20 _ _ NNP 42149 856 21 ½ ½ NNP 42149 856 22 Superintendent Superintendent NNP 42149 856 23 @ @ NFP 42149 856 24 $ $ $ 42149 856 25 250 250 CD 42149 856 26 per per IN 42149 856 27 month month NN 42149 856 28 ½ ½ NNP 42149 856 29 Assistant assistant JJ 42149 856 30 engineer engineer NN 42149 856 31 " " `` 42149 856 32 150 150 CD 42149 856 33 " " '' 42149 856 34 " " `` 42149 856 35 1 1 CD 42149 856 36 Assistant Assistant NNP 42149 856 37 superintendent superintendent NN 42149 856 38 " " `` 42149 856 39 150 150 CD 42149 856 40 " " '' 42149 856 41 " " '' 42149 856 42 _ _ NNP 42149 856 43 Surface Surface NNP 42149 856 44 Transport Transport NNP 42149 856 45 . . . 42149 856 46 _ _ NNP 42149 856 47 1 1 CD 42149 856 48 Foreman Foreman NNP 42149 856 49 @ @ CC 42149 856 50 $ $ $ 42149 856 51 2.50 2.50 CD 42149 856 52 per per IN 42149 856 53 day day NN 42149 856 54 1 1 CD 42149 856 55 Engineer Engineer NNP 42149 856 56 " " `` 42149 856 57 3.00 3.00 CD 42149 856 58 " " '' 42149 856 59 " " `` 42149 856 60 1 1 CD 42149 856 61 Signalman Signalman NNP 42149 856 62 " " `` 42149 856 63 2.00 2.00 CD 42149 856 64 " " '' 42149 856 65 " " '' 42149 856 66 16 16 CD 42149 856 67 Laborers Laborers NNPS 42149 856 68 " " `` 42149 856 69 1.75 1.75 CD 42149 856 70 " " '' 42149 856 71 " " `` 42149 856 72 3 3 CD 42149 856 73 Teams Teams NNPS 42149 856 74 " " `` 42149 856 75 7.50 7.50 CD 42149 856 76 " " '' 42149 856 77 " " `` 42149 856 78 _ _ NNP 42149 856 79 Laying Laying NNP 42149 856 80 . . . 42149 856 81 _ _ NNP 42149 856 82 1 1 CD 42149 856 83 Foreman Foreman NNP 42149 856 84 @ @ CC 42149 856 85 $ $ $ 42149 856 86 4.00 4.00 CD 42149 856 87 per per IN 42149 856 88 day day NN 42149 856 89 8 8 CD 42149 856 90 Laborers laborer NNS 42149 856 91 " " `` 42149 856 92 2.00 2.00 CD 42149 856 93 " " '' 42149 856 94 " " `` 42149 856 95 _ _ NNP 42149 856 96 Forms Forms NNP 42149 856 97 . . . 42149 856 98 _ _ NNP 42149 856 99 1 1 CD 42149 856 100 Foreman Foreman NNP 42149 856 101 @ @ CC 42149 856 102 $ $ $ 42149 856 103 4.50 4.50 CD 42149 856 104 per per IN 42149 856 105 day day NN 42149 856 106 4 4 CD 42149 856 107 Carpenters Carpenters NNPS 42149 856 108 " " `` 42149 856 109 3.25 3.25 CD 42149 856 110 " " '' 42149 856 111 " " `` 42149 856 112 5 5 CD 42149 856 113 Helpers Helpers NNPS 42149 856 114 " " `` 42149 856 115 2.25 2.25 CD 42149 856 116 " " '' 42149 856 117 " " `` 42149 856 118 _ _ NNP 42149 856 119 Tunnel Tunnel NNP 42149 856 120 Transport Transport NNP 42149 856 121 . . . 42149 856 122 _ _ NNP 42149 856 123 ¼ ¼ `` 42149 856 124 Foreman foreman NN 42149 856 125 @ @ CC 42149 856 126 $ $ $ 42149 856 127 3.25 3.25 CD 42149 856 128 per per IN 42149 856 129 day day NN 42149 856 130 ¼ â¼ CD 42149 856 131 Engineer Engineer NNP 42149 856 132 " " `` 42149 856 133 3.00 3.00 CD 42149 856 134 " " '' 42149 856 135 " " '' 42149 856 136 ¼ ¼ . 42149 856 137 Signalman Signalman NNP 42149 856 138 " " `` 42149 856 139 2.00 2.00 CD 42149 856 140 " " '' 42149 856 141 " " `` 42149 856 142 4 4 CD 42149 856 143 Laborers Laborers NNPS 42149 856 144 " " `` 42149 856 145 1.75 1.75 CD 42149 856 146 " " '' 42149 856 147 " " `` 42149 856 148 _ _ NNP 42149 856 149 Mixers Mixers NNP 42149 856 150 . . . 42149 856 151 _ _ NNP 42149 856 152 ¼ ¼ `` 42149 856 153 Foreman foreman NN 42149 856 154 @ @ CC 42149 856 155 $ $ $ 42149 856 156 3.25 3.25 CD 42149 856 157 per per IN 42149 856 158 day day NN 42149 856 159 2 2 CD 42149 856 160 Laborers Laborers NNPS 42149 856 161 " " `` 42149 856 162 1.75 1.75 CD 42149 856 163 " " '' 42149 856 164 " " `` 42149 856 165 The the DT 42149 856 166 superintendent superintendent NN 42149 856 167 and and CC 42149 856 168 assistant assistant NN 42149 856 169 engineer engineer NN 42149 856 170 looked look VBD 42149 856 171 after after IN 42149 856 172 the the DT 42149 856 173 brickwork brickwork NN 42149 856 174 and and CC 42149 856 175 other other JJ 42149 856 176 work work NN 42149 856 177 as as RB 42149 856 178 well well RB 42149 856 179 as as IN 42149 856 180 the the DT 42149 856 181 concrete concrete NN 42149 856 182 . . . 42149 857 1 The the DT 42149 857 2 surface surface NN 42149 857 3 transport transport NN 42149 857 4 gang gang NN 42149 857 5 handled handle VBD 42149 857 6 all all PDT 42149 857 7 the the DT 42149 857 8 materials material NNS 42149 857 9 on on IN 42149 857 10 the the DT 42149 857 11 surface surface NN 42149 857 12 , , , 42149 857 13 including include VBG 42149 857 14 the the DT 42149 857 15 fetching fetching NN 42149 857 16 of of IN 42149 857 17 the the DT 42149 857 18 cement cement NN 42149 857 19 from from IN 42149 857 20 the the DT 42149 857 21 cement cement NN 42149 857 22 warehouses warehouse NNS 42149 857 23 . . . 42149 858 1 The the DT 42149 858 2 tunnel tunnel NN 42149 858 3 transport transport NN 42149 858 4 gang gang NN 42149 858 5 handled handle VBD 42149 858 6 all all DT 42149 858 7 materials material NNS 42149 858 8 in in IN 42149 858 9 the the DT 42149 858 10 tunnel tunnel NN 42149 858 11 , , , 42149 858 12 but but CC 42149 858 13 , , , 42149 858 14 when when WRB 42149 858 15 the the DT 42149 858 16 haul haul NN 42149 858 17 became become VBD 42149 858 18 too too RB 42149 858 19 long long JJ 42149 858 20 , , , 42149 858 21 the the DT 42149 858 22 gang gang NN 42149 858 23 was be VBD 42149 858 24 reinforced reinforce VBN 42149 858 25 with with IN 42149 858 26 laborers laborer NNS 42149 858 27 from from IN 42149 858 28 the the DT 42149 858 29 laying lay VBG 42149 858 30 gang gang NN 42149 858 31 . . . 42149 859 1 Of of IN 42149 859 2 the the DT 42149 859 3 laying lay VBG 42149 859 4 gang gang NN 42149 859 5 , , , 42149 859 6 two two CD 42149 859 7 generally generally RB 42149 859 8 did do VBD 42149 859 9 the the DT 42149 859 10 spading spading NN 42149 859 11 , , , 42149 859 12 two two CD 42149 859 13 the the DT 42149 859 14 spreading spreading NN 42149 859 15 and and CC 42149 859 16 tamping tamping NN 42149 859 17 , , , 42149 859 18 and and CC 42149 859 19 the the DT 42149 859 20 remaining remain VBG 42149 859 21 force force NN 42149 859 22 dumped dump VBD 42149 859 23 the the DT 42149 859 24 concrete concrete NN 42149 859 25 . . . 42149 860 1 The the DT 42149 860 2 general general JJ 42149 860 3 cost cost NN 42149 860 4 of of IN 42149 860 5 this this DT 42149 860 6 part part NN 42149 860 7 of of IN 42149 860 8 the the DT 42149 860 9 work work NN 42149 860 10 is be VBZ 42149 860 11 shown show VBN 42149 860 12 in in IN 42149 860 13 Table Table NNP 42149 860 14 13 13 CD 42149 860 15 . . . 42149 861 1 The the DT 42149 861 2 figures figure NNS 42149 861 3 in in IN 42149 861 4 Table table NN 42149 861 5 13 13 CD 42149 861 6 include include VBP 42149 861 7 the the DT 42149 861 8 various various JJ 42149 861 9 items item NNS 42149 861 10 built build VBN 42149 861 11 into into IN 42149 861 12 the the DT 42149 861 13 concrete concrete NN 42149 861 14 and and CC 42149 861 15 some some DT 42149 861 16 that that WDT 42149 861 17 are be VBP 42149 861 18 certificate certificate NN 42149 861 19 extras extra NNS 42149 861 20 in in IN 42149 861 21 connection connection NN 42149 861 22 with with IN 42149 861 23 the the DT 42149 861 24 concrete concrete NN 42149 861 25 , , , 42149 861 26 such such JJ 42149 861 27 as as IN 42149 861 28 drains drain NNS 42149 861 29 , , , 42149 861 30 ironwork ironwork NN 42149 861 31 and and CC 42149 861 32 iron iron NN 42149 861 33 materials material NNS 42149 861 34 , , , 42149 861 35 rods rod NNS 42149 861 36 and and CC 42149 861 37 bars bar NNS 42149 861 38 , , , 42149 861 39 expanded expand VBN 42149 861 40 metal metal NN 42149 861 41 , , , 42149 861 42 doors door NNS 42149 861 43 , , , 42149 861 44 frames frame NNS 42149 861 45 and and CC 42149 861 46 fittings fitting NNS 42149 861 47 , , , 42149 861 48 etc etc FW 42149 861 49 . . . 42149 862 1 _ _ NNP 42149 862 2 Water Water NNP 42149 862 3 - - HYPH 42149 862 4 proofing._--According proofing._--accorde VBG 42149 862 5 to to IN 42149 862 6 the the DT 42149 862 7 specifications specification NNS 42149 862 8 , , , 42149 862 9 the the DT 42149 862 10 water water NN 42149 862 11 - - HYPH 42149 862 12 proofing proofing NN 42149 862 13 was be VBD 42149 862 14 to to TO 42149 862 15 consist consist VB 42149 862 16 of of IN 42149 862 17 seven seven CD 42149 862 18 layers layer NNS 42149 862 19 of of IN 42149 862 20 pitch pitch NN 42149 862 21 and and CC 42149 862 22 six six CD 42149 862 23 layers layer NNS 42149 862 24 of of IN 42149 862 25 felt feel VBD 42149 862 26 on on IN 42149 862 27 the the DT 42149 862 28 side side NN 42149 862 29 - - HYPH 42149 862 30 walls wall NNS 42149 862 31 and and CC 42149 862 32 a a DT 42149 862 33 ½-in â½-in XX 42149 862 34 . . . 42149 863 1 layer layer NNP 42149 863 2 of of IN 42149 863 3 mastic mastic NNP 42149 863 4 , , , 42149 863 5 composed compose VBN 42149 863 6 of of IN 42149 863 7 coal coal NN 42149 863 8 - - HYPH 42149 863 9 tar tar NN 42149 863 10 and and CC 42149 863 11 Portland Portland NNP 42149 863 12 cement cement NN 42149 863 13 , , , 42149 863 14 to to TO 42149 863 15 be be VB 42149 863 16 plastered plaster VBN 42149 863 17 over over IN 42149 863 18 the the DT 42149 863 19 outside outside NN 42149 863 20 of of IN 42149 863 21 the the DT 42149 863 22 arches arch NNS 42149 863 23 . . . 42149 864 1 By by IN 42149 864 2 the the DT 42149 864 3 time time NN 42149 864 4 the the DT 42149 864 5 work work NN 42149 864 6 was be VBD 42149 864 7 in in IN 42149 864 8 hand hand NN 42149 864 9 , , , 42149 864 10 some some DT 42149 864 11 distrust distrust NNP 42149 864 12 had have VBD 42149 864 13 arisen arise VBN 42149 864 14 as as IN 42149 864 15 to to IN 42149 864 16 the the DT 42149 864 17 efficiency efficiency NN 42149 864 18 of of IN 42149 864 19 this this DT 42149 864 20 mastic mastic JJ 42149 864 21 coating coating NN 42149 864 22 , , , 42149 864 23 and and CC 42149 864 24 a a DT 42149 864 25 great great JJ 42149 864 26 deal deal NN 42149 864 27 of of IN 42149 864 28 study study NN 42149 864 29 was be VBD 42149 864 30 devoted devoted JJ 42149 864 31 to to IN 42149 864 32 the the DT 42149 864 33 problem problem NN 42149 864 34 of of IN 42149 864 35 how how WRB 42149 864 36 to to TO 42149 864 37 apply apply VB 42149 864 38 a a DT 42149 864 39 felt felt JJ 42149 864 40 and and CC 42149 864 41 pitch pitch NN 42149 864 42 water water NN 42149 864 43 - - HYPH 42149 864 44 proofing proof VBG 42149 864 45 to to IN 42149 864 46 the the DT 42149 864 47 arches arch NNS 42149 864 48 . . . 42149 865 1 The the DT 42149 865 2 difficulty difficulty NN 42149 865 3 was be VBD 42149 865 4 that that IN 42149 865 5 there there EX 42149 865 6 was be VBD 42149 865 7 no no DT 42149 865 8 room room NN 42149 865 9 between between IN 42149 865 10 the the DT 42149 865 11 rock rock NN 42149 865 12 and and CC 42149 865 13 the the DT 42149 865 14 arch arch NN 42149 865 15 or or CC 42149 865 16 between between IN 42149 865 17 the the DT 42149 865 18 timber timber NN 42149 865 19 and and CC 42149 865 20 the the DT 42149 865 21 arch arch NN 42149 865 22 ( ( -LRB- 42149 865 23 as as IN 42149 865 24 the the DT 42149 865 25 case case NN 42149 865 26 might may MD 42149 865 27 be be VB 42149 865 28 ) ) -RRB- 42149 865 29 in in IN 42149 865 30 which which WDT 42149 865 31 to to TO 42149 865 32 work work VB 42149 865 33 . . . 42149 866 1 Several several JJ 42149 866 2 ingenious ingenious JJ 42149 866 3 schemes scheme NNS 42149 866 4 of of IN 42149 866 5 putting put VBG 42149 866 6 the the DT 42149 866 7 felt feel VBN 42149 866 8 on on IN 42149 866 9 in in IN 42149 866 10 layers layer NNS 42149 866 11 , , , 42149 866 12 or or CC 42149 866 13 in in IN 42149 866 14 small small JJ 42149 866 15 pieces piece NNS 42149 866 16 like like IN 42149 866 17 shingles shingle NNS 42149 866 18 , , , 42149 866 19 were be VBD 42149 866 20 proposed propose VBN 42149 866 21 and and CC 42149 866 22 discussed discuss VBN 42149 866 23 , , , 42149 866 24 and and CC 42149 866 25 a a DT 42149 866 26 full full JJ 42149 866 27 - - HYPH 42149 866 28 sized sized JJ 42149 866 29 model model NN 42149 866 30 of of IN 42149 866 31 the the DT 42149 866 32 tunnel tunnel NN 42149 866 33 arch arch NNP 42149 866 34 was be VBD 42149 866 35 even even RB 42149 866 36 built build VBN 42149 866 37 on on IN 42149 866 38 which which WDT 42149 866 39 to to TO 42149 866 40 try try VB 42149 866 41 experiments experiment NNS 42149 866 42 , , , 42149 866 43 but but CC 42149 866 44 it -PRON- PRP 42149 866 45 was be VBD 42149 866 46 finally finally RB 42149 866 47 decided decide VBN 42149 866 48 to to TO 42149 866 49 overcome overcome VB 42149 866 50 the the DT 42149 866 51 difficulty difficulty NN 42149 866 52 by by IN 42149 866 53 leaving leave VBG 42149 866 54 out out RP 42149 866 55 the the DT 42149 866 56 arch arch JJ 42149 866 57 water water NN 42149 866 58 - - HYPH 42149 866 59 proofing proof VBG 42149 866 60 altogether altogether RB 42149 866 61 , , , 42149 866 62 and and CC 42149 866 63 simply simply RB 42149 866 64 building build VBG 42149 866 65 in in IN 42149 866 66 pipes pipe NNS 42149 866 67 for for IN 42149 866 68 grouting grout VBG 42149 866 69 through through RP 42149 866 70 under under IN 42149 866 71 pressure pressure NN 42149 866 72 , , , 42149 866 73 in in IN 42149 866 74 case case NN 42149 866 75 it -PRON- PRP 42149 866 76 was be VBD 42149 866 77 found find VBN 42149 866 78 that that IN 42149 866 79 the the DT 42149 866 80 arch arch NN 42149 866 81 was be VBD 42149 866 82 wet wet JJ 42149 866 83 . . . 42149 867 1 As as IN 42149 867 2 to to IN 42149 867 3 the the DT 42149 867 4 arch arch NN 42149 867 5 built build VBN 42149 867 6 through through IN 42149 867 7 the the DT 42149 867 8 length length NN 42149 867 9 excavated excavate VBN 42149 867 10 by by IN 42149 867 11 cut cut VBN 42149 867 12 - - HYPH 42149 867 13 and and CC 42149 867 14 - - HYPH 42149 867 15 cover cover VB 42149 867 16 on on IN 42149 867 17 the the DT 42149 867 18 New New NNP 42149 867 19 York York NNP 42149 867 20 side side NN 42149 867 21 , , , 42149 867 22 it -PRON- PRP 42149 867 23 was be VBD 42149 867 24 resolved resolve VBN 42149 867 25 to to IN 42149 867 26 water water NN 42149 867 27 - - HYPH 42149 867 28 proof proof NN 42149 867 29 that that IN 42149 867 30 with with IN 42149 867 31 felt felt NN 42149 867 32 and and CC 42149 867 33 pitch pitch VBP 42149 867 34 exactly exactly RB 42149 867 35 as as IN 42149 867 36 the the DT 42149 867 37 side side NN 42149 867 38 - - HYPH 42149 867 39 walls wall NNS 42149 867 40 were be VBD 42149 867 41 done do VBN 42149 867 42 , , , 42149 867 43 the the DT 42149 867 44 spandrel spandrel NN 42149 867 45 filling fill VBG 42149 867 46 between between IN 42149 867 47 the the DT 42149 867 48 arches arch NNS 42149 867 49 being be VBG 42149 867 50 raised raise VBN 42149 867 51 in in IN 42149 867 52 a a DT 42149 867 53 slight slight JJ 42149 867 54 ridge ridge NN 42149 867 55 along along IN 42149 867 56 the the DT 42149 867 57 concrete concrete JJ 42149 867 58 line line NN 42149 867 59 between between IN 42149 867 60 tunnels tunnel NNS 42149 867 61 in in IN 42149 867 62 order order NN 42149 867 63 to to TO 42149 867 64 throw throw VB 42149 867 65 the the DT 42149 867 66 water water NN 42149 867 67 over over RP 42149 867 68 to to IN 42149 867 69 the the DT 42149 867 70 sides side NNS 42149 867 71 . . . 42149 868 1 The the DT 42149 868 2 portions portion NNS 42149 868 3 of of IN 42149 868 4 arch arch NN 42149 868 5 not not RB 42149 868 6 water water NN 42149 868 7 - - HYPH 42149 868 8 proofed proofed NN 42149 868 9 were be VBD 42149 868 10 rather rather RB 42149 868 11 wet wet JJ 42149 868 12 , , , 42149 868 13 and and CC 42149 868 14 grouting grout VBG 42149 868 15 with with IN 42149 868 16 a a DT 42149 868 17 1:1 1:1 CD 42149 868 18 mixture mixture NN 42149 868 19 was be VBD 42149 868 20 done do VBN 42149 868 21 , , , 42149 868 22 but but CC 42149 868 23 only only RB 42149 868 24 with with IN 42149 868 25 the the DT 42149 868 26 effect effect NN 42149 868 27 of of IN 42149 868 28 stopping stop VBG 42149 868 29 large large JJ 42149 868 30 local local JJ 42149 868 31 leaks leak NNS 42149 868 32 and and CC 42149 868 33 distributing distribute VBG 42149 868 34 a a DT 42149 868 35 general general JJ 42149 868 36 dampness dampness NN 42149 868 37 over over IN 42149 868 38 the the DT 42149 868 39 whole whole JJ 42149 868 40 surface surface NN 42149 868 41 of of IN 42149 868 42 the the DT 42149 868 43 arch arch NN 42149 868 44 . . . 42149 869 1 TABLE TABLE NNS 42149 869 2 13.--COST 13.--cost CD 42149 869 3 OF of IN 42149 869 4 CONCRETE concrete RB 42149 869 5 IN in IN 42149 869 6 LAND land NN 42149 869 7 TUNNELS tunnel NNS 42149 869 8 , , , 42149 869 9 IN in IN 42149 869 10 DOLLARS DOLLARS NNP 42149 869 11 PER per IN 42149 869 12 CUBIC CUBIC VBD 42149 869 13 YARD YARD NNP 42149 869 14 . . . 42149 870 1 = = NFP 42149 870 2 = = NFP 42149 870 3 = = SYM 42149 870 4 = = SYM 42149 870 5 = = SYM 42149 870 6 = = SYM 42149 870 7 = = SYM 42149 870 8 = = SYM 42149 870 9 = = SYM 42149 870 10 = = SYM 42149 870 11 = = SYM 42149 870 12 = = SYM 42149 870 13 = = SYM 42149 870 14 = = SYM 42149 870 15 = = SYM 42149 870 16 = = SYM 42149 870 17 = = SYM 42149 870 18 = = SYM 42149 870 19 = = SYM 42149 870 20 = = SYM 42149 870 21 = = SYM 42149 870 22 = = SYM 42149 870 23 = = SYM 42149 870 24 = = SYM 42149 870 25 = = SYM 42149 870 26 = = SYM 42149 870 27 = = SYM 42149 870 28 = = SYM 42149 870 29 = = SYM 42149 870 30 = = SYM 42149 870 31 = = SYM 42149 870 32 = = SYM 42149 870 33 = = SYM 42149 870 34 = = SYM 42149 870 35 = = SYM 42149 870 36 = = SYM 42149 870 37 = = SYM 42149 870 38 = = NFP 42149 870 39 = = SYM 42149 870 40 + + SYM 42149 870 41 = = SYM 42149 870 42 = = SYM 42149 870 43 = = SYM 42149 870 44 = = SYM 42149 870 45 = = SYM 42149 870 46 = = SYM 42149 870 47 = = SYM 42149 870 48 = = SYM 42149 870 49 = = NFP 42149 870 50 = = SYM 42149 870 51 + + SYM 42149 870 52 = = SYM 42149 870 53 = = SYM 42149 870 54 = = SYM 42149 870 55 = = SYM 42149 870 56 = = SYM 42149 870 57 = = SYM 42149 870 58 = = SYM 42149 870 59 = = SYM 42149 870 60 = = NFP 42149 870 61 = = SYM 42149 870 62 + + SYM 42149 870 63 = = SYM 42149 870 64 = = SYM 42149 870 65 = = SYM 42149 870 66 = = SYM 42149 870 67 = = SYM 42149 870 68 = = SYM 42149 870 69 = = SYM 42149 870 70 = = SYM 42149 870 71 = = SYM 42149 870 72 = = SYM 42149 870 73 | | NNP 42149 870 74 | | CD 42149 870 75 | | NNP 42149 870 76 Total total JJ 42149 870 77 |Manhattan.|Weehawken.| |manhattan.|weehawken.| NN 42149 870 78 yardage yardage NN 42149 870 79 . . . 42149 871 1 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- : 42149 871 2 Cubic cubic JJ 42149 871 3 yards yard NNS 42149 871 4 placed place VBD 42149 871 5 |14,706½ |14,706â½ CD 42149 871 6 | | CD 42149 871 7 3,723 3,723 CD 42149 871 8 |18,429½ |18,429½ NNP 42149 871 9 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- : 42149 871 10 LABOR labor NN 42149 871 11 . . . 42149 872 1 | | JJ 42149 872 2 Average average JJ 42149 872 3 Cost cost NN 42149 872 4 per per IN 42149 872 5 Cubic cubic JJ 42149 872 6 Yard yard NN 42149 872 7 . . . 42149 873 1 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- NFP 42149 873 2 Surface Surface NNP 42149 873 3 transport transport NN 42149 873 4 | | VBD 42149 873 5 $ $ $ 42149 873 6 0.31 0.31 CD 42149 873 7 | | CD 42149 873 8 $ $ $ 42149 873 9 1.43 1.43 CD 42149 873 10 | | CD 42149 873 11 $ $ $ 42149 873 12 0.54 0.54 CD 42149 873 13 Superintendence superintendence NN 42149 873 14 and and CC 42149 873 15 general general JJ 42149 873 16 labor labor NN 42149 873 17 at at IN 42149 873 18 | | CD 42149 873 19 | | CD 42149 873 20 | | CD 42149 873 21 point point NN 42149 873 22 of of IN 42149 873 23 work work NN 42149 873 24 | | CD 42149 873 25 0.31 0.31 CD 42149 873 26 | | CD 42149 873 27 1.31 1.31 CD 42149 873 28 | | CD 42149 873 29 0.51 0.51 CD 42149 873 30 Mixing Mixing NNP 42149 873 31 | | NNP 42149 873 32 0.52 0.52 CD 42149 873 33 | | CD 42149 873 34 0.56 0.56 CD 42149 873 35 | | CD 42149 873 36 0.53 0.53 CD 42149 873 37 Laying lay VBG 42149 873 38 | | CD 42149 873 39 1.38 1.38 CD 42149 873 40 | | CD 42149 873 41 1.45 1.45 CD 42149 873 42 | | CD 42149 873 43 1.39 1.39 CD 42149 873 44 Tunnel Tunnel NNP 42149 873 45 transport transport NN 42149 873 46 | | CD 42149 873 47 1.30 1.30 CD 42149 873 48 | | CD 42149 873 49 1.47 1.47 CD 42149 873 50 | | CD 42149 873 51 1.34 1.34 CD 42149 873 52 Cleaning Cleaning NNP 42149 873 53 | | NNP 42149 873 54 0.21 0.21 CD 42149 873 55 | | CD 42149 873 56 | | CD 42149 873 57 0.17 0.17 CD 42149 873 58 Forms form NNS 42149 873 59 : : : 42149 873 60 erecting erect VBG 42149 873 61 and and CC 42149 873 62 removal removal NN 42149 873 63 | | CD 42149 873 64 1.58 1.58 CD 42149 873 65 | | CD 42149 873 66 1.51 1.51 CD 42149 873 67 | | CD 42149 873 68 1.56 1.56 CD 42149 873 69 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- NFP 42149 873 70 Total total JJ 42149 873 71 labor labor NN 42149 873 72 | | CD 42149 873 73 $ $ $ 42149 873 74 5.61 5.61 CD 42149 873 75 | | CD 42149 873 76 $ $ $ 42149 873 77 7.73 7.73 CD 42149 873 78 | | CD 42149 873 79 $ $ $ 42149 873 80 6.04 6.04 CD 42149 873 81 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- SYM 42149 873 82 MATERIAL material NN 42149 873 83 . . . 42149 874 1 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- NFP 42149 874 2 Cement cement NN 42149 874 3 | | CD 42149 874 4 $ $ $ 42149 874 5 2.30 2.30 CD 42149 874 6 | | CD 42149 874 7 $ $ $ 42149 874 8 2.22 2.22 CD 42149 874 9 | | CD 42149 874 10 $ $ $ 42149 874 11 2.28 2.28 CD 42149 874 12 Sand Sand NNP 42149 874 13 | | NNP 42149 874 14 0.34 0.34 CD 42149 874 15 | | CD 42149 874 16 0.40 0.40 CD 42149 874 17 | | CD 42149 874 18 0.36 0.36 CD 42149 874 19 Stone Stone NNP 42149 874 20 | | CD 42149 874 21 0.91 0.91 CD 42149 874 22 | | CD 42149 874 23 0.61 0.61 CD 42149 874 24 | | CD 42149 874 25 0.85 0.85 CD 42149 874 26 Lumber Lumber NNP 42149 874 27 for for IN 42149 874 28 forms form NNS 42149 874 29 | | CD 42149 874 30 0.47 0.47 CD 42149 874 31 | | CD 42149 874 32 0.45 0.45 CD 42149 874 33 | | CD 42149 874 34 0.47 0.47 CD 42149 874 35 Sundry Sundry NNP 42149 874 36 tunnel tunnel NN 42149 874 37 supplies supply NNS 42149 874 38 | | CD 42149 874 39 0.16 0.16 CD 42149 874 40 | | CD 42149 874 41 0.17 0.17 CD 42149 874 42 | | CD 42149 874 43 0.16 0.16 CD 42149 874 44 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- CD 42149 874 45 Total total JJ 42149 874 46 materials material NNS 42149 874 47 | | CD 42149 874 48 $ $ $ 42149 874 49 4.18 4.18 CD 42149 874 50 | | CD 42149 874 51 $ $ $ 42149 874 52 3.85 3.85 CD 42149 874 53 | | CD 42149 874 54 $ $ $ 42149 874 55 4.12 4.12 CD 42149 874 56 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- CD 42149 874 57 Plant plant NN 42149 874 58 running run VBG 42149 874 59 | | CD 42149 874 60 $ $ $ 42149 874 61 0.44 0.44 CD 42149 874 62 | | CD 42149 874 63 $ $ $ 42149 874 64 0.44 0.44 CD 42149 874 65 | | CD 42149 874 66 $ $ $ 42149 874 67 0.44 0.44 CD 42149 874 68 Surface surface NN 42149 874 69 labor labor NN 42149 874 70 , , , 42149 874 71 repairs repair NNS 42149 874 72 and and CC 42149 874 73 maintenance maintenance NN 42149 874 74 | | NNP 42149 874 75 0.25 0.25 CD 42149 874 76 | | CD 42149 874 77 1.24 1.24 CD 42149 874 78 | | CD 42149 874 79 0.44 0.44 CD 42149 874 80 Field Field NNP 42149 874 81 office office NNP 42149 874 82 administration administration NN 42149 874 83 | | HYPH 42149 874 84 0.50 0.50 CD 42149 874 85 | | CD 42149 874 86 1.72 1.72 CD 42149 874 87 | | CD 42149 874 88 0.75 0.75 CD 42149 874 89 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- NN 42149 874 90 Total total JJ 42149 874 91 field field NN 42149 874 92 charges charge NNS 42149 874 93 | | CD 42149 874 94 $ $ $ 42149 874 95 10.98 10.98 CD 42149 874 96 | | CD 42149 874 97 $ $ $ 42149 874 98 14.98 14.98 CD 42149 874 99 | | CD 42149 874 100 $ $ $ 42149 874 101 11.79 11.79 CD 42149 874 102 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- CD 42149 874 103 Plant plant NN 42149 874 104 depreciation depreciation NN 42149 874 105 | | CD 42149 874 106 $ $ $ 42149 874 107 0.62 0.62 CD 42149 874 108 | | CD 42149 874 109 $ $ $ 42149 874 110 1.57 1.57 CD 42149 874 111 | | CD 42149 874 112 $ $ $ 42149 874 113 0.81 0.81 CD 42149 874 114 Chief Chief NNP 42149 874 115 office office NN 42149 874 116 administration administration NN 42149 874 117 | | CD 42149 874 118 0.24 0.24 CD 42149 874 119 | | CD 42149 874 120 0.31 0.31 CD 42149 874 121 | | CD 42149 874 122 0.25 0.25 CD 42149 874 123 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- NFP 42149 874 124 Total total JJ 42149 874 125 average average JJ 42149 874 126 cost cost NN 42149 874 127 per per IN 42149 874 128 cubic cubic JJ 42149 874 129 yard yard NN 42149 874 130 | | CD 42149 874 131 $ $ $ 42149 874 132 11.84 11.84 CD 42149 874 133 | | CD 42149 874 134 $ $ $ 42149 874 135 16.86 16.86 CD 42149 874 136 | | CD 42149 874 137 $ $ $ 42149 874 138 12.85 12.85 CD 42149 874 139 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- CD 42149 874 140 Cost cost NN 42149 874 141 of of IN 42149 874 142 Miscellaneous miscellaneous JJ 42149 874 143 Items Items NNPS 42149 874 144 in in IN 42149 874 145 Concrete Concrete NNP 42149 874 146 . . . 42149 875 1 ---------------------------------------+----------+----------+---------- ---------------------------------------+----------+----------+---------- : 42149 875 2 |Manhattan.|Weehawken.| |Manhattan.|Weehawken.| NNP 42149 875 3 Average Average NNP 42149 875 4 . . . 42149 876 1 Cubic cubic JJ 42149 876 2 yards yard NNS 42149 876 3 |14,706½ |14,706â½ NN 42149 876 4 | | CD 42149 876 5 3,723 3,723 CD 42149 876 6 |18,429½ |18,429½ NNP 42149 876 7 Amount Amount NNP 42149 876 8 , , , 42149 876 9 in in IN 42149 876 10 dollars dollar NNS 42149 876 11 |$6,184.83 |$6,184.83 NNP 42149 876 12 | | CD 42149 876 13 $ $ $ 42149 876 14 1,756.79|$7,941.62 1,756.79|$7,941.62 CD 42149 876 15 Unit Unit NNP 42149 876 16 cost cost VB 42149 876 17 | | CD 42149 876 18 0.42 0.42 CD 42149 876 19 | | NNS 42149 876 20 0.47| 0.47| CD 42149 876 21 0.43 0.43 CD 42149 876 22 = = SYM 42149 876 23 = = SYM 42149 876 24 = = SYM 42149 876 25 = = SYM 42149 876 26 = = SYM 42149 876 27 = = SYM 42149 876 28 = = SYM 42149 876 29 = = SYM 42149 876 30 = = SYM 42149 876 31 = = SYM 42149 876 32 = = SYM 42149 876 33 = = SYM 42149 876 34 = = SYM 42149 876 35 = = SYM 42149 876 36 = = SYM 42149 876 37 = = SYM 42149 876 38 = = SYM 42149 876 39 = = SYM 42149 876 40 = = SYM 42149 876 41 = = SYM 42149 876 42 = = SYM 42149 876 43 = = SYM 42149 876 44 = = SYM 42149 876 45 = = SYM 42149 876 46 = = SYM 42149 876 47 = = SYM 42149 876 48 = = SYM 42149 876 49 = = SYM 42149 876 50 = = SYM 42149 876 51 = = SYM 42149 876 52 = = SYM 42149 876 53 = = SYM 42149 876 54 = = SYM 42149 876 55 = = SYM 42149 876 56 = = SYM 42149 876 57 = = SYM 42149 876 58 = = SYM 42149 876 59 = = NFP 42149 876 60 = = SYM 42149 876 61 + + SYM 42149 876 62 = = SYM 42149 876 63 = = SYM 42149 876 64 = = SYM 42149 876 65 = = SYM 42149 876 66 = = SYM 42149 876 67 = = SYM 42149 876 68 = = SYM 42149 876 69 = = SYM 42149 876 70 = = NFP 42149 876 71 = = SYM 42149 876 72 + + SYM 42149 876 73 = = SYM 42149 876 74 = = SYM 42149 876 75 = = SYM 42149 876 76 = = SYM 42149 876 77 = = SYM 42149 876 78 = = SYM 42149 876 79 = = SYM 42149 876 80 = = SYM 42149 876 81 = = NFP 42149 876 82 = = SYM 42149 876 83 + + SYM 42149 876 84 = = SYM 42149 876 85 = = SYM 42149 876 86 = = SYM 42149 876 87 = = SYM 42149 876 88 = = SYM 42149 876 89 = = SYM 42149 876 90 = = SYM 42149 876 91 = = SYM 42149 876 92 = = NFP 42149 876 93 = = NFP 42149 876 94 The the DT 42149 876 95 24-ft 24-ft CD 42149 876 96 . . . 42149 876 97 6-in 6-in CD 42149 876 98 . . . 42149 877 1 tunnel tunnel NNP 42149 877 2 adjoining adjoin VBG 42149 877 3 the the DT 42149 877 4 Terminal Terminal NNP 42149 877 5 Station Station NNP 42149 877 6 - - HYPH 42149 877 7 West West NNP 42149 877 8 was be VBD 42149 877 9 water water NN 42149 877 10 - - HYPH 42149 877 11 proofed proof VBN 42149 877 12 by by IN 42149 877 13 a a DT 42149 877 14 surface surface NN 42149 877 15 - - HYPH 42149 877 16 rendering rendering NN 42149 877 17 method method NN 42149 877 18 which which WDT 42149 877 19 , , , 42149 877 20 up up IN 42149 877 21 to to IN 42149 877 22 the the DT 42149 877 23 present present JJ 42149 877 24 time time NN 42149 877 25 , , , 42149 877 26 has have VBZ 42149 877 27 been be VBN 42149 877 28 satisfactory satisfactory JJ 42149 877 29 . . . 42149 878 1 Generally generally RB 42149 878 2 speaking speak VBG 42149 878 3 , , , 42149 878 4 the the DT 42149 878 5 arches arch NNS 42149 878 6 of of IN 42149 878 7 the the DT 42149 878 8 Land Land NNP 42149 878 9 Tunnels Tunnels NNPS 42149 878 10 , , , 42149 878 11 though though IN 42149 878 12 not not RB 42149 878 13 dripping drip VBG 42149 878 14 with with IN 42149 878 15 water water NN 42149 878 16 , , , 42149 878 17 are be VBP 42149 878 18 the the DT 42149 878 19 dampest damp JJS 42149 878 20 parts part NNS 42149 878 21 of of IN 42149 878 22 the the DT 42149 878 23 whole whole JJ 42149 878 24 structure structure NN 42149 878 25 from from IN 42149 878 26 Tenth Tenth NNP 42149 878 27 Avenue Avenue NNP 42149 878 28 to to IN 42149 878 29 Weehawken Weehawken NNP 42149 878 30 , , , 42149 878 31 and and CC 42149 878 32 it -PRON- PRP 42149 878 33 would would MD 42149 878 34 seem seem VB 42149 878 35 as as IN 42149 878 36 if if IN 42149 878 37 some some DT 42149 878 38 form form NN 42149 878 39 of of IN 42149 878 40 water water NN 42149 878 41 - - HYPH 42149 878 42 proofing proof VBG 42149 878 43 over over IN 42149 878 44 these these DT 42149 878 45 arches arch NNS 42149 878 46 would would MD 42149 878 47 have have VB 42149 878 48 been be VBN 42149 878 49 a a DT 42149 878 50 distinct distinct JJ 42149 878 51 advantage advantage NN 42149 878 52 . . . 42149 879 1 There there EX 42149 879 2 was be VBD 42149 879 3 no no DT 42149 879 4 difficulty difficulty NN 42149 879 5 in in IN 42149 879 6 applying apply VBG 42149 879 7 the the DT 42149 879 8 water water NN 42149 879 9 - - HYPH 42149 879 10 proofing proof VBG 42149 879 11 on on IN 42149 879 12 the the DT 42149 879 13 side side NN 42149 879 14 - - HYPH 42149 879 15 walls wall NNS 42149 879 16 , , , 42149 879 17 after after IN 42149 879 18 a a DT 42149 879 19 little little JJ 42149 879 20 experience experience NN 42149 879 21 had have VBD 42149 879 22 been be VBN 42149 879 23 gained gain VBN 42149 879 24 as as IN 42149 879 25 to to IN 42149 879 26 the the DT 42149 879 27 best good JJS 42149 879 28 methods method NNS 42149 879 29 . . . 42149 880 1 The the DT 42149 880 2 specifications specification NNS 42149 880 3 required require VBD 42149 880 4 the the DT 42149 880 5 sand sand NN 42149 880 6 - - HYPH 42149 880 7 wall wall NN 42149 880 8 to to TO 42149 880 9 be be VB 42149 880 10 covered cover VBN 42149 880 11 with with IN 42149 880 12 alternate alternate JJ 42149 880 13 layers layer NNS 42149 880 14 of of IN 42149 880 15 coal coal NN 42149 880 16 - - HYPH 42149 880 17 tar tar NN 42149 880 18 pitch pitch NN 42149 880 19 and and CC 42149 880 20 felt feel VBD 42149 880 21 , , , 42149 880 22 seven seven CD 42149 880 23 layers layer NNS 42149 880 24 of of IN 42149 880 25 the the DT 42149 880 26 former former JJ 42149 880 27 and and CC 42149 880 28 six six CD 42149 880 29 layers layer NNS 42149 880 30 of of IN 42149 880 31 the the DT 42149 880 32 latter latter JJ 42149 880 33 , , , 42149 880 34 the the DT 42149 880 35 felt feel VBD 42149 880 36 to to TO 42149 880 37 be be VB 42149 880 38 of of IN 42149 880 39 Hydrex Hydrex NNP 42149 880 40 brand brand NN 42149 880 41 or or CC 42149 880 42 other other JJ 42149 880 43 equally equally RB 42149 880 44 satisfactory satisfactory JJ 42149 880 45 to to IN 42149 880 46 the the DT 42149 880 47 engineer engineer NN 42149 880 48 . . . 42149 881 1 The the DT 42149 881 2 pitch pitch NN 42149 881 3 was be VBD 42149 881 4 to to TO 42149 881 5 be be VB 42149 881 6 straight straight RB 42149 881 7 - - HYPH 42149 881 8 run run VBN 42149 881 9 , , , 42149 881 10 coal coal NN 42149 881 11 - - HYPH 42149 881 12 tar tar NN 42149 881 13 pitch pitch NN 42149 881 14 which which WDT 42149 881 15 would would MD 42149 881 16 soften soften VB 42149 881 17 at at IN 42149 881 18 60 60â CD 42149 881 19 ° ° NNPS 42149 881 20 Fahr Fahr NNP 42149 881 21 . . NNP 42149 881 22 , , , 42149 881 23 and and CC 42149 881 24 melt melt NNP 42149 881 25 at at IN 42149 881 26 100 100â CD 42149 881 27 ° ° NNS 42149 881 28 Fahr Fahr NNP 42149 881 29 . . . 42149 881 30 , , , 42149 881 31 being be VBG 42149 881 32 a a DT 42149 881 33 grade grade NN 42149 881 34 in in IN 42149 881 35 which which WDT 42149 881 36 distillate distillate NN 42149 881 37 oils oil NNS 42149 881 38 , , , 42149 881 39 distilled distil VBN 42149 881 40 from from IN 42149 881 41 it -PRON- PRP 42149 881 42 , , , 42149 881 43 should should MD 42149 881 44 have have VB 42149 881 45 a a DT 42149 881 46 specified specified JJ 42149 881 47 gravity gravity NN 42149 881 48 of of IN 42149 881 49 1.105 1.105 CD 42149 881 50 . . . 42149 882 1 The the DT 42149 882 2 pitch pitch NN 42149 882 3 was be VBD 42149 882 4 to to TO 42149 882 5 be be VB 42149 882 6 mopped mop VBN 42149 882 7 on on IN 42149 882 8 the the DT 42149 882 9 surface surface NN 42149 882 10 to to IN 42149 882 11 a a DT 42149 882 12 uniform uniform JJ 42149 882 13 thickness thickness NN 42149 882 14 of of IN 42149 882 15 1/16 1/16 CD 42149 882 16 in in IN 42149 882 17 . . . 42149 882 18 , , , 42149 882 19 and and CC 42149 882 20 a a DT 42149 882 21 covering covering NN 42149 882 22 of of IN 42149 882 23 felt feel VBN 42149 882 24 , , , 42149 882 25 previously previously RB 42149 882 26 mopped mop VBN 42149 882 27 with with IN 42149 882 28 pitch pitch NN 42149 882 29 , , , 42149 882 30 was be VBD 42149 882 31 to to TO 42149 882 32 be be VB 42149 882 33 applied apply VBN 42149 882 34 immediately immediately RB 42149 882 35 . . . 42149 883 1 The the DT 42149 883 2 sheets sheet NNS 42149 883 3 were be VBD 42149 883 4 to to TO 42149 883 5 lap lap VB 42149 883 6 not not RB 42149 883 7 less less JJR 42149 883 8 than than IN 42149 883 9 4 4 CD 42149 883 10 in in IN 42149 883 11 . . . 42149 884 1 on on IN 42149 884 2 cross cross NN 42149 884 3 - - NNS 42149 884 4 joints joint NNS 42149 884 5 and and CC 42149 884 6 12 12 CD 42149 884 7 in in IN 42149 884 8 . . . 42149 885 1 on on IN 42149 885 2 longitudinal longitudinal JJ 42149 885 3 joints joint NNS 42149 885 4 , , , 42149 885 5 and and CC 42149 885 6 had have VBD 42149 885 7 to to TO 42149 885 8 adhere adhere VB 42149 885 9 firmly firmly RB 42149 885 10 to to IN 42149 885 11 the the DT 42149 885 12 pitch pitch NN 42149 885 13 - - HYPH 42149 885 14 covered cover VBN 42149 885 15 surface surface NN 42149 885 16 . . . 42149 886 1 This this DT 42149 886 2 layer layer NN 42149 886 3 was be VBD 42149 886 4 then then RB 42149 886 5 to to TO 42149 886 6 be be VB 42149 886 7 mopped mop VBN 42149 886 8 , , , 42149 886 9 and and CC 42149 886 10 another another DT 42149 886 11 layer layer NN 42149 886 12 placed place VBN 42149 886 13 , , , 42149 886 14 and and CC 42149 886 15 so so RB 42149 886 16 on on RB 42149 886 17 until until IN 42149 886 18 all all PDT 42149 886 19 the the DT 42149 886 20 layers layer NNS 42149 886 21 were be VBD 42149 886 22 in in IN 42149 886 23 place place NN 42149 886 24 . . . 42149 887 1 This this DT 42149 887 2 water water NN 42149 887 3 - - HYPH 42149 887 4 proofing proofing NN 42149 887 5 was be VBD 42149 887 6 to to TO 42149 887 7 extend extend VB 42149 887 8 from from IN 42149 887 9 the the DT 42149 887 10 bottom bottom NN 42149 887 11 of of IN 42149 887 12 the the DT 42149 887 13 cable cable NN 42149 887 14 conduits conduit NNS 42149 887 15 to to IN 42149 887 16 the the DT 42149 887 17 springing springing NN 42149 887 18 of of IN 42149 887 19 the the DT 42149 887 20 brick brick NN 42149 887 21 arch arch NN 42149 887 22 . . . 42149 888 1 Where where WRB 42149 888 2 sub sub JJ 42149 888 3 - - JJ 42149 888 4 track track NN 42149 888 5 conduits conduit NNS 42149 888 6 were be VBD 42149 888 7 used use VBN 42149 888 8 , , , 42149 888 9 these these DT 42149 888 10 were be VBD 42149 888 11 to to TO 42149 888 12 be be VB 42149 888 13 surrounded surround VBN 42149 888 14 with with IN 42149 888 15 their -PRON- PRP$ 42149 888 16 own own JJ 42149 888 17 water water NN 42149 888 18 - - HYPH 42149 888 19 proofing proofing NN 42149 888 20 . . . 42149 889 1 The the DT 42149 889 2 work work NN 42149 889 3 was be VBD 42149 889 4 carried carry VBN 42149 889 5 out out RP 42149 889 6 as as IN 42149 889 7 specified specify VBN 42149 889 8 ; ; : 42149 889 9 the the DT 42149 889 10 sand sand NN 42149 889 11 - - HYPH 42149 889 12 walls wall NNS 42149 889 13 were be VBD 42149 889 14 not not RB 42149 889 15 rendered render VBN 42149 889 16 , , , 42149 889 17 but but CC 42149 889 18 were be VBD 42149 889 19 built build VBN 42149 889 20 smooth smooth JJ 42149 889 21 enough enough RB 42149 889 22 to to TO 42149 889 23 apply apply VB 42149 889 24 the the DT 42149 889 25 water water NN 42149 889 26 - - HYPH 42149 889 27 proofing proof VBG 42149 889 28 directly directly RB 42149 889 29 to to IN 42149 889 30 them -PRON- PRP 42149 889 31 . . . 42149 890 1 They -PRON- PRP 42149 890 2 were be VBD 42149 890 3 dried dry VBN 42149 890 4 with with IN 42149 890 5 gasoline gasoline NN 42149 890 6 torches torch NNS 42149 890 7 before before IN 42149 890 8 the the DT 42149 890 9 application application NN 42149 890 10 of of IN 42149 890 11 the the DT 42149 890 12 pitch pitch NN 42149 890 13 , , , 42149 890 14 and and CC 42149 890 15 in in IN 42149 890 16 very very RB 42149 890 17 wet wet JJ 42149 890 18 sections section NNS 42149 890 19 grooves groove NNS 42149 890 20 were be VBD 42149 890 21 cut cut VBN 42149 890 22 to to TO 42149 890 23 lead lead VB 42149 890 24 the the DT 42149 890 25 water water NN 42149 890 26 away away RB 42149 890 27 . . . 42149 891 1 The the DT 42149 891 2 first first JJ 42149 891 3 attempts attempt NNS 42149 891 4 were be VBD 42149 891 5 with with IN 42149 891 6 the the DT 42149 891 7 felt felt NN 42149 891 8 laid lay VBN 42149 891 9 in in IN 42149 891 10 horizontal horizontal JJ 42149 891 11 strips strip NNS 42149 891 12 . . . 42149 892 1 This this DT 42149 892 2 ended end VBD 42149 892 3 very very RB 42149 892 4 disastrously disastrously RB 42149 892 5 , , , 42149 892 6 as as IN 42149 892 7 the the DT 42149 892 8 pitch pitch NN 42149 892 9 could could MD 42149 892 10 not not RB 42149 892 11 sustain sustain VB 42149 892 12 the the DT 42149 892 13 weight weight NN 42149 892 14 of of IN 42149 892 15 the the DT 42149 892 16 felt felt NN 42149 892 17 , , , 42149 892 18 and and CC 42149 892 19 the the DT 42149 892 20 whole whole JJ 42149 892 21 arrangement arrangement NN 42149 892 22 slipped slip VBD 42149 892 23 down down IN 42149 892 24 the the DT 42149 892 25 wall wall NN 42149 892 26 . . . 42149 893 1 The the DT 42149 893 2 felt felt NN 42149 893 3 was be VBD 42149 893 4 then then RB 42149 893 5 laid lay VBN 42149 893 6 vertically vertically RB 42149 893 7 , , , 42149 893 8 being be VBG 42149 893 9 tacked tack VBN 42149 893 10 to to IN 42149 893 11 a a DT 42149 893 12 piece piece NN 42149 893 13 of of IN 42149 893 14 horizontal horizontal JJ 42149 893 15 scantling scantling NN 42149 893 16 at at IN 42149 893 17 the the DT 42149 893 18 top top NN 42149 893 19 of of IN 42149 893 20 the the DT 42149 893 21 sand sand NN 42149 893 22 - - HYPH 42149 893 23 wall wall NN 42149 893 24 and and CC 42149 893 25 also also RB 42149 893 26 held hold VBN 42149 893 27 by by IN 42149 893 28 a a DT 42149 893 29 row row NN 42149 893 30 of of IN 42149 893 31 planks plank NNS 42149 893 32 braced brace VBN 42149 893 33 against against IN 42149 893 34 it -PRON- PRP 42149 893 35 at at IN 42149 893 36 about about RB 42149 893 37 half half PDT 42149 893 38 its -PRON- PRP$ 42149 893 39 height height NN 42149 893 40 . . . 42149 894 1 A a DT 42149 894 2 layer layer NN 42149 894 3 of of IN 42149 894 4 porous porous JJ 42149 894 5 brick brick NN 42149 894 6 was be VBD 42149 894 7 laid lay VBN 42149 894 8 as as IN 42149 894 9 a a DT 42149 894 10 drain drain NN 42149 894 11 along along IN 42149 894 12 the the DT 42149 894 13 base base NN 42149 894 14 of of IN 42149 894 15 the the DT 42149 894 16 water water NN 42149 894 17 - - HYPH 42149 894 18 proofing proofing NN 42149 894 19 , , , 42149 894 20 covered cover VBN 42149 894 21 by by IN 42149 894 22 a a DT 42149 894 23 single single JJ 42149 894 24 layer layer NN 42149 894 25 of of IN 42149 894 26 felt feel VBN 42149 894 27 to to TO 42149 894 28 prevent prevent VB 42149 894 29 it -PRON- PRP 42149 894 30 from from IN 42149 894 31 becoming become VBG 42149 894 32 choked choke VBN 42149 894 33 with with IN 42149 894 34 concrete concrete NN 42149 894 35 . . . 42149 895 1 The the DT 42149 895 2 water water NN 42149 895 3 - - HYPH 42149 895 4 proofing proofing NN 42149 895 5 of of IN 42149 895 6 the the DT 42149 895 7 sub sub NN 42149 895 8 - - JJ 42149 895 9 track track NN 42149 895 10 conduits conduit NNS 42149 895 11 was be VBD 42149 895 12 troublesome troublesome JJ 42149 895 13 , , , 42149 895 14 as as IN 42149 895 15 the the DT 42149 895 16 numerous numerous JJ 42149 895 17 layers layer NNS 42149 895 18 and and CC 42149 895 19 the the DT 42149 895 20 necessity necessity NN 42149 895 21 for for IN 42149 895 22 preserving preserve VBG 42149 895 23 the the DT 42149 895 24 proper proper JJ 42149 895 25 laps lap NNS 42149 895 26 in in IN 42149 895 27 both both DT 42149 895 28 directions direction NNS 42149 895 29 between between IN 42149 895 30 adjacent adjacent JJ 42149 895 31 layers layer NNS 42149 895 32 made make VBD 42149 895 33 the the DT 42149 895 34 whole whole JJ 42149 895 35 thing thing NN 42149 895 36 a a DT 42149 895 37 kind kind NN 42149 895 38 of of IN 42149 895 39 Chinese chinese JJ 42149 895 40 puzzle puzzle NN 42149 895 41 . . . 42149 896 1 Various various JJ 42149 896 2 modifications modification NNS 42149 896 3 , , , 42149 896 4 to to TO 42149 896 5 suit suit VB 42149 896 6 local local JJ 42149 896 7 conditions condition NNS 42149 896 8 , , , 42149 896 9 were be VBD 42149 896 10 made make VBN 42149 896 11 from from IN 42149 896 12 time time NN 42149 896 13 to to IN 42149 896 14 time time NN 42149 896 15 . . . 42149 897 1 Conduits conduit NNS 42149 897 2 outside outside IN 42149 897 3 the the DT 42149 897 4 general general JJ 42149 897 5 outline outline NN 42149 897 6 of of IN 42149 897 7 the the DT 42149 897 8 tunnel tunnel NN 42149 897 9 are be VBP 42149 897 10 difficult difficult JJ 42149 897 11 to to TO 42149 897 12 excavate excavate VB 42149 897 13 , , , 42149 897 14 to to TO 42149 897 15 lay lay VB 42149 897 16 , , , 42149 897 17 and and CC 42149 897 18 to to IN 42149 897 19 water water NN 42149 897 20 - - HYPH 42149 897 21 proof proof NN 42149 897 22 , , , 42149 897 23 and and CC 42149 897 24 should should MD 42149 897 25 be be VB 42149 897 26 avoided avoid VBN 42149 897 27 wherever wherever WRB 42149 897 28 possible possible JJ 42149 897 29 . . . 42149 898 1 The the DT 42149 898 2 usual usual JJ 42149 898 3 force force NN 42149 898 4 in in IN 42149 898 5 water water NN 42149 898 6 - - HYPH 42149 898 7 proofing proofing NN 42149 898 8 consisted consist VBD 42149 898 9 of of IN 42149 898 10 a a DT 42149 898 11 foreman foreman NN 42149 898 12 , , , 42149 898 13 at at IN 42149 898 14 $ $ $ 42149 898 15 3.50 3.50 CD 42149 898 16 per per IN 42149 898 17 day day NN 42149 898 18 , , , 42149 898 19 and and CC 42149 898 20 nine nine CD 42149 898 21 laborers laborer NNS 42149 898 22 at at IN 42149 898 23 $ $ $ 42149 898 24 1.75 1.75 CD 42149 898 25 per per IN 42149 898 26 day day NN 42149 898 27 . . . 42149 899 1 These these DT 42149 899 2 men man NNS 42149 899 3 not not RB 42149 899 4 only only RB 42149 899 5 laid lay VBD 42149 899 6 the the DT 42149 899 7 water water NN 42149 899 8 - - HYPH 42149 899 9 proofing proofing NN 42149 899 10 , , , 42149 899 11 but but CC 42149 899 12 transported transport VBD 42149 899 13 the the DT 42149 899 14 materials material NNS 42149 899 15 , , , 42149 899 16 heated heat VBD 42149 899 17 the the DT 42149 899 18 pitch pitch NN 42149 899 19 , , , 42149 899 20 and and CC 42149 899 21 cut cut VBD 42149 899 22 up up RP 42149 899 23 the the DT 42149 899 24 rolls roll NNS 42149 899 25 of of IN 42149 899 26 felt feel VBD 42149 899 27 . . . 42149 900 1 In in IN 42149 900 2 general general JJ 42149 900 3 , , , 42149 900 4 two two CD 42149 900 5 men man NNS 42149 900 6 transported transport VBD 42149 900 7 material material NN 42149 900 8 , , , 42149 900 9 one one CD 42149 900 10 tended tend VBD 42149 900 11 the the DT 42149 900 12 heater heater NN 42149 900 13 , , , 42149 900 14 and and CC 42149 900 15 the the DT 42149 900 16 other other JJ 42149 900 17 six six CD 42149 900 18 worked work VBD 42149 900 19 in in IN 42149 900 20 pairs pairs NNP 42149 900 21 , , , 42149 900 22 two two CD 42149 900 23 preparing prepare VBG 42149 900 24 the the DT 42149 900 25 surface surface NN 42149 900 26 of of IN 42149 900 27 the the DT 42149 900 28 concrete concrete JJ 42149 900 29 sand sand NN 42149 900 30 - - HYPH 42149 900 31 wall wall NN 42149 900 32 , , , 42149 900 33 two two CD 42149 900 34 laying lay VBG 42149 900 35 pitch pitch NN 42149 900 36 , , , 42149 900 37 and and CC 42149 900 38 two two CD 42149 900 39 laying lay VBG 42149 900 40 felt felt NN 42149 900 41 . . . 42149 901 1 The the DT 42149 901 2 cost cost NN 42149 901 3 of of IN 42149 901 4 the the DT 42149 901 5 water water NN 42149 901 6 - - HYPH 42149 901 7 proofing proof VBG 42149 901 8 operation operation NN 42149 901 9 was be VBD 42149 901 10 about about RB 42149 901 11 as as IN 42149 901 12 shown show VBN 42149 901 13 in in IN 42149 901 14 Table Table NNP 42149 901 15 14 14 CD 42149 901 16 . . . 42149 902 1 TABLE table NN 42149 902 2 14.--COST 14.--cost CD 42149 902 3 OF of IN 42149 902 4 WATER water NN 42149 902 5 - - HYPH 42149 902 6 PROOFING PROOFING NNP 42149 902 7 , , , 42149 902 8 IN in IN 42149 902 9 DOLLARS DOLLARS NNP 42149 902 10 PER per IN 42149 902 11 SQUARE SQUARE NNP 42149 902 12 FOOT FOOT NNP 42149 902 13 . . . 42149 903 1 = = NFP 42149 903 2 = = NFP 42149 903 3 = = SYM 42149 903 4 = = SYM 42149 903 5 = = SYM 42149 903 6 = = SYM 42149 903 7 = = SYM 42149 903 8 = = SYM 42149 903 9 = = SYM 42149 903 10 = = SYM 42149 903 11 = = SYM 42149 903 12 = = SYM 42149 903 13 = = SYM 42149 903 14 = = SYM 42149 903 15 = = SYM 42149 903 16 = = SYM 42149 903 17 = = SYM 42149 903 18 = = SYM 42149 903 19 = = SYM 42149 903 20 = = SYM 42149 903 21 = = SYM 42149 903 22 = = SYM 42149 903 23 = = SYM 42149 903 24 = = SYM 42149 903 25 = = SYM 42149 903 26 = = SYM 42149 903 27 = = SYM 42149 903 28 = = SYM 42149 903 29 = = SYM 42149 903 30 = = SYM 42149 903 31 = = SYM 42149 903 32 = = SYM 42149 903 33 = = SYM 42149 903 34 = = SYM 42149 903 35 = = SYM 42149 903 36 = = SYM 42149 903 37 = = SYM 42149 903 38 = = NFP 42149 903 39 = = SYM 42149 903 40 + + SYM 42149 903 41 = = SYM 42149 903 42 = = SYM 42149 903 43 = = SYM 42149 903 44 = = SYM 42149 903 45 = = SYM 42149 903 46 = = SYM 42149 903 47 = = SYM 42149 903 48 = = SYM 42149 903 49 = = NFP 42149 903 50 = = SYM 42149 903 51 + + SYM 42149 903 52 = = SYM 42149 903 53 = = SYM 42149 903 54 = = SYM 42149 903 55 = = SYM 42149 903 56 = = SYM 42149 903 57 = = SYM 42149 903 58 = = SYM 42149 903 59 = = SYM 42149 903 60 = = SYM 42149 903 61 = = NFP 42149 903 62 = = SYM 42149 903 63 + + SYM 42149 903 64 = = SYM 42149 903 65 = = SYM 42149 903 66 = = SYM 42149 903 67 = = SYM 42149 903 68 = = SYM 42149 903 69 = = SYM 42149 903 70 = = SYM 42149 903 71 = = SYM 42149 903 72 |Manhattan.| |manhattan.| CD 42149 903 73 Weehawken.| Weehawken.| NNP 42149 903 74 Total Total NNP 42149 903 75 . . . 42149 904 1 ---------------------------------------+----------+-----------+-------- ---------------------------------------+----------+-----------+-------- NFP 42149 904 2 Square square JJ 42149 904 3 feet foot NNS 42149 904 4 covered cover VBD 42149 904 5 | | CD 42149 904 6 47,042 47,042 CD 42149 904 7 | | CD 42149 904 8 13,964 13,964 CD 42149 904 9 | | CD 42149 904 10 60,736 60,736 CD 42149 904 11 ---------------------------------------+----------+-----------+-------- ---------------------------------------+----------+-----------+-------- : 42149 904 12 Average average JJ 42149 904 13 cost cost NN 42149 904 14 per per IN 42149 904 15 square square JJ 42149 904 16 foot foot NN 42149 904 17 . . . 42149 905 1 ---------------------------------------+----------+-----------+-------- ---------------------------------------+----------+-----------+-------- : 42149 905 2 Labor labor NN 42149 905 3 | | NNP 42149 905 4 $ $ $ 42149 905 5 0.07 0.07 CD 42149 905 6 | | CD 42149 905 7 $ $ $ 42149 905 8 0.07 0.07 CD 42149 905 9 | | CD 42149 905 10 $ $ $ 42149 905 11 0.07 0.07 CD 42149 905 12 Material Material NNP 42149 905 13 | | NNP 42149 905 14 0.12 0.12 CD 42149 905 15 | | CD 42149 905 16 0.09 0.09 CD 42149 905 17 | | CD 42149 905 18 0.11 0.11 CD 42149 905 19 ---------------------------------------+----------+-----------+-------- ---------------------------------------+----------+-----------+-------- NNS 42149 905 20 Total total JJ 42149 905 21 field field NN 42149 905 22 charges charge NNS 42149 905 23 | | CD 42149 905 24 $ $ $ 42149 905 25 0.19 0.19 CD 42149 905 26 | | CD 42149 905 27 $ $ $ 42149 905 28 0.16 0.16 CD 42149 905 29 | | CD 42149 905 30 $ $ $ 42149 905 31 0.18 0.18 CD 42149 905 32 Chief chief JJ 42149 905 33 office office NN 42149 905 34 and and CC 42149 905 35 plant plant NN 42149 905 36 depreciation depreciation NN 42149 905 37 | | CD 42149 905 38 0.01 0.01 CD 42149 905 39 | | CD 42149 905 40 0.03 0.03 CD 42149 905 41 | | CD 42149 905 42 0.02 0.02 CD 42149 905 43 ---------------------------------------+----------+-----------+-------- ---------------------------------------+----------+-----------+-------- NNS 42149 905 44 Total total JJ 42149 905 45 average average JJ 42149 905 46 cost cost NN 42149 905 47 | | CD 42149 905 48 $ $ $ 42149 905 49 0.20 0.20 CD 42149 905 50 | | CD 42149 905 51 $ $ $ 42149 905 52 0.19 0.19 CD 42149 905 53 | | CD 42149 905 54 $ $ $ 42149 905 55 0.20 0.20 CD 42149 905 56 = = SYM 42149 905 57 = = SYM 42149 905 58 = = SYM 42149 905 59 = = SYM 42149 905 60 = = SYM 42149 905 61 = = SYM 42149 905 62 = = SYM 42149 905 63 = = SYM 42149 905 64 = = SYM 42149 905 65 = = SYM 42149 905 66 = = SYM 42149 905 67 = = SYM 42149 905 68 = = SYM 42149 905 69 = = SYM 42149 905 70 = = SYM 42149 905 71 = = SYM 42149 905 72 = = SYM 42149 905 73 = = SYM 42149 905 74 = = SYM 42149 905 75 = = SYM 42149 905 76 = = SYM 42149 905 77 = = SYM 42149 905 78 = = SYM 42149 905 79 = = SYM 42149 905 80 = = SYM 42149 905 81 = = SYM 42149 905 82 = = SYM 42149 905 83 = = SYM 42149 905 84 = = SYM 42149 905 85 = = SYM 42149 905 86 = = SYM 42149 905 87 = = SYM 42149 905 88 = = SYM 42149 905 89 = = SYM 42149 905 90 = = SYM 42149 905 91 = = SYM 42149 905 92 = = SYM 42149 905 93 = = NFP 42149 905 94 = = SYM 42149 905 95 + + SYM 42149 905 96 = = SYM 42149 905 97 = = SYM 42149 905 98 = = SYM 42149 905 99 = = SYM 42149 905 100 = = SYM 42149 905 101 = = SYM 42149 905 102 = = SYM 42149 905 103 = = SYM 42149 905 104 = = NFP 42149 905 105 = = SYM 42149 905 106 + + SYM 42149 905 107 = = SYM 42149 905 108 = = SYM 42149 905 109 = = SYM 42149 905 110 = = SYM 42149 905 111 = = SYM 42149 905 112 = = SYM 42149 905 113 = = SYM 42149 905 114 = = SYM 42149 905 115 = = SYM 42149 905 116 = = NFP 42149 905 117 = = SYM 42149 905 118 + + SYM 42149 905 119 = = SYM 42149 905 120 = = SYM 42149 905 121 = = SYM 42149 905 122 = = SYM 42149 905 123 = = SYM 42149 905 124 = = SYM 42149 905 125 = = NFP 42149 905 126 = = NFP 42149 905 127 _ _ NNP 42149 905 128 Brickwork Brickwork NNP 42149 905 129 in in IN 42149 905 130 Arches._--Owing arches._--owe VBG 42149 905 131 to to IN 42149 905 132 the the DT 42149 905 133 heavy heavy JJ 42149 905 134 timbering timbering NN 42149 905 135 , , , 42149 905 136 the the DT 42149 905 137 brickwork brickwork NN 42149 905 138 at at IN 42149 905 139 Manhattan Manhattan NNP 42149 905 140 was be VBD 42149 905 141 interfered interfere VBN 42149 905 142 with with IN 42149 905 143 to to IN 42149 905 144 a a DT 42149 905 145 considerable considerable JJ 42149 905 146 extent extent NN 42149 905 147 , , , 42149 905 148 and and CC 42149 905 149 the the DT 42149 905 150 gang gang NN 42149 905 151 was be VBD 42149 905 152 always always RB 42149 905 153 kept keep VBN 42149 905 154 at at IN 42149 905 155 work work NN 42149 905 156 at at IN 42149 905 157 two two CD 42149 905 158 or or CC 42149 905 159 more more JJR 42149 905 160 places place NNS 42149 905 161 . . . 42149 906 1 The the DT 42149 906 2 work work NN 42149 906 3 was be VBD 42149 906 4 carried carry VBN 42149 906 5 up up RP 42149 906 6 to to IN 42149 906 7 a a DT 42149 906 8 point point NN 42149 906 9 where where WRB 42149 906 10 it -PRON- PRP 42149 906 11 was be VBD 42149 906 12 necessary necessary JJ 42149 906 13 to to TO 42149 906 14 back back NN 42149 906 15 - - HYPH 42149 906 16 fill fill NN 42149 906 17 , , , 42149 906 18 or or CC 42149 906 19 prop prop NNP 42149 906 20 or or CC 42149 906 21 cut cut VB 42149 906 22 away away RP 42149 906 23 encroaching encroach VBG 42149 906 24 timbers timber NNS 42149 906 25 , , , 42149 906 26 and and CC 42149 906 27 then then RB 42149 906 28 the the DT 42149 906 29 men man NNS 42149 906 30 were be VBD 42149 906 31 moved move VBN 42149 906 32 to to IN 42149 906 33 another another DT 42149 906 34 place place NN 42149 906 35 while while IN 42149 906 36 this this DT 42149 906 37 was be VBD 42149 906 38 being be VBG 42149 906 39 done do VBN 42149 906 40 . . . 42149 907 1 The the DT 42149 907 2 centers center NNS 42149 907 3 were be VBD 42149 907 4 set set VBN 42149 907 5 up up RP 42149 907 6 in in IN 42149 907 7 sets set NNS 42149 907 8 of of IN 42149 907 9 seven seven CD 42149 907 10 , , , 42149 907 11 spaced spaced NNP 42149 907 12 4 4 CD 42149 907 13 ft ft NN 42149 907 14 . . NNP 42149 907 15 apart apart RB 42149 907 16 . . . 42149 908 1 Two two CD 42149 908 2 14-ft 14-ft NNPS 42149 908 3 . . . 42149 908 4 lengths length NNS 42149 908 5 of of IN 42149 908 6 3 3 CD 42149 908 7 by by IN 42149 908 8 4-in 4-in CD 42149 908 9 . . . 42149 909 1 yellow yellow JJ 42149 909 2 pine pine NN 42149 909 3 lagging lagging NNP 42149 909 4 were be VBD 42149 909 5 used use VBN 42149 909 6 with with IN 42149 909 7 each each DT 42149 909 8 set set NN 42149 909 9 of of IN 42149 909 10 ribs rib NNS 42149 909 11 , , , 42149 909 12 with with IN 42149 909 13 24 24 CD 42149 909 14 by by IN 42149 909 15 8-in 8-in CD 42149 909 16 . . . 42149 910 1 block block NN 42149 910 2 lagging lag VBG 42149 910 3 in in IN 42149 910 4 the the DT 42149 910 5 crown crown NN 42149 910 6 . . . 42149 911 1 All all DT 42149 911 2 centers center NNS 42149 911 3 were be VBD 42149 911 4 set set VBN 42149 911 5 ¼ ¼ NNS 42149 911 6 in in IN 42149 911 7 . . . 42149 912 1 high high JJ 42149 912 2 , , , 42149 912 3 to to TO 42149 912 4 allow allow VB 42149 912 5 for for IN 42149 912 6 settlement settlement NN 42149 912 7 , , , 42149 912 8 except except IN 42149 912 9 in in IN 42149 912 10 the the DT 42149 912 11 24-ft 24-ft NNP 42149 912 12 . . . 42149 912 13 6-in 6-in CD 42149 912 14 . . . 42149 913 1 span span NNP 42149 913 2 , , , 42149 913 3 in in IN 42149 913 4 which which WDT 42149 913 5 they -PRON- PRP 42149 913 6 were be VBD 42149 913 7 set set VBN 42149 913 8 ½ ½ NNP 42149 913 9 in in IN 42149 913 10 . . . 42149 914 1 high high JJ 42149 914 2 . . . 42149 915 1 This this DT 42149 915 2 proved prove VBD 42149 915 3 ample ample NN 42149 915 4 , , , 42149 915 5 the the DT 42149 915 6 average average JJ 42149 915 7 settlement settlement NN 42149 915 8 of of IN 42149 915 9 the the DT 42149 915 10 ribs rib NNS 42149 915 11 being be VBG 42149 915 12 0.01 0.01 CD 42149 915 13 ft ft NN 42149 915 14 . . . 42149 915 15 and and CC 42149 915 16 of of IN 42149 915 17 the the DT 42149 915 18 masonry masonry NN 42149 915 19 , , , 42149 915 20 0.003 0.003 CD 42149 915 21 ft ft NN 42149 915 22 . . . 42149 916 1 In in IN 42149 916 2 the the DT 42149 916 3 24-ft 24-ft NNP 42149 916 4 . . . 42149 916 5 6-in 6-in CD 42149 916 6 . . . 42149 917 1 span span VB 42149 917 2 the the DT 42149 917 3 ribs rib NNS 42149 917 4 were be VBD 42149 917 5 strengthened strengthen VBN 42149 917 6 with with IN 42149 917 7 6 6 CD 42149 917 8 by by IN 42149 917 9 6-in 6-in CD 42149 917 10 . . . 42149 918 1 blocking block VBG 42149 918 2 and and CC 42149 918 3 12 12 CD 42149 918 4 by by IN 42149 918 5 12-in 12-in CD 42149 918 6 . . . 42149 919 1 posts post NNS 42149 919 2 to to TO 42149 919 3 subgrade subgrade VB 42149 919 4 . . . 42149 920 1 Great great JJ 42149 920 2 trouble trouble NN 42149 920 3 was be VBD 42149 920 4 here here RB 42149 920 5 encountered encounter VBN 42149 920 6 with with IN 42149 920 7 encroaching encroach VBG 42149 920 8 timbering timbering NN 42149 920 9 , , , 42149 920 10 due due IN 42149 920 11 to to IN 42149 920 12 the the DT 42149 920 13 settlement settlement NN 42149 920 14 of of IN 42149 920 15 the the DT 42149 920 16 wide wide JJ 42149 920 17 flat flat JJ 42149 920 18 span span NN 42149 920 19 . . . 42149 921 1 Grout grout NN 42149 921 2 pipes pipe NNS 42149 921 3 were be VBD 42149 921 4 built build VBN 42149 921 5 in in IN 42149 921 6 , , , 42149 921 7 as as IN 42149 921 8 previously previously RB 42149 921 9 mentioned mention VBN 42149 921 10 . . . 42149 922 1 Each each DT 42149 922 2 mason mason NN 42149 922 3 laid lay VBD 42149 922 4 an an DT 42149 922 5 average average NN 42149 922 6 of of IN 42149 922 7 0.535 0.535 CD 42149 922 8 cu cu NNS 42149 922 9 . . . 42149 923 1 yd yd NNP 42149 923 2 . . . 42149 924 1 of of IN 42149 924 2 brickwork brickwork NN 42149 924 3 per per IN 42149 924 4 hour hour NN 42149 924 5 , , , 42149 924 6 or or CC 42149 924 7 4.28 4.28 CD 42149 924 8 cu cu NNS 42149 924 9 . . . 42149 925 1 yd yd NNP 42149 925 2 . . . 42149 926 1 per per IN 42149 926 2 day day NN 42149 926 3 . . . 42149 927 1 The the DT 42149 927 2 number number NN 42149 927 3 of of IN 42149 927 4 bricks brick NNS 42149 927 5 laid lay VBN 42149 927 6 per per IN 42149 927 7 mason mason NNP 42149 927 8 per per IN 42149 927 9 hour hour NN 42149 927 10 was be VBD 42149 927 11 218 218 CD 42149 927 12 , , , 42149 927 13 or or CC 42149 927 14 1,744 1,744 CD 42149 927 15 per per IN 42149 927 16 day day NN 42149 927 17 . . . 42149 928 1 The the DT 42149 928 2 bricks brick NNS 42149 928 3 were be VBD 42149 928 4 of of IN 42149 928 5 the the DT 42149 928 6 best good JJS 42149 928 7 quality quality NN 42149 928 8 of of IN 42149 928 9 vitrified vitrified JJ 42149 928 10 paving paving NN 42149 928 11 brick brick NN 42149 928 12 , , , 42149 928 13 and and CC 42149 928 14 were be VBD 42149 928 15 obtained obtain VBN 42149 928 16 from from IN 42149 928 17 the the DT 42149 928 18 Jamestown Jamestown NNP 42149 928 19 Brick Brick NNP 42149 928 20 Company Company NNP 42149 928 21 , , , 42149 928 22 of of IN 42149 928 23 Jamestown Jamestown NNP 42149 928 24 , , , 42149 928 25 N. N. NNP 42149 928 26 Y. Y. NNP 42149 929 1 The the DT 42149 929 2 average average JJ 42149 929 3 size size NN 42149 929 4 was be VBD 42149 929 5 8¾ 8â¾ CD 42149 929 6 by by IN 42149 929 7 3 3 CD 42149 929 8 - - SYM 42149 929 9 15/16 15/16 CD 42149 929 10 by by IN 42149 929 11 2 2 CD 42149 929 12 - - SYM 42149 929 13 7/16 7/16 CD 42149 929 14 in in IN 42149 929 15 . . . 42149 930 1 ; ; : 42149 930 2 the the DT 42149 930 3 average average JJ 42149 930 4 number number NN 42149 930 5 per per IN 42149 930 6 cubic cubic JJ 42149 930 7 yard yard NN 42149 930 8 of of IN 42149 930 9 masonry masonry NN 42149 930 10 was be VBD 42149 930 11 408 408 CD 42149 930 12 , , , 42149 930 13 the the DT 42149 930 14 arches arch NNS 42149 930 15 being be VBG 42149 930 16 from from IN 42149 930 17 19 19 CD 42149 930 18 ft ft NN 42149 930 19 . . . 42149 930 20 to to IN 42149 930 21 24 24 CD 42149 930 22 ft ft NN 42149 930 23 . . NNP 42149 930 24 6 6 CD 42149 930 25 in in IN 42149 930 26 . . . 42149 931 1 in in IN 42149 931 2 span span NN 42149 931 3 and and CC 42149 931 4 from from IN 42149 931 5 22 22 CD 42149 931 6 to to IN 42149 931 7 27 27 CD 42149 931 8 in in IN 42149 931 9 . . . 42149 932 1 thick thick JJ 42149 932 2 . . . 42149 933 1 The the DT 42149 933 2 joints joint NNS 42149 933 3 were be VBD 42149 933 4 3/16 3/16 CD 42149 933 5 in in IN 42149 933 6 . . . 42149 934 1 at at IN 42149 934 2 the the DT 42149 934 3 face face NN 42149 934 4 and and CC 42149 934 5 averaged average VBD 42149 934 6 9/16 9/16 CD 42149 934 7 in in IN 42149 934 8 . . . 42149 935 1 through through IN 42149 935 2 the the DT 42149 935 3 arch arch NN 42149 935 4 . . . 42149 936 1 The the DT 42149 936 2 proportions proportion NNS 42149 936 3 for for IN 42149 936 4 mortar mortar NN 42149 936 5 were be VBD 42149 936 6 1 1 CD 42149 936 7 of of IN 42149 936 8 cement cement NN 42149 936 9 and and CC 42149 936 10 2½ 2½ NNP 42149 936 11 of of IN 42149 936 12 sand sand NN 42149 936 13 . . . 42149 937 1 One one CD 42149 937 2 cubic cubic JJ 42149 937 3 yard yard NN 42149 937 4 of of IN 42149 937 5 masonry masonry NN 42149 937 6 was be VBD 42149 937 7 composed compose VBN 42149 937 8 of of IN 42149 937 9 73.5 73.5 CD 42149 937 10 % % NN 42149 937 11 brick brick NN 42149 937 12 and and CC 42149 937 13 26.5 26.5 CD 42149 937 14 % % NN 42149 937 15 mortar mortar NN 42149 937 16 . . . 42149 938 1 The the DT 42149 938 2 volume volume NN 42149 938 3 of of IN 42149 938 4 the the DT 42149 938 5 ingredients ingredient NNS 42149 938 6 in in IN 42149 938 7 a a DT 42149 938 8 four four CD 42149 938 9 - - HYPH 42149 938 10 bag bag NN 42149 938 11 batch batch NN 42149 938 12 was be VBD 42149 938 13 12.12 12.12 CD 42149 938 14 cu cu NNS 42149 938 15 . . . 42149 939 1 ft ft NNP 42149 939 2 . . NNP 42149 939 3 , , , 42149 939 4 and and CC 42149 939 5 the the DT 42149 939 6 resulting result VBG 42149 939 7 mixture mixture NN 42149 939 8 was be VBD 42149 939 9 9.54 9.54 CD 42149 939 10 cu cu NNS 42149 939 11 . . . 42149 940 1 ft ft IN 42149 940 2 . . . 42149 941 1 The the DT 42149 941 2 number number NN 42149 941 3 of of IN 42149 941 4 barrels barrel NNS 42149 941 5 of of IN 42149 941 6 cement cement NN 42149 941 7 was be VBD 42149 941 8 0.915 0.915 CD 42149 941 9 per per IN 42149 941 10 cu cu XX 42149 941 11 . . . 42149 942 1 yd yd NNP 42149 942 2 . . . 42149 943 1 of of IN 42149 943 2 masonry masonry NNP 42149 943 3 , , , 42149 943 4 and and CC 42149 943 5 about about RB 42149 943 6 17.7 17.7 CD 42149 943 7 % % NN 42149 943 8 of of IN 42149 943 9 the the DT 42149 943 10 mortar mortar NN 42149 943 11 made make VBN 42149 943 12 was be VBD 42149 943 13 wasted waste VBN 42149 943 14 . . . 42149 944 1 The the DT 42149 944 2 average average JJ 42149 944 3 force force NN 42149 944 4 employed employ VBN 42149 944 5 was be VBD 42149 944 6 : : : 42149 944 7 _ _ NNP 42149 944 8 Laying Laying NNP 42149 944 9 . . . 42149 944 10 _ _ NNP 42149 944 11 1 1 CD 42149 944 12 Foreman Foreman NNP 42149 944 13 @ @ CC 42149 944 14 $ $ $ 42149 944 15 8.00 8.00 CD 42149 944 16 per per IN 42149 944 17 day day NN 42149 944 18 4 4 CD 42149 944 19 Layers Layers NNPS 42149 944 20 " " `` 42149 944 21 6.00 6.00 CD 42149 944 22 " " '' 42149 944 23 " " `` 42149 944 24 8 8 CD 42149 944 25 Tenders tender NNS 42149 944 26 " " '' 42149 944 27 2.00 2.00 CD 42149 944 28 " " '' 42149 944 29 " " '' 42149 944 30 2 2 CD 42149 944 31 Mixers Mixers NNPS 42149 944 32 " " `` 42149 944 33 2.00 2.00 CD 42149 944 34 " " '' 42149 944 35 " " `` 42149 944 36 _ _ NNP 42149 944 37 Forms Forms NNP 42149 944 38 . . . 42149 944 39 _ _ NNP 42149 944 40 1 1 CD 42149 944 41 Foreman Foreman NNP 42149 944 42 @ @ CC 42149 944 43 $ $ $ 42149 944 44 4.50 4.50 CD 42149 944 45 per per IN 42149 944 46 day day NN 42149 944 47 4 4 CD 42149 944 48 Carpenters Carpenters NNPS 42149 944 49 " " `` 42149 944 50 3.50 3.50 CD 42149 944 51 " " '' 42149 944 52 " " `` 42149 944 53 5 5 CD 42149 944 54 Helpers Helpers NNPS 42149 944 55 " " `` 42149 944 56 2.25 2.25 CD 42149 944 57 " " '' 42149 944 58 " " `` 42149 944 59 _ _ NNP 42149 944 60 Transport Transport NNP 42149 944 61 . . . 42149 944 62 _ _ NNP 42149 944 63 ¼ â¼ CD 42149 944 64 Hoist hoist JJ 42149 944 65 engineer engineer NN 42149 944 66 @ @ NFP 42149 944 67 $ $ $ 42149 944 68 3.00 3.00 CD 42149 944 69 per per IN 42149 944 70 day day NN 42149 944 71 ¼ ¼ . 42149 944 72 Signalman Signalman NNP 42149 944 73 " " `` 42149 944 74 2.00 2.00 CD 42149 944 75 " " '' 42149 944 76 " " `` 42149 944 77 4 4 CD 42149 944 78 Laborers Laborers NNPS 42149 944 79 " " `` 42149 944 80 2.00 2.00 CD 42149 944 81 " " '' 42149 944 82 " " '' 42149 944 83 For for IN 42149 944 84 materials material NNS 42149 944 85 , , , 42149 944 86 the the DT 42149 944 87 following follow VBG 42149 944 88 prices price NNS 42149 944 89 prevailed prevail VBD 42149 944 90 : : : 42149 944 91 Cement cement NN 42149 944 92 , , , 42149 944 93 $ $ $ 42149 944 94 2.00 2.00 CD 42149 944 95 per per IN 42149 944 96 bbl bbl NN 42149 944 97 . . . 42149 944 98 , , , 42149 944 99 Sand Sand NNP 42149 944 100 , , , 42149 944 101 $ $ $ 42149 944 102 0.90 0.90 CD 42149 944 103 to to TO 42149 944 104 $ $ $ 42149 944 105 1.00 1.00 CD 42149 944 106 per per IN 42149 944 107 cu cu XX 42149 944 108 . . . 42149 945 1 yd yd NNP 42149 945 2 . . NNP 42149 945 3 , , , 42149 945 4 Brick Brick NNP 42149 945 5 , , , 42149 945 6 $ $ $ 42149 945 7 16.00 16.00 CD 42149 945 8 per per IN 42149 945 9 thousand thousand CD 42149 945 10 , , , 42149 945 11 delivered deliver VBN 42149 945 12 at at IN 42149 945 13 yard yard NN 42149 945 14 , , , 42149 945 15 Centers Centers NNPS 42149 945 16 , , , 42149 945 17 $ $ $ 42149 945 18 26.00 26.00 CD 42149 945 19 each each DT 42149 945 20 , , , 42149 945 21 Lagging Lagging NNP 42149 945 22 , , , 42149 945 23 $ $ $ 42149 945 24 45.00 45.00 CD 42149 945 25 per per IN 42149 945 26 1,000 1,000 CD 42149 945 27 ft ft NN 42149 945 28 . . . 42149 945 29 B. B. NNP 42149 945 30 M. M. NNP 42149 945 31 The the DT 42149 945 32 cost cost NN 42149 945 33 of of IN 42149 945 34 the the DT 42149 945 35 brickwork brickwork NN 42149 945 36 is be VBZ 42149 945 37 given give VBN 42149 945 38 in in IN 42149 945 39 Table table NN 42149 945 40 15 15 CD 42149 945 41 . . . 42149 946 1 TABLE TABLE NNS 42149 946 2 15.--COST 15.--cost CD 42149 946 3 OF of IN 42149 946 4 BRICKWORK BRICKWORK NNP 42149 946 5 . . . 42149 947 1 = = NFP 42149 947 2 = = NFP 42149 947 3 = = SYM 42149 947 4 = = SYM 42149 947 5 = = SYM 42149 947 6 = = SYM 42149 947 7 = = SYM 42149 947 8 = = SYM 42149 947 9 = = SYM 42149 947 10 = = SYM 42149 947 11 = = SYM 42149 947 12 = = SYM 42149 947 13 = = SYM 42149 947 14 = = SYM 42149 947 15 = = SYM 42149 947 16 = = SYM 42149 947 17 = = SYM 42149 947 18 = = SYM 42149 947 19 = = SYM 42149 947 20 = = SYM 42149 947 21 = = SYM 42149 947 22 = = SYM 42149 947 23 = = SYM 42149 947 24 = = SYM 42149 947 25 = = SYM 42149 947 26 = = SYM 42149 947 27 = = SYM 42149 947 28 = = SYM 42149 947 29 = = SYM 42149 947 30 = = SYM 42149 947 31 = = SYM 42149 947 32 = = SYM 42149 947 33 = = SYM 42149 947 34 = = SYM 42149 947 35 = = SYM 42149 947 36 = = SYM 42149 947 37 = = SYM 42149 947 38 = = SYM 42149 947 39 = = SYM 42149 947 40 = = SYM 42149 947 41 = = SYM 42149 947 42 = = NFP 42149 947 43 = = SYM 42149 947 44 + + SYM 42149 947 45 = = SYM 42149 947 46 = = SYM 42149 947 47 = = SYM 42149 947 48 = = SYM 42149 947 49 = = SYM 42149 947 50 = = SYM 42149 947 51 = = SYM 42149 947 52 = = SYM 42149 947 53 = = NFP 42149 947 54 = = SYM 42149 947 55 + + SYM 42149 947 56 = = SYM 42149 947 57 = = SYM 42149 947 58 = = SYM 42149 947 59 = = SYM 42149 947 60 = = SYM 42149 947 61 = = SYM 42149 947 62 = = SYM 42149 947 63 = = SYM 42149 947 64 = = NFP 42149 947 65 = = SYM 42149 947 66 + + SYM 42149 947 67 = = SYM 42149 947 68 = = SYM 42149 947 69 = = SYM 42149 947 70 = = SYM 42149 947 71 = = SYM 42149 947 72 = = SYM 42149 947 73 |Manhattan.|Weehawken.|Total |manhattan.|weehawken.|total CD 42149 947 74 . . . 42149 948 1 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ : 42149 948 2 Cubic cubic JJ 42149 948 3 yards yard NNS 42149 948 4 placed place VBD 42149 948 5 | | CD 42149 948 6 4,137 4,137 CD 42149 948 7 | | CD 42149 948 8 790 790 CD 42149 948 9 |4,927 |4,927 NNS 42149 948 10 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ : 42149 948 11 LABOR labor NN 42149 948 12 . . . 42149 949 1 |Average |average NN 42149 949 2 Cost cost NN 42149 949 3 per per IN 42149 949 4 Cubic Cubic NNP 42149 949 5 Yard yard NN 42149 949 6 . . . 42149 950 1 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NFP 42149 950 2 Surface surface NN 42149 950 3 transport transport NN 42149 950 4 | | VBD 42149 950 5 $ $ $ 42149 950 6 0.35 0.35 CD 42149 950 7 | | CD 42149 950 8 $ $ $ 42149 950 9 1.19 1.19 CD 42149 950 10 | | CD 42149 950 11 $ $ $ 42149 950 12 0.48 0.48 CD 42149 950 13 Superintendent Superintendent NNP 42149 950 14 and and CC 42149 950 15 general general JJ 42149 950 16 labor labor NN 42149 950 17 at at IN 42149 950 18 point point NN 42149 950 19 | | NNP 42149 950 20 | | NNP 42149 950 21 | | NNP 42149 950 22 of of IN 42149 950 23 work work NN 42149 950 24 | | CD 42149 950 25 0.17 0.17 CD 42149 950 26 | | CD 42149 950 27 0.04 0.04 CD 42149 950 28 | | CD 42149 950 29 0.16 0.16 CD 42149 950 30 Laying lay VBG 42149 950 31 and and CC 42149 950 32 mixing mix VBG 42149 950 33 | | CD 42149 950 34 2.58 2.58 CD 42149 950 35 | | CD 42149 950 36 3.20 3.20 CD 42149 950 37 | | CD 42149 950 38 2.60 2.60 CD 42149 950 39 Forms form NNS 42149 950 40 : : : 42149 950 41 erection erection NN 42149 950 42 and and CC 42149 950 43 removal removal NN 42149 950 44 | | CD 42149 950 45 2.62 2.62 CD 42149 950 46 | | CD 42149 950 47 0.32 0.32 CD 42149 950 48 | | CD 42149 950 49 2.25 2.25 CD 42149 950 50 Tunnel Tunnel NNP 42149 950 51 transport transport NN 42149 950 52 | | POS 42149 950 53 1.19 1.19 CD 42149 950 54 | | CD 42149 950 55 1.12 1.12 CD 42149 950 56 | | CD 42149 950 57 1.18 1.18 CD 42149 950 58 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NNP 42149 950 59 Total total JJ 42149 950 60 labor labor NN 42149 950 61 | | CD 42149 950 62 $ $ $ 42149 950 63 6.91 6.91 CD 42149 950 64 | | CD 42149 950 65 $ $ $ 42149 950 66 5.87 5.87 CD 42149 950 67 | | CD 42149 950 68 $ $ $ 42149 950 69 6.75 6.75 CD 42149 950 70 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ SYM 42149 950 71 MATERIAL material NN 42149 950 72 . . . 42149 951 1 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NFP 42149 951 2 Brick Brick NNP 42149 951 3 | | CD 42149 951 4 $ $ $ 42149 951 5 6.56 6.56 CD 42149 951 6 | | CD 42149 951 7 $ $ $ 42149 951 8 6.56 6.56 CD 42149 951 9 | | CD 42149 951 10 $ $ $ 42149 951 11 6.56 6.56 CD 42149 951 12 Cement Cement NNP 42149 951 13 | | NNP 42149 951 14 1.76 1.76 CD 42149 951 15 | | CD 42149 951 16 1.75 1.75 CD 42149 951 17 | | CD 42149 951 18 1.76 1.76 CD 42149 951 19 Sand Sand NNP 42149 951 20 | | NNP 42149 951 21 0.20 0.20 CD 42149 951 22 | | CD 42149 951 23 0.28 0.28 CD 42149 951 24 | | CD 42149 951 25 0.22 0.22 CD 42149 951 26 Forms Forms NNPS 42149 951 27 | | CD 42149 951 28 0.92 0.92 CD 42149 951 29 | | CD 42149 951 30 0.98 0.98 CD 42149 951 31 | | CD 42149 951 32 0.98 0.98 CD 42149 951 33 Overhead Overhead NNP 42149 951 34 conductor conductor NN 42149 951 35 pockets pocket VBZ 42149 951 36 | | NNP 42149 951 37 0.15 0.15 CD 42149 951 38 | | CD 42149 951 39 0.09 0.09 CD 42149 951 40 | | CD 42149 951 41 0.13 0.13 CD 42149 951 42 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ HYPH 42149 951 43 Total total JJ 42149 951 44 material material NN 42149 951 45 | | CD 42149 951 46 $ $ $ 42149 951 47 9.59 9.59 CD 42149 951 48 | | CD 42149 951 49 $ $ $ 42149 951 50 9.66 9.66 CD 42149 951 51 | | CD 42149 951 52 $ $ $ 42149 951 53 9.60 9.60 CD 42149 951 54 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NFP 42149 951 55 Plant plant NN 42149 951 56 running running NN 42149 951 57 | | CD 42149 951 58 $ $ $ 42149 951 59 0.55 0.55 CD 42149 951 60 | | CD 42149 951 61 $ $ $ 42149 951 62 0.30 0.30 CD 42149 951 63 | | CD 42149 951 64 $ $ $ 42149 951 65 0.51 0.51 CD 42149 951 66 Surface surface NN 42149 951 67 labor labor NN 42149 951 68 , , , 42149 951 69 repairs repair NNS 42149 951 70 and and CC 42149 951 71 maintenance maintenance NN 42149 951 72 | | NNP 42149 951 73 0.36 0.36 CD 42149 951 74 | | CD 42149 951 75 1.30 1.30 CD 42149 951 76 | | CD 42149 951 77 0.51 0.51 CD 42149 951 78 Field Field NNP 42149 951 79 office office NN 42149 951 80 administration administration NN 42149 951 81 | | HYPH 42149 951 82 0.55 0.55 CD 42149 951 83 | | CD 42149 951 84 0.88 0.88 CD 42149 951 85 | | CD 42149 951 86 0.60 0.60 CD 42149 951 87 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ HYPH 42149 951 88 Total total JJ 42149 951 89 field field NN 42149 951 90 charges charge NNS 42149 951 91 | | CD 42149 951 92 $ $ $ 42149 951 93 17.96 17.96 CD 42149 951 94 | | CD 42149 951 95 $ $ $ 42149 951 96 18.01 18.01 CD 42149 951 97 |$17.97 |$17.97 ADD 42149 951 98 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NNP 42149 951 99 Chief Chief NNP 42149 951 100 office office NN 42149 951 101 administration administration NN 42149 951 102 | | VBD 42149 951 103 $ $ $ 42149 951 104 0.60 0.60 CD 42149 951 105 | | CD 42149 951 106 $ $ $ 42149 951 107 0.66 0.66 CD 42149 951 108 | | CD 42149 951 109 $ $ $ 42149 951 110 0.61 0.61 CD 42149 951 111 Plant plant NN 42149 951 112 depreciation depreciation NN 42149 951 113 | | CD 42149 951 114 0.35 0.35 CD 42149 951 115 | | CD 42149 951 116 0.64 0.64 CD 42149 951 117 | | CD 42149 951 118 0.39 0.39 CD 42149 951 119 -------------------------------------------+----------+----------+------ -------------------------------------------+----------+----------+------ NNS 42149 951 120 Total total JJ 42149 951 121 average average JJ 42149 951 122 cost cost NN 42149 951 123 per per IN 42149 951 124 cubic cubic JJ 42149 951 125 yard yard NN 42149 951 126 | | CD 42149 951 127 $ $ $ 42149 951 128 18.91 18.91 CD 42149 951 129 | | CD 42149 951 130 $ $ $ 42149 951 131 19.31 19.31 CD 42149 951 132 |$18.97 |$18.97 ADD 42149 951 133 = = NFP 42149 951 134 = = SYM 42149 951 135 = = SYM 42149 951 136 = = SYM 42149 951 137 = = SYM 42149 951 138 = = SYM 42149 951 139 = = SYM 42149 951 140 = = SYM 42149 951 141 = = SYM 42149 951 142 = = SYM 42149 951 143 = = SYM 42149 951 144 = = SYM 42149 951 145 = = SYM 42149 951 146 = = SYM 42149 951 147 = = SYM 42149 951 148 = = SYM 42149 951 149 = = SYM 42149 951 150 = = SYM 42149 951 151 = = SYM 42149 951 152 = = SYM 42149 951 153 = = SYM 42149 951 154 = = SYM 42149 951 155 = = SYM 42149 951 156 = = SYM 42149 951 157 = = SYM 42149 951 158 = = SYM 42149 951 159 = = SYM 42149 951 160 = = SYM 42149 951 161 = = SYM 42149 951 162 = = SYM 42149 951 163 = = SYM 42149 951 164 = = SYM 42149 951 165 = = SYM 42149 951 166 = = SYM 42149 951 167 = = SYM 42149 951 168 = = SYM 42149 951 169 = = SYM 42149 951 170 = = SYM 42149 951 171 = = SYM 42149 951 172 = = SYM 42149 951 173 = = SYM 42149 951 174 = = NFP 42149 951 175 = = SYM 42149 951 176 + + SYM 42149 951 177 = = SYM 42149 951 178 = = SYM 42149 951 179 = = SYM 42149 951 180 = = SYM 42149 951 181 = = SYM 42149 951 182 = = SYM 42149 951 183 = = SYM 42149 951 184 = = SYM 42149 951 185 = = NFP 42149 951 186 = = SYM 42149 951 187 + + SYM 42149 951 188 = = SYM 42149 951 189 = = SYM 42149 951 190 = = SYM 42149 951 191 = = SYM 42149 951 192 = = SYM 42149 951 193 = = SYM 42149 951 194 = = SYM 42149 951 195 = = SYM 42149 951 196 = = NFP 42149 951 197 = = SYM 42149 951 198 + + SYM 42149 951 199 = = SYM 42149 951 200 = = SYM 42149 951 201 = = SYM 42149 951 202 = = SYM 42149 951 203 = = NFP 42149 951 204 = = NFP 42149 951 205 In in IN 42149 951 206 Table table NN 42149 951 207 16 16 CD 42149 951 208 the the DT 42149 951 209 cost cost NN 42149 951 210 of of IN 42149 951 211 grout grout NN 42149 951 212 is be VBZ 42149 951 213 expressed express VBN 42149 951 214 in in IN 42149 951 215 terms term NNS 42149 951 216 of of IN 42149 951 217 barrels barrel NNS 42149 951 218 of of IN 42149 951 219 cement cement NN 42149 951 220 used use VBN 42149 951 221 , , , 42149 951 222 because because IN 42149 951 223 in in IN 42149 951 224 the the DT 42149 951 225 schedule schedule NN 42149 951 226 of of IN 42149 951 227 prices price NNS 42149 951 228 attached attach VBN 42149 951 229 to to IN 42149 951 230 the the DT 42149 951 231 contract contract NN 42149 951 232 , , , 42149 951 233 that that WDT 42149 951 234 was be VBD 42149 951 235 the the DT 42149 951 236 unit unit NN 42149 951 237 of of IN 42149 951 238 payment payment NN 42149 951 239 for for IN 42149 951 240 grout grout NN 42149 951 241 . . . 42149 952 1 TABLE table NN 42149 952 2 16.--COST 16.--cost CD 42149 952 3 OF of IN 42149 952 4 GROUT grout NN 42149 952 5 OVER over IN 42149 952 6 ARCHES arch NNS 42149 952 7 IN in IN 42149 952 8 LAND land NN 42149 952 9 TUNNELS tunnel NNS 42149 952 10 . . . 42149 953 1 Cost cost NN 42149 953 2 , , , 42149 953 3 in in IN 42149 953 4 Dollars dollar NNS 42149 953 5 per per IN 42149 953 6 Barrel Barrel NNP 42149 953 7 of of IN 42149 953 8 Cement Cement NNP 42149 953 9 Used use VBN 42149 953 10 . . . 42149 954 1 = = NFP 42149 954 2 = = NFP 42149 954 3 = = SYM 42149 954 4 = = SYM 42149 954 5 = = SYM 42149 954 6 = = SYM 42149 954 7 = = SYM 42149 954 8 = = SYM 42149 954 9 = = SYM 42149 954 10 = = SYM 42149 954 11 = = SYM 42149 954 12 = = SYM 42149 954 13 = = SYM 42149 954 14 = = SYM 42149 954 15 = = SYM 42149 954 16 = = SYM 42149 954 17 = = SYM 42149 954 18 = = SYM 42149 954 19 = = SYM 42149 954 20 = = SYM 42149 954 21 = = SYM 42149 954 22 = = SYM 42149 954 23 = = SYM 42149 954 24 = = SYM 42149 954 25 = = SYM 42149 954 26 = = SYM 42149 954 27 = = SYM 42149 954 28 = = SYM 42149 954 29 = = SYM 42149 954 30 = = SYM 42149 954 31 = = SYM 42149 954 32 = = SYM 42149 954 33 = = SYM 42149 954 34 = = SYM 42149 954 35 = = SYM 42149 954 36 = = SYM 42149 954 37 = = NFP 42149 954 38 = = SYM 42149 954 39 + + SYM 42149 954 40 = = SYM 42149 954 41 = = SYM 42149 954 42 = = SYM 42149 954 43 = = SYM 42149 954 44 = = SYM 42149 954 45 = = SYM 42149 954 46 = = SYM 42149 954 47 = = SYM 42149 954 48 = = SYM 42149 954 49 = = SYM 42149 954 50 = = SYM 42149 954 51 = = SYM 42149 954 52 = = SYM 42149 954 53 = = NFP 42149 954 54 = = SYM 42149 954 55 + + SYM 42149 954 56 = = SYM 42149 954 57 = = SYM 42149 954 58 = = SYM 42149 954 59 = = SYM 42149 954 60 = = SYM 42149 954 61 = = SYM 42149 954 62 = = SYM 42149 954 63 = = SYM 42149 954 64 = = NFP 42149 954 65 = = SYM 42149 954 66 + + SYM 42149 954 67 = = SYM 42149 954 68 = = SYM 42149 954 69 = = SYM 42149 954 70 = = SYM 42149 954 71 = = NNS 42149 954 72 = = SYM 42149 954 73 | | NNP 42149 954 74 Manhattan Manhattan NNP 42149 954 75 . . . 42149 955 1 | | CD 42149 955 2 | | NNP 42149 955 3 |(Gy |(gy JJ 42149 955 4 - - HYPH 42149 955 5 East East NNP 42149 955 6 only.)|Weehawken.|Total only.)|Weehawken.|Total NNP 42149 955 7 . . . 42149 956 1 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ NFP 42149 956 2 Barrels barrel NNS 42149 956 3 used use VBD 42149 956 4 | | NNP 42149 956 5 3,000½ 3,000â½ CD 42149 956 6 | | CD 42149 956 7 261½ 261â½ CD 42149 956 8 |3,262 |3,262 NNS 42149 956 9 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ : 42149 956 10 Average average JJ 42149 956 11 Cost cost NN 42149 956 12 per per IN 42149 956 13 Barrel Barrel NNP 42149 956 14 of of IN 42149 956 15 Cement Cement NNP 42149 956 16 Used use VBN 42149 956 17 . . . 42149 957 1 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ : 42149 957 2 Labor labor NN 42149 957 3 | | CD 42149 957 4 $ $ $ 42149 957 5 0.55 0.55 CD 42149 957 6 | | CD 42149 957 7 $ $ $ 42149 957 8 0.46 0.46 CD 42149 957 9 |$0.53 |$0.53 CD 42149 957 10 Material Material NNP 42149 957 11 | | NNP 42149 957 12 2.30 2.30 CD 42149 957 13 | | CD 42149 957 14 2.25 2.25 CD 42149 957 15 | | CD 42149 957 16 2.28 2.28 CD 42149 957 17 Field Field NNP 42149 957 18 office office NN 42149 957 19 administration administration NN 42149 957 20 | | HYPH 42149 957 21 0.08 0.08 CD 42149 957 22 | | CD 42149 957 23 0.06 0.06 CD 42149 957 24 | | CD 42149 957 25 0.08 0.08 CD 42149 957 26 Plant Plant NNP 42149 957 27 and and CC 42149 957 28 supplies supply VBZ 42149 957 29 | | NNP 42149 957 30 0.10 0.10 CD 42149 957 31 | | CD 42149 957 32 0.07 0.07 CD 42149 957 33 | | CD 42149 957 34 0.09 0.09 CD 42149 957 35 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ : 42149 957 36 Total total JJ 42149 957 37 field field NN 42149 957 38 charges charge NNS 42149 957 39 | | CD 42149 957 40 $ $ $ 42149 957 41 3.03 3.03 CD 42149 957 42 | | CD 42149 957 43 $ $ $ 42149 957 44 2.84 2.84 CD 42149 957 45 |$2.98 |$2.98 CD 42149 957 46 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ NNP 42149 957 47 Chief chief JJ 42149 957 48 office office NN 42149 957 49 and and CC 42149 957 50 plant plant NN 42149 957 51 depreciation depreciation NN 42149 957 52 | | CD 42149 957 53 0.21 0.21 CD 42149 957 54 | | CD 42149 957 55 0.22 0.22 CD 42149 957 56 | | CD 42149 957 57 0.28 0.28 CD 42149 957 58 --------------------------------------+---------------+----------+------ --------------------------------------+---------------+----------+------ NFP 42149 957 59 Total total JJ 42149 957 60 average average JJ 42149 957 61 cost cost NN 42149 957 62 | | CD 42149 957 63 $ $ $ 42149 957 64 3.24 3.24 CD 42149 957 65 | | CD 42149 957 66 $ $ $ 42149 957 67 3.06 3.06 CD 42149 957 68 |$3.20 |$3.20 CD 42149 957 69 = = SYM 42149 957 70 = = SYM 42149 957 71 = = SYM 42149 957 72 = = SYM 42149 957 73 = = SYM 42149 957 74 = = SYM 42149 957 75 = = SYM 42149 957 76 = = SYM 42149 957 77 = = SYM 42149 957 78 = = SYM 42149 957 79 = = SYM 42149 957 80 = = SYM 42149 957 81 = = SYM 42149 957 82 = = SYM 42149 957 83 = = SYM 42149 957 84 = = SYM 42149 957 85 = = SYM 42149 957 86 = = SYM 42149 957 87 = = SYM 42149 957 88 = = SYM 42149 957 89 = = SYM 42149 957 90 = = SYM 42149 957 91 = = SYM 42149 957 92 = = SYM 42149 957 93 = = SYM 42149 957 94 = = SYM 42149 957 95 = = SYM 42149 957 96 = = SYM 42149 957 97 = = SYM 42149 957 98 = = SYM 42149 957 99 = = SYM 42149 957 100 = = SYM 42149 957 101 = = SYM 42149 957 102 = = SYM 42149 957 103 = = SYM 42149 957 104 = = SYM 42149 957 105 = = NFP 42149 957 106 = = SYM 42149 957 107 + + SYM 42149 957 108 = = SYM 42149 957 109 = = SYM 42149 957 110 = = SYM 42149 957 111 = = SYM 42149 957 112 = = SYM 42149 957 113 = = SYM 42149 957 114 = = SYM 42149 957 115 = = SYM 42149 957 116 = = SYM 42149 957 117 = = SYM 42149 957 118 = = SYM 42149 957 119 = = SYM 42149 957 120 = = SYM 42149 957 121 = = NFP 42149 957 122 = = SYM 42149 957 123 + + SYM 42149 957 124 = = SYM 42149 957 125 = = SYM 42149 957 126 = = SYM 42149 957 127 = = SYM 42149 957 128 = = SYM 42149 957 129 = = SYM 42149 957 130 = = SYM 42149 957 131 = = SYM 42149 957 132 = = NFP 42149 957 133 = = SYM 42149 957 134 + + SYM 42149 957 135 = = SYM 42149 957 136 = = SYM 42149 957 137 = = SYM 42149 957 138 = = SYM 42149 957 139 = = NFP 42149 957 140 = = NFP 42149 957 141 _ _ NNP 42149 957 142 Vitrified Vitrified NNP 42149 957 143 Earthenware Earthenware NNP 42149 957 144 Conduits Conduits NNP 42149 957 145 for for IN 42149 957 146 Electric Electric NNP 42149 957 147 Cables._--The Cables._--The NNP 42149 957 148 general general JJ 42149 957 149 drawings drawing NNS 42149 957 150 will will MD 42149 957 151 show show VB 42149 957 152 how how WRB 42149 957 153 the the DT 42149 957 154 ducts duct NNS 42149 957 155 were be VBD 42149 957 156 arranged arrange VBN 42149 957 157 , , , 42149 957 158 and and CC 42149 957 159 that that IN 42149 957 160 manholes manhole NNS 42149 957 161 were be VBD 42149 957 162 provided provide VBN 42149 957 163 at at IN 42149 957 164 intervals interval NNS 42149 957 165 . . . 42149 958 1 They -PRON- PRP 42149 958 2 were be VBD 42149 958 3 water water NN 42149 958 4 - - HYPH 42149 958 5 proofed proof VBN 42149 958 6 , , , 42149 958 7 in in IN 42149 958 8 the the DT 42149 958 9 case case NN 42149 958 10 of of IN 42149 958 11 those those DT 42149 958 12 embedded embed VBN 42149 958 13 in in IN 42149 958 14 the the DT 42149 958 15 bench bench NN 42149 958 16 , , , 42149 958 17 by by IN 42149 958 18 the the DT 42149 958 19 general general JJ 42149 958 20 water water NN 42149 958 21 - - HYPH 42149 958 22 proofing proofing NN 42149 958 23 of of IN 42149 958 24 the the DT 42149 958 25 tunnels tunnel NNS 42149 958 26 , , , 42149 958 27 which which WDT 42149 958 28 was be VBD 42149 958 29 carried carry VBN 42149 958 30 down down RP 42149 958 31 to to IN 42149 958 32 the the DT 42149 958 33 level level NN 42149 958 34 of of IN 42149 958 35 the the DT 42149 958 36 bottom bottom NN 42149 958 37 of of IN 42149 958 38 the the DT 42149 958 39 banks bank NNS 42149 958 40 of of IN 42149 958 41 ducts duct NNS 42149 958 42 ; ; : 42149 958 43 and and CC 42149 958 44 in in IN 42149 958 45 the the DT 42149 958 46 case case NN 42149 958 47 of of IN 42149 958 48 those those DT 42149 958 49 below below IN 42149 958 50 subgrade subgrade NN 42149 958 51 , , , 42149 958 52 by by IN 42149 958 53 a a DT 42149 958 54 special special JJ 42149 958 55 water water NN 42149 958 56 - - HYPH 42149 958 57 proofing proofing NN 42149 958 58 of of IN 42149 958 59 felt felt NN 42149 958 60 and and CC 42149 958 61 pitch pitch NN 42149 958 62 wrapped wrap VBN 42149 958 63 around around IN 42149 958 64 the the DT 42149 958 65 ducts duct NNS 42149 958 66 themselves -PRON- PRP 42149 958 67 . . . 42149 959 1 The the DT 42149 959 2 portion portion NN 42149 959 3 of of IN 42149 959 4 wall wall NN 42149 959 5 in in IN 42149 959 6 front front NN 42149 959 7 of of IN 42149 959 8 the the DT 42149 959 9 ducts duct NNS 42149 959 10 was be VBD 42149 959 11 bonded bond VBN 42149 959 12 to to IN 42149 959 13 that that DT 42149 959 14 behind behind RB 42149 959 15 by by IN 42149 959 16 bonds bond NNS 42149 959 17 , , , 42149 959 18 mostly mostly RB 42149 959 19 of of IN 42149 959 20 expanded expand VBN 42149 959 21 metal metal NN 42149 959 22 , , , 42149 959 23 passing pass VBG 42149 959 24 between between IN 42149 959 25 the the DT 42149 959 26 ducts duct NNS 42149 959 27 . . . 42149 960 1 Examples example NNS 42149 960 2 of of IN 42149 960 3 the the DT 42149 960 4 bonding bonding NN 42149 960 5 will will MD 42149 960 6 be be VB 42149 960 7 seen see VBN 42149 960 8 in in IN 42149 960 9 the the DT 42149 960 10 drawings drawing NNS 42149 960 11 . . . 42149 961 1 The the DT 42149 961 2 joints joint NNS 42149 961 3 between between IN 42149 961 4 successive successive JJ 42149 961 5 lengths length NNS 42149 961 6 of of IN 42149 961 7 4-way 4-way NN 42149 961 8 and and CC 42149 961 9 2-way 2-way CD 42149 961 10 ducts duct NNS 42149 961 11 were be VBD 42149 961 12 wrapped wrap VBN 42149 961 13 with with IN 42149 961 14 two two CD 42149 961 15 thicknesses thickness NNS 42149 961 16 of of IN 42149 961 17 cotton cotton NN 42149 961 18 duck duck NN 42149 961 19 , , , 42149 961 20 6 6 CD 42149 961 21 in in IN 42149 961 22 . . . 42149 962 1 wide wide RB 42149 962 2 , , , 42149 962 3 those those DT 42149 962 4 of of IN 42149 962 5 single single JJ 42149 962 6 - - HYPH 42149 962 7 way way NN 42149 962 8 ducts duct NNS 42149 962 9 were be VBD 42149 962 10 not not RB 42149 962 11 wrapped wrap VBN 42149 962 12 , , , 42149 962 13 but but CC 42149 962 14 plastered plaster VBN 42149 962 15 with with IN 42149 962 16 cement cement NN 42149 962 17 mortar mortar NN 42149 962 18 . . . 42149 963 1 The the DT 42149 963 2 ducts duct NNS 42149 963 3 were be VBD 42149 963 4 laid lay VBN 42149 963 5 on on IN 42149 963 6 beds bed NNS 42149 963 7 of of IN 42149 963 8 mortar mortar NN 42149 963 9 , , , 42149 963 10 and and CC 42149 963 11 were be VBD 42149 963 12 made make VBN 42149 963 13 to to TO 42149 963 14 break break VB 42149 963 15 joints joint NNS 42149 963 16 at at IN 42149 963 17 top top JJ 42149 963 18 and and CC 42149 963 19 bottom bottom NN 42149 963 20 and and CC 42149 963 21 side side NN 42149 963 22 to to TO 42149 963 23 side side VB 42149 963 24 with with IN 42149 963 25 the the DT 42149 963 26 adjacent adjacent JJ 42149 963 27 ducts duct NNS 42149 963 28 . . . 42149 964 1 They -PRON- PRP 42149 964 2 were be VBD 42149 964 3 laid lay VBN 42149 964 4 with with IN 42149 964 5 a a DT 42149 964 6 wooden wooden JJ 42149 964 7 mandrel mandrel NN 42149 964 8 ; ; : 42149 964 9 a a DT 42149 964 10 square square JJ 42149 964 11 leather leather NN 42149 964 12 washer washer NN 42149 964 13 at at IN 42149 964 14 the the DT 42149 964 15 near near JJ 42149 964 16 end end NN 42149 964 17 acted act VBD 42149 964 18 as as IN 42149 964 19 a a DT 42149 964 20 cleanser cleanser NN 42149 964 21 when when WRB 42149 964 22 the the DT 42149 964 23 mandrel mandrel NN 42149 964 24 was be VBD 42149 964 25 pulled pull VBN 42149 964 26 through through RB 42149 964 27 . . . 42149 965 1 The the DT 42149 965 2 specifications specification NNS 42149 965 3 required require VBD 42149 965 4 the the DT 42149 965 5 ducts duct NNS 42149 965 6 to to TO 42149 965 7 be be VB 42149 965 8 laid lay VBN 42149 965 9 at at IN 42149 965 10 the the DT 42149 965 11 same same JJ 42149 965 12 time time NN 42149 965 13 as as IN 42149 965 14 the the DT 42149 965 15 concrete concrete NN 42149 965 16 and and CC 42149 965 17 be be VB 42149 965 18 carried carry VBN 42149 965 19 up up RP 42149 965 20 with with IN 42149 965 21 it -PRON- PRP 42149 965 22 , , , 42149 965 23 but but CC 42149 965 24 this this DT 42149 965 25 was be VBD 42149 965 26 found find VBN 42149 965 27 to to TO 42149 965 28 be be VB 42149 965 29 a a DT 42149 965 30 very very RB 42149 965 31 awkward awkward JJ 42149 965 32 operation operation NN 42149 965 33 , , , 42149 965 34 as as IN 42149 965 35 the the DT 42149 965 36 tamping tamping NN 42149 965 37 of of IN 42149 965 38 the the DT 42149 965 39 concrete concrete NN 42149 965 40 and and CC 42149 965 41 the the DT 42149 965 42 walking walking NN 42149 965 43 of of IN 42149 965 44 men man NNS 42149 965 45 disturbed disturb VBD 42149 965 46 the the DT 42149 965 47 ducts duct NNS 42149 965 48 , , , 42149 965 49 especially especially RB 42149 965 50 as as IN 42149 965 51 the the DT 42149 965 52 bonds bond NNS 42149 965 53 lay lie VBD 42149 965 54 across across IN 42149 965 55 them -PRON- PRP 42149 965 56 . . . 42149 966 1 It -PRON- PRP 42149 966 2 was be VBD 42149 966 3 resolved resolve VBN 42149 966 4 , , , 42149 966 5 therefore therefore RB 42149 966 6 , , , 42149 966 7 to to TO 42149 966 8 build build VB 42149 966 9 the the DT 42149 966 10 portion portion NN 42149 966 11 of of IN 42149 966 12 the the DT 42149 966 13 wall wall NN 42149 966 14 behind behind IN 42149 966 15 the the DT 42149 966 16 ducts duct NNS 42149 966 17 first first RB 42149 966 18 , , , 42149 966 19 with with IN 42149 966 20 the the DT 42149 966 21 bonds bond NNS 42149 966 22 embedded embed VBN 42149 966 23 in in IN 42149 966 24 it -PRON- PRP 42149 966 25 at at IN 42149 966 26 the the DT 42149 966 27 proper proper JJ 42149 966 28 heights height NNS 42149 966 29 and and CC 42149 966 30 projecting project VBG 42149 966 31 from from IN 42149 966 32 it -PRON- PRP 42149 966 33 , , , 42149 966 34 then then RB 42149 966 35 to to TO 42149 966 36 lay lay VB 42149 966 37 up up RP 42149 966 38 the the DT 42149 966 39 banks bank NNS 42149 966 40 of of IN 42149 966 41 ducts duct NNS 42149 966 42 against against IN 42149 966 43 this this DT 42149 966 44 wall wall NN 42149 966 45 , , , 42149 966 46 bending bend VBG 42149 966 47 the the DT 42149 966 48 bonds bond NNS 42149 966 49 down down RP 42149 966 50 as as IN 42149 966 51 they -PRON- PRP 42149 966 52 were be VBD 42149 966 53 reached reach VBN 42149 966 54 , , , 42149 966 55 and and CC 42149 966 56 finally finally RB 42149 966 57 , , , 42149 966 58 after after IN 42149 966 59 all all PDT 42149 966 60 the the DT 42149 966 61 ducts duct NNS 42149 966 62 were be VBD 42149 966 63 in in RB 42149 966 64 , , , 42149 966 65 to to TO 42149 966 66 lay lay VB 42149 966 67 the the DT 42149 966 68 concrete concrete NN 42149 966 69 in in IN 42149 966 70 front front NN 42149 966 71 of of IN 42149 966 72 and and CC 42149 966 73 over over IN 42149 966 74 the the DT 42149 966 75 top top NN 42149 966 76 of of IN 42149 966 77 the the DT 42149 966 78 ducts duct NNS 42149 966 79 . . . 42149 967 1 Several several JJ 42149 967 2 detailed detailed JJ 42149 967 3 modifications modification NNS 42149 967 4 of of IN 42149 967 5 this this DT 42149 967 6 general general JJ 42149 967 7 scheme scheme NN 42149 967 8 were be VBD 42149 967 9 followed follow VBN 42149 967 10 at at IN 42149 967 11 one one CD 42149 967 12 time time NN 42149 967 13 or or CC 42149 967 14 another another DT 42149 967 15 when when WRB 42149 967 16 necessary necessary JJ 42149 967 17 or or CC 42149 967 18 advisable advisable JJ 42149 967 19 . . . 42149 968 1 The the DT 42149 968 2 laying laying NN 42149 968 3 of of IN 42149 968 4 ducts duct NNS 42149 968 5 below below IN 42149 968 6 subgrade subgrade NN 42149 968 7 was be VBD 42149 968 8 not not RB 42149 968 9 complicated complicate VBN 42149 968 10 by by IN 42149 968 11 the the DT 42149 968 12 presence presence NN 42149 968 13 of of IN 42149 968 14 bonds bond NNS 42149 968 15 , , , 42149 968 16 the the DT 42149 968 17 water water NN 42149 968 18 - - HYPH 42149 968 19 proofing proofing NN 42149 968 20 caused cause VBD 42149 968 21 the the DT 42149 968 22 trouble trouble NN 42149 968 23 here here RB 42149 968 24 , , , 42149 968 25 as as IN 42149 968 26 before before IN 42149 968 27 described describe VBN 42149 968 28 . . . 42149 969 1 The the DT 42149 969 2 specifications specification NNS 42149 969 3 called call VBD 42149 969 4 for for IN 42149 969 5 a a DT 42149 969 6 final final JJ 42149 969 7 rodding rodding NN 42149 969 8 after after IN 42149 969 9 completion completion NN 42149 969 10 . . . 42149 970 1 A a DT 42149 970 2 group group NN 42149 970 3 of of IN 42149 970 4 the the DT 42149 970 5 apparatus apparatus NN 42149 970 6 used use VBN 42149 970 7 in in IN 42149 970 8 this this DT 42149 970 9 process process NN 42149 970 10 is be VBZ 42149 970 11 shown show VBN 42149 970 12 in in IN 42149 970 13 Fig Fig NNP 42149 970 14 . . . 42149 971 1 1 1 LS 42149 971 2 , , , 42149 971 3 Plate Plate NNP 42149 971 4 XXXV XXXV NNP 42149 971 5 ; ; : 42149 971 6 the the DT 42149 971 7 various various JJ 42149 971 8 parts part NNS 42149 971 9 are be VBP 42149 971 10 identified identify VBN 42149 971 11 by by IN 42149 971 12 the the DT 42149 971 13 following follow VBG 42149 971 14 key key NN 42149 971 15 : : : 42149 971 16 KEY key NN 42149 971 17 TO to IN 42149 971 18 FIG FIG NNP 42149 971 19 . . . 42149 972 1 1 1 CD 42149 972 2 , , , 42149 972 3 PLATE PLATE NNP 42149 972 4 XXXV XXXV NNP 42149 972 5 . . . 42149 973 1 1.--4-way 1.--4-way CD 42149 973 2 duct duct NN 42149 973 3 , , , 42149 973 4 for for IN 42149 973 5 telephone telephone NN 42149 973 6 and and CC 42149 973 7 telegraph telegraph NN 42149 973 8 cables cable NNS 42149 973 9 , , , 42149 973 10 2.--2-way 2.--2-way CD 42149 973 11 duct duct NN 42149 973 12 , , , 42149 973 13 for for IN 42149 973 14 telephone telephone NN 42149 973 15 and and CC 42149 973 16 telegraph telegraph NN 42149 973 17 cables cable NNS 42149 973 18 , , , 42149 973 19 3.--1-way 3.--1-way CD 42149 973 20 duct duct NN 42149 973 21 , , , 42149 973 22 for for IN 42149 973 23 high- high- NN 42149 973 24 and and CC 42149 973 25 low low JJ 42149 973 26 - - HYPH 42149 973 27 tension tension NN 42149 973 28 cables cable NNS 42149 973 29 , , , 42149 973 30 4.--Plug 4.--plug CD 42149 973 31 for for IN 42149 973 32 closing close VBG 42149 973 33 open open JJ 42149 973 34 ends end NNS 42149 973 35 of of IN 42149 973 36 ducts duct NNS 42149 973 37 , , , 42149 973 38 5.--Plug 5.--Plug NNP 42149 973 39 for for IN 42149 973 40 closing close VBG 42149 973 41 open open JJ 42149 973 42 ends end NNS 42149 973 43 of of IN 42149 973 44 ducts duct NNS 42149 973 45 in in IN 42149 973 46 position position NN 42149 973 47 , , , 42149 973 48 6 6 CD 42149 973 49 , , , 42149 973 50 7 7 CD 42149 973 51 , , , 42149 973 52 and and CC 42149 973 53 8.--Cutters 8.--cutter NNS 42149 973 54 for for IN 42149 973 55 removing remove VBG 42149 973 56 obstructions obstruction NNS 42149 973 57 , , , 42149 973 58 9.--Hedgehog 9.--hedgehog CD 42149 973 59 cutter cutter NN 42149 973 60 for for IN 42149 973 61 removing remove VBG 42149 973 62 grout grout NN 42149 973 63 in in IN 42149 973 64 ducts duct NNS 42149 973 65 , , , 42149 973 66 10.--Rodding 10.--rodding CD 42149 973 67 mandrel mandrel NN 42149 973 68 for for IN 42149 973 69 multiple multiple JJ 42149 973 70 ducts duct NNS 42149 973 71 , , , 42149 973 72 11.--Laying 11.--laying CD 42149 973 73 mandrel mandrel NN 42149 973 74 , , , 42149 973 75 12.--Rodding 12.--rodding CD 42149 973 76 mandrel mandrel NN 42149 973 77 , , , 42149 973 78 with with IN 42149 973 79 jar jar NN 42149 973 80 - - HYPH 42149 973 81 link link NN 42149 973 82 attached attach VBN 42149 973 83 , , , 42149 973 84 13.--Laying 13.--laying CD 42149 973 85 mandrel mandrel NN 42149 973 86 , , , 42149 973 87 14 14 CD 42149 973 88 and and CC 42149 973 89 15.--Rubber 15.--rubber CD 42149 973 90 - - HYPH 42149 973 91 disk disk NN 42149 973 92 cleaners cleaner NNS 42149 973 93 , , , 42149 973 94 used use VBN 42149 973 95 after after IN 42149 973 96 final final JJ 42149 973 97 rodding rodding NN 42149 973 98 , , , 42149 973 99 16 16 CD 42149 973 100 and and CC 42149 973 101 17.--Sectional 17.--sectional CD 42149 973 102 wooden wooden JJ 42149 973 103 rods rod NNS 42149 973 104 used use VBN 42149 973 105 for for IN 42149 973 106 rodding rodding NN 42149 973 107 , , , 42149 973 108 18.--Section 18.--section CD 42149 973 109 of of IN 42149 973 110 iron iron NN 42149 973 111 rods rod NNS 42149 973 112 used use VBN 42149 973 113 for for IN 42149 973 114 rodding rodding NN 42149 973 115 , , , 42149 973 116 19.--Jar 19.--jar CD 42149 973 117 - - HYPH 42149 973 118 link link NN 42149 973 119 , , , 42149 973 120 20.--Cotton 20.--cotton CD 42149 973 121 duck duck NN 42149 973 122 for for IN 42149 973 123 wrapping wrap VBG 42149 973 124 joints joint NNS 42149 973 125 of of IN 42149 973 126 multiple multiple JJ 42149 973 127 ducts duct NNS 42149 973 128 , , , 42149 973 129 21.--Hook 21.--hook CD 42149 973 130 for for IN 42149 973 131 pulling pull VBG 42149 973 132 forward forward RB 42149 973 133 laying lay VBG 42149 973 134 mandrel mandrel NN 42149 973 135 , , , 42149 973 136 22.--Top 22.--top CD 42149 973 137 view view NN 42149 973 138 of of IN 42149 973 139 trap trap NN 42149 973 140 for for IN 42149 973 141 recovering recover VBG 42149 973 142 lost lose VBN 42149 973 143 or or CC 42149 973 144 broken break VBN 42149 973 145 rods rod NNS 42149 973 146 left leave VBN 42149 973 147 in in IN 42149 973 148 ducts duct NNS 42149 973 149 . . . 42149 974 1 [ [ -LRB- 42149 974 2 Illustration illustration NN 42149 974 3 : : : 42149 974 4 PLATE PLATE NNP 42149 974 5 XXXV XXXV NNP 42149 974 6 . . . 42149 975 1 TRANS trans UH 42149 975 2 . . . 42149 976 1 AM AM NNP 42149 976 2 . . . 42149 977 1 SOC SOC NNP 42149 977 2 . . . 42149 978 1 CIV CIV NNP 42149 978 2 . . . 42149 979 1 ENGRS ENGRS NNP 42149 979 2 . . . 42149 980 1 VOL VOL NNP 42149 980 2 . . . 42149 981 1 LXVIII LXVIII NNP 42149 981 2 , , , 42149 981 3 No no UH 42149 981 4 . . . 42149 982 1 1155 1155 CD 42149 982 2 . . . 42149 983 1 HEWETT HEWETT NNP 42149 983 2 AND and CC 42149 983 3 BROWN BROWN NNP 42149 983 4 ON ON NNP 42149 983 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 983 6 R. R. NNP 42149 983 7 R. R. NNP 42149 983 8 TUNNELS TUNNELS NNP 42149 983 9 : : : 42149 983 10 NORTH NORTH NNP 42149 983 11 RIVER river NN 42149 983 12 TUNNELS tunnel NNS 42149 983 13 . . . 42149 984 1 FIG FIG NNP 42149 984 2 . . . 42149 985 1 1 1 LS 42149 985 2 . . . 42149 986 1 FIG FIG NNP 42149 986 2 . . . 42149 987 1 2 2 LS 42149 987 2 . . . 42149 987 3 ] ] -RRB- 42149 988 1 Ordinary ordinary JJ 42149 988 2 ¾-in ¾-in NNP 42149 988 3 . . . 42149 989 1 gas gas NN 42149 989 2 pipe pipe NN 42149 989 3 was be VBD 42149 989 4 used use VBN 42149 989 5 for for IN 42149 989 6 the the DT 42149 989 7 rod rod NN 42149 989 8 , , , 42149 989 9 and and CC 42149 989 10 a a DT 42149 989 11 cutter cutter NN 42149 989 12 with with IN 42149 989 13 rectangular rectangular JJ 42149 989 14 cross cross JJ 42149 989 15 - - NN 42149 989 16 section section NN 42149 989 17 and and CC 42149 989 18 rounded rounded JJ 42149 989 19 corners corner NNS 42149 989 20 was be VBD 42149 989 21 run run VBN 42149 989 22 through through IN 42149 989 23 ahead ahead RB 42149 989 24 of of IN 42149 989 25 the the DT 42149 989 26 mandrel mandrel NN 42149 989 27 : : : 42149 989 28 following follow VBG 42149 989 29 the the DT 42149 989 30 cutter cutter NN 42149 989 31 came come VBD 42149 989 32 a a DT 42149 989 33 scraper scraper NN 42149 989 34 consisting consist VBG 42149 989 35 of of IN 42149 989 36 several several JJ 42149 989 37 square square JJ 42149 989 38 leather leather NN 42149 989 39 washers washer NNS 42149 989 40 , , , 42149 989 41 of of IN 42149 989 42 the the DT 42149 989 43 size size NN 42149 989 44 of of IN 42149 989 45 the the DT 42149 989 46 ducts duct NNS 42149 989 47 , , , 42149 989 48 spaced space VBN 42149 989 49 at at IN 42149 989 50 intervals interval NNS 42149 989 51 on on IN 42149 989 52 a a DT 42149 989 53 short short JJ 42149 989 54 rod rod NN 42149 989 55 . . . 42149 990 1 The the DT 42149 990 2 mandrel mandrel NN 42149 990 3 itself -PRON- PRP 42149 990 4 was be VBD 42149 990 5 next next JJ 42149 990 6 put put NN 42149 990 7 through through RP 42149 990 8 , , , 42149 990 9 three three CD 42149 990 10 or or CC 42149 990 11 four four CD 42149 990 12 men man NNS 42149 990 13 being be VBG 42149 990 14 used use VBN 42149 990 15 on on IN 42149 990 16 the the DT 42149 990 17 rods rod NNS 42149 990 18 . . . 42149 991 1 All all PDT 42149 991 2 the the DT 42149 991 3 ducts duct NNS 42149 991 4 in in IN 42149 991 5 a a DT 42149 991 6 bank bank NN 42149 991 7 were be VBD 42149 991 8 thus thus RB 42149 991 9 rodded rodde VBN 42149 991 10 from from IN 42149 991 11 manhole manhole NNP 42149 991 12 to to IN 42149 991 13 manhole manhole NNP 42149 991 14 . . . 42149 992 1 When when WRB 42149 992 2 a a DT 42149 992 3 duct duct NN 42149 992 4 was be VBD 42149 992 5 rodded rodde VBN 42149 992 6 it -PRON- PRP 42149 992 7 was be VBD 42149 992 8 plugged plug VBN 42149 992 9 at at IN 42149 992 10 each each DT 42149 992 11 end end NN 42149 992 12 with with IN 42149 992 13 a a DT 42149 992 14 wooden wooden JJ 42149 992 15 plug plug NN 42149 992 16 . . . 42149 993 1 A a DT 42149 993 2 solid solid JJ 42149 993 3 wooden wooden JJ 42149 993 4 paraffined paraffined JJ 42149 993 5 plug plug NN 42149 993 6 was be VBD 42149 993 7 used use VBN 42149 993 8 at at IN 42149 993 9 first first RB 42149 993 10 , , , 42149 993 11 but but CC 42149 993 12 afterward afterward RB 42149 993 13 an an DT 42149 993 14 expansion expansion NN 42149 993 15 plug plug NN 42149 993 16 was be VBD 42149 993 17 used use VBN 42149 993 18 . . . 42149 994 1 Very very RB 42149 994 2 little little JJ 42149 994 3 trouble trouble NN 42149 994 4 was be VBD 42149 994 5 met meet VBN 42149 994 6 in in IN 42149 994 7 rodding rodde VBG 42149 994 8 the the DT 42149 994 9 power power NN 42149 994 10 conduits conduit NNS 42149 994 11 , , , 42149 994 12 except except IN 42149 994 13 for for IN 42149 994 14 a a DT 42149 994 15 few few JJ 42149 994 16 misplaced misplace VBN 42149 994 17 ducts duct NNS 42149 994 18 , , , 42149 994 19 or or CC 42149 994 20 a a DT 42149 994 21 small small JJ 42149 994 22 mound mound NN 42149 994 23 of of IN 42149 994 24 mortar mortar NN 42149 994 25 or or CC 42149 994 26 a a DT 42149 994 27 laying lay VBG 42149 994 28 mandrel mandrel NN 42149 994 29 left leave VBN 42149 994 30 in in RP 42149 994 31 . . . 42149 995 1 At at IN 42149 995 2 such such JJ 42149 995 3 points point NNS 42149 995 4 a a DT 42149 995 5 cut cut NN 42149 995 6 was be VBD 42149 995 7 made make VBN 42149 995 8 in in IN 42149 995 9 the the DT 42149 995 10 concrete concrete NN 42149 995 11 and and CC 42149 995 12 the the DT 42149 995 13 duct duct NN 42149 995 14 replaced replace VBD 42149 995 15 . . . 42149 996 1 In in IN 42149 996 2 the the DT 42149 996 3 subgrade subgrade NN 42149 996 4 telephone telephone NN 42149 996 5 and and CC 42149 996 6 telegraph telegraph NN 42149 996 7 ducts duct NNS 42149 996 8 east east RB 42149 996 9 of of IN 42149 996 10 the the DT 42149 996 11 Manhattan Manhattan NNP 42149 996 12 Shaft Shaft NNP 42149 996 13 , , , 42149 996 14 much much JJ 42149 996 15 trouble trouble NN 42149 996 16 was be VBD 42149 996 17 caused cause VBN 42149 996 18 by by IN 42149 996 19 grout grout NN 42149 996 20 in in IN 42149 996 21 the the DT 42149 996 22 ducts duct NNS 42149 996 23 . . . 42149 997 1 The the DT 42149 997 2 mandrel mandrel NN 42149 997 3 and and CC 42149 997 4 cutters cutter NNS 42149 997 5 were be VBD 42149 997 6 deflected deflect VBN 42149 997 7 and and CC 42149 997 8 broke break VBD 42149 997 9 through through IN 42149 997 10 the the DT 42149 997 11 web web NN 42149 997 12 of of IN 42149 997 13 the the DT 42149 997 14 ducts duct NNS 42149 997 15 rather rather RB 42149 997 16 than than IN 42149 997 17 remove remove VB 42149 997 18 this this DT 42149 997 19 hard hard JJ 42149 997 20 grout grout NN 42149 997 21 . . . 42149 998 1 Trenches trench NNS 42149 998 2 had have VBD 42149 998 3 to to TO 42149 998 4 be be VB 42149 998 5 cut cut VBN 42149 998 6 from from IN 42149 998 7 the the DT 42149 998 8 floor floor NN 42149 998 9 to to IN 42149 998 10 the the DT 42149 998 11 top top NN 42149 998 12 of of IN 42149 998 13 the the DT 42149 998 14 water water NN 42149 998 15 - - HYPH 42149 998 16 proofing proofing NN 42149 998 17 , , , 42149 998 18 the the DT 42149 998 19 latter latter JJ 42149 998 20 was be VBD 42149 998 21 then then RB 42149 998 22 cut cut VBN 42149 998 23 and and CC 42149 998 24 folded fold VBD 42149 998 25 back back RP 42149 998 26 , , , 42149 998 27 and and CC 42149 998 28 the the DT 42149 998 29 ducts duct NNS 42149 998 30 replaced replace VBD 42149 998 31 . . . 42149 999 1 To to TO 42149 999 2 do do VB 42149 999 3 this this DT 42149 999 4 , , , 42149 999 5 a a DT 42149 999 6 number number NN 42149 999 7 of of IN 42149 999 8 ducts duct NNS 42149 999 9 had have VBD 42149 999 10 to to TO 42149 999 11 be be VB 42149 999 12 taken take VBN 42149 999 13 out out RP 42149 999 14 to to TO 42149 999 15 replace replace VB 42149 999 16 the the DT 42149 999 17 broken broken JJ 42149 999 18 ones one NNS 42149 999 19 and and CC 42149 999 20 get get VB 42149 999 21 the the DT 42149 999 22 proper proper JJ 42149 999 23 laps lap NNS 42149 999 24 . . . 42149 1000 1 The the DT 42149 1000 2 water water NN 42149 1000 3 - - HYPH 42149 1000 4 proofing proofing NN 42149 1000 5 was be VBD 42149 1000 6 then then RB 42149 1000 7 patched patch VBN 42149 1000 8 and and CC 42149 1000 9 the the DT 42149 1000 10 concrete concrete NN 42149 1000 11 replaced replace VBD 42149 1000 12 . . . 42149 1001 1 This this DT 42149 1001 2 grout grout NN 42149 1001 3 had have VBD 42149 1001 4 not not RB 42149 1001 5 penetrated penetrate VBN 42149 1001 6 the the DT 42149 1001 7 water water NN 42149 1001 8 - - HYPH 42149 1001 9 proofing proofing NN 42149 1001 10 , , , 42149 1001 11 but but CC 42149 1001 12 had have VBD 42149 1001 13 got get VBN 42149 1001 14 in in RP 42149 1001 15 through through IN 42149 1001 16 the the DT 42149 1001 17 ends end NNS 42149 1001 18 of of IN 42149 1001 19 the the DT 42149 1001 20 ducts duct NNS 42149 1001 21 where where WRB 42149 1001 22 they -PRON- PRP 42149 1001 23 had have VBD 42149 1001 24 not not RB 42149 1001 25 been be VBN 42149 1001 26 properly properly RB 42149 1001 27 plugged plug VBN 42149 1001 28 and and CC 42149 1001 29 protected protect VBN 42149 1001 30 . . . 42149 1002 1 The the DT 42149 1002 2 duct duct NN 42149 1002 3 gang gang NN 42149 1002 4 , , , 42149 1002 5 both both CC 42149 1002 6 for for IN 42149 1002 7 laying laying NN 42149 1002 8 and and CC 42149 1002 9 rodding rodding NN 42149 1002 10 , , , 42149 1002 11 generally generally RB 42149 1002 12 consisted consist VBD 42149 1002 13 of of IN 42149 1002 14 1 1 CD 42149 1002 15 Foreman Foreman NNP 42149 1002 16 , , , 42149 1002 17 at at IN 42149 1002 18 $ $ $ 42149 1002 19 3.50 3.50 CD 42149 1002 20 per per IN 42149 1002 21 day day NN 42149 1002 22 , , , 42149 1002 23 and and CC 42149 1002 24 9 9 CD 42149 1002 25 laborers laborer NNS 42149 1002 26 , , , 42149 1002 27 at at IN 42149 1002 28 $ $ $ 42149 1002 29 1.75 1.75 CD 42149 1002 30 per per IN 42149 1002 31 day day NN 42149 1002 32 . . . 42149 1003 1 When when WRB 42149 1003 2 laying lay VBG 42149 1003 3 : : : 42149 1003 4 4 4 CD 42149 1003 5 men man NNS 42149 1003 6 were be VBD 42149 1003 7 laying lay VBG 42149 1003 8 , , , 42149 1003 9 2 2 CD 42149 1003 10 men man NNS 42149 1003 11 mixing mix VBG 42149 1003 12 and and CC 42149 1003 13 carrying carry VBG 42149 1003 14 mortar mortar NN 42149 1003 15 , , , 42149 1003 16 and and CC 42149 1003 17 3 3 CD 42149 1003 18 were be VBD 42149 1003 19 transporting transport VBG 42149 1003 20 material material NN 42149 1003 21 . . . 42149 1004 1 When when WRB 42149 1004 2 rodding rodde VBG 42149 1004 3 : : : 42149 1004 4 4 4 CD 42149 1004 5 men man NNS 42149 1004 6 were be VBD 42149 1004 7 rodding rodde VBG 42149 1004 8 , , , 42149 1004 9 2 2 CD 42149 1004 10 men man NNS 42149 1004 11 at at IN 42149 1004 12 adjacent adjacent JJ 42149 1004 13 manholes manhole NNS 42149 1004 14 were be VBD 42149 1004 15 connecting connect VBG 42149 1004 16 and and CC 42149 1004 17 disconnecting disconnect VBG 42149 1004 18 cutters cutter NNS 42149 1004 19 and and CC 42149 1004 20 mandrels mandrel NNS 42149 1004 21 , , , 42149 1004 22 1 1 CD 42149 1004 23 was be VBD 42149 1004 24 joining join VBG 42149 1004 25 up up RP 42149 1004 26 rods rod NNS 42149 1004 27 , , , 42149 1004 28 and and CC 42149 1004 29 2 2 CD 42149 1004 30 men man NNS 42149 1004 31 assisting assist VBG 42149 1004 32 generally generally RB 42149 1004 33 . . . 42149 1005 1 The the DT 42149 1005 2 cost cost NN 42149 1005 3 of of IN 42149 1005 4 this this DT 42149 1005 5 work work NN 42149 1005 6 is be VBZ 42149 1005 7 shown show VBN 42149 1005 8 in in IN 42149 1005 9 Table table NN 42149 1005 10 17 17 CD 42149 1005 11 . . . 42149 1006 1 Transportation Transportation NNP 42149 1006 2 and and CC 42149 1006 3 Disposal Disposal NNP 42149 1006 4 . . . 42149 1007 1 The the DT 42149 1007 2 track track NN 42149 1007 3 on on IN 42149 1007 4 the the DT 42149 1007 5 surface surface NN 42149 1007 6 and and CC 42149 1007 7 in in IN 42149 1007 8 the the DT 42149 1007 9 tunnels tunnel NNS 42149 1007 10 was be VBD 42149 1007 11 of of IN 42149 1007 12 20-lb 20-lb CD 42149 1007 13 . . . 42149 1008 1 rails rail NNS 42149 1008 2 on on IN 42149 1008 3 a a DT 42149 1008 4 2-ft 2-ft NN 42149 1008 5 . . . 42149 1008 6 gauge gauge NN 42149 1008 7 . . . 42149 1009 1 The the DT 42149 1009 2 excavation excavation NN 42149 1009 3 was be VBD 42149 1009 4 handled handle VBN 42149 1009 5 in in IN 42149 1009 6 scale scale NN 42149 1009 7 - - HYPH 42149 1009 8 boxes box NNS 42149 1009 9 carried carry VBN 42149 1009 10 on on IN 42149 1009 11 flat flat JJ 42149 1009 12 cars car NNS 42149 1009 13 , , , 42149 1009 14 and and CC 42149 1009 15 the the DT 42149 1009 16 concrete concrete NN 42149 1009 17 in in IN 42149 1009 18 1¼-cu 1¼-cu NNP 42149 1009 19 . . . 42149 1010 1 yd yd NNP 42149 1010 2 . . . 42149 1011 1 mining mining NN 42149 1011 2 cars car NNS 42149 1011 3 dumping dump VBG 42149 1011 4 either either CC 42149 1011 5 at at IN 42149 1011 6 the the DT 42149 1011 7 side side NN 42149 1011 8 or or CC 42149 1011 9 end end NN 42149 1011 10 . . . 42149 1012 1 TABLE table NN 42149 1012 2 17.--COST 17.--cost CD 42149 1012 3 OF of IN 42149 1012 4 CONDUIT CONDUIT NNP 42149 1012 5 WORK WORK NNP 42149 1012 6 . . . 42149 1013 1 = = NFP 42149 1013 2 = = NFP 42149 1013 3 = = SYM 42149 1013 4 = = SYM 42149 1013 5 = = SYM 42149 1013 6 = = SYM 42149 1013 7 = = SYM 42149 1013 8 = = SYM 42149 1013 9 = = SYM 42149 1013 10 = = SYM 42149 1013 11 = = SYM 42149 1013 12 = = SYM 42149 1013 13 = = SYM 42149 1013 14 = = SYM 42149 1013 15 = = SYM 42149 1013 16 = = SYM 42149 1013 17 = = SYM 42149 1013 18 = = SYM 42149 1013 19 = = SYM 42149 1013 20 = = SYM 42149 1013 21 = = SYM 42149 1013 22 = = SYM 42149 1013 23 = = SYM 42149 1013 24 = = SYM 42149 1013 25 = = SYM 42149 1013 26 = = SYM 42149 1013 27 = = SYM 42149 1013 28 = = SYM 42149 1013 29 = = SYM 42149 1013 30 = = SYM 42149 1013 31 = = SYM 42149 1013 32 = = SYM 42149 1013 33 = = SYM 42149 1013 34 = = SYM 42149 1013 35 = = SYM 42149 1013 36 = = SYM 42149 1013 37 = = SYM 42149 1013 38 = = SYM 42149 1013 39 = = SYM 42149 1013 40 = = NFP 42149 1013 41 = = SYM 42149 1013 42 + + SYM 42149 1013 43 = = SYM 42149 1013 44 = = SYM 42149 1013 45 = = SYM 42149 1013 46 = = SYM 42149 1013 47 = = SYM 42149 1013 48 = = SYM 42149 1013 49 = = SYM 42149 1013 50 = = SYM 42149 1013 51 = = NFP 42149 1013 52 = = SYM 42149 1013 53 + + SYM 42149 1013 54 = = SYM 42149 1013 55 = = SYM 42149 1013 56 = = SYM 42149 1013 57 = = SYM 42149 1013 58 = = SYM 42149 1013 59 = = SYM 42149 1013 60 = = SYM 42149 1013 61 = = SYM 42149 1013 62 = = NFP 42149 1013 63 = = SYM 42149 1013 64 + + SYM 42149 1013 65 = = SYM 42149 1013 66 = = SYM 42149 1013 67 = = SYM 42149 1013 68 = = SYM 42149 1013 69 = = SYM 42149 1013 70 = = NFP 42149 1013 71 = = SYM 42149 1013 72 |Manhattan.|Weehawken.| |Manhattan.|Weehawken.| NNP 42149 1013 73 Total Total NNP 42149 1013 74 . . . 42149 1014 1 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- NFP 42149 1014 2 Duct duct NN 42149 1014 3 feet foot NNS 42149 1014 4 | | CD 42149 1014 5 115,962 115,962 CD 42149 1014 6 | | CD 42149 1014 7 35,155 35,155 CD 42149 1014 8 |151,117 |151,117 CD 42149 1014 9 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- : 42149 1014 10 Average average JJ 42149 1014 11 Cost cost NN 42149 1014 12 per per IN 42149 1014 13 Duct Duct NNP 42149 1014 14 Foot Foot NNP 42149 1014 15 . . . 42149 1015 1 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- : 42149 1015 2 Labor labor NN 42149 1015 3 | | NNP 42149 1015 4 $ $ $ 42149 1015 5 0.035 0.035 CD 42149 1015 6 | | CD 42149 1015 7 $ $ $ 42149 1015 8 0.032 0.032 CD 42149 1015 9 | | CD 42149 1015 10 $ $ $ 42149 1015 11 0.034 0.034 CD 42149 1015 12 Material material NN 42149 1015 13 | | CD 42149 1015 14 0.043 0.043 CD 42149 1015 15 | | CD 42149 1015 16 0.052 0.052 CD 42149 1015 17 | | CD 42149 1015 18 0.045 0.045 CD 42149 1015 19 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- NFP 42149 1015 20 Total total JJ 42149 1015 21 field field NN 42149 1015 22 charges charge NNS 42149 1015 23 | | CD 42149 1015 24 0.078 0.078 CD 42149 1015 25 | | CD 42149 1015 26 0.084 0.084 CD 42149 1015 27 | | CD 42149 1015 28 0.079 0.079 CD 42149 1015 29 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- : 42149 1015 30 Chief chief JJ 42149 1015 31 office office NN 42149 1015 32 and and CC 42149 1015 33 plant plant NN 42149 1015 34 depreciation depreciation NN 42149 1015 35 | | NNP 42149 1015 36 0.005 0.005 CD 42149 1015 37 | | CD 42149 1015 38 0.008 0.008 CD 42149 1015 39 | | CD 42149 1015 40 0.006 0.006 CD 42149 1015 41 -----------------------------------------+----------+----------+------- -----------------------------------------+----------+----------+------- : 42149 1015 42 Total total JJ 42149 1015 43 average average JJ 42149 1015 44 cost cost NN 42149 1015 45 | | CD 42149 1015 46 $ $ $ 42149 1015 47 0.083 0.083 CD 42149 1015 48 | | CD 42149 1015 49 $ $ $ 42149 1015 50 0.092 0.092 CD 42149 1015 51 | | CD 42149 1015 52 $ $ $ 42149 1015 53 0.085 0.085 CD 42149 1015 54 = = SYM 42149 1015 55 = = SYM 42149 1015 56 = = SYM 42149 1015 57 = = SYM 42149 1015 58 = = SYM 42149 1015 59 = = SYM 42149 1015 60 = = SYM 42149 1015 61 = = SYM 42149 1015 62 = = SYM 42149 1015 63 = = SYM 42149 1015 64 = = SYM 42149 1015 65 = = SYM 42149 1015 66 = = SYM 42149 1015 67 = = SYM 42149 1015 68 = = SYM 42149 1015 69 = = SYM 42149 1015 70 = = SYM 42149 1015 71 = = SYM 42149 1015 72 = = SYM 42149 1015 73 = = SYM 42149 1015 74 = = SYM 42149 1015 75 = = SYM 42149 1015 76 = = SYM 42149 1015 77 = = SYM 42149 1015 78 = = SYM 42149 1015 79 = = SYM 42149 1015 80 = = SYM 42149 1015 81 = = SYM 42149 1015 82 = = SYM 42149 1015 83 = = SYM 42149 1015 84 = = SYM 42149 1015 85 = = SYM 42149 1015 86 = = SYM 42149 1015 87 = = SYM 42149 1015 88 = = SYM 42149 1015 89 = = SYM 42149 1015 90 = = SYM 42149 1015 91 = = SYM 42149 1015 92 = = SYM 42149 1015 93 = = NFP 42149 1015 94 = = SYM 42149 1015 95 + + SYM 42149 1015 96 = = SYM 42149 1015 97 = = SYM 42149 1015 98 = = SYM 42149 1015 99 = = SYM 42149 1015 100 = = SYM 42149 1015 101 = = SYM 42149 1015 102 = = SYM 42149 1015 103 = = SYM 42149 1015 104 = = NFP 42149 1015 105 = = SYM 42149 1015 106 + + SYM 42149 1015 107 = = SYM 42149 1015 108 = = SYM 42149 1015 109 = = SYM 42149 1015 110 = = SYM 42149 1015 111 = = SYM 42149 1015 112 = = SYM 42149 1015 113 = = SYM 42149 1015 114 = = SYM 42149 1015 115 = = NFP 42149 1015 116 = = SYM 42149 1015 117 + + SYM 42149 1015 118 = = SYM 42149 1015 119 = = SYM 42149 1015 120 = = SYM 42149 1015 121 = = SYM 42149 1015 122 = = NFP 42149 1015 123 = = NFP 42149 1015 124 = = NFP 42149 1015 125 When when WRB 42149 1015 126 the the DT 42149 1015 127 haulage haulage NN 42149 1015 128 was be VBD 42149 1015 129 up up RB 42149 1015 130 grade grade NN 42149 1015 131 , , , 42149 1015 132 6 6 CD 42149 1015 133 by by IN 42149 1015 134 6-in 6-in CD 42149 1015 135 . . . 42149 1016 1 Lidgerwood lidgerwood NN 42149 1016 2 hoisting hoisting NN 42149 1016 3 engines engine NNS 42149 1016 4 , , , 42149 1016 5 with with IN 42149 1016 6 10-in 10-in CD 42149 1016 7 . . . 42149 1017 1 single single JJ 42149 1017 2 friction friction NN 42149 1017 3 drums drum VBZ 42149 1017 4 , , , 42149 1017 5 and and CC 42149 1017 6 driven drive VBN 42149 1017 7 by by IN 42149 1017 8 compressed compress VBN 42149 1017 9 air air NN 42149 1017 10 from from IN 42149 1017 11 the the DT 42149 1017 12 high high JJ 42149 1017 13 - - HYPH 42149 1017 14 pressure pressure NN 42149 1017 15 lines line NNS 42149 1017 16 , , , 42149 1017 17 were be VBD 42149 1017 18 used use VBN 42149 1017 19 . . . 42149 1018 1 Down down IN 42149 1018 2 grade grade NN 42149 1018 3 , , , 42149 1018 4 cars car NNS 42149 1018 5 were be VBD 42149 1018 6 moved move VBN 42149 1018 7 and and CC 42149 1018 8 controlled control VBN 42149 1018 9 by by IN 42149 1018 10 hand hand NN 42149 1018 11 . . . 42149 1019 1 The the DT 42149 1019 2 muck muck NN 42149 1019 3 which which WDT 42149 1019 4 came come VBD 42149 1019 5 through through IN 42149 1019 6 the the DT 42149 1019 7 shaft shaft NN 42149 1019 8 at at IN 42149 1019 9 Manhattan Manhattan NNP 42149 1019 10 was be VBD 42149 1019 11 dumped dump VBN 42149 1019 12 into into IN 42149 1019 13 hopper hopper NN 42149 1019 14 bins bin NNS 42149 1019 15 on on IN 42149 1019 16 the the DT 42149 1019 17 surface surface NN 42149 1019 18 and and CC 42149 1019 19 thence thence NN 42149 1019 20 loaded load VBD 42149 1019 21 into into IN 42149 1019 22 trucks truck NNS 42149 1019 23 at at IN 42149 1019 24 convenience convenience NN 42149 1019 25 . . . 42149 1020 1 At at IN 42149 1020 2 the the DT 42149 1020 3 open open JJ 42149 1020 4 cut cut NN 42149 1020 5 , , , 42149 1020 6 the the DT 42149 1020 7 muck muck NN 42149 1020 8 was be VBD 42149 1020 9 dumped dump VBN 42149 1020 10 into into IN 42149 1020 11 trucks truck NNS 42149 1020 12 direct direct JJ 42149 1020 13 . . . 42149 1021 1 The the DT 42149 1021 2 trucking trucking NN 42149 1021 3 was be VBD 42149 1021 4 sublet sublet NN 42149 1021 5 by by IN 42149 1021 6 the the DT 42149 1021 7 contractor contractor NN 42149 1021 8 to to IN 42149 1021 9 a a DT 42149 1021 10 sub sub NN 42149 1021 11 - - NN 42149 1021 12 contractor contractor NN 42149 1021 13 , , , 42149 1021 14 who who WP 42149 1021 15 provided provide VBD 42149 1021 16 trucks truck NNS 42149 1021 17 , , , 42149 1021 18 teams team NNS 42149 1021 19 , , , 42149 1021 20 and and CC 42149 1021 21 trimmers trimmer NNS 42149 1021 22 at at IN 42149 1021 23 the the DT 42149 1021 24 pier pier NN 42149 1021 25 . . . 42149 1022 1 At at IN 42149 1022 2 Weehawken Weehawken NNP 42149 1022 3 , , , 42149 1022 4 arrangements arrangement NNS 42149 1022 5 were be VBD 42149 1022 6 made make VBN 42149 1022 7 with with IN 42149 1022 8 the the DT 42149 1022 9 Erie Erie NNP 42149 1022 10 Railroad Railroad NNP 42149 1022 11 which which WDT 42149 1022 12 undertook undertake VBD 42149 1022 13 to to TO 42149 1022 14 take take VB 42149 1022 15 muck muck NNP 42149 1022 16 which which WDT 42149 1022 17 was be VBD 42149 1022 18 needed need VBN 42149 1022 19 as as IN 42149 1022 20 fill fill NN 42149 1022 21 . . . 42149 1023 1 The the DT 42149 1023 2 tunnel tunnel NN 42149 1023 3 cars car NNS 42149 1023 4 , , , 42149 1023 5 therefore therefore RB 42149 1023 6 , , , 42149 1023 7 were be VBD 42149 1023 8 dumped dump VBN 42149 1023 9 directly directly RB 42149 1023 10 on on IN 42149 1023 11 flat flat JJ 42149 1023 12 cars car NNS 42149 1023 13 which which WDT 42149 1023 14 were be VBD 42149 1023 15 brought bring VBN 42149 1023 16 up up RP 42149 1023 17 to to IN 42149 1023 18 a a DT 42149 1023 19 roughly roughly RB 42149 1023 20 made make VBN 42149 1023 21 platform platform NN 42149 1023 22 near near IN 42149 1023 23 the the DT 42149 1023 24 shaft shaft NN 42149 1023 25 . . . 42149 1024 1 The the DT 42149 1024 2 hoisting hoisting NN 42149 1024 3 at at IN 42149 1024 4 Manhattan Manhattan NNP 42149 1024 5 was be VBD 42149 1024 6 by by IN 42149 1024 7 derrick derrick NN 42149 1024 8 at at IN 42149 1024 9 Tenth Tenth NNP 42149 1024 10 Avenue Avenue NNP 42149 1024 11 and and CC 42149 1024 12 the the DT 42149 1024 13 open open JJ 42149 1024 14 cut cut NN 42149 1024 15 , , , 42149 1024 16 and and CC 42149 1024 17 by by IN 42149 1024 18 the the DT 42149 1024 19 elevator elevator NN 42149 1024 20 at at IN 42149 1024 21 the the DT 42149 1024 22 Manhattan Manhattan NNP 42149 1024 23 Shaft Shaft NNP 42149 1024 24 . . . 42149 1025 1 At at IN 42149 1025 2 Weehawken Weehawken NNP 42149 1025 3 , , , 42149 1025 4 all all DT 42149 1025 5 hoisting hoist VBG 42149 1025 6 was be VBD 42149 1025 7 done do VBN 42149 1025 8 by by IN 42149 1025 9 the the DT 42149 1025 10 elevator elevator NN 42149 1025 11 in in IN 42149 1025 12 the the DT 42149 1025 13 shaft shaft NN 42149 1025 14 . . . 42149 1026 1 The the DT 42149 1026 2 sand sand NN 42149 1026 3 and and CC 42149 1026 4 stone stone NN 42149 1026 5 were be VBD 42149 1026 6 received receive VBN 42149 1026 7 at at IN 42149 1026 8 the the DT 42149 1026 9 wharves wharf NNS 42149 1026 10 by by IN 42149 1026 11 scows scow NNS 42149 1026 12 . . . 42149 1027 1 At at IN 42149 1027 2 Manhattan Manhattan NNP 42149 1027 3 , , , 42149 1027 4 these these DT 42149 1027 5 materials material NNS 42149 1027 6 were be VBD 42149 1027 7 unloaded unload VBN 42149 1027 8 on on IN 42149 1027 9 trucks truck NNS 42149 1027 10 by by IN 42149 1027 11 an an DT 42149 1027 12 overhead overhead JJ 42149 1027 13 traveler traveler NN 42149 1027 14 , , , 42149 1027 15 and and CC 42149 1027 16 teamed team VBD 42149 1027 17 to to IN 42149 1027 18 the the DT 42149 1027 19 shaft shaft NN 42149 1027 20 , , , 42149 1027 21 where where WRB 42149 1027 22 they -PRON- PRP 42149 1027 23 were be VBD 42149 1027 24 unloaded unload VBN 42149 1027 25 by by IN 42149 1027 26 derricks derrick NNS 42149 1027 27 into into IN 42149 1027 28 the the DT 42149 1027 29 bins bin NNS 42149 1027 30 . . . 42149 1028 1 At at IN 42149 1028 2 Weehawken Weehawken NNP 42149 1028 3 , , , 42149 1028 4 they -PRON- PRP 42149 1028 5 were be VBD 42149 1028 6 unloaded unload VBN 42149 1028 7 by by IN 42149 1028 8 an an DT 42149 1028 9 orange orange NN 42149 1028 10 - - HYPH 42149 1028 11 peel peel NN 42149 1028 12 grab grab NN 42149 1028 13 bucket bucket NN 42149 1028 14 , , , 42149 1028 15 loaded load VBD 42149 1028 16 into into IN 42149 1028 17 cars car NNS 42149 1028 18 on on IN 42149 1028 19 the the DT 42149 1028 20 overhead overhead JJ 42149 1028 21 trestle trestle NN 42149 1028 22 , , , 42149 1028 23 transported transport VBN 42149 1028 24 in in IN 42149 1028 25 these these DT 42149 1028 26 to to IN 42149 1028 27 the the DT 42149 1028 28 top top NN 42149 1028 29 of of IN 42149 1028 30 the the DT 42149 1028 31 shaft shaft NN 42149 1028 32 , , , 42149 1028 33 and and CC 42149 1028 34 discharged discharge VBN 42149 1028 35 into into IN 42149 1028 36 the the DT 42149 1028 37 bins bin NNS 42149 1028 38 . . . 42149 1029 1 The the DT 42149 1029 2 cement cement NN 42149 1029 3 at at IN 42149 1029 4 Manhattan Manhattan NNP 42149 1029 5 was be VBD 42149 1029 6 trucked truck VBN 42149 1029 7 from from IN 42149 1029 8 the the DT 42149 1029 9 Company Company NNP 42149 1029 10 's 's POS 42149 1029 11 warehouse warehouse NN 42149 1029 12 , , , 42149 1029 13 at at IN 42149 1029 14 Eleventh Eleventh NNP 42149 1029 15 Avenue Avenue NNP 42149 1029 16 and and CC 42149 1029 17 38th 38th NNP 42149 1029 18 Street Street NNP 42149 1029 19 , , , 42149 1029 20 to to IN 42149 1029 21 the the DT 42149 1029 22 shaft shaft NN 42149 1029 23 , , , 42149 1029 24 where where WRB 42149 1029 25 it -PRON- PRP 42149 1029 26 was be VBD 42149 1029 27 put put VBN 42149 1029 28 into into IN 42149 1029 29 a a DT 42149 1029 30 supplementary supplementary JJ 42149 1029 31 storage storage NN 42149 1029 32 shed shed VBN 42149 1029 33 at at IN 42149 1029 34 the the DT 42149 1029 35 top top NN 42149 1029 36 of of IN 42149 1029 37 the the DT 42149 1029 38 shaft shaft NN 42149 1029 39 , , , 42149 1029 40 whence whence UH 42149 1029 41 it -PRON- PRP 42149 1029 42 was be VBD 42149 1029 43 removed remove VBN 42149 1029 44 to to IN 42149 1029 45 the the DT 42149 1029 46 mixer mixer NN 42149 1029 47 by by IN 42149 1029 48 the the DT 42149 1029 49 elevator elevator NN 42149 1029 50 when when WRB 42149 1029 51 needed need VBN 42149 1029 52 . . . 42149 1030 1 At at IN 42149 1030 2 Weehawken Weehawken NNP 42149 1030 3 , , , 42149 1030 4 it -PRON- PRP 42149 1030 5 was be VBD 42149 1030 6 taken take VBN 42149 1030 7 on on IN 42149 1030 8 flat flat JJ 42149 1030 9 cars car NNS 42149 1030 10 directly directly RB 42149 1030 11 from from IN 42149 1030 12 the the DT 42149 1030 13 warehouse warehouse NN 42149 1030 14 to to IN 42149 1030 15 the the DT 42149 1030 16 mixer mixer NN 42149 1030 17 . . . 42149 1031 1 Lighting lighting NN 42149 1031 2 . . . 42149 1032 1 Temporarily temporarily RB 42149 1032 2 and and CC 42149 1032 3 for for IN 42149 1032 4 a a DT 42149 1032 5 short short JJ 42149 1032 6 time time NN 42149 1032 7 at at IN 42149 1032 8 the the DT 42149 1032 9 start start NN 42149 1032 10 , , , 42149 1032 11 kerosene kerosene JJ 42149 1032 12 flares flare NNS 42149 1032 13 were be VBD 42149 1032 14 used use VBN 42149 1032 15 for for IN 42149 1032 16 light light NN 42149 1032 17 until until IN 42149 1032 18 replaced replace VBN 42149 1032 19 by by IN 42149 1032 20 electric electric JJ 42149 1032 21 lights light NNS 42149 1032 22 , , , 42149 1032 23 the the DT 42149 1032 24 current current NN 42149 1032 25 for for IN 42149 1032 26 which which WDT 42149 1032 27 was be VBD 42149 1032 28 furnished furnish VBN 42149 1032 29 by by IN 42149 1032 30 the the DT 42149 1032 31 contractor contractor NN 42149 1032 32 's 's POS 42149 1032 33 generators generator NNS 42149 1032 34 , , , 42149 1032 35 which which WDT 42149 1032 36 have have VBP 42149 1032 37 been be VBN 42149 1032 38 described describe VBN 42149 1032 39 under under IN 42149 1032 40 the the DT 42149 1032 41 head head NN 42149 1032 42 of of IN 42149 1032 43 " " `` 42149 1032 44 Power Power NNP 42149 1032 45 Plant Plant NNP 42149 1032 46 . . . 42149 1032 47 " " '' 42149 1033 1 The the DT 42149 1033 2 lamps lamp NNS 42149 1033 3 used use VBN 42149 1033 4 along along IN 42149 1033 5 the the DT 42149 1033 6 track track NN 42149 1033 7 were be VBD 42149 1033 8 of of IN 42149 1033 9 16 16 CD 42149 1033 10 c.p c.p NNP 42149 1033 11 . . NNP 42149 1033 12 , , , 42149 1033 13 and and CC 42149 1033 14 were be VBD 42149 1033 15 protected protect VBN 42149 1033 16 by by IN 42149 1033 17 wire wire NN 42149 1033 18 screens screen NNS 42149 1033 19 ; ; : 42149 1033 20 these these DT 42149 1033 21 were be VBD 42149 1033 22 single single JJ 42149 1033 23 , , , 42149 1033 24 but but CC 42149 1033 25 , , , 42149 1033 26 wherever wherever WRB 42149 1033 27 work work NN 42149 1033 28 was be VBD 42149 1033 29 going go VBG 42149 1033 30 on on RP 42149 1033 31 , , , 42149 1033 32 groups group NNS 42149 1033 33 of of IN 42149 1033 34 four four CD 42149 1033 35 or or CC 42149 1033 36 five five CD 42149 1033 37 , , , 42149 1033 38 provided provide VBN 42149 1033 39 with with IN 42149 1033 40 reflectors reflector NNS 42149 1033 41 , , , 42149 1033 42 were be VBD 42149 1033 43 used use VBN 42149 1033 44 . . . 42149 1034 1 Pumping pumping NN 42149 1034 2 . . . 42149 1035 1 Two two CD 42149 1035 2 pumps pump NNS 42149 1035 3 were be VBD 42149 1035 4 installed instal VBN 42149 1035 5 at at IN 42149 1035 6 the the DT 42149 1035 7 Manhattan Manhattan NNP 42149 1035 8 Shaft Shaft NNP 42149 1035 9 . . . 42149 1036 1 They -PRON- PRP 42149 1036 2 had have VBD 42149 1036 3 to to TO 42149 1036 4 handle handle VB 42149 1036 5 the the DT 42149 1036 6 water water NN 42149 1036 7 , , , 42149 1036 8 not not RB 42149 1036 9 only only RB 42149 1036 10 from from IN 42149 1036 11 the the DT 42149 1036 12 rock rock NN 42149 1036 13 tunnels tunnel NNS 42149 1036 14 , , , 42149 1036 15 but but CC 42149 1036 16 also also RB 42149 1036 17 from from IN 42149 1036 18 those those DT 42149 1036 19 under under IN 42149 1036 20 the the DT 42149 1036 21 river river NN 42149 1036 22 . . . 42149 1037 1 One one CD 42149 1037 2 was be VBD 42149 1037 3 a a DT 42149 1037 4 Deane Deane NNP 42149 1037 5 compound compound NN 42149 1037 6 duplex duplex NN 42149 1037 7 pump pump NN 42149 1037 8 , , , 42149 1037 9 having have VBG 42149 1037 10 a a DT 42149 1037 11 capacity capacity NN 42149 1037 12 of of IN 42149 1037 13 500 500 CD 42149 1037 14 gal gal NN 42149 1037 15 . . . 42149 1038 1 per per IN 42149 1038 2 min min NNP 42149 1038 3 . . NNP 42149 1038 4 , , , 42149 1038 5 the the DT 42149 1038 6 other other JJ 42149 1038 7 , , , 42149 1038 8 a a DT 42149 1038 9 Blake Blake NNP 42149 1038 10 pump pump NN 42149 1038 11 , , , 42149 1038 12 of of IN 42149 1038 13 150 150 CD 42149 1038 14 gal gal NN 42149 1038 15 . . . 42149 1039 1 per per IN 42149 1039 2 min min NNP 42149 1039 3 . . . 42149 1040 1 They -PRON- PRP 42149 1040 2 were be VBD 42149 1040 3 first first RB 42149 1040 4 driven drive VBN 42149 1040 5 by by IN 42149 1040 6 steam steam NN 42149 1040 7 direct direct JJ 42149 1040 8 from from IN 42149 1040 9 the the DT 42149 1040 10 power power NN 42149 1040 11 - - HYPH 42149 1040 12 house house NN 42149 1040 13 , , , 42149 1040 14 but but CC 42149 1040 15 compressed compress VBN 42149 1040 16 air air NN 42149 1040 17 was be VBD 42149 1040 18 used use VBN 42149 1040 19 later later RB 42149 1040 20 . . . 42149 1041 1 When when WRB 42149 1041 2 the the DT 42149 1041 3 power power NN 42149 1041 4 - - HYPH 42149 1041 5 house house NN 42149 1041 6 was be VBD 42149 1041 7 shut shut VBN 42149 1041 8 down down RP 42149 1041 9 , , , 42149 1041 10 an an DT 42149 1041 11 electrically electrically RB 42149 1041 12 - - HYPH 42149 1041 13 driven drive VBN 42149 1041 14 centrifugal centrifugal JJ 42149 1041 15 pump pump NN 42149 1041 16 was be VBD 42149 1041 17 used use VBN 42149 1041 18 . . . 42149 1042 1 This this DT 42149 1042 2 was be VBD 42149 1042 3 driven drive VBN 42149 1042 4 by by IN 42149 1042 5 a a DT 42149 1042 6 General General NNP 42149 1042 7 Electric Electric NNP 42149 1042 8 shunt shunt NN 42149 1042 9 - - HYPH 42149 1042 10 wound wind VBN 42149 1042 11 motor motor NN 42149 1042 12 , , , 42149 1042 13 Type Type NNP 42149 1042 14 C-07½ C-07½ NNP 42149 1042 15 , , , 42149 1042 16 with with IN 42149 1042 17 a a DT 42149 1042 18 speed speed NN 42149 1042 19 of of IN 42149 1042 20 1,250 1,250 CD 42149 1042 21 rev rev NNP 42149 1042 22 . . . 42149 1043 1 per per IN 42149 1043 2 min min NNP 42149 1043 3 . . . 42149 1044 1 at at IN 42149 1044 2 250 250 CD 42149 1044 3 volts volt NNS 42149 1044 4 and and CC 42149 1044 5 37.5 37.5 CD 42149 1044 6 amperes ampere NNS 42149 1044 7 ( ( -LRB- 42149 1044 8 10 10 CD 42149 1044 9 h.p h.p NNP 42149 1044 10 . . NNP 42149 1044 11 ) ) -RRB- 42149 1045 1 when when WRB 42149 1045 2 open open JJ 42149 1045 3 , , , 42149 1045 4 and and CC 42149 1045 5 22.9 22.9 CD 42149 1045 6 amperes ampere NNS 42149 1045 7 ( ( -LRB- 42149 1045 8 6 6 CD 42149 1045 9 h.p h.p NNP 42149 1045 10 . . . 42149 1045 11 ) ) -RRB- 42149 1046 1 when when WRB 42149 1046 2 closed close VBN 42149 1046 3 , , , 42149 1046 4 and and CC 42149 1046 5 had have VBD 42149 1046 6 a a DT 42149 1046 7 capacity capacity NN 42149 1046 8 of of IN 42149 1046 9 450 450 CD 42149 1046 10 gal gal NN 42149 1046 11 . . . 42149 1047 1 per per IN 42149 1047 2 min min NNP 42149 1047 3 . . . 42149 1048 1 To to TO 42149 1048 2 send send VB 42149 1048 3 the the DT 42149 1048 4 water water NN 42149 1048 5 to to IN 42149 1048 6 the the DT 42149 1048 7 shaft shaft NN 42149 1048 8 sump sump NN 42149 1048 9 during during IN 42149 1048 10 the the DT 42149 1048 11 construction construction NN 42149 1048 12 , , , 42149 1048 13 small small JJ 42149 1048 14 compressed compressed JJ 42149 1048 15 - - HYPH 42149 1048 16 air air NN 42149 1048 17 Cameron Cameron NNP 42149 1048 18 pumps pump NNS 42149 1048 19 , , , 42149 1048 20 of of IN 42149 1048 21 about about RB 42149 1048 22 140 140 CD 42149 1048 23 gal gal NN 42149 1048 24 . . . 42149 1049 1 per per IN 42149 1049 2 min min NNP 42149 1049 3 . . NNP 42149 1049 4 , , , 42149 1049 5 were be VBD 42149 1049 6 used use VBN 42149 1049 7 . . . 42149 1050 1 At at IN 42149 1050 2 the the DT 42149 1050 3 Weehawken Weehawken NNP 42149 1050 4 shaft shaft NN 42149 1050 5 two two CD 42149 1050 6 pumps pump NNS 42149 1050 7 were be VBD 42149 1050 8 used use VBN 42149 1050 9 ; ; : 42149 1050 10 these these DT 42149 1050 11 dealt deal VBD 42149 1050 12 with with IN 42149 1050 13 the the DT 42149 1050 14 water water NN 42149 1050 15 from from IN 42149 1050 16 the the DT 42149 1050 17 Bergen Bergen NNP 42149 1050 18 Hill Hill NNP 42149 1050 19 Tunnels Tunnels NNP 42149 1050 20 as as RB 42149 1050 21 well well RB 42149 1050 22 as as IN 42149 1050 23 that that DT 42149 1050 24 from from IN 42149 1050 25 the the DT 42149 1050 26 Weehawken Weehawken NNP 42149 1050 27 Tunnels Tunnels NNPS 42149 1050 28 . . . 42149 1051 1 At at IN 42149 1051 2 first first RB 42149 1051 3 a a DT 42149 1051 4 Worthington Worthington NNP 42149 1051 5 duplex duplex NN 42149 1051 6 pump pump NN 42149 1051 7 having have VBG 42149 1051 8 a a DT 42149 1051 9 capacity capacity NN 42149 1051 10 of of IN 42149 1051 11 about about RB 42149 1051 12 500 500 CD 42149 1051 13 gal gal NN 42149 1051 14 . . . 42149 1052 1 per per IN 42149 1052 2 min min NNP 42149 1052 3 . . . 42149 1053 1 was be VBD 42149 1053 2 used use VBN 42149 1053 3 . . . 42149 1054 1 Later later RBR 42149 1054 2 , , , 42149 1054 3 this this DT 42149 1054 4 was be VBD 42149 1054 5 replaced replace VBN 42149 1054 6 by by IN 42149 1054 7 a a DT 42149 1054 8 General General NNP 42149 1054 9 Electric Electric NNP 42149 1054 10 shunt shunt NN 42149 1054 11 - - HYPH 42149 1054 12 wound wind VBN 42149 1054 13 motor motor NN 42149 1054 14 , , , 42149 1054 15 Type Type NNP 42149 1054 16 O-15 o-15 CD 42149 1054 17 , , , 42149 1054 18 with with IN 42149 1054 19 a a DT 42149 1054 20 speed speed NN 42149 1054 21 of of IN 42149 1054 22 925 925 CD 42149 1054 23 rev rev NNP 42149 1054 24 . . . 42149 1055 1 per per IN 42149 1055 2 min min NNP 42149 1055 3 . . . 42149 1056 1 at at IN 42149 1056 2 230 230 CD 42149 1056 3 volts volt NNS 42149 1056 4 and and CC 42149 1056 5 74 74 CD 42149 1056 6 amperes ampere NNS 42149 1056 7 ( ( -LRB- 42149 1056 8 20 20 CD 42149 1056 9 h.p h.p NNP 42149 1056 10 . . . 42149 1056 11 ) ) -RRB- 42149 1057 1 when when WRB 42149 1057 2 open open JJ 42149 1057 3 , , , 42149 1057 4 and and CC 42149 1057 5 38.5 38.5 CD 42149 1057 6 amperes ampere NNS 42149 1057 7 ( ( -LRB- 42149 1057 8 10 10 CD 42149 1057 9 h.p h.p NNP 42149 1057 10 . . NNP 42149 1057 11 ) ) -RRB- 42149 1058 1 when when WRB 42149 1058 2 closed close VBN 42149 1058 3 . . . 42149 1059 1 Its -PRON- PRP$ 42149 1059 2 capacity capacity NN 42149 1059 3 was be VBD 42149 1059 4 240 240 CD 42149 1059 5 gal gal NN 42149 1059 6 . . . 42149 1060 1 per per IN 42149 1060 2 min min NNP 42149 1060 3 . . . 42149 1061 1 During during IN 42149 1061 2 the the DT 42149 1061 3 progress progress NN 42149 1061 4 of of IN 42149 1061 5 the the DT 42149 1061 6 construction construction NN 42149 1061 7 , , , 42149 1061 8 the the DT 42149 1061 9 water water NN 42149 1061 10 was be VBD 42149 1061 11 pumped pump VBN 42149 1061 12 from from IN 42149 1061 13 the the DT 42149 1061 14 working work VBG 42149 1061 15 face face NN 42149 1061 16 to to IN 42149 1061 17 the the DT 42149 1061 18 shaft shaft NN 42149 1061 19 by by IN 42149 1061 20 small small JJ 42149 1061 21 Cameron Cameron NNP 42149 1061 22 pumps pump NNS 42149 1061 23 similar similar JJ 42149 1061 24 to to IN 42149 1061 25 those those DT 42149 1061 26 used use VBN 42149 1061 27 at at IN 42149 1061 28 Manhattan Manhattan NNP 42149 1061 29 . . . 42149 1062 1 When when WRB 42149 1062 2 the the DT 42149 1062 3 work work NN 42149 1062 4 was be VBD 42149 1062 5 finished finish VBN 42149 1062 6 , , , 42149 1062 7 a a DT 42149 1062 8 subgrade subgrade NN 42149 1062 9 reversed reverse VBN 42149 1062 10 - - HYPH 42149 1062 11 grade grade NN 42149 1062 12 drain drain NN 42149 1062 13 carried carry VBD 42149 1062 14 the the DT 42149 1062 15 water water NN 42149 1062 16 to to IN 42149 1062 17 the the DT 42149 1062 18 shaft shaft NN 42149 1062 19 sump sump NN 42149 1062 20 by by IN 42149 1062 21 gravity gravity NN 42149 1062 22 . . . 42149 1063 1 The the DT 42149 1063 2 work work NN 42149 1063 3 in in IN 42149 1063 4 the the DT 42149 1063 5 Manhattan Manhattan NNP 42149 1063 6 Land Land NNP 42149 1063 7 Tunnels Tunnels NNP 42149 1063 8 was be VBD 42149 1063 9 practically practically RB 42149 1063 10 finished finish VBN 42149 1063 11 by by IN 42149 1063 12 May May NNP 42149 1063 13 1st 1st NN 42149 1063 14 , , , 42149 1063 15 1908 1908 CD 42149 1063 16 , , , 42149 1063 17 though though IN 42149 1063 18 the the DT 42149 1063 19 ventilating ventilate VBG 42149 1063 20 arrangements arrangement NNS 42149 1063 21 and and CC 42149 1063 22 overhead overhead JJ 42149 1063 23 platform platform NN 42149 1063 24 in in IN 42149 1063 25 the the DT 42149 1063 26 intercepting intercept VBG 42149 1063 27 arch arch NN 42149 1063 28 were be VBD 42149 1063 29 not not RB 42149 1063 30 put put VBN 42149 1063 31 in in RP 42149 1063 32 until until IN 42149 1063 33 after after IN 42149 1063 34 the the DT 42149 1063 35 River River NNP 42149 1063 36 Tunnel Tunnel NNP 42149 1063 37 concrete concrete NN 42149 1063 38 was be VBD 42149 1063 39 completed complete VBN 42149 1063 40 , , , 42149 1063 41 so so IN 42149 1063 42 that that IN 42149 1063 43 the the DT 42149 1063 44 work work NN 42149 1063 45 was be VBD 42149 1063 46 not not RB 42149 1063 47 finished finish VBN 42149 1063 48 until until IN 42149 1063 49 September September NNP 42149 1063 50 , , , 42149 1063 51 1909 1909 CD 42149 1063 52 . . . 42149 1064 1 The the DT 42149 1064 2 Weehawken Weehawken NNP 42149 1064 3 Land Land NNP 42149 1064 4 Tunnels Tunnels NNPS 42149 1064 5 work work NN 42149 1064 6 was be VBD 42149 1064 7 finished finish VBN 42149 1064 8 in in IN 42149 1064 9 July July NNP 42149 1064 10 , , , 42149 1064 11 1907 1907 CD 42149 1064 12 , , , 42149 1064 13 but but CC 42149 1064 14 the the DT 42149 1064 15 benches bench NNS 42149 1064 16 and and CC 42149 1064 17 ventilating ventilate VBG 42149 1064 18 arrangements arrangement NNS 42149 1064 19 in in IN 42149 1064 20 the the DT 42149 1064 21 Weehawken Weehawken NNP 42149 1064 22 Shaft Shaft NNP 42149 1064 23 were be VBD 42149 1064 24 not not RB 42149 1064 25 put put VBN 42149 1064 26 in in RP 42149 1064 27 until until IN 42149 1064 28 after after IN 42149 1064 29 the the DT 42149 1064 30 completion completion NN 42149 1064 31 of of IN 42149 1064 32 the the DT 42149 1064 33 Bergen Bergen NNP 42149 1064 34 Hill Hill NNP 42149 1064 35 Tunnels Tunnels NNPS 42149 1064 36 , , , 42149 1064 37 and and CC 42149 1064 38 so so RB 42149 1064 39 were be VBD 42149 1064 40 not not RB 42149 1064 41 finished finish VBN 42149 1064 42 until until IN 42149 1064 43 August August NNP 42149 1064 44 , , , 42149 1064 45 1909 1909 CD 42149 1064 46 . . . 42149 1065 1 The the DT 42149 1065 2 reinforced reinforce VBN 42149 1065 3 concrete concrete JJ 42149 1065 4 wall wall NN 42149 1065 5 around around IN 42149 1065 6 the the DT 42149 1065 7 Weehawken Weehawken NNP 42149 1065 8 Shaft Shaft NNP 42149 1065 9 , , , 42149 1065 10 together together RB 42149 1065 11 with with IN 42149 1065 12 the the DT 42149 1065 13 stairs stair NNS 42149 1065 14 from from IN 42149 1065 15 the the DT 42149 1065 16 bench bench NN 42149 1065 17 level level NN 42149 1065 18 of of IN 42149 1065 19 the the DT 42149 1065 20 shaft shaft NN 42149 1065 21 to to IN 42149 1065 22 the the DT 42149 1065 23 surface surface NN 42149 1065 24 , , , 42149 1065 25 was be VBD 42149 1065 26 let let VBN 42149 1065 27 as as IN 42149 1065 28 a a DT 42149 1065 29 separate separate JJ 42149 1065 30 contract contract NN 42149 1065 31 ; ; : 42149 1065 32 the the DT 42149 1065 33 work work NN 42149 1065 34 was be VBD 42149 1065 35 started start VBN 42149 1065 36 on on IN 42149 1065 37 September September NNP 42149 1065 38 15th 15th NN 42149 1065 39 , , , 42149 1065 40 1909 1909 CD 42149 1065 41 , , , 42149 1065 42 and and CC 42149 1065 43 finished finish VBN 42149 1065 44 by by IN 42149 1065 45 the the DT 42149 1065 46 end end NN 42149 1065 47 of of IN 42149 1065 48 December December NNP 42149 1065 49 , , , 42149 1065 50 1909 1909 CD 42149 1065 51 . . . 42149 1066 1 RIVER river NN 42149 1066 2 TUNNELS TUNNELS NNP 42149 1066 3 . . . 42149 1067 1 The the DT 42149 1067 2 River River NNP 42149 1067 3 Tunnel Tunnel NNP 42149 1067 4 work work NN 42149 1067 5 , , , 42149 1067 6 from from IN 42149 1067 7 some some DT 42149 1067 8 points point NNS 42149 1067 9 of of IN 42149 1067 10 view view NN 42149 1067 11 , , , 42149 1067 12 has have VBZ 42149 1067 13 the the DT 42149 1067 14 most most JJS 42149 1067 15 interest interest NN 42149 1067 16 . . . 42149 1068 1 It -PRON- PRP 42149 1068 2 is be VBZ 42149 1068 3 interesting interesting JJ 42149 1068 4 because because IN 42149 1068 5 it -PRON- PRP 42149 1068 6 is be VBZ 42149 1068 7 the the DT 42149 1068 8 first first JJ 42149 1068 9 main main JJ 42149 1068 10 line line NN 42149 1068 11 crossing crossing NN 42149 1068 12 of of IN 42149 1068 13 the the DT 42149 1068 14 formidable formidable JJ 42149 1068 15 obstacle obstacle NN 42149 1068 16 of of IN 42149 1068 17 the the DT 42149 1068 18 Hudson Hudson NNP 42149 1068 19 River River NNP 42149 1068 20 , , , 42149 1068 21 and and CC 42149 1068 22 also also RB 42149 1068 23 by by IN 42149 1068 24 reason reason NN 42149 1068 25 of of IN 42149 1068 26 the the DT 42149 1068 27 long long JJ 42149 1068 28 and and CC 42149 1068 29 anxiously anxiously RB 42149 1068 30 discussed discuss VBN 42149 1068 31 point point NN 42149 1068 32 as as IN 42149 1068 33 to to IN 42149 1068 34 whether whether IN 42149 1068 35 , , , 42149 1068 36 in in IN 42149 1068 37 view view NN 42149 1068 38 of of IN 42149 1068 39 the the DT 42149 1068 40 preceding precede VBG 42149 1068 41 experiences experience NNS 42149 1068 42 and and CC 42149 1068 43 failures failure NNS 42149 1068 44 to to TO 42149 1068 45 construct construct VB 42149 1068 46 tunnels tunnel NNS 42149 1068 47 under under IN 42149 1068 48 that that DT 42149 1068 49 river river NN 42149 1068 50 , , , 42149 1068 51 foundations foundation NNS 42149 1068 52 were be VBD 42149 1068 53 needed need VBN 42149 1068 54 under under IN 42149 1068 55 these these DT 42149 1068 56 tunnels tunnel NNS 42149 1068 57 to to TO 42149 1068 58 keep keep VB 42149 1068 59 them -PRON- PRP 42149 1068 60 from from IN 42149 1068 61 changing change VBG 42149 1068 62 in in IN 42149 1068 63 elevation elevation NN 42149 1068 64 under under IN 42149 1068 65 the the DT 42149 1068 66 action action NN 42149 1068 67 of of IN 42149 1068 68 heavy heavy JJ 42149 1068 69 traffic traffic NN 42149 1068 70 . . . 42149 1069 1 The the DT 42149 1069 2 River River NNP 42149 1069 3 Tunnels Tunnels NNPS 42149 1069 4 here here RB 42149 1069 5 described describe VBN 42149 1069 6 start start NN 42149 1069 7 on on IN 42149 1069 8 the the DT 42149 1069 9 east east JJ 42149 1069 10 side side NN 42149 1069 11 of of IN 42149 1069 12 the the DT 42149 1069 13 shield shield NN 42149 1069 14 chambers chamber NNS 42149 1069 15 on on IN 42149 1069 16 the the DT 42149 1069 17 New New NNP 42149 1069 18 York York NNP 42149 1069 19 side side NN 42149 1069 20 and and CC 42149 1069 21 end end VBP 42149 1069 22 at at IN 42149 1069 23 the the DT 42149 1069 24 east east JJ 42149 1069 25 side side NN 42149 1069 26 of of IN 42149 1069 27 the the DT 42149 1069 28 shield shield NN 42149 1069 29 chambers chamber NNS 42149 1069 30 on on IN 42149 1069 31 the the DT 42149 1069 32 New New NNP 42149 1069 33 Jersey Jersey NNP 42149 1069 34 side side NN 42149 1069 35 . . . 42149 1070 1 They -PRON- PRP 42149 1070 2 thus thus RB 42149 1070 3 include include VBP 42149 1070 4 the the DT 42149 1070 5 New New NNP 42149 1070 6 York York NNP 42149 1070 7 and and CC 42149 1070 8 exclude exclude VB 42149 1070 9 the the DT 42149 1070 10 New New NNP 42149 1070 11 Jersey Jersey NNP 42149 1070 12 shield shield NN 42149 1070 13 chambers chamber NNS 42149 1070 14 , , , 42149 1070 15 the the DT 42149 1070 16 reason reason NN 42149 1070 17 for for IN 42149 1070 18 such such JJ 42149 1070 19 discrimination discrimination NN 42149 1070 20 being be VBG 42149 1070 21 that that IN 42149 1070 22 the the DT 42149 1070 23 New New NNP 42149 1070 24 York York NNP 42149 1070 25 shield shield NN 42149 1070 26 chambers chamber NNS 42149 1070 27 are be VBP 42149 1070 28 lined line VBN 42149 1070 29 with with IN 42149 1070 30 cast cast NN 42149 1070 31 iron iron NN 42149 1070 32 while while IN 42149 1070 33 those those DT 42149 1070 34 on on IN 42149 1070 35 the the DT 42149 1070 36 New New NNP 42149 1070 37 Jersey Jersey NNP 42149 1070 38 side side NN 42149 1070 39 are be VBP 42149 1070 40 of of IN 42149 1070 41 the the DT 42149 1070 42 typical typical JJ 42149 1070 43 rock rock NN 42149 1070 44 section section NN 42149 1070 45 type type NN 42149 1070 46 , , , 42149 1070 47 as as IN 42149 1070 48 already already RB 42149 1070 49 described describe VBN 42149 1070 50 . . . 42149 1071 1 The the DT 42149 1071 2 design design NN 42149 1071 3 of of IN 42149 1071 4 the the DT 42149 1071 5 tunnels tunnel NNS 42149 1071 6 and and CC 42149 1071 7 their -PRON- PRP$ 42149 1071 8 accessories accessory NNS 42149 1071 9 will will MD 42149 1071 10 be be VB 42149 1071 11 first first RB 42149 1071 12 described describe VBN 42149 1071 13 , , , 42149 1071 14 then then RB 42149 1071 15 will will MD 42149 1071 16 come come VB 42149 1071 17 the the DT 42149 1071 18 construction construction NN 42149 1071 19 of of IN 42149 1071 20 the the DT 42149 1071 21 tunnels tunnel NNS 42149 1071 22 as as RB 42149 1071 23 far far RB 42149 1071 24 as as IN 42149 1071 25 the the DT 42149 1071 26 completion completion NN 42149 1071 27 of of IN 42149 1071 28 the the DT 42149 1071 29 metal metal NN 42149 1071 30 lining lining NN 42149 1071 31 , , , 42149 1071 32 followed follow VBN 42149 1071 33 by by IN 42149 1071 34 a a DT 42149 1071 35 description description NN 42149 1071 36 of of IN 42149 1071 37 the the DT 42149 1071 38 concrete concrete JJ 42149 1071 39 lining lining NN 42149 1071 40 and and CC 42149 1071 41 completion completion NN 42149 1071 42 of of IN 42149 1071 43 the the DT 42149 1071 44 work work NN 42149 1071 45 . . . 42149 1072 1 Design design NN 42149 1072 2 of of IN 42149 1072 3 Metal Metal NNP 42149 1072 4 Lining Lining NNP 42149 1072 5 . . . 42149 1073 1 _ _ NNP 42149 1073 2 New New NNP 42149 1073 3 York York NNP 42149 1073 4 Shield Shield NNP 42149 1073 5 Chambers._--The Chambers._--The NNP 42149 1073 6 shield shield NN 42149 1073 7 chambers chamber NNS 42149 1073 8 may may MD 42149 1073 9 be be VB 42149 1073 10 seen see VBN 42149 1073 11 on on IN 42149 1073 12 Plate Plate NNP 42149 1073 13 XXXII XXXII NNP 42149 1073 14 , , , 42149 1073 15 previously previously RB 42149 1073 16 referred refer VBD 42149 1073 17 to to IN 42149 1073 18 , , , 42149 1073 19 which which WDT 42149 1073 20 shows show VBZ 42149 1073 21 the the DT 42149 1073 22 junction junction NN 42149 1073 23 of of IN 42149 1073 24 the the DT 42149 1073 25 iron iron NN 42149 1073 26 - - HYPH 42149 1073 27 lined line VBN 42149 1073 28 tunnels tunnel NNS 42149 1073 29 and and CC 42149 1073 30 the the DT 42149 1073 31 shield shield NN 42149 1073 32 chambers chamber NNS 42149 1073 33 . . . 42149 1074 1 They -PRON- PRP 42149 1074 2 consist consist VBP 42149 1074 3 of of IN 42149 1074 4 two two CD 42149 1074 5 iron iron NN 42149 1074 6 - - HYPH 42149 1074 7 lined line VBN 42149 1074 8 pieces piece NNS 42149 1074 9 of of IN 42149 1074 10 tunnel tunnel NN 42149 1074 11 placed place VBN 42149 1074 12 side side NN 42149 1074 13 by by IN 42149 1074 14 side side NN 42149 1074 15 , , , 42149 1074 16 with with IN 42149 1074 17 semi semi JJ 42149 1074 18 - - JJ 42149 1074 19 circular circular JJ 42149 1074 20 arches arch NNS 42149 1074 21 and and CC 42149 1074 22 straight straight JJ 42149 1074 23 side side NN 42149 1074 24 - - HYPH 42149 1074 25 walls wall NNS 42149 1074 26 . . . 42149 1075 1 The the DT 42149 1075 2 segments segment NNS 42149 1075 3 of of IN 42149 1075 4 the the DT 42149 1075 5 arch arch NN 42149 1075 6 are be VBP 42149 1075 7 made make VBN 42149 1075 8 to to TO 42149 1075 9 break break VB 42149 1075 10 joint joint NN 42149 1075 11 with with IN 42149 1075 12 one one NN 42149 1075 13 another another DT 42149 1075 14 by by IN 42149 1075 15 making make VBG 42149 1075 16 the the DT 42149 1075 17 side side NN 42149 1075 18 - - HYPH 42149 1075 19 wall wall NN 42149 1075 20 or or CC 42149 1075 21 column column NN 42149 1075 22 castings casting NNS 42149 1075 23 of of IN 42149 1075 24 two two CD 42149 1075 25 different different JJ 42149 1075 26 heights height NNS 42149 1075 27 , , , 42149 1075 28 as as IN 42149 1075 29 shown show VBN 42149 1075 30 in in IN 42149 1075 31 Fig Fig NNP 42149 1075 32 . . . 42149 1076 1 9 9 CD 42149 1076 2 . . . 42149 1077 1 The the DT 42149 1077 2 length length NN 42149 1077 3 of of IN 42149 1077 4 each each DT 42149 1077 5 ring ring NN 42149 1077 6 is be VBZ 42149 1077 7 18 18 CD 42149 1077 8 in in IN 42149 1077 9 . . . 42149 1078 1 The the DT 42149 1078 2 reason reason NN 42149 1078 3 for for IN 42149 1078 4 the the DT 42149 1078 5 adoption adoption NN 42149 1078 6 of of IN 42149 1078 7 this this DT 42149 1078 8 type type NN 42149 1078 9 of of IN 42149 1078 10 construction construction NN 42149 1078 11 was be VBD 42149 1078 12 the the DT 42149 1078 13 necessity necessity NN 42149 1078 14 for for IN 42149 1078 15 keeping keep VBG 42149 1078 16 the the DT 42149 1078 17 width width NN 42149 1078 18 of of IN 42149 1078 19 the the DT 42149 1078 20 permanent permanent JJ 42149 1078 21 structure structure NN 42149 1078 22 within within IN 42149 1078 23 the the DT 42149 1078 24 60-ft 60-ft NNP 42149 1078 25 . . . 42149 1078 26 width width NN 42149 1078 27 of of IN 42149 1078 28 the the DT 42149 1078 29 street street NN 42149 1078 30 . . . 42149 1079 1 The the DT 42149 1079 2 length length NN 42149 1079 3 of of IN 42149 1079 4 this this DT 42149 1079 5 twin twin JJ 42149 1079 6 structure structure NN 42149 1079 7 is be VBZ 42149 1079 8 28.5 28.5 CD 42149 1079 9 ft ft NNP 42149 1079 10 . . NNP 42149 1079 11 , , , 42149 1079 12 and and CC 42149 1079 13 the the DT 42149 1079 14 weight weight NN 42149 1079 15 of of IN 42149 1079 16 the the DT 42149 1079 17 metal metal NN 42149 1079 18 in in IN 42149 1079 19 it -PRON- PRP 42149 1079 20 is be VBZ 42149 1079 21 as as IN 42149 1079 22 follows follow VBZ 42149 1079 23 : : : 42149 1079 24 19 19 CD 42149 1079 25 long long JJ 42149 1079 26 - - HYPH 42149 1079 27 column column NN 42149 1079 28 arch arch NN 42149 1079 29 rings ring NNS 42149 1079 30 at at IN 42149 1079 31 22,802 22,802 CD 42149 1079 32 lb lb RB 42149 1079 33 . . . 42149 1080 1 433,238 433,238 CD 42149 1080 2 lb lb IN 42149 1080 3 . . . 42149 1081 1 19 19 CD 42149 1081 2 short short JJ 42149 1081 3 - - HYPH 42149 1081 4 column column NN 42149 1081 5 arch arch NN 42149 1081 6 rings ring NNS 42149 1081 7 at at IN 42149 1081 8 23,028 23,028 CD 42149 1081 9 lb lb RB 42149 1081 10 . . . 42149 1082 1 437,532 437,532 CD 42149 1082 2 " " `` 42149 1082 3 ------- ------- NFP 42149 1082 4 Total total JJ 42149 1082 5 weight weight NN 42149 1082 6 870,770 870,770 CD 42149 1082 7 lb lb XX 42149 1082 8 . . . 42149 1083 1 _ _ NNP 42149 1083 2 General General NNP 42149 1083 3 Type Type NNP 42149 1083 4 of of IN 42149 1083 5 River River NNP 42149 1083 6 Tunnel Tunnel NNP 42149 1083 7 Lining._--The Lining._--The NNP 42149 1083 8 main main JJ 42149 1083 9 ruling ruling NN 42149 1083 10 type type NN 42149 1083 11 adopted adopt VBN 42149 1083 12 for for IN 42149 1083 13 the the DT 42149 1083 14 tunnels tunnel NNS 42149 1083 15 under under IN 42149 1083 16 the the DT 42149 1083 17 Hudson Hudson NNP 42149 1083 18 River River NNP 42149 1083 19 , , , 42149 1083 20 and and CC 42149 1083 21 in in IN 42149 1083 22 the the DT 42149 1083 23 soft soft JJ 42149 1083 24 water water NN 42149 1083 25 - - HYPH 42149 1083 26 bearing bear VBG 42149 1083 27 ground ground NN 42149 1083 28 for for IN 42149 1083 29 some some DT 42149 1083 30 distance distance NN 42149 1083 31 on on IN 42149 1083 32 the the DT 42149 1083 33 shoreward shoreward NN 42149 1083 34 side side NN 42149 1083 35 of of IN 42149 1083 36 the the DT 42149 1083 37 river river NN 42149 1083 38 lines line NNS 42149 1083 39 , , , 42149 1083 40 consists consist VBZ 42149 1083 41 of of IN 42149 1083 42 two two CD 42149 1083 43 parallel parallel JJ 42149 1083 44 metal metal NN 42149 1083 45 - - HYPH 42149 1083 46 lined line VBN 42149 1083 47 tunnels tunnel NNS 42149 1083 48 , , , 42149 1083 49 circular circular JJ 42149 1083 50 in in IN 42149 1083 51 cross cross NN 42149 1083 52 - - NN 42149 1083 53 section section NN 42149 1083 54 , , , 42149 1083 55 each each DT 42149 1083 56 tunnel tunnel NN 42149 1083 57 being be VBG 42149 1083 58 23 23 CD 42149 1083 59 ft ft NN 42149 1083 60 . . NN 42149 1083 61 outside outside JJ 42149 1083 62 diameter diameter NN 42149 1083 63 , , , 42149 1083 64 and and CC 42149 1083 65 the the DT 42149 1083 66 two two CD 42149 1083 67 tunnels tunnel NNS 42149 1083 68 37 37 CD 42149 1083 69 ft ft NN 42149 1083 70 . . NNP 42149 1083 71 apart apart RB 42149 1083 72 from from IN 42149 1083 73 center center NN 42149 1083 74 to to IN 42149 1083 75 center center NN 42149 1083 76 , , , 42149 1083 77 as as IN 42149 1083 78 shown show VBN 42149 1083 79 on on IN 42149 1083 80 Fig Fig NNP 42149 1083 81 . . . 42149 1084 1 10 10 CD 42149 1084 2 . . . 42149 1085 1 The the DT 42149 1085 2 metal metal NN 42149 1085 3 lining lining NN 42149 1085 4 is be VBZ 42149 1085 5 of of IN 42149 1085 6 cast cast NN 42149 1085 7 iron iron NN 42149 1085 8 ( ( -LRB- 42149 1085 9 except except IN 42149 1085 10 for for IN 42149 1085 11 a a DT 42149 1085 12 few few JJ 42149 1085 13 short short JJ 42149 1085 14 lengths length NNS 42149 1085 15 of of IN 42149 1085 16 cast cast VBN 42149 1085 17 steel steel NN 42149 1085 18 ) ) -RRB- 42149 1085 19 and and CC 42149 1085 20 of of IN 42149 1085 21 the the DT 42149 1085 22 usual usual JJ 42149 1085 23 segmental segmental JJ 42149 1085 24 type type NN 42149 1085 25 , , , 42149 1085 26 consisting consist VBG 42149 1085 27 of of IN 42149 1085 28 " " `` 42149 1085 29 Rings ring NNS 42149 1085 30 " " '' 42149 1085 31 of of IN 42149 1085 32 iron iron NN 42149 1085 33 , , , 42149 1085 34 each each DT 42149 1085 35 ring ring NN 42149 1085 36 being be VBG 42149 1085 37 2 2 CD 42149 1085 38 ft ft NN 42149 1085 39 . . NN 42149 1085 40 6 6 CD 42149 1085 41 in in IN 42149 1085 42 . . . 42149 1086 1 in in IN 42149 1086 2 length length NN 42149 1086 3 , , , 42149 1086 4 and and CC 42149 1086 5 divided divide VBN 42149 1086 6 by by IN 42149 1086 7 radial radial JJ 42149 1086 8 joints joint NNS 42149 1086 9 into into IN 42149 1086 10 eleven eleven CD 42149 1086 11 segments segment NNS 42149 1086 12 , , , 42149 1086 13 or or CC 42149 1086 14 " " `` 42149 1086 15 Plates plate NNS 42149 1086 16 , , , 42149 1086 17 " " '' 42149 1086 18 with with IN 42149 1086 19 one one CD 42149 1086 20 " " `` 42149 1086 21 Key Key NNP 42149 1086 22 , , , 42149 1086 23 " " '' 42149 1086 24 or or CC 42149 1086 25 closing closing NN 42149 1086 26 segment segment NN 42149 1086 27 , , , 42149 1086 28 having have VBG 42149 1086 29 joints joint NNS 42149 1086 30 not not RB 42149 1086 31 radial radial JJ 42149 1086 32 but but CC 42149 1086 33 narrower narrow JJR 42149 1086 34 at at IN 42149 1086 35 the the DT 42149 1086 36 outside outside JJ 42149 1086 37 circumference circumference NN 42149 1086 38 of of IN 42149 1086 39 the the DT 42149 1086 40 metal metal NN 42149 1086 41 lining lining NN 42149 1086 42 than than IN 42149 1086 43 at at IN 42149 1086 44 the the DT 42149 1086 45 inside inside NN 42149 1086 46 . . . 42149 1087 1 The the DT 42149 1087 2 whole whole JJ 42149 1087 3 structure structure NN 42149 1087 4 is be VBZ 42149 1087 5 joined join VBN 42149 1087 6 , , , 42149 1087 7 segment segment NN 42149 1087 8 to to IN 42149 1087 9 segment segment NN 42149 1087 10 , , , 42149 1087 11 and and CC 42149 1087 12 ring re VBG 42149 1087 13 to to IN 42149 1087 14 ring ring NN 42149 1087 15 , , , 42149 1087 16 by by IN 42149 1087 17 mild mild JJ 42149 1087 18 - - HYPH 42149 1087 19 steel steel NN 42149 1087 20 bolts bolt NNS 42149 1087 21 passing pass VBG 42149 1087 22 through through IN 42149 1087 23 bolt bolt NN 42149 1087 24 holes hole NNS 42149 1087 25 in in IN 42149 1087 26 flanges flange NNS 42149 1087 27 of of IN 42149 1087 28 all all DT 42149 1087 29 four four CD 42149 1087 30 faces face NNS 42149 1087 31 of of IN 42149 1087 32 each each DT 42149 1087 33 segment segment NN 42149 1087 34 . . . 42149 1088 1 The the DT 42149 1088 2 joints joint NNS 42149 1088 3 between between IN 42149 1088 4 the the DT 42149 1088 5 segments segment NNS 42149 1088 6 are be VBP 42149 1088 7 made make VBN 42149 1088 8 water water NN 42149 1088 9 - - HYPH 42149 1088 10 tight tight JJ 42149 1088 11 by by IN 42149 1088 12 a a DT 42149 1088 13 caulking caulking NN 42149 1088 14 of of IN 42149 1088 15 sal sal NN 42149 1088 16 - - HYPH 42149 1088 17 ammoniac ammoniac NN 42149 1088 18 and and CC 42149 1088 19 iron iron NN 42149 1088 20 borings boring NNS 42149 1088 21 driven drive VBN 42149 1088 22 into into IN 42149 1088 23 grooves groove NNS 42149 1088 24 formed form VBN 42149 1088 25 for for IN 42149 1088 26 the the DT 42149 1088 27 purpose purpose NN 42149 1088 28 on on IN 42149 1088 29 the the DT 42149 1088 30 inner inner JJ 42149 1088 31 edges edge NNS 42149 1088 32 of of IN 42149 1088 33 the the DT 42149 1088 34 flanges flange NNS 42149 1088 35 . . . 42149 1089 1 The the DT 42149 1089 2 clearances clearance NNS 42149 1089 3 between between IN 42149 1089 4 the the DT 42149 1089 5 bolts bolt NNS 42149 1089 6 and and CC 42149 1089 7 the the DT 42149 1089 8 bolt bolt NN 42149 1089 9 holes hole NNS 42149 1089 10 are be VBP 42149 1089 11 also also RB 42149 1089 12 made make VBN 42149 1089 13 water water NN 42149 1089 14 - - HYPH 42149 1089 15 tight tight JJ 42149 1089 16 by by IN 42149 1089 17 using use VBG 42149 1089 18 grummets grummet NNS 42149 1089 19 or or CC 42149 1089 20 rings ring NNS 42149 1089 21 of of IN 42149 1089 22 yarn yarn NN 42149 1089 23 smeared smear VBN 42149 1089 24 with with IN 42149 1089 25 red red JJ 42149 1089 26 lead lead NN 42149 1089 27 , , , 42149 1089 28 having have VBG 42149 1089 29 a a DT 42149 1089 30 snug snug NN 42149 1089 31 fit fit JJ 42149 1089 32 over over IN 42149 1089 33 the the DT 42149 1089 34 shank shank NN 42149 1089 35 of of IN 42149 1089 36 the the DT 42149 1089 37 bolt bolt NN 42149 1089 38 and and CC 42149 1089 39 placed place VBN 42149 1089 40 below below IN 42149 1089 41 the the DT 42149 1089 42 washer washer NN 42149 1089 43 on on IN 42149 1089 44 either either DT 42149 1089 45 end end NN 42149 1089 46 of of IN 42149 1089 47 each each DT 42149 1089 48 bolt bolt NN 42149 1089 49 . . . 42149 1090 1 When when WRB 42149 1090 2 passing pass VBG 42149 1090 3 through through IN 42149 1090 4 ground ground NN 42149 1090 5 more more RBR 42149 1090 6 or or CC 42149 1090 7 less less RBR 42149 1090 8 self self NN 42149 1090 9 - - HYPH 42149 1090 10 sustaining sustain VBG 42149 1090 11 , , , 42149 1090 12 the the DT 42149 1090 13 space space NN 42149 1090 14 outside outside IN 42149 1090 15 the the DT 42149 1090 16 iron iron NN 42149 1090 17 lining lining NN 42149 1090 18 ( ( -LRB- 42149 1090 19 formed form VBN 42149 1090 20 by by IN 42149 1090 21 the the DT 42149 1090 22 excavation excavation NN 42149 1090 23 being be VBG 42149 1090 24 necessarily necessarily RB 42149 1090 25 rather rather RB 42149 1090 26 larger large JJR 42149 1090 27 than than IN 42149 1090 28 the the DT 42149 1090 29 external external JJ 42149 1090 30 diameter diameter NN 42149 1090 31 of of IN 42149 1090 32 the the DT 42149 1090 33 lining lining NN 42149 1090 34 itself -PRON- PRP 42149 1090 35 ) ) -RRB- 42149 1090 36 was be VBD 42149 1090 37 filled fill VBN 42149 1090 38 with with IN 42149 1090 39 grout grout NN 42149 1090 40 of of IN 42149 1090 41 1:1 1:1 CD 42149 1090 42 Portland Portland NNP 42149 1090 43 cement cement NN 42149 1090 44 and and CC 42149 1090 45 sand sand NN 42149 1090 46 forced force VBN 42149 1090 47 by by IN 42149 1090 48 air air NN 42149 1090 49 pressure pressure NN 42149 1090 50 through through IN 42149 1090 51 grout grout NN 42149 1090 52 holes hole NNS 42149 1090 53 in in IN 42149 1090 54 each each DT 42149 1090 55 segment segment NN 42149 1090 56 . . . 42149 1091 1 These these DT 42149 1091 2 holes hole NNS 42149 1091 3 were be VBD 42149 1091 4 tapped tap VBN 42149 1091 5 , , , 42149 1091 6 and and CC 42149 1091 7 were be VBD 42149 1091 8 closed close VBN 42149 1091 9 with with IN 42149 1091 10 a a DT 42149 1091 11 screw screw NN 42149 1091 12 plug plug NN 42149 1091 13 before before RB 42149 1091 14 and and CC 42149 1091 15 after after IN 42149 1091 16 grouting grout VBG 42149 1091 17 . . . 42149 1092 1 [ [ -LRB- 42149 1092 2 Illustration illustration NN 42149 1092 3 : : : 42149 1092 4 DETAILS DETAILS NNP 42149 1092 5 OF of IN 42149 1092 6 MANHATTAN MANHATTAN NNP 42149 1092 7 SHIELD SHIELD NNP 42149 1092 8 CHAMBERS CHAMBERS NNPS 42149 1092 9 FIG FIG NNP 42149 1092 10 . . . 42149 1093 1 9 9 CD 42149 1093 2 . . . 42149 1093 3 ] ] -RRB- 42149 1094 1 Having have VBG 42149 1094 2 thus thus RB 42149 1094 3 stated state VBN 42149 1094 4 in in IN 42149 1094 5 a a DT 42149 1094 6 general general JJ 42149 1094 7 way way NN 42149 1094 8 the the DT 42149 1094 9 main main JJ 42149 1094 10 ruling ruling NN 42149 1094 11 features feature NNS 42149 1094 12 of of IN 42149 1094 13 the the DT 42149 1094 14 design design NN 42149 1094 15 , , , 42149 1094 16 a a DT 42149 1094 17 detailed detailed JJ 42149 1094 18 description description NN 42149 1094 19 of of IN 42149 1094 20 the the DT 42149 1094 21 various various JJ 42149 1094 22 modifications modification NNS 42149 1094 23 of of IN 42149 1094 24 the the DT 42149 1094 25 ruling rule VBG 42149 1094 26 type type NN 42149 1094 27 will will MD 42149 1094 28 be be VB 42149 1094 29 given give VBN 42149 1094 30 . . . 42149 1095 1 [ [ -LRB- 42149 1095 2 Illustration illustration NN 42149 1095 3 : : : 42149 1095 4 TYPICAL TYPICAL NNP 42149 1095 5 CROSS cross NN 42149 1095 6 - - HYPH 42149 1095 7 SECTION section NN 42149 1095 8 OF of IN 42149 1095 9 RULING ruling NN 42149 1095 10 DESIGN design NN 42149 1095 11 OF of IN 42149 1095 12 METAL metal NN 42149 1095 13 - - HYPH 42149 1095 14 LINED LINED NNP 42149 1095 15 SHIELD SHIELD NNP 42149 1095 16 - - HYPH 42149 1095 17 DRIVEN drive VBN 42149 1095 18 TUNNELS tunnel NNS 42149 1095 19 FIG FIG NNP 42149 1095 20 . . . 42149 1096 1 10 10 CD 42149 1096 2 . . . 42149 1096 3 ] ] -RRB- 42149 1097 1 The the DT 42149 1097 2 two two CD 42149 1097 3 main main JJ 42149 1097 4 divisions division NNS 42149 1097 5 of of IN 42149 1097 6 the the DT 42149 1097 7 iron iron NN 42149 1097 8 lining lining NN 42149 1097 9 are be VBP 42149 1097 10 the the DT 42149 1097 11 " " `` 42149 1097 12 ordinary ordinary JJ 42149 1097 13 " " '' 42149 1097 14 or or CC 42149 1097 15 lighter light JJR 42149 1097 16 type type NN 42149 1097 17 and and CC 42149 1097 18 the the DT 42149 1097 19 heavy heavy JJ 42149 1097 20 type type NN 42149 1097 21 . . . 42149 1098 1 The the DT 42149 1098 2 details detail NNS 42149 1098 3 of of IN 42149 1098 4 the the DT 42149 1098 5 ordinary ordinary JJ 42149 1098 6 iron iron NN 42149 1098 7 are be VBP 42149 1098 8 shown show VBN 42149 1098 9 in in IN 42149 1098 10 Fig Fig NNP 42149 1098 11 . . . 42149 1099 1 11 11 CD 42149 1099 2 , , , 42149 1099 3 which which WDT 42149 1099 4 shows show VBZ 42149 1099 5 all all DT 42149 1099 6 types type NNS 42149 1099 7 of of IN 42149 1099 8 lining lining NN 42149 1099 9 . . . 42149 1100 1 It -PRON- PRP 42149 1100 2 was be VBD 42149 1100 3 on on IN 42149 1100 4 this this DT 42149 1100 5 design design NN 42149 1100 6 that that IN 42149 1100 7 the the DT 42149 1100 8 contract contract NN 42149 1100 9 was be VBD 42149 1100 10 let let VBN 42149 1100 11 , , , 42149 1100 12 and and CC 42149 1100 13 it -PRON- PRP 42149 1100 14 was be VBD 42149 1100 15 originally originally RB 42149 1100 16 intended intend VBN 42149 1100 17 that that IN 42149 1100 18 this this DT 42149 1100 19 should should MD 42149 1100 20 be be VB 42149 1100 21 the the DT 42149 1100 22 only only JJ 42149 1100 23 type type NN 42149 1100 24 of of IN 42149 1100 25 iron iron NN 42149 1100 26 used use VBN 42149 1100 27 . . . 42149 1101 1 The the DT 42149 1101 2 dimensions dimension NNS 42149 1101 3 of of IN 42149 1101 4 the the DT 42149 1101 5 iron iron NN 42149 1101 6 are be VBP 42149 1101 7 clearly clearly RB 42149 1101 8 shown show VBN 42149 1101 9 on on IN 42149 1101 10 the the DT 42149 1101 11 drawing drawing NN 42149 1101 12 , , , 42149 1101 13 and and CC 42149 1101 14 it -PRON- PRP 42149 1101 15 will will MD 42149 1101 16 be be VB 42149 1101 17 seen see VBN 42149 1101 18 that that IN 42149 1101 19 the the DT 42149 1101 20 external external JJ 42149 1101 21 diameter diameter NN 42149 1101 22 is be VBZ 42149 1101 23 23 23 CD 42149 1101 24 ft ft NN 42149 1101 25 . . NNP 42149 1101 26 , , , 42149 1101 27 the the DT 42149 1101 28 interior interior JJ 42149 1101 29 diameter diameter NN 42149 1101 30 , , , 42149 1101 31 21 21 CD 42149 1101 32 ft ft NN 42149 1101 33 . . NNP 42149 1101 34 2 2 CD 42149 1101 35 in in IN 42149 1101 36 . . NNP 42149 1101 37 , , , 42149 1101 38 the the DT 42149 1101 39 length length NN 42149 1101 40 of of IN 42149 1101 41 each each DT 42149 1101 42 ring ring NN 42149 1101 43 , , , 42149 1101 44 2 2 CD 42149 1101 45 ft ft NN 42149 1101 46 . . NNP 42149 1101 47 6 6 CD 42149 1101 48 in in IN 42149 1101 49 . . NNP 42149 1101 50 , , , 42149 1101 51 and and CC 42149 1101 52 the the DT 42149 1101 53 thickness thickness NN 42149 1101 54 of of IN 42149 1101 55 the the DT 42149 1101 56 iron iron NN 42149 1101 57 skin skin NN 42149 1101 58 or or CC 42149 1101 59 web web NN 42149 1101 60 , , , 42149 1101 61 1½ 1½ NNP 42149 1101 62 in in IN 42149 1101 63 . . . 42149 1102 1 The the DT 42149 1102 2 bolt bolt NN 42149 1102 3 holes hole NNS 42149 1102 4 in in IN 42149 1102 5 the the DT 42149 1102 6 circumferential circumferential JJ 42149 1102 7 flanges flange NNS 42149 1102 8 are be VBP 42149 1102 9 evenly evenly RB 42149 1102 10 spaced space VBN 42149 1102 11 through through IN 42149 1102 12 the the DT 42149 1102 13 circle circle NN 42149 1102 14 , , , 42149 1102 15 so so IN 42149 1102 16 that that IN 42149 1102 17 adjacent adjacent JJ 42149 1102 18 rings ring NNS 42149 1102 19 may may MD 42149 1102 20 be be VB 42149 1102 21 bolted bolt VBN 42149 1102 22 together together RB 42149 1102 23 in in IN 42149 1102 24 any any DT 42149 1102 25 relative relative JJ 42149 1102 26 position position NN 42149 1102 27 as as IN 42149 1102 28 regards regard VBZ 42149 1102 29 the the DT 42149 1102 30 radial radial JJ 42149 1102 31 joints joint NNS 42149 1102 32 , , , 42149 1102 33 and and CC 42149 1102 34 , , , 42149 1102 35 as as IN 42149 1102 36 a a DT 42149 1102 37 matter matter NN 42149 1102 38 of of IN 42149 1102 39 fact fact NN 42149 1102 40 , , , 42149 1102 41 in in IN 42149 1102 42 the the DT 42149 1102 43 erection erection NN 42149 1102 44 of of IN 42149 1102 45 the the DT 42149 1102 46 tunnel tunnel NN 42149 1102 47 lining lining NN 42149 1102 48 , , , 42149 1102 49 all all PDT 42149 1102 50 the the DT 42149 1102 51 rings ring NNS 42149 1102 52 " " `` 42149 1102 53 break break VBP 42149 1102 54 joint joint JJ 42149 1102 55 , , , 42149 1102 56 " " '' 42149 1102 57 with with IN 42149 1102 58 the the DT 42149 1102 59 exception exception NN 42149 1102 60 of of IN 42149 1102 61 those those DT 42149 1102 62 at at IN 42149 1102 63 the the DT 42149 1102 64 bore bore NN 42149 1102 65 segments segment NNS 42149 1102 66 , , , 42149 1102 67 as as IN 42149 1102 68 will will MD 42149 1102 69 be be VB 42149 1102 70 described describe VBN 42149 1102 71 later later RB 42149 1102 72 . . . 42149 1103 1 This this DT 42149 1103 2 type type NN 42149 1103 3 of of IN 42149 1103 4 iron iron NN 42149 1103 5 , , , 42149 1103 6 when when WRB 42149 1103 7 the the DT 42149 1103 8 original original JJ 42149 1103 9 type type NN 42149 1103 10 was be VBD 42149 1103 11 modified modify VBN 42149 1103 12 , , , 42149 1103 13 came come VBD 42149 1103 14 to to TO 42149 1103 15 be be VB 42149 1103 16 known know VBN 42149 1103 17 as as IN 42149 1103 18 the the DT 42149 1103 19 ordinary ordinary JJ 42149 1103 20 pocketless pocketless NN 42149 1103 21 iron iron NN 42149 1103 22 ; ; : 42149 1103 23 that that RB 42149 1103 24 is is RB 42149 1103 25 , , , 42149 1103 26 the the DT 42149 1103 27 weight weight NN 42149 1103 28 is be VBZ 42149 1103 29 of of IN 42149 1103 30 the the DT 42149 1103 31 ordinary ordinary JJ 42149 1103 32 or or CC 42149 1103 33 lighter light JJR 42149 1103 34 type type NN 42149 1103 35 , , , 42149 1103 36 in in IN 42149 1103 37 contradistinction contradistinction NN 42149 1103 38 to to IN 42149 1103 39 the the DT 42149 1103 40 heavier heavy JJR 42149 1103 41 one one NN 42149 1103 42 , , , 42149 1103 43 which which WDT 42149 1103 44 later later RB 42149 1103 45 supplanted supplant VBD 42149 1103 46 it -PRON- PRP 42149 1103 47 , , , 42149 1103 48 and and CC 42149 1103 49 the the DT 42149 1103 50 caulking caulk VBG 42149 1103 51 groove groove NN 42149 1103 52 runs run VBZ 42149 1103 53 along along IN 42149 1103 54 the the DT 42149 1103 55 edges edge NNS 42149 1103 56 of of IN 42149 1103 57 the the DT 42149 1103 58 flanges flange NNS 42149 1103 59 and and CC 42149 1103 60 does do VBZ 42149 1103 61 not not RB 42149 1103 62 form form VB 42149 1103 63 pockets pocket NNS 42149 1103 64 around around IN 42149 1103 65 the the DT 42149 1103 66 bolt bolt NN 42149 1103 67 holes hole NNS 42149 1103 68 , , , 42149 1103 69 as as IN 42149 1103 70 did do VBD 42149 1103 71 the the DT 42149 1103 72 groove groove NN 42149 1103 73 in in IN 42149 1103 74 a a DT 42149 1103 75 later later JJ 42149 1103 76 type type NN 42149 1103 77 . . . 42149 1104 1 Each each DT 42149 1104 2 ring ring NN 42149 1104 3 is be VBZ 42149 1104 4 made make VBN 42149 1104 5 up up RP 42149 1104 6 of of IN 42149 1104 7 eleven eleven CD 42149 1104 8 segments segment NNS 42149 1104 9 and and CC 42149 1104 10 a a DT 42149 1104 11 key key JJ 42149 1104 12 piece piece NN 42149 1104 13 . . . 42149 1105 1 Of of IN 42149 1105 2 these these DT 42149 1105 3 , , , 42149 1105 4 nine nine CD 42149 1105 5 have have VBP 42149 1105 6 radial radial JJ 42149 1105 7 joints joint NNS 42149 1105 8 at at IN 42149 1105 9 both both DT 42149 1105 10 ends end NNS 42149 1105 11 , , , 42149 1105 12 and and CC 42149 1105 13 are be VBP 42149 1105 14 called call VBN 42149 1105 15 " " `` 42149 1105 16 _ _ NNP 42149 1105 17 A A NNP 42149 1105 18 _ _ NNP 42149 1105 19 " " '' 42149 1105 20 segments segment NNS 42149 1105 21 ; ; : 42149 1105 22 two two CD 42149 1105 23 , , , 42149 1105 24 called call VBN 42149 1105 25 " " `` 42149 1105 26 _ _ NNP 42149 1105 27 B B NNP 42149 1105 28 _ _ NNP 42149 1105 29 " " '' 42149 1105 30 segments segment NNS 42149 1105 31 , , , 42149 1105 32 have have VBP 42149 1105 33 a a DT 42149 1105 34 radial radial JJ 42149 1105 35 joint joint NN 42149 1105 36 at at IN 42149 1105 37 one one CD 42149 1105 38 end end NN 42149 1105 39 and and CC 42149 1105 40 a a DT 42149 1105 41 non non JJ 42149 1105 42 - - JJ 42149 1105 43 radial radial JJ 42149 1105 44 joint joint NN 42149 1105 45 at at IN 42149 1105 46 the the DT 42149 1105 47 other other JJ 42149 1105 48 . . . 42149 1106 1 The the DT 42149 1106 2 non non JJ 42149 1106 3 - - JJ 42149 1106 4 radial radial JJ 42149 1106 5 joint joint NN 42149 1106 6 is be VBZ 42149 1106 7 placed place VBN 42149 1106 8 next next RB 42149 1106 9 to to IN 42149 1106 10 the the DT 42149 1106 11 key key NN 42149 1106 12 , , , 42149 1106 13 which which WDT 42149 1106 14 is be VBZ 42149 1106 15 12.25 12.25 CD 42149 1106 16 in in IN 42149 1106 17 . . . 42149 1107 1 wide wide JJ 42149 1107 2 at at IN 42149 1107 3 the the DT 42149 1107 4 outside outside JJ 42149 1107 5 circumference circumference NN 42149 1107 6 of of IN 42149 1107 7 the the DT 42149 1107 8 iron iron NN 42149 1107 9 and and CC 42149 1107 10 12.50 12.50 CD 42149 1107 11 in in IN 42149 1107 12 . . . 42149 1108 1 wide wide JJ 42149 1108 2 at at IN 42149 1108 3 the the DT 42149 1108 4 inside inside NN 42149 1108 5 . . . 42149 1109 1 The the DT 42149 1109 2 web web NN 42149 1109 3 is be VBZ 42149 1109 4 not not RB 42149 1109 5 of of IN 42149 1109 6 uniform uniform JJ 42149 1109 7 thickness thickness NN 42149 1109 8 . . . 42149 1110 1 The the DT 42149 1110 2 middle middle JJ 42149 1110 3 part part NN 42149 1110 4 of of IN 42149 1110 5 each each DT 42149 1110 6 _ _ NNP 42149 1110 7 A A NNP 42149 1110 8 _ _ NNP 42149 1110 9 and and CC 42149 1110 10 _ _ NNP 42149 1110 11 B B NNP 42149 1110 12 _ _ NNP 42149 1110 13 segment segment NN 42149 1110 14 is be VBZ 42149 1110 15 1½ 1½ NNP 42149 1110 16 in in IN 42149 1110 17 . . . 42149 1111 1 thick thick JJ 42149 1111 2 ; ; : 42149 1111 3 at at IN 42149 1111 4 the the DT 42149 1111 5 distance distance NN 42149 1111 6 of of IN 42149 1111 7 6 6 CD 42149 1111 8 in in IN 42149 1111 9 . . . 42149 1112 1 from from IN 42149 1112 2 the the DT 42149 1112 3 root root NN 42149 1112 4 of of IN 42149 1112 5 each each DT 42149 1112 6 flange flange NN 42149 1112 7 , , , 42149 1112 8 the the DT 42149 1112 9 thickness thickness NN 42149 1112 10 of of IN 42149 1112 11 web web NN 42149 1112 12 begins begin VBZ 42149 1112 13 to to TO 42149 1112 14 increase increase VB 42149 1112 15 , , , 42149 1112 16 so so IN 42149 1112 17 that that IN 42149 1112 18 at at IN 42149 1112 19 the the DT 42149 1112 20 root root NN 42149 1112 21 it -PRON- PRP 42149 1112 22 is be VBZ 42149 1112 23 2 2 CD 42149 1112 24 - - SYM 42149 1112 25 3/8 3/8 CD 42149 1112 26 in in IN 42149 1112 27 . . . 42149 1113 1 thick thick JJ 42149 1113 2 . . . 42149 1114 1 The the DT 42149 1114 2 web web NN 42149 1114 3 of of IN 42149 1114 4 the the DT 42149 1114 5 key key JJ 42149 1114 6 plate plate NN 42149 1114 7 is be VBZ 42149 1114 8 1¾ 1â¾ CD 42149 1114 9 in in IN 42149 1114 10 . . . 42149 1115 1 thick thick JJ 42149 1115 2 . . . 42149 1116 1 The the DT 42149 1116 2 bolts bolt NNS 42149 1116 3 are be VBP 42149 1116 4 of of IN 42149 1116 5 mild mild JJ 42149 1116 6 steel steel NN 42149 1116 7 , , , 42149 1116 8 and and CC 42149 1116 9 are be VBP 42149 1116 10 1½ 1â½ CD 42149 1116 11 in in IN 42149 1116 12 . . . 42149 1117 1 in in IN 42149 1117 2 diameter diameter NN 42149 1117 3 ; ; : 42149 1117 4 there there EX 42149 1117 5 are be VBP 42149 1117 6 67 67 CD 42149 1117 7 in in IN 42149 1117 8 one one CD 42149 1117 9 circumferential circumferential JJ 42149 1117 10 joint joint NN 42149 1117 11 and and CC 42149 1117 12 5 5 CD 42149 1117 13 in in IN 42149 1117 14 each each DT 42149 1117 15 radial radial JJ 42149 1117 16 joint joint NN 42149 1117 17 . . . 42149 1118 1 As as IN 42149 1118 2 there there EX 42149 1118 3 are be VBP 42149 1118 4 12 12 CD 42149 1118 5 such such JJ 42149 1118 6 radial radial JJ 42149 1118 7 joints joint NNS 42149 1118 8 , , , 42149 1118 9 there there EX 42149 1118 10 are be VBP 42149 1118 11 altogether altogether RB 42149 1118 12 60 60 CD 42149 1118 13 bolts bolt NNS 42149 1118 14 in in IN 42149 1118 15 the the DT 42149 1118 16 cross cross NN 42149 1118 17 - - NNS 42149 1118 18 joints joint NNS 42149 1118 19 , , , 42149 1118 20 making make VBG 42149 1118 21 a a DT 42149 1118 22 total total NN 42149 1118 23 of of IN 42149 1118 24 127 127 CD 42149 1118 25 bolts bolt NNS 42149 1118 26 per per IN 42149 1118 27 ring ring NN 42149 1118 28 . . . 42149 1119 1 This this DT 42149 1119 2 original original JJ 42149 1119 3 type type NN 42149 1119 4 of of IN 42149 1119 5 ordinary ordinary JJ 42149 1119 6 iron iron NN 42149 1119 7 was be VBD 42149 1119 8 modified modify VBN 42149 1119 9 for for IN 42149 1119 10 a a DT 42149 1119 11 special special JJ 42149 1119 12 purpose purpose NN 42149 1119 13 as as IN 42149 1119 14 follows follow VBZ 42149 1119 15 : : : 42149 1119 16 It -PRON- PRP 42149 1119 17 was be VBD 42149 1119 18 known know VBN 42149 1119 19 that that IN 42149 1119 20 for for IN 42149 1119 21 some some DT 42149 1119 22 distance distance NN 42149 1119 23 on on IN 42149 1119 24 either either DT 42149 1119 25 side side NN 42149 1119 26 of of IN 42149 1119 27 the the DT 42149 1119 28 river river NN 42149 1119 29 , , , 42149 1119 30 and and CC 42149 1119 31 especially especially RB 42149 1119 32 at at IN 42149 1119 33 Weehawken Weehawken NNP 42149 1119 34 , , , 42149 1119 35 the the DT 42149 1119 36 tunnels tunnel NNS 42149 1119 37 would would MD 42149 1119 38 pass pass VB 42149 1119 39 through through IN 42149 1119 40 a a DT 42149 1119 41 gravel gravel NN 42149 1119 42 formation formation NN 42149 1119 43 , , , 42149 1119 44 rather rather RB 42149 1119 45 open open JJ 42149 1119 46 , , , 42149 1119 47 and and CC 42149 1119 48 containing contain VBG 42149 1119 49 a a DT 42149 1119 50 heavy heavy JJ 42149 1119 51 head head NN 42149 1119 52 of of IN 42149 1119 53 water water NN 42149 1119 54 . . . 42149 1120 1 It -PRON- PRP 42149 1120 2 was be VBD 42149 1120 3 thought think VBN 42149 1120 4 that that IN 42149 1120 5 , , , 42149 1120 6 by by IN 42149 1120 7 carrying carry VBG 42149 1120 8 the the DT 42149 1120 9 caulking caulking NN 42149 1120 10 groove groove NN 42149 1120 11 around around IN 42149 1120 12 the the DT 42149 1120 13 bolt bolt NN 42149 1120 14 holes hole NNS 42149 1120 15 , , , 42149 1120 16 it -PRON- PRP 42149 1120 17 would would MD 42149 1120 18 be be VB 42149 1120 19 possible possible JJ 42149 1120 20 to to TO 42149 1120 21 make make VB 42149 1120 22 them -PRON- PRP 42149 1120 23 more more JJR 42149 1120 24 water water NN 42149 1120 25 - - HYPH 42149 1120 26 proof proof NN 42149 1120 27 than than IN 42149 1120 28 by by IN 42149 1120 29 the the DT 42149 1120 30 simple simple JJ 42149 1120 31 use use NN 42149 1120 32 of of IN 42149 1120 33 the the DT 42149 1120 34 red red JJ 42149 1120 35 - - HYPH 42149 1120 36 leaded leaded JJ 42149 1120 37 grummets grummet NNS 42149 1120 38 . . . 42149 1121 1 Hence hence RB 42149 1121 2 the the DT 42149 1121 3 " " `` 42149 1121 4 Pocket Pocket NNP 42149 1121 5 Iron Iron NNP 42149 1121 6 " " '' 42149 1121 7 was be VBD 42149 1121 8 adopted adopt VBN 42149 1121 9 for for IN 42149 1121 10 this this DT 42149 1121 11 situation situation NN 42149 1121 12 , , , 42149 1121 13 the the DT 42149 1121 14 name name NN 42149 1121 15 being be VBG 42149 1121 16 derived derive VBN 42149 1121 17 from from IN 42149 1121 18 the the DT 42149 1121 19 pocket pocket NN 42149 1121 20 - - HYPH 42149 1121 21 like like JJ 42149 1121 22 recess recess NN 42149 1121 23 which which WDT 42149 1121 24 the the DT 42149 1121 25 caulking caulking NN 42149 1121 26 groove groove NN 42149 1121 27 formed form VBD 42149 1121 28 when when WRB 42149 1121 29 extended extend VBN 42149 1121 30 around around IN 42149 1121 31 the the DT 42149 1121 32 bolt bolt NN 42149 1121 33 hole hole NN 42149 1121 34 . . . 42149 1122 1 The the DT 42149 1122 2 details detail NNS 42149 1122 3 of of IN 42149 1122 4 this this DT 42149 1122 5 lining lining NN 42149 1122 6 are be VBP 42149 1122 7 shown show VBN 42149 1122 8 on on IN 42149 1122 9 Fig Fig NNP 42149 1122 10 . . . 42149 1123 1 11 11 CD 42149 1123 2 , , , 42149 1123 3 and and CC 42149 1123 4 the the DT 42149 1123 5 iron iron NN 42149 1123 6 ( ( -LRB- 42149 1123 7 except except IN 42149 1123 8 for for IN 42149 1123 9 the the DT 42149 1123 10 pockets pocket NNS 42149 1123 11 ) ) -RRB- 42149 1123 12 is be VBZ 42149 1123 13 exactly exactly RB 42149 1123 14 like like IN 42149 1123 15 the the DT 42149 1123 16 pocketless pocketless NN 42149 1123 17 type type NN 42149 1123 18 . . . 42149 1124 1 [ [ -LRB- 42149 1124 2 Illustration illustration NN 42149 1124 3 : : : 42149 1124 4 DETAILS details NN 42149 1124 5 OF of IN 42149 1124 6 ALL all DT 42149 1124 7 TYPES type NNS 42149 1124 8 OF of IN 42149 1124 9 METAL metal NN 42149 1124 10 LININGS lining NNS 42149 1124 11 USED use VBN 42149 1124 12 IN in IN 42149 1124 13 SUBAQUEOUS SUBAQUEOUS NNP 42149 1124 14 SHIELD SHIELD NNP 42149 1124 15 - - HYPH 42149 1124 16 DRIVEN drive VBN 42149 1124 17 TUNNELS tunnel NNS 42149 1124 18 FIG FIG NNP 42149 1124 19 . . . 42149 1125 1 11 11 CD 42149 1125 2 . . . 42149 1125 3 ] ] -RRB- 42149 1126 1 On on IN 42149 1126 2 the the DT 42149 1126 3 New New NNP 42149 1126 4 York York NNP 42149 1126 5 side side NN 42149 1126 6 , , , 42149 1126 7 in in IN 42149 1126 8 both both CC 42149 1126 9 North North NNP 42149 1126 10 and and CC 42149 1126 11 South South NNP 42149 1126 12 Tunnels Tunnels NNPS 42149 1126 13 , , , 42149 1126 14 two two CD 42149 1126 15 short short JJ 42149 1126 16 lengths length NNS 42149 1126 17 were be VBD 42149 1126 18 built build VBN 42149 1126 19 with with IN 42149 1126 20 cast cast VBN 42149 1126 21 - - HYPH 42149 1126 22 steel steel NN 42149 1126 23 lining lining NN 42149 1126 24 . . . 42149 1127 1 This this DT 42149 1127 2 was be VBD 42149 1127 3 done do VBN 42149 1127 4 where where WRB 42149 1127 5 unusual unusual JJ 42149 1127 6 stresses stress NNS 42149 1127 7 were be VBD 42149 1127 8 expected expect VBN 42149 1127 9 to to TO 42149 1127 10 come come VB 42149 1127 11 on on IN 42149 1127 12 the the DT 42149 1127 13 lining lining NN 42149 1127 14 , , , 42149 1127 15 namely namely RB 42149 1127 16 , , , 42149 1127 17 at at IN 42149 1127 18 the the DT 42149 1127 19 point point NN 42149 1127 20 where where WRB 42149 1127 21 the the DT 42149 1127 22 invert invert NN 42149 1127 23 passed pass VBD 42149 1127 24 from from IN 42149 1127 25 firm firm JJ 42149 1127 26 ground ground NN 42149 1127 27 to to IN 42149 1127 28 soft soft JJ 42149 1127 29 , , , 42149 1127 30 and and CC 42149 1127 31 also also RB 42149 1127 32 where where WRB 42149 1127 33 the the DT 42149 1127 34 tunnels tunnel NNS 42149 1127 35 passed pass VBD 42149 1127 36 under under IN 42149 1127 37 the the DT 42149 1127 38 heavy heavy JJ 42149 1127 39 river river NN 42149 1127 40 bulkhead bulkhead NN 42149 1127 41 wall wall NN 42149 1127 42 . . . 42149 1128 1 The the DT 42149 1128 2 design design NN 42149 1128 3 was be VBD 42149 1128 4 precisely precisely RB 42149 1128 5 the the DT 42149 1128 6 same same JJ 42149 1128 7 as as IN 42149 1128 8 for for IN 42149 1128 9 the the DT 42149 1128 10 ordinary ordinary JJ 42149 1128 11 pocketless pocketless NN 42149 1128 12 iron iron NN 42149 1128 13 , , , 42149 1128 14 and and CC 42149 1128 15 Fig Fig NNP 42149 1128 16 . . . 42149 1129 1 11 11 CD 42149 1129 2 shows show VBZ 42149 1129 3 the the DT 42149 1129 4 details detail NNS 42149 1129 5 . . . 42149 1130 1 After after IN 42149 1130 2 the the DT 42149 1130 3 tunnels tunnel NNS 42149 1130 4 had have VBD 42149 1130 5 entered enter VBN 42149 1130 6 into into IN 42149 1130 7 the the DT 42149 1130 8 actual actual JJ 42149 1130 9 under under NN 42149 1130 10 - - HYPH 42149 1130 11 river river NN 42149 1130 12 portion portion NN 42149 1130 13 , , , 42149 1130 14 several several JJ 42149 1130 15 phenomena phenomenon NNS 42149 1130 16 ( ( -LRB- 42149 1130 17 which which WDT 42149 1130 18 will will MD 42149 1130 19 be be VB 42149 1130 20 described describe VBN 42149 1130 21 later later RB 42149 1130 22 ) ) -RRB- 42149 1130 23 led lead VBD 42149 1130 24 to to IN 42149 1130 25 the the DT 42149 1130 26 fear fear NN 42149 1130 27 that that IN 42149 1130 28 the the DT 42149 1130 29 tunnels tunnel NNS 42149 1130 30 , , , 42149 1130 31 being be VBG 42149 1130 32 lighter light JJR 42149 1130 33 than than IN 42149 1130 34 the the DT 42149 1130 35 semi semi JJ 42149 1130 36 - - JJ 42149 1130 37 liquid liquid JJ 42149 1130 38 mud mud NN 42149 1130 39 they -PRON- PRP 42149 1130 40 displaced displace VBD 42149 1130 41 , , , 42149 1130 42 might may MD 42149 1130 43 be be VB 42149 1130 44 subject subject JJ 42149 1130 45 to to IN 42149 1130 46 a a DT 42149 1130 47 buoyant buoyant JJ 42149 1130 48 action action NN 42149 1130 49 , , , 42149 1130 50 and and CC 42149 1130 51 therefore therefore RB 42149 1130 52 a a DT 42149 1130 53 heavier heavy JJR 42149 1130 54 type type NN 42149 1130 55 of of IN 42149 1130 56 lining lining NN 42149 1130 57 was be VBD 42149 1130 58 designed design VBN 42149 1130 59 . . . 42149 1131 1 The the DT 42149 1131 2 length length NN 42149 1131 3 of of IN 42149 1131 4 ring ring NN 42149 1131 5 , , , 42149 1131 6 number number NN 42149 1131 7 of of IN 42149 1131 8 bolts bolt NNS 42149 1131 9 , , , 42149 1131 10 etc etc FW 42149 1131 11 . . FW 42149 1131 12 , , , 42149 1131 13 were be VBD 42149 1131 14 just just RB 42149 1131 15 the the DT 42149 1131 16 same same JJ 42149 1131 17 as as IN 42149 1131 18 for for IN 42149 1131 19 the the DT 42149 1131 20 lighter light JJR 42149 1131 21 iron iron NN 42149 1131 22 , , , 42149 1131 23 but but CC 42149 1131 24 the the DT 42149 1131 25 thickness thickness NN 42149 1131 26 of of IN 42149 1131 27 the the DT 42149 1131 28 web web NN 42149 1131 29 was be VBD 42149 1131 30 increased increase VBN 42149 1131 31 from from IN 42149 1131 32 1½ 1â½ CD 42149 1131 33 to to IN 42149 1131 34 2 2 CD 42149 1131 35 in in IN 42149 1131 36 . . NNP 42149 1131 37 , , , 42149 1131 38 the the DT 42149 1131 39 thickness thickness NN 42149 1131 40 of of IN 42149 1131 41 the the DT 42149 1131 42 flanges flange NNS 42149 1131 43 was be VBD 42149 1131 44 proportionately proportionately RB 42149 1131 45 increased increase VBN 42149 1131 46 , , , 42149 1131 47 and and CC 42149 1131 48 the the DT 42149 1131 49 diameter diameter NN 42149 1131 50 of of IN 42149 1131 51 the the DT 42149 1131 52 bolts bolt NNS 42149 1131 53 was be VBD 42149 1131 54 increased increase VBN 42149 1131 55 from from IN 42149 1131 56 1½ 1â½ CD 42149 1131 57 to to IN 42149 1131 58 1¾ 1â¾ CD 42149 1131 59 in in IN 42149 1131 60 . . . 42149 1132 1 This this DT 42149 1132 2 iron iron NN 42149 1132 3 was be VBD 42149 1132 4 all all DT 42149 1132 5 of of IN 42149 1132 6 the the DT 42149 1132 7 pocketless pocketless NN 42149 1132 8 type type NN 42149 1132 9 , , , 42149 1132 10 shown show VBN 42149 1132 11 in in IN 42149 1132 12 Fig Fig NNP 42149 1132 13 . . . 42149 1133 1 11 11 CD 42149 1133 2 . . . 42149 1134 1 Table table NN 42149 1134 2 18 18 CD 42149 1134 3 gives give VBZ 42149 1134 4 the the DT 42149 1134 5 weights weight NNS 42149 1134 6 of of IN 42149 1134 7 the the DT 42149 1134 8 various various JJ 42149 1134 9 types type NNS 42149 1134 10 of of IN 42149 1134 11 lining lining NN 42149 1134 12 . . . 42149 1135 1 TABLE table NN 42149 1135 2 18.--WEIGHTS 18.--weights CD 42149 1135 3 OF of IN 42149 1135 4 TUNNEL TUNNEL NNP 42149 1135 5 LINING LINING NNP 42149 1135 6 , , , 42149 1135 7 DIAMETER DIAMETER NNP 42149 1135 8 AND and CC 42149 1135 9 WEIGHTS WEIGHTS NNP 42149 1135 10 OF of IN 42149 1135 11 BOLTS BOLTS NNP 42149 1135 12 , , , 42149 1135 13 ETC ETC NNP 42149 1135 14 . . . 42149 1136 1 + + NFP 42149 1136 2 = = SYM 42149 1136 3 = = SYM 42149 1136 4 = = SYM 42149 1136 5 = = SYM 42149 1136 6 = = SYM 42149 1136 7 = = SYM 42149 1136 8 = = SYM 42149 1136 9 = = NFP 42149 1136 10 = = SYM 42149 1136 11 + + SYM 42149 1136 12 = = SYM 42149 1136 13 = = SYM 42149 1136 14 = = SYM 42149 1136 15 = = SYM 42149 1136 16 = = SYM 42149 1136 17 = = SYM 42149 1136 18 = = SYM 42149 1136 19 = = SYM 42149 1136 20 = = SYM 42149 1136 21 = = SYM 42149 1136 22 = = SYM 42149 1136 23 = = SYM 42149 1136 24 = = SYM 42149 1136 25 = = NFP 42149 1136 26 = = SYM 42149 1136 27 + + SYM 42149 1136 28 = = SYM 42149 1136 29 = = SYM 42149 1136 30 = = SYM 42149 1136 31 = = SYM 42149 1136 32 = = SYM 42149 1136 33 = = SYM 42149 1136 34 = = NFP 42149 1136 35 = = SYM 42149 1136 36 + + SYM 42149 1136 37 = = SYM 42149 1136 38 = = SYM 42149 1136 39 = = SYM 42149 1136 40 = = SYM 42149 1136 41 = = SYM 42149 1136 42 = = SYM 42149 1136 43 = = NFP 42149 1136 44 = = SYM 42149 1136 45 + + SYM 42149 1136 46 = = SYM 42149 1136 47 = = SYM 42149 1136 48 = = SYM 42149 1136 49 = = SYM 42149 1136 50 = = SYM 42149 1136 51 = = NFP 42149 1136 52 = = SYM 42149 1136 53 + + SYM 42149 1136 54 = = SYM 42149 1136 55 = = SYM 42149 1136 56 = = SYM 42149 1136 57 = = SYM 42149 1136 58 = = SYM 42149 1136 59 = = SYM 42149 1136 60 = = NFP 42149 1136 61 = = SYM 42149 1136 62 + + SYM 42149 1136 63 = = SYM 42149 1136 64 = = SYM 42149 1136 65 = = SYM 42149 1136 66 = = SYM 42149 1136 67 = = SYM 42149 1136 68 = = SYM 42149 1136 69 = = SYM 42149 1136 70 =| =| ADD 42149 1136 71 |Reference|Type |reference|type CD 42149 1136 72 of of IN 42149 1136 73 Lining.| Lining.| NNP 42149 1136 74 Weight Weight NNP 42149 1136 75 | | NNP 42149 1136 76 Weight Weight NNP 42149 1136 77 |Weight |Weight NNPS 42149 1136 78 | | NNP 42149 1136 79 Weight Weight NNP 42149 1136 80 |Diameter| |diameter| NN 42149 1136 81 |No |No NNP 42149 1136 82 . . . 42149 1137 1 | | CD 42149 1137 2 | | CD 42149 1137 3 of of IN 42149 1137 4 one one CD 42149 1137 5 | | CD 42149 1137 6 of of IN 42149 1137 7 one one CD 42149 1137 8 |of |of CD 42149 1137 9 one one CD 42149 1137 10 | | CD 42149 1137 11 of of IN 42149 1137 12 one one CD 42149 1137 13 | | NNP 42149 1137 14 of of IN 42149 1137 15 | | CD 42149 1137 16 | | CD 42149 1137 17 | | CD 42149 1137 18 | | CD 42149 1137 19 " " '' 42149 1137 20 A A NNP 42149 1137 21 " " `` 42149 1137 22 | | JJ 42149 1137 23 " " '' 42149 1137 24 B b NN 42149 1137 25 " " '' 42149 1137 26 |key |key NN 42149 1137 27 , , , 42149 1137 28 in|complete| in|complete| NN 42149 1137 29 bolts bolt NNS 42149 1137 30 , , , 42149 1137 31 | | NNP 42149 1137 32 | | CD 42149 1137 33 | | NNP 42149 1137 34 |Segment,|Segment,|pounds.|ring |Segment,|Segment,|pounds.|ring NNP 42149 1137 35 , , , 42149 1137 36 in| in| NNP 42149 1137 37 in in IN 42149 1137 38 | | NNP 42149 1137 39 | | NNP 42149 1137 40 | | CD 42149 1137 41 | | CD 42149 1137 42 in in IN 42149 1137 43 | | NNP 42149 1137 44 in in IN 42149 1137 45 | | CD 42149 1137 46 |pounds |pounds CD 42149 1137 47 . . . 42149 1138 1 |inches |inches NFP 42149 1138 2 . . . 42149 1139 1 | | NNP 42149 1139 2 | | CD 42149 1139 3 | | CD 42149 1139 4 |pounds |pounds CD 42149 1139 5 . . . 42149 1140 1 |pounds |pounds NFP 42149 1140 2 . . . 42149 1141 1 | | NNP 42149 1141 2 | | CD 42149 1141 3 | | CD 42149 1141 4 | | CD 42149 1141 5 | | CD 42149 1141 6 | | CD 42149 1141 7 | | CD 42149 1141 8 | | CD 42149 1141 9 | | CD 42149 1141 10 | | CD 42149 1141 11 | | CD 42149 1141 12 | | CD 42149 1141 13 | | CD 42149 1141 14 | | CD 42149 1141 15 | | CD 42149 1141 16 | | CD 42149 1141 17 | | CD 42149 1141 18 | | CD 42149 1141 19 | | CD 42149 1141 20 | | CD 42149 1141 21 | | CD 42149 1141 22 | | CD 42149 1141 23 | | CD 42149 1141 24 | | CD 42149 1141 25 | | CD 42149 1141 26 | | CD 42149 1141 27 | | CD 42149 1141 28 | | CD 42149 1141 29 | | CD 42149 1141 30 | | CD 42149 1141 31 | | CD 42149 1141 32 | | CD 42149 1141 33 | | CD 42149 1141 34 | | CD 42149 1141 35 | | CD 42149 1141 36 | | CD 42149 1141 37 |---------+---------------+--------+--------+-------+--------+--------| |---------+---------------+--------+--------+-------+--------+--------| NNP 42149 1141 38 |1 |1 NNP 42149 1141 39 |Ordinary |Ordinary NNP 42149 1141 40 cast cast VBD 42149 1141 41 | | NNP 42149 1141 42 2,063 2,063 CD 42149 1141 43 | | CD 42149 1141 44 2,068 2,068 CD 42149 1141 45 | | CD 42149 1141 46 480 480 CD 42149 1141 47 | | CD 42149 1141 48 23,183 23,183 CD 42149 1141 49 | | CD 42149 1141 50 1½ 1½ NNP 42149 1141 51 | | NNP 42149 1141 52 | | CD 42149 1141 53 |iron |iron CD 42149 1141 54 without without IN 42149 1141 55 | | NNP 42149 1141 56 | | NNP 42149 1141 57 | | CD 42149 1141 58 | | CD 42149 1141 59 | | CD 42149 1141 60 | | CD 42149 1141 61 | | CD 42149 1141 62 |caulking |caulking CD 42149 1141 63 | | NNP 42149 1141 64 | | CD 42149 1141 65 | | CD 42149 1141 66 | | CD 42149 1141 67 | | CD 42149 1141 68 | | CD 42149 1141 69 | | CD 42149 1141 70 |pockets |pockets CD 42149 1141 71 . . . 42149 1142 1 | | NNP 42149 1142 2 | | CD 42149 1142 3 | | CD 42149 1142 4 | | CD 42149 1142 5 | | CD 42149 1142 6 | | CD 42149 1142 7 |2 |2 CD 42149 1142 8 |Ordinary |ordinary CD 42149 1142 9 cast cast VBN 42149 1142 10 | | CD 42149 1142 11 2,038 2,038 CD 42149 1142 12 | | CD 42149 1142 13 2,043 2,043 CD 42149 1142 14 | | CD 42149 1142 15 469 469 CD 42149 1142 16 | | CD 42149 1142 17 22,897 22,897 CD 42149 1142 18 | | CD 42149 1142 19 1½ 1½ NNP 42149 1142 20 | | HYPH 42149 1142 21 | | CD 42149 1142 22 |iron |iron CD 42149 1142 23 with with IN 42149 1142 24 | | NNP 42149 1142 25 | | NNP 42149 1142 26 | | CD 42149 1142 27 | | CD 42149 1142 28 | | CD 42149 1142 29 | | CD 42149 1142 30 | | CD 42149 1142 31 |caulking |caulking CD 42149 1142 32 | | NNP 42149 1142 33 | | CD 42149 1142 34 | | CD 42149 1142 35 | | CD 42149 1142 36 | | CD 42149 1142 37 | | CD 42149 1142 38 | | CD 42149 1142 39 |pockets |pockets CD 42149 1142 40 . . . 42149 1143 1 | | NNP 42149 1143 2 | | CD 42149 1143 3 | | CD 42149 1143 4 | | CD 42149 1143 5 | | CD 42149 1143 6 | | CD 42149 1143 7 |3 |3 NNS 42149 1143 8 |Ordinary |Ordinary NNP 42149 1143 9 cast cast VBN 42149 1143 10 | | CD 42149 1143 11 2,247 2,247 CD 42149 1143 12 | | CD 42149 1143 13 2,252 2,252 CD 42149 1143 14 | | CD 42149 1143 15 522 522 CD 42149 1143 16 | | CD 42149 1143 17 25,249 25,249 CD 42149 1143 18 | | CD 42149 1143 19 1½ 1½ NNP 42149 1143 20 | | NNPS 42149 1143 21 | | CD 42149 1143 22 |steel |steel CD 42149 1143 23 without without IN 42149 1143 24 | | CD 42149 1143 25 | | CD 42149 1143 26 | | CD 42149 1143 27 | | CD 42149 1143 28 | | CD 42149 1143 29 | | CD 42149 1143 30 | | CD 42149 1143 31 |caulking |caulking CD 42149 1143 32 | | NNP 42149 1143 33 | | CD 42149 1143 34 | | CD 42149 1143 35 | | CD 42149 1143 36 | | CD 42149 1143 37 | | CD 42149 1143 38 | | CD 42149 1143 39 |pockets |pockets CD 42149 1143 40 . . . 42149 1144 1 | | NNP 42149 1144 2 | | CD 42149 1144 3 | | CD 42149 1144 4 | | CD 42149 1144 5 | | CD 42149 1144 6 | | CD 42149 1144 7 |4 |4 NN 42149 1144 8 |Heavy |Heavy NNS 42149 1144 9 cast cast VBD 42149 1144 10 iron| iron| -RRB- 42149 1144 11 2,579 2,579 CD 42149 1144 12 | | CD 42149 1144 13 2,584 2,584 CD 42149 1144 14 | | CD 42149 1144 15 606 606 CD 42149 1144 16 | | CD 42149 1144 17 28,985 28,985 CD 42149 1144 18 | | CD 42149 1144 19 1¾ 1â¾ CD 42149 1144 20 | | CD 42149 1144 21 | | CD 42149 1144 22 |without |without CD 42149 1144 23 | | NNP 42149 1144 24 | | CD 42149 1144 25 | | CD 42149 1144 26 | | CD 42149 1144 27 | | CD 42149 1144 28 | | CD 42149 1144 29 | | CD 42149 1144 30 |caulking |caulking CD 42149 1144 31 | | NNP 42149 1144 32 | | CD 42149 1144 33 | | CD 42149 1144 34 | | CD 42149 1144 35 | | CD 42149 1144 36 | | CD 42149 1144 37 | | CD 42149 1144 38 |pockets |pockets CD 42149 1144 39 . . . 42149 1145 1 | | NNP 42149 1145 2 | | CD 42149 1145 3 | | CD 42149 1145 4 | | CD 42149 1145 5 | | CD 42149 1145 6 | | CD 42149 1145 7 + + NNS 42149 1145 8 ---------+---------------+--------+--------+-------+--------+--------+ ---------+---------------+--------+--------+-------+--------+--------+ . 42149 1145 9 + + SYM 42149 1145 10 = = SYM 42149 1145 11 = = SYM 42149 1145 12 = = SYM 42149 1145 13 = = SYM 42149 1145 14 = = SYM 42149 1145 15 = = SYM 42149 1145 16 = = SYM 42149 1145 17 = = NFP 42149 1145 18 = = SYM 42149 1145 19 + + SYM 42149 1145 20 = = SYM 42149 1145 21 = = SYM 42149 1145 22 = = SYM 42149 1145 23 = = SYM 42149 1145 24 = = SYM 42149 1145 25 = = SYM 42149 1145 26 = = SYM 42149 1145 27 = = SYM 42149 1145 28 = = SYM 42149 1145 29 = = SYM 42149 1145 30 = = SYM 42149 1145 31 = = SYM 42149 1145 32 = = SYM 42149 1145 33 = = NFP 42149 1145 34 = = SYM 42149 1145 35 + + SYM 42149 1145 36 = = SYM 42149 1145 37 = = SYM 42149 1145 38 = = SYM 42149 1145 39 = = SYM 42149 1145 40 = = SYM 42149 1145 41 = = SYM 42149 1145 42 = = NFP 42149 1145 43 = = SYM 42149 1145 44 + + SYM 42149 1145 45 = = SYM 42149 1145 46 = = SYM 42149 1145 47 = = SYM 42149 1145 48 = = SYM 42149 1145 49 = = SYM 42149 1145 50 = = NFP 42149 1145 51 = = SYM 42149 1145 52 + + SYM 42149 1145 53 = = SYM 42149 1145 54 = = SYM 42149 1145 55 = = SYM 42149 1145 56 = = SYM 42149 1145 57 = = SYM 42149 1145 58 = = SYM 42149 1145 59 = = SYM 42149 1145 60 = = NFP 42149 1145 61 = = SYM 42149 1145 62 + + SYM 42149 1145 63 |Reference|Type |reference|type CD 42149 1145 64 of of IN 42149 1145 65 Lining.| Lining.| NNP 42149 1145 66 Weight Weight NNP 42149 1145 67 |Weight |Weight NNPS 42149 1145 68 | | NNP 42149 1145 69 Total Total NNP 42149 1145 70 | | NNS 42149 1145 71 |No |No NNP 42149 1145 72 . . . 42149 1146 1 | | NNP 42149 1146 2 | | NNP 42149 1146 3 of of IN 42149 1146 4 1 1 CD 42149 1146 5 | | CD 42149 1146 6 of of IN 42149 1146 7 |weight |weight CD 42149 1146 8 of| of| NNP 42149 1146 9 | | NNP 42149 1146 10 | | NNP 42149 1146 11 | | CD 42149 1146 12 bolt bolt NN 42149 1146 13 , , , 42149 1146 14 |bolts |bolts CD 42149 1146 15 , , , 42149 1146 16 |one |one NNP 42149 1146 17 ring ring NN 42149 1146 18 | | CD 42149 1146 19 | | CD 42149 1146 20 | | NNP 42149 1146 21 |nut |nut NNP 42149 1146 22 , , , 42149 1146 23 and| and| NNP 42149 1146 24 nuts nut NNS 42149 1146 25 , , , 42149 1146 26 |(segments| |(segments| CD 42149 1146 27 | | CD 42149 1146 28 | | CD 42149 1146 29 | | CD 42149 1146 30 2 2 CD 42149 1146 31 | | CD 42149 1146 32 and and CC 42149 1146 33 | | NNP 42149 1146 34 and and CC 42149 1146 35 | | NNP 42149 1146 36 | | CD 42149 1146 37 | | CD 42149 1146 38 |washers,|washers| |washers,|washers| CD 42149 1146 39 bolts bolt NNS 42149 1146 40 ) ) -RRB- 42149 1146 41 , , , 42149 1146 42 | | NNP 42149 1146 43 | | NNP 42149 1146 44 | | CD 42149 1146 45 | | NNS 42149 1146 46 in in IN 42149 1146 47 | | CD 42149 1146 48 per per IN 42149 1146 49 | | NNP 42149 1146 50 in in IN 42149 1146 51 | | NNP 42149 1146 52 | | CD 42149 1146 53 | | CD 42149 1146 54 |pounds |pounds CD 42149 1146 55 . . . 42149 1147 1 | | NNS 42149 1147 2 ring ring VBP 42149 1147 3 , , , 42149 1147 4 | | HYPH 42149 1147 5 pounds pound NNS 42149 1147 6 . . . 42149 1148 1 | | NNP 42149 1148 2 | | NNP 42149 1148 3 | | CD 42149 1148 4 | | CD 42149 1148 5 | | CD 42149 1148 6 in in IN 42149 1148 7 | | NNP 42149 1148 8 | | NNP 42149 1148 9 | | CD 42149 1148 10 | | NNP 42149 1148 11 | | NNP 42149 1148 12 |pounds.| |pounds.| NNP 42149 1148 13 | | NNP 42149 1148 14 |---------+---------------+--------+-------+---------| |---------+---------------+--------+-------+---------| NNP 42149 1148 15 |1 |1 . 42149 1148 16 |Ordinary |Ordinary NNP 42149 1148 17 cast cast VBD 42149 1148 18 | | CD 42149 1148 19 6.62 6.62 CD 42149 1148 20 | | CD 42149 1148 21 840.7 840.7 CD 42149 1148 22 | | CD 42149 1148 23 24,024 24,024 CD 42149 1148 24 | | CD 42149 1148 25 | | CD 42149 1148 26 |iron |iron CD 42149 1148 27 without without IN 42149 1148 28 | | NNP 42149 1148 29 | | NNP 42149 1148 30 | | CD 42149 1148 31 | | CD 42149 1148 32 | | CD 42149 1148 33 |caulking |caulking CD 42149 1148 34 | | NNP 42149 1148 35 | | CD 42149 1148 36 | | CD 42149 1148 37 | | CD 42149 1148 38 | | CD 42149 1148 39 |pockets |pockets CD 42149 1148 40 . . . 42149 1149 1 | | NNP 42149 1149 2 | | CD 42149 1149 3 | | CD 42149 1149 4 | | CD 42149 1149 5 |2 |2 CD 42149 1149 6 |Ordinary |ordinary CD 42149 1149 7 cast cast VBN 42149 1149 8 | | CD 42149 1149 9 6.62 6.62 CD 42149 1149 10 | | CD 42149 1149 11 840.7 840.7 CD 42149 1149 12 | | CD 42149 1149 13 23,738 23,738 CD 42149 1149 14 | | CD 42149 1149 15 | | CD 42149 1149 16 |iron |iron CD 42149 1149 17 with with IN 42149 1149 18 | | NNP 42149 1149 19 | | NNP 42149 1149 20 | | CD 42149 1149 21 | | CD 42149 1149 22 | | CD 42149 1149 23 |caulking |caulking CD 42149 1149 24 | | NNP 42149 1149 25 | | CD 42149 1149 26 | | CD 42149 1149 27 | | CD 42149 1149 28 | | CD 42149 1149 29 |pockets |pockets CD 42149 1149 30 . . . 42149 1150 1 | | NNP 42149 1150 2 | | NNP 42149 1150 3 | | CD 42149 1150 4 | | CD 42149 1150 5 |3 |3 NNS 42149 1150 6 |Ordinary |Ordinary NNP 42149 1150 7 cast cast VBN 42149 1150 8 | | CD 42149 1150 9 6.62 6.62 CD 42149 1150 10 | | CD 42149 1150 11 840.7 840.7 CD 42149 1150 12 | | CD 42149 1150 13 26,090 26,090 CD 42149 1150 14 | | CD 42149 1150 15 | | CD 42149 1150 16 |steel |steel CD 42149 1150 17 without without IN 42149 1150 18 | | CD 42149 1150 19 | | CD 42149 1150 20 | | CD 42149 1150 21 | | CD 42149 1150 22 | | CD 42149 1150 23 |caulking |caulking CD 42149 1150 24 | | NNP 42149 1150 25 | | CD 42149 1150 26 | | CD 42149 1150 27 | | CD 42149 1150 28 | | CD 42149 1150 29 |pockets |pockets CD 42149 1150 30 . . . 42149 1151 1 | | NNP 42149 1151 2 | | CD 42149 1151 3 | | CD 42149 1151 4 | | CD 42149 1151 5 |4 |4 NN 42149 1151 6 |Heavy |Heavy NNS 42149 1151 7 cast cast VBD 42149 1151 8 iron| iron| CD 42149 1151 9 10.50 10.50 CD 42149 1151 10 |1,333.5| |1,333.5| NN 42149 1151 11 30,319 30,319 CD 42149 1151 12 | | CD 42149 1151 13 | | CD 42149 1151 14 |without |without CD 42149 1151 15 | | CD 42149 1151 16 | | CD 42149 1151 17 | | CD 42149 1151 18 | | CD 42149 1151 19 | | CD 42149 1151 20 |caulking |caulking CD 42149 1151 21 | | NNP 42149 1151 22 | | CD 42149 1151 23 | | CD 42149 1151 24 | | CD 42149 1151 25 | | CD 42149 1151 26 |pockets |pockets CD 42149 1151 27 . . . 42149 1152 1 | | NNP 42149 1152 2 | | NNP 42149 1152 3 | | CD 42149 1152 4 | | CD 42149 1152 5 + + CC 42149 1152 6 ---------+---------------+--------+-------+---------+ ---------+---------------+--------+-------+---------+ XX 42149 1152 7 WEIGHTS weights WRB 42149 1152 8 OF of IN 42149 1152 9 VARIOUS various NN 42149 1152 10 TYPES TYPES NNP 42149 1152 11 OF of IN 42149 1152 12 LINING lining NN 42149 1152 13 PER per IN 42149 1152 14 LINEAR LINEAR NNP 42149 1152 15 FOOT FOOT NNS 42149 1152 16 OF of IN 42149 1152 17 TUNNEL TUNNEL NNP 42149 1152 18 . . . 42149 1153 1 + + NFP 42149 1153 2 ---------+---------------+--------------+-------------+---------------+ ---------+---------------+--------------+-------------+---------------+ NNP 42149 1153 3 |Reference|Type |reference|type ADD 42149 1153 4 of of IN 42149 1153 5 Lining.|Weights Lining.|Weights NNP 42149 1153 6 of of IN 42149 1153 7 |Weights |weight NNS 42149 1153 8 of of IN 42149 1153 9 |Weights |weight NNS 42149 1153 10 of of IN 42149 1153 11 | | CD 42149 1153 12 |No |No NNP 42149 1153 13 . . . 42149 1154 1 | | NNP 42149 1154 2 |complete |complete NNP 42149 1154 3 rings|bolts rings|bolts NNP 42149 1154 4 , , , 42149 1154 5 nuts nut NNS 42149 1154 6 , , , 42149 1154 7 |segments |segments CD 42149 1154 8 and and CC 42149 1154 9 | | NNP 42149 1154 10 | | NNP 42149 1154 11 | | CD 42149 1154 12 |(segments |(segment NNS 42149 1154 13 |and |and JJ 42149 1154 14 washers washer NNS 42149 1154 15 , , , 42149 1154 16 |bolts |bolts CD 42149 1154 17 in in IN 42149 1154 18 tunnel| tunnel| -LRB- 42149 1154 19 | | NNP 42149 1154 20 | | NNP 42149 1154 21 |only |only CD 42149 1154 22 ) ) -RRB- 42149 1154 23 , , , 42149 1154 24 in in IN 42149 1154 25 |in |in CD 42149 1154 26 pounds pound NNS 42149 1154 27 . . . 42149 1155 1 |complete |complete CD 42149 1155 2 , , , 42149 1155 3 in in IN 42149 1155 4 | | NNP 42149 1155 5 | | CD 42149 1155 6 | | CD 42149 1155 7 |pounds |pounds CD 42149 1155 8 . . . 42149 1156 1 | | NNP 42149 1156 2 |pounds |pounds CD 42149 1156 3 . . . 42149 1157 1 | | NNP 42149 1157 2 |---------+---------------+--------------+-------------+---------------| |---------+---------------+--------------+-------------+---------------| NNP 42149 1157 3 |1 |1 . 42149 1157 4 |Ordinary |Ordinary NNP 42149 1157 5 cast cast VBN 42149 1157 6 | | NNP 42149 1157 7 9,273.0 9,273.0 NNP 42149 1157 8 | | CD 42149 1157 9 336.3 336.3 CD 42149 1157 10 | | CD 42149 1157 11 9,609.6 9,609.6 CD 42149 1157 12 | | CD 42149 1157 13 | | NNP 42149 1157 14 |iron |iron CD 42149 1157 15 without without IN 42149 1157 16 | | NNP 42149 1157 17 | | NNP 42149 1157 18 | | CD 42149 1157 19 | | CD 42149 1157 20 | | CD 42149 1157 21 |pockets |pockets CD 42149 1157 22 . . . 42149 1158 1 | | NNP 42149 1158 2 | | CD 42149 1158 3 | | CD 42149 1158 4 | | CD 42149 1158 5 | | CD 42149 1158 6 | | CD 42149 1158 7 | | CD 42149 1158 8 | | CD 42149 1158 9 | | CD 42149 1158 10 | | CD 42149 1158 11 |2 |2 CD 42149 1158 12 |Ordinary |ordinary JJ 42149 1158 13 cast cast VBN 42149 1158 14 | | NNP 42149 1158 15 9,158.8 9,158.8 CD 42149 1158 16 | | CD 42149 1158 17 336.3 336.3 CD 42149 1158 18 | | CD 42149 1158 19 9,495.2 9,495.2 CD 42149 1158 20 | | CD 42149 1158 21 | | CD 42149 1158 22 |iron |iron CD 42149 1158 23 with with IN 42149 1158 24 | | NNP 42149 1158 25 | | NNP 42149 1158 26 | | CD 42149 1158 27 | | CD 42149 1158 28 | | CD 42149 1158 29 |pockets |pockets CD 42149 1158 30 . . . 42149 1159 1 | | NNP 42149 1159 2 | | CD 42149 1159 3 | | CD 42149 1159 4 | | CD 42149 1159 5 | | CD 42149 1159 6 | | CD 42149 1159 7 | | CD 42149 1159 8 | | CD 42149 1159 9 | | CD 42149 1159 10 | | CD 42149 1159 11 |3 |3 NNS 42149 1159 12 |Ordinary |Ordinary NNP 42149 1159 13 cast cast VBN 42149 1159 14 | | CD 42149 1159 15 10,099.6 10,099.6 CD 42149 1159 16 | | CD 42149 1159 17 336.3 336.3 CD 42149 1159 18 | | CD 42149 1159 19 10,436.0 10,436.0 CD 42149 1159 20 | | CD 42149 1159 21 | | CD 42149 1159 22 |steel |steel CD 42149 1159 23 without without IN 42149 1159 24 | | CD 42149 1159 25 | | CD 42149 1159 26 | | CD 42149 1159 27 | | CD 42149 1159 28 | | CD 42149 1159 29 |pockets |pockets CD 42149 1159 30 . . . 42149 1160 1 | | NNP 42149 1160 2 | | CD 42149 1160 3 | | CD 42149 1160 4 | | CD 42149 1160 5 | | CD 42149 1160 6 | | CD 42149 1160 7 | | CD 42149 1160 8 | | CD 42149 1160 9 | | CD 42149 1160 10 | | CD 42149 1160 11 |4 |4 NN 42149 1160 12 |Heavy |Heavy NNS 42149 1160 13 cast cast VBN 42149 1160 14 iron| iron| CD 42149 1160 15 11,594.0 11,594.0 CD 42149 1160 16 | | CD 42149 1160 17 533.4 533.4 CD 42149 1160 18 | | CD 42149 1160 19 12,127.6 12,127.6 CD 42149 1160 20 | | CD 42149 1160 21 | | CD 42149 1160 22 |without |without CD 42149 1160 23 | | CD 42149 1160 24 | | CD 42149 1160 25 | | CD 42149 1160 26 | | CD 42149 1160 27 | | CD 42149 1160 28 |pockets |pockets CD 42149 1160 29 . . . 42149 1161 1 | | NNP 42149 1161 2 | | CD 42149 1161 3 | | CD 42149 1161 4 | | NNS 42149 1161 5 + + NNS 42149 1161 6 = = SYM 42149 1161 7 = = SYM 42149 1161 8 = = SYM 42149 1161 9 = = SYM 42149 1161 10 = = SYM 42149 1161 11 = = SYM 42149 1161 12 = = SYM 42149 1161 13 = = NFP 42149 1161 14 = = SYM 42149 1161 15 + + SYM 42149 1161 16 = = SYM 42149 1161 17 = = SYM 42149 1161 18 = = SYM 42149 1161 19 = = SYM 42149 1161 20 = = SYM 42149 1161 21 = = SYM 42149 1161 22 = = SYM 42149 1161 23 = = SYM 42149 1161 24 = = SYM 42149 1161 25 = = SYM 42149 1161 26 = = SYM 42149 1161 27 = = SYM 42149 1161 28 = = SYM 42149 1161 29 = = NFP 42149 1161 30 = = SYM 42149 1161 31 + + SYM 42149 1161 32 = = SYM 42149 1161 33 = = SYM 42149 1161 34 = = SYM 42149 1161 35 = = SYM 42149 1161 36 = = SYM 42149 1161 37 = = SYM 42149 1161 38 = = SYM 42149 1161 39 = = SYM 42149 1161 40 = = SYM 42149 1161 41 = = SYM 42149 1161 42 = = SYM 42149 1161 43 = = SYM 42149 1161 44 = = NFP 42149 1161 45 = = SYM 42149 1161 46 + + SYM 42149 1161 47 = = SYM 42149 1161 48 = = SYM 42149 1161 49 = = SYM 42149 1161 50 = = SYM 42149 1161 51 = = SYM 42149 1161 52 = = SYM 42149 1161 53 = = SYM 42149 1161 54 = = SYM 42149 1161 55 = = SYM 42149 1161 56 = = SYM 42149 1161 57 = = SYM 42149 1161 58 = = NFP 42149 1161 59 = = SYM 42149 1161 60 + + SYM 42149 1161 61 = = SYM 42149 1161 62 = = SYM 42149 1161 63 = = SYM 42149 1161 64 = = SYM 42149 1161 65 = = SYM 42149 1161 66 = = SYM 42149 1161 67 = = SYM 42149 1161 68 = = SYM 42149 1161 69 = = SYM 42149 1161 70 = = SYM 42149 1161 71 = = SYM 42149 1161 72 = = SYM 42149 1161 73 = = SYM 42149 1161 74 = = NFP 42149 1161 75 = = NFP 42149 1161 76 + + CC 42149 1161 77 The the DT 42149 1161 78 weights weight NNS 42149 1161 79 in in IN 42149 1161 80 Table table NN 42149 1161 81 18 18 CD 42149 1161 82 are be VBP 42149 1161 83 calculated calculate VBN 42149 1161 84 by by IN 42149 1161 85 assuming assume VBG 42149 1161 86 cast cast NN 42149 1161 87 iron iron NN 42149 1161 88 to to TO 42149 1161 89 weigh weigh VB 42149 1161 90 450 450 CD 42149 1161 91 lb lb RB 42149 1161 92 . . . 42149 1162 1 per per IN 42149 1162 2 cu cu NNP 42149 1162 3 . . . 42149 1163 1 ft ft NNP 42149 1163 2 . . NNP 42149 1163 3 , , , 42149 1163 4 and and CC 42149 1163 5 cast cast VBN 42149 1163 6 steel steel NN 42149 1163 7 490 490 CD 42149 1163 8 lb lb RB 42149 1163 9 . . . 42149 1164 1 In in IN 42149 1164 2 actual actual JJ 42149 1164 3 practice practice NN 42149 1164 4 the the DT 42149 1164 5 " " `` 42149 1164 6 ordinary ordinary JJ 42149 1164 7 " " '' 42149 1164 8 iron iron NN 42149 1164 9 was be VBD 42149 1164 10 found find VBN 42149 1164 11 to to TO 42149 1164 12 weigh weigh VB 42149 1164 13 a a DT 42149 1164 14 little little JJ 42149 1164 15 more more JJR 42149 1164 16 than than IN 42149 1164 17 the the DT 42149 1164 18 weights weight NNS 42149 1164 19 given give VBN 42149 1164 20 , , , 42149 1164 21 and and CC 42149 1164 22 the the DT 42149 1164 23 " " `` 42149 1164 24 heavy heavy JJ 42149 1164 25 " " '' 42149 1164 26 a a DT 42149 1164 27 little little JJ 42149 1164 28 less less JJR 42149 1164 29 . . . 42149 1165 1 The the DT 42149 1165 2 silt silt NN 42149 1165 3 in in IN 42149 1165 4 the the DT 42149 1165 5 sub sub NN 42149 1165 6 - - JJ 42149 1165 7 river river JJ 42149 1165 8 portion portion NN 42149 1165 9 averaged average VBD 42149 1165 10 about about RB 42149 1165 11 100 100 CD 42149 1165 12 lb lb RB 42149 1165 13 . . . 42149 1166 1 per per IN 42149 1166 2 cu cu NNP 42149 1166 3 . . . 42149 1167 1 ft ft NNP 42149 1167 2 . . NNP 42149 1167 3 , , , 42149 1167 4 so so IN 42149 1167 5 that that IN 42149 1167 6 the the DT 42149 1167 7 weight weight NN 42149 1167 8 of of IN 42149 1167 9 the the DT 42149 1167 10 silt silt NN 42149 1167 11 displaced displace VBN 42149 1167 12 by by IN 42149 1167 13 the the DT 42149 1167 14 tunnel tunnel NN 42149 1167 15 was be VBD 42149 1167 16 about about RB 42149 1167 17 41,548 41,548 CD 42149 1167 18 lb lb RB 42149 1167 19 . . . 42149 1168 1 per per IN 42149 1168 2 lin lin NNP 42149 1168 3 . . . 42149 1169 1 ft ft NNP 42149 1169 2 . . NNP 42149 1169 3 _ _ NNP 42149 1169 4 Taper Taper NNP 42149 1169 5 Rings._--In rings._--in JJ 42149 1169 6 order order NN 42149 1169 7 to to TO 42149 1169 8 pass pass VB 42149 1169 9 around around RP 42149 1169 10 curves curve NNS 42149 1169 11 ( ( -LRB- 42149 1169 12 whether whether IN 42149 1169 13 horizontal horizontal JJ 42149 1169 14 or or CC 42149 1169 15 vertical vertical JJ 42149 1169 16 ) ) -RRB- 42149 1169 17 , , , 42149 1169 18 or or CC 42149 1169 19 to to TO 42149 1169 20 correct correct VB 42149 1169 21 deviation deviation NN 42149 1169 22 from from IN 42149 1169 23 line line NN 42149 1169 24 or or CC 42149 1169 25 grade grade NN 42149 1169 26 , , , 42149 1169 27 taper taper NN 42149 1169 28 rings ring NNS 42149 1169 29 were be VBD 42149 1169 30 used use VBN 42149 1169 31 ; ; : 42149 1169 32 by by IN 42149 1169 33 this this DT 42149 1169 34 is be VBZ 42149 1169 35 meant mean VBN 42149 1169 36 rings ring NNS 42149 1169 37 which which WDT 42149 1169 38 when when WRB 42149 1169 39 in in IN 42149 1169 40 place place NN 42149 1169 41 in in IN 42149 1169 42 the the DT 42149 1169 43 tunnels tunnel NNS 42149 1169 44 were be VBD 42149 1169 45 wider wide JJR 42149 1169 46 than than IN 42149 1169 47 the the DT 42149 1169 48 standard standard JJ 42149 1169 49 rings ring NNS 42149 1169 50 , , , 42149 1169 51 either either CC 42149 1169 52 at at IN 42149 1169 53 one one CD 42149 1169 54 side side NN 42149 1169 55 ( ( -LRB- 42149 1169 56 horizontal horizontal JJ 42149 1169 57 tapers taper NNS 42149 1169 58 or or CC 42149 1169 59 " " `` 42149 1169 60 Liners Liners NNPS 42149 1169 61 " " '' 42149 1169 62 ) ) -RRB- 42149 1169 63 , , , 42149 1169 64 or or CC 42149 1169 65 at at IN 42149 1169 66 the the DT 42149 1169 67 top top NN 42149 1169 68 ( ( -LRB- 42149 1169 69 " " `` 42149 1169 70 Depressors Depressors NNPS 42149 1169 71 " " '' 42149 1169 72 ) ) -RRB- 42149 1169 73 , , , 42149 1169 74 or or CC 42149 1169 75 at at IN 42149 1169 76 the the DT 42149 1169 77 bottom bottom NN 42149 1169 78 ( ( -LRB- 42149 1169 79 " " `` 42149 1169 80 Elevators Elevators NNPS 42149 1169 81 " " '' 42149 1169 82 ) ) -RRB- 42149 1169 83 . . . 42149 1170 1 In in IN 42149 1170 2 the the DT 42149 1170 3 original original JJ 42149 1170 4 design design NN 42149 1170 5 a a DT 42149 1170 6 ½-in â½-in XX 42149 1170 7 . . . 42149 1171 1 taper taper NN 42149 1171 2 was be VBD 42149 1171 3 called call VBN 42149 1171 4 for for IN 42149 1171 5 , , , 42149 1171 6 that that RB 42149 1171 7 is is RB 42149 1171 8 , , , 42149 1171 9 the the DT 42149 1171 10 wide wide JJ 42149 1171 11 side side NN 42149 1171 12 of of IN 42149 1171 13 the the DT 42149 1171 14 ring ring NN 42149 1171 15 was be VBD 42149 1171 16 ½ ½ NNP 42149 1171 17 in in IN 42149 1171 18 . . . 42149 1172 1 wider wide JJR 42149 1172 2 than than IN 42149 1172 3 the the DT 42149 1172 4 narrow narrow JJ 42149 1172 5 side side NN 42149 1172 6 , , , 42149 1172 7 which which WDT 42149 1172 8 was be VBD 42149 1172 9 of of IN 42149 1172 10 the the DT 42149 1172 11 standard standard JJ 42149 1172 12 width width NN 42149 1172 13 of of IN 42149 1172 14 2 2 CD 42149 1172 15 ft ft NN 42149 1172 16 . . NNP 42149 1172 17 6 6 CD 42149 1172 18 in in IN 42149 1172 19 . . . 42149 1173 1 As as IN 42149 1173 2 a a DT 42149 1173 3 matter matter NN 42149 1173 4 of of IN 42149 1173 5 fact fact NN 42149 1173 6 , , , 42149 1173 7 during during IN 42149 1173 8 construction construction NN 42149 1173 9 , , , 42149 1173 10 not not RB 42149 1173 11 only only RB 42149 1173 12 ½-in â½-in XX 42149 1173 13 . . . 42149 1173 14 , , , 42149 1173 15 but but CC 42149 1173 16 ¾-in ¾-in NNP 42149 1173 17 . . . 42149 1174 1 and and CC 42149 1174 2 1-in 1-in CD 42149 1174 3 . . . 42149 1175 1 tapers taper NNS 42149 1175 2 were be VBD 42149 1175 3 often often RB 42149 1175 4 used use VBN 42149 1175 5 . . . 42149 1176 1 These these DT 42149 1176 2 taper taper NN 42149 1176 3 rings ring NNS 42149 1176 4 necessitated necessitate VBD 42149 1176 5 each each DT 42149 1176 6 plate plate NN 42149 1176 7 having have VBG 42149 1176 8 its -PRON- PRP$ 42149 1176 9 own own JJ 42149 1176 10 unalterable unalterable JJ 42149 1176 11 position position NN 42149 1176 12 in in IN 42149 1176 13 the the DT 42149 1176 14 ring ring NN 42149 1176 15 , , , 42149 1176 16 hence hence RB 42149 1176 17 each each DT 42149 1176 18 plate plate NN 42149 1176 19 of of IN 42149 1176 20 the the DT 42149 1176 21 taper taper NN 42149 1176 22 ring ring NN 42149 1176 23 was be VBD 42149 1176 24 numbered number VBN 42149 1176 25 , , , 42149 1176 26 so so IN 42149 1176 27 that that IN 42149 1176 28 no no DT 42149 1176 29 mistake mistake NN 42149 1176 30 could could MD 42149 1176 31 be be VB 42149 1176 32 made make VBN 42149 1176 33 during during IN 42149 1176 34 erection erection NN 42149 1176 35 . . . 42149 1177 1 The the DT 42149 1177 2 taper taper NN 42149 1177 3 rings ring NNS 42149 1177 4 were be VBD 42149 1177 5 made make VBN 42149 1177 6 by by IN 42149 1177 7 casting cast VBG 42149 1177 8 a a DT 42149 1177 9 ring ring NN 42149 1177 10 with with IN 42149 1177 11 one one CD 42149 1177 12 circumferential circumferential JJ 42149 1177 13 flange flange NN 42149 1177 14 much much RB 42149 1177 15 thicker thick JJR 42149 1177 16 than than IN 42149 1177 17 usual usual JJ 42149 1177 18 , , , 42149 1177 19 and and CC 42149 1177 20 then then RB 42149 1177 21 machining machine VBG 42149 1177 22 off off RP 42149 1177 23 this this DT 42149 1177 24 flange flange NN 42149 1177 25 to to IN 42149 1177 26 the the DT 42149 1177 27 taper taper NN 42149 1177 28 . . . 42149 1178 1 This this DT 42149 1178 2 was be VBD 42149 1178 3 not not RB 42149 1178 4 only only RB 42149 1178 5 much much RB 42149 1178 6 cheaper cheap JJR 42149 1178 7 than than IN 42149 1178 8 making make VBG 42149 1178 9 a a DT 42149 1178 10 special special JJ 42149 1178 11 pattern pattern NN 42149 1178 12 for for IN 42149 1178 13 each each DT 42149 1178 14 plate plate NN 42149 1178 15 , , , 42149 1178 16 but but CC 42149 1178 17 made make VBD 42149 1178 18 it -PRON- PRP 42149 1178 19 possible possible JJ 42149 1178 20 to to TO 42149 1178 21 see see VB 42149 1178 22 clearly clearly RB 42149 1178 23 where where WRB 42149 1178 24 and and CC 42149 1178 25 what what WP 42149 1178 26 tapers taper NNS 42149 1178 27 were be VBD 42149 1178 28 used use VBN 42149 1178 29 in in IN 42149 1178 30 the the DT 42149 1178 31 tunnel tunnel NN 42149 1178 32 . . . 42149 1179 1 Taper taper NN 42149 1179 2 rings ring NNS 42149 1179 3 were be VBD 42149 1179 4 provided provide VBN 42149 1179 5 for for IN 42149 1179 6 all all DT 42149 1179 7 kinds kind NNS 42149 1179 8 of of IN 42149 1179 9 lining lining NN 42149 1179 10 ( ( -LRB- 42149 1179 11 except except IN 42149 1179 12 the the DT 42149 1179 13 cast cast JJ 42149 1179 14 steel steel NN 42149 1179 15 ) ) -RRB- 42149 1179 16 , , , 42149 1179 17 and and CC 42149 1179 18 the the DT 42149 1179 19 lack lack NN 42149 1179 20 of of IN 42149 1179 21 taper taper NN 42149 1179 22 steel steel NN 42149 1179 23 rings ring NNS 42149 1179 24 was be VBD 42149 1179 25 felt feel VBN 42149 1179 26 when when WRB 42149 1179 27 building build VBG 42149 1179 28 the the DT 42149 1179 29 steel steel NN 42149 1179 30 - - HYPH 42149 1179 31 lined line VBN 42149 1179 32 parts part NNS 42149 1179 33 of of IN 42149 1179 34 the the DT 42149 1179 35 tunnel tunnel NN 42149 1179 36 , , , 42149 1179 37 as as IN 42149 1179 38 nothing nothing NN 42149 1179 39 could could MD 42149 1179 40 be be VB 42149 1179 41 done do VBN 42149 1179 42 to to TO 42149 1179 43 remedy remedy VB 42149 1179 44 deviations deviation NNS 42149 1179 45 from from IN 42149 1179 46 line line NN 42149 1179 47 or or CC 42149 1179 48 grade grade NN 42149 1179 49 until until IN 42149 1179 50 the the DT 42149 1179 51 steel steel NN 42149 1179 52 section section NN 42149 1179 53 was be VBD 42149 1179 54 over over RB 42149 1179 55 and and CC 42149 1179 56 cast cast VBN 42149 1179 57 iron iron NN 42149 1179 58 could could MD 42149 1179 59 again again RB 42149 1179 60 be be VB 42149 1179 61 used use VBN 42149 1179 62 . . . 42149 1180 1 Table table NN 42149 1180 2 19 19 CD 42149 1180 3 gives give VBZ 42149 1180 4 the the DT 42149 1180 5 weights weight NNS 42149 1180 6 of of IN 42149 1180 7 the the DT 42149 1180 8 different different JJ 42149 1180 9 kinds kind NNS 42149 1180 10 of of IN 42149 1180 11 tapers taper NNS 42149 1180 12 used use VBN 42149 1180 13 . . . 42149 1181 1 TABLE table NN 42149 1181 2 19.--WEIGHTS 19.--weights CD 42149 1181 3 OF of IN 42149 1181 4 CAST cast NN 42149 1181 5 - - HYPH 42149 1181 6 IRON IRON NNP 42149 1181 7 TAPER taper NN 42149 1181 8 RINGS ring NNS 42149 1181 9 , , , 42149 1181 10 IN in IN 42149 1181 11 POUNDS pound NNS 42149 1181 12 PER per IN 42149 1181 13 COMPLETE COMPLETE NNP 42149 1181 14 RING ring NN 42149 1181 15 . . . 42149 1182 1 = = NFP 42149 1182 2 = = NFP 42149 1182 3 = = SYM 42149 1182 4 = = SYM 42149 1182 5 = = SYM 42149 1182 6 = = SYM 42149 1182 7 = = SYM 42149 1182 8 = = SYM 42149 1182 9 = = SYM 42149 1182 10 = = SYM 42149 1182 11 = = SYM 42149 1182 12 = = SYM 42149 1182 13 = = SYM 42149 1182 14 = = SYM 42149 1182 15 = = SYM 42149 1182 16 = = SYM 42149 1182 17 = = SYM 42149 1182 18 = = SYM 42149 1182 19 = = SYM 42149 1182 20 = = SYM 42149 1182 21 = = SYM 42149 1182 22 = = SYM 42149 1182 23 = = SYM 42149 1182 24 = = SYM 42149 1182 25 = = SYM 42149 1182 26 = = SYM 42149 1182 27 = = SYM 42149 1182 28 = = SYM 42149 1182 29 = = SYM 42149 1182 30 = = SYM 42149 1182 31 = = SYM 42149 1182 32 = = NFP 42149 1182 33 = = SYM 42149 1182 34 + + SYM 42149 1182 35 = = SYM 42149 1182 36 = = SYM 42149 1182 37 = = SYM 42149 1182 38 = = SYM 42149 1182 39 = = SYM 42149 1182 40 = = SYM 42149 1182 41 = = SYM 42149 1182 42 = = SYM 42149 1182 43 = = SYM 42149 1182 44 = = SYM 42149 1182 45 = = SYM 42149 1182 46 = = SYM 42149 1182 47 = = SYM 42149 1182 48 = = SYM 42149 1182 49 = = SYM 42149 1182 50 = = SYM 42149 1182 51 = = SYM 42149 1182 52 = = SYM 42149 1182 53 = = SYM 42149 1182 54 = = SYM 42149 1182 55 = = SYM 42149 1182 56 = = SYM 42149 1182 57 = = SYM 42149 1182 58 = = SYM 42149 1182 59 = = SYM 42149 1182 60 = = SYM 42149 1182 61 = = SYM 42149 1182 62 = = SYM 42149 1182 63 = = SYM 42149 1182 64 = = SYM 42149 1182 65 = = SYM 42149 1182 66 = = SYM 42149 1182 67 = = SYM 42149 1182 68 = = SYM 42149 1182 69 = = SYM 42149 1182 70 = = SYM 42149 1182 71 = = NFP 42149 1182 72 = = NFP 42149 1182 73 Classification classification NN 42149 1182 74 . . . 42149 1183 1 |Weight |Weight NNS 42149 1183 2 of of IN 42149 1183 3 cast cast NN 42149 1183 4 iron iron NN 42149 1183 5 per per IN 42149 1183 6 complete complete JJ 42149 1183 7 ring ring NN 42149 1183 8 , , , 42149 1183 9 | | NNP 42149 1183 10 in in IN 42149 1183 11 pounds pound NNS 42149 1183 12 . . . 42149 1184 1 ---------------------------------+-------------------------------------- ---------------------------------+-------------------------------------- : 42149 1184 2 Ordinary ordinary JJ 42149 1184 3 pocketless pocketless NN 42149 1184 4 ½- ½- : 42149 1184 5 in in IN 42149 1184 6 . . . 42149 1185 1 taper| taper| : 42149 1185 2 23,767.7 23,767.7 CD 42149 1185 3 " " '' 42149 1185 4 " " `` 42149 1185 5 1- 1- NNP 42149 1185 6 " " '' 42149 1185 7 " " `` 42149 1185 8 | | CD 42149 1185 9 24,352.4 24,352.4 CD 42149 1185 10 " " '' 42149 1185 11 pocket pocket NN 42149 1185 12 ½- ½- NNP 42149 1185 13 " " '' 42149 1185 14 " " `` 42149 1185 15 | | NNP 42149 1185 16 23,481.7 23,481.7 CD 42149 1185 17 Heavy heavy JJ 42149 1185 18 pocketless pocketless NN 42149 1185 19 ½- ½- NNP 42149 1185 20 in in IN 42149 1185 21 . . . 42149 1186 1 taper taper NN 42149 1186 2 | | NNP 42149 1186 3 29,564.8 29,564.8 CD 42149 1186 4 " " '' 42149 1186 5 " " `` 42149 1186 6 ¾- â¾- ADD 42149 1186 7 " " '' 42149 1186 8 " " `` 42149 1186 9 | | CD 42149 1186 10 29,854.7 29,854.7 CD 42149 1186 11 " " '' 42149 1186 12 " " `` 42149 1186 13 1- 1- NNP 42149 1186 14 " " '' 42149 1186 15 " " `` 42149 1186 16 | | CD 42149 1186 17 30,144.6 30,144.6 CD 42149 1186 18 = = SYM 42149 1186 19 = = NFP 42149 1186 20 = = SYM 42149 1186 21 = = SYM 42149 1186 22 = = SYM 42149 1186 23 = = SYM 42149 1186 24 = = SYM 42149 1186 25 = = SYM 42149 1186 26 = = SYM 42149 1186 27 = = SYM 42149 1186 28 = = SYM 42149 1186 29 = = SYM 42149 1186 30 = = SYM 42149 1186 31 = = SYM 42149 1186 32 = = SYM 42149 1186 33 = = SYM 42149 1186 34 = = SYM 42149 1186 35 = = SYM 42149 1186 36 = = SYM 42149 1186 37 = = SYM 42149 1186 38 = = SYM 42149 1186 39 = = SYM 42149 1186 40 = = SYM 42149 1186 41 = = SYM 42149 1186 42 = = SYM 42149 1186 43 = = SYM 42149 1186 44 = = SYM 42149 1186 45 = = SYM 42149 1186 46 = = SYM 42149 1186 47 = = SYM 42149 1186 48 = = SYM 42149 1186 49 = = NFP 42149 1186 50 = = SYM 42149 1186 51 + + SYM 42149 1186 52 = = SYM 42149 1186 53 = = SYM 42149 1186 54 = = SYM 42149 1186 55 = = SYM 42149 1186 56 = = SYM 42149 1186 57 = = SYM 42149 1186 58 = = SYM 42149 1186 59 = = SYM 42149 1186 60 = = SYM 42149 1186 61 = = SYM 42149 1186 62 = = SYM 42149 1186 63 = = SYM 42149 1186 64 = = SYM 42149 1186 65 = = SYM 42149 1186 66 = = SYM 42149 1186 67 = = SYM 42149 1186 68 = = SYM 42149 1186 69 = = SYM 42149 1186 70 = = SYM 42149 1186 71 = = SYM 42149 1186 72 = = SYM 42149 1186 73 = = SYM 42149 1186 74 = = SYM 42149 1186 75 = = SYM 42149 1186 76 = = SYM 42149 1186 77 = = SYM 42149 1186 78 = = SYM 42149 1186 79 = = SYM 42149 1186 80 = = SYM 42149 1186 81 = = SYM 42149 1186 82 = = SYM 42149 1186 83 = = SYM 42149 1186 84 = = SYM 42149 1186 85 = = SYM 42149 1186 86 = = SYM 42149 1186 87 = = SYM 42149 1186 88 = = SYM 42149 1186 89 = = NFP 42149 1186 90 = = NFP 42149 1186 91 _ _ NNP 42149 1186 92 Cast Cast NNP 42149 1186 93 - - HYPH 42149 1186 94 Steel Steel NNP 42149 1186 95 Bore Bore NNP 42149 1186 96 Segments Segments NNP 42149 1186 97 and and CC 42149 1186 98 Accessories._--The accessories._--the DT 42149 1186 99 following follow VBG 42149 1186 100 feature feature NN 42149 1186 101 of of IN 42149 1186 102 these these DT 42149 1186 103 tunnels tunnel NNS 42149 1186 104 is be VBZ 42149 1186 105 different different JJ 42149 1186 106 from from IN 42149 1186 107 any any DT 42149 1186 108 hitherto hitherto NN 42149 1186 109 built build VBN 42149 1186 110 . . . 42149 1187 1 It -PRON- PRP 42149 1187 2 was be VBD 42149 1187 3 the the DT 42149 1187 4 original original JJ 42149 1187 5 intention intention NN 42149 1187 6 to to TO 42149 1187 7 carry carry VB 42149 1187 8 the the DT 42149 1187 9 rolling rolling JJ 42149 1187 10 load load NN 42149 1187 11 independent independent NN 42149 1187 12 of of IN 42149 1187 13 the the DT 42149 1187 14 tunnel tunnel NN 42149 1187 15 , , , 42149 1187 16 or or CC 42149 1187 17 to to TO 42149 1187 18 assist assist VB 42149 1187 19 the the DT 42149 1187 20 support support NN 42149 1187 21 of of IN 42149 1187 22 the the DT 42149 1187 23 silt silt NN 42149 1187 24 portion portion NN 42149 1187 25 of of IN 42149 1187 26 the the DT 42149 1187 27 structure structure NN 42149 1187 28 by by IN 42149 1187 29 a a DT 42149 1187 30 single single JJ 42149 1187 31 row row NN 42149 1187 32 of of IN 42149 1187 33 screw screw NN 42149 1187 34 - - HYPH 42149 1187 35 piles pile NNS 42149 1187 36 , , , 42149 1187 37 under under IN 42149 1187 38 each each DT 42149 1187 39 tunnel tunnel NN 42149 1187 40 , , , 42149 1187 41 and and CC 42149 1187 42 extending extend VBG 42149 1187 43 down down RP 42149 1187 44 to to IN 42149 1187 45 firmer firm JJR 42149 1187 46 ground ground NN 42149 1187 47 than than IN 42149 1187 48 that that DT 42149 1187 49 through through IN 42149 1187 50 which which WDT 42149 1187 51 the the DT 42149 1187 52 tunnels tunnel NNS 42149 1187 53 were be VBD 42149 1187 54 driven drive VBN 42149 1187 55 . . . 42149 1188 1 Therefore therefore RB 42149 1188 2 , , , 42149 1188 3 provision provision NN 42149 1188 4 had have VBD 42149 1188 5 to to TO 42149 1188 6 be be VB 42149 1188 7 made make VBN 42149 1188 8 whereby whereby WRB 42149 1188 9 these these DT 42149 1188 10 piles pile NNS 42149 1188 11 could could MD 42149 1188 12 be be VB 42149 1188 13 put put VBN 42149 1188 14 down down RP 42149 1188 15 through through IN 42149 1188 16 the the DT 42149 1188 17 invert invert NN 42149 1188 18 of of IN 42149 1188 19 the the DT 42149 1188 20 tunnel tunnel NN 42149 1188 21 with with IN 42149 1188 22 no no DT 42149 1188 23 exposure exposure NN 42149 1188 24 of of IN 42149 1188 25 the the DT 42149 1188 26 ground ground NN 42149 1188 27 . . . 42149 1189 1 [ [ -LRB- 42149 1189 2 Illustration illustration NN 42149 1189 3 : : : 42149 1189 4 DETAILS details NN 42149 1189 5 OF of IN 42149 1189 6 BORE bore NN 42149 1189 7 SEGMENTS segment NNS 42149 1189 8 AND and CC 42149 1189 9 ACCESSORIES accessory NNS 42149 1189 10 USED use VBN 42149 1189 11 IN in IN 42149 1189 12 SUBAQUEOUS subaqueous JJ 42149 1189 13 SHIELD shield NN 42149 1189 14 DRIVEN driven NN 42149 1189 15 TUNNELS tunnels NN 42149 1189 16 FIG FIG NNP 42149 1189 17 . . . 42149 1190 1 12 12 CD 42149 1190 2 . . . 42149 1190 3 ] ] -RRB- 42149 1191 1 This this DT 42149 1191 2 provision provision NN 42149 1191 3 was be VBD 42149 1191 4 afforded afford VBN 42149 1191 5 by by IN 42149 1191 6 the the DT 42149 1191 7 " " `` 42149 1191 8 Bore Bore NNP 42149 1191 9 Segments Segments NNP 42149 1191 10 , , , 42149 1191 11 " " '' 42149 1191 12 which which WDT 42149 1191 13 are be VBP 42149 1191 14 shown show VBN 42149 1191 15 in in IN 42149 1191 16 detail detail NN 42149 1191 17 in in IN 42149 1191 18 Fig Fig NNP 42149 1191 19 . . . 42149 1192 1 12 12 CD 42149 1192 2 . . . 42149 1193 1 There there EX 42149 1193 2 are be VBP 42149 1193 3 two two CD 42149 1193 4 segments segment NNS 42149 1193 5 , , , 42149 1193 6 called call VBN 42149 1193 7 No no UH 42149 1193 8 . . . 42149 1194 1 1 1 CD 42149 1194 2 and and CC 42149 1194 3 No no UH 42149 1194 4 . . . 42149 1195 1 2 2 LS 42149 1195 2 , , , 42149 1195 3 respectively respectively RB 42149 1195 4 . . . 42149 1196 1 These these DT 42149 1196 2 two two CD 42149 1196 3 segments segment NNS 42149 1196 4 are be VBP 42149 1196 5 bolted bolt VBN 42149 1196 6 together together RB 42149 1196 7 in in IN 42149 1196 8 the the DT 42149 1196 9 bottom bottom NN 42149 1196 10 of of IN 42149 1196 11 two two CD 42149 1196 12 adjacent adjacent JJ 42149 1196 13 rings ring NNS 42149 1196 14 , , , 42149 1196 15 and and CC 42149 1196 16 thus thus RB 42149 1196 17 form form VBP 42149 1196 18 a a DT 42149 1196 19 " " `` 42149 1196 20 Pile Pile NNP 42149 1196 21 Bore Bore NNP 42149 1196 22 . . . 42149 1196 23 " " '' 42149 1197 1 As as IN 42149 1197 2 the the DT 42149 1197 3 piles pile NNS 42149 1197 4 were be VBD 42149 1197 5 to to TO 42149 1197 6 be be VB 42149 1197 7 kept keep VBN 42149 1197 8 at at IN 42149 1197 9 15-ft 15-ft NNP 42149 1197 10 . . . 42149 1197 11 centers center NNS 42149 1197 12 , , , 42149 1197 13 and and CC 42149 1197 14 as as IN 42149 1197 15 the the DT 42149 1197 16 tunnel tunnel NN 42149 1197 17 rings ring NNS 42149 1197 18 were be VBD 42149 1197 19 2 2 CD 42149 1197 20 ft ft NN 42149 1197 21 . . NN 42149 1197 22 6 6 CD 42149 1197 23 in in IN 42149 1197 24 . . . 42149 1198 1 in in IN 42149 1198 2 length length NN 42149 1198 3 , , , 42149 1198 4 it -PRON- PRP 42149 1198 5 will will MD 42149 1198 6 be be VB 42149 1198 7 seen see VBN 42149 1198 8 that that IN 42149 1198 9 , , , 42149 1198 10 between between IN 42149 1198 11 each each DT 42149 1198 12 pair pair NN 42149 1198 13 of of IN 42149 1198 14 bore bore NN 42149 1198 15 - - HYPH 42149 1198 16 segment segment NN 42149 1198 17 rings ring NNS 42149 1198 18 , , , 42149 1198 19 there there EX 42149 1198 20 came come VBD 42149 1198 21 four four CD 42149 1198 22 " " `` 42149 1198 23 Plain Plain NNP 42149 1198 24 " " '' 42149 1198 25 rings ring NNS 42149 1198 26 . . . 42149 1199 1 The the DT 42149 1199 2 plain plain JJ 42149 1199 3 rings ring NNS 42149 1199 4 were be VBD 42149 1199 5 built build VBN 42149 1199 6 up up RP 42149 1199 7 so so IN 42149 1199 8 that that IN 42149 1199 9 the the DT 42149 1199 10 radial radial JJ 42149 1199 11 joints joint NNS 42149 1199 12 broke break VBD 42149 1199 13 joint joint RB 42149 1199 14 from from IN 42149 1199 15 ring ring NN 42149 1199 16 to to IN 42149 1199 17 ring ring NN 42149 1199 18 , , , 42149 1199 19 but but CC 42149 1199 20 with with IN 42149 1199 21 the the DT 42149 1199 22 bore bore NN 42149 1199 23 - - HYPH 42149 1199 24 segment segment NN 42149 1199 25 rings ring NNS 42149 1199 26 this this DT 42149 1199 27 could could MD 42149 1199 28 not not RB 42149 1199 29 be be VB 42149 1199 30 done do VBN 42149 1199 31 , , , 42149 1199 32 without without IN 42149 1199 33 unnecessarily unnecessarily RB 42149 1199 34 adding add VBG 42149 1199 35 to to IN 42149 1199 36 the the DT 42149 1199 37 types type NNS 42149 1199 38 of of IN 42149 1199 39 segments segment NNS 42149 1199 40 . . . 42149 1200 1 The the DT 42149 1200 2 bore bore NN 42149 1200 3 segments segment NNS 42149 1200 4 were be VBD 42149 1200 5 made make VBN 42149 1200 6 of of IN 42149 1200 7 cast cast VBN 42149 1200 8 steel steel NN 42149 1200 9 , , , 42149 1200 10 and and CC 42149 1200 11 were be VBD 42149 1200 12 quite quite RB 42149 1200 13 complicated complicated JJ 42149 1200 14 castings casting NNS 42149 1200 15 , , , 42149 1200 16 the the DT 42149 1200 17 principle principle NN 42149 1200 18 , , , 42149 1200 19 however however RB 42149 1200 20 , , , 42149 1200 21 was be VBD 42149 1200 22 quite quite RB 42149 1200 23 simple simple JJ 42149 1200 24 . . . 42149 1201 1 The the DT 42149 1201 2 segments segment NNS 42149 1201 3 provided provide VBD 42149 1201 4 an an DT 42149 1201 5 opening opening NN 42149 1201 6 just just RB 42149 1201 7 a a DT 42149 1201 8 little little RB 42149 1201 9 larger large JJR 42149 1201 10 than than IN 42149 1201 11 the the DT 42149 1201 12 shaft shaft NN 42149 1201 13 of of IN 42149 1201 14 the the DT 42149 1201 15 pile pile NN 42149 1201 16 , , , 42149 1201 17 the the DT 42149 1201 18 orifice orifice NN 42149 1201 19 being be VBG 42149 1201 20 2 2 CD 42149 1201 21 ft ft NN 42149 1201 22 . . NN 42149 1201 23 7 7 CD 42149 1201 24 in in IN 42149 1201 25 . . . 42149 1202 1 in in IN 42149 1202 2 diameter diameter NN 42149 1202 3 at at IN 42149 1202 4 the the DT 42149 1202 5 smallest small JJS 42149 1202 6 ( ( -LRB- 42149 1202 7 lowest low JJS 42149 1202 8 ) ) -RRB- 42149 1202 9 point point NN 42149 1202 10 , , , 42149 1202 11 while while IN 42149 1202 12 the the DT 42149 1202 13 shaft shaft NN 42149 1202 14 of of IN 42149 1202 15 the the DT 42149 1202 16 pile pile NN 42149 1202 17 was be VBD 42149 1202 18 to to TO 42149 1202 19 be be VB 42149 1202 20 2 2 CD 42149 1202 21 ft ft NN 42149 1202 22 . . NN 42149 1202 23 5¼ 5â¼ CD 42149 1202 24 in in RB 42149 1202 25 . . . 42149 1203 1 In in IN 42149 1203 2 order order NN 42149 1203 3 to to TO 42149 1203 4 allow allow VB 42149 1203 5 of of IN 42149 1203 6 the the DT 42149 1203 7 entry entry NN 42149 1203 8 of of IN 42149 1203 9 the the DT 42149 1203 10 screw screw NN 42149 1203 11 - - HYPH 42149 1203 12 blade blade NN 42149 1203 13 or or CC 42149 1203 14 helix helix NN 42149 1203 15 of of IN 42149 1203 16 the the DT 42149 1203 17 pile pile NN 42149 1203 18 , , , 42149 1203 19 a a DT 42149 1203 20 slot slot NN 42149 1203 21 was be VBD 42149 1203 22 formed form VBN 42149 1203 23 in in IN 42149 1203 24 the the DT 42149 1203 25 depth depth NN 42149 1203 26 of of IN 42149 1203 27 Bore Bore NNP 42149 1203 28 Segment Segment NNP 42149 1203 29 No no UH 42149 1203 30 . . . 42149 1204 1 1 1 LS 42149 1204 2 , , , 42149 1204 3 so so IN 42149 1204 4 that that IN 42149 1204 5 , , , 42149 1204 6 when when WRB 42149 1204 7 a a DT 42149 1204 8 pile pile NN 42149 1204 9 was be VBD 42149 1204 10 put put VBN 42149 1204 11 in in IN 42149 1204 12 position position NN 42149 1204 13 above above IN 42149 1204 14 the the DT 42149 1204 15 bore bore NN 42149 1204 16 , , , 42149 1204 17 the the DT 42149 1204 18 blade blade NN 42149 1204 19 , , , 42149 1204 20 when when WRB 42149 1204 21 revolved revolve VBN 42149 1204 22 , , , 42149 1204 23 would would MD 42149 1204 24 enter enter VB 42149 1204 25 the the DT 42149 1204 26 slot slot NN 42149 1204 27 and and CC 42149 1204 28 thus thus RB 42149 1204 29 pass pass VB 42149 1204 30 under under IN 42149 1204 31 the the DT 42149 1204 32 metal metal NN 42149 1204 33 lining lining NN 42149 1204 34 , , , 42149 1204 35 although although IN 42149 1204 36 the the DT 42149 1204 37 actual actual JJ 42149 1204 38 orifice orifice NN 42149 1204 39 was be VBD 42149 1204 40 only only RB 42149 1204 41 slightly slightly RB 42149 1204 42 larger large JJR 42149 1204 43 than than IN 42149 1204 44 the the DT 42149 1204 45 pile pile NN 42149 1204 46 shaft shaft NN 42149 1204 47 . . . 42149 1205 1 The the DT 42149 1205 2 wall wall NN 42149 1205 3 of of IN 42149 1205 4 the the DT 42149 1205 5 pile pile JJ 42149 1205 6 orifice orifice NN 42149 1205 7 in in IN 42149 1205 8 Segment Segment NNP 42149 1205 9 No no UH 42149 1205 10 . . . 42149 1206 1 2 2 CD 42149 1206 2 was be VBD 42149 1206 3 made make VBN 42149 1206 4 lower low JJR 42149 1206 5 than than IN 42149 1206 6 that that DT 42149 1206 7 in in IN 42149 1206 8 No no UH 42149 1206 9 . . . 42149 1207 1 1 1 CD 42149 1207 2 so so IN 42149 1207 3 as as IN 42149 1207 4 to to TO 42149 1207 5 allow allow VB 42149 1207 6 the the DT 42149 1207 7 blade blade NN 42149 1207 8 to to TO 42149 1207 9 enter enter VB 42149 1207 10 the the DT 42149 1207 11 slot slot NN 42149 1207 12 in in IN 42149 1207 13 Segment Segment NNP 42149 1207 14 No no UH 42149 1207 15 . . . 42149 1208 1 1 1 LS 42149 1208 2 . . . 42149 1209 1 When when WRB 42149 1209 2 the the DT 42149 1209 3 pile pile NN 42149 1209 4 is be VBZ 42149 1209 5 not not RB 42149 1209 6 actually actually RB 42149 1209 7 in in IN 42149 1209 8 process process NN 42149 1209 9 of of IN 42149 1209 10 being be VBG 42149 1209 11 sunk sink VBN 42149 1209 12 , , , 42149 1209 13 this this DT 42149 1209 14 lower low JJR 42149 1209 15 height height NN 42149 1209 16 in in IN 42149 1209 17 No no UH 42149 1209 18 . . . 42149 1210 1 2 2 CD 42149 1210 2 is be VBZ 42149 1210 3 made make VBN 42149 1210 4 up up RP 42149 1210 5 with with IN 42149 1210 6 the the DT 42149 1210 7 removable removable JJ 42149 1210 8 " " `` 42149 1210 9 distance distance NN 42149 1210 10 piece piece NN 42149 1210 11 . . . 42149 1210 12 " " '' 42149 1211 1 This this DT 42149 1211 2 had have VBD 42149 1211 3 a a DT 42149 1211 4 tongue tongue NN 42149 1211 5 at at IN 42149 1211 6 one one CD 42149 1211 7 end end NN 42149 1211 8 which which WDT 42149 1211 9 engaged engage VBD 42149 1211 10 in in IN 42149 1211 11 a a DT 42149 1211 12 recess recess NN 42149 1211 13 cast cast VBN 42149 1211 14 to to TO 42149 1211 15 take take VB 42149 1211 16 it -PRON- PRP 42149 1211 17 in in IN 42149 1211 18 Segment Segment NNP 42149 1211 19 No no UH 42149 1211 20 . . . 42149 1212 1 2 2 CD 42149 1212 2 and and CC 42149 1212 3 was be VBD 42149 1212 4 held hold VBN 42149 1212 5 in in IN 42149 1212 6 place place NN 42149 1212 7 by by IN 42149 1212 8 a a DT 42149 1212 9 key key JJ 42149 1212 10 piece piece NN 42149 1212 11 at at IN 42149 1212 12 the the DT 42149 1212 13 other other JJ 42149 1212 14 end end NN 42149 1212 15 of of IN 42149 1212 16 the the DT 42149 1212 17 distance distance NN 42149 1212 18 piece piece NN 42149 1212 19 . . . 42149 1213 1 Details detail NNS 42149 1213 2 of of IN 42149 1213 3 the the DT 42149 1213 4 distance distance NN 42149 1213 5 piece piece NN 42149 1213 6 and and CC 42149 1213 7 key key NN 42149 1213 8 are be VBP 42149 1213 9 shown show VBN 42149 1213 10 in in IN 42149 1213 11 Fig Fig NNP 42149 1213 12 . . . 42149 1214 1 12 12 CD 42149 1214 2 . . . 42149 1215 1 The the DT 42149 1215 2 flanges flange NNS 42149 1215 3 around around IN 42149 1215 4 the the DT 42149 1215 5 pile pile JJ 42149 1215 6 bore bore NN 42149 1215 7 were be VBD 42149 1215 8 made make VBN 42149 1215 9 flat flat JJ 42149 1215 10 and and CC 42149 1215 11 furnished furnish VBN 42149 1215 12 with with IN 42149 1215 13 twelve twelve CD 42149 1215 14 tapped tap VBN 42149 1215 15 holes hole NNS 42149 1215 16 , , , 42149 1215 17 six six CD 42149 1215 18 in in IN 42149 1215 19 Segment Segment NNP 42149 1215 20 No no NN 42149 1215 21 . . . 42149 1216 1 1 1 CD 42149 1216 2 and and CC 42149 1216 3 six six CD 42149 1216 4 in in IN 42149 1216 5 Segment Segment NNP 42149 1216 6 No no NN 42149 1216 7 . . . 42149 1217 1 2 2 LS 42149 1217 2 , , , 42149 1217 3 for for IN 42149 1217 4 the the DT 42149 1217 5 purpose purpose NN 42149 1217 6 of of IN 42149 1217 7 attaching attach VBG 42149 1217 8 the the DT 42149 1217 9 permanent permanent JJ 42149 1217 10 arrangements arrangement NNS 42149 1217 11 in in IN 42149 1217 12 conjunction conjunction NN 42149 1217 13 with with IN 42149 1217 14 which which WDT 42149 1217 15 the the DT 42149 1217 16 pile pile NN 42149 1217 17 was be VBD 42149 1217 18 to to TO 42149 1217 19 be be VB 42149 1217 20 attached attach VBN 42149 1217 21 to to IN 42149 1217 22 the the DT 42149 1217 23 track track NN 42149 1217 24 system system NN 42149 1217 25 , , , 42149 1217 26 independently independently RB 42149 1217 27 of of IN 42149 1217 28 the the DT 42149 1217 29 tunnel tunnel NN 42149 1217 30 shell shell NNP 42149 1217 31 , , , 42149 1217 32 or or CC 42149 1217 33 directly directly RB 42149 1217 34 to to IN 42149 1217 35 the the DT 42149 1217 36 tunnel tunnel NN 42149 1217 37 . . . 42149 1218 1 It -PRON- PRP 42149 1218 2 was be VBD 42149 1218 3 never never RB 42149 1218 4 decided decide VBN 42149 1218 5 which which WDT 42149 1218 6 of of IN 42149 1218 7 these these DT 42149 1218 8 alternatives alternative NNS 42149 1218 9 would would MD 42149 1218 10 be be VB 42149 1218 11 used use VBN 42149 1218 12 , , , 42149 1218 13 for for IN 42149 1218 14 , , , 42149 1218 15 before before IN 42149 1218 16 this this DT 42149 1218 17 decision decision NN 42149 1218 18 was be VBD 42149 1218 19 reached reach VBN 42149 1218 20 , , , 42149 1218 21 it -PRON- PRP 42149 1218 22 was be VBD 42149 1218 23 agreed agree VBN 42149 1218 24 that that IN 42149 1218 25 , , , 42149 1218 26 at at IN 42149 1218 27 any any DT 42149 1218 28 rate rate NN 42149 1218 29 for for IN 42149 1218 30 the the DT 42149 1218 31 present present NN 42149 1218 32 , , , 42149 1218 33 it -PRON- PRP 42149 1218 34 was be VBD 42149 1218 35 better well JJR 42149 1218 36 not not RB 42149 1218 37 to to TO 42149 1218 38 put put VB 42149 1218 39 down down RP 42149 1218 40 piles pile NNS 42149 1218 41 at at RB 42149 1218 42 all all RB 42149 1218 43 . . . 42149 1219 1 To to TO 42149 1219 2 close close VB 42149 1219 3 the the DT 42149 1219 4 bore bore NN 42149 1219 5 , , , 42149 1219 6 the the DT 42149 1219 7 " " `` 42149 1219 8 Bore Bore NNP 42149 1219 9 Plug Plug NNP 42149 1219 10 " " '' 42149 1219 11 was be VBD 42149 1219 12 used use VBN 42149 1219 13 . . . 42149 1220 1 This this DT 42149 1220 2 is be VBZ 42149 1220 3 shown show VBN 42149 1220 4 on on IN 42149 1220 5 Fig Fig NNP 42149 1220 6 . . . 42149 1221 1 12 12 CD 42149 1221 2 . . . 42149 1222 1 It -PRON- PRP 42149 1222 2 was be VBD 42149 1222 3 of of IN 42149 1222 4 cast cast VBN 42149 1222 5 steel steel NN 42149 1222 6 , , , 42149 1222 7 and and CC 42149 1222 8 was be VBD 42149 1222 9 intended intend VBN 42149 1222 10 to to TO 42149 1222 11 act act VB 42149 1222 12 as as IN 42149 1222 13 a a DT 42149 1222 14 permanent permanent JJ 42149 1222 15 point point NN 42149 1222 16 of of IN 42149 1222 17 the the DT 42149 1222 18 screw screw NN 42149 1222 19 - - HYPH 42149 1222 20 pile pile NNP 42149 1222 21 , , , 42149 1222 22 that that RB 42149 1222 23 is is RB 42149 1222 24 , , , 42149 1222 25 the the DT 42149 1222 26 blade blade NN 42149 1222 27 section section NN 42149 1222 28 was be VBD 42149 1222 29 to to TO 42149 1222 30 be be VB 42149 1222 31 attached attach VBN 42149 1222 32 to to IN 42149 1222 33 the the DT 42149 1222 34 bore bore NN 42149 1222 35 plug plug NN 42149 1222 36 , , , 42149 1222 37 the the DT 42149 1222 38 distance distance NN 42149 1222 39 piece piece NN 42149 1222 40 and and CC 42149 1222 41 key key NN 42149 1222 42 were be VBD 42149 1222 43 to to TO 42149 1222 44 be be VB 42149 1222 45 removed remove VBN 42149 1222 46 , , , 42149 1222 47 and and CC 42149 1222 48 the the DT 42149 1222 49 pile pile NN 42149 1222 50 was be VBD 42149 1222 51 to to TO 42149 1222 52 be be VB 42149 1222 53 rotated rotate VBN 42149 1222 54 until until IN 42149 1222 55 the the DT 42149 1222 56 blade blade NN 42149 1222 57 had have VBD 42149 1222 58 cleared clear VBN 42149 1222 59 the the DT 42149 1222 60 slot slot NN 42149 1222 61 ; ; : 42149 1222 62 the the DT 42149 1222 63 distance distance NN 42149 1222 64 piece piece NN 42149 1222 65 and and CC 42149 1222 66 key key NN 42149 1222 67 were be VBD 42149 1222 68 then then RB 42149 1222 69 to to TO 42149 1222 70 be be VB 42149 1222 71 replaced replace VBN 42149 1222 72 and and CC 42149 1222 73 sinking sinking NN 42149 1222 74 resumed resume VBD 42149 1222 75 . . . 42149 1223 1 The the DT 42149 1223 2 plug plug NN 42149 1223 3 was be VBD 42149 1223 4 held hold VBN 42149 1223 5 in in IN 42149 1223 6 place place NN 42149 1223 7 against against IN 42149 1223 8 the the DT 42149 1223 9 pressure pressure NN 42149 1223 10 of of IN 42149 1223 11 the the DT 42149 1223 12 silt silt NN 42149 1223 13 by by IN 42149 1223 14 the the DT 42149 1223 15 two two CD 42149 1223 16 " " `` 42149 1223 17 dogs dog NNS 42149 1223 18 , , , 42149 1223 19 " " '' 42149 1223 20 while while IN 42149 1223 21 the the DT 42149 1223 22 dogs dog NNS 42149 1223 23 themselves -PRON- PRP 42149 1223 24 were be VBD 42149 1223 25 attached attach VBN 42149 1223 26 to to IN 42149 1223 27 the the DT 42149 1223 28 tunnel tunnel NN 42149 1223 29 , , , 42149 1223 30 as as IN 42149 1223 31 shown show VBN 42149 1223 32 in in IN 42149 1223 33 Fig Fig NNP 42149 1223 34 . . . 42149 1224 1 12 12 CD 42149 1224 2 . . . 42149 1225 1 The the DT 42149 1225 2 ends end NNS 42149 1225 3 of of IN 42149 1225 4 the the DT 42149 1225 5 dogs dog NNS 42149 1225 6 , , , 42149 1225 7 which which WDT 42149 1225 8 rested rest VBD 42149 1225 9 on on IN 42149 1225 10 the the DT 42149 1225 11 flanges flange NNS 42149 1225 12 of of IN 42149 1225 13 the the DT 42149 1225 14 metal metal NN 42149 1225 15 lining lining NN 42149 1225 16 of of IN 42149 1225 17 the the DT 42149 1225 18 tunnel tunnel NN 42149 1225 19 , , , 42149 1225 20 were be VBD 42149 1225 21 prevented prevent VBN 42149 1225 22 from from IN 42149 1225 23 being be VBG 42149 1225 24 knocked knock VBN 42149 1225 25 off off RP 42149 1225 26 the the DT 42149 1225 27 flanges flange NNS 42149 1225 28 ( ( -LRB- 42149 1225 29 and and CC 42149 1225 30 thus thus RB 42149 1225 31 releasing release VBG 42149 1225 32 the the DT 42149 1225 33 plug plug NN 42149 1225 34 ) ) -RRB- 42149 1225 35 by by IN 42149 1225 36 steel steel NN 42149 1225 37 clips clip NNS 42149 1225 38 . . . 42149 1226 1 It -PRON- PRP 42149 1226 2 was be VBD 42149 1226 3 expected expect VBN 42149 1226 4 that that IN 42149 1226 5 it -PRON- PRP 42149 1226 6 might may MD 42149 1226 7 be be VB 42149 1226 8 desirable desirable JJ 42149 1226 9 to to TO 42149 1226 10 keep keep VB 42149 1226 11 the the DT 42149 1226 12 lower low JJR 42149 1226 13 end end NN 42149 1226 14 of of IN 42149 1226 15 the the DT 42149 1226 16 piles pile NNS 42149 1226 17 open open JJ 42149 1226 18 during during IN 42149 1226 19 their -PRON- PRP$ 42149 1226 20 sinking sinking NN 42149 1226 21 , , , 42149 1226 22 so so IN 42149 1226 23 that that IN 42149 1226 24 the the DT 42149 1226 25 bore bore NN 42149 1226 26 plugs plug NNS 42149 1226 27 were be VBD 42149 1226 28 not not RB 42149 1226 29 made make VBN 42149 1226 30 permanently permanently RB 42149 1226 31 closed closed JJ 42149 1226 32 , , , 42149 1226 33 but but CC 42149 1226 34 a a DT 42149 1226 35 seating seating NN 42149 1226 36 was be VBD 42149 1226 37 formed form VBN 42149 1226 38 on on IN 42149 1226 39 the the DT 42149 1226 40 inner inner JJ 42149 1226 41 circumference circumference NN 42149 1226 42 of of IN 42149 1226 43 the the DT 42149 1226 44 plug plug NN 42149 1226 45 , , , 42149 1226 46 and and CC 42149 1226 47 on on IN 42149 1226 48 the the DT 42149 1226 49 seating seating NN 42149 1226 50 was be VBD 42149 1226 51 placed place VBN 42149 1226 52 the the DT 42149 1226 53 " " `` 42149 1226 54 Plug Plug NNP 42149 1226 55 Cover Cover NNP 42149 1226 56 , , , 42149 1226 57 " " '' 42149 1226 58 made make VBN 42149 1226 59 of of IN 42149 1226 60 cast cast NN 42149 1226 61 iron iron NN 42149 1226 62 , , , 42149 1226 63 18¾ 18â¾ CD 42149 1226 64 in in IN 42149 1226 65 . . . 42149 1227 1 in in IN 42149 1227 2 diameter diameter NN 42149 1227 3 and and CC 42149 1227 4 3 3 CD 42149 1227 5 in in IN 42149 1227 6 . . . 42149 1228 1 thick thick JJ 42149 1228 2 , , , 42149 1228 3 furnished furnish VBN 42149 1228 4 with with IN 42149 1228 5 a a DT 42149 1228 6 lug lug NN 42149 1228 7 for for IN 42149 1228 8 lifting lifting NN 42149 1228 9 and and CC 42149 1228 10 a a DT 42149 1228 11 3-in 3-in NN 42149 1228 12 . . . 42149 1229 1 tapped tap VBN 42149 1229 2 hole hole NN 42149 1229 3 closed close VBN 42149 1229 4 by by IN 42149 1229 5 a a DT 42149 1229 6 screw screw NN 42149 1229 7 - - HYPH 42149 1229 8 plug plug NN 42149 1229 9 , , , 42149 1229 10 through through IN 42149 1229 11 which which WDT 42149 1229 12 any any DT 42149 1229 13 soundings sounding NNS 42149 1229 14 or or CC 42149 1229 15 samples sample NNS 42149 1229 16 of of IN 42149 1229 17 ground ground NN 42149 1229 18 could could MD 42149 1229 19 be be VB 42149 1229 20 taken take VBN 42149 1229 21 prior prior RB 42149 1229 22 to to IN 42149 1229 23 sinking sink VBG 42149 1229 24 the the DT 42149 1229 25 piles pile NNS 42149 1229 26 . . . 42149 1230 1 This this DT 42149 1230 2 plug plug NN 42149 1230 3 cover cover NN 42149 1230 4 was be VBD 42149 1230 5 held hold VBN 42149 1230 6 in in IN 42149 1230 7 place place NN 42149 1230 8 by by IN 42149 1230 9 a a DT 42149 1230 10 heavy heavy JJ 42149 1230 11 steel steel NN 42149 1230 12 " " `` 42149 1230 13 Yoke Yoke NNP 42149 1230 14 " " '' 42149 1230 15 under under IN 42149 1230 16 it -PRON- PRP 42149 1230 17 , , , 42149 1230 18 which which WDT 42149 1230 19 engaged engage VBD 42149 1230 20 on on IN 42149 1230 21 the the DT 42149 1230 22 under under JJ 42149 1230 23 side side NN 42149 1230 24 of of IN 42149 1230 25 the the DT 42149 1230 26 flange flange NN 42149 1230 27 , , , 42149 1230 28 on on IN 42149 1230 29 top top NN 42149 1230 30 of of IN 42149 1230 31 which which WDT 42149 1230 32 the the DT 42149 1230 33 cover cover NN 42149 1230 34 was be VBD 42149 1230 35 set set VBN 42149 1230 36 . . . 42149 1231 1 The the DT 42149 1231 2 yoke yoke NN 42149 1231 3 was be VBD 42149 1231 4 attached attach VBN 42149 1231 5 to to IN 42149 1231 6 the the DT 42149 1231 7 cover cover NN 42149 1231 8 by by IN 42149 1231 9 a a DT 42149 1231 10 1¾-in 1â¾-in CD 42149 1231 11 . . . 42149 1232 1 tap tap NN 42149 1232 2 - - HYPH 42149 1232 3 bolt bolt NNP 42149 1232 4 , , , 42149 1232 5 screwed screw VBD 42149 1232 6 into into IN 42149 1232 7 the the DT 42149 1232 8 yoke yoke NN 42149 1232 9 and and CC 42149 1232 10 passing pass VBG 42149 1232 11 through through IN 42149 1232 12 a a DT 42149 1232 13 2-in 2-in CD 42149 1232 14 . . . 42149 1233 1 hole hole NNP 42149 1233 2 bored bore VBD 42149 1233 3 in in IN 42149 1233 4 the the DT 42149 1233 5 center center NN 42149 1233 6 of of IN 42149 1233 7 the the DT 42149 1233 8 cover cover NN 42149 1233 9 . . . 42149 1234 1 This this DT 42149 1234 2 rather rather RB 42149 1234 3 peculiar peculiar JJ 42149 1234 4 mode mode NN 42149 1234 5 of of IN 42149 1234 6 attaching attach VBG 42149 1234 7 the the DT 42149 1234 8 cover cover NN 42149 1234 9 was be VBD 42149 1234 10 adopted adopt VBN 42149 1234 11 so so IN 42149 1234 12 that that IN 42149 1234 13 the the DT 42149 1234 14 cover cover NN 42149 1234 15 could could MD 42149 1234 16 be be VB 42149 1234 17 removed remove VBN 42149 1234 18 by by IN 42149 1234 19 taking take VBG 42149 1234 20 off off RP 42149 1234 21 the the DT 42149 1234 22 nut nut NN 42149 1234 23 of of IN 42149 1234 24 the the DT 42149 1234 25 yoke yoke NN 42149 1234 26 , , , 42149 1234 27 in in IN 42149 1234 28 case case NN 42149 1234 29 it -PRON- PRP 42149 1234 30 was be VBD 42149 1234 31 desired desire VBN 42149 1234 32 to to TO 42149 1234 33 open open VB 42149 1234 34 the the DT 42149 1234 35 end end NN 42149 1234 36 of of IN 42149 1234 37 the the DT 42149 1234 38 pile pile NN 42149 1234 39 during during IN 42149 1234 40 the the DT 42149 1234 41 process process NN 42149 1234 42 of of IN 42149 1234 43 sinking sink VBG 42149 1234 44 . . . 42149 1235 1 The the DT 42149 1235 2 plug plug NN 42149 1235 3 was be VBD 42149 1235 4 a a DT 42149 1235 5 fairly fairly RB 42149 1235 6 close close JJ 42149 1235 7 fit fit NN 42149 1235 8 at at IN 42149 1235 9 the the DT 42149 1235 10 bottom bottom NN 42149 1235 11 of of IN 42149 1235 12 the the DT 42149 1235 13 orifice orifice NN 42149 1235 14 , , , 42149 1235 15 that that RB 42149 1235 16 is is RB 42149 1235 17 , , , 42149 1235 18 at at IN 42149 1235 19 the the DT 42149 1235 20 outside outside JJ 42149 1235 21 circumference circumference NN 42149 1235 22 of of IN 42149 1235 23 the the DT 42149 1235 24 tunnel tunnel NN 42149 1235 25 , , , 42149 1235 26 where where WRB 42149 1235 27 the the DT 42149 1235 28 bore bore NN 42149 1235 29 was be VBD 42149 1235 30 2 2 CD 42149 1235 31 ft ft NN 42149 1235 32 . . NNP 42149 1235 33 7 7 CD 42149 1235 34 in in IN 42149 1235 35 . . . 42149 1236 1 in in IN 42149 1236 2 diameter diameter NN 42149 1236 3 and and CC 42149 1236 4 the the DT 42149 1236 5 plug plug NN 42149 1236 6 2 2 CD 42149 1236 7 ft ft NN 42149 1236 8 . . NNP 42149 1236 9 6¾ 6¾ VBN 42149 1236 10 in in IN 42149 1236 11 . . . 42149 1236 12 , , , 42149 1236 13 but but CC 42149 1236 14 at at IN 42149 1236 15 the the DT 42149 1236 16 top top NN 42149 1236 17 of of IN 42149 1236 18 the the DT 42149 1236 19 bore bore NN 42149 1236 20 - - HYPH 42149 1236 21 segment segment NN 42149 1236 22 there there EX 42149 1236 23 was be VBD 42149 1236 24 more more JJR 42149 1236 25 clearance clearance NN 42149 1236 26 , , , 42149 1236 27 as as IN 42149 1236 28 the the DT 42149 1236 29 plug plug NN 42149 1236 30 was be VBD 42149 1236 31 cylindrical cylindrical JJ 42149 1236 32 while while IN 42149 1236 33 the the DT 42149 1236 34 bore bore NNP 42149 1236 35 tapered taper VBD 42149 1236 36 outward outward RB 42149 1236 37 . . . 42149 1237 1 To to TO 42149 1237 2 fill fill VB 42149 1237 3 this this DT 42149 1237 4 space space NN 42149 1237 5 , , , 42149 1237 6 it -PRON- PRP 42149 1237 7 was be VBD 42149 1237 8 intended intend VBN 42149 1237 9 that that IN 42149 1237 10 steel steel NN 42149 1237 11 wedges wedge NNS 42149 1237 12 should should MD 42149 1237 13 be be VB 42149 1237 14 used use VBN 42149 1237 15 while while IN 42149 1237 16 the the DT 42149 1237 17 shield shield NN 42149 1237 18 was be VBD 42149 1237 19 being be VBG 42149 1237 20 driven drive VBN 42149 1237 21 , , , 42149 1237 22 so so IN 42149 1237 23 that that IN 42149 1237 24 they -PRON- PRP 42149 1237 25 would would MD 42149 1237 26 withstand withstand VB 42149 1237 27 the the DT 42149 1237 28 crushing crush VBG 42149 1237 29 action action NN 42149 1237 30 of of IN 42149 1237 31 the the DT 42149 1237 32 thrusting thrust VBG 42149 1237 33 shield shield NN 42149 1237 34 , , , 42149 1237 35 and and CC 42149 1237 36 , , , 42149 1237 37 when when WRB 42149 1237 38 the the DT 42149 1237 39 shield shield NN 42149 1237 40 was be VBD 42149 1237 41 far far RB 42149 1237 42 enough enough RB 42149 1237 43 ahead ahead RB 42149 1237 44 , , , 42149 1237 45 that that IN 42149 1237 46 they -PRON- PRP 42149 1237 47 should should MD 42149 1237 48 be be VB 42149 1237 49 removed remove VBN 42149 1237 50 and and CC 42149 1237 51 replaced replace VBN 42149 1237 52 by by IN 42149 1237 53 hardwood hardwood NN 42149 1237 54 wedges wedge NNS 42149 1237 55 . . . 42149 1238 1 This this DT 42149 1238 2 method method NN 42149 1238 3 was be VBD 42149 1238 4 only only RB 42149 1238 5 used use VBN 42149 1238 6 in in IN 42149 1238 7 the the DT 42149 1238 8 early early JJ 42149 1238 9 weeks week NNS 42149 1238 10 of of IN 42149 1238 11 the the DT 42149 1238 12 work work NN 42149 1238 13 ; ; : 42149 1238 14 the the DT 42149 1238 15 modification modification NN 42149 1238 16 of of IN 42149 1238 17 not not RB 42149 1238 18 using use VBG 42149 1238 19 the the DT 42149 1238 20 shield shield NN 42149 1238 21 - - HYPH 42149 1238 22 jacks jack NNS 42149 1238 23 which which WDT 42149 1238 24 thrust thrust VBD 42149 1238 25 against against IN 42149 1238 26 the the DT 42149 1238 27 bore bore NN 42149 1238 28 segments segment NNS 42149 1238 29 was be VBD 42149 1238 30 then then RB 42149 1238 31 introduced introduce VBN 42149 1238 32 , , , 42149 1238 33 and and CC 42149 1238 34 the the DT 42149 1238 35 wooden wooden JJ 42149 1238 36 wedges wedge NNS 42149 1238 37 were be VBD 42149 1238 38 put put VBN 42149 1238 39 in in RP 42149 1238 40 , , , 42149 1238 41 when when WRB 42149 1238 42 the the DT 42149 1238 43 bore bore NN 42149 1238 44 plugs plug NNS 42149 1238 45 were be VBD 42149 1238 46 set set VBN 42149 1238 47 in in IN 42149 1238 48 place place NN 42149 1238 49 , , , 42149 1238 50 and and CC 42149 1238 51 driven drive VBN 42149 1238 52 down down RP 42149 1238 53 to to IN 42149 1238 54 the the DT 42149 1238 55 stage stage NN 42149 1238 56 of of IN 42149 1238 57 splitting splitting NN 42149 1238 58 . . . 42149 1239 1 When when WRB 42149 1239 2 it -PRON- PRP 42149 1239 3 was be VBD 42149 1239 4 resolved resolve VBN 42149 1239 5 not not RB 42149 1239 6 to to TO 42149 1239 7 sink sink VB 42149 1239 8 the the DT 42149 1239 9 screw screw NN 42149 1239 10 - - HYPH 42149 1239 11 piles pile NNS 42149 1239 12 , , , 42149 1239 13 the the DT 42149 1239 14 bores bore NNS 42149 1239 15 had have VBD 42149 1239 16 to to TO 42149 1239 17 be be VB 42149 1239 18 closed close VBN 42149 1239 19 before before IN 42149 1239 20 putting put VBG 42149 1239 21 in in RP 42149 1239 22 the the DT 42149 1239 23 concrete concrete JJ 42149 1239 24 lining lining NN 42149 1239 25 . . . 42149 1240 1 This this DT 42149 1240 2 was be VBD 42149 1240 3 done do VBN 42149 1240 4 by by IN 42149 1240 5 means mean NNS 42149 1240 6 of of IN 42149 1240 7 the the DT 42149 1240 8 covers cover NNS 42149 1240 9 shown show VBN 42149 1240 10 in in IN 42149 1240 11 Fig Fig NNP 42149 1240 12 . . . 42149 1241 1 13 13 CD 42149 1241 2 . . . 42149 1242 1 The the DT 42149 1242 2 bore bore NN 42149 1242 3 plug plug NN 42149 1242 4 and and CC 42149 1242 5 all all PDT 42149 1242 6 its -PRON- PRP$ 42149 1242 7 attachments attachment NNS 42149 1242 8 were be VBD 42149 1242 9 removed remove VBN 42149 1242 10 , , , 42149 1242 11 and and CC 42149 1242 12 the the DT 42149 1242 13 flat flat JJ 42149 1242 14 steel steel NN 42149 1242 15 cover cover NN 42149 1242 16 , , , 42149 1242 17 2 2 CD 42149 1242 18 in in IN 42149 1242 19 . . . 42149 1243 1 thick thick JJ 42149 1243 2 and and CC 42149 1243 3 with with IN 42149 1243 4 stiffening stiffening NN 42149 1243 5 webs webs NN 42149 1243 6 on on IN 42149 1243 7 the the DT 42149 1243 8 under under JJ 42149 1243 9 side side NN 42149 1243 10 , , , 42149 1243 11 was be VBD 42149 1243 12 placed place VBN 42149 1243 13 over over IN 42149 1243 14 the the DT 42149 1243 15 circular circular JJ 42149 1243 16 flanges flange NNS 42149 1243 17 of of IN 42149 1243 18 the the DT 42149 1243 19 pile pile JJ 42149 1243 20 bore bore NN 42149 1243 21 . . . 42149 1244 1 The the DT 42149 1244 2 cover cover NN 42149 1244 3 was be VBD 42149 1244 4 attached attach VBN 42149 1244 5 to to IN 42149 1244 6 the the DT 42149 1244 7 bore bore NN 42149 1244 8 segments segment NNS 42149 1244 9 by by IN 42149 1244 10 twelve twelve CD 42149 1244 11 1½-in 1½-in NNS 42149 1244 12 . . . 42149 1245 1 stud stud NN 42149 1245 2 - - HYPH 42149 1245 3 bolts bolts NNP 42149 1245 4 , , , 42149 1245 5 6 6 CD 42149 1245 6 in in IN 42149 1245 7 . . . 42149 1246 1 long long RB 42149 1246 2 , , , 42149 1246 3 in in IN 42149 1246 4 the the DT 42149 1246 5 bolt bolt NN 42149 1246 6 holes hole NNS 42149 1246 7 already already RB 42149 1246 8 mentioned mention VBN 42149 1246 9 as as IN 42149 1246 10 provided provide VBN 42149 1246 11 on on IN 42149 1246 12 these these DT 42149 1246 13 flanges flange NNS 42149 1246 14 . . . 42149 1247 1 When when WRB 42149 1247 2 these these DT 42149 1247 3 were be VBD 42149 1247 4 in in IN 42149 1247 5 place place NN 42149 1247 6 , , , 42149 1247 7 with with IN 42149 1247 8 lead lead JJ 42149 1247 9 grummets grummet NNS 42149 1247 10 under under IN 42149 1247 11 the the DT 42149 1247 12 heads head NNS 42149 1247 13 of of IN 42149 1247 14 the the DT 42149 1247 15 bolts bolt NNS 42149 1247 16 , , , 42149 1247 17 and and CC 42149 1247 18 the the DT 42149 1247 19 grooves groove NNS 42149 1247 20 caulked caulk VBD 42149 1247 21 , , , 42149 1247 22 the the DT 42149 1247 23 bore bore NN 42149 1247 24 segments segment NNS 42149 1247 25 were be VBD 42149 1247 26 water water NN 42149 1247 27 - - HYPH 42149 1247 28 tight tight JJ 42149 1247 29 , , , 42149 1247 30 except except IN 42149 1247 31 in in IN 42149 1247 32 Bore Bore NNP 42149 1247 33 Segment Segment NNP 42149 1247 34 No no UH 42149 1247 35 . . . 42149 1248 1 2 2 CD 42149 1248 2 , , , 42149 1248 3 at at IN 42149 1248 4 the the DT 42149 1248 5 joint joint NN 42149 1248 6 of of IN 42149 1248 7 the the DT 42149 1248 8 distance distance NN 42149 1248 9 piece piece NN 42149 1248 10 ; ; : 42149 1248 11 and and CC 42149 1248 12 , , , 42149 1248 13 to to TO 42149 1248 14 keep keep VB 42149 1248 15 water water NN 42149 1248 16 from from IN 42149 1248 17 entering enter VBG 42149 1248 18 here here RB 42149 1248 19 , , , 42149 1248 20 this this DT 42149 1248 21 segment segment NN 42149 1248 22 was be VBD 42149 1248 23 filled fill VBN 42149 1248 24 to to IN 42149 1248 25 the the DT 42149 1248 26 level level NN 42149 1248 27 of of IN 42149 1248 28 the the DT 42149 1248 29 top top NN 42149 1248 30 of of IN 42149 1248 31 the the DT 42149 1248 32 flanges flange NNS 42149 1248 33 with with IN 42149 1248 34 1:1 1:1 NNP 42149 1248 35 Portland Portland NNP 42149 1248 36 cement cement NN 42149 1248 37 mortar mortar NN 42149 1248 38 . . . 42149 1249 1 [ [ -LRB- 42149 1249 2 Illustration illustration NN 42149 1249 3 : : : 42149 1249 4 SUBAQUEOUS subaqueous VB 42149 1249 5 TUNNELS tunnels NN 42149 1249 6 COVER COVER NNS 42149 1249 7 FOR for IN 42149 1249 8 BORE bore NN 42149 1249 9 SEGMENTS segment NNS 42149 1249 10 FIG FIG NNP 42149 1249 11 . . . 42149 1250 1 13 13 CD 42149 1250 2 . . . 42149 1250 3 ] ] -RRB- 42149 1251 1 The the DT 42149 1251 2 weights weight NNS 42149 1251 3 of of IN 42149 1251 4 the the DT 42149 1251 5 various various JJ 42149 1251 6 parts part NNS 42149 1251 7 of of IN 42149 1251 8 the the DT 42149 1251 9 bore bore NN 42149 1251 10 segments segment NNS 42149 1251 11 are be VBP 42149 1251 12 given give VBN 42149 1251 13 in in IN 42149 1251 14 Table table NN 42149 1251 15 20 20 CD 42149 1251 16 . . . 42149 1252 1 TABLE TABLE NNS 42149 1252 2 20.--WEIGHTS 20.--weights CD 42149 1252 3 OF of IN 42149 1252 4 BORE bore JJ 42149 1252 5 SEGMENTS segment NNS 42149 1252 6 AND and CC 42149 1252 7 ACCESSORIES accessory NNS 42149 1252 8 , , , 42149 1252 9 IN in IN 42149 1252 10 POUNDS pound NNS 42149 1252 11 . . . 42149 1253 1 = = NFP 42149 1253 2 = = NFP 42149 1253 3 = = SYM 42149 1253 4 = = SYM 42149 1253 5 = = SYM 42149 1253 6 = = SYM 42149 1253 7 = = SYM 42149 1253 8 = = SYM 42149 1253 9 = = SYM 42149 1253 10 = = SYM 42149 1253 11 = = SYM 42149 1253 12 = = SYM 42149 1253 13 = = SYM 42149 1253 14 = = SYM 42149 1253 15 = = SYM 42149 1253 16 = = SYM 42149 1253 17 = = SYM 42149 1253 18 = = SYM 42149 1253 19 = = NFP 42149 1253 20 = = SYM 42149 1253 21 + + SYM 42149 1253 22 = = SYM 42149 1253 23 = = SYM 42149 1253 24 = = SYM 42149 1253 25 = = NFP 42149 1253 26 = = SYM 42149 1253 27 + + SYM 42149 1253 28 = = SYM 42149 1253 29 = = SYM 42149 1253 30 = = SYM 42149 1253 31 = = SYM 42149 1253 32 = = SYM 42149 1253 33 = = SYM 42149 1253 34 = = SYM 42149 1253 35 = = SYM 42149 1253 36 = = SYM 42149 1253 37 = = SYM 42149 1253 38 = = SYM 42149 1253 39 = = SYM 42149 1253 40 = = SYM 42149 1253 41 = = SYM 42149 1253 42 = = SYM 42149 1253 43 = = SYM 42149 1253 44 = = SYM 42149 1253 45 = = SYM 42149 1253 46 = = SYM 42149 1253 47 = = SYM 42149 1253 48 = = SYM 42149 1253 49 = = SYM 42149 1253 50 = = SYM 42149 1253 51 = = SYM 42149 1253 52 = = SYM 42149 1253 53 = = SYM 42149 1253 54 = = SYM 42149 1253 55 = = SYM 42149 1253 56 = = SYM 42149 1253 57 = = SYM 42149 1253 58 = = SYM 42149 1253 59 = = SYM 42149 1253 60 = = SYM 42149 1253 61 = = SYM 42149 1253 62 = = NFP 42149 1253 63 = = NFP 42149 1253 64 Part part NN 42149 1253 65 . . . 42149 1254 1 | | NNS 42149 1254 2 No no NN 42149 1254 3 . . . 42149 1255 1 | | NNP 42149 1255 2 Material Material NNP 42149 1255 3 . . . 42149 1256 1 | | NNP 42149 1256 2 Weight Weight NNP 42149 1256 3 , , , 42149 1256 4 in in IN 42149 1256 5 pounds pound NNS 42149 1256 6 . . . 42149 1257 1 --------------------+-----+---------------+-------------------- --------------------+-----+---------------+-------------------- : 42149 1257 2 Bore Bore NNP 42149 1257 3 Segment Segment NNP 42149 1257 4 No no NN 42149 1257 5 . . . 42149 1258 1 1 1 CD 42149 1258 2 | | CD 42149 1258 3 1 1 CD 42149 1258 4 | | CD 42149 1258 5 Cast Cast NNP 42149 1258 6 Steel Steel NNP 42149 1258 7 | | NNP 42149 1258 8 3,004.0 3,004.0 CD 42149 1258 9 Bore Bore NNP 42149 1258 10 Segment Segment NNP 42149 1258 11 No no UH 42149 1258 12 . . . 42149 1259 1 2 2 CD 42149 1259 2 | | CD 42149 1259 3 1 1 CD 42149 1259 4 | | CD 42149 1259 5 " " '' 42149 1259 6 " " `` 42149 1259 7 | | NNP 42149 1259 8 2,628.0 2,628.0 CD 42149 1259 9 Distance Distance NNP 42149 1259 10 piece piece NN 42149 1259 11 | | CD 42149 1259 12 1 1 CD 42149 1259 13 | | CD 42149 1259 14 " " '' 42149 1259 15 " " '' 42149 1259 16 | | NNP 42149 1259 17 423.5 423.5 CD 42149 1259 18 Key Key NNP 42149 1259 19 | | NNP 42149 1259 20 1 1 CD 42149 1259 21 | | CD 42149 1259 22 " " '' 42149 1259 23 " " '' 42149 1259 24 | | CD 42149 1259 25 34.3 34.3 CD 42149 1259 26 Plug Plug NNP 42149 1259 27 | | NNP 42149 1259 28 1 1 CD 42149 1259 29 | | CD 42149 1259 30 " " '' 42149 1259 31 " " '' 42149 1259 32 | | NNP 42149 1259 33 1,192.5 1,192.5 CD 42149 1259 34 Yoke Yoke NNP 42149 1259 35 | | NNP 42149 1259 36 1 1 CD 42149 1259 37 | | CD 42149 1259 38 " " '' 42149 1259 39 " " '' 42149 1259 40 | | NNP 42149 1259 41 57.3 57.3 CD 42149 1259 42 Dogs Dogs NNP 42149 1259 43 | | NNP 42149 1259 44 2 2 CD 42149 1259 45 | | CD 42149 1259 46 " " '' 42149 1259 47 " " '' 42149 1259 48 | | CD 42149 1259 49 106.0 106.0 CD 42149 1259 50 Slot Slot NNP 42149 1259 51 cover cover NN 42149 1259 52 | | CD 42149 1259 53 1 1 CD 42149 1259 54 | | CD 42149 1259 55 Rolled roll VBN 42149 1259 56 steel steel NN 42149 1259 57 | | CD 42149 1259 58 6.4 6.4 CD 42149 1259 59 Plug Plug NNP 42149 1259 60 cover cover NN 42149 1259 61 | | NNP 42149 1259 62 1 1 CD 42149 1259 63 | | CD 42149 1259 64 Cast Cast NNP 42149 1259 65 iron iron NN 42149 1259 66 | | CD 42149 1259 67 162.0 162.0 CD 42149 1259 68 Dog Dog NNP 42149 1259 69 holders holder NNS 42149 1259 70 | | CD 42149 1259 71 2 2 CD 42149 1259 72 | | HYPH 42149 1259 73 Rolled roll VBN 42149 1259 74 steel steel NN 42149 1259 75 | | CD 42149 1259 76 6.4 6.4 CD 42149 1259 77 --------------------+-----+---------------+-------------------- --------------------+-----+---------------+-------------------- HYPH 42149 1259 78 Complete complete JJ 42149 1259 79 weight weight NN 42149 1259 80 of of IN 42149 1259 81 one one CD 42149 1259 82 pair pair NN 42149 1259 83 , , , 42149 1259 84 without without IN 42149 1259 85 bolts| bolts| ADD 42149 1259 86 7,620.4 7,620.4 CD 42149 1259 87 = = SYM 42149 1259 88 = = SYM 42149 1259 89 = = SYM 42149 1259 90 = = SYM 42149 1259 91 = = SYM 42149 1259 92 = = SYM 42149 1259 93 = = SYM 42149 1259 94 = = SYM 42149 1259 95 = = SYM 42149 1259 96 = = SYM 42149 1259 97 = = SYM 42149 1259 98 = = SYM 42149 1259 99 = = SYM 42149 1259 100 = = SYM 42149 1259 101 = = SYM 42149 1259 102 = = SYM 42149 1259 103 = = SYM 42149 1259 104 = = SYM 42149 1259 105 = = SYM 42149 1259 106 = = SYM 42149 1259 107 = = SYM 42149 1259 108 = = SYM 42149 1259 109 = = SYM 42149 1259 110 = = SYM 42149 1259 111 = = SYM 42149 1259 112 = = SYM 42149 1259 113 = = SYM 42149 1259 114 = = SYM 42149 1259 115 = = SYM 42149 1259 116 = = SYM 42149 1259 117 = = SYM 42149 1259 118 = = SYM 42149 1259 119 = = SYM 42149 1259 120 = = SYM 42149 1259 121 = = SYM 42149 1259 122 = = SYM 42149 1259 123 = = SYM 42149 1259 124 = = SYM 42149 1259 125 = = SYM 42149 1259 126 = = SYM 42149 1259 127 = = NFP 42149 1259 128 = = SYM 42149 1259 129 + + SYM 42149 1259 130 = = SYM 42149 1259 131 = = SYM 42149 1259 132 = = SYM 42149 1259 133 = = SYM 42149 1259 134 = = SYM 42149 1259 135 = = SYM 42149 1259 136 = = SYM 42149 1259 137 = = SYM 42149 1259 138 = = SYM 42149 1259 139 = = SYM 42149 1259 140 = = SYM 42149 1259 141 = = SYM 42149 1259 142 = = SYM 42149 1259 143 = = SYM 42149 1259 144 = = SYM 42149 1259 145 = = SYM 42149 1259 146 = = SYM 42149 1259 147 = = SYM 42149 1259 148 = = NFP 42149 1259 149 = = NFP 42149 1259 150 _ _ NNP 42149 1259 151 Sump Sump NNP 42149 1259 152 Segments._--In segments._--in NN 42149 1259 153 order order NN 42149 1259 154 to to TO 42149 1259 155 provide provide VB 42149 1259 156 sumps sump NNS 42149 1259 157 to to TO 42149 1259 158 collect collect VB 42149 1259 159 the the DT 42149 1259 160 drainage drainage NN 42149 1259 161 and and CC 42149 1259 162 leakage leakage NN 42149 1259 163 water water NN 42149 1259 164 in in IN 42149 1259 165 the the DT 42149 1259 166 subaqueous subaqueous JJ 42149 1259 167 tunnels tunnel NNS 42149 1259 168 , , , 42149 1259 169 special special JJ 42149 1259 170 " " `` 42149 1259 171 sump sump NN 42149 1259 172 segments segment NNS 42149 1259 173 " " '' 42149 1259 174 were be VBD 42149 1259 175 installed instal VBN 42149 1259 176 in in IN 42149 1259 177 each each DT 42149 1259 178 tunnel tunnel NN 42149 1259 179 at at IN 42149 1259 180 the the DT 42149 1259 181 lowest low JJS 42149 1259 182 point point NN 42149 1259 183 -- -- : 42149 1259 184 about about IN 42149 1259 185 Station Station NNP 42149 1259 186 241 241 CD 42149 1259 187 + + SYM 42149 1259 188 00 00 CD 42149 1259 189 . . . 42149 1260 1 The the DT 42149 1260 2 details detail NNS 42149 1260 3 of of IN 42149 1260 4 the the DT 42149 1260 5 design design NN 42149 1260 6 are be VBP 42149 1260 7 shown show VBN 42149 1260 8 in in IN 42149 1260 9 Fig Fig NNP 42149 1260 10 . . . 42149 1261 1 14 14 CD 42149 1261 2 . . . 42149 1262 1 The the DT 42149 1262 2 segment segment NN 42149 1262 3 was be VBD 42149 1262 4 built build VBN 42149 1262 5 into into IN 42149 1262 6 the the DT 42149 1262 7 tunnel tunnel NNP 42149 1262 8 invert invert NNP 42149 1262 9 as as IN 42149 1262 10 though though IN 42149 1262 11 it -PRON- PRP 42149 1262 12 were be VBD 42149 1262 13 an an DT 42149 1262 14 ordinary ordinary JJ 42149 1262 15 " " `` 42149 1262 16 _ _ NNP 42149 1262 17 A A NNP 42149 1262 18 _ _ NNP 42149 1262 19 " " '' 42149 1262 20 segment segment NN 42149 1262 21 . . . 42149 1263 1 In in IN 42149 1263 2 building build VBG 42149 1263 3 the the DT 42149 1263 4 sump sump NN 42149 1263 5 , , , 42149 1263 6 three three CD 42149 1263 7 lining line VBG 42149 1263 8 castings casting NNS 42149 1263 9 were be VBD 42149 1263 10 bolted bolt VBN 42149 1263 11 , , , 42149 1263 12 one one CD 42149 1263 13 on on IN 42149 1263 14 top top NN 42149 1263 15 of of IN 42149 1263 16 the the DT 42149 1263 17 other other JJ 42149 1263 18 , , , 42149 1263 19 and and CC 42149 1263 20 attached attach VBN 42149 1263 21 to to IN 42149 1263 22 the the DT 42149 1263 23 flat flat JJ 42149 1263 24 upper upper JJ 42149 1263 25 surface surface NN 42149 1263 26 of of IN 42149 1263 27 the the DT 42149 1263 28 sump sump NN 42149 1263 29 segment segment NN 42149 1263 30 ; ; : 42149 1263 31 meanwhile meanwhile RB 42149 1263 32 , , , 42149 1263 33 the the DT 42149 1263 34 bolts bolt NNS 42149 1263 35 attaching attach VBG 42149 1263 36 the the DT 42149 1263 37 sump sump NN 42149 1263 38 segment segment NN 42149 1263 39 to to IN 42149 1263 40 the the DT 42149 1263 41 adjacent adjacent JJ 42149 1263 42 tunnel tunnel NN 42149 1263 43 plates plate NNS 42149 1263 44 were be VBD 42149 1263 45 taken take VBN 42149 1263 46 out out RP 42149 1263 47 and and CC 42149 1263 48 the the DT 42149 1263 49 plate plate NN 42149 1263 50 and and CC 42149 1263 51 lining lining NN 42149 1263 52 segments segment NNS 42149 1263 53 were be VBD 42149 1263 54 forced force VBN 42149 1263 55 through through IN 42149 1263 56 the the DT 42149 1263 57 soft soft JJ 42149 1263 58 mud mud NN 42149 1263 59 by by IN 42149 1263 60 hydraulic hydraulic NNP 42149 1263 61 jacks jack NNS 42149 1263 62 , , , 42149 1263 63 the the DT 42149 1263 64 three three CD 42149 1263 65 6-in 6-in CD 42149 1263 66 . . . 42149 1264 1 holes hole NNS 42149 1264 2 in in IN 42149 1264 3 the the DT 42149 1264 4 bottom bottom NN 42149 1264 5 of of IN 42149 1264 6 the the DT 42149 1264 7 sump sump NN 42149 1264 8 segment segment NN 42149 1264 9 being be VBG 42149 1264 10 opened open VBN 42149 1264 11 in in IN 42149 1264 12 order order NN 42149 1264 13 to to TO 42149 1264 14 minimize minimize VB 42149 1264 15 the the DT 42149 1264 16 resistance resistance NN 42149 1264 17 . . . 42149 1265 1 The the DT 42149 1265 2 sump sump NN 42149 1265 3 when when WRB 42149 1265 4 built build VBN 42149 1265 5 appeared appear VBD 42149 1265 6 as as IN 42149 1265 7 shown show VBN 42149 1265 8 in in IN 42149 1265 9 Fig Fig NNP 42149 1265 10 . . . 42149 1266 1 14 14 CD 42149 1266 2 , , , 42149 1266 3 the the DT 42149 1266 4 top top JJ 42149 1266 5 connection connection NN 42149 1266 6 being be VBG 42149 1266 7 made make VBN 42149 1266 8 with with IN 42149 1266 9 a a DT 42149 1266 10 special special JJ 42149 1266 11 casting casting NN 42149 1266 12 , , , 42149 1266 13 as as IN 42149 1266 14 shown show VBN 42149 1266 15 . . . 42149 1267 1 The the DT 42149 1267 2 capacity capacity NN 42149 1267 3 of of IN 42149 1267 4 each each DT 42149 1267 5 sump sump NN 42149 1267 6 is be VBZ 42149 1267 7 500 500 CD 42149 1267 8 gal gal NNP 42149 1267 9 . . . 42149 1267 10 , , , 42149 1267 11 which which WDT 42149 1267 12 is be VBZ 42149 1267 13 about about IN 42149 1267 14 the the DT 42149 1267 15 quantity quantity NN 42149 1267 16 of of IN 42149 1267 17 water water NN 42149 1267 18 entering enter VBG 42149 1267 19 the the DT 42149 1267 20 whole whole JJ 42149 1267 21 length length NN 42149 1267 22 of of IN 42149 1267 23 each each DT 42149 1267 24 subaqueous subaqueous JJ 42149 1267 25 tunnel tunnel NN 42149 1267 26 in in IN 42149 1267 27 24 24 CD 42149 1267 28 hours hour NNS 42149 1267 29 . . . 42149 1268 1 _ _ NNP 42149 1268 2 Cross Cross NNP 42149 1268 3 - - HYPH 42149 1268 4 Passages._--When Passages._--When NNP 42149 1268 5 the the DT 42149 1268 6 contract contract NN 42149 1268 7 was be VBD 42149 1268 8 let let VBN 42149 1268 9 , , , 42149 1268 10 provision provision NN 42149 1268 11 was be VBD 42149 1268 12 made make VBN 42149 1268 13 for for IN 42149 1268 14 cross cross NN 42149 1268 15 - - NNS 42149 1268 16 passages passage NNS 42149 1268 17 between between IN 42149 1268 18 the the DT 42149 1268 19 tubular tubular JJ 42149 1268 20 tunnels tunnel NNS 42149 1268 21 , , , 42149 1268 22 in in IN 42149 1268 23 the the DT 42149 1268 24 form form NN 42149 1268 25 of of IN 42149 1268 26 special special JJ 42149 1268 27 castings casting NNS 42149 1268 28 to to TO 42149 1268 29 be be VB 42149 1268 30 built build VBN 42149 1268 31 into into IN 42149 1268 32 the the DT 42149 1268 33 tunnel tunnel NN 42149 1268 34 lining line VBG 42149 1268 35 at at IN 42149 1268 36 intervals interval NNS 42149 1268 37 . . . 42149 1269 1 However however RB 42149 1269 2 , , , 42149 1269 3 the the DT 42149 1269 4 idea idea NN 42149 1269 5 was be VBD 42149 1269 6 given give VBN 42149 1269 7 up up RP 42149 1269 8 , , , 42149 1269 9 and and CC 42149 1269 10 these these DT 42149 1269 11 castings casting NNS 42149 1269 12 were be VBD 42149 1269 13 not not RB 42149 1269 14 made make VBN 42149 1269 15 . . . 42149 1270 1 Later later RB 42149 1270 2 , , , 42149 1270 3 however however RB 42149 1270 4 , , , 42149 1270 5 after after IN 42149 1270 6 tunnel tunnel NN 42149 1270 7 building building NN 42149 1270 8 had have VBD 42149 1270 9 started start VBN 42149 1270 10 , , , 42149 1270 11 the the DT 42149 1270 12 question question NN 42149 1270 13 was be VBD 42149 1270 14 raised raise VBN 42149 1270 15 again again RB 42149 1270 16 , , , 42149 1270 17 and and CC 42149 1270 18 it -PRON- PRP 42149 1270 19 was be VBD 42149 1270 20 thought think VBN 42149 1270 21 that that IN 42149 1270 22 such such JJ 42149 1270 23 cross cross NN 42149 1270 24 - - NNS 42149 1270 25 connections connection NNS 42149 1270 26 would would MD 42149 1270 27 be be VB 42149 1270 28 very very RB 42149 1270 29 useful useful JJ 42149 1270 30 to to IN 42149 1270 31 the the DT 42149 1270 32 maintenance maintenance NN 42149 1270 33 forces force NNS 42149 1270 34 , , , 42149 1270 35 that that IN 42149 1270 36 it -PRON- PRP 42149 1270 37 might may MD 42149 1270 38 be be VB 42149 1270 39 possible possible JJ 42149 1270 40 to to TO 42149 1270 41 build build VB 42149 1270 42 them -PRON- PRP 42149 1270 43 safely safely RB 42149 1270 44 , , , 42149 1270 45 and and CC 42149 1270 46 that that IN 42149 1270 47 their -PRON- PRP$ 42149 1270 48 subsequent subsequent JJ 42149 1270 49 construction construction NN 42149 1270 50 would would MD 42149 1270 51 be be VB 42149 1270 52 made make VBN 42149 1270 53 much much RB 42149 1270 54 easier easy JJR 42149 1270 55 if if IN 42149 1270 56 some some DT 42149 1270 57 provision provision NN 42149 1270 58 were be VBD 42149 1270 59 made make VBN 42149 1270 60 for for IN 42149 1270 61 them -PRON- PRP 42149 1270 62 while while IN 42149 1270 63 the the DT 42149 1270 64 shields shield NNS 42149 1270 65 were be VBD 42149 1270 66 being be VBG 42149 1270 67 driven drive VBN 42149 1270 68 . . . 42149 1271 1 It -PRON- PRP 42149 1271 2 was be VBD 42149 1271 3 therefore therefore RB 42149 1271 4 arranged arrange VBN 42149 1271 5 to to TO 42149 1271 6 build build VB 42149 1271 7 , , , 42149 1271 8 at at IN 42149 1271 9 intervals interval NNS 42149 1271 10 of of IN 42149 1271 11 about about RB 42149 1271 12 300 300 CD 42149 1271 13 ft ft NN 42149 1271 14 . . NNP 42149 1271 15 , , , 42149 1271 16 two two CD 42149 1271 17 consecutive consecutive JJ 42149 1271 18 rings ring NNS 42149 1271 19 in in IN 42149 1271 20 each each DT 42149 1271 21 tunnel tunnel NN 42149 1271 22 , , , 42149 1271 23 at at IN 42149 1271 24 the the DT 42149 1271 25 same same JJ 42149 1271 26 station station NN 42149 1271 27 in in IN 42149 1271 28 each each DT 42149 1271 29 tunnel tunnel NN 42149 1271 30 , , , 42149 1271 31 with with IN 42149 1271 32 their -PRON- PRP$ 42149 1271 33 longitudinal longitudinal JJ 42149 1271 34 flanges flange NNS 42149 1271 35 together together RB 42149 1271 36 , , , 42149 1271 37 instead instead RB 42149 1271 38 of of IN 42149 1271 39 breaking break VBG 42149 1271 40 joint joint NN 42149 1271 41 , , , 42149 1271 42 as as IN 42149 1271 43 was be VBD 42149 1271 44 usually usually RB 42149 1271 45 done do VBN 42149 1271 46 . . . 42149 1272 1 The the DT 42149 1272 2 keys key NNS 42149 1272 3 of of IN 42149 1272 4 these these DT 42149 1272 5 rings ring NNS 42149 1272 6 were be VBD 42149 1272 7 displaced displace VBN 42149 1272 8 twelve twelve CD 42149 1272 9 bolt bolt NN 42149 1272 10 holes hole NNS 42149 1272 11 from from IN 42149 1272 12 their -PRON- PRP$ 42149 1272 13 normal normal JJ 42149 1272 14 positions position NNS 42149 1272 15 toward toward IN 42149 1272 16 the the DT 42149 1272 17 other other JJ 42149 1272 18 tunnel tunnel NN 42149 1272 19 . . . 42149 1273 1 This this DT 42149 1273 2 brought bring VBD 42149 1273 3 the the DT 42149 1273 4 keys key NNS 42149 1273 5 about about RB 42149 1273 6 6 6 CD 42149 1273 7 ft ft NN 42149 1273 8 . . . 42149 1273 9 above above IN 42149 1273 10 the the DT 42149 1273 11 bench bench NN 42149 1273 12 , , , 42149 1273 13 so so IN 42149 1273 14 that that IN 42149 1273 15 if if IN 42149 1273 16 they -PRON- PRP 42149 1273 17 were be VBD 42149 1273 18 removed remove VBN 42149 1273 19 , , , 42149 1273 20 together together RB 42149 1273 21 with with IN 42149 1273 22 the the DT 42149 1273 23 _ _ NNP 42149 1273 24 B B NNP 42149 1273 25 _ _ NNP 42149 1273 26 plates plate VBZ 42149 1273 27 below below IN 42149 1273 28 them -PRON- PRP 42149 1273 29 , , , 42149 1273 30 an an DT 42149 1273 31 opening opening NN 42149 1273 32 of of IN 42149 1273 33 about about RB 42149 1273 34 5 5 CD 42149 1273 35 by by IN 42149 1273 36 7 7 CD 42149 1273 37 ft ft NN 42149 1273 38 . . . 42149 1273 39 would would MD 42149 1273 40 be be VB 42149 1273 41 left leave VBN 42149 1273 42 in in IN 42149 1273 43 a a DT 42149 1273 44 convenient convenient JJ 42149 1273 45 position position NN 42149 1273 46 with with IN 42149 1273 47 regard regard NN 42149 1273 48 to to IN 42149 1273 49 the the DT 42149 1273 50 bench bench NN 42149 1273 51 . . . 42149 1274 1 [ [ -LRB- 42149 1274 2 Illustration illustration NN 42149 1274 3 : : : 42149 1274 4 DETAILS DETAILS NNP 42149 1274 5 OF of IN 42149 1274 6 SUMPS SUMPS NNP 42149 1274 7 IN in IN 42149 1274 8 SUBAQUEOUS SUBAQUEOUS NNP 42149 1274 9 TUNNELS TUNNELS NNP 42149 1274 10 AT at IN 42149 1274 11 STATION station NN 42149 1274 12 241 241 CD 42149 1274 13 FIG FIG NNP 42149 1274 14 . . . 42149 1275 1 14 14 CD 42149 1275 2 . . . 42149 1275 3 ] ] -RRB- 42149 1276 1 Nothing nothing NN 42149 1276 2 more more RBR 42149 1276 3 was be VBD 42149 1276 4 done do VBN 42149 1276 5 until until IN 42149 1276 6 after after IN 42149 1276 7 the the DT 42149 1276 8 tunnels tunnel NNS 42149 1276 9 were be VBD 42149 1276 10 driven drive VBN 42149 1276 11 . . . 42149 1277 1 It -PRON- PRP 42149 1277 2 was be VBD 42149 1277 3 then then RB 42149 1277 4 decided decide VBN 42149 1277 5 to to TO 42149 1277 6 limit limit VB 42149 1277 7 the the DT 42149 1277 8 cross cross NN 42149 1277 9 - - NNS 42149 1277 10 passages passage NNS 42149 1277 11 between between IN 42149 1277 12 the the DT 42149 1277 13 tubular tubular JJ 42149 1277 14 tunnels tunnel NNS 42149 1277 15 to to IN 42149 1277 16 the the DT 42149 1277 17 landward landward NN 42149 1277 18 side side NN 42149 1277 19 of of IN 42149 1277 20 the the DT 42149 1277 21 bulkhead bulkhead NN 42149 1277 22 walls wall NNS 42149 1277 23 . . . 42149 1278 1 They -PRON- PRP 42149 1278 2 were be VBD 42149 1278 3 arranged arrange VBN 42149 1278 4 as as IN 42149 1278 5 follows follow VBZ 42149 1278 6 : : : 42149 1278 7 three three CD 42149 1278 8 on on IN 42149 1278 9 the the DT 42149 1278 10 New New NNP 42149 1278 11 York York NNP 42149 1278 12 side side NN 42149 1278 13 , , , 42149 1278 14 at at IN 42149 1278 15 Stations station NNS 42149 1278 16 203 203 CD 42149 1278 17 + + SYM 42149 1278 18 22 22 CD 42149 1278 19 , , , 42149 1278 20 206 206 CD 42149 1278 21 + + SYM 42149 1278 22 80 80 CD 42149 1278 23 , , , 42149 1278 24 and and CC 42149 1278 25 209 209 CD 42149 1278 26 + + SYM 42149 1278 27 80 80 CD 42149 1278 28 , , , 42149 1278 29 and and CC 42149 1278 30 two two CD 42149 1278 31 on on IN 42149 1278 32 the the DT 42149 1278 33 New New NNP 42149 1278 34 Jersey Jersey NNP 42149 1278 35 side side NN 42149 1278 36 , , , 42149 1278 37 at at IN 42149 1278 38 Stations station NNS 42149 1278 39 255 255 CD 42149 1278 40 + + CC 42149 1278 41 46 46 CD 42149 1278 42 and and CC 42149 1278 43 260 260 CD 42149 1278 44 + + SYM 42149 1278 45 14 14 CD 42149 1278 46 . . . 42149 1279 1 The the DT 42149 1279 2 cross cross NN 42149 1279 3 - - NNS 42149 1279 4 passages passage NNS 42149 1279 5 are be VBP 42149 1279 6 square square JJ 42149 1279 7 in in IN 42149 1279 8 cross cross NN 42149 1279 9 - - NN 42149 1279 10 section section NN 42149 1279 11 . . . 42149 1280 1 TABLE TABLE NNS 42149 1280 2 21.--WEIGHTS 21.--weights CD 42149 1280 3 OF of IN 42149 1280 4 SUMP SUMP NNP 42149 1280 5 SEGMENTS SEGMENTS NNP 42149 1280 6 . . . 42149 1281 1 = = NFP 42149 1281 2 = = NFP 42149 1281 3 = = SYM 42149 1281 4 = = SYM 42149 1281 5 = = SYM 42149 1281 6 = = SYM 42149 1281 7 = = SYM 42149 1281 8 = = SYM 42149 1281 9 = = SYM 42149 1281 10 = = SYM 42149 1281 11 = = SYM 42149 1281 12 = = SYM 42149 1281 13 = = SYM 42149 1281 14 = = SYM 42149 1281 15 = = SYM 42149 1281 16 = = SYM 42149 1281 17 = = SYM 42149 1281 18 = = SYM 42149 1281 19 = = NFP 42149 1281 20 = = SYM 42149 1281 21 + + SYM 42149 1281 22 = = SYM 42149 1281 23 = = SYM 42149 1281 24 = = SYM 42149 1281 25 = = NFP 42149 1281 26 = = SYM 42149 1281 27 + + SYM 42149 1281 28 = = SYM 42149 1281 29 = = SYM 42149 1281 30 = = SYM 42149 1281 31 = = SYM 42149 1281 32 = = SYM 42149 1281 33 = = SYM 42149 1281 34 = = SYM 42149 1281 35 = = SYM 42149 1281 36 = = SYM 42149 1281 37 = = SYM 42149 1281 38 = = SYM 42149 1281 39 = = SYM 42149 1281 40 = = SYM 42149 1281 41 = = NFP 42149 1281 42 = = SYM 42149 1281 43 + + SYM 42149 1281 44 = = SYM 42149 1281 45 = = SYM 42149 1281 46 = = SYM 42149 1281 47 = = SYM 42149 1281 48 = = SYM 42149 1281 49 = = SYM 42149 1281 50 = = SYM 42149 1281 51 = = SYM 42149 1281 52 = = SYM 42149 1281 53 = = SYM 42149 1281 54 = = SYM 42149 1281 55 = = SYM 42149 1281 56 = = SYM 42149 1281 57 = = SYM 42149 1281 58 = = SYM 42149 1281 59 = = SYM 42149 1281 60 = = SYM 42149 1281 61 = = SYM 42149 1281 62 = = NFP 42149 1281 63 = = NFP 42149 1281 64 Part part NN 42149 1281 65 . . . 42149 1282 1 | | NNS 42149 1282 2 No no NN 42149 1282 3 . . . 42149 1283 1 | | NNP 42149 1283 2 Material Material NNP 42149 1283 3 . . . 42149 1284 1 | | NNP 42149 1284 2 Weight Weight NNP 42149 1284 3 , , , 42149 1284 4 in in IN 42149 1284 5 pounds pound NNS 42149 1284 6 . . . 42149 1285 1 --------------------+-----+---------------+-------------------- --------------------+-----+---------------+-------------------- : 42149 1285 2 Middle middle JJ 42149 1285 3 top top JJ 42149 1285 4 casting cast VBG 42149 1285 5 | | CD 42149 1285 6 1 1 CD 42149 1285 7 | | CD 42149 1285 8 Cast Cast NNP 42149 1285 9 steel steel NN 42149 1285 10 | | CD 42149 1285 11 880 880 CD 42149 1285 12 End end NN 42149 1285 13 top top JJ 42149 1285 14 castings casting NNS 42149 1285 15 | | CD 42149 1285 16 2 2 CD 42149 1285 17 | | CD 42149 1285 18 " " '' 42149 1285 19 " " '' 42149 1285 20 | | CD 42149 1285 21 1,718 1,718 CD 42149 1285 22 Lining Lining NNP 42149 1285 23 castings casting NNS 42149 1285 24 | | CD 42149 1285 25 3 3 CD 42149 1285 26 | | NNP 42149 1285 27 " " '' 42149 1285 28 " " `` 42149 1285 29 | | CD 42149 1285 30 18,232 18,232 CD 42149 1285 31 Sump Sump NNP 42149 1285 32 segment segment NN 42149 1285 33 | | CD 42149 1285 34 1 1 CD 42149 1285 35 | | CD 42149 1285 36 Cast Cast NNP 42149 1285 37 iron iron NN 42149 1285 38 | | CD 42149 1285 39 3,560 3,560 CD 42149 1285 40 --------------------+-----+---------------+-------------------- --------------------+-----+---------------+-------------------- CD 42149 1285 41 Total total JJ 42149 1285 42 weight weight NN 42149 1285 43 per per IN 42149 1285 44 sump sump NN 42149 1285 45 , , , 42149 1285 46 exclusive exclusive JJ 42149 1285 47 of of IN 42149 1285 48 bolts bolt NNS 42149 1285 49 | | CD 42149 1285 50 24,390 24,390 CD 42149 1285 51 = = SYM 42149 1285 52 = = SYM 42149 1285 53 = = SYM 42149 1285 54 = = SYM 42149 1285 55 = = SYM 42149 1285 56 = = SYM 42149 1285 57 = = SYM 42149 1285 58 = = SYM 42149 1285 59 = = SYM 42149 1285 60 = = SYM 42149 1285 61 = = SYM 42149 1285 62 = = SYM 42149 1285 63 = = SYM 42149 1285 64 = = SYM 42149 1285 65 = = SYM 42149 1285 66 = = SYM 42149 1285 67 = = SYM 42149 1285 68 = = SYM 42149 1285 69 = = SYM 42149 1285 70 = = SYM 42149 1285 71 = = SYM 42149 1285 72 = = SYM 42149 1285 73 = = SYM 42149 1285 74 = = SYM 42149 1285 75 = = SYM 42149 1285 76 = = SYM 42149 1285 77 = = SYM 42149 1285 78 = = SYM 42149 1285 79 = = SYM 42149 1285 80 = = SYM 42149 1285 81 = = SYM 42149 1285 82 = = SYM 42149 1285 83 = = SYM 42149 1285 84 = = SYM 42149 1285 85 = = SYM 42149 1285 86 = = SYM 42149 1285 87 = = SYM 42149 1285 88 = = SYM 42149 1285 89 = = SYM 42149 1285 90 = = SYM 42149 1285 91 = = NFP 42149 1285 92 = = SYM 42149 1285 93 + + SYM 42149 1285 94 = = SYM 42149 1285 95 = = SYM 42149 1285 96 = = SYM 42149 1285 97 = = SYM 42149 1285 98 = = SYM 42149 1285 99 = = SYM 42149 1285 100 = = SYM 42149 1285 101 = = SYM 42149 1285 102 = = SYM 42149 1285 103 = = SYM 42149 1285 104 = = SYM 42149 1285 105 = = SYM 42149 1285 106 = = SYM 42149 1285 107 = = SYM 42149 1285 108 = = SYM 42149 1285 109 = = SYM 42149 1285 110 = = SYM 42149 1285 111 = = SYM 42149 1285 112 = = NFP 42149 1285 113 = = NFP 42149 1285 114 _ _ NNP 42149 1285 115 Turnbuckle Turnbuckle NNP 42149 1285 116 Reinforcement Reinforcement NNP 42149 1285 117 for for IN 42149 1285 118 Cast Cast NNP 42149 1285 119 - - HYPH 42149 1285 120 Iron Iron NNP 42149 1285 121 Segments._--During segments._--dure VBG 42149 1285 122 the the DT 42149 1285 123 period period NN 42149 1285 124 of of IN 42149 1285 125 construction construction NN 42149 1285 126 , , , 42149 1285 127 a a DT 42149 1285 128 certain certain JJ 42149 1285 129 number number NN 42149 1285 130 of of IN 42149 1285 131 cast cast NN 42149 1285 132 - - HYPH 42149 1285 133 iron iron NN 42149 1285 134 segments segment NNS 42149 1285 135 , , , 42149 1285 136 mostly mostly RB 42149 1285 137 in in IN 42149 1285 138 the the DT 42149 1285 139 roof roof NN 42149 1285 140 , , , 42149 1285 141 but but CC 42149 1285 142 in in IN 42149 1285 143 some some DT 42149 1285 144 cases case NNS 42149 1285 145 at at IN 42149 1285 146 Manhattan Manhattan NNP 42149 1285 147 in in IN 42149 1285 148 the the DT 42149 1285 149 invert invert NN 42149 1285 150 , , , 42149 1285 151 behind behind IN 42149 1285 152 the the DT 42149 1285 153 river river NN 42149 1285 154 lines line NNS 42149 1285 155 , , , 42149 1285 156 became become VBD 42149 1285 157 cracked crack VBN 42149 1285 158 owing owing NN 42149 1285 159 to to IN 42149 1285 160 uneven uneven JJ 42149 1285 161 pressures pressure NNS 42149 1285 162 of of IN 42149 1285 163 the the DT 42149 1285 164 ground ground NN 42149 1285 165 . . . 42149 1286 1 Before before IN 42149 1286 2 the the DT 42149 1286 3 concrete concrete JJ 42149 1286 4 lining lining NN 42149 1286 5 was be VBD 42149 1286 6 put put VBN 42149 1286 7 in in RP 42149 1286 8 , , , 42149 1286 9 considerable considerable JJ 42149 1286 10 discussion discussion NN 42149 1286 11 occurred occur VBD 42149 1286 12 as as IN 42149 1286 13 to to IN 42149 1286 14 the the DT 42149 1286 15 wisest wise JJS 42149 1286 16 course course NN 42149 1286 17 to to TO 42149 1286 18 pursue pursue VB 42149 1286 19 with with IN 42149 1286 20 regard regard NN 42149 1286 21 to to IN 42149 1286 22 these these DT 42149 1286 23 broken broken JJ 42149 1286 24 plates plate NNS 42149 1286 25 . . . 42149 1287 1 It -PRON- PRP 42149 1287 2 was be VBD 42149 1287 3 finally finally RB 42149 1287 4 thought think VBN 42149 1287 5 best well RBS 42149 1287 6 not not RB 42149 1287 7 to to TO 42149 1287 8 take take VB 42149 1287 9 the the DT 42149 1287 10 plates plate NNS 42149 1287 11 out out RP 42149 1287 12 , , , 42149 1287 13 as as IN 42149 1287 14 more more JJR 42149 1287 15 harm harm NN 42149 1287 16 than than IN 42149 1287 17 good good JJ 42149 1287 18 might may MD 42149 1287 19 be be VB 42149 1287 20 done do VBN 42149 1287 21 , , , 42149 1287 22 but but CC 42149 1287 23 to to TO 42149 1287 24 reinforce reinforce VB 42149 1287 25 them -PRON- PRP 42149 1287 26 with with IN 42149 1287 27 turnbuckles turnbuckle NNS 42149 1287 28 , , , 42149 1287 29 as as IN 42149 1287 30 shown show VBN 42149 1287 31 in in IN 42149 1287 32 Fig Fig NNP 42149 1287 33 . . . 42149 1288 1 15 15 CD 42149 1288 2 . . . 42149 1289 1 The the DT 42149 1289 2 number number NN 42149 1289 3 of of IN 42149 1289 4 broken broken JJ 42149 1289 5 segments segment NNS 42149 1289 6 was be VBD 42149 1289 7 distributed distribute VBN 42149 1289 8 as as IN 42149 1289 9 follows follow VBZ 42149 1289 10 : : : 42149 1289 11 North North NNP 42149 1289 12 Manhattan Manhattan NNP 42149 1289 13 Tunnel Tunnel NNP 42149 1289 14 87 87 CD 42149 1289 15 , , , 42149 1289 16 chiefly chiefly RB 42149 1289 17 in in IN 42149 1289 18 silt silt NN 42149 1289 19 ( ( -LRB- 42149 1289 20 not not RB 42149 1289 21 under under IN 42149 1289 22 the the DT 42149 1289 23 river river NN 42149 1289 24 ) ) -RRB- 42149 1289 25 , , , 42149 1289 26 South South NNP 42149 1289 27 Manhattan Manhattan NNP 42149 1289 28 Tunnel Tunnel NNP 42149 1289 29 7 7 CD 42149 1289 30 , , , 42149 1289 31 chiefly chiefly RB 42149 1289 32 in in IN 42149 1289 33 silt silt NN 42149 1289 34 ( ( -LRB- 42149 1289 35 " " `` 42149 1289 36 " " `` 42149 1289 37 " " '' 42149 1289 38 " " '' 42149 1289 39 ) ) -RRB- 42149 1289 40 , , , 42149 1289 41 North North NNP 42149 1289 42 Weehawken Weehawken NNP 42149 1289 43 Tunnel Tunnel NNP 42149 1289 44 24 24 CD 42149 1289 45 , , , 42149 1289 46 chiefly chiefly RB 42149 1289 47 in in IN 42149 1289 48 sand sand NN 42149 1289 49 ( ( -LRB- 42149 1289 50 " " `` 42149 1289 51 " " `` 42149 1289 52 " " '' 42149 1289 53 " " '' 42149 1289 54 ) ) -RRB- 42149 1289 55 , , , 42149 1289 56 South South NNP 42149 1289 57 Weehawken Weehawken NNP 42149 1289 58 Tunnel Tunnel NNP 42149 1289 59 48 48 CD 42149 1289 60 , , , 42149 1289 61 chiefly chiefly RB 42149 1289 62 in in IN 42149 1289 63 silt silt NN 42149 1289 64 , , , 42149 1289 65 under under IN 42149 1289 66 the the DT 42149 1289 67 Fowler Fowler NNP 42149 1289 68 Warehouse Warehouse NNP 42149 1289 69 . . . 42149 1290 1 The the DT 42149 1290 2 chief chief NN 42149 1290 3 features feature NNS 42149 1290 4 of of IN 42149 1290 5 the the DT 42149 1290 6 tunnel tunnel NN 42149 1290 7 lining lining NN 42149 1290 8 have have VBP 42149 1290 9 now now RB 42149 1290 10 been be VBN 42149 1290 11 described describe VBN 42149 1290 12 , , , 42149 1290 13 and and CC 42149 1290 14 , , , 42149 1290 15 before before IN 42149 1290 16 giving give VBG 42149 1290 17 any any DT 42149 1290 18 account account NN 42149 1290 19 of of IN 42149 1290 20 the the DT 42149 1290 21 methods method NNS 42149 1290 22 of of IN 42149 1290 23 work work NN 42149 1290 24 , , , 42149 1290 25 it -PRON- PRP 42149 1290 26 will will MD 42149 1290 27 be be VB 42149 1290 28 well well JJ 42149 1290 29 to to TO 42149 1290 30 mention mention VB 42149 1290 31 briefly briefly RB 42149 1290 32 the the DT 42149 1290 33 salient salient NN 42149 1290 34 features feature NNS 42149 1290 35 of of IN 42149 1290 36 the the DT 42149 1290 37 concrete concrete JJ 42149 1290 38 lining lining NN 42149 1290 39 which which WDT 42149 1290 40 is be VBZ 42149 1290 41 placed place VBN 42149 1290 42 within within IN 42149 1290 43 the the DT 42149 1290 44 actual actual JJ 42149 1290 45 lining lining NN 42149 1290 46 . . . 42149 1291 1 Design design NN 42149 1291 2 of of IN 42149 1291 3 Concrete Concrete NNP 42149 1291 4 Lining Lining NNP 42149 1291 5 . . . 42149 1292 1 This this DT 42149 1292 2 concrete concrete JJ 42149 1292 3 lining lining NN 42149 1292 4 will will MD 42149 1292 5 be be VB 42149 1292 6 considered consider VBN 42149 1292 7 and and CC 42149 1292 8 described describe VBN 42149 1292 9 in in IN 42149 1292 10 the the DT 42149 1292 11 following follow VBG 42149 1292 12 order order NN 42149 1292 13 : : : 42149 1292 14 The the DT 42149 1292 15 New New NNP 42149 1292 16 York York NNP 42149 1292 17 Shield Shield NNP 42149 1292 18 Chambers Chambers NNPS 42149 1292 19 , , , 42149 1292 20 Standard Standard NNP 42149 1292 21 Cross Cross NNP 42149 1292 22 - - HYPH 42149 1292 23 Section Section NNP 42149 1292 24 of of IN 42149 1292 25 Concrete Concrete NNP 42149 1292 26 Lining Lining NNP 42149 1292 27 of of IN 42149 1292 28 Shield Shield NNP 42149 1292 29 - - HYPH 42149 1292 30 Driven drive VBN 42149 1292 31 Tunnels Tunnels NNP 42149 1292 32 , , , 42149 1292 33 Final Final NNP 42149 1292 34 Lines Lines NNPS 42149 1292 35 and and CC 42149 1292 36 Grades Grades NNPS 42149 1292 37 , , , 42149 1292 38 and and CC 42149 1292 39 How how WRB 42149 1292 40 Obtained obtain VBN 42149 1292 41 , , , 42149 1292 42 Steel Steel NNP 42149 1292 43 Rod Rod NNP 42149 1292 44 Reinforcement Reinforcement NNP 42149 1292 45 of of IN 42149 1292 46 Concrete Concrete NNP 42149 1292 47 , , , 42149 1292 48 Cross Cross NNP 42149 1292 49 - - NNP 42149 1292 50 Passage Passage NNP 42149 1292 51 Lining Lining NNP 42149 1292 52 , , , 42149 1292 53 Special Special NNP 42149 1292 54 Provision Provision NNP 42149 1292 55 for for IN 42149 1292 56 Surveys Surveys NNP 42149 1292 57 and and CC 42149 1292 58 Observations observation NNS 42149 1292 59 . . . 42149 1293 1 [ [ -LRB- 42149 1293 2 Illustration illustration NN 42149 1293 3 : : : 42149 1293 4 SUBAQUEOUS subaqueous NN 42149 1293 5 TUNNELS tunnels NN 42149 1293 6 TURNBUCKLES turnbuckle NNS 42149 1293 7 AND and CC 42149 1293 8 RODS rods NN 42149 1293 9 REINFORCING reinforcing NN 42149 1293 10 TUNNEL tunnel JJ 42149 1293 11 SEGMENTS segment NNS 42149 1293 12 FIG FIG NNP 42149 1293 13 . . . 42149 1294 1 15 15 CD 42149 1294 2 . . . 42149 1294 3 ] ] -RRB- 42149 1295 1 _ _ NNP 42149 1295 2 The the DT 42149 1295 3 New New NNP 42149 1295 4 York York NNP 42149 1295 5 Shield Shield NNP 42149 1295 6 Chambers._--The Chambers._--The NNP 42149 1295 7 cross cross NN 42149 1295 8 - - NN 42149 1295 9 section section NN 42149 1295 10 of of IN 42149 1295 11 the the DT 42149 1295 12 concrete concrete JJ 42149 1295 13 lining lining NN 42149 1295 14 of of IN 42149 1295 15 these these DT 42149 1295 16 chambers chamber NNS 42149 1295 17 is be VBZ 42149 1295 18 shown show VBN 42149 1295 19 by by IN 42149 1295 20 Plate Plate NNP 42149 1295 21 XXXII XXXII NNP 42149 1295 22 , , , 42149 1295 23 referred refer VBD 42149 1295 24 to to IN 42149 1295 25 in in IN 42149 1295 26 the the DT 42149 1295 27 Land Land NNP 42149 1295 28 Tunnel Tunnel NNP 42149 1295 29 Section Section NNP 42149 1295 30 . . . 42149 1296 1 They -PRON- PRP 42149 1296 2 are be VBP 42149 1296 3 of of IN 42149 1296 4 the the DT 42149 1296 5 twin twin JJ 42149 1296 6 - - HYPH 42149 1296 7 tunnel tunnel NN 42149 1296 8 double double JJ 42149 1296 9 - - HYPH 42149 1296 10 bench bench NN 42149 1296 11 type type NN 42149 1296 12 . . . 42149 1297 1 The the DT 42149 1297 2 deep deep JJ 42149 1297 3 space space NN 42149 1297 4 beneath beneath IN 42149 1297 5 the the DT 42149 1297 6 floor floor NN 42149 1297 7 is be VBZ 42149 1297 8 used use VBN 42149 1297 9 as as IN 42149 1297 10 a a DT 42149 1297 11 sump sump NN 42149 1297 12 for for IN 42149 1297 13 drainage drainage NN 42149 1297 14 , , , 42149 1297 15 and and CC 42149 1297 16 manholes manhole NNS 42149 1297 17 for for IN 42149 1297 18 access access NN 42149 1297 19 to to IN 42149 1297 20 the the DT 42149 1297 21 cable cable NN 42149 1297 22 conduits conduit NNS 42149 1297 23 are be VBP 42149 1297 24 placed place VBN 42149 1297 25 in in IN 42149 1297 26 the the DT 42149 1297 27 benches bench NNS 42149 1297 28 . . . 42149 1298 1 [ [ -LRB- 42149 1298 2 Illustration illustration NN 42149 1298 3 : : : 42149 1298 4 TYPES types NN 42149 1298 5 OF of IN 42149 1298 6 CONCRETE concrete NN 42149 1298 7 LINING lining NN 42149 1298 8 OF of IN 42149 1298 9 SHIELD SHIELD NNP 42149 1298 10 - - HYPH 42149 1298 11 DRIVEN drive VBN 42149 1298 12 TUNNELS TUNNELS NNP 42149 1298 13 . . . 42149 1299 1 FIG FIG NNP 42149 1299 2 . . . 42149 1300 1 16 16 CD 42149 1300 2 . . . 42149 1300 3 ] ] -RRB- 42149 1301 1 _ _ NNP 42149 1301 2 Standard Standard NNP 42149 1301 3 Cross Cross NNP 42149 1301 4 - - HYPH 42149 1301 5 Section Section NNP 42149 1301 6 of of IN 42149 1301 7 Concrete Concrete NNP 42149 1301 8 Lining Lining NNP 42149 1301 9 of of IN 42149 1301 10 Shield Shield NNP 42149 1301 11 - - HYPH 42149 1301 12 Driven drive VBN 42149 1301 13 Tunnels._--The tunnels._--the POS 42149 1301 14 cross cross NN 42149 1301 15 - - NN 42149 1301 16 section section NN 42149 1301 17 of of IN 42149 1301 18 the the DT 42149 1301 19 concrete concrete JJ 42149 1301 20 lining lining NN 42149 1301 21 of of IN 42149 1301 22 the the DT 42149 1301 23 tube tube NN 42149 1301 24 tunnel tunnel NN 42149 1301 25 is be VBZ 42149 1301 26 shown show VBN 42149 1301 27 in in IN 42149 1301 28 Fig Fig NNP 42149 1301 29 . . . 42149 1302 1 16 16 CD 42149 1302 2 . . . 42149 1303 1 There there EX 42149 1303 2 are be VBP 42149 1303 3 two two CD 42149 1303 4 main main JJ 42149 1303 5 types type NNS 42149 1303 6 , , , 42149 1303 7 one one CD 42149 1303 8 extending extend VBG 42149 1303 9 from from IN 42149 1303 10 the the DT 42149 1303 11 shield shield NN 42149 1303 12 chambers chamber NNS 42149 1303 13 to to IN 42149 1303 14 the the DT 42149 1303 15 first first JJ 42149 1303 16 bore bore NN 42149 1303 17 segment segment NN 42149 1303 18 , , , 42149 1303 19 that that RB 42149 1303 20 is is RB 42149 1303 21 , , , 42149 1303 22 to to IN 42149 1303 23 where where WRB 42149 1303 24 the the DT 42149 1303 25 tunnel tunnel NN 42149 1303 26 leaves leave VBZ 42149 1303 27 solid solid JJ 42149 1303 28 ground ground NN 42149 1303 29 and and CC 42149 1303 30 passes pass VBZ 42149 1303 31 into into IN 42149 1303 32 silt silt NN 42149 1303 33 , , , 42149 1303 34 and and CC 42149 1303 35 the the DT 42149 1303 36 other other JJ 42149 1303 37 which which WDT 42149 1303 38 extends extend VBZ 42149 1303 39 the the DT 42149 1303 40 rest rest NN 42149 1303 41 of of IN 42149 1303 42 the the DT 42149 1303 43 way way NN 42149 1303 44 . . . 42149 1304 1 The the DT 42149 1304 2 first first JJ 42149 1304 3 type type NN 42149 1304 4 has have VBZ 42149 1304 5 a a DT 42149 1304 6 drain drain NN 42149 1304 7 in in IN 42149 1304 8 the the DT 42149 1304 9 invert invert NN 42149 1304 10 , , , 42149 1304 11 the the DT 42149 1304 12 second second JJ 42149 1304 13 has have VBZ 42149 1304 14 not not RB 42149 1304 15 . . . 42149 1305 1 The the DT 42149 1305 2 height height NN 42149 1305 3 from from IN 42149 1305 4 the the DT 42149 1305 5 top top NN 42149 1305 6 of of IN 42149 1305 7 the the DT 42149 1305 8 rail rail NN 42149 1305 9 to to IN 42149 1305 10 the the DT 42149 1305 11 soffit soffit NN 42149 1305 12 of of IN 42149 1305 13 the the DT 42149 1305 14 arch arch NN 42149 1305 15 being be VBG 42149 1305 16 less less JJR 42149 1305 17 than than IN 42149 1305 18 16 16 CD 42149 1305 19 ft ft NN 42149 1305 20 . . NNP 42149 1305 21 11 11 CD 42149 1305 22 in in IN 42149 1305 23 . . NNP 42149 1305 24 , , , 42149 1305 25 overhead overhead JJ 42149 1305 26 pockets pocket NNS 42149 1305 27 for for IN 42149 1305 28 the the DT 42149 1305 29 suspension suspension NN 42149 1305 30 of of IN 42149 1305 31 electrical electrical JJ 42149 1305 32 conductors conductor NNS 42149 1305 33 were be VBD 42149 1305 34 set set VBN 42149 1305 35 in in IN 42149 1305 36 the the DT 42149 1305 37 concrete concrete JJ 42149 1305 38 arch arch NN 42149 1305 39 on on IN 42149 1305 40 the the DT 42149 1305 41 vertical vertical JJ 42149 1305 42 axis axis NN 42149 1305 43 line line NN 42149 1305 44 at at IN 42149 1305 45 10-ft 10-ft NNP 42149 1305 46 . . . 42149 1305 47 centers center NNS 42149 1305 48 . . . 42149 1306 1 These these DT 42149 1306 2 pockets pocket NNS 42149 1306 3 are be VBP 42149 1306 4 shown show VBN 42149 1306 5 in in IN 42149 1306 6 Fig Fig NNP 42149 1306 7 . . . 42149 1307 1 16 16 CD 42149 1307 2 . . . 42149 1308 1 The the DT 42149 1308 2 benches bench NNS 42149 1308 3 are be VBP 42149 1308 4 utilized utilize VBN 42149 1308 5 for for IN 42149 1308 6 the the DT 42149 1308 7 cable cable NN 42149 1308 8 conduits conduit NNS 42149 1308 9 in in IN 42149 1308 10 the the DT 42149 1308 11 usual usual JJ 42149 1308 12 way way NN 42149 1308 13 . . . 42149 1309 1 Ladders ladder NNS 42149 1309 2 are be VBP 42149 1309 3 provided provide VBN 42149 1309 4 on on IN 42149 1309 5 one one CD 42149 1309 6 side side NN 42149 1309 7 at at IN 42149 1309 8 25-ft 25-ft CD 42149 1309 9 . . . 42149 1309 10 and and CC 42149 1309 11 on on IN 42149 1309 12 the the DT 42149 1309 13 other other JJ 42149 1309 14 side side NN 42149 1309 15 at at IN 42149 1309 16 50-ft 50-ft NNP 42149 1309 17 . . . 42149 1309 18 intervals interval NNS 42149 1309 19 , , , 42149 1309 20 to to TO 42149 1309 21 give give VB 42149 1309 22 access access NN 42149 1309 23 from from IN 42149 1309 24 the the DT 42149 1309 25 track track NN 42149 1309 26 level level NN 42149 1309 27 to to IN 42149 1309 28 the the DT 42149 1309 29 top top NN 42149 1309 30 of of IN 42149 1309 31 the the DT 42149 1309 32 benches bench NNS 42149 1309 33 . . . 42149 1310 1 Refuge refuge NN 42149 1310 2 niches niche NNS 42149 1310 3 for for IN 42149 1310 4 trackmen trackman NNS 42149 1310 5 are be VBP 42149 1310 6 placed place VBN 42149 1310 7 at at IN 42149 1310 8 25-ft 25-ft NNS 42149 1310 9 . . . 42149 1310 10 intervals interval NNS 42149 1310 11 on on IN 42149 1310 12 the the DT 42149 1310 13 single single JJ 42149 1310 14 - - HYPH 42149 1310 15 way way NN 42149 1310 16 conduits conduit NNS 42149 1310 17 side side VBP 42149 1310 18 only only RB 42149 1310 19 , , , 42149 1310 20 as as IN 42149 1310 21 there there EX 42149 1310 22 is be VBZ 42149 1310 23 not not RB 42149 1310 24 enough enough JJ 42149 1310 25 room room NN 42149 1310 26 in in IN 42149 1310 27 front front NN 42149 1310 28 of of IN 42149 1310 29 the the DT 42149 1310 30 4-way 4-way NNP 42149 1310 31 ducts duct NNS 42149 1310 32 . . . 42149 1311 1 Manholes manhole NNS 42149 1311 2 for for IN 42149 1311 3 giving give VBG 42149 1311 4 access access NN 42149 1311 5 to to IN 42149 1311 6 the the DT 42149 1311 7 cable cable NN 42149 1311 8 conduits conduit NNS 42149 1311 9 , , , 42149 1311 10 both both DT 42149 1311 11 power power NN 42149 1311 12 , , , 42149 1311 13 and and CC 42149 1311 14 telephone telephone NN 42149 1311 15 and and CC 42149 1311 16 telegraph telegraph NN 42149 1311 17 , , , 42149 1311 18 are be VBP 42149 1311 19 at at IN 42149 1311 20 400-ft 400-ft CD 42149 1311 21 . . . 42149 1311 22 intervals interval NNS 42149 1311 23 . . . 42149 1312 1 _ _ NNP 42149 1312 2 Final Final NNP 42149 1312 3 Lines Lines NNPS 42149 1312 4 and and CC 42149 1312 5 Grades Grades NNPS 42149 1312 6 , , , 42149 1312 7 and and CC 42149 1312 8 How how WRB 42149 1312 9 Obtained._--It Obtained._--It NNS 42149 1312 10 may may MD 42149 1312 11 be be VB 42149 1312 12 well well JJ 42149 1312 13 to to TO 42149 1312 14 explain explain VB 42149 1312 15 here here RB 42149 1312 16 how how WRB 42149 1312 17 the the DT 42149 1312 18 final final JJ 42149 1312 19 lines line NNS 42149 1312 20 and and CC 42149 1312 21 grades grade NNS 42149 1312 22 for for IN 42149 1312 23 the the DT 42149 1312 24 track track NN 42149 1312 25 , , , 42149 1312 26 and and CC 42149 1312 27 therefore therefore RB 42149 1312 28 for for IN 42149 1312 29 the the DT 42149 1312 30 concrete concrete JJ 42149 1312 31 lining lining NN 42149 1312 32 , , , 42149 1312 33 were be VBD 42149 1312 34 obtained obtain VBN 42149 1312 35 and and CC 42149 1312 36 determined determine VBN 42149 1312 37 . . . 42149 1313 1 It -PRON- PRP 42149 1313 2 is be VBZ 42149 1313 3 first first JJ 42149 1313 4 to to TO 42149 1313 5 be be VB 42149 1313 6 premised premise VBN 42149 1313 7 that that IN 42149 1313 8 the the DT 42149 1313 9 standard standard JJ 42149 1313 10 cross cross JJ 42149 1313 11 - - NN 42149 1313 12 section section NN 42149 1313 13 of of IN 42149 1313 14 the the DT 42149 1313 15 tunnel tunnel NN 42149 1313 16 ( ( -LRB- 42149 1313 17 that that RB 42149 1313 18 is is RB 42149 1313 19 , , , 42149 1313 20 of of IN 42149 1313 21 the the DT 42149 1313 22 concrete concrete NN 42149 1313 23 and and CC 42149 1313 24 iron iron NN 42149 1313 25 lining lining NN 42149 1313 26 combined combine VBN 42149 1313 27 ) ) -RRB- 42149 1313 28 is be VBZ 42149 1313 29 not not RB 42149 1313 30 maintained maintain VBN 42149 1313 31 throughout throughout IN 42149 1313 32 the the DT 42149 1313 33 tunnel tunnel NN 42149 1313 34 . . . 42149 1314 1 In in IN 42149 1314 2 other other JJ 42149 1314 3 words word NNS 42149 1314 4 , , , 42149 1314 5 the the DT 42149 1314 6 metal metal NN 42149 1314 7 lining lining NN 42149 1314 8 is be VBZ 42149 1314 9 of of IN 42149 1314 10 course course NN 42149 1314 11 uniform uniform NN 42149 1314 12 , , , 42149 1314 13 or or CC 42149 1314 14 practically practically RB 42149 1314 15 so so RB 42149 1314 16 , , , 42149 1314 17 throughout throughout IN 42149 1314 18 ; ; : 42149 1314 19 the the DT 42149 1314 20 interior interior JJ 42149 1314 21 surface surface NN 42149 1314 22 of of IN 42149 1314 23 the the DT 42149 1314 24 concrete concrete JJ 42149 1314 25 lining lining NN 42149 1314 26 is be VBZ 42149 1314 27 also also RB 42149 1314 28 uniform uniform JJ 42149 1314 29 from from IN 42149 1314 30 end end NN 42149 1314 31 to to IN 42149 1314 32 end end NN 42149 1314 33 , , , 42149 1314 34 but but CC 42149 1314 35 the the DT 42149 1314 36 metal metal NN 42149 1314 37 lining lining NN 42149 1314 38 , , , 42149 1314 39 owing owe VBG 42149 1314 40 to to IN 42149 1314 41 the the DT 42149 1314 42 difficulty difficulty NN 42149 1314 43 of of IN 42149 1314 44 keeping keep VBG 42149 1314 45 the the DT 42149 1314 46 shields shield NNS 42149 1314 47 , , , 42149 1314 48 and and CC 42149 1314 49 hence hence RB 42149 1314 50 the the DT 42149 1314 51 tunnels tunnel NNS 42149 1314 52 built build VBN 42149 1314 53 within within IN 42149 1314 54 them -PRON- PRP 42149 1314 55 , , , 42149 1314 56 exactly exactly RB 42149 1314 57 on on IN 42149 1314 58 the the DT 42149 1314 59 true true JJ 42149 1314 60 line line NN 42149 1314 61 and and CC 42149 1314 62 grade grade NN 42149 1314 63 , , , 42149 1314 64 is be VBZ 42149 1314 65 not not RB 42149 1314 66 on on IN 42149 1314 67 such such JJ 42149 1314 68 lines line NNS 42149 1314 69 and and CC 42149 1314 70 grades grade NNS 42149 1314 71 ; ; : 42149 1314 72 the the DT 42149 1314 73 concrete concrete JJ 42149 1314 74 lining lining NN 42149 1314 75 is be VBZ 42149 1314 76 built build VBN 42149 1314 77 exactly exactly RB 42149 1314 78 on on IN 42149 1314 79 the the DT 42149 1314 80 pre pre JJ 42149 1314 81 - - JJ 42149 1314 82 arranged arranged JJ 42149 1314 83 lines line NNS 42149 1314 84 and and CC 42149 1314 85 grades grade NNS 42149 1314 86 , , , 42149 1314 87 consequently consequently RB 42149 1314 88 , , , 42149 1314 89 the the DT 42149 1314 90 relative relative JJ 42149 1314 91 positions position NNS 42149 1314 92 of of IN 42149 1314 93 the the DT 42149 1314 94 concrete concrete NN 42149 1314 95 and and CC 42149 1314 96 metal metal NN 42149 1314 97 linings lining NNS 42149 1314 98 vary vary VBP 42149 1314 99 continually continually RB 42149 1314 100 along along IN 42149 1314 101 the the DT 42149 1314 102 length length NN 42149 1314 103 of of IN 42149 1314 104 the the DT 42149 1314 105 structure structure NN 42149 1314 106 , , , 42149 1314 107 according accord VBG 42149 1314 108 to to IN 42149 1314 109 whether whether IN 42149 1314 110 the the DT 42149 1314 111 metal metal NN 42149 1314 112 lining lining NN 42149 1314 113 is be VBZ 42149 1314 114 higher high JJR 42149 1314 115 or or CC 42149 1314 116 lower low JJR 42149 1314 117 than than IN 42149 1314 118 it -PRON- PRP 42149 1314 119 should should MD 42149 1314 120 be be VB 42149 1314 121 , , , 42149 1314 122 further further RB 42149 1314 123 to to IN 42149 1314 124 the the DT 42149 1314 125 north north NN 42149 1314 126 or or CC 42149 1314 127 to to IN 42149 1314 128 the the DT 42149 1314 129 south south NN 42149 1314 130 , , , 42149 1314 131 or or CC 42149 1314 132 any any DT 42149 1314 133 combination combination NN 42149 1314 134 of of IN 42149 1314 135 these these DT 42149 1314 136 . . . 42149 1315 1 As as IN 42149 1315 2 before before RB 42149 1315 3 stated state VBN 42149 1315 4 , , , 42149 1315 5 it -PRON- PRP 42149 1315 6 was be VBD 42149 1315 7 strongly strongly RB 42149 1315 8 desired desire VBN 42149 1315 9 to to TO 42149 1315 10 encroach encroach VB 42149 1315 11 as as RB 42149 1315 12 little little JJ 42149 1315 13 as as IN 42149 1315 14 possible possible JJ 42149 1315 15 on on IN 42149 1315 16 the the DT 42149 1315 17 standard standard JJ 42149 1315 18 2-ft 2-ft NNP 42149 1315 19 . . . 42149 1315 20 concrete concrete JJ 42149 1315 21 arch arch NNP 42149 1315 22 , , , 42149 1315 23 and and CC 42149 1315 24 after after IN 42149 1315 25 some some DT 42149 1315 26 discussion discussion NN 42149 1315 27 it -PRON- PRP 42149 1315 28 was be VBD 42149 1315 29 decided decide VBN 42149 1315 30 that that IN 42149 1315 31 a a DT 42149 1315 32 thickness thickness NN 42149 1315 33 of of IN 42149 1315 34 1 1 CD 42149 1315 35 ft ft NN 42149 1315 36 . . NNP 42149 1315 37 6 6 CD 42149 1315 38 in in IN 42149 1315 39 . . . 42149 1316 1 was be VBD 42149 1316 2 the the DT 42149 1316 3 thinnest thin JJS 42149 1316 4 it -PRON- PRP 42149 1316 5 was be VBD 42149 1316 6 advisable advisable JJ 42149 1316 7 to to TO 42149 1316 8 allow allow VB 42149 1316 9 . . . 42149 1317 1 This this DT 42149 1317 2 made make VBD 42149 1317 3 it -PRON- PRP 42149 1317 4 possible possible JJ 42149 1317 5 to to TO 42149 1317 6 permit permit VB 42149 1317 7 the the DT 42149 1317 8 metal metal NN 42149 1317 9 lining lining NN 42149 1317 10 of of IN 42149 1317 11 the the DT 42149 1317 12 tunnel tunnel NN 42149 1317 13 to to TO 42149 1317 14 be be VB 42149 1317 15 6 6 CD 42149 1317 16 in in IN 42149 1317 17 . . . 42149 1318 1 lower lower RBR 42149 1318 2 , , , 42149 1318 3 in in IN 42149 1318 4 respect respect NN 42149 1318 5 to to IN 42149 1318 6 the the DT 42149 1318 7 level level NN 42149 1318 8 of of IN 42149 1318 9 the the DT 42149 1318 10 track track NN 42149 1318 11 at at IN 42149 1318 12 any any DT 42149 1318 13 point point NN 42149 1318 14 , , , 42149 1318 15 than than IN 42149 1318 16 the the DT 42149 1318 17 standard standard JJ 42149 1318 18 section section NN 42149 1318 19 shows show NNS 42149 1318 20 , , , 42149 1318 21 and and CC 42149 1318 22 also also RB 42149 1318 23 allowed allow VBD 42149 1318 24 the the DT 42149 1318 25 center center NN 42149 1318 26 line line NN 42149 1318 27 of of IN 42149 1318 28 the the DT 42149 1318 29 track track NN 42149 1318 30 to to TO 42149 1318 31 have have VB 42149 1318 32 an an DT 42149 1318 33 eccentricity eccentricity NN 42149 1318 34 of of IN 42149 1318 35 6 6 CD 42149 1318 36 in in IN 42149 1318 37 . . . 42149 1319 1 either either CC 42149 1319 2 north north NNP 42149 1319 3 or or CC 42149 1319 4 south south RB 42149 1319 5 of of IN 42149 1319 6 the the DT 42149 1319 7 center center NN 42149 1319 8 line line NN 42149 1319 9 of of IN 42149 1319 10 the the DT 42149 1319 11 tunnel tunnel NN 42149 1319 12 . . . 42149 1320 1 This this DT 42149 1320 2 only only RB 42149 1320 3 left leave VBD 42149 1320 4 to to TO 42149 1320 5 be be VB 42149 1320 6 settled settle VBN 42149 1320 7 the the DT 42149 1320 8 extent extent NN 42149 1320 9 to to TO 42149 1320 10 which which WDT 42149 1320 11 the the DT 42149 1320 12 metal metal NN 42149 1320 13 lining lining NN 42149 1320 14 might may MD 42149 1320 15 be be VB 42149 1320 16 higher high JJR 42149 1320 17 in in IN 42149 1320 18 respect respect NN 42149 1320 19 to to IN 42149 1320 20 the the DT 42149 1320 21 track track NN 42149 1320 22 than than IN 42149 1320 23 that that DT 42149 1320 24 shown show VBN 42149 1320 25 on on IN 42149 1320 26 the the DT 42149 1320 27 standard standard JJ 42149 1320 28 section section NN 42149 1320 29 . . . 42149 1321 1 This this DT 42149 1321 2 amount amount NN 42149 1321 3 was be VBD 42149 1321 4 governed govern VBN 42149 1321 5 by by IN 42149 1321 6 the the DT 42149 1321 7 desirability desirability NN 42149 1321 8 of of IN 42149 1321 9 keeping keep VBG 42149 1321 10 sufficient sufficient JJ 42149 1321 11 clearance clearance NN 42149 1321 12 between between IN 42149 1321 13 the the DT 42149 1321 14 top top NN 42149 1321 15 of of IN 42149 1321 16 the the DT 42149 1321 17 rail rail NN 42149 1321 18 and and CC 42149 1321 19 the the DT 42149 1321 20 iron iron NN 42149 1321 21 lining lining NN 42149 1321 22 in in IN 42149 1321 23 the the DT 42149 1321 24 invert invert NN 42149 1321 25 to to TO 42149 1321 26 admit admit VB 42149 1321 27 of of IN 42149 1321 28 the the DT 42149 1321 29 attachment attachment NN 42149 1321 30 of of IN 42149 1321 31 pile pile JJ 42149 1321 32 foundations foundation NNS 42149 1321 33 and and CC 42149 1321 34 all all PDT 42149 1321 35 the the DT 42149 1321 36 accompanying accompany VBG 42149 1321 37 girder girder NN 42149 1321 38 - - HYPH 42149 1321 39 track track NN 42149 1321 40 system system NN 42149 1321 41 which which WDT 42149 1321 42 would would MD 42149 1321 43 necessarily necessarily RB 42149 1321 44 be be VB 42149 1321 45 caused cause VBN 42149 1321 46 by by IN 42149 1321 47 the the DT 42149 1321 48 use use NN 42149 1321 49 of of IN 42149 1321 50 piles pile NNS 42149 1321 51 , , , 42149 1321 52 should should MD 42149 1321 53 it -PRON- PRP 42149 1321 54 ever ever RB 42149 1321 55 become become VB 42149 1321 56 apparent apparent JJ 42149 1321 57 after after IN 42149 1321 58 operation operation NN 42149 1321 59 was be VBD 42149 1321 60 begun begin VBN 42149 1321 61 , , , 42149 1321 62 that that IN 42149 1321 63 , , , 42149 1321 64 after after RB 42149 1321 65 all all RB 42149 1321 66 , , , 42149 1321 67 it -PRON- PRP 42149 1321 68 was be VBD 42149 1321 69 essential essential JJ 42149 1321 70 to to TO 42149 1321 71 have have VB 42149 1321 72 the the DT 42149 1321 73 tunnels tunnel NNS 42149 1321 74 supported support VBN 42149 1321 75 in in IN 42149 1321 76 this this DT 42149 1321 77 way way NN 42149 1321 78 . . . 42149 1322 1 Careful careful JJ 42149 1322 2 studies study NNS 42149 1322 3 were be VBD 42149 1322 4 made make VBN 42149 1322 5 of of IN 42149 1322 6 the the DT 42149 1322 7 clearance clearance NN 42149 1322 8 necessary necessary JJ 42149 1322 9 , , , 42149 1322 10 and and CC 42149 1322 11 it -PRON- PRP 42149 1322 12 was be VBD 42149 1322 13 decided decide VBN 42149 1322 14 that that IN 42149 1322 15 4 4 CD 42149 1322 16 ft ft NN 42149 1322 17 . . NNP 42149 1322 18 9 9 CD 42149 1322 19 in in IN 42149 1322 20 . . . 42149 1323 1 was be VBD 42149 1323 2 the the DT 42149 1323 3 minimum minimum JJ 42149 1323 4 allowable allowable JJ 42149 1323 5 depth depth NN 42149 1323 6 from from IN 42149 1323 7 the the DT 42149 1323 8 top top NN 42149 1323 9 of of IN 42149 1323 10 the the DT 42149 1323 11 rail rail NN 42149 1323 12 to to IN 42149 1323 13 the the DT 42149 1323 14 outside outside NN 42149 1323 15 of of IN 42149 1323 16 the the DT 42149 1323 17 iron iron NN 42149 1323 18 at at IN 42149 1323 19 the the DT 42149 1323 20 bottom bottom NN 42149 1323 21 . . . 42149 1324 1 This this DT 42149 1324 2 meant mean VBD 42149 1324 3 that that IN 42149 1324 4 the the DT 42149 1324 5 iron iron NN 42149 1324 6 lining lining NN 42149 1324 7 could could MD 42149 1324 8 be be VB 42149 1324 9 3 3 CD 42149 1324 10 in in IN 42149 1324 11 . . . 42149 1325 1 higher higher RBR 42149 1325 2 , , , 42149 1325 3 with with IN 42149 1325 4 respect respect NN 42149 1325 5 to to IN 42149 1325 6 the the DT 42149 1325 7 track track NN 42149 1325 8 level level NN 42149 1325 9 , , , 42149 1325 10 than than IN 42149 1325 11 that that DT 42149 1325 12 shown show VBN 42149 1325 13 on on IN 42149 1325 14 the the DT 42149 1325 15 standard standard JJ 42149 1325 16 section section NN 42149 1325 17 . . . 42149 1326 1 All all PDT 42149 1326 2 the the DT 42149 1326 3 determining determine VBG 42149 1326 4 factors factor NNS 42149 1326 5 for for IN 42149 1326 6 fixing fix VBG 42149 1326 7 the the DT 42149 1326 8 best good JJS 42149 1326 9 possible possible JJ 42149 1326 10 lines line NNS 42149 1326 11 and and CC 42149 1326 12 grades grade NNS 42149 1326 13 for for IN 42149 1326 14 the the DT 42149 1326 15 track track NN 42149 1326 16 within within IN 42149 1326 17 the the DT 42149 1326 18 completed complete VBN 42149 1326 19 metal metal NN 42149 1326 20 lining lining NN 42149 1326 21 were be VBD 42149 1326 22 now now RB 42149 1326 23 at at IN 42149 1326 24 hand hand NN 42149 1326 25 . . . 42149 1327 1 In in IN 42149 1327 2 March March NNP 42149 1327 3 , , , 42149 1327 4 1908 1908 CD 42149 1327 5 , , , 42149 1327 6 careful careful JJ 42149 1327 7 surveys survey NNS 42149 1327 8 of of IN 42149 1327 9 plan plan NN 42149 1327 10 and and CC 42149 1327 11 elevation elevation NN 42149 1327 12 were be VBD 42149 1327 13 made make VBN 42149 1327 14 of of IN 42149 1327 15 the the DT 42149 1327 16 tunnels tunnel NNS 42149 1327 17 at at IN 42149 1327 18 intervals interval NNS 42149 1327 19 of of IN 42149 1327 20 25 25 CD 42149 1327 21 ft ft NN 42149 1327 22 . . NNP 42149 1327 23 throughout throughout IN 42149 1327 24 . . . 42149 1328 1 The the DT 42149 1328 2 following follow VBG 42149 1328 3 operations operation NNS 42149 1328 4 were be VBD 42149 1328 5 then then RB 42149 1328 6 performed perform VBN 42149 1328 7 to to TO 42149 1328 8 fix fix VB 42149 1328 9 on on IN 42149 1328 10 the the DT 42149 1328 11 best good JJS 42149 1328 12 lines line NNS 42149 1328 13 and and CC 42149 1328 14 grades grade NNS 42149 1328 15 : : : 42149 1328 16 First first RB 42149 1328 17 , , , 42149 1328 18 for for IN 42149 1328 19 Line line NN 42149 1328 20 : : : 42149 1328 21 It -PRON- PRP 42149 1328 22 has have VBZ 42149 1328 23 been be VBN 42149 1328 24 explained explain VBN 42149 1328 25 that that IN 42149 1328 26 the the DT 42149 1328 27 permissible permissible JJ 42149 1328 28 deviation deviation NN 42149 1328 29 of of IN 42149 1328 30 the the DT 42149 1328 31 center center NN 42149 1328 32 line line NN 42149 1328 33 of of IN 42149 1328 34 the the DT 42149 1328 35 track track NN 42149 1328 36 on on IN 42149 1328 37 either either DT 42149 1328 38 side side NN 42149 1328 39 of of IN 42149 1328 40 the the DT 42149 1328 41 center center NN 42149 1328 42 line line NN 42149 1328 43 of of IN 42149 1328 44 the the DT 42149 1328 45 tunnel tunnel NN 42149 1328 46 was be VBD 42149 1328 47 6 6 CD 42149 1328 48 in in IN 42149 1328 49 . . . 42149 1329 1 Had have VBD 42149 1329 2 the the DT 42149 1329 3 metal metal NN 42149 1329 4 lining lining NN 42149 1329 5 been be VBN 42149 1329 6 invariably invariably RB 42149 1329 7 of of IN 42149 1329 8 the the DT 42149 1329 9 true true JJ 42149 1329 10 diameter diameter NN 42149 1329 11 , , , 42149 1329 12 it -PRON- PRP 42149 1329 13 would would MD 42149 1329 14 have have VB 42149 1329 15 been be VBN 42149 1329 16 necessary necessary JJ 42149 1329 17 to to TO 42149 1329 18 survey survey VB 42149 1329 19 only only RB 42149 1329 20 one one CD 42149 1329 21 side side NN 42149 1329 22 of of IN 42149 1329 23 the the DT 42149 1329 24 tunnel tunnel NN 42149 1329 25 ; ; : 42149 1329 26 this this DT 42149 1329 27 would would MD 42149 1329 28 have have VB 42149 1329 29 given give VBN 42149 1329 30 a a DT 42149 1329 31 line line NN 42149 1329 32 parallel parallel JJ 42149 1329 33 to to IN 42149 1329 34 the the DT 42149 1329 35 center center NN 42149 1329 36 line line NN 42149 1329 37 , , , 42149 1329 38 and and CC 42149 1329 39 might may MD 42149 1329 40 have have VB 42149 1329 41 been be VBN 42149 1329 42 plotted plot VBN 42149 1329 43 as as IN 42149 1329 44 such such JJ 42149 1329 45 ; ; : 42149 1329 46 then then RB 42149 1329 47 , , , 42149 1329 48 by by IN 42149 1329 49 setting set VBG 42149 1329 50 off off RP 42149 1329 51 6 6 CD 42149 1329 52 in in IN 42149 1329 53 . . . 42149 1330 1 on on IN 42149 1330 2 either either DT 42149 1330 3 side side NN 42149 1330 4 of of IN 42149 1330 5 this this DT 42149 1330 6 line line NN 42149 1330 7 , , , 42149 1330 8 there there EX 42149 1330 9 would would MD 42149 1330 10 have have VB 42149 1330 11 been be VBN 42149 1330 12 obtained obtain VBN 42149 1330 13 a a DT 42149 1330 14 pair pair NN 42149 1330 15 of of IN 42149 1330 16 parallel parallel JJ 42149 1330 17 lines line NNS 42149 1330 18 within within IN 42149 1330 19 which which WDT 42149 1330 20 the the DT 42149 1330 21 center center NN 42149 1330 22 line line NN 42149 1330 23 of of IN 42149 1330 24 the the DT 42149 1330 25 track track NN 42149 1330 26 must must MD 42149 1330 27 lie lie VB 42149 1330 28 . . . 42149 1331 1 Owing owe VBG 42149 1331 2 to to IN 42149 1331 3 variations variation NNS 42149 1331 4 in in IN 42149 1331 5 the the DT 42149 1331 6 diameter diameter NN 42149 1331 7 of of IN 42149 1331 8 the the DT 42149 1331 9 tunnel tunnel NN 42149 1331 10 , , , 42149 1331 11 however however RB 42149 1331 12 , , , 42149 1331 13 such such PDT 42149 1331 14 a a DT 42149 1331 15 method method NN 42149 1331 16 was be VBD 42149 1331 17 not not RB 42149 1331 18 permissible permissible JJ 42149 1331 19 , , , 42149 1331 20 and and CC 42149 1331 21 therefore therefore RB 42149 1331 22 the the DT 42149 1331 23 following follow VBG 42149 1331 24 process process NN 42149 1331 25 was be VBD 42149 1331 26 used use VBN 42149 1331 27 : : : 42149 1331 28 When when WRB 42149 1331 29 running run VBG 42149 1331 30 the the DT 42149 1331 31 survey survey NN 42149 1331 32 lines line NNS 42149 1331 33 through through IN 42149 1331 34 the the DT 42149 1331 35 tunnel tunnel NN 42149 1331 36 ( ( -LRB- 42149 1331 37 which which WDT 42149 1331 38 were be VBD 42149 1331 39 the the DT 42149 1331 40 center center NN 42149 1331 41 lines line NNS 42149 1331 42 used use VBN 42149 1331 43 in in IN 42149 1331 44 driving drive VBG 42149 1331 45 the the DT 42149 1331 46 shields shield NNS 42149 1331 47 ) ) -RRB- 42149 1331 48 , , , 42149 1331 49 offsets offset NNS 42149 1331 50 were be VBD 42149 1331 51 taken take VBN 42149 1331 52 to to IN 42149 1331 53 the the DT 42149 1331 54 inner inner JJ 42149 1331 55 edges edge NNS 42149 1331 56 of of IN 42149 1331 57 the the DT 42149 1331 58 flanges flange NNS 42149 1331 59 of of IN 42149 1331 60 the the DT 42149 1331 61 metal metal NN 42149 1331 62 lining lining NN 42149 1331 63 , , , 42149 1331 64 both both CC 42149 1331 65 on on IN 42149 1331 66 the the DT 42149 1331 67 north north NN 42149 1331 68 and and CC 42149 1331 69 south south JJ 42149 1331 70 sides side NNS 42149 1331 71 , , , 42149 1331 72 at at IN 42149 1331 73 axis axis JJ 42149 1331 74 level level NN 42149 1331 75 at at IN 42149 1331 76 each each DT 42149 1331 77 25-ft 25-ft NNS 42149 1331 78 . . . 42149 1331 79 interval interval NN 42149 1331 80 . . . 42149 1332 1 On on IN 42149 1332 2 the the DT 42149 1332 3 plat plat NN 42149 1332 4 on on IN 42149 1332 5 which which WDT 42149 1332 6 the the DT 42149 1332 7 survey survey NN 42149 1332 8 lines line NNS 42149 1332 9 were be VBD 42149 1332 10 laid lay VBN 42149 1332 11 down down RP 42149 1332 12 , , , 42149 1332 13 and and CC 42149 1332 14 at at IN 42149 1332 15 each each DT 42149 1332 16 point point NN 42149 1332 17 surveyed survey VBN 42149 1332 18 , , , 42149 1332 19 a a DT 42149 1332 20 distance distance NN 42149 1332 21 was be VBD 42149 1332 22 laid lay VBN 42149 1332 23 off off RP 42149 1332 24 to to IN 42149 1332 25 north north NN 42149 1332 26 and and CC 42149 1332 27 south south RB 42149 1332 28 equal equal JJ 42149 1332 29 to to IN 42149 1332 30 the the DT 42149 1332 31 following follow VBG 42149 1332 32 distances distance NNS 42149 1332 33 : : : 42149 1332 34 Offset offset VB 42149 1332 35 , , , 42149 1332 36 as as IN 42149 1332 37 measured measure VBN 42149 1332 38 in in IN 42149 1332 39 the the DT 42149 1332 40 tunnel tunnel NN 42149 1332 41 to to IN 42149 1332 42 north north NNP 42149 1332 43 ( ( -LRB- 42149 1332 44 or or CC 42149 1332 45 south south NNP 42149 1332 46 ) ) -RRB- 42149 1332 47 , , , 42149 1332 48 minus minus CC 42149 1332 49 10.08 10.08 CD 42149 1332 50 ft ft NN 42149 1332 51 . . . 42149 1333 1 This this DT 42149 1333 2 10.08 10.08 CD 42149 1333 3 ft ft NN 42149 1333 4 . . . 42149 1333 5 ( ( -LRB- 42149 1333 6 or or CC 42149 1333 7 10 10 CD 42149 1333 8 ft ft NNS 42149 1333 9 , , , 42149 1333 10 1 1 CD 42149 1333 11 in in IN 42149 1333 12 . . . 42149 1333 13 ) ) -RRB- 42149 1334 1 represents represent VBZ 42149 1334 2 10 10 CD 42149 1334 3 ft ft NN 42149 1334 4 . . NNP 42149 1334 5 7 7 CD 42149 1334 6 in in IN 42149 1334 7 . . NNP 42149 1334 8 , , , 42149 1334 9 the the DT 42149 1334 10 true true JJ 42149 1334 11 radius radius NN 42149 1334 12 to to TO 42149 1334 13 inside inside RB 42149 1334 14 of of IN 42149 1334 15 iron iron NN 42149 1334 16 , , , 42149 1334 17 minus minus CC 42149 1334 18 6 6 CD 42149 1334 19 in in IN 42149 1334 20 . . NNP 42149 1334 21 , , , 42149 1334 22 the the DT 42149 1334 23 permissible permissible JJ 42149 1334 24 lateral lateral JJ 42149 1334 25 deviation deviation NN 42149 1334 26 of of IN 42149 1334 27 the the DT 42149 1334 28 track track NN 42149 1334 29 from from IN 42149 1334 30 the the DT 42149 1334 31 axis axis NN 42149 1334 32 of of IN 42149 1334 33 the the DT 42149 1334 34 tunnel tunnel NN 42149 1334 35 . . . 42149 1335 1 The the DT 42149 1335 2 result result NN 42149 1335 3 of of IN 42149 1335 4 this this DT 42149 1335 5 process process NN 42149 1335 6 was be VBD 42149 1335 7 two two CD 42149 1335 8 lines line NNS 42149 1335 9 , , , 42149 1335 10 one one CD 42149 1335 11 on on IN 42149 1335 12 either either DT 42149 1335 13 side side NN 42149 1335 14 of of IN 42149 1335 15 the the DT 42149 1335 16 survey survey NN 42149 1335 17 lines line NNS 42149 1335 18 , , , 42149 1335 19 not not RB 42149 1335 20 parallel parallel JJ 42149 1335 21 to to IN 42149 1335 22 it -PRON- PRP 42149 1335 23 or or CC 42149 1335 24 to to IN 42149 1335 25 each each DT 42149 1335 26 other other JJ 42149 1335 27 , , , 42149 1335 28 but but CC 42149 1335 29 approaching approach VBG 42149 1335 30 each each DT 42149 1335 31 other other JJ 42149 1335 32 when when WRB 42149 1335 33 the the DT 42149 1335 34 horizontal horizontal JJ 42149 1335 35 diameter diameter NN 42149 1335 36 was be VBD 42149 1335 37 less less JJR 42149 1335 38 than than IN 42149 1335 39 the the DT 42149 1335 40 true true JJ 42149 1335 41 diameter diameter NN 42149 1335 42 , , , 42149 1335 43 receding recede VBG 42149 1335 44 from from IN 42149 1335 45 each each DT 42149 1335 46 other other JJ 42149 1335 47 when when WRB 42149 1335 48 the the DT 42149 1335 49 diameter diameter NN 42149 1335 50 was be VBD 42149 1335 51 more more JJR 42149 1335 52 , , , 42149 1335 53 and and CC 42149 1335 54 exactly exactly RB 42149 1335 55 12 12 CD 42149 1335 56 in in IN 42149 1335 57 . . . 42149 1336 1 apart apart RB 42149 1336 2 when when WRB 42149 1336 3 the the DT 42149 1336 4 diameter diameter NN 42149 1336 5 was be VBD 42149 1336 6 correct correct JJ 42149 1336 7 . . . 42149 1337 1 As as RB 42149 1337 2 long long RB 42149 1337 3 as as IN 42149 1337 4 the the DT 42149 1337 5 center center NN 42149 1337 6 line line NN 42149 1337 7 of of IN 42149 1337 8 the the DT 42149 1337 9 track track NN 42149 1337 10 lay lie VBD 42149 1337 11 entirely entirely RB 42149 1337 12 within within IN 42149 1337 13 these these DT 42149 1337 14 two two CD 42149 1337 15 limiting limit VBG 42149 1337 16 lines line NNS 42149 1337 17 , , , 42149 1337 18 the the DT 42149 1337 19 condition condition NN 42149 1337 20 that that IN 42149 1337 21 the the DT 42149 1337 22 concrete concrete JJ 42149 1337 23 arch arch NN 42149 1337 24 should should MD 42149 1337 25 not not RB 42149 1337 26 be be VB 42149 1337 27 6 6 CD 42149 1337 28 in in IN 42149 1337 29 . . . 42149 1338 1 less less JJR 42149 1338 2 in in IN 42149 1338 3 thickness thickness NN 42149 1338 4 than than IN 42149 1338 5 the the DT 42149 1338 6 standard standard JJ 42149 1338 7 2 2 CD 42149 1338 8 ft ft NNP 42149 1338 9 . . NNP 42149 1338 10 was be VBD 42149 1338 11 satisfied satisfied JJ 42149 1338 12 , , , 42149 1338 13 and and CC 42149 1338 14 in in IN 42149 1338 15 order order NN 42149 1338 16 to to TO 42149 1338 17 arrive arrive VB 42149 1338 18 at at IN 42149 1338 19 the the DT 42149 1338 20 final final JJ 42149 1338 21 line line NN 42149 1338 22 , , , 42149 1338 23 the the DT 42149 1338 24 longest long JJS 42149 1338 25 possible possible JJ 42149 1338 26 tangents tangent NNS 42149 1338 27 that that WDT 42149 1338 28 would would MD 42149 1338 29 be be VB 42149 1338 30 within within IN 42149 1338 31 these these DT 42149 1338 32 limits limit NNS 42149 1338 33 were be VBD 42149 1338 34 adopted adopt VBN 42149 1338 35 as as IN 42149 1338 36 the the DT 42149 1338 37 final final JJ 42149 1338 38 lines line NNS 42149 1338 39 ; ; : 42149 1338 40 and and CC 42149 1338 41 , , , 42149 1338 42 as as IN 42149 1338 43 the the DT 42149 1338 44 survey survey NN 42149 1338 45 lines line NNS 42149 1338 46 were be VBD 42149 1338 47 those those DT 42149 1338 48 used use VBN 42149 1338 49 in in IN 42149 1338 50 driving drive VBG 42149 1338 51 the the DT 42149 1338 52 tunnel tunnel NN 42149 1338 53 shields shield NNS 42149 1338 54 ( ( -LRB- 42149 1338 55 that that RB 42149 1338 56 is is RB 42149 1338 57 , , , 42149 1338 58 the the DT 42149 1338 59 lines line NNS 42149 1338 60 to to TO 42149 1338 61 which which WDT 42149 1338 62 it -PRON- PRP 42149 1338 63 was be VBD 42149 1338 64 intended intend VBN 42149 1338 65 that that IN 42149 1338 66 the the DT 42149 1338 67 track track NN 42149 1338 68 should should MD 42149 1338 69 be be VB 42149 1338 70 built build VBN 42149 1338 71 ) ) -RRB- 42149 1338 72 , , , 42149 1338 73 the the DT 42149 1338 74 amount amount NN 42149 1338 75 by by IN 42149 1338 76 which which WDT 42149 1338 77 the the DT 42149 1338 78 new new JJ 42149 1338 79 lines line NNS 42149 1338 80 thus thus RB 42149 1338 81 obtained obtain VBD 42149 1338 82 deviated deviate VBN 42149 1338 83 from from IN 42149 1338 84 the the DT 42149 1338 85 survey survey NN 42149 1338 86 lines line NNS 42149 1338 87 was be VBD 42149 1338 88 a a DT 42149 1338 89 measure measure NN 42149 1338 90 of of IN 42149 1338 91 the the DT 42149 1338 92 deviation deviation NN 42149 1338 93 of of IN 42149 1338 94 the the DT 42149 1338 95 finally finally RB 42149 1338 96 adopted adopt VBN 42149 1338 97 track track NN 42149 1338 98 and and CC 42149 1338 99 concrete concrete JJ 42149 1338 100 line line NN 42149 1338 101 from from IN 42149 1338 102 the the DT 42149 1338 103 original original JJ 42149 1338 104 contract contract NN 42149 1338 105 lines line NNS 42149 1338 106 . . . 42149 1339 1 Next next RB 42149 1339 2 , , , 42149 1339 3 for for IN 42149 1339 4 Grades grade NNS 42149 1339 5 : : : 42149 1339 6 The the DT 42149 1339 7 considerations consideration NNS 42149 1339 8 for for IN 42149 1339 9 grade grade NN 42149 1339 10 were be VBD 42149 1339 11 very very RB 42149 1339 12 similar similar JJ 42149 1339 13 to to IN 42149 1339 14 those those DT 42149 1339 15 for for IN 42149 1339 16 line line NN 42149 1339 17 . . . 42149 1340 1 If if IN 42149 1340 2 the the DT 42149 1340 3 vertical vertical JJ 42149 1340 4 diameter diameter NN 42149 1340 5 of of IN 42149 1340 6 the the DT 42149 1340 7 tunnel tunnel NN 42149 1340 8 had have VBD 42149 1340 9 been be VBN 42149 1340 10 true true JJ 42149 1340 11 at at IN 42149 1340 12 each each DT 42149 1340 13 25-ft 25-ft NNS 42149 1340 14 . . . 42149 1340 15 interval interval JJ 42149 1340 16 surveyed survey VBN 42149 1340 17 , , , 42149 1340 18 it -PRON- PRP 42149 1340 19 would would MD 42149 1340 20 have have VB 42149 1340 21 been be VBN 42149 1340 22 correct correct JJ 42149 1340 23 to to TO 42149 1340 24 plot plot VB 42149 1340 25 the the DT 42149 1340 26 elevations elevation NNS 42149 1340 27 of of IN 42149 1340 28 the the DT 42149 1340 29 crown crown NN 42149 1340 30 ( ( -LRB- 42149 1340 31 or or CC 42149 1340 32 invert invert NNP 42149 1340 33 ) ) -RRB- 42149 1340 34 as as IN 42149 1340 35 a a DT 42149 1340 36 longitudinal longitudinal JJ 42149 1340 37 section section NN 42149 1340 38 of of IN 42149 1340 39 the the DT 42149 1340 40 tunnel tunnel NN 42149 1340 41 , , , 42149 1340 42 and and CC 42149 1340 43 to to TO 42149 1340 44 have have VB 42149 1340 45 set set VBN 42149 1340 46 up up RP 42149 1340 47 over over IN 42149 1340 48 those those DT 42149 1340 49 points point NNS 42149 1340 50 others other NNS 42149 1340 51 6 6 CD 42149 1340 52 in in IN 42149 1340 53 . . . 42149 1341 1 above above RB 42149 1341 2 ( ( -LRB- 42149 1341 3 as as IN 42149 1341 4 the the DT 42149 1341 5 metal metal NN 42149 1341 6 lining lining NN 42149 1341 7 could could MD 42149 1341 8 have have VB 42149 1341 9 been be VBN 42149 1341 10 6 6 CD 42149 1341 11 in in IN 42149 1341 12 . . . 42149 1342 1 lower low JJR 42149 1342 2 than than IN 42149 1342 3 the the DT 42149 1342 4 standard standard JJ 42149 1342 5 section section NN 42149 1342 6 , , , 42149 1342 7 which which WDT 42149 1342 8 is be VBZ 42149 1342 9 equivalent equivalent JJ 42149 1342 10 to to IN 42149 1342 11 the the DT 42149 1342 12 track track NN 42149 1342 13 being be VBG 42149 1342 14 an an DT 42149 1342 15 equal equal JJ 42149 1342 16 amount amount NN 42149 1342 17 higher high JJR 42149 1342 18 ) ) -RRB- 42149 1342 19 , , , 42149 1342 20 and and CC 42149 1342 21 below below IN 42149 1342 22 these these DT 42149 1342 23 crown crown NN 42149 1342 24 or or CC 42149 1342 25 invert invert VB 42149 1342 26 elevations elevation NNS 42149 1342 27 others other NNS 42149 1342 28 3 3 CD 42149 1342 29 in in IN 42149 1342 30 . . . 42149 1343 1 lower low JJR 42149 1343 2 ( ( -LRB- 42149 1343 3 as as IN 42149 1343 4 the the DT 42149 1343 5 metal metal NN 42149 1343 6 lining lining NN 42149 1343 7 could could MD 42149 1343 8 be be VB 42149 1343 9 3 3 CD 42149 1343 10 in in IN 42149 1343 11 . . . 42149 1344 1 higher higher RBR 42149 1344 2 ) ) -RRB- 42149 1344 3 . . . 42149 1345 1 Then then RB 42149 1345 2 , , , 42149 1345 3 by by IN 42149 1345 4 joining join VBG 42149 1345 5 the the DT 42149 1345 6 points point NNS 42149 1345 7 6 6 CD 42149 1345 8 in in IN 42149 1345 9 . . . 42149 1346 1 above above RB 42149 1346 2 in in IN 42149 1346 3 one one CD 42149 1346 4 line line NN 42149 1346 5 and and CC 42149 1346 6 those those DT 42149 1346 7 3 3 CD 42149 1346 8 in in IN 42149 1346 9 . . . 42149 1347 1 below below IN 42149 1347 2 in in IN 42149 1347 3 another another DT 42149 1347 4 , , , 42149 1347 5 there there EX 42149 1347 6 would would MD 42149 1347 7 have have VB 42149 1347 8 been be VBN 42149 1347 9 obtained obtain VBN 42149 1347 10 lines line NNS 42149 1347 11 of of IN 42149 1347 12 limitation limitation NN 42149 1347 13 between between IN 42149 1347 14 which which WDT 42149 1347 15 the the DT 42149 1347 16 track track NN 42149 1347 17 grades grade NNS 42149 1347 18 must must MD 42149 1347 19 lie lie VB 42149 1347 20 . . . 42149 1348 1 However however RB 42149 1348 2 , , , 42149 1348 3 as as IN 42149 1348 4 the the DT 42149 1348 5 tunnel tunnel NN 42149 1348 6 diameter diameter NN 42149 1348 7 was be VBD 42149 1348 8 not not RB 42149 1348 9 uniformly uniformly RB 42149 1348 10 correct correct JJ 42149 1348 11 , , , 42149 1348 12 a a DT 42149 1348 13 modification modification NN 42149 1348 14 of of IN 42149 1348 15 this this DT 42149 1348 16 method method NN 42149 1348 17 had have VBD 42149 1348 18 to to TO 42149 1348 19 be be VB 42149 1348 20 made make VBN 42149 1348 21 , , , 42149 1348 22 as as IN 42149 1348 23 in in IN 42149 1348 24 the the DT 42149 1348 25 case case NN 42149 1348 26 of of IN 42149 1348 27 the the DT 42149 1348 28 line line NN 42149 1348 29 determination determination NN 42149 1348 30 , , , 42149 1348 31 the the DT 42149 1348 32 principle principle NN 42149 1348 33 , , , 42149 1348 34 however however RB 42149 1348 35 , , , 42149 1348 36 remaining remain VBG 42149 1348 37 the the DT 42149 1348 38 same same JJ 42149 1348 39 . . . 42149 1349 1 The the DT 42149 1349 2 elevations elevation NNS 42149 1349 3 were be VBD 42149 1349 4 taken take VBN 42149 1349 5 on on IN 42149 1349 6 the the DT 42149 1349 7 inner inner JJ 42149 1349 8 edges edge NNS 42149 1349 9 of of IN 42149 1349 10 the the DT 42149 1349 11 circumferential circumferential JJ 42149 1349 12 flanges flange NNS 42149 1349 13 of of IN 42149 1349 14 the the DT 42149 1349 15 metal metal NN 42149 1349 16 lining lining NN 42149 1349 17 , , , 42149 1349 18 not not RB 42149 1349 19 only only RB 42149 1349 20 in in IN 42149 1349 21 the the DT 42149 1349 22 bottom bottom NN 42149 1349 23 , , , 42149 1349 24 but but CC 42149 1349 25 also also RB 42149 1349 26 in in IN 42149 1349 27 the the DT 42149 1349 28 top top NN 42149 1349 29 , , , 42149 1349 30 of of IN 42149 1349 31 the the DT 42149 1349 32 tunnel tunnel NN 42149 1349 33 , , , 42149 1349 34 at at IN 42149 1349 35 each each DT 42149 1349 36 25-ft 25-ft NNS 42149 1349 37 . . . 42149 1349 38 interval interval NN 42149 1349 39 ; ; : 42149 1349 40 then then RB 42149 1349 41 , , , 42149 1349 42 for for IN 42149 1349 43 the the DT 42149 1349 44 upper upper JJ 42149 1349 45 limit limit NN 42149 1349 46 of of IN 42149 1349 47 the the DT 42149 1349 48 track track NN 42149 1349 49 at at IN 42149 1349 50 each each DT 42149 1349 51 such such JJ 42149 1349 52 interval interval NN 42149 1349 53 the the DT 42149 1349 54 following follow VBG 42149 1349 55 was be VBD 42149 1349 56 plotted plot VBN 42149 1349 57 : : : 42149 1349 58 Elevation elevation NN 42149 1349 59 of of IN 42149 1349 60 inner inner JJ 42149 1349 61 edge edge NN 42149 1349 62 of of IN 42149 1349 63 flange flange NN 42149 1349 64 at at IN 42149 1349 65 top top NN 42149 1349 66 , , , 42149 1349 67 minus minus CC 42149 1349 68 16.58 16.58 CD 42149 1349 69 ft ft NN 42149 1349 70 . . . 42149 1350 1 This this DT 42149 1350 2 16.58 16.58 CD 42149 1350 3 ft ft NN 42149 1350 4 . . . 42149 1350 5 ( ( -LRB- 42149 1350 6 or or CC 42149 1350 7 16 16 CD 42149 1350 8 ft ft NN 42149 1350 9 . . NNP 42149 1350 10 7 7 CD 42149 1350 11 in in IN 42149 1350 12 . . . 42149 1350 13 ) ) -RRB- 42149 1351 1 was be VBD 42149 1351 2 obtained obtain VBN 42149 1351 3 thus thus RB 42149 1351 4 : : : 42149 1351 5 The the DT 42149 1351 6 standard standard JJ 42149 1351 7 height height NN 42149 1351 8 from from IN 42149 1351 9 the the DT 42149 1351 10 top top NN 42149 1351 11 of of IN 42149 1351 12 the the DT 42149 1351 13 rail rail NN 42149 1351 14 to to IN 42149 1351 15 the the DT 42149 1351 16 inner inner JJ 42149 1351 17 edge edge NN 42149 1351 18 of of IN 42149 1351 19 the the DT 42149 1351 20 iron iron NN 42149 1351 21 flange flange NN 42149 1351 22 is be VBZ 42149 1351 23 17 17 CD 42149 1351 24 ft ft NN 42149 1351 25 . . NNP 42149 1351 26 1 1 CD 42149 1351 27 in in IN 42149 1351 28 . . NNP 42149 1351 29 , , , 42149 1351 30 but but CC 42149 1351 31 , , , 42149 1351 32 as as IN 42149 1351 33 the the DT 42149 1351 34 track track NN 42149 1351 35 may may MD 42149 1351 36 be be VB 42149 1351 37 6 6 CD 42149 1351 38 in in IN 42149 1351 39 . . . 42149 1352 1 above above IN 42149 1352 2 the the DT 42149 1352 3 standard standard JJ 42149 1352 4 or or CC 42149 1352 5 normal normal JJ 42149 1352 6 , , , 42149 1352 7 the the DT 42149 1352 8 minimum minimum JJ 42149 1352 9 height height NN 42149 1352 10 permissible permissible NN 42149 1352 11 is be VBZ 42149 1352 12 16 16 CD 42149 1352 13 ft ft NN 42149 1352 14 . . NNP 42149 1352 15 7 7 CD 42149 1352 16 in in IN 42149 1352 17 . . . 42149 1353 1 For for IN 42149 1353 2 the the DT 42149 1353 3 lower low JJR 42149 1353 4 limit limit NN 42149 1353 5 of of IN 42149 1353 6 track track NN 42149 1353 7 at at IN 42149 1353 8 each each DT 42149 1353 9 25-ft 25-ft NNS 42149 1353 10 . . . 42149 1353 11 interval interval VBG 42149 1353 12 the the DT 42149 1353 13 following follow VBG 42149 1353 14 was be VBD 42149 1353 15 plotted plot VBN 42149 1353 16 : : : 42149 1353 17 Elevation elevation NN 42149 1353 18 of of IN 42149 1353 19 inner inner JJ 42149 1353 20 edge edge NN 42149 1353 21 of of IN 42149 1353 22 flange flange NN 42149 1353 23 at at IN 42149 1353 24 bottom bottom NN 42149 1353 25 , , , 42149 1353 26 plus plus CC 42149 1353 27 3.83 3.83 CD 42149 1353 28 ft ft NN 42149 1353 29 . . . 42149 1354 1 This this DT 42149 1354 2 3.83 3.83 CD 42149 1354 3 ft ft NN 42149 1354 4 . . . 42149 1354 5 ( ( -LRB- 42149 1354 6 or or CC 42149 1354 7 3 3 CD 42149 1354 8 ft ft NN 42149 1354 9 . . NNP 42149 1354 10 10 10 CD 42149 1354 11 in in IN 42149 1354 12 . . . 42149 1354 13 ) ) -RRB- 42149 1355 1 was be VBD 42149 1355 2 obtained obtain VBN 42149 1355 3 thus thus RB 42149 1355 4 : : : 42149 1355 5 The the DT 42149 1355 6 standard standard JJ 42149 1355 7 height height NN 42149 1355 8 from from IN 42149 1355 9 the the DT 42149 1355 10 top top NN 42149 1355 11 of of IN 42149 1355 12 the the DT 42149 1355 13 rail rail NN 42149 1355 14 to to IN 42149 1355 15 the the DT 42149 1355 16 inner inner JJ 42149 1355 17 edge edge NN 42149 1355 18 of of IN 42149 1355 19 the the DT 42149 1355 20 iron iron NN 42149 1355 21 flange flange NN 42149 1355 22 is be VBZ 42149 1355 23 4 4 CD 42149 1355 24 ft ft NN 42149 1355 25 . . NN 42149 1355 26 1 1 CD 42149 1355 27 in in IN 42149 1355 28 . . . 42149 1356 1 ( ( -LRB- 42149 1356 2 5 5 CD 42149 1356 3 ft ft NN 42149 1356 4 . . NN 42149 1356 5 to to IN 42149 1356 6 outside outside RB 42149 1356 7 of of IN 42149 1356 8 iron iron NN 42149 1356 9 , , , 42149 1356 10 less less JJR 42149 1356 11 11 11 CD 42149 1356 12 in in IN 42149 1356 13 . . . 42149 1357 1 for for IN 42149 1357 2 depth depth NN 42149 1357 3 of of IN 42149 1357 4 flange flange NN 42149 1357 5 ) ) -RRB- 42149 1357 6 , , , 42149 1357 7 but but CC 42149 1357 8 , , , 42149 1357 9 as as IN 42149 1357 10 the the DT 42149 1357 11 track track NN 42149 1357 12 may may MD 42149 1357 13 be be VB 42149 1357 14 3 3 CD 42149 1357 15 in in IN 42149 1357 16 . . . 42149 1358 1 below below IN 42149 1358 2 the the DT 42149 1358 3 standard standard NN 42149 1358 4 , , , 42149 1358 5 the the DT 42149 1358 6 minimum minimum JJ 42149 1358 7 height height NN 42149 1358 8 permissible permissible NN 42149 1358 9 is be VBZ 42149 1358 10 4 4 CD 42149 1358 11 ft ft NNS 42149 1358 12 , , , 42149 1358 13 1 1 CD 42149 1358 14 in in IN 42149 1358 15 . . . 42149 1359 1 less less RBR 42149 1359 2 3 3 CD 42149 1359 3 in in IN 42149 1359 4 . . NNP 42149 1359 5 , , , 42149 1359 6 or or CC 42149 1359 7 3 3 CD 42149 1359 8 ft ft NN 42149 1359 9 . . NNP 42149 1359 10 10 10 CD 42149 1359 11 in in IN 42149 1359 12 . . . 42149 1360 1 By by IN 42149 1360 2 plotting plot VBG 42149 1360 3 the the DT 42149 1360 4 elevations elevation NNS 42149 1360 5 thus thus RB 42149 1360 6 obtained obtain VBN 42149 1360 7 , , , 42149 1360 8 two two CD 42149 1360 9 lines line NNS 42149 1360 10 were be VBD 42149 1360 11 obtained obtain VBN 42149 1360 12 which which WDT 42149 1360 13 were be VBD 42149 1360 14 not not RB 42149 1360 15 parallel parallel JJ 42149 1360 16 but but CC 42149 1360 17 were be VBD 42149 1360 18 closer close JJR 42149 1360 19 together together RB 42149 1360 20 or or CC 42149 1360 21 further far RBR 42149 1360 22 apart apart RB 42149 1360 23 according accord VBG 42149 1360 24 as as IN 42149 1360 25 the the DT 42149 1360 26 actual actual JJ 42149 1360 27 vertical vertical JJ 42149 1360 28 diameter diameter NN 42149 1360 29 was be VBD 42149 1360 30 less less JJR 42149 1360 31 or or CC 42149 1360 32 greater great JJR 42149 1360 33 than than IN 42149 1360 34 the the DT 42149 1360 35 standard standard NN 42149 1360 36 , , , 42149 1360 37 and and CC 42149 1360 38 the the DT 42149 1360 39 track track NN 42149 1360 40 grade grade NN 42149 1360 41 had have VBD 42149 1360 42 to to TO 42149 1360 43 lie lie VB 42149 1360 44 within within IN 42149 1360 45 these these DT 42149 1360 46 two two CD 42149 1360 47 lines line NNS 42149 1360 48 in in IN 42149 1360 49 order order NN 42149 1360 50 to to TO 42149 1360 51 comply comply VB 42149 1360 52 with with IN 42149 1360 53 the the DT 42149 1360 54 requirements requirement NNS 42149 1360 55 indicated indicate VBN 42149 1360 56 above above RB 42149 1360 57 . . . 42149 1361 1 The the DT 42149 1361 2 results result NNS 42149 1361 3 of of IN 42149 1361 4 these these DT 42149 1361 5 operations operation NNS 42149 1361 6 for for IN 42149 1361 7 the the DT 42149 1361 8 North North NNP 42149 1361 9 Tunnel Tunnel NNP 42149 1361 10 are be VBP 42149 1361 11 shown show VBN 42149 1361 12 on on IN 42149 1361 13 Plate Plate NNP 42149 1361 14 XXXVI XXXVI NNP 42149 1361 15 . . . 42149 1362 1 The the DT 42149 1362 2 greatest great JJS 42149 1362 3 deviations deviation NNS 42149 1362 4 between between IN 42149 1362 5 the the DT 42149 1362 6 lines line NNS 42149 1362 7 and and CC 42149 1362 8 grades grade NNS 42149 1362 9 in in IN 42149 1362 10 the the DT 42149 1362 11 subaqueous subaqueous JJ 42149 1362 12 tunnels tunnel NNS 42149 1362 13 as as IN 42149 1362 14 determined determine VBN 42149 1362 15 by by IN 42149 1362 16 these these DT 42149 1362 17 means mean NNS 42149 1362 18 and and CC 42149 1362 19 those those DT 42149 1362 20 as as RB 42149 1362 21 originally originally RB 42149 1362 22 laid lay VBN 42149 1362 23 out out RP 42149 1362 24 in in IN 42149 1362 25 the the DT 42149 1362 26 contract contract NN 42149 1362 27 drawings drawing NNS 42149 1362 28 are be VBP 42149 1362 29 on on IN 42149 1362 30 the the DT 42149 1362 31 Weehawken Weehawken NNP 42149 1362 32 side side NN 42149 1362 33 , , , 42149 1362 34 and and CC 42149 1362 35 were be VBD 42149 1362 36 caused cause VBN 42149 1362 37 by by IN 42149 1362 38 the the DT 42149 1362 39 unexpected unexpected JJ 42149 1362 40 behavior behavior NN 42149 1362 41 of of IN 42149 1362 42 the the DT 42149 1362 43 tunnel tunnel NN 42149 1362 44 when when WRB 42149 1362 45 the the DT 42149 1362 46 shields shield NNS 42149 1362 47 were be VBD 42149 1362 48 driven drive VBN 42149 1362 49 " " `` 42149 1362 50 blind blind JJ 42149 1362 51 " " '' 42149 1362 52 into into IN 42149 1362 53 the the DT 42149 1362 54 silt silt NN 42149 1362 55 , , , 42149 1362 56 causing cause VBG 42149 1362 57 a a DT 42149 1362 58 rise rise NN 42149 1362 59 which which WDT 42149 1362 60 could could MD 42149 1362 61 not not RB 42149 1362 62 be be VB 42149 1362 63 overcome overcome VBN 42149 1362 64 , , , 42149 1362 65 and and CC 42149 1362 66 the the DT 42149 1362 67 thrusting thrusting NN 42149 1362 68 aside aside RB 42149 1362 69 of of IN 42149 1362 70 one one CD 42149 1362 71 tunnel tunnel NN 42149 1362 72 by by IN 42149 1362 73 the the DT 42149 1362 74 passage passage NN 42149 1362 75 of of IN 42149 1362 76 the the DT 42149 1362 77 neighboring neighboring NN 42149 1362 78 one one CD 42149 1362 79 . . . 42149 1363 1 Had have VBD 42149 1363 2 this this DT 42149 1363 3 unfortunate unfortunate JJ 42149 1363 4 incident incident NN 42149 1363 5 not not RB 42149 1363 6 occurred occur VBN 42149 1363 7 , , , 42149 1363 8 it -PRON- PRP 42149 1363 9 is be VBZ 42149 1363 10 clear clear JJ 42149 1363 11 that that IN 42149 1363 12 it -PRON- PRP 42149 1363 13 would would MD 42149 1363 14 have have VB 42149 1363 15 been be VBN 42149 1363 16 possible possible JJ 42149 1363 17 to to TO 42149 1363 18 adhere adhere VB 42149 1363 19 very very RB 42149 1363 20 closely closely RB 42149 1363 21 indeed indeed RB 42149 1363 22 to to IN 42149 1363 23 the the DT 42149 1363 24 contract contract NN 42149 1363 25 lines line NNS 42149 1363 26 and and CC 42149 1363 27 grades grade NNS 42149 1363 28 , , , 42149 1363 29 although although IN 42149 1363 30 the the DT 42149 1363 31 deviation deviation NN 42149 1363 32 is be VBZ 42149 1363 33 small small JJ 42149 1363 34 , , , 42149 1363 35 considering consider VBG 42149 1363 36 all all DT 42149 1363 37 things thing NNS 42149 1363 38 . . . 42149 1364 1 The the DT 42149 1364 2 internal internal JJ 42149 1364 3 outline outline NN 42149 1364 4 of of IN 42149 1364 5 the the DT 42149 1364 6 concrete concrete JJ 42149 1364 7 cross cross JJ 42149 1364 8 - - NN 42149 1364 9 section section NN 42149 1364 10 is be VBZ 42149 1364 11 uniform uniform JJ 42149 1364 12 throughout throughout IN 42149 1364 13 , , , 42149 1364 14 and and CC 42149 1364 15 is be VBZ 42149 1364 16 built build VBN 42149 1364 17 on on IN 42149 1364 18 the the DT 42149 1364 19 lines line NNS 42149 1364 20 and and CC 42149 1364 21 grades grade NNS 42149 1364 22 thus thus RB 42149 1364 23 described describe VBD 42149 1364 24 . . . 42149 1365 1 _ _ NNP 42149 1365 2 Steel Steel NNP 42149 1365 3 Rod Rod NNP 42149 1365 4 Reinforcement Reinforcement NNP 42149 1365 5 of of IN 42149 1365 6 Concrete._--The Concrete._--The NNP 42149 1365 7 original original JJ 42149 1365 8 intention intention NN 42149 1365 9 had have VBD 42149 1365 10 been be VBN 42149 1365 11 to to TO 42149 1365 12 line line VB 42149 1365 13 the the DT 42149 1365 14 metal metal NN 42149 1365 15 lining lining NN 42149 1365 16 of of IN 42149 1365 17 the the DT 42149 1365 18 tube tube NN 42149 1365 19 tunnels tunnel NNS 42149 1365 20 with with IN 42149 1365 21 plain plain JJ 42149 1365 22 concrete concrete NN 42149 1365 23 , , , 42149 1365 24 but but CC 42149 1365 25 , , , 42149 1365 26 as as IN 42149 1365 27 the the DT 42149 1365 28 discussion discussion NN 42149 1365 29 on on IN 42149 1365 30 the the DT 42149 1365 31 foundation foundation NN 42149 1365 32 question question NN 42149 1365 33 continued continue VBD 42149 1365 34 , , , 42149 1365 35 it -PRON- PRP 42149 1365 36 was be VBD 42149 1365 37 felt feel VBN 42149 1365 38 advisable advisable JJ 42149 1365 39 , , , 42149 1365 40 while while IN 42149 1365 41 still still RB 42149 1365 42 it -PRON- PRP 42149 1365 43 was be VBD 42149 1365 44 intended intend VBN 42149 1365 45 to to TO 42149 1365 46 put put VB 42149 1365 47 in in IN 42149 1365 48 the the DT 42149 1365 49 foundations foundation NNS 42149 1365 50 , , , 42149 1365 51 to to TO 42149 1365 52 guard guard VB 42149 1365 53 against against IN 42149 1365 54 any any DT 42149 1365 55 stresses stress NNS 42149 1365 56 which which WDT 42149 1365 57 were be VBD 42149 1365 58 likely likely JJ 42149 1365 59 to to TO 42149 1365 60 come come VB 42149 1365 61 on on IN 42149 1365 62 the the DT 42149 1365 63 structure structure NN 42149 1365 64 , , , 42149 1365 65 by by IN 42149 1365 66 using use VBG 42149 1365 67 a a DT 42149 1365 68 system system NN 42149 1365 69 of of IN 42149 1365 70 steel steel NN 42149 1365 71 rods rod NNS 42149 1365 72 embedded embed VBN 42149 1365 73 circumferentially circumferentially RB 42149 1365 74 within within IN 42149 1365 75 the the DT 42149 1365 76 concrete concrete NN 42149 1365 77 . . . 42149 1366 1 Designs design NNS 42149 1366 2 were be VBD 42149 1366 3 made make VBN 42149 1366 4 on on IN 42149 1366 5 this this DT 42149 1366 6 basis basis NN 42149 1366 7 , , , 42149 1366 8 and and CC 42149 1366 9 even even RB 42149 1366 10 the the DT 42149 1366 11 necessary necessary JJ 42149 1366 12 material material NN 42149 1366 13 prepared prepare VBN 42149 1366 14 , , , 42149 1366 15 before before IN 42149 1366 16 the the DT 42149 1366 17 decision decision NN 42149 1366 18 to to TO 42149 1366 19 omit omit VB 42149 1366 20 the the DT 42149 1366 21 piles pile NNS 42149 1366 22 altogether altogether RB 42149 1366 23 was be VBD 42149 1366 24 reached reach VBN 42149 1366 25 . . . 42149 1367 1 However however RB 42149 1367 2 , , , 42149 1367 3 in in IN 42149 1367 4 order order NN 42149 1367 5 to to TO 42149 1367 6 provide provide VB 42149 1367 7 a a DT 42149 1367 8 safeguard safeguard NN 42149 1367 9 for for IN 42149 1367 10 the the DT 42149 1367 11 structure structure NN 42149 1367 12 where where WRB 42149 1367 13 it -PRON- PRP 42149 1367 14 is be VBZ 42149 1367 15 partly partly RB 42149 1367 16 or or CC 42149 1367 17 wholly wholly RB 42149 1367 18 beyond beyond IN 42149 1367 19 the the DT 42149 1367 20 solid solid JJ 42149 1367 21 rock rock NN 42149 1367 22 , , , 42149 1367 23 it -PRON- PRP 42149 1367 24 was be VBD 42149 1367 25 decided decide VBN 42149 1367 26 to to TO 42149 1367 27 use use VB 42149 1367 28 reinforcement reinforcement NN 42149 1367 29 , , , 42149 1367 30 even even RB 42149 1367 31 with with IN 42149 1367 32 the the DT 42149 1367 33 piles pile NNS 42149 1367 34 omitted omit VBN 42149 1367 35 . . . 42149 1368 1 For for IN 42149 1368 2 this this DT 42149 1368 3 purpose purpose NN 42149 1368 4 the the DT 42149 1368 5 tunnel tunnel NN 42149 1368 6 was be VBD 42149 1368 7 considered consider VBN 42149 1368 8 as as IN 42149 1368 9 a a DT 42149 1368 10 girder girder NN 42149 1368 11 , , , 42149 1368 12 and and CC 42149 1368 13 longitudinal longitudinal JJ 42149 1368 14 reinforcement reinforcement NN 42149 1368 15 was be VBD 42149 1368 16 provided provide VBN 42149 1368 17 at at IN 42149 1368 18 the the DT 42149 1368 19 top top JJ 42149 1368 20 and and CC 42149 1368 21 bottom bottom NN 42149 1368 22 . . . 42149 1369 1 The the DT 42149 1369 2 top top JJ 42149 1369 3 reinforcement reinforcement NN 42149 1369 4 extends extend VBZ 42149 1369 5 from from IN 42149 1369 6 a a DT 42149 1369 7 point point NN 42149 1369 8 25 25 CD 42149 1369 9 ft ft NN 42149 1369 10 . . NN 42149 1369 11 behind behind IN 42149 1369 12 the the DT 42149 1369 13 point point NN 42149 1369 14 where where WRB 42149 1369 15 the the DT 42149 1369 16 crown crown NN 42149 1369 17 of of IN 42149 1369 18 the the DT 42149 1369 19 tunnel tunnel NN 42149 1369 20 passes pass VBZ 42149 1369 21 out out IN 42149 1369 22 of of IN 42149 1369 23 rock rock NN 42149 1369 24 on on IN 42149 1369 25 the the DT 42149 1369 26 New New NNP 42149 1369 27 York York NNP 42149 1369 28 side side NN 42149 1369 29 to to IN 42149 1369 30 where where WRB 42149 1369 31 the the DT 42149 1369 32 crown crown NN 42149 1369 33 passes pass VBZ 42149 1369 34 into into IN 42149 1369 35 rock rock NN 42149 1369 36 on on IN 42149 1369 37 the the DT 42149 1369 38 New New NNP 42149 1369 39 Jersey Jersey NNP 42149 1369 40 side side NN 42149 1369 41 . . . 42149 1370 1 The the DT 42149 1370 2 bottom bottom JJ 42149 1370 3 reinforcement reinforcement NN 42149 1370 4 extends extend VBZ 42149 1370 5 from from IN 42149 1370 6 where where WRB 42149 1370 7 the the DT 42149 1370 8 invert invert NN 42149 1370 9 of of IN 42149 1370 10 the the DT 42149 1370 11 tunnel tunnel NN 42149 1370 12 passes pass VBZ 42149 1370 13 out out IN 42149 1370 14 of of IN 42149 1370 15 rock rock NN 42149 1370 16 on on IN 42149 1370 17 the the DT 42149 1370 18 New New NNP 42149 1370 19 York York NNP 42149 1370 20 side side NN 42149 1370 21 to to IN 42149 1370 22 where where WRB 42149 1370 23 it -PRON- PRP 42149 1370 24 passes pass VBZ 42149 1370 25 into into IN 42149 1370 26 rock rock NN 42149 1370 27 on on IN 42149 1370 28 the the DT 42149 1370 29 New New NNP 42149 1370 30 Jersey Jersey NNP 42149 1370 31 side side NN 42149 1370 32 . . . 42149 1371 1 The the DT 42149 1371 2 reinforcement reinforcement NN 42149 1371 3 both both CC 42149 1371 4 at at IN 42149 1371 5 top top JJ 42149 1371 6 and and CC 42149 1371 7 bottom bottom NN 42149 1371 8 consists consist NNS 42149 1371 9 of of IN 42149 1371 10 twenty twenty CD 42149 1371 11 1-in 1-in CD 42149 1371 12 . . . 42149 1372 1 square square JJ 42149 1372 2 twisted twisted JJ 42149 1372 3 rods rod NNS 42149 1372 4 , , , 42149 1372 5 ten ten CD 42149 1372 6 placed place VBD 42149 1372 7 symmetrically symmetrically RB 42149 1372 8 on on IN 42149 1372 9 either either DT 42149 1372 10 side side NN 42149 1372 11 of of IN 42149 1372 12 the the DT 42149 1372 13 vertical vertical JJ 42149 1372 14 axis axi NNS 42149 1372 15 , , , 42149 1372 16 9 9 CD 42149 1372 17 in in IN 42149 1372 18 . . . 42149 1373 1 apart apart RB 42149 1373 2 from from IN 42149 1373 3 center center NN 42149 1373 4 to to IN 42149 1373 5 center center NN 42149 1373 6 and and CC 42149 1373 7 set set VBD 42149 1373 8 4 4 CD 42149 1373 9 in in IN 42149 1373 10 . . . 42149 1374 1 ( ( -LRB- 42149 1374 2 to to IN 42149 1374 3 their -PRON- PRP$ 42149 1374 4 centers center NNS 42149 1374 5 ) ) -RRB- 42149 1374 6 back back RB 42149 1374 7 from from IN 42149 1374 8 the the DT 42149 1374 9 face face NN 42149 1374 10 of of IN 42149 1374 11 the the DT 42149 1374 12 concrete concrete NN 42149 1374 13 . . . 42149 1375 1 As as IN 42149 1375 2 a a DT 42149 1375 3 further further JJ 42149 1375 4 precaution precaution NN 42149 1375 5 , , , 42149 1375 6 circumferentially circumferentially RB 42149 1375 7 - - HYPH 42149 1375 8 placed place VBN 42149 1375 9 rods rod NNS 42149 1375 10 were be VBD 42149 1375 11 used use VBN 42149 1375 12 on on IN 42149 1375 13 the the DT 42149 1375 14 landward landward JJ 42149 1375 15 side side NN 42149 1375 16 of of IN 42149 1375 17 the the DT 42149 1375 18 river river NN 42149 1375 19 lines line NNS 42149 1375 20 , , , 42149 1375 21 mainly mainly RB 42149 1375 22 to to TO 42149 1375 23 assist assist VB 42149 1375 24 in in IN 42149 1375 25 preventing prevent VBG 42149 1375 26 the the DT 42149 1375 27 distortion distortion NN 42149 1375 28 of of IN 42149 1375 29 shape shape NN 42149 1375 30 which which WDT 42149 1375 31 might may MD 42149 1375 32 occur occur VB 42149 1375 33 here here RB 42149 1375 34 , , , 42149 1375 35 either either CC 42149 1375 36 under under IN 42149 1375 37 present present JJ 42149 1375 38 conditions condition NNS 42149 1375 39 , , , 42149 1375 40 such such JJ 42149 1375 41 as as IN 42149 1375 42 under under IN 42149 1375 43 the the DT 42149 1375 44 Fowler Fowler NNP 42149 1375 45 Warehouse Warehouse NNP 42149 1375 46 at at IN 42149 1375 47 Weehawken Weehawken NNP 42149 1375 48 , , , 42149 1375 49 or or CC 42149 1375 50 under under IN 42149 1375 51 any any DT 42149 1375 52 possible possible JJ 42149 1375 53 different different JJ 42149 1375 54 future future JJ 42149 1375 55 conditions condition NNS 42149 1375 56 , , , 42149 1375 57 such such JJ 42149 1375 58 as as IN 42149 1375 59 might may MD 42149 1375 60 be be VB 42149 1375 61 brought bring VBN 42149 1375 62 about about RP 42149 1375 63 by by IN 42149 1375 64 building build VBG 42149 1375 65 some some DT 42149 1375 66 new new JJ 42149 1375 67 structure structure NN 42149 1375 68 in in IN 42149 1375 69 the the DT 42149 1375 70 vicinity vicinity NN 42149 1375 71 of of IN 42149 1375 72 the the DT 42149 1375 73 tunnels tunnel NNS 42149 1375 74 . . . 42149 1376 1 For for IN 42149 1376 2 purposes purpose NNS 42149 1376 3 of of IN 42149 1376 4 classification classification NN 42149 1376 5 of of IN 42149 1376 6 the the DT 42149 1376 7 circumferential circumferential JJ 42149 1376 8 reinforcement reinforcement NN 42149 1376 9 , , , 42149 1376 10 the the DT 42149 1376 11 tunnel tunnel NN 42149 1376 12 was be VBD 42149 1376 13 divided divide VBN 42149 1376 14 into into IN 42149 1376 15 two two CD 42149 1376 16 types type NNS 42149 1376 17 , , , 42149 1376 18 " " '' 42149 1376 19 _ _ NNP 42149 1376 20 B B NNP 42149 1376 21 _ _ NNP 42149 1376 22 " " '' 42149 1376 23 and and CC 42149 1376 24 " " `` 42149 1376 25 _ _ NNP 42149 1376 26 C C NNP 42149 1376 27 _ _ NNP 42149 1376 28 " " '' 42149 1376 29 ; ; , 42149 1376 30 ( ( -LRB- 42149 1376 31 Type type NN 42149 1376 32 " " `` 42149 1376 33 _ _ NNP 42149 1376 34 A A NNP 42149 1376 35 _ _ NNP 42149 1376 36 " " '' 42149 1376 37 covering cover VBG 42149 1376 38 the the DT 42149 1376 39 portion portion NN 42149 1376 40 which which WDT 42149 1376 41 , , , 42149 1376 42 being be VBG 42149 1376 43 wholly wholly RB 42149 1376 44 in in IN 42149 1376 45 solid solid JJ 42149 1376 46 rock rock NN 42149 1376 47 , , , 42149 1376 48 was be VBD 42149 1376 49 not not RB 42149 1376 50 reinforced reinforce VBN 42149 1376 51 at at RB 42149 1376 52 all all RB 42149 1376 53 ) ) -RRB- 42149 1376 54 . . . 42149 1377 1 Type type NN 42149 1377 2 " " `` 42149 1377 3 _ _ NNP 42149 1377 4 B B NNP 42149 1377 5 _ _ NNP 42149 1377 6 " " '' 42149 1377 7 covers cover VBZ 42149 1377 8 the the DT 42149 1377 9 part part NN 42149 1377 10 of of IN 42149 1377 11 the the DT 42149 1377 12 tunnels tunnel NNS 42149 1377 13 on on IN 42149 1377 14 both both DT 42149 1377 15 sides side NNS 42149 1377 16 of of IN 42149 1377 17 the the DT 42149 1377 18 river river NN 42149 1377 19 lying lie VBG 42149 1377 20 between between IN 42149 1377 21 the the DT 42149 1377 22 point point NN 42149 1377 23 where where WRB 42149 1377 24 the the DT 42149 1377 25 top top NN 42149 1377 26 of of IN 42149 1377 27 the the DT 42149 1377 28 tunnel tunnel NN 42149 1377 29 passes pass VBZ 42149 1377 30 out out IN 42149 1377 31 of of IN 42149 1377 32 rock rock NN 42149 1377 33 and and CC 42149 1377 34 the the DT 42149 1377 35 point point NN 42149 1377 36 where where WRB 42149 1377 37 the the DT 42149 1377 38 invert invert NN 42149 1377 39 passes pass VBZ 42149 1377 40 out out IN 42149 1377 41 of of IN 42149 1377 42 rock rock NN 42149 1377 43 on on IN 42149 1377 44 the the DT 42149 1377 45 Manhattan Manhattan NNP 42149 1377 46 side side NN 42149 1377 47 , , , 42149 1377 48 or or CC 42149 1377 49 out out IN 42149 1377 50 of of IN 42149 1377 51 gravel gravel NN 42149 1377 52 on on IN 42149 1377 53 the the DT 42149 1377 54 Weehawken Weehawken NNP 42149 1377 55 side side NN 42149 1377 56 . . . 42149 1378 1 The the DT 42149 1378 2 reinforcement reinforcement NN 42149 1378 3 consists consist VBZ 42149 1378 4 of of IN 42149 1378 5 twenty twenty CD 42149 1378 6 1-in 1-in CD 42149 1378 7 . . . 42149 1379 1 square square JJ 42149 1379 2 longitudinal longitudinal JJ 42149 1379 3 rods rod NNS 42149 1379 4 in in IN 42149 1379 5 the the DT 42149 1379 6 crown crown NN 42149 1379 7 of of IN 42149 1379 8 the the DT 42149 1379 9 tunnel tunnel NN 42149 1379 10 , , , 42149 1379 11 as as IN 42149 1379 12 described describe VBN 42149 1379 13 for for IN 42149 1379 14 the the DT 42149 1379 15 general general JJ 42149 1379 16 longitudinal longitudinal JJ 42149 1379 17 reinforcement reinforcement NN 42149 1379 18 , , , 42149 1379 19 together together RB 42149 1379 20 with with IN 42149 1379 21 1-in 1-in CD 42149 1379 22 . . . 42149 1380 1 square square JJ 42149 1380 2 circumferential circumferential JJ 42149 1380 3 rods rod NNS 42149 1380 4 at at IN 42149 1380 5 10-in 10-in CD 42149 1380 6 . . . 42149 1381 1 centers center NNS 42149 1381 2 , , , 42149 1381 3 and and CC 42149 1381 4 extending extend VBG 42149 1381 5 over over IN 42149 1381 6 the the DT 42149 1381 7 arch arch NN 42149 1381 8 to to IN 42149 1381 9 2 2 CD 42149 1381 10 ft ft NN 42149 1381 11 . . NNP 42149 1381 12 3 3 CD 42149 1381 13 in in IN 42149 1381 14 . . . 42149 1382 1 below below IN 42149 1382 2 the the DT 42149 1382 3 horizontal horizontal JJ 42149 1382 4 axis axi NNS 42149 1382 5 . . . 42149 1383 1 Type Type NNP 42149 1383 2 " " `` 42149 1383 3 _ _ NNP 42149 1383 4 C C NNP 42149 1383 5 _ _ NNP 42149 1383 6 " " '' 42149 1383 7 extends extend VBZ 42149 1383 8 from from IN 42149 1383 9 the the DT 42149 1383 10 latter latter JJ 42149 1383 11 limit limit NN 42149 1383 12 of of IN 42149 1383 13 Type Type NNP 42149 1383 14 " " `` 42149 1383 15 _ _ NNP 42149 1383 16 B B NNP 42149 1383 17 _ _ NNP 42149 1383 18 " " '' 42149 1383 19 to to IN 42149 1383 20 the the DT 42149 1383 21 river river NN 42149 1383 22 line line NN 42149 1383 23 on on IN 42149 1383 24 each each DT 42149 1383 25 side side NN 42149 1383 26 , , , 42149 1383 27 and and CC 42149 1383 28 consists consist VBZ 42149 1383 29 of of IN 42149 1383 30 longitudinal longitudinal JJ 42149 1383 31 reinforcement reinforcement NN 42149 1383 32 in in IN 42149 1383 33 both both DT 42149 1383 34 top top NN 42149 1383 35 and and CC 42149 1383 36 bottom bottom NN 42149 1383 37 , , , 42149 1383 38 as as IN 42149 1383 39 described describe VBN 42149 1383 40 before before RB 42149 1383 41 , , , 42149 1383 42 together together RB 42149 1383 43 with with IN 42149 1383 44 circumferential circumferential JJ 42149 1383 45 reinforcement reinforcement NN 42149 1383 46 entirely entirely RB 42149 1383 47 around around IN 42149 1383 48 the the DT 42149 1383 49 tunnel tunnel NN 42149 1383 50 , , , 42149 1383 51 and and CC 42149 1383 52 formed form VBN 42149 1383 53 of of IN 42149 1383 54 1-in 1-in CD 42149 1383 55 . . . 42149 1384 1 square square JJ 42149 1384 2 twisted twist VBD 42149 1384 3 rods rod NNS 42149 1384 4 at at IN 42149 1384 5 15-in 15-in NNS 42149 1384 6 . . . 42149 1385 1 centers center NNS 42149 1385 2 . . . 42149 1386 1 Type type NN 42149 1386 2 " " `` 42149 1386 3 _ _ NNP 42149 1386 4 D D NNP 42149 1386 5 _ _ NNP 42149 1386 6 " " '' 42149 1386 7 consists consist VBZ 42149 1386 8 of of IN 42149 1386 9 longitudinal longitudinal JJ 42149 1386 10 reinforcement reinforcement NN 42149 1386 11 only only RB 42149 1386 12 , , , 42149 1386 13 and and CC 42149 1386 14 extends extend VBZ 42149 1386 15 from from IN 42149 1386 16 river river NN 42149 1386 17 line line NN 42149 1386 18 to to IN 42149 1386 19 river river NN 42149 1386 20 line line NN 42149 1386 21 , , , 42149 1386 22 thus thus RB 42149 1386 23 occupying occupy VBG 42149 1386 24 72.5 72.5 CD 42149 1386 25 % % NN 42149 1386 26 of of IN 42149 1386 27 the the DT 42149 1386 28 length length NN 42149 1386 29 in in IN 42149 1386 30 which which WDT 42149 1386 31 concrete concrete NN 42149 1386 32 is be VBZ 42149 1386 33 used use VBN 42149 1386 34 . . . 42149 1387 1 The the DT 42149 1387 2 reinforcement reinforcement NN 42149 1387 3 consists consist VBZ 42149 1387 4 of of IN 42149 1387 5 twenty twenty CD 42149 1387 6 1-in 1-in CD 42149 1387 7 . . . 42149 1388 1 twisted twisted JJ 42149 1388 2 rods rod NNS 42149 1388 3 at at IN 42149 1388 4 9-in 9-in CD 42149 1388 5 . . . 42149 1389 1 centers center NNS 42149 1389 2 in in IN 42149 1389 3 the the DT 42149 1389 4 crown crown NN 42149 1389 5 , , , 42149 1389 6 and and CC 42149 1389 7 twenty twenty CD 42149 1389 8 1-in 1-in CD 42149 1389 9 . . . 42149 1390 1 rods rod NNS 42149 1390 2 at at IN 42149 1390 3 9-in 9-in CD 42149 1390 4 . . . 42149 1391 1 centers center NNS 42149 1391 2 in in IN 42149 1391 3 the the DT 42149 1391 4 invert invert NN 42149 1391 5 . . . 42149 1392 1 In in IN 42149 1392 2 addition addition NN 42149 1392 3 to to IN 42149 1392 4 the the DT 42149 1392 5 three three CD 42149 1392 6 standard standard JJ 42149 1392 7 types type NNS 42149 1392 8 , , , 42149 1392 9 " " '' 42149 1392 10 _ _ NNP 42149 1392 11 B B NNP 42149 1392 12 _ _ NNP 42149 1392 13 , , , 42149 1392 14 " " '' 42149 1392 15 " " `` 42149 1392 16 _ _ NNP 42149 1392 17 C C NNP 42149 1392 18 _ _ NNP 42149 1392 19 , , , 42149 1392 20 " " '' 42149 1392 21 and and CC 42149 1392 22 " " `` 42149 1392 23 _ _ NNP 42149 1392 24 D D NNP 42149 1392 25 _ _ NNP 42149 1392 26 , , , 42149 1392 27 " " `` 42149 1392 28 there there EX 42149 1392 29 were be VBD 42149 1392 30 two two CD 42149 1392 31 sub sub NN 42149 1392 32 - - NNS 42149 1392 33 types type NNS 42149 1392 34 which which WDT 42149 1392 35 were be VBD 42149 1392 36 used use VBN 42149 1392 37 in in IN 42149 1392 38 Type Type NNP 42149 1392 39 " " `` 42149 1392 40 _ _ NNP 42149 1392 41 D D NNP 42149 1392 42 _ _ NNP 42149 1392 43 , , , 42149 1392 44 " " '' 42149 1392 45 and and CC 42149 1392 46 in in IN 42149 1392 47 conjunction conjunction NN 42149 1392 48 with with IN 42149 1392 49 it -PRON- PRP 42149 1392 50 wherever wherever WRB 42149 1392 51 the the DT 42149 1392 52 thickness thickness NN 42149 1392 53 of of IN 42149 1392 54 the the DT 42149 1392 55 center center NN 42149 1392 56 of of IN 42149 1392 57 the the DT 42149 1392 58 concrete concrete JJ 42149 1392 59 arch arch NN 42149 1392 60 became become VBD 42149 1392 61 less less JJR 42149 1392 62 than than IN 42149 1392 63 1 1 CD 42149 1392 64 ft ft NN 42149 1392 65 . . NNP 42149 1392 66 6 6 CD 42149 1392 67 in in IN 42149 1392 68 . . NNP 42149 1392 69 , , , 42149 1392 70 measuring measure VBG 42149 1392 71 to to IN 42149 1392 72 the the DT 42149 1392 73 outside outside NN 42149 1392 74 of of IN 42149 1392 75 the the DT 42149 1392 76 metal metal NN 42149 1392 77 lining lining NN 42149 1392 78 . . . 42149 1393 1 This this DT 42149 1393 2 thickness thickness NN 42149 1393 3 was be VBD 42149 1393 4 one one CD 42149 1393 5 of of IN 42149 1393 6 the the DT 42149 1393 7 limits limit NNS 42149 1393 8 used use VBN 42149 1393 9 in in IN 42149 1393 10 laying lay VBG 42149 1393 11 out out RP 42149 1393 12 the the DT 42149 1393 13 lines line NNS 42149 1393 14 and and CC 42149 1393 15 grades grade NNS 42149 1393 16 , , , 42149 1393 17 and and CC 42149 1393 18 in in IN 42149 1393 19 general general JJ 42149 1393 20 the the DT 42149 1393 21 arch arch NN 42149 1393 22 was be VBD 42149 1393 23 not not RB 42149 1393 24 less less JJR 42149 1393 25 than than IN 42149 1393 26 this this DT 42149 1393 27 . . . 42149 1394 1 There there EX 42149 1394 2 were be VBD 42149 1394 3 one one CD 42149 1394 4 or or CC 42149 1394 5 two two CD 42149 1394 6 short short JJ 42149 1394 7 lengths length NNS 42149 1394 8 , , , 42149 1394 9 however however RB 42149 1394 10 , , , 42149 1394 11 where where WRB 42149 1394 12 it -PRON- PRP 42149 1394 13 was be VBD 42149 1394 14 less less JJR 42149 1394 15 , , , 42149 1394 16 for for IN 42149 1394 17 , , , 42149 1394 18 if if IN 42149 1394 19 the the DT 42149 1394 20 arch arch JJ 42149 1394 21 thickness thickness NN 42149 1394 22 requirement requirement NN 42149 1394 23 had have VBD 42149 1394 24 been be VBN 42149 1394 25 adhered adhere VBN 42149 1394 26 to to IN 42149 1394 27 , , , 42149 1394 28 it -PRON- PRP 42149 1394 29 would would MD 42149 1394 30 have have VB 42149 1394 31 resulted result VBN 42149 1394 32 in in IN 42149 1394 33 a a DT 42149 1394 34 break break NN 42149 1394 35 of of IN 42149 1394 36 line line NN 42149 1394 37 or or CC 42149 1394 38 grade grade NN 42149 1394 39 for for IN 42149 1394 40 the the DT 42149 1394 41 sake sake NN 42149 1394 42 of of IN 42149 1394 43 perhaps perhaps RB 42149 1394 44 only only RB 42149 1394 45 a a DT 42149 1394 46 few few JJ 42149 1394 47 feet foot NNS 42149 1394 48 of of IN 42149 1394 49 thin thin JJ 42149 1394 50 arch arch NN 42149 1394 51 , , , 42149 1394 52 and and CC 42149 1394 53 it -PRON- PRP 42149 1394 54 was be VBD 42149 1394 55 here here RB 42149 1394 56 that that IN 42149 1394 57 the the DT 42149 1394 58 sub sub NN 42149 1394 59 - - NNS 42149 1394 60 types type NNS 42149 1394 61 came come VBD 42149 1394 62 into into IN 42149 1394 63 play play NN 42149 1394 64 . . . 42149 1395 1 Sub Sub NNP 42149 1395 2 - - HYPH 42149 1395 3 type type NNP 42149 1395 4 1 1 CD 42149 1395 5 was be VBD 42149 1395 6 used use VBN 42149 1395 7 where where WRB 42149 1395 8 the the DT 42149 1395 9 arch arch NN 42149 1395 10 was be VBD 42149 1395 11 less less JJR 42149 1395 12 than than IN 42149 1395 13 1 1 CD 42149 1395 14 ft ft NN 42149 1395 15 . . NNP 42149 1395 16 6 6 CD 42149 1395 17 in in IN 42149 1395 18 . . . 42149 1396 1 thick thick JJ 42149 1396 2 at at IN 42149 1396 3 the the DT 42149 1396 4 top top NN 42149 1396 5 . . . 42149 1397 1 The the DT 42149 1397 2 extra extra JJ 42149 1397 3 reinforcement reinforcement NN 42149 1397 4 here here RB 42149 1397 5 consisted consist VBD 42149 1397 6 of of IN 42149 1397 7 1-in 1-in CD 42149 1397 8 . . . 42149 1398 1 square square JJ 42149 1398 2 twisted twisted JJ 42149 1398 3 rods rod NNS 42149 1398 4 , , , 42149 1398 5 16 16 CD 42149 1398 6 ft ft NN 42149 1398 7 . . NNP 42149 1398 8 long long RB 42149 1398 9 , , , 42149 1398 10 laid lay VBN 42149 1398 11 circumferentially circumferentially RB 42149 1398 12 in in IN 42149 1398 13 the the DT 42149 1398 14 crown crown NN 42149 1398 15 at at IN 42149 1398 16 10-in 10-in CD 42149 1398 17 . . . 42149 1399 1 centers center NNS 42149 1399 2 . . . 42149 1400 1 Sub Sub NNP 42149 1400 2 - - HYPH 42149 1400 3 type type NNP 42149 1400 4 2 2 CD 42149 1400 5 was be VBD 42149 1400 6 used use VBN 42149 1400 7 where where WRB 42149 1400 8 the the DT 42149 1400 9 arch arch NN 42149 1400 10 was be VBD 42149 1400 11 less less JJR 42149 1400 12 than than IN 42149 1400 13 1 1 CD 42149 1400 14 ft ft NN 42149 1400 15 . . NNP 42149 1400 16 6 6 CD 42149 1400 17 in in IN 42149 1400 18 . . . 42149 1401 1 thick thick JJ 42149 1401 2 at at IN 42149 1401 3 the the DT 42149 1401 4 side side NN 42149 1401 5 . . . 42149 1402 1 The the DT 42149 1402 2 extra extra JJ 42149 1402 3 reinforcement reinforcement NN 42149 1402 4 here here RB 42149 1402 5 consisted consist VBD 42149 1402 6 of of IN 42149 1402 7 1-in 1-in CD 42149 1402 8 . . . 42149 1403 1 square square JJ 42149 1403 2 twisted twisted JJ 42149 1403 3 rods rod NNS 42149 1403 4 , , , 42149 1403 5 16 16 CD 42149 1403 6 ft ft NN 42149 1403 7 . . NNP 42149 1403 8 long long RB 42149 1403 9 , , , 42149 1403 10 laid lay VBN 42149 1403 11 circumferentially circumferentially RB 42149 1403 12 , , , 42149 1403 13 at at IN 42149 1403 14 the the DT 42149 1403 15 side side NN 42149 1403 16 on on IN 42149 1403 17 which which WDT 42149 1403 18 the the DT 42149 1403 19 concrete concrete NN 42149 1403 20 was be VBD 42149 1403 21 thin thin JJ 42149 1403 22 , , , 42149 1403 23 at at IN 42149 1403 24 10-in 10-in CD 42149 1403 25 . . . 42149 1404 1 centers center NNS 42149 1404 2 . . . 42149 1405 1 Very very RB 42149 1405 2 little little JJ 42149 1405 3 of of IN 42149 1405 4 either either DT 42149 1405 5 of of IN 42149 1405 6 these these DT 42149 1405 7 two two CD 42149 1405 8 sub sub NNS 42149 1405 9 - - NNS 42149 1405 10 types type NNS 42149 1405 11 was be VBD 42149 1405 12 used use VBN 42149 1405 13 . . . 42149 1406 1 The the DT 42149 1406 2 entire entire JJ 42149 1406 3 scheme scheme NN 42149 1406 4 is be VBZ 42149 1406 5 shown show VBN 42149 1406 6 graphically graphically RB 42149 1406 7 and and CC 42149 1406 8 clearly clearly RB 42149 1406 9 on on IN 42149 1406 10 Plate plate NN 42149 1406 11 XXXVII XXXVII NNP 42149 1406 12 . . . 42149 1407 1 _ _ NNP 42149 1407 2 Cross Cross NNP 42149 1407 3 - - NNP 42149 1407 4 Passage Passage NNP 42149 1407 5 Lining._--There Lining._--There -LRB- 42149 1407 6 are be VBP 42149 1407 7 two two CD 42149 1407 8 main main JJ 42149 1407 9 types type NNS 42149 1407 10 of of IN 42149 1407 11 cross cross NN 42149 1407 12 - - NNS 42149 1407 13 passages passage NNS 42149 1407 14 : : : 42149 1407 15 Lined line VBN 42149 1407 16 with with IN 42149 1407 17 steel steel NN 42149 1407 18 plates plate NNS 42149 1407 19 , , , 42149 1407 20 and and CC 42149 1407 21 unlined unlined JJ 42149 1407 22 . . . 42149 1408 1 There there EX 42149 1408 2 is be VBZ 42149 1408 3 only only RB 42149 1408 4 one one CD 42149 1408 5 example example NN 42149 1408 6 of of IN 42149 1408 7 lining line VBG 42149 1408 8 with with IN 42149 1408 9 steel steel NN 42149 1408 10 plates plate NNS 42149 1408 11 , , , 42149 1408 12 namely namely RB 42149 1408 13 , , , 42149 1408 14 the the DT 42149 1408 15 most most RBS 42149 1408 16 western western JJ 42149 1408 17 one one NN 42149 1408 18 at at IN 42149 1408 19 Weehawken Weehawken NNP 42149 1408 20 . . . 42149 1409 1 This this DT 42149 1409 2 is be VBZ 42149 1409 3 built build VBN 42149 1409 4 in in IN 42149 1409 5 rock rock NN 42149 1409 6 which which WDT 42149 1409 7 carried carry VBD 42149 1409 8 so so RB 42149 1409 9 much much JJ 42149 1409 10 water water NN 42149 1409 11 that that IN 42149 1409 12 , , , 42149 1409 13 in in IN 42149 1409 14 order order NN 42149 1409 15 to to TO 42149 1409 16 keep keep VB 42149 1409 17 the the DT 42149 1409 18 tunnels tunnel NNS 42149 1409 19 and and CC 42149 1409 20 the the DT 42149 1409 21 passage passage NN 42149 1409 22 dry dry JJ 42149 1409 23 , , , 42149 1409 24 it -PRON- PRP 42149 1409 25 was be VBD 42149 1409 26 decided decide VBN 42149 1409 27 to to TO 42149 1409 28 build build VB 42149 1409 29 a a DT 42149 1409 30 concrete concrete NN 42149 1409 31 - - HYPH 42149 1409 32 lined line VBN 42149 1409 33 passage passage NN 42149 1409 34 , , , 42149 1409 35 without without IN 42149 1409 36 attempting attempt VBG 42149 1409 37 to to TO 42149 1409 38 stop stop VB 42149 1409 39 the the DT 42149 1409 40 flow flow NN 42149 1409 41 of of IN 42149 1409 42 water water NN 42149 1409 43 , , , 42149 1409 44 and and CC 42149 1409 45 within within IN 42149 1409 46 this this DT 42149 1409 47 to to TO 42149 1409 48 place place VB 42149 1409 49 a a DT 42149 1409 50 riveted rivet VBN 42149 1409 51 steel steel NN 42149 1409 52 lining lining NN 42149 1409 53 , , , 42149 1409 54 not not RB 42149 1409 55 in in IN 42149 1409 56 contact contact NN 42149 1409 57 with with IN 42149 1409 58 the the DT 42149 1409 59 concrete concrete NN 42149 1409 60 , , , 42149 1409 61 but but CC 42149 1409 62 with with IN 42149 1409 63 a a DT 42149 1409 64 space space NN 42149 1409 65 between between IN 42149 1409 66 the the DT 42149 1409 67 two two CD 42149 1409 68 . . . 42149 1410 1 This this DT 42149 1410 2 space space NN 42149 1410 3 was be VBD 42149 1410 4 drained drain VBN 42149 1410 5 and and CC 42149 1410 6 the the DT 42149 1410 7 water water NN 42149 1410 8 led lead VBD 42149 1410 9 back back RB 42149 1410 10 to to IN 42149 1410 11 the the DT 42149 1410 12 shield shield NN 42149 1410 13 chamber chamber NN 42149 1410 14 and and CC 42149 1410 15 thence thence NN 42149 1410 16 to to IN 42149 1410 17 the the DT 42149 1410 18 Weehawken Weehawken NNP 42149 1410 19 Shaft Shaft NNP 42149 1410 20 sump sump NN 42149 1410 21 . . . 42149 1411 1 The the DT 42149 1411 2 interior interior NN 42149 1411 3 of of IN 42149 1411 4 the the DT 42149 1411 5 steel steel NN 42149 1411 6 lining lining NN 42149 1411 7 is be VBZ 42149 1411 8 covered cover VBN 42149 1411 9 with with IN 42149 1411 10 concrete concrete NN 42149 1411 11 . . . 42149 1412 1 In in IN 42149 1412 2 the the DT 42149 1412 3 passages passage NNS 42149 1412 4 not not RB 42149 1412 5 lined line VBN 42149 1412 6 with with IN 42149 1412 7 steel steel NN 42149 1412 8 plates plate NNS 42149 1412 9 the the DT 42149 1412 10 square square JJ 42149 1412 11 concrete concrete JJ 42149 1412 12 lining lining NN 42149 1412 13 is be VBZ 42149 1412 14 rendered render VBN 42149 1412 15 on on IN 42149 1412 16 the the DT 42149 1412 17 inside inside NN 42149 1412 18 with with IN 42149 1412 19 a a DT 42149 1412 20 water water NN 42149 1412 21 - - HYPH 42149 1412 22 proof proof NN 42149 1412 23 plaster plaster NN 42149 1412 24 . . . 42149 1413 1 Each each DT 42149 1413 2 of of IN 42149 1413 3 the the DT 42149 1413 4 passages passage NNS 42149 1413 5 is be VBZ 42149 1413 6 provided provide VBN 42149 1413 7 with with IN 42149 1413 8 a a DT 42149 1413 9 steel steel NN 42149 1413 10 door door NN 42149 1413 11 . . . 42149 1414 1 _ _ NNP 42149 1414 2 Provisions Provisions NNPS 42149 1414 3 in in IN 42149 1414 4 Concrete Concrete NNP 42149 1414 5 Lining Lining NNP 42149 1414 6 for for IN 42149 1414 7 Surveys Surveys NNP 42149 1414 8 and and CC 42149 1414 9 Observations._--The observations._--the CD 42149 1414 10 long long JJ 42149 1414 11 protracted protract VBN 42149 1414 12 discussion discussion NN 42149 1414 13 as as IN 42149 1414 14 to to IN 42149 1414 15 the the DT 42149 1414 16 provision provision NN 42149 1414 17 for for IN 42149 1414 18 foundations foundation NNS 42149 1414 19 in in IN 42149 1414 20 these these DT 42149 1414 21 tunnels tunnel NNS 42149 1414 22 led lead VBD 42149 1414 23 to to IN 42149 1414 24 many many JJ 42149 1414 25 surveys survey NNS 42149 1414 26 , , , 42149 1414 27 tests test NNS 42149 1414 28 , , , 42149 1414 29 and and CC 42149 1414 30 observations observation NNS 42149 1414 31 , , , 42149 1414 32 which which WDT 42149 1414 33 were be VBD 42149 1414 34 carried carry VBN 42149 1414 35 out out RP 42149 1414 36 during during IN 42149 1414 37 the the DT 42149 1414 38 constructive constructive JJ 42149 1414 39 period period NN 42149 1414 40 , , , 42149 1414 41 and and CC 42149 1414 42 , , , 42149 1414 43 as as IN 42149 1414 44 it -PRON- PRP 42149 1414 45 was be VBD 42149 1414 46 desired desire VBN 42149 1414 47 to to TO 42149 1414 48 continue continue VB 42149 1414 49 as as RB 42149 1414 50 many many JJ 42149 1414 51 of of IN 42149 1414 52 these these DT 42149 1414 53 observations observation NNS 42149 1414 54 as as IN 42149 1414 55 possible possible JJ 42149 1414 56 up up IN 42149 1414 57 to to IN 42149 1414 58 and and CC 42149 1414 59 after after IN 42149 1414 60 the the DT 42149 1414 61 time time NN 42149 1414 62 when when WRB 42149 1414 63 traffic traffic NN 42149 1414 64 started start VBD 42149 1414 65 , , , 42149 1414 66 certain certain JJ 42149 1414 67 provisions provision NNS 42149 1414 68 were be VBD 42149 1414 69 made make VBN 42149 1414 70 in in IN 42149 1414 71 the the DT 42149 1414 72 concrete concrete JJ 42149 1414 73 lining line VBG 42149 1414 74 whereby whereby WRB 42149 1414 75 these these DT 42149 1414 76 requirements requirement NNS 42149 1414 77 might may MD 42149 1414 78 be be VB 42149 1414 79 fulfilled fulfil VBN 42149 1414 80 . . . 42149 1415 1 The the DT 42149 1415 2 chief chief JJ 42149 1415 3 points point NNS 42149 1415 4 on on IN 42149 1415 5 which which WDT 42149 1415 6 information information NN 42149 1415 7 was be VBD 42149 1415 8 desired desire VBN 42149 1415 9 were be VBD 42149 1415 10 as as IN 42149 1415 11 follows follow VBZ 42149 1415 12 : : : 42149 1415 13 The the DT 42149 1415 14 change change NN 42149 1415 15 in in IN 42149 1415 16 elevation elevation NN 42149 1415 17 of of IN 42149 1415 18 the the DT 42149 1415 19 tunnel tunnel NN 42149 1415 20 , , , 42149 1415 21 The the DT 42149 1415 22 change change NN 42149 1415 23 in in IN 42149 1415 24 lateral lateral JJ 42149 1415 25 position position NN 42149 1415 26 of of IN 42149 1415 27 the the DT 42149 1415 28 tunnel tunnel NN 42149 1415 29 , , , 42149 1415 30 The the DT 42149 1415 31 change change NN 42149 1415 32 in in IN 42149 1415 33 shape shape NN 42149 1415 34 of of IN 42149 1415 35 the the DT 42149 1415 36 tunnel tunnel NN 42149 1415 37 , , , 42149 1415 38 The the DT 42149 1415 39 tidal tidal JJ 42149 1415 40 oscillation oscillation NN 42149 1415 41 of of IN 42149 1415 42 the the DT 42149 1415 43 tunnel tunnel NN 42149 1415 44 . . . 42149 1416 1 A a DT 42149 1416 2 detailed detailed JJ 42149 1416 3 account account NN 42149 1416 4 of of IN 42149 1416 5 these these DT 42149 1416 6 observations observation NNS 42149 1416 7 will will MD 42149 1416 8 be be VB 42149 1416 9 found find VBN 42149 1416 10 in in IN 42149 1416 11 another another DT 42149 1416 12 paper paper NN 42149 1416 13 on on IN 42149 1416 14 this this DT 42149 1416 15 work work NN 42149 1416 16 , , , 42149 1416 17 but but CC 42149 1416 18 it -PRON- PRP 42149 1416 19 may may MD 42149 1416 20 be be VB 42149 1416 21 said say VBN 42149 1416 22 now now RB 42149 1416 23 that that IN 42149 1416 24 it -PRON- PRP 42149 1416 25 was be VBD 42149 1416 26 very very RB 42149 1416 27 desirable desirable JJ 42149 1416 28 to to TO 42149 1416 29 be be VB 42149 1416 30 able able JJ 42149 1416 31 to to TO 42149 1416 32 get get VB 42149 1416 33 this this DT 42149 1416 34 information information NN 42149 1416 35 independently independently RB 42149 1416 36 of of IN 42149 1416 37 the the DT 42149 1416 38 traffic traffic NN 42149 1416 39 as as RB 42149 1416 40 far far RB 42149 1416 41 as as IN 42149 1416 42 possible possible JJ 42149 1416 43 , , , 42149 1416 44 and and CC 42149 1416 45 therefore therefore RB 42149 1416 46 provision provision NN 42149 1416 47 was be VBD 42149 1416 48 made make VBN 42149 1416 49 for for IN 42149 1416 50 carrying carry VBG 42149 1416 51 on on IN 42149 1416 52 the the DT 42149 1416 53 observations observation NNS 42149 1416 54 from from IN 42149 1416 55 the the DT 42149 1416 56 side side NN 42149 1416 57 benches bench NNS 42149 1416 58 . . . 42149 1417 1 For for IN 42149 1417 2 studying study VBG 42149 1417 3 the the DT 42149 1417 4 changes change NNS 42149 1417 5 in in IN 42149 1417 6 level level NN 42149 1417 7 of of IN 42149 1417 8 the the DT 42149 1417 9 tunnel tunnel NN 42149 1417 10 , , , 42149 1417 11 a a DT 42149 1417 12 permanent permanent JJ 42149 1417 13 bench bench NN 42149 1417 14 - - HYPH 42149 1417 15 mark mark NN 42149 1417 16 is be VBZ 42149 1417 17 established establish VBN 42149 1417 18 in in IN 42149 1417 19 each each DT 42149 1417 20 tunnel tunnel NN 42149 1417 21 where where WRB 42149 1417 22 it -PRON- PRP 42149 1417 23 is be VBZ 42149 1417 24 in in IN 42149 1417 25 the the DT 42149 1417 26 solid solid JJ 42149 1417 27 rock rock NN 42149 1417 28 and and CC 42149 1417 29 therefore therefore RB 42149 1417 30 not not RB 42149 1417 31 subject subject JJ 42149 1417 32 to to IN 42149 1417 33 changes change NNS 42149 1417 34 of of IN 42149 1417 35 elevation elevation NN 42149 1417 36 ; ; : 42149 1417 37 throughout throughout IN 42149 1417 38 the the DT 42149 1417 39 tunnel tunnel NN 42149 1417 40 , , , 42149 1417 41 brass brass NN 42149 1417 42 studs stud NNS 42149 1417 43 are be VBP 42149 1417 44 set set VBN 42149 1417 45 in in IN 42149 1417 46 the the DT 42149 1417 47 bench bench NN 42149 1417 48 at at IN 42149 1417 49 intervals interval NNS 42149 1417 50 of of IN 42149 1417 51 about about RB 42149 1417 52 300 300 CD 42149 1417 53 ft ft NN 42149 1417 54 . . . 42149 1417 55 A a DT 42149 1417 56 series series NN 42149 1417 57 of of IN 42149 1417 58 levels level NNS 42149 1417 59 is be VBZ 42149 1417 60 run run VBN 42149 1417 61 every every DT 42149 1417 62 month month NN 42149 1417 63 from from IN 42149 1417 64 the the DT 42149 1417 65 stable stable JJ 42149 1417 66 bench bench NN 42149 1417 67 - - HYPH 42149 1417 68 mark mark NN 42149 1417 69 on on IN 42149 1417 70 each each DT 42149 1417 71 of of IN 42149 1417 72 these these DT 42149 1417 73 brass brass NN 42149 1417 74 plugs plug NNS 42149 1417 75 , , , 42149 1417 76 thus thus RB 42149 1417 77 obtaining obtain VBG 42149 1417 78 an an DT 42149 1417 79 indication indication NN 42149 1417 80 of of IN 42149 1417 81 the the DT 42149 1417 82 change change NN 42149 1417 83 of of IN 42149 1417 84 elevation elevation NN 42149 1417 85 that that IN 42149 1417 86 the the DT 42149 1417 87 tunnels tunnel NNS 42149 1417 88 have have VBP 42149 1417 89 undergone undergo VBN 42149 1417 90 during during IN 42149 1417 91 the the DT 42149 1417 92 month month NN 42149 1417 93 . . . 42149 1418 1 These these DT 42149 1418 2 results result NNS 42149 1418 3 are be VBP 42149 1418 4 checked check VBN 42149 1418 5 on on IN 42149 1418 6 permanent permanent JJ 42149 1418 7 bench bench NN 42149 1418 8 - - HYPH 42149 1418 9 marks mark NNS 42149 1418 10 in in IN 42149 1418 11 the the DT 42149 1418 12 subaqueous subaqueous JJ 42149 1418 13 portion portion NN 42149 1418 14 of of IN 42149 1418 15 the the DT 42149 1418 16 tunnels tunnel NNS 42149 1418 17 . . . 42149 1419 1 These these DT 42149 1419 2 consist consist VBP 42149 1419 3 of of IN 42149 1419 4 rods rod NNS 42149 1419 5 , , , 42149 1419 6 encased encase VBN 42149 1419 7 in in IN 42149 1419 8 pipes pipe NNS 42149 1419 9 of of IN 42149 1419 10 larger large JJR 42149 1419 11 diameter diameter NN 42149 1419 12 , , , 42149 1419 13 which which WDT 42149 1419 14 extend extend VBP 42149 1419 15 down down RP 42149 1419 16 through through IN 42149 1419 17 the the DT 42149 1419 18 tunnel tunnel NNP 42149 1419 19 invert invert NNP 42149 1419 20 into into IN 42149 1419 21 the the DT 42149 1419 22 bed bed NN 42149 1419 23 - - HYPH 42149 1419 24 rock rock NN 42149 1419 25 below below IN 42149 1419 26 the the DT 42149 1419 27 tunnel tunnel NN 42149 1419 28 . . . 42149 1420 1 Leakage leakage NN 42149 1420 2 is be VBZ 42149 1420 3 kept keep VBN 42149 1420 4 out out RP 42149 1420 5 by by IN 42149 1420 6 a a DT 42149 1420 7 stuffing stuffing NN 42149 1420 8 - - HYPH 42149 1420 9 box box NN 42149 1420 10 in in IN 42149 1420 11 the the DT 42149 1420 12 invert invert NN 42149 1420 13 . . . 42149 1421 1 By by IN 42149 1421 2 measuring measure VBG 42149 1421 3 between between IN 42149 1421 4 a a DT 42149 1421 5 point point NN 42149 1421 6 on on IN 42149 1421 7 these these DT 42149 1421 8 rods rod NNS 42149 1421 9 where where WRB 42149 1421 10 they -PRON- PRP 42149 1421 11 pass pass VBP 42149 1421 12 through through IN 42149 1421 13 the the DT 42149 1421 14 invert invert NN 42149 1421 15 and and CC 42149 1421 16 the the DT 42149 1421 17 tunnel tunnel NN 42149 1421 18 itself -PRON- PRP 42149 1421 19 a a DT 42149 1421 20 direct direct JJ 42149 1421 21 reading reading NN 42149 1421 22 of of IN 42149 1421 23 the the DT 42149 1421 24 change change NN 42149 1421 25 of of IN 42149 1421 26 elevation elevation NN 42149 1421 27 of of IN 42149 1421 28 the the DT 42149 1421 29 tunnel tunnel NN 42149 1421 30 is be VBZ 42149 1421 31 obtained obtain VBN 42149 1421 32 . . . 42149 1422 1 These these DT 42149 1422 2 measurements measurement NNS 42149 1422 3 are be VBP 42149 1422 4 taken take VBN 42149 1422 5 at at IN 42149 1422 6 weekly weekly JJ 42149 1422 7 intervals interval NNS 42149 1422 8 , , , 42149 1422 9 and and CC 42149 1422 10 , , , 42149 1422 11 as as IN 42149 1422 12 the the DT 42149 1422 13 tunnels tunnel NNS 42149 1422 14 are be VBP 42149 1422 15 subject subject JJ 42149 1422 16 to to IN 42149 1422 17 tidal tidal JJ 42149 1422 18 influences influence NNS 42149 1422 19 , , , 42149 1422 20 being be VBG 42149 1422 21 lower low JJR 42149 1422 22 at at IN 42149 1422 23 high high JJ 42149 1422 24 tide tide NN 42149 1422 25 than than IN 42149 1422 26 at at IN 42149 1422 27 low low JJ 42149 1422 28 tide tide NN 42149 1422 29 , , , 42149 1422 30 are be VBP 42149 1422 31 always always RB 42149 1422 32 taken take VBN 42149 1422 33 under under IN 42149 1422 34 the the DT 42149 1422 35 same same JJ 42149 1422 36 conditions condition NNS 42149 1422 37 as as IN 42149 1422 38 to to IN 42149 1422 39 height height NN 42149 1422 40 of of IN 42149 1422 41 water water NN 42149 1422 42 in in IN 42149 1422 43 the the DT 42149 1422 44 river river NN 42149 1422 45 . . . 42149 1423 1 These these DT 42149 1423 2 permanent permanent JJ 42149 1423 3 bench bench NN 42149 1423 4 - - HYPH 42149 1423 5 marks mark NNS 42149 1423 6 are be VBP 42149 1423 7 at at IN 42149 1423 8 Stations station NNS 42149 1423 9 209 209 CD 42149 1423 10 + + SYM 42149 1423 11 05 05 CD 42149 1423 12 and and CC 42149 1423 13 256 256 CD 42149 1423 14 + + SYM 42149 1423 15 02 02 CD 42149 1423 16 ( ( -LRB- 42149 1423 17 about about RB 42149 1423 18 100 100 CD 42149 1423 19 ft ft NN 42149 1423 20 . . NNP 42149 1423 21 on on IN 42149 1423 22 the the DT 42149 1423 23 shoreward shoreward NN 42149 1423 24 side side NN 42149 1423 25 of of IN 42149 1423 26 the the DT 42149 1423 27 river river NN 42149 1423 28 line line NN 42149 1423 29 in in IN 42149 1423 30 each each DT 42149 1423 31 case case NN 42149 1423 32 ) ) -RRB- 42149 1423 33 in in IN 42149 1423 34 the the DT 42149 1423 35 South South NNP 42149 1423 36 Tunnel Tunnel NNP 42149 1423 37 , , , 42149 1423 38 at at IN 42149 1423 39 Stations station NNS 42149 1423 40 220 220 CD 42149 1423 41 + + SYM 42149 1423 42 00 00 CD 42149 1423 43 and and CC 42149 1423 44 243 243 CD 42149 1423 45 + + SYM 42149 1423 46 86 86 CD 42149 1423 47 , , , 42149 1423 48 also also RB 42149 1423 49 in in IN 42149 1423 50 the the DT 42149 1423 51 South South NNP 42149 1423 52 Tunnel Tunnel NNP 42149 1423 53 , , , 42149 1423 54 and and CC 42149 1423 55 at at IN 42149 1423 56 Station Station NNP 42149 1423 57 231 231 CD 42149 1423 58 + + SYM 42149 1423 59 78 78 CD 42149 1423 60 in in IN 42149 1423 61 the the DT 42149 1423 62 North North NNP 42149 1423 63 Tunnel Tunnel NNP 42149 1423 64 . . . 42149 1424 1 In in IN 42149 1424 2 order order NN 42149 1424 3 to to TO 42149 1424 4 study study VB 42149 1424 5 the the DT 42149 1424 6 lateral lateral JJ 42149 1424 7 change change NN 42149 1424 8 of of IN 42149 1424 9 position position NN 42149 1424 10 , , , 42149 1424 11 a a DT 42149 1424 12 base base NN 42149 1424 13 line line NN 42149 1424 14 was be VBD 42149 1424 15 established establish VBN 42149 1424 16 on on IN 42149 1424 17 the the DT 42149 1424 18 side side NN 42149 1424 19 bench bench NN 42149 1424 20 at at IN 42149 1424 21 each each DT 42149 1424 22 end end NN 42149 1424 23 of of IN 42149 1424 24 each each DT 42149 1424 25 tunnel tunnel NN 42149 1424 26 in in IN 42149 1424 27 the the DT 42149 1424 28 portion portion NN 42149 1424 29 built build VBN 42149 1424 30 through through IN 42149 1424 31 the the DT 42149 1424 32 solid solid JJ 42149 1424 33 rock rock NN 42149 1424 34 . . . 42149 1425 1 At at IN 42149 1425 2 intervals interval NNS 42149 1425 3 of of IN 42149 1425 4 about about RB 42149 1425 5 300 300 CD 42149 1425 6 ft ft NN 42149 1425 7 . . NN 42149 1425 8 throughout throughout IN 42149 1425 9 each each DT 42149 1425 10 tunnel tunnel NN 42149 1425 11 , , , 42149 1425 12 alignment alignment NN 42149 1425 13 pockets pocket NNS 42149 1425 14 are be VBP 42149 1425 15 formed form VBN 42149 1425 16 in in IN 42149 1425 17 the the DT 42149 1425 18 concrete concrete NN 42149 1425 19 arch arch NN 42149 1425 20 , , , 42149 1425 21 also also RB 42149 1425 22 above above IN 42149 1425 23 the the DT 42149 1425 24 bench bench NN 42149 1425 25 , , , 42149 1425 26 on on IN 42149 1425 27 the the DT 42149 1425 28 south south JJ 42149 1425 29 bench bench NN 42149 1425 30 of of IN 42149 1425 31 the the DT 42149 1425 32 North North NNP 42149 1425 33 Tunnel Tunnel NNP 42149 1425 34 and and CC 42149 1425 35 the the DT 42149 1425 36 north north JJ 42149 1425 37 bench bench NN 42149 1425 38 of of IN 42149 1425 39 the the DT 42149 1425 40 South South NNP 42149 1425 41 Tunnel Tunnel NNP 42149 1425 42 . . . 42149 1426 1 In in IN 42149 1426 2 each each DT 42149 1426 3 pocket pocket NN 42149 1426 4 is be VBZ 42149 1426 5 placed place VBN 42149 1426 6 a a DT 42149 1426 7 graduated graduate VBN 42149 1426 8 and and CC 42149 1426 9 verniered verniere VBN 42149 1426 10 brass brass NN 42149 1426 11 bar bar NN 42149 1426 12 , , , 42149 1426 13 so so IN 42149 1426 14 that that IN 42149 1426 15 , , , 42149 1426 16 when when WRB 42149 1426 17 the the DT 42149 1426 18 base base NN 42149 1426 19 line line NN 42149 1426 20 is be VBZ 42149 1426 21 projected project VBN 42149 1426 22 on on IN 42149 1426 23 these these DT 42149 1426 24 bars bar NNS 42149 1426 25 , , , 42149 1426 26 the the DT 42149 1426 27 lateral lateral JJ 42149 1426 28 movement movement NN 42149 1426 29 of of IN 42149 1426 30 the the DT 42149 1426 31 tunnel tunnel NN 42149 1426 32 can can MD 42149 1426 33 be be VB 42149 1426 34 read read VBN 42149 1426 35 directly directly RB 42149 1426 36 . . . 42149 1427 1 As as IN 42149 1427 2 it -PRON- PRP 42149 1427 3 was be VBD 42149 1427 4 desirable desirable JJ 42149 1427 5 to to TO 42149 1427 6 have have VB 42149 1427 7 as as RB 42149 1427 8 much much JJ 42149 1427 9 cross cross NN 42149 1427 10 - - NN 42149 1427 11 connection connection NN 42149 1427 12 as as IN 42149 1427 13 possible possible JJ 42149 1427 14 between between IN 42149 1427 15 the the DT 42149 1427 16 tunnels tunnel NNS 42149 1427 17 at at IN 42149 1427 18 the the DT 42149 1427 19 points point NNS 42149 1427 20 where where WRB 42149 1427 21 the the DT 42149 1427 22 instruments instrument NNS 42149 1427 23 were be VBD 42149 1427 24 to to TO 42149 1427 25 be be VB 42149 1427 26 set set VBN 42149 1427 27 up up RP 42149 1427 28 , , , 42149 1427 29 five five CD 42149 1427 30 of of IN 42149 1427 31 the the DT 42149 1427 32 main main JJ 42149 1427 33 survey survey NN 42149 1427 34 stations station NNS 42149 1427 35 were be VBD 42149 1427 36 set set VBN 42149 1427 37 opposite opposite IN 42149 1427 38 each each DT 42149 1427 39 of of IN 42149 1427 40 the the DT 42149 1427 41 five five CD 42149 1427 42 cross cross NN 42149 1427 43 - - NNS 42149 1427 44 passages passage NNS 42149 1427 45 . . . 42149 1428 1 Then then RB 42149 1428 2 , , , 42149 1428 3 for for IN 42149 1428 4 the the DT 42149 1428 5 purpose purpose NN 42149 1428 6 of of IN 42149 1428 7 increasing increase VBG 42149 1428 8 the the DT 42149 1428 9 cross cross JJ 42149 1428 10 - - NN 42149 1428 11 connection connection NN 42149 1428 12 still still RB 42149 1428 13 further far RBR 42149 1428 14 , , , 42149 1428 15 pipes pipe VBZ 42149 1428 16 6 6 CD 42149 1428 17 in in IN 42149 1428 18 . . . 42149 1429 1 in in IN 42149 1429 2 diameter diameter NN 42149 1429 3 were be VBD 42149 1429 4 put put VBN 42149 1429 5 through through RP 42149 1429 6 from from IN 42149 1429 7 one one CD 42149 1429 8 tunnel tunnel NN 42149 1429 9 to to IN 42149 1429 10 the the DT 42149 1429 11 other other JJ 42149 1429 12 at at IN 42149 1429 13 axis axis JJ 42149 1429 14 level level NN 42149 1429 15 at at IN 42149 1429 16 Stations station NNS 42149 1429 17 220 220 CD 42149 1429 18 + + SYM 42149 1429 19 60 60 CD 42149 1429 20 , , , 42149 1429 21 231 231 CD 42149 1429 22 + + SYM 42149 1429 23 78 78 CD 42149 1429 24 , , , 42149 1429 25 234 234 CD 42149 1429 26 + + SYM 42149 1429 27 64 64 CD 42149 1429 28 , , , 42149 1429 29 241 241 CD 42149 1429 30 + + SYM 42149 1429 31 99 99 CD 42149 1429 32 , , , 42149 1429 33 and and CC 42149 1429 34 251 251 CD 42149 1429 35 + + SYM 42149 1429 36 13 13 CD 42149 1429 37 , , , 42149 1429 38 and and CC 42149 1429 39 a a DT 42149 1429 40 survey survey NN 42149 1429 41 station station NN 42149 1429 42 was be VBD 42149 1429 43 put put VBN 42149 1429 44 in in IN 42149 1429 45 opposite opposite IN 42149 1429 46 each each DT 42149 1429 47 one one NN 42149 1429 48 . . . 42149 1430 1 Points point NNS 42149 1430 2 were be VBD 42149 1430 3 established establish VBN 42149 1430 4 at at IN 42149 1430 5 Station Station NNP 42149 1430 6 220 220 CD 42149 1430 7 + + SYM 42149 1430 8 00 00 CD 42149 1430 9 , , , 42149 1430 10 which which WDT 42149 1430 11 is be VBZ 42149 1430 12 the the DT 42149 1430 13 point point NN 42149 1430 14 of of IN 42149 1430 15 intersection intersection NN 42149 1430 16 for for IN 42149 1430 17 the the DT 42149 1430 18 curve curve NN 42149 1430 19 on on IN 42149 1430 20 the the DT 42149 1430 21 original original JJ 42149 1430 22 center center NN 42149 1430 23 line line NN 42149 1430 24 of of IN 42149 1430 25 the the DT 42149 1430 26 tunnel tunnel NN 42149 1430 27 , , , 42149 1430 28 and and CC 42149 1430 29 also also RB 42149 1430 30 at at IN 42149 1430 31 Station Station NNP 42149 1430 32 220 220 CD 42149 1430 33 + + SYM 42149 1430 34 23 23 CD 42149 1430 35 , , , 42149 1430 36 where where WRB 42149 1430 37 the the DT 42149 1430 38 intersection intersection NN 42149 1430 39 of of IN 42149 1430 40 the the DT 42149 1430 41 track track NN 42149 1430 42 center center NN 42149 1430 43 line line NN 42149 1430 44 comes come VBZ 42149 1430 45 in in IN 42149 1430 46 the the DT 42149 1430 47 North North NNP 42149 1430 48 Tunnel Tunnel NNP 42149 1430 49 . . . 42149 1431 1 As as IN 42149 1431 2 it -PRON- PRP 42149 1431 3 was be VBD 42149 1431 4 desirable desirable JJ 42149 1431 5 to to TO 42149 1431 6 have have VB 42149 1431 7 the the DT 42149 1431 8 survey survey NN 42149 1431 9 stations station NNS 42149 1431 10 not not RB 42149 1431 11 much much RB 42149 1431 12 more more JJR 42149 1431 13 than than IN 42149 1431 14 300 300 CD 42149 1431 15 ft ft NN 42149 1431 16 . . NNP 42149 1431 17 apart apart RB 42149 1431 18 , , , 42149 1431 19 so so IN 42149 1431 20 as as IN 42149 1431 21 to to TO 42149 1431 22 obtain obtain VB 42149 1431 23 clear clear JJ 42149 1431 24 sights sight NNS 42149 1431 25 , , , 42149 1431 26 other other JJ 42149 1431 27 stations station NNS 42149 1431 28 were be VBD 42149 1431 29 established establish VBN 42149 1431 30 so so IN 42149 1431 31 that that IN 42149 1431 32 the the DT 42149 1431 33 distances distance NNS 42149 1431 34 between between IN 42149 1431 35 survey survey NN 42149 1431 36 stations station NNS 42149 1431 37 were be VBD 42149 1431 38 at at IN 42149 1431 39 about about IN 42149 1431 40 that that DT 42149 1431 41 interval interval NN 42149 1431 42 . . . 42149 1432 1 For for IN 42149 1432 2 studying study VBG 42149 1432 3 changes change NNS 42149 1432 4 of of IN 42149 1432 5 shape shape NN 42149 1432 6 in in IN 42149 1432 7 the the DT 42149 1432 8 tunnel tunnel NN 42149 1432 9 , , , 42149 1432 10 brass brass NN 42149 1432 11 " " `` 42149 1432 12 diameter diameter NN 42149 1432 13 markers marker NNS 42149 1432 14 " " '' 42149 1432 15 were be VBD 42149 1432 16 inserted insert VBN 42149 1432 17 at at IN 42149 1432 18 each each DT 42149 1432 19 survey survey NN 42149 1432 20 station station NN 42149 1432 21 in in IN 42149 1432 22 the the DT 42149 1432 23 concrete concrete JJ 42149 1432 24 lining lining NN 42149 1432 25 at at IN 42149 1432 26 the the DT 42149 1432 27 extremities extremity NNS 42149 1432 28 of of IN 42149 1432 29 the the DT 42149 1432 30 vertical vertical JJ 42149 1432 31 and and CC 42149 1432 32 horizontal horizontal JJ 42149 1432 33 axes axis NNS 42149 1432 34 . . . 42149 1433 1 These these DT 42149 1433 2 were be VBD 42149 1433 3 pieces piece NNS 42149 1433 4 of of IN 42149 1433 5 brass brass NN 42149 1433 6 bar bar NN 42149 1433 7 , , , 42149 1433 8 3/8 3/8 CD 42149 1433 9 in in IN 42149 1433 10 . . . 42149 1434 1 in in IN 42149 1434 2 diameter diameter NN 42149 1434 3 and and CC 42149 1434 4 6 6 CD 42149 1434 5 in in RB 42149 1434 6 . . . 42149 1435 1 long long RB 42149 1435 2 , , , 42149 1435 3 set set VBN 42149 1435 4 in in IN 42149 1435 5 the the DT 42149 1435 6 concrete concrete NN 42149 1435 7 and and CC 42149 1435 8 projecting project VBG 42149 1435 9 5/8 5/8 CD 42149 1435 10 in in IN 42149 1435 11 . . . 42149 1436 1 into into IN 42149 1436 2 the the DT 42149 1436 3 tunnel tunnel NN 42149 1436 4 , , , 42149 1436 5 so so IN 42149 1436 6 that that IN 42149 1436 7 a a DT 42149 1436 8 tape tape NN 42149 1436 9 could could MD 42149 1436 10 be be VB 42149 1436 11 easily easily RB 42149 1436 12 held hold VBN 42149 1436 13 against against IN 42149 1436 14 the the DT 42149 1436 15 marker marker NN 42149 1436 16 and and CC 42149 1436 17 read read VBD 42149 1436 18 . . . 42149 1437 1 For for IN 42149 1437 2 obtaining obtain VBG 42149 1437 3 the the DT 42149 1437 4 tidal tidal JJ 42149 1437 5 oscillation oscillation NN 42149 1437 6 of of IN 42149 1437 7 elevation elevation NN 42149 1437 8 of of IN 42149 1437 9 the the DT 42149 1437 10 tunnel tunnel NN 42149 1437 11 , , , 42149 1437 12 recording record VBG 42149 1437 13 gauges gauge NNS 42149 1437 14 are be VBP 42149 1437 15 attached attach VBN 42149 1437 16 to to IN 42149 1437 17 the the DT 42149 1437 18 invert invert NN 42149 1437 19 of of IN 42149 1437 20 the the DT 42149 1437 21 tunnel tunnel NN 42149 1437 22 at at IN 42149 1437 23 each each DT 42149 1437 24 of of IN 42149 1437 25 the the DT 42149 1437 26 five five CD 42149 1437 27 permanent permanent JJ 42149 1437 28 bench bench NN 42149 1437 29 - - HYPH 42149 1437 30 marks mark NNS 42149 1437 31 referred refer VBD 42149 1437 32 to to IN 42149 1437 33 above above RB 42149 1437 34 in in IN 42149 1437 35 such such PDT 42149 1437 36 a a DT 42149 1437 37 way way NN 42149 1437 38 that that WDT 42149 1437 39 the the DT 42149 1437 40 recording record VBG 42149 1437 41 pencil pencil NN 42149 1437 42 of of IN 42149 1437 43 the the DT 42149 1437 44 gauge gauge NN 42149 1437 45 is be VBZ 42149 1437 46 actuated actuate VBN 42149 1437 47 by by IN 42149 1437 48 the the DT 42149 1437 49 rod rod NN 42149 1437 50 of of IN 42149 1437 51 the the DT 42149 1437 52 permanent permanent JJ 42149 1437 53 bench bench NN 42149 1437 54 - - HYPH 42149 1437 55 mark mark NN 42149 1437 56 . . . 42149 1438 1 A a DT 42149 1438 2 roll roll NN 42149 1438 3 of of IN 42149 1438 4 graduated graduated JJ 42149 1438 5 paper paper NN 42149 1438 6 is be VBZ 42149 1438 7 driven drive VBN 42149 1438 8 by by IN 42149 1438 9 clock clock NN 42149 1438 10 - - HYPH 42149 1438 11 work work NN 42149 1438 12 below below IN 42149 1438 13 the the DT 42149 1438 14 recording recording NN 42149 1438 15 pencil pencil NN 42149 1438 16 which which WDT 42149 1438 17 thus thus RB 42149 1438 18 marks mark VBZ 42149 1438 19 automatically automatically RB 42149 1438 20 the the DT 42149 1438 21 relative relative JJ 42149 1438 22 movement movement NN 42149 1438 23 between between IN 42149 1438 24 the the DT 42149 1438 25 moving move VBG 42149 1438 26 tunnel tunnel NN 42149 1438 27 and and CC 42149 1438 28 the the DT 42149 1438 29 stable stable JJ 42149 1438 30 rods rod NNS 42149 1438 31 . . . 42149 1439 1 These these DT 42149 1439 2 have have VBP 42149 1439 3 shown show VBN 42149 1439 4 that that IN 42149 1439 5 in in IN 42149 1439 6 the the DT 42149 1439 7 subaqueous subaqueous JJ 42149 1439 8 part part NN 42149 1439 9 of of IN 42149 1439 10 the the DT 42149 1439 11 tunnel tunnel NN 42149 1439 12 there there EX 42149 1439 13 is be VBZ 42149 1439 14 a a DT 42149 1439 15 regular regular JJ 42149 1439 16 tidal tidal JJ 42149 1439 17 fluctuation fluctuation NN 42149 1439 18 of of IN 42149 1439 19 elevation elevation NN 42149 1439 20 , , , 42149 1439 21 the the DT 42149 1439 22 tunnel tunnel NN 42149 1439 23 moving move VBG 42149 1439 24 down down RP 42149 1439 25 as as IN 42149 1439 26 the the DT 42149 1439 27 tide tide NN 42149 1439 28 rises rise VBZ 42149 1439 29 , , , 42149 1439 30 and and CC 42149 1439 31 rising rise VBG 42149 1439 32 again again RB 42149 1439 33 when when WRB 42149 1439 34 the the DT 42149 1439 35 tide tide NN 42149 1439 36 falls fall VBZ 42149 1439 37 . . . 42149 1440 1 For for IN 42149 1440 2 an an DT 42149 1440 3 average average JJ 42149 1440 4 tide tide NN 42149 1440 5 of of IN 42149 1440 6 about about RB 42149 1440 7 5 5 CD 42149 1440 8 ft ft NN 42149 1440 9 . . . 42149 1440 10 the the DT 42149 1440 11 tunnel tunnel NNP 42149 1440 12 oscillation oscillation NN 42149 1440 13 would would MD 42149 1440 14 be be VB 42149 1440 15 about about RB 42149 1440 16 1/8 1/8 CD 42149 1440 17 in in IN 42149 1440 18 . . . 42149 1441 1 Before before IN 42149 1441 2 the the DT 42149 1441 3 concrete concrete JJ 42149 1441 4 lining lining NN 42149 1441 5 was be VBD 42149 1441 6 placed place VBN 42149 1441 7 , , , 42149 1441 8 there there EX 42149 1441 9 was be VBD 42149 1441 10 a a DT 42149 1441 11 tidal tidal JJ 42149 1441 12 change change NN 42149 1441 13 in in IN 42149 1441 14 the the DT 42149 1441 15 shape shape NN 42149 1441 16 of of IN 42149 1441 17 the the DT 42149 1441 18 tunnel tunnel NN 42149 1441 19 , , , 42149 1441 20 which which WDT 42149 1441 21 flattened flatten VBD 42149 1441 22 about about RB 42149 1441 23 1/64 1/64 CD 42149 1441 24 in in RB 42149 1441 25 . . . 42149 1442 1 at at IN 42149 1442 2 high high JJ 42149 1442 3 tide tide NN 42149 1442 4 . . . 42149 1443 1 After after IN 42149 1443 2 the the DT 42149 1443 3 concrete concrete NN 42149 1443 4 lining lining NN 42149 1443 5 was be VBD 42149 1443 6 placed place VBN 42149 1443 7 , , , 42149 1443 8 this this DT 42149 1443 9 distortion distortion NN 42149 1443 10 seemed seem VBD 42149 1443 11 to to TO 42149 1443 12 cease cease VB 42149 1443 13 . . . 42149 1444 1 The the DT 42149 1444 2 general general JJ 42149 1444 3 design design NN 42149 1444 4 and and CC 42149 1444 5 plan plan NN 42149 1444 6 of of IN 42149 1444 7 the the DT 42149 1444 8 work work NN 42149 1444 9 have have VBP 42149 1444 10 been be VBN 42149 1444 11 described describe VBN 42149 1444 12 , , , 42149 1444 13 and and CC 42149 1444 14 before before IN 42149 1444 15 giving give VBG 42149 1444 16 any any DT 42149 1444 17 account account NN 42149 1444 18 of of IN 42149 1444 19 the the DT 42149 1444 20 contractor contractor NN 42149 1444 21 's 's POS 42149 1444 22 methods method NNS 42149 1444 23 in in IN 42149 1444 24 carrying carry VBG 42149 1444 25 it -PRON- PRP 42149 1444 26 out out RP 42149 1444 27 , , , 42149 1444 28 Table table NN 42149 1444 29 22 22 CD 42149 1444 30 , , , 42149 1444 31 showing show VBG 42149 1444 32 the the DT 42149 1444 33 chief chief JJ 42149 1444 34 quantities quantity NNS 42149 1444 35 of of IN 42149 1444 36 work work NN 42149 1444 37 in in IN 42149 1444 38 the the DT 42149 1444 39 river river NN 42149 1444 40 tunnels tunnel NNS 42149 1444 41 , , , 42149 1444 42 is be VBZ 42149 1444 43 presented present VBN 42149 1444 44 . . . 42149 1445 1 Methods method NNS 42149 1445 2 of of IN 42149 1445 3 Construction construction NN 42149 1445 4 . . . 42149 1446 1 The the DT 42149 1446 2 following follow VBG 42149 1446 3 is be VBZ 42149 1446 4 an an DT 42149 1446 5 account account NN 42149 1446 6 of of IN 42149 1446 7 the the DT 42149 1446 8 methods method NNS 42149 1446 9 used use VBN 42149 1446 10 by by IN 42149 1446 11 the the DT 42149 1446 12 contractor contractor NN 42149 1446 13 in in IN 42149 1446 14 carrying carry VBG 42149 1446 15 out out RP 42149 1446 16 the the DT 42149 1446 17 plans plan NNS 42149 1446 18 which which WDT 42149 1446 19 have have VBP 42149 1446 20 already already RB 42149 1446 21 been be VBN 42149 1446 22 described describe VBN 42149 1446 23 . . . 42149 1447 1 First first RB 42149 1447 2 , , , 42149 1447 3 it -PRON- PRP 42149 1447 4 may may MD 42149 1447 5 be be VB 42149 1447 6 well well JJ 42149 1447 7 to to TO 42149 1447 8 point point VB 42149 1447 9 out out RP 42149 1447 10 the the DT 42149 1447 11 sequence sequence NN 42149 1447 12 of of IN 42149 1447 13 events event NNS 42149 1447 14 as as IN 42149 1447 15 they -PRON- PRP 42149 1447 16 developed develop VBD 42149 1447 17 in in IN 42149 1447 18 this this DT 42149 1447 19 work work NN 42149 1447 20 . . . 42149 1448 1 These these DT 42149 1448 2 events event NNS 42149 1448 3 may may MD 42149 1448 4 be be VB 42149 1448 5 divided divide VBN 42149 1448 6 into into IN 42149 1448 7 six six CD 42149 1448 8 periods period NNS 42149 1448 9 . . . 42149 1449 1 _ _ NNP 42149 1449 2 1._--Excavation 1._--excavation CD 42149 1449 3 and and CC 42149 1449 4 Iron Iron NNP 42149 1449 5 Lining Lining NNP 42149 1449 6 : : : 42149 1449 7 June June NNP 42149 1449 8 , , , 42149 1449 9 1903 1903 CD 42149 1449 10 , , , 42149 1449 11 to to IN 42149 1449 12 November November NNP 42149 1449 13 , , , 42149 1449 14 1906 1906 CD 42149 1449 15 ; ; : 42149 1449 16 _ _ NNP 42149 1449 17 2._--Caulking 2._--caulking CD 42149 1449 18 and and CC 42149 1449 19 grummeting grummete VBG 42149 1449 20 the the DT 42149 1449 21 iron iron NN 42149 1449 22 lining lining NN 42149 1449 23 : : : 42149 1449 24 November November NNP 42149 1449 25 , , , 42149 1449 26 1906 1906 CD 42149 1449 27 , , , 42149 1449 28 to to IN 42149 1449 29 June June NNP 42149 1449 30 , , , 42149 1449 31 1907 1907 CD 42149 1449 32 ; ; : 42149 1449 33 _ _ NNP 42149 1449 34 3._--Surveys 3._--Surveys NNP 42149 1449 35 , , , 42149 1449 36 tests test NNS 42149 1449 37 and and CC 42149 1449 38 observations observation NNS 42149 1449 39 : : : 42149 1449 40 April April NNP 42149 1449 41 , , , 42149 1449 42 1907 1907 CD 42149 1449 43 , , , 42149 1449 44 to to IN 42149 1449 45 April April NNP 42149 1449 46 , , , 42149 1449 47 1908 1908 CD 42149 1449 48 ; ; : 42149 1449 49 _ _ NNP 42149 1449 50 4._--Building 4._--building CD 42149 1449 51 cross cross NN 42149 1449 52 - - NNS 42149 1449 53 passages passage NNS 42149 1449 54 and and CC 42149 1449 55 capping cap VBG 42149 1449 56 pile pile NN 42149 1449 57 bores bore NNS 42149 1449 58 : : : 42149 1449 59 April April NNP 42149 1449 60 , , , 42149 1449 61 1908 1908 CD 42149 1449 62 , , , 42149 1449 63 to to IN 42149 1449 64 November November NNP 42149 1449 65 , , , 42149 1449 66 1908 1908 CD 42149 1449 67 ; ; : 42149 1449 68 _ _ NNP 42149 1449 69 5._--Placing 5._--placing CD 42149 1449 70 the the DT 42149 1449 71 concrete concrete JJ 42149 1449 72 lining lining NN 42149 1449 73 : : : 42149 1449 74 November November NNP 42149 1449 75 , , , 42149 1449 76 1908 1908 CD 42149 1449 77 , , , 42149 1449 78 to to IN 42149 1449 79 June June NNP 42149 1449 80 , , , 42149 1449 81 1909 1909 CD 42149 1449 82 ; ; : 42149 1449 83 _ _ NNP 42149 1449 84 6._--Cleaning 6._--cleaning CD 42149 1449 85 up up IN 42149 1449 86 and and CC 42149 1449 87 various various JJ 42149 1449 88 small small JJ 42149 1449 89 works work NNS 42149 1449 90 : : : 42149 1449 91 June June NNP 42149 1449 92 , , , 42149 1449 93 1909 1909 CD 42149 1449 94 , , , 42149 1449 95 to to IN 42149 1449 96 November November NNP 42149 1449 97 , , , 42149 1449 98 1909 1909 CD 42149 1449 99 . . . 42149 1450 1 The the DT 42149 1450 2 tunnels tunnel NNS 42149 1450 3 were be VBD 42149 1450 4 under under IN 42149 1450 5 an an DT 42149 1450 6 average average JJ 42149 1450 7 air air NN 42149 1450 8 pressure pressure NN 42149 1450 9 of of IN 42149 1450 10 25 25 CD 42149 1450 11 lb lb RB 42149 1450 12 . . . 42149 1451 1 per per IN 42149 1451 2 sq sq NNP 42149 1451 3 . . . 42149 1452 1 in in IN 42149 1452 2 . . . 42149 1453 1 above above IN 42149 1453 2 normal normal JJ 42149 1453 3 for for IN 42149 1453 4 all all DT 42149 1453 5 except except IN 42149 1453 6 Periods Periods NNP 42149 1453 7 5 5 CD 42149 1453 8 and and CC 42149 1453 9 6 6 CD 42149 1453 10 , , , 42149 1453 11 during during IN 42149 1453 12 which which WDT 42149 1453 13 times time NNS 42149 1453 14 there there EX 42149 1453 15 was be VBD 42149 1453 16 no no DT 42149 1453 17 air air NN 42149 1453 18 pressure pressure NN 42149 1453 19 in in IN 42149 1453 20 the the DT 42149 1453 21 tunnels tunnel NNS 42149 1453 22 . . . 42149 1454 1 All all PDT 42149 1454 2 the the DT 42149 1454 3 work work NN 42149 1454 4 will will MD 42149 1454 5 be be VB 42149 1454 6 described describe VBN 42149 1454 7 in in IN 42149 1454 8 this this DT 42149 1454 9 paper paper NN 42149 1454 10 except except IN 42149 1454 11 that that IN 42149 1454 12 under under IN 42149 1454 13 Period Period NNP 42149 1454 14 3 3 CD 42149 1454 15 which which WDT 42149 1454 16 will will MD 42149 1454 17 be be VB 42149 1454 18 found find VBN 42149 1454 19 in in IN 42149 1454 20 another another DT 42149 1454 21 paper paper NN 42149 1454 22 . . . 42149 1455 1 _ _ NNP 42149 1455 2 Period Period NNP 42149 1455 3 1.--Excavation 1.--excavation CD 42149 1455 4 and and CC 42149 1455 5 Iron Iron NNP 42149 1455 6 Lining Lining NNP 42149 1455 7 , , , 42149 1455 8 June June NNP 42149 1455 9 , , , 42149 1455 10 1903 1903 CD 42149 1455 11 , , , 42149 1455 12 to to IN 42149 1455 13 November November NNP 42149 1455 14 , , , 42149 1455 15 1906._--Table 1906._--table CD 42149 1455 16 23 23 CD 42149 1455 17 gives give VBZ 42149 1455 18 the the DT 42149 1455 19 chief chief JJ 42149 1455 20 dates date NNS 42149 1455 21 in in IN 42149 1455 22 connection connection NN 42149 1455 23 with with IN 42149 1455 24 this this DT 42149 1455 25 period period NN 42149 1455 26 . . . 42149 1456 1 _ _ NNP 42149 1456 2 Manhattan Manhattan NNP 42149 1456 3 Shield Shield NNP 42149 1456 4 Chambers._--The Chambers._--The NNP 42149 1456 5 Manhattan Manhattan NNP 42149 1456 6 shield shield NN 42149 1456 7 chamber chamber NN 42149 1456 8 construction construction NN 42149 1456 9 will will MD 42149 1456 10 be be VB 42149 1456 11 first first RB 42149 1456 12 described describe VBN 42149 1456 13 . . . 42149 1457 1 The the DT 42149 1457 2 Weehawken Weehawken NNP 42149 1457 3 shield shield NN 42149 1457 4 chambers chamber NNS 42149 1457 5 have have VBP 42149 1457 6 been be VBN 42149 1457 7 described describe VBN 42149 1457 8 under under IN 42149 1457 9 the the DT 42149 1457 10 Land Land NNP 42149 1457 11 Tunnel Tunnel NNP 42149 1457 12 Section Section NNP 42149 1457 13 , , , 42149 1457 14 as as IN 42149 1457 15 they -PRON- PRP 42149 1457 16 are be VBP 42149 1457 17 of of IN 42149 1457 18 the the DT 42149 1457 19 regular regular JJ 42149 1457 20 masonry masonry NN 42149 1457 21 - - HYPH 42149 1457 22 lined line VBN 42149 1457 23 Land Land NNP 42149 1457 24 Tunnels Tunnels NNPS 42149 1457 25 type type NN 42149 1457 26 , , , 42149 1457 27 whereas whereas IN 42149 1457 28 the the DT 42149 1457 29 Manhattan Manhattan NNP 42149 1457 30 chambers chamber NNS 42149 1457 31 are be VBP 42149 1457 32 of of IN 42149 1457 33 segmental segmental JJ 42149 1457 34 iron iron NN 42149 1457 35 lining lining NN 42149 1457 36 with with IN 42149 1457 37 a a DT 42149 1457 38 concrete concrete JJ 42149 1457 39 inner inner JJ 42149 1457 40 lining lining NN 42149 1457 41 . . . 42149 1458 1 During during IN 42149 1458 2 the the DT 42149 1458 3 progress progress NN 42149 1458 4 of of IN 42149 1458 5 excavation excavation NN 42149 1458 6 , , , 42149 1458 7 the the DT 42149 1458 8 location location NN 42149 1458 9 of of IN 42149 1458 10 the the DT 42149 1458 11 New New NNP 42149 1458 12 York York NNP 42149 1458 13 shield shield NN 42149 1458 14 chambers chamber NNS 42149 1458 15 was be VBD 42149 1458 16 moved move VBN 42149 1458 17 back back RB 42149 1458 18 133 133 CD 42149 1458 19 ft ft NN 42149 1458 20 . . NNP 42149 1458 21 , , , 42149 1458 22 as as IN 42149 1458 23 previously previously RB 42149 1458 24 described describe VBN 42149 1458 25 in in IN 42149 1458 26 the the DT 42149 1458 27 " " `` 42149 1458 28 Land Land NNP 42149 1458 29 Tunnel Tunnel NNP 42149 1458 30 " " '' 42149 1458 31 Section Section NNP 42149 1458 32 , , , 42149 1458 33 and and CC 42149 1458 34 when when WRB 42149 1458 35 the the DT 42149 1458 36 location location NN 42149 1458 37 had have VBD 42149 1458 38 been be VBN 42149 1458 39 finally finally RB 42149 1458 40 decided decide VBN 42149 1458 41 , , , 42149 1458 42 there there EX 42149 1458 43 was be VBD 42149 1458 44 a a DT 42149 1458 45 middle middle JJ 42149 1458 46 top top JJ 42149 1458 47 heading heading NN 42149 1458 48 driven drive VBN 42149 1458 49 all all RB 42149 1458 50 through through IN 42149 1458 51 the the DT 42149 1458 52 length length NN 42149 1458 53 now now RB 42149 1458 54 occupied occupy VBN 42149 1458 55 by by IN 42149 1458 56 the the DT 42149 1458 57 shield shield NN 42149 1458 58 chamber chamber NN 42149 1458 59 . . . 42149 1459 1 Narrow narrow JJ 42149 1459 2 cross cross NN 42149 1459 3 - - NNS 42149 1459 4 drifts drift NNS 42149 1459 5 were be VBD 42149 1459 6 taken take VBN 42149 1459 7 out out RP 42149 1459 8 at at IN 42149 1459 9 right right JJ 42149 1459 10 angles angle NNS 42149 1459 11 to to IN 42149 1459 12 the the DT 42149 1459 13 top top NN 42149 1459 14 heading heading NN 42149 1459 15 , , , 42149 1459 16 and and CC 42149 1459 17 from from IN 42149 1459 18 the the DT 42149 1459 19 ends end NNS 42149 1459 20 of of IN 42149 1459 21 these these DT 42149 1459 22 the the DT 42149 1459 23 wall wall NN 42149 1459 24 - - HYPH 42149 1459 25 plate plate NN 42149 1459 26 headings heading NNS 42149 1459 27 were be VBD 42149 1459 28 taken take VBN 42149 1459 29 out out RP 42149 1459 30 . . . 42149 1460 1 Heavy heavy JJ 42149 1460 2 timbering timbering NN 42149 1460 3 was be VBD 42149 1460 4 used use VBN 42149 1460 5 , , , 42149 1460 6 as as IN 42149 1460 7 the the DT 42149 1460 8 rock rock NN 42149 1460 9 cover cover NN 42149 1460 10 was be VBD 42149 1460 11 only only RB 42149 1460 12 about about RB 42149 1460 13 6 6 CD 42149 1460 14 ft ft NN 42149 1460 15 . . NN 42149 1460 16 , , , 42149 1460 17 and and CC 42149 1460 18 the the DT 42149 1460 19 whole whole JJ 42149 1460 20 span span NN 42149 1460 21 to to TO 42149 1460 22 be be VB 42149 1460 23 covered cover VBN 42149 1460 24 was be VBD 42149 1460 25 60 60 CD 42149 1460 26 ft ft NN 42149 1460 27 . . . 42149 1461 1 The the DT 42149 1461 2 process process NN 42149 1461 3 adopted adopt VBN 42149 1461 4 was be VBD 42149 1461 5 to to TO 42149 1461 6 excavate excavate VB 42149 1461 7 and and CC 42149 1461 8 timber timber VB 42149 1461 9 the the DT 42149 1461 10 north north NN 42149 1461 11 side side NN 42149 1461 12 first first RB 42149 1461 13 , , , 42149 1461 14 place place VB 42149 1461 15 the the DT 42149 1461 16 iron iron NN 42149 1461 17 lining lining NN 42149 1461 18 , , , 42149 1461 19 and and CC 42149 1461 20 then then RB 42149 1461 21 excavate excavate VB 42149 1461 22 the the DT 42149 1461 23 south south JJ 42149 1461 24 side side NN 42149 1461 25 , , , 42149 1461 26 using use VBG 42149 1461 27 the the DT 42149 1461 28 iron iron NN 42149 1461 29 of of IN 42149 1461 30 the the DT 42149 1461 31 north north NN 42149 1461 32 side side NN 42149 1461 33 as as IN 42149 1461 34 the the DT 42149 1461 35 supports support NNS 42149 1461 36 for for IN 42149 1461 37 the the DT 42149 1461 38 north north NN 42149 1461 39 ends end NNS 42149 1461 40 of of IN 42149 1461 41 the the DT 42149 1461 42 segmental segmental JJ 42149 1461 43 timbering timbering NN 42149 1461 44 of of IN 42149 1461 45 the the DT 42149 1461 46 south south NN 42149 1461 47 . . . 42149 1462 1 The the DT 42149 1462 2 only only JJ 42149 1462 3 incident incident NN 42149 1462 4 of of IN 42149 1462 5 note note NN 42149 1462 6 was be VBD 42149 1462 7 that that IN 42149 1462 8 at at IN 42149 1462 9 2:00 2:00 CD 42149 1462 10 A.M. A.M. NNP 42149 1462 11 , , , 42149 1462 12 on on IN 42149 1462 13 October October NNP 42149 1462 14 20th 20th NN 42149 1462 15 , , , 42149 1462 16 1904 1904 CD 42149 1462 17 , , , 42149 1462 18 the the DT 42149 1462 19 rock rock NN 42149 1462 20 at at IN 42149 1462 21 the the DT 42149 1462 22 west west JJ 42149 1462 23 end end NN 42149 1462 24 of of IN 42149 1462 25 the the DT 42149 1462 26 south south JJ 42149 1462 27 wall wall NN 42149 1462 28 - - HYPH 42149 1462 29 plate plate NN 42149 1462 30 heading heading NN 42149 1462 31 was be VBD 42149 1462 32 pierced pierce VBN 42149 1462 33 . . . 42149 1463 1 Water water NN 42149 1463 2 soon soon RB 42149 1463 3 flooded flood VBD 42149 1463 4 the the DT 42149 1463 5 workings working NNS 42149 1463 6 , , , 42149 1463 7 and and CC 42149 1463 8 considerable considerable JJ 42149 1463 9 disturbance disturbance NN 42149 1463 10 was be VBD 42149 1463 11 caused cause VBN 42149 1463 12 in in IN 42149 1463 13 the the DT 42149 1463 14 New New NNP 42149 1463 15 York York NNP 42149 1463 16 Central Central NNP 42149 1463 17 Railroad Railroad NNP 42149 1463 18 yard yard NN 42149 1463 19 above above RB 42149 1463 20 . . . 42149 1464 1 The the DT 42149 1464 2 cavity cavity NN 42149 1464 3 on on IN 42149 1464 4 the the DT 42149 1464 5 surface surface NN 42149 1464 6 was be VBD 42149 1464 7 soon soon RB 42149 1464 8 filled fill VBN 42149 1464 9 in in RB 42149 1464 10 , , , 42149 1464 11 but but CC 42149 1464 12 to to TO 42149 1464 13 stop stop VB 42149 1464 14 the the DT 42149 1464 15 flow flow NN 42149 1464 16 of of IN 42149 1464 17 mud mud NN 42149 1464 18 and and CC 42149 1464 19 water water NN 42149 1464 20 was be VBD 42149 1464 21 quite quite PDT 42149 1464 22 a a DT 42149 1464 23 troublesome troublesome JJ 42149 1464 24 job job NN 42149 1464 25 . . . 42149 1465 1 TABLE TABLE NNS 42149 1465 2 22.--QUANTITIES 22.--quantities CD 42149 1465 3 OF of IN 42149 1465 4 WORK work NN 42149 1465 5 IN in IN 42149 1465 6 SUBAQUEOUS subaqueous NN 42149 1465 7 TUNNELS TUNNELS NNP 42149 1465 8 . . . 42149 1466 1 = = NFP 42149 1466 2 = = NFP 42149 1466 3 = = SYM 42149 1466 4 = = SYM 42149 1466 5 = = SYM 42149 1466 6 = = SYM 42149 1466 7 = = SYM 42149 1466 8 = = SYM 42149 1466 9 = = SYM 42149 1466 10 = = SYM 42149 1466 11 = = SYM 42149 1466 12 = = SYM 42149 1466 13 = = SYM 42149 1466 14 = = SYM 42149 1466 15 = = SYM 42149 1466 16 = = SYM 42149 1466 17 = = SYM 42149 1466 18 = = SYM 42149 1466 19 = = SYM 42149 1466 20 = = SYM 42149 1466 21 = = SYM 42149 1466 22 = = SYM 42149 1466 23 = = SYM 42149 1466 24 = = SYM 42149 1466 25 = = SYM 42149 1466 26 = = SYM 42149 1466 27 = = NFP 42149 1466 28 = = SYM 42149 1466 29 + + SYM 42149 1466 30 = = SYM 42149 1466 31 = = SYM 42149 1466 32 = = SYM 42149 1466 33 = = SYM 42149 1466 34 = = SYM 42149 1466 35 = = SYM 42149 1466 36 = = SYM 42149 1466 37 = = SYM 42149 1466 38 = = SYM 42149 1466 39 = = SYM 42149 1466 40 = = SYM 42149 1466 41 = = SYM 42149 1466 42 = = SYM 42149 1466 43 = = SYM 42149 1466 44 = = SYM 42149 1466 45 = = SYM 42149 1466 46 = = SYM 42149 1466 47 = = SYM 42149 1466 48 = = SYM 42149 1466 49 = = SYM 42149 1466 50 = = SYM 42149 1466 51 = = SYM 42149 1466 52 = = SYM 42149 1466 53 = = SYM 42149 1466 54 = = SYM 42149 1466 55 = = SYM 42149 1466 56 = = SYM 42149 1466 57 = = SYM 42149 1466 58 = = SYM 42149 1466 59 = = SYM 42149 1466 60 = = SYM 42149 1466 61 = = SYM 42149 1466 62 = = SYM 42149 1466 63 = = SYM 42149 1466 64 = = SYM 42149 1466 65 = = SYM 42149 1466 66 = = SYM 42149 1466 67 = = SYM 42149 1466 68 = = SYM 42149 1466 69 = = NNS 42149 1466 70 = = SYM 42149 1466 71 | | NNP 42149 1466 72 TYPE TYPE NNP 42149 1466 73 . . . 42149 1467 1 |----------+--------------+--------------+ |----------+--------------+--------------+ NNP 42149 1467 2 DESCRIPTION DESCRIPTION NNP 42149 1467 3 , , , 42149 1467 4 QUANTITY QUANTITY NNP 42149 1467 5 , , , 42149 1467 6 |MANHATTAN |MANHATTAN NNP 42149 1467 7 | | CD 42149 1467 8 CAST CAST NNP 42149 1467 9 IRON IRON NNP 42149 1467 10 , , , 42149 1467 11 | | NNP 42149 1467 12 CAST CAST NNP 42149 1467 13 IRON IRON NNP 42149 1467 14 , , , 42149 1467 15 | | NNP 42149 1467 16 LENGTH LENGTH NNP 42149 1467 17 , , , 42149 1467 18 ETC ETC NNP 42149 1467 19 . . . 42149 1468 1 |shield |shield CD 42149 1468 2 | | CD 42149 1468 3 ordinary ordinary JJ 42149 1468 4 | | HYPH 42149 1468 5 ordinary ordinary JJ 42149 1468 6 | | CD 42149 1468 7 |chambers |chambers CD 42149 1468 8 . . . 42149 1469 1 | | JJ 42149 1469 2 pocketless pocketless NN 42149 1469 3 . . . 42149 1470 1 | | JJ 42149 1470 2 pocket pocket NN 42149 1470 3 . . . 42149 1471 1 | | NNP 42149 1471 2 ----------------------------+----------+--------------+--------------+ ----------------------------+----------+--------------+--------------+ NNP 42149 1471 3 Length Length NNP 42149 1471 4 , , , 42149 1471 5 in in IN 42149 1471 6 feet foot NNS 42149 1471 7 . . . 42149 1472 1 | | NNP 42149 1472 2 59.00| 59.00| CD 42149 1472 3 4,374.99 4,374.99 CD 42149 1472 4 | | CD 42149 1472 5 2,146.3 2,146.3 CD 42149 1472 6 | | NNP 42149 1472 7 ----------------------------+----------+--------------+--------------+ ----------------------------+----------+--------------+--------------+ NNP 42149 1472 8 Excavation Excavation NNP 42149 1472 9 , , , 42149 1472 10 in in IN 42149 1472 11 cubic cubic JJ 42149 1472 12 yards yard NNS 42149 1472 13 . . . 42149 1473 1 | | NNP 42149 1473 2 | | NNP 42149 1473 3 | | CD 42149 1473 4 | | NNP 42149 1473 5 Total total NN 42149 1473 6 . . . 42149 1474 1 | | NNP 42149 1474 2 1,884 1,884 CD 42149 1474 3 | | CD 42149 1474 4 67,344 67,344 CD 42149 1474 5 | | CD 42149 1474 6 33,038 33,038 CD 42149 1474 7 | | CD 42149 1474 8 Per per IN 42149 1474 9 linear linear JJ 42149 1474 10 foot foot NN 42149 1474 11 . . . 42149 1475 1 | | NNP 42149 1475 2 31.9 31.9 CD 42149 1475 3 | | CD 42149 1475 4 15.4 15.4 CD 42149 1475 5 | | CD 42149 1475 6 15.4 15.4 CD 42149 1475 7 | | NNP 42149 1475 8 Cast cast NN 42149 1475 9 - - HYPH 42149 1475 10 iron iron NN 42149 1475 11 tunnel tunnel NN 42149 1475 12 lining lining NN 42149 1475 13 , , , 42149 1475 14 | | NNP 42149 1475 15 | | NNP 42149 1475 16 | | CD 42149 1475 17 | | CD 42149 1475 18 in in IN 42149 1475 19 pounds pound NNS 42149 1475 20 . . . 42149 1476 1 | | NNP 42149 1476 2 | | NNP 42149 1476 3 | | CD 42149 1476 4 | | NNP 42149 1476 5 Total total NN 42149 1476 6 . . . 42149 1477 1 |847,042 |847,042 NFP 42149 1477 2 |39,643,120 |39,643,120 UH 42149 1477 3 |19,715,405 |19,715,405 NNP 42149 1477 4 | | NNP 42149 1477 5 Per per IN 42149 1477 6 linear linear JJ 42149 1477 7 foot foot NN 42149 1477 8 . . . 42149 1478 1 | | CD 42149 1478 2 14,357 14,357 CD 42149 1478 3 | | CD 42149 1478 4 9,061 9,061 CD 42149 1478 5 | | CD 42149 1478 6 9,186 9,186 CD 42149 1478 7 | | CD 42149 1478 8 Cast Cast VBN 42149 1478 9 - - HYPH 42149 1478 10 steel steel NN 42149 1478 11 tunnel tunnel NN 42149 1478 12 lining lining NN 42149 1478 13 , , , 42149 1478 14 | | NNP 42149 1478 15 | | NNP 42149 1478 16 | | CD 42149 1478 17 | | CD 42149 1478 18 in in IN 42149 1478 19 pounds pound NNS 42149 1478 20 . . . 42149 1479 1 | | NNP 42149 1479 2 | | NNP 42149 1479 3 | | CD 42149 1479 4 | | NNP 42149 1479 5 Total total NN 42149 1479 6 . . . 42149 1480 1 | | CD 42149 1480 2 | | CD 42149 1480 3 1,544,962 1,544,962 CD 42149 1480 4 | | CD 42149 1480 5 757,938 757,938 CD 42149 1480 6 | | CD 42149 1480 7 Per per IN 42149 1480 8 linear linear JJ 42149 1480 9 foot foot NN 42149 1480 10 . . . 42149 1481 1 | | NNP 42149 1481 2 | | CD 42149 1481 3 353.1 353.1 CD 42149 1481 4 | | CD 42149 1481 5 353.1 353.1 CD 42149 1481 6 | | NNP 42149 1481 7 Steel Steel NNP 42149 1481 8 bolts bolt NNS 42149 1481 9 and and CC 42149 1481 10 washers washer NNS 42149 1481 11 , , , 42149 1481 12 | | NNP 42149 1481 13 | | NNP 42149 1481 14 | | CD 42149 1481 15 | | CD 42149 1481 16 in in IN 42149 1481 17 pounds pound NNS 42149 1481 18 . . . 42149 1482 1 | | NNP 42149 1482 2 | | NNP 42149 1482 3 | | CD 42149 1482 4 | | NNP 42149 1482 5 Total total NN 42149 1482 6 . . . 42149 1483 1 | | CD 42149 1483 2 23,627 23,627 CD 42149 1483 3 | | CD 42149 1483 4 1,475,991 1,475,991 CD 42149 1483 5 | | CD 42149 1483 6 724,095 724,095 CD 42149 1483 7 | | CD 42149 1483 8 Per per IN 42149 1483 9 linear linear JJ 42149 1483 10 foot foot NN 42149 1483 11 . . . 42149 1484 1 | | NNP 42149 1484 2 400.46| 400.46| CD 42149 1484 3 337.37 337.37 CD 42149 1484 4 | | CD 42149 1484 5 397.00 397.00 CD 42149 1484 6 | | NNP 42149 1484 7 Rust Rust NNP 42149 1484 8 joints joint NNS 42149 1484 9 , , , 42149 1484 10 in in IN 42149 1484 11 linear linear JJ 42149 1484 12 feet.| feet.| NNP 42149 1484 13 | | NNP 42149 1484 14 | | NNP 42149 1484 15 | | NNP 42149 1484 16 Total total NN 42149 1484 17 . . . 42149 1485 1 | | NNP 42149 1485 2 3,376 3,376 CD 42149 1485 3 | | CD 42149 1485 4 170,755 170,755 CD 42149 1485 5 | | CD 42149 1485 6 83,935 83,935 CD 42149 1485 7 | | NNS 42149 1485 8 Per per IN 42149 1485 9 linear linear JJ 42149 1485 10 foot foot NN 42149 1485 11 . . . 42149 1486 1 | | NNP 42149 1486 2 57.2 57.2 CD 42149 1486 3 | | CD 42149 1486 4 39.0 39.0 CD 42149 1486 5 | | CD 42149 1486 6 39.1 39.1 CD 42149 1486 7 | | NNP 42149 1486 8 Concrete Concrete NNP 42149 1486 9 , , , 42149 1486 10 in in IN 42149 1486 11 cubic cubic JJ 42149 1486 12 yards yard NNS 42149 1486 13 . . . 42149 1487 1 | | NNP 42149 1487 2 | | NNP 42149 1487 3 | | CD 42149 1487 4 | | NNP 42149 1487 5 Total total NN 42149 1487 6 . . . 42149 1488 1 | | NNP 42149 1488 2 766 766 CD 42149 1488 3 | | CD 42149 1488 4 20,030 20,030 CD 42149 1488 5 | | CD 42149 1488 6 9,827 9,827 CD 42149 1488 7 | | CD 42149 1488 8 Per per IN 42149 1488 9 linear linear JJ 42149 1488 10 foot foot NN 42149 1488 11 . . . 42149 1489 1 | | NNP 42149 1489 2 12.98| 12.98| CD 42149 1489 3 4.58 4.58 CD 42149 1489 4 | | CD 42149 1489 5 4.58 4.58 CD 42149 1489 6 | | NNP 42149 1489 7 Steel Steel NNP 42149 1489 8 beams beam NNS 42149 1489 9 , , , 42149 1489 10 plates plate NNS 42149 1489 11 , , , 42149 1489 12 etc etc FW 42149 1489 13 . . FW 42149 1489 14 , , , 42149 1489 15 | | NNP 42149 1489 16 | | NNP 42149 1489 17 | | CD 42149 1489 18 | | CD 42149 1489 19 in in IN 42149 1489 20 pounds pound NNS 42149 1489 21 . . . 42149 1490 1 | | NNP 42149 1490 2 | | NNP 42149 1490 3 | | CD 42149 1490 4 | | NNP 42149 1490 5 Total total NN 42149 1490 6 . . . 42149 1491 1 | | CD 42149 1491 2 12,346 12,346 CD 42149 1491 3 | | CD 42149 1491 4 83,774 83,774 CD 42149 1491 5 | | CD 42149 1491 6 41,098 41,098 CD 42149 1491 7 | | NNS 42149 1491 8 Per per IN 42149 1491 9 linear linear JJ 42149 1491 10 foot foot NN 42149 1491 11 . . . 42149 1492 1 | | NNP 42149 1492 2 2,092.5 2,092.5 CD 42149 1492 3 | | CD 42149 1492 4 19.1 19.1 CD 42149 1492 5 | | CD 42149 1492 6 19.1 19.1 CD 42149 1492 7 | | NNP 42149 1492 8 Steel Steel NNP 42149 1492 9 bolts bolt NNS 42149 1492 10 , , , 42149 1492 11 hooks hook NNS 42149 1492 12 , , , 42149 1492 13 etc etc FW 42149 1492 14 . . FW 42149 1492 15 , , , 42149 1492 16 | | NNP 42149 1492 17 | | NNP 42149 1492 18 | | CD 42149 1492 19 | | CD 42149 1492 20 in in IN 42149 1492 21 pounds pound NNS 42149 1492 22 . . . 42149 1493 1 | | NNP 42149 1493 2 | | NNP 42149 1493 3 | | CD 42149 1493 4 | | NNP 42149 1493 5 Total total NN 42149 1493 6 . . . 42149 1494 1 | | NNP 42149 1494 2 1,328 1,328 CD 42149 1494 3 | | CD 42149 1494 4 36,980 36,980 CD 42149 1494 5 | | CD 42149 1494 6 18,142 18,142 CD 42149 1494 7 | | NNS 42149 1494 8 Per per IN 42149 1494 9 linear linear JJ 42149 1494 10 foot foot NN 42149 1494 11 . . . 42149 1495 1 | | NNP 42149 1495 2 22.5 22.5 CD 42149 1495 3 | | CD 42149 1495 4 84.5 84.5 CD 42149 1495 5 | | CD 42149 1495 6 84.5 84.5 CD 42149 1495 7 | | JJ 42149 1495 8 Expanded expand VBN 42149 1495 9 metal metal NN 42149 1495 10 , , , 42149 1495 11 in in IN 42149 1495 12 pounds pound NNS 42149 1495 13 . . . 42149 1496 1 | | NNP 42149 1496 2 | | NNP 42149 1496 3 | | CD 42149 1496 4 | | NNP 42149 1496 5 Total total NN 42149 1496 6 . . . 42149 1497 1 | | NNP 42149 1497 2 594 594 CD 42149 1497 3 | | CD 42149 1497 4 2,215 2,215 CD 42149 1497 5 | | CD 42149 1497 6 1,086 1,086 CD 42149 1497 7 | | CD 42149 1497 8 Per per IN 42149 1497 9 linear linear JJ 42149 1497 10 foot foot NN 42149 1497 11 . . . 42149 1498 1 | | NNP 42149 1498 2 10.07| 10.07| CD 42149 1498 3 0.506| 0.506| JJ 42149 1498 4 0.506| 0.506| NN 42149 1498 5 Vitrified Vitrified NNP 42149 1498 6 conduits conduit NNS 42149 1498 7 , , , 42149 1498 8 in in IN 42149 1498 9 | | NNP 42149 1498 10 | | CD 42149 1498 11 | | CD 42149 1498 12 | | CD 42149 1498 13 duct duct VB 42149 1498 14 feet foot NNS 42149 1498 15 . . . 42149 1499 1 | | NNP 42149 1499 2 | | NNP 42149 1499 3 | | CD 42149 1499 4 | | NNP 42149 1499 5 Total total NN 42149 1499 6 . . . 42149 1500 1 | | NNP 42149 1500 2 2,560 2,560 CD 42149 1500 3 | | CD 42149 1500 4 235,903 235,903 CD 42149 1500 5 | | CD 42149 1500 6 115,728 115,728 CD 42149 1500 7 | | CD 42149 1500 8 Per per IN 42149 1500 9 linear linear JJ 42149 1500 10 foot foot NN 42149 1500 11 . . . 42149 1501 1 | | CD 42149 1501 2 43.49| 43.49| CD 42149 1501 3 53.92 53.92 CD 42149 1501 4 | | NNP 42149 1501 5 53.92 53.92 CD 42149 1501 6 | | NNP 42149 1501 7 = = SYM 42149 1501 8 = = SYM 42149 1501 9 = = SYM 42149 1501 10 = = SYM 42149 1501 11 = = SYM 42149 1501 12 = = SYM 42149 1501 13 = = SYM 42149 1501 14 = = SYM 42149 1501 15 = = SYM 42149 1501 16 = = SYM 42149 1501 17 = = SYM 42149 1501 18 = = SYM 42149 1501 19 = = SYM 42149 1501 20 = = SYM 42149 1501 21 = = SYM 42149 1501 22 = = SYM 42149 1501 23 = = SYM 42149 1501 24 = = SYM 42149 1501 25 = = SYM 42149 1501 26 = = SYM 42149 1501 27 = = SYM 42149 1501 28 = = SYM 42149 1501 29 = = SYM 42149 1501 30 = = SYM 42149 1501 31 = = SYM 42149 1501 32 = = SYM 42149 1501 33 = = NFP 42149 1501 34 = = SYM 42149 1501 35 + + SYM 42149 1501 36 = = SYM 42149 1501 37 = = SYM 42149 1501 38 = = SYM 42149 1501 39 = = SYM 42149 1501 40 = = SYM 42149 1501 41 = = SYM 42149 1501 42 = = SYM 42149 1501 43 = = SYM 42149 1501 44 = = NFP 42149 1501 45 = = SYM 42149 1501 46 + + SYM 42149 1501 47 = = SYM 42149 1501 48 = = SYM 42149 1501 49 = = SYM 42149 1501 50 = = SYM 42149 1501 51 = = SYM 42149 1501 52 = = SYM 42149 1501 53 = = SYM 42149 1501 54 = = SYM 42149 1501 55 = = SYM 42149 1501 56 = = SYM 42149 1501 57 = = SYM 42149 1501 58 = = SYM 42149 1501 59 = = NFP 42149 1501 60 = = SYM 42149 1501 61 + + SYM 42149 1501 62 = = SYM 42149 1501 63 = = SYM 42149 1501 64 = = SYM 42149 1501 65 = = SYM 42149 1501 66 = = SYM 42149 1501 67 = = SYM 42149 1501 68 = = SYM 42149 1501 69 = = SYM 42149 1501 70 = = SYM 42149 1501 71 = = SYM 42149 1501 72 = = SYM 42149 1501 73 = = SYM 42149 1501 74 = = NFP 42149 1501 75 = = SYM 42149 1501 76 + + SYM 42149 1501 77 = = SYM 42149 1501 78 = = SYM 42149 1501 79 = = SYM 42149 1501 80 = = SYM 42149 1501 81 = = SYM 42149 1501 82 = = SYM 42149 1501 83 = = SYM 42149 1501 84 = = SYM 42149 1501 85 = = SYM 42149 1501 86 = = SYM 42149 1501 87 = = SYM 42149 1501 88 = = SYM 42149 1501 89 = = SYM 42149 1501 90 = = SYM 42149 1501 91 = = SYM 42149 1501 92 = = SYM 42149 1501 93 = = SYM 42149 1501 94 = = SYM 42149 1501 95 = = SYM 42149 1501 96 = = SYM 42149 1501 97 = = SYM 42149 1501 98 = = SYM 42149 1501 99 = = SYM 42149 1501 100 = = SYM 42149 1501 101 = = SYM 42149 1501 102 = = SYM 42149 1501 103 = = NFP 42149 1501 104 = = SYM 42149 1501 105 + + SYM 42149 1501 106 = = SYM 42149 1501 107 = = SYM 42149 1501 108 = = SYM 42149 1501 109 = = SYM 42149 1501 110 = = SYM 42149 1501 111 = = SYM 42149 1501 112 = = SYM 42149 1501 113 = = SYM 42149 1501 114 = = SYM 42149 1501 115 = = SYM 42149 1501 116 = = SYM 42149 1501 117 = = SYM 42149 1501 118 = = SYM 42149 1501 119 = = SYM 42149 1501 120 = = SYM 42149 1501 121 = = SYM 42149 1501 122 = = SYM 42149 1501 123 = = SYM 42149 1501 124 = = SYM 42149 1501 125 = = SYM 42149 1501 126 = = SYM 42149 1501 127 = = SYM 42149 1501 128 = = SYM 42149 1501 129 = = SYM 42149 1501 130 = = SYM 42149 1501 131 = = SYM 42149 1501 132 = = SYM 42149 1501 133 = = SYM 42149 1501 134 = = SYM 42149 1501 135 = = SYM 42149 1501 136 = = SYM 42149 1501 137 = = SYM 42149 1501 138 = = SYM 42149 1501 139 = = SYM 42149 1501 140 = = SYM 42149 1501 141 = = SYM 42149 1501 142 = = SYM 42149 1501 143 = = SYM 42149 1501 144 = = SYM 42149 1501 145 = = SYM 42149 1501 146 = = NNS 42149 1501 147 = = SYM 42149 1501 148 | | CD 42149 1501 149 |--------------+-------------+------------- |--------------+-------------+------------- NN 42149 1501 150 DESCRIPTION description NN 42149 1501 151 , , , 42149 1501 152 QUANTITY QUANTITY NNP 42149 1501 153 , , , 42149 1501 154 | | NNP 42149 1501 155 CAST CAST NNP 42149 1501 156 IRON IRON NNP 42149 1501 157 , , , 42149 1501 158 | | NNP 42149 1501 159 CAST CAST NNP 42149 1501 160 STEEL STEEL NNP 42149 1501 161 , , , 42149 1501 162 | | NNP 42149 1501 163 LENGTH LENGTH NNP 42149 1501 164 , , , 42149 1501 165 ETC ETC NNP 42149 1501 166 . . . 42149 1502 1 | | JJ 42149 1502 2 heavy heavy JJ 42149 1502 3 | | JJ 42149 1502 4 ordinary ordinary JJ 42149 1502 5 | | NNP 42149 1502 6 Total Total NNP 42149 1502 7 . . . 42149 1503 1 | | JJ 42149 1503 2 pocketless pocketless NN 42149 1503 3 . . . 42149 1504 1 | | JJ 42149 1504 2 pocketless pocketless NN 42149 1504 3 . . . 42149 1505 1 | | NNP 42149 1505 2 ----------------------------+--------------+-------------+------------- ----------------------------+--------------+-------------+------------- NNP 42149 1505 3 Length Length NNP 42149 1505 4 , , , 42149 1505 5 in in IN 42149 1505 6 feet foot NNS 42149 1505 7 . . . 42149 1506 1 | | NNP 42149 1506 2 5,522.05 5,522.05 CD 42149 1506 3 | | CD 42149 1506 4 152.66 152.66 CD 42149 1506 5 |12,255.00 |12,255.00 NN 42149 1506 6 ft ft NN 42149 1506 7 . . . 42149 1506 8 ----------------------------+--------------+-------------+------------- ----------------------------+--------------+-------------+------------- NFP 42149 1506 9 Excavation Excavation NNP 42149 1506 10 , , , 42149 1506 11 in in IN 42149 1506 12 cubic cubic JJ 42149 1506 13 yards yard NNS 42149 1506 14 . . . 42149 1507 1 | | NNP 42149 1507 2 | | NNP 42149 1507 3 | | NNP 42149 1507 4 Total total NN 42149 1507 5 . . . 42149 1508 1 | | CD 42149 1508 2 85,001 85,001 CD 42149 1508 3 | | CD 42149 1508 4 2,349 2,349 CD 42149 1508 5 | | CD 42149 1508 6 189,616 189,616 CD 42149 1508 7 Per per IN 42149 1508 8 linear linear JJ 42149 1508 9 foot foot NN 42149 1508 10 . . . 42149 1509 1 | | NNP 42149 1509 2 15.4 15.4 CD 42149 1509 3 | | CD 42149 1509 4 15.4 15.4 CD 42149 1509 5 | | CD 42149 1509 6 cu cu NNS 42149 1509 7 . . . 42149 1510 1 yd yd NNP 42149 1510 2 . . . 42149 1511 1 Cast cast NN 42149 1511 2 - - HYPH 42149 1511 3 iron iron NN 42149 1511 4 tunnel tunnel NN 42149 1511 5 lining lining NN 42149 1511 6 , , , 42149 1511 7 | | NNP 42149 1511 8 | | NNP 42149 1511 9 | | NNP 42149 1511 10 in in IN 42149 1511 11 pounds pound NNS 42149 1511 12 . . . 42149 1512 1 | | NNP 42149 1512 2 | | NNP 42149 1512 3 | | NNP 42149 1512 4 Total total NN 42149 1512 5 . . . 42149 1513 1 |61,559,845 |61,559,845 NNP 42149 1513 2 | | NNP 42149 1513 3 | | NNP 42149 1513 4 121,765,412 121,765,412 CD 42149 1513 5 Per per IN 42149 1513 6 linear linear JJ 42149 1513 7 foot foot NN 42149 1513 8 . . . 42149 1514 1 | | NNP 42149 1514 2 11,148 11,148 CD 42149 1514 3 | | CD 42149 1514 4 | | NNS 42149 1514 5 lb lb RB 42149 1514 6 . . . 42149 1515 1 Cast Cast VBN 42149 1515 2 - - HYPH 42149 1515 3 steel steel NN 42149 1515 4 tunnel tunnel NN 42149 1515 5 lining lining NN 42149 1515 6 , , , 42149 1515 7 | | NNP 42149 1515 8 | | NNP 42149 1515 9 | | NNP 42149 1515 10 in in IN 42149 1515 11 pounds pound NNS 42149 1515 12 . . . 42149 1516 1 | | NNP 42149 1516 2 | | NNP 42149 1516 3 | | NNP 42149 1516 4 Total total NN 42149 1516 5 . . . 42149 1517 1 | | CD 42149 1517 2 2,730,905 2,730,905 CD 42149 1517 3 |1,549,711 |1,549,711 CD 42149 1517 4 | | CD 42149 1517 5 6,583,516 6,583,516 CD 42149 1517 6 Per per IN 42149 1517 7 linear linear JJ 42149 1517 8 foot foot NN 42149 1517 9 . . . 42149 1518 1 | | NNP 42149 1518 2 494.5 494.5 CD 42149 1518 3 | | CD 42149 1518 4 10,151.4 10,151.4 CD 42149 1518 5 | | NNS 42149 1518 6 lb lb RB 42149 1518 7 . . . 42149 1519 1 Steel steel NN 42149 1519 2 bolts bolt NNS 42149 1519 3 and and CC 42149 1519 4 washers washer NNS 42149 1519 5 , , , 42149 1519 6 | | NNP 42149 1519 7 | | NNP 42149 1519 8 | | NNP 42149 1519 9 in in IN 42149 1519 10 pounds pound NNS 42149 1519 11 . . . 42149 1520 1 | | NNP 42149 1520 2 | | NNP 42149 1520 3 | | NNP 42149 1520 4 Total total NN 42149 1520 5 . . . 42149 1521 1 | | CD 42149 1521 2 2,935,455 2,935,455 CD 42149 1521 3 | | CD 42149 1521 4 51,266 51,266 CD 42149 1521 5 | | CD 42149 1521 6 5,210,434 5,210,434 CD 42149 1521 7 Per per IN 42149 1521 8 linear linear JJ 42149 1521 9 foot foot NN 42149 1521 10 . . . 42149 1522 1 | | NNP 42149 1522 2 581.59 581.59 CD 42149 1522 3 | | NNP 42149 1522 4 335.82 335.82 CD 42149 1522 5 | | CD 42149 1522 6 lb lb RB 42149 1522 7 . . . 42149 1523 1 Rust rust NN 42149 1523 2 joints joint NNS 42149 1523 3 , , , 42149 1523 4 in in IN 42149 1523 5 linear linear JJ 42149 1523 6 feet.| feet.| NNP 42149 1523 7 | | NNP 42149 1523 8 | | NNP 42149 1523 9 Total Total NNP 42149 1523 10 . . . 42149 1524 1 | | NNP 42149 1524 2 218,656 218,656 CD 42149 1524 3 | | CD 42149 1524 4 5,996 5,996 CD 42149 1524 5 | | CD 42149 1524 6 482,718 482,718 CD 42149 1524 7 Per per IN 42149 1524 8 linear linear JJ 42149 1524 9 foot foot NN 42149 1524 10 . . . 42149 1525 1 | | NNP 42149 1525 2 39.6 39.6 CD 42149 1525 3 | | CD 42149 1525 4 39.3 39.3 CD 42149 1525 5 | | CD 42149 1525 6 ft ft NNS 42149 1525 7 . . . 42149 1526 1 Concrete concrete NN 42149 1526 2 , , , 42149 1526 3 in in IN 42149 1526 4 cubic cubic JJ 42149 1526 5 yards yard NNS 42149 1526 6 . . . 42149 1527 1 | | NNP 42149 1527 2 | | NNP 42149 1527 3 | | NNP 42149 1527 4 Total total NN 42149 1527 5 . . . 42149 1528 1 | | CD 42149 1528 2 25,282 25,282 CD 42149 1528 3 | | CD 42149 1528 4 713 713 CD 42149 1528 5 | | CD 42149 1528 6 56,618 56,618 CD 42149 1528 7 Per per IN 42149 1528 8 linear linear JJ 42149 1528 9 foot foot NN 42149 1528 10 . . . 42149 1529 1 | | NNP 42149 1529 2 4.58 4.58 CD 42149 1529 3 | | CD 42149 1529 4 4.58 4.58 CD 42149 1529 5 | | NNS 42149 1529 6 cu cu NNS 42149 1529 7 . . . 42149 1530 1 yd yd NNP 42149 1530 2 . . . 42149 1531 1 Steel steel NN 42149 1531 2 beams beam NNS 42149 1531 3 , , , 42149 1531 4 plates plate NNS 42149 1531 5 , , , 42149 1531 6 etc etc FW 42149 1531 7 . . FW 42149 1531 8 , , , 42149 1531 9 | | NNP 42149 1531 10 | | NNP 42149 1531 11 | | NNP 42149 1531 12 in in IN 42149 1531 13 pounds pound NNS 42149 1531 14 . . . 42149 1532 1 | | NNP 42149 1532 2 | | NNP 42149 1532 3 | | NNP 42149 1532 4 Total total NN 42149 1532 5 . . . 42149 1533 1 | | CD 42149 1533 2 105,738 105,738 CD 42149 1533 3 | | CD 42149 1533 4 7,432 7,432 CD 42149 1533 5 | | CD 42149 1533 6 250,388 250,388 CD 42149 1533 7 Per per IN 42149 1533 8 linear linear JJ 42149 1533 9 foot foot NN 42149 1533 10 . . . 42149 1534 1 | | NNP 42149 1534 2 19.1 19.1 CD 42149 1534 3 | | CD 42149 1534 4 48.7 48.7 CD 42149 1534 5 | | NNS 42149 1534 6 lb lb RB 42149 1534 7 . . . 42149 1535 1 Steel steel NN 42149 1535 2 bolts bolt NNS 42149 1535 3 , , , 42149 1535 4 hooks hook NNS 42149 1535 5 , , , 42149 1535 6 etc etc FW 42149 1535 7 . . FW 42149 1535 8 , , , 42149 1535 9 | | NNP 42149 1535 10 | | NNP 42149 1535 11 | | NNP 42149 1535 12 in in IN 42149 1535 13 pounds pound NNS 42149 1535 14 . . . 42149 1536 1 | | NNP 42149 1536 2 | | NNP 42149 1536 3 | | NNP 42149 1536 4 Total total NN 42149 1536 5 . . . 42149 1537 1 | | CD 42149 1537 2 46,675 46,675 CD 42149 1537 3 | | CD 42149 1537 4 1,471 1,471 CD 42149 1537 5 | | CD 42149 1537 6 104,596 104,596 CD 42149 1537 7 Per per IN 42149 1537 8 linear linear JJ 42149 1537 9 foot foot NN 42149 1537 10 . . . 42149 1538 1 | | NNP 42149 1538 2 84.5 84.5 CD 42149 1538 3 | | CD 42149 1538 4 96.4 96.4 CD 42149 1538 5 | | CD 42149 1538 6 lb lb RB 42149 1538 7 . . . 42149 1539 1 Expanded expand VBN 42149 1539 2 metal metal NN 42149 1539 3 , , , 42149 1539 4 in in IN 42149 1539 5 pounds pound NNS 42149 1539 6 . . . 42149 1540 1 | | NNP 42149 1540 2 | | NNP 42149 1540 3 | | NNP 42149 1540 4 Total total NN 42149 1540 5 . . . 42149 1541 1 | | CD 42149 1541 2 2,795 2,795 CD 42149 1541 3 | | CD 42149 1541 4 62 62 CD 42149 1541 5 | | CD 42149 1541 6 6,752 6,752 CD 42149 1541 7 Per per IN 42149 1541 8 linear linear JJ 42149 1541 9 foot foot NN 42149 1541 10 . . . 42149 1542 1 | | NNP 42149 1542 2 0.506| 0.506| NNP 42149 1542 3 0.406| 0.406| NNP 42149 1542 4 lb lb IN 42149 1542 5 . . . 42149 1543 1 Vitrified Vitrified NNP 42149 1543 2 conduits conduit NNS 42149 1543 3 , , , 42149 1543 4 in in IN 42149 1543 5 | | CD 42149 1543 6 | | CD 42149 1543 7 | | CD 42149 1543 8 duct duct VB 42149 1543 9 feet foot NNS 42149 1543 10 . . . 42149 1544 1 | | NNP 42149 1544 2 | | NNP 42149 1544 3 | | NNP 42149 1544 4 Total total NN 42149 1544 5 . . . 42149 1545 1 | | NNP 42149 1545 2 297,752 297,752 CD 42149 1545 3 | | CD 42149 1545 4 7,757 7,757 CD 42149 1545 5 | | CD 42149 1545 6 659,700 659,700 CD 42149 1545 7 Per per IN 42149 1545 8 linear linear JJ 42149 1545 9 foot foot NN 42149 1545 10 . . . 42149 1546 1 | | NNP 42149 1546 2 53.92 53.92 CD 42149 1546 3 | | CD 42149 1546 4 50.81 50.81 CD 42149 1546 5 | | CD 42149 1546 6 duct duct NN 42149 1546 7 ft ft NN 42149 1546 8 . . . 42149 1546 9 = = NFP 42149 1546 10 = = NFP 42149 1546 11 = = SYM 42149 1546 12 = = SYM 42149 1546 13 = = SYM 42149 1546 14 = = SYM 42149 1546 15 = = SYM 42149 1546 16 = = SYM 42149 1546 17 = = SYM 42149 1546 18 = = SYM 42149 1546 19 = = SYM 42149 1546 20 = = SYM 42149 1546 21 = = SYM 42149 1546 22 = = SYM 42149 1546 23 = = SYM 42149 1546 24 = = SYM 42149 1546 25 = = SYM 42149 1546 26 = = SYM 42149 1546 27 = = SYM 42149 1546 28 = = SYM 42149 1546 29 = = SYM 42149 1546 30 = = SYM 42149 1546 31 = = SYM 42149 1546 32 = = SYM 42149 1546 33 = = SYM 42149 1546 34 = = SYM 42149 1546 35 = = NFP 42149 1546 36 = = SYM 42149 1546 37 + + SYM 42149 1546 38 = = SYM 42149 1546 39 = = SYM 42149 1546 40 = = SYM 42149 1546 41 = = SYM 42149 1546 42 = = SYM 42149 1546 43 = = SYM 42149 1546 44 = = SYM 42149 1546 45 = = SYM 42149 1546 46 = = SYM 42149 1546 47 = = SYM 42149 1546 48 = = SYM 42149 1546 49 = = SYM 42149 1546 50 = = NFP 42149 1546 51 = = SYM 42149 1546 52 + + SYM 42149 1546 53 = = SYM 42149 1546 54 = = SYM 42149 1546 55 = = SYM 42149 1546 56 = = SYM 42149 1546 57 = = SYM 42149 1546 58 = = SYM 42149 1546 59 = = SYM 42149 1546 60 = = SYM 42149 1546 61 = = SYM 42149 1546 62 = = SYM 42149 1546 63 = = SYM 42149 1546 64 = = NFP 42149 1546 65 = = SYM 42149 1546 66 + + SYM 42149 1546 67 = = SYM 42149 1546 68 = = SYM 42149 1546 69 = = SYM 42149 1546 70 = = SYM 42149 1546 71 = = SYM 42149 1546 72 = = SYM 42149 1546 73 = = SYM 42149 1546 74 = = SYM 42149 1546 75 = = SYM 42149 1546 76 = = SYM 42149 1546 77 = = NFP 42149 1546 78 = = NFP 42149 1546 79 TABLE table NN 42149 1546 80 23.--EXCAVATION 23.--excavation CD 42149 1546 81 AND and CC 42149 1546 82 IRON iron NN 42149 1546 83 LINING LINING NNP 42149 1546 84 . . . 42149 1547 1 = = NFP 42149 1547 2 = = NFP 42149 1547 3 = = SYM 42149 1547 4 = = SYM 42149 1547 5 = = SYM 42149 1547 6 = = SYM 42149 1547 7 = = SYM 42149 1547 8 = = SYM 42149 1547 9 = = SYM 42149 1547 10 = = SYM 42149 1547 11 = = SYM 42149 1547 12 = = SYM 42149 1547 13 = = SYM 42149 1547 14 = = SYM 42149 1547 15 = = SYM 42149 1547 16 = = SYM 42149 1547 17 = = SYM 42149 1547 18 = = SYM 42149 1547 19 = = SYM 42149 1547 20 = = SYM 42149 1547 21 = = SYM 42149 1547 22 = = SYM 42149 1547 23 = = SYM 42149 1547 24 = = SYM 42149 1547 25 = = SYM 42149 1547 26 = = SYM 42149 1547 27 = = SYM 42149 1547 28 = = SYM 42149 1547 29 = = SYM 42149 1547 30 = = SYM 42149 1547 31 = = SYM 42149 1547 32 = = SYM 42149 1547 33 = = SYM 42149 1547 34 = = SYM 42149 1547 35 = = NFP 42149 1547 36 = = SYM 42149 1547 37 + + SYM 42149 1547 38 = = SYM 42149 1547 39 = = SYM 42149 1547 40 = = SYM 42149 1547 41 = = SYM 42149 1547 42 = = SYM 42149 1547 43 = = SYM 42149 1547 44 = = SYM 42149 1547 45 = = SYM 42149 1547 46 = = SYM 42149 1547 47 = = SYM 42149 1547 48 = = SYM 42149 1547 49 = = SYM 42149 1547 50 = = SYM 42149 1547 51 = = SYM 42149 1547 52 = = NFP 42149 1547 53 = = SYM 42149 1547 54 + + SYM 42149 1547 55 = = SYM 42149 1547 56 = = SYM 42149 1547 57 = = SYM 42149 1547 58 = = SYM 42149 1547 59 = = SYM 42149 1547 60 = = SYM 42149 1547 61 = = SYM 42149 1547 62 = = SYM 42149 1547 63 = = SYM 42149 1547 64 = = SYM 42149 1547 65 = = SYM 42149 1547 66 = = SYM 42149 1547 67 = = SYM 42149 1547 68 = = SYM 42149 1547 69 = = SYM 42149 1547 70 =| =| NNP 42149 1547 71 | | NNP 42149 1547 72 North North NNP 42149 1547 73 | | NNP 42149 1547 74 North North NNP 42149 1547 75 | | NNP 42149 1547 76 | | NNP 42149 1547 77 Manhattan Manhattan NNP 42149 1547 78 . . . 42149 1548 1 | | NNP 42149 1548 2 Weehawken Weehawken NNP 42149 1548 3 . . . 42149 1549 1 | | NNP 42149 1549 2 ------------------------------------+----------------+----------------| ------------------------------------+----------------+----------------| NNP 42149 1549 3 Shaft shaft NN 42149 1549 4 and and CC 42149 1549 5 preliminary preliminary JJ 42149 1549 6 headings heading NNS 42149 1549 7 . . . 42149 1550 1 | | NNP 42149 1550 2 June June NNP 42149 1550 3 10 10 CD 42149 1550 4 , , , 42149 1550 5 ' ' '' 42149 1550 6 03 03 CD 42149 1550 7 . . . 42149 1551 1 | | NNP 42149 1551 2 June June NNP 42149 1551 3 11 11 CD 42149 1551 4 , , , 42149 1551 5 ' ' '' 42149 1551 6 03 03 CD 42149 1551 7 . . . 42149 1552 1 | | NNP 42149 1552 2 Begun Begun NNP 42149 1552 3 . . . 42149 1553 1 | | NNP 42149 1553 2 | | NNP 42149 1553 3 | | NNP 42149 1553 4 Shaft Shaft NNP 42149 1553 5 and and CC 42149 1553 6 preliminary preliminary JJ 42149 1553 7 headings heading NNS 42149 1553 8 . . . 42149 1554 1 |December |December NNS 42149 1554 2 11 11 CD 42149 1554 3 , , , 42149 1554 4 ' ' '' 42149 1554 5 03|September 03|september NN 42149 1554 6 1 1 CD 42149 1554 7 , , , 42149 1554 8 ' ' '' 42149 1554 9 04| 04| CD 42149 1554 10 Finished Finished NNP 42149 1554 11 . . . 42149 1555 1 | | NNP 42149 1555 2 | | NNP 42149 1555 3 | | NNP 42149 1555 4 Excavation Excavation NNP 42149 1555 5 of of IN 42149 1555 6 shield shield NN 42149 1555 7 chamber chamber NN 42149 1555 8 . . . 42149 1556 1 Begun.| Begun.| NNP 42149 1556 2 May May NNP 42149 1556 3 24 24 CD 42149 1556 4 , , , 42149 1556 5 ' ' '' 42149 1556 6 04 04 CD 42149 1556 7 . . . 42149 1557 1 |January |january JJ 42149 1557 2 16 16 CD 42149 1557 3 , , , 42149 1557 4 ' ' '' 42149 1557 5 05.| 05.| NNP 42149 1557 6 Excavation Excavation NNP 42149 1557 7 of of IN 42149 1557 8 shield shield NN 42149 1557 9 chamber chamber NN 42149 1557 10 . . . 42149 1558 1 |January |january JJ 42149 1558 2 21 21 CD 42149 1558 3 , , , 42149 1558 4 ' ' '' 42149 1558 5 05.| 05.| NNP 42149 1558 6 March March NNP 42149 1558 7 25 25 CD 42149 1558 8 , , , 42149 1558 9 ' ' CD 42149 1558 10 05 05 CD 42149 1558 11 . . . 42149 1559 1 | | NNP 42149 1559 2 Finished finish VBD 42149 1559 3 . . . 42149 1560 1 | | NNP 42149 1560 2 | | CD 42149 1560 3 | | CD 42149 1560 4 Cast cast NN 42149 1560 5 - - HYPH 42149 1560 6 iron iron NN 42149 1560 7 lining lining NN 42149 1560 8 of of IN 42149 1560 9 shield shield NNP 42149 1560 10 chambers.|February chambers.|February NNP 42149 1560 11 4 4 CD 42149 1560 12 , , , 42149 1560 13 ' ' '' 42149 1560 14 05.| 05.| ADD 42149 1560 15 None none NN 42149 1560 16 . . . 42149 1561 1 | | NNP 42149 1561 2 Begun Begun NNP 42149 1561 3 . . . 42149 1562 1 | | NNP 42149 1562 2 | | CD 42149 1562 3 | | CD 42149 1562 4 Cast cast NN 42149 1562 5 - - HYPH 42149 1562 6 iron iron NN 42149 1562 7 lining lining NN 42149 1562 8 of of IN 42149 1562 9 shield shield NN 42149 1562 10 chambers.| chambers.| NNP 42149 1562 11 March March NNP 42149 1562 12 13 13 CD 42149 1562 13 , , , 42149 1562 14 ' ' CD 42149 1562 15 05 05 CD 42149 1562 16 . . . 42149 1563 1 | | NNP 42149 1563 2 None None NNP 42149 1563 3 . . . 42149 1564 1 | | NNP 42149 1564 2 Finished finish VBD 42149 1564 3 . . . 42149 1565 1 | | NNP 42149 1565 2 | | NNP 42149 1565 3 | | NNP 42149 1565 4 Excavation Excavation NNP 42149 1565 5 of of IN 42149 1565 6 tunnels tunnel NNS 42149 1565 7 begun begin VBN 42149 1565 8 before before IN 42149 1565 9 |October |October NNP 42149 1565 10 17 17 CD 42149 1565 11 , , , 42149 1565 12 ' ' '' 42149 1565 13 04.|January 04.|january CD 42149 1565 14 13 13 CD 42149 1565 15 , , , 42149 1565 16 ' ' '' 42149 1565 17 05.| 05.| NNS 42149 1565 18 installation installation NN 42149 1565 19 of of IN 42149 1565 20 shield shield NN 42149 1565 21 . . . 42149 1566 1 | | NNP 42149 1566 2 | | CD 42149 1566 3 | | CD 42149 1566 4 Commenced Commenced NNP 42149 1566 5 building building NN 42149 1566 6 falsework falsework NN 42149 1566 7 for for IN 42149 1566 8 | | NNP 42149 1566 9 March March NNP 42149 1566 10 6 6 CD 42149 1566 11 , , , 42149 1566 12 ' ' CD 42149 1566 13 05 05 CD 42149 1566 14 . . . 42149 1567 1 | | NNP 42149 1567 2 March March NNP 42149 1567 3 23 23 CD 42149 1567 4 , , , 42149 1567 5 ' ' CD 42149 1567 6 05 05 CD 42149 1567 7 . . . 42149 1568 1 | | NNS 42149 1568 2 shield shield NN 42149 1568 3 . . . 42149 1569 1 | | NNP 42149 1569 2 | | CD 42149 1569 3 | | CD 42149 1569 4 Shield Shield NNP 42149 1569 5 parts part NNS 42149 1569 6 received receive VBD 42149 1569 7 at at IN 42149 1569 8 shaft shaft NN 42149 1569 9 . . . 42149 1570 1 | | NNP 42149 1570 2 March March NNP 42149 1570 3 11 11 CD 42149 1570 4 , , , 42149 1570 5 ' ' CD 42149 1570 6 05 05 CD 42149 1570 7 . . . 42149 1571 1 | | NNP 42149 1571 2 March March NNP 42149 1571 3 20 20 CD 42149 1571 4 , , , 42149 1571 5 ' ' CD 42149 1571 6 05 05 CD 42149 1571 7 . . . 42149 1572 1 | | NNP 42149 1572 2 Erection Erection NNP 42149 1572 3 of of IN 42149 1572 4 shield shield NN 42149 1572 5 begun begin VBN 42149 1572 6 . . . 42149 1573 1 | | NNP 42149 1573 2 March March NNP 42149 1573 3 13 13 CD 42149 1573 4 , , , 42149 1573 5 ' ' CD 42149 1573 6 05 05 CD 42149 1573 7 . . . 42149 1574 1 | | NNP 42149 1574 2 March March NNP 42149 1574 3 27 27 CD 42149 1574 4 , , , 42149 1574 5 ' ' CD 42149 1574 6 05 05 CD 42149 1574 7 . . . 42149 1575 1 | | NNP 42149 1575 2 Erection Erection NNP 42149 1575 3 of of IN 42149 1575 4 shield shield NN 42149 1575 5 ( ( -LRB- 42149 1575 6 structural structural JJ 42149 1575 7 | | NNP 42149 1575 8 March March NNP 42149 1575 9 27 27 CD 42149 1575 10 , , , 42149 1575 11 ' ' CD 42149 1575 12 05 05 CD 42149 1575 13 . . . 42149 1576 1 | | NNP 42149 1576 2 April April NNP 42149 1576 3 12 12 CD 42149 1576 4 , , , 42149 1576 5 ' ' CD 42149 1576 6 05 05 CD 42149 1576 7 . . . 42149 1577 1 | | NNS 42149 1577 2 steel steel NNP 42149 1577 3 ) ) -RRB- 42149 1577 4 . . . 42149 1578 1 Finished finish VBN 42149 1578 2 . . . 42149 1579 1 | | NNP 42149 1579 2 | | CD 42149 1579 3 | | NNP 42149 1579 4 Erection Erection NNP 42149 1579 5 of of IN 42149 1579 6 shield shield NNP 42149 1579 7 ( ( -LRB- 42149 1579 8 hydraulic hydraulic NNP 42149 1579 9 | | NNP 42149 1579 10 May May NNP 42149 1579 11 11 11 CD 42149 1579 12 , , , 42149 1579 13 ' ' '' 42149 1579 14 05 05 CD 42149 1579 15 . . . 42149 1580 1 | | NNP 42149 1580 2 May May NNP 42149 1580 3 25 25 CD 42149 1580 4 , , , 42149 1580 5 ' ' CD 42149 1580 6 05 05 CD 42149 1580 7 . . . 42149 1581 1 | | NNP 42149 1581 2 fittings fitting NNS 42149 1581 3 ) ) -RRB- 42149 1581 4 . . . 42149 1582 1 Finished finish VBN 42149 1582 2 . . . 42149 1583 1 | | NNP 42149 1583 2 | | NNP 42149 1583 3 | | CD 42149 1583 4 First first JJ 42149 1583 5 ring ring NN 42149 1583 6 of of IN 42149 1583 7 permanent permanent JJ 42149 1583 8 cast cast NN 42149 1583 9 - - HYPH 42149 1583 10 iron iron NN 42149 1583 11 | | NNP 42149 1583 12 May May NNP 42149 1583 13 12 12 CD 42149 1583 14 , , , 42149 1583 15 ' ' CD 42149 1583 16 05 05 CD 42149 1583 17 . . . 42149 1584 1 | | NNP 42149 1584 2 May May NNP 42149 1584 3 29 29 CD 42149 1584 4 , , , 42149 1584 5 ' ' CD 42149 1584 6 05 05 CD 42149 1584 7 . . . 42149 1585 1 | | JJ 42149 1585 2 lining lining NN 42149 1585 3 put put NN 42149 1585 4 in in RP 42149 1585 5 . . . 42149 1586 1 | | NNP 42149 1586 2 | | CD 42149 1586 3 | | CD 42149 1586 4 First first JJ 42149 1586 5 air air NN 42149 1586 6 lock lock NN 42149 1586 7 bulkhead bulkhead NN 42149 1586 8 wall wall NN 42149 1586 9 . . . 42149 1587 1 Begun.| Begun.| NNP 42149 1587 2 May May NNP 42149 1587 3 29 29 CD 42149 1587 4 , , , 42149 1587 5 ' ' CD 42149 1587 6 05 05 CD 42149 1587 7 . . . 42149 1588 1 | | NNP 42149 1588 2 June June NNP 42149 1588 3 15 15 CD 42149 1588 4 , , , 42149 1588 5 ' ' CD 42149 1588 6 05 05 CD 42149 1588 7 . . . 42149 1589 1 | | CD 42149 1589 2 First first JJ 42149 1589 3 air air NN 42149 1589 4 lock lock NN 42149 1589 5 bulkhead bulkhead NN 42149 1589 6 wall wall NN 42149 1589 7 . . . 42149 1590 1 | | NNP 42149 1590 2 June June NNP 42149 1590 3 7 7 CD 42149 1590 4 , , , 42149 1590 5 ' ' CD 42149 1590 6 05 05 CD 42149 1590 7 . . . 42149 1591 1 | | NNP 42149 1591 2 June June NNP 42149 1591 3 23 23 CD 42149 1591 4 , , , 42149 1591 5 ' ' CD 42149 1591 6 05 05 CD 42149 1591 7 . . . 42149 1592 1 | | NNP 42149 1592 2 Finished finish VBD 42149 1592 3 . . . 42149 1593 1 | | NNP 42149 1593 2 | | CD 42149 1593 3 | | CD 42149 1593 4 Air air NN 42149 1593 5 pressure pressure NN 42149 1593 6 first first RB 42149 1593 7 put put VBN 42149 1593 8 in in IN 42149 1593 9 tunnel tunnel NN 42149 1593 10 . . . 42149 1594 1 | | NNP 42149 1594 2 June June NNP 42149 1594 3 25 25 CD 42149 1594 4 , , , 42149 1594 5 ' ' CD 42149 1594 6 05 05 CD 42149 1594 7 . . . 42149 1595 1 | | NNP 42149 1595 2 June June NNP 42149 1595 3 29 29 CD 42149 1595 4 , , , 42149 1595 5 ' ' CD 42149 1595 6 05 05 CD 42149 1595 7 . . . 42149 1596 1 | | NNP 42149 1596 2 Rock Rock NNP 42149 1596 3 disappeared disappear VBD 42149 1596 4 from from IN 42149 1596 5 invert invert NN 42149 1596 6 of of IN 42149 1596 7 |December |December NNP 42149 1596 8 1 1 CD 42149 1596 9 , , , 42149 1596 10 ' ' '' 42149 1596 11 05.|October 05.|october NN 42149 1596 12 31 31 CD 42149 1596 13 , , , 42149 1596 14 ' ' '' 42149 1596 15 05.| 05.| NNS 42149 1596 16 tunnel tunnel NN 42149 1596 17 . . . 42149 1597 1 | | NNP 42149 1597 2 | | CD 42149 1597 3 | | CD 42149 1597 4 First first JJ 42149 1597 5 pair pair NN 42149 1597 6 of of IN 42149 1597 7 bore bore NN 42149 1597 8 segments segment NNS 42149 1597 9 built build VBN 42149 1597 10 in|December in|december NN 42149 1597 11 9 9 CD 42149 1597 12 , , , 42149 1597 13 ' ' '' 42149 1597 14 05.|January 05.|january JJ 42149 1597 15 12 12 CD 42149 1597 16 , , , 42149 1597 17 ' ' '' 42149 1597 18 06.| 06.| NNP 42149 1597 19 tunnel tunnel NN 42149 1597 20 . . . 42149 1598 1 | | NNP 42149 1598 2 | | NNP 42149 1598 3 | | NNP 42149 1598 4 Rip Rip NNP 42149 1598 5 - - HYPH 42149 1598 6 rap rap NN 42149 1598 7 of of IN 42149 1598 8 river river NN 42149 1598 9 bulkhead bulkhead NN 42149 1598 10 wall wall NNP 42149 1598 11 met meet VBD 42149 1598 12 . . . 42149 1599 1 |February |February : 42149 1599 2 8 8 CD 42149 1599 3 , , , 42149 1599 4 ' ' '' 42149 1599 5 06.| 06.| VBZ 42149 1599 6 None none NN 42149 1599 7 . . . 42149 1600 1 | | CD 42149 1600 2 First First NNP 42149 1600 3 pile pile NN 42149 1600 4 met meet VBD 42149 1600 5 ( ( -LRB- 42149 1600 6 in in IN 42149 1600 7 river river NN 42149 1600 8 bulkhead bulkhead NN 42149 1600 9 |February |February NNP 42149 1600 10 18 18 CD 42149 1600 11 , , , 42149 1600 12 ' ' '' 42149 1600 13 06|January 06|january NN 42149 1600 14 3 3 CD 42149 1600 15 , , , 42149 1600 16 ' ' '' 42149 1600 17 06 06 CD 42149 1600 18 . . . 42149 1601 1 | | JJ 42149 1601 2 wall wall NN 42149 1601 3 at at IN 42149 1601 4 Manhattan Manhattan NNP 42149 1601 5 , , , 42149 1601 6 and and CC 42149 1601 7 Fowler Fowler NNP 42149 1601 8 | | NNP 42149 1601 9 | | NNP 42149 1601 10 | | CD 42149 1601 11 warehouse warehouse NN 42149 1601 12 foundation foundation NN 42149 1601 13 at at IN 42149 1601 14 Weehawken Weehawken NNP 42149 1601 15 ) ) -RRB- 42149 1601 16 . . . 42149 1602 1 | | NNP 42149 1602 2 | | CD 42149 1602 3 | | NNP 42149 1602 4 Last last JJ 42149 1602 5 pile pile NN 42149 1602 6 met meet VBD 42149 1602 7 . . . 42149 1603 1 | | NNP 42149 1603 2 March March NNP 42149 1603 3 2 2 CD 42149 1603 4 , , , 42149 1603 5 ' ' '' 42149 1603 6 06 06 CD 42149 1603 7 . . . 42149 1604 1 |February |February : 42149 1604 2 5 5 CD 42149 1604 3 , , , 42149 1604 4 ' ' '' 42149 1604 5 06.| 06.| ADD 42149 1604 6 First first JJ 42149 1604 7 ring ring NN 42149 1604 8 erected erect VBN 42149 1604 9 on on IN 42149 1604 10 river river NN 42149 1604 11 side side NN 42149 1604 12 of of IN 42149 1604 13 | | NNP 42149 1604 14 March March NNP 42149 1604 15 3 3 CD 42149 1604 16 , , , 42149 1604 17 ' ' '' 42149 1604 18 06 06 CD 42149 1604 19 . . . 42149 1605 1 |February |February : 42149 1605 2 6 6 CD 42149 1605 3 , , , 42149 1605 4 ' ' '' 42149 1605 5 06.| 06.| JJ 42149 1605 6 shore shore NN 42149 1605 7 line line NN 42149 1605 8 . . . 42149 1606 1 | | NNP 42149 1606 2 | | CD 42149 1606 3 | | NNP 42149 1606 4 Removing Removing NNP 42149 1606 5 hood hood NN 42149 1606 6 of of IN 42149 1606 7 shield shield NN 42149 1606 8 . . . 42149 1607 1 Begun begin VBN 42149 1607 2 . . . 42149 1608 1 | | NNP 42149 1608 2 March March NNP 42149 1608 3 27 27 CD 42149 1608 4 , , , 42149 1608 5 ' ' '' 42149 1608 6 06 06 CD 42149 1608 7 . . . 42149 1609 1 |February |February : 42149 1609 2 6 6 CD 42149 1609 3 , , , 42149 1609 4 ' ' '' 42149 1609 5 06.| 06.| NNP 42149 1609 6 Removing remove VBG 42149 1609 7 hood hood NN 42149 1609 8 of of IN 42149 1609 9 shield shield NN 42149 1609 10 . . . 42149 1610 1 Finished finish VBN 42149 1610 2 . . . 42149 1611 1 | | NNP 42149 1611 2 April April NNP 42149 1611 3 1 1 CD 42149 1611 4 , , , 42149 1611 5 ' ' '' 42149 1611 6 06 06 CD 42149 1611 7 . . . 42149 1612 1 |February |February : 42149 1612 2 8 8 CD 42149 1612 3 , , , 42149 1612 4 ' ' '' 42149 1612 5 06.| 06.| ADD 42149 1612 6 Second second JJ 42149 1612 7 air air NN 42149 1612 8 - - HYPH 42149 1612 9 lock lock NN 42149 1612 10 bulkhead bulkhead NN 42149 1612 11 wall wall NN 42149 1612 12 . . . 42149 1613 1 | | NNP 42149 1613 2 May May NNP 42149 1613 3 12 12 CD 42149 1613 4 , , , 42149 1613 5 ' ' '' 42149 1613 6 06 06 CD 42149 1613 7 . . . 42149 1614 1 | | NNP 42149 1614 2 March March NNP 42149 1614 3 19 19 CD 42149 1614 4 , , , 42149 1614 5 ' ' '' 42149 1614 6 06 06 CD 42149 1614 7 . . . 42149 1615 1 | | NNP 42149 1615 2 Begun Begun NNP 42149 1615 3 . . . 42149 1616 1 | | NNP 42149 1616 2 | | CD 42149 1616 3 | | CD 42149 1616 4 Second second JJ 42149 1616 5 air air NN 42149 1616 6 - - HYPH 42149 1616 7 lock lock NN 42149 1616 8 bulkhead bulkhead NN 42149 1616 9 wall wall NN 42149 1616 10 . . . 42149 1617 1 | | NNP 42149 1617 2 May May NNP 42149 1617 3 21 21 CD 42149 1617 4 , , , 42149 1617 5 ' ' '' 42149 1617 6 06 06 CD 42149 1617 7 . . . 42149 1618 1 | | NNP 42149 1618 2 March March NNP 42149 1618 3 24 24 CD 42149 1618 4 , , , 42149 1618 5 ' ' '' 42149 1618 6 06 06 CD 42149 1618 7 . . . 42149 1619 1 | | NNP 42149 1619 2 Finished finish VBD 42149 1619 3 . . . 42149 1620 1 | | NNP 42149 1620 2 | | CD 42149 1620 3 | | CD 42149 1620 4 ------------------------------------+----------------+----------------| ------------------------------------+----------------+----------------| : 42149 1620 5 Tunnel Tunnel NNP 42149 1620 6 holed hole VBD 42149 1620 7 through through RB 42149 1620 8 with with IN 42149 1620 9 meeting meeting NN 42149 1620 10 | | NNP 42149 1620 11 September September NNP 42149 1620 12 12 12 CD 42149 1620 13 , , , 42149 1620 14 1906 1906 CD 42149 1620 15 . . . 42149 1621 1 | | NNS 42149 1621 2 tunnel tunnel NN 42149 1621 3 . . . 42149 1622 1 | | NNS 42149 1622 2 | | NNP 42149 1622 3 Last last JJ 42149 1622 4 ring ring NN 42149 1622 5 of of IN 42149 1622 6 permanent permanent JJ 42149 1622 7 cast cast NN 42149 1622 8 - - HYPH 42149 1622 9 iron iron NN 42149 1622 10 | | NNP 42149 1622 11 October October NNP 42149 1622 12 9 9 CD 42149 1622 13 , , , 42149 1622 14 1906 1906 CD 42149 1622 15 . . . 42149 1623 1 | | JJ 42149 1623 2 lining lining NN 42149 1623 3 built build VBN 42149 1623 4 in in IN 42149 1623 5 . . . 42149 1624 1 | | NNS 42149 1624 2 | | NNS 42149 1624 3 = = SYM 42149 1624 4 = = SYM 42149 1624 5 = = SYM 42149 1624 6 = = SYM 42149 1624 7 = = SYM 42149 1624 8 = = SYM 42149 1624 9 = = SYM 42149 1624 10 = = SYM 42149 1624 11 = = SYM 42149 1624 12 = = SYM 42149 1624 13 = = SYM 42149 1624 14 = = SYM 42149 1624 15 = = SYM 42149 1624 16 = = SYM 42149 1624 17 = = SYM 42149 1624 18 = = SYM 42149 1624 19 = = SYM 42149 1624 20 = = SYM 42149 1624 21 = = SYM 42149 1624 22 = = SYM 42149 1624 23 = = SYM 42149 1624 24 = = SYM 42149 1624 25 = = SYM 42149 1624 26 = = SYM 42149 1624 27 = = SYM 42149 1624 28 = = SYM 42149 1624 29 = = SYM 42149 1624 30 = = SYM 42149 1624 31 = = SYM 42149 1624 32 = = SYM 42149 1624 33 = = SYM 42149 1624 34 = = SYM 42149 1624 35 = = SYM 42149 1624 36 = = SYM 42149 1624 37 = = NFP 42149 1624 38 = = SYM 42149 1624 39 + + SYM 42149 1624 40 = = SYM 42149 1624 41 = = SYM 42149 1624 42 = = SYM 42149 1624 43 = = SYM 42149 1624 44 = = SYM 42149 1624 45 = = SYM 42149 1624 46 = = SYM 42149 1624 47 = = SYM 42149 1624 48 = = SYM 42149 1624 49 = = SYM 42149 1624 50 = = SYM 42149 1624 51 = = SYM 42149 1624 52 = = SYM 42149 1624 53 = = SYM 42149 1624 54 = = NFP 42149 1624 55 = = SYM 42149 1624 56 + + SYM 42149 1624 57 = = SYM 42149 1624 58 = = SYM 42149 1624 59 = = SYM 42149 1624 60 = = SYM 42149 1624 61 = = SYM 42149 1624 62 = = SYM 42149 1624 63 = = SYM 42149 1624 64 = = SYM 42149 1624 65 = = SYM 42149 1624 66 = = SYM 42149 1624 67 = = SYM 42149 1624 68 = = SYM 42149 1624 69 = = SYM 42149 1624 70 = = SYM 42149 1624 71 = = SYM 42149 1624 72 =| =| ADD 42149 1624 73 = = NFP 42149 1624 74 = = NFP 42149 1624 75 = = NFP 42149 1624 76 = = SYM 42149 1624 77 = = SYM 42149 1624 78 = = SYM 42149 1624 79 = = SYM 42149 1624 80 = = SYM 42149 1624 81 = = SYM 42149 1624 82 = = SYM 42149 1624 83 = = SYM 42149 1624 84 = = SYM 42149 1624 85 = = SYM 42149 1624 86 = = SYM 42149 1624 87 = = SYM 42149 1624 88 = = SYM 42149 1624 89 = = SYM 42149 1624 90 = = SYM 42149 1624 91 = = SYM 42149 1624 92 = = SYM 42149 1624 93 = = SYM 42149 1624 94 = = SYM 42149 1624 95 = = SYM 42149 1624 96 = = SYM 42149 1624 97 = = SYM 42149 1624 98 = = SYM 42149 1624 99 = = SYM 42149 1624 100 = = SYM 42149 1624 101 = = SYM 42149 1624 102 = = SYM 42149 1624 103 = = SYM 42149 1624 104 = = SYM 42149 1624 105 = = SYM 42149 1624 106 = = SYM 42149 1624 107 = = NFP 42149 1624 108 = = SYM 42149 1624 109 + + SYM 42149 1624 110 = = SYM 42149 1624 111 = = SYM 42149 1624 112 = = SYM 42149 1624 113 = = SYM 42149 1624 114 = = SYM 42149 1624 115 = = SYM 42149 1624 116 = = SYM 42149 1624 117 = = SYM 42149 1624 118 = = SYM 42149 1624 119 = = SYM 42149 1624 120 = = SYM 42149 1624 121 = = SYM 42149 1624 122 = = SYM 42149 1624 123 = = SYM 42149 1624 124 = = NFP 42149 1624 125 = = SYM 42149 1624 126 + + SYM 42149 1624 127 = = SYM 42149 1624 128 = = SYM 42149 1624 129 = = SYM 42149 1624 130 = = SYM 42149 1624 131 = = SYM 42149 1624 132 = = SYM 42149 1624 133 = = SYM 42149 1624 134 = = SYM 42149 1624 135 = = SYM 42149 1624 136 = = SYM 42149 1624 137 = = SYM 42149 1624 138 = = SYM 42149 1624 139 = = SYM 42149 1624 140 = = SYM 42149 1624 141 = = SYM 42149 1624 142 =| =| NNP 42149 1624 143 | | NNP 42149 1624 144 South South NNP 42149 1624 145 | | NNP 42149 1624 146 South South NNP 42149 1624 147 | | NNP 42149 1624 148 | | NNP 42149 1624 149 Manhattan Manhattan NNP 42149 1624 150 . . . 42149 1625 1 | | NNP 42149 1625 2 Weehawken Weehawken NNP 42149 1625 3 . . . 42149 1626 1 | | NNP 42149 1626 2 ------------------------------------+----------------+----------------| ------------------------------------+----------------+----------------| NNP 42149 1626 3 Shaft shaft NN 42149 1626 4 and and CC 42149 1626 5 preliminary preliminary JJ 42149 1626 6 headings heading NNS 42149 1626 7 . . . 42149 1627 1 |June |June NNP 42149 1627 2 10 10 CD 42149 1627 3 , , , 42149 1627 4 ' ' '' 42149 1627 5 03 03 CD 42149 1627 6 . . . 42149 1628 1 |June |June NNP 42149 1628 2 11 11 CD 42149 1628 3 , , , 42149 1628 4 ' ' '' 42149 1628 5 03 03 CD 42149 1628 6 . . . 42149 1629 1 | | NNP 42149 1629 2 Begun Begun NNP 42149 1629 3 . . . 42149 1630 1 | | NNP 42149 1630 2 | | NNP 42149 1630 3 | | NNP 42149 1630 4 Shaft Shaft NNP 42149 1630 5 and and CC 42149 1630 6 preliminary preliminary JJ 42149 1630 7 headings heading NNS 42149 1630 8 . . . 42149 1631 1 |December |December NNS 42149 1631 2 11 11 CD 42149 1631 3 , , , 42149 1631 4 |September |September NNP 42149 1631 5 1 1 CD 42149 1631 6 , , , 42149 1631 7 04| 04| CD 42149 1631 8 Finished finish VBN 42149 1631 9 . . . 42149 1632 1 |'03 |'03 NNS 42149 1632 2 . . . 42149 1633 1 | | NNP 42149 1633 2 | | NNP 42149 1633 3 Excavation Excavation NNP 42149 1633 4 of of IN 42149 1633 5 shield shield NN 42149 1633 6 chamber chamber NN 42149 1633 7 . . . 42149 1634 1 Begun.|May Begun.|May : 42149 1634 2 24 24 CD 42149 1634 3 , , , 42149 1634 4 ' ' '' 42149 1634 5 04 04 CD 42149 1634 6 . . . 42149 1635 1 |January |january JJ 42149 1635 2 16 16 CD 42149 1635 3 , , , 42149 1635 4 ' ' '' 42149 1635 5 05.| 05.| NNP 42149 1635 6 Excavation Excavation NNP 42149 1635 7 of of IN 42149 1635 8 shield shield NN 42149 1635 9 chamber chamber NN 42149 1635 10 . . . 42149 1636 1 |May |May NNP 42149 1636 2 13 13 CD 42149 1636 3 , , , 42149 1636 4 ' ' CD 42149 1636 5 05 05 CD 42149 1636 6 . . . 42149 1637 1 |April |April NNP 42149 1637 2 19 19 CD 42149 1637 3 , , , 42149 1637 4 ' ' CD 42149 1637 5 05 05 CD 42149 1637 6 . . . 42149 1638 1 | | NNP 42149 1638 2 Finished finish VBD 42149 1638 3 . . . 42149 1639 1 | | NNP 42149 1639 2 | | CD 42149 1639 3 | | CD 42149 1639 4 Cast cast NN 42149 1639 5 - - HYPH 42149 1639 6 iron iron NN 42149 1639 7 lining lining NN 42149 1639 8 of of IN 42149 1639 9 shield shield NNP 42149 1639 10 chambers.|May chambers.|May NNP 42149 1639 11 15 15 CD 42149 1639 12 , , , 42149 1639 13 ' ' CD 42149 1639 14 05 05 CD 42149 1639 15 . . . 42149 1640 1 |None |none CD 42149 1640 2 . . . 42149 1641 1 | | NNP 42149 1641 2 Begun Begun NNP 42149 1641 3 . . . 42149 1642 1 | | NNP 42149 1642 2 | | CD 42149 1642 3 | | CD 42149 1642 4 Cast cast NN 42149 1642 5 - - HYPH 42149 1642 6 iron iron NN 42149 1642 7 lining lining NN 42149 1642 8 of of IN 42149 1642 9 shield shield NN 42149 1642 10 chambers.|June chambers.|June NNP 42149 1642 11 14 14 CD 42149 1642 12 , , , 42149 1642 13 ' ' CD 42149 1642 14 05 05 CD 42149 1642 15 . . . 42149 1643 1 |None |none CD 42149 1643 2 . . . 42149 1644 1 | | NNP 42149 1644 2 Finished finish VBD 42149 1644 3 . . . 42149 1645 1 | | NNP 42149 1645 2 | | NNP 42149 1645 3 | | NNP 42149 1645 4 Excavation Excavation NNP 42149 1645 5 of of IN 42149 1645 6 tunnels tunnel NNS 42149 1645 7 begun begin VBN 42149 1645 8 before before IN 42149 1645 9 |January |January NNP 42149 1645 10 5 5 CD 42149 1645 11 , , , 42149 1645 12 ' ' CD 42149 1645 13 05 05 CD 42149 1645 14 . . . 42149 1646 1 |January |january JJ 42149 1646 2 25 25 CD 42149 1646 3 , , , 42149 1646 4 ' ' '' 42149 1646 5 05.| 05.| NNS 42149 1646 6 installation installation NN 42149 1646 7 of of IN 42149 1646 8 shield shield NN 42149 1646 9 . . . 42149 1647 1 | | NNP 42149 1647 2 | | CD 42149 1647 3 | | CD 42149 1647 4 Commenced Commenced NNP 42149 1647 5 building building NN 42149 1647 6 falsework falsework NN 42149 1647 7 for for IN 42149 1647 8 |June |June NNP 42149 1647 9 19 19 CD 42149 1647 10 , , , 42149 1647 11 ' ' CD 42149 1647 12 05 05 CD 42149 1647 13 . . . 42149 1648 1 |April |April NNP 42149 1648 2 17 17 CD 42149 1648 3 , , , 42149 1648 4 ' ' CD 42149 1648 5 05 05 CD 42149 1648 6 . . . 42149 1649 1 | | NNS 42149 1649 2 shield shield NN 42149 1649 3 . . . 42149 1650 1 | | NNP 42149 1650 2 | | CD 42149 1650 3 | | CD 42149 1650 4 Shield Shield NNP 42149 1650 5 parts part NNS 42149 1650 6 received receive VBD 42149 1650 7 at at IN 42149 1650 8 shaft shaft NN 42149 1650 9 . . . 42149 1651 1 |June |June NNP 42149 1651 2 22 22 CD 42149 1651 3 , , , 42149 1651 4 ' ' CD 42149 1651 5 05 05 CD 42149 1651 6 . . . 42149 1652 1 |April |April NNP 42149 1652 2 24 24 CD 42149 1652 3 , , , 42149 1652 4 ' ' CD 42149 1652 5 05 05 CD 42149 1652 6 . . . 42149 1653 1 | | NNP 42149 1653 2 Erection Erection NNP 42149 1653 3 of of IN 42149 1653 4 shield shield NN 42149 1653 5 begun begin VBN 42149 1653 6 . . . 42149 1654 1 |June |June NNP 42149 1654 2 22 22 CD 42149 1654 3 , , , 42149 1654 4 ' ' CD 42149 1654 5 05 05 CD 42149 1654 6 . . . 42149 1655 1 |April |April NNP 42149 1655 2 24 24 CD 42149 1655 3 , , , 42149 1655 4 ' ' CD 42149 1655 5 05 05 CD 42149 1655 6 . . . 42149 1656 1 | | NNP 42149 1656 2 Erection Erection NNP 42149 1656 3 of of IN 42149 1656 4 shield shield NN 42149 1656 5 ( ( -LRB- 42149 1656 6 structural structural NNP 42149 1656 7 |June |June NNP 42149 1656 8 8 8 CD 42149 1656 9 , , , 42149 1656 10 ' ' '' 42149 1656 11 05 05 CD 42149 1656 12 . . . 42149 1657 1 |May |May NNP 42149 1657 2 6 6 CD 42149 1657 3 , , , 42149 1657 4 ' ' CD 42149 1657 5 05 05 CD 42149 1657 6 . . . 42149 1658 1 | | NNS 42149 1658 2 steel steel NNP 42149 1658 3 ) ) -RRB- 42149 1658 4 . . . 42149 1659 1 Finished finish VBN 42149 1659 2 . . . 42149 1660 1 | | NNP 42149 1660 2 | | CD 42149 1660 3 | | NNP 42149 1660 4 Erection Erection NNP 42149 1660 5 of of IN 42149 1660 6 shield shield NN 42149 1660 7 ( ( -LRB- 42149 1660 8 hydraulic hydraulic NNP 42149 1660 9 |August |August NNP 42149 1660 10 27 27 CD 42149 1660 11 , , , 42149 1660 12 ' ' CD 42149 1660 13 05 05 CD 42149 1660 14 . . . 42149 1661 1 |June |June NNP 42149 1661 2 13 13 CD 42149 1661 3 , , , 42149 1661 4 ' ' CD 42149 1661 5 05 05 CD 42149 1661 6 . . . 42149 1662 1 | | NNP 42149 1662 2 fittings fitting NNS 42149 1662 3 ) ) -RRB- 42149 1662 4 . . . 42149 1663 1 Finished finish VBN 42149 1663 2 . . . 42149 1664 1 | | NNP 42149 1664 2 | | NNP 42149 1664 3 | | CD 42149 1664 4 First first JJ 42149 1664 5 ring ring NN 42149 1664 6 of of IN 42149 1664 7 permanent permanent JJ 42149 1664 8 cast cast NN 42149 1664 9 - - HYPH 42149 1664 10 iron iron NN 42149 1664 11 |August |august NN 42149 1664 12 27 27 CD 42149 1664 13 , , , 42149 1664 14 ' ' CD 42149 1664 15 05 05 CD 42149 1664 16 . . . 42149 1665 1 |June |June NNP 42149 1665 2 14 14 CD 42149 1665 3 , , , 42149 1665 4 ' ' '' 42149 1665 5 05 05 CD 42149 1665 6 . . . 42149 1666 1 | | JJ 42149 1666 2 lining lining NN 42149 1666 3 put put NN 42149 1666 4 in in RP 42149 1666 5 . . . 42149 1667 1 | | NNP 42149 1667 2 | | CD 42149 1667 3 | | CD 42149 1667 4 First first JJ 42149 1667 5 air air NN 42149 1667 6 lock lock NN 42149 1667 7 bulkhead bulkhead NN 42149 1667 8 wall wall NN 42149 1667 9 . . . 42149 1668 1 Begun.|September begun.|september NN 42149 1668 2 18 18 CD 42149 1668 3 , , , 42149 1668 4 |June |June NNP 42149 1668 5 21 21 CD 42149 1668 6 , , , 42149 1668 7 ' ' CD 42149 1668 8 05 05 CD 42149 1668 9 . . . 42149 1669 1 | | NNP 42149 1669 2 |'05 |'05 NNP 42149 1669 3 | | NNP 42149 1669 4 | | CD 42149 1669 5 First first JJ 42149 1669 6 air air NN 42149 1669 7 lock lock NN 42149 1669 8 bulkhead bulkhead NN 42149 1669 9 wall wall NN 42149 1669 10 . . . 42149 1670 1 |September |September NNP 42149 1670 2 23 23 CD 42149 1670 3 , , , 42149 1670 4 |July |july CD 42149 1670 5 3 3 CD 42149 1670 6 , , , 42149 1670 7 ' ' '' 42149 1670 8 05 05 CD 42149 1670 9 . . . 42149 1671 1 | | NNP 42149 1671 2 Finished finish VBD 42149 1671 3 . . . 42149 1672 1 |'05 |'05 NNP 42149 1672 2 | | NNP 42149 1672 3 | | NNP 42149 1672 4 Air air NN 42149 1672 5 pressure pressure NN 42149 1672 6 first first RB 42149 1672 7 put put VBN 42149 1672 8 in in IN 42149 1672 9 tunnel tunnel NN 42149 1672 10 . . . 42149 1673 1 |October |October NNP 42149 1673 2 6 6 CD 42149 1673 3 , , , 42149 1673 4 ' ' CD 42149 1673 5 05 05 CD 42149 1673 6 . . . 42149 1674 1 |July |July NNP 42149 1674 2 8 8 CD 42149 1674 3 , , , 42149 1674 4 ' ' '' 42149 1674 5 05 05 CD 42149 1674 6 . . . 42149 1675 1 | | NNP 42149 1675 2 Rock Rock NNP 42149 1675 3 disappeared disappear VBD 42149 1675 4 from from IN 42149 1675 5 invert invert NN 42149 1675 6 of of IN 42149 1675 7 |February |February NNP 42149 1675 8 8 8 CD 42149 1675 9 , , , 42149 1675 10 ' ' '' 42149 1675 11 06.|September 06.|September NNP 42149 1675 12 21 21 CD 42149 1675 13 , , , 42149 1675 14 05| 05| CD 42149 1675 15 tunnel tunnel NN 42149 1675 16 . . . 42149 1676 1 | | NNP 42149 1676 2 | | CD 42149 1676 3 | | CD 42149 1676 4 First first JJ 42149 1676 5 pair pair NN 42149 1676 6 of of IN 42149 1676 7 bore bore NN 42149 1676 8 segments segment NNS 42149 1676 9 built build VBN 42149 1676 10 in|February in|February NNP 42149 1676 11 16 16 CD 42149 1676 12 , , , 42149 1676 13 |December |december CD 42149 1676 14 12 12 CD 42149 1676 15 , , , 42149 1676 16 ' ' '' 42149 1676 17 05| 05| CD 42149 1676 18 tunnel tunnel NN 42149 1676 19 . . . 42149 1677 1 |'06 |'06 NNP 42149 1677 2 . . . 42149 1678 1 | | NNP 42149 1678 2 | | NNP 42149 1678 3 Rip Rip NNP 42149 1678 4 - - HYPH 42149 1678 5 rap rap NN 42149 1678 6 of of IN 42149 1678 7 river river NN 42149 1678 8 bulkhead bulkhead NN 42149 1678 9 wall wall NNP 42149 1678 10 met meet VBD 42149 1678 11 . . . 42149 1679 1 |April |April NNP 42149 1679 2 11 11 CD 42149 1679 3 , , , 42149 1679 4 ' ' '' 42149 1679 5 06 06 CD 42149 1679 6 . . . 42149 1680 1 |None |none CD 42149 1680 2 . . . 42149 1681 1 | | CD 42149 1681 2 First First NNP 42149 1681 3 pile pile NN 42149 1681 4 met meet VBD 42149 1681 5 ( ( -LRB- 42149 1681 6 in in IN 42149 1681 7 river river NN 42149 1681 8 bulkhead bulkhead NN 42149 1681 9 |April |April NNP 42149 1681 10 18 18 CD 42149 1681 11 , , , 42149 1681 12 ' ' '' 42149 1681 13 06 06 CD 42149 1681 14 . . . 42149 1682 1 |December |December NNS 42149 1682 2 4 4 CD 42149 1682 3 , , , 42149 1682 4 ' ' '' 42149 1682 5 06.| 06.| JJ 42149 1682 6 wall wall NN 42149 1682 7 at at IN 42149 1682 8 Manhattan Manhattan NNP 42149 1682 9 , , , 42149 1682 10 and and CC 42149 1682 11 Fowler Fowler NNP 42149 1682 12 | | NNP 42149 1682 13 | | NNP 42149 1682 14 | | CD 42149 1682 15 warehouse warehouse NN 42149 1682 16 foundation foundation NN 42149 1682 17 at at IN 42149 1682 18 Weehawken Weehawken NNP 42149 1682 19 ) ) -RRB- 42149 1682 20 . . . 42149 1683 1 | | NNP 42149 1683 2 | | CD 42149 1683 3 | | NNP 42149 1683 4 Last last JJ 42149 1683 5 pile pile NN 42149 1683 6 met meet VBD 42149 1683 7 . . . 42149 1684 1 |May |May NNP 42149 1684 2 1 1 CD 42149 1684 3 , , , 42149 1684 4 ' ' '' 42149 1684 5 06 06 CD 42149 1684 6 . . . 42149 1685 1 |January |january JJ 42149 1685 2 9 9 CD 42149 1685 3 ' ' CD 42149 1685 4 06 06 CD 42149 1685 5 . . . 42149 1686 1 | | CD 42149 1686 2 First first RB 42149 1686 3 ring ring NN 42149 1686 4 erected erect VBN 42149 1686 5 on on IN 42149 1686 6 river river NN 42149 1686 7 side side NN 42149 1686 8 of of IN 42149 1686 9 |May |may JJ 42149 1686 10 9 9 CD 42149 1686 11 , , , 42149 1686 12 ' ' '' 42149 1686 13 06 06 CD 42149 1686 14 . . . 42149 1687 1 |January |january JJ 42149 1687 2 19 19 CD 42149 1687 3 , , , 42149 1687 4 ' ' '' 42149 1687 5 06.| 06.| JJ 42149 1687 6 shore shore NN 42149 1687 7 line line NN 42149 1687 8 . . . 42149 1688 1 | | NNP 42149 1688 2 | | CD 42149 1688 3 | | NNP 42149 1688 4 Removing Removing NNP 42149 1688 5 hood hood NN 42149 1688 6 of of IN 42149 1688 7 shield shield NN 42149 1688 8 . . . 42149 1689 1 Begun begin VBN 42149 1689 2 . . . 42149 1690 1 |May |May NNP 42149 1690 2 9 9 CD 42149 1690 3 , , , 42149 1690 4 ' ' '' 42149 1690 5 06 06 CD 42149 1690 6 . . . 42149 1691 1 |January |january JJ 42149 1691 2 19 19 CD 42149 1691 3 , , , 42149 1691 4 ' ' '' 42149 1691 5 06.| 06.| NNP 42149 1691 6 Removing remove VBG 42149 1691 7 hood hood NN 42149 1691 8 of of IN 42149 1691 9 shield shield NN 42149 1691 10 . . . 42149 1692 1 Finished finish VBN 42149 1692 2 . . . 42149 1693 1 |May |May NNP 42149 1693 2 12 12 CD 42149 1693 3 , , , 42149 1693 4 ' ' '' 42149 1693 5 06 06 CD 42149 1693 6 . . . 42149 1694 1 |January |january JJ 42149 1694 2 24 24 CD 42149 1694 3 , , , 42149 1694 4 ' ' '' 42149 1694 5 06.| 06.| ADD 42149 1694 6 Second second JJ 42149 1694 7 air air NN 42149 1694 8 - - HYPH 42149 1694 9 lock lock NN 42149 1694 10 bulkhead bulkhead NN 42149 1694 11 wall wall NN 42149 1694 12 . . . 42149 1695 1 |July |July NNP 42149 1695 2 13 13 CD 42149 1695 3 , , , 42149 1695 4 ' ' '' 42149 1695 5 06 06 CD 42149 1695 6 . . . 42149 1696 1 |March |March NNS 42149 1696 2 11 11 CD 42149 1696 3 , , , 42149 1696 4 ' ' '' 42149 1696 5 06 06 CD 42149 1696 6 . . . 42149 1697 1 | | NNP 42149 1697 2 Begun Begun NNP 42149 1697 3 . . . 42149 1698 1 | | NNP 42149 1698 2 | | CD 42149 1698 3 | | CD 42149 1698 4 Second second JJ 42149 1698 5 air air NN 42149 1698 6 - - HYPH 42149 1698 7 lock lock NN 42149 1698 8 bulkhead bulkhead NN 42149 1698 9 wall wall NN 42149 1698 10 . . . 42149 1699 1 |July |July NNP 42149 1699 2 21 21 CD 42149 1699 3 , , , 42149 1699 4 ' ' '' 42149 1699 5 06 06 CD 42149 1699 6 . . . 42149 1700 1 |March |March NNP 42149 1700 2 18 18 CD 42149 1700 3 , , , 42149 1700 4 ' ' '' 42149 1700 5 06 06 CD 42149 1700 6 . . . 42149 1701 1 | | NNP 42149 1701 2 Finished finish VBD 42149 1701 3 . . . 42149 1702 1 | | NNP 42149 1702 2 | | CD 42149 1702 3 | | CD 42149 1702 4 ------------------------------------+----------------+----------------| ------------------------------------+----------------+----------------| : 42149 1702 5 Tunnel Tunnel NNP 42149 1702 6 holed hole VBD 42149 1702 7 through through RB 42149 1702 8 with with IN 42149 1702 9 meeting meeting NN 42149 1702 10 | | NNP 42149 1702 11 October October NNP 42149 1702 12 9 9 CD 42149 1702 13 , , , 42149 1702 14 1906 1906 CD 42149 1702 15 . . . 42149 1703 1 | | NNS 42149 1703 2 tunnel tunnel NN 42149 1703 3 . . . 42149 1704 1 | | NNS 42149 1704 2 | | NNP 42149 1704 3 Last last JJ 42149 1704 4 ring ring NN 42149 1704 5 of of IN 42149 1704 6 permanent permanent JJ 42149 1704 7 cast cast NN 42149 1704 8 - - HYPH 42149 1704 9 iron iron NN 42149 1704 10 | | NNP 42149 1704 11 November November NNP 42149 1704 12 18 18 CD 42149 1704 13 , , , 42149 1704 14 1906 1906 CD 42149 1704 15 . . . 42149 1705 1 | | JJ 42149 1705 2 lining lining NN 42149 1705 3 built build VBN 42149 1705 4 in in IN 42149 1705 5 . . . 42149 1706 1 | | NNS 42149 1706 2 | | NNS 42149 1706 3 = = SYM 42149 1706 4 = = SYM 42149 1706 5 = = SYM 42149 1706 6 = = SYM 42149 1706 7 = = SYM 42149 1706 8 = = SYM 42149 1706 9 = = SYM 42149 1706 10 = = SYM 42149 1706 11 = = SYM 42149 1706 12 = = SYM 42149 1706 13 = = SYM 42149 1706 14 = = SYM 42149 1706 15 = = SYM 42149 1706 16 = = SYM 42149 1706 17 = = SYM 42149 1706 18 = = SYM 42149 1706 19 = = SYM 42149 1706 20 = = SYM 42149 1706 21 = = SYM 42149 1706 22 = = SYM 42149 1706 23 = = SYM 42149 1706 24 = = SYM 42149 1706 25 = = SYM 42149 1706 26 = = SYM 42149 1706 27 = = SYM 42149 1706 28 = = SYM 42149 1706 29 = = SYM 42149 1706 30 = = SYM 42149 1706 31 = = SYM 42149 1706 32 = = SYM 42149 1706 33 = = SYM 42149 1706 34 = = SYM 42149 1706 35 = = SYM 42149 1706 36 = = SYM 42149 1706 37 = = NFP 42149 1706 38 = = SYM 42149 1706 39 + + SYM 42149 1706 40 = = SYM 42149 1706 41 = = SYM 42149 1706 42 = = SYM 42149 1706 43 = = SYM 42149 1706 44 = = SYM 42149 1706 45 = = SYM 42149 1706 46 = = SYM 42149 1706 47 = = SYM 42149 1706 48 = = SYM 42149 1706 49 = = SYM 42149 1706 50 = = SYM 42149 1706 51 = = SYM 42149 1706 52 = = SYM 42149 1706 53 = = SYM 42149 1706 54 = = NFP 42149 1706 55 = = SYM 42149 1706 56 + + SYM 42149 1706 57 = = SYM 42149 1706 58 = = SYM 42149 1706 59 = = SYM 42149 1706 60 = = SYM 42149 1706 61 = = SYM 42149 1706 62 = = SYM 42149 1706 63 = = SYM 42149 1706 64 = = SYM 42149 1706 65 = = SYM 42149 1706 66 = = SYM 42149 1706 67 = = SYM 42149 1706 68 = = SYM 42149 1706 69 = = SYM 42149 1706 70 = = SYM 42149 1706 71 = = NFP 42149 1706 72 = = NFP 42149 1706 73 + + CC 42149 1706 74 The the DT 42149 1706 75 excavation excavation NN 42149 1706 76 was be VBD 42149 1706 77 begun begin VBN 42149 1706 78 on on IN 42149 1706 79 May May NNP 42149 1706 80 24th 24th NN 42149 1706 81 , , , 42149 1706 82 1904 1904 CD 42149 1706 83 , , , 42149 1706 84 and and CC 42149 1706 85 finished finish VBD 42149 1706 86 on on IN 42149 1706 87 May May NNP 42149 1706 88 15th 15th NN 42149 1706 89 , , , 42149 1706 90 1905 1905 CD 42149 1706 91 . . . 42149 1707 1 The the DT 42149 1707 2 segments segment NNS 42149 1707 3 were be VBD 42149 1707 4 placed place VBN 42149 1707 5 by by IN 42149 1707 6 an an DT 42149 1707 7 erector erector NN 42149 1707 8 consisting consist VBG 42149 1707 9 of of IN 42149 1707 10 a a DT 42149 1707 11 timber timber NN 42149 1707 12 boom boom NN 42149 1707 13 supported support VBN 42149 1707 14 by by IN 42149 1707 15 cross cross NN 42149 1707 16 - - NNS 42149 1707 17 timbers timber NNS 42149 1707 18 running run VBG 42149 1707 19 on on IN 42149 1707 20 car car NN 42149 1707 21 wheels wheel NNS 42149 1707 22 on on IN 42149 1707 23 longitudinal longitudinal JJ 42149 1707 24 timbers timber NNS 42149 1707 25 at at IN 42149 1707 26 each each DT 42149 1707 27 side side NN 42149 1707 28 of of IN 42149 1707 29 the the DT 42149 1707 30 tunnel tunnel NN 42149 1707 31 . . . 42149 1708 1 Motion motion NN 42149 1708 2 was be VBD 42149 1708 3 transmitted transmit VBN 42149 1708 4 to to IN 42149 1708 5 the the DT 42149 1708 6 boom boom NN 42149 1708 7 by by IN 42149 1708 8 two two CD 42149 1708 9 sets set NNS 42149 1708 10 of of IN 42149 1708 11 tackle tackle NN 42149 1708 12 , , , 42149 1708 13 and and CC 42149 1708 14 the the DT 42149 1708 15 heavy heavy JJ 42149 1708 16 ( ( -LRB- 42149 1708 17 5,000-lb 5,000-lb NNP 42149 1708 18 . . . 42149 1708 19 ) ) -RRB- 42149 1709 1 segments segment NNS 42149 1709 2 were be VBD 42149 1709 3 easily easily RB 42149 1709 4 handled handle VBN 42149 1709 5 . . . 42149 1710 1 The the DT 42149 1710 2 erection erection NN 42149 1710 3 of of IN 42149 1710 4 the the DT 42149 1710 5 lining lining NN 42149 1710 6 was be VBD 42149 1710 7 started start VBN 42149 1710 8 on on IN 42149 1710 9 February February NNP 42149 1710 10 4th 4th NN 42149 1710 11 , , , 42149 1710 12 1905 1905 CD 42149 1710 13 , , , 42149 1710 14 and and CC 42149 1710 15 finished finish VBD 42149 1710 16 on on IN 42149 1710 17 June June NNP 42149 1710 18 14th 14th NN 42149 1710 19 , , , 42149 1710 20 1905 1905 CD 42149 1710 21 . . . 42149 1711 1 While while IN 42149 1711 2 the the DT 42149 1711 3 shield shield NN 42149 1711 4 chambers chamber NNS 42149 1711 5 were be VBD 42149 1711 6 being be VBG 42149 1711 7 excavated excavate VBN 42149 1711 8 , , , 42149 1711 9 bottom bottom JJ 42149 1711 10 headings heading NNS 42149 1711 11 were be VBD 42149 1711 12 run run VBN 42149 1711 13 along along IN 42149 1711 14 the the DT 42149 1711 15 lines line NNS 42149 1711 16 of of IN 42149 1711 17 the the DT 42149 1711 18 river river NN 42149 1711 19 tunnels tunnel NNS 42149 1711 20 and and CC 42149 1711 21 continued continue VBD 42149 1711 22 until until IN 42149 1711 23 the the DT 42149 1711 24 lack lack NN 42149 1711 25 of of IN 42149 1711 26 rock rock NN 42149 1711 27 cover cover NN 42149 1711 28 prevented prevent VBD 42149 1711 29 their -PRON- PRP$ 42149 1711 30 being be VBG 42149 1711 31 driven drive VBN 42149 1711 32 further further RB 42149 1711 33 . . . 42149 1712 1 These these DT 42149 1712 2 were be VBD 42149 1712 3 afterward afterward RB 42149 1712 4 enlarged enlarge VBN 42149 1712 5 to to IN 42149 1712 6 the the DT 42149 1712 7 full full JJ 42149 1712 8 section section NN 42149 1712 9 as as RB 42149 1712 10 far far RB 42149 1712 11 as as IN 42149 1712 12 possible possible JJ 42149 1712 13 . . . 42149 1713 1 The the DT 42149 1713 2 typical typical JJ 42149 1713 3 working work VBG 42149 1713 4 force force NN 42149 1713 5 in in IN 42149 1713 6 the the DT 42149 1713 7 shield shield NN 42149 1713 8 chambers chamber NNS 42149 1713 9 was be VBD 42149 1713 10 as as IN 42149 1713 11 follows follow VBZ 42149 1713 12 : : : 42149 1713 13 _ _ NNP 42149 1713 14 Ten ten CD 42149 1713 15 - - HYPH 42149 1713 16 hour hour NN 42149 1713 17 Shifts Shifts NNP 42149 1713 18 . . . 42149 1713 19 _ _ NNP 42149 1713 20 _ _ NNP 42149 1713 21 Drilling Drilling NNP 42149 1713 22 and and CC 42149 1713 23 Blasting Blasting NNP 42149 1713 24 . . . 42149 1713 25 _ _ NNP 42149 1713 26 1 1 CD 42149 1713 27 Foreman Foreman NNP 42149 1713 28 @ @ CC 42149 1713 29 $ $ $ 42149 1713 30 3.50 3.50 CD 42149 1713 31 6 6 CD 42149 1713 32 Drillers Drillers NNPS 42149 1713 33 " " CD 42149 1713 34 3.00 3.00 CD 42149 1713 35 6 6 CD 42149 1713 36 Drillers Drillers NNPS 42149 1713 37 ' ' POS 42149 1713 38 helpers helper NNS 42149 1713 39 " " `` 42149 1713 40 2.00 2.00 CD 42149 1713 41 1 1 CD 42149 1713 42 Blacksmith Blacksmith NNP 42149 1713 43 " " '' 42149 1713 44 3.50 3.50 CD 42149 1713 45 1 1 CD 42149 1713 46 Blacksmith Blacksmith NNP 42149 1713 47 's 's POS 42149 1713 48 helper helper NN 42149 1713 49 " " `` 42149 1713 50 2.25 2.25 CD 42149 1713 51 1 1 CD 42149 1713 52 Powderman Powderman NNP 42149 1713 53 " " `` 42149 1713 54 2.00 2.00 CD 42149 1713 55 1 1 CD 42149 1713 56 Waterboy Waterboy NNP 42149 1713 57 " " '' 42149 1713 58 2.00 2.00 CD 42149 1713 59 1 1 CD 42149 1713 60 Nipper Nipper NNP 42149 1713 61 " " `` 42149 1713 62 2.00 2.00 CD 42149 1713 63 1 1 CD 42149 1713 64 Machinist Machinist NNP 42149 1713 65 " " '' 42149 1713 66 3.00 3.00 CD 42149 1713 67 1 1 CD 42149 1713 68 Machinist Machinist NNP 42149 1713 69 's 's POS 42149 1713 70 helper helper NN 42149 1713 71 " " `` 42149 1713 72 1.80 1.80 CD 42149 1713 73 _ _ NNP 42149 1713 74 Mucking Mucking NNP 42149 1713 75 . . . 42149 1713 76 _ _ NNP 42149 1713 77 1 1 CD 42149 1713 78 or or CC 42149 1713 79 2 2 CD 42149 1713 80 Foremen Foremen NNPS 42149 1713 81 @ @ NFP 42149 1713 82 $ $ $ 42149 1713 83 3.00 3.00 CD 42149 1713 84 16 16 CD 42149 1713 85 Muckers Muckers NNPS 42149 1713 86 " " `` 42149 1713 87 2.00 2.00 CD 42149 1713 88 [ [ -LRB- 42149 1713 89 Illustration illustration NN 42149 1713 90 : : : 42149 1713 91 PLATE plate NN 42149 1713 92 XXXVIII xxxviii NN 42149 1713 93 . . . 42149 1714 1 TRANS trans UH 42149 1714 2 . . . 42149 1715 1 AM AM NNP 42149 1715 2 . . . 42149 1716 1 SOC SOC NNP 42149 1716 2 . . . 42149 1717 1 CIV CIV NNP 42149 1717 2 . . . 42149 1718 1 ENGRS ENGRS NNP 42149 1718 2 . . . 42149 1719 1 VOL VOL NNP 42149 1719 2 . . . 42149 1720 1 LXVII LXVII NNP 42149 1720 2 , , , 42149 1720 3 NO no UH 42149 1720 4 . . . 42149 1721 1 1155 1155 CD 42149 1721 2 . . . 42149 1722 1 HEWETT HEWETT NNP 42149 1722 2 AND and CC 42149 1722 3 BROWN BROWN NNP 42149 1722 4 ON ON NNP 42149 1722 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 1722 6 R. R. NNP 42149 1722 7 R. R. NNP 42149 1722 8 TUNNELS TUNNELS NNP 42149 1722 9 : : : 42149 1722 10 NORTH NORTH NNP 42149 1722 11 RIVER river NN 42149 1722 12 TUNNELS tunnel NNS 42149 1722 13 . . . 42149 1723 1 FIG FIG NNP 42149 1723 2 . . . 42149 1724 1 1 1 LS 42149 1724 2 . . . 42149 1725 1 FIG FIG NNP 42149 1725 2 . . . 42149 1726 1 2 2 LS 42149 1726 2 . . . 42149 1726 3 ] ] -RRB- 42149 1727 1 _ _ NNP 42149 1727 2 Erection Erection NNP 42149 1727 3 of of IN 42149 1727 4 Shields._--The shields._--the CD 42149 1727 5 tunneling tunnel VBG 42149 1727 6 shields shield NNS 42149 1727 7 have have VBP 42149 1727 8 been be VBN 42149 1727 9 described describe VBN 42149 1727 10 in in IN 42149 1727 11 some some DT 42149 1727 12 detail detail NN 42149 1727 13 in in IN 42149 1727 14 the the DT 42149 1727 15 section section NN 42149 1727 16 of of IN 42149 1727 17 this this DT 42149 1727 18 paper paper NN 42149 1727 19 dealing deal VBG 42149 1727 20 with with IN 42149 1727 21 the the DT 42149 1727 22 contractor contractor NN 42149 1727 23 's 's POS 42149 1727 24 plant plant NN 42149 1727 25 . . . 42149 1728 1 They -PRON- PRP 42149 1728 2 consist consist VBP 42149 1728 3 essentially essentially RB 42149 1728 4 of of IN 42149 1728 5 two two CD 42149 1728 6 parts part NNS 42149 1728 7 , , , 42149 1728 8 the the DT 42149 1728 9 structural structural JJ 42149 1728 10 steelwork steelwork NN 42149 1728 11 and and CC 42149 1728 12 the the DT 42149 1728 13 hydraulic hydraulic NNP 42149 1728 14 fittings fitting NNS 42149 1728 15 . . . 42149 1729 1 The the DT 42149 1729 2 former former JJ 42149 1729 3 was be VBD 42149 1729 4 made make VBN 42149 1729 5 by by IN 42149 1729 6 the the DT 42149 1729 7 Riter Riter NNP 42149 1729 8 Conley Conley NNP 42149 1729 9 Manufacturing Manufacturing NNP 42149 1729 10 Company Company NNP 42149 1729 11 , , , 42149 1729 12 of of IN 42149 1729 13 Pittsburg Pittsburg NNP 42149 1729 14 , , , 42149 1729 15 Pa. Pennsylvania NNP 42149 1729 16 , , , 42149 1729 17 and and CC 42149 1729 18 put put VBD 42149 1729 19 up up RP 42149 1729 20 by by IN 42149 1729 21 the the DT 42149 1729 22 Terry Terry NNP 42149 1729 23 and and CC 42149 1729 24 Tench Tench NNP 42149 1729 25 Company Company NNP 42149 1729 26 , , , 42149 1729 27 of of IN 42149 1729 28 New New NNP 42149 1729 29 York York NNP 42149 1729 30 City City NNP 42149 1729 31 ; ; : 42149 1729 32 the the DT 42149 1729 33 hydraulic hydraulic JJ 42149 1729 34 fittings fitting NNS 42149 1729 35 were be VBD 42149 1729 36 made make VBN 42149 1729 37 and and CC 42149 1729 38 put put VBN 42149 1729 39 in in RP 42149 1729 40 by by IN 42149 1729 41 the the DT 42149 1729 42 Watson Watson NNP 42149 1729 43 - - HYPH 42149 1729 44 Stillman Stillman NNP 42149 1729 45 Company Company NNP 42149 1729 46 , , , 42149 1729 47 of of IN 42149 1729 48 New New NNP 42149 1729 49 York York NNP 42149 1729 50 City City NNP 42149 1729 51 . . . 42149 1730 1 On on IN 42149 1730 2 the the DT 42149 1730 3 New New NNP 42149 1730 4 York York NNP 42149 1730 5 side side NN 42149 1730 6 , , , 42149 1730 7 the the DT 42149 1730 8 shields shield NNS 42149 1730 9 were be VBD 42149 1730 10 built build VBN 42149 1730 11 inside inside IN 42149 1730 12 the the DT 42149 1730 13 iron iron NN 42149 1730 14 lining lining NN 42149 1730 15 of of IN 42149 1730 16 the the DT 42149 1730 17 shield shield NN 42149 1730 18 chambers chamber NNS 42149 1730 19 , , , 42149 1730 20 hence hence RB 42149 1730 21 no no DT 42149 1730 22 falsework falsework NN 42149 1730 23 was be VBD 42149 1730 24 needed need VBN 42149 1730 25 , , , 42149 1730 26 as as IN 42149 1730 27 the the DT 42149 1730 28 necessary necessary JJ 42149 1730 29 hoisting hoist VBG 42149 1730 30 tackle tackle NN 42149 1730 31 could could MD 42149 1730 32 be be VB 42149 1730 33 slung sling VBN 42149 1730 34 from from IN 42149 1730 35 the the DT 42149 1730 36 iron iron NN 42149 1730 37 lining lining NN 42149 1730 38 ; ; : 42149 1730 39 at at IN 42149 1730 40 Weehawken Weehawken NNP 42149 1730 41 , , , 42149 1730 42 however however RB 42149 1730 43 , , , 42149 1730 44 the the DT 42149 1730 45 erection erection NN 42149 1730 46 was be VBD 42149 1730 47 done do VBN 42149 1730 48 in in IN 42149 1730 49 the the DT 42149 1730 50 bare bare JJ 42149 1730 51 rock rock NN 42149 1730 52 excavation excavation NN 42149 1730 53 , , , 42149 1730 54 so so IN 42149 1730 55 that that DT 42149 1730 56 timber timber NN 42149 1730 57 falsework falsework NN 42149 1730 58 had have VBD 42149 1730 59 to to TO 42149 1730 60 be be VB 42149 1730 61 used use VBN 42149 1730 62 . . . 42149 1731 1 The the DT 42149 1731 2 assembly assembly NN 42149 1731 3 and and CC 42149 1731 4 riveting riveting JJ 42149 1731 5 took take VBD 42149 1731 6 about about RB 42149 1731 7 2 2 CD 42149 1731 8 weeks week NNS 42149 1731 9 for for IN 42149 1731 10 each each DT 42149 1731 11 shield shield NN 42149 1731 12 ; ; : 42149 1731 13 the the DT 42149 1731 14 riveting riveting NN 42149 1731 15 was be VBD 42149 1731 16 done do VBN 42149 1731 17 with with IN 42149 1731 18 pneumatic pneumatic JJ 42149 1731 19 riveters riveter NNS 42149 1731 20 , , , 42149 1731 21 using use VBG 42149 1731 22 compressed compress VBN 42149 1731 23 air air NN 42149 1731 24 direct direct RB 42149 1731 25 from from IN 42149 1731 26 the the DT 42149 1731 27 tunnel tunnel NN 42149 1731 28 supply supply NN 42149 1731 29 . . . 42149 1732 1 After after IN 42149 1732 2 the the DT 42149 1732 3 structural structural JJ 42149 1732 4 steel steel NN 42149 1732 5 had have VBD 42149 1732 6 been be VBN 42149 1732 7 finished finish VBN 42149 1732 8 , , , 42149 1732 9 the the DT 42149 1732 10 shields shield NNS 42149 1732 11 , , , 42149 1732 12 which which WDT 42149 1732 13 had have VBD 42149 1732 14 hitherto hitherto VBN 42149 1732 15 been be VBN 42149 1732 16 set set VBN 42149 1732 17 on on IN 42149 1732 18 the the DT 42149 1732 19 floor floor NN 42149 1732 20 of of IN 42149 1732 21 the the DT 42149 1732 22 chambers chamber NNS 42149 1732 23 in in IN 42149 1732 24 order order NN 42149 1732 25 to to TO 42149 1732 26 give give VB 42149 1732 27 room room NN 42149 1732 28 for for IN 42149 1732 29 working work VBG 42149 1732 30 over over IN 42149 1732 31 the the DT 42149 1732 32 top top NN 42149 1732 33 , , , 42149 1732 34 were be VBD 42149 1732 35 jacked jack VBN 42149 1732 36 up up RP 42149 1732 37 to to IN 42149 1732 38 grade grade NN 42149 1732 39 ; ; : 42149 1732 40 this this DT 42149 1732 41 involved involve VBD 42149 1732 42 lifting lift VBG 42149 1732 43 a a DT 42149 1732 44 weight weight NN 42149 1732 45 of of IN 42149 1732 46 113 113 CD 42149 1732 47 tons ton NNS 42149 1732 48 . . . 42149 1733 1 While while IN 42149 1733 2 the the DT 42149 1733 3 hydraulic hydraulic JJ 42149 1733 4 fittings fitting NNS 42149 1733 5 were be VBD 42149 1733 6 being be VBG 42149 1733 7 put put VBN 42149 1733 8 in in RP 42149 1733 9 , , , 42149 1733 10 the the DT 42149 1733 11 shields shield NNS 42149 1733 12 were be VBD 42149 1733 13 moved move VBN 42149 1733 14 forward forward RB 42149 1733 15 on on IN 42149 1733 16 a a DT 42149 1733 17 cradle cradle NN 42149 1733 18 , , , 42149 1733 19 built build VBN 42149 1733 20 of of IN 42149 1733 21 concrete concrete NN 42149 1733 22 with with IN 42149 1733 23 steel steel NN 42149 1733 24 rails rail NNS 42149 1733 25 embedded embed VBN 42149 1733 26 , , , 42149 1733 27 on on IN 42149 1733 28 which which WDT 42149 1733 29 the the DT 42149 1733 30 shield shield NN 42149 1733 31 was be VBD 42149 1733 32 driven drive VBN 42149 1733 33 for for IN 42149 1733 34 the the DT 42149 1733 35 length length NN 42149 1733 36 in in IN 42149 1733 37 which which WDT 42149 1733 38 the the DT 42149 1733 39 tunnel tunnel NN 42149 1733 40 was be VBD 42149 1733 41 in in IN 42149 1733 42 solid solid JJ 42149 1733 43 rock rock NN 42149 1733 44 . . . 42149 1734 1 The the DT 42149 1734 2 installation installation NN 42149 1734 3 of of IN 42149 1734 4 the the DT 42149 1734 5 hydraulic hydraulic NNP 42149 1734 6 fittings fitting NNS 42149 1734 7 took take VBD 42149 1734 8 from from IN 42149 1734 9 4 4 CD 42149 1734 10 to to TO 42149 1734 11 6 6 CD 42149 1734 12 weeks week NNS 42149 1734 13 per per IN 42149 1734 14 shield shield NN 42149 1734 15 . . . 42149 1735 1 The the DT 42149 1735 2 total total JJ 42149 1735 3 weight weight NN 42149 1735 4 of of IN 42149 1735 5 each each DT 42149 1735 6 finished finish VBN 42149 1735 7 shield shield NN 42149 1735 8 was be VBD 42149 1735 9 about about RB 42149 1735 10 193 193 CD 42149 1735 11 tons ton NNS 42149 1735 12 . . . 42149 1736 1 The the DT 42149 1736 2 completed complete VBN 42149 1736 3 shield shield NN 42149 1736 4 , , , 42149 1736 5 as as IN 42149 1736 6 it -PRON- PRP 42149 1736 7 appeared appear VBD 42149 1736 8 in in IN 42149 1736 9 the the DT 42149 1736 10 tunnel tunnel NN 42149 1736 11 , , , 42149 1736 12 is be VBZ 42149 1736 13 shown show VBN 42149 1736 14 by by IN 42149 1736 15 Fig Fig NNP 42149 1736 16 . . . 42149 1737 1 1 1 LS 42149 1737 2 , , , 42149 1737 3 Plate plate NN 42149 1737 4 XXXVIII xxxviii NN 42149 1737 5 . . . 42149 1738 1 The the DT 42149 1738 2 typical typical JJ 42149 1738 3 force force NN 42149 1738 4 working work VBG 42149 1738 5 on on IN 42149 1738 6 shield shield NN 42149 1738 7 erection erection NN 42149 1738 8 was be VBD 42149 1738 9 as as IN 42149 1738 10 follows follow VBZ 42149 1738 11 : : : 42149 1738 12 _ _ NNP 42149 1738 13 Ten ten CD 42149 1738 14 - - HYPH 42149 1738 15 hour hour NN 42149 1738 16 Shifts Shifts NNP 42149 1738 17 . . . 42149 1738 18 _ _ NNP 42149 1738 19 _ _ NNP 42149 1738 20 Shield Shield NNP 42149 1738 21 Erection Erection NNP 42149 1738 22 . . . 42149 1738 23 _ _ NNP 42149 1738 24 ( ( -LRB- 42149 1738 25 _ _ NNP 42149 1738 26 Terry Terry NNP 42149 1738 27 and and CC 42149 1738 28 Tench Tench NNP 42149 1738 29 . . . 42149 1738 30 _ _ NNP 42149 1738 31 ) ) -RRB- 42149 1738 32 1 1 CD 42149 1738 33 Superintendent superintendent NN 42149 1738 34 @ @ NFP 42149 1738 35 $ $ $ 42149 1738 36 13.00 13.00 CD 42149 1738 37 per per IN 42149 1738 38 day day NN 42149 1738 39 4 4 CD 42149 1738 40 Foremen foreman NNS 42149 1738 41 " " `` 42149 1738 42 5.50 5.50 CD 42149 1738 43 " " '' 42149 1738 44 " " `` 42149 1738 45 1 1 CD 42149 1738 46 Timekeeper Timekeeper NNP 42149 1738 47 " " `` 42149 1738 48 2.50 2.50 CD 42149 1738 49 " " '' 42149 1738 50 " " `` 42149 1738 51 2 2 CD 42149 1738 52 Engineers Engineers NNPS 42149 1738 53 " " '' 42149 1738 54 4.50 4.50 CD 42149 1738 55 " " '' 42149 1738 56 " " `` 42149 1738 57 34 34 CD 42149 1738 58 Iron iron NN 42149 1738 59 workers worker NNS 42149 1738 60 " " `` 42149 1738 61 4.50 4.50 CD 42149 1738 62 " " '' 42149 1738 63 " " `` 42149 1738 64 7 7 CD 42149 1738 65 Laborers Laborers NNPS 42149 1738 66 " " `` 42149 1738 67 2.25 2.25 CD 42149 1738 68 " " '' 42149 1738 69 " " `` 42149 1738 70 _ _ NNP 42149 1738 71 Hydraulic Hydraulic NNP 42149 1738 72 Work Work NNP 42149 1738 73 . . . 42149 1738 74 _ _ NNP 42149 1738 75 ( ( -LRB- 42149 1738 76 _ _ NNP 42149 1738 77 Watson Watson NNP 42149 1738 78 - - HYPH 42149 1738 79 Stillman Stillman NNP 42149 1738 80 Company Company NNP 42149 1738 81 . . . 42149 1738 82 _ _ NNP 42149 1738 83 ) ) -RRB- 42149 1738 84 4 4 CD 42149 1738 85 Mechanics mechanic NNS 42149 1738 86 @ @ CC 42149 1738 87 $ $ $ 42149 1738 88 4.00 4.00 CD 42149 1738 89 per per IN 42149 1738 90 day day NN 42149 1738 91 _ _ NNP 42149 1738 92 General General NNP 42149 1738 93 Labor Labor NNP 42149 1738 94 . . . 42149 1738 95 _ _ NNP 42149 1738 96 ( ( -LRB- 42149 1738 97 _ _ NNP 42149 1738 98 O'Rourke O'Rourke NNP 42149 1738 99 Engineering Engineering NNP 42149 1738 100 Construction Construction NNP 42149 1738 101 Company Company NNP 42149 1738 102 . . . 42149 1738 103 _ _ NNP 42149 1738 104 ) ) -RRB- 42149 1738 105 1 1 CD 42149 1738 106 Inspector inspector NN 42149 1738 107 @ @ CC 42149 1738 108 $ $ $ 42149 1738 109 4.00 4.00 CD 42149 1738 110 per per IN 42149 1738 111 day day NN 42149 1738 112 1 1 CD 42149 1738 113 Foreman Foreman NNP 42149 1738 114 " " `` 42149 1738 115 4.00 4.00 CD 42149 1738 116 " " '' 42149 1738 117 " " `` 42149 1738 118 8 8 CD 42149 1738 119 Laborers laborer NNS 42149 1738 120 " " '' 42149 1738 121 2.00 2.00 CD 42149 1738 122 " " '' 42149 1738 123 " " `` 42149 1738 124 1 1 CD 42149 1738 125 Engineer Engineer NNP 42149 1738 126 " " '' 42149 1738 127 2.50 2.50 CD 42149 1738 128 " " '' 42149 1738 129 " " '' 42149 1738 130 After after IN 42149 1738 131 the the DT 42149 1738 132 shield shield NN 42149 1738 133 was be VBD 42149 1738 134 finished finish VBN 42149 1738 135 and and CC 42149 1738 136 in in IN 42149 1738 137 position position NN 42149 1738 138 , , , 42149 1738 139 the the DT 42149 1738 140 first first JJ 42149 1738 141 two two CD 42149 1738 142 rings ring NNS 42149 1738 143 of of IN 42149 1738 144 the the DT 42149 1738 145 lining lining NN 42149 1738 146 were be VBD 42149 1738 147 erected erect VBN 42149 1738 148 in in IN 42149 1738 149 the the DT 42149 1738 150 tail tail NN 42149 1738 151 of of IN 42149 1738 152 the the DT 42149 1738 153 shield shield NN 42149 1738 154 . . . 42149 1739 1 These these DT 42149 1739 2 first first JJ 42149 1739 3 rings ring NNS 42149 1739 4 were be VBD 42149 1739 5 then then RB 42149 1739 6 firmly firmly RB 42149 1739 7 braced brace VBN 42149 1739 8 to to IN 42149 1739 9 the the DT 42149 1739 10 rock rock NN 42149 1739 11 and and CC 42149 1739 12 the the DT 42149 1739 13 chamber chamber NN 42149 1739 14 lining lining NN 42149 1739 15 ; ; : 42149 1739 16 then then RB 42149 1739 17 the the DT 42149 1739 18 shield shield NN 42149 1739 19 was be VBD 42149 1739 20 shoved shove VBN 42149 1739 21 ahead ahead RB 42149 1739 22 by by IN 42149 1739 23 its -PRON- PRP$ 42149 1739 24 own own JJ 42149 1739 25 jacks jack NNS 42149 1739 26 , , , 42149 1739 27 another another DT 42149 1739 28 ring ring NN 42149 1739 29 was be VBD 42149 1739 30 built build VBN 42149 1739 31 , , , 42149 1739 32 and and CC 42149 1739 33 so so RB 42149 1739 34 on on RB 42149 1739 35 . . . 42149 1740 1 The the DT 42149 1740 2 description description NN 42149 1740 3 of of IN 42149 1740 4 the the DT 42149 1740 5 actual actual JJ 42149 1740 6 methods method NNS 42149 1740 7 of of IN 42149 1740 8 work work NN 42149 1740 9 in in IN 42149 1740 10 the the DT 42149 1740 11 shield shield NN 42149 1740 12 - - HYPH 42149 1740 13 driven drive VBN 42149 1740 14 tunnels tunnel NNS 42149 1740 15 can can MD 42149 1740 16 now now RB 42149 1740 17 be be VB 42149 1740 18 given give VBN 42149 1740 19 ; ; : 42149 1740 20 this this DT 42149 1740 21 will will MD 42149 1740 22 be be VB 42149 1740 23 divided divide VBN 42149 1740 24 generally generally RB 42149 1740 25 into into IN 42149 1740 26 the the DT 42149 1740 27 different different JJ 42149 1740 28 kinds kind NNS 42149 1740 29 of of IN 42149 1740 30 conditions condition NNS 42149 1740 31 met meet VBD 42149 1740 32 at at IN 42149 1740 33 the the DT 42149 1740 34 working work VBG 42149 1740 35 face face NN 42149 1740 36 , , , 42149 1740 37 for for IN 42149 1740 38 example example NN 42149 1740 39 , , , 42149 1740 40 Full full JJ 42149 1740 41 Face face NN 42149 1740 42 of of IN 42149 1740 43 Rock Rock NNP 42149 1740 44 , , , 42149 1740 45 Mixed Mixed NNP 42149 1740 46 Face Face NNP 42149 1740 47 , , , 42149 1740 48 Full full JJ 42149 1740 49 Face face NN 42149 1740 50 of of IN 42149 1740 51 Sand Sand NNP 42149 1740 52 and and CC 42149 1740 53 Gravel Gravel NNP 42149 1740 54 , , , 42149 1740 55 Under under IN 42149 1740 56 River River NNP 42149 1740 57 Bulkhead Bulkhead NNP 42149 1740 58 , , , 42149 1740 59 and and CC 42149 1740 60 Full full JJ 42149 1740 61 Face face NN 42149 1740 62 of of IN 42149 1740 63 Silt Silt NNP 42149 1740 64 . . . 42149 1741 1 The the DT 42149 1741 2 last last JJ 42149 1741 3 heading heading NN 42149 1741 4 is be VBZ 42149 1741 5 the the DT 42149 1741 6 one one NN 42149 1741 7 under under IN 42149 1741 8 which which WDT 42149 1741 9 by by IN 42149 1741 10 far far RB 42149 1741 11 the the DT 42149 1741 12 longest long JJS 42149 1741 13 length length NN 42149 1741 14 of of IN 42149 1741 15 tunnel tunnel NN 42149 1741 16 was be VBD 42149 1741 17 driven drive VBN 42149 1741 18 , , , 42149 1741 19 and and CC 42149 1741 20 , , , 42149 1741 21 as as IN 42149 1741 22 not not RB 42149 1741 23 much much JJ 42149 1741 24 has have VBZ 42149 1741 25 hitherto hitherto VBN 42149 1741 26 appeared appear VBN 42149 1741 27 descriptive descriptive JJ 42149 1741 28 of of IN 42149 1741 29 the the DT 42149 1741 30 handling handling NN 42149 1741 31 of of IN 42149 1741 32 a a DT 42149 1741 33 shield shield NN 42149 1741 34 , , , 42149 1741 35 through through IN 42149 1741 36 this this DT 42149 1741 37 material material NN 42149 1741 38 , , , 42149 1741 39 considerable considerable JJ 42149 1741 40 space space NN 42149 1741 41 will will MD 42149 1741 42 be be VB 42149 1741 43 devoted devoted JJ 42149 1741 44 to to IN 42149 1741 45 it -PRON- PRP 42149 1741 46 . . . 42149 1742 1 _ _ NNP 42149 1742 2 Full Full NNP 42149 1742 3 Face face NN 42149 1742 4 of of IN 42149 1742 5 Rock._--As Rock._--As NNP 42149 1742 6 was be VBD 42149 1742 7 described describe VBN 42149 1742 8 when when WRB 42149 1742 9 dealing deal VBG 42149 1742 10 with with IN 42149 1742 11 the the DT 42149 1742 12 shield shield NN 42149 1742 13 chambers chamber NNS 42149 1742 14 , , , 42149 1742 15 as as RB 42149 1742 16 much much RB 42149 1742 17 as as IN 42149 1742 18 possible possible JJ 42149 1742 19 of of IN 42149 1742 20 the the DT 42149 1742 21 rock rock NN 42149 1742 22 excavation excavation NN 42149 1742 23 was be VBD 42149 1742 24 done do VBN 42149 1742 25 before before IN 42149 1742 26 the the DT 42149 1742 27 shields shield NNS 42149 1742 28 were be VBD 42149 1742 29 installed instal VBN 42149 1742 30 . . . 42149 1743 1 On on IN 42149 1743 2 the the DT 42149 1743 3 New New NNP 42149 1743 4 York York NNP 42149 1743 5 side side NN 42149 1743 6 , , , 42149 1743 7 about about RB 42149 1743 8 146 146 CD 42149 1743 9 ft ft NN 42149 1743 10 . . NN 42149 1743 11 of of IN 42149 1743 12 tunnel tunnel NNP 42149 1743 13 was be VBD 42149 1743 14 completely completely RB 42149 1743 15 excavated excavate VBN 42149 1743 16 , , , 42149 1743 17 with with IN 42149 1743 18 71 71 CD 42149 1743 19 ft ft NN 42149 1743 20 . . NN 42149 1743 21 of of IN 42149 1743 22 bottom bottom JJ 42149 1743 23 headings heading NNS 42149 1743 24 beyond beyond IN 42149 1743 25 that that DT 42149 1743 26 , , , 42149 1743 27 and and CC 42149 1743 28 at at IN 42149 1743 29 Weehawken Weehawken NNP 42149 1743 30 , , , 42149 1743 31 58 58 CD 42149 1743 32 and and CC 42149 1743 33 40 40 CD 42149 1743 34 ft ft NN 42149 1743 35 . . NN 42149 1743 36 of of IN 42149 1743 37 tunnel tunnel NN 42149 1743 38 and and CC 42149 1743 39 heading head VBG 42149 1743 40 beyond beyond IN 42149 1743 41 , , , 42149 1743 42 respectively respectively RB 42149 1743 43 . . . 42149 1744 1 This this DT 42149 1744 2 was be VBD 42149 1744 3 chiefly chiefly RB 42149 1744 4 done do VBN 42149 1744 5 to to TO 42149 1744 6 avoid avoid VB 42149 1744 7 handling handle VBG 42149 1744 8 the the DT 42149 1744 9 rock rock NN 42149 1744 10 through through IN 42149 1744 11 the the DT 42149 1744 12 narrow narrow JJ 42149 1744 13 shield shield NN 42149 1744 14 doors door NNS 42149 1744 15 . . . 42149 1745 1 Test test NN 42149 1745 2 holes hole NNS 42149 1745 3 were be VBD 42149 1745 4 driven drive VBN 42149 1745 5 ahead ahead RB 42149 1745 6 at at IN 42149 1745 7 short short JJ 42149 1745 8 intervals interval NNS 42149 1745 9 to to TO 42149 1745 10 make make VB 42149 1745 11 sure sure JJ 42149 1745 12 that that IN 42149 1745 13 the the DT 42149 1745 14 rock rock NN 42149 1745 15 cover cover NN 42149 1745 16 was be VBD 42149 1745 17 not not RB 42149 1745 18 being be VBG 42149 1745 19 lost lose VBN 42149 1745 20 , , , 42149 1745 21 but but CC 42149 1745 22 , , , 42149 1745 23 nevertheless nevertheless RB 42149 1745 24 , , , 42149 1745 25 at at IN 42149 1745 26 Weehawken Weehawken NNP 42149 1745 27 , , , 42149 1745 28 on on IN 42149 1745 29 February February NNP 42149 1745 30 14th 14th NN 42149 1745 31 , , , 42149 1745 32 1905 1905 CD 42149 1745 33 , , , 42149 1745 34 a a DT 42149 1745 35 blast blast NN 42149 1745 36 broke break VBD 42149 1745 37 through through IN 42149 1745 38 the the DT 42149 1745 39 rock rock NN 42149 1745 40 and and CC 42149 1745 41 let let VB 42149 1745 42 the the DT 42149 1745 43 mud mud NN 42149 1745 44 flow flow VB 42149 1745 45 in in RB 42149 1745 46 , , , 42149 1745 47 filling fill VBG 42149 1745 48 the the DT 42149 1745 49 tunnel tunnel NN 42149 1745 50 for for IN 42149 1745 51 half half PDT 42149 1745 52 its -PRON- PRP$ 42149 1745 53 height height NN 42149 1745 54 for for IN 42149 1745 55 a a DT 42149 1745 56 distance distance NN 42149 1745 57 of of IN 42149 1745 58 300 300 CD 42149 1745 59 ft ft NN 42149 1745 60 . . . 42149 1745 61 from from IN 42149 1745 62 its -PRON- PRP$ 42149 1745 63 face face NN 42149 1745 64 . . . 42149 1746 1 Throughout throughout IN 42149 1746 2 the the DT 42149 1746 3 rock rock NN 42149 1746 4 section section NN 42149 1746 5 the the DT 42149 1746 6 shield shield NN 42149 1746 7 traveled travel VBD 42149 1746 8 on on IN 42149 1746 9 a a DT 42149 1746 10 cradle cradle NN 42149 1746 11 of of IN 42149 1746 12 concrete concrete NN 42149 1746 13 in in IN 42149 1746 14 which which WDT 42149 1746 15 were be VBD 42149 1746 16 embedded embed VBN 42149 1746 17 either either CC 42149 1746 18 two two CD 42149 1746 19 or or CC 42149 1746 20 three three CD 42149 1746 21 steel steel NN 42149 1746 22 rails rail NNS 42149 1746 23 . . . 42149 1747 1 In in IN 42149 1747 2 the the DT 42149 1747 3 portion portion NN 42149 1747 4 in in IN 42149 1747 5 which which WDT 42149 1747 6 the the DT 42149 1747 7 whole whole NN 42149 1747 8 of of IN 42149 1747 9 the the DT 42149 1747 10 excavation excavation NN 42149 1747 11 had have VBD 42149 1747 12 been be VBN 42149 1747 13 taken take VBN 42149 1747 14 out out RP 42149 1747 15 , , , 42149 1747 16 it -PRON- PRP 42149 1747 17 was be VBD 42149 1747 18 only only RB 42149 1747 19 necessary necessary JJ 42149 1747 20 to to TO 42149 1747 21 trim trim VB 42149 1747 22 off off RP 42149 1747 23 projecting project VBG 42149 1747 24 corners corner NNS 42149 1747 25 of of IN 42149 1747 26 rock rock NN 42149 1747 27 . . . 42149 1748 1 In in IN 42149 1748 2 the the DT 42149 1748 3 portion portion NN 42149 1748 4 in in IN 42149 1748 5 which which WDT 42149 1748 6 only only RB 42149 1748 7 a a DT 42149 1748 8 bottom bottom NN 42149 1748 9 heading heading NN 42149 1748 10 had have VBD 42149 1748 11 been be VBN 42149 1748 12 driven drive VBN 42149 1748 13 , , , 42149 1748 14 the the DT 42149 1748 15 excavation excavation NN 42149 1748 16 was be VBD 42149 1748 17 completed complete VBN 42149 1748 18 just just RB 42149 1748 19 in in IN 42149 1748 20 front front NN 42149 1748 21 of of IN 42149 1748 22 the the DT 42149 1748 23 shield shield NN 42149 1748 24 , , , 42149 1748 25 the the DT 42149 1748 26 drilling drilling NN 42149 1748 27 below below IN 42149 1748 28 axis axis JJ 42149 1748 29 level level NN 42149 1748 30 being be VBG 42149 1748 31 done do VBN 42149 1748 32 from from IN 42149 1748 33 the the DT 42149 1748 34 heading heading NN 42149 1748 35 itself -PRON- PRP 42149 1748 36 , , , 42149 1748 37 and and CC 42149 1748 38 above above IN 42149 1748 39 that that DT 42149 1748 40 from from IN 42149 1748 41 the the DT 42149 1748 42 front front JJ 42149 1748 43 sliding slide VBG 42149 1748 44 platforms platform NNS 42149 1748 45 of of IN 42149 1748 46 the the DT 42149 1748 47 shield shield NN 42149 1748 48 . . . 42149 1749 1 The the DT 42149 1749 2 holes hole NNS 42149 1749 3 were be VBD 42149 1749 4 placed place VBN 42149 1749 5 near near IN 42149 1749 6 together together RB 42149 1749 7 and and CC 42149 1749 8 drilled drill VBN 42149 1749 9 short short JJ 42149 1749 10 , , , 42149 1749 11 and and CC 42149 1749 12 very very RB 42149 1749 13 light light JJ 42149 1749 14 charges charge NNS 42149 1749 15 of of IN 42149 1749 16 powder powder NN 42149 1749 17 were be VBD 42149 1749 18 used use VBN 42149 1749 19 , , , 42149 1749 20 so so IN 42149 1749 21 as as IN 42149 1749 22 to to TO 42149 1749 23 lessen lessen VB 42149 1749 24 the the DT 42149 1749 25 chance chance NN 42149 1749 26 of of IN 42149 1749 27 knocking knock VBG 42149 1749 28 the the DT 42149 1749 29 shield shield NN 42149 1749 30 about about RB 42149 1749 31 too too RB 42149 1749 32 much much JJ 42149 1749 33 . . . 42149 1750 1 In in IN 42149 1750 2 this this DT 42149 1750 3 work work NN 42149 1750 4 the the DT 42149 1750 5 small small JJ 42149 1750 6 shield shield NN 42149 1750 7 doors door NNS 42149 1750 8 hampered hamper VBD 42149 1750 9 the the DT 42149 1750 10 work work NN 42149 1750 11 greatly greatly RB 42149 1750 12 , , , 42149 1750 13 and and CC 42149 1750 14 it -PRON- PRP 42149 1750 15 might may MD 42149 1750 16 have have VB 42149 1750 17 been be VBN 42149 1750 18 well well JJ 42149 1750 19 to to TO 42149 1750 20 have have VB 42149 1750 21 provided provide VBN 42149 1750 22 a a DT 42149 1750 23 larger large JJR 42149 1750 24 bottom bottom NN 42149 1750 25 opening opening NN 42149 1750 26 which which WDT 42149 1750 27 could could MD 42149 1750 28 have have VB 42149 1750 29 been be VBN 42149 1750 30 subdivided subdivide VBN 42149 1750 31 or or CC 42149 1750 32 partly partly RB 42149 1750 33 closed close VBN 42149 1750 34 when when WRB 42149 1750 35 soft soft JJ 42149 1750 36 ground ground NN 42149 1750 37 was be VBD 42149 1750 38 met meet VBN 42149 1750 39 ; ; , 42149 1750 40 on on IN 42149 1750 41 the the DT 42149 1750 42 other other JJ 42149 1750 43 hand hand NN 42149 1750 44 , , , 42149 1750 45 the the DT 42149 1750 46 quantity quantity NN 42149 1750 47 thus thus RB 42149 1750 48 handled handle VBN 42149 1750 49 was be VBD 42149 1750 50 small small JJ 42149 1750 51 , , , 42149 1750 52 owing owe VBG 42149 1750 53 to to IN 42149 1750 54 the the DT 42149 1750 55 fact fact NN 42149 1750 56 that that IN 42149 1750 57 the the DT 42149 1750 58 greater great JJR 42149 1750 59 part part NN 42149 1750 60 of of IN 42149 1750 61 the the DT 42149 1750 62 rock rock NN 42149 1750 63 was be VBD 42149 1750 64 excavated excavate VBN 42149 1750 65 before before IN 42149 1750 66 the the DT 42149 1750 67 shields shield NNS 42149 1750 68 were be VBD 42149 1750 69 installed instal VBN 42149 1750 70 . . . 42149 1751 1 The the DT 42149 1751 2 space space NN 42149 1751 3 outside outside IN 42149 1751 4 the the DT 42149 1751 5 lining lining NN 42149 1751 6 was be VBD 42149 1751 7 grouted grout VBN 42149 1751 8 with with IN 42149 1751 9 a a DT 42149 1751 10 1:1 1:1 CD 42149 1751 11 mixture mixture NN 42149 1751 12 of of IN 42149 1751 13 Portland Portland NNP 42149 1751 14 cement cement NN 42149 1751 15 and and CC 42149 1751 16 sand sand NN 42149 1751 17 . . . 42149 1752 1 Large large JJ 42149 1752 2 voids void NNS 42149 1752 3 were be VBD 42149 1752 4 hand hand NN 42149 1752 5 - - HYPH 42149 1752 6 packed pack VBN 42149 1752 7 with with IN 42149 1752 8 stone stone NN 42149 1752 9 before before IN 42149 1752 10 grouting grout VBG 42149 1752 11 . . . 42149 1753 1 The the DT 42149 1753 2 details detail NNS 42149 1753 3 of of IN 42149 1753 4 grouting grouting NN 42149 1753 5 will will MD 42149 1753 6 be be VB 42149 1753 7 described describe VBN 42149 1753 8 later later RB 42149 1753 9 . . . 42149 1754 1 A a DT 42149 1754 2 typical typical JJ 42149 1754 3 working working NN 42149 1754 4 gang gang NN 42149 1754 5 is be VBZ 42149 1754 6 given give VBN 42149 1754 7 herewith herewith JJ 42149 1754 8 . . . 42149 1755 1 Two two CD 42149 1755 2 such such JJ 42149 1755 3 gangs gang NNS 42149 1755 4 were be VBD 42149 1755 5 worked work VBN 42149 1755 6 per per IN 42149 1755 7 shield shield NN 42149 1755 8 per per IN 42149 1755 9 24 24 CD 42149 1755 10 hours hour NNS 42149 1755 11 , , , 42149 1755 12 10 10 CD 42149 1755 13 hours hour NNS 42149 1755 14 per per IN 42149 1755 15 shift shift NN 42149 1755 16 . . . 42149 1756 1 All all PDT 42149 1756 2 this this DT 42149 1756 3 work work NN 42149 1756 4 was be VBD 42149 1756 5 done do VBN 42149 1756 6 under under IN 42149 1756 7 normal normal JJ 42149 1756 8 air air NN 42149 1756 9 pressure pressure NN 42149 1756 10 . . . 42149 1757 1 _ _ NNP 42149 1757 2 General General NNP 42149 1757 3 : : : 42149 1757 4 _ _ NNP 42149 1757 5 ½ ½ NNP 42149 1757 6 Tunnel Tunnel NNP 42149 1757 7 superintendent superintendent NN 42149 1757 8 @ @ IN 42149 1757 9 $ $ $ 42149 1757 10 200.00 200.00 CD 42149 1757 11 per per IN 42149 1757 12 month month NN 42149 1757 13 1 1 CD 42149 1757 14 Assistant Assistant NNP 42149 1757 15 tunnel tunnel NN 42149 1757 16 superintendent superintendent NN 42149 1757 17 " " `` 42149 1757 18 5.00 5.00 CD 42149 1757 19 per per IN 42149 1757 20 day day NN 42149 1757 21 1 1 CD 42149 1757 22 General general JJ 42149 1757 23 foreman foreman NN 42149 1757 24 " " `` 42149 1757 25 5.00 5.00 CD 42149 1757 26 " " '' 42149 1757 27 " " '' 42149 1757 28 ½ ½ NNP 42149 1757 29 Electrician Electrician NNP 42149 1757 30 " " `` 42149 1757 31 3.50 3.50 CD 42149 1757 32 " " '' 42149 1757 33 " " '' 42149 1757 34 ½ ½ NNP 42149 1757 35 Electrician Electrician NNP 42149 1757 36 's 's POS 42149 1757 37 helper helper NN 42149 1757 38 " " `` 42149 1757 39 3.00 3.00 CD 42149 1757 40 " " '' 42149 1757 41 " " '' 42149 1757 42 ½ ½ NNP 42149 1757 43 Pipefitter Pipefitter NNP 42149 1757 44 " " `` 42149 1757 45 3.00 3.00 CD 42149 1757 46 " " '' 42149 1757 47 " " '' 42149 1757 48 ½ ½ NNP 42149 1757 49 Pipefitter Pipefitter NNP 42149 1757 50 's 's POS 42149 1757 51 helper helper NN 42149 1757 52 " " `` 42149 1757 53 2.75 2.75 CD 42149 1757 54 " " '' 42149 1757 55 " " `` 42149 1757 56 _ _ NNP 42149 1757 57 Drilling Drilling NNP 42149 1757 58 : : : 42149 1757 59 _ _ NNP 42149 1757 60 1 1 CD 42149 1757 61 Foreman Foreman NNP 42149 1757 62 " " `` 42149 1757 63 5.00 5.00 CD 42149 1757 64 " " '' 42149 1757 65 " " `` 42149 1757 66 3 3 CD 42149 1757 67 Drillers Drillers NNPS 42149 1757 68 " " '' 42149 1757 69 4.00 4.00 CD 42149 1757 70 " " '' 42149 1757 71 " " `` 42149 1757 72 3 3 CD 42149 1757 73 Drillers Drillers NNPS 42149 1757 74 ' ' POS 42149 1757 75 helpers helper NNS 42149 1757 76 " " `` 42149 1757 77 3.00 3.00 CD 42149 1757 78 " " '' 42149 1757 79 " " `` 42149 1757 80 1 1 CD 42149 1757 81 Nipper Nipper NNP 42149 1757 82 " " `` 42149 1757 83 2.50 2.50 CD 42149 1757 84 " " '' 42149 1757 85 " " `` 42149 1757 86 ½ ½ NNP 42149 1757 87 Waterboy Waterboy NNP 42149 1757 88 " " `` 42149 1757 89 2.50 2.50 CD 42149 1757 90 " " '' 42149 1757 91 " " '' 42149 1757 92 ½ ½ NNP 42149 1757 93 Powderboy Powderboy NNP 42149 1757 94 " " `` 42149 1757 95 2.75 2.75 CD 42149 1757 96 " " '' 42149 1757 97 " " `` 42149 1757 98 _ _ NNP 42149 1757 99 Mucking Mucking NNP 42149 1757 100 : : : 42149 1757 101 _ _ NNP 42149 1757 102 1 1 CD 42149 1757 103 Foreman Foreman NNP 42149 1757 104 " " `` 42149 1757 105 3.50 3.50 CD 42149 1757 106 " " '' 42149 1757 107 " " `` 42149 1757 108 8 8 CD 42149 1757 109 Muckers Muckers NNPS 42149 1757 110 " " `` 42149 1757 111 2.75 2.75 CD 42149 1757 112 " " '' 42149 1757 113 " " `` 42149 1757 114 _ _ NNP 42149 1757 115 Erecting Erecting NNP 42149 1757 116 Iron Iron NNP 42149 1757 117 and and CC 42149 1757 118 Driving Driving NNP 42149 1757 119 Shield Shield NNP 42149 1757 120 : : : 42149 1757 121 _ _ NNP 42149 1757 122 1 1 CD 42149 1757 123 Erector Erector NNP 42149 1757 124 runner runner NN 42149 1757 125 " " `` 42149 1757 126 4.00 4.00 CD 42149 1757 127 " " '' 42149 1757 128 " " `` 42149 1757 129 3 3 CD 42149 1757 130 Iron Iron NNP 42149 1757 131 workers worker NNS 42149 1757 132 " " `` 42149 1757 133 3.00 3.00 CD 42149 1757 134 " " '' 42149 1757 135 " " `` 42149 1757 136 The the DT 42149 1757 137 duties duty NNS 42149 1757 138 of of IN 42149 1757 139 such such PDT 42149 1757 140 a a DT 42149 1757 141 gang gang NN 42149 1757 142 were be VBD 42149 1757 143 as as IN 42149 1757 144 follows follow VBZ 42149 1757 145 : : : 42149 1757 146 The the DT 42149 1757 147 tunnel tunnel NN 42149 1757 148 superintendent superintendent NN 42149 1757 149 looked look VBD 42149 1757 150 after after IN 42149 1757 151 both both DT 42149 1757 152 shifts shift NNS 42149 1757 153 of of IN 42149 1757 154 one one CD 42149 1757 155 shield shield NN 42149 1757 156 . . . 42149 1758 1 The the DT 42149 1758 2 assistant assistant NN 42149 1758 3 or or CC 42149 1758 4 " " `` 42149 1758 5 walking walk VBG 42149 1758 6 boss boss NN 42149 1758 7 " " '' 42149 1758 8 had have VBD 42149 1758 9 charge charge NN 42149 1758 10 of of IN 42149 1758 11 all all DT 42149 1758 12 work work NN 42149 1758 13 in in IN 42149 1758 14 the the DT 42149 1758 15 tunnel tunnel NN 42149 1758 16 on on IN 42149 1758 17 one one CD 42149 1758 18 shift shift NN 42149 1758 19 . . . 42149 1759 1 The the DT 42149 1759 2 general general JJ 42149 1759 3 foreman foreman NN 42149 1759 4 had have VBD 42149 1759 5 charge charge NN 42149 1759 6 of of IN 42149 1759 7 the the DT 42149 1759 8 labor labor NN 42149 1759 9 at at IN 42149 1759 10 the the DT 42149 1759 11 face face NN 42149 1759 12 . . . 42149 1760 1 The the DT 42149 1760 2 electricians electrician NNS 42149 1760 3 looked look VBD 42149 1760 4 after after IN 42149 1760 5 repairs repair NNS 42149 1760 6 , , , 42149 1760 7 extensions extension NNS 42149 1760 8 of of IN 42149 1760 9 the the DT 42149 1760 10 cables cable NNS 42149 1760 11 , , , 42149 1760 12 and and CC 42149 1760 13 lamp lamp NN 42149 1760 14 renewals renewal NNS 42149 1760 15 . . . 42149 1761 1 The the DT 42149 1761 2 pipefitters pipefitter NNS 42149 1761 3 worked work VBD 42149 1761 4 in in IN 42149 1761 5 both both DT 42149 1761 6 tunnels tunnel NNS 42149 1761 7 repairing repair VBG 42149 1761 8 leaks leak NNS 42149 1761 9 in in IN 42149 1761 10 pipes pipe NNS 42149 1761 11 between between IN 42149 1761 12 the the DT 42149 1761 13 power power NN 42149 1761 14 - - HYPH 42149 1761 15 house house NN 42149 1761 16 and and CC 42149 1761 17 the the DT 42149 1761 18 working work VBG 42149 1761 19 faces face NNS 42149 1761 20 , , , 42149 1761 21 extending extend VBG 42149 1761 22 the the DT 42149 1761 23 pipe pipe NN 42149 1761 24 lines line NNS 42149 1761 25 , , , 42149 1761 26 and and CC 42149 1761 27 attending attend VBG 42149 1761 28 to to TO 42149 1761 29 shield shield VB 42149 1761 30 repairs repair NNS 42149 1761 31 , , , 42149 1761 32 and and CC 42149 1761 33 in in IN 42149 1761 34 the the DT 42149 1761 35 latter latter JJ 42149 1761 36 work work NN 42149 1761 37 the the DT 42149 1761 38 erector erector NNP 42149 1761 39 runner runner NNP 42149 1761 40 helped help VBD 42149 1761 41 . . . 42149 1762 1 The the DT 42149 1762 2 drillers driller NNS 42149 1762 3 stuck stick VBD 42149 1762 4 to to IN 42149 1762 5 their -PRON- PRP$ 42149 1762 6 own own JJ 42149 1762 7 jobs job NNS 42149 1762 8 , , , 42149 1762 9 which which WDT 42149 1762 10 were be VBD 42149 1762 11 not not RB 42149 1762 12 subject subject JJ 42149 1762 13 to to IN 42149 1762 14 interruption interruption NN 42149 1762 15 as as RB 42149 1762 16 long long RB 42149 1762 17 as as IN 42149 1762 18 the the DT 42149 1762 19 bottom bottom JJ 42149 1762 20 headings heading NNS 42149 1762 21 lasted last VBD 42149 1762 22 . . . 42149 1763 1 One one CD 42149 1763 2 waterboy waterboy NN 42149 1763 3 and and CC 42149 1763 4 one one CD 42149 1763 5 powderboy powderboy NN 42149 1763 6 served serve VBD 42149 1763 7 two two CD 42149 1763 8 tunnels tunnel NNS 42149 1763 9 . . . 42149 1764 1 The the DT 42149 1764 2 muckers mucker NNS 42149 1764 3 helped help VBD 42149 1764 4 the the DT 42149 1764 5 iron iron NN 42149 1764 6 men man NNS 42149 1764 7 put put VB 42149 1764 8 up up RP 42149 1764 9 the the DT 42149 1764 10 rings ring NNS 42149 1764 11 of of IN 42149 1764 12 lining lining NN 42149 1764 13 , , , 42149 1764 14 as as RB 42149 1764 15 well well RB 42149 1764 16 as as IN 42149 1764 17 doing do VBG 42149 1764 18 their -PRON- PRP$ 42149 1764 19 own own JJ 42149 1764 20 work work NN 42149 1764 21 . . . 42149 1765 1 The the DT 42149 1765 2 iron iron NN 42149 1765 3 men man NNS 42149 1765 4 tightened tighten VBD 42149 1765 5 bolts bolt NNS 42149 1765 6 , , , 42149 1765 7 whenever whenever WRB 42149 1765 8 not not RB 42149 1765 9 actually actually RB 42149 1765 10 building build VBG 42149 1765 11 up up RP 42149 1765 12 iron iron NN 42149 1765 13 . . . 42149 1766 1 The the DT 42149 1766 2 list list NN 42149 1766 3 does do VBZ 42149 1766 4 not not RB 42149 1766 5 include include VB 42149 1766 6 the the DT 42149 1766 7 transportation transportation NN 42149 1766 8 gang gang NN 42149 1766 9 , , , 42149 1766 10 which which WDT 42149 1766 11 will will MD 42149 1766 12 be be VB 42149 1766 13 described describe VBN 42149 1766 14 under under IN 42149 1766 15 its -PRON- PRP$ 42149 1766 16 own own JJ 42149 1766 17 heading heading NN 42149 1766 18 . . . 42149 1767 1 The the DT 42149 1767 2 rate rate NN 42149 1767 3 of of IN 42149 1767 4 progress progress NN 42149 1767 5 attained attain VBN 42149 1767 6 was be VBD 42149 1767 7 4.2 4.2 CD 42149 1767 8 ft ft NN 42149 1767 9 . . NN 42149 1767 10 per per IN 42149 1767 11 day day NN 42149 1767 12 per per IN 42149 1767 13 shield shield NN 42149 1767 14 where where WRB 42149 1767 15 most most JJS 42149 1767 16 of of IN 42149 1767 17 the the DT 42149 1767 18 excavation excavation NN 42149 1767 19 had have VBD 42149 1767 20 been be VBN 42149 1767 21 done do VBN 42149 1767 22 before before RB 42149 1767 23 , , , 42149 1767 24 and and CC 42149 1767 25 2.1 2.1 CD 42149 1767 26 ft ft NN 42149 1767 27 . . . 42149 1767 28 where where WRB 42149 1767 29 none none NN 42149 1767 30 had have VBD 42149 1767 31 been be VBN 42149 1767 32 done do VBN 42149 1767 33 before before RB 42149 1767 34 . . . 42149 1768 1 When when WRB 42149 1768 2 the the DT 42149 1768 3 shields shield NNS 42149 1768 4 had have VBD 42149 1768 5 got get VBN 42149 1768 6 far far RB 42149 1768 7 enough enough RB 42149 1768 8 away away RB 42149 1768 9 from from IN 42149 1768 10 the the DT 42149 1768 11 shield shield NN 42149 1768 12 chamber chamber NN 42149 1768 13 , , , 42149 1768 14 and and CC 42149 1768 15 before before IN 42149 1768 16 rock rock NN 42149 1768 17 cover cover NN 42149 1768 18 was be VBD 42149 1768 19 lost lose VBN 42149 1768 20 , , , 42149 1768 21 the the DT 42149 1768 22 first first JJ 42149 1768 23 air air NN 42149 1768 24 - - HYPH 42149 1768 25 lock lock NN 42149 1768 26 bulkhead bulkhead NN 42149 1768 27 walls wall NNS 42149 1768 28 were be VBD 42149 1768 29 put put VBN 42149 1768 30 in in RB 42149 1768 31 . . . 42149 1769 1 _ _ NNP 42149 1769 2 Air Air NNP 42149 1769 3 - - HYPH 42149 1769 4 Lock Lock NNP 42149 1769 5 Bulkhead Bulkhead NNP 42149 1769 6 Walls._--The Walls._--The NNP 42149 1769 7 specifications specification NNS 42149 1769 8 required require VBD 42149 1769 9 these these DT 42149 1769 10 walls wall NNS 42149 1769 11 and and CC 42149 1769 12 all all PDT 42149 1769 13 their -PRON- PRP$ 42149 1769 14 fittings fitting NNS 42149 1769 15 to to TO 42149 1769 16 be be VB 42149 1769 17 strong strong JJ 42149 1769 18 enough enough RB 42149 1769 19 to to TO 42149 1769 20 stand stand VB 42149 1769 21 a a DT 42149 1769 22 pressure pressure NN 42149 1769 23 of of IN 42149 1769 24 50 50 CD 42149 1769 25 lb lb XX 42149 1769 26 . . . 42149 1770 1 per per IN 42149 1770 2 sq sq NNP 42149 1770 3 . . . 42149 1771 1 in in IN 42149 1771 2 . . . 42149 1772 1 Accordingly accordingly RB 42149 1772 2 , , , 42149 1772 3 all all PDT 42149 1772 4 the the DT 42149 1772 5 walls wall NNS 42149 1772 6 were be VBD 42149 1772 7 of of IN 42149 1772 8 concrete concrete JJ 42149 1772 9 , , , 42149 1772 10 10 10 CD 42149 1772 11 ft ft NN 42149 1772 12 . . NN 42149 1772 13 in in IN 42149 1772 14 thickness thickness NN 42149 1772 15 , , , 42149 1772 16 except except IN 42149 1772 17 the the DT 42149 1772 18 first first JJ 42149 1772 19 two two CD 42149 1772 20 , , , 42149 1772 21 which which WDT 42149 1772 22 were be VBD 42149 1772 23 8 8 CD 42149 1772 24 ft ft NN 42149 1772 25 . . NN 42149 1772 26 in in IN 42149 1772 27 thickness thickness NN 42149 1772 28 , , , 42149 1772 29 and and CC 42149 1772 30 grouted grout VBN 42149 1772 31 up up RP 42149 1772 32 tight tight RB 42149 1772 33 . . . 42149 1773 1 There there EX 42149 1773 2 were be VBD 42149 1773 3 three three CD 42149 1773 4 locks lock NNS 42149 1773 5 in in IN 42149 1773 6 each each DT 42149 1773 7 bulkhead bulkhead NN 42149 1773 8 wall wall NN 42149 1773 9 capable capable JJ 42149 1773 10 of of IN 42149 1773 11 holding hold VBG 42149 1773 12 men man NNS 42149 1773 13 , , , 42149 1773 14 namely namely RB 42149 1773 15 , , , 42149 1773 16 the the DT 42149 1773 17 top top NN 42149 1773 18 or or CC 42149 1773 19 emergency emergency NN 42149 1773 20 lock lock NN 42149 1773 21 which which WDT 42149 1773 22 is be VBZ 42149 1773 23 set set VBN 42149 1773 24 high high JJ 42149 1773 25 in in IN 42149 1773 26 order order NN 42149 1773 27 to to TO 42149 1773 28 afford afford VB 42149 1773 29 a a DT 42149 1773 30 safe safe JJ 42149 1773 31 means mean NNS 42149 1773 32 of of IN 42149 1773 33 getting get VBG 42149 1773 34 away away RB 42149 1773 35 in in IN 42149 1773 36 case case NN 42149 1773 37 of of IN 42149 1773 38 a a DT 42149 1773 39 flood flood NN 42149 1773 40 ; ; : 42149 1773 41 this this DT 42149 1773 42 lock lock NN 42149 1773 43 was be VBD 42149 1773 44 used use VBN 42149 1773 45 continuously continuously RB 42149 1773 46 for for IN 42149 1773 47 producing produce VBG 42149 1773 48 the the DT 42149 1773 49 lines line NNS 42149 1773 50 and and CC 42149 1773 51 levels level NNS 42149 1773 52 into into IN 42149 1773 53 the the DT 42149 1773 54 tunnels tunnel NNS 42149 1773 55 . . . 42149 1774 1 It -PRON- PRP 42149 1774 2 was be VBD 42149 1774 3 very very RB 42149 1774 4 small small JJ 42149 1774 5 and and CC 42149 1774 6 cramped cramp VBN 42149 1774 7 for for IN 42149 1774 8 this this DT 42149 1774 9 purpose purpose NN 42149 1774 10 , , , 42149 1774 11 and and CC 42149 1774 12 a a DT 42149 1774 13 larger large JJR 42149 1774 14 one one PRP 42149 1774 15 would would MD 42149 1774 16 have have VB 42149 1774 17 been be VBN 42149 1774 18 better well JJR 42149 1774 19 , , , 42149 1774 20 both both DT 42149 1774 21 for for IN 42149 1774 22 lines line NNS 42149 1774 23 and and CC 42149 1774 24 emergencies emergency NNS 42149 1774 25 . . . 42149 1775 1 This this DT 42149 1775 2 lock lock NN 42149 1775 3 was be VBD 42149 1775 4 directly directly RB 42149 1775 5 connected connect VBN 42149 1775 6 with with IN 42149 1775 7 the the DT 42149 1775 8 overhead overhead JJ 42149 1775 9 platform platform NN 42149 1775 10 ( ( -LRB- 42149 1775 11 also also RB 42149 1775 12 called call VBN 42149 1775 13 for for IN 42149 1775 14 in in IN 42149 1775 15 the the DT 42149 1775 16 specifications specification NNS 42149 1775 17 ) ) -RRB- 42149 1775 18 which which WDT 42149 1775 19 ran run VBD 42149 1775 20 the the DT 42149 1775 21 whole whole JJ 42149 1775 22 length length NN 42149 1775 23 of of IN 42149 1775 24 the the DT 42149 1775 25 tunnels tunnel NNS 42149 1775 26 . . . 42149 1776 1 Side side NN 42149 1776 2 by by IN 42149 1776 3 side side NN 42149 1776 4 , , , 42149 1776 5 on on IN 42149 1776 6 the the DT 42149 1776 7 level level NN 42149 1776 8 of of IN 42149 1776 9 the the DT 42149 1776 10 lower low JJR 42149 1776 11 or or CC 42149 1776 12 working working NN 42149 1776 13 platform platform NN 42149 1776 14 of of IN 42149 1776 15 the the DT 42149 1776 16 tunnel tunnel NN 42149 1776 17 , , , 42149 1776 18 were be VBD 42149 1776 19 the the DT 42149 1776 20 man man NN 42149 1776 21 lock lock NN 42149 1776 22 and and CC 42149 1776 23 the the DT 42149 1776 24 muck muck JJ 42149 1776 25 lock lock NN 42149 1776 26 . . . 42149 1777 1 In in IN 42149 1777 2 addition addition NN 42149 1777 3 a a DT 42149 1777 4 number number NN 42149 1777 5 of of IN 42149 1777 6 pipes pipe NNS 42149 1777 7 were be VBD 42149 1777 8 built build VBN 42149 1777 9 in in IN 42149 1777 10 to to TO 42149 1777 11 give give VB 42149 1777 12 access access NN 42149 1777 13 to to IN 42149 1777 14 the the DT 42149 1777 15 cables cable NNS 42149 1777 16 and and CC 42149 1777 17 for for IN 42149 1777 18 passing pass VBG 42149 1777 19 pipes pipe NNS 42149 1777 20 , , , 42149 1777 21 rails rail NNS 42149 1777 22 , , , 42149 1777 23 etc etc FW 42149 1777 24 . . FW 42149 1777 25 , , , 42149 1777 26 in in IN 42149 1777 27 and and CC 42149 1777 28 out out RB 42149 1777 29 . . . 42149 1778 1 After after IN 42149 1778 2 each each DT 42149 1778 3 tunnel tunnel NN 42149 1778 4 was be VBD 42149 1778 5 about about RB 42149 1778 6 1,200 1,200 CD 42149 1778 7 ft ft NN 42149 1778 8 . . . 42149 1778 9 ahead ahead RB 42149 1778 10 of of IN 42149 1778 11 the the DT 42149 1778 12 first first JJ 42149 1778 13 walls wall NNS 42149 1778 14 , , , 42149 1778 15 a a DT 42149 1778 16 second second JJ 42149 1778 17 wall wall NN 42149 1778 18 was be VBD 42149 1778 19 built build VBN 42149 1778 20 just just RB 42149 1778 21 like like IN 42149 1778 22 the the DT 42149 1778 23 first first JJ 42149 1778 24 , , , 42149 1778 25 and and CC 42149 1778 26 no no DT 42149 1778 27 others other NNS 42149 1778 28 were be VBD 42149 1778 29 put put VBN 42149 1778 30 in in RP 42149 1778 31 , , , 42149 1778 32 so so IN 42149 1778 33 that that IN 42149 1778 34 altogether altogether RB 42149 1778 35 there there EX 42149 1778 36 were be VBD 42149 1778 37 eight eight CD 42149 1778 38 walls wall NNS 42149 1778 39 . . . 42149 1779 1 This this DT 42149 1779 2 second second JJ 42149 1779 3 wall wall NN 42149 1779 4 not not RB 42149 1779 5 only only RB 42149 1779 6 gave give VBD 42149 1779 7 an an DT 42149 1779 8 added add VBN 42149 1779 9 safeguard safeguard NN 42149 1779 10 to to IN 42149 1779 11 the the DT 42149 1779 12 tunnel tunnel NN 42149 1779 13 but but CC 42149 1779 14 enabled enable VBD 42149 1779 15 the the DT 42149 1779 16 air air NN 42149 1779 17 pressure pressure NN 42149 1779 18 at at IN 42149 1779 19 the the DT 42149 1779 20 working work VBG 42149 1779 21 face face NN 42149 1779 22 to to TO 42149 1779 23 be be VB 42149 1779 24 divided divide VBN 42149 1779 25 between between IN 42149 1779 26 the the DT 42149 1779 27 two two CD 42149 1779 28 walls wall NNS 42149 1779 29 , , , 42149 1779 30 and and CC 42149 1779 31 this this DT 42149 1779 32 compression compression NN 42149 1779 33 or or CC 42149 1779 34 decompression decompression NN 42149 1779 35 in in IN 42149 1779 36 stages stage NNS 42149 1779 37 , , , 42149 1779 38 separated separate VBN 42149 1779 39 by by IN 42149 1779 40 a a DT 42149 1779 41 spell spell NN 42149 1779 42 of of IN 42149 1779 43 walking walking NN 42149 1779 44 exercise exercise NN 42149 1779 45 , , , 42149 1779 46 was be VBD 42149 1779 47 found find VBN 42149 1779 48 to to TO 42149 1779 49 be be VB 42149 1779 50 very very RB 42149 1779 51 good good JJ 42149 1779 52 for for IN 42149 1779 53 the the DT 42149 1779 54 health health NN 42149 1779 55 of of IN 42149 1779 56 those those DT 42149 1779 57 working work VBG 42149 1779 58 in in IN 42149 1779 59 the the DT 42149 1779 60 air air NN 42149 1779 61 . . . 42149 1780 1 _ _ NNP 42149 1780 2 Mixed Mixed NNP 42149 1780 3 Face._--When Face._--When NNP 42149 1780 4 the the DT 42149 1780 5 rock rock NN 42149 1780 6 cover cover NN 42149 1780 7 became become VBD 42149 1780 8 so so RB 42149 1780 9 thin thin JJ 42149 1780 10 that that IN 42149 1780 11 it -PRON- PRP 42149 1780 12 was be VBD 42149 1780 13 risky risky JJ 42149 1780 14 to to TO 42149 1780 15 go go VB 42149 1780 16 on on RP 42149 1780 17 without without IN 42149 1780 18 the the DT 42149 1780 19 air air NN 42149 1780 20 pressure pressure NN 42149 1780 21 , , , 42149 1780 22 the the DT 42149 1780 23 air air NN 42149 1780 24 pressure pressure NN 42149 1780 25 was be VBD 42149 1780 26 turned turn VBN 42149 1780 27 on on RP 42149 1780 28 , , , 42149 1780 29 starting start VBG 42149 1780 30 with with IN 42149 1780 31 from from IN 42149 1780 32 12 12 CD 42149 1780 33 to to TO 42149 1780 34 18 18 CD 42149 1780 35 lb lb RB 42149 1780 36 . . . 42149 1780 37 , , , 42149 1780 38 which which WDT 42149 1780 39 was be VBD 42149 1780 40 enough enough JJ 42149 1780 41 to to TO 42149 1780 42 stop stop VB 42149 1780 43 the the DT 42149 1780 44 water water NN 42149 1780 45 from from IN 42149 1780 46 the the DT 42149 1780 47 gravel gravel NN 42149 1780 48 on on IN 42149 1780 49 top top NN 42149 1780 50 of of IN 42149 1780 51 the the DT 42149 1780 52 rock rock NN 42149 1780 53 . . . 42149 1781 1 At at IN 42149 1781 2 first first RB 42149 1781 3 , , , 42149 1781 4 when when WRB 42149 1781 5 the the DT 42149 1781 6 surface surface NN 42149 1781 7 of of IN 42149 1781 8 the the DT 42149 1781 9 rock rock NN 42149 1781 10 was be VBD 42149 1781 11 penetrated penetrate VBN 42149 1781 12 , , , 42149 1781 13 the the DT 42149 1781 14 soft soft JJ 42149 1781 15 face face NN 42149 1781 16 was be VBD 42149 1781 17 held hold VBN 42149 1781 18 up up RP 42149 1781 19 by by IN 42149 1781 20 horizontal horizontal JJ 42149 1781 21 boards board NNS 42149 1781 22 braced brace VBN 42149 1781 23 from from IN 42149 1781 24 the the DT 42149 1781 25 shield shield NN 42149 1781 26 until until IN 42149 1781 27 the the DT 42149 1781 28 shield shield NN 42149 1781 29 was be VBD 42149 1781 30 shoved shove VBN 42149 1781 31 . . . 42149 1782 1 The the DT 42149 1782 2 braces brace NNS 42149 1782 3 were be VBD 42149 1782 4 then then RB 42149 1782 5 taken take VBN 42149 1782 6 out out RP 42149 1782 7 and and CC 42149 1782 8 , , , 42149 1782 9 as as RB 42149 1782 10 soon soon RB 42149 1782 11 as as IN 42149 1782 12 the the DT 42149 1782 13 shield shield NN 42149 1782 14 had have VBD 42149 1782 15 been be VBN 42149 1782 16 shoved shove VBN 42149 1782 17 , , , 42149 1782 18 were be VBD 42149 1782 19 replaced replace VBN 42149 1782 20 by by IN 42149 1782 21 others other NNS 42149 1782 22 . . . 42149 1783 1 As as IN 42149 1783 2 the the DT 42149 1783 3 amount amount NN 42149 1783 4 of of IN 42149 1783 5 soft soft JJ 42149 1783 6 ground ground NN 42149 1783 7 in in IN 42149 1783 8 the the DT 42149 1783 9 face face NN 42149 1783 10 increased increase VBD 42149 1783 11 , , , 42149 1783 12 the the DT 42149 1783 13 system system NN 42149 1783 14 of of IN 42149 1783 15 timbering timbering NN 42149 1783 16 was be VBD 42149 1783 17 gradually gradually RB 42149 1783 18 changed change VBN 42149 1783 19 to to IN 42149 1783 20 one one CD 42149 1783 21 of of IN 42149 1783 22 2-in 2-in CD 42149 1783 23 . . . 42149 1784 1 poling pole VBG 42149 1784 2 boards board NNS 42149 1784 3 resting rest VBG 42149 1784 4 on on IN 42149 1784 5 top top NN 42149 1784 6 of of IN 42149 1784 7 the the DT 42149 1784 8 shield shield NN 42149 1784 9 and and CC 42149 1784 10 supported support VBD 42149 1784 11 at at IN 42149 1784 12 the the DT 42149 1784 13 face face NN 42149 1784 14 by by IN 42149 1784 15 vertical vertical JJ 42149 1784 16 breast breast NN 42149 1784 17 boards board NNS 42149 1784 18 , , , 42149 1784 19 in in IN 42149 1784 20 turn turn NN 42149 1784 21 held hold VBN 42149 1784 22 by by IN 42149 1784 23 6 6 CD 42149 1784 24 by by IN 42149 1784 25 6-in 6-in CD 42149 1784 26 . . . 42149 1785 1 walings waling NNS 42149 1785 2 braced brace VBD 42149 1785 3 both both CC 42149 1785 4 through through IN 42149 1785 5 the the DT 42149 1785 6 upper upper JJ 42149 1785 7 doors door NNS 42149 1785 8 to to IN 42149 1785 9 the the DT 42149 1785 10 iron iron NN 42149 1785 11 lining lining NN 42149 1785 12 and and CC 42149 1785 13 from from IN 42149 1785 14 the the DT 42149 1785 15 sliding slide VBG 42149 1785 16 platforms platform NNS 42149 1785 17 of of IN 42149 1785 18 the the DT 42149 1785 19 shield shield NN 42149 1785 20 . . . 42149 1786 1 The the DT 42149 1786 2 latter latter JJ 42149 1786 3 were be VBD 42149 1786 4 in in IN 42149 1786 5 their -PRON- PRP$ 42149 1786 6 forward forward JJ 42149 1786 7 position position NN 42149 1786 8 before before IN 42149 1786 9 the the DT 42149 1786 10 shield shield NN 42149 1786 11 was be VBD 42149 1786 12 shoved shove VBN 42149 1786 13 , , , 42149 1786 14 the the DT 42149 1786 15 pressure pressure NN 42149 1786 16 being be VBG 42149 1786 17 turned turn VBD 42149 1786 18 off off RP 42149 1786 19 and and CC 42149 1786 20 the the DT 42149 1786 21 exhaust exhaust NN 42149 1786 22 valves valve NNS 42149 1786 23 opened open VBN 42149 1786 24 just just RB 42149 1786 25 before before IN 42149 1786 26 the the DT 42149 1786 27 shove shove NN 42149 1786 28 began begin VBD 42149 1786 29 . . . 42149 1787 1 As as IN 42149 1787 2 the the DT 42149 1787 3 shield shield NN 42149 1787 4 went go VBD 42149 1787 5 ahead ahead RB 42149 1787 6 , , , 42149 1787 7 the the DT 42149 1787 8 platform platform NN 42149 1787 9 jacks jack NNS 42149 1787 10 gradually gradually RB 42149 1787 11 exhausted exhausted JJ 42149 1787 12 and and CC 42149 1787 13 thus thus RB 42149 1787 14 held hold VBN 42149 1787 15 enough enough JJ 42149 1787 16 pressure pressure NN 42149 1787 17 on on IN 42149 1787 18 the the DT 42149 1787 19 face face NN 42149 1787 20 to to TO 42149 1787 21 keep keep VB 42149 1787 22 it -PRON- PRP 42149 1787 23 up up RP 42149 1787 24 . . . 42149 1788 1 Fig fig NN 42149 1788 2 . . . 42149 1789 1 17 17 CD 42149 1789 2 is be VBZ 42149 1789 3 a a DT 42149 1789 4 sketch sketch NN 42149 1789 5 of of IN 42149 1789 6 this this DT 42149 1789 7 method method NN 42149 1789 8 . . . 42149 1790 1 In in IN 42149 1790 2 driving drive VBG 42149 1790 3 through through IN 42149 1790 4 mixed mixed JJ 42149 1790 5 ground ground NN 42149 1790 6 a a DT 42149 1790 7 typical typical JJ 42149 1790 8 working working NN 42149 1790 9 gang gang NN 42149 1790 10 was be VBD 42149 1790 11 about about IN 42149 1790 12 as as IN 42149 1790 13 follows follow VBZ 42149 1790 14 : : : 42149 1790 15 _ _ NNP 42149 1790 16 General General NNP 42149 1790 17 : : : 42149 1790 18 _ _ NNP 42149 1790 19 1/3 1/3 CD 42149 1790 20 Tunnel Tunnel NNP 42149 1790 21 superintendent superintendent NN 42149 1790 22 @ @ IN 42149 1790 23 $ $ $ 42149 1790 24 300.00 300.00 CD 42149 1790 25 per per IN 42149 1790 26 month month NN 42149 1790 27 1 1 CD 42149 1790 28 Assistant Assistant NNP 42149 1790 29 tunnel tunnel NN 42149 1790 30 superintendent superintendent NN 42149 1790 31 " " `` 42149 1790 32 5.00 5.00 CD 42149 1790 33 per per IN 42149 1790 34 day day NN 42149 1790 35 1 1 CD 42149 1790 36 General general JJ 42149 1790 37 foreman foreman NN 42149 1790 38 " " `` 42149 1790 39 5.00 5.00 CD 42149 1790 40 " " '' 42149 1790 41 " " '' 42149 1790 42 ½ ½ NNP 42149 1790 43 Electrician Electrician NNP 42149 1790 44 " " `` 42149 1790 45 3.50 3.50 CD 42149 1790 46 " " '' 42149 1790 47 " " '' 42149 1790 48 ½ ½ NNP 42149 1790 49 Electrician Electrician NNP 42149 1790 50 's 's POS 42149 1790 51 helper helper NN 42149 1790 52 " " `` 42149 1790 53 3.00 3.00 CD 42149 1790 54 " " '' 42149 1790 55 " " '' 42149 1790 56 ½ ½ NNP 42149 1790 57 Pipefitter Pipefitter NNP 42149 1790 58 " " `` 42149 1790 59 3.25 3.25 CD 42149 1790 60 " " '' 42149 1790 61 " " '' 42149 1790 62 ½ ½ NNP 42149 1790 63 Pipefitter Pipefitter NNP 42149 1790 64 's 's POS 42149 1790 65 helper helper NN 42149 1790 66 " " `` 42149 1790 67 3.00 3.00 CD 42149 1790 68 " " '' 42149 1790 69 " " `` 42149 1790 70 _ _ NNP 42149 1790 71 Drilling Drilling NNP 42149 1790 72 : : : 42149 1790 73 _ _ NNP 42149 1790 74 1 1 CD 42149 1790 75 Foreman Foreman NNP 42149 1790 76 " " `` 42149 1790 77 5.00 5.00 CD 42149 1790 78 " " '' 42149 1790 79 " " '' 42149 1790 80 2 2 CD 42149 1790 81 Drillers Drillers NNPS 42149 1790 82 " " `` 42149 1790 83 3.25 3.25 CD 42149 1790 84 " " '' 42149 1790 85 " " '' 42149 1790 86 2 2 CD 42149 1790 87 Drillers Drillers NNPS 42149 1790 88 ' ' POS 42149 1790 89 helpers helper NNS 42149 1790 90 " " `` 42149 1790 91 3.00 3.00 CD 42149 1790 92 " " '' 42149 1790 93 " " `` 42149 1790 94 _ _ NNP 42149 1790 95 Timbering Timbering NNP 42149 1790 96 : : : 42149 1790 97 _ _ NNP 42149 1790 98 2 2 CD 42149 1790 99 Timbermen Timbermen NNP 42149 1790 100 @ @ CC 42149 1790 101 $ $ $ 42149 1790 102 2.50 2.50 CD 42149 1790 103 per per IN 42149 1790 104 day day NN 42149 1790 105 2 2 CD 42149 1790 106 Timbermen Timbermen NNP 42149 1790 107 's 's POS 42149 1790 108 helpers helper NNS 42149 1790 109 " " `` 42149 1790 110 2.00 2.00 CD 42149 1790 111 " " '' 42149 1790 112 " " `` 42149 1790 113 _ _ NNP 42149 1790 114 Mucking Mucking NNP 42149 1790 115 : : : 42149 1790 116 _ _ NNP 42149 1790 117 1 1 CD 42149 1790 118 Foreman Foreman NNP 42149 1790 119 " " `` 42149 1790 120 3.50 3.50 CD 42149 1790 121 " " '' 42149 1790 122 " " `` 42149 1790 123 6 6 CD 42149 1790 124 Muckers Muckers NNPS 42149 1790 125 " " `` 42149 1790 126 2.75 2.75 CD 42149 1790 127 " " '' 42149 1790 128 " " `` 42149 1790 129 _ _ NNP 42149 1790 130 Erecting Erecting NNP 42149 1790 131 Iron Iron NNP 42149 1790 132 and and CC 42149 1790 133 Driving Driving NNP 42149 1790 134 Shield Shield NNP 42149 1790 135 : : : 42149 1790 136 _ _ NNP 42149 1790 137 1 1 CD 42149 1790 138 Erector Erector NNP 42149 1790 139 runner runner NN 42149 1790 140 " " `` 42149 1790 141 3.25 3.25 CD 42149 1790 142 " " '' 42149 1790 143 " " `` 42149 1790 144 3 3 CD 42149 1790 145 Iron Iron NNP 42149 1790 146 workers worker NNS 42149 1790 147 " " `` 42149 1790 148 3.00 3.00 CD 42149 1790 149 " " '' 42149 1790 150 " " `` 42149 1790 151 The the DT 42149 1790 152 average average JJ 42149 1790 153 rate rate NN 42149 1790 154 of of IN 42149 1790 155 progress progress NN 42149 1790 156 was be VBD 42149 1790 157 2.6 2.6 CD 42149 1790 158 ft ft NN 42149 1790 159 . . NN 42149 1790 160 per per IN 42149 1790 161 day day NN 42149 1790 162 . . . 42149 1791 1 In in IN 42149 1791 2 this this DT 42149 1791 3 case case NN 42149 1791 4 there there EX 42149 1791 5 were be VBD 42149 1791 6 three three CD 42149 1791 7 such such JJ 42149 1791 8 gangs gang NNS 42149 1791 9 , , , 42149 1791 10 each each DT 42149 1791 11 on on IN 42149 1791 12 an an DT 42149 1791 13 8-hour 8-hour CD 42149 1791 14 shift shift NN 42149 1791 15 . . . 42149 1792 1 _ _ NNP 42149 1792 2 Full Full NNP 42149 1792 3 Face face NN 42149 1792 4 of of IN 42149 1792 5 Sand Sand NNP 42149 1792 6 and and CC 42149 1792 7 Gravel._--This gravel._--this CD 42149 1792 8 condition condition NN 42149 1792 9 of of IN 42149 1792 10 affairs affair NNS 42149 1792 11 was be VBD 42149 1792 12 only only RB 42149 1792 13 met meet VBN 42149 1792 14 at at IN 42149 1792 15 Weehawken Weehawken NNP 42149 1792 16 . . . 42149 1793 1 Two two CD 42149 1793 2 systems system NNS 42149 1793 3 of of IN 42149 1793 4 timbering timbering NN 42149 1793 5 were be VBD 42149 1793 6 used use VBN 42149 1793 7 . . . 42149 1794 1 In in IN 42149 1794 2 the the DT 42149 1794 3 first first JJ 42149 1794 4 system system NN 42149 1794 5 , , , 42149 1794 6 Fig Fig NNP 42149 1794 7 . . . 42149 1795 1 17 17 CD 42149 1795 2 , , , 42149 1795 3 the the DT 42149 1795 4 ground ground NN 42149 1795 5 was be VBD 42149 1795 6 excavated excavate VBN 42149 1795 7 2 2 CD 42149 1795 8 ft ft NN 42149 1795 9 . . NNP 42149 1795 10 6 6 CD 42149 1795 11 in in IN 42149 1795 12 . . . 42149 1796 1 ahead ahead RB 42149 1796 2 of of IN 42149 1796 3 the the DT 42149 1796 4 cutting cutting NN 42149 1796 5 edge edge NN 42149 1796 6 , , , 42149 1796 7 the the DT 42149 1796 8 roof roof NN 42149 1796 9 being be VBG 42149 1796 10 held hold VBN 42149 1796 11 by by IN 42149 1796 12 longitudinal longitudinal JJ 42149 1796 13 poling poling NN 42149 1796 14 boards board NNS 42149 1796 15 , , , 42149 1796 16 resting rest VBG 42149 1796 17 on on IN 42149 1796 18 the the DT 42149 1796 19 outside outside NN 42149 1796 20 of of IN 42149 1796 21 the the DT 42149 1796 22 skin skin NN 42149 1796 23 at at IN 42149 1796 24 their -PRON- PRP$ 42149 1796 25 back back JJ 42149 1796 26 end end NN 42149 1796 27 and and CC 42149 1796 28 on on IN 42149 1796 29 vertical vertical JJ 42149 1796 30 breast breast NN 42149 1796 31 boards board NNS 42149 1796 32 at at IN 42149 1796 33 the the DT 42149 1796 34 forward forward JJ 42149 1796 35 end end NN 42149 1796 36 . . . 42149 1797 1 When when WRB 42149 1797 2 the the DT 42149 1797 3 upper upper JJ 42149 1797 4 part part NN 42149 1797 5 of of IN 42149 1797 6 the the DT 42149 1797 7 face face NN 42149 1797 8 was be VBD 42149 1797 9 dry dry JJ 42149 1797 10 , , , 42149 1797 11 it -PRON- PRP 42149 1797 12 was be VBD 42149 1797 13 held hold VBN 42149 1797 14 by by IN 42149 1797 15 vertical vertical JJ 42149 1797 16 breast breast NN 42149 1797 17 boards board NNS 42149 1797 18 braced brace VBN 42149 1797 19 from from IN 42149 1797 20 the the DT 42149 1797 21 sliding slide VBG 42149 1797 22 platform platform NN 42149 1797 23 and and CC 42149 1797 24 through through IN 42149 1797 25 the the DT 42149 1797 26 shield shield NN 42149 1797 27 doors door NNS 42149 1797 28 to to TO 42149 1797 29 cross cross NN 42149 1797 30 - - NNS 42149 1797 31 timbers timber NNS 42149 1797 32 in in IN 42149 1797 33 the the DT 42149 1797 34 tunnel tunnel NN 42149 1797 35 ; ; : 42149 1797 36 the the DT 42149 1797 37 lower low JJR 42149 1797 38 part part NN 42149 1797 39 , , , 42149 1797 40 which which WDT 42149 1797 41 was be VBD 42149 1797 42 always always RB 42149 1797 43 wet wet JJ 42149 1797 44 , , , 42149 1797 45 was be VBD 42149 1797 46 held hold VBN 42149 1797 47 by by IN 42149 1797 48 horizontal horizontal JJ 42149 1797 49 breast breast NN 42149 1797 50 boards board NNS 42149 1797 51 braced brace VBN 42149 1797 52 through through IN 42149 1797 53 the the DT 42149 1797 54 lower low JJR 42149 1797 55 shield shield NN 42149 1797 56 pockets pocket NNS 42149 1797 57 to to IN 42149 1797 58 cross cross NN 42149 1797 59 - - NNS 42149 1797 60 timbers timber NNS 42149 1797 61 in in IN 42149 1797 62 the the DT 42149 1797 63 tunnel tunnel NN 42149 1797 64 . . . 42149 1798 1 This this DT 42149 1798 2 system system NN 42149 1798 3 worked work VBD 42149 1798 4 all all RB 42149 1798 5 right right RB 42149 1798 6 as as RB 42149 1798 7 long long RB 42149 1798 8 as as IN 42149 1798 9 the the DT 42149 1798 10 ground ground NN 42149 1798 11 in in IN 42149 1798 12 the the DT 42149 1798 13 top top NN 42149 1798 14 was be VBD 42149 1798 15 sandy sandy JJ 42149 1798 16 enough enough RB 42149 1798 17 and and CC 42149 1798 18 had have VBD 42149 1798 19 sufficient sufficient JJ 42149 1798 20 cohesion cohesion NN 42149 1798 21 to to TO 42149 1798 22 allow allow VB 42149 1798 23 the the DT 42149 1798 24 polings poling NNS 42149 1798 25 to to TO 42149 1798 26 be be VB 42149 1798 27 put put VBN 42149 1798 28 in in RP 42149 1798 29 , , , 42149 1798 30 but but CC 42149 1798 31 , , , 42149 1798 32 when when WRB 42149 1798 33 the the DT 42149 1798 34 upper upper JJ 42149 1798 35 part part NN 42149 1798 36 was be VBD 42149 1798 37 in in IN 42149 1798 38 gravel gravel NN 42149 1798 39 , , , 42149 1798 40 thus thus RB 42149 1798 41 making make VBG 42149 1798 42 it -PRON- PRP 42149 1798 43 impossible impossible JJ 42149 1798 44 to to TO 42149 1798 45 put put VB 42149 1798 46 in in IN 42149 1798 47 the the DT 42149 1798 48 longitudinal longitudinal JJ 42149 1798 49 polings poling NNS 42149 1798 50 or or CC 42149 1798 51 the the DT 42149 1798 52 vertical vertical JJ 42149 1798 53 breasting breasting NN 42149 1798 54 , , , 42149 1798 55 the the DT 42149 1798 56 second second JJ 42149 1798 57 system system NN 42149 1798 58 came come VBD 42149 1798 59 in in RP 42149 1798 60 . . . 42149 1799 1 Here here RB 42149 1799 2 the the DT 42149 1799 3 excavation excavation NN 42149 1799 4 was be VBD 42149 1799 5 only only RB 42149 1799 6 carried carry VBN 42149 1799 7 1 1 CD 42149 1799 8 ft ft NN 42149 1799 9 . . NNP 42149 1799 10 3 3 CD 42149 1799 11 in in IN 42149 1799 12 . . . 42149 1800 1 ( ( -LRB- 42149 1800 2 half half PDT 42149 1800 3 a a DT 42149 1800 4 shove shove NN 42149 1800 5 ) ) -RRB- 42149 1800 6 ahead ahead RB 42149 1800 7 of of IN 42149 1800 8 the the DT 42149 1800 9 cutting cutting NN 42149 1800 10 edge edge NN 42149 1800 11 , , , 42149 1800 12 and and CC 42149 1800 13 the the DT 42149 1800 14 longitudinal longitudinal JJ 42149 1800 15 polings poling NNS 42149 1800 16 were be VBD 42149 1800 17 replaced replace VBN 42149 1800 18 by by IN 42149 1800 19 transverse transverse JJ 42149 1800 20 boards board NNS 42149 1800 21 supported support VBN 42149 1800 22 by by IN 42149 1800 23 pipes pipe NNS 42149 1800 24 which which WDT 42149 1800 25 were be VBD 42149 1800 26 placed place VBN 42149 1800 27 in in IN 42149 1800 28 the the DT 42149 1800 29 holes hole NNS 42149 1800 30 provided provide VBN 42149 1800 31 in in IN 42149 1800 32 the the DT 42149 1800 33 shield shield NN 42149 1800 34 to to TO 42149 1800 35 accommodate accommodate VB 42149 1800 36 some some DT 42149 1800 37 telescopic telescopic JJ 42149 1800 38 poling poling NN 42149 1800 39 struts strut NNS 42149 1800 40 which which WDT 42149 1800 41 had have VBD 42149 1800 42 been be VBN 42149 1800 43 designed design VBN 42149 1800 44 but but CC 42149 1800 45 not not RB 42149 1800 46 made make VBN 42149 1800 47 . . . 42149 1801 1 These these DT 42149 1801 2 pipes pipe NNS 42149 1801 3 acted act VBD 42149 1801 4 as as IN 42149 1801 5 cantilevers cantilever NNS 42149 1801 6 , , , 42149 1801 7 and and CC 42149 1801 8 were be VBD 42149 1801 9 in in IN 42149 1801 10 two two CD 42149 1801 11 parts part NNS 42149 1801 12 , , , 42149 1801 13 a a DT 42149 1801 14 2½-in 2â½-in CD 42149 1801 15 . . . 42149 1802 1 pipe pipe NN 42149 1802 2 wedged wedge VBD 42149 1802 3 tight tight RB 42149 1802 4 into into IN 42149 1802 5 the the DT 42149 1802 6 holes hole NNS 42149 1802 7 and and CC 42149 1802 8 smaller small JJR 42149 1802 9 pipes pipe NNS 42149 1802 10 sliding slide VBG 42149 1802 11 inside inside IN 42149 1802 12 them -PRON- PRP 42149 1802 13 . . . 42149 1803 1 After after IN 42149 1803 2 a a DT 42149 1803 3 small small JJ 42149 1803 4 section section NN 42149 1803 5 of of IN 42149 1803 6 the the DT 42149 1803 7 ground ground NN 42149 1803 8 had have VBD 42149 1803 9 been be VBN 42149 1803 10 excavated excavate VBN 42149 1803 11 , , , 42149 1803 12 a a DT 42149 1803 13 board board NN 42149 1803 14 was be VBD 42149 1803 15 placed place VBN 42149 1803 16 against against IN 42149 1803 17 it -PRON- PRP 42149 1803 18 , , , 42149 1803 19 one one CD 42149 1803 20 of of IN 42149 1803 21 the the DT 42149 1803 22 pipes pipe NNS 42149 1803 23 was be VBD 42149 1803 24 drawn draw VBN 42149 1803 25 out out RP 42149 1803 26 under under IN 42149 1803 27 it -PRON- PRP 42149 1803 28 , , , 42149 1803 29 and and CC 42149 1803 30 wedges wedge NNS 42149 1803 31 were be VBD 42149 1803 32 driven drive VBN 42149 1803 33 between between IN 42149 1803 34 it -PRON- PRP 42149 1803 35 and and CC 42149 1803 36 the the DT 42149 1803 37 board board NN 42149 1803 38 . . . 42149 1804 1 These these DT 42149 1804 2 polings poling NNS 42149 1804 3 were be VBD 42149 1804 4 kept keep VBN 42149 1804 5 below below IN 42149 1804 6 the the DT 42149 1804 7 level level NN 42149 1804 8 of of IN 42149 1804 9 the the DT 42149 1804 10 hood hood NN 42149 1804 11 , , , 42149 1804 12 so so IN 42149 1804 13 that that IN 42149 1804 14 when when WRB 42149 1804 15 the the DT 42149 1804 16 shield shield NN 42149 1804 17 was be VBD 42149 1804 18 shoved shove VBN 42149 1804 19 they -PRON- PRP 42149 1804 20 would would MD 42149 1804 21 come come VB 42149 1804 22 inside inside RB 42149 1804 23 of of IN 42149 1804 24 it -PRON- PRP 42149 1804 25 ; ; : 42149 1804 26 in in IN 42149 1804 27 addition addition NN 42149 1804 28 , , , 42149 1804 29 they -PRON- PRP 42149 1804 30 were be VBD 42149 1804 31 braced brace VBN 42149 1804 32 with with IN 42149 1804 33 vertical vertical JJ 42149 1804 34 posts post NNS 42149 1804 35 from from IN 42149 1804 36 the the DT 42149 1804 37 sliding slide VBG 42149 1804 38 platforms platform NNS 42149 1804 39 . . . 42149 1805 1 The the DT 42149 1805 2 upper upper JJ 42149 1805 3 part part NN 42149 1805 4 of of IN 42149 1805 5 the the DT 42149 1805 6 face face NN 42149 1805 7 was be VBD 42149 1805 8 held hold VBN 42149 1805 9 by by IN 42149 1805 10 longitudinal longitudinal JJ 42149 1805 11 breast breast NN 42149 1805 12 boards board NNS 42149 1805 13 braced brace VBN 42149 1805 14 from from IN 42149 1805 15 the the DT 42149 1805 16 sliding slide VBG 42149 1805 17 platform platform NN 42149 1805 18 by by IN 42149 1805 19 vertical vertical JJ 42149 1805 20 " " `` 42149 1805 21 soldier soldier NN 42149 1805 22 " " '' 42149 1805 23 pieces piece NNS 42149 1805 24 . . . 42149 1806 1 The the DT 42149 1806 2 lower low JJR 42149 1806 3 part part NN 42149 1806 4 of of IN 42149 1806 5 the the DT 42149 1806 6 face face NN 42149 1806 7 was be VBD 42149 1806 8 supported support VBN 42149 1806 9 by by IN 42149 1806 10 vertical vertical JJ 42149 1806 11 sheet sheet NN 42149 1806 12 - - HYPH 42149 1806 13 piling piling NN 42149 1806 14 braced braced NN 42149 1806 15 to to IN 42149 1806 16 the the DT 42149 1806 17 tunnel tunnel NN 42149 1806 18 through through IN 42149 1806 19 the the DT 42149 1806 20 lower low JJR 42149 1806 21 doors door NNS 42149 1806 22 . . . 42149 1807 1 Sometimes sometimes RB 42149 1807 2 two two CD 42149 1807 3 rows row NNS 42149 1807 4 of of IN 42149 1807 5 piling piling NN 42149 1807 6 were be VBD 42149 1807 7 used use VBN 42149 1807 8 , , , 42149 1807 9 but but CC 42149 1807 10 generally generally RB 42149 1807 11 one one CD 42149 1807 12 , , , 42149 1807 13 as as IN 42149 1807 14 shown show VBN 42149 1807 15 in in IN 42149 1807 16 Fig Fig NNP 42149 1807 17 . . . 42149 1808 1 17 17 CD 42149 1808 2 . . . 42149 1809 1 Notwithstanding notwithstanding IN 42149 1809 2 the the DT 42149 1809 3 fact fact NN 42149 1809 4 that that IN 42149 1809 5 the the DT 42149 1809 6 breasting breasting NN 42149 1809 7 was be VBD 42149 1809 8 only only RB 42149 1809 9 1 1 CD 42149 1809 10 ft ft NN 42149 1809 11 . . NNP 42149 1809 12 3 3 CD 42149 1809 13 in in IN 42149 1809 14 . . . 42149 1810 1 ahead ahead RB 42149 1810 2 of of IN 42149 1810 3 the the DT 42149 1810 4 hood hood NN 42149 1810 5 , , , 42149 1810 6 the the DT 42149 1810 7 shield shield NN 42149 1810 8 was be VBD 42149 1810 9 moved move VBN 42149 1810 10 its -PRON- PRP$ 42149 1810 11 full full JJ 42149 1810 12 stroke stroke NN 42149 1810 13 of of IN 42149 1810 14 2 2 CD 42149 1810 15 ft ft NN 42149 1810 16 . . NNP 42149 1810 17 6 6 CD 42149 1810 18 in in IN 42149 1810 19 . . NNP 42149 1810 20 , , , 42149 1810 21 the the DT 42149 1810 22 ground ground NN 42149 1810 23 around around IN 42149 1810 24 the the DT 42149 1810 25 cutting cutting JJ 42149 1810 26 edge edge NN 42149 1810 27 of of IN 42149 1810 28 the the DT 42149 1810 29 hood hood NN 42149 1810 30 being be VBG 42149 1810 31 scraped scrape VBN 42149 1810 32 away away RB 42149 1810 33 by by IN 42149 1810 34 men man NNS 42149 1810 35 working work VBG 42149 1810 36 bars bar NNS 42149 1810 37 in in IN 42149 1810 38 the the DT 42149 1810 39 place place NN 42149 1810 40 from from IN 42149 1810 41 which which WDT 42149 1810 42 the the DT 42149 1810 43 temporary temporary JJ 42149 1810 44 breast breast NN 42149 1810 45 boards board NNS 42149 1810 46 at at IN 42149 1810 47 the the DT 42149 1810 48 circumference circumference NN 42149 1810 49 had have VBD 42149 1810 50 been be VBN 42149 1810 51 removed remove VBN 42149 1810 52 . . . 42149 1811 1 The the DT 42149 1811 2 back back JJ 42149 1811 3 pressure pressure NN 42149 1811 4 on on IN 42149 1811 5 the the DT 42149 1811 6 sliding slide VBG 42149 1811 7 platform platform NN 42149 1811 8 jacks jack NNS 42149 1811 9 , , , 42149 1811 10 when when WRB 42149 1811 11 the the DT 42149 1811 12 exhaust exhaust NN 42149 1811 13 valves valve NNS 42149 1811 14 were be VBD 42149 1811 15 only only RB 42149 1811 16 partly partly RB 42149 1811 17 open open JJ 42149 1811 18 , , , 42149 1811 19 offered offer VBD 42149 1811 20 a a DT 42149 1811 21 good good JJ 42149 1811 22 deal deal NN 42149 1811 23 of of IN 42149 1811 24 resistance resistance NN 42149 1811 25 , , , 42149 1811 26 and and CC 42149 1811 27 held hold VBD 42149 1811 28 the the DT 42149 1811 29 face face NN 42149 1811 30 as as RB 42149 1811 31 long long RB 42149 1811 32 as as IN 42149 1811 33 the the DT 42149 1811 34 movement movement NN 42149 1811 35 of of IN 42149 1811 36 the the DT 42149 1811 37 shield shield NN 42149 1811 38 was be VBD 42149 1811 39 continuous continuous JJ 42149 1811 40 . . . 42149 1812 1 [ [ -LRB- 42149 1812 2 Illustration illustration NN 42149 1812 3 : : : 42149 1812 4 METHOD method NN 42149 1812 5 OF of IN 42149 1812 6 TIMBERING TIMBERING NNP 42149 1812 7 FACE face VBP 42149 1812 8 IN in IN 42149 1812 9 MIXED MIXED NNP 42149 1812 10 GROUND GROUND NNP 42149 1812 11 METHOD method NN 42149 1812 12 OF of IN 42149 1812 13 TIMBERING TIMBERING NNP 42149 1812 14 FACE face VBP 42149 1812 15 IN in IN 42149 1812 16 SAND sand NN 42149 1812 17 METHOD method NN 42149 1812 18 OF of IN 42149 1812 19 TIMBERING TIMBERING NNP 42149 1812 20 FACE face VBP 42149 1812 21 IN in IN 42149 1812 22 SAND sand NN 42149 1812 23 AND and CC 42149 1812 24 GRAVEL gravel NN 42149 1812 25 FIG FIG NNP 42149 1812 26 . . . 42149 1813 1 17 17 CD 42149 1813 2 . . . 42149 1813 3 ] ] -RRB- 42149 1814 1 On on IN 42149 1814 2 one one CD 42149 1814 3 occasion occasion NN 42149 1814 4 , , , 42149 1814 5 when when WRB 42149 1814 6 for for IN 42149 1814 7 some some DT 42149 1814 8 reason reason NN 42149 1814 9 the the DT 42149 1814 10 shield shield NN 42149 1814 11 was be VBD 42149 1814 12 stopped stop VBN 42149 1814 13 with with IN 42149 1814 14 the the DT 42149 1814 15 shove shove NN 42149 1814 16 only only RB 42149 1814 17 partly partly RB 42149 1814 18 done do VBN 42149 1814 19 , , , 42149 1814 20 and and CC 42149 1814 21 the the DT 42149 1814 22 exhaust exhaust NN 42149 1814 23 valves valve NNS 42149 1814 24 had have VBD 42149 1814 25 not not RB 42149 1814 26 been be VBN 42149 1814 27 shut shut VBN 42149 1814 28 off off RP 42149 1814 29 , , , 42149 1814 30 the the DT 42149 1814 31 platforms platform NNS 42149 1814 32 continued continue VBD 42149 1814 33 to to TO 42149 1814 34 slide slide VB 42149 1814 35 and and CC 42149 1814 36 allowed allow VBD 42149 1814 37 the the DT 42149 1814 38 face face NN 42149 1814 39 to to TO 42149 1814 40 collapse collapse VB 42149 1814 41 ; ; : 42149 1814 42 the the DT 42149 1814 43 shield shield NN 42149 1814 44 platforms platform NNS 42149 1814 45 and and CC 42149 1814 46 doorways doorway NNS 42149 1814 47 , , , 42149 1814 48 however however RB 42149 1814 49 , , , 42149 1814 50 caught catch VBD 42149 1814 51 the the DT 42149 1814 52 falling fall VBG 42149 1814 53 sand sand NN 42149 1814 54 and and CC 42149 1814 55 gravel gravel NN 42149 1814 56 and and CC 42149 1814 57 the the DT 42149 1814 58 flow flow NN 42149 1814 59 choked choke VBD 42149 1814 60 itself -PRON- PRP 42149 1814 61 . . . 42149 1815 1 As as RB 42149 1815 2 soon soon RB 42149 1815 3 as as IN 42149 1815 4 the the DT 42149 1815 5 rock rock NN 42149 1815 6 surface surface NN 42149 1815 7 was be VBD 42149 1815 8 penetrated penetrate VBN 42149 1815 9 and and CC 42149 1815 10 the the DT 42149 1815 11 sand sand NN 42149 1815 12 and and CC 42149 1815 13 gravel gravel NN 42149 1815 14 were be VBD 42149 1815 15 met meet VBN 42149 1815 16 , , , 42149 1815 17 which which WDT 42149 1815 18 happened happen VBD 42149 1815 19 almost almost RB 42149 1815 20 at at IN 42149 1815 21 the the DT 42149 1815 22 same same JJ 42149 1815 23 time time NN 42149 1815 24 in in IN 42149 1815 25 the the DT 42149 1815 26 two two CD 42149 1815 27 Weehawken Weehawken NNP 42149 1815 28 Tunnels Tunnels NNPS 42149 1815 29 , , , 42149 1815 30 the the DT 42149 1815 31 escape escape NN 42149 1815 32 of of IN 42149 1815 33 air air NN 42149 1815 34 increased increase VBD 42149 1815 35 enormously enormously RB 42149 1815 36 , , , 42149 1815 37 and and CC 42149 1815 38 it -PRON- PRP 42149 1815 39 at at IN 42149 1815 40 once once RB 42149 1815 41 became become VBD 42149 1815 42 clear clear JJ 42149 1815 43 that that IN 42149 1815 44 it -PRON- PRP 42149 1815 45 was be VBD 42149 1815 46 impossible impossible JJ 42149 1815 47 to to TO 42149 1815 48 keep keep VB 42149 1815 49 enough enough JJ 42149 1815 50 air air NN 42149 1815 51 in in IN 42149 1815 52 the the DT 42149 1815 53 two two CD 42149 1815 54 tunnels tunnel NNS 42149 1815 55 by by IN 42149 1815 56 the the DT 42149 1815 57 methods method NNS 42149 1815 58 then then RB 42149 1815 59 in in IN 42149 1815 60 use use NN 42149 1815 61 , , , 42149 1815 62 even even RB 42149 1815 63 when when WRB 42149 1815 64 working work VBG 42149 1815 65 the the DT 42149 1815 66 three three CD 42149 1815 67 compressors compressor NNS 42149 1815 68 , , , 42149 1815 69 each each DT 42149 1815 70 capable capable JJ 42149 1815 71 of of IN 42149 1815 72 compressing compress VBG 42149 1815 73 4,400 4,400 CD 42149 1815 74 cu cu NNS 42149 1815 75 . . . 42149 1816 1 ft ft NNP 42149 1816 2 . . NNP 42149 1816 3 of of IN 42149 1816 4 free free JJ 42149 1816 5 air air NN 42149 1816 6 per per IN 42149 1816 7 min min NN 42149 1816 8 . . . 42149 1817 1 at at IN 42149 1817 2 top top JJ 42149 1817 3 speed speed NN 42149 1817 4 . . . 42149 1818 1 When when WRB 42149 1818 2 the the DT 42149 1818 3 shields shield NNS 42149 1818 4 just just RB 42149 1818 5 entered enter VBD 42149 1818 6 the the DT 42149 1818 7 sand sand NN 42149 1818 8 and and CC 42149 1818 9 gravel gravel NN 42149 1818 10 , , , 42149 1818 11 the the DT 42149 1818 12 face face NN 42149 1818 13 had have VBD 42149 1818 14 been be VBN 42149 1818 15 held hold VBN 42149 1818 16 by by IN 42149 1818 17 light light JJ 42149 1818 18 breasting breasting NN 42149 1818 19 , , , 42149 1818 20 without without IN 42149 1818 21 any any DT 42149 1818 22 special special JJ 42149 1818 23 effort effort NN 42149 1818 24 to to TO 42149 1818 25 prevent prevent VB 42149 1818 26 the the DT 42149 1818 27 escape escape NN 42149 1818 28 of of IN 42149 1818 29 air air NN 42149 1818 30 , , , 42149 1818 31 but but CC 42149 1818 32 when when WRB 42149 1818 33 it -PRON- PRP 42149 1818 34 was be VBD 42149 1818 35 found find VBN 42149 1818 36 impossible impossible JJ 42149 1818 37 to to TO 42149 1818 38 supply supply VB 42149 1818 39 enough enough JJ 42149 1818 40 air air NN 42149 1818 41 , , , 42149 1818 42 a a DT 42149 1818 43 large large JJ 42149 1818 44 amount amount NN 42149 1818 45 of of IN 42149 1818 46 straw straw NN 42149 1818 47 and and CC 42149 1818 48 clay clay NN 42149 1818 49 was be VBD 42149 1818 50 used use VBN 42149 1818 51 in in IN 42149 1818 52 front front NN 42149 1818 53 of of IN 42149 1818 54 the the DT 42149 1818 55 boards board NNS 42149 1818 56 . . . 42149 1819 1 This this DT 42149 1819 2 cut cut VBD 42149 1819 3 down down RP 42149 1819 4 the the DT 42149 1819 5 escape escape NN 42149 1819 6 , , , 42149 1819 7 but but CC 42149 1819 8 , , , 42149 1819 9 as as IN 42149 1819 10 much much JJ 42149 1819 11 air air NN 42149 1819 12 was be VBD 42149 1819 13 escaping escape VBG 42149 1819 14 through through IN 42149 1819 15 the the DT 42149 1819 16 joints joint NNS 42149 1819 17 of of IN 42149 1819 18 the the DT 42149 1819 19 iron iron NN 42149 1819 20 lining lining NN 42149 1819 21 , , , 42149 1819 22 these these DT 42149 1819 23 were be VBD 42149 1819 24 plastered plaster VBN 42149 1819 25 with with IN 42149 1819 26 Portland Portland NNP 42149 1819 27 cement cement NN 42149 1819 28 . . . 42149 1820 1 Even even RB 42149 1820 2 then then RB 42149 1820 3 , , , 42149 1820 4 the the DT 42149 1820 5 loss loss NN 42149 1820 6 was be VBD 42149 1820 7 too too RB 42149 1820 8 great great JJ 42149 1820 9 , , , 42149 1820 10 therefore therefore RB 42149 1820 11 one one CD 42149 1820 12 tunnel tunnel NN 42149 1820 13 was be VBD 42149 1820 14 shut shut VBN 42149 1820 15 down down RP 42149 1820 16 entirely entirely RB 42149 1820 17 and and CC 42149 1820 18 all all PDT 42149 1820 19 the the DT 42149 1820 20 air air NN 42149 1820 21 was be VBD 42149 1820 22 sent send VBN 42149 1820 23 to to IN 42149 1820 24 the the DT 42149 1820 25 other other JJ 42149 1820 26 . . . 42149 1821 1 This this DT 42149 1821 2 allowed allow VBD 42149 1821 3 a a DT 42149 1821 4 pressure pressure NN 42149 1821 5 of of IN 42149 1821 6 10 10 CD 42149 1821 7 lb lb NN 42149 1821 8 . . . 42149 1822 1 to to TO 42149 1822 2 be be VB 42149 1822 3 kept keep VBN 42149 1822 4 up up RP 42149 1822 5 in in IN 42149 1822 6 the the DT 42149 1822 7 working working NN 42149 1822 8 tunnel tunnel NN 42149 1822 9 , , , 42149 1822 10 and and CC 42149 1822 11 this this DT 42149 1822 12 , , , 42149 1822 13 though though IN 42149 1822 14 less less JJR 42149 1822 15 than than IN 42149 1822 16 the the DT 42149 1822 17 head head NN 42149 1822 18 , , , 42149 1822 19 was be VBD 42149 1822 20 enough enough JJ 42149 1822 21 to to TO 42149 1822 22 allow allow VB 42149 1822 23 progress progress NN 42149 1822 24 to to TO 42149 1822 25 be be VB 42149 1822 26 made make VBN 42149 1822 27 . . . 42149 1823 1 In in IN 42149 1823 2 order order NN 42149 1823 3 to to TO 42149 1823 4 use use VB 42149 1823 5 one one CD 42149 1823 6 tunnel tunnel NN 42149 1823 7 as as IN 42149 1823 8 a a DT 42149 1823 9 drain drain NN 42149 1823 10 for for IN 42149 1823 11 the the DT 42149 1823 12 other other JJ 42149 1823 13 , , , 42149 1823 14 the the DT 42149 1823 15 two two CD 42149 1823 16 faces face NNS 42149 1823 17 were be VBD 42149 1823 18 always always RB 42149 1823 19 kept keep VBN 42149 1823 20 within within IN 42149 1823 21 150 150 CD 42149 1823 22 ft ft NN 42149 1823 23 . . NN 42149 1823 24 of of IN 42149 1823 25 each each DT 42149 1823 26 other other JJ 42149 1823 27 by by IN 42149 1823 28 working work VBG 42149 1823 29 them -PRON- PRP 42149 1823 30 alternately alternately RB 42149 1823 31 . . . 42149 1824 1 The the DT 42149 1824 2 timbered timbered JJ 42149 1824 3 face face NN 42149 1824 4 was be VBD 42149 1824 5 never never RB 42149 1824 6 grouted grout VBN 42149 1824 7 , , , 42149 1824 8 though though IN 42149 1824 9 this this DT 42149 1824 10 would would MD 42149 1824 11 have have VB 42149 1824 12 reduced reduce VBN 42149 1824 13 the the DT 42149 1824 14 loss loss NN 42149 1824 15 of of IN 42149 1824 16 air air NN 42149 1824 17 , , , 42149 1824 18 as as IN 42149 1824 19 at at IN 42149 1824 20 the the DT 42149 1824 21 same same JJ 42149 1824 22 time time NN 42149 1824 23 it -PRON- PRP 42149 1824 24 would would MD 42149 1824 25 have have VB 42149 1824 26 decreased decrease VBN 42149 1824 27 the the DT 42149 1824 28 progress progress NN 42149 1824 29 very very RB 42149 1824 30 much much RB 42149 1824 31 , , , 42149 1824 32 and and CC 42149 1824 33 any any DT 42149 1824 34 one one NN 42149 1824 35 who who WP 42149 1824 36 saw see VBD 42149 1824 37 the the DT 42149 1824 38 racing racing NN 42149 1824 39 engines engine NNS 42149 1824 40 in in IN 42149 1824 41 the the DT 42149 1824 42 power power NN 42149 1824 43 - - HYPH 42149 1824 44 house house NN 42149 1824 45 , , , 42149 1824 46 and and CC 42149 1824 47 realized realize VBD 42149 1824 48 that that IN 42149 1824 49 a a DT 42149 1824 50 breakdown breakdown NN 42149 1824 51 of of IN 42149 1824 52 one one CD 42149 1824 53 of of IN 42149 1824 54 them -PRON- PRP 42149 1824 55 would would MD 42149 1824 56 mean mean VB 42149 1824 57 the the DT 42149 1824 58 loss loss NN 42149 1824 59 of of IN 42149 1824 60 the the DT 42149 1824 61 faces face NNS 42149 1824 62 , , , 42149 1824 63 was be VBD 42149 1824 64 ready ready JJ 42149 1824 65 to to TO 42149 1824 66 admit admit VB 42149 1824 67 that that IN 42149 1824 68 the the DT 42149 1824 69 quicker quick JJR 42149 1824 70 this this DT 42149 1824 71 particular particular JJ 42149 1824 72 period period NN 42149 1824 73 was be VBD 42149 1824 74 cut cut VBN 42149 1824 75 short short JJ 42149 1824 76 , , , 42149 1824 77 the the DT 42149 1824 78 better well JJR 42149 1824 79 . . . 42149 1825 1 Above above IN 42149 1825 2 the the DT 42149 1825 3 sand sand NN 42149 1825 4 and and CC 42149 1825 5 gravel gravel NN 42149 1825 6 lay lie VBD 42149 1825 7 the the DT 42149 1825 8 silt silt NN 42149 1825 9 , , , 42149 1825 10 and and CC 42149 1825 11 , , , 42149 1825 12 when when WRB 42149 1825 13 it -PRON- PRP 42149 1825 14 showed show VBD 42149 1825 15 in in IN 42149 1825 16 the the DT 42149 1825 17 roof roof NN 42149 1825 18 , , , 42149 1825 19 the the DT 42149 1825 20 escape escape NN 42149 1825 21 of of IN 42149 1825 22 air air NN 42149 1825 23 was be VBD 42149 1825 24 immediately immediately RB 42149 1825 25 reduced reduce VBN 42149 1825 26 and and CC 42149 1825 27 the the DT 42149 1825 28 two two CD 42149 1825 29 faces face NNS 42149 1825 30 could could MD 42149 1825 31 be be VB 42149 1825 32 worked work VBN 42149 1825 33 simultaneously simultaneously RB 42149 1825 34 . . . 42149 1826 1 Almost almost RB 42149 1826 2 at at IN 42149 1826 3 the the DT 42149 1826 4 same same JJ 42149 1826 5 time time NN 42149 1826 6 the the DT 42149 1826 7 piles pile NNS 42149 1826 8 supporting support VBG 42149 1826 9 the the DT 42149 1826 10 large large JJ 42149 1826 11 warehouse warehouse NN 42149 1826 12 , , , 42149 1826 13 known know VBN 42149 1826 14 as as IN 42149 1826 15 the the DT 42149 1826 16 Fowler Fowler NNP 42149 1826 17 Building Building NNP 42149 1826 18 , , , 42149 1826 19 were be VBD 42149 1826 20 met meet VBN 42149 1826 21 . . . 42149 1827 1 Although although IN 42149 1827 2 the the DT 42149 1827 3 face face NN 42149 1827 4 now now RB 42149 1827 5 took take VBD 42149 1827 6 much much RB 42149 1827 7 less less JJR 42149 1827 8 timber timber NN 42149 1827 9 , , , 42149 1827 10 the the DT 42149 1827 11 same same JJ 42149 1827 12 system system NN 42149 1827 13 of of IN 42149 1827 14 breast breast NN 42149 1827 15 boards board NNS 42149 1827 16 as as IN 42149 1827 17 had have VBD 42149 1827 18 been be VBN 42149 1827 19 used use VBN 42149 1827 20 in in IN 42149 1827 21 the the DT 42149 1827 22 gravel gravel NN 42149 1827 23 was be VBD 42149 1827 24 kept keep VBN 42149 1827 25 up up RP 42149 1827 26 , , , 42149 1827 27 but but CC 42149 1827 28 in in IN 42149 1827 29 skeleton skeleton NNP 42149 1827 30 form form NN 42149 1827 31 . . . 42149 1828 1 They -PRON- PRP 42149 1828 2 were be VBD 42149 1828 3 set set VBN 42149 1828 4 2 2 CD 42149 1828 5 ft ft NN 42149 1828 6 . . NNP 42149 1828 7 6 6 CD 42149 1828 8 in in IN 42149 1828 9 . . . 42149 1829 1 ahead ahead RB 42149 1829 2 of of IN 42149 1829 3 the the DT 42149 1829 4 shield shield NN 42149 1829 5 , , , 42149 1829 6 however however RB 42149 1829 7 , , , 42149 1829 8 instead instead RB 42149 1829 9 of of IN 42149 1829 10 1 1 CD 42149 1829 11 ft ft NN 42149 1829 12 . . NNP 42149 1829 13 3 3 CD 42149 1829 14 in in IN 42149 1829 15 . . NNP 42149 1829 16 , , , 42149 1829 17 and and CC 42149 1829 18 the the DT 42149 1829 19 transverse transverse JJ 42149 1829 20 roof roof NN 42149 1829 21 poling poling NN 42149 1829 22 boards board NNS 42149 1829 23 were be VBD 42149 1829 24 replaced replace VBN 42149 1829 25 by by IN 42149 1829 26 longitudinals longitudinal NNS 42149 1829 27 resting rest VBG 42149 1829 28 on on IN 42149 1829 29 the the DT 42149 1829 30 shield shield NN 42149 1829 31 . . . 42149 1830 1 The the DT 42149 1830 2 more more JJR 42149 1830 3 piles pile NNS 42149 1830 4 in in IN 42149 1830 5 the the DT 42149 1830 6 face face NN 42149 1830 7 the the DT 42149 1830 8 less less RBR 42149 1830 9 timbering timbering JJ 42149 1830 10 was be VBD 42149 1830 11 done do VBN 42149 1830 12 . . . 42149 1831 1 The the DT 42149 1831 2 piles pile NNS 42149 1831 3 were be VBD 42149 1831 4 cut cut VBN 42149 1831 5 into into IN 42149 1831 6 handy handy JJ 42149 1831 7 lengths length NNS 42149 1831 8 with with IN 42149 1831 9 axes axis NNS 42149 1831 10 and and CC 42149 1831 11 chisels chisel NNS 42149 1831 12 . . . 42149 1832 1 All all DT 42149 1832 2 timbering timbering NN 42149 1832 3 was be VBD 42149 1832 4 light light JJ 42149 1832 5 compared compare VBN 42149 1832 6 with with IN 42149 1832 7 the the DT 42149 1832 8 weight weight NN 42149 1832 9 of of IN 42149 1832 10 the the DT 42149 1832 11 ground ground NN 42149 1832 12 , , , 42149 1832 13 but but CC 42149 1832 14 , , , 42149 1832 15 as as IN 42149 1832 16 the the DT 42149 1832 17 shove shove NN 42149 1832 18 took take VBD 42149 1832 19 place place NN 42149 1832 20 as as RB 42149 1832 21 soon soon RB 42149 1832 22 as as IN 42149 1832 23 the the DT 42149 1832 24 set set NN 42149 1832 25 was be VBD 42149 1832 26 made make VBN 42149 1832 27 , , , 42149 1832 28 it -PRON- PRP 42149 1832 29 served serve VBD 42149 1832 30 its -PRON- PRP$ 42149 1832 31 purpose purpose NN 42149 1832 32 . . . 42149 1833 1 When when WRB 42149 1833 2 a a DT 42149 1833 3 face face NN 42149 1833 4 was be VBD 42149 1833 5 closed close VBN 42149 1833 6 down down IN 42149 1833 7 the the DT 42149 1833 8 whole whole JJ 42149 1833 9 system system NN 42149 1833 10 was be VBD 42149 1833 11 greatly greatly RB 42149 1833 12 reinforced reinforce VBN 42149 1833 13 by by IN 42149 1833 14 braces brace NNS 42149 1833 15 from from IN 42149 1833 16 the the DT 42149 1833 17 shield shield NN 42149 1833 18 , , , 42149 1833 19 the the DT 42149 1833 20 face face NN 42149 1833 21 of of IN 42149 1833 22 which which WDT 42149 1833 23 was be VBD 42149 1833 24 closed close VBN 42149 1833 25 by by IN 42149 1833 26 the the DT 42149 1833 27 doors door NNS 42149 1833 28 . . . 42149 1834 1 In in IN 42149 1834 2 driving drive VBG 42149 1834 3 through through IN 42149 1834 4 such such PDT 42149 1834 5 a a DT 42149 1834 6 face face NN 42149 1834 7 the the DT 42149 1834 8 typical typical JJ 42149 1834 9 8-hour 8-hour CD 42149 1834 10 shift shift NN 42149 1834 11 gang gang NN 42149 1834 12 was be VBD 42149 1834 13 about about IN 42149 1834 14 as as IN 42149 1834 15 follows follow VBZ 42149 1834 16 : : : 42149 1834 17 _ _ NNP 42149 1834 18 General General NNP 42149 1834 19 : : : 42149 1834 20 _ _ NNP 42149 1834 21 1/3 1/3 CD 42149 1834 22 Tunnel Tunnel NNP 42149 1834 23 superintendent superintendent NN 42149 1834 24 @ @ IN 42149 1834 25 $ $ $ 42149 1834 26 300.00 300.00 CD 42149 1834 27 per per IN 42149 1834 28 month month NN 42149 1834 29 . . . 42149 1835 1 1 1 CD 42149 1835 2 Assistant Assistant NNP 42149 1835 3 tunnel tunnel NN 42149 1835 4 superintendent superintendent NN 42149 1835 5 " " `` 42149 1835 6 5.00 5.00 CD 42149 1835 7 per per IN 42149 1835 8 day day NN 42149 1835 9 . . . 42149 1836 1 1 1 CD 42149 1836 2 General general JJ 42149 1836 3 foreman foreman NN 42149 1836 4 " " `` 42149 1836 5 5.00 5.00 CD 42149 1836 6 " " '' 42149 1836 7 " " '' 42149 1836 8 ½ ½ NNP 42149 1836 9 Pipefitter Pipefitter NNP 42149 1836 10 " " `` 42149 1836 11 3.25 3.25 CD 42149 1836 12 " " '' 42149 1836 13 " " '' 42149 1836 14 ½ ½ NNP 42149 1836 15 Pipefitter Pipefitter NNP 42149 1836 16 's 's POS 42149 1836 17 helper helper NN 42149 1836 18 " " `` 42149 1836 19 2.75 2.75 CD 42149 1836 20 " " '' 42149 1836 21 " " '' 42149 1836 22 ½ ½ NNP 42149 1836 23 Electrician Electrician NNP 42149 1836 24 " " `` 42149 1836 25 3.00 3.00 CD 42149 1836 26 " " '' 42149 1836 27 " " '' 42149 1836 28 ½ ½ NNP 42149 1836 29 Electrician Electrician NNP 42149 1836 30 's 's POS 42149 1836 31 helper helper NN 42149 1836 32 " " `` 42149 1836 33 2.75 2.75 CD 42149 1836 34 " " '' 42149 1836 35 " " `` 42149 1836 36 _ _ NNP 42149 1836 37 Timbering Timbering NNP 42149 1836 38 : : : 42149 1836 39 _ _ NNP 42149 1836 40 3 3 CD 42149 1836 41 Timbermen Timbermen NNP 42149 1836 42 " " `` 42149 1836 43 2.50 2.50 CD 42149 1836 44 " " '' 42149 1836 45 " " `` 42149 1836 46 3 3 NNP 42149 1836 47 Timbermen Timbermen NNP 42149 1836 48 's 's POS 42149 1836 49 helpers helper NNS 42149 1836 50 " " `` 42149 1836 51 2.00 2.00 CD 42149 1836 52 " " '' 42149 1836 53 " " `` 42149 1836 54 _ _ NNP 42149 1836 55 Mucking Mucking NNP 42149 1836 56 : : : 42149 1836 57 _ _ NNP 42149 1836 58 1 1 CD 42149 1836 59 Foreman Foreman NNP 42149 1836 60 " " `` 42149 1836 61 3.50 3.50 CD 42149 1836 62 " " '' 42149 1836 63 " " `` 42149 1836 64 6 6 CD 42149 1836 65 Muckers Muckers NNPS 42149 1836 66 " " `` 42149 1836 67 2.75 2.75 CD 42149 1836 68 " " '' 42149 1836 69 " " `` 42149 1836 70 _ _ NNP 42149 1836 71 Erecting Erecting NNP 42149 1836 72 Iron Iron NNP 42149 1836 73 and and CC 42149 1836 74 Driving Driving NNP 42149 1836 75 Shield Shield NNP 42149 1836 76 : : : 42149 1836 77 _ _ NNP 42149 1836 78 1 1 CD 42149 1836 79 Erector Erector NNP 42149 1836 80 runner runner NN 42149 1836 81 " " `` 42149 1836 82 3.25 3.25 CD 42149 1836 83 " " '' 42149 1836 84 " " `` 42149 1836 85 1 1 CD 42149 1836 86 Foreman Foreman NNP 42149 1836 87 " " '' 42149 1836 88 4.00 4.00 CD 42149 1836 89 " " '' 42149 1836 90 " " `` 42149 1836 91 4 4 CD 42149 1836 92 Iron Iron NNP 42149 1836 93 workers worker NNS 42149 1836 94 " " `` 42149 1836 95 3.00 3.00 CD 42149 1836 96 " " '' 42149 1836 97 " " `` 42149 1836 98 The the DT 42149 1836 99 drillers driller NNS 42149 1836 100 were be VBD 42149 1836 101 not not RB 42149 1836 102 kept keep VBN 42149 1836 103 on on RP 42149 1836 104 after after IN 42149 1836 105 the the DT 42149 1836 106 rock rock NN 42149 1836 107 disappeared disappear VBD 42149 1836 108 ; ; : 42149 1836 109 a a DT 42149 1836 110 foreman foreman NN 42149 1836 111 was be VBD 42149 1836 112 added add VBN 42149 1836 113 who who WP 42149 1836 114 divided divide VBD 42149 1836 115 his -PRON- PRP$ 42149 1836 116 time time NN 42149 1836 117 between between IN 42149 1836 118 iron iron NN 42149 1836 119 erection erection NN 42149 1836 120 and and CC 42149 1836 121 mucking mucking NN 42149 1836 122 . . . 42149 1837 1 The the DT 42149 1837 2 average average JJ 42149 1837 3 rate rate NN 42149 1837 4 of of IN 42149 1837 5 progress progress NN 42149 1837 6 in in IN 42149 1837 7 sand sand NN 42149 1837 8 and and CC 42149 1837 9 gravel gravel NN 42149 1837 10 without without IN 42149 1837 11 piles pile NNS 42149 1837 12 was be VBD 42149 1837 13 5.1 5.1 CD 42149 1837 14 ft ft NN 42149 1837 15 . . NN 42149 1837 16 per per IN 42149 1837 17 day day NN 42149 1837 18 per per IN 42149 1837 19 shield shield NN 42149 1837 20 . . . 42149 1838 1 When when WRB 42149 1838 2 piles pile NNS 42149 1838 3 and and CC 42149 1838 4 silt silt NN 42149 1838 5 were be VBD 42149 1838 6 met meet VBN 42149 1838 7 in in IN 42149 1838 8 the the DT 42149 1838 9 upper upper JJ 42149 1838 10 part part NN 42149 1838 11 of of IN 42149 1838 12 the the DT 42149 1838 13 face face NN 42149 1838 14 , , , 42149 1838 15 the the DT 42149 1838 16 speed speed NN 42149 1838 17 increased increase VBD 42149 1838 18 to to IN 42149 1838 19 7.0 7.0 CD 42149 1838 20 ft ft NN 42149 1838 21 . . NN 42149 1838 22 per per IN 42149 1838 23 day day NN 42149 1838 24 . . . 42149 1839 1 _ _ NNP 42149 1839 2 Passing pass VBG 42149 1839 3 Under under IN 42149 1839 4 River River NNP 42149 1839 5 Bulkhead._--At bulkhead._--at NN 42149 1839 6 Weehawken Weehawken NNP 42149 1839 7 no no DT 42149 1839 8 trouble trouble NN 42149 1839 9 was be VBD 42149 1839 10 found find VBN 42149 1839 11 in in IN 42149 1839 12 passing pass VBG 42149 1839 13 under under IN 42149 1839 14 the the DT 42149 1839 15 river river NN 42149 1839 16 wall wall NN 42149 1839 17 , , , 42149 1839 18 as as IN 42149 1839 19 the the DT 42149 1839 20 bulkhead bulkhead NN 42149 1839 21 consisted consist VBD 42149 1839 22 of of IN 42149 1839 23 only only JJ 42149 1839 24 cribwork cribwork NN 42149 1839 25 supported support VBN 42149 1839 26 on on IN 42149 1839 27 silt silt NN 42149 1839 28 , , , 42149 1839 29 and and CC 42149 1839 30 , , , 42149 1839 31 though though IN 42149 1839 32 the the DT 42149 1839 33 piles pile NNS 42149 1839 34 obstructed obstruct VBD 42149 1839 35 the the DT 42149 1839 36 motion motion NN 42149 1839 37 of of IN 42149 1839 38 the the DT 42149 1839 39 shield shield NN 42149 1839 40 , , , 42149 1839 41 they -PRON- PRP 42149 1839 42 were be VBD 42149 1839 43 easily easily RB 42149 1839 44 cut cut VBN 42149 1839 45 out out RP 42149 1839 46 , , , 42149 1839 47 and and CC 42149 1839 48 the the DT 42149 1839 49 cribwork cribwork NN 42149 1839 50 itself -PRON- PRP 42149 1839 51 was be VBD 42149 1839 52 well well RB 42149 1839 53 above above IN 42149 1839 54 the the DT 42149 1839 55 top top NN 42149 1839 56 of of IN 42149 1839 57 the the DT 42149 1839 58 shield shield NN 42149 1839 59 . . . 42149 1840 1 On on IN 42149 1840 2 the the DT 42149 1840 3 New New NNP 42149 1840 4 York York NNP 42149 1840 5 side side NN 42149 1840 6 , , , 42149 1840 7 however however RB 42149 1840 8 , , , 42149 1840 9 conditions condition NNS 42149 1840 10 were be VBD 42149 1840 11 not not RB 42149 1840 12 nearly nearly RB 42149 1840 13 as as RB 42149 1840 14 good good JJ 42149 1840 15 . . . 42149 1841 1 The the DT 42149 1841 2 heavy heavy JJ 42149 1841 3 masonry masonry NN 42149 1841 4 bulkhead bulkhead NN 42149 1841 5 was be VBD 42149 1841 6 supported support VBN 42149 1841 7 on on IN 42149 1841 8 piles pile NNS 42149 1841 9 and and CC 42149 1841 10 rip rip NN 42149 1841 11 - - HYPH 42149 1841 12 rap rap NN 42149 1841 13 , , , 42149 1841 14 as as IN 42149 1841 15 shown show VBN 42149 1841 16 in in IN 42149 1841 17 Fig Fig NNP 42149 1841 18 . . . 42149 1842 1 18 18 CD 42149 1842 2 . . . 42149 1843 1 The the DT 42149 1843 2 line line NN 42149 1843 3 of of IN 42149 1843 4 the the DT 42149 1843 5 top top NN 42149 1843 6 of of IN 42149 1843 7 the the DT 42149 1843 8 shield shield NN 42149 1843 9 was be VBD 42149 1843 10 about about RB 42149 1843 11 6 6 CD 42149 1843 12 ft ft NN 42149 1843 13 . . . 42149 1843 14 above above IN 42149 1843 15 the the DT 42149 1843 16 bottom bottom NN 42149 1843 17 of of IN 42149 1843 18 the the DT 42149 1843 19 rip rip NN 42149 1843 20 - - HYPH 42149 1843 21 rap rap NN 42149 1843 22 , , , 42149 1843 23 the the DT 42149 1843 24 spaces space NNS 42149 1843 25 between between IN 42149 1843 26 the the DT 42149 1843 27 stones stone NNS 42149 1843 28 of of IN 42149 1843 29 which which WDT 42149 1843 30 were be VBD 42149 1843 31 quite quite RB 42149 1843 32 open open JJ 42149 1843 33 and and CC 42149 1843 34 allowed allow VBD 42149 1843 35 a a DT 42149 1843 36 free free JJ 42149 1843 37 flow flow NN 42149 1843 38 of of IN 42149 1843 39 water water NN 42149 1843 40 directly directly RB 42149 1843 41 from from IN 42149 1843 42 the the DT 42149 1843 43 river river NN 42149 1843 44 . . . 42149 1844 1 As as RB 42149 1844 2 soon soon RB 42149 1844 3 , , , 42149 1844 4 therefore therefore RB 42149 1844 5 , , , 42149 1844 6 as as IN 42149 1844 7 the the DT 42149 1844 8 cutting cutting JJ 42149 1844 9 edge edge NN 42149 1844 10 of of IN 42149 1844 11 the the DT 42149 1844 12 shield shield NN 42149 1844 13 entered enter VBD 42149 1844 14 the the DT 42149 1844 15 rip rip NN 42149 1844 16 - - HYPH 42149 1844 17 rap rap NN 42149 1844 18 there there EX 42149 1844 19 was be VBD 42149 1844 20 a a DT 42149 1844 21 blow blow NN 42149 1844 22 , , , 42149 1844 23 the the DT 42149 1844 24 air air NN 42149 1844 25 escaping escape VBG 42149 1844 26 freely freely RB 42149 1844 27 to to IN 42149 1844 28 the the DT 42149 1844 29 ground ground NN 42149 1844 30 surface surface NN 42149 1844 31 behind behind IN 42149 1844 32 the the DT 42149 1844 33 bulkhead bulkhead NN 42149 1844 34 and and CC 42149 1844 35 to to IN 42149 1844 36 the the DT 42149 1844 37 river river NN 42149 1844 38 in in IN 42149 1844 39 front front NN 42149 1844 40 of of IN 42149 1844 41 it -PRON- PRP 42149 1844 42 . . . 42149 1845 1 Clay clay NN 42149 1845 2 puddle puddle NN 42149 1845 3 , , , 42149 1845 4 or or CC 42149 1845 5 mud mud NN 42149 1845 6 made make VBN 42149 1845 7 from from IN 42149 1845 8 the the DT 42149 1845 9 excavated excavate VBN 42149 1845 10 silt silt NN 42149 1845 11 , , , 42149 1845 12 was be VBD 42149 1845 13 used use VBN 42149 1845 14 in in IN 42149 1845 15 large large JJ 42149 1845 16 quantities quantity NNS 42149 1845 17 to to TO 42149 1845 18 plug plug VB 42149 1845 19 up up RP 42149 1845 20 the the DT 42149 1845 21 interstices interstice NNS 42149 1845 22 between between IN 42149 1845 23 the the DT 42149 1845 24 stone stone NN 42149 1845 25 in in IN 42149 1845 26 the the DT 42149 1845 27 working work VBG 42149 1845 28 face face NN 42149 1845 29 , , , 42149 1845 30 the the DT 42149 1845 31 air air NN 42149 1845 32 pressure pressure NN 42149 1845 33 being be VBG 42149 1845 34 slightly slightly RB 42149 1845 35 greater great JJR 42149 1845 36 than than IN 42149 1845 37 that that DT 42149 1845 38 needed need VBN 42149 1845 39 to to TO 42149 1845 40 keep keep VB 42149 1845 41 out out RP 42149 1845 42 the the DT 42149 1845 43 water water NN 42149 1845 44 holding hold VBG 42149 1845 45 it -PRON- PRP 42149 1845 46 in in IN 42149 1845 47 place place NN 42149 1845 48 . . . 42149 1846 1 The the DT 42149 1846 2 excavation excavation NN 42149 1846 3 of of IN 42149 1846 4 the the DT 42149 1846 5 rip rip NNP 42149 1846 6 - - HYPH 42149 1846 7 rap rap NN 42149 1846 8 was be VBD 42149 1846 9 a a DT 42149 1846 10 tedious tedious JJ 42149 1846 11 affair affair NN 42149 1846 12 , , , 42149 1846 13 for for IN 42149 1846 14 it -PRON- PRP 42149 1846 15 had have VBD 42149 1846 16 to to TO 42149 1846 17 be be VB 42149 1846 18 removed remove VBN 42149 1846 19 one one CD 42149 1846 20 stone stone NN 42149 1846 21 at at IN 42149 1846 22 a a DT 42149 1846 23 time time NN 42149 1846 24 and and CC 42149 1846 25 the the DT 42149 1846 26 spaces space NNS 42149 1846 27 between between IN 42149 1846 28 the the DT 42149 1846 29 newly newly RB 42149 1846 30 exposed expose VBN 42149 1846 31 stones stone NNS 42149 1846 32 plugged plug VBN 42149 1846 33 with with IN 42149 1846 34 mud mud NN 42149 1846 35 immediately immediately RB 42149 1846 36 . . . 42149 1847 1 One one CD 42149 1847 2 man man NN 42149 1847 3 stood stand VBD 42149 1847 4 ready ready JJ 42149 1847 5 with with IN 42149 1847 6 the the DT 42149 1847 7 mud mud NN 42149 1847 8 while while IN 42149 1847 9 another another DT 42149 1847 10 loosened loosen VBD 42149 1847 11 the the DT 42149 1847 12 stones stone NNS 42149 1847 13 with with IN 42149 1847 14 a a DT 42149 1847 15 bar bar NN 42149 1847 16 . . . 42149 1848 1 When when WRB 42149 1848 2 the the DT 42149 1848 3 shield shield NN 42149 1848 4 had have VBD 42149 1848 5 advanced advance VBN 42149 1848 6 its -PRON- PRP$ 42149 1848 7 own own JJ 42149 1848 8 length length NN 42149 1848 9 in in IN 42149 1848 10 the the DT 42149 1848 11 rip rip NN 42149 1848 12 - - HYPH 42149 1848 13 rap rap NN 42149 1848 14 , , , 42149 1848 15 another another DT 42149 1848 16 point point NN 42149 1848 17 for for IN 42149 1848 18 the the DT 42149 1848 19 escape escape NN 42149 1848 20 of of IN 42149 1848 21 the the DT 42149 1848 22 air air NN 42149 1848 23 was be VBD 42149 1848 24 exposed expose VBN 42149 1848 25 at at IN 42149 1848 26 the the DT 42149 1848 27 rear rear JJ 42149 1848 28 end end NN 42149 1848 29 of of IN 42149 1848 30 the the DT 42149 1848 31 shield shield NN 42149 1848 32 . . . 42149 1849 1 This this DT 42149 1849 2 loss loss NN 42149 1849 3 was be VBD 42149 1849 4 closed close VBN 42149 1849 5 at at IN 42149 1849 6 the the DT 42149 1849 7 leading lead VBG 42149 1849 8 end end NN 42149 1849 9 of of IN 42149 1849 10 the the DT 42149 1849 11 last last JJ 42149 1849 12 ring ring NN 42149 1849 13 with with IN 42149 1849 14 mud mud NN 42149 1849 15 and and CC 42149 1849 16 cement cement NN 42149 1849 17 sacks sack NNS 42149 1849 18 . . . 42149 1850 1 [ [ -LRB- 42149 1850 2 Illustration illustration NN 42149 1850 3 : : : 42149 1850 4 SKETCH SKETCH NNP 42149 1850 5 SHOWING show VBG 42149 1850 6 RIVER river NN 42149 1850 7 TUNNELS tunnel NNS 42149 1850 8 PASSING pass VBG 42149 1850 9 UNDER under IN 42149 1850 10 RIVER river NN 42149 1850 11 BULKHEAD bulkhead NN 42149 1850 12 WALL WALL NNP 42149 1850 13 AT at IN 42149 1850 14 MANHATTAN MANHATTAN NNP 42149 1850 15 CROSS CROSS NNP 42149 1850 16 - - HYPH 42149 1850 17 SECTION section NN 42149 1850 18 OF of IN 42149 1850 19 RIVER river NN 42149 1850 20 BULKHEAD bulkhead NN 42149 1850 21 WALL WALL NNP 42149 1850 22 ON on IN 42149 1850 23 AXIS axis NN 42149 1850 24 OF of IN 42149 1850 25 NORTH NORTH NNP 42149 1850 26 TUNNEL TUNNEL NNP 42149 1850 27 PLAN plan NN 42149 1850 28 SHOWING show VBD 42149 1850 29 PILES pile NNS 42149 1850 30 REMOVED remove VBN 42149 1850 31 TO to IN 42149 1850 32 ALLOW ALLOW NNP 42149 1850 33 PASSAGE PASSAGE NNP 42149 1850 34 OF of IN 42149 1850 35 SHIELD SHIELD NNP 42149 1850 36 FIG FIG NNP 42149 1850 37 . . . 42149 1851 1 18 18 CD 42149 1851 2 . . . 42149 1851 3 ] ] -RRB- 42149 1852 1 As as RB 42149 1852 2 long long RB 42149 1852 3 as as IN 42149 1852 4 the the DT 42149 1852 5 shield shield NN 42149 1852 6 was be VBD 42149 1852 7 stationary stationary JJ 42149 1852 8 it -PRON- PRP 42149 1852 9 was be VBD 42149 1852 10 possible possible JJ 42149 1852 11 , , , 42149 1852 12 by by IN 42149 1852 13 using use VBG 42149 1852 14 these these DT 42149 1852 15 methods method NNS 42149 1852 16 and and CC 42149 1852 17 exercising exercise VBG 42149 1852 18 great great JJ 42149 1852 19 care care NN 42149 1852 20 and and CC 42149 1852 21 watchfulness watchfulness NN 42149 1852 22 , , , 42149 1852 23 to to TO 42149 1852 24 prevent prevent VB 42149 1852 25 excessive excessive JJ 42149 1852 26 loss loss NN 42149 1852 27 of of IN 42149 1852 28 air air NN 42149 1852 29 ; ; : 42149 1852 30 but but CC 42149 1852 31 , , , 42149 1852 32 while while IN 42149 1852 33 the the DT 42149 1852 34 shield shield NN 42149 1852 35 was be VBD 42149 1852 36 being be VBG 42149 1852 37 shoved shove VBN 42149 1852 38 ahead ahead RB 42149 1852 39 , , , 42149 1852 40 the the DT 42149 1852 41 difficulties difficulty NNS 42149 1852 42 were be VBD 42149 1852 43 much much RB 42149 1852 44 increased increase VBN 42149 1852 45 , , , 42149 1852 46 for for IN 42149 1852 47 the the DT 42149 1852 48 movement movement NN 42149 1852 49 of of IN 42149 1852 50 the the DT 42149 1852 51 shield shield NN 42149 1852 52 displaced displace VBD 42149 1852 53 the the DT 42149 1852 54 bags bag NNS 42149 1852 55 and and CC 42149 1852 56 mud mud NN 42149 1852 57 as as RB 42149 1852 58 fast fast RB 42149 1852 59 as as IN 42149 1852 60 they -PRON- PRP 42149 1852 61 were be VBD 42149 1852 62 placed place VBN 42149 1852 63 , , , 42149 1852 64 and and CC 42149 1852 65 it -PRON- PRP 42149 1852 66 was be VBD 42149 1852 67 only only RB 42149 1852 68 by by IN 42149 1852 69 shoving shove VBG 42149 1852 70 slowly slowly RB 42149 1852 71 and and CC 42149 1852 72 having have VBG 42149 1852 73 a a DT 42149 1852 74 large large JJ 42149 1852 75 number number NN 42149 1852 76 of of IN 42149 1852 77 men man NNS 42149 1852 78 looking look VBG 42149 1852 79 out out RP 42149 1852 80 for for IN 42149 1852 81 leaks leak NNS 42149 1852 82 and and CC 42149 1852 83 stopping stop VBG 42149 1852 84 them -PRON- PRP 42149 1852 85 up up IN 42149 1852 86 the the DT 42149 1852 87 instant instant NN 42149 1852 88 they -PRON- PRP 42149 1852 89 developed develop VBD 42149 1852 90 that that IN 42149 1852 91 excessive excessive JJ 42149 1852 92 loss loss NN 42149 1852 93 of of IN 42149 1852 94 air air NN 42149 1852 95 could could MD 42149 1852 96 be be VB 42149 1852 97 prevented prevent VBN 42149 1852 98 . . . 42149 1853 1 In in IN 42149 1853 2 erecting erect VBG 42149 1853 3 the the DT 42149 1853 4 iron iron NN 42149 1853 5 lining lining NN 42149 1853 6 , , , 42149 1853 7 as as IN 42149 1853 8 each each DT 42149 1853 9 segment segment NN 42149 1853 10 was be VBD 42149 1853 11 brought bring VBN 42149 1853 12 into into IN 42149 1853 13 position position NN 42149 1853 14 , , , 42149 1853 15 it -PRON- PRP 42149 1853 16 was be VBD 42149 1853 17 necessary necessary JJ 42149 1853 18 to to TO 42149 1853 19 clean clean VB 42149 1853 20 off off RP 42149 1853 21 the the DT 42149 1853 22 leading lead VBG 42149 1853 23 surface surface NN 42149 1853 24 of of IN 42149 1853 25 the the DT 42149 1853 26 previous previous JJ 42149 1853 27 ring ring NN 42149 1853 28 and and CC 42149 1853 29 the the DT 42149 1853 30 adjacent adjacent JJ 42149 1853 31 portion portion NN 42149 1853 32 of of IN 42149 1853 33 the the DT 42149 1853 34 tail tail NN 42149 1853 35 of of IN 42149 1853 36 the the DT 42149 1853 37 shield shield NN 42149 1853 38 ; ; : 42149 1853 39 this this DT 42149 1853 40 was be VBD 42149 1853 41 always always RB 42149 1853 42 accompanied accompany VBN 42149 1853 43 by by IN 42149 1853 44 a a DT 42149 1853 45 slight slight JJ 42149 1853 46 " " `` 42149 1853 47 blow blow NN 42149 1853 48 , , , 42149 1853 49 " " '' 42149 1853 50 and and CC 42149 1853 51 for for IN 42149 1853 52 some some DT 42149 1853 53 time time NN 42149 1853 54 the the DT 42149 1853 55 air air NN 42149 1853 56 pressure pressure NN 42149 1853 57 in in IN 42149 1853 58 the the DT 42149 1853 59 tunnel tunnel NN 42149 1853 60 dropped drop VBD 42149 1853 61 from from IN 42149 1853 62 25 25 CD 42149 1853 63 to to TO 42149 1853 64 20 20 CD 42149 1853 65 lb lb RB 42149 1853 66 . . . 42149 1853 67 , , , 42149 1853 68 that that RB 42149 1853 69 is is RB 42149 1853 70 , , , 42149 1853 71 from from IN 42149 1853 72 greater great JJR 42149 1853 73 than than IN 42149 1853 74 the the DT 42149 1853 75 balancing balance VBG 42149 1853 76 pressure pressure NN 42149 1853 77 to to IN 42149 1853 78 less less JJR 42149 1853 79 , , , 42149 1853 80 every every DT 42149 1853 81 time time NN 42149 1853 82 a a DT 42149 1853 83 segment segment NN 42149 1853 84 was be VBD 42149 1853 85 placed place VBN 42149 1853 86 , , , 42149 1853 87 and and CC 42149 1853 88 on on IN 42149 1853 89 two two CD 42149 1853 90 occasions occasion NNS 42149 1853 91 the the DT 42149 1853 92 " " `` 42149 1853 93 blow blow NN 42149 1853 94 " " '' 42149 1853 95 became become VBD 42149 1853 96 so so RB 42149 1853 97 great great JJ 42149 1853 98 that that IN 42149 1853 99 the the DT 42149 1853 100 tunnel tunnel NN 42149 1853 101 pressure pressure NN 42149 1853 102 was be VBD 42149 1853 103 reduced reduce VBN 42149 1853 104 considerably considerably RB 42149 1853 105 further far RBR 42149 1853 106 , , , 42149 1853 107 and and CC 42149 1853 108 in in IN 42149 1853 109 consequence consequence NN 42149 1853 110 the the DT 42149 1853 111 water water NN 42149 1853 112 from from IN 42149 1853 113 the the DT 42149 1853 114 river river NN 42149 1853 115 rushed rush VBD 42149 1853 116 in in RP 42149 1853 117 and and CC 42149 1853 118 was be VBD 42149 1853 119 not not RB 42149 1853 120 stopped stop VBN 42149 1853 121 until until IN 42149 1853 122 it -PRON- PRP 42149 1853 123 had have VBD 42149 1853 124 risen rise VBN 42149 1853 125 about about RB 42149 1853 126 4 4 CD 42149 1853 127 ft ft NN 42149 1853 128 . . . 42149 1853 129 in in IN 42149 1853 130 the the DT 42149 1853 131 tunnel tunnel NNP 42149 1853 132 invert invert NNP 42149 1853 133 . . . 42149 1854 1 On on IN 42149 1854 2 such such JJ 42149 1854 3 occasions occasion NNS 42149 1854 4 the the DT 42149 1854 5 surface surface NN 42149 1854 6 of of IN 42149 1854 7 the the DT 42149 1854 8 river river NN 42149 1854 9 was be VBD 42149 1854 10 greatly greatly RB 42149 1854 11 disturbed disturb VBN 42149 1854 12 , , , 42149 1854 13 rising rise VBG 42149 1854 14 more more JJR 42149 1854 15 than than IN 42149 1854 16 20 20 CD 42149 1854 17 ft ft NN 42149 1854 18 . . . 42149 1854 19 in in IN 42149 1854 20 the the DT 42149 1854 21 air air NN 42149 1854 22 in in IN 42149 1854 23 a a DT 42149 1854 24 sort sort NN 42149 1854 25 of of IN 42149 1854 26 geyser geyser NN 42149 1854 27 . . . 42149 1855 1 A a DT 42149 1855 2 large large JJ 42149 1855 3 quantity quantity NN 42149 1855 4 of of IN 42149 1855 5 grout grout NN 42149 1855 6 ( ( -LRB- 42149 1855 7 about about RB 42149 1855 8 2,500 2,500 CD 42149 1855 9 bbl bbl NN 42149 1855 10 . . . 42149 1856 1 of of IN 42149 1856 2 cement cement NN 42149 1856 3 and and CC 42149 1856 4 a a DT 42149 1856 5 similar similar JJ 42149 1856 6 quantity quantity NN 42149 1856 7 of of IN 42149 1856 8 sand sand NN 42149 1856 9 in in IN 42149 1856 10 the the DT 42149 1856 11 North North NNP 42149 1856 12 Tunnel Tunnel NNP 42149 1856 13 and and CC 42149 1856 14 1,000 1,000 CD 42149 1856 15 bbl bbl NN 42149 1856 16 . . . 42149 1857 1 in in IN 42149 1857 2 the the DT 42149 1857 3 South South NNP 42149 1857 4 Tunnel Tunnel NNP 42149 1857 5 ) ) -RRB- 42149 1857 6 was be VBD 42149 1857 7 used use VBN 42149 1857 8 at at IN 42149 1857 9 this this DT 42149 1857 10 point point NN 42149 1857 11 ; ; : 42149 1857 12 it -PRON- PRP 42149 1857 13 was be VBD 42149 1857 14 forced force VBN 42149 1857 15 through through IN 42149 1857 16 the the DT 42149 1857 17 tunnel tunnel NN 42149 1857 18 lining line VBG 42149 1857 19 immediately immediately RB 42149 1857 20 behind behind IN 42149 1857 21 the the DT 42149 1857 22 shield shield NN 42149 1857 23 , , , 42149 1857 24 greatly greatly RB 42149 1857 25 reducing reduce VBG 42149 1857 26 the the DT 42149 1857 27 loss loss NN 42149 1857 28 of of IN 42149 1857 29 air air NN 42149 1857 30 and and CC 42149 1857 31 helping help VBG 42149 1857 32 to to TO 42149 1857 33 bind bind VB 42149 1857 34 the the DT 42149 1857 35 rip rip NN 42149 1857 36 - - HYPH 42149 1857 37 rap rap NN 42149 1857 38 together together RB 42149 1857 39 . . . 42149 1858 1 When when WRB 42149 1858 2 the the DT 42149 1858 3 shield shield NN 42149 1858 4 had have VBD 42149 1858 5 traveled travel VBN 42149 1858 6 25 25 CD 42149 1858 7 ft ft NN 42149 1858 8 . . . 42149 1858 9 through through IN 42149 1858 10 the the DT 42149 1858 11 rip rip NNP 42149 1858 12 - - HYPH 42149 1858 13 rap rap NN 42149 1858 14 , , , 42149 1858 15 the the DT 42149 1858 16 piles pile NNS 42149 1858 17 which which WDT 42149 1858 18 support support VBP 42149 1858 19 the the DT 42149 1858 20 bulkhead bulkhead NN 42149 1858 21 were be VBD 42149 1858 22 met meet VBN 42149 1858 23 . . . 42149 1859 1 One one CD 42149 1859 2 hundred hundred CD 42149 1859 3 of of IN 42149 1859 4 these these DT 42149 1859 5 which which WDT 42149 1859 6 were be VBD 42149 1859 7 spaced space VBN 42149 1859 8 at at IN 42149 1859 9 3-ft 3-ft CD 42149 1859 10 . . . 42149 1859 11 centers center NNS 42149 1859 12 in in IN 42149 1859 13 each each DT 42149 1859 14 direction direction NN 42149 1859 15 , , , 42149 1859 16 were be VBD 42149 1859 17 cut cut VBN 42149 1859 18 out out IN 42149 1859 19 of of IN 42149 1859 20 the the DT 42149 1859 21 path path NN 42149 1859 22 of of IN 42149 1859 23 each each DT 42149 1859 24 shield shield NN 42149 1859 25 in in IN 42149 1859 26 a a DT 42149 1859 27 distance distance NN 42149 1859 28 of of IN 42149 1859 29 35 35 CD 42149 1859 30 ft ft NN 42149 1859 31 . . . 42149 1860 1 The the DT 42149 1860 2 presence presence NN 42149 1860 3 of of IN 42149 1860 4 the the DT 42149 1860 5 piles pile NNS 42149 1860 6 caused cause VBD 42149 1860 7 considerable considerable JJ 42149 1860 8 extra extra JJ 42149 1860 9 labor labor NN 42149 1860 10 , , , 42149 1860 11 as as IN 42149 1860 12 each each DT 42149 1860 13 pile pile NN 42149 1860 14 had have VBD 42149 1860 15 to to TO 42149 1860 16 be be VB 42149 1860 17 cut cut VBN 42149 1860 18 into into IN 42149 1860 19 several several JJ 42149 1860 20 pieces piece NNS 42149 1860 21 with with IN 42149 1860 22 axes axis NNS 42149 1860 23 to to TO 42149 1860 24 enable enable VB 42149 1860 25 it -PRON- PRP 42149 1860 26 to to TO 42149 1860 27 be be VB 42149 1860 28 removed remove VBN 42149 1860 29 through through IN 42149 1860 30 the the DT 42149 1860 31 shield shield NN 42149 1860 32 doors door NNS 42149 1860 33 , , , 42149 1860 34 otherwise otherwise RB 42149 1860 35 they -PRON- PRP 42149 1860 36 presented present VBD 42149 1860 37 no no DT 42149 1860 38 difficulties difficulty NNS 42149 1860 39 . . . 42149 1861 1 It -PRON- PRP 42149 1861 2 was be VBD 42149 1861 3 not not RB 42149 1861 4 necessary necessary JJ 42149 1861 5 to to TO 42149 1861 6 timber timber VB 42149 1861 7 the the DT 42149 1861 8 face face NN 42149 1861 9 , , , 42149 1861 10 as as IN 42149 1861 11 the the DT 42149 1861 12 piles pile NNS 42149 1861 13 supported support VBD 42149 1861 14 it -PRON- PRP 42149 1861 15 most most RBS 42149 1861 16 effectively effectively RB 42149 1861 17 . . . 42149 1862 1 When when WRB 42149 1862 2 the the DT 42149 1862 3 river river NN 42149 1862 4 line line NN 42149 1862 5 had have VBD 42149 1862 6 been be VBN 42149 1862 7 passed pass VBN 42149 1862 8 , , , 42149 1862 9 the the DT 42149 1862 10 " " `` 42149 1862 11 blow blow NN 42149 1862 12 " " '' 42149 1862 13 still still RB 42149 1862 14 continued continued JJ 42149 1862 15 , , , 42149 1862 16 and and CC 42149 1862 17 as as IN 42149 1862 18 there there EX 42149 1862 19 was be VBD 42149 1862 20 no no DT 42149 1862 21 heavy heavy JJ 42149 1862 22 ground ground NN 42149 1862 23 above above IN 42149 1862 24 the the DT 42149 1862 25 tunnel tunnel NN 42149 1862 26 the the DT 42149 1862 27 light light JJ 42149 1862 28 silt silt NN 42149 1862 29 was be VBD 42149 1862 30 carried carry VBN 42149 1862 31 away away RB 42149 1862 32 into into IN 42149 1862 33 the the DT 42149 1862 34 water water NN 42149 1862 35 by by IN 42149 1862 36 the the DT 42149 1862 37 escaping escape VBG 42149 1862 38 air air NN 42149 1862 39 . . . 42149 1863 1 At at IN 42149 1863 2 one one CD 42149 1863 3 time time NN 42149 1863 4 the the DT 42149 1863 5 cover cover NN 42149 1863 6 over over IN 42149 1863 7 the the DT 42149 1863 8 crown crown NN 42149 1863 9 of of IN 42149 1863 10 the the DT 42149 1863 11 tunnel tunnel NN 42149 1863 12 was be VBD 42149 1863 13 reduced reduce VBN 42149 1863 14 to to IN 42149 1863 15 such such PDT 42149 1863 16 an an DT 42149 1863 17 extent extent NN 42149 1863 18 that that IN 42149 1863 19 for for IN 42149 1863 20 a a DT 42149 1863 21 distance distance NN 42149 1863 22 of of IN 42149 1863 23 30 30 CD 42149 1863 24 ft ft NN 42149 1863 25 . . . 42149 1863 26 there there EX 42149 1863 27 was be VBD 42149 1863 28 less less JJR 42149 1863 29 than than IN 42149 1863 30 10 10 CD 42149 1863 31 ft ft NN 42149 1863 32 . . NN 42149 1863 33 of of IN 42149 1863 34 very very RB 42149 1863 35 soft soft JJ 42149 1863 36 silt silt NN 42149 1863 37 , , , 42149 1863 38 and and CC 42149 1863 39 in in IN 42149 1863 40 some some DT 42149 1863 41 places place NNS 42149 1863 42 none none NN 42149 1863 43 at at RB 42149 1863 44 all all RB 42149 1863 45 . . . 42149 1864 1 Therefore therefore RB 42149 1864 2 , , , 42149 1864 3 the the DT 42149 1864 4 shield shield NN 42149 1864 5 was be VBD 42149 1864 6 stopped stop VBN 42149 1864 7 and and CC 42149 1864 8 the the DT 42149 1864 9 air air NN 42149 1864 10 pressure pressure NN 42149 1864 11 reduced reduce VBN 42149 1864 12 until until IN 42149 1864 13 it -PRON- PRP 42149 1864 14 was be VBD 42149 1864 15 less less JJR 42149 1864 16 than than IN 42149 1864 17 the the DT 42149 1864 18 balancing balancing NN 42149 1864 19 pressure pressure NN 42149 1864 20 ; ; : 42149 1864 21 the the DT 42149 1864 22 blow blow NN 42149 1864 23 then then RB 42149 1864 24 ceased cease VBD 42149 1864 25 , , , 42149 1864 26 and and CC 42149 1864 27 about about RB 42149 1864 28 28,000 28,000 CD 42149 1864 29 cement cement NN 42149 1864 30 bags bag NNS 42149 1864 31 filled fill VBN 42149 1864 32 with with IN 42149 1864 33 mud mud NN 42149 1864 34 were be VBD 42149 1864 35 dumped dump VBN 42149 1864 36 into into IN 42149 1864 37 the the DT 42149 1864 38 hole hole NN 42149 1864 39 ( ( -LRB- 42149 1864 40 the the DT 42149 1864 41 location location NN 42149 1864 42 made make VBD 42149 1864 43 it -PRON- PRP 42149 1864 44 impossible impossible JJ 42149 1864 45 to to TO 42149 1864 46 dump dump VB 42149 1864 47 them -PRON- PRP 42149 1864 48 _ _ NNP 42149 1864 49 en en IN 42149 1864 50 masse masse FW 42149 1864 51 _ _ NNP 42149 1864 52 from from IN 42149 1864 53 a a DT 42149 1864 54 scow scow NN 42149 1864 55 ) ) -RRB- 42149 1864 56 . . . 42149 1865 1 They -PRON- PRP 42149 1865 2 were be VBD 42149 1865 3 then then RB 42149 1865 4 weighted weight VBN 42149 1865 5 down down RP 42149 1865 6 with with IN 42149 1865 7 rip rip NN 42149 1865 8 - - HYPH 42149 1865 9 rap rap NN 42149 1865 10 . . . 42149 1866 1 This this DT 42149 1866 2 sealed seal VBD 42149 1866 3 the the DT 42149 1866 4 blow blow NN 42149 1866 5 , , , 42149 1866 6 and and CC 42149 1866 7 the the DT 42149 1866 8 work work NN 42149 1866 9 was be VBD 42149 1866 10 continued continue VBN 42149 1866 11 without without IN 42149 1866 12 any any DT 42149 1866 13 further further JJ 42149 1866 14 disturbance disturbance NN 42149 1866 15 from from IN 42149 1866 16 this this DT 42149 1866 17 source source NN 42149 1866 18 . . . 42149 1867 1 Just just RB 42149 1867 2 before before IN 42149 1867 3 the the DT 42149 1867 4 blow blow NN 42149 1867 5 reached reach VBD 42149 1867 6 its -PRON- PRP$ 42149 1867 7 maximum maximum NN 42149 1867 8 it -PRON- PRP 42149 1867 9 was be VBD 42149 1867 10 found find VBN 42149 1867 11 that that IN 42149 1867 12 two two CD 42149 1867 13 of of IN 42149 1867 14 the the DT 42149 1867 15 piles pile NNS 42149 1867 16 which which WDT 42149 1867 17 had have VBD 42149 1867 18 been be VBN 42149 1867 19 encountered encounter VBN 42149 1867 20 were be VBD 42149 1867 21 directly directly RB 42149 1867 22 in in IN 42149 1867 23 the the DT 42149 1867 24 path path NN 42149 1867 25 of of IN 42149 1867 26 one one CD 42149 1867 27 of of IN 42149 1867 28 the the DT 42149 1867 29 proposed propose VBN 42149 1867 30 screw screw NN 42149 1867 31 - - HYPH 42149 1867 32 piles pile NNS 42149 1867 33 . . . 42149 1868 1 It -PRON- PRP 42149 1868 2 was be VBD 42149 1868 3 therefore therefore RB 42149 1868 4 decided decide VBN 42149 1868 5 to to TO 42149 1868 6 pull pull VB 42149 1868 7 these these DT 42149 1868 8 , , , 42149 1868 9 and and CC 42149 1868 10 this this DT 42149 1868 11 was be VBD 42149 1868 12 done do VBN 42149 1868 13 with with IN 42149 1868 14 two two CD 42149 1868 15 40-ton 40-ton CD 42149 1868 16 hydraulic hydraulic JJ 42149 1868 17 jacks jack NNS 42149 1868 18 supported support VBN 42149 1868 19 by by IN 42149 1868 20 the the DT 42149 1868 21 upper upper JJ 42149 1868 22 sliding sliding JJ 42149 1868 23 platforms platform NNS 42149 1868 24 and and CC 42149 1868 25 acting act VBG 42149 1868 26 on on IN 42149 1868 27 a a DT 42149 1868 28 horizontal horizontal JJ 42149 1868 29 timber timber NN 42149 1868 30 which which WDT 42149 1868 31 was be VBD 42149 1868 32 connected connect VBN 42149 1868 33 to to IN 42149 1868 34 the the DT 42149 1868 35 piles pile NNS 42149 1868 36 by by IN 42149 1868 37 tie tie NN 42149 1868 38 - - HYPH 42149 1868 39 rods rod NNS 42149 1868 40 and and CC 42149 1868 41 chains chain NNS 42149 1868 42 . . . 42149 1869 1 The the DT 42149 1869 2 working work VBG 42149 1869 3 force force NN 42149 1869 4 here here RB 42149 1869 5 was be VBD 42149 1869 6 similar similar JJ 42149 1869 7 to to IN 42149 1869 8 that that DT 42149 1869 9 employed employ VBN 42149 1869 10 in in IN 42149 1869 11 the the DT 42149 1869 12 sand sand NN 42149 1869 13 and and CC 42149 1869 14 gravel gravel NN 42149 1869 15 section section NN 42149 1869 16 previously previously RB 42149 1869 17 described describe VBN 42149 1869 18 . . . 42149 1870 1 _ _ NNP 42149 1870 2 In in IN 42149 1870 3 Full Full NNP 42149 1870 4 Face face NN 42149 1870 5 of of IN 42149 1870 6 Silt._--A Silt._--A NNS 42149 1870 7 full full JJ 42149 1870 8 face face NN 42149 1870 9 of of IN 42149 1870 10 silt silt NN 42149 1870 11 was be VBD 42149 1870 12 first first RB 42149 1870 13 met meet VBN 42149 1870 14 under under IN 42149 1870 15 the the DT 42149 1870 16 New New NNP 42149 1870 17 York York NNP 42149 1870 18 Central Central NNP 42149 1870 19 Railroad Railroad NNP 42149 1870 20 freight freight NN 42149 1870 21 yard yard NN 42149 1870 22 on on IN 42149 1870 23 the the DT 42149 1870 24 New New NNP 42149 1870 25 York York NNP 42149 1870 26 side side NN 42149 1870 27 . . . 42149 1871 1 Up up IN 42149 1871 2 to to IN 42149 1871 3 this this DT 42149 1871 4 point point NN 42149 1871 5 the the DT 42149 1871 6 ground ground NN 42149 1871 7 passed pass VBD 42149 1871 8 through through RP 42149 1871 9 had have VBD 42149 1871 10 been be VBN 42149 1871 11 either either CC 42149 1871 12 solid solid JJ 42149 1871 13 rock rock NN 42149 1871 14 or or CC 42149 1871 15 a a DT 42149 1871 16 mixed mixed JJ 42149 1871 17 face face NN 42149 1871 18 of of IN 42149 1871 19 rock rock NN 42149 1871 20 and and CC 42149 1871 21 gravel gravel NN 42149 1871 22 . . . 42149 1872 1 In in IN 42149 1872 2 both both DT 42149 1872 3 of of IN 42149 1872 4 these these DT 42149 1872 5 the the DT 42149 1872 6 full full JJ 42149 1872 7 excavation excavation NN 42149 1872 8 had have VBD 42149 1872 9 to to TO 42149 1872 10 be be VB 42149 1872 11 taken take VBN 42149 1872 12 out out RP 42149 1872 13 before before IN 42149 1872 14 the the DT 42149 1872 15 shield shield NN 42149 1872 16 could could MD 42149 1872 17 be be VB 42149 1872 18 shoved shove VBN 42149 1872 19 , , , 42149 1872 20 and and CC 42149 1872 21 the the DT 42149 1872 22 soft soft JJ 42149 1872 23 ground ground NN 42149 1872 24 had have VBD 42149 1872 25 needed need VBN 42149 1872 26 timbering timbere VBG 42149 1872 27 . . . 42149 1873 1 When when WRB 42149 1873 2 the the DT 42149 1873 3 rock rock NN 42149 1873 4 , , , 42149 1873 5 gravel gravel NN 42149 1873 6 , , , 42149 1873 7 and and CC 42149 1873 8 hardpan hardpan NNP 42149 1873 9 gave give VBD 42149 1873 10 place place NN 42149 1873 11 to to IN 42149 1873 12 a a DT 42149 1873 13 full full JJ 42149 1873 14 face face NN 42149 1873 15 of of IN 42149 1873 16 silt silt NN 42149 1873 17 , , , 42149 1873 18 the the DT 42149 1873 19 timber timber NN 42149 1873 20 was be VBD 42149 1873 21 removed remove VBN 42149 1873 22 , , , 42149 1873 23 all all PDT 42149 1873 24 the the DT 42149 1873 25 shield shield NN 42149 1873 26 doors door NNS 42149 1873 27 were be VBD 42149 1873 28 opened open VBN 42149 1873 29 , , , 42149 1873 30 and and CC 42149 1873 31 the the DT 42149 1873 32 shield shield NN 42149 1873 33 was be VBD 42149 1873 34 shoved shove VBN 42149 1873 35 into into IN 42149 1873 36 the the DT 42149 1873 37 ground ground NN 42149 1873 38 without without IN 42149 1873 39 any any DT 42149 1873 40 excavation excavation NN 42149 1873 41 being be VBG 42149 1873 42 done do VBN 42149 1873 43 by by IN 42149 1873 44 hand hand NN 42149 1873 45 ahead ahead RB 42149 1873 46 of of IN 42149 1873 47 the the DT 42149 1873 48 diaphragm diaphragm NN 42149 1873 49 . . . 42149 1874 1 As as IN 42149 1874 2 the the DT 42149 1874 3 shield shield NN 42149 1874 4 advanced advance VBD 42149 1874 5 , , , 42149 1874 6 the the DT 42149 1874 7 silt silt NN 42149 1874 8 was be VBD 42149 1874 9 forced force VBN 42149 1874 10 through through IN 42149 1874 11 the the DT 42149 1874 12 open open JJ 42149 1874 13 doors door NNS 42149 1874 14 into into IN 42149 1874 15 the the DT 42149 1874 16 tunnel tunnel NN 42149 1874 17 . . . 42149 1875 1 After after IN 42149 1875 2 the the DT 42149 1875 3 work work NN 42149 1875 4 had have VBD 42149 1875 5 gone go VBN 42149 1875 6 on on RP 42149 1875 7 in in IN 42149 1875 8 this this DT 42149 1875 9 way way NN 42149 1875 10 for for IN 42149 1875 11 some some DT 42149 1875 12 time time NN 42149 1875 13 , , , 42149 1875 14 taking take VBG 42149 1875 15 in in RP 42149 1875 16 about about RB 42149 1875 17 90 90 CD 42149 1875 18 % % NN 42149 1875 19 of of IN 42149 1875 20 the the DT 42149 1875 21 full full JJ 42149 1875 22 volume volume NN 42149 1875 23 of of IN 42149 1875 24 the the DT 42149 1875 25 tunnel tunnel NN 42149 1875 26 excavation excavation NN 42149 1875 27 per per IN 42149 1875 28 foot foot NN 42149 1875 29 forward forward RB 42149 1875 30 , , , 42149 1875 31 the the DT 42149 1875 32 air air NN 42149 1875 33 pressure pressure NN 42149 1875 34 was be VBD 42149 1875 35 raised raise VBN 42149 1875 36 from from IN 42149 1875 37 20 20 CD 42149 1875 38 to to TO 42149 1875 39 22 22 CD 42149 1875 40 lb lb RB 42149 1875 41 . . . 42149 1876 1 The the DT 42149 1876 2 result result NN 42149 1876 3 was be VBD 42149 1876 4 that that IN 42149 1876 5 the the DT 42149 1876 6 silt silt NN 42149 1876 7 in in IN 42149 1876 8 the the DT 42149 1876 9 face face NN 42149 1876 10 got get VBD 42149 1876 11 harder hard JJR 42149 1876 12 and and CC 42149 1876 13 flowed flow VBD 42149 1876 14 less less RBR 42149 1876 15 readily readily RB 42149 1876 16 through through IN 42149 1876 17 the the DT 42149 1876 18 shield shield NN 42149 1876 19 , , , 42149 1876 20 and and CC 42149 1876 21 the the DT 42149 1876 22 amount amount NN 42149 1876 23 taken take VBN 42149 1876 24 in in RP 42149 1876 25 fell fall VBD 42149 1876 26 to to IN 42149 1876 27 about about RB 42149 1876 28 65 65 CD 42149 1876 29 % % NN 42149 1876 30 of of IN 42149 1876 31 the the DT 42149 1876 32 full full JJ 42149 1876 33 volume volume NN 42149 1876 34 . . . 42149 1877 1 This this DT 42149 1877 2 manner manner NN 42149 1877 3 of of IN 42149 1877 4 shoving shove VBG 42149 1877 5 at at IN 42149 1877 6 once once RB 42149 1877 7 caused cause VBD 42149 1877 8 a a DT 42149 1877 9 disturbance disturbance NN 42149 1877 10 on on IN 42149 1877 11 the the DT 42149 1877 12 surface surface NN 42149 1877 13 and and CC 42149 1877 14 the the DT 42149 1877 15 railroad railroad NN 42149 1877 16 tracks track NNS 42149 1877 17 above above IN 42149 1877 18 the the DT 42149 1877 19 tunnel tunnel NN 42149 1877 20 were be VBD 42149 1877 21 raised raise VBN 42149 1877 22 , , , 42149 1877 23 so so IN 42149 1877 24 that that IN 42149 1877 25 the the DT 42149 1877 26 pressure pressure NN 42149 1877 27 was be VBD 42149 1877 28 lowered lower VBN 42149 1877 29 to to IN 42149 1877 30 16 16 CD 42149 1877 31 lb lb JJ 42149 1877 32 . . . 42149 1877 33 , , , 42149 1877 34 then then RB 42149 1877 35 the the DT 42149 1877 36 muck muck NN 42149 1877 37 got get VBD 42149 1877 38 softer soft JJR 42149 1877 39 and and CC 42149 1877 40 the the DT 42149 1877 41 full full JJ 42149 1877 42 volume volume NN 42149 1877 43 of of IN 42149 1877 44 excavation excavation NN 42149 1877 45 was be VBD 42149 1877 46 taken take VBN 42149 1877 47 in in RP 42149 1877 48 ; ; : 42149 1877 49 after after IN 42149 1877 50 a a DT 42149 1877 51 while while NN 42149 1877 52 the the DT 42149 1877 53 pressure pressure NN 42149 1877 54 was be VBD 42149 1877 55 again again RB 42149 1877 56 raised raise VBN 42149 1877 57 to to IN 42149 1877 58 20 20 CD 42149 1877 59 lb lb RB 42149 1877 60 . . . 42149 1878 1 The the DT 42149 1878 2 forcing forcing NN 42149 1878 3 of of IN 42149 1878 4 the the DT 42149 1878 5 shield shield NN 42149 1878 6 through through IN 42149 1878 7 the the DT 42149 1878 8 silt silt NN 42149 1878 9 resulted result VBD 42149 1878 10 in in IN 42149 1878 11 a a DT 42149 1878 12 rising rising NN 42149 1878 13 of of IN 42149 1878 14 the the DT 42149 1878 15 bed bed NN 42149 1878 16 of of IN 42149 1878 17 the the DT 42149 1878 18 river river NN 42149 1878 19 , , , 42149 1878 20 the the DT 42149 1878 21 amount amount NN 42149 1878 22 that that WDT 42149 1878 23 the the DT 42149 1878 24 bed bed NN 42149 1878 25 was be VBD 42149 1878 26 raised raise VBN 42149 1878 27 depending depend VBG 42149 1878 28 on on IN 42149 1878 29 the the DT 42149 1878 30 quantity quantity NN 42149 1878 31 of of IN 42149 1878 32 material material NN 42149 1878 33 brought bring VBN 42149 1878 34 into into IN 42149 1878 35 the the DT 42149 1878 36 shield shield NN 42149 1878 37 . . . 42149 1879 1 If if IN 42149 1879 2 the the DT 42149 1879 3 whole whole JJ 42149 1879 4 volume volume NN 42149 1879 5 of of IN 42149 1879 6 excavation excavation NN 42149 1879 7 was be VBD 42149 1879 8 being be VBG 42149 1879 9 brought bring VBN 42149 1879 10 in in RP 42149 1879 11 , , , 42149 1879 12 the the DT 42149 1879 13 surface surface NN 42149 1879 14 of of IN 42149 1879 15 the the DT 42149 1879 16 bed bed NN 42149 1879 17 was be VBD 42149 1879 18 not not RB 42149 1879 19 affected affect VBN 42149 1879 20 ; ; : 42149 1879 21 when when WRB 42149 1879 22 about about IN 42149 1879 23 50 50 CD 42149 1879 24 % % NN 42149 1879 25 was be VBD 42149 1879 26 being be VBG 42149 1879 27 taken take VBN 42149 1879 28 in in RP 42149 1879 29 , , , 42149 1879 30 the the DT 42149 1879 31 surface surface NN 42149 1879 32 was be VBD 42149 1879 33 raised raise VBN 42149 1879 34 about about RB 42149 1879 35 3 3 CD 42149 1879 36 ft ft NN 42149 1879 37 . . NNP 42149 1879 38 ; ; : 42149 1879 39 if if IN 42149 1879 40 the the DT 42149 1879 41 shield shield NN 42149 1879 42 was be VBD 42149 1879 43 being be VBG 42149 1879 44 driven drive VBN 42149 1879 45 blind blind JJ 42149 1879 46 , , , 42149 1879 47 the the DT 42149 1879 48 bed bed NN 42149 1879 49 was be VBD 42149 1879 50 raised raise VBN 42149 1879 51 about about RB 42149 1879 52 7 7 CD 42149 1879 53 ft ft NN 42149 1879 54 . . . 42149 1880 1 The the DT 42149 1880 2 number number NN 42149 1880 3 of of IN 42149 1880 4 open open JJ 42149 1880 5 doors door NNS 42149 1880 6 was be VBD 42149 1880 7 regulated regulate VBN 42149 1880 8 so so IN 42149 1880 9 as as IN 42149 1880 10 to to TO 42149 1880 11 take take VB 42149 1880 12 in in RP 42149 1880 13 the the DT 42149 1880 14 minimum minimum JJ 42149 1880 15 quantity quantity NN 42149 1880 16 of of IN 42149 1880 17 muck muck NN 42149 1880 18 consistent consistent JJ 42149 1880 19 with with IN 42149 1880 20 causing cause VBG 42149 1880 21 no no DT 42149 1880 22 surface surface NN 42149 1880 23 disturbance disturbance NN 42149 1880 24 . . . 42149 1881 1 On on IN 42149 1881 2 the the DT 42149 1881 3 average average NN 42149 1881 4 , , , 42149 1881 5 in in IN 42149 1881 6 the the DT 42149 1881 7 North North NNP 42149 1881 8 Manhattan Manhattan NNP 42149 1881 9 Tunnel Tunnel NNP 42149 1881 10 , , , 42149 1881 11 all all PDT 42149 1881 12 the the DT 42149 1881 13 doors door NNS 42149 1881 14 were be VBD 42149 1881 15 open open JJ 42149 1881 16 , , , 42149 1881 17 but but CC 42149 1881 18 in in IN 42149 1881 19 the the DT 42149 1881 20 South South NNP 42149 1881 21 Tunnel Tunnel NNP 42149 1881 22 there there EX 42149 1881 23 were be VBD 42149 1881 24 generally generally RB 42149 1881 25 only only RB 42149 1881 26 five five CD 42149 1881 27 or or CC 42149 1881 28 six six CD 42149 1881 29 out out IN 42149 1881 30 of of IN 42149 1881 31 the the DT 42149 1881 32 total total JJ 42149 1881 33 nine nine CD 42149 1881 34 . . . 42149 1882 1 In in IN 42149 1882 2 front front NN 42149 1882 3 of of IN 42149 1882 4 the the DT 42149 1882 5 bulkhead bulkhead NN 42149 1882 6 wall wall NN 42149 1882 7 at at IN 42149 1882 8 Manhattan Manhattan NNP 42149 1882 9 the the DT 42149 1882 10 tunnels tunnel NNS 42149 1882 11 were be VBD 42149 1882 12 under under IN 42149 1882 13 Pier Pier NNP 42149 1882 14 No no UH 42149 1882 15 . . . 42149 1883 1 72 72 CD 42149 1883 2 . . . 42149 1884 1 This this DT 42149 1884 2 structure structure NN 42149 1884 3 was be VBD 42149 1884 4 supported support VBN 42149 1884 5 on on IN 42149 1884 6 wooden wooden JJ 42149 1884 7 piles pile NNS 42149 1884 8 , , , 42149 1884 9 some some DT 42149 1884 10 80 80 CD 42149 1884 11 ft ft NN 42149 1884 12 . . . 42149 1884 13 or or CC 42149 1884 14 more more RBR 42149 1884 15 in in IN 42149 1884 16 length length NN 42149 1884 17 , , , 42149 1884 18 which which WDT 42149 1884 19 came come VBD 42149 1884 20 down down RP 42149 1884 21 below below IN 42149 1884 22 the the DT 42149 1884 23 tunnel tunnel NNP 42149 1884 24 invert invert NNP 42149 1884 25 . . . 42149 1885 1 The the DT 42149 1885 2 piles pile NNS 42149 1885 3 which which WDT 42149 1885 4 lay lie VBD 42149 1885 5 directly directly RB 42149 1885 6 in in IN 42149 1885 7 the the DT 42149 1885 8 path path NN 42149 1885 9 of of IN 42149 1885 10 the the DT 42149 1885 11 tunnels tunnel NNS 42149 1885 12 , , , 42149 1885 13 with with IN 42149 1885 14 a a DT 42149 1885 15 few few JJ 42149 1885 16 exceptions exception NNS 42149 1885 17 , , , 42149 1885 18 had have VBD 42149 1885 19 been be VBN 42149 1885 20 pulled pull VBN 42149 1885 21 . . . 42149 1886 1 In in IN 42149 1886 2 driving drive VBG 42149 1886 3 the the DT 42149 1886 4 tunnels tunnel NNS 42149 1886 5 through through IN 42149 1886 6 this this DT 42149 1886 7 section section NN 42149 1886 8 , , , 42149 1886 9 great great JJ 42149 1886 10 care care NN 42149 1886 11 had have VBD 42149 1886 12 to to TO 42149 1886 13 be be VB 42149 1886 14 taken take VBN 42149 1886 15 not not RB 42149 1886 16 to to TO 42149 1886 17 disturb disturb VB 42149 1886 18 the the DT 42149 1886 19 piles pile NNS 42149 1886 20 on on IN 42149 1886 21 either either DT 42149 1886 22 side side NN 42149 1886 23 of of IN 42149 1886 24 the the DT 42149 1886 25 tunnels tunnel NNS 42149 1886 26 , , , 42149 1886 27 as as IN 42149 1886 28 they -PRON- PRP 42149 1886 29 supported support VBD 42149 1886 30 a a DT 42149 1886 31 heavy heavy JJ 42149 1886 32 trestle trestle NN 42149 1886 33 used use VBN 42149 1886 34 in in IN 42149 1886 35 disposing dispose VBG 42149 1886 36 of of IN 42149 1886 37 the the DT 42149 1886 38 excavation excavation NN 42149 1886 39 from from IN 42149 1886 40 the the DT 42149 1886 41 open open JJ 42149 1886 42 cut cut NN 42149 1886 43 in in IN 42149 1886 44 the the DT 42149 1886 45 terminal terminal JJ 42149 1886 46 yard yard NN 42149 1886 47 . . . 42149 1887 1 To to TO 42149 1887 2 avoid avoid VB 42149 1887 3 such such JJ 42149 1887 4 disturbance disturbance NN 42149 1887 5 , , , 42149 1887 6 a a DT 42149 1887 7 large large JJ 42149 1887 8 portion portion NN 42149 1887 9 of of IN 42149 1887 10 the the DT 42149 1887 11 total total JJ 42149 1887 12 excavation excavation NN 42149 1887 13 had have VBD 42149 1887 14 to to TO 42149 1887 15 be be VB 42149 1887 16 taken take VBN 42149 1887 17 through through IN 42149 1887 18 the the DT 42149 1887 19 shields shield NNS 42149 1887 20 . . . 42149 1888 1 The the DT 42149 1888 2 first first JJ 42149 1888 3 shield shield NN 42149 1888 4 which which WDT 42149 1888 5 passed pass VBD 42149 1888 6 the the DT 42149 1888 7 river river NN 42149 1888 8 bulkhead bulkhead NN 42149 1888 9 was be VBD 42149 1888 10 the the DT 42149 1888 11 south south JJ 42149 1888 12 one one CD 42149 1888 13 at at IN 42149 1888 14 Weehawken Weehawken NNP 42149 1888 15 . . . 42149 1889 1 As as RB 42149 1889 2 soon soon RB 42149 1889 3 as as IN 42149 1889 4 this this DT 42149 1889 5 line line NN 42149 1889 6 was be VBD 42149 1889 7 crossed cross VBN 42149 1889 8 the the DT 42149 1889 9 silt silt NN 42149 1889 10 was be VBD 42149 1889 11 found find VBN 42149 1889 12 to to TO 42149 1889 13 be be VB 42149 1889 14 much much RB 42149 1889 15 softer soft JJR 42149 1889 16 than than IN 42149 1889 17 behind behind IN 42149 1889 18 the the DT 42149 1889 19 wall wall NN 42149 1889 20 , , , 42149 1889 21 in in IN 42149 1889 22 fact fact NN 42149 1889 23 it -PRON- PRP 42149 1889 24 was be VBD 42149 1889 25 like like IN 42149 1889 26 a a DT 42149 1889 27 fluid fluid NN 42149 1889 28 in in IN 42149 1889 29 many many JJ 42149 1889 30 of of IN 42149 1889 31 its -PRON- PRP$ 42149 1889 32 properties property NNS 42149 1889 33 . . . 42149 1890 1 The the DT 42149 1890 2 fluidity fluidity NN 42149 1890 3 could could MD 42149 1890 4 be be VB 42149 1890 5 changed change VBN 42149 1890 6 by by IN 42149 1890 7 varying vary VBG 42149 1890 8 the the DT 42149 1890 9 tunnel tunnel NN 42149 1890 10 air air NN 42149 1890 11 pressure pressure NN 42149 1890 12 ; ; : 42149 1890 13 for for IN 42149 1890 14 example example NN 42149 1890 15 , , , 42149 1890 16 when when WRB 42149 1890 17 the the DT 42149 1890 18 air air NN 42149 1890 19 pressure pressure NN 42149 1890 20 was be VBD 42149 1890 21 made make VBN 42149 1890 22 equal equal JJ 42149 1890 23 to to IN 42149 1890 24 the the DT 42149 1890 25 weight weight NN 42149 1890 26 of of IN 42149 1890 27 the the DT 42149 1890 28 overlying overlying NN 42149 1890 29 material material NN 42149 1890 30 ( ( -LRB- 42149 1890 31 water water NN 42149 1890 32 and and CC 42149 1890 33 silt silt NN 42149 1890 34 ) ) -RRB- 42149 1890 35 , , , 42149 1890 36 the the DT 42149 1890 37 silt silt NN 42149 1890 38 was be VBD 42149 1890 39 quite quite RB 42149 1890 40 stiff stiff JJ 42149 1890 41 , , , 42149 1890 42 and and CC 42149 1890 43 resembled resemble VBD 42149 1890 44 a a DT 42149 1890 45 rather rather RB 42149 1890 46 soft soft JJ 42149 1890 47 clay clay NN 42149 1890 48 ; ; : 42149 1890 49 but but CC 42149 1890 50 when when WRB 42149 1890 51 the the DT 42149 1890 52 air air NN 42149 1890 53 pressure pressure NN 42149 1890 54 was be VBD 42149 1890 55 from from IN 42149 1890 56 10 10 CD 42149 1890 57 to to TO 42149 1890 58 15 15 CD 42149 1890 59 lb lb RB 42149 1890 60 . . . 42149 1891 1 per per IN 42149 1891 2 sq sq NNP 42149 1891 3 . . . 42149 1892 1 in in IN 42149 1892 2 . . . 42149 1893 1 lower lower RBR 42149 1893 2 , , , 42149 1893 3 it -PRON- PRP 42149 1893 4 became become VBD 42149 1893 5 so so RB 42149 1893 6 liquid liquid JJ 42149 1893 7 that that IN 42149 1893 8 it -PRON- PRP 42149 1893 9 would would MD 42149 1893 10 flow flow VB 42149 1893 11 through through IN 42149 1893 12 a a DT 42149 1893 13 1½-in 1â½-in NN 42149 1893 14 . . . 42149 1894 1 grout grout NN 42149 1894 2 hole hole NN 42149 1894 3 in in IN 42149 1894 4 the the DT 42149 1894 5 lining lining NN 42149 1894 6 , , , 42149 1894 7 in in IN 42149 1894 8 a a DT 42149 1894 9 thick thick JJ 42149 1894 10 stream stream NN 42149 1894 11 , , , 42149 1894 12 at at IN 42149 1894 13 the the DT 42149 1894 14 rate rate NN 42149 1894 15 of of IN 42149 1894 16 from from IN 42149 1894 17 10 10 CD 42149 1894 18 to to TO 42149 1894 19 50 50 CD 42149 1894 20 gal gal NN 42149 1894 21 . . . 42149 1895 1 per per IN 42149 1895 2 min min NNP 42149 1895 3 . . . 42149 1896 1 as as RB 42149 1896 2 soon soon RB 42149 1896 3 as as IN 42149 1896 4 the the DT 42149 1896 5 plug plug NN 42149 1896 6 was be VBD 42149 1896 7 taken take VBN 42149 1896 8 out out RP 42149 1896 9 . . . 42149 1897 1 This this DT 42149 1897 2 was be VBD 42149 1897 3 the the DT 42149 1897 4 point point NN 42149 1897 5 to to TO 42149 1897 6 which which WDT 42149 1897 7 the the DT 42149 1897 8 contractor contractor NN 42149 1897 9 had have VBD 42149 1897 10 long long RB 42149 1897 11 looked look VBN 42149 1897 12 forward forward RB 42149 1897 13 , , , 42149 1897 14 as as IN 42149 1897 15 he -PRON- PRP 42149 1897 16 expected expect VBD 42149 1897 17 to to TO 42149 1897 18 be be VB 42149 1897 19 able able JJ 42149 1897 20 to to TO 42149 1897 21 close close VB 42149 1897 22 all all DT 42149 1897 23 his -PRON- PRP$ 42149 1897 24 shield shield NN 42149 1897 25 doors door NNS 42149 1897 26 and and CC 42149 1897 27 drive drive VB 42149 1897 28 the the DT 42149 1897 29 rest rest NN 42149 1897 30 of of IN 42149 1897 31 the the DT 42149 1897 32 way way NN 42149 1897 33 across across RB 42149 1897 34 without without IN 42149 1897 35 taking take VBG 42149 1897 36 in in RP 42149 1897 37 a a DT 42149 1897 38 shovelful shovelful NN 42149 1897 39 of of IN 42149 1897 40 muck muck NN 42149 1897 41 , , , 42149 1897 42 as as IN 42149 1897 43 had have VBD 42149 1897 44 just just RB 42149 1897 45 been be VBN 42149 1897 46 done do VBN 42149 1897 47 under under IN 42149 1897 48 the the DT 42149 1897 49 Hudson Hudson NNP 42149 1897 50 River River NNP 42149 1897 51 , , , 42149 1897 52 on on IN 42149 1897 53 the the DT 42149 1897 54 South South NNP 42149 1897 55 Tunnel Tunnel NNP 42149 1897 56 of of IN 42149 1897 57 the the DT 42149 1897 58 Hudson Hudson NNP 42149 1897 59 and and CC 42149 1897 60 Manhattan Manhattan NNP 42149 1897 61 Railroad Railroad NNP 42149 1897 62 Company Company NNP 42149 1897 63 's 's POS 42149 1897 64 Tunnels Tunnels NNPS 42149 1897 65 between between IN 42149 1897 66 Morton Morton NNP 42149 1897 67 Street Street NNP 42149 1897 68 , , , 42149 1897 69 New New NNP 42149 1897 70 York York NNP 42149 1897 71 City City NNP 42149 1897 72 , , , 42149 1897 73 and and CC 42149 1897 74 Hoboken Hoboken NNP 42149 1897 75 , , , 42149 1897 76 N. N. NNP 42149 1897 77 J. J. NNP 42149 1898 1 The the DT 42149 1898 2 doors door NNS 42149 1898 3 were be VBD 42149 1898 4 shut shut VBN 42149 1898 5 and and CC 42149 1898 6 the the DT 42149 1898 7 shield shield NN 42149 1898 8 was be VBD 42149 1898 9 shoved shove VBN 42149 1898 10 ; ; : 42149 1898 11 the the DT 42149 1898 12 tunnel tunnel NN 42149 1898 13 at at IN 42149 1898 14 once once RB 42149 1898 15 began begin VBD 42149 1898 16 to to TO 42149 1898 17 rise rise VB 42149 1898 18 rapidly rapidly RB 42149 1898 19 , , , 42149 1898 20 notwithstanding notwithstanding IN 42149 1898 21 that that IN 42149 1898 22 the the DT 42149 1898 23 heaviest heavy JJS 42149 1898 24 possible possible JJ 42149 1898 25 downward downward JJ 42149 1898 26 leads lead VBZ 42149 1898 27 that that IN 42149 1898 28 the the DT 42149 1898 29 clearance clearance NN 42149 1898 30 between between IN 42149 1898 31 the the DT 42149 1898 32 iron iron NN 42149 1898 33 and and CC 42149 1898 34 the the DT 42149 1898 35 shield shield NN 42149 1898 36 would would MD 42149 1898 37 allow allow VB 42149 1898 38 were be VBD 42149 1898 39 put put VBN 42149 1898 40 on on RP 42149 1898 41 . . . 42149 1899 1 At at IN 42149 1899 2 the the DT 42149 1899 3 same same JJ 42149 1899 4 time time NN 42149 1899 5 , , , 42149 1899 6 the the DT 42149 1899 7 pressures pressure NNS 42149 1899 8 induced induce VBN 42149 1899 9 in in IN 42149 1899 10 the the DT 42149 1899 11 silt silt NN 42149 1899 12 by by IN 42149 1899 13 the the DT 42149 1899 14 shield shield NN 42149 1899 15 shouldering shoulder VBG 42149 1899 16 the the DT 42149 1899 17 ground ground NN 42149 1899 18 aside aside RB 42149 1899 19 caused cause VBD 42149 1899 20 the the DT 42149 1899 21 iron iron NN 42149 1899 22 lining line VBG 42149 1899 23 to to TO 42149 1899 24 rise rise VB 42149 1899 25 about about RB 42149 1899 26 2 2 CD 42149 1899 27 in in IN 42149 1899 28 . . . 42149 1900 1 as as RB 42149 1900 2 soon soon RB 42149 1900 3 as as IN 42149 1900 4 the the DT 42149 1900 5 shield shield NN 42149 1900 6 left leave VBD 42149 1900 7 it -PRON- PRP 42149 1900 8 , , , 42149 1900 9 and and CC 42149 1900 10 also also RB 42149 1900 11 distorted distort VBD 42149 1900 12 it -PRON- PRP 42149 1900 13 , , , 42149 1900 14 the the DT 42149 1900 15 horizontal horizontal JJ 42149 1900 16 diameter diameter NN 42149 1900 17 decreasing decrease VBG 42149 1900 18 and and CC 42149 1900 19 the the DT 42149 1900 20 vertical vertical JJ 42149 1900 21 diameter diameter NN 42149 1900 22 increasing increase VBG 42149 1900 23 by by IN 42149 1900 24 about about RB 42149 1900 25 as as RB 42149 1900 26 much much JJ 42149 1900 27 as as IN 42149 1900 28 1¼ 1â¼ CD 42149 1900 29 in in IN 42149 1900 30 . . . 42149 1901 1 An an DT 42149 1901 2 anxious anxious JJ 42149 1901 3 discussion discussion NN 42149 1901 4 followed follow VBD 42149 1901 5 these these DT 42149 1901 6 phenomena phenomenon NNS 42149 1901 7 , , , 42149 1901 8 as as IN 42149 1901 9 the the DT 42149 1901 10 effects effect NNS 42149 1901 11 had have VBD 42149 1901 12 been be VBN 42149 1901 13 so so RB 42149 1901 14 utterly utterly RB 42149 1901 15 unexpected unexpected JJ 42149 1901 16 , , , 42149 1901 17 and and CC 42149 1901 18 a a DT 42149 1901 19 good good JJ 42149 1901 20 many many JJ 42149 1901 21 different different JJ 42149 1901 22 theories theory NNS 42149 1901 23 were be VBD 42149 1901 24 advanced advance VBN 42149 1901 25 as as IN 42149 1901 26 to to IN 42149 1901 27 the the DT 42149 1901 28 probable probable JJ 42149 1901 29 cause cause NN 42149 1901 30 . . . 42149 1902 1 It -PRON- PRP 42149 1902 2 was be VBD 42149 1902 3 thought think VBN 42149 1902 4 that that IN 42149 1902 5 the the DT 42149 1902 6 hood hood NN 42149 1902 7 of of IN 42149 1902 8 the the DT 42149 1902 9 shield shield NN 42149 1902 10 might may MD 42149 1902 11 have have VB 42149 1902 12 something something NN 42149 1902 13 to to TO 42149 1902 14 do do VB 42149 1902 15 with with IN 42149 1902 16 the the DT 42149 1902 17 trouble trouble NN 42149 1902 18 . . . 42149 1903 1 The the DT 42149 1903 2 shield shield NN 42149 1903 3 was be VBD 42149 1903 4 stopped stop VBN 42149 1903 5 , , , 42149 1903 6 the the DT 42149 1903 7 hood hood NN 42149 1903 8 removed remove VBD 42149 1903 9 , , , 42149 1903 10 the the DT 42149 1903 11 doors door NNS 42149 1903 12 were be VBD 42149 1903 13 shut shut VBN 42149 1903 14 , , , 42149 1903 15 and and CC 42149 1903 16 the the DT 42149 1903 17 driving driving NN 42149 1903 18 continued continue VBD 42149 1903 19 . . . 42149 1904 1 The the DT 42149 1904 2 same same JJ 42149 1904 3 trouble trouble NN 42149 1904 4 was be VBD 42149 1904 5 found find VBN 42149 1904 6 , , , 42149 1904 7 and and CC 42149 1904 8 it -PRON- PRP 42149 1904 9 was be VBD 42149 1904 10 impossible impossible JJ 42149 1904 11 to to TO 42149 1904 12 keep keep VB 42149 1904 13 to to IN 42149 1904 14 grade grade NN 42149 1904 15 . . . 42149 1905 1 Work work NN 42149 1905 2 was be VBD 42149 1905 3 stopped stop VBN 42149 1905 4 , , , 42149 1905 5 and and CC 42149 1905 6 the the DT 42149 1905 7 question question NN 42149 1905 8 was be VBD 42149 1905 9 thoroughly thoroughly RB 42149 1905 10 debated debate VBN 42149 1905 11 ; ; : 42149 1905 12 finally finally RB 42149 1905 13 , , , 42149 1905 14 on on IN 42149 1905 15 January January NNP 42149 1905 16 31st 31st NN 42149 1905 17 , , , 42149 1905 18 1906 1906 CD 42149 1905 19 , , , 42149 1905 20 the the DT 42149 1905 21 chief chief JJ 42149 1905 22 engineer engineer NN 42149 1905 23 directed direct VBD 42149 1905 24 that that IN 42149 1905 25 one one CD 42149 1905 26 of of IN 42149 1905 27 the the DT 42149 1905 28 shield shield NN 42149 1905 29 doors door NNS 42149 1905 30 be be VB 42149 1905 31 opened open VBN 42149 1905 32 as as IN 42149 1905 33 an an DT 42149 1905 34 experiment experiment NN 42149 1905 35 and and CC 42149 1905 36 50 50 CD 42149 1905 37 % % NN 42149 1905 38 of of IN 42149 1905 39 the the DT 42149 1905 40 excavation excavation NN 42149 1905 41 taken take VBN 42149 1905 42 in in RP 42149 1905 43 . . . 42149 1906 1 The the DT 42149 1906 2 effect effect NN 42149 1906 3 was be VBD 42149 1906 4 instantaneous instantaneous JJ 42149 1906 5 , , , 42149 1906 6 the the DT 42149 1906 7 shield shield NN 42149 1906 8 began begin VBD 42149 1906 9 to to TO 42149 1906 10 come come VB 42149 1906 11 down down RP 42149 1906 12 to to IN 42149 1906 13 grade grade NN 42149 1906 14 at at IN 42149 1906 15 once once RB 42149 1906 16 , , , 42149 1906 17 and and CC 42149 1906 18 it -PRON- PRP 42149 1906 19 soon soon RB 42149 1906 20 became become VBD 42149 1906 21 necessary necessary JJ 42149 1906 22 to to TO 42149 1906 23 close close VB 42149 1906 24 the the DT 42149 1906 25 door door NN 42149 1906 26 partially partially RB 42149 1906 27 and and CC 42149 1906 28 reduce reduce VB 42149 1906 29 the the DT 42149 1906 30 quantity quantity NN 42149 1906 31 of of IN 42149 1906 32 muck muck NN 42149 1906 33 taken take VBN 42149 1906 34 in in RP 42149 1906 35 in in IN 42149 1906 36 order order NN 42149 1906 37 to to TO 42149 1906 38 prevent prevent VB 42149 1906 39 the the DT 42149 1906 40 tunnel tunnel NN 42149 1906 41 from from IN 42149 1906 42 getting get VBG 42149 1906 43 below below IN 42149 1906 44 grade grade NN 42149 1906 45 . . . 42149 1907 1 The the DT 42149 1907 2 other other JJ 42149 1907 3 troubles trouble NNS 42149 1907 4 from from IN 42149 1907 5 distortion distortion NN 42149 1907 6 , , , 42149 1907 7 etc etc FW 42149 1907 8 . . NN 42149 1907 9 , , , 42149 1907 10 ceased cease VBD 42149 1907 11 at at IN 42149 1907 12 the the DT 42149 1907 13 same same JJ 42149 1907 14 time time NN 42149 1907 15 . . . 42149 1908 1 It -PRON- PRP 42149 1908 2 was be VBD 42149 1908 3 soon soon RB 42149 1908 4 found find VBN 42149 1908 5 that that IN 42149 1908 6 a a DT 42149 1908 7 powerful powerful JJ 42149 1908 8 aid aid NN 42149 1908 9 in in IN 42149 1908 10 the the DT 42149 1908 11 guidance guidance NN 42149 1908 12 of of IN 42149 1908 13 the the DT 42149 1908 14 shield shield NN 42149 1908 15 was be VBD 42149 1908 16 thus thus RB 42149 1908 17 brought bring VBN 42149 1908 18 to to IN 42149 1908 19 hand hand NN 42149 1908 20 , , , 42149 1908 21 for for IN 42149 1908 22 , , , 42149 1908 23 if if IN 42149 1908 24 high high JJ 42149 1908 25 , , , 42149 1908 26 the the DT 42149 1908 27 shield shield NN 42149 1908 28 could could MD 42149 1908 29 be be VB 42149 1908 30 brought bring VBN 42149 1908 31 down down RP 42149 1908 32 by by IN 42149 1908 33 increasing increase VBG 42149 1908 34 the the DT 42149 1908 35 quantity quantity NN 42149 1908 36 of of IN 42149 1908 37 muck muck NN 42149 1908 38 taken take VBN 42149 1908 39 in in RP 42149 1908 40 , , , 42149 1908 41 if if IN 42149 1908 42 low low JJ 42149 1908 43 , , , 42149 1908 44 by by IN 42149 1908 45 decreasing decrease VBG 42149 1908 46 it -PRON- PRP 42149 1908 47 . . . 42149 1909 1 From from IN 42149 1909 2 this this DT 42149 1909 3 time time NN 42149 1909 4 forward forward RB 42149 1909 5 , , , 42149 1909 6 the the DT 42149 1909 7 quantity quantity NN 42149 1909 8 of of IN 42149 1909 9 muck muck NNP 42149 1909 10 taken take VBN 42149 1909 11 in in RP 42149 1909 12 at at IN 42149 1909 13 each each DT 42149 1909 14 shove shove NN 42149 1909 15 was be VBD 42149 1909 16 carefully carefully RB 42149 1909 17 regulated regulate VBN 42149 1909 18 according accord VBG 42149 1909 19 to to IN 42149 1909 20 the the DT 42149 1909 21 position position NN 42149 1909 22 of of IN 42149 1909 23 the the DT 42149 1909 24 tunnel tunnel NN 42149 1909 25 with with IN 42149 1909 26 regard regard NN 42149 1909 27 to to IN 42149 1909 28 grade grade NN 42149 1909 29 and and CC 42149 1909 30 the the DT 42149 1909 31 nature nature NN 42149 1909 32 of of IN 42149 1909 33 the the DT 42149 1909 34 ground ground NN 42149 1909 35 . . . 42149 1910 1 The the DT 42149 1910 2 quantity quantity NN 42149 1910 3 varied vary VBD 42149 1910 4 from from IN 42149 1910 5 nothing nothing NN 42149 1910 6 to to IN 42149 1910 7 the the DT 42149 1910 8 full full JJ 42149 1910 9 volume volume NN 42149 1910 10 displaced displace VBN 42149 1910 11 by by IN 42149 1910 12 the the DT 42149 1910 13 tunnel tunnel NN 42149 1910 14 , , , 42149 1910 15 and and CC 42149 1910 16 averaged average VBD 42149 1910 17 33 33 CD 42149 1910 18 % % NN 42149 1910 19 of of IN 42149 1910 20 the the DT 42149 1910 21 latter latter JJ 42149 1910 22 . . . 42149 1911 1 To to TO 42149 1911 2 regulate regulate VB 42149 1911 3 the the DT 42149 1911 4 flow flow NN 42149 1911 5 , , , 42149 1911 6 the the DT 42149 1911 7 bottom bottom JJ 42149 1911 8 middle middle JJ 42149 1911 9 door door NN 42149 1911 10 was be VBD 42149 1911 11 fitted fit VBN 42149 1911 12 with with IN 42149 1911 13 two two CD 42149 1911 14 steel steel NN 42149 1911 15 angles angle NNS 42149 1911 16 behind behind IN 42149 1911 17 which which WDT 42149 1911 18 were be VBD 42149 1911 19 placed place VBN 42149 1911 20 6 6 CD 42149 1911 21 by by IN 42149 1911 22 6-in 6-in CD 42149 1911 23 . . . 42149 1912 1 timbers timber NNS 42149 1912 2 . . . 42149 1913 1 In in IN 42149 1913 2 this this DT 42149 1913 3 way way NN 42149 1913 4 the the DT 42149 1913 5 opening opening NN 42149 1913 6 could could MD 42149 1913 7 be be VB 42149 1913 8 entirely entirely RB 42149 1913 9 closed close VBN 42149 1913 10 or or CC 42149 1913 11 one one CD 42149 1913 12 of of IN 42149 1913 13 any any DT 42149 1913 14 size size NN 42149 1913 15 left leave VBN 42149 1913 16 . . . 42149 1914 1 The the DT 42149 1914 2 muck muck NN 42149 1914 3 flowed flow VBD 42149 1914 4 into into IN 42149 1914 5 the the DT 42149 1914 6 tunnel tunnel NN 42149 1914 7 in in IN 42149 1914 8 a a DT 42149 1914 9 thick thick JJ 42149 1914 10 stream stream NN 42149 1914 11 , , , 42149 1914 12 as as IN 42149 1914 13 shown show VBN 42149 1914 14 in in IN 42149 1914 15 Fig Fig NNP 42149 1914 16 . . . 42149 1915 1 2 2 LS 42149 1915 2 , , , 42149 1915 3 Plate Plate NNP 42149 1915 4 XXXV XXXV NNP 42149 1915 5 , , , 42149 1915 6 and and CC 42149 1915 7 , , , 42149 1915 8 by by IN 42149 1915 9 regulating regulate VBG 42149 1915 10 the the DT 42149 1915 11 rate rate NN 42149 1915 12 of of IN 42149 1915 13 shove shove NN 42149 1915 14 it -PRON- PRP 42149 1915 15 could could MD 42149 1915 16 be be VB 42149 1915 17 made make VBN 42149 1915 18 to to TO 42149 1915 19 flow flow VB 42149 1915 20 just just RB 42149 1915 21 as as RB 42149 1915 22 fast fast RB 42149 1915 23 as as IN 42149 1915 24 it -PRON- PRP 42149 1915 25 could could MD 42149 1915 26 be be VB 42149 1915 27 loaded load VBN 42149 1915 28 into into IN 42149 1915 29 cars car NNS 42149 1915 30 . . . 42149 1916 1 In in IN 42149 1916 2 driving drive VBG 42149 1916 3 through through IN 42149 1916 4 the the DT 42149 1916 5 silt silt NN 42149 1916 6 , , , 42149 1916 7 the the DT 42149 1916 8 typical typical JJ 42149 1916 9 gang gang NN 42149 1916 10 per per IN 42149 1916 11 shift shift NN 42149 1916 12 of of IN 42149 1916 13 8 8 CD 42149 1916 14 hours hour NNS 42149 1916 15 per per IN 42149 1916 16 shield shield NN 42149 1916 17 was be VBD 42149 1916 18 as as IN 42149 1916 19 follows follow VBZ 42149 1916 20 : : : 42149 1916 21 _ _ NNP 42149 1916 22 General General NNP 42149 1916 23 : : : 42149 1916 24 _ _ NNP 42149 1916 25 1/3 1/3 CD 42149 1916 26 Tunnel Tunnel NNP 42149 1916 27 superintendent superintendent NN 42149 1916 28 @ @ IN 42149 1916 29 $ $ $ 42149 1916 30 300 300 CD 42149 1916 31 per per IN 42149 1916 32 month month NN 42149 1916 33 1 1 CD 42149 1916 34 Assistant Assistant NNP 42149 1916 35 tunnel tunnel NN 42149 1916 36 superintendent superintendent NN 42149 1916 37 " " `` 42149 1916 38 6.00 6.00 CD 42149 1916 39 per per IN 42149 1916 40 day day NN 42149 1916 41 1 1 CD 42149 1916 42 General general JJ 42149 1916 43 foreman foreman NN 42149 1916 44 " " `` 42149 1916 45 5.00 5.00 CD 42149 1916 46 " " '' 42149 1916 47 " " '' 42149 1916 48 ½ ½ NNP 42149 1916 49 Electrician Electrician NNP 42149 1916 50 " " `` 42149 1916 51 3.50 3.50 CD 42149 1916 52 " " '' 42149 1916 53 " " '' 42149 1916 54 ½ ½ NNP 42149 1916 55 Electrician Electrician NNP 42149 1916 56 's 's POS 42149 1916 57 helper helper NN 42149 1916 58 " " `` 42149 1916 59 3.00 3.00 CD 42149 1916 60 " " '' 42149 1916 61 " " `` 42149 1916 62 1 1 CD 42149 1916 63 Foreman Foreman NNP 42149 1916 64 " " '' 42149 1916 65 4.00 4.00 CD 42149 1916 66 " " '' 42149 1916 67 " " `` 42149 1916 68 2 2 CD 42149 1916 69 Pipefitters Pipefitters NNPS 42149 1916 70 " " `` 42149 1916 71 3.50 3.50 CD 42149 1916 72 " " '' 42149 1916 73 " " '' 42149 1916 74 2 2 CD 42149 1916 75 Pipefitters Pipefitters NNPS 42149 1916 76 ' ' POS 42149 1916 77 helpers helper NNS 42149 1916 78 " " `` 42149 1916 79 3.25 3.25 CD 42149 1916 80 " " '' 42149 1916 81 " " `` 42149 1916 82 _ _ NNP 42149 1916 83 Mucking Mucking NNP 42149 1916 84 : : : 42149 1916 85 _ _ NNP 42149 1916 86 1 1 CD 42149 1916 87 Foreman Foreman NNP 42149 1916 88 " " `` 42149 1916 89 4.00 4.00 CD 42149 1916 90 " " '' 42149 1916 91 " " `` 42149 1916 92 6 6 CD 42149 1916 93 Muckers Muckers NNPS 42149 1916 94 " " `` 42149 1916 95 3.00 3.00 CD 42149 1916 96 " " '' 42149 1916 97 " " `` 42149 1916 98 _ _ NNP 42149 1916 99 Erecting Erecting NNP 42149 1916 100 Iron Iron NNP 42149 1916 101 and and CC 42149 1916 102 Driving Driving NNP 42149 1916 103 Shield Shield NNP 42149 1916 104 : : : 42149 1916 105 _ _ NNP 42149 1916 106 1 1 CD 42149 1916 107 Foreman Foreman NNP 42149 1916 108 @ @ CC 42149 1916 109 $ $ $ 42149 1916 110 4.00 4.00 CD 42149 1916 111 per per IN 42149 1916 112 day day NN 42149 1916 113 1 1 CD 42149 1916 114 Erector Erector NNP 42149 1916 115 runner runner NN 42149 1916 116 " " `` 42149 1916 117 3.50 3.50 CD 42149 1916 118 " " '' 42149 1916 119 " " `` 42149 1916 120 4 4 CD 42149 1916 121 Iron Iron NNP 42149 1916 122 workers worker NNS 42149 1916 123 " " `` 42149 1916 124 3.00 3.00 CD 42149 1916 125 " " '' 42149 1916 126 " " `` 42149 1916 127 3 3 CD 42149 1916 128 Laborers Laborers NNPS 42149 1916 129 " " `` 42149 1916 130 3.00 3.00 CD 42149 1916 131 " " '' 42149 1916 132 " " `` 42149 1916 133 Three three CD 42149 1916 134 such such JJ 42149 1916 135 shifts shift NNS 42149 1916 136 were be VBD 42149 1916 137 worked work VBN 42149 1916 138 per per IN 42149 1916 139 day day NN 42149 1916 140 , , , 42149 1916 141 and and CC 42149 1916 142 the the DT 42149 1916 143 air air NN 42149 1916 144 pressure pressure NN 42149 1916 145 averaged average VBD 42149 1916 146 25 25 CD 42149 1916 147 lb lb RB 42149 1916 148 . . . 42149 1917 1 per per IN 42149 1917 2 sq sq NNP 42149 1917 3 . . . 42149 1918 1 in in IN 42149 1918 2 . . . 42149 1919 1 The the DT 42149 1919 2 increase increase NN 42149 1919 3 in in IN 42149 1919 4 the the DT 42149 1919 5 number number NN 42149 1919 6 of of IN 42149 1919 7 pipefitters pipefitter NNS 42149 1919 8 was be VBD 42149 1919 9 due due JJ 42149 1919 10 to to IN 42149 1919 11 the the DT 42149 1919 12 greatly greatly RB 42149 1919 13 increased increase VBN 42149 1919 14 speed speed NN 42149 1919 15 , , , 42149 1919 16 and and CC 42149 1919 17 also also RB 42149 1919 18 the the DT 42149 1919 19 steadily steadily RB 42149 1919 20 increasing increase VBG 42149 1919 21 length length NN 42149 1919 22 of of IN 42149 1919 23 completed complete VBN 42149 1919 24 tunnel tunnel NN 42149 1919 25 . . . 42149 1920 1 The the DT 42149 1920 2 three three CD 42149 1920 3 laborers laborer NNS 42149 1920 4 in in IN 42149 1920 5 the the DT 42149 1920 6 erection erection NN 42149 1920 7 gang gang NN 42149 1920 8 spent spend VBD 42149 1920 9 their -PRON- PRP$ 42149 1920 10 whole whole JJ 42149 1920 11 time time NN 42149 1920 12 tightening tighten VBG 42149 1920 13 bolts bolt NNS 42149 1920 14 . . . 42149 1921 1 The the DT 42149 1921 2 rate rate NN 42149 1921 3 of of IN 42149 1921 4 progress progress NN 42149 1921 5 in in IN 42149 1921 6 the the DT 42149 1921 7 silt silt NN 42149 1921 8 under under IN 42149 1921 9 the the DT 42149 1921 10 river river NN 42149 1921 11 per per IN 42149 1921 12 ring ring NN 42149 1921 13 of of IN 42149 1921 14 2½ 2½ NNP 42149 1921 15 ft ft NNP 42149 1921 16 . . NNP 42149 1921 17 was be VBD 42149 1921 18 3 3 CD 42149 1921 19 hours hour NNS 42149 1921 20 21 21 CD 42149 1921 21 min min NN 42149 1921 22 . . NNP 42149 1921 23 , , , 42149 1921 24 exclusive exclusive JJ 42149 1921 25 of of IN 42149 1921 26 all all DT 42149 1921 27 time time NN 42149 1921 28 when when WRB 42149 1921 29 work work NN 42149 1921 30 was be VBD 42149 1921 31 actually actually RB 42149 1921 32 suspended suspend VBN 42149 1921 33 . . . 42149 1922 1 For for IN 42149 1922 2 a a DT 42149 1922 3 considerable considerable JJ 42149 1922 4 part part NN 42149 1922 5 of of IN 42149 1922 6 the the DT 42149 1922 7 time time NN 42149 1922 8 only only RB 42149 1922 9 two two CD 42149 1922 10 8-hour 8-hour CD 42149 1922 11 shifts shift NNS 42149 1922 12 were be VBD 42149 1922 13 worked work VBN 42149 1922 14 , , , 42149 1922 15 owing owe VBG 42149 1922 16 to to IN 42149 1922 17 a a DT 42149 1922 18 shortage shortage NN 42149 1922 19 of of IN 42149 1922 20 iron iron NN 42149 1922 21 caused cause VBN 42149 1922 22 by by IN 42149 1922 23 the the DT 42149 1922 24 change change NN 42149 1922 25 in in IN 42149 1922 26 the the DT 42149 1922 27 design design NN 42149 1922 28 of of IN 42149 1922 29 the the DT 42149 1922 30 lining lining NN 42149 1922 31 , , , 42149 1922 32 whereby whereby WRB 42149 1922 33 the the DT 42149 1922 34 original original JJ 42149 1922 35 lining lining NN 42149 1922 36 was be VBD 42149 1922 37 changed change VBN 42149 1922 38 to to IN 42149 1922 39 a a DT 42149 1922 40 heavier heavy JJR 42149 1922 41 one one NN 42149 1922 42 , , , 42149 1922 43 and and CC 42149 1922 44 , , , 42149 1922 45 as as IN 42149 1922 46 the the DT 42149 1922 47 work work NN 42149 1922 48 was be VBD 42149 1922 49 also also RB 42149 1922 50 stopped stop VBN 42149 1922 51 for for IN 42149 1922 52 experiments experiment NNS 42149 1922 53 and and CC 42149 1922 54 observations observation NNS 42149 1922 55 , , , 42149 1922 56 the the DT 42149 1922 57 average average NN 42149 1922 58 of of IN 42149 1922 59 the the DT 42149 1922 60 actual actual JJ 42149 1922 61 total total JJ 42149 1922 62 time time NN 42149 1922 63 , , , 42149 1922 64 including include VBG 42149 1922 65 all all PDT 42149 1922 66 the the DT 42149 1922 67 time time NN 42149 1922 68 during during IN 42149 1922 69 which which WDT 42149 1922 70 work work NN 42149 1922 71 was be VBD 42149 1922 72 suspended suspend VBN 42149 1922 73 , , , 42149 1922 74 was be VBD 42149 1922 75 5 5 CD 42149 1922 76 hours hour NNS 42149 1922 77 32 32 CD 42149 1922 78 min min NN 42149 1922 79 . . . 42149 1923 1 per per IN 42149 1923 2 ring ring NN 42149 1923 3 , , , 42149 1923 4 or or CC 42149 1923 5 10.8 10.8 CD 42149 1923 6 ft ft NN 42149 1923 7 . . NN 42149 1923 8 per per IN 42149 1923 9 day day NN 42149 1923 10 . . . 42149 1924 1 The the DT 42149 1924 2 junction junction NN 42149 1924 3 of of IN 42149 1924 4 the the DT 42149 1924 5 shields shield NNS 42149 1924 6 under under IN 42149 1924 7 the the DT 42149 1924 8 river river NN 42149 1924 9 was be VBD 42149 1924 10 made make VBN 42149 1924 11 as as IN 42149 1924 12 follows follow VBZ 42149 1924 13 : : : 42149 1924 14 When when WRB 42149 1924 15 the the DT 42149 1924 16 two two CD 42149 1924 17 shields shield NNS 42149 1924 18 of of IN 42149 1924 19 one one CD 42149 1924 20 tunnel tunnel NN 42149 1924 21 , , , 42149 1924 22 which which WDT 42149 1924 23 had have VBD 42149 1924 24 been be VBN 42149 1924 25 driven drive VBN 42149 1924 26 from from IN 42149 1924 27 opposite opposite JJ 42149 1924 28 sides side NNS 42149 1924 29 of of IN 42149 1924 30 the the DT 42149 1924 31 river river NN 42149 1924 32 approached approach VBN 42149 1924 33 within within IN 42149 1924 34 10 10 CD 42149 1924 35 ft ft NN 42149 1924 36 . . NN 42149 1924 37 of of IN 42149 1924 38 each each DT 42149 1924 39 other other JJ 42149 1924 40 , , , 42149 1924 41 the the DT 42149 1924 42 shields shield NNS 42149 1924 43 were be VBD 42149 1924 44 stopped stop VBN 42149 1924 45 , , , 42149 1924 46 a a DT 42149 1924 47 10-in 10-in NNP 42149 1924 48 . . . 42149 1925 1 pipe pipe NN 42149 1925 2 was be VBD 42149 1925 3 driven drive VBN 42149 1925 4 between between IN 42149 1925 5 them -PRON- PRP 42149 1925 6 , , , 42149 1925 7 and and CC 42149 1925 8 a a DT 42149 1925 9 final final JJ 42149 1925 10 check check NN 42149 1925 11 of of IN 42149 1925 12 lines line NNS 42149 1925 13 and and CC 42149 1925 14 levels level NNS 42149 1925 15 was be VBD 42149 1925 16 made make VBN 42149 1925 17 through through IN 42149 1925 18 the the DT 42149 1925 19 pipe pipe NN 42149 1925 20 . . . 42149 1926 1 Incidentally incidentally RB 42149 1926 2 , , , 42149 1926 3 also also RB 42149 1926 4 , , , 42149 1926 5 the the DT 42149 1926 6 first first JJ 42149 1926 7 through through IN 42149 1926 8 traffic traffic NN 42149 1926 9 was be VBD 42149 1926 10 established establish VBN 42149 1926 11 by by IN 42149 1926 12 passing pass VBG 42149 1926 13 a a DT 42149 1926 14 box box NN 42149 1926 15 of of IN 42149 1926 16 cigars cigar NNS 42149 1926 17 through through IN 42149 1926 18 the the DT 42149 1926 19 pipe pipe NN 42149 1926 20 from from IN 42149 1926 21 the the DT 42149 1926 22 Manhattan Manhattan NNP 42149 1926 23 shield shield NN 42149 1926 24 to to IN 42149 1926 25 that that DT 42149 1926 26 from from IN 42149 1926 27 Weehawken Weehawken NNP 42149 1926 28 . . . 42149 1927 1 One one CD 42149 1927 2 shield shield NN 42149 1927 3 was be VBD 42149 1927 4 then then RB 42149 1927 5 started start VBN 42149 1927 6 up up RP 42149 1927 7 with with IN 42149 1927 8 all all DT 42149 1927 9 doors door NNS 42149 1927 10 closed close VBN 42149 1927 11 while while IN 42149 1927 12 the the DT 42149 1927 13 doors door NNS 42149 1927 14 on on IN 42149 1927 15 the the DT 42149 1927 16 stationary stationary JJ 42149 1927 17 shield shield NN 42149 1927 18 were be VBD 42149 1927 19 opened open VBN 42149 1927 20 so so IN 42149 1927 21 that that IN 42149 1927 22 the the DT 42149 1927 23 muck muck NN 42149 1927 24 driven drive VBN 42149 1927 25 ahead ahead RB 42149 1927 26 by by IN 42149 1927 27 the the DT 42149 1927 28 moving move VBG 42149 1927 29 shield shield NN 42149 1927 30 was be VBD 42149 1927 31 taken take VBN 42149 1927 32 in in RP 42149 1927 33 through through IN 42149 1927 34 the the DT 42149 1927 35 other other JJ 42149 1927 36 one one NN 42149 1927 37 's 's POS 42149 1927 38 doors door NNS 42149 1927 39 . . . 42149 1928 1 This this DT 42149 1928 2 was be VBD 42149 1928 3 continued continue VBN 42149 1928 4 until until IN 42149 1928 5 the the DT 42149 1928 6 cutting cut VBG 42149 1928 7 edges edge NNS 42149 1928 8 came come VBD 42149 1928 9 together together RB 42149 1928 10 . . . 42149 1929 1 All all DT 42149 1929 2 doors door NNS 42149 1929 3 in in IN 42149 1929 4 both both DT 42149 1929 5 shields shield NNS 42149 1929 6 were be VBD 42149 1929 7 then then RB 42149 1929 8 opened open VBN 42149 1929 9 and and CC 42149 1929 10 the the DT 42149 1929 11 shield shield NN 42149 1929 12 mucked muck VBD 42149 1929 13 out out RP 42149 1929 14 . . . 42149 1930 1 The the DT 42149 1930 2 cutting cut VBG 42149 1930 3 edges edge NNS 42149 1930 4 were be VBD 42149 1930 5 taken take VBN 42149 1930 6 off off RP 42149 1930 7 , , , 42149 1930 8 and and CC 42149 1930 9 the the DT 42149 1930 10 shields shield NNS 42149 1930 11 moved move VBD 42149 1930 12 together together RB 42149 1930 13 again again RB 42149 1930 14 , , , 42149 1930 15 edge edge NN 42149 1930 16 of of IN 42149 1930 17 skin skin NN 42149 1930 18 to to TO 42149 1930 19 edge edge NN 42149 1930 20 of of IN 42149 1930 21 skin skin NN 42149 1930 22 . . . 42149 1931 1 The the DT 42149 1931 2 removal removal NN 42149 1931 3 of of IN 42149 1931 4 the the DT 42149 1931 5 cutting cutting JJ 42149 1931 6 edge edge NN 42149 1931 7 necessitated necessitate VBD 42149 1931 8 the the DT 42149 1931 9 raising raising NN 42149 1931 10 of of IN 42149 1931 11 the the DT 42149 1931 12 pressure pressure NN 42149 1931 13 to to IN 42149 1931 14 37 37 CD 42149 1931 15 lb lb RB 42149 1931 16 . . . 42149 1932 1 As as IN 42149 1932 2 the the DT 42149 1932 3 sections section NNS 42149 1932 4 of of IN 42149 1932 5 the the DT 42149 1932 6 cutting cut VBG 42149 1932 7 edges edge NNS 42149 1932 8 were be VBD 42149 1932 9 taken take VBN 42149 1932 10 off off RP 42149 1932 11 , , , 42149 1932 12 the the DT 42149 1932 13 space space NN 42149 1932 14 between between IN 42149 1932 15 the the DT 42149 1932 16 skin skin NN 42149 1932 17 edges edge NNS 42149 1932 18 was be VBD 42149 1932 19 poled pole VBN 42149 1932 20 with with IN 42149 1932 21 3-in 3-in CD 42149 1932 22 . . . 42149 1933 1 stuff stuff NN 42149 1933 2 . . . 42149 1934 1 Fig fig NN 42149 1934 2 . . . 42149 1935 1 1 1 LS 42149 1935 2 , , , 42149 1935 3 Plate Plate NNP 42149 1935 4 XXXIX XXXIX NNP 42149 1935 5 , , , 42149 1935 6 is be VBZ 42149 1935 7 a a DT 42149 1935 8 view view NN 42149 1935 9 of of IN 42149 1935 10 the the DT 42149 1935 11 shields shield NNS 42149 1935 12 of of IN 42149 1935 13 the the DT 42149 1935 14 North North NNP 42149 1935 15 Tunnel Tunnel NNP 42149 1935 16 after after IN 42149 1935 17 being be VBG 42149 1935 18 brought bring VBN 42149 1935 19 together together RB 42149 1935 20 and and CC 42149 1935 21 after after IN 42149 1935 22 parts part NNS 42149 1935 23 of of IN 42149 1935 24 the the DT 42149 1935 25 interior interior JJ 42149 1935 26 frames frame NNS 42149 1935 27 had have VBD 42149 1935 28 been be VBN 42149 1935 29 removed remove VBN 42149 1935 30 . . . 42149 1936 1 When when WRB 42149 1936 2 everything everything NN 42149 1936 3 except except IN 42149 1936 4 the the DT 42149 1936 5 skins skin NNS 42149 1936 6 had have VBD 42149 1936 7 been be VBN 42149 1936 8 removed remove VBN 42149 1936 9 , , , 42149 1936 10 iron iron NN 42149 1936 11 lining lining NN 42149 1936 12 was be VBD 42149 1936 13 built build VBN 42149 1936 14 up up RP 42149 1936 15 inside inside IN 42149 1936 16 the the DT 42149 1936 17 skins skin NNS 42149 1936 18 , , , 42149 1936 19 the the DT 42149 1936 20 gap gap NN 42149 1936 21 at at IN 42149 1936 22 the the DT 42149 1936 23 junction junction NN 42149 1936 24 was be VBD 42149 1936 25 filled fill VBN 42149 1936 26 with with IN 42149 1936 27 concrete concrete NN 42149 1936 28 , , , 42149 1936 29 and and CC 42149 1936 30 long long JJ 42149 1936 31 bolts bolt NNS 42149 1936 32 were be VBD 42149 1936 33 used use VBN 42149 1936 34 from from IN 42149 1936 35 ring ring NN 42149 1936 36 to to IN 42149 1936 37 ring ring NN 42149 1936 38 on on IN 42149 1936 39 the the DT 42149 1936 40 circumferential circumferential JJ 42149 1936 41 joint joint NN 42149 1936 42 . . . 42149 1937 1 Finally finally RB 42149 1937 2 , , , 42149 1937 3 the the DT 42149 1937 4 rings ring NNS 42149 1937 5 inside inside IN 42149 1937 6 the the DT 42149 1937 7 shield shield NN 42149 1937 8 skins skin NNS 42149 1937 9 were be VBD 42149 1937 10 grouted grout VBN 42149 1937 11 . . . 42149 1938 1 [ [ -LRB- 42149 1938 2 Illustration illustration NN 42149 1938 3 : : : 42149 1938 4 Plate plate NN 42149 1938 5 XXXIX xxxix NN 42149 1938 6 . . . 42149 1939 1 TRANS trans UH 42149 1939 2 . . . 42149 1940 1 AM AM NNP 42149 1940 2 . . . 42149 1941 1 SOC SOC NNP 42149 1941 2 . . . 42149 1942 1 CIV CIV NNP 42149 1942 2 . . . 42149 1943 1 ENGRS ENGRS NNP 42149 1943 2 . . . 42149 1944 1 VOL VOL NNP 42149 1944 2 . . . 42149 1945 1 LXVIII LXVIII NNP 42149 1945 2 , , , 42149 1945 3 No no UH 42149 1945 4 . . . 42149 1946 1 1155 1155 CD 42149 1946 2 . . . 42149 1947 1 HEWETT HEWETT NNP 42149 1947 2 AND and CC 42149 1947 3 BROWN BROWN NNP 42149 1947 4 ON ON NNP 42149 1947 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 1947 6 R. R. NNP 42149 1947 7 R. R. NNP 42149 1947 8 TUNNELS TUNNELS NNP 42149 1947 9 : : : 42149 1947 10 NORTH NORTH NNP 42149 1947 11 RIVER river NN 42149 1947 12 TUNNELS tunnel NNS 42149 1947 13 . . . 42149 1948 1 FIG FIG NNP 42149 1948 2 . . . 42149 1949 1 1 1 LS 42149 1949 2 . . . 42149 1950 1 FIG FIG NNP 42149 1950 2 . . . 42149 1951 1 2 2 LS 42149 1951 2 . . . 42149 1951 3 ] ] -RRB- 42149 1952 1 In in IN 42149 1952 2 order order NN 42149 1952 3 to to TO 42149 1952 4 make make VB 42149 1952 5 clear clear JJ 42149 1952 6 the the DT 42149 1952 7 nature nature NN 42149 1952 8 of of IN 42149 1952 9 the the DT 42149 1952 10 work work NN 42149 1952 11 done do VBN 42149 1952 12 in in IN 42149 1952 13 building build VBG 42149 1952 14 these these DT 42149 1952 15 shield shield NN 42149 1952 16 - - HYPH 42149 1952 17 driven drive VBN 42149 1952 18 tunnels tunnel NNS 42149 1952 19 in in IN 42149 1952 20 silt silt NN 42149 1952 21 , , , 42149 1952 22 a a DT 42149 1952 23 short short JJ 42149 1952 24 description description NN 42149 1952 25 will will MD 42149 1952 26 be be VB 42149 1952 27 attempted attempt VBN 42149 1952 28 , , , 42149 1952 29 this this DT 42149 1952 30 description description NN 42149 1952 31 falling fall VBG 42149 1952 32 into into IN 42149 1952 33 three three CD 42149 1952 34 main main JJ 42149 1952 35 divisions division NNS 42149 1952 36 , , , 42149 1952 37 namely namely RB 42149 1952 38 , , , 42149 1952 39 Shoving shove VBG 42149 1952 40 the the DT 42149 1952 41 Shield Shield NNP 42149 1952 42 , , , 42149 1952 43 Pushing push VBG 42149 1952 44 Back back RP 42149 1952 45 the the DT 42149 1952 46 Jacks Jacks NNPS 42149 1952 47 , , , 42149 1952 48 and and CC 42149 1952 49 Erecting erect VBG 42149 1952 50 the the DT 42149 1952 51 Iron Iron NNP 42149 1952 52 Lining Lining NNP 42149 1952 53 . . . 42149 1953 1 _ _ NNP 42149 1953 2 Shoving shove VBG 42149 1953 3 the the DT 42149 1953 4 Shield._--This shield._--this CD 42149 1953 5 part part NN 42149 1953 6 of of IN 42149 1953 7 the the DT 42149 1953 8 work work NN 42149 1953 9 is be VBZ 42149 1953 10 naturally naturally RB 42149 1953 11 very very RB 42149 1953 12 important important JJ 42149 1953 13 , , , 42149 1953 14 as as IN 42149 1953 15 the the DT 42149 1953 16 position position NN 42149 1953 17 of of IN 42149 1953 18 the the DT 42149 1953 19 shield shield NN 42149 1953 20 determines determine VBZ 42149 1953 21 within within IN 42149 1953 22 pretty pretty RB 42149 1953 23 narrow narrow JJ 42149 1953 24 limits limit NNS 42149 1953 25 the the DT 42149 1953 26 position position NN 42149 1953 27 of of IN 42149 1953 28 the the DT 42149 1953 29 iron iron NN 42149 1953 30 built build VBN 42149 1953 31 within within IN 42149 1953 32 it -PRON- PRP 42149 1953 33 , , , 42149 1953 34 hence hence RB 42149 1953 35 the the DT 42149 1953 36 shield shield NN 42149 1953 37 during during IN 42149 1953 38 its -PRON- PRP$ 42149 1953 39 forward forward JJ 42149 1953 40 movement movement NN 42149 1953 41 has have VBZ 42149 1953 42 to to TO 42149 1953 43 be be VB 42149 1953 44 guided guide VBN 42149 1953 45 very very RB 42149 1953 46 carefully carefully RB 42149 1953 47 . . . 42149 1954 1 On on IN 42149 1954 2 this this DT 42149 1954 3 work work NN 42149 1954 4 certain certain JJ 42149 1954 5 instructions instruction NNS 42149 1954 6 were be VBD 42149 1954 7 issued issue VBN 42149 1954 8 for for IN 42149 1954 9 the the DT 42149 1954 10 guidance guidance NN 42149 1954 11 of of IN 42149 1954 12 the the DT 42149 1954 13 foreman foreman NN 42149 1954 14 in in IN 42149 1954 15 charge charge NN 42149 1954 16 of of IN 42149 1954 17 the the DT 42149 1954 18 shield shield NN 42149 1954 19 . . . 42149 1955 1 These these DT 42149 1955 2 instructions instruction NNS 42149 1955 3 were be VBD 42149 1955 4 based base VBN 42149 1955 5 on on IN 42149 1955 6 results result NNS 42149 1955 7 of of IN 42149 1955 8 " " `` 42149 1955 9 checks check NNS 42149 1955 10 " " '' 42149 1955 11 of of IN 42149 1955 12 the the DT 42149 1955 13 shield shield NN 42149 1955 14 and and CC 42149 1955 15 iron iron NN 42149 1955 16 's 's POS 42149 1955 17 position position NN 42149 1955 18 by by IN 42149 1955 19 the the DT 42149 1955 20 engineering engineering NN 42149 1955 21 corps corps NN 42149 1955 22 of of IN 42149 1955 23 the the DT 42149 1955 24 Company Company NNP 42149 1955 25 , , , 42149 1955 26 and and CC 42149 1955 27 comprised comprise VBD 42149 1955 28 , , , 42149 1955 29 in in IN 42149 1955 30 the the DT 42149 1955 31 main main JJ 42149 1955 32 , , , 42149 1955 33 two two CD 42149 1955 34 requirements requirement NNS 42149 1955 35 , , , 42149 1955 36 namely namely RB 42149 1955 37 , , , 42149 1955 38 the the DT 42149 1955 39 leads lead NNS 42149 1955 40 that that WDT 42149 1955 41 were be VBD 42149 1955 42 to to TO 42149 1955 43 be be VB 42149 1955 44 got get VBN 42149 1955 45 , , , 42149 1955 46 and and CC 42149 1955 47 the the DT 42149 1955 48 quantity quantity NN 42149 1955 49 of of IN 42149 1955 50 muck muck NN 42149 1955 51 to to TO 42149 1955 52 be be VB 42149 1955 53 taken take VBN 42149 1955 54 in in RP 42149 1955 55 . . . 42149 1956 1 The the DT 42149 1956 2 " " `` 42149 1956 3 lead lead NN 42149 1956 4 " " '' 42149 1956 5 is be VBZ 42149 1956 6 the the DT 42149 1956 7 amount amount NN 42149 1956 8 that that WDT 42149 1956 9 the the DT 42149 1956 10 shield shield NN 42149 1956 11 must must MD 42149 1956 12 be be VB 42149 1956 13 advanced advance VBN 42149 1956 14 further further RB 42149 1956 15 from from IN 42149 1956 16 the the DT 42149 1956 17 iron iron NN 42149 1956 18 , , , 42149 1956 19 on on IN 42149 1956 20 one one CD 42149 1956 21 side side NN 42149 1956 22 or or CC 42149 1956 23 the the DT 42149 1956 24 other other JJ 42149 1956 25 , , , 42149 1956 26 or or CC 42149 1956 27 on on IN 42149 1956 28 the the DT 42149 1956 29 top top JJ 42149 1956 30 or or CC 42149 1956 31 bottom bottom NN 42149 1956 32 , , , 42149 1956 33 as as IN 42149 1956 34 measured measure VBN 42149 1956 35 from from IN 42149 1956 36 the the DT 42149 1956 37 front front JJ 42149 1956 38 face face NN 42149 1956 39 of of IN 42149 1956 40 the the DT 42149 1956 41 last last JJ 42149 1956 42 ring ring NN 42149 1956 43 of of IN 42149 1956 44 iron iron NN 42149 1956 45 lining lining NN 42149 1956 46 to to IN 42149 1956 47 the the DT 42149 1956 48 diaphragm diaphragm NN 42149 1956 49 of of IN 42149 1956 50 the the DT 42149 1956 51 shield shield NN 42149 1956 52 . . . 42149 1957 1 These these DT 42149 1957 2 leads lead NNS 42149 1957 3 are be VBP 42149 1957 4 not not RB 42149 1957 5 necessarily necessarily RB 42149 1957 6 true true JJ 42149 1957 7 leads lead NNS 42149 1957 8 from from IN 42149 1957 9 a a DT 42149 1957 10 line line NN 42149 1957 11 at at IN 42149 1957 12 right right JJ 42149 1957 13 angles angle NNS 42149 1957 14 to to IN 42149 1957 15 the the DT 42149 1957 16 center center NN 42149 1957 17 line line NN 42149 1957 18 , , , 42149 1957 19 as as IN 42149 1957 20 the the DT 42149 1957 21 iron iron NN 42149 1957 22 may may MD 42149 1957 23 have have VB 42149 1957 24 , , , 42149 1957 25 and and CC 42149 1957 26 in in IN 42149 1957 27 fact fact NN 42149 1957 28 usually usually RB 42149 1957 29 does do VBZ 42149 1957 30 have have VB 42149 1957 31 , , , 42149 1957 32 a a DT 42149 1957 33 lead lead NN 42149 1957 34 of of IN 42149 1957 35 its -PRON- PRP$ 42149 1957 36 own own JJ 42149 1957 37 which which WDT 42149 1957 38 is be VBZ 42149 1957 39 known know VBN 42149 1957 40 and and CC 42149 1957 41 allowed allow VBN 42149 1957 42 for for IN 42149 1957 43 when when WRB 42149 1957 44 issuing issue VBG 42149 1957 45 the the DT 42149 1957 46 requirements requirement NNS 42149 1957 47 for for IN 42149 1957 48 the the DT 42149 1957 49 shove shove NN 42149 1957 50 . . . 42149 1958 1 The the DT 42149 1958 2 foreman foreman NN 42149 1958 3 , , , 42149 1958 4 knowing know VBG 42149 1958 5 what what WP 42149 1958 6 was be VBD 42149 1958 7 wanted want VBN 42149 1958 8 , , , 42149 1958 9 arranged arrange VBD 42149 1958 10 the the DT 42149 1958 11 combination combination NN 42149 1958 12 of of IN 42149 1958 13 shield shield NN 42149 1958 14 jacks jack NNS 42149 1958 15 which which WDT 42149 1958 16 would would MD 42149 1958 17 give give VB 42149 1958 18 the the DT 42149 1958 19 required require VBN 42149 1958 20 leads lead NNS 42149 1958 21 and and CC 42149 1958 22 the the DT 42149 1958 23 amount amount NN 42149 1958 24 of of IN 42149 1958 25 opening opening NN 42149 1958 26 on on IN 42149 1958 27 the the DT 42149 1958 28 shield shield NN 42149 1958 29 door door NN 42149 1958 30 which which WDT 42149 1958 31 would would MD 42149 1958 32 give give VB 42149 1958 33 the the DT 42149 1958 34 required require VBN 42149 1958 35 amount amount NN 42149 1958 36 of of IN 42149 1958 37 muck muck NN 42149 1958 38 . . . 42149 1959 1 To to TO 42149 1959 2 see see VB 42149 1959 3 how how WRB 42149 1959 4 the the DT 42149 1959 5 shield shield NN 42149 1959 6 was be VBD 42149 1959 7 going go VBG 42149 1959 8 ahead ahead RB 42149 1959 9 , , , 42149 1959 10 a a DT 42149 1959 11 man man NN 42149 1959 12 was be VBD 42149 1959 13 stationed station VBN 42149 1959 14 at at IN 42149 1959 15 each each DT 42149 1959 16 side side NN 42149 1959 17 at at IN 42149 1959 18 axis axis JJ 42149 1959 19 level level NN 42149 1959 20 and and CC 42149 1959 21 another another DT 42149 1959 22 in in IN 42149 1959 23 the the DT 42149 1959 24 crown crown NN 42149 1959 25 . . . 42149 1960 1 Each each DT 42149 1960 2 man man NN 42149 1960 3 had have VBD 42149 1960 4 a a DT 42149 1960 5 graduated graduated JJ 42149 1960 6 rod rod NN 42149 1960 7 on on IN 42149 1960 8 which which WDT 42149 1960 9 the the DT 42149 1960 10 marks mark NNS 42149 1960 11 were be VBD 42149 1960 12 so so RB 42149 1960 13 distinct distinct JJ 42149 1960 14 that that IN 42149 1960 15 they -PRON- PRP 42149 1960 16 could could MD 42149 1960 17 be be VB 42149 1960 18 read read VBN 42149 1960 19 by by IN 42149 1960 20 anyone anyone NN 42149 1960 21 standing stand VBG 42149 1960 22 on on IN 42149 1960 23 the the DT 42149 1960 24 lower low JJR 42149 1960 25 platform platform NN 42149 1960 26 . . . 42149 1961 1 These these DT 42149 1961 2 rods rod NNS 42149 1961 3 were be VBD 42149 1961 4 held hold VBN 42149 1961 5 against against IN 42149 1961 6 the the DT 42149 1961 7 shield shield NN 42149 1961 8 diaphragm diaphragm NN 42149 1961 9 , , , 42149 1961 10 and and CC 42149 1961 11 , , , 42149 1961 12 as as IN 42149 1961 13 it -PRON- PRP 42149 1961 14 advanced advance VBD 42149 1961 15 , , , 42149 1961 16 its -PRON- PRP$ 42149 1961 17 distance distance NN 42149 1961 18 from from IN 42149 1961 19 the the DT 42149 1961 20 leading lead VBG 42149 1961 21 end end NN 42149 1961 22 of of IN 42149 1961 23 the the DT 42149 1961 24 last last JJ 42149 1961 25 ring ring NN 42149 1961 26 could could MD 42149 1961 27 be be VB 42149 1961 28 seen see VBN 42149 1961 29 by by IN 42149 1961 30 the the DT 42149 1961 31 man man NN 42149 1961 32 in in IN 42149 1961 33 control control NN 42149 1961 34 of of IN 42149 1961 35 the the DT 42149 1961 36 jack jack NNP 42149 1961 37 valves valve NNS 42149 1961 38 . . . 42149 1962 1 If if IN 42149 1962 2 he -PRON- PRP 42149 1962 3 found find VBD 42149 1962 4 that that IN 42149 1962 5 he -PRON- PRP 42149 1962 6 was be VBD 42149 1962 7 not not RB 42149 1962 8 getting get VBG 42149 1962 9 the the DT 42149 1962 10 required require VBN 42149 1962 11 leads lead NNS 42149 1962 12 , , , 42149 1962 13 he -PRON- PRP 42149 1962 14 could could MD 42149 1962 15 change change VB 42149 1962 16 the the DT 42149 1962 17 combination combination NN 42149 1962 18 of of IN 42149 1962 19 jacks jack NNS 42149 1962 20 in in IN 42149 1962 21 action action NN 42149 1962 22 . . . 42149 1963 1 As as IN 42149 1963 2 the the DT 42149 1963 3 time time NN 42149 1963 4 of of IN 42149 1963 5 a a DT 42149 1963 6 shove shove NN 42149 1963 7 was be VBD 42149 1963 8 often often RB 42149 1963 9 less less JJR 42149 1963 10 than than IN 42149 1963 11 10 10 CD 42149 1963 12 min min NNP 42149 1963 13 . . NNP 42149 1963 14 , , , 42149 1963 15 the the DT 42149 1963 16 man man NN 42149 1963 17 had have VBD 42149 1963 18 to to TO 42149 1963 19 be be VB 42149 1963 20 very very RB 42149 1963 21 quick quick JJ 42149 1963 22 in in IN 42149 1963 23 reading read VBG 42149 1963 24 the the DT 42149 1963 25 rods rod NNS 42149 1963 26 and and CC 42149 1963 27 changing change VBG 42149 1963 28 the the DT 42149 1963 29 jacks jack NNS 42149 1963 30 . . . 42149 1964 1 If if IN 42149 1964 2 it -PRON- PRP 42149 1964 3 was be VBD 42149 1964 4 found find VBN 42149 1964 5 that that IN 42149 1964 6 extensive extensive JJ 42149 1964 7 change change NN 42149 1964 8 in in IN 42149 1964 9 the the DT 42149 1964 10 jack jack NNP 42149 1964 11 arrangement arrangement NN 42149 1964 12 was be VBD 42149 1964 13 wanted want VBN 42149 1964 14 , , , 42149 1964 15 the the DT 42149 1964 16 shove shove NN 42149 1964 17 could could MD 42149 1964 18 be be VB 42149 1964 19 stopped stop VBN 42149 1964 20 by by IN 42149 1964 21 a a DT 42149 1964 22 man man NN 42149 1964 23 stationed station VBN 42149 1964 24 at at IN 42149 1964 25 the the DT 42149 1964 26 main main JJ 42149 1964 27 hydraulic hydraulic JJ 42149 1964 28 control control NN 42149 1964 29 valve valve NN 42149 1964 30 ; ; : 42149 1964 31 but but CC 42149 1964 32 , , , 42149 1964 33 as as IN 42149 1964 34 any any DT 42149 1964 35 such such JJ 42149 1964 36 stoppage stoppage NN 42149 1964 37 affected affect VBD 42149 1964 38 the the DT 42149 1964 39 quantity quantity NN 42149 1964 40 of of IN 42149 1964 41 muck muck NN 42149 1964 42 taken take VBN 42149 1964 43 in in RP 42149 1964 44 , , , 42149 1964 45 it -PRON- PRP 42149 1964 46 was be VBD 42149 1964 47 not not RB 42149 1964 48 resorted resort VBN 42149 1964 49 to to IN 42149 1964 50 unless unless IN 42149 1964 51 absolutely absolutely RB 42149 1964 52 necessary necessary JJ 42149 1964 53 . . . 42149 1965 1 If if IN 42149 1965 2 the the DT 42149 1965 3 quantity quantity NN 42149 1965 4 of of IN 42149 1965 5 muck muck NN 42149 1965 6 coming coming NN 42149 1965 7 in in RB 42149 1965 8 was be VBD 42149 1965 9 not not RB 42149 1965 10 as as RB 42149 1965 11 desired desire VBN 42149 1965 12 , , , 42149 1965 13 a a DT 42149 1965 14 stop stop NN 42149 1965 15 had have VBD 42149 1965 16 to to TO 42149 1965 17 be be VB 42149 1965 18 made make VBN 42149 1965 19 to to TO 42149 1965 20 alter alter VB 42149 1965 21 the the DT 42149 1965 22 size size NN 42149 1965 23 of of IN 42149 1965 24 the the DT 42149 1965 25 opening opening NN 42149 1965 26 , , , 42149 1965 27 and and CC 42149 1965 28 if if IN 42149 1965 29 , , , 42149 1965 30 while while IN 42149 1965 31 this this DT 42149 1965 32 was be VBD 42149 1965 33 being be VBG 42149 1965 34 done do VBN 42149 1965 35 , , , 42149 1965 36 the the DT 42149 1965 37 exhaust exhaust NN 42149 1965 38 valves valve NNS 42149 1965 39 were be VBD 42149 1965 40 not not RB 42149 1965 41 closed close VBN 42149 1965 42 quite quite RB 42149 1965 43 tight tight JJ 42149 1965 44 , , , 42149 1965 45 the the DT 42149 1965 46 silt silt NN 42149 1965 47 pressure pressure NN 42149 1965 48 on on IN 42149 1965 49 the the DT 42149 1965 50 face face NN 42149 1965 51 of of IN 42149 1965 52 the the DT 42149 1965 53 shield shield NN 42149 1965 54 would would MD 42149 1965 55 force force VB 42149 1965 56 it -PRON- PRP 42149 1965 57 back back RB 42149 1965 58 against against IN 42149 1965 59 the the DT 42149 1965 60 iron iron NN 42149 1965 61 . . . 42149 1966 1 This this DT 42149 1966 2 fact fact NN 42149 1966 3 was be VBD 42149 1966 4 sometimes sometimes RB 42149 1966 5 taken take VBN 42149 1966 6 advantage advantage NN 42149 1966 7 of of IN 42149 1966 8 when when WRB 42149 1966 9 a a DT 42149 1966 10 full full JJ 42149 1966 11 opening opening NN 42149 1966 12 did do VBD 42149 1966 13 not not RB 42149 1966 14 let let VB 42149 1966 15 in in IN 42149 1966 16 the the DT 42149 1966 17 desired desire VBN 42149 1966 18 quantity quantity NN 42149 1966 19 , , , 42149 1966 20 for for IN 42149 1966 21 the the DT 42149 1966 22 shield shield NN 42149 1966 23 could could MD 42149 1966 24 be be VB 42149 1966 25 shoved shove VBN 42149 1966 26 , , , 42149 1966 27 allowed allow VBN 42149 1966 28 to to TO 42149 1966 29 return return VB 42149 1966 30 , , , 42149 1966 31 and and CC 42149 1966 32 shoved shove VBD 42149 1966 33 again again RB 42149 1966 34 . . . 42149 1967 1 The the DT 42149 1967 2 time time NN 42149 1967 3 taken take VBN 42149 1967 4 to to TO 42149 1967 5 shove shove VB 42149 1967 6 in in RP 42149 1967 7 silt silt NN 42149 1967 8 varied varied JJ 42149 1967 9 greatly greatly RB 42149 1967 10 with with IN 42149 1967 11 the the DT 42149 1967 12 quantity quantity NN 42149 1967 13 of of IN 42149 1967 14 material material NN 42149 1967 15 taken take VBN 42149 1967 16 in in RP 42149 1967 17 ; ; : 42149 1967 18 for for IN 42149 1967 19 shoving shove VBG 42149 1967 20 and and CC 42149 1967 21 mucking mucking NN 42149 1967 22 combined combine VBN 42149 1967 23 , , , 42149 1967 24 it -PRON- PRP 42149 1967 25 averaged average VBD 42149 1967 26 66 66 CD 42149 1967 27 min min NNP 42149 1967 28 . . NNP 42149 1967 29 , , , 42149 1967 30 with with IN 42149 1967 31 an an DT 42149 1967 32 average average NN 42149 1967 33 of of IN 42149 1967 34 13 13 CD 42149 1967 35 cu cu NNS 42149 1967 36 . . . 42149 1968 1 yd yd NNP 42149 1968 2 . . . 42149 1969 1 of of IN 42149 1969 2 muck muck NNP 42149 1969 3 disposed dispose VBN 42149 1969 4 of of IN 42149 1969 5 , , , 42149 1969 6 or or CC 42149 1969 7 about about RB 42149 1969 8 5 5 CD 42149 1969 9 min min NN 42149 1969 10 . . . 42149 1970 1 per per IN 42149 1970 2 cu cu NNP 42149 1970 3 . . . 42149 1971 1 yd yd NNP 42149 1971 2 . . . 42149 1972 1 of of IN 42149 1972 2 material material NN 42149 1972 3 . . . 42149 1973 1 _ _ NNP 42149 1973 2 Pushing Pushing NNP 42149 1973 3 Back back RP 42149 1973 4 the the DT 42149 1973 5 Jacks._--This jacks._--this CD 42149 1973 6 was be VBD 42149 1973 7 a a DT 42149 1973 8 simple simple JJ 42149 1973 9 matter matter NN 42149 1973 10 , , , 42149 1973 11 and and CC 42149 1973 12 merely merely RB 42149 1973 13 consisted consist VBD 42149 1973 14 in in IN 42149 1973 15 making make VBG 42149 1973 16 the the DT 42149 1973 17 loose loose JJ 42149 1973 18 push push VB 42149 1973 19 - - HYPH 42149 1973 20 back back NN 42149 1973 21 connection connection NN 42149 1973 22 to to IN 42149 1973 23 each each DT 42149 1973 24 jack jack NN 42149 1973 25 as as IN 42149 1973 26 it -PRON- PRP 42149 1973 27 had have VBD 42149 1973 28 to to TO 42149 1973 29 be be VB 42149 1973 30 sent send VBN 42149 1973 31 back back RB 42149 1973 32 . . . 42149 1974 1 Some some DT 42149 1974 2 of of IN 42149 1974 3 the the DT 42149 1974 4 jacks jack NNS 42149 1974 5 became become VBD 42149 1974 6 strained strained JJ 42149 1974 7 and and CC 42149 1974 8 bent bent JJ 42149 1974 9 , , , 42149 1974 10 and and CC 42149 1974 11 had have VBD 42149 1974 12 to to TO 42149 1974 13 be be VB 42149 1974 14 taken take VBN 42149 1974 15 out out RP 42149 1974 16 and and CC 42149 1974 17 replaced replace VBN 42149 1974 18 . . . 42149 1975 1 Where where WRB 42149 1975 2 there there EX 42149 1975 3 was be VBD 42149 1975 4 silt silt NN 42149 1975 5 pressure pressure NN 42149 1975 6 against against IN 42149 1975 7 the the DT 42149 1975 8 face face NN 42149 1975 9 of of IN 42149 1975 10 the the DT 42149 1975 11 shield shield NN 42149 1975 12 , , , 42149 1975 13 the the DT 42149 1975 14 hydraulic hydraulic JJ 42149 1975 15 pressure pressure NN 42149 1975 16 had have VBD 42149 1975 17 to to TO 42149 1975 18 be be VB 42149 1975 19 kept keep VBN 42149 1975 20 on on RP 42149 1975 21 until until IN 42149 1975 22 the the DT 42149 1975 23 ring ring NN 42149 1975 24 was be VBD 42149 1975 25 erected erect VBN 42149 1975 26 . . . 42149 1976 1 In in IN 42149 1976 2 such such JJ 42149 1976 3 cases case NNS 42149 1976 4 , , , 42149 1976 5 only only RB 42149 1976 6 two two CD 42149 1976 7 or or CC 42149 1976 8 three three CD 42149 1976 9 jacks jack NNS 42149 1976 10 could could MD 42149 1976 11 be be VB 42149 1976 12 pushed push VBN 42149 1976 13 back back RB 42149 1976 14 at at IN 42149 1976 15 a a DT 42149 1976 16 time time NN 42149 1976 17 , , , 42149 1976 18 and and CC 42149 1976 19 only only RB 42149 1976 20 after after IN 42149 1976 21 a a DT 42149 1976 22 segment segment NN 42149 1976 23 had have VBD 42149 1976 24 been be VBN 42149 1976 25 set set VBN 42149 1976 26 in in IN 42149 1976 27 position position NN 42149 1976 28 , , , 42149 1976 29 and and CC 42149 1976 30 the the DT 42149 1976 31 pressure pressure NN 42149 1976 32 taken take VBN 42149 1976 33 on on IN 42149 1976 34 it -PRON- PRP 42149 1976 35 , , , 42149 1976 36 could could MD 42149 1976 37 the the DT 42149 1976 38 next next JJ 42149 1976 39 jack jack NN 42149 1976 40 be be VB 42149 1976 41 pushed push VBN 42149 1976 42 back back RB 42149 1976 43 , , , 42149 1976 44 and and CC 42149 1976 45 so so RB 42149 1976 46 on on RB 42149 1976 47 around around IN 42149 1976 48 the the DT 42149 1976 49 ring ring NN 42149 1976 50 . . . 42149 1977 1 The the DT 42149 1977 2 time time NN 42149 1977 3 between between IN 42149 1977 4 the the DT 42149 1977 5 finish finish NN 42149 1977 6 of of IN 42149 1977 7 the the DT 42149 1977 8 shove shove NN 42149 1977 9 ( ( -LRB- 42149 1977 10 hydraulic hydraulic JJ 42149 1977 11 pressure pressure NN 42149 1977 12 turned turn VBD 42149 1977 13 off off RP 42149 1977 14 ) ) -RRB- 42149 1977 15 and and CC 42149 1977 16 the the DT 42149 1977 17 placing placing NN 42149 1977 18 of of IN 42149 1977 19 the the DT 42149 1977 20 first first JJ 42149 1977 21 segment segment NN 42149 1977 22 , , , 42149 1977 23 was be VBD 42149 1977 24 occupied occupy VBN 42149 1977 25 in in IN 42149 1977 26 pushing push VBG 42149 1977 27 back back RP 42149 1977 28 the the DT 42149 1977 29 bottom bottom JJ 42149 1977 30 jacks jack NNS 42149 1977 31 and and CC 42149 1977 32 cleaning clean VBG 42149 1977 33 dirt dirt NN 42149 1977 34 off off RP 42149 1977 35 the the DT 42149 1977 36 tail tail NN 42149 1977 37 of of IN 42149 1977 38 the the DT 42149 1977 39 shield shield NN 42149 1977 40 , , , 42149 1977 41 and and CC 42149 1977 42 averaged average VBD 42149 1977 43 about about RB 42149 1977 44 14 14 CD 42149 1977 45 min min NN 42149 1977 46 . . . 42149 1978 1 _ _ NNP 42149 1978 2 Erecting erect VBG 42149 1978 3 the the DT 42149 1978 4 Iron Iron NNP 42149 1978 5 Lining._--As lining._--as NN 42149 1978 6 soon soon RB 42149 1978 7 as as IN 42149 1978 8 the the DT 42149 1978 9 shove shove NN 42149 1978 10 was be VBD 42149 1978 11 over over RB 42149 1978 12 , , , 42149 1978 13 the the DT 42149 1978 14 whole whole JJ 42149 1978 15 force force NN 42149 1978 16 , , , 42149 1978 17 when when WRB 42149 1978 18 in in IN 42149 1978 19 silt silt NN 42149 1978 20 , , , 42149 1978 21 set set VBN 42149 1978 22 to to TO 42149 1978 23 work work VB 42149 1978 24 at at IN 42149 1978 25 building build VBG 42149 1978 26 up up RP 42149 1978 27 the the DT 42149 1978 28 iron iron NN 42149 1978 29 and and CC 42149 1978 30 then then RB 42149 1978 31 tightening tighten VBG 42149 1978 32 the the DT 42149 1978 33 bolts bolt NNS 42149 1978 34 so so IN 42149 1978 35 that that IN 42149 1978 36 the the DT 42149 1978 37 shield shield NN 42149 1978 38 could could MD 42149 1978 39 be be VB 42149 1978 40 shoved shove VBN 42149 1978 41 again again RB 42149 1978 42 . . . 42149 1979 1 A a DT 42149 1979 2 section section NN 42149 1979 3 of of IN 42149 1979 4 the the DT 42149 1979 5 tunnel tunnel NN 42149 1979 6 with with IN 42149 1979 7 bolting bolting NN 42149 1979 8 and and CC 42149 1979 9 working working NN 42149 1979 10 platform platform NN 42149 1979 11 is be VBZ 42149 1979 12 shown show VBN 42149 1979 13 on on IN 42149 1979 14 Plate Plate NNP 42149 1979 15 XL XL NNP 42149 1979 16 . . . 42149 1980 1 In in IN 42149 1980 2 the the DT 42149 1980 3 early early JJ 42149 1980 4 part part NN 42149 1980 5 of of IN 42149 1980 6 the the DT 42149 1980 7 work work NN 42149 1980 8 , , , 42149 1980 9 when when WRB 42149 1980 10 the the DT 42149 1980 11 ground ground NN 42149 1980 12 was be VBD 42149 1980 13 being be VBG 42149 1980 14 excavated excavate VBN 42149 1980 15 ahead ahead RB 42149 1980 16 of of IN 42149 1980 17 the the DT 42149 1980 18 shield shield NN 42149 1980 19 , , , 42149 1980 20 the the DT 42149 1980 21 whole whole JJ 42149 1980 22 force force NN 42149 1980 23 , , , 42149 1980 24 with with IN 42149 1980 25 the the DT 42149 1980 26 exception exception NN 42149 1980 27 of of IN 42149 1980 28 those those DT 42149 1980 29 working work VBG 42149 1980 30 in in IN 42149 1980 31 front front NN 42149 1980 32 of of IN 42149 1980 33 the the DT 42149 1980 34 shield shield NN 42149 1980 35 , , , 42149 1980 36 was be VBD 42149 1980 37 engaged engage VBN 42149 1980 38 in in IN 42149 1980 39 erecting erect VBG 42149 1980 40 the the DT 42149 1980 41 iron iron NN 42149 1980 42 , , , 42149 1980 43 but but CC 42149 1980 44 , , , 42149 1980 45 as as RB 42149 1980 46 soon soon RB 42149 1980 47 as as IN 42149 1980 48 this this DT 42149 1980 49 was be VBD 42149 1980 50 done do VBN 42149 1980 51 , , , 42149 1980 52 most most JJS 42149 1980 53 of of IN 42149 1980 54 the the DT 42149 1980 55 men man NNS 42149 1980 56 returned return VBD 42149 1980 57 to to IN 42149 1980 58 the the DT 42149 1980 59 mucking mucking NN 42149 1980 60 , , , 42149 1980 61 and and CC 42149 1980 62 only only RB 42149 1980 63 the the DT 42149 1980 64 iron iron NN 42149 1980 65 workers worker NNS 42149 1980 66 continued continue VBD 42149 1980 67 to to TO 42149 1980 68 tighten tighten VB 42149 1980 69 up up RP 42149 1980 70 bolts bolt NNS 42149 1980 71 . . . 42149 1981 1 On on IN 42149 1981 2 the the DT 42149 1981 3 other other JJ 42149 1981 4 sections section NNS 42149 1981 5 , , , 42149 1981 6 where where WRB 42149 1981 7 the the DT 42149 1981 8 shield shield NN 42149 1981 9 was be VBD 42149 1981 10 shoved shove VBN 42149 1981 11 into into IN 42149 1981 12 the the DT 42149 1981 13 silt silt NN 42149 1981 14 without without IN 42149 1981 15 excavating excavating NN 42149 1981 16 ahead ahead RB 42149 1981 17 , , , 42149 1981 18 as as RB 42149 1981 19 soon soon RB 42149 1981 20 as as IN 42149 1981 21 the the DT 42149 1981 22 shove shove NN 42149 1981 23 was be VBD 42149 1981 24 completed complete VBN 42149 1981 25 , , , 42149 1981 26 the the DT 42149 1981 27 whole whole JJ 42149 1981 28 force force NN 42149 1981 29 was be VBD 42149 1981 30 engaged engage VBN 42149 1981 31 in in IN 42149 1981 32 the the DT 42149 1981 33 erection erection NN 42149 1981 34 of of IN 42149 1981 35 the the DT 42149 1981 36 iron iron NN 42149 1981 37 and and CC 42149 1981 38 the the DT 42149 1981 39 tightening tightening NN 42149 1981 40 of of IN 42149 1981 41 the the DT 42149 1981 42 bolts bolt NNS 42149 1981 43 , , , 42149 1981 44 until until IN 42149 1981 45 they -PRON- PRP 42149 1981 46 were be VBD 42149 1981 47 so so RB 42149 1981 48 tight tight JJ 42149 1981 49 that that IN 42149 1981 50 the the DT 42149 1981 51 shield shield NN 42149 1981 52 could could MD 42149 1981 53 be be VB 42149 1981 54 shoved shove VBN 42149 1981 55 again again RB 42149 1981 56 for for IN 42149 1981 57 another another DT 42149 1981 58 ring ring NN 42149 1981 59 . . . 42149 1982 1 The the DT 42149 1982 2 iron iron NN 42149 1982 3 was be VBD 42149 1982 4 brought bring VBN 42149 1982 5 into into IN 42149 1982 6 the the DT 42149 1982 7 tunnel tunnel NN 42149 1982 8 on on IN 42149 1982 9 flat flat JJ 42149 1982 10 cars car NNS 42149 1982 11 , , , 42149 1982 12 two two CD 42149 1982 13 segments segment NNS 42149 1982 14 to to IN 42149 1982 15 the the DT 42149 1982 16 car car NN 42149 1982 17 , , , 42149 1982 18 and and CC 42149 1982 19 was be VBD 42149 1982 20 lifted lift VBN 42149 1982 21 from from IN 42149 1982 22 the the DT 42149 1982 23 car car NN 42149 1982 24 and and CC 42149 1982 25 lowered lower VBD 42149 1982 26 into into IN 42149 1982 27 the the DT 42149 1982 28 invert invert NN 42149 1982 29 of of IN 42149 1982 30 the the DT 42149 1982 31 shield shield NN 42149 1982 32 by by IN 42149 1982 33 a a DT 42149 1982 34 block block NN 42149 1982 35 and and CC 42149 1982 36 fall fall VB 42149 1982 37 and and CC 42149 1982 38 chain chain NN 42149 1982 39 sling sling NN 42149 1982 40 , , , 42149 1982 41 as as IN 42149 1982 42 shown show VBN 42149 1982 43 in in IN 42149 1982 44 Fig Fig NNP 42149 1982 45 . . . 42149 1983 1 2 2 LS 42149 1983 2 , , , 42149 1983 3 Plate plate NN 42149 1983 4 XXXIX XXXIX NNP 42149 1983 5 . . . 42149 1984 1 The the DT 42149 1984 2 bottom bottom JJ 42149 1984 3 three three CD 42149 1984 4 or or CC 42149 1984 5 four four CD 42149 1984 6 segments segment NNS 42149 1984 7 were be VBD 42149 1984 8 pushed push VBN 42149 1984 9 around around RB 42149 1984 10 into into IN 42149 1984 11 position position NN 42149 1984 12 with with IN 42149 1984 13 the the DT 42149 1984 14 erector erector NN 42149 1984 15 , , , 42149 1984 16 the the DT 42149 1984 17 head head NN 42149 1984 18 simply simply RB 42149 1984 19 bearing bear VBG 42149 1984 20 against against IN 42149 1984 21 the the DT 42149 1984 22 longitudinal longitudinal JJ 42149 1984 23 flange flange NN 42149 1984 24 without without IN 42149 1984 25 being be VBG 42149 1984 26 attached attach VBN 42149 1984 27 to to IN 42149 1984 28 the the DT 42149 1984 29 segment segment NN 42149 1984 30 ; ; : 42149 1984 31 the the DT 42149 1984 32 upper upper JJ 42149 1984 33 segments segment NNS 42149 1984 34 , , , 42149 1984 35 however however RB 42149 1984 36 , , , 42149 1984 37 were be VBD 42149 1984 38 , , , 42149 1984 39 as as IN 42149 1984 40 shown show VBN 42149 1984 41 in in IN 42149 1984 42 Fig Fig NNP 42149 1984 43 . . . 42149 1985 1 2 2 LS 42149 1985 2 , , , 42149 1985 3 Plate plate NN 42149 1985 4 XXXVIII xxxviii NN 42149 1985 5 , , , 42149 1985 6 and and CC 42149 1985 7 Fig Fig NNP 42149 1985 8 . . . 42149 1986 1 1 1 LS 42149 1986 2 , , , 42149 1986 3 Plate Plate NNP 42149 1986 4 XLI XLI NNP 42149 1986 5 , , , 42149 1986 6 attached attach VBN 42149 1986 7 to to IN 42149 1986 8 the the DT 42149 1986 9 erector erector NN 42149 1986 10 , , , 42149 1986 11 by by IN 42149 1986 12 using use VBG 42149 1986 13 the the DT 42149 1986 14 expanding expand VBG 42149 1986 15 bar bar NN 42149 1986 16 and and CC 42149 1986 17 the the DT 42149 1986 18 erector erector NN 42149 1986 19 head head NN 42149 1986 20 designed design VBN 42149 1986 21 by by IN 42149 1986 22 Mr. Mr. NNP 42149 1986 23 Patrick Patrick NNP 42149 1986 24 Fitzgerald Fitzgerald NNP 42149 1986 25 , , , 42149 1986 26 the the DT 42149 1986 27 Tunnel Tunnel NNP 42149 1986 28 Superintendent Superintendent NNP 42149 1986 29 . . . 42149 1987 1 This this DT 42149 1987 2 was be VBD 42149 1987 3 found find VBN 42149 1987 4 to to TO 42149 1987 5 be be VB 42149 1987 6 a a DT 42149 1987 7 most most RBS 42149 1987 8 convenient convenient JJ 42149 1987 9 arrangement arrangement NN 42149 1987 10 . . . 42149 1988 1 The the DT 42149 1988 2 single single JJ 42149 1988 3 erector erector NN 42149 1988 4 attached attach VBN 42149 1988 5 to to IN 42149 1988 6 the the DT 42149 1988 7 center center NN 42149 1988 8 of of IN 42149 1988 9 the the DT 42149 1988 10 shield shield NN 42149 1988 11 was be VBD 42149 1988 12 able able JJ 42149 1988 13 to to TO 42149 1988 14 erect erect VB 42149 1988 15 the the DT 42149 1988 16 iron iron NN 42149 1988 17 as as RB 42149 1988 18 fast fast RB 42149 1988 19 as as IN 42149 1988 20 it -PRON- PRP 42149 1988 21 could could MD 42149 1988 22 be be VB 42149 1988 23 brought bring VBN 42149 1988 24 into into IN 42149 1988 25 the the DT 42149 1988 26 tunnel tunnel NN 42149 1988 27 , , , 42149 1988 28 and and CC 42149 1988 29 even even RB 42149 1988 30 when when WRB 42149 1988 31 the the DT 42149 1988 32 weight weight NN 42149 1988 33 of of IN 42149 1988 34 the the DT 42149 1988 35 segments segment NNS 42149 1988 36 was be VBD 42149 1988 37 increased increase VBN 42149 1988 38 25 25 CD 42149 1988 39 % % NN 42149 1988 40 ( ( -LRB- 42149 1988 41 from from IN 42149 1988 42 2,060 2,060 CD 42149 1988 43 to to IN 42149 1988 44 2,580 2,580 CD 42149 1988 45 lb lb IN 42149 1988 46 . . . 42149 1988 47 ) ) -RRB- 42149 1989 1 it -PRON- PRP 42149 1989 2 always always RB 42149 1989 3 proved prove VBD 42149 1989 4 equal equal JJ 42149 1989 5 to to IN 42149 1989 6 its -PRON- PRP$ 42149 1989 7 task task NN 42149 1989 8 , , , 42149 1989 9 although although IN 42149 1989 10 occasionally occasionally RB 42149 1989 11 one one CD 42149 1989 12 of of IN 42149 1989 13 the the DT 42149 1989 14 chains chain NNS 42149 1989 15 in in IN 42149 1989 16 the the DT 42149 1989 17 mechanism mechanism NN 42149 1989 18 broke break VBD 42149 1989 19 and and CC 42149 1989 20 delayed delay VBD 42149 1989 21 the the DT 42149 1989 22 work work NN 42149 1989 23 for for IN 42149 1989 24 an an DT 42149 1989 25 hour hour NN 42149 1989 26 or or CC 42149 1989 27 so so RB 42149 1989 28 ; ; : 42149 1989 29 but but CC 42149 1989 30 the the DT 42149 1989 31 sum sum NN 42149 1989 32 of of IN 42149 1989 33 all all PDT 42149 1989 34 the the DT 42149 1989 35 delays delay NNS 42149 1989 36 from from IN 42149 1989 37 this this DT 42149 1989 38 cause cause NN 42149 1989 39 and and CC 42149 1989 40 from from IN 42149 1989 41 breaks break NNS 42149 1989 42 and and CC 42149 1989 43 leaks leak NNS 42149 1989 44 in in IN 42149 1989 45 the the DT 42149 1989 46 hydraulic hydraulic JJ 42149 1989 47 line line NN 42149 1989 48 only only RB 42149 1989 49 averaged average VBD 42149 1989 50 13 13 CD 42149 1989 51 min min NN 42149 1989 52 . . . 42149 1990 1 per per IN 42149 1990 2 ring ring NN 42149 1990 3 . . . 42149 1991 1 The the DT 42149 1991 2 operating operating NN 42149 1991 3 valve valve NN 42149 1991 4 which which WDT 42149 1991 5 was be VBD 42149 1991 6 first first RB 42149 1991 7 used use VBN 42149 1991 8 was be VBD 42149 1991 9 a a DT 42149 1991 10 four four CD 42149 1991 11 - - HYPH 42149 1991 12 spindle spindle NN 42149 1991 13 turning turning NN 42149 1991 14 valve valve NN 42149 1991 15 , , , 42149 1991 16 but but CC 42149 1991 17 this this DT 42149 1991 18 was be VBD 42149 1991 19 replaced replace VBN 42149 1991 20 by by IN 42149 1991 21 a a DT 42149 1991 22 sliding sliding JJ 42149 1991 23 valve valve NN 42149 1991 24 which which WDT 42149 1991 25 was be VBD 42149 1991 26 found find VBN 42149 1991 27 to to TO 42149 1991 28 be be VB 42149 1991 29 much much RB 42149 1991 30 more more RBR 42149 1991 31 satisfactory satisfactory JJ 42149 1991 32 , , , 42149 1991 33 both both CC 42149 1991 34 in in IN 42149 1991 35 ease ease NN 42149 1991 36 of of IN 42149 1991 37 operation operation NN 42149 1991 38 and and CC 42149 1991 39 freedom freedom NN 42149 1991 40 from from IN 42149 1991 41 failure failure NN 42149 1991 42 . . . 42149 1992 1 As as IN 42149 1992 2 the the DT 42149 1992 3 iron iron NN 42149 1992 4 was be VBD 42149 1992 5 put put VBN 42149 1992 6 into into IN 42149 1992 7 place place NN 42149 1992 8 , , , 42149 1992 9 two two CD 42149 1992 10 of of IN 42149 1992 11 the the DT 42149 1992 12 middle middle JJ 42149 1992 13 bolts bolt NNS 42149 1992 14 in in IN 42149 1992 15 each each DT 42149 1992 16 longitudinal longitudinal JJ 42149 1992 17 flange flange NN 42149 1992 18 and and CC 42149 1992 19 two two CD 42149 1992 20 in in IN 42149 1992 21 each each DT 42149 1992 22 circumferential circumferential JJ 42149 1992 23 one one CD 42149 1992 24 were be VBD 42149 1992 25 pulled pull VBN 42149 1992 26 as as RB 42149 1992 27 tight tight RB 42149 1992 28 as as IN 42149 1992 29 possible possible JJ 42149 1992 30 , , , 42149 1992 31 and and CC 42149 1992 32 the the DT 42149 1992 33 others other NNS 42149 1992 34 put put VBD 42149 1992 35 in in RP 42149 1992 36 loosely loosely RB 42149 1992 37 ; ; : 42149 1992 38 then then RB 42149 1992 39 , , , 42149 1992 40 as as RB 42149 1992 41 soon soon RB 42149 1992 42 as as IN 42149 1992 43 the the DT 42149 1992 44 ring ring NN 42149 1992 45 was be VBD 42149 1992 46 in in IN 42149 1992 47 position position NN 42149 1992 48 , , , 42149 1992 49 as as IN 42149 1992 50 large large JJ 42149 1992 51 a a DT 42149 1992 52 force force NN 42149 1992 53 as as IN 42149 1992 54 could could MD 42149 1992 55 be be VB 42149 1992 56 conveniently conveniently RB 42149 1992 57 worked work VBN 42149 1992 58 at at IN 42149 1992 59 one one CD 42149 1992 60 time time NN 42149 1992 61 was be VBD 42149 1992 62 engaged engage VBN 42149 1992 63 in in IN 42149 1992 64 tightening tighten VBG 42149 1992 65 the the DT 42149 1992 66 bolts bolt NNS 42149 1992 67 . . . 42149 1993 1 The the DT 42149 1993 2 shape shape NN 42149 1993 3 of of IN 42149 1993 4 the the DT 42149 1993 5 tunnel tunnel NN 42149 1993 6 depended depend VBD 42149 1993 7 on on IN 42149 1993 8 the the DT 42149 1993 9 thoroughness thoroughness NN 42149 1993 10 of of IN 42149 1993 11 the the DT 42149 1993 12 tightening tightening NN 42149 1993 13 of of IN 42149 1993 14 the the DT 42149 1993 15 bolts bolt NNS 42149 1993 16 , , , 42149 1993 17 and and CC 42149 1993 18 the the DT 42149 1993 19 shield shield NN 42149 1993 20 was be VBD 42149 1993 21 never never RB 42149 1993 22 shoved shove VBN 42149 1993 23 until until IN 42149 1993 24 the the DT 42149 1993 25 bolts bolt NNS 42149 1993 26 in in IN 42149 1993 27 all all PDT 42149 1993 28 the the DT 42149 1993 29 longitudinal longitudinal JJ 42149 1993 30 flanges flange NNS 42149 1993 31 had have VBD 42149 1993 32 been be VBN 42149 1993 33 thoroughly thoroughly RB 42149 1993 34 tightened tighten VBN 42149 1993 35 . . . 42149 1994 1 In in IN 42149 1994 2 addition addition NN 42149 1994 3 , , , 42149 1994 4 all all PDT 42149 1994 5 the the DT 42149 1994 6 bolts bolt NNS 42149 1994 7 in in IN 42149 1994 8 the the DT 42149 1994 9 circumferential circumferential JJ 42149 1994 10 flanges flange NNS 42149 1994 11 below below IN 42149 1994 12 the the DT 42149 1994 13 axis axi NNS 42149 1994 14 were be VBD 42149 1994 15 tightened tighten VBN 42149 1994 16 , , , 42149 1994 17 and and CC 42149 1994 18 at at RB 42149 1994 19 least least RBS 42149 1994 20 three three CD 42149 1994 21 of of IN 42149 1994 22 the the DT 42149 1994 23 six six CD 42149 1994 24 in in IN 42149 1994 25 each each DT 42149 1994 26 segment segment NN 42149 1994 27 above above RB 42149 1994 28 . . . 42149 1995 1 After after IN 42149 1995 2 the the DT 42149 1995 3 shield shield NN 42149 1995 4 had have VBD 42149 1995 5 been be VBN 42149 1995 6 shoved shove VBN 42149 1995 7 ahead ahead RB 42149 1995 8 , , , 42149 1995 9 the the DT 42149 1995 10 bolts bolt NNS 42149 1995 11 were be VBD 42149 1995 12 found find VBN 42149 1995 13 to to TO 42149 1995 14 have have VB 42149 1995 15 slackened slacken VBN 42149 1995 16 , , , 42149 1995 17 and and CC 42149 1995 18 , , , 42149 1995 19 where where WRB 42149 1995 20 the the DT 42149 1995 21 daily daily JJ 42149 1995 22 progress progress NN 42149 1995 23 was be VBD 42149 1995 24 four four CD 42149 1995 25 rings ring NNS 42149 1995 26 , , , 42149 1995 27 or or CC 42149 1995 28 more more JJR 42149 1995 29 , , , 42149 1995 30 it -PRON- PRP 42149 1995 31 was be VBD 42149 1995 32 necessary necessary JJ 42149 1995 33 to to TO 42149 1995 34 have have VB 42149 1995 35 a a DT 42149 1995 36 small small JJ 42149 1995 37 gang gang NN 42149 1995 38 of of IN 42149 1995 39 men man NNS 42149 1995 40 always always RB 42149 1995 41 at at IN 42149 1995 42 this this DT 42149 1995 43 work work NN 42149 1995 44 . . . 42149 1996 1 In in IN 42149 1996 2 order order NN 42149 1996 3 to to TO 42149 1996 4 get get VB 42149 1996 5 at at IN 42149 1996 6 the the DT 42149 1996 7 bolts bolt NNS 42149 1996 8 , , , 42149 1996 9 special special JJ 42149 1996 10 platforms platform NNS 42149 1996 11 were be VBD 42149 1996 12 necessary necessary JJ 42149 1996 13 , , , 42149 1996 14 and and CC 42149 1996 15 throughout throughout IN 42149 1996 16 the the DT 42149 1996 17 greater great JJR 42149 1996 18 part part NN 42149 1996 19 of of IN 42149 1996 20 the the DT 42149 1996 21 work work NN 42149 1996 22 , , , 42149 1996 23 a a DT 42149 1996 24 traveling travel VBG 42149 1996 25 platform platform NN 42149 1996 26 was be VBD 42149 1996 27 used use VBN 42149 1996 28 . . . 42149 1997 1 This this DT 42149 1997 2 enabled enable VBD 42149 1997 3 the the DT 42149 1997 4 men man NNS 42149 1997 5 to to TO 42149 1997 6 reach reach VB 42149 1997 7 handily handily RB 42149 1997 8 all all DT 42149 1997 9 parts part NNS 42149 1997 10 of of IN 42149 1997 11 the the DT 42149 1997 12 seven seven CD 42149 1997 13 leading lead VBG 42149 1997 14 rings ring NNS 42149 1997 15 . . . 42149 1998 1 This this DT 42149 1998 2 platform platform NN 42149 1998 3 was be VBD 42149 1998 4 supported support VBN 42149 1998 5 and and CC 42149 1998 6 moved move VBN 42149 1998 7 forward forward RB 42149 1998 8 on on IN 42149 1998 9 wheels wheel NNS 42149 1998 10 fixed fix VBN 42149 1998 11 on on IN 42149 1998 12 brackets bracket NNS 42149 1998 13 to to IN 42149 1998 14 the the DT 42149 1998 15 tunnel tunnel NN 42149 1998 16 , , , 42149 1998 17 and and CC 42149 1998 18 was be VBD 42149 1998 19 pulled pull VBN 42149 1998 20 forward forward RB 42149 1998 21 by by IN 42149 1998 22 connecting connect VBG 42149 1998 23 chains chain NNS 42149 1998 24 every every DT 42149 1998 25 time time NN 42149 1998 26 the the DT 42149 1998 27 shield shield NN 42149 1998 28 was be VBD 42149 1998 29 shoved shove VBN 42149 1998 30 . . . 42149 1999 1 In in IN 42149 1999 2 the the DT 42149 1999 3 early early JJ 42149 1999 4 part part NN 42149 1999 5 of of IN 42149 1999 6 the the DT 42149 1999 7 work work NN 42149 1999 8 it -PRON- PRP 42149 1999 9 was be VBD 42149 1999 10 not not RB 42149 1999 11 possible possible JJ 42149 1999 12 to to TO 42149 1999 13 use use VB 42149 1999 14 platforms platform NNS 42149 1999 15 , , , 42149 1999 16 because because IN 42149 1999 17 , , , 42149 1999 18 in in IN 42149 1999 19 order order NN 42149 1999 20 to to TO 42149 1999 21 maintain maintain VB 42149 1999 22 the the DT 42149 1999 23 correct correct JJ 42149 1999 24 circular circular JJ 42149 1999 25 shape shape NN 42149 1999 26 of of IN 42149 1999 27 the the DT 42149 1999 28 iron iron NN 42149 1999 29 lining lining NN 42149 1999 30 , , , 42149 1999 31 it -PRON- PRP 42149 1999 32 was be VBD 42149 1999 33 necessary necessary JJ 42149 1999 34 to to TO 42149 1999 35 put put VB 42149 1999 36 in in RP 42149 1999 37 temporary temporary JJ 42149 1999 38 horizontal horizontal JJ 42149 1999 39 turnbuckles turnbuckle NNS 42149 1999 40 at at IN 42149 1999 41 axis axis JJ 42149 1999 42 level level NN 42149 1999 43 . . . 42149 2000 1 These these DT 42149 2000 2 , , , 42149 2000 3 however however RB 42149 2000 4 , , , 42149 2000 5 were be VBD 42149 2000 6 very very RB 42149 2000 7 convenient convenient JJ 42149 2000 8 for for IN 42149 2000 9 supporting support VBG 42149 2000 10 the the DT 42149 2000 11 planks plank NNS 42149 2000 12 which which WDT 42149 2000 13 were be VBD 42149 2000 14 used use VBN 42149 2000 15 as as IN 42149 2000 16 a a DT 42149 2000 17 temporary temporary JJ 42149 2000 18 bolting bolting NN 42149 2000 19 platform platform NN 42149 2000 20 for for IN 42149 2000 21 the the DT 42149 2000 22 sides side NNS 42149 2000 23 of of IN 42149 2000 24 the the DT 42149 2000 25 tunnel tunnel NN 42149 2000 26 , , , 42149 2000 27 and and CC 42149 2000 28 a a DT 42149 2000 29 temporary temporary JJ 42149 2000 30 platform platform NN 42149 2000 31 resting rest VBG 42149 2000 32 on on IN 42149 2000 33 6 6 CD 42149 2000 34 by by IN 42149 2000 35 6-in 6-in CD 42149 2000 36 . . . 42149 2001 1 timbers timber NNS 42149 2001 2 across across IN 42149 2001 3 the the DT 42149 2001 4 tunnel tunnel NN 42149 2001 5 enabled enable VBD 42149 2001 6 the the DT 42149 2001 7 bolts bolt NNS 42149 2001 8 in in IN 42149 2001 9 the the DT 42149 2001 10 crown crown NN 42149 2001 11 of of IN 42149 2001 12 the the DT 42149 2001 13 tunnel tunnel NN 42149 2001 14 to to TO 42149 2001 15 be be VB 42149 2001 16 reached reach VBN 42149 2001 17 , , , 42149 2001 18 while while IN 42149 2001 19 the the DT 42149 2001 20 6 6 CD 42149 2001 21 by by IN 42149 2001 22 6-in 6-in CD 42149 2001 23 . . . 42149 2002 1 timbers timber NNS 42149 2002 2 were be VBD 42149 2002 3 left leave VBN 42149 2002 4 in in RP 42149 2002 5 to to TO 42149 2002 6 support support VB 42149 2002 7 the the DT 42149 2002 8 emergency emergency NN 42149 2002 9 platform platform NN 42149 2002 10 previously previously RB 42149 2002 11 described describe VBN 42149 2002 12 ( ( -LRB- 42149 2002 13 Plate plate NN 42149 2002 14 XL XL NNP 42149 2002 15 ) ) -RRB- 42149 2002 16 , , , 42149 2002 17 which which WDT 42149 2002 18 extended extend VBD 42149 2002 19 the the DT 42149 2002 20 entire entire JJ 42149 2002 21 length length NN 42149 2002 22 of of IN 42149 2002 23 the the DT 42149 2002 24 tunnel tunnel NN 42149 2002 25 . . . 42149 2003 1 The the DT 42149 2003 2 time time NN 42149 2003 3 taken take VBN 42149 2003 4 to to TO 42149 2003 5 erect erect VB 42149 2003 6 the the DT 42149 2003 7 iron iron NN 42149 2003 8 lining lining NN 42149 2003 9 became become VBD 42149 2003 10 shorter short JJR 42149 2003 11 and and CC 42149 2003 12 shorter short JJR 42149 2003 13 as as IN 42149 2003 14 the the DT 42149 2003 15 tunnel tunnel NNP 42149 2003 16 organization organization NN 42149 2003 17 became become VBD 42149 2003 18 more more RBR 42149 2003 19 perfect perfect JJ 42149 2003 20 and and CC 42149 2003 21 the the DT 42149 2003 22 force force NN 42149 2003 23 better better RB 42149 2003 24 trained train VBD 42149 2003 25 , , , 42149 2003 26 so so IN 42149 2003 27 that that IN 42149 2003 28 , , , 42149 2003 29 whereas whereas IN 42149 2003 30 , , , 42149 2003 31 in in IN 42149 2003 32 the the DT 42149 2003 33 early early JJ 42149 2003 34 part part NN 42149 2003 35 of of IN 42149 2003 36 the the DT 42149 2003 37 work work NN 42149 2003 38 , , , 42149 2003 39 it -PRON- PRP 42149 2003 40 frequently frequently RB 42149 2003 41 took take VBD 42149 2003 42 6 6 CD 42149 2003 43 hours hour NNS 42149 2003 44 to to TO 42149 2003 45 erect erect VB 42149 2003 46 a a DT 42149 2003 47 ring ring NN 42149 2003 48 , , , 42149 2003 49 in in IN 42149 2003 50 the the DT 42149 2003 51 latter latter JJ 42149 2003 52 part part NN 42149 2003 53 , , , 42149 2003 54 when when WRB 42149 2003 55 the the DT 42149 2003 56 work work NN 42149 2003 57 was be VBD 42149 2003 58 nearing near VBG 42149 2003 59 completion completion NN 42149 2003 60 , , , 42149 2003 61 it -PRON- PRP 42149 2003 62 was be VBD 42149 2003 63 a a DT 42149 2003 64 common common JJ 42149 2003 65 occurrence occurrence NN 42149 2003 66 to to TO 42149 2003 67 erect erect VB 42149 2003 68 a a DT 42149 2003 69 ring ring NN 42149 2003 70 in in IN 42149 2003 71 30 30 CD 42149 2003 72 min min NN 42149 2003 73 . . . 42149 2004 1 The the DT 42149 2004 2 average average JJ 42149 2004 3 time time NN 42149 2004 4 in in IN 42149 2004 5 the the DT 42149 2004 6 " " `` 42149 2004 7 heavy heavy JJ 42149 2004 8 iron iron NN 42149 2004 9 " " '' 42149 2004 10 section section NN 42149 2004 11 , , , 42149 2004 12 which which WDT 42149 2004 13 included include VBD 42149 2004 14 the the DT 42149 2004 15 greater great JJR 42149 2004 16 part part NN 42149 2004 17 of of IN 42149 2004 18 the the DT 42149 2004 19 work work NN 42149 2004 20 under under IN 42149 2004 21 the the DT 42149 2004 22 river river NN 42149 2004 23 , , , 42149 2004 24 was be VBD 42149 2004 25 1 1 CD 42149 2004 26 hour hour NN 42149 2004 27 4 4 CD 42149 2004 28 min min NN 42149 2004 29 . . . 42149 2005 1 for for IN 42149 2005 2 the the DT 42149 2005 3 erection erection NN 42149 2005 4 of of IN 42149 2005 5 the the DT 42149 2005 6 ring ring NN 42149 2005 7 and and CC 42149 2005 8 40 40 CD 42149 2005 9 min min NN 42149 2005 10 . . . 42149 2006 1 for for IN 42149 2006 2 tightening tighten VBG 42149 2006 3 the the DT 42149 2006 4 bolts bolt NNS 42149 2006 5 after after IN 42149 2006 6 that that DT 42149 2006 7 had have VBD 42149 2006 8 been be VBN 42149 2006 9 completed complete VBN 42149 2006 10 , , , 42149 2006 11 so so IN 42149 2006 12 that that IN 42149 2006 13 the the DT 42149 2006 14 total total JJ 42149 2006 15 time time NN 42149 2006 16 spent spend VBN 42149 2006 17 by by IN 42149 2006 18 the the DT 42149 2006 19 whole whole JJ 42149 2006 20 gang gang NN 42149 2006 21 on on IN 42149 2006 22 erection erection NN 42149 2006 23 and and CC 42149 2006 24 bolting bolting NN 42149 2006 25 averaged average VBD 42149 2006 26 1 1 CD 42149 2006 27 hour hour NN 42149 2006 28 44 44 CD 42149 2006 29 min min NN 42149 2006 30 . . . 42149 2007 1 per per IN 42149 2007 2 ring ring NN 42149 2007 3 , , , 42149 2007 4 exclusive exclusive JJ 42149 2007 5 of of IN 42149 2007 6 the the DT 42149 2007 7 time time NN 42149 2007 8 spent spend VBN 42149 2007 9 by by IN 42149 2007 10 the the DT 42149 2007 11 small small JJ 42149 2007 12 gang gang NN 42149 2007 13 which which WDT 42149 2007 14 was be VBD 42149 2007 15 always always RB 42149 2007 16 engaged engage VBN 42149 2007 17 in in IN 42149 2007 18 tightening tighten VBG 42149 2007 19 the the DT 42149 2007 20 bolts bolt NNS 42149 2007 21 . . . 42149 2008 1 The the DT 42149 2008 2 average average JJ 42149 2008 3 time time NN 42149 2008 4 spent spend VBN 42149 2008 5 in in IN 42149 2008 6 erecting erect VBG 42149 2008 7 and and CC 42149 2008 8 bolting bolt VBG 42149 2008 9 , , , 42149 2008 10 for for IN 42149 2008 11 the the DT 42149 2008 12 whole whole JJ 42149 2008 13 length length NN 42149 2008 14 of of IN 42149 2008 15 the the DT 42149 2008 16 tube tube NN 42149 2008 17 tunnels tunnel NNS 42149 2008 18 , , , 42149 2008 19 was be VBD 42149 2008 20 2 2 CD 42149 2008 21 hours hour NNS 42149 2008 22 15 15 CD 42149 2008 23 min min NN 42149 2008 24 . . . 42149 2009 1 per per IN 42149 2009 2 ring ring NN 42149 2009 3 . . . 42149 2010 1 _ _ NNP 42149 2010 2 Tables Tables NNPS 42149 2010 3 of of IN 42149 2010 4 Progress._--Tables Progress._--Tables NNP 42149 2010 5 24 24 CD 42149 2010 6 , , , 42149 2010 7 25 25 CD 42149 2010 8 , , , 42149 2010 9 26 26 CD 42149 2010 10 , , , 42149 2010 11 and and CC 42149 2010 12 27 27 CD 42149 2010 13 have have VBP 42149 2010 14 been be VBN 42149 2010 15 prepared prepare VBN 42149 2010 16 to to TO 42149 2010 17 show show VB 42149 2010 18 the the DT 42149 2010 19 time time NN 42149 2010 20 taken take VBN 42149 2010 21 in in IN 42149 2010 22 the the DT 42149 2010 23 various various JJ 42149 2010 24 operations operation NNS 42149 2010 25 at at IN 42149 2010 26 each each DT 42149 2010 27 working work VBG 42149 2010 28 face face NN 42149 2010 29 . . . 42149 2011 1 [ [ -LRB- 42149 2011 2 Illustration illustration NN 42149 2011 3 : : : 42149 2011 4 PLATE PLATE NNP 42149 2011 5 XLI XLI NNP 42149 2011 6 . . . 42149 2012 1 TRANS trans UH 42149 2012 2 . . . 42149 2013 1 AM AM NNP 42149 2013 2 . . . 42149 2014 1 SOC SOC NNP 42149 2014 2 . . . 42149 2015 1 CIV CIV NNP 42149 2015 2 . . . 42149 2016 1 ENGRS ENGRS NNP 42149 2016 2 . . . 42149 2017 1 VOL VOL NNP 42149 2017 2 . . . 42149 2018 1 LXVIII LXVIII NNP 42149 2018 2 , , , 42149 2018 3 No no UH 42149 2018 4 . . . 42149 2019 1 1155 1155 CD 42149 2019 2 . . . 42149 2020 1 HEWETT HEWETT NNP 42149 2020 2 AND and CC 42149 2020 3 BROWN BROWN NNP 42149 2020 4 ON ON NNP 42149 2020 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 2020 6 R. R. NNP 42149 2020 7 R. R. NNP 42149 2020 8 TUNNELS TUNNELS NNP 42149 2020 9 : : : 42149 2020 10 NORTH NORTH NNP 42149 2020 11 RIVER river NN 42149 2020 12 TUNNELS tunnel NNS 42149 2020 13 . . . 42149 2021 1 FIG FIG NNP 42149 2021 2 . . . 42149 2022 1 1 1 LS 42149 2022 2 . . . 42149 2022 3 ] ] -RRB- 42149 2023 1 [ [ -LRB- 42149 2023 2 Illustration illustration NN 42149 2023 3 : : : 42149 2023 4 PLATE PLATE NNP 42149 2023 5 XLI XLI NNP 42149 2023 6 . . . 42149 2024 1 TRANS trans UH 42149 2024 2 . . . 42149 2025 1 AM AM NNP 42149 2025 2 . . . 42149 2026 1 SOC SOC NNP 42149 2026 2 . . . 42149 2027 1 CIV CIV NNP 42149 2027 2 . . . 42149 2028 1 ENGRS ENGRS NNP 42149 2028 2 . . . 42149 2029 1 VOL VOL NNP 42149 2029 2 . . . 42149 2030 1 LXVIII LXVIII NNP 42149 2030 2 , , , 42149 2030 3 No no UH 42149 2030 4 . . . 42149 2031 1 1155 1155 CD 42149 2031 2 . . . 42149 2032 1 HEWETT HEWETT NNP 42149 2032 2 AND and CC 42149 2032 3 BROWN BROWN NNP 42149 2032 4 ON ON NNP 42149 2032 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 2032 6 R. R. NNP 42149 2032 7 R. R. NNP 42149 2032 8 TUNNELS TUNNELS NNP 42149 2032 9 : : : 42149 2032 10 NORTH NORTH NNP 42149 2032 11 RIVER river NN 42149 2032 12 TUNNELS tunnel NNS 42149 2032 13 . . . 42149 2033 1 FIG FIG NNP 42149 2033 2 . . . 42149 2034 1 2 2 LS 42149 2034 2 . . . 42149 2034 3 ] ] -RRB- 42149 2035 1 In in IN 42149 2035 2 Tables Tables NNP 42149 2035 3 24 24 CD 42149 2035 4 , , , 42149 2035 5 25 25 CD 42149 2035 6 , , , 42149 2035 7 26 26 CD 42149 2035 8 , , , 42149 2035 9 and and CC 42149 2035 10 27 27 CD 42149 2035 11 , , , 42149 2035 12 the the DT 42149 2035 13 following follow VBG 42149 2035 14 symbols symbol NNS 42149 2035 15 are be VBP 42149 2035 16 used use VBN 42149 2035 17 : : : 42149 2035 18 _ _ NNP 42149 2035 19 A_--Including A_--Including NNP 42149 2035 20 assistant assistant NN 42149 2035 21 superintendents superintendent NNS 42149 2035 22 , , , 42149 2035 23 foremen foreman NNS 42149 2035 24 , , , 42149 2035 25 and and CC 42149 2035 26 electricians electrician NNS 42149 2035 27 , , , 42149 2035 28 in in IN 42149 2035 29 driving drive VBG 42149 2035 30 the the DT 42149 2035 31 shield shield NN 42149 2035 32 , , , 42149 2035 33 erecting erect VBG 42149 2035 34 iron iron NN 42149 2035 35 , , , 42149 2035 36 mucking mucking NN 42149 2035 37 , , , 42149 2035 38 attending attend VBG 42149 2035 39 to to IN 42149 2035 40 the the DT 42149 2035 41 electric electric JJ 42149 2035 42 lights light NNS 42149 2035 43 , , , 42149 2035 44 and and CC 42149 2035 45 repairing repair VBG 42149 2035 46 the the DT 42149 2035 47 pipe pipe NN 42149 2035 48 line line NN 42149 2035 49 . . . 42149 2036 1 _ _ NNP 42149 2036 2 B_--Drillers B_--Drillers NNP 42149 2036 3 , , , 42149 2036 4 drillers driller NNS 42149 2036 5 ' ' POS 42149 2036 6 helpers helper NNS 42149 2036 7 , , , 42149 2036 8 drill drill VB 42149 2036 9 foremen foreman NNS 42149 2036 10 , , , 42149 2036 11 and and CC 42149 2036 12 nippers nipper NNS 42149 2036 13 . . . 42149 2037 1 _ _ NNP 42149 2037 2 C_--All C_--All NNP 42149 2037 3 men man NNS 42149 2037 4 grouting grout VBG 42149 2037 5 . . . 42149 2038 1 _ _ NNP 42149 2038 2 D_--Engineers D_--Engineers NNPS 42149 2038 3 and and CC 42149 2038 4 laborers laborer NNS 42149 2038 5 wholly wholly RB 42149 2038 6 employed employ VBN 42149 2038 7 on on IN 42149 2038 8 transport transport NN 42149 2038 9 between between IN 42149 2038 10 the the DT 42149 2038 11 first first JJ 42149 2038 12 lock lock NN 42149 2038 13 and and CC 42149 2038 14 the the DT 42149 2038 15 face face NN 42149 2038 16 . . . 42149 2039 1 _ _ NNP 42149 2039 2 E_--In E_--In NNP 42149 2039 3 rock rock NN 42149 2039 4 , , , 42149 2039 5 one one CD 42149 2039 6 car car NN 42149 2039 7 = = SYM 42149 2039 8 0.60 0.60 CD 42149 2039 9 cu cu NNS 42149 2039 10 . . . 42149 2040 1 yd yd NNP 42149 2040 2 . . . 42149 2041 1 ; ; : 42149 2041 2 in in IN 42149 2041 3 sand sand NN 42149 2041 4 or or CC 42149 2041 5 silt silt NN 42149 2041 6 = = SYM 42149 2041 7 1.20 1.20 CD 42149 2041 8 cu cu NNS 42149 2041 9 . . . 42149 2042 1 yd yd NNP 42149 2042 2 . . . 42149 2043 1 in in IN 42149 2043 2 place place NN 42149 2043 3 . . . 42149 2044 1 _ _ NNP 42149 2044 2 F_--Time f_--time NN 42149 2044 3 between between IN 42149 2044 4 completion completion NN 42149 2044 5 of of IN 42149 2044 6 mucking mucking NN 42149 2044 7 and and CC 42149 2044 8 putting put VBG 42149 2044 9 in in RP 42149 2044 10 first first JJ 42149 2044 11 plate plate NN 42149 2044 12 , , , 42149 2044 13 spent spend VBN 42149 2044 14 in in IN 42149 2044 15 shoving shove VBG 42149 2044 16 the the DT 42149 2044 17 jacks jack NNS 42149 2044 18 back back RB 42149 2044 19 . . . 42149 2045 1 _ _ NNP 42149 2045 2 G_--In G_--In NNP 42149 2045 3 ordinary ordinary JJ 42149 2045 4 iron iron NN 42149 2045 5 = = NFP 42149 2045 6 the the DT 42149 2045 7 whole whole JJ 42149 2045 8 time time NN 42149 2045 9 spent spend VBN 42149 2045 10 on on IN 42149 2045 11 erection erection NN 42149 2045 12 and and CC 42149 2045 13 bolting bolting NN 42149 2045 14 . . . 42149 2046 1 In in IN 42149 2046 2 heavy heavy JJ 42149 2046 3 iron iron NN 42149 2046 4 = = , 42149 2046 5 the the DT 42149 2046 6 time time NN 42149 2046 7 between between IN 42149 2046 8 putting put VBG 42149 2046 9 in in RP 42149 2046 10 the the DT 42149 2046 11 first first JJ 42149 2046 12 plate plate NN 42149 2046 13 and and CC 42149 2046 14 placing place VBG 42149 2046 15 the the DT 42149 2046 16 key key NN 42149 2046 17 only only RB 42149 2046 18 . . . 42149 2047 1 _ _ NNP 42149 2047 2 H_--Time H_--Time -LRB- 42149 2047 3 between between IN 42149 2047 4 placing place VBG 42149 2047 5 the the DT 42149 2047 6 key key NN 42149 2047 7 and and CC 42149 2047 8 starting start VBG 42149 2047 9 the the DT 42149 2047 10 next next JJ 42149 2047 11 shove shove NN 42149 2047 12 , , , 42149 2047 13 spent spend VBN 42149 2047 14 by by IN 42149 2047 15 the the DT 42149 2047 16 whole whole JJ 42149 2047 17 gang gang NN 42149 2047 18 in in IN 42149 2047 19 tightening tighten VBG 42149 2047 20 bolts bolt NNS 42149 2047 21 . . . 42149 2048 1 In in IN 42149 2048 2 addition addition NN 42149 2048 3 to to IN 42149 2048 4 this this DT 42149 2048 5 , , , 42149 2048 6 there there EX 42149 2048 7 was be VBD 42149 2048 8 a a DT 42149 2048 9 small small JJ 42149 2048 10 gang gang NN 42149 2048 11 which which WDT 42149 2048 12 spent spend VBD 42149 2048 13 its -PRON- PRP$ 42149 2048 14 whole whole JJ 42149 2048 15 time time NN 42149 2048 16 at at IN 42149 2048 17 this this DT 42149 2048 18 work work NN 42149 2048 19 . . . 42149 2049 1 _ _ NNP 42149 2049 2 I_--In I_--In NNP 42149 2049 3 Table table NN 42149 2049 4 24 24 CD 42149 2049 5 the the DT 42149 2049 6 first first JJ 42149 2049 7 pair pair NN 42149 2049 8 of of IN 42149 2049 9 bore bore NN 42149 2049 10 segments segment NNS 42149 2049 11 is be VBZ 42149 2049 12 at at IN 42149 2049 13 ring re VBG 42149 2049 14 207 207 CD 42149 2049 15 - - SYM 42149 2049 16 208 208 CD 42149 2049 17 . . . 42149 2049 18 " " '' 42149 2050 1 " " `` 42149 2050 2 25 25 CD 42149 2050 3 " " '' 42149 2050 4 " " `` 42149 2050 5 " " '' 42149 2050 6 " " '' 42149 2050 7 " " '' 42149 2050 8 " " '' 42149 2050 9 " " '' 42149 2050 10 " " '' 42149 2050 11 " " '' 42149 2050 12 201 201 CD 42149 2050 13 - - SYM 42149 2050 14 202 202 CD 42149 2050 15 . . . 42149 2050 16 " " '' 42149 2051 1 " " `` 42149 2051 2 26 26 CD 42149 2051 3 " " `` 42149 2051 4 " " `` 42149 2051 5 " " '' 42149 2051 6 " " '' 42149 2051 7 " " '' 42149 2051 8 " " '' 42149 2051 9 " " '' 42149 2051 10 " " '' 42149 2051 11 " " '' 42149 2051 12 185 185 CD 42149 2051 13 - - SYM 42149 2051 14 186 186 CD 42149 2051 15 . . . 42149 2051 16 " " '' 42149 2052 1 " " `` 42149 2052 2 27 27 CD 42149 2052 3 " " '' 42149 2052 4 " " `` 42149 2052 5 " " '' 42149 2052 6 " " '' 42149 2052 7 " " '' 42149 2052 8 " " '' 42149 2052 9 " " '' 42149 2052 10 " " '' 42149 2052 11 " " '' 42149 2052 12 171 171 CD 42149 2052 13 - - HYPH 42149 2052 14 172 172 CD 42149 2052 15 . . . 42149 2053 1 Outside outside JJ 42149 2053 2 diameter diameter NN 42149 2053 3 of of IN 42149 2053 4 tunnel tunnel NN 42149 2053 5 = = SYM 42149 2053 6 23 23 CD 42149 2053 7 ft ft NN 42149 2053 8 . . NN 42149 2053 9 0 0 CD 42149 2053 10 in in IN 42149 2053 11 . . . 42149 2054 1 Inside inside IN 42149 2054 2 " " `` 42149 2054 3 " " `` 42149 2054 4 " " '' 42149 2054 5 = = SYM 42149 2054 6 21 21 CD 42149 2054 7 ft ft NN 42149 2054 8 . . NN 42149 2054 9 2 2 CD 42149 2054 10 in in IN 42149 2054 11 . . . 42149 2055 1 Length length NN 42149 2055 2 of of IN 42149 2055 3 ring ring NN 42149 2055 4 = = SYM 42149 2055 5 2 2 CD 42149 2055 6 ft ft NN 42149 2055 7 . . NN 42149 2055 8 6 6 CD 42149 2055 9 in in IN 42149 2055 10 . . . 42149 2056 1 In in IN 42149 2056 2 the the DT 42149 2056 3 " " `` 42149 2056 4 Ordinary Ordinary NNP 42149 2056 5 Iron Iron NNP 42149 2056 6 " " '' 42149 2056 7 section section NN 42149 2056 8 the the DT 42149 2056 9 time time NN 42149 2056 10 is be VBZ 42149 2056 11 divided divide VBN 42149 2056 12 between between IN 42149 2056 13 mucking muck VBG 42149 2056 14 ( ( -LRB- 42149 2056 15 which which WDT 42149 2056 16 included include VBD 42149 2056 17 the the DT 42149 2056 18 shoving shove VBG 42149 2056 19 and and CC 42149 2056 20 pushing push VBG 42149 2056 21 back back RB 42149 2056 22 of of IN 42149 2056 23 the the DT 42149 2056 24 jacks jack NNS 42149 2056 25 ) ) -RRB- 42149 2056 26 and and CC 42149 2056 27 the the DT 42149 2056 28 erection erection NN 42149 2056 29 time time NN 42149 2056 30 ( ( -LRB- 42149 2056 31 which which WDT 42149 2056 32 included include VBD 42149 2056 33 the the DT 42149 2056 34 time time NN 42149 2056 35 spent spend VBN 42149 2056 36 by by IN 42149 2056 37 the the DT 42149 2056 38 whole whole JJ 42149 2056 39 gang gang NN 42149 2056 40 in in IN 42149 2056 41 tightening tighten VBG 42149 2056 42 bolts bolt NNS 42149 2056 43 ) ) -RRB- 42149 2056 44 . . . 42149 2057 1 In in IN 42149 2057 2 the the DT 42149 2057 3 " " `` 42149 2057 4 Heavy Heavy NNP 42149 2057 5 Iron Iron NNP 42149 2057 6 " " '' 42149 2057 7 section section NN 42149 2057 8 these these DT 42149 2057 9 times time NNS 42149 2057 10 are be VBP 42149 2057 11 all all DT 42149 2057 12 separated separate VBN 42149 2057 13 into into IN 42149 2057 14 " " `` 42149 2057 15 Mucking mucking NN 42149 2057 16 , , , 42149 2057 17 " " '' 42149 2057 18 " " `` 42149 2057 19 Pushing push VBG 42149 2057 20 Back back RP 42149 2057 21 Jacks jack NNS 42149 2057 22 , , , 42149 2057 23 " " '' 42149 2057 24 " " `` 42149 2057 25 Erecting erecting NN 42149 2057 26 , , , 42149 2057 27 " " '' 42149 2057 28 and and CC 42149 2057 29 " " `` 42149 2057 30 Bolting Bolting NNP 42149 2057 31 , , , 42149 2057 32 " " '' 42149 2057 33 and and CC 42149 2057 34 here here RB 42149 2057 35 the the DT 42149 2057 36 bolting bolting NN 42149 2057 37 time time NN 42149 2057 38 included include VBD 42149 2057 39 only only RB 42149 2057 40 that that WDT 42149 2057 41 spent spend VBD 42149 2057 42 on on IN 42149 2057 43 bolts bolt NNS 42149 2057 44 by by IN 42149 2057 45 the the DT 42149 2057 46 whole whole JJ 42149 2057 47 gang gang NN 42149 2057 48 ; ; : 42149 2057 49 in in IN 42149 2057 50 addition addition NN 42149 2057 51 , , , 42149 2057 52 there there EX 42149 2057 53 was be VBD 42149 2057 54 a a DT 42149 2057 55 small small JJ 42149 2057 56 gang gang NN 42149 2057 57 engaged engage VBN 42149 2057 58 solely solely RB 42149 2057 59 in in IN 42149 2057 60 tightening tighten VBG 42149 2057 61 bolts bolt NNS 42149 2057 62 . . . 42149 2058 1 The the DT 42149 2058 2 lost lost JJ 42149 2058 3 time time NN 42149 2058 4 is be VBZ 42149 2058 5 the the DT 42149 2058 6 average average JJ 42149 2058 7 time time NN 42149 2058 8 lost lose VBN 42149 2058 9 due due IN 42149 2058 10 to to IN 42149 2058 11 the the DT 42149 2058 12 break break NN 42149 2058 13 - - HYPH 42149 2058 14 down down NN 42149 2058 15 of of IN 42149 2058 16 hydraulic hydraulic JJ 42149 2058 17 pipe pipe NN 42149 2058 18 lines line NNS 42149 2058 19 , , , 42149 2058 20 damaged damage VBN 42149 2058 21 jacks jack NNS 42149 2058 22 , , , 42149 2058 23 and and CC 42149 2058 24 broken break VBN 42149 2058 25 erector erector NN 42149 2058 26 chains chain NNS 42149 2058 27 . . . 42149 2059 1 The the DT 42149 2059 2 erection erection NN 42149 2059 3 time time NN 42149 2059 4 is be VBZ 42149 2059 5 separated separate VBN 42149 2059 6 for for IN 42149 2059 7 the the DT 42149 2059 8 various various JJ 42149 2059 9 kinds kind NNS 42149 2059 10 of of IN 42149 2059 11 rings ring NNS 42149 2059 12 , , , 42149 2059 13 that that RB 42149 2059 14 is is RB 42149 2059 15 , , , 42149 2059 16 straight straight JJ 42149 2059 17 ordinary ordinary JJ 42149 2059 18 rings ring NNS 42149 2059 19 , , , 42149 2059 20 rings ring NNS 42149 2059 21 containing contain VBG 42149 2059 22 No no UH 42149 2059 23 . . . 42149 2060 1 1 1 CD 42149 2060 2 bore bore NN 42149 2060 3 segments segment NNS 42149 2060 4 , , , 42149 2060 5 rings ring NNS 42149 2060 6 containing contain VBG 42149 2060 7 No no UH 42149 2060 8 . . . 42149 2061 1 2 2 CD 42149 2061 2 bore bore NN 42149 2061 3 segments segment NNS 42149 2061 4 , , , 42149 2061 5 and and CC 42149 2061 6 taper taper NN 42149 2061 7 rings ring NNS 42149 2061 8 , , , 42149 2061 9 and and CC 42149 2061 10 it -PRON- PRP 42149 2061 11 will will MD 42149 2061 12 be be VB 42149 2061 13 seen see VBN 42149 2061 14 that that IN 42149 2061 15 , , , 42149 2061 16 on on IN 42149 2061 17 the the DT 42149 2061 18 average average JJ 42149 2061 19 , , , 42149 2061 20 taper taper NN 42149 2061 21 rings ring NNS 42149 2061 22 took take VBD 42149 2061 23 22 22 CD 42149 2061 24 min min NN 42149 2061 25 . . . 42149 2062 1 ( ( -LRB- 42149 2062 2 or or CC 42149 2062 3 24 24 CD 42149 2062 4 % % NN 42149 2062 5 ) ) -RRB- 42149 2062 6 more more JJR 42149 2062 7 time time NN 42149 2062 8 to to TO 42149 2062 9 erect erect VB 42149 2062 10 and and CC 42149 2062 11 to to TO 42149 2062 12 bolt bolt VB 42149 2062 13 than than IN 42149 2062 14 ordinary ordinary JJ 42149 2062 15 ones one NNS 42149 2062 16 , , , 42149 2062 17 and and CC 42149 2062 18 that that IN 42149 2062 19 rings ring NNS 42149 2062 20 containing contain VBG 42149 2062 21 No no UH 42149 2062 22 . . . 42149 2063 1 2 2 CD 42149 2063 2 bore bore NN 42149 2063 3 segments segment NNS 42149 2063 4 took take VBD 42149 2063 5 14 14 CD 42149 2063 6 min min NN 42149 2063 7 . . . 42149 2064 1 ( ( -LRB- 42149 2064 2 or or CC 42149 2064 3 15 15 CD 42149 2064 4 % % NN 42149 2064 5 ) ) -RRB- 42149 2064 6 more more JJR 42149 2064 7 . . . 42149 2065 1 TABLE TABLE NNS 42149 2065 2 24.--SHIELD 24.--shield CD 42149 2065 3 - - HYPH 42149 2065 4 DRIVEN drive VBN 42149 2065 5 TUNNEL TUNNEL NNP 42149 2065 6 WORK work NN 42149 2065 7 , , , 42149 2065 8 MANHATTAN MANHATTAN NNP 42149 2065 9 SHAFT SHAFT NNP 42149 2065 10 , , , 42149 2065 11 RIVER RIVER NNP 42149 2065 12 TUNNEL TUNNEL NNP 42149 2065 13 NORTH NORTH NNP 42149 2065 14 . . . 42149 2066 1 Table table NN 42149 2066 2 showing show VBG 42149 2066 3 the the DT 42149 2066 4 size size NN 42149 2066 5 of of IN 42149 2066 6 the the DT 42149 2066 7 gang gang NN 42149 2066 8 , , , 42149 2066 9 the the DT 42149 2066 10 amount amount NN 42149 2066 11 of of IN 42149 2066 12 excavation excavation NN 42149 2066 13 , , , 42149 2066 14 and and CC 42149 2066 15 the the DT 42149 2066 16 time time NN 42149 2066 17 per per IN 42149 2066 18 ring ring NN 42149 2066 19 taken take VBN 42149 2066 20 for for IN 42149 2066 21 the the DT 42149 2066 22 various various JJ 42149 2066 23 operations operation NNS 42149 2066 24 involved involve VBN 42149 2066 25 in in IN 42149 2066 26 building build VBG 42149 2066 27 tunnel tunnel NN 42149 2066 28 through through IN 42149 2066 29 the the DT 42149 2066 30 several several JJ 42149 2066 31 kinds kind NNS 42149 2066 32 of of IN 42149 2066 33 ground ground NN 42149 2066 34 encountered encounter VBN 42149 2066 35 ; ; : 42149 2066 36 also also RB 42149 2066 37 the the DT 42149 2066 38 extent extent NN 42149 2066 39 and and CC 42149 2066 40 nature nature NN 42149 2066 41 of of IN 42149 2066 42 all all PDT 42149 2066 43 the the DT 42149 2066 44 unavoidable unavoidable JJ 42149 2066 45 delays delay NNS 42149 2066 46 . . . 42149 2067 1 TABLE TABLE NNP 42149 2067 2 24 24 CD 42149 2067 3 PART part NN 42149 2067 4 1 1 CD 42149 2067 5 = = SYM 42149 2067 6 + + SYM 42149 2067 7 = = SYM 42149 2067 8 = = SYM 42149 2067 9 = = SYM 42149 2067 10 = = SYM 42149 2067 11 = = SYM 42149 2067 12 = = SYM 42149 2067 13 = = SYM 42149 2067 14 = = SYM 42149 2067 15 = = SYM 42149 2067 16 = = NFP 42149 2067 17 = = SYM 42149 2067 18 + + SYM 42149 2067 19 = = SYM 42149 2067 20 = = SYM 42149 2067 21 = = SYM 42149 2067 22 = = SYM 42149 2067 23 = = SYM 42149 2067 24 = = NFP 42149 2067 25 = = SYM 42149 2067 26 + + SYM 42149 2067 27 = = SYM 42149 2067 28 = = SYM 42149 2067 29 = = SYM 42149 2067 30 = = SYM 42149 2067 31 = = SYM 42149 2067 32 = = SYM 42149 2067 33 = = SYM 42149 2067 34 = = SYM 42149 2067 35 = = SYM 42149 2067 36 = = SYM 42149 2067 37 = = SYM 42149 2067 38 = = NFP 42149 2067 39 = = SYM 42149 2067 40 + + SYM 42149 2067 41 = = SYM 42149 2067 42 = = SYM 42149 2067 43 = = SYM 42149 2067 44 + + SYM 42149 2067 45 = = SYM 42149 2067 46 = = SYM 42149 2067 47 = = SYM 42149 2067 48 = = SYM 42149 2067 49 = = SYM 42149 2067 50 = = SYM 42149 2067 51 = = SYM 42149 2067 52 = = SYM 42149 2067 53 = = SYM 42149 2067 54 = = SYM 42149 2067 55 = = SYM 42149 2067 56 = = NFP 42149 2067 57 = = SYM 42149 2067 58 + + SYM 42149 2067 59 = = SYM 42149 2067 60 = = SYM 42149 2067 61 = = SYM 42149 2067 62 = = NFP 42149 2067 63 = = SYM 42149 2067 64 + + SYM 42149 2067 65 = = SYM 42149 2067 66 = = SYM 42149 2067 67 = = SYM 42149 2067 68 + + SYM 42149 2067 69 = = SYM 42149 2067 70 = = SYM 42149 2067 71 + + SYM 42149 2067 72 = = SYM 42149 2067 73 =| =| ADD 42149 2067 74 W| W| NNP 42149 2067 75 | | NNP 42149 2067 76 | | NNP 42149 2067 77 AVE AVE NNP 42149 2067 78 . . . 42149 2067 79 NO no UH 42149 2067 80 . . . 42149 2068 1 | | NNP 42149 2068 2 e| e| NNP 42149 2068 3 | | HYPH 42149 2068 4 | | NNP 42149 2068 5 OF OF NNP 42149 2068 6 MEN MEN NNP 42149 2068 7 | | NNP 42149 2068 8 i| i| JJ 42149 2068 9 | | NNP 42149 2068 10 DESCRIPTION description NN 42149 2068 11 | | CD 42149 2068 12 IN IN NNP 42149 2068 13 GANG gang NN 42149 2068 14 | | HYPH 42149 2068 15 g| g| NN 42149 2068 16 |-------+-------------+---+-------------+--+--+---+--+--| |-------+-------------+---+-------------+--+--+---+--+--| NNP 42149 2068 17 h| h| NNP 42149 2068 18 | | NNP 42149 2068 19 | | NNP 42149 2068 20 |Ave| |Ave| NNP 42149 2068 21 | | CD 42149 2068 22 | | CD 42149 2068 23 | | CD 42149 2068 24 |A |a CD 42149 2068 25 | | CD 42149 2068 26 | | CD 42149 2068 27 t| t| JJ 42149 2068 28 | | CD 42149 2068 29 | | NNP 42149 2068 30 |air| |air| NNP 42149 2068 31 | | CD 42149 2068 32 |D |d CD 42149 2068 33 |G |g CD 42149 2068 34 |i |i NNP 42149 2068 35 | | NNP 42149 2068 36 | | NNP 42149 2068 37 | | CD 42149 2068 38 | | CD 42149 2068 39 | | CD 42149 2068 40 | | CD 42149 2068 41 | | CD 42149 2068 42 | | NNP 42149 2068 43 |r |r NNP 42149 2068 44 |r |r NNP 42149 2068 45 |r |r NNP 42149 2068 46 | | NNP 42149 2068 47 | | NNP 42149 2068 48 o| o| NNP 42149 2068 49 | | CD 42149 2068 50 | | CD 42149 2068 51 |P |p CD 42149 2068 52 | | CD 42149 2068 53 |S |s CD 42149 2068 54 |i |i NNP 42149 2068 55 |o |o NNP 42149 2068 56 | | NNP 42149 2068 57 | | NNP 42149 2068 58 | | CD 42149 2068 59 f| f| NN 42149 2068 60 | | CD 42149 2068 61 | | NNP 42149 2068 62 |r |r NNP 42149 2068 63 | | NNP 42149 2068 64 |h |h NNP 42149 2068 65 |l |l NNP 42149 2068 66 |u |u NN 42149 2068 67 |t |t NNP 42149 2068 68 |T |t CD 42149 2068 69 | | CD 42149 2068 70 | | CD 42149 2068 71 | | NNP 42149 2068 72 | | NNP 42149 2068 73 |e |e NNP 42149 2068 74 | | NNP 42149 2068 75 |i |i NNP 42149 2068 76 |l |l NNP 42149 2068 77 |t |t JJ 42149 2068 78 |r |r NNP 42149 2068 79 |o |o NNP 42149 2068 80 | | NNP 42149 2068 81 | | NNP 42149 2068 82 | | NNP 42149 2068 83 | | NNP 42149 2068 84 |s |s NNP 42149 2068 85 | | NNP 42149 2068 86 |e |e NNP 42149 2068 87 |i |i NNP 42149 2068 88 |i |i NNP 42149 2068 89 |a |a NNP 42149 2068 90 |t |t NNP 42149 2068 91 | | CD 42149 2068 92 i| i| JJ 42149 2068 93 | | NNP 42149 2068 94 | | NNP 42149 2068 95 |s |s NNP 42149 2068 96 | | NNP 42149 2068 97 |l |l NNP 42149 2068 98 |n |n NNP 42149 2068 99 |n |n NNP 42149 2068 100 |n |n NNP 42149 2068 101 |a |a NNP 42149 2068 102 | | NNP 42149 2068 103 r| r| NNP 42149 2068 104 Section Section NNP 42149 2068 105 | | NNP 42149 2068 106 | | NNP 42149 2068 107 |u |u JJ 42149 2068 108 | | NNP 42149 2068 109 |d |d NNP 42149 2068 110 |g |g NNP 42149 2068 111 |g |g NNP 42149 2068 112 |s |s NNP 42149 2068 113 |l |l NNP 42149 2068 114 | | NNP 42149 2068 115 o| o| NN 42149 2068 116 between between IN 42149 2068 117 | | NNP 42149 2068 118 Length| Length| NNP 42149 2068 119 |r |r NN 42149 2068 120 |Method |Method NNS 42149 2068 121 of of IN 42149 2068 122 |--+--+---+--| |--+--+---+--| NNP 42149 2068 123 | | NNP 42149 2068 124 n| n| NN 42149 2068 125 rings ring NNS 42149 2068 126 |in |in CD 42149 2068 127 feet|Material feet|Material NNP 42149 2068 128 |e |e NNS 42149 2068 129 |Excavation |excavation CD 42149 2068 130 |A |a CD 42149 2068 131 |B |b CD 42149 2068 132 |C |c CD 42149 2068 133 |D |d CD 42149 2068 134 | | NNP 42149 2068 135 | | NNP 42149 2068 136 -+-----------+-------+-------------+---|-------------+--+--+---+--+--| -+-----------+-------+-------------+---|-------------+--+--+---+--+--| NNP 42149 2068 137 | | NNP 42149 2068 138 1 1 CD 42149 2068 139 - - HYPH 42149 2068 140 54 54 CD 42149 2068 141 | | CD 42149 2068 142 135.0|Rock 135.0|rock CD 42149 2068 143 | | CD 42149 2068 144 |[P |[P NNP 42149 2068 145 ] ] -RRB- 42149 2068 146 | | CD 42149 2068 147 | | CD 42149 2068 148 | | CD 42149 2068 149 | | CD 42149 2068 150 |14| |14| JJ 42149 2068 151 | | CD 42149 2068 152 55 55 CD 42149 2068 153 - - HYPH 42149 2068 154 80 80 CD 42149 2068 155 | | CD 42149 2068 156 65.0| 65.0| CD 42149 2068 157 " " '' 42149 2068 158 |19 |19 NNP 42149 2068 159 |[P |[P NNP 42149 2068 160 ] ] -RRB- 42149 2068 161 |24| |24| NN 42149 2068 162 7|1/3| 7|1/3| CD 42149 2068 163 1|32| 1|32| CD 42149 2068 164 | | CD 42149 2068 165 81 81 CD 42149 2068 166 - - HYPH 42149 2068 167 107 107 CD 42149 2068 168 | | CD 42149 2068 169 65.0|Soft 65.0|soft CD 42149 2068 170 rock rock NN 42149 2068 171 |18 |18 CD 42149 2068 172 |[P |[P NNP 42149 2068 173 ] ] -RRB- 42149 2068 174 |22| |22| JJ 42149 2068 175 5| 5| CD 42149 2068 176 | | CD 42149 2068 177 2|29| 2|29| CD 42149 2068 178 O| o| CD 42149 2068 179 108 108 CD 42149 2068 180 - - HYPH 42149 2068 181 153 153 CD 42149 2068 182 | | CD 42149 2068 183 117.5|Rock 117.5|rock CD 42149 2068 184 |14 |14 CD 42149 2068 185 |[P |[P NNP 42149 2068 186 ] ] -RRB- 42149 2068 187 |17|11| |17|11| NNP 42149 2068 188 | | NNP 42149 2068 189 2|30| 2|30| CD 42149 2068 190 r| r| NN 42149 2068 191 154 154 CD 42149 2068 192 - - SYM 42149 2068 193 194 194 CD 42149 2068 194 | | CD 42149 2068 195 102.5|Rock 102.5|rock CD 42149 2068 196 and and CC 42149 2068 197 |14 |14 CD 42149 2068 198 |[P |[P NNP 42149 2068 199 ] ] -RRB- 42149 2068 200 |23| |23| CD 42149 2068 201 6| 6| CD 42149 2068 202 | | NNP 42149 2068 203 2|31| 2|31| CD 42149 2068 204 d| d| NN 42149 2068 205 | | NNP 42149 2068 206 |earth |earth CD 42149 2068 207 | | CD 42149 2068 208 | | CD 42149 2068 209 | | CD 42149 2068 210 | | CD 42149 2068 211 | | CD 42149 2068 212 | | CD 42149 2068 213 | | CD 42149 2068 214 i| i| NN 42149 2068 215 195 195 CD 42149 2068 216 - - SYM 42149 2068 217 215 215 CD 42149 2068 218 | | CD 42149 2068 219 52.5|Silt 52.5|silt CD 42149 2068 220 |19 |19 NNP 42149 2068 221 |[P]Breasting |[p]breaste VBG 42149 2068 222 |28| |28| NN 42149 2068 223 | | CD 42149 2068 224 | | CD 42149 2068 225 2|30| 2|30| CD 42149 2068 226 n| n| NN 42149 2068 227 216 216 CD 42149 2068 228 - - SYM 42149 2068 229 393 393 CD 42149 2068 230 | | CD 42149 2068 231 445.0| 445.0| CD 42149 2068 232 " " '' 42149 2068 233 |20 |20 CD 42149 2068 234 |[Q]8 |[Q]8 NNP 42149 2068 235 doors door NNS 42149 2068 236 |27| |27| JJ 42149 2068 237 | | CD 42149 2068 238 | | CD 42149 2068 239 4|31| 4|31| CD 42149 2068 240 a| a| NN 42149 2068 241 394 394 CD 42149 2068 242 - - SYM 42149 2068 243 429 429 CD 42149 2068 244 | | CD 42149 2068 245 90.0|Silt 90.0|silt CD 42149 2068 246 , , , 42149 2068 247 piles pile NNS 42149 2068 248 , , , 42149 2068 249 |24 |24 NNP 42149 2068 250 |[C]Breasting |[C]Breasting NNP 42149 2068 251 |28| |28| NNP 42149 2068 252 | | NNP 42149 2068 253 | | CD 42149 2068 254 4|32| 4|32| CD 42149 2068 255 r| r| NN 42149 2068 256 | | CD 42149 2068 257 |rip |rip JJ 42149 2068 258 - - HYPH 42149 2068 259 rap rap NN 42149 2068 260 | | NNP 42149 2068 261 | | NNP 42149 2068 262 | | CD 42149 2068 263 | | CD 42149 2068 264 | | CD 42149 2068 265 | | CD 42149 2068 266 | | CD 42149 2068 267 y| y| NNS 42149 2068 268 430 430 CD 42149 2068 269 - - SYM 42149 2068 270 509 509 CD 42149 2068 271 | | CD 42149 2068 272 200.0|Silt 200.0|silt CD 42149 2068 273 |23 |23 NNP 42149 2068 274 |[Q]1 |[Q]1 NNP 42149 2068 275 door door NN 42149 2068 276 |24| |24| NN 42149 2068 277 | | CD 42149 2068 278 | | CD 42149 2068 279 3|27| 3|27| CD 42149 2068 280 | | CD 42149 2068 281 510 510 CD 42149 2068 282 - - HYPH 42149 2068 283 692 692 CD 42149 2068 284 | | CD 42149 2068 285 457.5| 457.5| CD 42149 2068 286 " " '' 42149 2068 287 |23 |23 NNP 42149 2068 288 |[Q]3 |[Q]3 NNP 42149 2068 289 doors door NNS 42149 2068 290 |26| |26| VBZ 42149 2068 291 | | CD 42149 2068 292 | | NNP 42149 2068 293 4|30| 4|30| CD 42149 2068 294 | | CD 42149 2068 295 55 55 CD 42149 2068 296 - - SYM 42149 2068 297 692 692 CD 42149 2068 298 |1,593.0| |1,593.0| NN 42149 2068 299 |20 |20 CD 42149 2068 300 | | CD 42149 2068 301 |25| |25| JJ 42149 2068 302 2| 2| CD 42149 2068 303 | | CD 42149 2068 304 3|30| 3|30| CD 42149 2068 305 | | CD 42149 2068 306 216 216 CD 42149 2068 307 - - SYM 42149 2068 308 692 692 CD 42149 2068 309 |1,192.5| |1,192.5| NNP 42149 2068 310 |22 |22 NNP 42149 2068 311 | | CD 42149 2068 312 |26| |26| VBZ 42149 2068 313 | | CD 42149 2068 314 | | NNP 42149 2068 315 4|30| 4|30| CD 42149 2068 316 -+-----------+-------+-------------+---+-------------+--+--+---+--+--| -+-----------+-------+-------------+---+-------------+--+--+---+--+--| NN 42149 2068 317 | | CD 42149 2068 318 693 693 CD 42149 2068 319 - - HYPH 42149 2068 320 954 954 CD 42149 2068 321 | | CD 42149 2068 322 655.0|Silt 655.0|silt CD 42149 2068 323 |24 |24 NNP 42149 2068 324 |[Q]1 |[Q]1 NNP 42149 2068 325 door door NN 42149 2068 326 |28| |28| NNP 42149 2068 327 | | NNP 42149 2068 328 | | NNP 42149 2068 329 6|34| 6|34| CD 42149 2068 330 | | CD 42149 2068 331 955 955 CD 42149 2068 332 - - HYPH 42149 2068 333 1,014 1,014 CD 42149 2068 334 | | CD 42149 2068 335 150.0| 150.0| CD 42149 2068 336 " " '' 42149 2068 337 |24 |24 NNP 42149 2068 338 |[Q]1 |[Q]1 NNP 42149 2068 339 " " '' 42149 2068 340 |28| |28| NNP 42149 2068 341 | | NNP 42149 2068 342 | | CD 42149 2068 343 8|36| 8|36| CD 42149 2068 344 |1,015 |1,015 NNS 42149 2068 345 - - HYPH 42149 2068 346 1,074| 1,074| CD 42149 2068 347 150.0| 150.0| CD 42149 2068 348 " " `` 42149 2068 349 |24 |24 NNP 42149 2068 350 |[Q]1 |[Q]1 NNP 42149 2068 351 " " '' 42149 2068 352 |25| |25| JJ 42149 2068 353 | | CD 42149 2068 354 | | CD 42149 2068 355 8|33| 8|33| CD 42149 2068 356 H|1,075 H|1,075 NNP 42149 2068 357 - - HYPH 42149 2068 358 1,134| 1,134| CD 42149 2068 359 150.0| 150.0| CD 42149 2068 360 " " '' 42149 2068 361 |24 |24 NNP 42149 2068 362 |[Q]1 |[Q]1 NNP 42149 2068 363 " " '' 42149 2068 364 |27| |27| JJ 42149 2068 365 | | CD 42149 2068 366 | | CD 42149 2068 367 9|36| 9|36| CD 42149 2068 368 e|1,135 e|1,135 NNS 42149 2068 369 - - HYPH 42149 2068 370 1,194| 1,194| CD 42149 2068 371 150.0| 150.0| CD 42149 2068 372 " " `` 42149 2068 373 |25 |25 CD 42149 2068 374 |[Q]1 |[Q]1 NNP 42149 2068 375 " " '' 42149 2068 376 |26| |26| VBZ 42149 2068 377 | | NNP 42149 2068 378 | | NNP 42149 2068 379 8|34| 8|34| CD 42149 2068 380 a|1,195 a|1,195 NN 42149 2068 381 - - HYPH 42149 2068 382 1,224| 1,224| CD 42149 2068 383 75.0| 75.0| CD 42149 2068 384 " " `` 42149 2068 385 |25 |25 CD 42149 2068 386 |[Q]1 |[Q]1 NNP 42149 2068 387 " " '' 42149 2068 388 |24| |24| NN 42149 2068 389 | | CD 42149 2068 390 | | CD 42149 2068 391 9|33| 9|33| CD 42149 2068 392 v|1,225 v|1,225 NN 42149 2068 393 - - HYPH 42149 2068 394 1,262| 1,262| CD 42149 2068 395 95.0| 95.0| CD 42149 2068 396 " " `` 42149 2068 397 |25 |25 CD 42149 2068 398 |[Q]1 |[Q]1 NNP 42149 2068 399 " " '' 42149 2068 400 |23| |23| JJ 42149 2068 401 | | CD 42149 2068 402 | | CD 42149 2068 403 9|32| 9|32| CD 42149 2068 404 y|1,263 y|1,263 CD 42149 2068 405 - - HYPH 42149 2068 406 1,277| 1,277| CD 42149 2068 407 37.5| 37.5| CD 42149 2068 408 " " `` 42149 2068 409 |25 |25 CD 42149 2068 410 |[Q]1 |[Q]1 NNP 42149 2068 411 " " '' 42149 2068 412 |24| |24| NN 42149 2068 413 | | CD 42149 2068 414 |10|34| |10|34| CD 42149 2068 415 |1,278 |1,278 VBN 42149 2068 416 - - HYPH 42149 2068 417 1,307| 1,307| CD 42149 2068 418 75.0| 75.0| CD 42149 2068 419 " " `` 42149 2068 420 |25 |25 CD 42149 2068 421 |[Q]1 |[Q]1 NNP 42149 2068 422 " " '' 42149 2068 423 |21| |21| NN 42149 2068 424 | | NNP 42149 2068 425 |10|31| |10|31| NNP 42149 2068 426 |1,308 |1,308 NNP 42149 2068 427 - - HYPH 42149 2068 428 1,326| 1,326| CD 42149 2068 429 47.5| 47.5| CD 42149 2068 430 " " `` 42149 2068 431 |28 |28 NNP 42149 2068 432 |[Q]1 |[Q]1 NNP 42149 2068 433 " " '' 42149 2068 434 |27| |27| JJ 42149 2068 435 | | NNP 42149 2068 436 |11|38| |11|38| NNP 42149 2068 437 | | NNP 42149 2068 438 955 955 CD 42149 2068 439 - - HYPH 42149 2068 440 1,326| 1,326| CD 42149 2068 441 930.0| 930.0| CD 42149 2068 442 |24 |24 CD 42149 2068 443 | | CD 42149 2068 444 |26| |26| VBZ 42149 2068 445 | | CD 42149 2068 446 | | CD 42149 2068 447 9|35| 9|35| CD 42149 2068 448 | | CD 42149 2068 449 693 693 CD 42149 2068 450 - - HYPH 42149 2068 451 1,326|1,585.0| 1,326|1,585.0| CD 42149 2068 452 |24 |24 CD 42149 2068 453 | | CD 42149 2068 454 |27| |27| JJ 42149 2068 455 | | CD 42149 2068 456 | | NNP 42149 2068 457 8|35| 8|35| CD 42149 2068 458 -+-----------+-------+-------------+---+-------------+--+--+---+--+--| -+-----------+-------+-------------+---+-------------+--+--+---+--+--| NN 42149 2068 459 A| a| CD 42149 2068 460 216 216 CD 42149 2068 461 - - HYPH 42149 2068 462 1,326|2,777.5| 1,326|2,777.5| CD 42149 2068 463 |23 |23 CD 42149 2068 464 | | CD 42149 2068 465 |27| |27| JJ 42149 2068 466 | | CD 42149 2068 467 | | CD 42149 2068 468 7|34| 7|34| CD 42149 2068 469 l| l| JJ 42149 2068 470 55 55 CD 42149 2068 471 - - SYM 42149 2068 472 1,326|3,180.0| 1,326|3,180.0| CD 42149 2068 473 |22 |22 CD 42149 2068 474 | | CD 42149 2068 475 |26| |26| VBZ 42149 2068 476 | | CD 42149 2068 477 | | CD 42149 2068 478 6|32| 6|32| CD 42149 2068 479 l| l| JJ 42149 2068 480 | | CD 42149 2068 481 | | CD 42149 2068 482 | | CD 42149 2068 483 | | CD 42149 2068 484 | | CD 42149 2068 485 | | CD 42149 2068 486 | | CD 42149 2068 487 | | CD 42149 2068 488 | | CD 42149 2068 489 | | NNS 42149 2068 490 = = SYM 42149 2068 491 + + SYM 42149 2068 492 = = SYM 42149 2068 493 = = SYM 42149 2068 494 = = SYM 42149 2068 495 = = SYM 42149 2068 496 = = SYM 42149 2068 497 = = SYM 42149 2068 498 = = SYM 42149 2068 499 = = SYM 42149 2068 500 = = SYM 42149 2068 501 = = NFP 42149 2068 502 = = SYM 42149 2068 503 + + SYM 42149 2068 504 = = SYM 42149 2068 505 = = SYM 42149 2068 506 = = SYM 42149 2068 507 = = SYM 42149 2068 508 = = SYM 42149 2068 509 = = NFP 42149 2068 510 = = SYM 42149 2068 511 + + SYM 42149 2068 512 = = SYM 42149 2068 513 = = SYM 42149 2068 514 = = SYM 42149 2068 515 = = SYM 42149 2068 516 = = SYM 42149 2068 517 = = SYM 42149 2068 518 = = SYM 42149 2068 519 = = SYM 42149 2068 520 = = SYM 42149 2068 521 = = SYM 42149 2068 522 = = SYM 42149 2068 523 = = NFP 42149 2068 524 = = SYM 42149 2068 525 + + SYM 42149 2068 526 = = SYM 42149 2068 527 = = SYM 42149 2068 528 = = SYM 42149 2068 529 + + SYM 42149 2068 530 = = SYM 42149 2068 531 = = SYM 42149 2068 532 = = SYM 42149 2068 533 = = SYM 42149 2068 534 = = SYM 42149 2068 535 = = SYM 42149 2068 536 = = SYM 42149 2068 537 = = SYM 42149 2068 538 = = SYM 42149 2068 539 = = SYM 42149 2068 540 = = SYM 42149 2068 541 = = NFP 42149 2068 542 = = SYM 42149 2068 543 + + SYM 42149 2068 544 = = SYM 42149 2068 545 = = SYM 42149 2068 546 + + SYM 42149 2068 547 = = SYM 42149 2068 548 = = SYM 42149 2068 549 + + SYM 42149 2068 550 = = SYM 42149 2068 551 = = SYM 42149 2068 552 = = SYM 42149 2068 553 + + SYM 42149 2068 554 = = SYM 42149 2068 555 = = SYM 42149 2068 556 + + SYM 42149 2068 557 = = SYM 42149 2068 558 =| =| ADD 42149 2068 559 TABLE TABLE VBZ 42149 2068 560 24 24 CD 42149 2068 561 PART part CD 42149 2068 562 2 2 CD 42149 2068 563 = = SYM 42149 2068 564 + + SYM 42149 2068 565 = = SYM 42149 2068 566 = = SYM 42149 2068 567 = = SYM 42149 2068 568 = = SYM 42149 2068 569 = = SYM 42149 2068 570 = = SYM 42149 2068 571 = = SYM 42149 2068 572 = = SYM 42149 2068 573 = = SYM 42149 2068 574 = = NFP 42149 2068 575 = = SYM 42149 2068 576 + + SYM 42149 2068 577 = = SYM 42149 2068 578 = = SYM 42149 2068 579 = = NFP 42149 2068 580 = = SYM 42149 2068 581 + + SYM 42149 2068 582 = = SYM 42149 2068 583 = = SYM 42149 2068 584 = = SYM 42149 2068 585 = = NFP 42149 2068 586 = = SYM 42149 2068 587 + + SYM 42149 2068 588 = = SYM 42149 2068 589 = = SYM 42149 2068 590 = = SYM 42149 2068 591 = = NFP 42149 2068 592 = = SYM 42149 2068 593 + + SYM 42149 2068 594 = = SYM 42149 2068 595 = = SYM 42149 2068 596 = = SYM 42149 2068 597 = = SYM 42149 2068 598 = = SYM 42149 2068 599 = = SYM 42149 2068 600 = = NFP 42149 2068 601 = = SYM 42149 2068 602 + + SYM 42149 2068 603 = = SYM 42149 2068 604 = = SYM 42149 2068 605 = = NFP 42149 2068 606 = = SYM 42149 2068 607 + + SYM 42149 2068 608 = = SYM 42149 2068 609 = = SYM 42149 2068 610 = = NFP 42149 2068 611 = = SYM 42149 2068 612 + + SYM 42149 2068 613 = = SYM 42149 2068 614 = = SYM 42149 2068 615 = = NFP 42149 2068 616 = = SYM 42149 2068 617 + + SYM 42149 2068 618 = = SYM 42149 2068 619 = = SYM 42149 2068 620 = = NFP 42149 2068 621 = = SYM 42149 2068 622 + + SYM 42149 2068 623 = = SYM 42149 2068 624 = = SYM 42149 2068 625 = = SYM 42149 2068 626 =| =| ADD 42149 2068 627 W| W| NNP 42149 2068 628 | | NNP 42149 2068 629 | | NNP 42149 2068 630 |Av |Av NNP 42149 2068 631 . . . 42149 2069 1 | | CD 42149 2069 2 | | CD 42149 2069 3 TIME TIME NNP 42149 2069 4 FOR for IN 42149 2069 5 RING ring NN 42149 2069 6 | | NNP 42149 2069 7 e| e| NNP 42149 2069 8 | | CD 42149 2069 9 | | NNP 42149 2069 10 | | CD 42149 2069 11 | | CD 42149 2069 12 | | CD 42149 2069 13 ERECTION ERECTION NNS 42149 2069 14 , , , 42149 2069 15 | | NNP 42149 2069 16 i| i| JJ 42149 2069 17 | | HYPH 42149 2069 18 | | CD 42149 2069 19 |Time |time CD 42149 2069 20 | | CD 42149 2069 21 | | NNP 42149 2069 22 HRS HRS NNP 42149 2069 23 . . . 42149 2070 1 AND and CC 42149 2070 2 MIN MIN NNP 42149 2070 3 . . . 42149 2071 1 | | NNP 42149 2071 2 g| g| NNP 42149 2071 3 |----+-----| |----+-----| NNP 42149 2071 4 | | NNP 42149 2071 5 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2071 6 h| h| NNP 42149 2071 7 |Av |Av NNP 42149 2071 8 . . . 42149 2072 1 |Time |Time NNP 42149 2072 2 |per |per NNP 42149 2072 3 | | NNP 42149 2072 4 | | NNP 42149 2072 5 | | CD 42149 2072 6 | | CD 42149 2072 7 | | CD 42149 2072 8 | | CD 42149 2072 9 | | CD 42149 2072 10 t| t| NN 42149 2072 11 |No |No NNP 42149 2072 12 . . . 42149 2073 1 |Muck-| |Muck-| NFP 42149 2073 2 |T |t CD 42149 2073 3 | | NNP 42149 2073 4 O O NNP 42149 2073 5 | | NNP 42149 2073 6 | | NNP 42149 2073 7 | | CD 42149 2073 8 | | CD 42149 2073 9 | | CD 42149 2073 10 | | CD 42149 2073 11 |of |of CD 42149 2073 12 |ing |e VBG 42149 2073 13 , , , 42149 2073 14 |ring,|i |ring,|i CD 42149 2073 15 | | NNP 42149 2073 16 r r NNP 42149 2073 17 | | CD 42149 2073 18 | | CD 42149 2073 19 | | CD 42149 2073 20 | | CD 42149 2073 21 | | CD 42149 2073 22 o| o| NN 42149 2073 23 |cu |cu CD 42149 2073 24 . . . 42149 2074 1 |per |per NNP 42149 2074 2 | | NNP 42149 2074 3 |m |m JJ 42149 2074 4 | | NNP 42149 2074 5 d d NNP 42149 2074 6 | | NNP 42149 2074 7 B B NNP 42149 2074 8 | | NNP 42149 2074 9 B B NNP 42149 2074 10 | | NNP 42149 2074 11 | | CD 42149 2074 12 | | CD 42149 2074 13 f| f| NN 42149 2074 14 |yd |yd CD 42149 2074 15 . . . 42149 2075 1 |cu |cu CD 42149 2075 2 . . . 42149 2076 1 |shov-|e |shov-|e NNP 42149 2076 2 J J NNP 42149 2076 3 | | NNP 42149 2076 4 i i PRP 42149 2076 5 | | NNP 42149 2076 6 o o NNP 42149 2076 7 | | NNP 42149 2076 8 o o NNP 42149 2076 9 | | NNP 42149 2076 10 T T NNP 42149 2076 11 | | HYPH 42149 2076 12 | | NNP 42149 2076 13 | | NNP 42149 2076 14 |per |per NN 42149 2076 15 |yd |yd CD 42149 2076 16 . . . 42149 2077 1 |ing |e VBG 42149 2077 2 |a |a NNP 42149 2077 3 | | NNP 42149 2077 4 n n CC 42149 2077 5 | | NNP 42149 2077 6 r r NNP 42149 2077 7 | | NNP 42149 2077 8 r r NNP 42149 2077 9 | | NNP 42149 2077 10 a a DT 42149 2077 11 | | NNP 42149 2077 12 M M NNP 42149 2077 13 | | HYPH 42149 2077 14 | | NNP 42149 2077 15 |ring| |ring| NNP 42149 2077 16 | | NNP 42149 2077 17 |f |f NNP 42149 2077 18 c c NNP 42149 2077 19 | | NNP 42149 2077 20 a a DT 42149 2077 21 | | CD 42149 2077 22 e e NN 42149 2077 23 | | NNP 42149 2077 24 e e NNP 42149 2077 25 | | NNP 42149 2077 26 p p NNP 42149 2077 27 | | NNP 42149 2077 28 e e NNP 42149 2077 29 | | NNP 42149 2077 30 i| i| JJ 42149 2077 31 | | CD 42149 2077 32 | | CD 42149 2077 33 |and |and NNP 42149 2077 34 |o |o NNP 42149 2077 35 k k NNP 42149 2077 36 | | NNP 42149 2077 37 r r NNP 42149 2077 38 | | CD 42149 2077 39 | | NNP 42149 2077 40 | | NNP 42149 2077 41 e e NN 42149 2077 42 | | NNP 42149 2077 43 a a DT 42149 2077 44 | | CD 42149 2077 45 r| r| NN 42149 2077 46 Section Section NNP 42149 2077 47 | | NNP 42149 2077 48 | | NNP 42149 2077 49 | | NNP 42149 2077 50 |r |r NNP 42149 2077 51 s s NNP 42149 2077 52 | | NNP 42149 2077 53 y y NNP 42149 2077 54 | | NNP 42149 2077 55 1 1 CD 42149 2077 56 | | CD 42149 2077 57 2 2 CD 42149 2077 58 | | CD 42149 2077 59 r r NNP 42149 2077 60 | | CD 42149 2077 61 n n CC 42149 2077 62 | | CD 42149 2077 63 o| o| NN 42149 2077 64 between between IN 42149 2077 65 | | CD 42149 2077 66 | | NNP 42149 2077 67 |Muck-+--------+----+----+----+----+----| |muck-+--------+----+----+----+----+----| ADD 42149 2077 68 n| n| NN 42149 2077 69 rings ring NNS 42149 2077 70 |E |e CD 42149 2077 71 | | CD 42149 2077 72 |ing |e VBG 42149 2077 73 | | NNP 42149 2077 74 F F NNP 42149 2077 75 | | NNP 42149 2077 76 G G NNP 42149 2077 77 | | NNP 42149 2077 78 G G NNP 42149 2077 79 | | NNP 42149 2077 80 G G NNP 42149 2077 81 | | NNP 42149 2077 82 G G NNP 42149 2077 83 | | NNP 42149 2077 84 G G NNP 42149 2077 85 | | NNP 42149 2077 86 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2077 87 | | CD 42149 2077 88 1 1 CD 42149 2077 89 - - HYPH 42149 2077 90 54 54 CD 42149 2077 91 | | CD 42149 2077 92 | | CD 42149 2077 93 | | CD 42149 2077 94 |Time |time CD 42149 2077 95 for|4 for|4 NNP 42149 2077 96 - - HYPH 42149 2077 97 00| 00| CD 42149 2077 98 | | CD 42149 2077 99 |4 |4 CD 42149 2077 100 - - HYPH 42149 2077 101 21|4 21|4 CD 42149 2077 102 - - HYPH 42149 2077 103 04| 04| CD 42149 2077 104 | | CD 42149 2077 105 55 55 CD 42149 2077 106 - - HYPH 42149 2077 107 80 80 CD 42149 2077 108 |41 |41 CD 42149 2077 109 |0 |0 NN 42149 2077 110 - - : 42149 2077 111 31 31 CD 42149 2077 112 |21 |21 CD 42149 2077 113 - - HYPH 42149 2077 114 00|jacks 00|jacks NNP 42149 2077 115 |6 |6 , 42149 2077 116 - - : 42149 2077 117 04| 04| CD 42149 2077 118 | | HYPH 42149 2077 119 |5 |5 NN 42149 2077 120 - - HYPH 42149 2077 121 30|5 30|5 CD 42149 2077 122 - - HYPH 42149 2077 123 57| 57| CD 42149 2077 124 | | CD 42149 2077 125 81 81 CD 42149 2077 126 - - HYPH 42149 2077 127 107 107 CD 42149 2077 128 |41 |41 CD 42149 2077 129 |0 |0 NN 42149 2077 130 - - : 42149 2077 131 33 33 CD 42149 2077 132 |22 |22 CD 42149 2077 133 - - HYPH 42149 2077 134 30|for 30|for CD 42149 2077 135 |4 |4 CD 42149 2077 136 - - HYPH 42149 2077 137 26| 26| CD 42149 2077 138 | | CD 42149 2077 139 | | CD 42149 2077 140 |4 |4 CD 42149 2077 141 - - : 42149 2077 142 26| 26| CD 42149 2077 143 O| o| CD 42149 2077 144 108 108 CD 42149 2077 145 - - HYPH 42149 2077 146 153 153 CD 42149 2077 147 |41 |41 CD 42149 2077 148 |0 |0 NN 42149 2077 149 - - : 42149 2077 150 39 39 CD 42149 2077 151 |26 |26 CD 42149 2077 152 - - HYPH 42149 2077 153 31|light 31|light CD 42149 2077 154 |3 |3 NNP 42149 2077 155 - - : 42149 2077 156 10| 10| CD 42149 2077 157 | | NNP 42149 2077 158 |3 |3 NNS 42149 2077 159 - - HYPH 42149 2077 160 30|3 30|3 CD 42149 2077 161 - - HYPH 42149 2077 162 12| 12| CD 42149 2077 163 r| r| NN 42149 2077 164 154 154 CD 42149 2077 165 - - SYM 42149 2077 166 194 194 CD 42149 2077 167 |41 |41 CD 42149 2077 168 |0 |0 NN 42149 2077 169 - - : 42149 2077 170 27 27 CD 42149 2077 171 |18 |18 CD 42149 2077 172 - - HYPH 42149 2077 173 34|iron 34|iron NNP 42149 2077 174 is be VBZ 42149 2077 175 |2 |2 JJ 42149 2077 176 - - HYPH 42149 2077 177 08| 08| CD 42149 2077 178 J. J. NNP 42149 2078 1 | | NNP 42149 2078 2 J. J. NNP 42149 2079 1 |2 |2 LS 42149 2079 2 - - : 42149 2079 3 40|2 40|2 CD 42149 2079 4 - - SYM 42149 2079 5 10| 10| CD 42149 2079 6 d| d| NNP 42149 2079 7 | | NNP 42149 2079 8 | | NNP 42149 2079 9 | | NNP 42149 2079 10 |included| |included| NNP 42149 2079 11 | | NNP 42149 2079 12 | | CD 42149 2079 13 | | CD 42149 2079 14 | | CD 42149 2079 15 | | CD 42149 2079 16 i| i| NN 42149 2079 17 195 195 CD 42149 2079 18 - - SYM 42149 2079 19 215 215 CD 42149 2079 20 |41 |41 CD 42149 2079 21 |0 |0 NN 42149 2079 22 - - : 42149 2079 23 10 10 CD 42149 2079 24 | | CD 42149 2079 25 6 6 CD 42149 2079 26 - - HYPH 42149 2079 27 46|in 46|in CD 42149 2079 28 |3 |3 JJ 42149 2079 29 - - HYPH 42149 2079 30 03|3 03|3 CD 42149 2079 31 - - HYPH 42149 2079 32 30|3 30|3 CD 42149 2079 33 - - SYM 42149 2079 34 30| 30| CD 42149 2079 35 |3 |3 NN 42149 2079 36 - - : 42149 2079 37 09| 09| NNP 42149 2079 38 n| n| NN 42149 2079 39 216 216 CD 42149 2079 40 - - SYM 42149 2079 41 393 393 CD 42149 2079 42 |46 |46 CD 42149 2079 43 |0 |0 NN 42149 2079 44 - - HYPH 42149 2079 45 05 05 CD 42149 2079 46 | | CD 42149 2079 47 3 3 CD 42149 2079 48 - - HYPH 42149 2079 49 53|shoving 53|shoving CD 42149 2079 50 |2 |2 : 42149 2079 51 - - HYPH 42149 2079 52 40|2 40|2 CD 42149 2079 53 - - HYPH 42149 2079 54 56|3 56|3 CD 42149 2079 55 - - HYPH 42149 2079 56 00|3 00|3 CD 42149 2079 57 - - HYPH 42149 2079 58 10|2 10|2 CD 42149 2079 59 - - HYPH 42149 2079 60 50| 50| CD 42149 2079 61 a| a| NN 42149 2079 62 394 394 CD 42149 2079 63 - - SYM 42149 2079 64 429 429 CD 42149 2079 65 |46 |46 CD 42149 2079 66 |0 |0 NN 42149 2079 67 - - : 42149 2079 68 18 18 CD 42149 2079 69 |17 |17 CD 42149 2079 70 - - HYPH 42149 2079 71 09|and 09|and CD 42149 2079 72 |3 |3 NNP 42149 2079 73 - - HYPH 42149 2079 74 43|3 43|3 CD 42149 2079 75 - - HYPH 42149 2079 76 39|4 39|4 CD 42149 2079 77 - - HYPH 42149 2079 78 46|4 46|4 CD 42149 2079 79 - - HYPH 42149 2079 80 11|3 11|3 CD 42149 2079 81 - - HYPH 42149 2079 82 56| 56| CD 42149 2079 83 r| r| NN 42149 2079 84 | | CD 42149 2079 85 | | CD 42149 2079 86 | | CD 42149 2079 87 |mucking |mucking NNP 42149 2079 88 | | NNP 42149 2079 89 | | CD 42149 2079 90 | | CD 42149 2079 91 | | CD 42149 2079 92 | | CD 42149 2079 93 | | CD 42149 2079 94 y| y| NNS 42149 2079 95 430 430 CD 42149 2079 96 - - SYM 42149 2079 97 509 509 CD 42149 2079 98 |11 |11 CD 42149 2079 99 |0 |0 NN 42149 2079 100 - - HYPH 42149 2079 101 10 10 CD 42149 2079 102 | | CD 42149 2079 103 1 1 CD 42149 2079 104 - - HYPH 42149 2079 105 42| 42| CD 42149 2079 106 |3 |3 NNS 42149 2079 107 - - : 42149 2079 108 14|4 14|4 CD 42149 2079 109 - - HYPH 42149 2079 110 12|3 12|3 CD 42149 2079 111 - - HYPH 42149 2079 112 59|3 59|3 CD 42149 2079 113 - - HYPH 42149 2079 114 46|3 46|3 CD 42149 2079 115 - - HYPH 42149 2079 116 34| 34| CD 42149 2079 117 | | NNP 42149 2079 118 510 510 CD 42149 2079 119 - - SYM 42149 2079 120 692 692 CD 42149 2079 121 |30 |30 CD 42149 2079 122 |0 |0 '' 42149 2079 123 - - : 42149 2079 124 05 05 CD 42149 2079 125 | | CD 42149 2079 126 1 1 CD 42149 2079 127 - - HYPH 42149 2079 128 47| 47| CD 42149 2079 129 |2 |2 NNS 42149 2079 130 - - HYPH 42149 2079 131 08|2 08|2 CD 42149 2079 132 - - HYPH 42149 2079 133 21|2 21|2 CD 42149 2079 134 - - HYPH 42149 2079 135 32|2 32|2 CD 42149 2079 136 - - HYPH 42149 2079 137 50|2 50|2 CD 42149 2079 138 - - HYPH 42149 2079 139 18| 18| CD 42149 2079 140 | | CD 42149 2079 141 55 55 CD 42149 2079 142 - - SYM 42149 2079 143 692 692 CD 42149 2079 144 |30 |30 CD 42149 2079 145 |0 |0 '' 42149 2079 146 - - : 42149 2079 147 15 15 CD 42149 2079 148 | | CD 42149 2079 149 7 7 CD 42149 2079 150 - - HYPH 42149 2079 151 35|[N 35|[n NN 42149 2079 152 ] ] -RRB- 42149 2079 153 |3 |3 NNP 42149 2079 154 - - HYPH 42149 2079 155 02| 02| CD 42149 2079 156 | | CD 42149 2079 157 |4 |4 JJ 42149 2079 158 - - HYPH 42149 2079 159 31|3 31|3 CD 42149 2079 160 - - HYPH 42149 2079 161 12| 12| CD 42149 2079 162 | | CD 42149 2079 163 216 216 CD 42149 2079 164 - - SYM 42149 2079 165 692 692 CD 42149 2079 166 |30 |30 CD 42149 2079 167 |0 |0 '' 42149 2079 168 - - : 42149 2079 169 07 07 CD 42149 2079 170 | | CD 42149 2079 171 3 3 CD 42149 2079 172 - - HYPH 42149 2079 173 42|[N 42|[n CD 42149 2079 174 ] ] -RRB- 42149 2079 175 |2 |2 CD 42149 2079 176 - - HYPH 42149 2079 177 38|2 38|2 CD 42149 2079 178 - - HYPH 42149 2079 179 59|3 59|3 CD 42149 2079 180 - - HYPH 42149 2079 181 08|1 08|1 CD 42149 2079 182 - - HYPH 42149 2079 183 30|2 30|2 CD 42149 2079 184 - - HYPH 42149 2079 185 50| 50| CD 42149 2079 186 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2079 187 | | CD 42149 2079 188 693- 693- NNS 42149 2079 189 954|11 954|11 CD 42149 2079 190 |0 |0 . 42149 2079 191 - - : 42149 2079 192 12 12 CD 42149 2079 193 | | CD 42149 2079 194 1 1 CD 42149 2079 195 - - HYPH 42149 2079 196 02|[N 02|[N NNP 42149 2079 197 ] ] -RRB- 42149 2079 198 |1 |1 NN 42149 2079 199 - - HYPH 42149 2079 200 52|2 52|2 CD 42149 2079 201 - - HYPH 42149 2079 202 05|2 05|2 CD 42149 2079 203 - - HYPH 42149 2079 204 15|2 15|2 CD 42149 2079 205 - - HYPH 42149 2079 206 29|2 29|2 CD 42149 2079 207 - - HYPH 42149 2079 208 0 0 CD 42149 2079 209 | | CD 42149 2079 210 | | CD 42149 2079 211 955 955 CD 42149 2079 212 - - HYPH 42149 2079 213 1,014|12 1,014|12 CD 42149 2079 214 |0 |0 NN 42149 2079 215 - - : 42149 2079 216 04 04 CD 42149 2079 217 | | CD 42149 2079 218 0 0 CD 42149 2079 219 - - HYPH 42149 2079 220 48|0 48|0 CD 42149 2079 221 - - HYPH 42149 2079 222 16 16 CD 42149 2079 223 |0 |0 NN 42149 2079 224 - - HYPH 42149 2079 225 51|1 51|1 CD 42149 2079 226 - - HYPH 42149 2079 227 18|1 18|1 CD 42149 2079 228 - - HYPH 42149 2079 229 08|0 08|0 CD 42149 2079 230 - - HYPH 42149 2079 231 50|0 50|0 CD 42149 2079 232 - - HYPH 42149 2079 233 58| 58| CD 42149 2079 234 |1,015 |1,015 NNS 42149 2079 235 - - HYPH 42149 2079 236 1,074|12 1,074|12 JJ 42149 2079 237 |0 |0 NN 42149 2079 238 - - : 42149 2079 239 03 03 CD 42149 2079 240 | | CD 42149 2079 241 0 0 CD 42149 2079 242 - - HYPH 42149 2079 243 41|0 41|0 CD 42149 2079 244 - - SYM 42149 2079 245 13 13 CD 42149 2079 246 |0 |0 VBG 42149 2079 247 - - HYPH 42149 2079 248 43|0 43|0 CD 42149 2079 249 - - HYPH 42149 2079 250 46|0 46|0 CD 42149 2079 251 - - HYPH 42149 2079 252 55|0 55|0 CD 42149 2079 253 - - HYPH 42149 2079 254 40|0 40|0 CD 42149 2079 255 - - HYPH 42149 2079 256 45| 45| CD 42149 2079 257 H|1,075 H|1,075 NNP 42149 2079 258 - - HYPH 42149 2079 259 1,134| 1,134| CD 42149 2079 260 8 8 CD 42149 2079 261 |0 |0 SYM 42149 2079 262 - - HYPH 42149 2079 263 04 04 CD 42149 2079 264 | | CD 42149 2079 265 0 0 CD 42149 2079 266 - - HYPH 42149 2079 267 34|0 34|0 CD 42149 2079 268 - - HYPH 42149 2079 269 12 12 CD 42149 2079 270 |1 |1 . 42149 2079 271 - - HYPH 42149 2079 272 04|1 04|1 CD 42149 2079 273 - - HYPH 42149 2079 274 01|1 01|1 CD 42149 2079 275 - - HYPH 42149 2079 276 15|1 15|1 CD 42149 2079 277 - - HYPH 42149 2079 278 20|1 20|1 CD 42149 2079 279 - - HYPH 42149 2079 280 08| 08| CD 42149 2079 281 e|1,135 e|1,135 NNS 42149 2079 282 - - HYPH 42149 2079 283 1,194| 1,194| CD 42149 2079 284 8 8 CD 42149 2079 285 |0 |0 SYM 42149 2079 286 - - HYPH 42149 2079 287 04 04 CD 42149 2079 288 | | CD 42149 2079 289 0 0 CD 42149 2079 290 - - HYPH 42149 2079 291 33|0 33|0 CD 42149 2079 292 - - SYM 42149 2079 293 13 13 CD 42149 2079 294 |0 |0 NN 42149 2079 295 - - HYPH 42149 2079 296 53|0 53|0 CD 42149 2079 297 - - HYPH 42149 2079 298 51|0 51|0 CD 42149 2079 299 - - HYPH 42149 2079 300 58|0 58|0 CD 42149 2079 301 - - HYPH 42149 2079 302 46|0 46|0 CD 42149 2079 303 - - HYPH 42149 2079 304 53| 53| CD 42149 2079 305 a|1,195 a|1,195 NN 42149 2079 306 - - : 42149 2079 307 1,224| 1,224| CD 42149 2079 308 6 6 CD 42149 2079 309 |0 |0 NNP 42149 2079 310 - - HYPH 42149 2079 311 04 04 CD 42149 2079 312 | | CD 42149 2079 313 0 0 CD 42149 2079 314 - - HYPH 42149 2079 315 24|0 24|0 CD 42149 2079 316 - - HYPH 42149 2079 317 12 12 CD 42149 2079 318 |0 |0 NN 42149 2079 319 - - HYPH 42149 2079 320 58|0 58|0 CD 42149 2079 321 - - HYPH 42149 2079 322 42|0 42|0 CD 42149 2079 323 - - HYPH 42149 2079 324 53|0 53|0 CD 42149 2079 325 - - HYPH 42149 2079 326 50|0 50|0 CD 42149 2079 327 - - HYPH 42149 2079 328 54| 54| CD 42149 2079 329 v|1,225 v|1,225 NN 42149 2079 330 - - HYPH 42149 2079 331 1,262| 1,262| CD 42149 2079 332 5 5 CD 42149 2079 333 |0 |0 SYM 42149 2079 334 - - HYPH 42149 2079 335 05 05 CD 42149 2079 336 | | CD 42149 2079 337 0 0 CD 42149 2079 338 - - HYPH 42149 2079 339 23|0 23|0 CD 42149 2079 340 - - SYM 42149 2079 341 10 10 CD 42149 2079 342 |0 |0 NN 42149 2079 343 - - HYPH 42149 2079 344 48|0 48|0 CD 42149 2079 345 - - HYPH 42149 2079 346 49|0 49|0 CD 42149 2079 347 - - HYPH 42149 2079 348 50|0 50|0 CD 42149 2079 349 - - HYPH 42149 2079 350 35|0 35|0 CD 42149 2079 351 - - HYPH 42149 2079 352 47| 47| CD 42149 2079 353 y|1,263 y|1,263 NNS 42149 2079 354 - - HYPH 42149 2079 355 1,277|10 1,277|10 NN 42149 2079 356 |0 |0 . 42149 2079 357 - - : 42149 2079 358 04 04 CD 42149 2079 359 | | CD 42149 2079 360 0 0 CD 42149 2079 361 - - HYPH 42149 2079 362 36|0 36|0 CD 42149 2079 363 - - HYPH 42149 2079 364 11 11 CD 42149 2079 365 |0 |0 NN 42149 2079 366 - - HYPH 42149 2079 367 47|0 47|0 CD 42149 2079 368 - - HYPH 42149 2079 369 50|0 50|0 CD 42149 2079 370 - - HYPH 42149 2079 371 52|0 52|0 CD 42149 2079 372 - - HYPH 42149 2079 373 48|0 48|0 CD 42149 2079 374 - - HYPH 42149 2079 375 52| 52| CD 42149 2079 376 |1,278 |1,278 VBN 42149 2079 377 - - HYPH 42149 2079 378 1,307|17 1,307|17 JJ 42149 2079 379 |0 |0 '' 42149 2079 380 - - HYPH 42149 2079 381 04 04 CD 42149 2079 382 | | CD 42149 2079 383 1 1 CD 42149 2079 384 - - HYPH 42149 2079 385 09|0 09|0 CD 42149 2079 386 - - HYPH 42149 2079 387 10 10 CD 42149 2079 388 |1 |1 HYPH 42149 2079 389 - - HYPH 42149 2079 390 03|1 03|1 CD 42149 2079 391 - - HYPH 42149 2079 392 01|1 01|1 CD 42149 2079 393 - - HYPH 42149 2079 394 06|0 06|0 NNP 42149 2079 395 - - HYPH 42149 2079 396 00|1 00|1 CD 42149 2079 397 - - HYPH 42149 2079 398 04| 04| CD 42149 2079 399 |1,308 |1,308 CD 42149 2079 400 - - HYPH 42149 2079 401 1,326|22 1,326|22 NN 42149 2079 402 |0 |0 '' 42149 2079 403 - - HYPH 42149 2079 404 05 05 CD 42149 2079 405 | | CD 42149 2079 406 1 1 CD 42149 2079 407 - - HYPH 42149 2079 408 39|0 39|0 CD 42149 2079 409 - - SYM 42149 2079 410 18 18 CD 42149 2079 411 |1 |1 : 42149 2079 412 - - HYPH 42149 2079 413 25|1 25|1 CD 42149 2079 414 - - HYPH 42149 2079 415 48|1 48|1 CD 42149 2079 416 - - HYPH 42149 2079 417 50|0 50|0 CD 42149 2079 418 - - HYPH 42149 2079 419 50|1 50|1 CD 42149 2079 420 - - HYPH 42149 2079 421 31| 31| CD 42149 2079 422 | | CD 42149 2079 423 955 955 CD 42149 2079 424 - - HYPH 42149 2079 425 1,326|11 1,326|11 CD 42149 2079 426 |0 |0 , 42149 2079 427 - - : 42149 2079 428 04 04 CD 42149 2079 429 | | CD 42149 2079 430 0 0 CD 42149 2079 431 - - HYPH 42149 2079 432 41|0 41|0 CD 42149 2079 433 - - SYM 42149 2079 434 13 13 CD 42149 2079 435 |0 |0 NN 42149 2079 436 - - HYPH 42149 2079 437 55|0 55|0 CD 42149 2079 438 - - HYPH 42149 2079 439 59|1 59|1 CD 42149 2079 440 - - HYPH 42149 2079 441 03|0 03|0 CD 42149 2079 442 - - HYPH 42149 2079 443 55|0 55|0 CD 42149 2079 444 - - HYPH 42149 2079 445 58| 58| CD 42149 2079 446 | | CD 42149 2079 447 693 693 CD 42149 2079 448 - - HYPH 42149 2079 449 1,326|12 1,326|12 CD 42149 2079 450 |0 |0 NN 42149 2079 451 - - HYPH 42149 2079 452 04 04 CD 42149 2079 453 | | CD 42149 2079 454 0 0 CD 42149 2079 455 - - HYPH 42149 2079 456 51|[N 51|[n CD 42149 2079 457 ] ] -RRB- 42149 2079 458 |1 |1 NN 42149 2079 459 - - HYPH 42149 2079 460 27|1 27|1 CD 42149 2079 461 - - HYPH 42149 2079 462 34|1 34|1 CD 42149 2079 463 - - HYPH 42149 2079 464 41|1 41|1 CD 42149 2079 465 - - HYPH 42149 2079 466 38|1 38|1 CD 42149 2079 467 - - HYPH 42149 2079 468 31| 31| CD 42149 2079 469 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2079 470 A| a| CD 42149 2079 471 216 216 CD 42149 2079 472 - - HYPH 42149 2079 473 1,326|19 1,326|19 CD 42149 2079 474 |0 |0 NN 42149 2079 475 - - : 42149 2079 476 06 06 CD 42149 2079 477 | | CD 42149 2079 478 1 1 CD 42149 2079 479 - - HYPH 42149 2079 480 59|[N 59|[n CD 42149 2079 481 ] ] -RRB- 42149 2079 482 |1 |1 NN 42149 2079 483 - - HYPH 42149 2079 484 55|2 55|2 CD 42149 2079 485 - - HYPH 42149 2079 486 08|2 08|2 CD 42149 2079 487 - - HYPH 42149 2079 488 16|1 16|1 CD 42149 2079 489 - - HYPH 42149 2079 490 35|2 35|2 CD 42149 2079 491 - - HYPH 42149 2079 492 03| 03| CD 42149 2079 493 l| l| JJ 42149 2079 494 55 55 CD 42149 2079 495 - - HYPH 42149 2079 496 1,326|21 1,326|21 CD 42149 2079 497 |0 |0 '' 42149 2079 498 - - : 42149 2079 499 10 10 CD 42149 2079 500 | | CD 42149 2079 501 4 4 CD 42149 2079 502 - - HYPH 42149 2079 503 13|[N 13|[n CD 42149 2079 504 ] ] -RRB- 42149 2079 505 | | NNP 42149 2079 506 | | CD 42149 2079 507 | | CD 42149 2079 508 | | CD 42149 2079 509 |2 |2 CD 42149 2079 510 - - HYPH 42149 2079 511 22| 22| CD 42149 2079 512 l| l| JJ 42149 2079 513 | | CD 42149 2079 514 | | CD 42149 2079 515 | | CD 42149 2079 516 | | CD 42149 2079 517 | | CD 42149 2079 518 | | CD 42149 2079 519 | | CD 42149 2079 520 | | CD 42149 2079 521 | | CD 42149 2079 522 | | NNS 42149 2079 523 = = SYM 42149 2079 524 + + SYM 42149 2079 525 = = SYM 42149 2079 526 = = SYM 42149 2079 527 = = SYM 42149 2079 528 = = SYM 42149 2079 529 = = SYM 42149 2079 530 = = SYM 42149 2079 531 = = SYM 42149 2079 532 = = SYM 42149 2079 533 = = SYM 42149 2079 534 = = NFP 42149 2079 535 = = SYM 42149 2079 536 + + SYM 42149 2079 537 = = SYM 42149 2079 538 = = SYM 42149 2079 539 = = NFP 42149 2079 540 = = SYM 42149 2079 541 + + SYM 42149 2079 542 = = SYM 42149 2079 543 = = SYM 42149 2079 544 = = SYM 42149 2079 545 = = NFP 42149 2079 546 = = SYM 42149 2079 547 + + SYM 42149 2079 548 = = SYM 42149 2079 549 = = SYM 42149 2079 550 = = SYM 42149 2079 551 = = NFP 42149 2079 552 = = SYM 42149 2079 553 + + SYM 42149 2079 554 = = SYM 42149 2079 555 = = SYM 42149 2079 556 = = SYM 42149 2079 557 = = SYM 42149 2079 558 = = SYM 42149 2079 559 = = SYM 42149 2079 560 = = NFP 42149 2079 561 = = SYM 42149 2079 562 + + SYM 42149 2079 563 = = SYM 42149 2079 564 = = SYM 42149 2079 565 = = NFP 42149 2079 566 = = SYM 42149 2079 567 + + SYM 42149 2079 568 = = SYM 42149 2079 569 = = SYM 42149 2079 570 = = NFP 42149 2079 571 = = SYM 42149 2079 572 + + SYM 42149 2079 573 = = SYM 42149 2079 574 = = SYM 42149 2079 575 = = NFP 42149 2079 576 = = SYM 42149 2079 577 + + SYM 42149 2079 578 = = SYM 42149 2079 579 = = SYM 42149 2079 580 = = NFP 42149 2079 581 = = SYM 42149 2079 582 + + SYM 42149 2079 583 = = SYM 42149 2079 584 = = SYM 42149 2079 585 = = NFP 42149 2079 586 =| =| ADD 42149 2079 587 TABLE table NN 42149 2079 588 24 24 CD 42149 2079 589 PART part CD 42149 2079 590 3 3 CD 42149 2079 591 = = SYM 42149 2079 592 + + SYM 42149 2079 593 = = SYM 42149 2079 594 = = SYM 42149 2079 595 = = SYM 42149 2079 596 = = SYM 42149 2079 597 = = SYM 42149 2079 598 = = SYM 42149 2079 599 = = SYM 42149 2079 600 = = SYM 42149 2079 601 = = SYM 42149 2079 602 = = NFP 42149 2079 603 = = SYM 42149 2079 604 + + SYM 42149 2079 605 = = SYM 42149 2079 606 = = SYM 42149 2079 607 = = NFP 42149 2079 608 = = SYM 42149 2079 609 + + SYM 42149 2079 610 = = SYM 42149 2079 611 = = SYM 42149 2079 612 = = NFP 42149 2079 613 = = SYM 42149 2079 614 + + SYM 42149 2079 615 = = SYM 42149 2079 616 = = SYM 42149 2079 617 = = NFP 42149 2079 618 = = SYM 42149 2079 619 + + SYM 42149 2079 620 = = SYM 42149 2079 621 = = SYM 42149 2079 622 = = NFP 42149 2079 623 = = SYM 42149 2079 624 + + SYM 42149 2079 625 = = SYM 42149 2079 626 = = SYM 42149 2079 627 = = NFP 42149 2079 628 = = SYM 42149 2079 629 + + SYM 42149 2079 630 = = SYM 42149 2079 631 = = SYM 42149 2079 632 = = NFP 42149 2079 633 = = SYM 42149 2079 634 + + SYM 42149 2079 635 = = SYM 42149 2079 636 = = SYM 42149 2079 637 = = SYM 42149 2079 638 = = NFP 42149 2079 639 = = SYM 42149 2079 640 + + SYM 42149 2079 641 = = SYM 42149 2079 642 = = SYM 42149 2079 643 = = SYM 42149 2079 644 = = NFP 42149 2079 645 = = SYM 42149 2079 646 + + SYM 42149 2079 647 = = SYM 42149 2079 648 = = SYM 42149 2079 649 = = SYM 42149 2079 650 = = NFP 42149 2079 651 = = SYM 42149 2079 652 + + SYM 42149 2079 653 = = SYM 42149 2079 654 = = SYM 42149 2079 655 = = SYM 42149 2079 656 = = NFP 42149 2079 657 = = SYM 42149 2079 658 + + SYM 42149 2079 659 = = SYM 42149 2079 660 = = SYM 42149 2079 661 = = SYM 42149 2079 662 = = SYM 42149 2079 663 =| =| ADD 42149 2079 664 W| w| CD 42149 2079 665 | | JJ 42149 2079 666 BOLTING bolting NN 42149 2079 667 TIME time NN 42149 2079 668 , , , 42149 2079 669 WHOLE WHOLE NNP 42149 2079 670 |Time| |Time| NNP 42149 2079 671 | | NNP 42149 2079 672 e| e| JJ 42149 2079 673 | | CD 42149 2079 674 TIME time NN 42149 2079 675 ON on IN 42149 2079 676 BOLTS BOLTS NNP 42149 2079 677 AFTER AFTER NNP 42149 2079 678 | | CD 42149 2079 679 | | NNP 42149 2079 680 | | CD 42149 2079 681 i| i| NN 42149 2079 682 | | NNP 42149 2079 683 RING ring NN 42149 2079 684 IS be VBZ 42149 2079 685 COMPLETE COMPLETE NNP 42149 2079 686 . . . 42149 2080 1 |lost| |lost| NNP 42149 2080 2 TOTAL TOTAL NNP 42149 2080 3 TIME time NN 42149 2080 4 . . . 42149 2081 1 | | JJ 42149 2081 2 g| g| NN 42149 2081 3 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2081 4 |-----+-----+-----+-----+-----| |-----+-----+-----+-----+-----| NNP 42149 2081 5 h| h| NNP 42149 2081 6 | | NNP 42149 2081 7 | | NNP 42149 2081 8 | | CD 42149 2081 9 | | CD 42149 2081 10 | | CD 42149 2081 11 |re- |re- CD 42149 2081 12 | | CD 42149 2081 13 | | CD 42149 2081 14 | | CD 42149 2081 15 | | CD 42149 2081 16 | | CD 42149 2081 17 | | CD 42149 2081 18 t| t| JJ 42149 2081 19 | | NNP 42149 2081 20 O O NNP 42149 2081 21 | | NNP 42149 2081 22 | | NNP 42149 2081 23 | | CD 42149 2081 24 | | NNP 42149 2081 25 |pair- |pair- NNP 42149 2081 26 | | NNP 42149 2081 27 | | NNP 42149 2081 28 | | CD 42149 2081 29 | | CD 42149 2081 30 | | CD 42149 2081 31 | | CD 42149 2081 32 | | NNP 42149 2081 33 r r NNP 42149 2081 34 | | CD 42149 2081 35 | | CD 42149 2081 36 | | CD 42149 2081 37 | | CD 42149 2081 38 |ing |e VBG 42149 2081 39 | | CD 42149 2081 40 | | CD 42149 2081 41 | | CD 42149 2081 42 | | CD 42149 2081 43 | | CD 42149 2081 44 | | CD 42149 2081 45 o| o| NN 42149 2081 46 | | CD 42149 2081 47 d d NNP 42149 2081 48 | | NNP 42149 2081 49 B B NNP 42149 2081 50 | | NNP 42149 2081 51 B B NNP 42149 2081 52 | | NNP 42149 2081 53 | | CD 42149 2081 54 | | CD 42149 2081 55 | | NNP 42149 2081 56 O O NNP 42149 2081 57 | | NNP 42149 2081 58 | | NNP 42149 2081 59 | | CD 42149 2081 60 | | CD 42149 2081 61 | | CD 42149 2081 62 f| f| NN 42149 2081 63 | | NNP 42149 2081 64 i i PRP 42149 2081 65 | | NNP 42149 2081 66 o o NNP 42149 2081 67 | | NNP 42149 2081 68 o o NNP 42149 2081 69 | | NNP 42149 2081 70 T T NNP 42149 2081 71 | | NNP 42149 2081 72 |hy- |hy- NNP 42149 2081 73 | | NNP 42149 2081 74 r r NNP 42149 2081 75 | | NNP 42149 2081 76 | | CD 42149 2081 77 | | CD 42149 2081 78 | | CD 42149 2081 79 | | CD 42149 2081 80 | | CD 42149 2081 81 | | CD 42149 2081 82 n n CC 42149 2081 83 | | NNP 42149 2081 84 r r NNP 42149 2081 85 | | NNP 42149 2081 86 r r NNP 42149 2081 87 | | NNP 42149 2081 88 a a DT 42149 2081 89 | | NNP 42149 2081 90 M M NNP 42149 2081 91 |drau- |drau- NNP 42149 2081 92 d d NNP 42149 2081 93 | | NNP 42149 2081 94 B B NNP 42149 2081 95 | | NNP 42149 2081 96 B B NNP 42149 2081 97 | | NNP 42149 2081 98 | | NNP 42149 2081 99 | | CD 42149 2081 100 | | CD 42149 2081 101 | | NNP 42149 2081 102 a a DT 42149 2081 103 | | CD 42149 2081 104 e e NN 42149 2081 105 | | NNP 42149 2081 106 e e NNP 42149 2081 107 | | NNP 42149 2081 108 p p NNP 42149 2081 109 | | NNP 42149 2081 110 e e NNP 42149 2081 111 |lic |lic NNP 42149 2081 112 | | NNP 42149 2081 113 i i PRP 42149 2081 114 | | NNP 42149 2081 115 o o NNP 42149 2081 116 | | NNP 42149 2081 117 o o NNP 42149 2081 118 | | NNP 42149 2081 119 T T NNP 42149 2081 120 | | HYPH 42149 2081 121 | | NNP 42149 2081 122 i| i| JJ 42149 2081 123 | | HYPH 42149 2081 124 r r NNP 42149 2081 125 | | NNP 42149 2081 126 | | NNP 42149 2081 127 | | NNP 42149 2081 128 e e NN 42149 2081 129 | | NNP 42149 2081 130 a a DT 42149 2081 131 | | CD 42149 2081 132 | | NNP 42149 2081 133 n n CC 42149 2081 134 | | NNP 42149 2081 135 r r NNP 42149 2081 136 | | NNP 42149 2081 137 r r NNP 42149 2081 138 | | NNP 42149 2081 139 a a DT 42149 2081 140 | | NNP 42149 2081 141 M M NNP 42149 2081 142 | | CD 42149 2081 143 r| r| NNP 42149 2081 144 Section Section NNP 42149 2081 145 | | NNP 42149 2081 146 y y NNP 42149 2081 147 | | NNP 42149 2081 148 1 1 CD 42149 2081 149 | | CD 42149 2081 150 2 2 CD 42149 2081 151 | | CD 42149 2081 152 r r NN 42149 2081 153 | | CD 42149 2081 154 n n CC 42149 2081 155 |pip-| |pip-| NNP 42149 2081 156 a a DT 42149 2081 157 | | NNP 42149 2081 158 e e NN 42149 2081 159 | | NNP 42149 2081 160 e e NNP 42149 2081 161 | | NNP 42149 2081 162 p p NNP 42149 2081 163 | | NNP 42149 2081 164 e e NN 42149 2081 165 | | CD 42149 2081 166 o| o| NN 42149 2081 167 between between IN 42149 2081 168 |----+----+----+----+----|ing |----+----+----+----+----|ing NNP 42149 2081 169 | | NNP 42149 2081 170 r r NNP 42149 2081 171 | | NNP 42149 2081 172 | | NNP 42149 2081 173 | | NNP 42149 2081 174 e e NN 42149 2081 175 | | NNP 42149 2081 176 a a DT 42149 2081 177 | | CD 42149 2081 178 n| n| NN 42149 2081 179 rings ring NNS 42149 2081 180 | | CD 42149 2081 181 H H NNP 42149 2081 182 | | NNP 42149 2081 183 H h NN 42149 2081 184 | | NNP 42149 2081 185 H h NN 42149 2081 186 | | NNP 42149 2081 187 H H NNP 42149 2081 188 | | NNP 42149 2081 189 H H NNP 42149 2081 190 | | NNP 42149 2081 191 | | NNP 42149 2081 192 y y NNP 42149 2081 193 | | NNP 42149 2081 194 1 1 CD 42149 2081 195 | | CD 42149 2081 196 2 2 CD 42149 2081 197 | | CD 42149 2081 198 r r NNP 42149 2081 199 | | CD 42149 2081 200 n n CC 42149 2081 201 | | CD 42149 2081 202 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2081 203 | | CD 42149 2081 204 1 1 CD 42149 2081 205 - - HYPH 42149 2081 206 54 54 CD 42149 2081 207 | | NNP 42149 2081 208 Excavation Excavation NNP 42149 2081 209 partially partially RB 42149 2081 210 completed complete VBN 42149 2081 211 previously previously RB 42149 2081 212 . . . 42149 2082 1 | | CD 42149 2082 2 | | CD 42149 2082 3 55 55 CD 42149 2082 4 - - HYPH 42149 2082 5 80 80 CD 42149 2082 6 | | NNS 42149 2082 7 } } -RRB- 42149 2082 8 { { -LRB- 42149 2082 9 | | CD 42149 2082 10 |27 |27 CD 42149 2082 11 - - HYPH 42149 2082 12 4 4 CD 42149 2082 13 | | CD 42149 2082 14 | | CD 42149 2082 15 |26 |26 CD 42149 2082 16 - - HYPH 42149 2082 17 30|26 30|26 CD 42149 2082 18 - - HYPH 42149 2082 19 57| 57| CD 42149 2082 20 O| o| CD 42149 2082 21 81 81 CD 42149 2082 22 - - SYM 42149 2082 23 107 107 CD 42149 2082 24 | | NNS 42149 2082 25 } } -RRB- 42149 2082 26 { { -LRB- 42149 2082 27 | | CD 42149 2082 28 |26 |26 CD 42149 2082 29 - - HYPH 42149 2082 30 56| 56| CD 42149 2082 31 | | CD 42149 2082 32 | | CD 42149 2082 33 |26 |26 CD 42149 2082 34 - - HYPH 42149 2082 35 56| 56| CD 42149 2082 36 r| r| NN 42149 2082 37 108 108 CD 42149 2082 38 - - HYPH 42149 2082 39 153 153 CD 42149 2082 40 | | NNS 42149 2082 41 } } -RRB- 42149 2082 42 { { -LRB- 42149 2082 43 | | CD 42149 2082 44 |29 |29 CD 42149 2082 45 - - HYPH 42149 2082 46 41| 41| CD 42149 2082 47 | | CD 42149 2082 48 |30 |30 CD 42149 2082 49 - - HYPH 42149 2082 50 1 1 CD 42149 2082 51 |29 |29 CD 42149 2082 52 - - HYPH 42149 2082 53 43| 43| CD 42149 2082 54 d| d| NN 42149 2082 55 154 154 CD 42149 2082 56 - - SYM 42149 2082 57 194 194 CD 42149 2082 58 | | CD 42149 2082 59 } } -RRB- 42149 2082 60 { { -LRB- 42149 2082 61 | | NNP 42149 2082 62 |20 |20 CD 42149 2082 63 - - HYPH 42149 2082 64 42| 42| CD 42149 2082 65 | | CD 42149 2082 66 |21 |21 CD 42149 2082 67 - - HYPH 42149 2082 68 14|20 14|20 CD 42149 2082 69 - - HYPH 42149 2082 70 44| 44| CD 42149 2082 71 i| i| NN 42149 2082 72 | | JJ 42149 2082 73 } } -RRB- 42149 2082 74 { { -LRB- 42149 2082 75 | | CD 42149 2082 76 | | NNP 42149 2082 77 | | CD 42149 2082 78 | | CD 42149 2082 79 | | CD 42149 2082 80 | | CD 42149 2082 81 | | CD 42149 2082 82 n| n| NN 42149 2082 83 195 195 CD 42149 2082 84 - - SYM 42149 2082 85 215 215 CD 42149 2082 86 | | NNS 42149 2082 87 } } -RRB- 42149 2082 88 { { -LRB- 42149 2082 89 | | CD 42149 2082 90 | | CD 42149 2082 91 9 9 CD 42149 2082 92 - - HYPH 42149 2082 93 49|10 49|10 CD 42149 2082 94 - - HYPH 42149 2082 95 16|10 16|10 CD 42149 2082 96 - - HYPH 42149 2082 97 16| 16| CD 42149 2082 98 | | CD 42149 2082 99 9 9 CD 42149 2082 100 - - HYPH 42149 2082 101 55| 55| CD 42149 2082 102 a| a| NN 42149 2082 103 216 216 CD 42149 2082 104 - - SYM 42149 2082 105 393 393 CD 42149 2082 106 | | CD 42149 2082 107 } } -RRB- 42149 2082 108 Bolting Bolting NNP 42149 2082 109 time time NN 42149 2082 110 for for IN 42149 2082 111 { { -LRB- 42149 2082 112 |0 |0 NN 42149 2082 113 - - : 42149 2082 114 09| 09| NNP 42149 2082 115 6 6 CD 42149 2082 116 - - SYM 42149 2082 117 42| 42| CD 42149 2082 118 6 6 CD 42149 2082 119 - - HYPH 42149 2082 120 58| 58| CD 42149 2082 121 7 7 CD 42149 2082 122 - - SYM 42149 2082 123 02| 02| CD 42149 2082 124 7 7 CD 42149 2082 125 - - SYM 42149 2082 126 12| 12| CD 42149 2082 127 6 6 CD 42149 2082 128 - - HYPH 42149 2082 129 52| 52| CD 42149 2082 130 r| r| NN 42149 2082 131 394 394 CD 42149 2082 132 - - SYM 42149 2082 133 429 429 CD 42149 2082 134 | | CD 42149 2082 135 } } -RRB- 42149 2082 136 light light JJ 42149 2082 137 iron iron NN 42149 2082 138 is be VBZ 42149 2082 139 { { -LRB- 42149 2082 140 | | NNP 42149 2082 141 |23 |23 CD 42149 2082 142 - - HYPH 42149 2082 143 79|23 79|23 CD 42149 2082 144 - - HYPH 42149 2082 145 25|24 25|24 CD 42149 2082 146 - - HYPH 42149 2082 147 32|23 32|23 CD 42149 2082 148 - - HYPH 42149 2082 149 57|23 57|23 CD 42149 2082 150 - - HYPH 42149 2082 151 42| 42| CD 42149 2082 152 y| y| NNS 42149 2082 153 | | NNP 42149 2082 154 } } -RRB- 42149 2082 155 included include VBD 42149 2082 156 in in IN 42149 2082 157 { { -LRB- 42149 2082 158 | | NNP 42149 2082 159 | | NNP 42149 2082 160 | | CD 42149 2082 161 | | CD 42149 2082 162 | | CD 42149 2082 163 | | CD 42149 2082 164 | | CD 42149 2082 165 | | CD 42149 2082 166 430 430 CD 42149 2082 167 - - HYPH 42149 2082 168 509 509 CD 42149 2082 169 | | CD 42149 2082 170 } } -RRB- 42149 2082 171 erection erection NN 42149 2082 172 . . . 42149 2083 1 { { -LRB- 42149 2083 2 |0 |0 `` 42149 2083 3 - - : 42149 2083 4 18| 18| CD 42149 2083 5 5 5 CD 42149 2083 6 - - SYM 42149 2083 7 14| 14| CD 42149 2083 8 6 6 CD 42149 2083 9 - - HYPH 42149 2083 10 12| 12| CD 42149 2083 11 5 5 CD 42149 2083 12 - - SYM 42149 2083 13 59| 59| CD 42149 2083 14 5 5 CD 42149 2083 15 - - SYM 42149 2083 16 46| 46| CD 42149 2083 17 5 5 CD 42149 2083 18 - - SYM 42149 2083 19 34| 34| CD 42149 2083 20 | | NNP 42149 2083 21 510 510 CD 42149 2083 22 - - HYPH 42149 2083 23 692 692 CD 42149 2083 24 | | NNS 42149 2083 25 } } -RRB- 42149 2083 26 { { -LRB- 42149 2083 27 |0 |0 NN 42149 2083 28 - - : 42149 2083 29 11| 11| CD 42149 2083 30 4 4 CD 42149 2083 31 - - SYM 42149 2083 32 06| 06| CD 42149 2083 33 4 4 CD 42149 2083 34 - - SYM 42149 2083 35 19| 19| CD 42149 2083 36 4 4 CD 42149 2083 37 - - SYM 42149 2083 38 30| 30| CD 42149 2083 39 4 4 CD 42149 2083 40 - - SYM 42149 2083 41 48| 48| CD 42149 2083 42 4 4 CD 42149 2083 43 - - HYPH 42149 2083 44 16| 16| CD 42149 2083 45 | | CD 42149 2083 46 55 55 CD 42149 2083 47 - - HYPH 42149 2083 48 692 692 CD 42149 2083 49 | | CD 42149 2083 50 } } -RRB- 42149 2083 51 { { -LRB- 42149 2083 52 |0 |0 VB 42149 2083 53 - - HYPH 42149 2083 54 17|10 17|10 CD 42149 2083 55 - - HYPH 42149 2083 56 54| 54| CD 42149 2083 57 | | CD 42149 2083 58 |12 |12 CD 42149 2083 59 - - HYPH 42149 2083 60 23|11 23|11 CD 42149 2083 61 - - HYPH 42149 2083 62 04| 04| CD 42149 2083 63 | | CD 42149 2083 64 216 216 CD 42149 2083 65 - - HYPH 42149 2083 66 692 692 CD 42149 2083 67 | | NNS 42149 2083 68 } } -RRB- 42149 2083 69 { { -LRB- 42149 2083 70 |0 |0 NN 42149 2083 71 - - : 42149 2083 72 25| 25| CD 42149 2083 73 6 6 CD 42149 2083 74 - - SYM 42149 2083 75 45| 45| CD 42149 2083 76 7 7 CD 42149 2083 77 - - SYM 42149 2083 78 06| 06| CD 42149 2083 79 7 7 CD 42149 2083 80 - - SYM 42149 2083 81 15| 15| CD 42149 2083 82 5 5 CD 42149 2083 83 - - SYM 42149 2083 84 37| 37| CD 42149 2083 85 6 6 CD 42149 2083 86 - - HYPH 42149 2083 87 57| 57| CD 42149 2083 88 -+-----------| -+-----------| HYPH 42149 2083 89 } } -RRB- 42149 2083 90 { { -LRB- 42149 2083 91 |----+-----+-----+-----+-----+-----| |----+-----+-----+-----+-----+-----| NNP 42149 2083 92 | | NNP 42149 2083 93 693- 693- NNS 42149 2083 94 954| 954| NNS 42149 2083 95 } } -RRB- 42149 2083 96 { { -LRB- 42149 2083 97 |0 |0 NN 42149 2083 98 - - : 42149 2083 99 13| 13| CD 42149 2083 100 3 3 CD 42149 2083 101 - - SYM 42149 2083 102 7 7 CD 42149 2083 103 | | CD 42149 2083 104 3 3 CD 42149 2083 105 - - SYM 42149 2083 106 20| 20| CD 42149 2083 107 3 3 CD 42149 2083 108 - - SYM 42149 2083 109 30| 30| CD 42149 2083 110 3 3 CD 42149 2083 111 - - SYM 42149 2083 112 44| 44| CD 42149 2083 113 3 3 CD 42149 2083 114 - - SYM 42149 2083 115 15| 15| CD 42149 2083 116 | | CD 42149 2083 117 955 955 CD 42149 2083 118 - - HYPH 42149 2083 119 1,014|0 1,014|0 CD 42149 2083 120 - - HYPH 42149 2083 121 24|0 24|0 CD 42149 2083 122 - - HYPH 42149 2083 123 21|0 21|0 CD 42149 2083 124 - - HYPH 42149 2083 125 37|0 37|0 CD 42149 2083 126 - - HYPH 42149 2083 127 10|0 10|0 CD 42149 2083 128 - - HYPH 42149 2083 129 25|0 25|0 CD 42149 2083 130 | | CD 42149 2083 131 2 2 CD 42149 2083 132 - - SYM 42149 2083 133 19| 19| CD 42149 2083 134 2 2 CD 42149 2083 135 - - SYM 42149 2083 136 43| 43| CD 42149 2083 137 2 2 CD 42149 2083 138 - - SYM 42149 2083 139 49| 49| CD 42149 2083 140 2 2 CD 42149 2083 141 - - SYM 42149 2083 142 04| 04| CD 42149 2083 143 2 2 CD 42149 2083 144 - - SYM 42149 2083 145 27| 27| CD 42149 2083 146 |1,015 |1,015 JJ 42149 2083 147 - - HYPH 42149 2083 148 1,074|0 1,074|0 CD 42149 2083 149 - - HYPH 42149 2083 150 31|0 31|0 CD 42149 2083 151 - - HYPH 42149 2083 152 30|0 30|0 CD 42149 2083 153 - - HYPH 42149 2083 154 52|0 52|0 CD 42149 2083 155 - - HYPH 42149 2083 156 23|0 23|0 CD 42149 2083 157 - - HYPH 42149 2083 158 34|0 34|0 CD 42149 2083 159 - - HYPH 42149 2083 160 02| 02| CD 42149 2083 161 2 2 CD 42149 2083 162 - - SYM 42149 2083 163 10| 10| CD 42149 2083 164 2 2 CD 42149 2083 165 - - HYPH 42149 2083 166 12| 12| CD 42149 2083 167 2 2 CD 42149 2083 168 - - SYM 42149 2083 169 43| 43| CD 42149 2083 170 1 1 CD 42149 2083 171 - - SYM 42149 2083 172 59| 59| CD 42149 2083 173 2 2 CD 42149 2083 174 - - SYM 42149 2083 175 15| 15| CD 42149 2083 176 H|1,075 H|1,075 NNP 42149 2083 177 - - HYPH 42149 2083 178 1,134|0 1,134|0 CD 42149 2083 179 - - HYPH 42149 2083 180 28|0 28|0 CD 42149 2083 181 - - HYPH 42149 2083 182 35|1 35|1 CD 42149 2083 183 - - HYPH 42149 2083 184 40|0 40|0 CD 42149 2083 185 - - HYPH 42149 2083 186 52|0 52|0 CD 42149 2083 187 - - HYPH 42149 2083 188 44|0 44|0 CD 42149 2083 189 - - HYPH 42149 2083 190 03| 03| CD 42149 2083 191 2 2 CD 42149 2083 192 - - SYM 42149 2083 193 21| 21| CD 42149 2083 194 2 2 CD 42149 2083 195 - - SYM 42149 2083 196 25| 25| CD 42149 2083 197 3 3 CD 42149 2083 198 - - SYM 42149 2083 199 44| 44| CD 42149 2083 200 3 3 CD 42149 2083 201 - - HYPH 42149 2083 202 01| 01| CD 42149 2083 203 2 2 CD 42149 2083 204 - - SYM 42149 2083 205 41| 41| CD 42149 2083 206 e|1,135 e|1,135 NNS 42149 2083 207 - - HYPH 42149 2083 208 1,194|0 1,194|0 CD 42149 2083 209 - - HYPH 42149 2083 210 32|0 32|0 CD 42149 2083 211 - - HYPH 42149 2083 212 20|0 20|0 CD 42149 2083 213 - - HYPH 42149 2083 214 24|0 24|0 CD 42149 2083 215 - - HYPH 42149 2083 216 18|0 18|0 CD 42149 2083 217 - - HYPH 42149 2083 218 26|0 26|0 CD 42149 2083 219 | | CD 42149 2083 220 2 2 CD 42149 2083 221 - - HYPH 42149 2083 222 11| 11| CD 42149 2083 223 1 1 CD 42149 2083 224 - - HYPH 42149 2083 225 57| 57| CD 42149 2083 226 2 2 CD 42149 2083 227 - - SYM 42149 2083 228 08| 08| CD 42149 2083 229 1 1 CD 42149 2083 230 - - HYPH 42149 2083 231 50| 50| CD 42149 2083 232 2 2 CD 42149 2083 233 - - HYPH 42149 2083 234 05| 05| CD 42149 2083 235 a|1,195 a|1,195 NN 42149 2083 236 - - HYPH 42149 2083 237 1,224|0 1,224|0 CD 42149 2083 238 - - HYPH 42149 2083 239 19|0 19|0 CD 42149 2083 240 - - HYPH 42149 2083 241 20|0 20|0 CD 42149 2083 242 - - HYPH 42149 2083 243 34|0 34|0 CD 42149 2083 244 - - HYPH 42149 2083 245 35|0 35|0 CD 42149 2083 246 - - HYPH 42149 2083 247 23|0 23|0 CD 42149 2083 248 | | CD 42149 2083 249 1 1 CD 42149 2083 250 - - HYPH 42149 2083 251 53| 53| CD 42149 2083 252 1 1 CD 42149 2083 253 - - SYM 42149 2083 254 38| 38| CD 42149 2083 255 2 2 CD 42149 2083 256 - - HYPH 42149 2083 257 03| 03| CD 42149 2083 258 2 2 CD 42149 2083 259 - - SYM 42149 2083 260 01| 01| CD 42149 2083 261 1 1 CD 42149 2083 262 - - HYPH 42149 2083 263 53| 53| CD 42149 2083 264 v|1,225 v|1,225 JJ 42149 2083 265 - - HYPH 42149 2083 266 1,262|0 1,262|0 CD 42149 2083 267 - - HYPH 42149 2083 268 29|0 29|0 CD 42149 2083 269 - - HYPH 42149 2083 270 29|0 29|0 CD 42149 2083 271 - - HYPH 42149 2083 272 36|0 36|0 CD 42149 2083 273 - - HYPH 42149 2083 274 18|0 18|0 CD 42149 2083 275 - - HYPH 42149 2083 276 30|0 30|0 CD 42149 2083 277 | | CD 42149 2083 278 1 1 CD 42149 2083 279 - - HYPH 42149 2083 280 50| 50| CD 42149 2083 281 1 1 CD 42149 2083 282 - - SYM 42149 2083 283 51| 51| NNP 42149 2083 284 1 1 CD 42149 2083 285 - - SYM 42149 2083 286 59| 59| CD 42149 2083 287 1 1 CD 42149 2083 288 - - SYM 42149 2083 289 26| 26| CD 42149 2083 290 1 1 CD 42149 2083 291 - - SYM 42149 2083 292 50| 50| CD 42149 2083 293 y|1,263 y|1,263 CD 42149 2083 294 - - HYPH 42149 2083 295 1,277|0 1,277|0 CD 42149 2083 296 - - HYPH 42149 2083 297 23|0 23|0 CD 42149 2083 298 - - HYPH 42149 2083 299 23|0 23|0 CD 42149 2083 300 - - HYPH 42149 2083 301 41|0 41|0 CD 42149 2083 302 - - HYPH 42149 2083 303 23|0 23|0 CD 42149 2083 304 - - HYPH 42149 2083 305 27|0 27|0 CD 42149 2083 306 | | CD 42149 2083 307 1 1 CD 42149 2083 308 - - HYPH 42149 2083 309 57| 57| CD 42149 2083 310 2 2 CD 42149 2083 311 - - SYM 42149 2083 312 0 0 CD 42149 2083 313 | | CD 42149 2083 314 2 2 CD 42149 2083 315 - - HYPH 42149 2083 316 20| 20| CD 42149 2083 317 1 1 CD 42149 2083 318 - - HYPH 42149 2083 319 58| 58| CD 42149 2083 320 2 2 CD 42149 2083 321 - - SYM 42149 2083 322 06| 06| CD 42149 2083 323 |1,278 |1,278 VBN 42149 2083 324 - - HYPH 42149 2083 325 1,307|0 1,307|0 CD 42149 2083 326 - - HYPH 42149 2083 327 33|0 33|0 CD 42149 2083 328 - - HYPH 42149 2083 329 34|0 34|0 CD 42149 2083 330 - - HYPH 42149 2083 331 51|0 51|0 CD 42149 2083 332 - - HYPH 42149 2083 333 0 0 CD 42149 2083 334 |0 |0 NN 42149 2083 335 - - HYPH 42149 2083 336 36|0 36|0 CD 42149 2083 337 | | CD 42149 2083 338 2 2 CD 42149 2083 339 - - HYPH 42149 2083 340 55| 55| CD 42149 2083 341 2 2 CD 42149 2083 342 - - SYM 42149 2083 343 54| 54| CD 42149 2083 344 3 3 CD 42149 2083 345 - - SYM 42149 2083 346 16| 16| CD 42149 2083 347 0 0 CD 42149 2083 348 - - SYM 42149 2083 349 0 0 CD 42149 2083 350 | | CD 42149 2083 351 2 2 CD 42149 2083 352 - - HYPH 42149 2083 353 59| 59| CD 42149 2083 354 |1,308 |1,308 CD 42149 2083 355 - - HYPH 42149 2083 356 1,326|0 1,326|0 CD 42149 2083 357 - - HYPH 42149 2083 358 49|0 49|0 CD 42149 2083 359 - - HYPH 42149 2083 360 42|0 42|0 CD 42149 2083 361 - - HYPH 42149 2083 362 58|0 58|0 CD 42149 2083 363 - - HYPH 42149 2083 364 25|0 25|0 CD 42149 2083 365 - - HYPH 42149 2083 366 48|0 48|0 CD 42149 2083 367 | | CD 42149 2083 368 4 4 CD 42149 2083 369 - - HYPH 42149 2083 370 11| 11| CD 42149 2083 371 4 4 CD 42149 2083 372 - - SYM 42149 2083 373 27| 27| CD 42149 2083 374 4 4 CD 42149 2083 375 - - SYM 42149 2083 376 45| 45| CD 42149 2083 377 3 3 CD 42149 2083 378 - - SYM 42149 2083 379 12| 12| CD 42149 2083 380 4 4 CD 42149 2083 381 - - HYPH 42149 2083 382 16| 16| CD 42149 2083 383 | | CD 42149 2083 384 955 955 CD 42149 2083 385 - - HYPH 42149 2083 386 1,326|0 1,326|0 CD 42149 2083 387 - - HYPH 42149 2083 388 29|0 29|0 CD 42149 2083 389 - - HYPH 42149 2083 390 27|0 27|0 CD 42149 2083 391 - - HYPH 42149 2083 392 49|0 49|0 CD 42149 2083 393 - - HYPH 42149 2083 394 31|0 31|0 CD 42149 2083 395 - - HYPH 42149 2083 396 32|0 32|0 CD 42149 2083 397 | | CD 42149 2083 398 2 2 CD 42149 2083 399 - - SYM 42149 2083 400 18| 18| CD 42149 2083 401 2 2 CD 42149 2083 402 - - SYM 42149 2083 403 20| 20| CD 42149 2083 404 2 2 CD 42149 2083 405 - - SYM 42149 2083 406 46| 46| CD 42149 2083 407 2 2 CD 42149 2083 408 - - SYM 42149 2083 409 20| 20| CD 42149 2083 410 2 2 CD 42149 2083 411 - - HYPH 42149 2083 412 24| 24| CD 42149 2083 413 | | CD 42149 2083 414 693 693 CD 42149 2083 415 - - HYPH 42149 2083 416 1,326|[O 1,326|[o CD 42149 2083 417 ] ] -RRB- 42149 2083 418 | | CD 42149 2083 419 | | CD 42149 2083 420 | | CD 42149 2083 421 | | CD 42149 2083 422 |0 |0 '' 42149 2083 423 - - HYPH 42149 2083 424 06| 06| CD 42149 2083 425 2 2 CD 42149 2083 426 - - SYM 42149 2083 427 24| 24| CD 42149 2083 428 2 2 CD 42149 2083 429 - - SYM 42149 2083 430 31| 31| CD 42149 2083 431 2 2 CD 42149 2083 432 - - SYM 42149 2083 433 38| 38| CD 42149 2083 434 2 2 CD 42149 2083 435 - - SYM 42149 2083 436 35| 35| CD 42149 2083 437 2 2 CD 42149 2083 438 - - HYPH 42149 2083 439 28| 28| CD 42149 2083 440 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2083 441 A| a| CD 42149 2083 442 216 216 CD 42149 2083 443 - - HYPH 42149 2083 444 1,326|[O 1,326|[o CD 42149 2083 445 ] ] -RRB- 42149 2083 446 | | CD 42149 2083 447 | | CD 42149 2083 448 | | CD 42149 2083 449 | | CD 42149 2083 450 |0 |0 '' 42149 2083 451 - - HYPH 42149 2083 452 16| 16| CD 42149 2083 453 | | NNP 42149 2083 454 | | CD 42149 2083 455 | | CD 42149 2083 456 | | CD 42149 2083 457 4 4 CD 42149 2083 458 - - SYM 42149 2083 459 18| 18| CD 42149 2083 460 l| l| JJ 42149 2083 461 55 55 CD 42149 2083 462 - - HYPH 42149 2083 463 1,326|[O 1,326|[o CD 42149 2083 464 ] ] -RRB- 42149 2083 465 | | CD 42149 2083 466 | | CD 42149 2083 467 | | CD 42149 2083 468 | | CD 42149 2083 469 |0 |0 NN 42149 2083 470 - - HYPH 42149 2083 471 12| 12| CD 42149 2083 472 | | NNP 42149 2083 473 | | CD 42149 2083 474 | | CD 42149 2083 475 | | CD 42149 2083 476 6 6 CD 42149 2083 477 - - HYPH 42149 2083 478 47| 47| CD 42149 2083 479 l| l| JJ 42149 2083 480 | | NNP 42149 2083 481 | | CD 42149 2083 482 | | CD 42149 2083 483 | | CD 42149 2083 484 | | CD 42149 2083 485 | | CD 42149 2083 486 | | CD 42149 2083 487 | | CD 42149 2083 488 | | CD 42149 2083 489 | | CD 42149 2083 490 | | CD 42149 2083 491 | | NNS 42149 2083 492 = = SYM 42149 2083 493 + + SYM 42149 2083 494 = = SYM 42149 2083 495 = = SYM 42149 2083 496 = = SYM 42149 2083 497 = = SYM 42149 2083 498 = = SYM 42149 2083 499 = = SYM 42149 2083 500 = = SYM 42149 2083 501 = = SYM 42149 2083 502 = = SYM 42149 2083 503 = = NFP 42149 2083 504 = = SYM 42149 2083 505 + + SYM 42149 2083 506 = = SYM 42149 2083 507 = = SYM 42149 2083 508 = = NFP 42149 2083 509 = = SYM 42149 2083 510 + + SYM 42149 2083 511 = = SYM 42149 2083 512 = = SYM 42149 2083 513 = = NFP 42149 2083 514 = = SYM 42149 2083 515 + + SYM 42149 2083 516 = = SYM 42149 2083 517 = = SYM 42149 2083 518 = = NFP 42149 2083 519 = = SYM 42149 2083 520 + + SYM 42149 2083 521 = = SYM 42149 2083 522 = = SYM 42149 2083 523 = = NFP 42149 2083 524 = = SYM 42149 2083 525 + + SYM 42149 2083 526 = = SYM 42149 2083 527 = = SYM 42149 2083 528 = = NFP 42149 2083 529 = = SYM 42149 2083 530 + + SYM 42149 2083 531 = = SYM 42149 2083 532 = = SYM 42149 2083 533 = = NFP 42149 2083 534 = = SYM 42149 2083 535 + + SYM 42149 2083 536 = = SYM 42149 2083 537 = = SYM 42149 2083 538 = = SYM 42149 2083 539 = = NFP 42149 2083 540 = = SYM 42149 2083 541 + + SYM 42149 2083 542 = = SYM 42149 2083 543 = = SYM 42149 2083 544 = = SYM 42149 2083 545 = = NFP 42149 2083 546 = = SYM 42149 2083 547 + + SYM 42149 2083 548 = = SYM 42149 2083 549 = = SYM 42149 2083 550 = = SYM 42149 2083 551 = = NFP 42149 2083 552 = = SYM 42149 2083 553 + + SYM 42149 2083 554 = = SYM 42149 2083 555 = = SYM 42149 2083 556 = = SYM 42149 2083 557 = = NFP 42149 2083 558 = = SYM 42149 2083 559 + + SYM 42149 2083 560 = = SYM 42149 2083 561 = = SYM 42149 2083 562 = = SYM 42149 2083 563 = = NFP 42149 2083 564 =| =| ADD 42149 2083 565 TABLE TABLE VBZ 42149 2083 566 24 24 CD 42149 2083 567 SUMMARY summary NN 42149 2083 568 PART part NN 42149 2083 569 1 1 CD 42149 2083 570 = = SYM 42149 2083 571 = = SYM 42149 2083 572 = = SYM 42149 2083 573 + + SYM 42149 2083 574 = = SYM 42149 2083 575 = = SYM 42149 2083 576 = = SYM 42149 2083 577 = = SYM 42149 2083 578 = = SYM 42149 2083 579 = = SYM 42149 2083 580 = = SYM 42149 2083 581 = = SYM 42149 2083 582 = = SYM 42149 2083 583 = = NFP 42149 2083 584 = = SYM 42149 2083 585 + + SYM 42149 2083 586 = = SYM 42149 2083 587 = = SYM 42149 2083 588 = = SYM 42149 2083 589 = = SYM 42149 2083 590 = = SYM 42149 2083 591 = = NFP 42149 2083 592 = = SYM 42149 2083 593 + + SYM 42149 2083 594 = = SYM 42149 2083 595 = = SYM 42149 2083 596 = = SYM 42149 2083 597 = = SYM 42149 2083 598 = = SYM 42149 2083 599 = = SYM 42149 2083 600 = = SYM 42149 2083 601 = = SYM 42149 2083 602 = = SYM 42149 2083 603 = = SYM 42149 2083 604 = = SYM 42149 2083 605 = = SYM 42149 2083 606 = = NFP 42149 2083 607 = = SYM 42149 2083 608 + + SYM 42149 2083 609 = = SYM 42149 2083 610 = = SYM 42149 2083 611 = = NFP 42149 2083 612 = = SYM 42149 2083 613 + + SYM 42149 2083 614 = = SYM 42149 2083 615 = = SYM 42149 2083 616 = = SYM 42149 2083 617 = = SYM 42149 2083 618 = = SYM 42149 2083 619 = = SYM 42149 2083 620 = = SYM 42149 2083 621 = = SYM 42149 2083 622 = = SYM 42149 2083 623 = = SYM 42149 2083 624 = = NFP 42149 2083 625 = = SYM 42149 2083 626 + + SYM 42149 2083 627 = = SYM 42149 2083 628 = = SYM 42149 2083 629 + + SYM 42149 2083 630 = = SYM 42149 2083 631 = = SYM 42149 2083 632 + + SYM 42149 2083 633 = = SYM 42149 2083 634 = = SYM 42149 2083 635 = = SYM 42149 2083 636 + + SYM 42149 2083 637 = = SYM 42149 2083 638 = = SYM 42149 2083 639 + + SYM 42149 2083 640 = = SYM 42149 2083 641 =| =| NNP 42149 2083 642 | | CD 42149 2083 643 | | NNP 42149 2083 644 | | NNP 42149 2083 645 AVE AVE NNP 42149 2083 646 . . . 42149 2083 647 NO no UH 42149 2083 648 . . . 42149 2084 1 | | NNP 42149 2084 2 W| w| CD 42149 2084 3 | | CD 42149 2084 4 | | CD 42149 2084 5 OF OF NNP 42149 2084 6 MEN MEN NNP 42149 2084 7 | | NNP 42149 2084 8 e| e| NNP 42149 2084 9 | | CD 42149 2084 10 DESCRIPTION description NN 42149 2084 11 | | CD 42149 2084 12 IN IN NNP 42149 2084 13 GANG gang NN 42149 2084 14 | | , 42149 2084 15 i| i| NN 42149 2084 16 |-------+--------------+----+------------+--+--+---+--+--| |-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2084 17 g| g| NNP 42149 2084 18 | | NNP 42149 2084 19 | | NNP 42149 2084 20 |Ave.| |Ave.| NNP 42149 2084 21 | | NNP 42149 2084 22 | | NNP 42149 2084 23 | | CD 42149 2084 24 | | CD 42149 2084 25 | | CD 42149 2084 26 | | NNP 42149 2084 27 h| h| JJ 42149 2084 28 | | CD 42149 2084 29 | | NNP 42149 2084 30 |air |air NNP 42149 2084 31 | | NNP 42149 2084 32 | | NNP 42149 2084 33 | | NNP 42149 2084 34 | | CD 42149 2084 35 | | CD 42149 2084 36 | | CD 42149 2084 37 | | CD 42149 2084 38 t| t| JJ 42149 2084 39 | | NNP 42149 2084 40 | | NNP 42149 2084 41 | | CD 42149 2084 42 | | CD 42149 2084 43 | | CD 42149 2084 44 | | CD 42149 2084 45 | | CD 42149 2084 46 | | CD 42149 2084 47 A| a| CD 42149 2084 48 | | CD 42149 2084 49 | | CD 42149 2084 50 | | CD 42149 2084 51 | | CD 42149 2084 52 |P |p CD 42149 2084 53 | | CD 42149 2084 54 | | CD 42149 2084 55 | | CD 42149 2084 56 D| d| NN 42149 2084 57 G g NN 42149 2084 58 | | NNP 42149 2084 59 i| i| NN 42149 2084 60 | | NNP 42149 2084 61 o| o| NNP 42149 2084 62 | | NNP 42149 2084 63 | | NNP 42149 2084 64 |r |r NNP 42149 2084 65 | | NNP 42149 2084 66 | | NNP 42149 2084 67 | | CD 42149 2084 68 r| r| NN 42149 2084 69 r r DT 42149 2084 70 | | CD 42149 2084 71 r| r| NN 42149 2084 72 | | CD 42149 2084 73 f| f| NN 42149 2084 74 | | NNP 42149 2084 75 | | NNP 42149 2084 76 |e |e NNPS 42149 2084 77 | | NNP 42149 2084 78 | | NNP 42149 2084 79 S| s| VB 42149 2084 80 i| i| NNP 42149 2084 81 o o NNP 42149 2084 82 | | NNP 42149 2084 83 | | NNP 42149 2084 84 | | CD 42149 2084 85 | | CD 42149 2084 86 | | NNP 42149 2084 87 | | NNP 42149 2084 88 |s |s NNP 42149 2084 89 | | NNP 42149 2084 90 | | NNP 42149 2084 91 h| h| NNP 42149 2084 92 l| l| NN 42149 2084 93 u u NNP 42149 2084 94 | | NNP 42149 2084 95 T|T T|T NNP 42149 2084 96 | | NNP 42149 2084 97 i| i| NN 42149 2084 98 | | NNP 42149 2084 99 | | NNP 42149 2084 100 |s |s NNP 42149 2084 101 | | NNP 42149 2084 102 | | NNP 42149 2084 103 i| i| RB 42149 2084 104 l| l| NNP 42149 2084 105 t t NNP 42149 2084 106 | | NNP 42149 2084 107 r|o r|o CD 42149 2084 108 | | CD 42149 2084 109 r| r| NN 42149 2084 110 Section Section NNP 42149 2084 111 | | NNP 42149 2084 112 | | NNP 42149 2084 113 |u |u NNP 42149 2084 114 | | CD 42149 2084 115 | | CD 42149 2084 116 e| e| JJ 42149 2084 117 i| i| NNP 42149 2084 118 i i PRP 42149 2084 119 | | CD 42149 2084 120 a|t a|t CD 42149 2084 121 | | CD 42149 2084 122 o| o| NN 42149 2084 123 between between IN 42149 2084 124 |Length |Length NNP 42149 2084 125 | | NNP 42149 2084 126 |r |r JJ 42149 2084 127 |Method |Method NNS 42149 2084 128 of of IN 42149 2084 129 | | CD 42149 2084 130 l| l| JJ 42149 2084 131 n| n| NN 42149 2084 132 n n CC 42149 2084 133 | | NNP 42149 2084 134 n|a n|a CD 42149 2084 135 | | CD 42149 2084 136 n| n| NN 42149 2084 137 rings ring NNS 42149 2084 138 |in |in CD 42149 2084 139 feet| feet| CD 42149 2084 140 Material Material NNP 42149 2084 141 |e |e NNPS 42149 2084 142 |Excavation |Excavation NNP 42149 2084 143 | | NNP 42149 2084 144 d| d| NN 42149 2084 145 g| g| NNP 42149 2084 146 g g NNP 42149 2084 147 | | NNP 42149 2084 148 s|l s|l CD 42149 2084 149 | | NNS 42149 2084 150 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| NN 42149 2084 151 O o NN 42149 2084 152 { { -LRB- 42149 2084 153 | | NNP 42149 2084 154 1 1 CD 42149 2084 155 - - HYPH 42149 2084 156 54 54 CD 42149 2084 157 | | CD 42149 2084 158 135.0|Rock 135.0|rock NN 42149 2084 159 |0 |0 JJR 42149 2084 160 | | NNP 42149 2084 161 [ [ -LRB- 42149 2084 162 P p NN 42149 2084 163 ] ] -RRB- 42149 2084 164 | | NNP 42149 2084 165 | | CD 42149 2084 166 | | CD 42149 2084 167 | | CD 42149 2084 168 |14| |14| NN 42149 2084 169 r r NN 42149 2084 170 { { -LRB- 42149 2084 171 | | CD 42149 2084 172 55 55 CD 42149 2084 173 - - HYPH 42149 2084 174 194 194 CD 42149 2084 175 | | CD 42149 2084 176 350.0|Earth 350.0|earth CD 42149 2084 177 and and CC 42149 2084 178 rock|16 rock|16 NNP 42149 2084 179 | | NNP 42149 2084 180 [ [ -LRB- 42149 2084 181 P p NN 42149 2084 182 ] ] -RRB- 42149 2084 183 |22| |22| JJ 42149 2084 184 6|1/3| 6|1/3| . 42149 2084 185 2|30| 2|30| CD 42149 2084 186 d d NN 42149 2084 187 { { -LRB- 42149 2084 188 | | CD 42149 2084 189 195 195 CD 42149 2084 190 - - HYPH 42149 2084 191 393 393 CD 42149 2084 192 | | CD 42149 2084 193 497.5|Silt 497.5|silt CD 42149 2084 194 |20 |20 CD 42149 2084 195 |[P]Breasting|27| |[p]breasting|27| CD 42149 2084 196 | | CD 42149 2084 197 | | NNP 42149 2084 198 4|31| 4|31| NNS 42149 2084 199 i i PRP 42149 2084 200 { { -LRB- 42149 2084 201 | | CD 42149 2084 202 394 394 CD 42149 2084 203 - - HYPH 42149 2084 204 440 440 CD 42149 2084 205 | | CD 42149 2084 206 117.5| 117.5| CD 42149 2084 207 " " `` 42149 2084 208 |24 |24 CD 42149 2084 209 |[P]Breasting|28| |[p]breasting|28| CD 42149 2084 210 | | NNP 42149 2084 211 | | NNP 42149 2084 212 4|32| 4|32| CD 42149 2084 213 n n CC 42149 2084 214 { { -LRB- 42149 2084 215 | | CD 42149 2084 216 441 441 CD 42149 2084 217 - - HYPH 42149 2084 218 692 692 CD 42149 2084 219 | | CD 42149 2084 220 630.0| 630.0| CD 42149 2084 221 " " '' 42149 2084 222 |23 |23 NNP 42149 2084 223 |[Q]3 |[Q]3 NNP 42149 2084 224 doors door NNS 42149 2084 225 |25| |25| JJ 42149 2084 226 | | CD 42149 2084 227 | | CD 42149 2084 228 4|29| 4|29| CD 42149 2084 229 a a DT 42149 2084 230 { { -LRB- 42149 2084 231 |-----------+-------+--------------+----+------------+--+--+---+--+--| |-----------+-------+--------------+----+------------+--+--+---+--+--| `` 42149 2084 232 r r NN 42149 2084 233 { { -LRB- 42149 2084 234 | | NNP 42149 2084 235 216 216 CD 42149 2084 236 - - SYM 42149 2084 237 692 692 CD 42149 2084 238 |1,192.5| |1,192.5| NNP 42149 2084 239 |22 |22 NNP 42149 2084 240 | | CD 42149 2084 241 |26| |26| VBZ 42149 2084 242 | | CD 42149 2084 243 | | CD 42149 2084 244 4|30| 4|30| CD 42149 2084 245 y y NN 42149 2084 246 { { -LRB- 42149 2084 247 |-----------+-------+--------------+----+------------+--+--+---+--+--| |-----------+-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2084 248 { { -LRB- 42149 2084 249 | | CD 42149 2084 250 55 55 CD 42149 2084 251 - - SYM 42149 2084 252 692 692 CD 42149 2084 253 |1,595.0| |1,595.0| NN 42149 2084 254 |20 |20 CD 42149 2084 255 | | CD 42149 2084 256 |25| |25| JJ 42149 2084 257 2| 2| CD 42149 2084 258 | | CD 42149 2084 259 3|30| 3|30| NNS 42149 2084 260 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| CC 42149 2084 261 Hvy| hvy| $ 42149 2084 262 693 693 CD 42149 2084 263 - - SYM 42149 2084 264 1,326|1,585.0|Silt 1,326|1,585.0|silt CD 42149 2084 265 |24 |24 CD 42149 2084 266 |[Q]1 |[Q]1 NNP 42149 2084 267 door door NN 42149 2084 268 |27| |27| JJ 42149 2084 269 | | NNP 42149 2084 270 | | CD 42149 2084 271 8|35| 8|35| NNS 42149 2084 272 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2084 273 All| All| NNP 42149 2084 274 55 55 CD 42149 2084 275 - - SYM 42149 2084 276 1,326|3,180.0| 1,326|3,180.0| CD 42149 2084 277 |22 |22 CD 42149 2084 278 | | CD 42149 2084 279 |26| |26| VBZ 42149 2084 280 | | CD 42149 2084 281 | | CD 42149 2084 282 6|32| 6|32| CD 42149 2084 283 = = SYM 42149 2084 284 = = SYM 42149 2084 285 = = SYM 42149 2084 286 + + SYM 42149 2084 287 = = SYM 42149 2084 288 = = SYM 42149 2084 289 = = SYM 42149 2084 290 = = SYM 42149 2084 291 = = SYM 42149 2084 292 = = SYM 42149 2084 293 = = SYM 42149 2084 294 = = SYM 42149 2084 295 = = SYM 42149 2084 296 = = NFP 42149 2084 297 = = SYM 42149 2084 298 + + SYM 42149 2084 299 = = SYM 42149 2084 300 = = SYM 42149 2084 301 = = SYM 42149 2084 302 = = SYM 42149 2084 303 = = SYM 42149 2084 304 = = NFP 42149 2084 305 = = SYM 42149 2084 306 + + SYM 42149 2084 307 = = SYM 42149 2084 308 = = SYM 42149 2084 309 = = SYM 42149 2084 310 = = SYM 42149 2084 311 = = SYM 42149 2084 312 = = SYM 42149 2084 313 = = SYM 42149 2084 314 = = SYM 42149 2084 315 = = SYM 42149 2084 316 = = SYM 42149 2084 317 = = SYM 42149 2084 318 = = SYM 42149 2084 319 = = NFP 42149 2084 320 = = SYM 42149 2084 321 + + SYM 42149 2084 322 = = SYM 42149 2084 323 = = SYM 42149 2084 324 = = NFP 42149 2084 325 = = SYM 42149 2084 326 + + SYM 42149 2084 327 = = SYM 42149 2084 328 = = SYM 42149 2084 329 = = SYM 42149 2084 330 = = SYM 42149 2084 331 = = SYM 42149 2084 332 = = SYM 42149 2084 333 = = SYM 42149 2084 334 = = SYM 42149 2084 335 = = SYM 42149 2084 336 = = SYM 42149 2084 337 = = NFP 42149 2084 338 = = SYM 42149 2084 339 + + SYM 42149 2084 340 = = SYM 42149 2084 341 = = SYM 42149 2084 342 + + SYM 42149 2084 343 = = SYM 42149 2084 344 = = SYM 42149 2084 345 + + SYM 42149 2084 346 = = SYM 42149 2084 347 = = SYM 42149 2084 348 = = SYM 42149 2084 349 + + SYM 42149 2084 350 = = SYM 42149 2084 351 = = SYM 42149 2084 352 + + SYM 42149 2084 353 = = SYM 42149 2084 354 =| =| ADD 42149 2084 355 TABLE TABLE VBZ 42149 2084 356 24 24 CD 42149 2084 357 SUMMARY summary NN 42149 2084 358 PART part NN 42149 2084 359 2 2 CD 42149 2084 360 = = SYM 42149 2084 361 = = SYM 42149 2084 362 = = SYM 42149 2084 363 + + SYM 42149 2084 364 = = SYM 42149 2084 365 = = SYM 42149 2084 366 = = SYM 42149 2084 367 = = SYM 42149 2084 368 = = SYM 42149 2084 369 = = SYM 42149 2084 370 = = NFP 42149 2084 371 = = SYM 42149 2084 372 + + SYM 42149 2084 373 = = SYM 42149 2084 374 = = SYM 42149 2084 375 = = SYM 42149 2084 376 = = SYM 42149 2084 377 = = SYM 42149 2084 378 = = SYM 42149 2084 379 = = NFP 42149 2084 380 = = SYM 42149 2084 381 + + SYM 42149 2084 382 = = SYM 42149 2084 383 = = SYM 42149 2084 384 = = SYM 42149 2084 385 = = SYM 42149 2084 386 = = SYM 42149 2084 387 = = NFP 42149 2084 388 = = SYM 42149 2084 389 + + SYM 42149 2084 390 = = SYM 42149 2084 391 = = SYM 42149 2084 392 = = SYM 42149 2084 393 = = SYM 42149 2084 394 = = SYM 42149 2084 395 = = NFP 42149 2084 396 = = SYM 42149 2084 397 + + SYM 42149 2084 398 = = SYM 42149 2084 399 = = SYM 42149 2084 400 = = NFP 42149 2084 401 = = SYM 42149 2084 402 + + SYM 42149 2084 403 = = SYM 42149 2084 404 = = SYM 42149 2084 405 = = SYM 42149 2084 406 = = NFP 42149 2084 407 = = SYM 42149 2084 408 + + SYM 42149 2084 409 = = SYM 42149 2084 410 = = SYM 42149 2084 411 = = SYM 42149 2084 412 = = SYM 42149 2084 413 = = SYM 42149 2084 414 = = SYM 42149 2084 415 = = SYM 42149 2084 416 = = SYM 42149 2084 417 = = SYM 42149 2084 418 = = SYM 42149 2084 419 = = SYM 42149 2084 420 = = SYM 42149 2084 421 = = SYM 42149 2084 422 = = NFP 42149 2084 423 = = SYM 42149 2084 424 + + SYM 42149 2084 425 = = SYM 42149 2084 426 = = SYM 42149 2084 427 = = SYM 42149 2084 428 = = SYM 42149 2084 429 = = SYM 42149 2084 430 = = SYM 42149 2084 431 = = NFP 42149 2084 432 =| =| NNP 42149 2084 433 W W NNP 42149 2084 434 | | NNP 42149 2084 435 | | NNP 42149 2084 436 | | CD 42149 2084 437 | | CD 42149 2084 438 UNAVOIDABLE UNAVOIDABLE NNP 42149 2084 439 DELAYS DELAYS NNP 42149 2084 440 | | NNP 42149 2084 441 e e NNP 42149 2084 442 | | CD 42149 2084 443 | | CD 42149 2084 444 | | CD 42149 2084 445 AVERAGE average NN 42149 2084 446 TIME time NN 42149 2084 447 |(NOT |(not CD 42149 2084 448 INCLUDED include VBN 42149 2084 449 IN in IN 42149 2084 450 AVERAGE| AVERAGE| NNP 42149 2084 451 i i PRP 42149 2084 452 o| o| NNP 42149 2084 453 | | CD 42149 2084 454 | | NNS 42149 2084 455 PER per NN 42149 2084 456 RING ring NN 42149 2084 457 . . . 42149 2085 1 | | JJ 42149 2085 2 TIME TIME NNP 42149 2085 3 PER per IN 42149 2085 4 RING ring NN 42149 2085 5 ) ) -RRB- 42149 2085 6 . . . 42149 2086 1 | | NNP 42149 2086 2 g g NNP 42149 2086 3 f| f| NN 42149 2086 4 | | NNP 42149 2086 5 |-------+-------+----+-----+---------------+--------| |-------+-------+----+-----+---------------+--------| NNP 42149 2086 6 h h NNP 42149 2086 7 |Average |average NN 42149 2086 8 | | NNP 42149 2086 9 Time Time NNP 42149 2086 10 | | NNP 42149 2086 11 | | NNP 42149 2086 12 | | CD 42149 2086 13 | | CD 42149 2086 14 | | CD 42149 2086 15 | | CD 42149 2086 16 | | CD 42149 2086 17 t t NN 42149 2086 18 i| i| JJ 42149 2086 19 No no NN 42149 2086 20 . . . 42149 2087 1 of of IN 42149 2087 2 |mucking,|Shoving| |mucking,|shoving| CD 42149 2087 3 | | NNP 42149 2087 4 | | CD 42149 2087 5 | | CD 42149 2087 6 | | CD 42149 2087 7 | | CD 42149 2087 8 r| r| NN 42149 2087 9 cubic cubic JJ 42149 2087 10 | | CD 42149 2087 11 per per IN 42149 2087 12 | | NNP 42149 2087 13 and and CC 42149 2087 14 | | NNP 42149 2087 15 Erec- Erec- NNP 42149 2087 16 | | NNP 42149 2087 17 | | NNP 42149 2087 18 | | CD 42149 2087 19 | | CD 42149 2087 20 | | CD 42149 2087 21 o| o| NN 42149 2087 22 yards yard NNS 42149 2087 23 | | CD 42149 2087 24 cubic cubic JJ 42149 2087 25 |mucking| |mucking| NNP 42149 2087 26 tion tion NN 42149 2087 27 |Lost| |Lost| NNP 42149 2087 28 | | NNP 42149 2087 29 | | NNP 42149 2087 30 Time Time NNP 42149 2087 31 | | NNP 42149 2087 32 n|per n|per NN 42149 2087 33 ring| ring| CD 42149 2087 34 yard yard NN 42149 2087 35 | | NNP 42149 2087 36 [ [ -LRB- 42149 2087 37 N n NN 42149 2087 38 ] ] -RRB- 42149 2087 39 | | NN 42149 2087 40 [ [ -LRB- 42149 2087 41 O o NN 42149 2087 42 ] ] -RRB- 42149 2087 43 |time|Total| |time|Total| . 42149 2087 44 Items item NNS 42149 2087 45 |hrs |hrs VBP 42149 2087 46 min| min| CD 42149 2087 47 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| FW 42149 2087 48 O o UH 42149 2087 49 { { -LRB- 42149 2087 50 | | NNP 42149 2087 51 | | NNP 42149 2087 52 | | CD 42149 2087 53 | | CD 42149 2087 54 4 4 CD 42149 2087 55 - - HYPH 42149 2087 56 14 14 CD 42149 2087 57 | | CD 42149 2087 58 | | CD 42149 2087 59 |First |First NNP 42149 2087 60 bulkhead bulkhead NN 42149 2087 61 |172 |172 CD 42149 2087 62 00| 00| CD 42149 2087 63 r r NNP 42149 2087 64 { { -LRB- 42149 2087 65 | | CD 42149 2087 66 41 41 CD 42149 2087 67 | | CD 42149 2087 68 0 0 CD 42149 2087 69 - - HYPH 42149 2087 70 32 32 CD 42149 2087 71 | | CD 42149 2087 72 21 21 CD 42149 2087 73 - - HYPH 42149 2087 74 44 44 CD 42149 2087 75 | | CD 42149 2087 76 4 4 CD 42149 2087 77 - - SYM 42149 2087 78 4 4 CD 42149 2087 79 | | CD 42149 2087 80 |25 |25 CD 42149 2087 81 - - HYPH 42149 2087 82 48|Second 48|second CD 42149 2087 83 bulkhead|119 bulkhead|119 JJ 42149 2087 84 00| 00| CD 42149 2087 85 d d NN 42149 2087 86 { { -LRB- 42149 2087 87 | | NNP 42149 2087 88 38 38 CD 42149 2087 89 | | CD 42149 2087 90 0 0 CD 42149 2087 91 - - HYPH 42149 2087 92 7 7 CD 42149 2087 93 | | CD 42149 2087 94 4 4 CD 42149 2087 95 - - HYPH 42149 2087 96 11 11 CD 42149 2087 97 | | CD 42149 2087 98 2 2 CD 42149 2087 99 - - SYM 42149 2087 100 52 52 CD 42149 2087 101 |0 |0 NN 42149 2087 102 - - : 42149 2087 103 9 9 CD 42149 2087 104 | | CD 42149 2087 105 7 7 CD 42149 2087 106 - - HYPH 42149 2087 107 12|Grouting 12|grouting CD 42149 2087 108 |200 |200 CD 42149 2087 109 00| 00| CD 42149 2087 110 i i PRP 42149 2087 111 { { -LRB- 42149 2087 112 | | CD 42149 2087 113 41 41 CD 42149 2087 114 | | CD 42149 2087 115 0 0 CD 42149 2087 116 - - HYPH 42149 2087 117 18 18 CD 42149 2087 118 | | CD 42149 2087 119 11 11 CD 42149 2087 120 - - HYPH 42149 2087 121 54 54 CD 42149 2087 122 | | CD 42149 2087 123 4 4 CD 42149 2087 124 - - SYM 42149 2087 125 17 17 CD 42149 2087 126 |1 |1 HYPH 42149 2087 127 - - HYPH 42149 2087 128 41|17 41|17 CD 42149 2087 129 - - HYPH 42149 2087 130 52|Blowout 52|blowout CD 42149 2087 131 | | CD 42149 2087 132 73 73 CD 42149 2087 133 00| 00| CD 42149 2087 134 n n CC 42149 2087 135 { { -LRB- 42149 2087 136 | | CD 42149 2087 137 17 17 CD 42149 2087 138 | | CD 42149 2087 139 0 0 CD 42149 2087 140 - - HYPH 42149 2087 141 6 6 CD 42149 2087 142 | | CD 42149 2087 143 2 2 CD 42149 2087 144 - - HYPH 42149 2087 145 04 04 CD 42149 2087 146 | | CD 42149 2087 147 2 2 CD 42149 2087 148 - - SYM 42149 2087 149 34 34 CD 42149 2087 150 |0 |0 NN 42149 2087 151 - - : 42149 2087 152 42| 42| CD 42149 2087 153 5 5 CD 42149 2087 154 - - HYPH 42149 2087 155 20|Cradle 20|cradle CD 42149 2087 156 |100 |100 CD 42149 2087 157 00| 00| CD 42149 2087 158 a a DT 42149 2087 159 { { -LRB- 42149 2087 160 |--------+--------+-------+-------+----+-----+---------------+--------| |--------+--------+-------+-------+----+-----+---------------+--------| NNP 42149 2087 161 r r NNP 42149 2087 162 { { -LRB- 42149 2087 163 | | CD 42149 2087 164 30 30 CD 42149 2087 165 | | CD 42149 2087 166 0 0 CD 42149 2087 167 - - HYPH 42149 2087 168 7 7 CD 42149 2087 169 | | CD 42149 2087 170 3 3 CD 42149 2087 171 - - HYPH 42149 2087 172 42 42 CD 42149 2087 173 | | CD 42149 2087 174 2 2 CD 42149 2087 175 - - HYPH 42149 2087 176 50 50 CD 42149 2087 177 |0 |0 NN 42149 2087 178 - - : 42149 2087 179 25| 25| CD 42149 2087 180 6 6 CD 42149 2087 181 - - HYPH 42149 2087 182 57|Total 57|total NN 42149 2087 183 |664 |664 NN 42149 2087 184 00| 00| CD 42149 2087 185 y y NNP 42149 2087 186 { { -LRB- 42149 2087 187 |--------+--------+-------+-------+----+-----+---------------+--------| |--------+--------+-------+-------+----+-----+---------------+--------| NNP 42149 2087 188 { { -LRB- 42149 2087 189 | | CD 42149 2087 190 30 30 CD 42149 2087 191 | | CD 42149 2087 192 0 0 CD 42149 2087 193 - - HYPH 42149 2087 194 15 15 CD 42149 2087 195 | | CD 42149 2087 196 7 7 CD 42149 2087 197 - - SYM 42149 2087 198 35 35 CD 42149 2087 199 | | CD 42149 2087 200 3 3 CD 42149 2087 201 - - SYM 42149 2087 202 12 12 CD 42149 2087 203 |0 |0 NN 42149 2087 204 - - HYPH 42149 2087 205 17|11 17|11 CD 42149 2087 206 - - HYPH 42149 2087 207 04|Per 04|per CD 42149 2087 208 ring re VBG 42149 2087 209 | | CD 42149 2087 210 0 0 CD 42149 2087 211 30| 30| CD 42149 2087 212 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| : 42149 2087 213 Hvy| Hvy| NNS 42149 2087 214 12 12 CD 42149 2087 215 | | CD 42149 2087 216 0 0 CD 42149 2087 217 - - HYPH 42149 2087 218 4 4 CD 42149 2087 219 | | CD 42149 2087 220 0 0 CD 42149 2087 221 - - HYPH 42149 2087 222 51 51 CD 42149 2087 223 | | CD 42149 2087 224 1 1 CD 42149 2087 225 - - SYM 42149 2087 226 31 31 CD 42149 2087 227 |0 |0 NN 42149 2087 228 - - : 42149 2087 229 06| 06| CD 42149 2087 230 2 2 CD 42149 2087 231 - - HYPH 42149 2087 232 28| 28| CD 42149 2087 233 | | CD 42149 2087 234 | | NNS 42149 2087 235 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| . 42149 2087 236 All| All| NNP 42149 2087 237 21 21 CD 42149 2087 238 | | CD 42149 2087 239 0 0 CD 42149 2087 240 - - HYPH 42149 2087 241 10 10 CD 42149 2087 242 | | CD 42149 2087 243 4 4 CD 42149 2087 244 - - CD 42149 2087 245 13 13 CD 42149 2087 246 | | CD 42149 2087 247 2 2 CD 42149 2087 248 - - SYM 42149 2087 249 22 22 CD 42149 2087 250 |0 |0 NN 42149 2087 251 - - : 42149 2087 252 12| 12| CD 42149 2087 253 6 6 CD 42149 2087 254 - - HYPH 42149 2087 255 47| 47| CD 42149 2087 256 | | CD 42149 2087 257 | | NNPS 42149 2087 258 = = SYM 42149 2087 259 = = SYM 42149 2087 260 = = SYM 42149 2087 261 + + SYM 42149 2087 262 = = SYM 42149 2087 263 = = SYM 42149 2087 264 = = SYM 42149 2087 265 = = SYM 42149 2087 266 = = SYM 42149 2087 267 = = SYM 42149 2087 268 = = NFP 42149 2087 269 = = SYM 42149 2087 270 + + SYM 42149 2087 271 = = SYM 42149 2087 272 = = SYM 42149 2087 273 = = SYM 42149 2087 274 = = SYM 42149 2087 275 = = SYM 42149 2087 276 = = SYM 42149 2087 277 = = NFP 42149 2087 278 = = SYM 42149 2087 279 + + SYM 42149 2087 280 = = SYM 42149 2087 281 = = SYM 42149 2087 282 = = SYM 42149 2087 283 = = SYM 42149 2087 284 = = SYM 42149 2087 285 = = NFP 42149 2087 286 = = SYM 42149 2087 287 + + SYM 42149 2087 288 = = SYM 42149 2087 289 = = SYM 42149 2087 290 = = SYM 42149 2087 291 = = SYM 42149 2087 292 = = SYM 42149 2087 293 = = NFP 42149 2087 294 = = SYM 42149 2087 295 + + SYM 42149 2087 296 = = SYM 42149 2087 297 = = SYM 42149 2087 298 = = NFP 42149 2087 299 = = SYM 42149 2087 300 + + SYM 42149 2087 301 = = SYM 42149 2087 302 = = SYM 42149 2087 303 = = SYM 42149 2087 304 = = NFP 42149 2087 305 = = SYM 42149 2087 306 + + SYM 42149 2087 307 = = SYM 42149 2087 308 = = SYM 42149 2087 309 = = SYM 42149 2087 310 = = SYM 42149 2087 311 = = SYM 42149 2087 312 = = SYM 42149 2087 313 = = SYM 42149 2087 314 = = SYM 42149 2087 315 = = SYM 42149 2087 316 = = SYM 42149 2087 317 = = SYM 42149 2087 318 = = SYM 42149 2087 319 = = SYM 42149 2087 320 = = NFP 42149 2087 321 = = SYM 42149 2087 322 + + SYM 42149 2087 323 = = SYM 42149 2087 324 = = SYM 42149 2087 325 = = SYM 42149 2087 326 = = SYM 42149 2087 327 = = SYM 42149 2087 328 = = SYM 42149 2087 329 = = SYM 42149 2087 330 =| =| ADD 42149 2087 331 [ [ -LRB- 42149 2087 332 N n NN 42149 2087 333 ] ] -RRB- 42149 2087 334 Including include VBG 42149 2087 335 time time NN 42149 2087 336 for for IN 42149 2087 337 jacks jack NNS 42149 2087 338 . . . 42149 2088 1 [ [ -LRB- 42149 2088 2 O o NN 42149 2088 3 ] ] -RRB- 42149 2088 4 Including include VBG 42149 2088 5 bolting bolting NN 42149 2088 6 time time NN 42149 2088 7 . . . 42149 2089 1 [ [ -LRB- 42149 2089 2 P p NN 42149 2089 3 ] ] -RRB- 42149 2089 4 Excavating excavating NN 42149 2089 5 ahead ahead RB 42149 2089 6 of of IN 42149 2089 7 shield shield NN 42149 2089 8 . . . 42149 2090 1 [ [ -LRB- 42149 2090 2 Q q NN 42149 2090 3 ] ] -RRB- 42149 2090 4 Shoving shove VBG 42149 2090 5 shield shield NN 42149 2090 6 into into IN 42149 2090 7 silt silt NN 42149 2090 8 with with IN 42149 2090 9 ... ... : 42149 2090 10 doors door NNS 42149 2090 11 open open JJ 42149 2090 12 . . . 42149 2091 1 TABLE TABLE NNP 42149 2091 2 25.--SHIELD 25.--shield CD 42149 2091 3 - - HYPH 42149 2091 4 DRIVEN drive VBN 42149 2091 5 TUNNEL TUNNEL NNP 42149 2091 6 WORK work NN 42149 2091 7 , , , 42149 2091 8 MANHATTAN MANHATTAN NNP 42149 2091 9 SHAFT SHAFT NNP 42149 2091 10 , , , 42149 2091 11 RIVER RIVER NNP 42149 2091 12 TUNNEL TUNNEL NNP 42149 2091 13 SOUTH SOUTH NNP 42149 2091 14 . . . 42149 2092 1 Table table NN 42149 2092 2 showing show VBG 42149 2092 3 the the DT 42149 2092 4 size size NN 42149 2092 5 of of IN 42149 2092 6 the the DT 42149 2092 7 gang gang NN 42149 2092 8 , , , 42149 2092 9 the the DT 42149 2092 10 amount amount NN 42149 2092 11 of of IN 42149 2092 12 excavation excavation NN 42149 2092 13 , , , 42149 2092 14 and and CC 42149 2092 15 the the DT 42149 2092 16 time time NN 42149 2092 17 per per IN 42149 2092 18 ring ring NN 42149 2092 19 taken take VBN 42149 2092 20 for for IN 42149 2092 21 the the DT 42149 2092 22 various various JJ 42149 2092 23 operations operation NNS 42149 2092 24 involved involve VBN 42149 2092 25 in in IN 42149 2092 26 building build VBG 42149 2092 27 tunnel tunnel NN 42149 2092 28 through through IN 42149 2092 29 the the DT 42149 2092 30 several several JJ 42149 2092 31 kinds kind NNS 42149 2092 32 of of IN 42149 2092 33 ground ground NN 42149 2092 34 encountered encounter VBN 42149 2092 35 ; ; : 42149 2092 36 also also RB 42149 2092 37 the the DT 42149 2092 38 extent extent NN 42149 2092 39 and and CC 42149 2092 40 nature nature NN 42149 2092 41 of of IN 42149 2092 42 all all PDT 42149 2092 43 the the DT 42149 2092 44 unavoidable unavoidable JJ 42149 2092 45 delays delay NNS 42149 2092 46 . . . 42149 2093 1 TABLE TABLE NNS 42149 2093 2 25 25 CD 42149 2093 3 PART part CD 42149 2093 4 1 1 CD 42149 2093 5 = = SYM 42149 2093 6 + + SYM 42149 2093 7 = = SYM 42149 2093 8 = = SYM 42149 2093 9 = = SYM 42149 2093 10 = = SYM 42149 2093 11 = = SYM 42149 2093 12 = = SYM 42149 2093 13 = = SYM 42149 2093 14 = = SYM 42149 2093 15 = = SYM 42149 2093 16 = = NFP 42149 2093 17 = = SYM 42149 2093 18 + + SYM 42149 2093 19 = = SYM 42149 2093 20 = = SYM 42149 2093 21 = = SYM 42149 2093 22 = = SYM 42149 2093 23 = = SYM 42149 2093 24 = = NFP 42149 2093 25 = = SYM 42149 2093 26 + + SYM 42149 2093 27 = = SYM 42149 2093 28 = = SYM 42149 2093 29 = = SYM 42149 2093 30 = = SYM 42149 2093 31 = = SYM 42149 2093 32 = = SYM 42149 2093 33 = = SYM 42149 2093 34 = = SYM 42149 2093 35 = = SYM 42149 2093 36 = = SYM 42149 2093 37 = = SYM 42149 2093 38 = = SYM 42149 2093 39 = = SYM 42149 2093 40 = = SYM 42149 2093 41 = = SYM 42149 2093 42 = = SYM 42149 2093 43 = = NFP 42149 2093 44 = = SYM 42149 2093 45 + + SYM 42149 2093 46 = = SYM 42149 2093 47 = = SYM 42149 2093 48 = = SYM 42149 2093 49 + + SYM 42149 2093 50 = = SYM 42149 2093 51 = = SYM 42149 2093 52 = = SYM 42149 2093 53 = = SYM 42149 2093 54 = = SYM 42149 2093 55 = = SYM 42149 2093 56 = = SYM 42149 2093 57 = = SYM 42149 2093 58 = = SYM 42149 2093 59 = = SYM 42149 2093 60 = = NFP 42149 2093 61 = = SYM 42149 2093 62 + + SYM 42149 2093 63 = = SYM 42149 2093 64 = = SYM 42149 2093 65 + + SYM 42149 2093 66 = = SYM 42149 2093 67 = = SYM 42149 2093 68 + + SYM 42149 2093 69 = = SYM 42149 2093 70 = = SYM 42149 2093 71 + + SYM 42149 2093 72 = = SYM 42149 2093 73 = = SYM 42149 2093 74 + + SYM 42149 2093 75 = = SYM 42149 2093 76 =| =| ADD 42149 2093 77 W| W| NNP 42149 2093 78 | | NNP 42149 2093 79 | | NNP 42149 2093 80 AVE AVE NNP 42149 2093 81 . . . 42149 2093 82 NO no UH 42149 2093 83 . . . 42149 2094 1 | | NNP 42149 2094 2 e| e| NNP 42149 2094 3 | | HYPH 42149 2094 4 | | NNP 42149 2094 5 OF OF NNP 42149 2094 6 MEN MEN NNP 42149 2094 7 | | NNP 42149 2094 8 i| i| JJ 42149 2094 9 | | NNP 42149 2094 10 DESCRIPTION description NN 42149 2094 11 | | CD 42149 2094 12 IN IN NNP 42149 2094 13 GANG GANG NNP 42149 2094 14 | | HYPH 42149 2094 15 g| g| NN 42149 2094 16 |-------+------------------+---+------------+--+--+--+--+--| |-------+------------------+---+------------+--+--+--+--+--| NNP 42149 2094 17 h| h| NNP 42149 2094 18 | | NNP 42149 2094 19 | | NNP 42149 2094 20 |Ave| |Ave| NNP 42149 2094 21 | | CD 42149 2094 22 | | CD 42149 2094 23 | | CD 42149 2094 24 |A |a CD 42149 2094 25 | | CD 42149 2094 26 | | CD 42149 2094 27 t| t| JJ 42149 2094 28 | | CD 42149 2094 29 | | NNP 42149 2094 30 |air| |air| NNP 42149 2094 31 | | CD 42149 2094 32 |D |d CD 42149 2094 33 |G |g CD 42149 2094 34 |i |i NNP 42149 2094 35 | | NNP 42149 2094 36 | | NNP 42149 2094 37 | | CD 42149 2094 38 | | CD 42149 2094 39 | | CD 42149 2094 40 | | CD 42149 2094 41 | | CD 42149 2094 42 | | NNP 42149 2094 43 |r |r NNP 42149 2094 44 |r |r NNP 42149 2094 45 |r |r NNP 42149 2094 46 | | NNP 42149 2094 47 | | NNP 42149 2094 48 o| o| NNP 42149 2094 49 | | CD 42149 2094 50 | | CD 42149 2094 51 |P |p CD 42149 2094 52 | | CD 42149 2094 53 |S |s CD 42149 2094 54 |i |i NNP 42149 2094 55 |o |o NNP 42149 2094 56 | | NNP 42149 2094 57 | | NNP 42149 2094 58 | | CD 42149 2094 59 f| f| NN 42149 2094 60 | | CD 42149 2094 61 | | NNP 42149 2094 62 |r |r NNP 42149 2094 63 | | NNP 42149 2094 64 |h |h NNP 42149 2094 65 |l |l NNP 42149 2094 66 |u |u NN 42149 2094 67 |t |t NNP 42149 2094 68 |T |t CD 42149 2094 69 | | CD 42149 2094 70 | | CD 42149 2094 71 | | NNP 42149 2094 72 | | NNP 42149 2094 73 |e |e NNP 42149 2094 74 | | NNP 42149 2094 75 |i |i NNP 42149 2094 76 |l |l NNP 42149 2094 77 |t |t JJ 42149 2094 78 |r |r NNP 42149 2094 79 |o |o NNP 42149 2094 80 | | NNP 42149 2094 81 | | NNP 42149 2094 82 | | NNP 42149 2094 83 | | NNP 42149 2094 84 |s |s NNP 42149 2094 85 | | NNP 42149 2094 86 |e |e NNP 42149 2094 87 |i |i NNP 42149 2094 88 |i |i NNP 42149 2094 89 |a |a NNP 42149 2094 90 |t |t NNP 42149 2094 91 | | CD 42149 2094 92 i| i| JJ 42149 2094 93 | | NNP 42149 2094 94 | | NNP 42149 2094 95 |s |s NNP 42149 2094 96 | | NNP 42149 2094 97 |l |l NNP 42149 2094 98 |n |n NNP 42149 2094 99 |n |n NNP 42149 2094 100 |n |n NNP 42149 2094 101 |a |a NNP 42149 2094 102 | | NNP 42149 2094 103 r| r| NNP 42149 2094 104 Section Section NNP 42149 2094 105 | | NNP 42149 2094 106 | | NNP 42149 2094 107 |u |u JJ 42149 2094 108 | | NNP 42149 2094 109 |d |d NNP 42149 2094 110 |g |g NNP 42149 2094 111 |g |g NNP 42149 2094 112 |s |s NNP 42149 2094 113 |l |l NNP 42149 2094 114 | | NNP 42149 2094 115 o| o| NN 42149 2094 116 between between IN 42149 2094 117 | | NNP 42149 2094 118 Length| Length| NNP 42149 2094 119 |r |r JJ 42149 2094 120 |Method |Method NNS 42149 2094 121 of of IN 42149 2094 122 |--+--+--+--| |--+--+--+--| NNP 42149 2094 123 | | NNP 42149 2094 124 n| n| NN 42149 2094 125 rings ring NNS 42149 2094 126 |in |in CD 42149 2094 127 feet|Material feet|Material NNP 42149 2094 128 |e |e NNS 42149 2094 129 |Excavation |excavation CD 42149 2094 130 |A |a CD 42149 2094 131 |B |b CD 42149 2094 132 |C |c CD 42149 2094 133 |D |d CD 42149 2094 134 | | CD 42149 2094 135 | | CD 42149 2094 136 -+-----------+-------+------------------+---+------------+--+--+--+--+--| -+-----------+-------+------------------+---+------------+--+--+--+--+--| NN 42149 2094 137 | | CD 42149 2094 138 1 1 CD 42149 2094 139 - - HYPH 42149 2094 140 68 68 CD 42149 2094 141 | | CD 42149 2094 142 170.0|Rock 170.0|rock CD 42149 2094 143 | | CD 42149 2094 144 0 0 CD 42149 2094 145 |[R |[R NNP 42149 2094 146 ] ] -RRB- 42149 2094 147 |20| |20| CD 42149 2094 148 5| 5| CD 42149 2094 149 5|2 5|2 CD 42149 2094 150 |32| |32| NNS 42149 2094 151 | | CD 42149 2094 152 69 69 CD 42149 2094 153 - - HYPH 42149 2094 154 95 95 CD 42149 2094 155 | | CD 42149 2094 156 67.5|Rock 67.5|rock CD 42149 2094 157 and and CC 42149 2094 158 earth earth NN 42149 2094 159 |13 |13 CD 42149 2094 160 |[R |[r CD 42149 2094 161 ] ] -RRB- 42149 2094 162 |22| |22| JJ 42149 2094 163 8| 8| CD 42149 2094 164 |2 |2 NNP 42149 2094 165 |32| |32| NN 42149 2094 166 O| o| CD 42149 2094 167 96 96 CD 42149 2094 168 - - SYM 42149 2094 169 141 141 CD 42149 2094 170 | | CD 42149 2094 171 115.0|Rock 115.0|rock CD 42149 2094 172 |10 |10 CD 42149 2094 173 |[R |[r CD 42149 2094 174 ] ] -RRB- 42149 2094 175 |21|13| |21|13| NN 42149 2094 176 |2 |2 NNP 42149 2094 177 |36| |36| NNP 42149 2094 178 r|142 r|142 NNP 42149 2094 179 - - : 42149 2094 180 191 191 CD 42149 2094 181 | | CD 42149 2094 182 125.0|Rock 125.0|rock CD 42149 2094 183 and and CC 42149 2094 184 earth earth NN 42149 2094 185 |15 |15 CD 42149 2094 186 |[R |[R NNP 42149 2094 187 ] ] -RRB- 42149 2094 188 |24| |24| NN 42149 2094 189 7| 7| CD 42149 2094 190 |2 |2 , 42149 2094 191 |33| |33| JJ 42149 2094 192 d|192 d|192 CD 42149 2094 193 - - HYPH 42149 2094 194 203 203 CD 42149 2094 195 | | CD 42149 2094 196 30.0|Silt 30.0|silt CD 42149 2094 197 |18 |18 CD 42149 2094 198 |[R]Breasting|23| |[R]Breasting|23| NNP 42149 2094 199 | | NNP 42149 2094 200 |3 |3 NNS 42149 2094 201 |26| |26| VBZ 42149 2094 202 i|204 i|204 NNP 42149 2094 203 - - HYPH 42149 2094 204 388 388 CD 42149 2094 205 | | CD 42149 2094 206 462.5| 462.5| CD 42149 2094 207 " " '' 42149 2094 208 |18 |18 CD 42149 2094 209 |[S]7 |[S]7 NNP 42149 2094 210 doors door NNS 42149 2094 211 |27| |27| JJ 42149 2094 212 | | NNP 42149 2094 213 |3 |3 POS 42149 2094 214 |30| |30| NNP 42149 2094 215 n|389 n|389 NNP 42149 2094 216 - - : 42149 2094 217 429 429 CD 42149 2094 218 | | CD 42149 2094 219 102.5|{Silt 102.5|{silt CD 42149 2094 220 , , , 42149 2094 221 piles pile NNS 42149 2094 222 and and CC 42149 2094 223 } } -RRB- 42149 2094 224 |22 |22 NNP 42149 2094 225 |[S]6 |[S]6 NNP 42149 2094 226 doors door NNS 42149 2094 227 |24| |24| NN 42149 2094 228 | | CD 42149 2094 229 |4 |4 NNP 42149 2094 230 |28| |28| NNP 42149 2094 231 a| a| NN 42149 2094 232 | | NNP 42149 2094 233 |{rip |{rip NNP 42149 2094 234 - - HYPH 42149 2094 235 rap rap NN 42149 2094 236 . . . 42149 2094 237 } } -RRB- 42149 2095 1 | | NNP 42149 2095 2 |[R]Breasting| |[R]Breasting| NNP 42149 2095 3 | | CD 42149 2095 4 | | NNP 42149 2095 5 | | CD 42149 2095 6 | | CD 42149 2095 7 | | CD 42149 2095 8 r|430 r|430 JJ 42149 2095 9 - - HYPH 42149 2095 10 504 504 CD 42149 2095 11 | | CD 42149 2095 12 187.5|Silt 187.5|silt CD 42149 2095 13 |21 |21 CD 42149 2095 14 |[S]3 |[S]3 NNP 42149 2095 15 doors door NNS 42149 2095 16 |23| |23| JJ 42149 2095 17 | | JJ 42149 2095 18 |5 |5 . 42149 2095 19 |28| |28| NNP 42149 2095 20 y|505 y|505 NNP 42149 2095 21 - - HYPH 42149 2095 22 629 629 CD 42149 2095 23 | | CD 42149 2095 24 312.5| 312.5| CD 42149 2095 25 " " `` 42149 2095 26 |22 |22 NNP 42149 2095 27 |[S]4 |[S]4 NNP 42149 2095 28 doors door NNS 42149 2095 29 |25| |25| JJ 42149 2095 30 | | CD 42149 2095 31 |6 |6 CD 42149 2095 32 |31| |31| VBZ 42149 2095 33 |630 |630 NNP 42149 2095 34 - - HYPH 42149 2095 35 692 692 CD 42149 2095 36 | | CD 42149 2095 37 157.5| 157.5| CD 42149 2095 38 " " '' 42149 2095 39 |23 |23 NNP 42149 2095 40 |[S]2 |[S]2 NNP 42149 2095 41 doors door NNS 42149 2095 42 . . . 42149 2096 1 |24| |24| NNP 42149 2096 2 | | NNP 42149 2096 3 |8 |8 . 42149 2096 4 |32| |32| NNP 42149 2096 5 |204 |204 NNP 42149 2096 6 - - HYPH 42149 2096 7 692 692 CD 42149 2096 8 |1,222.5| |1,222.5| NNP 42149 2096 9 |21 |21 CD 42149 2096 10 | | CD 42149 2096 11 |25| |25| JJ 42149 2096 12 | | CD 42149 2096 13 |5 |5 CD 42149 2096 14 |30| |30| NNP 42149 2096 15 | | NNP 42149 2096 16 69 69 CD 42149 2096 17 - - SYM 42149 2096 18 692 692 CD 42149 2096 19 |1,560.0| |1,560.0| NNP 42149 2096 20 |17 |17 NNP 42149 2096 21 | | NNP 42149 2096 22 |23|4 |23|4 NNP 42149 2096 23 | | NNP 42149 2096 24 0|3 0|3 CD 42149 2096 25 |30| |30| NN 42149 2096 26 -+-----------+-------+------------------+---+------------+--+--+--+--+--| -+-----------+-------+------------------+---+------------+--+--+--+--+--| : 42149 2096 27 | | NNP 42149 2096 28 693 693 CD 42149 2096 29 - - HYPH 42149 2096 30 766 766 CD 42149 2096 31 | | CD 42149 2096 32 185.0|Silt 185.0|silt CD 42149 2096 33 |24 |24 CD 42149 2096 34 |[S]2 |[S]2 NNP 42149 2096 35 doors door NNS 42149 2096 36 |21| |21| NN 42149 2096 37 | | NNS 42149 2096 38 |6 |6 CC 42149 2096 39 |27| |27| JJ 42149 2096 40 | | NNP 42149 2096 41 767 767 CD 42149 2096 42 - - HYPH 42149 2096 43 806 806 CD 42149 2096 44 | | CD 42149 2096 45 100.0| 100.0| CD 42149 2096 46 " " '' 42149 2096 47 |24 |24 CD 42149 2096 48 |[S]2 |[S]2 NNP 42149 2096 49 " " '' 42149 2096 50 |22| |22| JJ 42149 2096 51 | | CD 42149 2096 52 |7 |7 NN 42149 2096 53 |29| |29| NNP 42149 2096 54 H| h| CD 42149 2096 55 807 807 CD 42149 2096 56 - - HYPH 42149 2096 57 900 900 CD 42149 2096 58 | | CD 42149 2096 59 235.0| 235.0| CD 42149 2096 60 " " '' 42149 2096 61 |24 |24 CD 42149 2096 62 |[S]1½ |[s]1â½ CD 42149 2096 63 " " '' 42149 2096 64 |23| |23| JJ 42149 2096 65 | | NNP 42149 2096 66 |8 |8 '' 42149 2096 67 |31| |31| NNS 42149 2096 68 e| e| VBP 42149 2096 69 901 901 CD 42149 2096 70 - - SYM 42149 2096 71 933 933 CD 42149 2096 72 | | CD 42149 2096 73 82.5| 82.5| CD 42149 2096 74 " " '' 42149 2096 75 |25 |25 CD 42149 2096 76 |[S]1 |[S]1 NNP 42149 2096 77 door door NN 42149 2096 78 |30| |30| NN 42149 2096 79 | | NNP 42149 2096 80 |10|40| |10|40| NNP 42149 2096 81 a| a| NN 42149 2096 82 934 934 CD 42149 2096 83 - - SYM 42149 2096 84 988 988 CD 42149 2096 85 | | CD 42149 2096 86 137.5| 137.5| NNS 42149 2096 87 " " `` 42149 2096 88 |25 |25 CD 42149 2096 89 |[S]1 |[S]1 NNP 42149 2096 90 " " '' 42149 2096 91 |30| |30| NN 42149 2096 92 | | CD 42149 2096 93 |11|41| |11|41| JJ 42149 2096 94 v| v| NN 42149 2096 95 989 989 CD 42149 2096 96 - - HYPH 42149 2096 97 1,043| 1,043| CD 42149 2096 98 137.5| 137.5| CD 42149 2096 99 " " `` 42149 2096 100 |25 |25 CD 42149 2096 101 |[S]1 |[S]1 NNP 42149 2096 102 " " '' 42149 2096 103 |28| |28| NNP 42149 2096 104 | | NNP 42149 2096 105 |11|39| |11|39| NNP 42149 2096 106 y|1,044 y|1,044 NNP 42149 2096 107 - - HYPH 42149 2096 108 1,053| 1,053| CD 42149 2096 109 25.0| 25.0| CD 42149 2096 110 " " `` 42149 2096 111 |26 |26 NNP 42149 2096 112 |[S]1 |[S]1 NNP 42149 2096 113 " " '' 42149 2096 114 |25| |25| JJ 42149 2096 115 | | CD 42149 2096 116 |9 |9 JJ 42149 2096 117 |34| |34| NNP 42149 2096 118 |1,054 |1,054 NNP 42149 2096 119 - - HYPH 42149 2096 120 1,068| 1,068| CD 42149 2096 121 37.5| 37.5| CD 42149 2096 122 " " `` 42149 2096 123 |26 |26 NNP 42149 2096 124 |[S]1 |[S]1 NNP 42149 2096 125 " " '' 42149 2096 126 |26| |26| VBZ 42149 2096 127 | | CD 42149 2096 128 |9 |9 NN 42149 2096 129 |35| |35| VBP 42149 2096 130 |1,069 |1,069 NNP 42149 2096 131 - - HYPH 42149 2096 132 1,110| 1,110| CD 42149 2096 133 105.0| 105.0| CD 42149 2096 134 " " `` 42149 2096 135 |26 |26 NNP 42149 2096 136 |[S]1 |[S]1 NNP 42149 2096 137 " " '' 42149 2096 138 |30| |30| NN 42149 2096 139 | | NNP 42149 2096 140 |11|41| |11|41| NNP 42149 2096 141 | | CD 42149 2096 142 693 693 CD 42149 2096 143 - - HYPH 42149 2096 144 1,110|1,045.0| 1,110|1,045.0| CD 42149 2096 145 |25 |25 CD 42149 2096 146 | | CD 42149 2096 147 |25| |25| JJ 42149 2096 148 | | CD 42149 2096 149 |8 |8 NN 42149 2096 150 |33| |33| NNP 42149 2096 151 -+-----------+-------+------------------+---+------------+--+--+--+--+--| -+-----------+-------+------------------+---+------------+--+--+--+--+--| : 42149 2096 152 A| A| NNP 42149 2096 153 204 204 CD 42149 2096 154 - - HYPH 42149 2096 155 1,110|2,267.5| 1,110|2,267.5| CD 42149 2096 156 |23 |23 CD 42149 2096 157 | | CD 42149 2096 158 |25| |25| JJ 42149 2096 159 | | CD 42149 2096 160 |6 |6 CC 42149 2096 161 |31| |31| NNS 42149 2096 162 l| l| NNP 42149 2096 163 69 69 CD 42149 2096 164 - - HYPH 42149 2096 165 1,110|2,605.0| 1,110|2,605.0| CD 42149 2096 166 |20 |20 CD 42149 2096 167 | | NNP 42149 2096 168 |24|2 |24|2 NNP 42149 2096 169 | | NNP 42149 2096 170 |5 |5 NN 42149 2096 171 |31| |31| NNS 42149 2096 172 l| l| NNP 42149 2096 173 | | NNP 42149 2096 174 | | NNP 42149 2096 175 | | CD 42149 2096 176 | | CD 42149 2096 177 | | CD 42149 2096 178 | | CD 42149 2096 179 | | CD 42149 2096 180 | | CD 42149 2096 181 | | CD 42149 2096 182 | | NNS 42149 2096 183 = = SYM 42149 2096 184 + + SYM 42149 2096 185 = = SYM 42149 2096 186 = = SYM 42149 2096 187 = = SYM 42149 2096 188 = = SYM 42149 2096 189 = = SYM 42149 2096 190 = = SYM 42149 2096 191 = = SYM 42149 2096 192 = = SYM 42149 2096 193 = = SYM 42149 2096 194 = = NFP 42149 2096 195 = = SYM 42149 2096 196 + + SYM 42149 2096 197 = = SYM 42149 2096 198 = = SYM 42149 2096 199 = = SYM 42149 2096 200 = = SYM 42149 2096 201 = = SYM 42149 2096 202 = = NFP 42149 2096 203 = = SYM 42149 2096 204 + + SYM 42149 2096 205 = = SYM 42149 2096 206 = = SYM 42149 2096 207 = = SYM 42149 2096 208 = = SYM 42149 2096 209 = = SYM 42149 2096 210 = = SYM 42149 2096 211 = = SYM 42149 2096 212 = = SYM 42149 2096 213 = = SYM 42149 2096 214 = = SYM 42149 2096 215 = = SYM 42149 2096 216 = = SYM 42149 2096 217 = = SYM 42149 2096 218 = = SYM 42149 2096 219 = = SYM 42149 2096 220 = = SYM 42149 2096 221 = = NFP 42149 2096 222 = = SYM 42149 2096 223 + + SYM 42149 2096 224 = = SYM 42149 2096 225 = = SYM 42149 2096 226 = = SYM 42149 2096 227 + + SYM 42149 2096 228 = = SYM 42149 2096 229 = = SYM 42149 2096 230 = = SYM 42149 2096 231 = = SYM 42149 2096 232 = = SYM 42149 2096 233 = = SYM 42149 2096 234 = = SYM 42149 2096 235 = = SYM 42149 2096 236 = = SYM 42149 2096 237 = = SYM 42149 2096 238 = = NFP 42149 2096 239 = = SYM 42149 2096 240 + + SYM 42149 2096 241 = = SYM 42149 2096 242 = = SYM 42149 2096 243 + + SYM 42149 2096 244 = = SYM 42149 2096 245 = = SYM 42149 2096 246 + + SYM 42149 2096 247 = = SYM 42149 2096 248 = = SYM 42149 2096 249 + + SYM 42149 2096 250 = = SYM 42149 2096 251 = = SYM 42149 2096 252 + + SYM 42149 2096 253 = = SYM 42149 2096 254 =| =| ADD 42149 2096 255 TABLE TABLE VBZ 42149 2096 256 25 25 CD 42149 2096 257 PART part CD 42149 2096 258 2 2 CD 42149 2096 259 = = SYM 42149 2096 260 + + SYM 42149 2096 261 = = SYM 42149 2096 262 = = SYM 42149 2096 263 = = SYM 42149 2096 264 = = SYM 42149 2096 265 = = SYM 42149 2096 266 = = SYM 42149 2096 267 = = SYM 42149 2096 268 = = SYM 42149 2096 269 = = SYM 42149 2096 270 = = NFP 42149 2096 271 = = SYM 42149 2096 272 + + SYM 42149 2096 273 = = SYM 42149 2096 274 = = SYM 42149 2096 275 = = NFP 42149 2096 276 = = SYM 42149 2096 277 + + SYM 42149 2096 278 = = SYM 42149 2096 279 = = SYM 42149 2096 280 = = SYM 42149 2096 281 = = NFP 42149 2096 282 = = SYM 42149 2096 283 + + SYM 42149 2096 284 = = SYM 42149 2096 285 = = SYM 42149 2096 286 = = SYM 42149 2096 287 = = NFP 42149 2096 288 = = SYM 42149 2096 289 + + SYM 42149 2096 290 = = SYM 42149 2096 291 = = SYM 42149 2096 292 = = SYM 42149 2096 293 = = SYM 42149 2096 294 = = SYM 42149 2096 295 = = SYM 42149 2096 296 = = NFP 42149 2096 297 = = SYM 42149 2096 298 + + SYM 42149 2096 299 = = SYM 42149 2096 300 = = SYM 42149 2096 301 = = NFP 42149 2096 302 = = SYM 42149 2096 303 + + SYM 42149 2096 304 = = SYM 42149 2096 305 = = SYM 42149 2096 306 = = NFP 42149 2096 307 = = SYM 42149 2096 308 + + SYM 42149 2096 309 = = SYM 42149 2096 310 = = SYM 42149 2096 311 = = NFP 42149 2096 312 = = SYM 42149 2096 313 + + SYM 42149 2096 314 = = SYM 42149 2096 315 = = SYM 42149 2096 316 = = NFP 42149 2096 317 = = SYM 42149 2096 318 + + SYM 42149 2096 319 = = SYM 42149 2096 320 = = SYM 42149 2096 321 = = SYM 42149 2096 322 =| =| ADD 42149 2096 323 W| W| NNP 42149 2096 324 | | NNP 42149 2096 325 | | NNP 42149 2096 326 |Av |Av NNP 42149 2096 327 . . . 42149 2097 1 | | CD 42149 2097 2 | | CD 42149 2097 3 TIME TIME NNP 42149 2097 4 FOR for IN 42149 2097 5 RING ring NN 42149 2097 6 | | NNP 42149 2097 7 e| e| NNP 42149 2097 8 | | CD 42149 2097 9 | | NNP 42149 2097 10 | | CD 42149 2097 11 | | CD 42149 2097 12 | | CD 42149 2097 13 ERECTION ERECTION NNS 42149 2097 14 , , , 42149 2097 15 | | NNP 42149 2097 16 i| i| JJ 42149 2097 17 | | HYPH 42149 2097 18 | | CD 42149 2097 19 |time |time CD 42149 2097 20 | | CD 42149 2097 21 | | NNP 42149 2097 22 HRS HRS NNP 42149 2097 23 . . . 42149 2098 1 AND and CC 42149 2098 2 MIN MIN NNP 42149 2098 3 . . . 42149 2099 1 | | NNP 42149 2099 2 g| g| NNP 42149 2099 3 |----+-----| |----+-----| NNP 42149 2099 4 | | NNP 42149 2099 5 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2099 6 h| h| NNP 42149 2099 7 |Av |Av NNP 42149 2099 8 . . . 42149 2100 1 |Time |Time NNP 42149 2100 2 |per |per NNP 42149 2100 3 | | NNP 42149 2100 4 | | NNP 42149 2100 5 | | CD 42149 2100 6 | | CD 42149 2100 7 | | CD 42149 2100 8 | | CD 42149 2100 9 | | CD 42149 2100 10 t| t| NN 42149 2100 11 |No |No NNP 42149 2100 12 . . . 42149 2101 1 |Muck-| |Muck-| NFP 42149 2101 2 |T |t CD 42149 2101 3 | | NNP 42149 2101 4 O O NNP 42149 2101 5 | | NNP 42149 2101 6 | | NNP 42149 2101 7 | | CD 42149 2101 8 | | CD 42149 2101 9 | | CD 42149 2101 10 | | CD 42149 2101 11 |of |of CD 42149 2101 12 |ing |e VBG 42149 2101 13 , , , 42149 2101 14 |ring,|i |ring,|i CD 42149 2101 15 | | NNP 42149 2101 16 r r NNP 42149 2101 17 | | CD 42149 2101 18 | | CD 42149 2101 19 | | CD 42149 2101 20 | | CD 42149 2101 21 | | CD 42149 2101 22 o| o| NN 42149 2101 23 |cu |cu CD 42149 2101 24 . . . 42149 2102 1 |per |per NNP 42149 2102 2 | | NNP 42149 2102 3 |m |m JJ 42149 2102 4 | | NNP 42149 2102 5 d d NNP 42149 2102 6 | | NNP 42149 2102 7 B B NNP 42149 2102 8 | | NNP 42149 2102 9 B B NNP 42149 2102 10 | | NNP 42149 2102 11 | | CD 42149 2102 12 | | CD 42149 2102 13 f| f| NN 42149 2102 14 |yd |yd CD 42149 2102 15 . . . 42149 2103 1 |cu |cu CD 42149 2103 2 . . . 42149 2104 1 |shov-|e |shov-|e NNP 42149 2104 2 J J NNP 42149 2104 3 | | NNP 42149 2104 4 i i PRP 42149 2104 5 | | NNP 42149 2104 6 o o NNP 42149 2104 7 | | NNP 42149 2104 8 o o NNP 42149 2104 9 | | NNP 42149 2104 10 T T NNP 42149 2104 11 | | HYPH 42149 2104 12 | | NNP 42149 2104 13 | | NNP 42149 2104 14 |per |per NN 42149 2104 15 |yd |yd CD 42149 2104 16 . . . 42149 2105 1 |ing |e VBG 42149 2105 2 | | CD 42149 2105 3 a a DT 42149 2105 4 | | CD 42149 2105 5 n n CC 42149 2105 6 | | NNP 42149 2105 7 r r NNP 42149 2105 8 | | NNP 42149 2105 9 r r NNP 42149 2105 10 | | NNP 42149 2105 11 a a DT 42149 2105 12 | | NNP 42149 2105 13 M M NNP 42149 2105 14 | | HYPH 42149 2105 15 | | NNP 42149 2105 16 |ring| |ring| NNP 42149 2105 17 | | NNP 42149 2105 18 |f |f NNP 42149 2105 19 c c NNP 42149 2105 20 | | NNP 42149 2105 21 a a DT 42149 2105 22 | | CD 42149 2105 23 e e NN 42149 2105 24 | | NNP 42149 2105 25 e e NNP 42149 2105 26 | | NNP 42149 2105 27 p p NNP 42149 2105 28 | | NNP 42149 2105 29 e e NNP 42149 2105 30 | | NNP 42149 2105 31 i| i| JJ 42149 2105 32 | | CD 42149 2105 33 | | CD 42149 2105 34 |and |and NNP 42149 2105 35 |o |o NNP 42149 2105 36 k k NNP 42149 2105 37 | | NNP 42149 2105 38 r r NNP 42149 2105 39 | | CD 42149 2105 40 | | NNP 42149 2105 41 | | NNP 42149 2105 42 e e NN 42149 2105 43 | | NNP 42149 2105 44 a a DT 42149 2105 45 | | CD 42149 2105 46 r| r| NN 42149 2105 47 Section Section NNP 42149 2105 48 | | NNP 42149 2105 49 | | NNP 42149 2105 50 | | NNP 42149 2105 51 |r |r NNP 42149 2105 52 s s NNP 42149 2105 53 | | NNP 42149 2105 54 y y NNP 42149 2105 55 | | NNP 42149 2105 56 1 1 CD 42149 2105 57 | | CD 42149 2105 58 2 2 CD 42149 2105 59 | | CD 42149 2105 60 r r NNP 42149 2105 61 | | CD 42149 2105 62 n n CC 42149 2105 63 | | CD 42149 2105 64 o| o| NN 42149 2105 65 between between IN 42149 2105 66 |----| |----| NNP 42149 2105 67 |Muck-+--------+----+----+----+----+----| |muck-+--------+----+----+----+----+----| ADD 42149 2105 68 n| n| NN 42149 2105 69 rings ring NNS 42149 2105 70 | | NNP 42149 2105 71 E E NNP 42149 2105 72 | | NNP 42149 2105 73 |ing |e VBG 42149 2105 74 | | NNP 42149 2105 75 F F NNP 42149 2105 76 | | NNP 42149 2105 77 G G NNP 42149 2105 78 | | NNP 42149 2105 79 G G NNP 42149 2105 80 | | NNP 42149 2105 81 G G NNP 42149 2105 82 | | NNP 42149 2105 83 G G NNP 42149 2105 84 | | NNP 42149 2105 85 G G NNP 42149 2105 86 | | NNP 42149 2105 87 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2105 88 | | CD 42149 2105 89 1 1 CD 42149 2105 90 - - HYPH 42149 2105 91 68 68 CD 42149 2105 92 |41 |41 CD 42149 2105 93 |0 |0 NN 42149 2105 94 - - : 42149 2105 95 14 14 CD 42149 2105 96 | | CD 42149 2105 97 9 9 CD 42149 2105 98 - - HYPH 42149 2105 99 53|Time 53|time CD 42149 2105 100 for|5 for|5 NNP 42149 2105 101 - - HYPH 42149 2105 102 27| 27| CD 42149 2105 103 | | CD 42149 2105 104 |4 |4 CD 42149 2105 105 - - HYPH 42149 2105 106 32|5 32|5 CD 42149 2105 107 - - HYPH 42149 2105 108 07| 07| CD 42149 2105 109 | | CD 42149 2105 110 69 69 CD 42149 2105 111 - - SYM 42149 2105 112 95 95 CD 42149 2105 113 |41 |41 CD 42149 2105 114 |0 |0 NN 42149 2105 115 - - : 42149 2105 116 24 24 CD 42149 2105 117 |16 |16 CD 42149 2105 118 - - HYPH 42149 2105 119 18|jacks 18|jacks CD 42149 2105 120 |3 |3 JJ 42149 2105 121 - - : 42149 2105 122 02| 02| CD 42149 2105 123 | | CD 42149 2105 124 |2 |2 CD 42149 2105 125 - - HYPH 42149 2105 126 40|3 40|3 CD 42149 2105 127 - - HYPH 42149 2105 128 00| 00| CD 42149 2105 129 O| o| CD 42149 2105 130 96 96 CD 42149 2105 131 - - SYM 42149 2105 132 141 141 CD 42149 2105 133 |70 |70 CD 42149 2105 134 |0 |0 NN 42149 2105 135 - - : 42149 2105 136 16 16 CD 42149 2105 137 |18 |18 CD 42149 2105 138 - - HYPH 42149 2105 139 16|for 16|for CD 42149 2105 140 |2 |2 CD 42149 2105 141 - - HYPH 42149 2105 142 08| 08| CD 42149 2105 143 | | CD 42149 2105 144 |2 |2 CD 42149 2105 145 - - HYPH 42149 2105 146 27|2 27|2 CD 42149 2105 147 - - HYPH 42149 2105 148 09| 09| CD 42149 2105 149 r| r| NN 42149 2105 150 142 142 CD 42149 2105 151 - - SYM 42149 2105 152 191 191 CD 42149 2105 153 |52 |52 CD 42149 2105 154 |0 |0 NN 42149 2105 155 - - : 42149 2105 156 20 20 CD 42149 2105 157 |17 |17 CD 42149 2105 158 - - HYPH 42149 2105 159 27|light 27|light CD 42149 2105 160 |2 |2 CD 42149 2105 161 - - HYPH 42149 2105 162 08| 08| CD 42149 2105 163 J J NNP 42149 2105 164 | | NNP 42149 2105 165 J J NNP 42149 2105 166 |2 |2 : 42149 2105 167 - - HYPH 42149 2105 168 04|2 04|2 CD 42149 2105 169 - - HYPH 42149 2105 170 08| 08| CD 42149 2105 171 d| d| NN 42149 2105 172 192 192 CD 42149 2105 173 - - SYM 42149 2105 174 203 203 CD 42149 2105 175 |36 |36 CD 42149 2105 176 |0 |0 NN 42149 2105 177 - - : 42149 2105 178 13 13 CD 42149 2105 179 | | CD 42149 2105 180 7 7 CD 42149 2105 181 - - HYPH 42149 2105 182 58|iron 58|iron NNP 42149 2105 183 is be VBZ 42149 2105 184 |2 |2 CD 42149 2105 185 - - HYPH 42149 2105 186 27|6 27|6 CD 42149 2105 187 - - HYPH 42149 2105 188 00|2 00|2 CD 42149 2105 189 - - HYPH 42149 2105 190 10|3 10|3 CD 42149 2105 191 - - HYPH 42149 2105 192 15|2 15|2 CD 42149 2105 193 - - HYPH 42149 2105 194 47| 47| CD 42149 2105 195 i| i| NNP 42149 2105 196 204 204 CD 42149 2105 197 - - SYM 42149 2105 198 388 388 CD 42149 2105 199 |37 |37 CD 42149 2105 200 |0 |0 NN 42149 2105 201 - - HYPH 42149 2105 202 05 05 CD 42149 2105 203 | | CD 42149 2105 204 3 3 CD 42149 2105 205 - - HYPH 42149 2105 206 19|included|2 19|included|2 CD 42149 2105 207 - - HYPH 42149 2105 208 41|2 41|2 CD 42149 2105 209 - - HYPH 42149 2105 210 49|2 49|2 CD 42149 2105 211 - - HYPH 42149 2105 212 54|2 54|2 CD 42149 2105 213 - - HYPH 42149 2105 214 56|2 56|2 CD 42149 2105 215 - - HYPH 42149 2105 216 47| 47| CD 42149 2105 217 n| n| NN 42149 2105 218 389 389 CD 42149 2105 219 - - SYM 42149 2105 220 429 429 CD 42149 2105 221 |40 |40 CD 42149 2105 222 |0 |0 NN 42149 2105 223 - - : 42149 2105 224 17 17 CD 42149 2105 225 |12 |12 CD 42149 2105 226 - - HYPH 42149 2105 227 42|in 42|in CD 42149 2105 228 |3 |3 JJ 42149 2105 229 - - HYPH 42149 2105 230 15|2 15|2 CD 42149 2105 231 - - HYPH 42149 2105 232 36|5 36|5 CD 42149 2105 233 - - HYPH 42149 2105 234 03|3 03|3 CD 42149 2105 235 - - HYPH 42149 2105 236 26|3 26|3 CD 42149 2105 237 - - HYPH 42149 2105 238 27| 27| CD 42149 2105 239 a| a| NN 42149 2105 240 | | CD 42149 2105 241 | | CD 42149 2105 242 | | CD 42149 2105 243 |shoving |shoving CD 42149 2105 244 | | CD 42149 2105 245 | | CD 42149 2105 246 | | CD 42149 2105 247 | | CD 42149 2105 248 | | CD 42149 2105 249 | | CD 42149 2105 250 r| r| NN 42149 2105 251 430 430 CD 42149 2105 252 - - SYM 42149 2105 253 504 504 CD 42149 2105 254 |20 |20 CD 42149 2105 255 |0 |0 NNP 42149 2105 256 - - : 42149 2105 257 06 06 CD 42149 2105 258 | | CD 42149 2105 259 1 1 CD 42149 2105 260 - - HYPH 42149 2105 261 51|and 51|and CD 42149 2105 262 |2 |2 CD 42149 2105 263 - - HYPH 42149 2105 264 53|3 53|3 CD 42149 2105 265 - - HYPH 42149 2105 266 17|3 17|3 CD 42149 2105 267 - - HYPH 42149 2105 268 00|2 00|2 CD 42149 2105 269 - - HYPH 42149 2105 270 57|2 57|2 CD 42149 2105 271 - - HYPH 42149 2105 272 59| 59| CD 42149 2105 273 y| y| NNS 42149 2105 274 505 505 CD 42149 2105 275 - - CD 42149 2105 276 629 629 CD 42149 2105 277 |27 |27 CD 42149 2105 278 |0 |0 NN 42149 2105 279 - - HYPH 42149 2105 280 05 05 CD 42149 2105 281 | | CD 42149 2105 282 2 2 CD 42149 2105 283 - - HYPH 42149 2105 284 20|mucking 20|mucking CD 42149 2105 285 |2 |2 CD 42149 2105 286 - - HYPH 42149 2105 287 23|2 23|2 CD 42149 2105 288 - - HYPH 42149 2105 289 40|2 40|2 CD 42149 2105 290 - - HYPH 42149 2105 291 45|2 45|2 CD 42149 2105 292 - - HYPH 42149 2105 293 28|2 28|2 CD 42149 2105 294 - - HYPH 42149 2105 295 30| 30| CD 42149 2105 296 | | CD 42149 2105 297 630 630 CD 42149 2105 298 - - SYM 42149 2105 299 692 692 CD 42149 2105 300 |22 |22 CD 42149 2105 301 |0 |0 '' 42149 2105 302 - - HYPH 42149 2105 303 05 05 CD 42149 2105 304 | | CD 42149 2105 305 1 1 CD 42149 2105 306 - - HYPH 42149 2105 307 53| 53| CD 42149 2105 308 |1 |1 . 42149 2105 309 - - HYPH 42149 2105 310 54|2 54|2 CD 42149 2105 311 - - HYPH 42149 2105 312 10|2 10|2 CD 42149 2105 313 - - HYPH 42149 2105 314 22|2 22|2 CD 42149 2105 315 - - HYPH 42149 2105 316 23|2 23|2 CD 42149 2105 317 - - HYPH 42149 2105 318 02| 02| CD 42149 2105 319 | | CD 42149 2105 320 204 204 CD 42149 2105 321 - - HYPH 42149 2105 322 692 692 CD 42149 2105 323 |30 |30 CD 42149 2105 324 |0 |0 '' 42149 2105 325 - - : 42149 2105 326 07 07 CD 42149 2105 327 | | CD 42149 2105 328 3 3 CD 42149 2105 329 - - HYPH 42149 2105 330 27| 27| CD 42149 2105 331 [ [ -LRB- 42149 2105 332 T t NN 42149 2105 333 ] ] -RRB- 42149 2105 334 |2 |2 CD 42149 2105 335 - - HYPH 42149 2105 336 34|2 34|2 CD 42149 2105 337 - - HYPH 42149 2105 338 45|2 45|2 CD 42149 2105 339 - - HYPH 42149 2105 340 58|2 58|2 CD 42149 2105 341 - - HYPH 42149 2105 342 35|2 35|2 CD 42149 2105 343 - - HYPH 42149 2105 344 42| 42| CD 42149 2105 345 | | CD 42149 2105 346 69 69 CD 42149 2105 347 - - SYM 42149 2105 348 692 692 CD 42149 2105 349 |36 |36 CD 42149 2105 350 |0 |0 NN 42149 2105 351 - - HYPH 42149 2105 352 11 11 CD 42149 2105 353 | | CD 42149 2105 354 6 6 CD 42149 2105 355 - - HYPH 42149 2105 356 40| 40| CD 42149 2105 357 [ [ -LRB- 42149 2105 358 T t NN 42149 2105 359 ] ] -RRB- 42149 2105 360 |2 |2 CD 42149 2105 361 - - HYPH 42149 2105 362 47| 47| CD 42149 2105 363 | | NNP 42149 2105 364 |3 |3 NNS 42149 2105 365 - - HYPH 42149 2105 366 18|2 18|2 CD 42149 2105 367 - - HYPH 42149 2105 368 52| 52| CD 42149 2105 369 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2105 370 | | CD 42149 2105 371 693 693 CD 42149 2105 372 - - HYPH 42149 2105 373 766 766 CD 42149 2105 374 |22 |22 CD 42149 2105 375 |0 |0 '' 42149 2105 376 - - HYPH 42149 2105 377 05 05 CD 42149 2105 378 | | CD 42149 2105 379 1 1 CD 42149 2105 380 - - HYPH 42149 2105 381 35| 35| CD 42149 2105 382 0 0 CD 42149 2105 383 - - SYM 42149 2105 384 25 25 CD 42149 2105 385 |1 |1 HYPH 42149 2105 386 - - HYPH 42149 2105 387 18|1 18|1 CD 42149 2105 388 - - HYPH 42149 2105 389 44|1 44|1 CD 42149 2105 390 - - HYPH 42149 2105 391 30|1 30|1 CD 42149 2105 392 - - HYPH 42149 2105 393 40|1 40|1 CD 42149 2105 394 - - HYPH 42149 2105 395 25| 25| CD 42149 2105 396 | | CD 42149 2105 397 767 767 CD 42149 2105 398 - - HYPH 42149 2105 399 806 806 CD 42149 2105 400 |22 |22 CD 42149 2105 401 |0 |0 NN 42149 2105 402 - - HYPH 42149 2105 403 05 05 CD 42149 2105 404 | | CD 42149 2105 405 1 1 CD 42149 2105 406 - - HYPH 42149 2105 407 19| 19| CD 42149 2105 408 0 0 CD 42149 2105 409 - - SYM 42149 2105 410 21 21 CD 42149 2105 411 |1 |1 HYPH 42149 2105 412 - - HYPH 42149 2105 413 00|0 00|0 CD 42149 2105 414 - - HYPH 42149 2105 415 56|1 56|1 CD 42149 2105 416 - - HYPH 42149 2105 417 37|1 37|1 CD 42149 2105 418 - - HYPH 42149 2105 419 21|1 21|1 CD 42149 2105 420 - - HYPH 42149 2105 421 08| 08| CD 42149 2105 422 | | CD 42149 2105 423 807 807 CD 42149 2105 424 - - HYPH 42149 2105 425 900 900 CD 42149 2105 426 |19 |19 CD 42149 2105 427 |0 |0 NN 42149 2105 428 - - HYPH 42149 2105 429 05 05 CD 42149 2105 430 | | CD 42149 2105 431 1 1 CD 42149 2105 432 - - HYPH 42149 2105 433 11| 11| CD 42149 2105 434 0 0 CD 42149 2105 435 - - SYM 42149 2105 436 17 17 CD 42149 2105 437 |0 |0 NN 42149 2105 438 - - HYPH 42149 2105 439 58|1 58|1 CD 42149 2105 440 - - HYPH 42149 2105 441 13|1 13|1 CD 42149 2105 442 - - HYPH 42149 2105 443 08|1 08|1 CD 42149 2105 444 - - HYPH 42149 2105 445 12|1 12|1 CD 42149 2105 446 - - HYPH 42149 2105 447 04| 04| CD 42149 2105 448 H| h| CD 42149 2105 449 901 901 CD 42149 2105 450 - - SYM 42149 2105 451 933 933 CD 42149 2105 452 |19 |19 CD 42149 2105 453 |0 |0 NN 42149 2105 454 - - HYPH 42149 2105 455 04 04 CD 42149 2105 456 | | CD 42149 2105 457 1 1 CD 42149 2105 458 - - SYM 42149 2105 459 13| 13| CD 42149 2105 460 0 0 CD 42149 2105 461 - - SYM 42149 2105 462 09 09 CD 42149 2105 463 |0 |0 HYPH 42149 2105 464 - - HYPH 42149 2105 465 59|1 59|1 CD 42149 2105 466 - - HYPH 42149 2105 467 05|0 05|0 CD 42149 2105 468 - - HYPH 42149 2105 469 59| 59| CD 42149 2105 470 |1 |1 . 42149 2105 471 - - HYPH 42149 2105 472 00| 00| CD 42149 2105 473 e| e| NNP 42149 2105 474 934 934 CD 42149 2105 475 - - SYM 42149 2105 476 988 988 CD 42149 2105 477 |16 |16 CD 42149 2105 478 |0 |0 NN 42149 2105 479 - - HYPH 42149 2105 480 04 04 CD 42149 2105 481 | | CD 42149 2105 482 0 0 CD 42149 2105 483 - - HYPH 42149 2105 484 54| 54| CD 42149 2105 485 0 0 CD 42149 2105 486 - - SYM 42149 2105 487 12 12 CD 42149 2105 488 |0 |0 NN 42149 2105 489 - - HYPH 42149 2105 490 49|0 49|0 CD 42149 2105 491 - - HYPH 42149 2105 492 44|0 44|0 CD 42149 2105 493 - - HYPH 42149 2105 494 56| 56| CD 42149 2105 495 |0 |0 NN 42149 2105 496 - - HYPH 42149 2105 497 50| 50| CD 42149 2105 498 a| a| NN 42149 2105 499 989 989 CD 42149 2105 500 - - HYPH 42149 2105 501 1,043|13 1,043|13 NNP 42149 2105 502 |0 |0 NN 42149 2105 503 - - : 42149 2105 504 05 05 CD 42149 2105 505 | | CD 42149 2105 506 0 0 CD 42149 2105 507 - - HYPH 42149 2105 508 52| 52| CD 42149 2105 509 0 0 CD 42149 2105 510 - - SYM 42149 2105 511 14 14 CD 42149 2105 512 |0 |0 NN 42149 2105 513 - - HYPH 42149 2105 514 51|0 51|0 CD 42149 2105 515 - - HYPH 42149 2105 516 44|0 44|0 CD 42149 2105 517 - - HYPH 42149 2105 518 52|1 52|1 CD 42149 2105 519 - - HYPH 42149 2105 520 14|0 14|0 CD 42149 2105 521 - - HYPH 42149 2105 522 52| 52| CD 42149 2105 523 v|1,044 v|1,044 NN 42149 2105 524 - - HYPH 42149 2105 525 1,053|16 1,053|16 NNP 42149 2105 526 |0 |0 NN 42149 2105 527 - - : 42149 2105 528 07 07 CD 42149 2105 529 | | CD 42149 2105 530 0 0 CD 42149 2105 531 - - SYM 42149 2105 532 40| 40| CD 42149 2105 533 0 0 CD 42149 2105 534 - - SYM 42149 2105 535 15 15 CD 42149 2105 536 |1 |1 HYPH 42149 2105 537 - - HYPH 42149 2105 538 04|1 04|1 CD 42149 2105 539 - - HYPH 42149 2105 540 15|0 15|0 CD 42149 2105 541 - - HYPH 42149 2105 542 50|0 50|0 CD 42149 2105 543 - - HYPH 42149 2105 544 55|1 55|1 CD 42149 2105 545 - - HYPH 42149 2105 546 02| 02| CD 42149 2105 547 y|1,054 y|1,054 NNP 42149 2105 548 - - HYPH 42149 2105 549 1,068| 1,068| NNP 42149 2105 550 8 8 CD 42149 2105 551 |0 |0 SYM 42149 2105 552 - - HYPH 42149 2105 553 05 05 CD 42149 2105 554 | | CD 42149 2105 555 0 0 CD 42149 2105 556 - - HYPH 42149 2105 557 36| 36| CD 42149 2105 558 0 0 CD 42149 2105 559 - - SYM 42149 2105 560 08 08 CD 42149 2105 561 |0 |0 NN 42149 2105 562 - - HYPH 42149 2105 563 57|0 57|0 CD 42149 2105 564 - - HYPH 42149 2105 565 40|1 40|1 CD 42149 2105 566 - - HYPH 42149 2105 567 02| 02| CD 42149 2105 568 |0 |0 NN 42149 2105 569 - - : 42149 2105 570 56| 56| CD 42149 2105 571 |1,069 |1,069 NNP 42149 2105 572 - - HYPH 42149 2105 573 1,110|14 1,110|14 NNP 42149 2105 574 |0 |0 . 42149 2105 575 - - : 42149 2105 576 06 06 CD 42149 2105 577 | | CD 42149 2105 578 1 1 CD 42149 2105 579 - - HYPH 42149 2105 580 00| 00| CD 42149 2105 581 0 0 CD 42149 2105 582 - - SYM 42149 2105 583 15 15 CD 42149 2105 584 |0 |0 NN 42149 2105 585 - - HYPH 42149 2105 586 48|0 48|0 CD 42149 2105 587 - - HYPH 42149 2105 588 54|1 54|1 CD 42149 2105 589 - - HYPH 42149 2105 590 06|1 06|1 CD 42149 2105 591 - - HYPH 42149 2105 592 31|0 31|0 CD 42149 2105 593 - - HYPH 42149 2105 594 56| 56| CD 42149 2105 595 | | CD 42149 2105 596 693 693 CD 42149 2105 597 - - HYPH 42149 2105 598 1,110|18 1,110|18 NN 42149 2105 599 |0 |0 NN 42149 2105 600 - - HYPH 42149 2105 601 05 05 CD 42149 2105 602 | | CD 42149 2105 603 1 1 CD 42149 2105 604 - - HYPH 42149 2105 605 29| 29| CD 42149 2105 606 [ [ -LRB- 42149 2105 607 T T NNP 42149 2105 608 ] ] -RRB- 42149 2105 609 |1 |1 NN 42149 2105 610 - - HYPH 42149 2105 611 01|1 01|1 CD 42149 2105 612 - - HYPH 42149 2105 613 08|1 08|1 CD 42149 2105 614 - - HYPH 42149 2105 615 09|1 09|1 CD 42149 2105 616 - - HYPH 42149 2105 617 19|1 19|1 CD 42149 2105 618 - - HYPH 42149 2105 619 05| 05| CD 42149 2105 620 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2105 621 A| a| CD 42149 2105 622 204 204 CD 42149 2105 623 - - HYPH 42149 2105 624 1,110|25 1,110|25 NN 42149 2105 625 |0 |0 , 42149 2105 626 - - : 42149 2105 627 06 06 CD 42149 2105 628 | | CD 42149 2105 629 2 2 CD 42149 2105 630 - - HYPH 42149 2105 631 35| 35| CD 42149 2105 632 [ [ -LRB- 42149 2105 633 T t NN 42149 2105 634 ] ] -RRB- 42149 2105 635 |2 |2 CD 42149 2105 636 - - HYPH 42149 2105 637 09|2 09|2 CD 42149 2105 638 - - HYPH 42149 2105 639 19|2 19|2 CD 42149 2105 640 - - HYPH 42149 2105 641 33|2 33|2 CD 42149 2105 642 - - HYPH 42149 2105 643 19|2 19|2 CD 42149 2105 644 - - HYPH 42149 2105 645 17| 17| CD 42149 2105 646 l| l| JJ 42149 2105 647 69 69 CD 42149 2105 648 - - HYPH 42149 2105 649 1,110|29 1,110|29 CD 42149 2105 650 |0 |0 JJ 42149 2105 651 - - : 42149 2105 652 09 09 CD 42149 2105 653 | | CD 42149 2105 654 4 4 CD 42149 2105 655 - - HYPH 42149 2105 656 36| 36| CD 42149 2105 657 [ [ -LRB- 42149 2105 658 T t NN 42149 2105 659 ] ] -RRB- 42149 2105 660 |2 |2 CD 42149 2105 661 - - HYPH 42149 2105 662 19| 19| CD 42149 2105 663 | | CD 42149 2105 664 |2 |2 CD 42149 2105 665 - - HYPH 42149 2105 666 46|2 46|2 CD 42149 2105 667 - - HYPH 42149 2105 668 25| 25| CD 42149 2105 669 l| l| JJ 42149 2105 670 | | CD 42149 2105 671 | | CD 42149 2105 672 | | CD 42149 2105 673 | | CD 42149 2105 674 | | CD 42149 2105 675 | | CD 42149 2105 676 | | CD 42149 2105 677 | | CD 42149 2105 678 | | CD 42149 2105 679 | | NNS 42149 2105 680 = = SYM 42149 2105 681 + + SYM 42149 2105 682 = = SYM 42149 2105 683 = = SYM 42149 2105 684 = = SYM 42149 2105 685 = = SYM 42149 2105 686 = = SYM 42149 2105 687 = = SYM 42149 2105 688 = = SYM 42149 2105 689 = = SYM 42149 2105 690 = = SYM 42149 2105 691 = = NFP 42149 2105 692 = = SYM 42149 2105 693 + + SYM 42149 2105 694 = = SYM 42149 2105 695 = = SYM 42149 2105 696 = = NFP 42149 2105 697 = = SYM 42149 2105 698 + + SYM 42149 2105 699 = = SYM 42149 2105 700 = = SYM 42149 2105 701 = = SYM 42149 2105 702 = = NFP 42149 2105 703 = = SYM 42149 2105 704 + + SYM 42149 2105 705 = = SYM 42149 2105 706 = = SYM 42149 2105 707 = = SYM 42149 2105 708 = = NFP 42149 2105 709 = = SYM 42149 2105 710 + + SYM 42149 2105 711 = = SYM 42149 2105 712 = = SYM 42149 2105 713 = = SYM 42149 2105 714 = = SYM 42149 2105 715 = = SYM 42149 2105 716 = = SYM 42149 2105 717 = = NFP 42149 2105 718 = = SYM 42149 2105 719 + + SYM 42149 2105 720 = = SYM 42149 2105 721 = = SYM 42149 2105 722 = = NFP 42149 2105 723 = = SYM 42149 2105 724 + + SYM 42149 2105 725 = = SYM 42149 2105 726 = = SYM 42149 2105 727 = = NFP 42149 2105 728 = = SYM 42149 2105 729 + + SYM 42149 2105 730 = = SYM 42149 2105 731 = = SYM 42149 2105 732 = = NFP 42149 2105 733 = = SYM 42149 2105 734 + + SYM 42149 2105 735 = = SYM 42149 2105 736 = = SYM 42149 2105 737 = = NFP 42149 2105 738 = = SYM 42149 2105 739 + + SYM 42149 2105 740 = = SYM 42149 2105 741 = = SYM 42149 2105 742 = = UH 42149 2105 743 =| =| ADD 42149 2105 744 TABLE TABLE VBZ 42149 2105 745 25 25 CD 42149 2105 746 PART part CD 42149 2105 747 3 3 CD 42149 2105 748 = = SYM 42149 2105 749 + + SYM 42149 2105 750 = = SYM 42149 2105 751 = = SYM 42149 2105 752 = = SYM 42149 2105 753 = = SYM 42149 2105 754 = = SYM 42149 2105 755 = = SYM 42149 2105 756 = = SYM 42149 2105 757 = = SYM 42149 2105 758 = = SYM 42149 2105 759 = = NFP 42149 2105 760 = = SYM 42149 2105 761 + + SYM 42149 2105 762 = = SYM 42149 2105 763 = = SYM 42149 2105 764 = = NFP 42149 2105 765 = = SYM 42149 2105 766 + + SYM 42149 2105 767 = = SYM 42149 2105 768 = = SYM 42149 2105 769 = = NFP 42149 2105 770 = = SYM 42149 2105 771 + + SYM 42149 2105 772 = = SYM 42149 2105 773 = = SYM 42149 2105 774 = = NFP 42149 2105 775 = = SYM 42149 2105 776 + + SYM 42149 2105 777 = = SYM 42149 2105 778 = = SYM 42149 2105 779 = = NFP 42149 2105 780 = = SYM 42149 2105 781 + + SYM 42149 2105 782 = = SYM 42149 2105 783 = = SYM 42149 2105 784 = = NFP 42149 2105 785 = = SYM 42149 2105 786 + + SYM 42149 2105 787 = = SYM 42149 2105 788 = = SYM 42149 2105 789 = = NFP 42149 2105 790 = = SYM 42149 2105 791 + + SYM 42149 2105 792 = = SYM 42149 2105 793 = = SYM 42149 2105 794 = = SYM 42149 2105 795 = = NFP 42149 2105 796 = = SYM 42149 2105 797 + + SYM 42149 2105 798 = = SYM 42149 2105 799 = = SYM 42149 2105 800 = = SYM 42149 2105 801 = = NFP 42149 2105 802 = = SYM 42149 2105 803 + + SYM 42149 2105 804 = = SYM 42149 2105 805 = = SYM 42149 2105 806 = = SYM 42149 2105 807 = = NFP 42149 2105 808 = = SYM 42149 2105 809 + + SYM 42149 2105 810 = = SYM 42149 2105 811 = = SYM 42149 2105 812 = = SYM 42149 2105 813 = = NFP 42149 2105 814 = = SYM 42149 2105 815 + + SYM 42149 2105 816 = = SYM 42149 2105 817 = = SYM 42149 2105 818 = = SYM 42149 2105 819 = = SYM 42149 2105 820 =| =| ADD 42149 2105 821 W| w| CD 42149 2105 822 | | JJ 42149 2105 823 BOLTING bolting NN 42149 2105 824 TIME time NN 42149 2105 825 , , , 42149 2105 826 WHOLE WHOLE NNP 42149 2105 827 |Time| |Time| NNP 42149 2105 828 | | NNP 42149 2105 829 e| e| JJ 42149 2105 830 | | CD 42149 2105 831 TIME time NN 42149 2105 832 ON on IN 42149 2105 833 BOLTS BOLTS NNP 42149 2105 834 AFTER AFTER NNP 42149 2105 835 | | CD 42149 2105 836 | | NNP 42149 2105 837 | | CD 42149 2105 838 i| i| NN 42149 2105 839 | | NNP 42149 2105 840 RING ring NN 42149 2105 841 IS be VBZ 42149 2105 842 COMPLETE COMPLETE NNP 42149 2105 843 . . . 42149 2106 1 |lost| |lost| NNP 42149 2106 2 TOTAL TOTAL NNP 42149 2106 3 TIME time NN 42149 2106 4 . . . 42149 2107 1 | | JJ 42149 2107 2 g| g| NN 42149 2107 3 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2107 4 |-----+-----+-----+-----+-----| |-----+-----+-----+-----+-----| NNP 42149 2107 5 h| h| NNP 42149 2107 6 | | NNP 42149 2107 7 | | NNP 42149 2107 8 | | CD 42149 2107 9 | | CD 42149 2107 10 | | CD 42149 2107 11 |re- |re- CD 42149 2107 12 | | CD 42149 2107 13 | | CD 42149 2107 14 | | CD 42149 2107 15 | | CD 42149 2107 16 | | CD 42149 2107 17 | | CD 42149 2107 18 t| t| JJ 42149 2107 19 | | NNP 42149 2107 20 O O NNP 42149 2107 21 | | NNP 42149 2107 22 | | NNP 42149 2107 23 | | CD 42149 2107 24 | | NNP 42149 2107 25 |pair- |pair- NNP 42149 2107 26 | | NNP 42149 2107 27 | | NNP 42149 2107 28 | | CD 42149 2107 29 | | CD 42149 2107 30 | | CD 42149 2107 31 | | CD 42149 2107 32 | | NNP 42149 2107 33 r r NNP 42149 2107 34 | | CD 42149 2107 35 | | CD 42149 2107 36 | | CD 42149 2107 37 | | CD 42149 2107 38 |ing |e VBG 42149 2107 39 | | CD 42149 2107 40 | | CD 42149 2107 41 | | CD 42149 2107 42 | | CD 42149 2107 43 | | CD 42149 2107 44 | | CD 42149 2107 45 o| o| NN 42149 2107 46 | | CD 42149 2107 47 d d NNP 42149 2107 48 | | NNP 42149 2107 49 B B NNP 42149 2107 50 | | NNP 42149 2107 51 B B NNP 42149 2107 52 | | NNP 42149 2107 53 | | CD 42149 2107 54 | | CD 42149 2107 55 | | NNP 42149 2107 56 O O NNP 42149 2107 57 | | NNP 42149 2107 58 | | NNP 42149 2107 59 | | CD 42149 2107 60 | | CD 42149 2107 61 | | CD 42149 2107 62 f| f| NN 42149 2107 63 | | NNP 42149 2107 64 i i PRP 42149 2107 65 | | NNP 42149 2107 66 o o NNP 42149 2107 67 | | NNP 42149 2107 68 o o NNP 42149 2107 69 | | NNP 42149 2107 70 T T NNP 42149 2107 71 | | NNP 42149 2107 72 |hy- |hy- NNP 42149 2107 73 | | NNP 42149 2107 74 r r NNP 42149 2107 75 | | NNP 42149 2107 76 | | CD 42149 2107 77 | | CD 42149 2107 78 | | CD 42149 2107 79 | | CD 42149 2107 80 | | CD 42149 2107 81 | | CD 42149 2107 82 n n CC 42149 2107 83 | | NNP 42149 2107 84 r r NNP 42149 2107 85 | | NNP 42149 2107 86 r r NNP 42149 2107 87 | | NNP 42149 2107 88 a a DT 42149 2107 89 | | NNP 42149 2107 90 M M NNP 42149 2107 91 |drau- |drau- NNP 42149 2107 92 d d NNP 42149 2107 93 | | NNP 42149 2107 94 B B NNP 42149 2107 95 | | NNP 42149 2107 96 B B NNP 42149 2107 97 | | NNP 42149 2107 98 | | NNP 42149 2107 99 | | CD 42149 2107 100 | | CD 42149 2107 101 | | NNP 42149 2107 102 a a DT 42149 2107 103 | | CD 42149 2107 104 e e NN 42149 2107 105 | | NNP 42149 2107 106 e e NNP 42149 2107 107 | | NNP 42149 2107 108 p p NNP 42149 2107 109 | | NNP 42149 2107 110 e e NNP 42149 2107 111 |lic |lic NNP 42149 2107 112 | | NNP 42149 2107 113 i i PRP 42149 2107 114 | | NNP 42149 2107 115 o o NNP 42149 2107 116 | | NNP 42149 2107 117 o o NNP 42149 2107 118 | | NNP 42149 2107 119 T T NNP 42149 2107 120 | | HYPH 42149 2107 121 | | NNP 42149 2107 122 i| i| JJ 42149 2107 123 | | HYPH 42149 2107 124 r r NNP 42149 2107 125 | | NNP 42149 2107 126 | | NNP 42149 2107 127 | | NNP 42149 2107 128 e e NN 42149 2107 129 | | NNP 42149 2107 130 a a DT 42149 2107 131 | | CD 42149 2107 132 | | NNP 42149 2107 133 n n CC 42149 2107 134 | | NNP 42149 2107 135 r r NNP 42149 2107 136 | | NNP 42149 2107 137 r r NNP 42149 2107 138 | | NNP 42149 2107 139 a a DT 42149 2107 140 | | NNP 42149 2107 141 M M NNP 42149 2107 142 | | CD 42149 2107 143 r| r| NNP 42149 2107 144 Section Section NNP 42149 2107 145 | | NNP 42149 2107 146 y y NNP 42149 2107 147 | | NNP 42149 2107 148 1 1 CD 42149 2107 149 | | CD 42149 2107 150 2 2 CD 42149 2107 151 | | CD 42149 2107 152 r r NN 42149 2107 153 | | CD 42149 2107 154 n n CC 42149 2107 155 |pip-| |pip-| NNP 42149 2107 156 a a DT 42149 2107 157 | | NNP 42149 2107 158 e e NN 42149 2107 159 | | NNP 42149 2107 160 e e NNP 42149 2107 161 | | NNP 42149 2107 162 p p NNP 42149 2107 163 | | NNP 42149 2107 164 e e NN 42149 2107 165 | | CD 42149 2107 166 o| o| NN 42149 2107 167 between between IN 42149 2107 168 |----+----+----+----+----|ing |----+----+----+----+----|ing NNP 42149 2107 169 | | NNP 42149 2107 170 r r NNP 42149 2107 171 | | NNP 42149 2107 172 | | NNP 42149 2107 173 | | NNP 42149 2107 174 e e NN 42149 2107 175 | | NNP 42149 2107 176 a a DT 42149 2107 177 | | CD 42149 2107 178 n| n| NN 42149 2107 179 rings ring NNS 42149 2107 180 | | CD 42149 2107 181 H H NNP 42149 2107 182 | | NNP 42149 2107 183 H h NN 42149 2107 184 | | NNP 42149 2107 185 H h NN 42149 2107 186 | | NNP 42149 2107 187 H H NNP 42149 2107 188 | | NNP 42149 2107 189 H H NNP 42149 2107 190 | | NNP 42149 2107 191 | | NNP 42149 2107 192 y y NNP 42149 2107 193 | | NNP 42149 2107 194 1 1 CD 42149 2107 195 | | CD 42149 2107 196 2 2 CD 42149 2107 197 | | CD 42149 2107 198 r r NNP 42149 2107 199 | | CD 42149 2107 200 n n CC 42149 2107 201 | | CD 42149 2107 202 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2107 203 | | CD 42149 2107 204 1 1 CD 42149 2107 205 - - HYPH 42149 2107 206 68 68 CD 42149 2107 207 |}Excavation |}excavation NN 42149 2107 208 partially partially RB 42149 2107 209 { { -LRB- 42149 2107 210 | | CD 42149 2107 211 |15 |15 CD 42149 2107 212 - - HYPH 42149 2107 213 20| 20| CD 42149 2107 214 | | NNP 42149 2107 215 |14 |14 CD 42149 2107 216 - - HYPH 42149 2107 217 25|15 25|15 CD 42149 2107 218 - - HYPH 42149 2107 219 00| 00| CD 42149 2107 220 | | CD 42149 2107 221 69 69 CD 42149 2107 222 - - SYM 42149 2107 223 95 95 CD 42149 2107 224 |}completed |}completed NN 42149 2107 225 previously previously RB 42149 2107 226 . . . 42149 2108 1 { { -LRB- 42149 2108 2 | | NNP 42149 2108 3 |19 |19 CD 42149 2108 4 - - HYPH 42149 2108 5 20| 20| CD 42149 2108 6 | | CD 42149 2108 7 |18 |18 CD 42149 2108 8 - - HYPH 42149 2108 9 58|19 58|19 CD 42149 2108 10 - - HYPH 42149 2108 11 18| 18| CD 42149 2108 12 O| o| CD 42149 2108 13 96 96 CD 42149 2108 14 - - SYM 42149 2108 15 141 141 CD 42149 2108 16 | | NNS 42149 2108 17 } } -RRB- 42149 2108 18 { { -LRB- 42149 2108 19 |0 |0 IN 42149 2108 20 - - HYPH 42149 2108 21 03|20 03|20 CD 42149 2108 22 - - HYPH 42149 2108 23 27| 27| CD 42149 2108 24 | | CD 42149 2108 25 |20 |20 CD 42149 2108 26 - - HYPH 42149 2108 27 46|20 46|20 CD 42149 2108 28 - - HYPH 42149 2108 29 28| 28| CD 42149 2108 30 r| r| NN 42149 2108 31 142 142 CD 42149 2108 32 - - SYM 42149 2108 33 191 191 CD 42149 2108 34 | | CD 42149 2108 35 } } -RRB- 42149 2108 36 { { -LRB- 42149 2108 37 |0 |0 VB 42149 2108 38 - - HYPH 42149 2108 39 12|19 12|19 CD 42149 2108 40 - - HYPH 42149 2108 41 47| 47| CD 42149 2108 42 | | CD 42149 2108 43 |19 |19 CD 42149 2108 44 - - HYPH 42149 2108 45 43|19 43|19 CD 42149 2108 46 - - HYPH 42149 2108 47 47| 47| CD 42149 2108 48 d| d| NNP 42149 2108 49 192 192 CD 42149 2108 50 - - SYM 42149 2108 51 203 203 CD 42149 2108 52 |}Bolting |}bolting NN 42149 2108 53 time time NN 42149 2108 54 for for IN 42149 2108 55 light{|1 light{|1 NNP 42149 2108 56 - - HYPH 42149 2108 57 20|11 20|11 CD 42149 2108 58 - - HYPH 42149 2108 59 45|15 45|15 CD 42149 2108 60 - - HYPH 42149 2108 61 18|11 18|11 CD 42149 2108 62 - - HYPH 42149 2108 63 28|12 28|12 CD 42149 2108 64 - - HYPH 42149 2108 65 33|12 33|12 CD 42149 2108 66 - - HYPH 42149 2108 67 05| 05| CD 42149 2108 68 i| i| NNP 42149 2108 69 204 204 CD 42149 2108 70 - - SYM 42149 2108 71 388 388 CD 42149 2108 72 |}iron |}iron NN 42149 2108 73 is be VBZ 42149 2108 74 included include VBN 42149 2108 75 in in IN 42149 2108 76 { { -LRB- 42149 2108 77 |0 |0 IN 42149 2108 78 - - : 42149 2108 79 05| 05| CD 42149 2108 80 6 6 CD 42149 2108 81 - - HYPH 42149 2108 82 05| 05| CD 42149 2108 83 6 6 CD 42149 2108 84 - - SYM 42149 2108 85 13| 13| CD 42149 2108 86 6 6 CD 42149 2108 87 - - SYM 42149 2108 88 18| 18| CD 42149 2108 89 6 6 CD 42149 2108 90 - - SYM 42149 2108 91 20| 20| CD 42149 2108 92 6 6 CD 42149 2108 93 - - HYPH 42149 2108 94 11| 11| CD 42149 2108 95 n| n| NN 42149 2108 96 389 389 CD 42149 2108 97 - - SYM 42149 2108 98 429 429 CD 42149 2108 99 |}erection |}erection CD 42149 2108 100 . . . 42149 2109 1 { { -LRB- 42149 2109 2 |0 |0 IN 42149 2109 3 - - HYPH 42149 2109 4 38|16 38|16 CD 42149 2109 5 - - HYPH 42149 2109 6 35|15 35|15 CD 42149 2109 7 - - HYPH 42149 2109 8 56|18 56|18 CD 42149 2109 9 - - HYPH 42149 2109 10 23|16 23|16 CD 42149 2109 11 - - HYPH 42149 2109 12 46|16 46|16 CD 42149 2109 13 - - HYPH 42149 2109 14 47| 47| CD 42149 2109 15 a| a| NN 42149 2109 16 | | NNP 42149 2109 17 } } -RRB- 42149 2109 18 { { -LRB- 42149 2109 19 | | CD 42149 2109 20 | | NNP 42149 2109 21 | | CD 42149 2109 22 | | CD 42149 2109 23 | | CD 42149 2109 24 | | CD 42149 2109 25 | | CD 42149 2109 26 r| r| NN 42149 2109 27 430 430 CD 42149 2109 28 - - SYM 42149 2109 29 504 504 CD 42149 2109 30 | | CD 42149 2109 31 } } -RRB- 42149 2109 32 { { -LRB- 42149 2109 33 |0 |0 IN 42149 2109 34 - - : 42149 2109 35 39| 39| CD 42149 2109 36 5 5 CD 42149 2109 37 - - SYM 42149 2109 38 23| 23| CD 42149 2109 39 5 5 CD 42149 2109 40 - - SYM 42149 2109 41 47| 47| CD 42149 2109 42 5 5 CD 42149 2109 43 - - SYM 42149 2109 44 30| 30| CD 42149 2109 45 6 6 CD 42149 2109 46 - - SYM 42149 2109 47 27| 27| CD 42149 2109 48 5 5 CD 42149 2109 49 - - SYM 42149 2109 50 29| 29| CD 42149 2109 51 y| y| NNS 42149 2109 52 505 505 CD 42149 2109 53 - - CD 42149 2109 54 629 629 CD 42149 2109 55 | | NNS 42149 2109 56 } } -RRB- 42149 2109 57 { { -LRB- 42149 2109 58 |0 |0 NN 42149 2109 59 - - : 42149 2109 60 23| 23| CD 42149 2109 61 5 5 CD 42149 2109 62 - - SYM 42149 2109 63 06| 06| CD 42149 2109 64 5 5 CD 42149 2109 65 - - SYM 42149 2109 66 23| 23| CD 42149 2109 67 5 5 CD 42149 2109 68 - - SYM 42149 2109 69 28| 28| CD 42149 2109 70 5 5 CD 42149 2109 71 - - SYM 42149 2109 72 11| 11| CD 42149 2109 73 5 5 CD 42149 2109 74 - - SYM 42149 2109 75 13| 13| CD 42149 2109 76 | | CD 42149 2109 77 630 630 CD 42149 2109 78 - - HYPH 42149 2109 79 692 692 CD 42149 2109 80 | | NNS 42149 2109 81 } } -RRB- 42149 2109 82 { { -LRB- 42149 2109 83 |0 |0 NN 42149 2109 84 - - : 42149 2109 85 08| 08| CD 42149 2109 86 3 3 CD 42149 2109 87 - - SYM 42149 2109 88 55| 55| CD 42149 2109 89 4 4 CD 42149 2109 90 - - SYM 42149 2109 91 11| 11| CD 42149 2109 92 4 4 CD 42149 2109 93 - - SYM 42149 2109 94 23| 23| CD 42149 2109 95 4 4 CD 42149 2109 96 - - SYM 42149 2109 97 24| 24| CD 42149 2109 98 4 4 CD 42149 2109 99 - - HYPH 42149 2109 100 03| 03| CD 42149 2109 101 | | CD 42149 2109 102 204 204 CD 42149 2109 103 - - HYPH 42149 2109 104 692 692 CD 42149 2109 105 | | CD 42149 2109 106 } } -RRB- 42149 2109 107 { { -LRB- 42149 2109 108 |0 |0 VB 42149 2109 109 - - : 42149 2109 110 18| 18| CD 42149 2109 111 6 6 CD 42149 2109 112 - - SYM 42149 2109 113 19| 19| CD 42149 2109 114 6 6 CD 42149 2109 115 - - SYM 42149 2109 116 30| 30| CD 42149 2109 117 6 6 CD 42149 2109 118 - - SYM 42149 2109 119 43| 43| CD 42149 2109 120 6 6 CD 42149 2109 121 - - SYM 42149 2109 122 20| 20| CD 42149 2109 123 6 6 CD 42149 2109 124 - - HYPH 42149 2109 125 27| 27| CD 42149 2109 126 | | CD 42149 2109 127 69 69 CD 42149 2109 128 - - HYPH 42149 2109 129 692 692 CD 42149 2109 130 | | CD 42149 2109 131 } } -RRB- 42149 2109 132 { { -LRB- 42149 2109 133 |0 |0 IN 42149 2109 134 - - : 42149 2109 135 15| 15| CD 42149 2109 136 9 9 CD 42149 2109 137 - - SYM 42149 2109 138 42| 42| CD 42149 2109 139 | | CD 42149 2109 140 |10 |10 CD 42149 2109 141 - - HYPH 42149 2109 142 13| 13| CD 42149 2109 143 9 9 CD 42149 2109 144 - - HYPH 42149 2109 145 47| 47| CD 42149 2109 146 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2109 147 | | CD 42149 2109 148 693 693 CD 42149 2109 149 - - HYPH 42149 2109 150 766 766 CD 42149 2109 151 |0 |0 '' 42149 2109 152 - - HYPH 42149 2109 153 43|1 43|1 CD 42149 2109 154 - - HYPH 42149 2109 155 09|0 09|0 CD 42149 2109 156 - - HYPH 42149 2109 157 52|0 52|0 CD 42149 2109 158 - - HYPH 42149 2109 159 50|0 50|0 CD 42149 2109 160 - - HYPH 42149 2109 161 49|0 49|0 CD 42149 2109 162 - - HYPH 42149 2109 163 07| 07| CD 42149 2109 164 4 4 CD 42149 2109 165 - - SYM 42149 2109 166 08| 08| CD 42149 2109 167 5 5 CD 42149 2109 168 - - SYM 42149 2109 169 00| 00| CD 42149 2109 170 4 4 CD 42149 2109 171 - - SYM 42149 2109 172 29| 29| CD 42149 2109 173 4 4 CD 42149 2109 174 - - SYM 42149 2109 175 37| 37| CD 42149 2109 176 4 4 CD 42149 2109 177 - - SYM 42149 2109 178 21| 21| CD 42149 2109 179 | | CD 42149 2109 180 767 767 CD 42149 2109 181 - - HYPH 42149 2109 182 806 806 CD 42149 2109 183 |0 |0 NN 42149 2109 184 - - HYPH 42149 2109 185 38|0 38|0 CD 42149 2109 186 - - HYPH 42149 2109 187 24|0 24|0 CD 42149 2109 188 - - HYPH 42149 2109 189 43|0 43|0 CD 42149 2109 190 - - HYPH 42149 2109 191 38|0 38|0 CD 42149 2109 192 - - HYPH 42149 2109 193 42|0 42|0 CD 42149 2109 194 - - CD 42149 2109 195 02| 02| CD 42149 2109 196 3 3 CD 42149 2109 197 - - SYM 42149 2109 198 20| 20| CD 42149 2109 199 3 3 CD 42149 2109 200 - - SYM 42149 2109 201 02| 02| CD 42149 2109 202 4 4 CD 42149 2109 203 - - SYM 42149 2109 204 02| 02| CD 42149 2109 205 3 3 CD 42149 2109 206 - - SYM 42149 2109 207 41| 41| CD 42149 2109 208 3 3 CD 42149 2109 209 - - SYM 42149 2109 210 32| 32| CD 42149 2109 211 | | CD 42149 2109 212 807 807 CD 42149 2109 213 - - HYPH 42149 2109 214 900 900 CD 42149 2109 215 |0 |0 '' 42149 2109 216 - - HYPH 42149 2109 217 39|0 39|0 CD 42149 2109 218 - - HYPH 42149 2109 219 34|0 34|0 CD 42149 2109 220 - - HYPH 42149 2109 221 56|0 56|0 CD 42149 2109 222 - - HYPH 42149 2109 223 31|0 31|0 CD 42149 2109 224 - - HYPH 42149 2109 225 40|0 40|0 CD 42149 2109 226 - - HYPH 42149 2109 227 06| 06| CD 42149 2109 228 3 3 CD 42149 2109 229 - - SYM 42149 2109 230 11| 11| CD 42149 2109 231 3 3 CD 42149 2109 232 - - SYM 42149 2109 233 21| 21| CD 42149 2109 234 3 3 CD 42149 2109 235 - - SYM 42149 2109 236 38| 38| CD 42149 2109 237 3 3 CD 42149 2109 238 - - SYM 42149 2109 239 17| 17| CD 42149 2109 240 3 3 CD 42149 2109 241 - - SYM 42149 2109 242 18| 18| CD 42149 2109 243 H| h| CD 42149 2109 244 901 901 CD 42149 2109 245 - - SYM 42149 2109 246 933 933 CD 42149 2109 247 |0 |0 : 42149 2109 248 - - HYPH 42149 2109 249 34|0 34|0 CD 42149 2109 250 - - HYPH 42149 2109 251 26|1 26|1 CD 42149 2109 252 - - HYPH 42149 2109 253 47| 47| CD 42149 2109 254 |0 |0 NN 42149 2109 255 - - HYPH 42149 2109 256 43|0 43|0 CD 42149 2109 257 - - HYPH 42149 2109 258 05| 05| CD 42149 2109 259 3 3 CD 42149 2109 260 - - SYM 42149 2109 261 00| 00| CD 42149 2109 262 2 2 CD 42149 2109 263 - - SYM 42149 2109 264 58| 58| CD 42149 2109 265 4 4 CD 42149 2109 266 - - SYM 42149 2109 267 13| 13| CD 42149 2109 268 | | CD 42149 2109 269 3 3 CD 42149 2109 270 - - SYM 42149 2109 271 10| 10| CD 42149 2109 272 e| e| NNP 42149 2109 273 934 934 CD 42149 2109 274 - - SYM 42149 2109 275 988 988 CD 42149 2109 276 |0 |0 , 42149 2109 277 - - HYPH 42149 2109 278 28|0 28|0 CD 42149 2109 279 - - HYPH 42149 2109 280 34|0 34|0 CD 42149 2109 281 - - HYPH 42149 2109 282 34| 34| CD 42149 2109 283 |0 |0 NN 42149 2109 284 - - HYPH 42149 2109 285 30|0 30|0 CD 42149 2109 286 - - HYPH 42149 2109 287 06| 06| CD 42149 2109 288 2 2 CD 42149 2109 289 - - HYPH 42149 2109 290 29| 29| CD 42149 2109 291 2 2 CD 42149 2109 292 - - SYM 42149 2109 293 30| 30| CD 42149 2109 294 2 2 CD 42149 2109 295 - - HYPH 42149 2109 296 42| 42| CD 42149 2109 297 | | CD 42149 2109 298 2 2 CD 42149 2109 299 - - HYPH 42149 2109 300 32| 32| CD 42149 2109 301 a| a| NN 42149 2109 302 989 989 CD 42149 2109 303 - - HYPH 42149 2109 304 1,043|0 1,043|0 CD 42149 2109 305 - - HYPH 42149 2109 306 33|0 33|0 CD 42149 2109 307 - - HYPH 42149 2109 308 24|0 24|0 CD 42149 2109 309 - - HYPH 42149 2109 310 51|0 51|0 CD 42149 2109 311 - - HYPH 42149 2109 312 35|0 35|0 CD 42149 2109 313 - - HYPH 42149 2109 314 35|0 35|0 CD 42149 2109 315 - - HYPH 42149 2109 316 04| 04| CD 42149 2109 317 2 2 CD 42149 2109 318 - - SYM 42149 2109 319 34| 34| CD 42149 2109 320 2 2 CD 42149 2109 321 - - SYM 42149 2109 322 18| 18| CD 42149 2109 323 2 2 CD 42149 2109 324 - - SYM 42149 2109 325 53| 53| CD 42149 2109 326 2 2 CD 42149 2109 327 - - SYM 42149 2109 328 59| 59| CD 42149 2109 329 2 2 CD 42149 2109 330 - - SYM 42149 2109 331 37| 37| CD 42149 2109 332 v|1,044 v|1,044 NN 42149 2109 333 - - HYPH 42149 2109 334 1,053|0 1,053|0 CD 42149 2109 335 - - HYPH 42149 2109 336 23|0 23|0 CD 42149 2109 337 - - HYPH 42149 2109 338 38|0 38|0 CD 42149 2109 339 - - HYPH 42149 2109 340 30|0 30|0 CD 42149 2109 341 - - HYPH 42149 2109 342 55|0 55|0 CD 42149 2109 343 - - HYPH 42149 2109 344 36| 36| CD 42149 2109 345 | | CD 42149 2109 346 3 3 CD 42149 2109 347 - - SYM 42149 2109 348 22| 22| CD 42149 2109 349 3 3 CD 42149 2109 350 - - SYM 42149 2109 351 48| 48| CD 42149 2109 352 3 3 CD 42149 2109 353 - - SYM 42149 2109 354 15| 15| CD 42149 2109 355 3 3 CD 42149 2109 356 - - SYM 42149 2109 357 45| 45| CD 42149 2109 358 3 3 CD 42149 2109 359 - - HYPH 42149 2109 360 33| 33| CD 42149 2109 361 y|1,054 y|1,054 NN 42149 2109 362 - - HYPH 42149 2109 363 1,068|0 1,068|0 CD 42149 2109 364 - - HYPH 42149 2109 365 33|0 33|0 CD 42149 2109 366 - - HYPH 42149 2109 367 25|0 25|0 CD 42149 2109 368 - - HYPH 42149 2109 369 35| 35| CD 42149 2109 370 |0 |0 VBG 42149 2109 371 - - HYPH 42149 2109 372 32| 32| CD 42149 2109 373 | | CD 42149 2109 374 2 2 CD 42149 2109 375 - - SYM 42149 2109 376 14| 14| CD 42149 2109 377 1 1 CD 42149 2109 378 - - SYM 42149 2109 379 49| 49| CD 42149 2109 380 2 2 CD 42149 2109 381 - - HYPH 42149 2109 382 21| 21| CD 42149 2109 383 | | CD 42149 2109 384 2 2 CD 42149 2109 385 - - HYPH 42149 2109 386 12| 12| CD 42149 2109 387 |1,069 |1,069 NNP 42149 2109 388 - - HYPH 42149 2109 389 1,110|0 1,110|0 CD 42149 2109 390 - - HYPH 42149 2109 391 32|0 32|0 CD 42149 2109 392 - - HYPH 42149 2109 393 40|0 40|0 CD 42149 2109 394 - - HYPH 42149 2109 395 48|0 48|0 CD 42149 2109 396 - - HYPH 42149 2109 397 46|0 46|0 CD 42149 2109 398 - - HYPH 42149 2109 399 37|0 37|0 CD 42149 2109 400 - - HYPH 42149 2109 401 05| 05| CD 42149 2109 402 2 2 CD 42149 2109 403 - - SYM 42149 2109 404 40| 40| CD 42149 2109 405 2 2 CD 42149 2109 406 - - HYPH 42149 2109 407 54| 54| CD 42149 2109 408 3 3 CD 42149 2109 409 - - SYM 42149 2109 410 14| 14| CD 42149 2109 411 3 3 CD 42149 2109 412 - - SYM 42149 2109 413 37| 37| CD 42149 2109 414 2 2 CD 42149 2109 415 - - HYPH 42149 2109 416 53| 53| CD 42149 2109 417 | | CD 42149 2109 418 693 693 CD 42149 2109 419 - - HYPH 42149 2109 420 1,110|0 1,110|0 CD 42149 2109 421 - - HYPH 42149 2109 422 37|0 37|0 CD 42149 2109 423 - - HYPH 42149 2109 424 39|0 39|0 CD 42149 2109 425 - - HYPH 42149 2109 426 52|0 52|0 CD 42149 2109 427 - - HYPH 42149 2109 428 40|0 40|0 CD 42149 2109 429 - - HYPH 42149 2109 430 40|0 40|0 CD 42149 2109 431 - - HYPH 42149 2109 432 05| 05| CD 42149 2109 433 3 3 CD 42149 2109 434 - - SYM 42149 2109 435 12| 12| CD 42149 2109 436 3 3 CD 42149 2109 437 - - SYM 42149 2109 438 21| 21| CD 42149 2109 439 3 3 CD 42149 2109 440 - - SYM 42149 2109 441 35| 35| CD 42149 2109 442 3 3 CD 42149 2109 443 - - SYM 42149 2109 444 33| 33| CD 42149 2109 445 3 3 CD 42149 2109 446 - - SYM 42149 2109 447 19| 19| CD 42149 2109 448 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2109 449 A| a| CD 42149 2109 450 204 204 CD 42149 2109 451 - - HYPH 42149 2109 452 1,110| 1,110| CD 42149 2109 453 [ [ -LRB- 42149 2109 454 U]| U]| NNP 42149 2109 455 | | CD 42149 2109 456 | | CD 42149 2109 457 | | CD 42149 2109 458 |0 |0 NN 42149 2109 459 - - : 42149 2109 460 12| 12| CD 42149 2109 461 4 4 CD 42149 2109 462 - - SYM 42149 2109 463 56| 56| CD 42149 2109 464 5 5 CD 42149 2109 465 - - SYM 42149 2109 466 06| 06| CD 42149 2109 467 5 5 CD 42149 2109 468 - - SYM 42149 2109 469 20| 20| CD 42149 2109 470 5 5 CD 42149 2109 471 - - SYM 42149 2109 472 06| 06| CD 42149 2109 473 5 5 CD 42149 2109 474 - - SYM 42149 2109 475 04| 04| CD 42149 2109 476 l| l| JJ 42149 2109 477 69 69 CD 42149 2109 478 - - SYM 42149 2109 479 1,110| 1,110| CD 42149 2109 480 [ [ -LRB- 42149 2109 481 U]| U]| NNP 42149 2109 482 | | CD 42149 2109 483 | | CD 42149 2109 484 | | CD 42149 2109 485 |0 |0 '' 42149 2109 486 - - HYPH 42149 2109 487 14| 14| CD 42149 2109 488 7 7 CD 42149 2109 489 - - HYPH 42149 2109 490 -0| -0| CD 42149 2109 491 | | CD 42149 2109 492 | | CD 42149 2109 493 7 7 CD 42149 2109 494 - - SYM 42149 2109 495 36| 36| CD 42149 2109 496 7 7 CD 42149 2109 497 - - SYM 42149 2109 498 15| 15| CD 42149 2109 499 l| l| JJ 42149 2109 500 | | CD 42149 2109 501 | | CD 42149 2109 502 | | CD 42149 2109 503 | | CD 42149 2109 504 | | CD 42149 2109 505 | | CD 42149 2109 506 | | CD 42149 2109 507 | | CD 42149 2109 508 | | CD 42149 2109 509 | | CD 42149 2109 510 | | CD 42149 2109 511 | | NNS 42149 2109 512 = = SYM 42149 2109 513 + + SYM 42149 2109 514 = = SYM 42149 2109 515 = = SYM 42149 2109 516 = = SYM 42149 2109 517 = = SYM 42149 2109 518 = = SYM 42149 2109 519 = = SYM 42149 2109 520 = = SYM 42149 2109 521 = = SYM 42149 2109 522 = = SYM 42149 2109 523 = = NFP 42149 2109 524 = = SYM 42149 2109 525 + + SYM 42149 2109 526 = = SYM 42149 2109 527 = = SYM 42149 2109 528 = = NFP 42149 2109 529 = = SYM 42149 2109 530 + + SYM 42149 2109 531 = = SYM 42149 2109 532 = = SYM 42149 2109 533 = = NFP 42149 2109 534 = = SYM 42149 2109 535 + + SYM 42149 2109 536 = = SYM 42149 2109 537 = = SYM 42149 2109 538 = = NFP 42149 2109 539 = = SYM 42149 2109 540 + + SYM 42149 2109 541 = = SYM 42149 2109 542 = = SYM 42149 2109 543 = = NFP 42149 2109 544 = = SYM 42149 2109 545 + + SYM 42149 2109 546 = = SYM 42149 2109 547 = = SYM 42149 2109 548 = = NFP 42149 2109 549 = = SYM 42149 2109 550 + + SYM 42149 2109 551 = = SYM 42149 2109 552 = = SYM 42149 2109 553 = = NFP 42149 2109 554 = = SYM 42149 2109 555 + + SYM 42149 2109 556 = = SYM 42149 2109 557 = = SYM 42149 2109 558 = = SYM 42149 2109 559 = = NFP 42149 2109 560 = = SYM 42149 2109 561 + + SYM 42149 2109 562 = = SYM 42149 2109 563 = = SYM 42149 2109 564 = = SYM 42149 2109 565 = = NFP 42149 2109 566 = = SYM 42149 2109 567 + + SYM 42149 2109 568 = = SYM 42149 2109 569 = = SYM 42149 2109 570 = = SYM 42149 2109 571 = = NFP 42149 2109 572 = = SYM 42149 2109 573 + + SYM 42149 2109 574 = = SYM 42149 2109 575 = = SYM 42149 2109 576 = = SYM 42149 2109 577 = = NFP 42149 2109 578 = = SYM 42149 2109 579 + + SYM 42149 2109 580 = = SYM 42149 2109 581 = = SYM 42149 2109 582 = = SYM 42149 2109 583 = = NFP 42149 2109 584 =| =| ADD 42149 2109 585 TABLE TABLE VBZ 42149 2109 586 25 25 CD 42149 2109 587 SUMMARY summary NN 42149 2109 588 PART part NN 42149 2109 589 1 1 CD 42149 2109 590 = = SYM 42149 2109 591 = = SYM 42149 2109 592 = = SYM 42149 2109 593 + + SYM 42149 2109 594 = = SYM 42149 2109 595 = = SYM 42149 2109 596 = = SYM 42149 2109 597 = = SYM 42149 2109 598 = = SYM 42149 2109 599 = = SYM 42149 2109 600 = = SYM 42149 2109 601 = = SYM 42149 2109 602 = = SYM 42149 2109 603 = = NFP 42149 2109 604 = = SYM 42149 2109 605 + + SYM 42149 2109 606 = = SYM 42149 2109 607 = = SYM 42149 2109 608 = = SYM 42149 2109 609 = = SYM 42149 2109 610 = = SYM 42149 2109 611 = = NFP 42149 2109 612 = = SYM 42149 2109 613 + + SYM 42149 2109 614 = = SYM 42149 2109 615 = = SYM 42149 2109 616 = = SYM 42149 2109 617 = = SYM 42149 2109 618 = = SYM 42149 2109 619 = = SYM 42149 2109 620 = = SYM 42149 2109 621 = = SYM 42149 2109 622 = = SYM 42149 2109 623 = = SYM 42149 2109 624 = = SYM 42149 2109 625 = = SYM 42149 2109 626 = = NFP 42149 2109 627 = = SYM 42149 2109 628 + + SYM 42149 2109 629 = = SYM 42149 2109 630 = = SYM 42149 2109 631 = = NFP 42149 2109 632 = = SYM 42149 2109 633 + + SYM 42149 2109 634 = = SYM 42149 2109 635 = = SYM 42149 2109 636 = = SYM 42149 2109 637 = = SYM 42149 2109 638 = = SYM 42149 2109 639 = = SYM 42149 2109 640 = = SYM 42149 2109 641 = = SYM 42149 2109 642 = = SYM 42149 2109 643 = = SYM 42149 2109 644 = = NFP 42149 2109 645 = = SYM 42149 2109 646 + + SYM 42149 2109 647 = = SYM 42149 2109 648 = = SYM 42149 2109 649 + + SYM 42149 2109 650 = = SYM 42149 2109 651 = = SYM 42149 2109 652 + + SYM 42149 2109 653 = = SYM 42149 2109 654 = = SYM 42149 2109 655 = = SYM 42149 2109 656 + + SYM 42149 2109 657 = = SYM 42149 2109 658 = = SYM 42149 2109 659 + + SYM 42149 2109 660 = = SYM 42149 2109 661 =| =| NNP 42149 2109 662 | | CD 42149 2109 663 | | NNP 42149 2109 664 | | NNP 42149 2109 665 AVE AVE NNP 42149 2109 666 . . . 42149 2109 667 NO no UH 42149 2109 668 . . . 42149 2110 1 | | NNP 42149 2110 2 W| w| CD 42149 2110 3 | | CD 42149 2110 4 | | CD 42149 2110 5 OF OF NNP 42149 2110 6 MEN MEN NNP 42149 2110 7 | | NNP 42149 2110 8 e| e| NNP 42149 2110 9 | | CD 42149 2110 10 DESCRIPTION description NN 42149 2110 11 | | CD 42149 2110 12 IN IN NNP 42149 2110 13 GANG gang NN 42149 2110 14 | | , 42149 2110 15 i| i| NN 42149 2110 16 |-------+--------------+----+------------+--+--+---+--+--| |-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2110 17 g| g| NNP 42149 2110 18 | | NNP 42149 2110 19 | | NNP 42149 2110 20 |Ave.| |Ave.| NNP 42149 2110 21 | | NNP 42149 2110 22 | | NNP 42149 2110 23 | | CD 42149 2110 24 | | CD 42149 2110 25 | | CD 42149 2110 26 | | NNP 42149 2110 27 h| h| JJ 42149 2110 28 | | CD 42149 2110 29 | | NNP 42149 2110 30 |air |air NNP 42149 2110 31 | | NNP 42149 2110 32 | | NNP 42149 2110 33 | | NNP 42149 2110 34 | | CD 42149 2110 35 | | CD 42149 2110 36 | | CD 42149 2110 37 | | CD 42149 2110 38 t| t| JJ 42149 2110 39 | | NNP 42149 2110 40 | | NNP 42149 2110 41 | | CD 42149 2110 42 | | CD 42149 2110 43 | | CD 42149 2110 44 | | CD 42149 2110 45 | | CD 42149 2110 46 | | CD 42149 2110 47 A| a| CD 42149 2110 48 | | CD 42149 2110 49 | | CD 42149 2110 50 | | CD 42149 2110 51 | | CD 42149 2110 52 |P |p CD 42149 2110 53 | | CD 42149 2110 54 | | CD 42149 2110 55 | | CD 42149 2110 56 D| d| NN 42149 2110 57 G g NN 42149 2110 58 | | NNP 42149 2110 59 i| i| NN 42149 2110 60 | | NNP 42149 2110 61 o| o| NNP 42149 2110 62 | | NNP 42149 2110 63 | | NNP 42149 2110 64 |r |r NNP 42149 2110 65 | | NNP 42149 2110 66 | | NNP 42149 2110 67 | | CD 42149 2110 68 r| r| NN 42149 2110 69 r r DT 42149 2110 70 | | CD 42149 2110 71 r| r| NN 42149 2110 72 | | CD 42149 2110 73 f| f| NN 42149 2110 74 | | NNP 42149 2110 75 | | NNP 42149 2110 76 |e |e NNPS 42149 2110 77 | | NNP 42149 2110 78 | | NNP 42149 2110 79 S| s| VB 42149 2110 80 i| i| NNP 42149 2110 81 o o NNP 42149 2110 82 | | NNP 42149 2110 83 | | NNP 42149 2110 84 | | CD 42149 2110 85 | | CD 42149 2110 86 | | NNP 42149 2110 87 | | NNP 42149 2110 88 |s |s NNP 42149 2110 89 | | NNP 42149 2110 90 | | NNP 42149 2110 91 h| h| NNP 42149 2110 92 l| l| NN 42149 2110 93 u u NNP 42149 2110 94 | | NNP 42149 2110 95 T|T T|T NNP 42149 2110 96 | | NNP 42149 2110 97 i| i| NN 42149 2110 98 | | NNP 42149 2110 99 | | NNP 42149 2110 100 |s |s NNP 42149 2110 101 | | NNP 42149 2110 102 | | NNP 42149 2110 103 i| i| RB 42149 2110 104 l| l| NNP 42149 2110 105 t t NNP 42149 2110 106 | | NNP 42149 2110 107 r|o r|o CD 42149 2110 108 | | CD 42149 2110 109 r| r| NN 42149 2110 110 Section Section NNP 42149 2110 111 | | NNP 42149 2110 112 | | NNP 42149 2110 113 |u |u NNP 42149 2110 114 | | CD 42149 2110 115 | | CD 42149 2110 116 e| e| JJ 42149 2110 117 i| i| NNP 42149 2110 118 i i PRP 42149 2110 119 | | CD 42149 2110 120 a|t a|t CD 42149 2110 121 | | CD 42149 2110 122 o| o| NN 42149 2110 123 between between IN 42149 2110 124 |Length |Length NNP 42149 2110 125 | | NNP 42149 2110 126 |r |r JJ 42149 2110 127 |Method |Method NNS 42149 2110 128 of of IN 42149 2110 129 | | CD 42149 2110 130 l| l| JJ 42149 2110 131 n| n| NN 42149 2110 132 n n CC 42149 2110 133 | | NNP 42149 2110 134 n|a n|a CD 42149 2110 135 | | CD 42149 2110 136 n| n| NN 42149 2110 137 rings ring NNS 42149 2110 138 |in |in CD 42149 2110 139 feet| feet| CD 42149 2110 140 Material Material NNP 42149 2110 141 |e |e NNPS 42149 2110 142 |Excavation |Excavation NNP 42149 2110 143 | | NNP 42149 2110 144 d| d| NN 42149 2110 145 g| g| NNP 42149 2110 146 g g NNP 42149 2110 147 | | NNP 42149 2110 148 s|l s|l CD 42149 2110 149 | | NNS 42149 2110 150 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| NN 42149 2110 151 O o NN 42149 2110 152 { { -LRB- 42149 2110 153 | | NNP 42149 2110 154 1 1 CD 42149 2110 155 - - HYPH 42149 2110 156 68 68 CD 42149 2110 157 | | CD 42149 2110 158 170.0|Rock 170.0|rock CD 42149 2110 159 | | CD 42149 2110 160 0 0 CD 42149 2110 161 | | NNS 42149 2110 162 [ [ -LRB- 42149 2110 163 R r NN 42149 2110 164 ] ] -RRB- 42149 2110 165 |20| |20| JJ 42149 2110 166 5| 5| CD 42149 2110 167 5| 5| NNP 42149 2110 168 5|32| 5|32| CD 42149 2110 169 r r NN 42149 2110 170 { { -LRB- 42149 2110 171 | | CD 42149 2110 172 69 69 CD 42149 2110 173 - - HYPH 42149 2110 174 191 191 CD 42149 2110 175 | | CD 42149 2110 176 307.5|Rock 307.5|rock CD 42149 2110 177 and and CC 42149 2110 178 earth|13 earth|13 NNP 42149 2110 179 | | JJ 42149 2110 180 [ [ -LRB- 42149 2110 181 R r NN 42149 2110 182 ] ] -RRB- 42149 2110 183 |22| |22| JJ 42149 2110 184 9| 9| CD 42149 2110 185 | | CD 42149 2110 186 2|33| 2|33| CD 42149 2110 187 d d NN 42149 2110 188 { { -LRB- 42149 2110 189 | | CD 42149 2110 190 192 192 CD 42149 2110 191 - - HYPH 42149 2110 192 388 388 CD 42149 2110 193 | | CD 42149 2110 194 492.5|Silt 492.5|silt CD 42149 2110 195 |18 |18 CD 42149 2110 196 |[R]Breasting|25| |[r]breasting|25| NN 42149 2110 197 | | NNP 42149 2110 198 | | NNP 42149 2110 199 3|28| 3|28| NNS 42149 2110 200 i i PRP 42149 2110 201 { { -LRB- 42149 2110 202 | | CD 42149 2110 203 | | CD 42149 2110 204 | | CD 42149 2110 205 | | CD 42149 2110 206 { { -LRB- 42149 2110 207 |[S]7 |[S]7 NNP 42149 2110 208 doors door NNS 42149 2110 209 | | NNP 42149 2110 210 | | CD 42149 2110 211 | | CD 42149 2110 212 | | CD 42149 2110 213 | | CD 42149 2110 214 | | CD 42149 2110 215 n n CC 42149 2110 216 { { -LRB- 42149 2110 217 | | CD 42149 2110 218 389 389 CD 42149 2110 219 - - HYPH 42149 2110 220 429 429 CD 42149 2110 221 | | CD 42149 2110 222 102.5|Silt 102.5|silt CD 42149 2110 223 piles pile NNS 42149 2110 224 and|22 and|22 IN 42149 2110 225 |[R]Breasting|24| |[R]Breasting|24| NNP 42149 2110 226 | | CD 42149 2110 227 | | NNP 42149 2110 228 4|28| 4|28| CD 42149 2110 229 a a DT 42149 2110 230 { { -LRB- 42149 2110 231 | | CD 42149 2110 232 | | CD 42149 2110 233 |rip |rip JJ 42149 2110 234 - - HYPH 42149 2110 235 rap rap NN 42149 2110 236 | | NNP 42149 2110 237 { { -LRB- 42149 2110 238 |[S]6 |[S]6 NNP 42149 2110 239 doors door NNS 42149 2110 240 | | NNP 42149 2110 241 | | CD 42149 2110 242 | | CD 42149 2110 243 | | CD 42149 2110 244 | | CD 42149 2110 245 | | CD 42149 2110 246 r r NN 42149 2110 247 { { -LRB- 42149 2110 248 | | CD 42149 2110 249 430 430 CD 42149 2110 250 - - HYPH 42149 2110 251 692 692 CD 42149 2110 252 | | CD 42149 2110 253 657.5|Silt 657.5|silt CD 42149 2110 254 |22 |22 NNP 42149 2110 255 |[S]3 |[S]3 NNP 42149 2110 256 doors door NNS 42149 2110 257 |24| |24| NN 42149 2110 258 | | CD 42149 2110 259 | | CD 42149 2110 260 6|30| 6|30| CD 42149 2110 261 y y NN 42149 2110 262 { { -LRB- 42149 2110 263 |-----------+-------+--------------+----+------------+--+--+---+--+--| |-----------+-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2110 264 { { -LRB- 42149 2110 265 | | NNP 42149 2110 266 204 204 CD 42149 2110 267 - - SYM 42149 2110 268 692 692 CD 42149 2110 269 |1,222.5| |1,222.5| NNP 42149 2110 270 |21 |21 CD 42149 2110 271 | | CD 42149 2110 272 |25| |25| JJ 42149 2110 273 | | CD 42149 2110 274 | | CD 42149 2110 275 5|30| 5|30| CD 42149 2110 276 { { -LRB- 42149 2110 277 |-----------+-------+--------------+----+------------+--+--+---+--+--| |-----------+-------+--------------+----+------------+--+--+---+--+--| JJ 42149 2110 278 { { -LRB- 42149 2110 279 | | NNP 42149 2110 280 69 69 CD 42149 2110 281 - - SYM 42149 2110 282 692 692 CD 42149 2110 283 |1,560.0| |1,560.0| NN 42149 2110 284 |17 |17 CD 42149 2110 285 | | CD 42149 2110 286 |23| |23| JJ 42149 2110 287 4| 4| CD 42149 2110 288 0| 0| CD 42149 2110 289 3|30| 3|30| CD 42149 2110 290 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| CC 42149 2110 291 Hvy| hvy| $ 42149 2110 292 693 693 CD 42149 2110 293 - - SYM 42149 2110 294 1,110|1,045.0| 1,110|1,045.0| CD 42149 2110 295 |25 |25 CD 42149 2110 296 |[S]1 |[S]1 NNP 42149 2110 297 door door NN 42149 2110 298 |25| |25| JJ 42149 2110 299 | | CD 42149 2110 300 | | CD 42149 2110 301 8|33| 8|33| NNPS 42149 2110 302 ---+-----------+-------+--------------+----+------------+--+--+---+--+--| ---+-----------+-------+--------------+----+------------+--+--+---+--+--| NNP 42149 2110 303 All| All| NNP 42149 2110 304 69 69 CD 42149 2110 305 - - HYPH 42149 2110 306 1,110|2,605.0| 1,110|2,605.0| CD 42149 2110 307 |20 |20 CD 42149 2110 308 | | CD 42149 2110 309 |24| |24| NN 42149 2110 310 | | CD 42149 2110 311 | | CD 42149 2110 312 5|31| 5|31| NNS 42149 2110 313 = = SYM 42149 2110 314 = = SYM 42149 2110 315 = = SYM 42149 2110 316 + + SYM 42149 2110 317 = = SYM 42149 2110 318 = = SYM 42149 2110 319 = = SYM 42149 2110 320 = = SYM 42149 2110 321 = = SYM 42149 2110 322 = = SYM 42149 2110 323 = = SYM 42149 2110 324 = = SYM 42149 2110 325 = = SYM 42149 2110 326 = = NFP 42149 2110 327 = = SYM 42149 2110 328 + + SYM 42149 2110 329 = = SYM 42149 2110 330 = = SYM 42149 2110 331 = = SYM 42149 2110 332 = = SYM 42149 2110 333 = = SYM 42149 2110 334 = = NFP 42149 2110 335 = = SYM 42149 2110 336 + + SYM 42149 2110 337 = = SYM 42149 2110 338 = = SYM 42149 2110 339 = = SYM 42149 2110 340 = = SYM 42149 2110 341 = = SYM 42149 2110 342 = = SYM 42149 2110 343 = = SYM 42149 2110 344 = = SYM 42149 2110 345 = = SYM 42149 2110 346 = = SYM 42149 2110 347 = = SYM 42149 2110 348 = = SYM 42149 2110 349 = = NFP 42149 2110 350 = = SYM 42149 2110 351 + + SYM 42149 2110 352 = = SYM 42149 2110 353 = = SYM 42149 2110 354 = = NFP 42149 2110 355 = = SYM 42149 2110 356 + + SYM 42149 2110 357 = = SYM 42149 2110 358 = = SYM 42149 2110 359 = = SYM 42149 2110 360 = = SYM 42149 2110 361 = = SYM 42149 2110 362 = = SYM 42149 2110 363 = = SYM 42149 2110 364 = = SYM 42149 2110 365 = = SYM 42149 2110 366 = = SYM 42149 2110 367 = = NFP 42149 2110 368 = = SYM 42149 2110 369 + + SYM 42149 2110 370 = = SYM 42149 2110 371 = = SYM 42149 2110 372 + + SYM 42149 2110 373 = = SYM 42149 2110 374 = = SYM 42149 2110 375 + + SYM 42149 2110 376 = = SYM 42149 2110 377 = = SYM 42149 2110 378 = = SYM 42149 2110 379 + + SYM 42149 2110 380 = = SYM 42149 2110 381 = = SYM 42149 2110 382 + + SYM 42149 2110 383 = = SYM 42149 2110 384 =| =| ADD 42149 2110 385 TABLE TABLE VBZ 42149 2110 386 25 25 CD 42149 2110 387 SUMMARY summary NN 42149 2110 388 PART PART VBN 42149 2110 389 2 2 CD 42149 2110 390 = = SYM 42149 2110 391 = = SYM 42149 2110 392 = = SYM 42149 2110 393 + + SYM 42149 2110 394 = = SYM 42149 2110 395 = = SYM 42149 2110 396 = = SYM 42149 2110 397 = = SYM 42149 2110 398 = = SYM 42149 2110 399 = = SYM 42149 2110 400 = = NFP 42149 2110 401 = = SYM 42149 2110 402 + + SYM 42149 2110 403 = = SYM 42149 2110 404 = = SYM 42149 2110 405 = = SYM 42149 2110 406 = = SYM 42149 2110 407 = = SYM 42149 2110 408 = = SYM 42149 2110 409 = = NFP 42149 2110 410 = = SYM 42149 2110 411 + + SYM 42149 2110 412 = = SYM 42149 2110 413 = = SYM 42149 2110 414 = = SYM 42149 2110 415 = = SYM 42149 2110 416 = = SYM 42149 2110 417 = = NFP 42149 2110 418 = = SYM 42149 2110 419 + + SYM 42149 2110 420 = = SYM 42149 2110 421 = = SYM 42149 2110 422 = = SYM 42149 2110 423 = = NFP 42149 2110 424 = = SYM 42149 2110 425 + + SYM 42149 2110 426 = = SYM 42149 2110 427 = = SYM 42149 2110 428 = = NFP 42149 2110 429 = = SYM 42149 2110 430 + + SYM 42149 2110 431 = = SYM 42149 2110 432 = = SYM 42149 2110 433 = = SYM 42149 2110 434 = = NFP 42149 2110 435 = = SYM 42149 2110 436 + + SYM 42149 2110 437 = = SYM 42149 2110 438 = = SYM 42149 2110 439 = = SYM 42149 2110 440 = = SYM 42149 2110 441 = = SYM 42149 2110 442 = = SYM 42149 2110 443 = = SYM 42149 2110 444 = = SYM 42149 2110 445 = = SYM 42149 2110 446 = = SYM 42149 2110 447 = = SYM 42149 2110 448 = = SYM 42149 2110 449 = = SYM 42149 2110 450 = = SYM 42149 2110 451 = = SYM 42149 2110 452 = = SYM 42149 2110 453 = = NFP 42149 2110 454 = = SYM 42149 2110 455 + + SYM 42149 2110 456 = = SYM 42149 2110 457 = = SYM 42149 2110 458 = = SYM 42149 2110 459 = = SYM 42149 2110 460 = = SYM 42149 2110 461 = = NFP 42149 2110 462 =| =| NNP 42149 2110 463 W W NNP 42149 2110 464 | | NNP 42149 2110 465 | | NNP 42149 2110 466 | | CD 42149 2110 467 | | CD 42149 2110 468 UNAVOIDABLE UNAVOIDABLE NNP 42149 2110 469 DELAYS DELAYS NNP 42149 2110 470 | | NNP 42149 2110 471 e e NNP 42149 2110 472 | | CD 42149 2110 473 | | CD 42149 2110 474 | | NNP 42149 2110 475 AVERAGE AVERAGE NNP 42149 2110 476 TIME time NN 42149 2110 477 | | NNS 42149 2110 478 ( ( -LRB- 42149 2110 479 NOT not RB 42149 2110 480 INCLUDED include VBN 42149 2110 481 IN in IN 42149 2110 482 AVERAGE AVERAGE NNP 42149 2110 483 | | NNS 42149 2110 484 i i PRP 42149 2110 485 o| o| VBP 42149 2110 486 | | CD 42149 2110 487 | | NNS 42149 2110 488 PER per NN 42149 2110 489 RING ring NN 42149 2110 490 . . . 42149 2111 1 | | JJ 42149 2111 2 TIME TIME NNP 42149 2111 3 PER per IN 42149 2111 4 RING ring NN 42149 2111 5 ) ) -RRB- 42149 2111 6 . . . 42149 2112 1 | | NNP 42149 2112 2 g g NNP 42149 2112 3 f| f| NN 42149 2112 4 | | NNP 42149 2112 5 |-------+-----+----+-----+------------------+-------| |-------+-----+----+-----+------------------+-------| NNP 42149 2112 6 h h NNP 42149 2112 7 |Average |average NN 42149 2112 8 | | NNP 42149 2112 9 Time Time NNP 42149 2112 10 | | NNP 42149 2112 11 | | NNP 42149 2112 12 | | CD 42149 2112 13 | | CD 42149 2112 14 | | CD 42149 2112 15 | | CD 42149 2112 16 | | CD 42149 2112 17 t t NN 42149 2112 18 i| i| JJ 42149 2112 19 No no NN 42149 2112 20 . . . 42149 2113 1 of of IN 42149 2113 2 |mucking,|Shoving| |mucking,|shoving| CD 42149 2113 3 | | NNP 42149 2113 4 | | CD 42149 2113 5 | | CD 42149 2113 6 | | CD 42149 2113 7 | | CD 42149 2113 8 r| r| NN 42149 2113 9 cubic cubic JJ 42149 2113 10 | | CD 42149 2113 11 per per IN 42149 2113 12 | | NNP 42149 2113 13 and and CC 42149 2113 14 |Erec-| |Erec-| NNP 42149 2113 15 | | NNP 42149 2113 16 | | NNP 42149 2113 17 | | CD 42149 2113 18 | | CD 42149 2113 19 o| o| NN 42149 2113 20 yards yard NNS 42149 2113 21 | | CD 42149 2113 22 cubic cubic JJ 42149 2113 23 |mucking|tion |mucking|tion NNP 42149 2113 24 |Lost| |Lost| NNP 42149 2113 25 | | NNP 42149 2113 26 | | NNP 42149 2113 27 Time Time NNP 42149 2113 28 | | NNP 42149 2113 29 n|per n|per NN 42149 2113 30 ring| ring| CD 42149 2113 31 yard yard NN 42149 2113 32 | | NNP 42149 2113 33 [ [ -LRB- 42149 2113 34 T T NNP 42149 2113 35 ] ] -RRB- 42149 2113 36 | | CD 42149 2113 37 [ [ -LRB- 42149 2113 38 U u NN 42149 2113 39 ] ] -RRB- 42149 2113 40 |time|Total|Items |time|total|items NN 42149 2113 41 |hrs |hrs VB 42149 2113 42 min| min| NN 42149 2113 43 ---+--------+--------+-------+-----+----+-----+------------------+-------| ---+--------+--------+-------+-----+----+-----+------------------+-------| : 42149 2113 44 O o NN 42149 2113 45 { { -LRB- 42149 2113 46 | | CD 42149 2113 47 41 41 CD 42149 2113 48 | | CD 42149 2113 49 0 0 CD 42149 2113 50 - - HYPH 42149 2113 51 14 14 CD 42149 2113 52 | | CD 42149 2113 53 9 9 CD 42149 2113 54 - - HYPH 42149 2113 55 53 53 CD 42149 2113 56 | | CD 42149 2113 57 5 5 CD 42149 2113 58 - - HYPH 42149 2113 59 07| 07| CD 42149 2113 60 |15 |15 CD 42149 2113 61 - - HYPH 42149 2113 62 00|First 00|first CD 42149 2113 63 bulkhead bulkhead NN 42149 2113 64 |160 |160 CD 42149 2113 65 00| 00| CD 42149 2113 66 r r NN 42149 2113 67 { { -LRB- 42149 2113 68 | | CD 42149 2113 69 54 54 CD 42149 2113 70 | | CD 42149 2113 71 0 0 CD 42149 2113 72 - - HYPH 42149 2113 73 19 19 CD 42149 2113 74 | | CD 42149 2113 75 17 17 CD 42149 2113 76 - - HYPH 42149 2113 77 20 20 CD 42149 2113 78 | | CD 42149 2113 79 2 2 CD 42149 2113 80 - - HYPH 42149 2113 81 26|0 26|0 CD 42149 2113 82 - - HYPH 42149 2113 83 05|19 05|19 CD 42149 2113 84 - - HYPH 42149 2113 85 51|Second 51|Second NNP 42149 2113 86 bulkhead bulkhead NN 42149 2113 87 |157 |157 NN 42149 2113 88 45| 45| CD 42149 2113 89 d d NN 42149 2113 90 { { -LRB- 42149 2113 91 | | NNP 42149 2113 92 37 37 CD 42149 2113 93 | | CD 42149 2113 94 0 0 CD 42149 2113 95 - - HYPH 42149 2113 96 09 09 CD 42149 2113 97 | | CD 42149 2113 98 5 5 CD 42149 2113 99 - - HYPH 42149 2113 100 39 39 CD 42149 2113 101 | | CD 42149 2113 102 2 2 CD 42149 2113 103 - - HYPH 42149 2113 104 47|0 47|0 CD 42149 2113 105 - - HYPH 42149 2113 106 63| 63| CD 42149 2113 107 9 9 CD 42149 2113 108 - - HYPH 42149 2113 109 29|Grouting 29|grouting CD 42149 2113 110 |200 |200 CD 42149 2113 111 00| 00| CD 42149 2113 112 i i PRP 42149 2113 113 { { -LRB- 42149 2113 114 | | CD 42149 2113 115 | | NNP 42149 2113 116 | | CD 42149 2113 117 | | CD 42149 2113 118 | | CD 42149 2113 119 | | CD 42149 2113 120 | | CD 42149 2113 121 | | CD 42149 2113 122 | | CD 42149 2113 123 n n CC 42149 2113 124 { { -LRB- 42149 2113 125 | | CD 42149 2113 126 40 40 CD 42149 2113 127 | | CD 42149 2113 128 0 0 CD 42149 2113 129 - - HYPH 42149 2113 130 17 17 CD 42149 2113 131 | | CD 42149 2113 132 12 12 CD 42149 2113 133 - - SYM 42149 2113 134 42 42 CD 42149 2113 135 | | CD 42149 2113 136 3 3 CD 42149 2113 137 - - HYPH 42149 2113 138 27|0 27|0 CD 42149 2113 139 - - HYPH 42149 2113 140 38|16 38|16 CD 42149 2113 141 - - HYPH 42149 2113 142 47|Blowout 47|blowout CD 42149 2113 143 | | CD 42149 2113 144 69 69 CD 42149 2113 145 45| 45| CD 42149 2113 146 a a DT 42149 2113 147 { { -LRB- 42149 2113 148 | | NNP 42149 2113 149 | | CD 42149 2113 150 | | CD 42149 2113 151 | | CD 42149 2113 152 | | CD 42149 2113 153 | | CD 42149 2113 154 | | CD 42149 2113 155 | | CD 42149 2113 156 | | CD 42149 2113 157 r r NN 42149 2113 158 { { -LRB- 42149 2113 159 | | CD 42149 2113 160 24 24 CD 42149 2113 161 | | CD 42149 2113 162 0 0 CD 42149 2113 163 - - HYPH 42149 2113 164 05 05 CD 42149 2113 165 | | CD 42149 2113 166 1 1 CD 42149 2113 167 - - HYPH 42149 2113 168 58 58 CD 42149 2113 169 | | CD 42149 2113 170 2 2 CD 42149 2113 171 - - HYPH 42149 2113 172 29|0 29|0 CD 42149 2113 173 - - SYM 42149 2113 174 22| 22| CD 42149 2113 175 4 4 CD 42149 2113 176 - - HYPH 42149 2113 177 49|Waiting 49|waiting CD 42149 2113 178 - - HYPH 42149 2113 179 heavy heavy JJ 42149 2113 180 iron| iron| $ 42149 2113 181 64 64 CD 42149 2113 182 00| 00| CD 42149 2113 183 y y NNP 42149 2113 184 { { -LRB- 42149 2113 185 |--------+--------+-------+-----+----+-----+------------------+-------| |--------+--------+-------+-----+----+-----+------------------+-------| NNP 42149 2113 186 { { -LRB- 42149 2113 187 | | NNP 42149 2113 188 30 30 CD 42149 2113 189 | | CD 42149 2113 190 0 0 CD 42149 2113 191 - - HYPH 42149 2113 192 07 07 CD 42149 2113 193 | | CD 42149 2113 194 3 3 CD 42149 2113 195 - - HYPH 42149 2113 196 27 27 CD 42149 2113 197 | | CD 42149 2113 198 2 2 CD 42149 2113 199 - - HYPH 42149 2113 200 42|0 42|0 CD 42149 2113 201 - - CD 42149 2113 202 18| 18| CD 42149 2113 203 6 6 CD 42149 2113 204 - - HYPH 42149 2113 205 27|Total 27|total CD 42149 2113 206 |715 |715 CD 42149 2113 207 30| 30| CD 42149 2113 208 { { -LRB- 42149 2113 209 |--------+--------+-------+-----+----+-----+------------------+-------| |--------+--------+-------+-----+----+-----+------------------+-------| NNP 42149 2113 210 { { -LRB- 42149 2113 211 | | CD 42149 2113 212 36 36 CD 42149 2113 213 | | CD 42149 2113 214 0 0 CD 42149 2113 215 - - HYPH 42149 2113 216 11 11 CD 42149 2113 217 | | CD 42149 2113 218 6 6 CD 42149 2113 219 - - HYPH 42149 2113 220 40 40 CD 42149 2113 221 | | CD 42149 2113 222 2 2 CD 42149 2113 223 - - HYPH 42149 2113 224 52|0 52|0 CD 42149 2113 225 - - HYPH 42149 2113 226 15| 15| CD 42149 2113 227 9 9 CD 42149 2113 228 - - SYM 42149 2113 229 47|Per 47|per CD 42149 2113 230 ring ring NN 42149 2113 231 | | CD 42149 2113 232 0 0 CD 42149 2113 233 39| 39| CD 42149 2113 234 ---+--------+--------+-------+-----+----+-----+------------------+-------| ---+--------+--------+-------+-----+----+-----+------------------+-------| : 42149 2113 235 Hvy| Hvy| NNS 42149 2113 236 18 18 CD 42149 2113 237 | | CD 42149 2113 238 0 0 CD 42149 2113 239 - - HYPH 42149 2113 240 05 05 CD 42149 2113 241 | | CD 42149 2113 242 1 1 CD 42149 2113 243 - - HYPH 42149 2113 244 29 29 CD 42149 2113 245 | | CD 42149 2113 246 1 1 CD 42149 2113 247 - - HYPH 42149 2113 248 45|0 45|0 CD 42149 2113 249 - - HYPH 42149 2113 250 06| 06| CD 42149 2113 251 3 3 CD 42149 2113 252 - - SYM 42149 2113 253 19| 19| CD 42149 2113 254 | | CD 42149 2113 255 | | NNS 42149 2113 256 ---+--------+--------+-------+-----+----+-----+------------------+-------| ---+--------+--------+-------+-----+----+-----+------------------+-------| : 42149 2113 257 All| All| NNP 42149 2113 258 29 29 CD 42149 2113 259 | | CD 42149 2113 260 0 0 CD 42149 2113 261 - - HYPH 42149 2113 262 09 09 CD 42149 2113 263 | | CD 42149 2113 264 4 4 CD 42149 2113 265 - - SYM 42149 2113 266 36 36 CD 42149 2113 267 | | CD 42149 2113 268 2 2 CD 42149 2113 269 - - HYPH 42149 2113 270 25|0 25|0 CD 42149 2113 271 - - HYPH 42149 2113 272 14| 14| CD 42149 2113 273 7 7 CD 42149 2113 274 - - SYM 42149 2113 275 15| 15| CD 42149 2113 276 | | CD 42149 2113 277 | | NNS 42149 2113 278 = = SYM 42149 2113 279 = = SYM 42149 2113 280 = = SYM 42149 2113 281 + + SYM 42149 2113 282 = = SYM 42149 2113 283 = = SYM 42149 2113 284 = = SYM 42149 2113 285 = = SYM 42149 2113 286 = = SYM 42149 2113 287 = = SYM 42149 2113 288 = = NFP 42149 2113 289 = = SYM 42149 2113 290 + + SYM 42149 2113 291 = = SYM 42149 2113 292 = = SYM 42149 2113 293 = = SYM 42149 2113 294 = = SYM 42149 2113 295 = = SYM 42149 2113 296 = = SYM 42149 2113 297 = = NFP 42149 2113 298 = = SYM 42149 2113 299 + + SYM 42149 2113 300 = = SYM 42149 2113 301 = = SYM 42149 2113 302 = = SYM 42149 2113 303 = = SYM 42149 2113 304 = = SYM 42149 2113 305 = = NFP 42149 2113 306 = = SYM 42149 2113 307 + + SYM 42149 2113 308 = = SYM 42149 2113 309 = = SYM 42149 2113 310 = = SYM 42149 2113 311 = = NFP 42149 2113 312 = = SYM 42149 2113 313 + + SYM 42149 2113 314 = = SYM 42149 2113 315 = = SYM 42149 2113 316 = = NFP 42149 2113 317 = = SYM 42149 2113 318 + + SYM 42149 2113 319 = = SYM 42149 2113 320 = = SYM 42149 2113 321 = = SYM 42149 2113 322 = = NFP 42149 2113 323 = = SYM 42149 2113 324 + + SYM 42149 2113 325 = = SYM 42149 2113 326 = = SYM 42149 2113 327 = = SYM 42149 2113 328 = = SYM 42149 2113 329 = = SYM 42149 2113 330 = = SYM 42149 2113 331 = = SYM 42149 2113 332 = = SYM 42149 2113 333 = = SYM 42149 2113 334 = = SYM 42149 2113 335 = = SYM 42149 2113 336 = = SYM 42149 2113 337 = = SYM 42149 2113 338 = = SYM 42149 2113 339 = = SYM 42149 2113 340 = = SYM 42149 2113 341 = = NFP 42149 2113 342 = = SYM 42149 2113 343 + + SYM 42149 2113 344 = = SYM 42149 2113 345 = = SYM 42149 2113 346 = = SYM 42149 2113 347 = = SYM 42149 2113 348 = = SYM 42149 2113 349 = = SYM 42149 2113 350 =| =| ADD 42149 2113 351 [ [ -LRB- 42149 2113 352 R r NN 42149 2113 353 ] ] -RRB- 42149 2113 354 Excavating excavating NN 42149 2113 355 ahead ahead RB 42149 2113 356 of of IN 42149 2113 357 shield shield NN 42149 2113 358 . . . 42149 2114 1 [ [ -LRB- 42149 2114 2 S S NNP 42149 2114 3 ] ] -RRB- 42149 2114 4 Shoving shove VBG 42149 2114 5 shield shield NN 42149 2114 6 into into IN 42149 2114 7 silt silt NN 42149 2114 8 with with IN 42149 2114 9 ... ... : 42149 2114 10 doors door NNS 42149 2114 11 open open JJ 42149 2114 12 . . . 42149 2115 1 [ [ -LRB- 42149 2115 2 T t NN 42149 2115 3 ] ] -RRB- 42149 2115 4 Including include VBG 42149 2115 5 time time NN 42149 2115 6 for for IN 42149 2115 7 jacks jack NNS 42149 2115 8 . . . 42149 2116 1 [ [ -LRB- 42149 2116 2 U u NN 42149 2116 3 ] ] -RRB- 42149 2116 4 Including include VBG 42149 2116 5 bolting bolting NN 42149 2116 6 time time NN 42149 2116 7 . . . 42149 2117 1 TABLE TABLE NNP 42149 2117 2 26.--SHIELD 26.--shield CD 42149 2117 3 - - HYPH 42149 2117 4 DRIVEN drive VBN 42149 2117 5 TUNNEL TUNNEL NNP 42149 2117 6 WORK work NN 42149 2117 7 , , , 42149 2117 8 WEEHAWKEN WEEHAWKEN NNP 42149 2117 9 SHAFT SHAFT NNP 42149 2117 10 , , , 42149 2117 11 RIVER RIVER NNP 42149 2117 12 TUNNEL TUNNEL NNP 42149 2117 13 NORTH NORTH NNP 42149 2117 14 . . . 42149 2118 1 Table table NN 42149 2118 2 showing show VBG 42149 2118 3 the the DT 42149 2118 4 size size NN 42149 2118 5 of of IN 42149 2118 6 the the DT 42149 2118 7 gang gang NN 42149 2118 8 , , , 42149 2118 9 the the DT 42149 2118 10 amount amount NN 42149 2118 11 of of IN 42149 2118 12 excavation excavation NN 42149 2118 13 , , , 42149 2118 14 and and CC 42149 2118 15 the the DT 42149 2118 16 time time NN 42149 2118 17 per per IN 42149 2118 18 ring ring NN 42149 2118 19 taken take VBN 42149 2118 20 for for IN 42149 2118 21 the the DT 42149 2118 22 various various JJ 42149 2118 23 operations operation NNS 42149 2118 24 involved involve VBN 42149 2118 25 in in IN 42149 2118 26 building build VBG 42149 2118 27 tunnel tunnel NN 42149 2118 28 through through IN 42149 2118 29 the the DT 42149 2118 30 several several JJ 42149 2118 31 kinds kind NNS 42149 2118 32 of of IN 42149 2118 33 ground ground NN 42149 2118 34 encountered encounter VBN 42149 2118 35 ; ; : 42149 2118 36 also also RB 42149 2118 37 the the DT 42149 2118 38 extent extent NN 42149 2118 39 and and CC 42149 2118 40 nature nature NN 42149 2118 41 of of IN 42149 2118 42 all all PDT 42149 2118 43 the the DT 42149 2118 44 unavoidable unavoidable JJ 42149 2118 45 delays delay NNS 42149 2118 46 . . . 42149 2119 1 TABLE TABLE NNP 42149 2119 2 26 26 CD 42149 2119 3 PART part CD 42149 2119 4 1 1 CD 42149 2119 5 = = SYM 42149 2119 6 + + SYM 42149 2119 7 = = SYM 42149 2119 8 = = SYM 42149 2119 9 = = SYM 42149 2119 10 = = SYM 42149 2119 11 = = SYM 42149 2119 12 = = SYM 42149 2119 13 = = SYM 42149 2119 14 = = SYM 42149 2119 15 = = SYM 42149 2119 16 = = NFP 42149 2119 17 = = SYM 42149 2119 18 + + SYM 42149 2119 19 = = SYM 42149 2119 20 = = SYM 42149 2119 21 = = SYM 42149 2119 22 = = SYM 42149 2119 23 = = SYM 42149 2119 24 = = NFP 42149 2119 25 = = SYM 42149 2119 26 + + SYM 42149 2119 27 = = SYM 42149 2119 28 = = SYM 42149 2119 29 = = SYM 42149 2119 30 = = SYM 42149 2119 31 = = SYM 42149 2119 32 = = SYM 42149 2119 33 = = SYM 42149 2119 34 = = SYM 42149 2119 35 = = SYM 42149 2119 36 = = SYM 42149 2119 37 = = SYM 42149 2119 38 = = SYM 42149 2119 39 = = SYM 42149 2119 40 = = SYM 42149 2119 41 = = SYM 42149 2119 42 = = NFP 42149 2119 43 = = SYM 42149 2119 44 + + SYM 42149 2119 45 = = SYM 42149 2119 46 = = SYM 42149 2119 47 = = SYM 42149 2119 48 + + SYM 42149 2119 49 = = SYM 42149 2119 50 = = SYM 42149 2119 51 = = SYM 42149 2119 52 = = SYM 42149 2119 53 = = SYM 42149 2119 54 = = SYM 42149 2119 55 = = SYM 42149 2119 56 = = SYM 42149 2119 57 = = SYM 42149 2119 58 = = SYM 42149 2119 59 = = NFP 42149 2119 60 = = SYM 42149 2119 61 + + SYM 42149 2119 62 = = SYM 42149 2119 63 = = SYM 42149 2119 64 + + SYM 42149 2119 65 = = SYM 42149 2119 66 = = SYM 42149 2119 67 = = SYM 42149 2119 68 + + SYM 42149 2119 69 = = SYM 42149 2119 70 = = SYM 42149 2119 71 = = SYM 42149 2119 72 + + SYM 42149 2119 73 = = SYM 42149 2119 74 = = SYM 42149 2119 75 + + SYM 42149 2119 76 = = SYM 42149 2119 77 =| =| ADD 42149 2119 78 W| W| NNP 42149 2119 79 | | NNP 42149 2119 80 | | NNP 42149 2119 81 AVE AVE NNP 42149 2119 82 . . . 42149 2119 83 NO no UH 42149 2119 84 . . . 42149 2120 1 | | NNP 42149 2120 2 e| e| NNP 42149 2120 3 | | HYPH 42149 2120 4 | | NNP 42149 2120 5 OF OF NNP 42149 2120 6 MEN MEN NNP 42149 2120 7 | | NNP 42149 2120 8 i| i| JJ 42149 2120 9 | | NNP 42149 2120 10 DESCRIPTION description NN 42149 2120 11 | | CD 42149 2120 12 IN IN NNP 42149 2120 13 GANG GANG NNP 42149 2120 14 | | HYPH 42149 2120 15 g| g| NN 42149 2120 16 |-------+- |-------+- NNP 42149 2120 17 ------------- ------------- NFP 42149 2120 18 + + NFP 42149 2120 19 ---+------------+--+---+---+--+--| ---+------------+--+---+---+--+--| NNP 42149 2120 20 h| h| NNP 42149 2120 21 | | NNP 42149 2120 22 | | NNP 42149 2120 23 |Ave| |Ave| NNP 42149 2120 24 | | CD 42149 2120 25 | | CD 42149 2120 26 | | CD 42149 2120 27 |A |a CD 42149 2120 28 | | CD 42149 2120 29 | | CD 42149 2120 30 t| t| JJ 42149 2120 31 | | CD 42149 2120 32 | | NNP 42149 2120 33 |air| |air| NNP 42149 2120 34 | | CD 42149 2120 35 |D |d CD 42149 2120 36 |G |g CD 42149 2120 37 |i |i NNP 42149 2120 38 | | NNP 42149 2120 39 | | NNP 42149 2120 40 | | CD 42149 2120 41 | | CD 42149 2120 42 | | CD 42149 2120 43 | | CD 42149 2120 44 | | CD 42149 2120 45 | | NNP 42149 2120 46 |r |r NNP 42149 2120 47 |r |r NNP 42149 2120 48 |r |r NNP 42149 2120 49 | | NNP 42149 2120 50 | | NNP 42149 2120 51 o| o| NNP 42149 2120 52 | | CD 42149 2120 53 | | CD 42149 2120 54 |P |p CD 42149 2120 55 | | CD 42149 2120 56 |S |s CD 42149 2120 57 |i |i NNP 42149 2120 58 |o |o NNP 42149 2120 59 | | NNP 42149 2120 60 | | NNP 42149 2120 61 | | CD 42149 2120 62 f| f| NN 42149 2120 63 | | CD 42149 2120 64 | | NNP 42149 2120 65 |r |r NNP 42149 2120 66 | | NNP 42149 2120 67 |h |h NNP 42149 2120 68 |l |l NNP 42149 2120 69 |u |u NN 42149 2120 70 |t |t NNP 42149 2120 71 |T |t CD 42149 2120 72 | | CD 42149 2120 73 | | CD 42149 2120 74 | | NNP 42149 2120 75 | | NNP 42149 2120 76 |e |e NNP 42149 2120 77 | | NNP 42149 2120 78 |i |i NNP 42149 2120 79 |l |l NNP 42149 2120 80 |t |t JJ 42149 2120 81 |r |r NNP 42149 2120 82 |o |o NNP 42149 2120 83 | | NNP 42149 2120 84 | | NNP 42149 2120 85 | | NNP 42149 2120 86 | | NNP 42149 2120 87 |s |s NNP 42149 2120 88 | | NNP 42149 2120 89 |e |e NNP 42149 2120 90 |i |i NNP 42149 2120 91 |i |i NNP 42149 2120 92 |a |a NNP 42149 2120 93 |t |t NNP 42149 2120 94 | | CD 42149 2120 95 i| i| JJ 42149 2120 96 | | NNP 42149 2120 97 | | NNP 42149 2120 98 |s |s NNP 42149 2120 99 | | NNP 42149 2120 100 |l |l NNP 42149 2120 101 |n |n NNP 42149 2120 102 |n |n NNP 42149 2120 103 |n |n NNP 42149 2120 104 |l |l NNP 42149 2120 105 | | NNP 42149 2120 106 r| r| NNP 42149 2120 107 Section Section NNP 42149 2120 108 | | NNP 42149 2120 109 | | NNP 42149 2120 110 |u |u JJ 42149 2120 111 | | NNP 42149 2120 112 |d |d NNP 42149 2120 113 |g |g NNP 42149 2120 114 |g |g NNP 42149 2120 115 |s |s NNP 42149 2120 116 |e |e NNP 42149 2120 117 | | NNP 42149 2120 118 o| o| NNP 42149 2120 119 between between IN 42149 2120 120 | | NNP 42149 2120 121 Length| Length| NNP 42149 2120 122 |r |r NN 42149 2120 123 |Method |Method NNS 42149 2120 124 of of IN 42149 2120 125 |--+---+---+--+--| |--+---+---+--+--| NNP 42149 2120 126 n| n| NN 42149 2120 127 rings ring NNS 42149 2120 128 |in |in CD 42149 2120 129 feet|Material feet|Material NNP 42149 2120 130 |e |e NNS 42149 2120 131 |Excavation |excavation CD 42149 2120 132 |A |a CD 42149 2120 133 |B |b CD 42149 2120 134 |C |c CD 42149 2120 135 |D |d CD 42149 2120 136 | | CD 42149 2120 137 | | CD 42149 2120 138 -+-----------+-------+-----------------+---+------------+--+---+---+--+--| -+-----------+-------+-----------------+---+------------+--+---+---+--+--| CD 42149 2120 139 | | NNP 42149 2120 140 1 1 CD 42149 2120 141 - - HYPH 42149 2120 142 24 24 CD 42149 2120 143 | | CD 42149 2120 144 60.0|Rock 60.0|rock CD 42149 2120 145 | | CD 42149 2120 146 0 0 CD 42149 2120 147 |[X |[X NNP 42149 2120 148 ] ] -RRB- 42149 2120 149 | | CD 42149 2120 150 9|.04| 9|.04| CD 42149 2120 151 0 0 CD 42149 2120 152 | | CD 42149 2120 153 0|10| 0|10| CD 42149 2120 154 | | CD 42149 2120 155 25 25 CD 42149 2120 156 - - HYPH 42149 2120 157 55 55 CD 42149 2120 158 | | CD 42149 2120 159 77.5| 77.5| CD 42149 2120 160 " " `` 42149 2120 161 |20 |20 CD 42149 2120 162 |[X |[x CD 42149 2120 163 ] ] -RRB- 42149 2120 164 |14|5 |14|5 NNP 42149 2120 165 |0.5| |0.5| NNP 42149 2120 166 1|21| 1|21| CD 42149 2120 167 | | CD 42149 2120 168 56 56 CD 42149 2120 169 - - HYPH 42149 2120 170 72 72 CD 42149 2120 171 | | CD 42149 2120 172 42.5|Mixed 42.5|mixed CD 42149 2120 173 sand sand NN 42149 2120 174 and and CC 42149 2120 175 |10 |10 CD 42149 2120 176 |[X]Breasting|22|2 |[x]breasting|22|2 CD 42149 2120 177 |.09| |.09| NNP 42149 2120 178 2|26| 2|26| CD 42149 2120 179 O| o| CD 42149 2120 180 | | CD 42149 2120 181 |rock |rock CD 42149 2120 182 | | CD 42149 2120 183 | | CD 42149 2120 184 | | CD 42149 2120 185 | | CD 42149 2120 186 | | CD 42149 2120 187 | | CD 42149 2120 188 | | CD 42149 2120 189 | | CD 42149 2120 190 r| r| NN 42149 2120 191 73 73 CD 42149 2120 192 - - SYM 42149 2120 193 165 165 CD 42149 2120 194 | | CD 42149 2120 195 232.5|Sand 232.5|sand CD 42149 2120 196 and and CC 42149 2120 197 gravel gravel NN 42149 2120 198 |10 |10 NN 42149 2120 199 |[X |[x CD 42149 2120 200 ] ] -RRB- 42149 2120 201 " " `` 42149 2120 202 |22|0 |22|0 NNP 42149 2120 203 |0.1| |0.1| NNP 42149 2120 204 2|24| 2|24| CD 42149 2120 205 d| d| NN 42149 2120 206 166 166 CD 42149 2120 207 - - SYM 42149 2120 208 184 184 CD 42149 2120 209 | | CD 42149 2120 210 47.5|Sand 47.5|sand CD 42149 2120 211 and and CC 42149 2120 212 silt silt NN 42149 2120 213 |20{|[X]Breasting|22|0 |20{|[X]Breasting|22|0 NNP 42149 2120 214 |.38| |.38| NN 42149 2120 215 3|25| 3|25| NNP 42149 2120 216 i| i| NN 42149 2120 217 | | CD 42149 2120 218 |with |with CD 42149 2120 219 piles pile NNS 42149 2120 220 | | CD 42149 2120 221 { { -LRB- 42149 2120 222 |and |and NNP 42149 2120 223 cutting}| cutting}| NNP 42149 2120 224 | | NNP 42149 2120 225 | | NNP 42149 2120 226 | | CD 42149 2120 227 | | CD 42149 2120 228 | | CD 42149 2120 229 n| n| NN 42149 2120 230 185 185 CD 42149 2120 231 - - SYM 42149 2120 232 253 253 CD 42149 2120 233 | | CD 42149 2120 234 172.5|Silt 172.5|silt CD 42149 2120 235 and and CC 42149 2120 236 piles pile NNS 42149 2120 237 |24{|piles |24{|pile NNS 42149 2120 238 } } -RRB- 42149 2120 239 |23|0 |23|0 NNP 42149 2120 240 |.71| |.71| NNP 42149 2120 241 3|26| 3|26| CD 42149 2120 242 a| a| IN 42149 2120 243 254 254 CD 42149 2120 244 - - SYM 42149 2120 245 293 293 CD 42149 2120 246 | | CD 42149 2120 247 100.0|Silt 100.0|silt CD 42149 2120 248 |26 |26 CD 42149 2120 249 |[Y]8 |[Y]8 NNP 42149 2120 250 doors door NNS 42149 2120 251 |22|0 |22|0 NNP 42149 2120 252 | | NNP 42149 2120 253 0 0 CD 42149 2120 254 | | CD 42149 2120 255 3|25| 3|25| CD 42149 2120 256 r| r| NN 42149 2120 257 294 294 CD 42149 2120 258 - - SYM 42149 2120 259 301 301 CD 42149 2120 260 | | CD 42149 2120 261 20.0| 20.0| CD 42149 2120 262 " " `` 42149 2120 263 |27 |27 CD 42149 2120 264 | | NNP 42149 2120 265 |19|0 |19|0 NNP 42149 2120 266 | | NNP 42149 2120 267 0 0 CD 42149 2120 268 | | CD 42149 2120 269 2|21| 2|21| CD 42149 2120 270 y| y| NNS 42149 2120 271 302 302 CD 42149 2120 272 - - HYPH 42149 2120 273 307 307 CD 42149 2120 274 | | CD 42149 2120 275 15.0| 15.0| CD 42149 2120 276 " " '' 42149 2120 277 |27 |27 CD 42149 2120 278 |[Y]8 |[Y]8 NNP 42149 2120 279 doors door NNS 42149 2120 280 |21|0 |21|0 NNP 42149 2120 281 | | CD 42149 2120 282 0 0 CD 42149 2120 283 | | CD 42149 2120 284 2|23| 2|23| CD 42149 2120 285 | | CD 42149 2120 286 308 308 CD 42149 2120 287 - - HYPH 42149 2120 288 342 342 CD 42149 2120 289 | | CD 42149 2120 290 87.5| 87.5| CD 42149 2120 291 " " '' 42149 2120 292 |28 |28 NNP 42149 2120 293 | | NNP 42149 2120 294 |19|0 |19|0 NNP 42149 2120 295 | | NNP 42149 2120 296 0 0 CD 42149 2120 297 | | CD 42149 2120 298 2|21| 2|21| CD 42149 2120 299 | | CD 42149 2120 300 343 343 CD 42149 2120 301 - - HYPH 42149 2120 302 347 347 CD 42149 2120 303 | | CD 42149 2120 304 12.5| 12.5| CD 42149 2120 305 " " '' 42149 2120 306 |28 |28 NNP 42149 2120 307 |[Y]8 |[Y]8 NNP 42149 2120 308 doors door NNS 42149 2120 309 |15|0 |15|0 NNP 42149 2120 310 | | NNP 42149 2120 311 0 0 CD 42149 2120 312 | | NNP 42149 2120 313 2|17| 2|17| CD 42149 2120 314 | | CD 42149 2120 315 348 348 CD 42149 2120 316 - - HYPH 42149 2120 317 459 459 CD 42149 2120 318 | | CD 42149 2120 319 280.0| 280.0| CD 42149 2120 320 " " '' 42149 2120 321 |28 |28 NNP 42149 2120 322 | | NNP 42149 2120 323 |20|0 |20|0 NNP 42149 2120 324 | | NNP 42149 2120 325 0 0 CD 42149 2120 326 | | NNP 42149 2120 327 3|28| 3|28| CD 42149 2120 328 | | CD 42149 2120 329 460 460 CD 42149 2120 330 - - HYPH 42149 2120 331 494 494 CD 42149 2120 332 | | CD 42149 2120 333 87.5| 87.5| CD 42149 2120 334 " " '' 42149 2120 335 |28 |28 NNP 42149 2120 336 |[Y]8 |[Y]8 NNP 42149 2120 337 doors door NNS 42149 2120 338 |21|0 |21|0 NNP 42149 2120 339 | | CD 42149 2120 340 0 0 CD 42149 2120 341 | | NNP 42149 2120 342 3|24| 3|24| CD 42149 2120 343 | | CD 42149 2120 344 495 495 CD 42149 2120 345 - - HYPH 42149 2120 346 513 513 CD 42149 2120 347 | | CD 42149 2120 348 47.5| 47.5| CD 42149 2120 349 " " '' 42149 2120 350 |28 |28 NNP 42149 2120 351 | | CD 42149 2120 352 8 8 CD 42149 2120 353 " " '' 42149 2120 354 |23|0 |23|0 NNP 42149 2120 355 | | NNP 42149 2120 356 0 0 CD 42149 2120 357 | | CD 42149 2120 358 4|27| 4|27| CD 42149 2120 359 | | CD 42149 2120 360 514 514 CD 42149 2120 361 - - HYPH 42149 2120 362 605 605 CD 42149 2120 363 | | CD 42149 2120 364 230.0| 230.0| CD 42149 2120 365 " " '' 42149 2120 366 |28 |28 CD 42149 2120 367 | | CD 42149 2120 368 8 8 CD 42149 2120 369 " " '' 42149 2120 370 |25|0 |25|0 NNP 42149 2120 371 | | NNP 42149 2120 372 0 0 CD 42149 2120 373 | | NNP 42149 2120 374 4|29| 4|29| CD 42149 2120 375 | | CD 42149 2120 376 606 606 CD 42149 2120 377 - - HYPH 42149 2120 378 624 624 CD 42149 2120 379 | | CD 42149 2120 380 47.5| 47.5| CD 42149 2120 381 " " '' 42149 2120 382 |28 |28 NNP 42149 2120 383 | | CD 42149 2120 384 8 8 CD 42149 2120 385 " " '' 42149 2120 386 |24|0 |24|0 NNP 42149 2120 387 | | NNP 42149 2120 388 0 0 CD 42149 2120 389 | | NNP 42149 2120 390 4|28| 4|28| CD 42149 2120 391 | | CD 42149 2120 392 625 625 CD 42149 2120 393 - - SYM 42149 2120 394 640 640 CD 42149 2120 395 | | CD 42149 2120 396 40.0| 40.0| CD 42149 2120 397 " " '' 42149 2120 398 |28 |28 CD 42149 2120 399 | | CD 42149 2120 400 8 8 CD 42149 2120 401 " " '' 42149 2120 402 |38|0 |38|0 NNP 42149 2120 403 | | NNP 42149 2120 404 0 0 CD 42149 2120 405 | | NNP 42149 2120 406 5|43| 5|43| CD 42149 2120 407 | | CD 42149 2120 408 25 25 CD 42149 2120 409 - - HYPH 42149 2120 410 640 640 CD 42149 2120 411 |1,540.0| |1,540.0| NNP 42149 2120 412 |20 |20 CD 42149 2120 413 | | NNP 42149 2120 414 | | NNP 42149 2120 415 | | CD 42149 2120 416 | | CD 42149 2120 417 | | CD 42149 2120 418 | | CD 42149 2120 419 | | CD 42149 2120 420 | | CD 42149 2120 421 185 185 CD 42149 2120 422 - - SYM 42149 2120 423 640 640 CD 42149 2120 424 |1,140.0| |1,140.0| NN 42149 2120 425 |26 |26 CD 42149 2120 426 | | NNP 42149 2120 427 |23|0 |23|0 NNP 42149 2120 428 |0.2| |0.2| NNP 42149 2120 429 3|26| 3|26| CD 42149 2120 430 -+-----------+-------+-----------------+---+------------+--+---+---+--+--| -+-----------+-------+-----------------+---+------------+--+---+---+--+--| CD 42149 2120 431 | | CD 42149 2120 432 641 641 CD 42149 2120 433 - - HYPH 42149 2120 434 647 647 CD 42149 2120 435 | | CD 42149 2120 436 17.5|Silt 17.5|silt CD 42149 2120 437 |28 |28 CD 42149 2120 438 |[Y]8 |[Y]8 NNP 42149 2120 439 doors door NNS 42149 2120 440 |24|0 |24|0 NNP 42149 2120 441 | | NNP 42149 2120 442 0 0 CD 42149 2120 443 | | NNP 42149 2120 444 6|30| 6|30| CD 42149 2120 445 | | CD 42149 2120 446 648 648 CD 42149 2120 447 - - HYPH 42149 2120 448 751 751 CD 42149 2120 449 | | CD 42149 2120 450 260.0| 260.0| CD 42149 2120 451 " " '' 42149 2120 452 |28 |28 NNP 42149 2120 453 |[Y]8 |[Y]8 NNP 42149 2120 454 " " '' 42149 2120 455 |22|0 |22|0 NNP 42149 2120 456 | | NNP 42149 2120 457 0 0 CD 42149 2120 458 | | NNP 42149 2120 459 4|26| 4|26| CD 42149 2120 460 | | CD 42149 2120 461 752 752 CD 42149 2120 462 - - HYPH 42149 2120 463 795 795 CD 42149 2120 464 | | CD 42149 2120 465 110.0| 110.0| CD 42149 2120 466 " " '' 42149 2120 467 |28 |28 NNP 42149 2120 468 |[Y]8 |[Y]8 NNP 42149 2120 469 " " '' 42149 2120 470 |18|0 |18|0 NNP 42149 2120 471 | | NNP 42149 2120 472 0 0 CD 42149 2120 473 | | NNP 42149 2120 474 7|25| 7|25| CD 42149 2120 475 | | CD 42149 2120 476 796 796 CD 42149 2120 477 - - HYPH 42149 2120 478 825 825 CD 42149 2120 479 | | CD 42149 2120 480 75.0| 75.0| CD 42149 2120 481 " " '' 42149 2120 482 |28 |28 NNP 42149 2120 483 |[Y]8 |[Y]8 NNP 42149 2120 484 " " '' 42149 2120 485 |19|0 |19|0 NNP 42149 2120 486 | | NNP 42149 2120 487 0 0 NNP 42149 2120 488 |10|28| |10|28| NNP 42149 2120 489 H| h| CD 42149 2120 490 826 826 CD 42149 2120 491 - - HYPH 42149 2120 492 854 854 CD 42149 2120 493 | | CD 42149 2120 494 72.5| 72.5| CD 42149 2120 495 " " '' 42149 2120 496 |28 |28 NNP 42149 2120 497 |[Y]8 |[Y]8 NNP 42149 2120 498 " " '' 42149 2120 499 |17|0 |17|0 NNP 42149 2120 500 | | NNP 42149 2120 501 0 0 CD 42149 2120 502 | | CD 42149 2120 503 3|20| 3|20| CD 42149 2120 504 e| e| JJ 42149 2120 505 855 855 CD 42149 2120 506 - - SYM 42149 2120 507 881 881 CD 42149 2120 508 | | CD 42149 2120 509 67.5| 67.5| CD 42149 2120 510 " " '' 42149 2120 511 |28 |28 NNP 42149 2120 512 |[Y]8 |[Y]8 NNP 42149 2120 513 " " '' 42149 2120 514 |23|0 |23|0 NNP 42149 2120 515 | | NNP 42149 2120 516 0 0 CD 42149 2120 517 | | CD 42149 2120 518 9|32| 9|32| CD 42149 2120 519 a| a| NN 42149 2120 520 882 882 CD 42149 2120 521 - - SYM 42149 2120 522 982 982 CD 42149 2120 523 | | CD 42149 2120 524 252.5| 252.5| CD 42149 2120 525 " " '' 42149 2120 526 |28 |28 NNP 42149 2120 527 |[Y]8 |[Y]8 NNP 42149 2120 528 " " '' 42149 2120 529 |20|0 |20|0 NNP 42149 2120 530 | | NNP 42149 2120 531 0 0 CD 42149 2120 532 | | CD 42149 2120 533 8|28| 8|28| CD 42149 2120 534 v| v| NN 42149 2120 535 983 983 CD 42149 2120 536 - - HYPH 42149 2120 537 990 990 CD 42149 2120 538 | | CD 42149 2120 539 20.0| 20.0| CD 42149 2120 540 " " '' 42149 2120 541 |28 |28 NNP 42149 2120 542 |[Y]8 |[Y]8 NNP 42149 2120 543 " " '' 42149 2120 544 |21|0 |21|0 NNP 42149 2120 545 | | NNP 42149 2120 546 0 0 CD 42149 2120 547 | | CD 42149 2120 548 7|28| 7|28| CD 42149 2120 549 y| y| NNS 42149 2120 550 991 991 CD 42149 2120 551 - - HYPH 42149 2120 552 1,049| 1,049| CD 42149 2120 553 147.5| 147.5| CD 42149 2120 554 " " `` 42149 2120 555 |28 |28 NNP 42149 2120 556 |[Y]8 |[Y]8 NNP 42149 2120 557 " " `` 42149 2120 558 |23|0 |23|0 NNP 42149 2120 559 | | NNP 42149 2120 560 0 0 CD 42149 2120 561 | | CD 42149 2120 562 7|30| 7|30| CD 42149 2120 563 |1,050 |1,050 NNP 42149 2120 564 - - HYPH 42149 2120 565 1,074| 1,074| CD 42149 2120 566 62.5| 62.5| CD 42149 2120 567 " " NN 42149 2120 568 |28 |28 NNP 42149 2120 569 |[Y]8 |[Y]8 NNP 42149 2120 570 " " '' 42149 2120 571 |24|0 |24|0 NNP 42149 2120 572 | | NNP 42149 2120 573 0 0 CD 42149 2120 574 | | CD 42149 2120 575 9|33| 9|33| CD 42149 2120 576 |1,075 |1,075 CD 42149 2120 577 - - HYPH 42149 2120 578 1,110| 1,110| CD 42149 2120 579 90.0| 90.0| CD 42149 2120 580 " " `` 42149 2120 581 |28 |28 NNP 42149 2120 582 |[Y]8 |[Y]8 NNP 42149 2120 583 " " '' 42149 2120 584 |25|0 |25|0 NNP 42149 2120 585 | | NNP 42149 2120 586 0 0 NNP 42149 2120 587 |10|35| |10|35| NNP 42149 2120 588 | | NNP 42149 2120 589 641 641 CD 42149 2120 590 - - HYPH 42149 2120 591 1,110|1,175.0| 1,110|1,175.0| CD 42149 2120 592 |28 |28 CD 42149 2120 593 | | NNP 42149 2120 594 |21|0 |21|0 NNP 42149 2120 595 | | CD 42149 2120 596 0 0 CD 42149 2120 597 | | CD 42149 2120 598 7|28| 7|28| CD 42149 2120 599 -+-----------+-------+-----------------+---+------------+--+---+---+--+--| -+-----------+-------+-----------------+---+------------+--+---+---+--+--| : 42149 2120 600 A| a| CD 42149 2120 601 185 185 CD 42149 2120 602 - - HYPH 42149 2120 603 1,110|2,315.0| 1,110|2,315.0| CD 42149 2120 604 |28 |28 CD 42149 2120 605 | | NNP 42149 2120 606 |22|0 |22|0 NNP 42149 2120 607 |0.1| |0.1| NNP 42149 2120 608 5|27| 5|27| CD 42149 2120 609 l| l| VBD 42149 2120 610 25 25 CD 42149 2120 611 - - HYPH 42149 2120 612 1,110|2,715.0| 1,110|2,715.0| CD 42149 2120 613 |26 |26 CD 42149 2120 614 | | CD 42149 2120 615 |21|0.1|0.1| |21|0.1|0.1| CD 42149 2120 616 3|24| 3|24| CD 42149 2120 617 l| l| JJ 42149 2120 618 | | CD 42149 2120 619 | | CD 42149 2120 620 | | CD 42149 2120 621 | | CD 42149 2120 622 | | CD 42149 2120 623 | | CD 42149 2120 624 | | CD 42149 2120 625 | | CD 42149 2120 626 | | CD 42149 2120 627 | | NNS 42149 2120 628 = = SYM 42149 2120 629 + + SYM 42149 2120 630 = = SYM 42149 2120 631 = = SYM 42149 2120 632 = = SYM 42149 2120 633 = = SYM 42149 2120 634 = = SYM 42149 2120 635 = = SYM 42149 2120 636 = = SYM 42149 2120 637 = = SYM 42149 2120 638 = = SYM 42149 2120 639 = = NFP 42149 2120 640 = = SYM 42149 2120 641 + + SYM 42149 2120 642 = = SYM 42149 2120 643 = = SYM 42149 2120 644 = = SYM 42149 2120 645 = = SYM 42149 2120 646 = = SYM 42149 2120 647 = = NFP 42149 2120 648 = = SYM 42149 2120 649 + + SYM 42149 2120 650 = = SYM 42149 2120 651 = = SYM 42149 2120 652 = = SYM 42149 2120 653 = = SYM 42149 2120 654 = = SYM 42149 2120 655 = = SYM 42149 2120 656 = = SYM 42149 2120 657 = = SYM 42149 2120 658 = = SYM 42149 2120 659 = = SYM 42149 2120 660 = = SYM 42149 2120 661 = = SYM 42149 2120 662 = = SYM 42149 2120 663 = = SYM 42149 2120 664 = = SYM 42149 2120 665 = = NFP 42149 2120 666 = = SYM 42149 2120 667 + + SYM 42149 2120 668 = = SYM 42149 2120 669 = = SYM 42149 2120 670 = = SYM 42149 2120 671 + + SYM 42149 2120 672 = = SYM 42149 2120 673 = = SYM 42149 2120 674 = = SYM 42149 2120 675 = = SYM 42149 2120 676 = = SYM 42149 2120 677 = = SYM 42149 2120 678 = = SYM 42149 2120 679 = = SYM 42149 2120 680 = = SYM 42149 2120 681 = = SYM 42149 2120 682 = = NFP 42149 2120 683 = = SYM 42149 2120 684 + + SYM 42149 2120 685 = = SYM 42149 2120 686 = = SYM 42149 2120 687 + + SYM 42149 2120 688 = = SYM 42149 2120 689 = = SYM 42149 2120 690 = = SYM 42149 2120 691 + + SYM 42149 2120 692 = = SYM 42149 2120 693 = = SYM 42149 2120 694 = = SYM 42149 2120 695 + + SYM 42149 2120 696 = = SYM 42149 2120 697 = = SYM 42149 2120 698 + + SYM 42149 2120 699 = = SYM 42149 2120 700 =| =| ADD 42149 2120 701 TABLE TABLE VBZ 42149 2120 702 26 26 CD 42149 2120 703 PART part CD 42149 2120 704 2 2 CD 42149 2120 705 = = SYM 42149 2120 706 + + SYM 42149 2120 707 = = SYM 42149 2120 708 = = SYM 42149 2120 709 = = SYM 42149 2120 710 = = SYM 42149 2120 711 = = SYM 42149 2120 712 = = SYM 42149 2120 713 = = SYM 42149 2120 714 = = SYM 42149 2120 715 = = SYM 42149 2120 716 = = NFP 42149 2120 717 = = SYM 42149 2120 718 + + SYM 42149 2120 719 = = SYM 42149 2120 720 = = SYM 42149 2120 721 = = NFP 42149 2120 722 = = SYM 42149 2120 723 + + SYM 42149 2120 724 = = SYM 42149 2120 725 = = SYM 42149 2120 726 = = SYM 42149 2120 727 = = NFP 42149 2120 728 = = SYM 42149 2120 729 + + SYM 42149 2120 730 = = SYM 42149 2120 731 = = SYM 42149 2120 732 = = SYM 42149 2120 733 = = NFP 42149 2120 734 = = SYM 42149 2120 735 + + SYM 42149 2120 736 = = SYM 42149 2120 737 = = SYM 42149 2120 738 = = SYM 42149 2120 739 = = SYM 42149 2120 740 = = SYM 42149 2120 741 = = SYM 42149 2120 742 = = NFP 42149 2120 743 = = SYM 42149 2120 744 + + SYM 42149 2120 745 = = SYM 42149 2120 746 = = SYM 42149 2120 747 = = NFP 42149 2120 748 = = SYM 42149 2120 749 + + SYM 42149 2120 750 = = SYM 42149 2120 751 = = SYM 42149 2120 752 = = NFP 42149 2120 753 = = SYM 42149 2120 754 + + SYM 42149 2120 755 = = SYM 42149 2120 756 = = SYM 42149 2120 757 = = NFP 42149 2120 758 = = SYM 42149 2120 759 + + SYM 42149 2120 760 = = SYM 42149 2120 761 = = SYM 42149 2120 762 = = NFP 42149 2120 763 = = SYM 42149 2120 764 + + SYM 42149 2120 765 = = SYM 42149 2120 766 = = SYM 42149 2120 767 = = SYM 42149 2120 768 =| =| ADD 42149 2120 769 W| W| NNP 42149 2120 770 | | NNP 42149 2120 771 | | NNP 42149 2120 772 |Av |Av NNP 42149 2120 773 . . . 42149 2121 1 | | CD 42149 2121 2 | | CD 42149 2121 3 TIME TIME NNP 42149 2121 4 FOR for IN 42149 2121 5 RING ring NN 42149 2121 6 | | NNP 42149 2121 7 e| e| NNP 42149 2121 8 | | CD 42149 2121 9 | | NNP 42149 2121 10 | | CD 42149 2121 11 | | CD 42149 2121 12 | | CD 42149 2121 13 ERECTION ERECTION NNS 42149 2121 14 , , , 42149 2121 15 | | NNP 42149 2121 16 i| i| JJ 42149 2121 17 | | HYPH 42149 2121 18 | | CD 42149 2121 19 |Time |time CD 42149 2121 20 | | CD 42149 2121 21 | | NNP 42149 2121 22 HRS HRS NNP 42149 2121 23 . . . 42149 2122 1 AND and CC 42149 2122 2 MIN MIN NNP 42149 2122 3 . . . 42149 2123 1 | | NNP 42149 2123 2 g| g| NNP 42149 2123 3 |----+-----| |----+-----| NNP 42149 2123 4 | | NNP 42149 2123 5 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2123 6 h| h| NNP 42149 2123 7 |Av |Av NNP 42149 2123 8 . . . 42149 2124 1 |Time |Time NNP 42149 2124 2 |per |per NNP 42149 2124 3 | | NNP 42149 2124 4 | | NNP 42149 2124 5 | | CD 42149 2124 6 | | CD 42149 2124 7 | | CD 42149 2124 8 | | CD 42149 2124 9 | | CD 42149 2124 10 t| t| NN 42149 2124 11 |No |No NNP 42149 2124 12 . . . 42149 2125 1 |Muck-| |Muck-| NFP 42149 2125 2 |T |t CD 42149 2125 3 | | NNP 42149 2125 4 S S NNP 42149 2125 5 | | NNP 42149 2125 6 | | NNP 42149 2125 7 | | CD 42149 2125 8 | | CD 42149 2125 9 | | CD 42149 2125 10 | | CD 42149 2125 11 |of |of CD 42149 2125 12 |ing |e VBG 42149 2125 13 , , , 42149 2125 14 |ring,|i |ring,|i CD 42149 2125 15 | | NNP 42149 2125 16 t t NNP 42149 2125 17 | | NNP 42149 2125 18 | | NNP 42149 2125 19 | | CD 42149 2125 20 | | CD 42149 2125 21 | | CD 42149 2125 22 o| o| NN 42149 2125 23 |cu |cu CD 42149 2125 24 . . . 42149 2126 1 |per |per NNP 42149 2126 2 | | NNP 42149 2126 3 |m |m NNP 42149 2126 4 | | NNP 42149 2126 5 r r NNP 42149 2126 6 | | NNP 42149 2126 7 B B NNP 42149 2126 8 | | NNP 42149 2126 9 B B NNP 42149 2126 10 | | NNP 42149 2126 11 | | CD 42149 2126 12 | | CD 42149 2126 13 f| f| NN 42149 2126 14 |yd |yd CD 42149 2126 15 . . . 42149 2127 1 |cu |cu CD 42149 2127 2 . . . 42149 2128 1 |shov-|e |shov-|e NNP 42149 2128 2 J J NNP 42149 2128 3 | | NNP 42149 2128 4 a a DT 42149 2128 5 | | CD 42149 2128 6 o o NN 42149 2128 7 | | NNP 42149 2128 8 o o NNP 42149 2128 9 | | NNP 42149 2128 10 T T NNP 42149 2128 11 | | HYPH 42149 2128 12 | | NNP 42149 2128 13 | | NNP 42149 2128 14 |per |per NN 42149 2128 15 |yd |yd CD 42149 2128 16 . . . 42149 2129 1 |ing |e VBG 42149 2129 2 |a |a NNP 42149 2129 3 | | NNP 42149 2129 4 i i PRP 42149 2129 5 | | CD 42149 2129 6 r r NNP 42149 2129 7 | | NNP 42149 2129 8 r r NNP 42149 2129 9 | | NNP 42149 2129 10 a a DT 42149 2129 11 | | NNP 42149 2129 12 M M NNP 42149 2129 13 | | HYPH 42149 2129 14 | | NNP 42149 2129 15 |ring| |ring| NNP 42149 2129 16 | | NNP 42149 2129 17 |f |f NNP 42149 2129 18 c c NNP 42149 2129 19 | | NNP 42149 2129 20 g g NNP 42149 2129 21 | | NNP 42149 2129 22 e e NNP 42149 2129 23 | | NNP 42149 2129 24 e e NNP 42149 2129 25 | | NNP 42149 2129 26 p p NNP 42149 2129 27 | | NNP 42149 2129 28 e e NNP 42149 2129 29 | | NNP 42149 2129 30 i| i| JJ 42149 2129 31 | | CD 42149 2129 32 | | CD 42149 2129 33 |and |and NNP 42149 2129 34 |o |o NNP 42149 2129 35 k k NNP 42149 2129 36 | | NNP 42149 2129 37 h h NNP 42149 2129 38 | | CD 42149 2129 39 | | CD 42149 2129 40 | | CD 42149 2129 41 e e NN 42149 2129 42 | | NNP 42149 2129 43 a a DT 42149 2129 44 | | CD 42149 2129 45 r| r| NN 42149 2129 46 Section Section NNP 42149 2129 47 | | NNP 42149 2129 48 | | NNP 42149 2129 49 | | NNP 42149 2129 50 |r |r NNP 42149 2129 51 s s NNP 42149 2129 52 | | NNP 42149 2129 53 t t NNP 42149 2129 54 | | NNP 42149 2129 55 1 1 CD 42149 2129 56 | | CD 42149 2129 57 2 2 CD 42149 2129 58 | | CD 42149 2129 59 r r NNP 42149 2129 60 | | CD 42149 2129 61 n n CC 42149 2129 62 | | CD 42149 2129 63 o| o| NN 42149 2129 64 between between IN 42149 2129 65 | | CD 42149 2129 66 | | NNP 42149 2129 67 |Muck-+--------+----+----+----+----+----| |muck-+--------+----+----+----+----+----| ADD 42149 2129 68 n| n| NN 42149 2129 69 rings ring NNS 42149 2129 70 | | NNP 42149 2129 71 E E NNP 42149 2129 72 | | NNP 42149 2129 73 |ing |e VBG 42149 2129 74 | | NNP 42149 2129 75 F F NNP 42149 2129 76 | | NNP 42149 2129 77 G G NNP 42149 2129 78 | | NNP 42149 2129 79 G G NNP 42149 2129 80 | | NNP 42149 2129 81 G G NNP 42149 2129 82 | | NNP 42149 2129 83 G G NNP 42149 2129 84 | | NNP 42149 2129 85 G G NNP 42149 2129 86 | | NNP 42149 2129 87 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2129 88 | | CD 42149 2129 89 1 1 CD 42149 2129 90 - - HYPH 42149 2129 91 24 24 CD 42149 2129 92 | | CD 42149 2129 93 46 46 CD 42149 2129 94 |0 |0 NN 42149 2129 95 - - : 42149 2129 96 06 06 CD 42149 2129 97 | | CD 42149 2129 98 4 4 CD 42149 2129 99 - - SYM 42149 2129 100 32|Time 32|time CD 42149 2129 101 |6 |6 NN 42149 2129 102 - - : 42149 2129 103 23| 23| CD 42149 2129 104 | | CD 42149 2129 105 | | CD 42149 2129 106 |6 |6 CC 42149 2129 107 - - HYPH 42149 2129 108 23| 23| CD 42149 2129 109 | | CD 42149 2129 110 25 25 CD 42149 2129 111 - - HYPH 42149 2129 112 55 55 CD 42149 2129 113 | | CD 42149 2129 114 46 46 CD 42149 2129 115 |0 |0 NN 42149 2129 116 - - : 42149 2129 117 51 51 CD 42149 2129 118 |39 |39 CD 42149 2129 119 - - HYPH 42149 2129 120 33|for 33|for CD 42149 2129 121 |4 |4 CD 42149 2129 122 - - HYPH 42149 2129 123 25| 25| CD 42149 2129 124 | | HYPH 42149 2129 125 |5 |5 CD 42149 2129 126 - - HYPH 42149 2129 127 10|4 10|4 CD 42149 2129 128 - - HYPH 42149 2129 129 29| 29| CD 42149 2129 130 O| o| CD 42149 2129 131 56 56 CD 42149 2129 132 - - SYM 42149 2129 133 72 72 CD 42149 2129 134 | | CD 42149 2129 135 44 44 CD 42149 2129 136 |0 |0 NN 42149 2129 137 - - : 42149 2129 138 21 21 CD 42149 2129 139 |15 |15 CD 42149 2129 140 - - HYPH 42149 2129 141 05|jacks 05|jacks CD 42149 2129 142 |2 |2 NN 42149 2129 143 - - HYPH 42149 2129 144 53| 53| CD 42149 2129 145 | | CD 42149 2129 146 |3 |3 NNS 42149 2129 147 - - HYPH 42149 2129 148 15|2 15|2 CD 42149 2129 149 - - HYPH 42149 2129 150 55| 55| CD 42149 2129 151 O| o| CD 42149 2129 152 | | CD 42149 2129 153 | | CD 42149 2129 154 | | CD 42149 2129 155 |for |for IN 42149 2129 156 | | CD 42149 2129 157 | | NNP 42149 2129 158 | | CD 42149 2129 159 | | CD 42149 2129 160 | | CD 42149 2129 161 | | CD 42149 2129 162 r| r| NN 42149 2129 163 73 73 CD 42149 2129 164 - - SYM 42149 2129 165 165 165 CD 42149 2129 166 | | CD 42149 2129 167 39 39 CD 42149 2129 168 |0 |0 '' 42149 2129 169 - - HYPH 42149 2129 170 11 11 CD 42149 2129 171 | | CD 42149 2129 172 6 6 CD 42149 2129 173 - - HYPH 42149 2129 174 56|light 56|light CD 42149 2129 175 |2 |2 CD 42149 2129 176 - - HYPH 42149 2129 177 27| 27| CD 42149 2129 178 | | CD 42149 2129 179 |2 |2 CD 42149 2129 180 - - HYPH 42149 2129 181 21|2 21|2 CD 42149 2129 182 - - HYPH 42149 2129 183 26| 26| CD 42149 2129 184 d| d| NN 42149 2129 185 166 166 CD 42149 2129 186 - - SYM 42149 2129 187 184 184 CD 42149 2129 188 | | CD 42149 2129 189 42 42 CD 42149 2129 190 |0 |0 NN 42149 2129 191 - - : 42149 2129 192 09 09 CD 42149 2129 193 | | CD 42149 2129 194 6 6 CD 42149 2129 195 - - HYPH 42149 2129 196 19|iron 19|iron CD 42149 2129 197 is be VBZ 42149 2129 198 |2 |2 CD 42149 2129 199 - - SYM 42149 2129 200 31| 31| CD 42149 2129 201 J J NNP 42149 2129 202 | | NNP 42149 2129 203 J J NNP 42149 2129 204 |6 |6 NN 42149 2129 205 - - HYPH 42149 2129 206 30|2 30|2 CD 42149 2129 207 - - SYM 42149 2129 208 37| 37| CD 42149 2129 209 i| i| JJ 42149 2129 210 | | NNP 42149 2129 211 | | CD 42149 2129 212 | | NNP 42149 2129 213 |included| |included| NNP 42149 2129 214 | | NNP 42149 2129 215 | | CD 42149 2129 216 | | CD 42149 2129 217 | | CD 42149 2129 218 | | CD 42149 2129 219 n| n| NN 42149 2129 220 185 185 CD 42149 2129 221 - - SYM 42149 2129 222 253 253 CD 42149 2129 223 | | CD 42149 2129 224 43 43 CD 42149 2129 225 |0 |0 NN 42149 2129 226 - - HYPH 42149 2129 227 09 09 CD 42149 2129 228 | | CD 42149 2129 229 6 6 CD 42149 2129 230 - - HYPH 42149 2129 231 13|in 13|in CD 42149 2129 232 |1 |1 : 42149 2129 233 - - HYPH 42149 2129 234 57|2 57|2 CD 42149 2129 235 - - HYPH 42149 2129 236 44|2 44|2 CD 42149 2129 237 - - HYPH 42149 2129 238 52|2 52|2 CD 42149 2129 239 - - HYPH 42149 2129 240 00|2 00|2 CD 42149 2129 241 - - HYPH 42149 2129 242 15| 15| CD 42149 2129 243 a| a| NN 42149 2129 244 254 254 CD 42149 2129 245 - - SYM 42149 2129 246 293 293 CD 42149 2129 247 | | CD 42149 2129 248 6 6 CD 42149 2129 249 |0 |0 SYM 42149 2129 250 - - HYPH 42149 2129 251 18 18 CD 42149 2129 252 | | CD 42149 2129 253 1 1 CD 42149 2129 254 - - HYPH 42149 2129 255 45|shoving 45|shoving CD 42149 2129 256 |1 |1 NNP 42149 2129 257 - - HYPH 42149 2129 258 58|1 58|1 CD 42149 2129 259 - - HYPH 42149 2129 260 57|2 57|2 CD 42149 2129 261 - - HYPH 42149 2129 262 15|2 15|2 CD 42149 2129 263 - - HYPH 42149 2129 264 45|2 45|2 CD 42149 2129 265 - - HYPH 42149 2129 266 02| 02| CD 42149 2129 267 r| r| NN 42149 2129 268 294 294 CD 42149 2129 269 - - SYM 42149 2129 270 301 301 CD 42149 2129 271 | | CD 42149 2129 272 0 0 CD 42149 2129 273 | | CD 42149 2129 274 | | CD 42149 2129 275 1 1 CD 42149 2129 276 - - HYPH 42149 2129 277 08|and 08|and CD 42149 2129 278 |0 |0 : 42149 2129 279 - - HYPH 42149 2129 280 58|1 58|1 CD 42149 2129 281 - - HYPH 42149 2129 282 45|1 45|1 CD 42149 2129 283 - - HYPH 42149 2129 284 50| 50| CD 42149 2129 285 |1 |1 : 42149 2129 286 - - HYPH 42149 2129 287 17| 17| CD 42149 2129 288 y| y| NNS 42149 2129 289 302 302 CD 42149 2129 290 - - HYPH 42149 2129 291 307 307 CD 42149 2129 292 | | CD 42149 2129 293 26 26 CD 42149 2129 294 |0 |0 SYM 42149 2129 295 - - HYPH 42149 2129 296 09 09 CD 42149 2129 297 | | CD 42149 2129 298 4 4 CD 42149 2129 299 - - HYPH 42149 2129 300 03|mucking.|2 03|mucking.|2 NNP 42149 2129 301 - - HYPH 42149 2129 302 20|1 20|1 CD 42149 2129 303 - - HYPH 42149 2129 304 40|1 40|1 CD 42149 2129 305 - - HYPH 42149 2129 306 55|2 55|2 CD 42149 2129 307 - - HYPH 42149 2129 308 57|2 57|2 CD 42149 2129 309 - - HYPH 42149 2129 310 22| 22| CD 42149 2129 311 | | CD 42149 2129 312 308 308 CD 42149 2129 313 - - HYPH 42149 2129 314 342 342 CD 42149 2129 315 | | CD 42149 2129 316 0 0 CD 42149 2129 317 | | CD 42149 2129 318 | | CD 42149 2129 319 0 0 CD 42149 2129 320 - - HYPH 42149 2129 321 36| 36| CD 42149 2129 322 |2 |2 CD 42149 2129 323 - - HYPH 42149 2129 324 00|1 00|1 CD 42149 2129 325 - - HYPH 42149 2129 326 34|2 34|2 CD 42149 2129 327 - - HYPH 42149 2129 328 42|1 42|1 CD 42149 2129 329 - - HYPH 42149 2129 330 58|2 58|2 CD 42149 2129 331 - - HYPH 42149 2129 332 02| 02| CD 42149 2129 333 | | CD 42149 2129 334 343 343 CD 42149 2129 335 - - HYPH 42149 2129 336 347 347 CD 42149 2129 337 | | CD 42149 2129 338 2 2 CD 42149 2129 339 |0 |0 SYM 42149 2129 340 - - HYPH 42149 2129 341 36 36 CD 42149 2129 342 | | CD 42149 2129 343 1 1 CD 42149 2129 344 - - HYPH 42149 2129 345 11| 11| CD 42149 2129 346 |2 |2 NNS 42149 2129 347 - - HYPH 42149 2129 348 15|2 15|2 CD 42149 2129 349 - - HYPH 42149 2129 350 20| 20| CD 42149 2129 351 |2 |2 NNS 42149 2129 352 - - HYPH 42149 2129 353 43|2 43|2 CD 42149 2129 354 - - HYPH 42149 2129 355 33| 33| CD 42149 2129 356 | | CD 42149 2129 357 348 348 CD 42149 2129 358 - - HYPH 42149 2129 359 459 459 CD 42149 2129 360 | | CD 42149 2129 361 0 0 CD 42149 2129 362 | | CD 42149 2129 363 | | CD 42149 2129 364 0 0 CD 42149 2129 365 - - HYPH 42149 2129 366 33| 33| CD 42149 2129 367 |2 |2 JJ 42149 2129 368 - - HYPH 42149 2129 369 03|2 03|2 CD 42149 2129 370 - - HYPH 42149 2129 371 04|2 04|2 CD 42149 2129 372 - - HYPH 42149 2129 373 09|2 09|2 CD 42149 2129 374 - - HYPH 42149 2129 375 23|2 23|2 CD 42149 2129 376 - - HYPH 42149 2129 377 06| 06| CD 42149 2129 378 | | NNP 42149 2129 379 | | NNP 42149 2129 380 | | CD 42149 2129 381 | | CD 42149 2129 382 | | CD 42149 2129 383 | | CD 42149 2129 384 | | CD 42149 2129 385 | | CD 42149 2129 386 | | CD 42149 2129 387 | | CD 42149 2129 388 | | CD 42149 2129 389 | | CD 42149 2129 390 460 460 CD 42149 2129 391 - - HYPH 42149 2129 392 494 494 CD 42149 2129 393 | | CD 42149 2129 394 9 9 CD 42149 2129 395 |0 |0 SYM 42149 2129 396 - - HYPH 42149 2129 397 09 09 CD 42149 2129 398 | | CD 42149 2129 399 1 1 CD 42149 2129 400 - - HYPH 42149 2129 401 23| 23| CD 42149 2129 402 |2 |2 CD 42149 2129 403 - - HYPH 42149 2129 404 49|2 49|2 CD 42149 2129 405 - - HYPH 42149 2129 406 30|2 30|2 CD 42149 2129 407 - - HYPH 42149 2129 408 50|1 50|1 CD 42149 2129 409 - - HYPH 42149 2129 410 50|2 50|2 CD 42149 2129 411 - - HYPH 42149 2129 412 38| 38| CD 42149 2129 413 | | CD 42149 2129 414 495 495 CD 42149 2129 415 - - HYPH 42149 2129 416 513 513 CD 42149 2129 417 | | CD 42149 2129 418 17 17 CD 42149 2129 419 |0 |0 SYM 42149 2129 420 - - HYPH 42149 2129 421 05 05 CD 42149 2129 422 | | CD 42149 2129 423 1 1 CD 42149 2129 424 - - HYPH 42149 2129 425 28| 28| CD 42149 2129 426 |2 |2 CD 42149 2129 427 - - : 42149 2129 428 35|2 35|2 CD 42149 2129 429 - - HYPH 42149 2129 430 23|1 23|1 CD 42149 2129 431 - - HYPH 42149 2129 432 55|2 55|2 CD 42149 2129 433 - - HYPH 42149 2129 434 10|2 10|2 CD 42149 2129 435 - - HYPH 42149 2129 436 26| 26| CD 42149 2129 437 | | CD 42149 2129 438 514 514 CD 42149 2129 439 - - HYPH 42149 2129 440 605 605 CD 42149 2129 441 | | CD 42149 2129 442 26 26 CD 42149 2129 443 |0 |0 SYM 42149 2129 444 - - HYPH 42149 2129 445 04 04 CD 42149 2129 446 | | CD 42149 2129 447 1 1 CD 42149 2129 448 - - HYPH 42149 2129 449 44| 44| CD 42149 2129 450 |2 |2 CD 42149 2129 451 - - HYPH 42149 2129 452 12|2 12|2 CD 42149 2129 453 - - HYPH 42149 2129 454 34|2 34|2 CD 42149 2129 455 - - HYPH 42149 2129 456 29|2 29|2 CD 42149 2129 457 - - HYPH 42149 2129 458 15|2 15|2 CD 42149 2129 459 - - HYPH 42149 2129 460 19| 19| CD 42149 2129 461 | | CD 42149 2129 462 606 606 CD 42149 2129 463 - - HYPH 42149 2129 464 624 624 CD 42149 2129 465 | | CD 42149 2129 466 16 16 CD 42149 2129 467 |0 |0 SYM 42149 2129 468 - - HYPH 42149 2129 469 04 04 CD 42149 2129 470 | | CD 42149 2129 471 1 1 CD 42149 2129 472 - - HYPH 42149 2129 473 07| 07| CD 42149 2129 474 |1 |1 HYPH 42149 2129 475 - - HYPH 42149 2129 476 54|2 54|2 CD 42149 2129 477 - - HYPH 42149 2129 478 33|2 33|2 CD 42149 2129 479 - - HYPH 42149 2129 480 16|1 16|1 CD 42149 2129 481 - - HYPH 42149 2129 482 35|2 35|2 CD 42149 2129 483 - - HYPH 42149 2129 484 04| 04| CD 42149 2129 485 | | CD 42149 2129 486 625 625 CD 42149 2129 487 - - SYM 42149 2129 488 640 640 CD 42149 2129 489 | | CD 42149 2129 490 24 24 CD 42149 2129 491 |0 |0 SYM 42149 2129 492 - - : 42149 2129 493 03 03 CD 42149 2129 494 | | CD 42149 2129 495 1 1 CD 42149 2129 496 - - SYM 42149 2129 497 13| 13| CD 42149 2129 498 |2 |2 CD 42149 2129 499 - - HYPH 42149 2129 500 14|2 14|2 CD 42149 2129 501 - - HYPH 42149 2129 502 55|2 55|2 CD 42149 2129 503 - - HYPH 42149 2129 504 35|2 35|2 CD 42149 2129 505 - - HYPH 42149 2129 506 46|2 46|2 CD 42149 2129 507 - - HYPH 42149 2129 508 28| 28| CD 42149 2129 509 | | CD 42149 2129 510 25 25 CD 42149 2129 511 - - HYPH 42149 2129 512 640 640 CD 42149 2129 513 | | CD 42149 2129 514 | | CD 42149 2129 515 | | CD 42149 2129 516 | | CD 42149 2129 517 | | CD 42149 2129 518 | | CD 42149 2129 519 | | CD 42149 2129 520 | | CD 42149 2129 521 | | CD 42149 2129 522 | | CD 42149 2129 523 | | CD 42149 2129 524 185 185 CD 42149 2129 525 - - HYPH 42149 2129 526 640 640 CD 42149 2129 527 | | CD 42149 2129 528 16 16 CD 42149 2129 529 |0 |0 NN 42149 2129 530 - - : 42149 2129 531 07 07 CD 42149 2129 532 |1 |1 . 42149 2129 533 - - HYPH 42149 2129 534 58 58 CD 42149 2129 535 | | CD 42149 2129 536 |2 |2 CD 42149 2129 537 - - HYPH 42149 2129 538 07|2 07|2 CD 42149 2129 539 - - HYPH 42149 2129 540 19|2 19|2 CD 42149 2129 541 - - HYPH 42149 2129 542 26|2 26|2 CD 42149 2129 543 - - HYPH 42149 2129 544 15|2 15|2 CD 42149 2129 545 - - HYPH 42149 2129 546 13| 13| CD 42149 2129 547 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2129 548 | | CD 42149 2129 549 641 641 CD 42149 2129 550 - - HYPH 42149 2129 551 647 647 CD 42149 2129 552 | | CD 42149 2129 553 19 19 CD 42149 2129 554 |0 |0 NN 42149 2129 555 - - HYPH 42149 2129 556 04 04 CD 42149 2129 557 | | CD 42149 2129 558 0 0 CD 42149 2129 559 - - HYPH 42149 2129 560 08| 08| CD 42149 2129 561 [ [ -LRB- 42149 2129 562 V v NN 42149 2129 563 ] ] -RRB- 42149 2129 564 |1 |1 . 42149 2129 565 - - HYPH 42149 2129 566 20|2 20|2 CD 42149 2129 567 - - HYPH 42149 2129 568 08|1 08|1 CD 42149 2129 569 - - HYPH 42149 2129 570 65|1 65|1 CD 42149 2129 571 - - HYPH 42149 2129 572 40|1 40|1 CD 42149 2129 573 - - HYPH 42149 2129 574 41| 41| CD 42149 2129 575 | | CD 42149 2129 576 648 648 CD 42149 2129 577 - - HYPH 42149 2129 578 751 751 CD 42149 2129 579 | | CD 42149 2129 580 14 14 CD 42149 2129 581 |0 |0 '' 42149 2129 582 - - : 42149 2129 583 03 03 CD 42149 2129 584 | | CD 42149 2129 585 0 0 CD 42149 2129 586 - - HYPH 42149 2129 587 36| 36| CD 42149 2129 588 0 0 CD 42149 2129 589 - - SYM 42149 2129 590 12 12 CD 42149 2129 591 |1 |1 NN 42149 2129 592 - - HYPH 42149 2129 593 21|1 21|1 CD 42149 2129 594 - - HYPH 42149 2129 595 22|1 22|1 CD 42149 2129 596 - - HYPH 42149 2129 597 26|1 26|1 CD 42149 2129 598 - - HYPH 42149 2129 599 55|1 55|1 CD 42149 2129 600 - - HYPH 42149 2129 601 23| 23| CD 42149 2129 602 | | CD 42149 2129 603 752 752 CD 42149 2129 604 - - HYPH 42149 2129 605 795 795 CD 42149 2129 606 | | CD 42149 2129 607 10 10 CD 42149 2129 608 |0 |0 NN 42149 2129 609 - - : 42149 2129 610 03 03 CD 42149 2129 611 | | CD 42149 2129 612 0 0 CD 42149 2129 613 - - HYPH 42149 2129 614 29| 29| CD 42149 2129 615 0 0 CD 42149 2129 616 - - SYM 42149 2129 617 14 14 CD 42149 2129 618 |0 |0 NN 42149 2129 619 - - : 42149 2129 620 46|1 46|1 CD 42149 2129 621 - - HYPH 42149 2129 622 25|1 25|1 CD 42149 2129 623 - - HYPH 42149 2129 624 31|2 31|2 CD 42149 2129 625 - - HYPH 42149 2129 626 37|1 37|1 CD 42149 2129 627 - - HYPH 42149 2129 628 10| 10| CD 42149 2129 629 | | NNP 42149 2129 630 796 796 CD 42149 2129 631 - - HYPH 42149 2129 632 825 825 CD 42149 2129 633 | | CD 42149 2129 634 5 5 CD 42149 2129 635 |0 |0 SYM 42149 2129 636 - - HYPH 42149 2129 637 08 08 CD 42149 2129 638 | | CD 42149 2129 639 0 0 CD 42149 2129 640 - - SYM 42149 2129 641 40| 40| CD 42149 2129 642 0 0 CD 42149 2129 643 - - SYM 42149 2129 644 11 11 CD 42149 2129 645 |0 |0 NN 42149 2129 646 - - HYPH 42149 2129 647 48|1 48|1 CD 42149 2129 648 - - HYPH 42149 2129 649 31|1 31|1 CD 42149 2129 650 - - HYPH 42149 2129 651 34|0 34|0 CD 42149 2129 652 - - HYPH 42149 2129 653 53|1 53|1 CD 42149 2129 654 - - HYPH 42149 2129 655 03| 03| CD 42149 2129 656 H| h| CD 42149 2129 657 826 826 CD 42149 2129 658 - - HYPH 42149 2129 659 854 854 CD 42149 2129 660 | | CD 42149 2129 661 15 15 CD 42149 2129 662 |0 |0 NN 42149 2129 663 - - : 42149 2129 664 03 03 CD 42149 2129 665 | | CD 42149 2129 666 0 0 CD 42149 2129 667 - - HYPH 42149 2129 668 48| 48| CD 42149 2129 669 0 0 CD 42149 2129 670 - - SYM 42149 2129 671 19 19 CD 42149 2129 672 |0 |0 NN 42149 2129 673 - - HYPH 42149 2129 674 54|1 54|1 CD 42149 2129 675 - - HYPH 42149 2129 676 12|1 12|1 CD 42149 2129 677 - - HYPH 42149 2129 678 02|1 02|1 CD 42149 2129 679 - - HYPH 42149 2129 680 23|1 23|1 CD 42149 2129 681 - - HYPH 42149 2129 682 01| 01| CD 42149 2129 683 e| e| JJ 42149 2129 684 855 855 CD 42149 2129 685 - - SYM 42149 2129 686 881 881 CD 42149 2129 687 | | CD 42149 2129 688 7 7 CD 42149 2129 689 |0 |0 SYM 42149 2129 690 - - HYPH 42149 2129 691 05 05 CD 42149 2129 692 | | CD 42149 2129 693 0 0 CD 42149 2129 694 - - HYPH 42149 2129 695 33| 33| CD 42149 2129 696 0 0 CD 42149 2129 697 - - SYM 42149 2129 698 16 16 CD 42149 2129 699 |0 |0 NN 42149 2129 700 - - HYPH 42149 2129 701 59|0 59|0 CD 42149 2129 702 - - HYPH 42149 2129 703 45|1 45|1 CD 42149 2129 704 - - HYPH 42149 2129 705 15|1 15|1 CD 42149 2129 706 - - HYPH 42149 2129 707 20|1 20|1 CD 42149 2129 708 - - HYPH 42149 2129 709 01| 01| CD 42149 2129 710 a| a| NN 42149 2129 711 882 882 CD 42149 2129 712 - - SYM 42149 2129 713 982 982 CD 42149 2129 714 | | CD 42149 2129 715 10 10 CD 42149 2129 716 |0 |0 NN 42149 2129 717 - - : 42149 2129 718 02 02 CD 42149 2129 719 | | CD 42149 2129 720 0 0 CD 42149 2129 721 - - HYPH 42149 2129 722 20| 20| CD 42149 2129 723 0 0 CD 42149 2129 724 - - SYM 42149 2129 725 14 14 CD 42149 2129 726 |0 |0 NN 42149 2129 727 - - HYPH 42149 2129 728 49|1 49|1 CD 42149 2129 729 - - HYPH 42149 2129 730 02|1 02|1 CD 42149 2129 731 - - HYPH 42149 2129 732 01|0 01|0 CD 42149 2129 733 - - HYPH 42149 2129 734 50|0 50|0 CD 42149 2129 735 - - HYPH 42149 2129 736 54| 54| CD 42149 2129 737 v| v| NN 42149 2129 738 983 983 CD 42149 2129 739 - - HYPH 42149 2129 740 990 990 CD 42149 2129 741 | | CD 42149 2129 742 17 17 CD 42149 2129 743 |0 |0 SYM 42149 2129 744 - - HYPH 42149 2129 745 02 02 CD 42149 2129 746 | | CD 42149 2129 747 0 0 CD 42149 2129 748 - - HYPH 42149 2129 749 34| 34| CD 42149 2129 750 0 0 CD 42149 2129 751 - - SYM 42149 2129 752 14 14 CD 42149 2129 753 |0 |0 NN 42149 2129 754 - - HYPH 42149 2129 755 40|0 40|0 CD 42149 2129 756 - - HYPH 42149 2129 757 40|0 40|0 CD 42149 2129 758 - - HYPH 42149 2129 759 48| 48| CD 42149 2129 760 |0 |0 NN 42149 2129 761 - - : 42149 2129 762 44| 44| CD 42149 2129 763 y| y| NNS 42149 2129 764 991 991 CD 42149 2129 765 - - HYPH 42149 2129 766 1,049| 1,049| CD 42149 2129 767 8 8 CD 42149 2129 768 |0 |0 SYM 42149 2129 769 - - HYPH 42149 2129 770 03 03 CD 42149 2129 771 | | CD 42149 2129 772 0 0 CD 42149 2129 773 - - HYPH 42149 2129 774 21| 21| CD 42149 2129 775 0 0 CD 42149 2129 776 - - SYM 42149 2129 777 11 11 CD 42149 2129 778 |0 |0 NN 42149 2129 779 - - HYPH 42149 2129 780 40|0 40|0 CD 42149 2129 781 - - HYPH 42149 2129 782 48|0 48|0 CD 42149 2129 783 - - HYPH 42149 2129 784 39| 39| CD 42149 2129 785 |0 |0 NN 42149 2129 786 - - : 42149 2129 787 41| 41| CD 42149 2129 788 |1,050 |1,050 NNP 42149 2129 789 - - HYPH 42149 2129 790 1,074| 1,074| CD 42149 2129 791 7 7 CD 42149 2129 792 |0 |0 SYM 42149 2129 793 - - HYPH 42149 2129 794 03 03 CD 42149 2129 795 | | CD 42149 2129 796 0 0 CD 42149 2129 797 - - HYPH 42149 2129 798 18| 18| CD 42149 2129 799 0 0 CD 42149 2129 800 - - SYM 42149 2129 801 10 10 CD 42149 2129 802 |0 |0 NN 42149 2129 803 - - HYPH 42149 2129 804 43|0 43|0 CD 42149 2129 805 - - HYPH 42149 2129 806 44|0 44|0 CD 42149 2129 807 - - HYPH 42149 2129 808 46|0 46|0 CD 42149 2129 809 - - HYPH 42149 2129 810 40|0 40|0 CD 42149 2129 811 - - HYPH 42149 2129 812 43| 43| CD 42149 2129 813 |1,075 |1,075 NNP 42149 2129 814 - - HYPH 42149 2129 815 1,110| 1,110| CD 42149 2129 816 16 16 CD 42149 2129 817 |0 |0 SYM 42149 2129 818 - - : 42149 2129 819 02 02 CD 42149 2129 820 | | CD 42149 2129 821 0 0 CD 42149 2129 822 - - HYPH 42149 2129 823 33| 33| CD 42149 2129 824 0 0 CD 42149 2129 825 - - SYM 42149 2129 826 12 12 CD 42149 2129 827 |0 |0 NN 42149 2129 828 - - HYPH 42149 2129 829 50|1 50|1 CD 42149 2129 830 - - HYPH 42149 2129 831 02|1 02|1 CD 42149 2129 832 - - HYPH 42149 2129 833 06|0 06|0 NNP 42149 2129 834 - - HYPH 42149 2129 835 58|0 58|0 CD 42149 2129 836 - - HYPH 42149 2129 837 55| 55| CD 42149 2129 838 | | CD 42149 2129 839 641 641 CD 42149 2129 840 - - HYPH 42149 2129 841 1,110| 1,110| CD 42149 2129 842 8 8 CD 42149 2129 843 |0 |0 SYM 42149 2129 844 - - HYPH 42149 2129 845 04 04 CD 42149 2129 846 | | CD 42149 2129 847 0 0 CD 42149 2129 848 - - HYPH 42149 2129 849 30| 30| CD 42149 2129 850 0 0 CD 42149 2129 851 - - SYM 42149 2129 852 14 14 CD 42149 2129 853 |0 |0 NN 42149 2129 854 - - HYPH 42149 2129 855 56|1 56|1 CD 42149 2129 856 - - HYPH 42149 2129 857 08|1 08|1 CD 42149 2129 858 - - HYPH 42149 2129 859 12|1 12|1 CD 42149 2129 860 - - HYPH 42149 2129 861 29|1 29|1 CD 42149 2129 862 - - HYPH 42149 2129 863 02| 02| CD 42149 2129 864 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2129 865 A| a| CD 42149 2129 866 185 185 CD 42149 2129 867 - - SYM 42149 2129 868 1,110| 1,110| CD 42149 2129 869 12 12 CD 42149 2129 870 |0 |0 CD 42149 2129 871 - - : 42149 2129 872 07 07 CD 42149 2129 873 | | CD 42149 2129 874 1 1 CD 42149 2129 875 - - HYPH 42149 2129 876 20| 20| CD 42149 2129 877 0[V 0[v CD 42149 2129 878 ] ] -RRB- 42149 2129 879 |1 |1 : 42149 2129 880 - - HYPH 42149 2129 881 48|2 48|2 CD 42149 2129 882 - - HYPH 42149 2129 883 01|2 01|2 CD 42149 2129 884 - - HYPH 42149 2129 885 11|2 11|2 CD 42149 2129 886 - - HYPH 42149 2129 887 17|1 17|1 CD 42149 2129 888 - - HYPH 42149 2129 889 56| 56| CD 42149 2129 890 l| l| JJ 42149 2129 891 25 25 CD 42149 2129 892 - - HYPH 42149 2129 893 1,110|17.1|0 1,110|17.1|0 CD 42149 2129 894 - - HYPH 42149 2129 895 12 12 CD 42149 2129 896 | | CD 42149 2129 897 3 3 CD 42149 2129 898 - - SYM 42149 2129 899 13| 13| CD 42149 2129 900 [ [ -LRB- 42149 2129 901 V V NNP 42149 2129 902 ] ] -RRB- 42149 2129 903 | | NNP 42149 2129 904 | | CD 42149 2129 905 | | CD 42149 2129 906 | | CD 42149 2129 907 |2 |2 CD 42149 2129 908 - - HYPH 42149 2129 909 05| 05| CD 42149 2129 910 l| l| JJ 42149 2129 911 | | CD 42149 2129 912 | | CD 42149 2129 913 | | CD 42149 2129 914 | | CD 42149 2129 915 | | CD 42149 2129 916 | | CD 42149 2129 917 | | CD 42149 2129 918 | | CD 42149 2129 919 | | CD 42149 2129 920 | | NNS 42149 2129 921 = = SYM 42149 2129 922 + + SYM 42149 2129 923 = = SYM 42149 2129 924 = = SYM 42149 2129 925 = = SYM 42149 2129 926 = = SYM 42149 2129 927 = = SYM 42149 2129 928 = = SYM 42149 2129 929 = = SYM 42149 2129 930 = = SYM 42149 2129 931 = = SYM 42149 2129 932 = = NFP 42149 2129 933 = = SYM 42149 2129 934 + + SYM 42149 2129 935 = = SYM 42149 2129 936 = = SYM 42149 2129 937 = = NFP 42149 2129 938 = = SYM 42149 2129 939 + + SYM 42149 2129 940 = = SYM 42149 2129 941 = = SYM 42149 2129 942 = = SYM 42149 2129 943 = = NFP 42149 2129 944 = = SYM 42149 2129 945 + + SYM 42149 2129 946 = = SYM 42149 2129 947 = = SYM 42149 2129 948 = = SYM 42149 2129 949 = = NFP 42149 2129 950 = = SYM 42149 2129 951 + + SYM 42149 2129 952 = = SYM 42149 2129 953 = = SYM 42149 2129 954 = = SYM 42149 2129 955 = = SYM 42149 2129 956 = = SYM 42149 2129 957 = = SYM 42149 2129 958 = = NFP 42149 2129 959 = = SYM 42149 2129 960 + + SYM 42149 2129 961 = = SYM 42149 2129 962 = = SYM 42149 2129 963 = = NFP 42149 2129 964 = = SYM 42149 2129 965 + + SYM 42149 2129 966 = = SYM 42149 2129 967 = = SYM 42149 2129 968 = = NFP 42149 2129 969 = = SYM 42149 2129 970 + + SYM 42149 2129 971 = = SYM 42149 2129 972 = = SYM 42149 2129 973 = = NFP 42149 2129 974 = = SYM 42149 2129 975 + + SYM 42149 2129 976 = = SYM 42149 2129 977 = = SYM 42149 2129 978 = = NFP 42149 2129 979 = = SYM 42149 2129 980 + + SYM 42149 2129 981 = = SYM 42149 2129 982 = = SYM 42149 2129 983 = = NFP 42149 2129 984 =| =| ADD 42149 2129 985 TABLE TABLE VBZ 42149 2129 986 26 26 CD 42149 2129 987 PART part CD 42149 2129 988 3 3 CD 42149 2129 989 = = SYM 42149 2129 990 + + SYM 42149 2129 991 = = SYM 42149 2129 992 = = SYM 42149 2129 993 = = SYM 42149 2129 994 = = SYM 42149 2129 995 = = SYM 42149 2129 996 = = SYM 42149 2129 997 = = SYM 42149 2129 998 = = SYM 42149 2129 999 = = SYM 42149 2129 1000 = = NFP 42149 2129 1001 = = SYM 42149 2129 1002 + + SYM 42149 2129 1003 = = SYM 42149 2129 1004 = = SYM 42149 2129 1005 = = NFP 42149 2129 1006 = = SYM 42149 2129 1007 + + SYM 42149 2129 1008 = = SYM 42149 2129 1009 = = SYM 42149 2129 1010 = = NFP 42149 2129 1011 = = SYM 42149 2129 1012 + + SYM 42149 2129 1013 = = SYM 42149 2129 1014 = = SYM 42149 2129 1015 = = NFP 42149 2129 1016 = = SYM 42149 2129 1017 + + SYM 42149 2129 1018 = = SYM 42149 2129 1019 = = SYM 42149 2129 1020 = = NFP 42149 2129 1021 = = SYM 42149 2129 1022 + + SYM 42149 2129 1023 = = SYM 42149 2129 1024 = = SYM 42149 2129 1025 = = NFP 42149 2129 1026 = = SYM 42149 2129 1027 + + SYM 42149 2129 1028 = = SYM 42149 2129 1029 = = SYM 42149 2129 1030 = = NFP 42149 2129 1031 = = SYM 42149 2129 1032 + + SYM 42149 2129 1033 = = SYM 42149 2129 1034 = = SYM 42149 2129 1035 = = SYM 42149 2129 1036 = = NFP 42149 2129 1037 = = SYM 42149 2129 1038 + + SYM 42149 2129 1039 = = SYM 42149 2129 1040 = = SYM 42149 2129 1041 = = SYM 42149 2129 1042 = = NFP 42149 2129 1043 = = SYM 42149 2129 1044 + + SYM 42149 2129 1045 = = SYM 42149 2129 1046 = = SYM 42149 2129 1047 = = SYM 42149 2129 1048 = = NFP 42149 2129 1049 = = SYM 42149 2129 1050 + + SYM 42149 2129 1051 = = SYM 42149 2129 1052 = = SYM 42149 2129 1053 = = SYM 42149 2129 1054 = = NFP 42149 2129 1055 = = SYM 42149 2129 1056 + + SYM 42149 2129 1057 = = SYM 42149 2129 1058 = = SYM 42149 2129 1059 = = SYM 42149 2129 1060 = = SYM 42149 2129 1061 =| =| ADD 42149 2129 1062 W| w| CD 42149 2129 1063 | | JJ 42149 2129 1064 BOLTING bolting NN 42149 2129 1065 TIME time NN 42149 2129 1066 , , , 42149 2129 1067 WHOLE WHOLE NNP 42149 2129 1068 |Time| |Time| NNP 42149 2129 1069 | | NNP 42149 2129 1070 e| e| JJ 42149 2129 1071 | | CD 42149 2129 1072 TIME time NN 42149 2129 1073 ON on IN 42149 2129 1074 BOLTS BOLTS NNP 42149 2129 1075 AFTER AFTER NNP 42149 2129 1076 | | CD 42149 2129 1077 | | NNP 42149 2129 1078 | | CD 42149 2129 1079 i| i| NN 42149 2129 1080 | | NNP 42149 2129 1081 RING ring NN 42149 2129 1082 IS be VBZ 42149 2129 1083 COMPLETE COMPLETE NNP 42149 2129 1084 . . . 42149 2130 1 |lost| |lost| NNP 42149 2130 2 TOTAL TOTAL NNP 42149 2130 3 TIME time NN 42149 2130 4 . . . 42149 2131 1 | | JJ 42149 2131 2 g| g| NN 42149 2131 3 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2131 4 |-----+-----+-----+-----+-----| |-----+-----+-----+-----+-----| NNP 42149 2131 5 h| h| NNP 42149 2131 6 | | NNP 42149 2131 7 | | NNP 42149 2131 8 | | CD 42149 2131 9 | | CD 42149 2131 10 | | CD 42149 2131 11 |re- |re- CD 42149 2131 12 | | CD 42149 2131 13 | | CD 42149 2131 14 | | CD 42149 2131 15 | | CD 42149 2131 16 | | CD 42149 2131 17 | | CD 42149 2131 18 t| t| NN 42149 2131 19 | | NNP 42149 2131 20 S S NNP 42149 2131 21 | | NNP 42149 2131 22 | | NNP 42149 2131 23 | | NNP 42149 2131 24 | | NNP 42149 2131 25 |pair- |pair- NNP 42149 2131 26 | | NNP 42149 2131 27 | | NNP 42149 2131 28 | | CD 42149 2131 29 | | CD 42149 2131 30 | | CD 42149 2131 31 | | CD 42149 2131 32 | | NNP 42149 2131 33 t t NNP 42149 2131 34 | | NNP 42149 2131 35 | | NNP 42149 2131 36 | | CD 42149 2131 37 | | CD 42149 2131 38 |ing |e VBG 42149 2131 39 | | CD 42149 2131 40 | | CD 42149 2131 41 | | CD 42149 2131 42 | | CD 42149 2131 43 | | CD 42149 2131 44 | | CD 42149 2131 45 o| o| NN 42149 2131 46 | | CD 42149 2131 47 r r NNP 42149 2131 48 | | NNP 42149 2131 49 B B NNP 42149 2131 50 | | NNP 42149 2131 51 B B NNP 42149 2131 52 | | NNP 42149 2131 53 | | NNP 42149 2131 54 | | NNP 42149 2131 55 | | NNP 42149 2131 56 S S NNP 42149 2131 57 | | NNP 42149 2131 58 | | NNP 42149 2131 59 | | CD 42149 2131 60 | | CD 42149 2131 61 | | CD 42149 2131 62 f| f| NN 42149 2131 63 | | NNP 42149 2131 64 a a DT 42149 2131 65 | | CD 42149 2131 66 o o NN 42149 2131 67 | | NNP 42149 2131 68 o o NNP 42149 2131 69 | | NNP 42149 2131 70 T T NNP 42149 2131 71 | | NNP 42149 2131 72 |hy- |hy- NNP 42149 2131 73 | | NNP 42149 2131 74 t t NNP 42149 2131 75 | | NNP 42149 2131 76 | | NNP 42149 2131 77 | | CD 42149 2131 78 | | CD 42149 2131 79 | | CD 42149 2131 80 | | CD 42149 2131 81 | | NNP 42149 2131 82 i i PRP 42149 2131 83 | | CD 42149 2131 84 r r NNP 42149 2131 85 | | NNP 42149 2131 86 r r NNP 42149 2131 87 | | NNP 42149 2131 88 a a DT 42149 2131 89 | | NNP 42149 2131 90 M M NNP 42149 2131 91 |drau- |drau- NNP 42149 2131 92 r r NNP 42149 2131 93 | | NNP 42149 2131 94 B B NNP 42149 2131 95 | | NNP 42149 2131 96 B B NNP 42149 2131 97 | | NNP 42149 2131 98 | | NNP 42149 2131 99 | | CD 42149 2131 100 | | CD 42149 2131 101 | | NNP 42149 2131 102 g g NNP 42149 2131 103 | | NNP 42149 2131 104 e e NNP 42149 2131 105 | | NNP 42149 2131 106 e e NNP 42149 2131 107 | | NNP 42149 2131 108 p p NNP 42149 2131 109 | | NNP 42149 2131 110 e e NNP 42149 2131 111 |lic |lic NNP 42149 2131 112 | | NNP 42149 2131 113 a a DT 42149 2131 114 | | NNP 42149 2131 115 o o NN 42149 2131 116 | | NNP 42149 2131 117 o o NNP 42149 2131 118 | | NNP 42149 2131 119 T T NNP 42149 2131 120 | | HYPH 42149 2131 121 | | NNP 42149 2131 122 i| i| JJ 42149 2131 123 | | CD 42149 2131 124 h h NNP 42149 2131 125 | | CD 42149 2131 126 | | CD 42149 2131 127 | | CD 42149 2131 128 e e NN 42149 2131 129 | | NNP 42149 2131 130 a a DT 42149 2131 131 | | CD 42149 2131 132 | | NNP 42149 2131 133 i i PRP 42149 2131 134 | | CD 42149 2131 135 r r NNP 42149 2131 136 | | NNP 42149 2131 137 r r NNP 42149 2131 138 | | NNP 42149 2131 139 a a DT 42149 2131 140 | | NNP 42149 2131 141 M M NNP 42149 2131 142 | | CD 42149 2131 143 r| r| NNP 42149 2131 144 Section Section NNP 42149 2131 145 | | NNP 42149 2131 146 t t NNP 42149 2131 147 | | CD 42149 2131 148 1 1 CD 42149 2131 149 | | CD 42149 2131 150 2 2 CD 42149 2131 151 | | CD 42149 2131 152 r r NN 42149 2131 153 | | CD 42149 2131 154 n n NN 42149 2131 155 |pip-| |pip-| NNP 42149 2131 156 g g NN 42149 2131 157 | | NNP 42149 2131 158 e e NNP 42149 2131 159 | | NNP 42149 2131 160 e e NNP 42149 2131 161 | | NNP 42149 2131 162 p p NNP 42149 2131 163 | | NNP 42149 2131 164 e e NN 42149 2131 165 | | CD 42149 2131 166 o| o| NN 42149 2131 167 between between IN 42149 2131 168 |----+----+----+----+----|ing |----+----+----+----+----|ing NNP 42149 2131 169 | | NNP 42149 2131 170 h h NNP 42149 2131 171 | | CD 42149 2131 172 | | CD 42149 2131 173 | | CD 42149 2131 174 e e NN 42149 2131 175 | | NNP 42149 2131 176 a a DT 42149 2131 177 | | CD 42149 2131 178 n| n| NN 42149 2131 179 rings ring NNS 42149 2131 180 | | CD 42149 2131 181 H H NNP 42149 2131 182 | | NNP 42149 2131 183 H h NN 42149 2131 184 | | NNP 42149 2131 185 H h NN 42149 2131 186 | | NNP 42149 2131 187 H H NNP 42149 2131 188 | | NNP 42149 2131 189 H H NNP 42149 2131 190 | | NNP 42149 2131 191 | | NNP 42149 2131 192 t t NN 42149 2131 193 | | CD 42149 2131 194 1 1 CD 42149 2131 195 | | CD 42149 2131 196 2 2 CD 42149 2131 197 | | CD 42149 2131 198 r r NNP 42149 2131 199 | | CD 42149 2131 200 n n CC 42149 2131 201 | | CD 42149 2131 202 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2131 203 | | CD 42149 2131 204 1 1 CD 42149 2131 205 - - HYPH 42149 2131 206 24 24 CD 42149 2131 207 | | NNP 42149 2131 208 Excavation Excavation NNP 42149 2131 209 partially partially RB 42149 2131 210 | | VBZ 42149 2131 211 |10 |10 CD 42149 2131 212 - - HYPH 42149 2131 213 55| 55| CD 42149 2131 214 | | CD 42149 2131 215 | | CD 42149 2131 216 |10 |10 CD 42149 2131 217 - - HYPH 42149 2131 218 55| 55| CD 42149 2131 219 | | CD 42149 2131 220 25 25 CD 42149 2131 221 - - HYPH 42149 2131 222 55 55 CD 42149 2131 223 | | NNS 42149 2131 224 } } -RRB- 42149 2131 225 completed complete VBN 42149 2131 226 previously previously RB 42149 2131 227 . . . 42149 2132 1 { { -LRB- 42149 2132 2 | | CD 42149 2132 3 |43 |43 CD 42149 2132 4 - - HYPH 42149 2132 5 58| 58| CD 42149 2132 6 | | CD 42149 2132 7 |44 |44 CD 42149 2132 8 - - HYPH 42149 2132 9 43|44 43|44 CD 42149 2132 10 - - HYPH 42149 2132 11 02| 02| CD 42149 2132 12 | | CD 42149 2132 13 56 56 CD 42149 2132 14 - - HYPH 42149 2132 15 72 72 CD 42149 2132 16 | | NNS 42149 2132 17 } } -RRB- 42149 2132 18 { { -LRB- 42149 2132 19 |0 |0 IN 42149 2132 20 - - HYPH 42149 2132 21 04|18 04|18 CD 42149 2132 22 - - HYPH 42149 2132 23 02| 02| CD 42149 2132 24 | | CD 42149 2132 25 |18 |18 CD 42149 2132 26 - - HYPH 42149 2132 27 24|18 24|18 CD 42149 2132 28 - - HYPH 42149 2132 29 04| 04| CD 42149 2132 30 O| o| CD 42149 2132 31 73 73 CD 42149 2132 32 - - SYM 42149 2132 33 165 165 CD 42149 2132 34 | | NNS 42149 2132 35 } } -RRB- 42149 2132 36 { { -LRB- 42149 2132 37 |0 |0 NN 42149 2132 38 - - : 42149 2132 39 09| 09| CD 42149 2132 40 9 9 CD 42149 2132 41 - - SYM 42149 2132 42 32| 32| CD 42149 2132 43 | | CD 42149 2132 44 | | CD 42149 2132 45 9 9 CD 42149 2132 46 - - SYM 42149 2132 47 26| 26| CD 42149 2132 48 9 9 CD 42149 2132 49 - - SYM 42149 2132 50 31| 31| CD 42149 2132 51 r| r| NN 42149 2132 52 166 166 CD 42149 2132 53 - - SYM 42149 2132 54 184 184 CD 42149 2132 55 | | CD 42149 2132 56 } } -RRB- 42149 2132 57 { { -LRB- 42149 2132 58 |0 |0 IN 42149 2132 59 - - : 42149 2132 60 07| 07| CD 42149 2132 61 8 8 CD 42149 2132 62 - - SYM 42149 2132 63 57| 57| CD 42149 2132 64 | | CD 42149 2132 65 |12 |12 CD 42149 2132 66 - - HYPH 42149 2132 67 56| 56| CD 42149 2132 68 9 9 CD 42149 2132 69 - - HYPH 42149 2132 70 03| 03| CD 42149 2132 71 d| d| NN 42149 2132 72 185 185 CD 42149 2132 73 - - SYM 42149 2132 74 253 253 CD 42149 2132 75 | | CD 42149 2132 76 } } -RRB- 42149 2132 77 { { -LRB- 42149 2132 78 |0 |0 IN 42149 2132 79 - - : 42149 2132 80 15| 15| CD 42149 2132 81 8 8 CD 42149 2132 82 - - SYM 42149 2132 83 25| 25| CD 42149 2132 84 9 9 CD 42149 2132 85 - - SYM 42149 2132 86 12| 12| CD 42149 2132 87 9 9 CD 42149 2132 88 - - SYM 42149 2132 89 20| 20| CD 42149 2132 90 8 8 CD 42149 2132 91 - - SYM 42149 2132 92 28| 28| CD 42149 2132 93 8 8 CD 42149 2132 94 - - SYM 42149 2132 95 43| 43| CD 42149 2132 96 i| i| NN 42149 2132 97 | | NNS 42149 2132 98 } } -RRB- 42149 2132 99 { { -LRB- 42149 2132 100 | | CD 42149 2132 101 | | NNP 42149 2132 102 | | CD 42149 2132 103 | | CD 42149 2132 104 | | CD 42149 2132 105 | | CD 42149 2132 106 | | CD 42149 2132 107 n| n| NN 42149 2132 108 254 254 CD 42149 2132 109 - - SYM 42149 2132 110 293 293 CD 42149 2132 111 | | CD 42149 2132 112 } } -RRB- 42149 2132 113 Bolting Bolting NNP 42149 2132 114 time time NN 42149 2132 115 for for IN 42149 2132 116 { { -LRB- 42149 2132 117 |0 |0 IN 42149 2132 118 - - : 42149 2132 119 14| 14| CD 42149 2132 120 3 3 CD 42149 2132 121 - - SYM 42149 2132 122 57| 57| CD 42149 2132 123 3 3 CD 42149 2132 124 - - SYM 42149 2132 125 56| 56| CD 42149 2132 126 4 4 CD 42149 2132 127 - - SYM 42149 2132 128 14| 14| CD 42149 2132 129 4 4 CD 42149 2132 130 - - SYM 42149 2132 131 44| 44| CD 42149 2132 132 4 4 CD 42149 2132 133 - - HYPH 42149 2132 134 01| 01| CD 42149 2132 135 a| a| NN 42149 2132 136 294 294 CD 42149 2132 137 - - SYM 42149 2132 138 301 301 CD 42149 2132 139 | | CD 42149 2132 140 } } -RRB- 42149 2132 141 light light JJ 42149 2132 142 iron iron NN 42149 2132 143 is be VBZ 42149 2132 144 { { -LRB- 42149 2132 145 | | CD 42149 2132 146 | | CD 42149 2132 147 2 2 CD 42149 2132 148 - - HYPH 42149 2132 149 06| 06| CD 42149 2132 150 2 2 CD 42149 2132 151 - - SYM 42149 2132 152 53| 53| CD 42149 2132 153 2 2 CD 42149 2132 154 - - HYPH 42149 2132 155 58| 58| CD 42149 2132 156 | | CD 42149 2132 157 2 2 CD 42149 2132 158 - - SYM 42149 2132 159 25| 25| CD 42149 2132 160 r| r| NN 42149 2132 161 302 302 CD 42149 2132 162 - - HYPH 42149 2132 163 307 307 CD 42149 2132 164 | | CD 42149 2132 165 } } -RRB- 42149 2132 166 included include VBD 42149 2132 167 in in IN 42149 2132 168 { { -LRB- 42149 2132 169 | | CD 42149 2132 170 | | CD 42149 2132 171 6 6 CD 42149 2132 172 - - HYPH 42149 2132 173 23| 23| CD 42149 2132 174 5 5 CD 42149 2132 175 - - SYM 42149 2132 176 43| 43| CD 42149 2132 177 5 5 CD 42149 2132 178 - - SYM 42149 2132 179 58| 58| CD 42149 2132 180 7 7 CD 42149 2132 181 - - SYM 42149 2132 182 00| 00| CD 42149 2132 183 6 6 CD 42149 2132 184 - - SYM 42149 2132 185 25| 25| CD 42149 2132 186 y| y| NNS 42149 2132 187 308 308 CD 42149 2132 188 - - SYM 42149 2132 189 342 342 CD 42149 2132 190 | | CD 42149 2132 191 } } -RRB- 42149 2132 192 erection erection NN 42149 2132 193 . . . 42149 2133 1 { { -LRB- 42149 2133 2 | | CD 42149 2133 3 | | CD 42149 2133 4 2 2 CD 42149 2133 5 - - SYM 42149 2133 6 36| 36| CD 42149 2133 7 2 2 CD 42149 2133 8 - - SYM 42149 2133 9 10| 10| CD 42149 2133 10 3 3 CD 42149 2133 11 - - SYM 42149 2133 12 18| 18| CD 42149 2133 13 2 2 CD 42149 2133 14 - - HYPH 42149 2133 15 29| 29| CD 42149 2133 16 2 2 CD 42149 2133 17 - - SYM 42149 2133 18 38| 38| CD 42149 2133 19 | | CD 42149 2133 20 343 343 CD 42149 2133 21 - - HYPH 42149 2133 22 347 347 CD 42149 2133 23 | | NNS 42149 2133 24 } } -RRB- 42149 2133 25 { { -LRB- 42149 2133 26 |0 |0 NN 42149 2133 27 - - : 42149 2133 28 39| 39| CD 42149 2133 29 4 4 CD 42149 2133 30 - - HYPH 42149 2133 31 05| 05| CD 42149 2133 32 4 4 CD 42149 2133 33 - - SYM 42149 2133 34 10| 10| CD 42149 2133 35 | | CD 42149 2133 36 4 4 CD 42149 2133 37 - - SYM 42149 2133 38 43| 43| CD 42149 2133 39 4 4 CD 42149 2133 40 - - CD 42149 2133 41 23| 23| CD 42149 2133 42 | | CD 42149 2133 43 348 348 CD 42149 2133 44 - - HYPH 42149 2133 45 459 459 CD 42149 2133 46 | | NNS 42149 2133 47 } } -RRB- 42149 2133 48 { { -LRB- 42149 2133 49 |0 |0 IN 42149 2133 50 - - : 42149 2133 51 14| 14| CD 42149 2133 52 2 2 CD 42149 2133 53 - - SYM 42149 2133 54 50| 50| CD 42149 2133 55 2 2 CD 42149 2133 56 - - SYM 42149 2133 57 51| 51| CD 42149 2133 58 2 2 CD 42149 2133 59 - - SYM 42149 2133 60 56| 56| CD 42149 2133 61 3 3 CD 42149 2133 62 - - SYM 42149 2133 63 10| 10| CD 42149 2133 64 2 2 CD 42149 2133 65 - - HYPH 42149 2133 66 53| 53| CD 42149 2133 67 | | CD 42149 2133 68 | | NNS 42149 2133 69 } } -RRB- 42149 2133 70 { { -LRB- 42149 2133 71 | | CD 42149 2133 72 | | NNP 42149 2133 73 | | CD 42149 2133 74 | | CD 42149 2133 75 | | CD 42149 2133 76 | | CD 42149 2133 77 | | CD 42149 2133 78 | | CD 42149 2133 79 460 460 CD 42149 2133 80 - - HYPH 42149 2133 81 494 494 CD 42149 2133 82 | | NNS 42149 2133 83 } } -RRB- 42149 2133 84 { { -LRB- 42149 2133 85 |0 |0 IN 42149 2133 86 - - : 42149 2133 87 27| 27| CD 42149 2133 88 4 4 CD 42149 2133 89 - - SYM 42149 2133 90 39| 39| CD 42149 2133 91 4 4 CD 42149 2133 92 - - SYM 42149 2133 93 20| 20| CD 42149 2133 94 4 4 CD 42149 2133 95 - - SYM 42149 2133 96 40| 40| CD 42149 2133 97 3 3 CD 42149 2133 98 - - SYM 42149 2133 99 40| 40| CD 42149 2133 100 4 4 CD 42149 2133 101 - - SYM 42149 2133 102 28| 28| CD 42149 2133 103 | | CD 42149 2133 104 495 495 CD 42149 2133 105 - - HYPH 42149 2133 106 513 513 CD 42149 2133 107 | | NNS 42149 2133 108 } } -RRB- 42149 2133 109 { { -LRB- 42149 2133 110 | | CD 42149 2133 111 | | CD 42149 2133 112 4 4 CD 42149 2133 113 - - HYPH 42149 2133 114 03| 03| CD 42149 2133 115 3 3 CD 42149 2133 116 - - SYM 42149 2133 117 51| 51| CD 42149 2133 118 3 3 CD 42149 2133 119 - - SYM 42149 2133 120 23| 23| CD 42149 2133 121 3 3 CD 42149 2133 122 - - SYM 42149 2133 123 38| 38| CD 42149 2133 124 3 3 CD 42149 2133 125 - - HYPH 42149 2133 126 54| 54| CD 42149 2133 127 | | CD 42149 2133 128 514 514 CD 42149 2133 129 - - HYPH 42149 2133 130 605 605 CD 42149 2133 131 | | CD 42149 2133 132 } } -RRB- 42149 2133 133 { { -LRB- 42149 2133 134 | | CD 42149 2133 135 | | CD 42149 2133 136 3 3 CD 42149 2133 137 - - HYPH 42149 2133 138 56| 56| CD 42149 2133 139 4 4 CD 42149 2133 140 - - SYM 42149 2133 141 18| 18| CD 42149 2133 142 4 4 CD 42149 2133 143 - - SYM 42149 2133 144 13| 13| CD 42149 2133 145 3 3 CD 42149 2133 146 - - SYM 42149 2133 147 59| 59| CD 42149 2133 148 4 4 CD 42149 2133 149 - - HYPH 42149 2133 150 03| 03| CD 42149 2133 151 | | CD 42149 2133 152 606 606 CD 42149 2133 153 - - HYPH 42149 2133 154 624 624 CD 42149 2133 155 | | CD 42149 2133 156 } } -RRB- 42149 2133 157 { { -LRB- 42149 2133 158 | | CD 42149 2133 159 | | CD 42149 2133 160 3 3 CD 42149 2133 161 - - HYPH 42149 2133 162 01| 01| CD 42149 2133 163 3 3 CD 42149 2133 164 - - SYM 42149 2133 165 40| 40| CD 42149 2133 166 3 3 CD 42149 2133 167 - - SYM 42149 2133 168 23| 23| CD 42149 2133 169 2 2 CD 42149 2133 170 - - SYM 42149 2133 171 42| 42| CD 42149 2133 172 3 3 CD 42149 2133 173 - - HYPH 42149 2133 174 11| 11| CD 42149 2133 175 | | CD 42149 2133 176 625 625 CD 42149 2133 177 - - SYM 42149 2133 178 640 640 CD 42149 2133 179 | | NNS 42149 2133 180 } } -RRB- 42149 2133 181 { { -LRB- 42149 2133 182 | | CD 42149 2133 183 | | CD 42149 2133 184 3 3 CD 42149 2133 185 - - HYPH 42149 2133 186 27| 27| CD 42149 2133 187 4 4 CD 42149 2133 188 - - SYM 42149 2133 189 08| 08| CD 42149 2133 190 3 3 CD 42149 2133 191 - - SYM 42149 2133 192 48| 48| CD 42149 2133 193 3 3 CD 42149 2133 194 - - SYM 42149 2133 195 59| 59| CD 42149 2133 196 3 3 CD 42149 2133 197 - - SYM 42149 2133 198 41| 41| CD 42149 2133 199 | | CD 42149 2133 200 25 25 CD 42149 2133 201 - - HYPH 42149 2133 202 640 640 CD 42149 2133 203 | | NNS 42149 2133 204 } } -RRB- 42149 2133 205 { { -LRB- 42149 2133 206 | | CD 42149 2133 207 | | NNP 42149 2133 208 | | CD 42149 2133 209 | | CD 42149 2133 210 | | CD 42149 2133 211 | | CD 42149 2133 212 | | CD 42149 2133 213 | | CD 42149 2133 214 185 185 CD 42149 2133 215 - - HYPH 42149 2133 216 640 640 CD 42149 2133 217 | | NNS 42149 2133 218 } } -RRB- 42149 2133 219 { { -LRB- 42149 2133 220 |0 |0 NN 42149 2133 221 - - : 42149 2133 222 09| 09| NNP 42149 2133 223 4 4 CD 42149 2133 224 - - SYM 42149 2133 225 14| 14| CD 42149 2133 226 4 4 CD 42149 2133 227 - - SYM 42149 2133 228 26| 26| CD 42149 2133 229 4 4 CD 42149 2133 230 - - SYM 42149 2133 231 33| 33| CD 42149 2133 232 4 4 CD 42149 2133 233 - - SYM 42149 2133 234 22| 22| CD 42149 2133 235 4 4 CD 42149 2133 236 - - SYM 42149 2133 237 20| 20| CD 42149 2133 238 -+-----------+------------------------+----+-----+-----+-----+-----+-----| -+-----------+------------------------+----+-----+-----+-----+-----+-----| NNP 42149 2133 239 | | NNP 42149 2133 240 641 641 CD 42149 2133 241 - - SYM 42149 2133 242 647 647 CD 42149 2133 243 |0 |0 NN 42149 2133 244 - - HYPH 42149 2133 245 40|0 40|0 CD 42149 2133 246 - - HYPH 42149 2133 247 35|1 35|1 CD 42149 2133 248 - - HYPH 42149 2133 249 25|0 25|0 CD 42149 2133 250 - - HYPH 42149 2133 251 55|0 55|0 CD 42149 2133 252 - - HYPH 42149 2133 253 47| 47| CD 42149 2133 254 | | CD 42149 2133 255 3 3 CD 42149 2133 256 - - HYPH 42149 2133 257 08| 08| CD 42149 2133 258 3 3 CD 42149 2133 259 - - SYM 42149 2133 260 51| 51| CD 42149 2133 261 4 4 CD 42149 2133 262 - - SYM 42149 2133 263 28| 28| CD 42149 2133 264 3 3 CD 42149 2133 265 - - SYM 42149 2133 266 43| 43| CD 42149 2133 267 3 3 CD 42149 2133 268 - - SYM 42149 2133 269 36| 36| CD 42149 2133 270 | | CD 42149 2133 271 648 648 CD 42149 2133 272 - - HYPH 42149 2133 273 751 751 CD 42149 2133 274 |0 |0 . 42149 2133 275 - - HYPH 42149 2133 276 31|0 31|0 CD 42149 2133 277 - - HYPH 42149 2133 278 29|0 29|0 CD 42149 2133 279 - - HYPH 42149 2133 280 38|0 38|0 CD 42149 2133 281 - - HYPH 42149 2133 282 30|0 30|0 CD 42149 2133 283 - - HYPH 42149 2133 284 32|0 32|0 CD 42149 2133 285 - - HYPH 42149 2133 286 12| 12| CD 42149 2133 287 2 2 CD 42149 2133 288 - - SYM 42149 2133 289 52| 52| CD 42149 2133 290 2 2 CD 42149 2133 291 - - SYM 42149 2133 292 51| 51| NNP 42149 2133 293 3 3 CD 42149 2133 294 - - SYM 42149 2133 295 04| 04| CD 42149 2133 296 3 3 CD 42149 2133 297 - - SYM 42149 2133 298 25| 25| CD 42149 2133 299 2 2 CD 42149 2133 300 - - HYPH 42149 2133 301 55| 55| CD 42149 2133 302 | | CD 42149 2133 303 752 752 CD 42149 2133 304 - - HYPH 42149 2133 305 795 795 CD 42149 2133 306 |0 |0 : 42149 2133 307 - - HYPH 42149 2133 308 48|0 48|0 CD 42149 2133 309 - - HYPH 42149 2133 310 31|0 31|0 CD 42149 2133 311 - - HYPH 42149 2133 312 44|0 44|0 CD 42149 2133 313 - - HYPH 42149 2133 314 35|0 35|0 CD 42149 2133 315 - - HYPH 42149 2133 316 43|0 43|0 CD 42149 2133 317 - - HYPH 42149 2133 318 05| 05| CD 42149 2133 319 2 2 CD 42149 2133 320 - - SYM 42149 2133 321 22| 22| CD 42149 2133 322 2 2 CD 42149 2133 323 - - SYM 42149 2133 324 44| 44| CD 42149 2133 325 3 3 CD 42149 2133 326 - - HYPH 42149 2133 327 03| 03| CD 42149 2133 328 4 4 CD 42149 2133 329 - - SYM 42149 2133 330 00| 00| CD 42149 2133 331 2 2 CD 42149 2133 332 - - SYM 42149 2133 333 41| 41| CD 42149 2133 334 H| h| CD 42149 2133 335 796 796 CD 42149 2133 336 - - SYM 42149 2133 337 825 825 CD 42149 2133 338 |0 |0 NN 42149 2133 339 - - HYPH 42149 2133 340 31|1 31|1 CD 42149 2133 341 - - HYPH 42149 2133 342 03|0 03|0 CD 42149 2133 343 - - HYPH 42149 2133 344 49|3 49|3 CD 42149 2133 345 - - HYPH 42149 2133 346 27|0 27|0 CD 42149 2133 347 - - HYPH 42149 2133 348 51| 51| CD 42149 2133 349 | | CD 42149 2133 350 2 2 CD 42149 2133 351 - - SYM 42149 2133 352 10| 10| CD 42149 2133 353 3 3 CD 42149 2133 354 - - SYM 42149 2133 355 25| 25| CD 42149 2133 356 3 3 CD 42149 2133 357 - - SYM 42149 2133 358 14| 14| CD 42149 2133 359 5 5 CD 42149 2133 360 - - HYPH 42149 2133 361 11| 11| CD 42149 2133 362 2 2 CD 42149 2133 363 - - SYM 42149 2133 364 45| 45| CD 42149 2133 365 e| e| NNP 42149 2133 366 826 826 CD 42149 2133 367 - - SYM 42149 2133 368 854 854 CD 42149 2133 369 |0 |0 NNS 42149 2133 370 - - : 42149 2133 371 22|0 22|0 CD 42149 2133 372 - - HYPH 42149 2133 373 37|0 37|0 CD 42149 2133 374 - - HYPH 42149 2133 375 38|0 38|0 CD 42149 2133 376 - - HYPH 42149 2133 377 20|0 20|0 CD 42149 2133 378 - - HYPH 42149 2133 379 27|0 27|0 CD 42149 2133 380 - - HYPH 42149 2133 381 06| 06| CD 42149 2133 382 2 2 CD 42149 2133 383 - - SYM 42149 2133 384 29| 29| CD 42149 2133 385 3 3 CD 42149 2133 386 - - SYM 42149 2133 387 02| 02| CD 42149 2133 388 2 2 CD 42149 2133 389 - - SYM 42149 2133 390 53| 53| CD 42149 2133 391 2 2 CD 42149 2133 392 - - SYM 42149 2133 393 56| 56| CD 42149 2133 394 2 2 CD 42149 2133 395 - - SYM 42149 2133 396 41| 41| CD 42149 2133 397 a| a| NN 42149 2133 398 855 855 CD 42149 2133 399 - - SYM 42149 2133 400 881 881 CD 42149 2133 401 |0 |0 NN 42149 2133 402 - - : 42149 2133 403 22|0 22|0 CD 42149 2133 404 - - HYPH 42149 2133 405 21|0 21|0 CD 42149 2133 406 - - HYPH 42149 2133 407 45|0 45|0 CD 42149 2133 408 - - HYPH 42149 2133 409 40|0 40|0 CD 42149 2133 410 - - HYPH 42149 2133 411 26|0 26|0 CD 42149 2133 412 - - HYPH 42149 2133 413 45| 45| CD 42149 2133 414 2 2 CD 42149 2133 415 - - SYM 42149 2133 416 55| 55| CD 42149 2133 417 2 2 CD 42149 2133 418 - - SYM 42149 2133 419 40| 40| CD 42149 2133 420 3 3 CD 42149 2133 421 - - SYM 42149 2133 422 34| 34| CD 42149 2133 423 3 3 CD 42149 2133 424 - - SYM 42149 2133 425 34| 34| CD 42149 2133 426 3 3 CD 42149 2133 427 - - HYPH 42149 2133 428 01| 01| CD 42149 2133 429 v| v| NN 42149 2133 430 882 882 CD 42149 2133 431 - - SYM 42149 2133 432 982 982 CD 42149 2133 433 |0 |0 : 42149 2133 434 - - HYPH 42149 2133 435 41|0 41|0 CD 42149 2133 436 - - HYPH 42149 2133 437 36|0 36|0 CD 42149 2133 438 - - HYPH 42149 2133 439 36|0 36|0 CD 42149 2133 440 - - HYPH 42149 2133 441 15|0 15|0 CD 42149 2133 442 - - HYPH 42149 2133 443 39|0 39|0 CD 42149 2133 444 - - HYPH 42149 2133 445 12| 12| CD 42149 2133 446 2 2 CD 42149 2133 447 - - HYPH 42149 2133 448 16| 16| CD 42149 2133 449 2 2 CD 42149 2133 450 - - SYM 42149 2133 451 24| 24| CD 42149 2133 452 2 2 CD 42149 2133 453 - - SYM 42149 2133 454 23| 23| CD 42149 2133 455 1 1 CD 42149 2133 456 - - SYM 42149 2133 457 51| 51| CD 42149 2133 458 2 2 CD 42149 2133 459 - - SYM 42149 2133 460 19| 19| CD 42149 2133 461 y| y| NNS 42149 2133 462 983 983 CD 42149 2133 463 - - HYPH 42149 2133 464 990 990 CD 42149 2133 465 |1 |1 : 42149 2133 466 - - HYPH 42149 2133 467 15|0 15|0 CD 42149 2133 468 - - HYPH 42149 2133 469 15|0 15|0 CD 42149 2133 470 - - HYPH 42149 2133 471 28| 28| CD 42149 2133 472 |0 |0 '' 42149 2133 473 - - : 42149 2133 474 48| 48| CD 42149 2133 475 | | CD 42149 2133 476 2 2 CD 42149 2133 477 - - HYPH 42149 2133 478 43| 43| CD 42149 2133 479 1 1 CD 42149 2133 480 - - SYM 42149 2133 481 43| 43| CD 42149 2133 482 2 2 CD 42149 2133 483 - - HYPH 42149 2133 484 04| 04| CD 42149 2133 485 | | CD 42149 2133 486 2 2 CD 42149 2133 487 - - HYPH 42149 2133 488 20| 20| CD 42149 2133 489 | | CD 42149 2133 490 990 990 CD 42149 2133 491 - - HYPH 42149 2133 492 1,046|0 1,046|0 CD 42149 2133 493 - - HYPH 42149 2133 494 41|0 41|0 CD 42149 2133 495 - - HYPH 42149 2133 496 34|0 34|0 CD 42149 2133 497 - - HYPH 42149 2133 498 55| 55| CD 42149 2133 499 |0 |0 . 42149 2133 500 - - : 42149 2133 501 41| 41| CD 42149 2133 502 | | CD 42149 2133 503 1 1 CD 42149 2133 504 - - HYPH 42149 2133 505 53| 53| CD 42149 2133 506 1 1 CD 42149 2133 507 - - HYPH 42149 2133 508 54| 54| CD 42149 2133 509 2 2 CD 42149 2133 510 - - HYPH 42149 2133 511 06| 06| CD 42149 2133 512 | | CD 42149 2133 513 1 1 CD 42149 2133 514 - - HYPH 42149 2133 515 54| 54| CD 42149 2133 516 |1,047 |1,047 NNP 42149 2133 517 - - HYPH 42149 2133 518 1,074|0 1,074|0 IN 42149 2133 519 - - HYPH 42149 2133 520 35|1 35|1 CD 42149 2133 521 - - HYPH 42149 2133 522 15|0 15|0 CD 42149 2133 523 - - HYPH 42149 2133 524 07|0 07|0 CD 42149 2133 525 - - HYPH 42149 2133 526 35|0 35|0 CD 42149 2133 527 - - HYPH 42149 2133 528 48|0 48|0 CD 42149 2133 529 - - HYPH 42149 2133 530 04| 04| CD 42149 2133 531 1 1 CD 42149 2133 532 - - SYM 42149 2133 533 50| 50| CD 42149 2133 534 2 2 CD 42149 2133 535 - - SYM 42149 2133 536 31| 31| CD 42149 2133 537 2 2 CD 42149 2133 538 - - SYM 42149 2133 539 25| 25| CD 42149 2133 540 1 1 CD 42149 2133 541 - - SYM 42149 2133 542 47| 47| CD 42149 2133 543 2 2 CD 42149 2133 544 - - HYPH 42149 2133 545 03| 03| CD 42149 2133 546 |1,075 |1,075 NNP 42149 2133 547 - - HYPH 42149 2133 548 1,110|0 1,110|0 CD 42149 2133 549 - - HYPH 42149 2133 550 35|0 35|0 CD 42149 2133 551 - - HYPH 42149 2133 552 46|0 46|0 CD 42149 2133 553 - - HYPH 42149 2133 554 58|2 58|2 CD 42149 2133 555 - - HYPH 42149 2133 556 10|0 10|0 CD 42149 2133 557 - - HYPH 42149 2133 558 41|0 41|0 CD 42149 2133 559 - - HYPH 42149 2133 560 21| 21| CD 42149 2133 561 2 2 CD 42149 2133 562 - - SYM 42149 2133 563 31| 31| CD 42149 2133 564 2 2 CD 42149 2133 565 - - HYPH 42149 2133 566 54| 54| CD 42149 2133 567 2 2 CD 42149 2133 568 - - SYM 42149 2133 569 10| 10| CD 42149 2133 570 4 4 CD 42149 2133 571 - - SYM 42149 2133 572 14| 14| CD 42149 2133 573 2 2 CD 42149 2133 574 - - HYPH 42149 2133 575 42| 42| CD 42149 2133 576 | | CD 42149 2133 577 641 641 CD 42149 2133 578 - - HYPH 42149 2133 579 1,110|0 1,110|0 CD 42149 2133 580 - - HYPH 42149 2133 581 36|0 36|0 CD 42149 2133 582 - - HYPH 42149 2133 583 36|0 36|0 CD 42149 2133 584 - - HYPH 42149 2133 585 44|0 44|0 CD 42149 2133 586 - - HYPH 42149 2133 587 54|6 54|6 CD 42149 2133 588 - - HYPH 42149 2133 589 38|0 38|0 CD 42149 2133 590 - - HYPH 42149 2133 591 11| 11| CD 42149 2133 592 2 2 CD 42149 2133 593 - - SYM 42149 2133 594 27| 27| CD 42149 2133 595 2 2 CD 42149 2133 596 - - SYM 42149 2133 597 27| 27| CD 42149 2133 598 2 2 CD 42149 2133 599 - - SYM 42149 2133 600 51| 51| CD 42149 2133 601 3 3 CD 42149 2133 602 - - SYM 42149 2133 603 18| 18| CD 42149 2133 604 2 2 CD 42149 2133 605 - - HYPH 42149 2133 606 35| 35| CD 42149 2133 607 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2133 608 A| a| CD 42149 2133 609 185 185 CD 42149 2133 610 - - HYPH 42149 2133 611 1,110|[W 1,110|[W NNP 42149 2133 612 ] ] -RRB- 42149 2133 613 | | CD 42149 2133 614 | | CD 42149 2133 615 | | CD 42149 2133 616 | | CD 42149 2133 617 |0 |0 NN 42149 2133 618 - - , 42149 2133 619 10| 10| CD 42149 2133 620 3 3 CD 42149 2133 621 - - SYM 42149 2133 622 18| 18| CD 42149 2133 623 3 3 CD 42149 2133 624 - - SYM 42149 2133 625 31| 31| CD 42149 2133 626 3 3 CD 42149 2133 627 - - SYM 42149 2133 628 41| 41| CD 42149 2133 629 3 3 CD 42149 2133 630 - - SYM 42149 2133 631 47| 47| CD 42149 2133 632 3 3 CD 42149 2133 633 - - SYM 42149 2133 634 26| 26| CD 42149 2133 635 l| l| JJ 42149 2133 636 25 25 CD 42149 2133 637 - - HYPH 42149 2133 638 1,110|[W 1,110|[W NNP 42149 2133 639 ] ] -RRB- 42149 2133 640 | | CD 42149 2133 641 | | CD 42149 2133 642 | | CD 42149 2133 643 | | CD 42149 2133 644 |0 |0 '' 42149 2133 645 - - HYPH 42149 2133 646 09| 09| CD 42149 2133 647 | | CD 42149 2133 648 | | NNP 42149 2133 649 | | CD 42149 2133 650 | | CD 42149 2133 651 5 5 CD 42149 2133 652 - - HYPH 42149 2133 653 27| 27| CD 42149 2133 654 l| l| JJ 42149 2133 655 | | CD 42149 2133 656 | | CD 42149 2133 657 | | CD 42149 2133 658 | | CD 42149 2133 659 | | CD 42149 2133 660 | | CD 42149 2133 661 | | CD 42149 2133 662 | | CD 42149 2133 663 | | CD 42149 2133 664 | | CD 42149 2133 665 | | CD 42149 2133 666 | | NNS 42149 2133 667 = = SYM 42149 2133 668 + + SYM 42149 2133 669 = = SYM 42149 2133 670 = = SYM 42149 2133 671 = = SYM 42149 2133 672 = = SYM 42149 2133 673 = = SYM 42149 2133 674 = = SYM 42149 2133 675 = = SYM 42149 2133 676 = = SYM 42149 2133 677 = = SYM 42149 2133 678 = = NFP 42149 2133 679 = = SYM 42149 2133 680 + + SYM 42149 2133 681 = = SYM 42149 2133 682 = = SYM 42149 2133 683 = = NFP 42149 2133 684 = = SYM 42149 2133 685 + + SYM 42149 2133 686 = = SYM 42149 2133 687 = = SYM 42149 2133 688 = = NFP 42149 2133 689 = = SYM 42149 2133 690 + + SYM 42149 2133 691 = = SYM 42149 2133 692 = = SYM 42149 2133 693 = = NFP 42149 2133 694 = = SYM 42149 2133 695 + + SYM 42149 2133 696 = = SYM 42149 2133 697 = = SYM 42149 2133 698 = = NFP 42149 2133 699 = = SYM 42149 2133 700 + + SYM 42149 2133 701 = = SYM 42149 2133 702 = = SYM 42149 2133 703 = = NFP 42149 2133 704 = = SYM 42149 2133 705 + + SYM 42149 2133 706 = = SYM 42149 2133 707 = = SYM 42149 2133 708 = = NFP 42149 2133 709 = = SYM 42149 2133 710 + + SYM 42149 2133 711 = = SYM 42149 2133 712 = = SYM 42149 2133 713 = = SYM 42149 2133 714 = = NFP 42149 2133 715 = = SYM 42149 2133 716 + + SYM 42149 2133 717 = = SYM 42149 2133 718 = = SYM 42149 2133 719 = = SYM 42149 2133 720 = = NFP 42149 2133 721 = = SYM 42149 2133 722 + + SYM 42149 2133 723 = = SYM 42149 2133 724 = = SYM 42149 2133 725 = = SYM 42149 2133 726 = = NFP 42149 2133 727 = = SYM 42149 2133 728 + + SYM 42149 2133 729 = = SYM 42149 2133 730 = = SYM 42149 2133 731 = = SYM 42149 2133 732 = = NFP 42149 2133 733 = = SYM 42149 2133 734 + + SYM 42149 2133 735 = = SYM 42149 2133 736 = = SYM 42149 2133 737 = = SYM 42149 2133 738 = = NFP 42149 2133 739 =| =| ADD 42149 2133 740 TABLE TABLE VBZ 42149 2133 741 26 26 CD 42149 2133 742 SUMMARY summary NN 42149 2133 743 PART part NN 42149 2133 744 1 1 CD 42149 2133 745 = = SYM 42149 2133 746 = = SYM 42149 2133 747 = = SYM 42149 2133 748 + + SYM 42149 2133 749 = = SYM 42149 2133 750 = = SYM 42149 2133 751 = = SYM 42149 2133 752 = = SYM 42149 2133 753 = = SYM 42149 2133 754 = = SYM 42149 2133 755 = = SYM 42149 2133 756 = = SYM 42149 2133 757 = = SYM 42149 2133 758 = = NFP 42149 2133 759 = = SYM 42149 2133 760 + + SYM 42149 2133 761 = = SYM 42149 2133 762 = = SYM 42149 2133 763 = = SYM 42149 2133 764 = = SYM 42149 2133 765 = = SYM 42149 2133 766 = = NFP 42149 2133 767 = = SYM 42149 2133 768 + + SYM 42149 2133 769 = = SYM 42149 2133 770 = = SYM 42149 2133 771 = = SYM 42149 2133 772 = = SYM 42149 2133 773 = = SYM 42149 2133 774 = = SYM 42149 2133 775 = = SYM 42149 2133 776 = = SYM 42149 2133 777 = = SYM 42149 2133 778 = = SYM 42149 2133 779 = = SYM 42149 2133 780 = = SYM 42149 2133 781 = = NFP 42149 2133 782 = = SYM 42149 2133 783 + + SYM 42149 2133 784 = = SYM 42149 2133 785 = = SYM 42149 2133 786 = = NFP 42149 2133 787 = = SYM 42149 2133 788 + + SYM 42149 2133 789 = = SYM 42149 2133 790 = = SYM 42149 2133 791 = = SYM 42149 2133 792 = = SYM 42149 2133 793 = = SYM 42149 2133 794 = = SYM 42149 2133 795 = = SYM 42149 2133 796 = = SYM 42149 2133 797 = = SYM 42149 2133 798 = = SYM 42149 2133 799 = = NFP 42149 2133 800 = = SYM 42149 2133 801 + + SYM 42149 2133 802 = = SYM 42149 2133 803 = = SYM 42149 2133 804 + + SYM 42149 2133 805 = = SYM 42149 2133 806 = = SYM 42149 2133 807 = = SYM 42149 2133 808 + + SYM 42149 2133 809 = = SYM 42149 2133 810 = = SYM 42149 2133 811 = = SYM 42149 2133 812 + + SYM 42149 2133 813 = = SYM 42149 2133 814 = = SYM 42149 2133 815 + + SYM 42149 2133 816 = = SYM 42149 2133 817 =| =| NNP 42149 2133 818 | | CD 42149 2133 819 | | NNP 42149 2133 820 | | NNP 42149 2133 821 AVE AVE NNP 42149 2133 822 . . . 42149 2133 823 NO no UH 42149 2133 824 . . . 42149 2134 1 | | NNP 42149 2134 2 W| w| CD 42149 2134 3 | | CD 42149 2134 4 | | CD 42149 2134 5 OF OF NNP 42149 2134 6 MEN MEN NNP 42149 2134 7 | | NNP 42149 2134 8 e| e| NNP 42149 2134 9 | | CD 42149 2134 10 DESCRIPTION description NN 42149 2134 11 | | CD 42149 2134 12 IN IN NNP 42149 2134 13 GANG gang NN 42149 2134 14 | | , 42149 2134 15 i| i| RB 42149 2134 16 |-------+--------------+----+------------+--+---+---+--+--| |-------+--------------+----+------------+--+---+---+--+--| NNP 42149 2134 17 g| g| NNP 42149 2134 18 | | NNP 42149 2134 19 | | NNP 42149 2134 20 |Ave.| |Ave.| NNP 42149 2134 21 | | NNP 42149 2134 22 | | NNP 42149 2134 23 | | CD 42149 2134 24 | | CD 42149 2134 25 | | CD 42149 2134 26 | | NNP 42149 2134 27 h| h| JJ 42149 2134 28 | | CD 42149 2134 29 | | NNP 42149 2134 30 |air |air NNP 42149 2134 31 | | NNP 42149 2134 32 | | NNP 42149 2134 33 | | NNP 42149 2134 34 | | CD 42149 2134 35 | | CD 42149 2134 36 | | CD 42149 2134 37 | | CD 42149 2134 38 t| t| JJ 42149 2134 39 | | NNP 42149 2134 40 | | NNP 42149 2134 41 | | CD 42149 2134 42 | | CD 42149 2134 43 | | CD 42149 2134 44 | | CD 42149 2134 45 | | CD 42149 2134 46 | | CD 42149 2134 47 A| a| CD 42149 2134 48 | | CD 42149 2134 49 | | CD 42149 2134 50 | | CD 42149 2134 51 | | CD 42149 2134 52 |P |p CD 42149 2134 53 | | CD 42149 2134 54 | | CD 42149 2134 55 | | NNP 42149 2134 56 D D NNP 42149 2134 57 | | NNP 42149 2134 58 G G NNP 42149 2134 59 | | NNP 42149 2134 60 i| i| NN 42149 2134 61 | | NNP 42149 2134 62 o| o| NNP 42149 2134 63 | | NNP 42149 2134 64 | | NNP 42149 2134 65 |r |r NNP 42149 2134 66 | | NNP 42149 2134 67 | | NNP 42149 2134 68 | | NNP 42149 2134 69 r r NNP 42149 2134 70 | | NNP 42149 2134 71 r r NNP 42149 2134 72 | | CD 42149 2134 73 r| r| NN 42149 2134 74 | | CD 42149 2134 75 f| f| NN 42149 2134 76 | | NNP 42149 2134 77 | | NNP 42149 2134 78 |e |e NNPS 42149 2134 79 | | NNP 42149 2134 80 | | NNP 42149 2134 81 S| s| NN 42149 2134 82 i i PRP 42149 2134 83 | | NNP 42149 2134 84 o o NNP 42149 2134 85 | | NNP 42149 2134 86 | | NNP 42149 2134 87 | | CD 42149 2134 88 | | CD 42149 2134 89 | | NNP 42149 2134 90 | | NNP 42149 2134 91 |s |s NNP 42149 2134 92 | | NNP 42149 2134 93 | | NNP 42149 2134 94 h| h| NNP 42149 2134 95 l l NNP 42149 2134 96 | | NNP 42149 2134 97 u u NNP 42149 2134 98 | | NNP 42149 2134 99 t|T t|T NNP 42149 2134 100 | | NNP 42149 2134 101 i| i| NNP 42149 2134 102 | | NNP 42149 2134 103 | | NNP 42149 2134 104 |s |s NNP 42149 2134 105 | | NNP 42149 2134 106 | | NNP 42149 2134 107 i| i| NNP 42149 2134 108 l l NNP 42149 2134 109 | | NNP 42149 2134 110 t t NNP 42149 2134 111 | | NNP 42149 2134 112 r|o r|o CD 42149 2134 113 | | CD 42149 2134 114 r| r| NN 42149 2134 115 Section Section NNP 42149 2134 116 | | NNP 42149 2134 117 | | NNP 42149 2134 118 |u |u NNP 42149 2134 119 | | CD 42149 2134 120 | | CD 42149 2134 121 e| e| VBP 42149 2134 122 i i PRP 42149 2134 123 | | VBD 42149 2134 124 i i PRP 42149 2134 125 | | CD 42149 2134 126 a|t a|t CD 42149 2134 127 | | CD 42149 2134 128 o| o| NN 42149 2134 129 between between IN 42149 2134 130 |Length |Length NNP 42149 2134 131 | | NNP 42149 2134 132 |r |r JJ 42149 2134 133 |Method |Method NNS 42149 2134 134 of of IN 42149 2134 135 | | CD 42149 2134 136 l| l| JJ 42149 2134 137 n n CD 42149 2134 138 | | NNP 42149 2134 139 n n CC 42149 2134 140 | | CD 42149 2134 141 n|a n|a CD 42149 2134 142 | | CD 42149 2134 143 n| n| NN 42149 2134 144 rings ring NNS 42149 2134 145 |in |in CD 42149 2134 146 feet| feet| CD 42149 2134 147 Material Material NNP 42149 2134 148 |e |e NNPS 42149 2134 149 |Excavation |Excavation NNP 42149 2134 150 | | NNP 42149 2134 151 d| d| NN 42149 2134 152 g g NNP 42149 2134 153 | | NNP 42149 2134 154 g g NNP 42149 2134 155 | | CD 42149 2134 156 s|l s|l CD 42149 2134 157 | | NNP 42149 2134 158 ---+-----------+-------+--------------+----+------------+--+---+---+--+--| ---+-----------+-------+--------------+----+------------+--+---+---+--+--| NNP 42149 2134 159 O o NN 42149 2134 160 { { -LRB- 42149 2134 161 | | NNP 42149 2134 162 1 1 CD 42149 2134 163 - - HYPH 42149 2134 164 24 24 CD 42149 2134 165 | | CD 42149 2134 166 60.0|Rock 60.0|rock CD 42149 2134 167 | | CD 42149 2134 168 0 0 CD 42149 2134 169 | | NNS 42149 2134 170 [ [ -LRB- 42149 2134 171 X x NN 42149 2134 172 ] ] -RRB- 42149 2134 173 | | CD 42149 2134 174 9|.04| 9|.04| CD 42149 2134 175 0 0 CD 42149 2134 176 | | CD 42149 2134 177 0|10| 0|10| CD 42149 2134 178 r r NN 42149 2134 179 { { -LRB- 42149 2134 180 | | CD 42149 2134 181 25 25 CD 42149 2134 182 - - HYPH 42149 2134 183 55 55 CD 42149 2134 184 | | CD 42149 2134 185 77.5| 77.5| CD 42149 2134 186 " " '' 42149 2134 187 |20 |20 CD 42149 2134 188 | | NNS 42149 2134 189 [ [ -LRB- 42149 2134 190 X X NNP 42149 2134 191 ] ] -RRB- 42149 2134 192 |14|5 |14|5 NNP 42149 2134 193 |0.5| |0.5| NNP 42149 2134 194 1|21| 1|21| CD 42149 2134 195 d d NNP 42149 2134 196 { { -LRB- 42149 2134 197 | | CD 42149 2134 198 56 56 CD 42149 2134 199 - - HYPH 42149 2134 200 72 72 CD 42149 2134 201 | | CD 42149 2134 202 42.5|Mixed 42.5|mixed CD 42149 2134 203 sand sand NN 42149 2134 204 and|10 and|10 IN 42149 2134 205 |[X]Breasting|22|2 |[x]breasting|22|2 CD 42149 2134 206 |.09| |.09| NNP 42149 2134 207 2|26| 2|26| CD 42149 2134 208 i i PRP 42149 2134 209 { { -LRB- 42149 2134 210 | | CD 42149 2134 211 | | CD 42149 2134 212 |rock |rock CD 42149 2134 213 | | CD 42149 2134 214 | | CD 42149 2134 215 | | CD 42149 2134 216 | | CD 42149 2134 217 | | CD 42149 2134 218 | | CD 42149 2134 219 | | CD 42149 2134 220 | | CD 42149 2134 221 n n CC 42149 2134 222 { { -LRB- 42149 2134 223 | | CD 42149 2134 224 73 73 CD 42149 2134 225 - - HYPH 42149 2134 226 165 165 CD 42149 2134 227 | | CD 42149 2134 228 232.5|Sand 232.5|sand CD 42149 2134 229 & & CC 42149 2134 230 gravel gravel NN 42149 2134 231 |10 |10 NNP 42149 2134 232 |[X]Breasting|22|0 |[x]breasting|22|0 CD 42149 2134 233 |.1 |.1 NNP 42149 2134 234 | | CD 42149 2134 235 2|24| 2|24| CD 42149 2134 236 a a DT 42149 2134 237 { { -LRB- 42149 2134 238 | | CD 42149 2134 239 166 166 CD 42149 2134 240 - - SYM 42149 2134 241 184 184 CD 42149 2134 242 | | CD 42149 2134 243 47.5|Sand 47.5|sand CD 42149 2134 244 and and CC 42149 2134 245 silt silt VBD 42149 2134 246 |20 |20 CD 42149 2134 247 { { -LRB- 42149 2134 248 |[X]Breasting|22|0 |[x]breasting|22|0 CD 42149 2134 249 |.38| |.38| NN 42149 2134 250 3|25| 3|25| CD 42149 2134 251 r r NN 42149 2134 252 { { -LRB- 42149 2134 253 | | CD 42149 2134 254 | | CD 42149 2134 255 |with |with CD 42149 2134 256 piles pile NNS 42149 2134 257 | | CD 42149 2134 258 { { -LRB- 42149 2134 259 |and |and NNP 42149 2134 260 cutting cut VBG 42149 2134 261 | | CD 42149 2134 262 | | CD 42149 2134 263 | | CD 42149 2134 264 | | CD 42149 2134 265 | | CD 42149 2134 266 | | CD 42149 2134 267 y y NN 42149 2134 268 { { -LRB- 42149 2134 269 | | NNP 42149 2134 270 185 185 CD 42149 2134 271 - - HYPH 42149 2134 272 253 253 CD 42149 2134 273 | | CD 42149 2134 274 172.5|Silt 172.5|silt CD 42149 2134 275 w/ w/ NNP 42149 2134 276 piles pile NNS 42149 2134 277 |24 |24 CD 42149 2134 278 { { -LRB- 42149 2134 279 |piles |piles CD 42149 2134 280 |23|0 |23|0 NNP 42149 2134 281 |.71| |.71| NNP 42149 2134 282 3|26| 3|26| CD 42149 2134 283 { { -LRB- 42149 2134 284 | | CD 42149 2134 285 254 254 CD 42149 2134 286 - - HYPH 42149 2134 287 640 640 CD 42149 2134 288 | | CD 42149 2134 289 110.0|Silt 110.0|silt CD 42149 2134 290 |26 |26 CD 42149 2134 291 |[Y]Doors |[Y]Doors NNPS 42149 2134 292 |22|0 |22|0 NNP 42149 2134 293 | | NNP 42149 2134 294 0 0 CD 42149 2134 295 | | CD 42149 2134 296 3|25| 3|25| CD 42149 2134 297 { { -LRB- 42149 2134 298 |-----------+-------+--------------+----+------------+--+---+---+--+--| |-----------+-------+--------------+----+------------+--+---+---+--+--| NNP 42149 2134 299 { { -LRB- 42149 2134 300 | | CD 42149 2134 301 25 25 CD 42149 2134 302 - - HYPH 42149 2134 303 640 640 CD 42149 2134 304 |1,540.0| |1,540.0| NN 42149 2134 305 |20 |20 CD 42149 2134 306 |[Y]Doors |[Y]Doors NNPS 42149 2134 307 |21|0.3|.12| |21|0.3|.12| NNP 42149 2134 308 3|24| 3|24| CD 42149 2134 309 ---+-----------+-------+--------------+----+------------+--+---+---+--+--| ---+-----------+-------+--------------+----+------------+--+---+---+--+--| NNP 42149 2134 310 Hvy| Hvy| NNS 42149 2134 311 641 641 CD 42149 2134 312 - - SYM 42149 2134 313 1,110|1,175.0| 1,110|1,175.0| CD 42149 2134 314 |28 |28 CD 42149 2134 315 | | NNP 42149 2134 316 |21| |21| NN 42149 2134 317 0 0 CD 42149 2134 318 | | CD 42149 2134 319 0 0 CD 42149 2134 320 | | CD 42149 2134 321 7|28| 7|28| CD 42149 2134 322 ---+-----------+-------+--------------+----+------------+--+---+---+--+--| ---+-----------+-------+--------------+----+------------+--+---+---+--+--| NNPS 42149 2134 323 All| All| NNP 42149 2134 324 25 25 CD 42149 2134 325 - - SYM 42149 2134 326 1,110|2,715.0| 1,110|2,715.0| CD 42149 2134 327 |26 |26 CD 42149 2134 328 | | CD 42149 2134 329 |21|0.1|0.1| |21|0.1|0.1| CD 42149 2134 330 3|24| 3|24| CD 42149 2134 331 = = SYM 42149 2134 332 = = SYM 42149 2134 333 = = SYM 42149 2134 334 + + SYM 42149 2134 335 = = SYM 42149 2134 336 = = SYM 42149 2134 337 = = SYM 42149 2134 338 = = SYM 42149 2134 339 = = SYM 42149 2134 340 = = SYM 42149 2134 341 = = SYM 42149 2134 342 = = SYM 42149 2134 343 = = SYM 42149 2134 344 = = NFP 42149 2134 345 = = SYM 42149 2134 346 + + SYM 42149 2134 347 = = SYM 42149 2134 348 = = SYM 42149 2134 349 = = SYM 42149 2134 350 = = SYM 42149 2134 351 = = SYM 42149 2134 352 = = NFP 42149 2134 353 = = SYM 42149 2134 354 + + SYM 42149 2134 355 = = SYM 42149 2134 356 = = SYM 42149 2134 357 = = SYM 42149 2134 358 = = SYM 42149 2134 359 = = SYM 42149 2134 360 = = SYM 42149 2134 361 = = SYM 42149 2134 362 = = SYM 42149 2134 363 = = SYM 42149 2134 364 = = SYM 42149 2134 365 = = SYM 42149 2134 366 = = SYM 42149 2134 367 = = NFP 42149 2134 368 = = SYM 42149 2134 369 + + SYM 42149 2134 370 = = SYM 42149 2134 371 = = SYM 42149 2134 372 = = NFP 42149 2134 373 = = SYM 42149 2134 374 + + SYM 42149 2134 375 = = SYM 42149 2134 376 = = SYM 42149 2134 377 = = SYM 42149 2134 378 = = SYM 42149 2134 379 = = SYM 42149 2134 380 = = SYM 42149 2134 381 = = SYM 42149 2134 382 = = SYM 42149 2134 383 = = SYM 42149 2134 384 = = SYM 42149 2134 385 = = NFP 42149 2134 386 = = SYM 42149 2134 387 + + SYM 42149 2134 388 = = SYM 42149 2134 389 = = SYM 42149 2134 390 + + SYM 42149 2134 391 = = SYM 42149 2134 392 = = SYM 42149 2134 393 = = SYM 42149 2134 394 + + SYM 42149 2134 395 = = SYM 42149 2134 396 = = SYM 42149 2134 397 = = SYM 42149 2134 398 + + SYM 42149 2134 399 = = SYM 42149 2134 400 = = SYM 42149 2134 401 + + SYM 42149 2134 402 = = SYM 42149 2134 403 =| =| ADD 42149 2134 404 TABLE TABLE NNS 42149 2134 405 26 26 CD 42149 2134 406 SUMMARY summary NN 42149 2134 407 PART PART VBN 42149 2134 408 2 2 CD 42149 2134 409 = = SYM 42149 2134 410 = = SYM 42149 2134 411 = = SYM 42149 2134 412 + + SYM 42149 2134 413 = = SYM 42149 2134 414 = = SYM 42149 2134 415 = = SYM 42149 2134 416 = = SYM 42149 2134 417 = = SYM 42149 2134 418 = = SYM 42149 2134 419 = = NFP 42149 2134 420 = = SYM 42149 2134 421 + + SYM 42149 2134 422 = = SYM 42149 2134 423 = = SYM 42149 2134 424 = = SYM 42149 2134 425 = = SYM 42149 2134 426 = = SYM 42149 2134 427 = = SYM 42149 2134 428 = = NFP 42149 2134 429 = = SYM 42149 2134 430 + + SYM 42149 2134 431 = = SYM 42149 2134 432 = = SYM 42149 2134 433 = = SYM 42149 2134 434 = = SYM 42149 2134 435 = = SYM 42149 2134 436 = = NFP 42149 2134 437 = = SYM 42149 2134 438 + + SYM 42149 2134 439 = = SYM 42149 2134 440 = = SYM 42149 2134 441 = = SYM 42149 2134 442 = = SYM 42149 2134 443 = = SYM 42149 2134 444 = = NFP 42149 2134 445 = = SYM 42149 2134 446 + + SYM 42149 2134 447 = = SYM 42149 2134 448 = = SYM 42149 2134 449 = = NFP 42149 2134 450 = = SYM 42149 2134 451 + + SYM 42149 2134 452 = = SYM 42149 2134 453 = = SYM 42149 2134 454 = = SYM 42149 2134 455 = = NFP 42149 2134 456 = = SYM 42149 2134 457 + + SYM 42149 2134 458 = = SYM 42149 2134 459 = = SYM 42149 2134 460 = = SYM 42149 2134 461 = = SYM 42149 2134 462 = = SYM 42149 2134 463 = = SYM 42149 2134 464 = = SYM 42149 2134 465 = = SYM 42149 2134 466 = = SYM 42149 2134 467 = = SYM 42149 2134 468 = = SYM 42149 2134 469 = = SYM 42149 2134 470 = = SYM 42149 2134 471 = = NFP 42149 2134 472 = = SYM 42149 2134 473 + + SYM 42149 2134 474 = = SYM 42149 2134 475 = = SYM 42149 2134 476 = = SYM 42149 2134 477 = = SYM 42149 2134 478 = = SYM 42149 2134 479 = = SYM 42149 2134 480 = = NFP 42149 2134 481 =| =| NNP 42149 2134 482 W W NNP 42149 2134 483 | | NNP 42149 2134 484 | | NNP 42149 2134 485 | | CD 42149 2134 486 | | CD 42149 2134 487 UNAVOIDABLE UNAVOIDABLE NNP 42149 2134 488 DELAYS DELAYS NNP 42149 2134 489 | | NNP 42149 2134 490 e e NNP 42149 2134 491 | | CD 42149 2134 492 | | CD 42149 2134 493 | | CD 42149 2134 494 AVERAGE average NN 42149 2134 495 TIME time NN 42149 2134 496 |(NOT |(not CD 42149 2134 497 INCLUDED include VBN 42149 2134 498 IN in IN 42149 2134 499 AVERAGE| AVERAGE| NNP 42149 2134 500 i i PRP 42149 2134 501 o| o| NNP 42149 2134 502 | | CD 42149 2134 503 | | NNS 42149 2134 504 PER per NN 42149 2134 505 RING ring NN 42149 2134 506 . . . 42149 2135 1 | | JJ 42149 2135 2 TIME TIME NNP 42149 2135 3 PER per IN 42149 2135 4 RING ring NN 42149 2135 5 ) ) -RRB- 42149 2135 6 . . . 42149 2136 1 | | NNP 42149 2136 2 g g NNP 42149 2136 3 f| f| NN 42149 2136 4 | | NNP 42149 2136 5 |-------+-------+----+-----+---------------+--------| |-------+-------+----+-----+---------------+--------| NNP 42149 2136 6 h h NNP 42149 2136 7 |Average |average NN 42149 2136 8 | | NNP 42149 2136 9 Time Time NNP 42149 2136 10 | | NNP 42149 2136 11 | | NNP 42149 2136 12 | | CD 42149 2136 13 | | CD 42149 2136 14 | | CD 42149 2136 15 | | CD 42149 2136 16 | | CD 42149 2136 17 t t NN 42149 2136 18 i| i| JJ 42149 2136 19 No no NN 42149 2136 20 . . . 42149 2137 1 of of IN 42149 2137 2 |mucking,|Shoving| |mucking,|shoving| CD 42149 2137 3 | | NNP 42149 2137 4 | | CD 42149 2137 5 | | CD 42149 2137 6 | | CD 42149 2137 7 | | CD 42149 2137 8 r| r| NN 42149 2137 9 cubic cubic JJ 42149 2137 10 | | CD 42149 2137 11 per per IN 42149 2137 12 | | NNP 42149 2137 13 and and CC 42149 2137 14 | | NNP 42149 2137 15 Erec- Erec- NNP 42149 2137 16 | | NNP 42149 2137 17 | | NNP 42149 2137 18 | | CD 42149 2137 19 | | CD 42149 2137 20 | | CD 42149 2137 21 o| o| NN 42149 2137 22 yards yard NNS 42149 2137 23 | | CD 42149 2137 24 cubic cubic JJ 42149 2137 25 |mucking| |mucking| NNP 42149 2137 26 tion tion NN 42149 2137 27 |Lost| |Lost| NNP 42149 2137 28 | | NNP 42149 2137 29 | | NNP 42149 2137 30 Time Time NNP 42149 2137 31 | | NNP 42149 2137 32 n|per n|per NN 42149 2137 33 ring| ring| CD 42149 2137 34 yard yard NN 42149 2137 35 | | JJ 42149 2137 36 [ [ -LRB- 42149 2137 37 V V NNP 42149 2137 38 ] ] -RRB- 42149 2137 39 | | NNP 42149 2137 40 [ [ -LRB- 42149 2137 41 W w NN 42149 2137 42 ] ] -RRB- 42149 2137 43 |time|Total| |time|Total| . 42149 2137 44 Items item NNS 42149 2137 45 |hrs |hrs VBP 42149 2137 46 min| min| CD 42149 2137 47 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| FW 42149 2137 48 O o UH 42149 2137 49 { { -LRB- 42149 2137 50 | | CD 42149 2137 51 46 46 CD 42149 2137 52 | | CD 42149 2137 53 0 0 CD 42149 2137 54 - - HYPH 42149 2137 55 06 06 CD 42149 2137 56 | | CD 42149 2137 57 4 4 CD 42149 2137 58 - - SYM 42149 2137 59 32 32 CD 42149 2137 60 |6 |6 NN 42149 2137 61 - - : 42149 2137 62 23 23 CD 42149 2137 63 |0 |0 NN 42149 2137 64 - - HYPH 42149 2137 65 00|10 00|10 CD 42149 2137 66 - - HYPH 42149 2137 67 55|First 55|first CD 42149 2137 68 bulkhead bulkhead NN 42149 2137 69 |132 |132 CD 42149 2137 70 - - HYPH 42149 2137 71 00 00 CD 42149 2137 72 | | HYPH 42149 2137 73 r r NN 42149 2137 74 { { -LRB- 42149 2137 75 | | CD 42149 2137 76 46 46 CD 42149 2137 77 | | CD 42149 2137 78 0 0 CD 42149 2137 79 - - HYPH 42149 2137 80 51 51 CD 42149 2137 81 |39 |39 CD 42149 2137 82 - - HYPH 42149 2137 83 33 33 CD 42149 2137 84 |4 |4 CD 42149 2137 85 - - HYPH 42149 2137 86 29 29 CD 42149 2137 87 |0 |0 SYM 42149 2137 88 - - HYPH 42149 2137 89 00|44 00|44 CD 42149 2137 90 - - HYPH 42149 2137 91 02|Second 02|second CD 42149 2137 92 bulkhead|158 bulkhead|158 NNP 42149 2137 93 - - HYPH 42149 2137 94 50 50 CD 42149 2137 95 | | HYPH 42149 2137 96 d d NN 42149 2137 97 { { -LRB- 42149 2137 98 | | CD 42149 2137 99 44 44 CD 42149 2137 100 | | CD 42149 2137 101 0 0 CD 42149 2137 102 - - HYPH 42149 2137 103 21 21 CD 42149 2137 104 |15 |15 CD 42149 2137 105 - - HYPH 42149 2137 106 05 05 CD 42149 2137 107 |2 |2 CD 42149 2137 108 - - SYM 42149 2137 109 55 55 CD 42149 2137 110 |0 |0 JJ 42149 2137 111 - - HYPH 42149 2137 112 04|18 04|18 CD 42149 2137 113 - - HYPH 42149 2137 114 04|Grouting 04|Grouting NNP 42149 2137 115 |240 |240 NNP 42149 2137 116 - - HYPH 42149 2137 117 00 00 CD 42149 2137 118 | | NNS 42149 2137 119 i i PRP 42149 2137 120 { { -LRB- 42149 2137 121 | | CD 42149 2137 122 | | NNP 42149 2137 123 | | CD 42149 2137 124 | | CD 42149 2137 125 | | CD 42149 2137 126 | | CD 42149 2137 127 |Old |old NN 42149 2137 128 cave cave NN 42149 2137 129 - - : 42149 2137 130 in in IN 42149 2137 131 |234 |234 NNP 42149 2137 132 - - HYPH 42149 2137 133 00 00 CD 42149 2137 134 | | CD 42149 2137 135 n n CC 42149 2137 136 { { -LRB- 42149 2137 137 | | CD 42149 2137 138 39 39 CD 42149 2137 139 | | CD 42149 2137 140 0 0 CD 42149 2137 141 - - HYPH 42149 2137 142 11 11 CD 42149 2137 143 | | CD 42149 2137 144 6 6 CD 42149 2137 145 - - HYPH 42149 2137 146 56 56 CD 42149 2137 147 |2 |2 CD 42149 2137 148 - - SYM 42149 2137 149 26 26 CD 42149 2137 150 |0 |0 NN 42149 2137 151 - - : 42149 2137 152 09| 09| CD 42149 2137 153 9 9 CD 42149 2137 154 - - SYM 42149 2137 155 31|shoving 31|shoving CD 42149 2137 156 tube tube NN 42149 2137 157 |128 |128 JJ 42149 2137 158 - - HYPH 42149 2137 159 00 00 CD 42149 2137 160 | | NNS 42149 2137 161 a a DT 42149 2137 162 { { -LRB- 42149 2137 163 | | CD 42149 2137 164 42 42 CD 42149 2137 165 | | CD 42149 2137 166 0 0 CD 42149 2137 167 - - HYPH 42149 2137 168 09 09 CD 42149 2137 169 | | CD 42149 2137 170 6 6 CD 42149 2137 171 - - SYM 42149 2137 172 19 19 CD 42149 2137 173 |2 |2 CD 42149 2137 174 - - SYM 42149 2137 175 37 37 CD 42149 2137 176 |0 |0 NNP 42149 2137 177 - - HYPH 42149 2137 178 07| 07| CD 42149 2137 179 9 9 CD 42149 2137 180 - - HYPH 42149 2137 181 03|---------------+--------| 03|---------------+--------| NNP 42149 2137 182 r r NN 42149 2137 183 { { -LRB- 42149 2137 184 | | NNP 42149 2137 185 | | NNP 42149 2137 186 | | CD 42149 2137 187 | | CD 42149 2137 188 | | CD 42149 2137 189 | | CD 42149 2137 190 | | NNP 42149 2137 191 Total total JJ 42149 2137 192 |892 |892 CD 42149 2137 193 - - HYPH 42149 2137 194 50 50 CD 42149 2137 195 | | HYPH 42149 2137 196 y y NN 42149 2137 197 { { -LRB- 42149 2137 198 | | NNP 42149 2137 199 43 43 CD 42149 2137 200 | | CD 42149 2137 201 0 0 CD 42149 2137 202 - - HYPH 42149 2137 203 09 09 CD 42149 2137 204 | | CD 42149 2137 205 6 6 CD 42149 2137 206 - - SYM 42149 2137 207 13 13 CD 42149 2137 208 |2 |2 CD 42149 2137 209 - - HYPH 42149 2137 210 15 15 CD 42149 2137 211 |0 |0 NN 42149 2137 212 - - HYPH 42149 2137 213 05| 05| CD 42149 2137 214 8 8 CD 42149 2137 215 - - HYPH 42149 2137 216 43|---------------+--------| 43|---------------+--------| CD 42149 2137 217 { { -LRB- 42149 2137 218 | | CD 42149 2137 219 11 11 CD 42149 2137 220 | | CD 42149 2137 221 0 0 CD 42149 2137 222 - - HYPH 42149 2137 223 07 07 CD 42149 2137 224 | | CD 42149 2137 225 1 1 CD 42149 2137 226 - - SYM 42149 2137 227 13 13 CD 42149 2137 228 |2 |2 CD 42149 2137 229 - - : 42149 2137 230 20 20 CD 42149 2137 231 |0 |0 NN 42149 2137 232 - - : 42149 2137 233 08| 08| CD 42149 2137 234 3 3 CD 42149 2137 235 - - SYM 42149 2137 236 41| 41| CD 42149 2137 237 per per IN 42149 2137 238 ring re VBG 42149 2137 239 | | CD 42149 2137 240 0 0 CD 42149 2137 241 - - HYPH 42149 2137 242 49 49 CD 42149 2137 243 | | CD 42149 2137 244 { { -LRB- 42149 2137 245 |--------+--------+-------+-------+----+-----+---------------+--------| |--------+--------+-------+-------+----+-----+---------------+--------| NNP 42149 2137 246 { { -LRB- 42149 2137 247 | | NNP 42149 2137 248 24 24 CD 42149 2137 249 | | CD 42149 2137 250 0 0 CD 42149 2137 251 - - HYPH 42149 2137 252 14 14 CD 42149 2137 253 | | CD 42149 2137 254 5 5 CD 42149 2137 255 - - SYM 42149 2137 256 06 06 CD 42149 2137 257 |2 |2 CD 42149 2137 258 - - : 42149 2137 259 24 24 CD 42149 2137 260 |0 |0 NN 42149 2137 261 - - : 42149 2137 262 08| 08| CD 42149 2137 263 7 7 CD 42149 2137 264 - - SYM 42149 2137 265 38| 38| CD 42149 2137 266 | | NNP 42149 2137 267 | | NNP 42149 2137 268 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| : 42149 2137 269 Hvy| Hvy| NNS 42149 2137 270 8 8 CD 42149 2137 271 | | CD 42149 2137 272 0 0 CD 42149 2137 273 - - HYPH 42149 2137 274 04 04 CD 42149 2137 275 | | CD 42149 2137 276 0 0 CD 42149 2137 277 - - HYPH 42149 2137 278 44 44 CD 42149 2137 279 |1 |1 NN 42149 2137 280 - - : 42149 2137 281 40 40 CD 42149 2137 282 |0 |0 NN 42149 2137 283 - - : 42149 2137 284 11| 11| CD 42149 2137 285 2 2 CD 42149 2137 286 - - SYM 42149 2137 287 35| 35| CD 42149 2137 288 | | CD 42149 2137 289 | | NNS 42149 2137 290 ---+--------+--------+-------+-------+----+-----+---------------+--------| ---+--------+--------+-------+-------+----+-----+---------------+--------| . 42149 2137 291 All| All| NNP 42149 2137 292 17.1 17.1 CD 42149 2137 293 | | CD 42149 2137 294 0 0 CD 42149 2137 295 - - HYPH 42149 2137 296 12 12 CD 42149 2137 297 | | CD 42149 2137 298 3 3 CD 42149 2137 299 - - SYM 42149 2137 300 13 13 CD 42149 2137 301 |3 |3 NNP 42149 2137 302 - - HYPH 42149 2137 303 05 05 CD 42149 2137 304 |0 |0 NN 42149 2137 305 - - : 42149 2137 306 09| 09| NNP 42149 2137 307 5 5 CD 42149 2137 308 - - SYM 42149 2137 309 27| 27| CD 42149 2137 310 | | CD 42149 2137 311 | | NNS 42149 2137 312 = = SYM 42149 2137 313 = = SYM 42149 2137 314 = = SYM 42149 2137 315 + + SYM 42149 2137 316 = = SYM 42149 2137 317 = = SYM 42149 2137 318 = = SYM 42149 2137 319 = = SYM 42149 2137 320 = = SYM 42149 2137 321 = = SYM 42149 2137 322 = = NFP 42149 2137 323 = = SYM 42149 2137 324 + + SYM 42149 2137 325 = = SYM 42149 2137 326 = = SYM 42149 2137 327 = = SYM 42149 2137 328 = = SYM 42149 2137 329 = = SYM 42149 2137 330 = = SYM 42149 2137 331 = = NFP 42149 2137 332 = = SYM 42149 2137 333 + + SYM 42149 2137 334 = = SYM 42149 2137 335 = = SYM 42149 2137 336 = = SYM 42149 2137 337 = = SYM 42149 2137 338 = = SYM 42149 2137 339 = = NFP 42149 2137 340 = = SYM 42149 2137 341 + + SYM 42149 2137 342 = = SYM 42149 2137 343 = = SYM 42149 2137 344 = = SYM 42149 2137 345 = = SYM 42149 2137 346 = = SYM 42149 2137 347 = = NFP 42149 2137 348 = = SYM 42149 2137 349 + + SYM 42149 2137 350 = = SYM 42149 2137 351 = = SYM 42149 2137 352 = = NFP 42149 2137 353 = = SYM 42149 2137 354 + + SYM 42149 2137 355 = = SYM 42149 2137 356 = = SYM 42149 2137 357 = = SYM 42149 2137 358 = = NFP 42149 2137 359 = = SYM 42149 2137 360 + + SYM 42149 2137 361 = = SYM 42149 2137 362 = = SYM 42149 2137 363 = = SYM 42149 2137 364 = = SYM 42149 2137 365 = = SYM 42149 2137 366 = = SYM 42149 2137 367 = = SYM 42149 2137 368 = = SYM 42149 2137 369 = = SYM 42149 2137 370 = = SYM 42149 2137 371 = = SYM 42149 2137 372 = = SYM 42149 2137 373 = = SYM 42149 2137 374 = = NFP 42149 2137 375 = = SYM 42149 2137 376 + + SYM 42149 2137 377 = = SYM 42149 2137 378 = = SYM 42149 2137 379 = = SYM 42149 2137 380 = = SYM 42149 2137 381 = = SYM 42149 2137 382 = = SYM 42149 2137 383 = = SYM 42149 2137 384 =| =| ADD 42149 2137 385 [ [ -LRB- 42149 2137 386 V v NN 42149 2137 387 ] ] -RRB- 42149 2137 388 Including include VBG 42149 2137 389 time time NN 42149 2137 390 for for IN 42149 2137 391 jacks jack NNS 42149 2137 392 . . . 42149 2138 1 [ [ -LRB- 42149 2138 2 W w NN 42149 2138 3 ] ] -RRB- 42149 2138 4 Including include VBG 42149 2138 5 bolting bolting NN 42149 2138 6 time time NN 42149 2138 7 . . . 42149 2139 1 [ [ -LRB- 42149 2139 2 X x NN 42149 2139 3 ] ] -RRB- 42149 2139 4 Excavating excavating NN 42149 2139 5 ahead ahead RB 42149 2139 6 of of IN 42149 2139 7 shield shield NN 42149 2139 8 . . . 42149 2140 1 [ [ -LRB- 42149 2140 2 Y Y NNP 42149 2140 3 ] ] -RRB- 42149 2140 4 Shoving shove VBG 42149 2140 5 shield shield NN 42149 2140 6 into into IN 42149 2140 7 silt silt NN 42149 2140 8 with with IN 42149 2140 9 ... ... : 42149 2140 10 doors door NNS 42149 2140 11 open open JJ 42149 2140 12 . . . 42149 2141 1 TABLE TABLE NNP 42149 2141 2 27.--SHIELD 27.--shield JJ 42149 2141 3 - - HYPH 42149 2141 4 DRIVEN drive VBN 42149 2141 5 TUNNEL TUNNEL NNP 42149 2141 6 WORK work NN 42149 2141 7 , , , 42149 2141 8 WEEHAWKEN WEEHAWKEN NNP 42149 2141 9 SHAFT SHAFT NNS 42149 2141 10 , , , 42149 2141 11 RIVER RIVER NNP 42149 2141 12 TUNNEL TUNNEL NNP 42149 2141 13 SOUTH SOUTH NNP 42149 2141 14 . . . 42149 2142 1 Table table NN 42149 2142 2 showing show VBG 42149 2142 3 the the DT 42149 2142 4 size size NN 42149 2142 5 of of IN 42149 2142 6 the the DT 42149 2142 7 gang gang NN 42149 2142 8 , , , 42149 2142 9 the the DT 42149 2142 10 amount amount NN 42149 2142 11 of of IN 42149 2142 12 excavation excavation NN 42149 2142 13 , , , 42149 2142 14 and and CC 42149 2142 15 the the DT 42149 2142 16 time time NN 42149 2142 17 per per IN 42149 2142 18 ring ring NN 42149 2142 19 taken take VBN 42149 2142 20 for for IN 42149 2142 21 the the DT 42149 2142 22 various various JJ 42149 2142 23 operations operation NNS 42149 2142 24 involved involve VBN 42149 2142 25 in in IN 42149 2142 26 building build VBG 42149 2142 27 tunnel tunnel NN 42149 2142 28 through through IN 42149 2142 29 the the DT 42149 2142 30 several several JJ 42149 2142 31 kinds kind NNS 42149 2142 32 of of IN 42149 2142 33 ground ground NN 42149 2142 34 encountered encounter VBN 42149 2142 35 ; ; : 42149 2142 36 also also RB 42149 2142 37 the the DT 42149 2142 38 extent extent NN 42149 2142 39 and and CC 42149 2142 40 nature nature NN 42149 2142 41 of of IN 42149 2142 42 all all PDT 42149 2142 43 the the DT 42149 2142 44 unavoidable unavoidable JJ 42149 2142 45 delays delay NNS 42149 2142 46 . . . 42149 2143 1 TABLE TABLE NNS 42149 2143 2 27 27 CD 42149 2143 3 PART part NN 42149 2143 4 1 1 CD 42149 2143 5 = = SYM 42149 2143 6 + + SYM 42149 2143 7 = = SYM 42149 2143 8 = = SYM 42149 2143 9 = = SYM 42149 2143 10 = = SYM 42149 2143 11 = = SYM 42149 2143 12 = = SYM 42149 2143 13 = = SYM 42149 2143 14 = = SYM 42149 2143 15 = = SYM 42149 2143 16 = = NFP 42149 2143 17 = = SYM 42149 2143 18 + + SYM 42149 2143 19 = = SYM 42149 2143 20 = = SYM 42149 2143 21 = = SYM 42149 2143 22 = = SYM 42149 2143 23 = = SYM 42149 2143 24 = = NFP 42149 2143 25 = = SYM 42149 2143 26 + + SYM 42149 2143 27 = = SYM 42149 2143 28 = = SYM 42149 2143 29 = = SYM 42149 2143 30 = = SYM 42149 2143 31 = = SYM 42149 2143 32 = = SYM 42149 2143 33 = = SYM 42149 2143 34 = = SYM 42149 2143 35 = = SYM 42149 2143 36 = = SYM 42149 2143 37 = = NFP 42149 2143 38 = = SYM 42149 2143 39 + + SYM 42149 2143 40 = = SYM 42149 2143 41 = = SYM 42149 2143 42 = = NFP 42149 2143 43 = = SYM 42149 2143 44 + + SYM 42149 2143 45 = = SYM 42149 2143 46 = = SYM 42149 2143 47 = = SYM 42149 2143 48 = = SYM 42149 2143 49 = = SYM 42149 2143 50 = = SYM 42149 2143 51 = = SYM 42149 2143 52 = = SYM 42149 2143 53 = = SYM 42149 2143 54 = = SYM 42149 2143 55 = = NFP 42149 2143 56 = = SYM 42149 2143 57 + + SYM 42149 2143 58 = = SYM 42149 2143 59 = = SYM 42149 2143 60 + + SYM 42149 2143 61 = = SYM 42149 2143 62 = = SYM 42149 2143 63 + + SYM 42149 2143 64 = = SYM 42149 2143 65 = = SYM 42149 2143 66 = = SYM 42149 2143 67 + + SYM 42149 2143 68 = = SYM 42149 2143 69 = = SYM 42149 2143 70 = = SYM 42149 2143 71 + + SYM 42149 2143 72 = = SYM 42149 2143 73 =| =| ADD 42149 2143 74 W| W| NNP 42149 2143 75 | | NNP 42149 2143 76 | | NNP 42149 2143 77 AVE AVE NNP 42149 2143 78 . . . 42149 2143 79 NO no UH 42149 2143 80 . . . 42149 2144 1 | | NNP 42149 2144 2 e| e| NNP 42149 2144 3 | | HYPH 42149 2144 4 | | NNP 42149 2144 5 OF OF NNP 42149 2144 6 MEN MEN NNP 42149 2144 7 | | NNP 42149 2144 8 i| i| JJ 42149 2144 9 | | NNP 42149 2144 10 DESCRIPTION description NN 42149 2144 11 | | CD 42149 2144 12 IN IN NNP 42149 2144 13 GANG GANG NNP 42149 2144 14 | | HYPH 42149 2144 15 g| g| NN 42149 2144 16 |-------+------------+----+------------+--+--+---+---+--| |-------+------------+----+------------+--+--+---+---+--| NNP 42149 2144 17 h| h| NNP 42149 2144 18 | | NNP 42149 2144 19 | | NNP 42149 2144 20 |Ave |ave NN 42149 2144 21 | | CD 42149 2144 22 | | CD 42149 2144 23 | | CD 42149 2144 24 | | CD 42149 2144 25 |A |a CD 42149 2144 26 | | CD 42149 2144 27 | | CD 42149 2144 28 t| t| JJ 42149 2144 29 | | CD 42149 2144 30 | | NNP 42149 2144 31 |air |air NNP 42149 2144 32 | | HYPH 42149 2144 33 | | CD 42149 2144 34 |D |d CD 42149 2144 35 |G |g CD 42149 2144 36 |i |i NNP 42149 2144 37 | | NNP 42149 2144 38 | | NNP 42149 2144 39 | | CD 42149 2144 40 | | CD 42149 2144 41 | | CD 42149 2144 42 | | CD 42149 2144 43 | | CD 42149 2144 44 | | NNP 42149 2144 45 |r |r NNP 42149 2144 46 |r |r NNP 42149 2144 47 |r |r NNP 42149 2144 48 | | NNP 42149 2144 49 | | NNP 42149 2144 50 o| o| NNP 42149 2144 51 | | CD 42149 2144 52 | | CD 42149 2144 53 |P |p CD 42149 2144 54 | | CD 42149 2144 55 |S |s CD 42149 2144 56 |i |i NNP 42149 2144 57 |o |o NNP 42149 2144 58 | | NNP 42149 2144 59 | | NNP 42149 2144 60 | | CD 42149 2144 61 f| f| NN 42149 2144 62 | | CD 42149 2144 63 | | NNP 42149 2144 64 |r |r NNP 42149 2144 65 | | NNP 42149 2144 66 |h |h NNP 42149 2144 67 |l |l NNP 42149 2144 68 |u |u NN 42149 2144 69 |t |t NNP 42149 2144 70 |T |t CD 42149 2144 71 | | CD 42149 2144 72 | | CD 42149 2144 73 | | NNP 42149 2144 74 | | NNP 42149 2144 75 |e |e NNP 42149 2144 76 | | NNP 42149 2144 77 |i |i NNP 42149 2144 78 |l |l NNP 42149 2144 79 |t |t JJ 42149 2144 80 |r |r NNP 42149 2144 81 |o |o NNP 42149 2144 82 | | NNP 42149 2144 83 | | NNP 42149 2144 84 | | NNP 42149 2144 85 | | NNP 42149 2144 86 |s |s NNP 42149 2144 87 | | NNP 42149 2144 88 |e |e NNP 42149 2144 89 |i |i NNP 42149 2144 90 |i |i NNP 42149 2144 91 |a |a NNP 42149 2144 92 |t |t NNP 42149 2144 93 | | CD 42149 2144 94 i| i| JJ 42149 2144 95 | | NNP 42149 2144 96 | | NNP 42149 2144 97 |s |s NNP 42149 2144 98 | | NNP 42149 2144 99 |l |l NNP 42149 2144 100 |n |n NNP 42149 2144 101 |n |n NNP 42149 2144 102 |n |n NNP 42149 2144 103 |a |a NNP 42149 2144 104 | | NNP 42149 2144 105 r| r| NNP 42149 2144 106 Section Section NNP 42149 2144 107 | | NNP 42149 2144 108 | | NNP 42149 2144 109 |u |u JJ 42149 2144 110 | | NNP 42149 2144 111 |d |d NNP 42149 2144 112 |g |g NNP 42149 2144 113 |g |g NNP 42149 2144 114 |s |s NNP 42149 2144 115 |l |l NNP 42149 2144 116 | | NNP 42149 2144 117 o| o| NN 42149 2144 118 between between IN 42149 2144 119 | | NNP 42149 2144 120 Length| Length| NNP 42149 2144 121 |r |r NN 42149 2144 122 |Method |Method NNS 42149 2144 123 of of IN 42149 2144 124 |--+--+---+---| |--+--+---+---| NNP 42149 2144 125 | | NNP 42149 2144 126 n| n| NN 42149 2144 127 rings ring NNS 42149 2144 128 |in |in CD 42149 2144 129 feet|Material feet|Material NNP 42149 2144 130 |e |e NNS 42149 2144 131 |Excavation |excavation CD 42149 2144 132 |A |a CD 42149 2144 133 |B |b CD 42149 2144 134 |C |c CD 42149 2144 135 |D |d CD 42149 2144 136 | | NNP 42149 2144 137 | | NNP 42149 2144 138 -+-----------+-------+------------+----+------------+--+--+---+---+--| -+-----------+-------+------------+----+------------+--+--+---+---+--| NNP 42149 2144 139 | | NNP 42149 2144 140 1 1 CD 42149 2144 141 - - HYPH 42149 2144 142 27 27 CD 42149 2144 143 | | CD 42149 2144 144 67.5|Rock 67.5|rock CD 42149 2144 145 | | CD 42149 2144 146 9 9 CD 42149 2144 147 |[C |[c CD 42149 2144 148 ] ] -RRB- 42149 2144 149 { { -LRB- 42149 2144 150 |Excavation |Excavation NNP 42149 2144 151 } } -RRB- 42149 2144 152 | | NNP 42149 2144 153 | | CD 42149 2144 154 | | CD 42149 2144 155 | | CD 42149 2144 156 | | CD 42149 2144 157 | | CD 42149 2144 158 { { -LRB- 42149 2144 159 |partially |partially CD 42149 2144 160 } } -RRB- 42149 2144 161 | | NNP 42149 2144 162 | | CD 42149 2144 163 | | CD 42149 2144 164 | | CD 42149 2144 165 | | CD 42149 2144 166 | | CD 42149 2144 167 { { -LRB- 42149 2144 168 |completed |completed NNP 42149 2144 169 } } -RRB- 42149 2144 170 | | NNP 42149 2144 171 | | NNP 42149 2144 172 | | CD 42149 2144 173 | | CD 42149 2144 174 | | CD 42149 2144 175 | | CD 42149 2144 176 { { -LRB- 42149 2144 177 |previously |previously RB 42149 2144 178 . . . 42149 2145 1 } } -RRB- 42149 2145 2 | | CD 42149 2145 3 | | CD 42149 2145 4 28 28 CD 42149 2145 5 - - HYPH 42149 2145 6 42 42 CD 42149 2145 7 | | CD 42149 2145 8 37.5| 37.5| CD 42149 2145 9 " " `` 42149 2145 10 |12 |12 NNP 42149 2145 11 |[C |[C NNP 42149 2145 12 ] ] -RRB- 42149 2145 13 |13| |13| VBG 42149 2145 14 4|1 4|1 CD 42149 2145 15 |1 |1 . 42149 2145 16 |19| |19| NN 42149 2145 17 | | NNP 42149 2145 18 43 43 CD 42149 2145 19 - - HYPH 42149 2145 20 58 58 CD 42149 2145 21 | | CD 42149 2145 22 40.0|Rock 40.0|rock CD 42149 2145 23 or or CC 42149 2145 24 |12 |12 CD 42149 2145 25 |[C |[C NNP 42149 2145 26 ] ] -RRB- 42149 2145 27 |19| |19| VBP 42149 2145 28 2|2 2|2 CD 42149 2145 29 |2 |2 CD 42149 2145 30 |25| |25| JJ 42149 2145 31 | | NNP 42149 2145 32 | | NNP 42149 2145 33 | | CD 42149 2145 34 | | CD 42149 2145 35 | | CD 42149 2145 36 | | CD 42149 2145 37 | | CD 42149 2145 38 | | CD 42149 2145 39 O| o| CD 42149 2145 40 59 59 CD 42149 2145 41 - - HYPH 42149 2145 42 153 153 CD 42149 2145 43 | | CD 42149 2145 44 237.5|Gravel 237.5|gravel CD 42149 2145 45 and and CC 42149 2145 46 |16 |16 CD 42149 2145 47 |[C]Breasting|25| |[C]Breasting|25| NNP 42149 2145 48 |1 |1 . 42149 2145 49 |4 |4 NNP 42149 2145 50 |30| |30| NNP 42149 2145 51 r| r| NNP 42149 2145 52 | | NNP 42149 2145 53 |sand |sand CD 42149 2145 54 | | NNP 42149 2145 55 | | CD 42149 2145 56 | | CD 42149 2145 57 | | CD 42149 2145 58 | | CD 42149 2145 59 | | CD 42149 2145 60 | | CD 42149 2145 61 | | CD 42149 2145 62 d| d| NN 42149 2145 63 154 154 CD 42149 2145 64 - - SYM 42149 2145 65 170 170 CD 42149 2145 66 | | CD 42149 2145 67 42.5|Sand 42.5|sand CD 42149 2145 68 and and CC 42149 2145 69 |18 |18 CD 42149 2145 70 | | NNP 42149 2145 71 " " '' 42149 2145 72 |26| |26| VBZ 42149 2145 73 |1 |1 . 42149 2145 74 |5 |5 NNP 42149 2145 75 |32| |32| NNP 42149 2145 76 i| i| NNP 42149 2145 77 | | NNP 42149 2145 78 |silt |silt CD 42149 2145 79 w w NNP 42149 2145 80 / / SYM 42149 2145 81 piles| piles| NNP 42149 2145 82 | | NNP 42149 2145 83 | | CD 42149 2145 84 | | CD 42149 2145 85 | | CD 42149 2145 86 | | CD 42149 2145 87 | | CD 42149 2145 88 | | CD 42149 2145 89 n| n| NN 42149 2145 90 171 171 CD 42149 2145 91 - - SYM 42149 2145 92 236 236 CD 42149 2145 93 | | CD 42149 2145 94 165.0|Silt 165.0|silt CD 42149 2145 95 with with IN 42149 2145 96 |22 |22 NNP 42149 2145 97 |Top |top NN 42149 2145 98 half half NN 42149 2145 99 |22| |22| JJ 42149 2145 100 |1 |1 . 42149 2145 101 |3 |3 NNP 42149 2145 102 |26| |26| NNP 42149 2145 103 a| a| NNP 42149 2145 104 | | NNP 42149 2145 105 |piles |piles CD 42149 2145 106 | | CD 42149 2145 107 | | CD 42149 2145 108 r| r| NN 42149 2145 109 237 237 CD 42149 2145 110 - - SYM 42149 2145 111 259 259 CD 42149 2145 112 | | CD 42149 2145 113 57.5|Silt 57.5|silt CD 42149 2145 114 |25 |25 CD 42149 2145 115 |[D]1 |[D]1 NNP 42149 2145 116 door door NN 42149 2145 117 |18| |18| NNS 42149 2145 118 |1 |1 . 42149 2145 119 |3 |3 . 42149 2145 120 |22| |22| JJ 42149 2145 121 y| y| NNP 42149 2145 122 260 260 CD 42149 2145 123 - - HYPH 42149 2145 124 302 302 CD 42149 2145 125 | | CD 42149 2145 126 107.5| 107.5| CD 42149 2145 127 " " '' 42149 2145 128 |27 |27 CD 42149 2145 129 |[D]1 |[D]1 NNP 42149 2145 130 door door NN 42149 2145 131 |15| |15| CD 42149 2145 132 | | CD 42149 2145 133 |2 |2 CD 42149 2145 134 |17| |17| CD 42149 2145 135 | | CD 42149 2145 136 303 303 CD 42149 2145 137 - - HYPH 42149 2145 138 350 350 CD 42149 2145 139 | | CD 42149 2145 140 120.0| 120.0| CD 42149 2145 141 " " '' 42149 2145 142 |27 |27 CD 42149 2145 143 |[D]8 |[D]8 NNP 42149 2145 144 doors door NNS 42149 2145 145 |15| |15| CD 42149 2145 146 | | CD 42149 2145 147 |4 |4 CD 42149 2145 148 |19| |19| NN 42149 2145 149 | | NNP 42149 2145 150 351 351 CD 42149 2145 151 - - SYM 42149 2145 152 378 378 CD 42149 2145 153 | | CD 42149 2145 154 70.0| 70.0| CD 42149 2145 155 " " `` 42149 2145 156 |27.5|[D]8 |27.5|[D]8 NNP 42149 2145 157 " " '' 42149 2145 158 |18| |18| CD 42149 2145 159 | | NNP 42149 2145 160 |6 |6 CC 42149 2145 161 |24| |24| NN 42149 2145 162 | | CD 42149 2145 163 379 379 CD 42149 2145 164 - - HYPH 42149 2145 165 424 424 CD 42149 2145 166 | | CD 42149 2145 167 115.0| 115.0| CD 42149 2145 168 " " `` 42149 2145 169 |27.5|[D]8 |27.5|[D]8 NNP 42149 2145 170 " " '' 42149 2145 171 |19| |19| JJ 42149 2145 172 | | CD 42149 2145 173 |4 |4 CD 42149 2145 174 |23| |23| CD 42149 2145 175 | | CD 42149 2145 176 425 425 CD 42149 2145 177 - - HYPH 42149 2145 178 522 522 CD 42149 2145 179 | | CD 42149 2145 180 245.0| 245.0| CD 42149 2145 181 " " '' 42149 2145 182 |28 |28 CD 42149 2145 183 |[D]1 |[D]1 NNP 42149 2145 184 door door NN 42149 2145 185 |19| |19| NN 42149 2145 186 | | CD 42149 2145 187 |4 |4 CD 42149 2145 188 |23| |23| CD 42149 2145 189 | | CD 42149 2145 190 523 523 CD 42149 2145 191 - - HYPH 42149 2145 192 625 625 CD 42149 2145 193 | | CD 42149 2145 194 257.5| 257.5| CD 42149 2145 195 " " '' 42149 2145 196 |28 |28 NNP 42149 2145 197 |[D]1 |[D]1 NNP 42149 2145 198 " " '' 42149 2145 199 |20| |20| JJ 42149 2145 200 | | CD 42149 2145 201 |4 |4 CD 42149 2145 202 |24| |24| NN 42149 2145 203 | | CD 42149 2145 204 171 171 CD 42149 2145 205 - - SYM 42149 2145 206 625 625 CD 42149 2145 207 |1,137.5| |1,137.5| NNP 42149 2145 208 |27 |27 CD 42149 2145 209 | | CD 42149 2145 210 |19| |19| NN 42149 2145 211 | | CD 42149 2145 212 |4 |4 CD 42149 2145 213 |23| |23| CD 42149 2145 214 | | CD 42149 2145 215 28 28 CD 42149 2145 216 - - SYM 42149 2145 217 625 625 CD 42149 2145 218 |1,495.0| |1,495.0| NN 42149 2145 219 |25 |25 CD 42149 2145 220 | | CD 42149 2145 221 |19|.8|0.8|3.4|24| |19|.8|0.8|3.4|24| NN 42149 2145 222 -+-----------+-------+------------+----+------------+--+--+---+---+--| -+-----------+-------+------------+----+------------+--+--+---+---+--| NNP 42149 2145 223 | | NNP 42149 2145 224 626 626 CD 42149 2145 225 - - HYPH 42149 2145 226 649 649 CD 42149 2145 227 | | CD 42149 2145 228 57.5|Silt 57.5|silt CD 42149 2145 229 |28 |28 CD 42149 2145 230 |[D]1 |[D]1 NNP 42149 2145 231 door door NN 42149 2145 232 |16| |16| NNP 42149 2145 233 | | CD 42149 2145 234 | | CD 42149 2145 235 3 3 CD 42149 2145 236 |19| |19| NN 42149 2145 237 | | CD 42149 2145 238 650 650 CD 42149 2145 239 - - HYPH 42149 2145 240 733 733 CD 42149 2145 241 | | CD 42149 2145 242 210.0| 210.0| CD 42149 2145 243 " " '' 42149 2145 244 |28 |28 CD 42149 2145 245 |[D]8 |[D]8 NNP 42149 2145 246 doors door NNS 42149 2145 247 |19| |19| VBP 42149 2145 248 | | CD 42149 2145 249 | | CD 42149 2145 250 4 4 CD 42149 2145 251 |23| |23| CD 42149 2145 252 | | CD 42149 2145 253 734 734 CD 42149 2145 254 - - HYPH 42149 2145 255 753 753 CD 42149 2145 256 | | CD 42149 2145 257 50.0| 50.0| CD 42149 2145 258 " " '' 42149 2145 259 |28 |28 CD 42149 2145 260 |[D]8 |[D]8 NNP 42149 2145 261 " " '' 42149 2145 262 |24| |24| NN 42149 2145 263 | | CD 42149 2145 264 | | CD 42149 2145 265 5 5 CD 42149 2145 266 |29| |29| NN 42149 2145 267 H| h| CD 42149 2145 268 754 754 CD 42149 2145 269 - - SYM 42149 2145 270 844 844 CD 42149 2145 271 | | CD 42149 2145 272 227.5| 227.5| CD 42149 2145 273 " " '' 42149 2145 274 |28 |28 NNP 42149 2145 275 |[D]8 |[D]8 NNP 42149 2145 276 " " '' 42149 2145 277 |26| |26| VBZ 42149 2145 278 | | CD 42149 2145 279 | | CD 42149 2145 280 8 8 CD 42149 2145 281 |34| |34| NN 42149 2145 282 e| e| NNP 42149 2145 283 845 845 CD 42149 2145 284 - - HYPH 42149 2145 285 859 859 CD 42149 2145 286 | | CD 42149 2145 287 37.5| 37.5| CD 42149 2145 288 " " '' 42149 2145 289 |28 |28 NNP 42149 2145 290 |[D]8 |[D]8 NNP 42149 2145 291 " " '' 42149 2145 292 |27| |27| JJ 42149 2145 293 | | CD 42149 2145 294 | | CD 42149 2145 295 9 9 CD 42149 2145 296 |36| |36| NN 42149 2145 297 a| a| NN 42149 2145 298 860 860 CD 42149 2145 299 - - HYPH 42149 2145 300 899 899 CD 42149 2145 301 | | CD 42149 2145 302 100.0| 100.0| CD 42149 2145 303 " " '' 42149 2145 304 |28 |28 CD 42149 2145 305 |[D]8 |[D]8 NNP 42149 2145 306 " " '' 42149 2145 307 |24| |24| NN 42149 2145 308 | | CD 42149 2145 309 | | CD 42149 2145 310 8 8 CD 42149 2145 311 |33| |33| NN 42149 2145 312 v| v| NN 42149 2145 313 900 900 CD 42149 2145 314 - - HYPH 42149 2145 315 935 935 CD 42149 2145 316 | | CD 42149 2145 317 90.0| 90.0| CD 42149 2145 318 " " '' 42149 2145 319 |28 |28 NNP 42149 2145 320 |[D]1 |[D]1 NNP 42149 2145 321 door door NN 42149 2145 322 |25| |25| JJ 42149 2145 323 | | CD 42149 2145 324 | | CD 42149 2145 325 7 7 CD 42149 2145 326 |32| |32| NN 42149 2145 327 y| y| NNS 42149 2145 328 936 936 CD 42149 2145 329 - - SYM 42149 2145 330 963 963 CD 42149 2145 331 | | CD 42149 2145 332 70.5| 70.5| CD 42149 2145 333 " " '' 42149 2145 334 |28 |28 NNP 42149 2145 335 |[D]1 |[D]1 NNP 42149 2145 336 " " '' 42149 2145 337 |25| |25| JJ 42149 2145 338 | | CD 42149 2145 339 | | CD 42149 2145 340 8 8 CD 42149 2145 341 |33| |33| RB 42149 2145 342 | | CD 42149 2145 343 964 964 CD 42149 2145 344 - - HYPH 42149 2145 345 1,003| 1,003| CD 42149 2145 346 100.0| 100.0| CD 42149 2145 347 " " `` 42149 2145 348 |28 |28 NNP 42149 2145 349 |[D]1 |[D]1 NNP 42149 2145 350 " " '' 42149 2145 351 |25| |25| JJ 42149 2145 352 | | NNP 42149 2145 353 |10 |10 CD 42149 2145 354 |35| |35| VBP 42149 2145 355 |1,004 |1,004 CD 42149 2145 356 - - HYPH 42149 2145 357 1,060| 1,060| CD 42149 2145 358 142.5| 142.5| CD 42149 2145 359 " " `` 42149 2145 360 |28 |28 NNP 42149 2145 361 |[D]1 |[D]1 NNP 42149 2145 362 " " '' 42149 2145 363 |26| |26| VBZ 42149 2145 364 | | CD 42149 2145 365 |10 |10 CD 42149 2145 366 |36| |36| NN 42149 2145 367 |1,061 |1,061 CD 42149 2145 368 - - HYPH 42149 2145 369 1,110| 1,110| CD 42149 2145 370 125.0| 125.0| CD 42149 2145 371 " " `` 42149 2145 372 |28 |28 NNP 42149 2145 373 |[D]1 |[D]1 NNP 42149 2145 374 " " '' 42149 2145 375 |37| |37| JJ 42149 2145 376 | | NNP 42149 2145 377 |10 |10 NN 42149 2145 378 |47| |47| NN 42149 2145 379 |1,111 |1,111 NNP 42149 2145 380 - - HYPH 42149 2145 381 1,238| 1,238| CD 42149 2145 382 320.0| 320.0| NN 42149 2145 383 " " '' 42149 2145 384 |28 |28 NNP 42149 2145 385 |[D]1 |[D]1 NNP 42149 2145 386 " " '' 42149 2145 387 |30| |30| NNP 42149 2145 388 | | NNP 42149 2145 389 | | NNP 42149 2145 390 9 9 CD 42149 2145 391 |39| |39| NN 42149 2145 392 |1,239 |1,239 NNS 42149 2145 393 - - HYPH 42149 2145 394 1,312| 1,312| NNP 42149 2145 395 185.0| 185.0| CD 42149 2145 396 " " `` 42149 2145 397 |28 |28 NNP 42149 2145 398 | | NNP 42149 2145 399 |39| |39| NN 42149 2145 400 | | CD 42149 2145 401 | | CD 42149 2145 402 9 9 CD 42149 2145 403 |38| |38| CD 42149 2145 404 | | CD 42149 2145 405 626 626 CD 42149 2145 406 - - HYPH 42149 2145 407 1,312|1,717.5| 1,312|1,717.5| CD 42149 2145 408 " " `` 42149 2145 409 |28 |28 NNP 42149 2145 410 | | NNP 42149 2145 411 |35| |35| NN 42149 2145 412 | | CD 42149 2145 413 | | CD 42149 2145 414 8 8 CD 42149 2145 415 |33| |33| JJ 42149 2145 416 -+-----------+-------+------------+----+------------+--+--+---+---+--| -+-----------+-------+------------+----+------------+--+--+---+---+--| NN 42149 2145 417 A| A| NNP 42149 2145 418 171 171 CD 42149 2145 419 - - HYPH 42149 2145 420 1,312|2,855.0| 1,312|2,855.0| CD 42149 2145 421 |28 |28 CD 42149 2145 422 | | NNP 42149 2145 423 |23| |23| CD 42149 2145 424 | | CD 42149 2145 425 | | CD 42149 2145 426 6 6 CD 42149 2145 427 |29| |29| NN 42149 2145 428 l| l| JJ 42149 2145 429 28 28 CD 42149 2145 430 - - SYM 42149 2145 431 1,312|3,212.5| 1,312|3,212.5| CD 42149 2145 432 |26 |26 CD 42149 2145 433 | | CD 42149 2145 434 |21| |21| NN 42149 2145 435 | | CD 42149 2145 436 | | CD 42149 2145 437 5 5 CD 42149 2145 438 |26| |26| NN 42149 2145 439 l| l| JJ 42149 2145 440 | | CD 42149 2145 441 | | CD 42149 2145 442 | | CD 42149 2145 443 | | CD 42149 2145 444 | | CD 42149 2145 445 | | CD 42149 2145 446 | | CD 42149 2145 447 | | CD 42149 2145 448 | | CD 42149 2145 449 | | NNS 42149 2145 450 = = SYM 42149 2145 451 + + SYM 42149 2145 452 = = SYM 42149 2145 453 = = SYM 42149 2145 454 = = SYM 42149 2145 455 = = SYM 42149 2145 456 = = SYM 42149 2145 457 = = SYM 42149 2145 458 = = SYM 42149 2145 459 = = SYM 42149 2145 460 = = SYM 42149 2145 461 = = NFP 42149 2145 462 = = SYM 42149 2145 463 + + SYM 42149 2145 464 = = SYM 42149 2145 465 = = SYM 42149 2145 466 = = SYM 42149 2145 467 = = SYM 42149 2145 468 = = SYM 42149 2145 469 = = NFP 42149 2145 470 = = SYM 42149 2145 471 + + SYM 42149 2145 472 = = SYM 42149 2145 473 = = SYM 42149 2145 474 = = SYM 42149 2145 475 = = SYM 42149 2145 476 = = SYM 42149 2145 477 = = SYM 42149 2145 478 = = SYM 42149 2145 479 = = SYM 42149 2145 480 = = SYM 42149 2145 481 = = SYM 42149 2145 482 = = NFP 42149 2145 483 = = SYM 42149 2145 484 + + SYM 42149 2145 485 = = SYM 42149 2145 486 = = SYM 42149 2145 487 = = NFP 42149 2145 488 = = SYM 42149 2145 489 + + SYM 42149 2145 490 = = SYM 42149 2145 491 = = SYM 42149 2145 492 = = SYM 42149 2145 493 = = SYM 42149 2145 494 = = SYM 42149 2145 495 = = SYM 42149 2145 496 = = SYM 42149 2145 497 = = SYM 42149 2145 498 = = SYM 42149 2145 499 = = SYM 42149 2145 500 = = NFP 42149 2145 501 = = SYM 42149 2145 502 + + SYM 42149 2145 503 = = SYM 42149 2145 504 = = SYM 42149 2145 505 + + SYM 42149 2145 506 = = SYM 42149 2145 507 = = SYM 42149 2145 508 + + SYM 42149 2145 509 = = SYM 42149 2145 510 = = SYM 42149 2145 511 = = SYM 42149 2145 512 + + SYM 42149 2145 513 = = SYM 42149 2145 514 = = SYM 42149 2145 515 = = SYM 42149 2145 516 + + SYM 42149 2145 517 = = SYM 42149 2145 518 =| =| ADD 42149 2145 519 TABLE TABLE VBZ 42149 2145 520 27 27 CD 42149 2145 521 PART part NN 42149 2145 522 2 2 CD 42149 2145 523 = = SYM 42149 2145 524 + + SYM 42149 2145 525 = = SYM 42149 2145 526 = = SYM 42149 2145 527 = = SYM 42149 2145 528 = = SYM 42149 2145 529 = = SYM 42149 2145 530 = = SYM 42149 2145 531 = = SYM 42149 2145 532 = = SYM 42149 2145 533 = = SYM 42149 2145 534 = = NFP 42149 2145 535 = = SYM 42149 2145 536 + + SYM 42149 2145 537 = = SYM 42149 2145 538 = = SYM 42149 2145 539 = = NFP 42149 2145 540 = = SYM 42149 2145 541 + + SYM 42149 2145 542 = = SYM 42149 2145 543 = = SYM 42149 2145 544 = = SYM 42149 2145 545 = = NFP 42149 2145 546 = = SYM 42149 2145 547 + + SYM 42149 2145 548 = = SYM 42149 2145 549 = = SYM 42149 2145 550 = = SYM 42149 2145 551 = = NFP 42149 2145 552 = = SYM 42149 2145 553 + + SYM 42149 2145 554 = = SYM 42149 2145 555 = = SYM 42149 2145 556 = = SYM 42149 2145 557 = = SYM 42149 2145 558 = = SYM 42149 2145 559 = = SYM 42149 2145 560 = = NFP 42149 2145 561 = = SYM 42149 2145 562 + + SYM 42149 2145 563 = = SYM 42149 2145 564 = = SYM 42149 2145 565 = = NFP 42149 2145 566 = = SYM 42149 2145 567 + + SYM 42149 2145 568 = = SYM 42149 2145 569 = = SYM 42149 2145 570 = = NFP 42149 2145 571 = = SYM 42149 2145 572 + + SYM 42149 2145 573 = = SYM 42149 2145 574 = = SYM 42149 2145 575 = = NFP 42149 2145 576 = = SYM 42149 2145 577 + + SYM 42149 2145 578 = = SYM 42149 2145 579 = = SYM 42149 2145 580 = = NFP 42149 2145 581 = = SYM 42149 2145 582 + + SYM 42149 2145 583 = = SYM 42149 2145 584 = = SYM 42149 2145 585 = = SYM 42149 2145 586 =| =| ADD 42149 2145 587 W| W| NNP 42149 2145 588 | | NNP 42149 2145 589 | | NNP 42149 2145 590 |Av |Av NNP 42149 2145 591 . . . 42149 2146 1 | | CD 42149 2146 2 | | CD 42149 2146 3 TIME TIME NNP 42149 2146 4 FOR for IN 42149 2146 5 RING ring NN 42149 2146 6 | | NNP 42149 2146 7 e| e| NNP 42149 2146 8 | | CD 42149 2146 9 | | NNP 42149 2146 10 | | CD 42149 2146 11 | | CD 42149 2146 12 | | CD 42149 2146 13 ERECTION ERECTION NNS 42149 2146 14 , , , 42149 2146 15 | | NNP 42149 2146 16 i| i| JJ 42149 2146 17 | | HYPH 42149 2146 18 | | CD 42149 2146 19 |Time |time CD 42149 2146 20 | | CD 42149 2146 21 | | NNP 42149 2146 22 HRS HRS NNP 42149 2146 23 . . . 42149 2147 1 AND and CC 42149 2147 2 MIN MIN NNP 42149 2147 3 . . . 42149 2148 1 | | NNP 42149 2148 2 g| g| NNP 42149 2148 3 |----+-----| |----+-----| NNP 42149 2148 4 | | NNP 42149 2148 5 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2148 6 h| h| NNP 42149 2148 7 |Av |Av NNP 42149 2148 8 . . . 42149 2149 1 |Time |Time NNP 42149 2149 2 |per |per NNP 42149 2149 3 | | NNP 42149 2149 4 | | NNP 42149 2149 5 | | CD 42149 2149 6 | | CD 42149 2149 7 | | CD 42149 2149 8 | | CD 42149 2149 9 | | CD 42149 2149 10 t| t| NN 42149 2149 11 |No |No NNP 42149 2149 12 . . . 42149 2150 1 |Muck-| |Muck-| NFP 42149 2150 2 |T |t CD 42149 2150 3 | | NNP 42149 2150 4 O O NNP 42149 2150 5 | | NNP 42149 2150 6 | | NNP 42149 2150 7 | | CD 42149 2150 8 | | CD 42149 2150 9 | | CD 42149 2150 10 | | CD 42149 2150 11 |of |of CD 42149 2150 12 |ing |e VBG 42149 2150 13 , , , 42149 2150 14 |ring,|i |ring,|i CD 42149 2150 15 | | NNP 42149 2150 16 r r NNP 42149 2150 17 | | CD 42149 2150 18 | | CD 42149 2150 19 | | CD 42149 2150 20 | | CD 42149 2150 21 | | CD 42149 2150 22 o| o| NN 42149 2150 23 |cu |cu CD 42149 2150 24 . . . 42149 2151 1 |per |per NNP 42149 2151 2 | | NNP 42149 2151 3 |m |m JJ 42149 2151 4 | | NNP 42149 2151 5 d d NNP 42149 2151 6 | | NNP 42149 2151 7 B B NNP 42149 2151 8 | | NNP 42149 2151 9 B B NNP 42149 2151 10 | | NNP 42149 2151 11 | | CD 42149 2151 12 | | CD 42149 2151 13 f| f| NN 42149 2151 14 |yd |yd CD 42149 2151 15 . . . 42149 2152 1 |cu |cu CD 42149 2152 2 . . . 42149 2153 1 |shov-|e |shov-|e NNP 42149 2153 2 J J NNP 42149 2153 3 | | NNP 42149 2153 4 i i PRP 42149 2153 5 | | NNP 42149 2153 6 o o NNP 42149 2153 7 | | NNP 42149 2153 8 o o NNP 42149 2153 9 | | NNP 42149 2153 10 T T NNP 42149 2153 11 | | HYPH 42149 2153 12 | | NNP 42149 2153 13 | | NNP 42149 2153 14 |per |per NN 42149 2153 15 |yd |yd CD 42149 2153 16 . . . 42149 2154 1 |ing |e VBG 42149 2154 2 |a |a NNP 42149 2154 3 | | NNP 42149 2154 4 n n CC 42149 2154 5 | | NNP 42149 2154 6 r r NNP 42149 2154 7 | | NNP 42149 2154 8 r r NNP 42149 2154 9 | | NNP 42149 2154 10 a a DT 42149 2154 11 | | NNP 42149 2154 12 M M NNP 42149 2154 13 | | HYPH 42149 2154 14 | | NNP 42149 2154 15 |ring| |ring| NNP 42149 2154 16 | | NNP 42149 2154 17 |f |f NNP 42149 2154 18 c c NNP 42149 2154 19 | | NNP 42149 2154 20 a a DT 42149 2154 21 | | CD 42149 2154 22 e e NN 42149 2154 23 | | NNP 42149 2154 24 e e NNP 42149 2154 25 | | NNP 42149 2154 26 p p NNP 42149 2154 27 | | NNP 42149 2154 28 e e NNP 42149 2154 29 | | NNP 42149 2154 30 i| i| JJ 42149 2154 31 | | CD 42149 2154 32 | | CD 42149 2154 33 |and |and NNP 42149 2154 34 |o |o NNP 42149 2154 35 k k NNP 42149 2154 36 | | NNP 42149 2154 37 r r NNP 42149 2154 38 | | CD 42149 2154 39 | | NNP 42149 2154 40 | | NNP 42149 2154 41 e e NN 42149 2154 42 | | NNP 42149 2154 43 a a DT 42149 2154 44 | | CD 42149 2154 45 r| r| NN 42149 2154 46 Section Section NNP 42149 2154 47 | | NNP 42149 2154 48 | | NNP 42149 2154 49 | | NNP 42149 2154 50 |r |r NNP 42149 2154 51 s s NNP 42149 2154 52 | | NNP 42149 2154 53 y y NNP 42149 2154 54 | | NNP 42149 2154 55 1 1 CD 42149 2154 56 | | CD 42149 2154 57 2 2 CD 42149 2154 58 | | CD 42149 2154 59 r r NNP 42149 2154 60 | | CD 42149 2154 61 n n CC 42149 2154 62 | | CD 42149 2154 63 o| o| NN 42149 2154 64 between between IN 42149 2154 65 | | CD 42149 2154 66 | | NNP 42149 2154 67 |Muck-+--------+----+----+----+----+----| |muck-+--------+----+----+----+----+----| ADD 42149 2154 68 n| n| NN 42149 2154 69 rings ring NNS 42149 2154 70 | | NNP 42149 2154 71 E E NNP 42149 2154 72 | | NNP 42149 2154 73 |ing |e VBG 42149 2154 74 | | NNP 42149 2154 75 F F NNP 42149 2154 76 | | NNP 42149 2154 77 G G NNP 42149 2154 78 | | NNP 42149 2154 79 G G NNP 42149 2154 80 | | NNP 42149 2154 81 G G NNP 42149 2154 82 | | NNP 42149 2154 83 G G NNP 42149 2154 84 | | NNP 42149 2154 85 G G NNP 42149 2154 86 | | NNP 42149 2154 87 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2154 88 | | CD 42149 2154 89 1 1 CD 42149 2154 90 - - SYM 42149 2154 91 27 27 CD 42149 2154 92 |Excavation| |excavation| CD 42149 2154 93 | | NNP 42149 2154 94 |8 |8 '' 42149 2154 95 - - : 42149 2154 96 30| 30| CD 42149 2154 97 | | CD 42149 2154 98 |3 |3 NN 42149 2154 99 - - HYPH 42149 2154 100 45|8 45|8 CD 42149 2154 101 - - HYPH 42149 2154 102 08| 08| CD 42149 2154 103 | | HYPH 42149 2154 104 | | NNP 42149 2154 105 partially| partially| VBN 42149 2154 106 | | NNP 42149 2154 107 | | NNP 42149 2154 108 | | CD 42149 2154 109 | | CD 42149 2154 110 | | CD 42149 2154 111 | | CD 42149 2154 112 | | CD 42149 2154 113 | | CD 42149 2154 114 | | NNP 42149 2154 115 completed| completed| CD 42149 2154 116 | | NNP 42149 2154 117 | | NNP 42149 2154 118 | | CD 42149 2154 119 | | CD 42149 2154 120 | | CD 42149 2154 121 | | CD 42149 2154 122 | | CD 42149 2154 123 | | NNP 42149 2154 124 |previously| |previously| NNP 42149 2154 125 | | NNP 42149 2154 126 | | NNP 42149 2154 127 | | CD 42149 2154 128 | | CD 42149 2154 129 | | CD 42149 2154 130 | | CD 42149 2154 131 | | CD 42149 2154 132 | | CD 42149 2154 133 28 28 CD 42149 2154 134 - - HYPH 42149 2154 135 42 42 CD 42149 2154 136 |48.7|0 |48.7|0 NNP 42149 2154 137 - - HYPH 42149 2154 138 25 25 CD 42149 2154 139 |20 |20 CD 42149 2154 140 - - HYPH 42149 2154 141 33| 33| CD 42149 2154 142 |4 |4 NNP 42149 2154 143 - - HYPH 42149 2154 144 23| 23| CD 42149 2154 145 | | CD 42149 2154 146 |4 |4 CD 42149 2154 147 - - HYPH 42149 2154 148 00|4 00|4 CD 42149 2154 149 - - HYPH 42149 2154 150 21| 21| CD 42149 2154 151 | | CD 42149 2154 152 43 43 CD 42149 2154 153 - - HYPH 42149 2154 154 58 58 CD 42149 2154 155 |44.2|0 |44.2|0 SYM 42149 2154 156 - - SYM 42149 2154 157 46 46 CD 42149 2154 158 |33 |33 CD 42149 2154 159 - - HYPH 42149 2154 160 44| 44| CD 42149 2154 161 |4 |4 CD 42149 2154 162 - - HYPH 42149 2154 163 16| 16| CD 42149 2154 164 | | HYPH 42149 2154 165 |5 |5 NN 42149 2154 166 - - HYPH 42149 2154 167 45|4 45|4 CD 42149 2154 168 - - HYPH 42149 2154 169 44| 44| CD 42149 2154 170 | | CD 42149 2154 171 | | CD 42149 2154 172 | | CD 42149 2154 173 | | CD 42149 2154 174 | | CD 42149 2154 175 | | CD 42149 2154 176 | | CD 42149 2154 177 | | CD 42149 2154 178 | | CD 42149 2154 179 | | CD 42149 2154 180 | | CD 42149 2154 181 O| o| CD 42149 2154 182 59 59 CD 42149 2154 183 - - HYPH 42149 2154 184 153 153 CD 42149 2154 185 |39.0|0 |39.0|0 NNP 42149 2154 186 - - HYPH 42149 2154 187 12 12 CD 42149 2154 188 | | CD 42149 2154 189 8 8 CD 42149 2154 190 - - HYPH 42149 2154 191 06| 06| CD 42149 2154 192 |2 |2 CD 42149 2154 193 - - HYPH 42149 2154 194 19| 19| CD 42149 2154 195 | | CD 42149 2154 196 |4 |4 CD 42149 2154 197 - - HYPH 42149 2154 198 18|2 18|2 CD 42149 2154 199 - - HYPH 42149 2154 200 23| 23| CD 42149 2154 201 r| r| NN 42149 2154 202 | | CD 42149 2154 203 | | NNP 42149 2154 204 | | CD 42149 2154 205 | | CD 42149 2154 206 | | CD 42149 2154 207 | | CD 42149 2154 208 | | CD 42149 2154 209 | | CD 42149 2154 210 | | CD 42149 2154 211 | | CD 42149 2154 212 d| d| NN 42149 2154 213 154 154 CD 42149 2154 214 - - SYM 42149 2154 215 170 170 CD 42149 2154 216 |41.6|0 |41.6|0 NNP 42149 2154 217 - - HYPH 42149 2154 218 10 10 CD 42149 2154 219 | | CD 42149 2154 220 7 7 CD 42149 2154 221 - - SYM 42149 2154 222 10| 10| CD 42149 2154 223 |2 |2 JJ 42149 2154 224 - - HYPH 42149 2154 225 00| 00| CD 42149 2154 226 J. j. NN 42149 2155 1 | | NNP 42149 2155 2 J. J. NNP 42149 2156 1 |1 |1 NFP 42149 2156 2 - - HYPH 42149 2156 3 48|1 48|1 CD 42149 2156 4 - - HYPH 42149 2156 5 59| 59| CD 42149 2156 6 i| i| JJ 42149 2156 7 | | NNP 42149 2156 8 | | NNP 42149 2156 9 | | CD 42149 2156 10 | | CD 42149 2156 11 | | CD 42149 2156 12 | | CD 42149 2156 13 | | CD 42149 2156 14 | | CD 42149 2156 15 | | CD 42149 2156 16 | | CD 42149 2156 17 n| n| NN 42149 2156 18 171 171 CD 42149 2156 19 - - SYM 42149 2156 20 236 236 CD 42149 2156 21 |42.6|0 |42.6|0 NNP 42149 2156 22 - - HYPH 42149 2156 23 10 10 CD 42149 2156 24 | | CD 42149 2156 25 7 7 CD 42149 2156 26 - - HYPH 42149 2156 27 23| 23| CD 42149 2156 28 |2 |2 CD 42149 2156 29 - - HYPH 42149 2156 30 36|2 36|2 CD 42149 2156 31 - - HYPH 42149 2156 32 55|2 55|2 CD 42149 2156 33 - - HYPH 42149 2156 34 58|1 58|1 CD 42149 2156 35 - - HYPH 42149 2156 36 24|2 24|2 CD 42149 2156 37 - - HYPH 42149 2156 38 35| 35| CD 42149 2156 39 a| a| NN 42149 2156 40 | | NNP 42149 2156 41 | | CD 42149 2156 42 | | CD 42149 2156 43 | | CD 42149 2156 44 | | CD 42149 2156 45 | | CD 42149 2156 46 | | CD 42149 2156 47 | | CD 42149 2156 48 | | CD 42149 2156 49 | | CD 42149 2156 50 r| r| NN 42149 2156 51 237 237 CD 42149 2156 52 - - SYM 42149 2156 53 259 259 CD 42149 2156 54 |13.8|0 |13.8|0 NNP 42149 2156 55 - - HYPH 42149 2156 56 11 11 CD 42149 2156 57 | | CD 42149 2156 58 2 2 CD 42149 2156 59 - - HYPH 42149 2156 60 29| 29| CD 42149 2156 61 |3 |3 NNS 42149 2156 62 - - : 42149 2156 63 01|2 01|2 CD 42149 2156 64 - - HYPH 42149 2156 65 05|1 05|1 CD 42149 2156 66 - - HYPH 42149 2156 67 28|2 28|2 CD 42149 2156 68 - - HYPH 42149 2156 69 00|2 00|2 CD 42149 2156 70 - - HYPH 42149 2156 71 32| 32| CD 42149 2156 72 y| y| NNS 42149 2156 73 260 260 CD 42149 2156 74 - - HYPH 42149 2156 75 302 302 CD 42149 2156 76 | | CD 42149 2156 77 0 0 CD 42149 2156 78 | | CD 42149 2156 79 | | CD 42149 2156 80 0 0 CD 42149 2156 81 - - HYPH 42149 2156 82 32| 32| CD 42149 2156 83 |2 |2 NN 42149 2156 84 - - HYPH 42149 2156 85 34|2 34|2 CD 42149 2156 86 - - HYPH 42149 2156 87 35|3 35|3 CD 42149 2156 88 - - HYPH 42149 2156 89 38|4 38|4 CD 42149 2156 90 - - HYPH 42149 2156 91 28|3 28|3 CD 42149 2156 92 - - HYPH 42149 2156 93 05| 05| CD 42149 2156 94 | | CD 42149 2156 95 303 303 CD 42149 2156 96 - - HYPH 42149 2156 97 350 350 CD 42149 2156 98 | | CD 42149 2156 99 6.9|0 6.9|0 CD 42149 2156 100 - - HYPH 42149 2156 101 07 07 CD 42149 2156 102 | | CD 42149 2156 103 0 0 CD 42149 2156 104 - - HYPH 42149 2156 105 52| 52| CD 42149 2156 106 |2 |2 CD 42149 2156 107 - - HYPH 42149 2156 108 59|2 59|2 CD 42149 2156 109 - - HYPH 42149 2156 110 28|2 28|2 CD 42149 2156 111 - - HYPH 42149 2156 112 37|1 37|1 CD 42149 2156 113 - - HYPH 42149 2156 114 44|2 44|2 CD 42149 2156 115 - - HYPH 42149 2156 116 41| 41| CD 42149 2156 117 | | CD 42149 2156 118 351 351 CD 42149 2156 119 - - HYPH 42149 2156 120 378 378 CD 42149 2156 121 | | CD 42149 2156 122 0 0 CD 42149 2156 123 | | CD 42149 2156 124 | | CD 42149 2156 125 0 0 CD 42149 2156 126 - - HYPH 42149 2156 127 33| 33| CD 42149 2156 128 |2 |2 JJ 42149 2156 129 - - HYPH 42149 2156 130 05|2 05|2 CD 42149 2156 131 - - HYPH 42149 2156 132 32|2 32|2 CD 42149 2156 133 - - HYPH 42149 2156 134 48|2 48|2 CD 42149 2156 135 - - HYPH 42149 2156 136 00|2 00|2 CD 42149 2156 137 - - HYPH 42149 2156 138 18| 18| CD 42149 2156 139 | | CD 42149 2156 140 379 379 CD 42149 2156 141 - - HYPH 42149 2156 142 424 424 CD 42149 2156 143 | | CD 42149 2156 144 6.9|0 6.9|0 CD 42149 2156 145 - - HYPH 42149 2156 146 07 07 CD 42149 2156 147 | | CD 42149 2156 148 0 0 CD 42149 2156 149 - - HYPH 42149 2156 150 48| 48| CD 42149 2156 151 |3 |3 NNS 42149 2156 152 - - HYPH 42149 2156 153 34|2 34|2 CD 42149 2156 154 - - HYPH 42149 2156 155 51|3 51|3 CD 42149 2156 156 - - HYPH 42149 2156 157 18|3 18|3 CD 42149 2156 158 - - HYPH 42149 2156 159 19|3 19|3 CD 42149 2156 160 - - HYPH 42149 2156 161 22| 22| CD 42149 2156 162 | | CD 42149 2156 163 425 425 CD 42149 2156 164 - - HYPH 42149 2156 165 522 522 CD 42149 2156 166 | | CD 42149 2156 167 6.7|0 6.7|0 CD 42149 2156 168 - - HYPH 42149 2156 169 06 06 CD 42149 2156 170 | | CD 42149 2156 171 0 0 CD 42149 2156 172 - - HYPH 42149 2156 173 45| 45| CD 42149 2156 174 |3 |3 NN 42149 2156 175 - - HYPH 42149 2156 176 09|3 09|3 CD 42149 2156 177 - - HYPH 42149 2156 178 51|3 51|3 CD 42149 2156 179 - - HYPH 42149 2156 180 00|3 00|3 CD 42149 2156 181 - - HYPH 42149 2156 182 28|3 28|3 CD 42149 2156 183 - - HYPH 42149 2156 184 16| 16| CD 42149 2156 185 | | NNP 42149 2156 186 523 523 CD 42149 2156 187 - - HYPH 42149 2156 188 625 625 CD 42149 2156 189 | | CD 42149 2156 190 0 0 CD 42149 2156 191 | | CD 42149 2156 192 | | CD 42149 2156 193 0 0 CD 42149 2156 194 - - HYPH 42149 2156 195 32| 32| CD 42149 2156 196 |1 |1 : 42149 2156 197 - - HYPH 42149 2156 198 36|1 36|1 CD 42149 2156 199 - - HYPH 42149 2156 200 37|1 37|1 CD 42149 2156 201 - - HYPH 42149 2156 202 47|1 47|1 CD 42149 2156 203 - - HYPH 42149 2156 204 51|1 51|1 CD 42149 2156 205 - - HYPH 42149 2156 206 39| 39| CD 42149 2156 207 | | CD 42149 2156 208 171 171 CD 42149 2156 209 - - HYPH 42149 2156 210 625 625 CD 42149 2156 211 | | CD 42149 2156 212 9.7|0 9.7|0 CD 42149 2156 213 - - HYPH 42149 2156 214 11 11 CD 42149 2156 215 | | CD 42149 2156 216 1 1 CD 42149 2156 217 - - HYPH 42149 2156 218 44| 44| CD 42149 2156 219 [ [ -LRB- 42149 2156 220 A a NN 42149 2156 221 ] ] -RRB- 42149 2156 222 |2 |2 CD 42149 2156 223 - - HYPH 42149 2156 224 37|2 37|2 CD 42149 2156 225 - - HYPH 42149 2156 226 41|2 41|2 CD 42149 2156 227 - - HYPH 42149 2156 228 41|2 41|2 CD 42149 2156 229 - - HYPH 42149 2156 230 32|2 32|2 CD 42149 2156 231 - - HYPH 42149 2156 232 38| 38| CD 42149 2156 233 | | CD 42149 2156 234 28 28 CD 42149 2156 235 - - HYPH 42149 2156 236 625 625 CD 42149 2156 237 |17.8|0 |17.8|0 CD 42149 2156 238 - - HYPH 42149 2156 239 14 14 CD 42149 2156 240 | | CD 42149 2156 241 4 4 CD 42149 2156 242 - - HYPH 42149 2156 243 14| 14| CD 42149 2156 244 [ [ -LRB- 42149 2156 245 A a NN 42149 2156 246 ] ] -RRB- 42149 2156 247 | | NNP 42149 2156 248 | | CD 42149 2156 249 | | CD 42149 2156 250 | | CD 42149 2156 251 |2 |2 CD 42149 2156 252 - - HYPH 42149 2156 253 41| 41| CD 42149 2156 254 -+-----------+----+-----+-----+--------+----+----+----+----+----| -+-----------+----+-----+-----+--------+----+----+----+----+----| HYPH 42149 2156 255 | | CD 42149 2156 256 626 626 CD 42149 2156 257 - - HYPH 42149 2156 258 649 649 CD 42149 2156 259 |12.2|0 |12.2|0 NNP 42149 2156 260 - - HYPH 42149 2156 261 12 12 CD 42149 2156 262 | | CD 42149 2156 263 2 2 CD 42149 2156 264 - - HYPH 42149 2156 265 23| 23| CD 42149 2156 266 [ [ -LRB- 42149 2156 267 A a NN 42149 2156 268 ] ] -RRB- 42149 2156 269 |2 |2 CD 42149 2156 270 - - HYPH 42149 2156 271 19|2 19|2 CD 42149 2156 272 - - HYPH 42149 2156 273 30|2 30|2 CD 42149 2156 274 - - HYPH 42149 2156 275 05|1 05|1 CD 42149 2156 276 - - HYPH 42149 2156 277 42|2 42|2 CD 42149 2156 278 - - HYPH 42149 2156 279 16| 16| CD 42149 2156 280 | | CD 42149 2156 281 650 650 CD 42149 2156 282 - - SYM 42149 2156 283 733 733 CD 42149 2156 284 |13.5| |13.5| CD 42149 2156 285 | | CD 42149 2156 286 0 0 CD 42149 2156 287 - - HYPH 42149 2156 288 57| 57| CD 42149 2156 289 0 0 CD 42149 2156 290 - - SYM 42149 2156 291 13 13 CD 42149 2156 292 |1 |1 HYPH 42149 2156 293 - - HYPH 42149 2156 294 42|1 42|1 CD 42149 2156 295 - - HYPH 42149 2156 296 24|1 24|1 CD 42149 2156 297 - - HYPH 42149 2156 298 47|1 47|1 CD 42149 2156 299 - - HYPH 42149 2156 300 48|1 48|1 CD 42149 2156 301 - - HYPH 42149 2156 302 39| 39| CD 42149 2156 303 | | NNP 42149 2156 304 734 734 CD 42149 2156 305 - - HYPH 42149 2156 306 753 753 CD 42149 2156 307 | | CD 42149 2156 308 8.3|0 8.3|0 CD 42149 2156 309 - - HYPH 42149 2156 310 05 05 CD 42149 2156 311 | | CD 42149 2156 312 0 0 CD 42149 2156 313 - - SYM 42149 2156 314 41| 41| CD 42149 2156 315 0 0 CD 42149 2156 316 - - SYM 42149 2156 317 17 17 CD 42149 2156 318 |1 |1 HYPH 42149 2156 319 - - HYPH 42149 2156 320 06|1 06|1 CD 42149 2156 321 - - HYPH 42149 2156 322 55|0 55|0 CD 42149 2156 323 - - HYPH 42149 2156 324 38|1 38|1 CD 42149 2156 325 - - HYPH 42149 2156 326 20|1 20|1 CD 42149 2156 327 - - HYPH 42149 2156 328 12| 12| CD 42149 2156 329 H| h| CD 42149 2156 330 754 754 CD 42149 2156 331 - - HYPH 42149 2156 332 844 844 CD 42149 2156 333 |12.8|0 |12.8|0 CD 42149 2156 334 - - HYPH 42149 2156 335 04 04 CD 42149 2156 336 | | CD 42149 2156 337 0 0 CD 42149 2156 338 - - HYPH 42149 2156 339 51| 51| CD 42149 2156 340 0 0 CD 42149 2156 341 - - SYM 42149 2156 342 16 16 CD 42149 2156 343 |1 |1 : 42149 2156 344 - - HYPH 42149 2156 345 19|1 19|1 CD 42149 2156 346 - - HYPH 42149 2156 347 41|1 41|1 CD 42149 2156 348 - - HYPH 42149 2156 349 52|0 52|0 CD 42149 2156 350 - - HYPH 42149 2156 351 50|1 50|1 CD 42149 2156 352 - - HYPH 42149 2156 353 29| 29| CD 42149 2156 354 e| e| NNP 42149 2156 355 845 845 CD 42149 2156 356 - - HYPH 42149 2156 357 859 859 CD 42149 2156 358 | | CD 42149 2156 359 5.6|0 5.6|0 CD 42149 2156 360 - - HYPH 42149 2156 361 07 07 CD 42149 2156 362 | | CD 42149 2156 363 0 0 CD 42149 2156 364 - - HYPH 42149 2156 365 39| 39| CD 42149 2156 366 0 0 CD 42149 2156 367 - - SYM 42149 2156 368 19 19 CD 42149 2156 369 |1 |1 : 42149 2156 370 - - HYPH 42149 2156 371 24|1 24|1 CD 42149 2156 372 - - HYPH 42149 2156 373 08|1 08|1 CD 42149 2156 374 - - HYPH 42149 2156 375 10| 10| CD 42149 2156 376 |1 |1 NNP 42149 2156 377 - - HYPH 42149 2156 378 20| 20| CD 42149 2156 379 a| a| NN 42149 2156 380 860 860 CD 42149 2156 381 - - HYPH 42149 2156 382 899 899 CD 42149 2156 383 |16.5|0 |16.5|0 CD 42149 2156 384 - - HYPH 42149 2156 385 02 02 CD 42149 2156 386 | | CD 42149 2156 387 0 0 CD 42149 2156 388 - - HYPH 42149 2156 389 39| 39| CD 42149 2156 390 0 0 CD 42149 2156 391 - - SYM 42149 2156 392 13 13 CD 42149 2156 393 |1 |1 HYPH 42149 2156 394 - - HYPH 42149 2156 395 00|1 00|1 VBN 42149 2156 396 - - HYPH 42149 2156 397 05|1 05|1 CD 42149 2156 398 - - HYPH 42149 2156 399 13| 13| CD 42149 2156 400 |1 |1 : 42149 2156 401 - - : 42149 2156 402 04| 04| CD 42149 2156 403 v| v| NN 42149 2156 404 900 900 CD 42149 2156 405 - - HYPH 42149 2156 406 935 935 CD 42149 2156 407 |11.5|0 |11.5|0 NNPS 42149 2156 408 - - HYPH 42149 2156 409 03 03 CD 42149 2156 410 | | CD 42149 2156 411 0 0 CD 42149 2156 412 - - HYPH 42149 2156 413 29| 29| CD 42149 2156 414 0 0 CD 42149 2156 415 - - SYM 42149 2156 416 14 14 CD 42149 2156 417 |0 |0 NN 42149 2156 418 - - HYPH 42149 2156 419 47|1 47|1 CD 42149 2156 420 - - HYPH 42149 2156 421 13|0 13|0 CD 42149 2156 422 - - HYPH 42149 2156 423 52|1 52|1 CD 42149 2156 424 - - HYPH 42149 2156 425 10|0 10|0 CD 42149 2156 426 - - HYPH 42149 2156 427 52| 52| CD 42149 2156 428 y| y| NNS 42149 2156 429 936 936 CD 42149 2156 430 - - SYM 42149 2156 431 963 963 CD 42149 2156 432 | | CD 42149 2156 433 5.9|0 5.9|0 CD 42149 2156 434 - - HYPH 42149 2156 435 03 03 CD 42149 2156 436 | | CD 42149 2156 437 0 0 CD 42149 2156 438 - - HYPH 42149 2156 439 19| 19| CD 42149 2156 440 0 0 CD 42149 2156 441 - - SYM 42149 2156 442 15 15 CD 42149 2156 443 |0 |0 NN 42149 2156 444 - - HYPH 42149 2156 445 59|0 59|0 CD 42149 2156 446 - - HYPH 42149 2156 447 47|0 47|0 CD 42149 2156 448 - - HYPH 42149 2156 449 55| 55| CD 42149 2156 450 |0 |0 . 42149 2156 451 - - HYPH 42149 2156 452 56| 56| CD 42149 2156 453 | | CD 42149 2156 454 964 964 CD 42149 2156 455 - - HYPH 42149 2156 456 1,003| 1,003| CD 42149 2156 457 8.1|0 8.1|0 CD 42149 2156 458 - - HYPH 42149 2156 459 03 03 CD 42149 2156 460 | | CD 42149 2156 461 0 0 CD 42149 2156 462 - - HYPH 42149 2156 463 27| 27| CD 42149 2156 464 0 0 CD 42149 2156 465 - - SYM 42149 2156 466 10 10 CD 42149 2156 467 |0 |0 NN 42149 2156 468 - - HYPH 42149 2156 469 51|0 51|0 CD 42149 2156 470 - - HYPH 42149 2156 471 52|1 52|1 CD 42149 2156 472 - - HYPH 42149 2156 473 05| 05| CD 42149 2156 474 |0 |0 NN 42149 2156 475 - - : 42149 2156 476 53| 53| NNP 42149 2156 477 |1,004 |1,004 NNP 42149 2156 478 - - HYPH 42149 2156 479 1,060| 1,060| CD 42149 2156 480 8.7|0 8.7|0 NNP 42149 2156 481 - - HYPH 42149 2156 482 03 03 CD 42149 2156 483 | | CD 42149 2156 484 0 0 CD 42149 2156 485 - - HYPH 42149 2156 486 30| 30| CD 42149 2156 487 0 0 CD 42149 2156 488 - - SYM 42149 2156 489 15 15 CD 42149 2156 490 |1 |1 HYPH 42149 2156 491 - - HYPH 42149 2156 492 01|1 01|1 CD 42149 2156 493 - - HYPH 42149 2156 494 09|1 09|1 CD 42149 2156 495 - - HYPH 42149 2156 496 05|0 05|0 CD 42149 2156 497 - - HYPH 42149 2156 498 45|1 45|1 CD 42149 2156 499 - - HYPH 42149 2156 500 03| 03| CD 42149 2156 501 |1,061 |1,061 CD 42149 2156 502 - - HYPH 42149 2156 503 1,110| 1,110| CD 42149 2156 504 6.2|0 6.2|0 CD 42149 2156 505 - - HYPH 42149 2156 506 03 03 CD 42149 2156 507 | | CD 42149 2156 508 0 0 CD 42149 2156 509 - - HYPH 42149 2156 510 19| 19| CD 42149 2156 511 0 0 CD 42149 2156 512 - - SYM 42149 2156 513 10 10 CD 42149 2156 514 |0 |0 NN 42149 2156 515 - - HYPH 42149 2156 516 42|0 42|0 CD 42149 2156 517 - - HYPH 42149 2156 518 49|0 49|0 CD 42149 2156 519 - - HYPH 42149 2156 520 54|0 54|0 CD 42149 2156 521 - - HYPH 42149 2156 522 45|0 45|0 CD 42149 2156 523 - - HYPH 42149 2156 524 45| 45| CD 42149 2156 525 |1,111 |1,111 JJ 42149 2156 526 - - HYPH 42149 2156 527 1,238|15.6|0 1,238|15.6|0 CD 42149 2156 528 - - HYPH 42149 2156 529 02 02 CD 42149 2156 530 | | CD 42149 2156 531 0 0 CD 42149 2156 532 - - HYPH 42149 2156 533 38| 38| CD 42149 2156 534 0 0 CD 42149 2156 535 - - SYM 42149 2156 536 16 16 CD 42149 2156 537 |0 |0 NN 42149 2156 538 - - HYPH 42149 2156 539 48|1 48|1 CD 42149 2156 540 - - HYPH 42149 2156 541 06|1 06|1 CD 42149 2156 542 - - HYPH 42149 2156 543 04|1 04|1 CD 42149 2156 544 - - HYPH 42149 2156 545 23|0 23|0 CD 42149 2156 546 - - HYPH 42149 2156 547 56| 56| CD 42149 2156 548 |1,239 |1,239 NNP 42149 2156 549 - - HYPH 42149 2156 550 1,312|13.0|0 1,312|13.0|0 CD 42149 2156 551 - - HYPH 42149 2156 552 03 03 CD 42149 2156 553 | | CD 42149 2156 554 0 0 CD 42149 2156 555 - - HYPH 42149 2156 556 36| 36| CD 42149 2156 557 0 0 CD 42149 2156 558 - - SYM 42149 2156 559 18 18 CD 42149 2156 560 |1 |1 : 42149 2156 561 - - HYPH 42149 2156 562 04|1 04|1 CD 42149 2156 563 - - HYPH 42149 2156 564 01|1 01|1 CD 42149 2156 565 - - HYPH 42149 2156 566 02|1 02|1 CD 42149 2156 567 - - HYPH 42149 2156 568 15|1 15|1 CD 42149 2156 569 - - HYPH 42149 2156 570 07| 07| CD 42149 2156 571 | | CD 42149 2156 572 626 626 CD 42149 2156 573 - - HYPH 42149 2156 574 1,312|10.6|0 1,312|10.6|0 CD 42149 2156 575 - - HYPH 42149 2156 576 04 04 CD 42149 2156 577 | | CD 42149 2156 578 0 0 CD 42149 2156 579 - - HYPH 42149 2156 580 42| 42| CD 42149 2156 581 0 0 CD 42149 2156 582 - - SYM 42149 2156 583 14 14 CD 42149 2156 584 |1 |1 HYPH 42149 2156 585 - - HYPH 42149 2156 586 06|1 06|1 CD 42149 2156 587 - - HYPH 42149 2156 588 15|1 15|1 CD 42149 2156 589 - - HYPH 42149 2156 590 16|1 16|1 CD 42149 2156 591 - - HYPH 42149 2156 592 18|1 18|1 CD 42149 2156 593 - - HYPH 42149 2156 594 10| 10| CD 42149 2156 595 -+-----------+----+-----+-----+--------+--- -+-----------+----+-----+-----+--------+--- -RRB- 42149 2156 596 |----+----+----+----| |----+----+----+----| JJ 42149 2156 597 A| a| CD 42149 2156 598 171 171 CD 42149 2156 599 - - HYPH 42149 2156 600 1,312|10.2|0 1,312|10.2|0 CD 42149 2156 601 - - HYPH 42149 2156 602 07 07 CD 42149 2156 603 |1 |1 : 42149 2156 604 - - HYPH 42149 2156 605 15 15 CD 42149 2156 606 | | CD 42149 2156 607 [ [ -LRB- 42149 2156 608 A a NN 42149 2156 609 ] ] -RRB- 42149 2156 610 |2 |2 CD 42149 2156 611 - - HYPH 42149 2156 612 09|2 09|2 CD 42149 2156 613 - - HYPH 42149 2156 614 13|2 13|2 CD 42149 2156 615 - - HYPH 42149 2156 616 21|2 21|2 CD 42149 2156 617 - - HYPH 42149 2156 618 20|2 20|2 CD 42149 2156 619 - - HYPH 42149 2156 620 13| 13| CD 42149 2156 621 l| l| JJ 42149 2156 622 28 28 CD 42149 2156 623 - - HYPH 42149 2156 624 1,312|14.1|0 1,312|14.1|0 CD 42149 2156 625 - - HYPH 42149 2156 626 10 10 CD 42149 2156 627 |2 |2 CD 42149 2156 628 - - HYPH 42149 2156 629 28 28 CD 42149 2156 630 | | NNS 42149 2156 631 [ [ -LRB- 42149 2156 632 A a NN 42149 2156 633 ] ] -RRB- 42149 2156 634 | | NNP 42149 2156 635 | | CD 42149 2156 636 | | CD 42149 2156 637 | | CD 42149 2156 638 |2 |2 CD 42149 2156 639 - - HYPH 42149 2156 640 18| 18| CD 42149 2156 641 l| l| JJ 42149 2156 642 | | CD 42149 2156 643 | | CD 42149 2156 644 | | CD 42149 2156 645 | | CD 42149 2156 646 | | CD 42149 2156 647 | | CD 42149 2156 648 | | CD 42149 2156 649 | | CD 42149 2156 650 | | CD 42149 2156 651 | | NNS 42149 2156 652 = = SYM 42149 2156 653 + + SYM 42149 2156 654 = = SYM 42149 2156 655 = = SYM 42149 2156 656 = = SYM 42149 2156 657 = = SYM 42149 2156 658 = = SYM 42149 2156 659 = = SYM 42149 2156 660 = = SYM 42149 2156 661 = = SYM 42149 2156 662 = = SYM 42149 2156 663 = = NFP 42149 2156 664 = = SYM 42149 2156 665 + + SYM 42149 2156 666 = = SYM 42149 2156 667 = = SYM 42149 2156 668 = = NFP 42149 2156 669 = = SYM 42149 2156 670 + + SYM 42149 2156 671 = = SYM 42149 2156 672 = = SYM 42149 2156 673 = = SYM 42149 2156 674 = = NFP 42149 2156 675 = = SYM 42149 2156 676 + + SYM 42149 2156 677 = = SYM 42149 2156 678 = = SYM 42149 2156 679 = = SYM 42149 2156 680 = = NFP 42149 2156 681 = = SYM 42149 2156 682 + + SYM 42149 2156 683 = = SYM 42149 2156 684 = = SYM 42149 2156 685 = = SYM 42149 2156 686 = = SYM 42149 2156 687 = = SYM 42149 2156 688 = = SYM 42149 2156 689 = = NFP 42149 2156 690 = = SYM 42149 2156 691 + + SYM 42149 2156 692 = = SYM 42149 2156 693 = = SYM 42149 2156 694 = = NFP 42149 2156 695 = = SYM 42149 2156 696 + + SYM 42149 2156 697 = = SYM 42149 2156 698 = = SYM 42149 2156 699 = = NFP 42149 2156 700 = = SYM 42149 2156 701 + + SYM 42149 2156 702 = = SYM 42149 2156 703 = = SYM 42149 2156 704 = = NFP 42149 2156 705 = = SYM 42149 2156 706 + + SYM 42149 2156 707 = = SYM 42149 2156 708 = = SYM 42149 2156 709 = = NFP 42149 2156 710 = = SYM 42149 2156 711 + + SYM 42149 2156 712 = = SYM 42149 2156 713 = = SYM 42149 2156 714 = = UH 42149 2156 715 =| =| ADD 42149 2156 716 TABLE TABLE VBZ 42149 2156 717 27 27 CD 42149 2156 718 PART part NN 42149 2156 719 3 3 CD 42149 2156 720 = = SYM 42149 2156 721 + + SYM 42149 2156 722 = = SYM 42149 2156 723 = = SYM 42149 2156 724 = = SYM 42149 2156 725 = = SYM 42149 2156 726 = = SYM 42149 2156 727 = = SYM 42149 2156 728 = = SYM 42149 2156 729 = = SYM 42149 2156 730 = = SYM 42149 2156 731 = = NFP 42149 2156 732 = = SYM 42149 2156 733 + + SYM 42149 2156 734 = = SYM 42149 2156 735 = = SYM 42149 2156 736 = = NFP 42149 2156 737 = = SYM 42149 2156 738 + + SYM 42149 2156 739 = = SYM 42149 2156 740 = = SYM 42149 2156 741 = = NFP 42149 2156 742 = = SYM 42149 2156 743 + + SYM 42149 2156 744 = = SYM 42149 2156 745 = = SYM 42149 2156 746 = = NFP 42149 2156 747 = = SYM 42149 2156 748 + + SYM 42149 2156 749 = = SYM 42149 2156 750 = = SYM 42149 2156 751 = = NFP 42149 2156 752 = = SYM 42149 2156 753 + + SYM 42149 2156 754 = = SYM 42149 2156 755 = = SYM 42149 2156 756 = = NFP 42149 2156 757 = = SYM 42149 2156 758 + + SYM 42149 2156 759 = = SYM 42149 2156 760 = = SYM 42149 2156 761 = = NFP 42149 2156 762 = = SYM 42149 2156 763 + + SYM 42149 2156 764 = = SYM 42149 2156 765 = = SYM 42149 2156 766 = = SYM 42149 2156 767 = = NFP 42149 2156 768 = = SYM 42149 2156 769 + + SYM 42149 2156 770 = = SYM 42149 2156 771 = = SYM 42149 2156 772 = = SYM 42149 2156 773 = = NFP 42149 2156 774 = = SYM 42149 2156 775 + + SYM 42149 2156 776 = = SYM 42149 2156 777 = = SYM 42149 2156 778 = = SYM 42149 2156 779 = = NFP 42149 2156 780 = = SYM 42149 2156 781 + + SYM 42149 2156 782 = = SYM 42149 2156 783 = = SYM 42149 2156 784 = = SYM 42149 2156 785 = = NFP 42149 2156 786 = = SYM 42149 2156 787 + + SYM 42149 2156 788 = = SYM 42149 2156 789 = = SYM 42149 2156 790 = = SYM 42149 2156 791 = = SYM 42149 2156 792 =| =| ADD 42149 2156 793 W| w| CD 42149 2156 794 | | JJ 42149 2156 795 BOLTING bolting NN 42149 2156 796 TIME time NN 42149 2156 797 , , , 42149 2156 798 WHOLE WHOLE NNP 42149 2156 799 |Time| |Time| NNP 42149 2156 800 | | NNP 42149 2156 801 e| e| JJ 42149 2156 802 | | CD 42149 2156 803 TIME time NN 42149 2156 804 ON on IN 42149 2156 805 BOLTS BOLTS NNP 42149 2156 806 AFTER AFTER NNP 42149 2156 807 | | CD 42149 2156 808 | | NNP 42149 2156 809 | | CD 42149 2156 810 i| i| NN 42149 2156 811 | | NNP 42149 2156 812 RING ring NN 42149 2156 813 IS be VBZ 42149 2156 814 COMPLETE COMPLETE NNP 42149 2156 815 . . . 42149 2157 1 |lost| |lost| NNP 42149 2157 2 TOTAL TOTAL NNP 42149 2157 3 TIME time NN 42149 2157 4 . . . 42149 2158 1 | | JJ 42149 2158 2 g| g| NN 42149 2158 3 |----+----+----+----+----| |----+----+----+----+----| NNP 42149 2158 4 |-----+-----+-----+-----+-----| |-----+-----+-----+-----+-----| NNP 42149 2158 5 h| h| NNP 42149 2158 6 | | NNP 42149 2158 7 | | NNP 42149 2158 8 | | CD 42149 2158 9 | | CD 42149 2158 10 | | CD 42149 2158 11 |re- |re- CD 42149 2158 12 | | CD 42149 2158 13 | | CD 42149 2158 14 | | CD 42149 2158 15 | | CD 42149 2158 16 | | CD 42149 2158 17 | | CD 42149 2158 18 t| t| NN 42149 2158 19 | | NNP 42149 2158 20 S S NNP 42149 2158 21 | | NNP 42149 2158 22 | | NNP 42149 2158 23 | | NNP 42149 2158 24 | | NNP 42149 2158 25 |pair- |pair- NNP 42149 2158 26 | | NNP 42149 2158 27 | | NNP 42149 2158 28 | | CD 42149 2158 29 | | CD 42149 2158 30 | | CD 42149 2158 31 | | CD 42149 2158 32 | | NNP 42149 2158 33 t t NNP 42149 2158 34 | | NNP 42149 2158 35 | | NNP 42149 2158 36 | | CD 42149 2158 37 | | CD 42149 2158 38 |ing |e VBG 42149 2158 39 | | CD 42149 2158 40 | | CD 42149 2158 41 | | CD 42149 2158 42 | | CD 42149 2158 43 | | CD 42149 2158 44 | | CD 42149 2158 45 o| o| NN 42149 2158 46 | | CD 42149 2158 47 r r NNP 42149 2158 48 | | NNP 42149 2158 49 B B NNP 42149 2158 50 | | NNP 42149 2158 51 B B NNP 42149 2158 52 | | NNP 42149 2158 53 | | NNP 42149 2158 54 | | NNP 42149 2158 55 | | NNP 42149 2158 56 s s POS 42149 2158 57 | | NNP 42149 2158 58 | | NNP 42149 2158 59 | | CD 42149 2158 60 | | CD 42149 2158 61 | | CD 42149 2158 62 f| f| NN 42149 2158 63 | | NNP 42149 2158 64 a a DT 42149 2158 65 | | CD 42149 2158 66 o o NN 42149 2158 67 | | NNP 42149 2158 68 o o NNP 42149 2158 69 | | NNP 42149 2158 70 T T NNP 42149 2158 71 | | NNP 42149 2158 72 |hy- |hy- NNP 42149 2158 73 | | NNP 42149 2158 74 t t NNP 42149 2158 75 | | NNP 42149 2158 76 | | NNP 42149 2158 77 | | CD 42149 2158 78 | | CD 42149 2158 79 | | CD 42149 2158 80 | | CD 42149 2158 81 | | NNP 42149 2158 82 i i PRP 42149 2158 83 | | CD 42149 2158 84 r r NNP 42149 2158 85 | | NNP 42149 2158 86 r r NNP 42149 2158 87 | | NNP 42149 2158 88 a a DT 42149 2158 89 | | NNP 42149 2158 90 M M NNP 42149 2158 91 |drau- |drau- NNP 42149 2158 92 r r NNP 42149 2158 93 | | NNP 42149 2158 94 B B NNP 42149 2158 95 | | NNP 42149 2158 96 B B NNP 42149 2158 97 | | NNP 42149 2158 98 | | NNP 42149 2158 99 | | CD 42149 2158 100 | | CD 42149 2158 101 | | NNP 42149 2158 102 g g NNP 42149 2158 103 | | NNP 42149 2158 104 e e NNP 42149 2158 105 | | NNP 42149 2158 106 e e NNP 42149 2158 107 | | NNP 42149 2158 108 p p NNP 42149 2158 109 | | NNP 42149 2158 110 e e NNP 42149 2158 111 |lic |lic NNP 42149 2158 112 | | NNP 42149 2158 113 a a DT 42149 2158 114 | | NNP 42149 2158 115 o o NN 42149 2158 116 | | NNP 42149 2158 117 o o NNP 42149 2158 118 | | NNP 42149 2158 119 T T NNP 42149 2158 120 | | HYPH 42149 2158 121 | | NNP 42149 2158 122 i| i| JJ 42149 2158 123 | | CD 42149 2158 124 h h NNP 42149 2158 125 | | CD 42149 2158 126 | | CD 42149 2158 127 | | CD 42149 2158 128 e e NN 42149 2158 129 | | NNP 42149 2158 130 a a DT 42149 2158 131 | | CD 42149 2158 132 | | NNP 42149 2158 133 i i PRP 42149 2158 134 | | CD 42149 2158 135 r r NNP 42149 2158 136 | | NNP 42149 2158 137 r r NNP 42149 2158 138 | | NNP 42149 2158 139 a a DT 42149 2158 140 | | NNP 42149 2158 141 M M NNP 42149 2158 142 | | CD 42149 2158 143 r| r| NNP 42149 2158 144 Section Section NNP 42149 2158 145 | | NNP 42149 2158 146 t t NNP 42149 2158 147 | | CD 42149 2158 148 1 1 CD 42149 2158 149 | | CD 42149 2158 150 2 2 CD 42149 2158 151 | | CD 42149 2158 152 r r NN 42149 2158 153 | | CD 42149 2158 154 n n NN 42149 2158 155 |pip-| |pip-| NNP 42149 2158 156 g g NN 42149 2158 157 | | NNP 42149 2158 158 e e NNP 42149 2158 159 | | NNP 42149 2158 160 e e NNP 42149 2158 161 | | NNP 42149 2158 162 p p NNP 42149 2158 163 | | NNP 42149 2158 164 e e NN 42149 2158 165 | | CD 42149 2158 166 o| o| NN 42149 2158 167 between between IN 42149 2158 168 |----+----+----+----+----|ing |----+----+----+----+----|ing NNP 42149 2158 169 | | NNP 42149 2158 170 h h NNP 42149 2158 171 | | CD 42149 2158 172 | | CD 42149 2158 173 | | CD 42149 2158 174 e e NN 42149 2158 175 | | NNP 42149 2158 176 a a DT 42149 2158 177 | | CD 42149 2158 178 n| n| NN 42149 2158 179 rings ring NNS 42149 2158 180 | | CD 42149 2158 181 H H NNP 42149 2158 182 | | NNP 42149 2158 183 H h NN 42149 2158 184 | | NNP 42149 2158 185 H h NN 42149 2158 186 | | NNP 42149 2158 187 H H NNP 42149 2158 188 | | NNP 42149 2158 189 H H NNP 42149 2158 190 | | NNP 42149 2158 191 | | NNP 42149 2158 192 t t NN 42149 2158 193 | | CD 42149 2158 194 1 1 CD 42149 2158 195 | | CD 42149 2158 196 2 2 CD 42149 2158 197 | | CD 42149 2158 198 r r NNP 42149 2158 199 | | CD 42149 2158 200 n n CC 42149 2158 201 | | CD 42149 2158 202 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2158 203 | | CD 42149 2158 204 1 1 CD 42149 2158 205 - - HYPH 42149 2158 206 27 27 CD 42149 2158 207 | | NNS 42149 2158 208 } } -RRB- 42149 2158 209 { { -LRB- 42149 2158 210 |0 |0 VB 42149 2158 211 - - HYPH 42149 2158 212 14|21 14|21 CD 42149 2158 213 - - HYPH 42149 2158 214 11| 11| CD 42149 2158 215 | | CD 42149 2158 216 |16 |16 CD 42149 2158 217 - - HYPH 42149 2158 218 26|20 26|20 CD 42149 2158 219 - - HYPH 42149 2158 220 49| 49| CD 42149 2158 221 | | CD 42149 2158 222 | | CD 42149 2158 223 } } -RRB- 42149 2158 224 { { -LRB- 42149 2158 225 | | CD 42149 2158 226 | | NNP 42149 2158 227 | | CD 42149 2158 228 | | CD 42149 2158 229 | | CD 42149 2158 230 | | CD 42149 2158 231 | | CD 42149 2158 232 | | CD 42149 2158 233 | | NNS 42149 2158 234 } } -RRB- 42149 2158 235 { { -LRB- 42149 2158 236 | | CD 42149 2158 237 | | NNP 42149 2158 238 | | CD 42149 2158 239 | | CD 42149 2158 240 | | CD 42149 2158 241 | | CD 42149 2158 242 | | CD 42149 2158 243 | | CD 42149 2158 244 | | NNS 42149 2158 245 } } -RRB- 42149 2158 246 { { -LRB- 42149 2158 247 | | CD 42149 2158 248 | | NNP 42149 2158 249 | | CD 42149 2158 250 | | CD 42149 2158 251 | | CD 42149 2158 252 | | CD 42149 2158 253 | | CD 42149 2158 254 | | CD 42149 2158 255 28 28 CD 42149 2158 256 - - HYPH 42149 2158 257 42 42 CD 42149 2158 258 | | NNS 42149 2158 259 } } -RRB- 42149 2158 260 { { -LRB- 42149 2158 261 |0 |0 IN 42149 2158 262 - - HYPH 42149 2158 263 12|25 12|25 CD 42149 2158 264 - - HYPH 42149 2158 265 08| 08| CD 42149 2158 266 | | CD 42149 2158 267 |24 |24 CD 42149 2158 268 - - HYPH 42149 2158 269 45|25 45|25 CD 42149 2158 270 - - HYPH 42149 2158 271 06| 06| CD 42149 2158 272 | | NNP 42149 2158 273 43 43 CD 42149 2158 274 - - HYPH 42149 2158 275 58 58 CD 42149 2158 276 | | NNS 42149 2158 277 } } -RRB- 42149 2158 278 { { -LRB- 42149 2158 279 |1 |1 . 42149 2158 280 - - HYPH 42149 2158 281 15|39 15|39 CD 42149 2158 282 - - HYPH 42149 2158 283 15| 15| CD 42149 2158 284 | | CD 42149 2158 285 |40 |40 CD 42149 2158 286 - - HYPH 42149 2158 287 44|39 44|39 CD 42149 2158 288 - - HYPH 42149 2158 289 43| 43| CD 42149 2158 290 | | CD 42149 2158 291 | | CD 42149 2158 292 } } -RRB- 42149 2158 293 { { -LRB- 42149 2158 294 | | CD 42149 2158 295 | | NNP 42149 2158 296 | | CD 42149 2158 297 | | CD 42149 2158 298 | | CD 42149 2158 299 | | CD 42149 2158 300 | | CD 42149 2158 301 O| o| CD 42149 2158 302 59 59 CD 42149 2158 303 - - HYPH 42149 2158 304 153 153 CD 42149 2158 305 | | NNS 42149 2158 306 } } -RRB- 42149 2158 307 { { -LRB- 42149 2158 308 |0 |0 IN 42149 2158 309 - - HYPH 42149 2158 310 30|10 30|10 CD 42149 2158 311 - - HYPH 42149 2158 312 55| 55| CD 42149 2158 313 | | CD 42149 2158 314 |12 |12 CD 42149 2158 315 - - HYPH 42149 2158 316 54|10 54|10 CD 42149 2158 317 - - HYPH 42149 2158 318 59| 59| CD 42149 2158 319 r| r| NN 42149 2158 320 | | CD 42149 2158 321 { { -LRB- 42149 2158 322 { { -LRB- 42149 2158 323 | | NNP 42149 2158 324 | | NNP 42149 2158 325 | | CD 42149 2158 326 | | CD 42149 2158 327 | | CD 42149 2158 328 | | CD 42149 2158 329 | | CD 42149 2158 330 d| d| NN 42149 2158 331 154 154 CD 42149 2158 332 - - SYM 42149 2158 333 170 170 CD 42149 2158 334 | | NNS 42149 2158 335 } } -RRB- 42149 2158 336 { { -LRB- 42149 2158 337 |0 |0 NN 42149 2158 338 - - : 42149 2158 339 00| 00| CD 42149 2158 340 9 9 CD 42149 2158 341 - - SYM 42149 2158 342 10| 10| CD 42149 2158 343 J. J. NNP 42149 2159 1 | | NNP 42149 2159 2 J. J. NNP 42149 2160 1 | | CD 42149 2160 2 8 8 CD 42149 2160 3 - - HYPH 42149 2160 4 58| 58| CD 42149 2160 5 9 9 CD 42149 2160 6 - - SYM 42149 2160 7 09| 09| CD 42149 2160 8 i| i| JJ 42149 2160 9 | | NNP 42149 2160 10 } } -RRB- 42149 2160 11 { { -LRB- 42149 2160 12 | | CD 42149 2160 13 | | NNP 42149 2160 14 | | CD 42149 2160 15 | | CD 42149 2160 16 | | CD 42149 2160 17 | | CD 42149 2160 18 n| n| NN 42149 2160 19 171 171 CD 42149 2160 20 - - SYM 42149 2160 21 236 236 CD 42149 2160 22 | | CD 42149 2160 23 } } -RRB- 42149 2160 24 Bolting bolting NN 42149 2160 25 time time NN 42149 2160 26 for for IN 42149 2160 27 { { -LRB- 42149 2160 28 |0 |0 VBG 42149 2160 29 - - : 42149 2160 30 05|10 05|10 CD 42149 2160 31 - - HYPH 42149 2160 32 04|10 04|10 CD 42149 2160 33 - - HYPH 42149 2160 34 23|10 23|10 CD 42149 2160 35 - - HYPH 42149 2160 36 26| 26| CD 42149 2160 37 8 8 CD 42149 2160 38 - - HYPH 42149 2160 39 52|10 52|10 CD 42149 2160 40 - - HYPH 42149 2160 41 03| 03| CD 42149 2160 42 a| a| NN 42149 2160 43 | | JJ 42149 2160 44 } } -RRB- 42149 2160 45 light light JJ 42149 2160 46 iron iron NN 42149 2160 47 is be VBZ 42149 2160 48 { { -LRB- 42149 2160 49 | | NNP 42149 2160 50 | | NNP 42149 2160 51 | | CD 42149 2160 52 | | CD 42149 2160 53 | | CD 42149 2160 54 | | CD 42149 2160 55 | | CD 42149 2160 56 r| r| NN 42149 2160 57 237 237 CD 42149 2160 58 - - SYM 42149 2160 59 259 259 CD 42149 2160 60 | | NNS 42149 2160 61 } } -RRB- 42149 2160 62 included include VBD 42149 2160 63 in in IN 42149 2160 64 { { -LRB- 42149 2160 65 |0 |0 NN 42149 2160 66 - - : 42149 2160 67 20| 20| CD 42149 2160 68 5 5 CD 42149 2160 69 - - SYM 42149 2160 70 50| 50| CD 42149 2160 71 4 4 CD 42149 2160 72 - - SYM 42149 2160 73 54| 54| CD 42149 2160 74 4 4 CD 42149 2160 75 - - SYM 42149 2160 76 17| 17| CD 42149 2160 77 4 4 CD 42149 2160 78 - - SYM 42149 2160 79 49| 49| CD 42149 2160 80 5 5 CD 42149 2160 81 - - SYM 42149 2160 82 21| 21| CD 42149 2160 83 y| y| NNS 42149 2160 84 260 260 CD 42149 2160 85 - - HYPH 42149 2160 86 302 302 CD 42149 2160 87 | | CD 42149 2160 88 } } -RRB- 42149 2160 89 erection erection NN 42149 2160 90 . . . 42149 2161 1 { { -LRB- 42149 2161 2 |0 |0 `` 42149 2161 3 - - : 42149 2161 4 08| 08| CD 42149 2161 5 3 3 CD 42149 2161 6 - - SYM 42149 2161 7 14| 14| CD 42149 2161 8 3 3 CD 42149 2161 9 - - SYM 42149 2161 10 15| 15| CD 42149 2161 11 4 4 CD 42149 2161 12 - - SYM 42149 2161 13 18| 18| CD 42149 2161 14 5 5 CD 42149 2161 15 - - SYM 42149 2161 16 08| 08| CD 42149 2161 17 3 3 CD 42149 2161 18 - - SYM 42149 2161 19 45| 45| CD 42149 2161 20 | | CD 42149 2161 21 303 303 CD 42149 2161 22 - - HYPH 42149 2161 23 350 350 CD 42149 2161 24 | | NNS 42149 2161 25 } } -RRB- 42149 2161 26 { { -LRB- 42149 2161 27 |0 |0 IN 42149 2161 28 - - : 42149 2161 29 07| 07| CD 42149 2161 30 3 3 CD 42149 2161 31 - - SYM 42149 2161 32 58| 58| CD 42149 2161 33 3 3 CD 42149 2161 34 - - SYM 42149 2161 35 27| 27| CD 42149 2161 36 3 3 CD 42149 2161 37 - - SYM 42149 2161 38 36| 36| CD 42149 2161 39 2 2 CD 42149 2161 40 - - SYM 42149 2161 41 43| 43| CD 42149 2161 42 3 3 CD 42149 2161 43 - - SYM 42149 2161 44 40| 40| CD 42149 2161 45 | | CD 42149 2161 46 351 351 CD 42149 2161 47 - - SYM 42149 2161 48 378 378 CD 42149 2161 49 | | CD 42149 2161 50 } } -RRB- 42149 2161 51 { { -LRB- 42149 2161 52 |0 |0 IN 42149 2161 53 - - : 42149 2161 54 17| 17| CD 42149 2161 55 2 2 CD 42149 2161 56 - - SYM 42149 2161 57 55| 55| CD 42149 2161 58 3 3 CD 42149 2161 59 - - SYM 42149 2161 60 22| 22| CD 42149 2161 61 3 3 CD 42149 2161 62 - - SYM 42149 2161 63 38| 38| CD 42149 2161 64 2 2 CD 42149 2161 65 - - SYM 42149 2161 66 50| 50| CD 42149 2161 67 3 3 CD 42149 2161 68 - - HYPH 42149 2161 69 08| 08| CD 42149 2161 70 | | CD 42149 2161 71 379 379 CD 42149 2161 72 - - HYPH 42149 2161 73 424 424 CD 42149 2161 74 | | NNS 42149 2161 75 } } -RRB- 42149 2161 76 { { -LRB- 42149 2161 77 |0 |0 NN 42149 2161 78 - - : 42149 2161 79 25| 25| CD 42149 2161 80 4 4 CD 42149 2161 81 - - SYM 42149 2161 82 47| 47| CD 42149 2161 83 4 4 CD 42149 2161 84 - - SYM 42149 2161 85 09| 09| CD 42149 2161 86 4 4 CD 42149 2161 87 - - SYM 42149 2161 88 31| 31| CD 42149 2161 89 4 4 CD 42149 2161 90 - - SYM 42149 2161 91 32| 32| CD 42149 2161 92 4 4 CD 42149 2161 93 - - SYM 42149 2161 94 35| 35| CD 42149 2161 95 | | CD 42149 2161 96 425 425 CD 42149 2161 97 - - HYPH 42149 2161 98 522 522 CD 42149 2161 99 | | NNS 42149 2161 100 } } -RRB- 42149 2161 101 { { -LRB- 42149 2161 102 |0 |0 NN 42149 2161 103 - - : 42149 2161 104 16| 16| CD 42149 2161 105 4 4 CD 42149 2161 106 - - SYM 42149 2161 107 10| 10| CD 42149 2161 108 4 4 CD 42149 2161 109 - - SYM 42149 2161 110 52| 52| CD 42149 2161 111 4 4 CD 42149 2161 112 - - HYPH 42149 2161 113 01| 01| CD 42149 2161 114 4 4 CD 42149 2161 115 - - SYM 42149 2161 116 29| 29| CD 42149 2161 117 4 4 CD 42149 2161 118 - - SYM 42149 2161 119 17| 17| CD 42149 2161 120 | | CD 42149 2161 121 523 523 CD 42149 2161 122 - - HYPH 42149 2161 123 625 625 CD 42149 2161 124 | | NNS 42149 2161 125 } } -RRB- 42149 2161 126 { { -LRB- 42149 2161 127 |0 |0 IN 42149 2161 128 - - : 42149 2161 129 12| 12| CD 42149 2161 130 2 2 CD 42149 2161 131 - - SYM 42149 2161 132 20| 20| CD 42149 2161 133 2 2 CD 42149 2161 134 - - SYM 42149 2161 135 21| 21| CD 42149 2161 136 2 2 CD 42149 2161 137 - - SYM 42149 2161 138 31| 31| CD 42149 2161 139 2 2 CD 42149 2161 140 - - SYM 42149 2161 141 35| 35| CD 42149 2161 142 2 2 CD 42149 2161 143 - - HYPH 42149 2161 144 23| 23| CD 42149 2161 145 | | CD 42149 2161 146 171 171 CD 42149 2161 147 - - HYPH 42149 2161 148 625 625 CD 42149 2161 149 | | NNS 42149 2161 150 } } -RRB- 42149 2161 151 { { -LRB- 42149 2161 152 |0 |0 NN 42149 2161 153 - - : 42149 2161 154 13| 13| CD 42149 2161 155 4 4 CD 42149 2161 156 - - SYM 42149 2161 157 34| 34| CD 42149 2161 158 4 4 CD 42149 2161 159 - - SYM 42149 2161 160 38| 38| CD 42149 2161 161 4 4 CD 42149 2161 162 - - SYM 42149 2161 163 38| 38| CD 42149 2161 164 4 4 CD 42149 2161 165 - - SYM 42149 2161 166 29| 29| CD 42149 2161 167 4 4 CD 42149 2161 168 - - SYM 42149 2161 169 35| 35| CD 42149 2161 170 | | CD 42149 2161 171 28 28 CD 42149 2161 172 - - HYPH 42149 2161 173 625 625 CD 42149 2161 174 | | NNS 42149 2161 175 } } -RRB- 42149 2161 176 { { -LRB- 42149 2161 177 |0 |0 IN 42149 2161 178 - - HYPH 42149 2161 179 16| 16| CD 42149 2161 180 | | NNP 42149 2161 181 | | CD 42149 2161 182 | | CD 42149 2161 183 | | CD 42149 2161 184 7 7 CD 42149 2161 185 - - HYPH 42149 2161 186 11| 11| CD 42149 2161 187 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2161 188 | | CD 42149 2161 189 626 626 CD 42149 2161 190 - - HYPH 42149 2161 191 649 649 CD 42149 2161 192 |1 |1 : 42149 2161 193 - - HYPH 42149 2161 194 01|1 01|1 CD 42149 2161 195 - - HYPH 42149 2161 196 04|1 04|1 CD 42149 2161 197 - - HYPH 42149 2161 198 04|0 04|0 CD 42149 2161 199 - - HYPH 42149 2161 200 50|1 50|1 CD 42149 2161 201 - - HYPH 42149 2161 202 01|0 01|0 CD 42149 2161 203 - - HYPH 42149 2161 204 32| 32| CD 42149 2161 205 6 6 CD 42149 2161 206 - - SYM 42149 2161 207 15| 15| CD 42149 2161 208 6 6 CD 42149 2161 209 - - HYPH 42149 2161 210 29| 29| CD 42149 2161 211 6 6 CD 42149 2161 212 - - HYPH 42149 2161 213 04| 04| CD 42149 2161 214 5 5 CD 42149 2161 215 - - SYM 42149 2161 216 27| 27| CD 42149 2161 217 6 6 CD 42149 2161 218 - - HYPH 42149 2161 219 12| 12| CD 42149 2161 220 | | CD 42149 2161 221 650 650 CD 42149 2161 222 - - HYPH 42149 2161 223 733 733 CD 42149 2161 224 |1 |1 : 42149 2161 225 - - HYPH 42149 2161 226 15|0 15|0 CD 42149 2161 227 - - HYPH 42149 2161 228 52|0 52|0 CD 42149 2161 229 - - HYPH 42149 2161 230 55|0 55|0 CD 42149 2161 231 - - HYPH 42149 2161 232 42|1 42|1 CD 42149 2161 233 - - HYPH 42149 2161 234 07|0 07|0 CD 42149 2161 235 - - HYPH 42149 2161 236 32| 32| CD 42149 2161 237 4 4 CD 42149 2161 238 - - SYM 42149 2161 239 39| 39| CD 42149 2161 240 3 3 CD 42149 2161 241 - - SYM 42149 2161 242 58| 58| CD 42149 2161 243 4 4 CD 42149 2161 244 - - SYM 42149 2161 245 24| 24| CD 42149 2161 246 4 4 CD 42149 2161 247 - - SYM 42149 2161 248 12| 12| CD 42149 2161 249 4 4 CD 42149 2161 250 - - HYPH 42149 2161 251 28| 28| CD 42149 2161 252 | | CD 42149 2161 253 734 734 CD 42149 2161 254 - - HYPH 42149 2161 255 753 753 CD 42149 2161 256 |0 |0 NN 42149 2161 257 - - HYPH 42149 2161 258 38|0 38|0 CD 42149 2161 259 - - HYPH 42149 2161 260 44|1 44|1 CD 42149 2161 261 - - HYPH 42149 2161 262 13|0 13|0 CD 42149 2161 263 - - HYPH 42149 2161 264 20|0 20|0 CD 42149 2161 265 - - HYPH 42149 2161 266 44|0 44|0 CD 42149 2161 267 - - HYPH 42149 2161 268 06| 06| CD 42149 2161 269 2 2 CD 42149 2161 270 - - SYM 42149 2161 271 48| 48| CD 42149 2161 272 3 3 CD 42149 2161 273 - - SYM 42149 2161 274 43| 43| CD 42149 2161 275 2 2 CD 42149 2161 276 - - SYM 42149 2161 277 55| 55| CD 42149 2161 278 2 2 CD 42149 2161 279 - - SYM 42149 2161 280 44| 44| CD 42149 2161 281 3 3 CD 42149 2161 282 - - SYM 42149 2161 283 00| 00| CD 42149 2161 284 H| h| CD 42149 2161 285 754 754 CD 42149 2161 286 - - SYM 42149 2161 287 844 844 CD 42149 2161 288 |0 |0 : 42149 2161 289 - - HYPH 42149 2161 290 39|0 39|0 CD 42149 2161 291 - - HYPH 42149 2161 292 50|0 50|0 CD 42149 2161 293 - - HYPH 42149 2161 294 54|0 54|0 CD 42149 2161 295 - - HYPH 42149 2161 296 40|0 40|0 CD 42149 2161 297 - - HYPH 42149 2161 298 44|0 44|0 CD 42149 2161 299 - - HYPH 42149 2161 300 25| 25| CD 42149 2161 301 3 3 CD 42149 2161 302 - - SYM 42149 2161 303 30| 30| CD 42149 2161 304 4 4 CD 42149 2161 305 - - SYM 42149 2161 306 08| 08| CD 42149 2161 307 4 4 CD 42149 2161 308 - - SYM 42149 2161 309 18| 18| CD 42149 2161 310 3 3 CD 42149 2161 311 - - SYM 42149 2161 312 02| 02| CD 42149 2161 313 3 3 CD 42149 2161 314 - - SYM 42149 2161 315 45| 45| CD 42149 2161 316 e| e| NNP 42149 2161 317 845 845 CD 42149 2161 318 - - SYM 42149 2161 319 859 859 CD 42149 2161 320 |0 |0 NN 42149 2161 321 - - HYPH 42149 2161 322 45|0 45|0 CD 42149 2161 323 - - HYPH 42149 2161 324 15|0 15|0 CD 42149 2161 325 - - HYPH 42149 2161 326 15| 15| CD 42149 2161 327 |0 |0 NN 42149 2161 328 - - HYPH 42149 2161 329 37|0 37|0 CD 42149 2161 330 - - SYM 42149 2161 331 48| 48| CD 42149 2161 332 3 3 CD 42149 2161 333 - - SYM 42149 2161 334 55| 55| CD 42149 2161 335 3 3 CD 42149 2161 336 - - SYM 42149 2161 337 09| 09| CD 42149 2161 338 3 3 CD 42149 2161 339 - - HYPH 42149 2161 340 11| 11| CD 42149 2161 341 | | CD 42149 2161 342 3 3 CD 42149 2161 343 - - HYPH 42149 2161 344 43| 43| CD 42149 2161 345 a| a| NN 42149 2161 346 860 860 CD 42149 2161 347 - - SYM 42149 2161 348 899 899 CD 42149 2161 349 |0 |0 NN 42149 2161 350 - - HYPH 42149 2161 351 59|0 59|0 CD 42149 2161 352 - - HYPH 42149 2161 353 32|0 32|0 CD 42149 2161 354 - - HYPH 42149 2161 355 49| 49| CD 42149 2161 356 |0 |0 NN 42149 2161 357 - - HYPH 42149 2161 358 52|0 52|0 CD 42149 2161 359 - - HYPH 42149 2161 360 07| 07| CD 42149 2161 361 2 2 CD 42149 2161 362 - - SYM 42149 2161 363 58| 58| CD 42149 2161 364 2 2 CD 42149 2161 365 - - SYM 42149 2161 366 36| 36| CD 42149 2161 367 3 3 CD 42149 2161 368 - - HYPH 42149 2161 369 01| 01| CD 42149 2161 370 | | HYPH 42149 2161 371 2 2 CD 42149 2161 372 - - HYPH 42149 2161 373 55| 55| CD 42149 2161 374 v| v| NN 42149 2161 375 900 900 CD 42149 2161 376 - - SYM 42149 2161 377 935 935 CD 42149 2161 378 |0 |0 NNS 42149 2161 379 - - HYPH 42149 2161 380 39|0 39|0 CD 42149 2161 381 - - HYPH 42149 2161 382 43|0 43|0 CD 42149 2161 383 - - HYPH 42149 2161 384 32|0 32|0 CD 42149 2161 385 - - HYPH 42149 2161 386 20|0 20|0 CD 42149 2161 387 - - HYPH 42149 2161 388 38|0 38|0 CD 42149 2161 389 - - HYPH 42149 2161 390 04| 04| CD 42149 2161 391 2 2 CD 42149 2161 392 - - SYM 42149 2161 393 18| 18| CD 42149 2161 394 2 2 CD 42149 2161 395 - - SYM 42149 2161 396 43| 43| CD 42149 2161 397 2 2 CD 42149 2161 398 - - HYPH 42149 2161 399 11| 11| CD 42149 2161 400 2 2 CD 42149 2161 401 - - SYM 42149 2161 402 17| 17| CD 42149 2161 403 2 2 CD 42149 2161 404 - - SYM 42149 2161 405 17| 17| CD 42149 2161 406 y| y| NNS 42149 2161 407 936 936 CD 42149 2161 408 - - SYM 42149 2161 409 963 963 CD 42149 2161 410 |0 |0 NN 42149 2161 411 - - HYPH 42149 2161 412 34|0 34|0 CD 42149 2161 413 - - HYPH 42149 2161 414 16|0 16|0 CD 42149 2161 415 - - SYM 42149 2161 416 41| 41| CD 42149 2161 417 |0 |0 , 42149 2161 418 - - HYPH 42149 2161 419 32|0 32|0 CD 42149 2161 420 - - SYM 42149 2161 421 37| 37| CD 42149 2161 422 2 2 CD 42149 2161 423 - - SYM 42149 2161 424 44| 44| CD 42149 2161 425 2 2 CD 42149 2161 426 - - SYM 42149 2161 427 14| 14| CD 42149 2161 428 2 2 CD 42149 2161 429 - - SYM 42149 2161 430 47| 47| CD 42149 2161 431 | | CD 42149 2161 432 2 2 CD 42149 2161 433 - - HYPH 42149 2161 434 39| 39| CD 42149 2161 435 | | CD 42149 2161 436 964 964 CD 42149 2161 437 - - HYPH 42149 2161 438 1,003|0 1,003|0 CD 42149 2161 439 - - HYPH 42149 2161 440 32|0 32|0 CD 42149 2161 441 - - HYPH 42149 2161 442 45|0 45|0 CD 42149 2161 443 - - HYPH 42149 2161 444 37| 37| CD 42149 2161 445 |0 |0 NN 42149 2161 446 - - HYPH 42149 2161 447 35|0 35|0 CD 42149 2161 448 - - HYPH 42149 2161 449 16| 16| CD 42149 2161 450 2 2 CD 42149 2161 451 - - SYM 42149 2161 452 16| 16| CD 42149 2161 453 2 2 CD 42149 2161 454 - - SYM 42149 2161 455 30| 30| CD 42149 2161 456 2 2 CD 42149 2161 457 - - SYM 42149 2161 458 35| 35| CD 42149 2161 459 | | CD 42149 2161 460 2 2 CD 42149 2161 461 - - HYPH 42149 2161 462 21| 21| CD 42149 2161 463 |1,004 |1,004 CD 42149 2161 464 - - HYPH 42149 2161 465 1,060|0 1,060|0 CD 42149 2161 466 - - HYPH 42149 2161 467 54|0 54|0 CD 42149 2161 468 - - HYPH 42149 2161 469 37|0 37|0 CD 42149 2161 470 - - HYPH 42149 2161 471 49|0 49|0 CD 42149 2161 472 - - HYPH 42149 2161 473 40|0 40|0 CD 42149 2161 474 - - HYPH 42149 2161 475 49|0 49|0 CD 42149 2161 476 - - SYM 42149 2161 477 24| 24| CD 42149 2161 478 3 3 CD 42149 2161 479 - - SYM 42149 2161 480 04| 04| CD 42149 2161 481 2 2 CD 42149 2161 482 - - SYM 42149 2161 483 55| 55| CD 42149 2161 484 3 3 CD 42149 2161 485 - - HYPH 42149 2161 486 03| 03| CD 42149 2161 487 2 2 CD 42149 2161 488 - - SYM 42149 2161 489 34| 34| CD 42149 2161 490 3 3 CD 42149 2161 491 - - HYPH 42149 2161 492 01| 01| CD 42149 2161 493 |1,061 |1,061 CD 42149 2161 494 - - HYPH 42149 2161 495 1,110|0 1,110|0 CD 42149 2161 496 - - HYPH 42149 2161 497 24|0 24|0 CD 42149 2161 498 - - HYPH 42149 2161 499 26|0 26|0 CD 42149 2161 500 - - HYPH 42149 2161 501 39|0 39|0 CD 42149 2161 502 - - HYPH 42149 2161 503 25|0 25|0 CD 42149 2161 504 - - HYPH 42149 2161 505 27|0 27|0 CD 42149 2161 506 - - HYPH 42149 2161 507 00| 00| CD 42149 2161 508 1 1 CD 42149 2161 509 - - SYM 42149 2161 510 35| 35| CD 42149 2161 511 1 1 CD 42149 2161 512 - - SYM 42149 2161 513 44| 44| CD 42149 2161 514 2 2 CD 42149 2161 515 - - SYM 42149 2161 516 02| 02| CD 42149 2161 517 1 1 CD 42149 2161 518 - - SYM 42149 2161 519 39| 39| CD 42149 2161 520 1 1 CD 42149 2161 521 - - SYM 42149 2161 522 41| 41| CD 42149 2161 523 |1,111 |1,111 JJ 42149 2161 524 - - HYPH 42149 2161 525 1,238|0 1,238|0 CD 42149 2161 526 - - HYPH 42149 2161 527 36|0 36|0 CD 42149 2161 528 - - HYPH 42149 2161 529 34|0 34|0 CD 42149 2161 530 - - HYPH 42149 2161 531 57|1 57|1 CD 42149 2161 532 - - HYPH 42149 2161 533 12|0 12|0 CD 42149 2161 534 - - HYPH 42149 2161 535 41|0 41|0 CD 42149 2161 536 - - HYPH 42149 2161 537 02| 02| CD 42149 2161 538 2 2 CD 42149 2161 539 - - SYM 42149 2161 540 20| 20| CD 42149 2161 541 2 2 CD 42149 2161 542 - - SYM 42149 2161 543 36| 36| CD 42149 2161 544 2 2 CD 42149 2161 545 - - SYM 42149 2161 546 57| 57| CD 42149 2161 547 3 3 CD 42149 2161 548 - - SYM 42149 2161 549 31| 31| CD 42149 2161 550 2 2 CD 42149 2161 551 - - SYM 42149 2161 552 33| 33| CD 42149 2161 553 |1,239 |1,239 NNP 42149 2161 554 - - HYPH 42149 2161 555 1,312|0 1,312|0 CD 42149 2161 556 - - HYPH 42149 2161 557 39|0 39|0 CD 42149 2161 558 - - HYPH 42149 2161 559 43|1 43|1 CD 42149 2161 560 - - HYPH 42149 2161 561 12|0 12|0 CD 42149 2161 562 - - HYPH 42149 2161 563 59|0 59|0 CD 42149 2161 564 - - HYPH 42149 2161 565 50|0 50|0 CD 42149 2161 566 - - HYPH 42149 2161 567 10| 10| CD 42149 2161 568 2 2 CD 42149 2161 569 - - SYM 42149 2161 570 47| 47| CD 42149 2161 571 2 2 CD 42149 2161 572 - - SYM 42149 2161 573 48| 48| CD 42149 2161 574 3 3 CD 42149 2161 575 - - SYM 42149 2161 576 18| 18| CD 42149 2161 577 3 3 CD 42149 2161 578 - - SYM 42149 2161 579 18| 18| CD 42149 2161 580 3 3 CD 42149 2161 581 - - HYPH 42149 2161 582 01| 01| CD 42149 2161 583 | | NNP 42149 2161 584 626 626 CD 42149 2161 585 - - HYPH 42149 2161 586 1,312|0 1,312|0 CD 42149 2161 587 - - HYPH 42149 2161 588 45|0 45|0 CD 42149 2161 589 - - HYPH 42149 2161 590 40|0 40|0 CD 42149 2161 591 - - HYPH 42149 2161 592 52|0 52|0 CD 42149 2161 593 - - HYPH 42149 2161 594 54|0 54|0 CD 42149 2161 595 - - HYPH 42149 2161 596 47|0 47|0 CD 42149 2161 597 - - HYPH 42149 2161 598 16| 16| CD 42149 2161 599 3 3 CD 42149 2161 600 - - HYPH 42149 2161 601 03| 03| CD 42149 2161 602 3 3 CD 42149 2161 603 - - SYM 42149 2161 604 07| 07| CD 42149 2161 605 3 3 CD 42149 2161 606 - - SYM 42149 2161 607 20| 20| CD 42149 2161 608 3 3 CD 42149 2161 609 - - SYM 42149 2161 610 24| 24| CD 42149 2161 611 3 3 CD 42149 2161 612 - - HYPH 42149 2161 613 09| 09| CD 42149 2161 614 -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| -+-----------+----+----+----+----+----+----+-----+-----+-----+-----+-----| HYPH 42149 2161 615 A| a| CD 42149 2161 616 171 171 CD 42149 2161 617 - - HYPH 42149 2161 618 1,312| 1,312| NNS 42149 2161 619 [ [ -LRB- 42149 2161 620 C]| C]| NNP 42149 2161 621 | | NNP 42149 2161 622 | | CD 42149 2161 623 | | CD 42149 2161 624 |0 |0 '' 42149 2161 625 - - HYPH 42149 2161 626 15| 15| CD 42149 2161 627 3 3 CD 42149 2161 628 - - SYM 42149 2161 629 39| 39| CD 42149 2161 630 3 3 CD 42149 2161 631 - - SYM 42149 2161 632 43| 43| CD 42149 2161 633 3 3 CD 42149 2161 634 - - SYM 42149 2161 635 51| 51| CD 42149 2161 636 3 3 CD 42149 2161 637 - - SYM 42149 2161 638 50| 50| CD 42149 2161 639 3 3 CD 42149 2161 640 - - SYM 42149 2161 641 43| 43| CD 42149 2161 642 l| l| JJ 42149 2161 643 28 28 CD 42149 2161 644 - - HYPH 42149 2161 645 1,312| 1,312| NNS 42149 2161 646 [ [ -LRB- 42149 2161 647 C]| C]| NNP 42149 2161 648 | | NNP 42149 2161 649 | | CD 42149 2161 650 | | CD 42149 2161 651 |0 |0 '' 42149 2161 652 - - HYPH 42149 2161 653 15| 15| CD 42149 2161 654 | | CD 42149 2161 655 | | CD 42149 2161 656 | | CD 42149 2161 657 | | CD 42149 2161 658 5 5 CD 42149 2161 659 - - HYPH 42149 2161 660 01| 01| CD 42149 2161 661 l| l| JJ 42149 2161 662 | | CD 42149 2161 663 | | CD 42149 2161 664 | | CD 42149 2161 665 | | CD 42149 2161 666 | | CD 42149 2161 667 | | CD 42149 2161 668 | | CD 42149 2161 669 | | CD 42149 2161 670 | | CD 42149 2161 671 | | CD 42149 2161 672 | | CD 42149 2161 673 | | NNS 42149 2161 674 = = SYM 42149 2161 675 + + SYM 42149 2161 676 = = SYM 42149 2161 677 = = SYM 42149 2161 678 = = SYM 42149 2161 679 = = SYM 42149 2161 680 = = SYM 42149 2161 681 = = SYM 42149 2161 682 = = SYM 42149 2161 683 = = SYM 42149 2161 684 = = SYM 42149 2161 685 = = NFP 42149 2161 686 = = SYM 42149 2161 687 + + SYM 42149 2161 688 = = SYM 42149 2161 689 = = SYM 42149 2161 690 = = NFP 42149 2161 691 = = SYM 42149 2161 692 + + SYM 42149 2161 693 = = SYM 42149 2161 694 = = SYM 42149 2161 695 = = NFP 42149 2161 696 = = SYM 42149 2161 697 + + SYM 42149 2161 698 = = SYM 42149 2161 699 = = SYM 42149 2161 700 = = NFP 42149 2161 701 = = SYM 42149 2161 702 + + SYM 42149 2161 703 = = SYM 42149 2161 704 = = SYM 42149 2161 705 = = NFP 42149 2161 706 = = SYM 42149 2161 707 + + SYM 42149 2161 708 = = SYM 42149 2161 709 = = SYM 42149 2161 710 = = NFP 42149 2161 711 = = SYM 42149 2161 712 + + SYM 42149 2161 713 = = SYM 42149 2161 714 = = SYM 42149 2161 715 = = NFP 42149 2161 716 = = SYM 42149 2161 717 + + SYM 42149 2161 718 = = SYM 42149 2161 719 = = SYM 42149 2161 720 = = SYM 42149 2161 721 = = NFP 42149 2161 722 = = SYM 42149 2161 723 + + SYM 42149 2161 724 = = SYM 42149 2161 725 = = SYM 42149 2161 726 = = SYM 42149 2161 727 = = NFP 42149 2161 728 = = SYM 42149 2161 729 + + SYM 42149 2161 730 = = SYM 42149 2161 731 = = SYM 42149 2161 732 = = SYM 42149 2161 733 = = NFP 42149 2161 734 = = SYM 42149 2161 735 + + SYM 42149 2161 736 = = SYM 42149 2161 737 = = SYM 42149 2161 738 = = SYM 42149 2161 739 = = NFP 42149 2161 740 = = SYM 42149 2161 741 + + SYM 42149 2161 742 = = SYM 42149 2161 743 = = SYM 42149 2161 744 = = SYM 42149 2161 745 = = UH 42149 2161 746 =| =| ADD 42149 2161 747 TABLE TABLE VBZ 42149 2161 748 27 27 CD 42149 2161 749 SUMMARY summary NN 42149 2161 750 PART part NN 42149 2161 751 1 1 CD 42149 2161 752 = = SYM 42149 2161 753 = = SYM 42149 2161 754 = = SYM 42149 2161 755 + + SYM 42149 2161 756 = = SYM 42149 2161 757 = = SYM 42149 2161 758 = = SYM 42149 2161 759 = = SYM 42149 2161 760 = = SYM 42149 2161 761 = = SYM 42149 2161 762 = = SYM 42149 2161 763 = = SYM 42149 2161 764 = = SYM 42149 2161 765 = = NFP 42149 2161 766 = = SYM 42149 2161 767 + + SYM 42149 2161 768 = = SYM 42149 2161 769 = = SYM 42149 2161 770 = = SYM 42149 2161 771 = = SYM 42149 2161 772 = = SYM 42149 2161 773 = = NFP 42149 2161 774 = = SYM 42149 2161 775 + + SYM 42149 2161 776 = = SYM 42149 2161 777 = = SYM 42149 2161 778 = = SYM 42149 2161 779 = = SYM 42149 2161 780 = = SYM 42149 2161 781 = = SYM 42149 2161 782 = = SYM 42149 2161 783 = = SYM 42149 2161 784 = = SYM 42149 2161 785 = = SYM 42149 2161 786 = = SYM 42149 2161 787 = = SYM 42149 2161 788 = = NFP 42149 2161 789 = = SYM 42149 2161 790 + + SYM 42149 2161 791 = = SYM 42149 2161 792 = = SYM 42149 2161 793 = = NFP 42149 2161 794 = = SYM 42149 2161 795 + + SYM 42149 2161 796 = = SYM 42149 2161 797 = = SYM 42149 2161 798 = = SYM 42149 2161 799 = = SYM 42149 2161 800 = = SYM 42149 2161 801 = = SYM 42149 2161 802 = = SYM 42149 2161 803 = = SYM 42149 2161 804 = = SYM 42149 2161 805 = = SYM 42149 2161 806 = = NFP 42149 2161 807 = = SYM 42149 2161 808 + + SYM 42149 2161 809 = = SYM 42149 2161 810 = = SYM 42149 2161 811 + + SYM 42149 2161 812 = = SYM 42149 2161 813 = = SYM 42149 2161 814 + + SYM 42149 2161 815 = = SYM 42149 2161 816 = = SYM 42149 2161 817 = = SYM 42149 2161 818 + + SYM 42149 2161 819 = = SYM 42149 2161 820 = = SYM 42149 2161 821 = = SYM 42149 2161 822 + + SYM 42149 2161 823 = = SYM 42149 2161 824 =| =| NNP 42149 2161 825 | | CD 42149 2161 826 | | NNP 42149 2161 827 | | NNP 42149 2161 828 AVE AVE NNP 42149 2161 829 . . . 42149 2161 830 NO no UH 42149 2161 831 . . . 42149 2162 1 | | NNP 42149 2162 2 W| w| CD 42149 2162 3 | | CD 42149 2162 4 | | CD 42149 2162 5 OF OF NNP 42149 2162 6 MEN MEN NNP 42149 2162 7 | | NNP 42149 2162 8 e| e| NNP 42149 2162 9 | | CD 42149 2162 10 DESCRIPTION description NN 42149 2162 11 | | CD 42149 2162 12 IN IN NNP 42149 2162 13 GANG gang NN 42149 2162 14 | | , 42149 2162 15 i| i| NN 42149 2162 16 |-------+--------------+----+------------+--+--+---+---+--| |-------+--------------+----+------------+--+--+---+---+--| NNP 42149 2162 17 g| g| NNP 42149 2162 18 | | NNP 42149 2162 19 | | NNP 42149 2162 20 |Ave.| |Ave.| NNP 42149 2162 21 | | NNP 42149 2162 22 | | NNP 42149 2162 23 | | CD 42149 2162 24 | | CD 42149 2162 25 | | CD 42149 2162 26 | | NNP 42149 2162 27 h| h| JJ 42149 2162 28 | | CD 42149 2162 29 | | NNP 42149 2162 30 |air |air NNP 42149 2162 31 | | NNP 42149 2162 32 | | NNP 42149 2162 33 | | NNP 42149 2162 34 | | CD 42149 2162 35 | | CD 42149 2162 36 | | CD 42149 2162 37 | | CD 42149 2162 38 t| t| JJ 42149 2162 39 | | NNP 42149 2162 40 | | NNP 42149 2162 41 | | CD 42149 2162 42 | | CD 42149 2162 43 | | CD 42149 2162 44 | | CD 42149 2162 45 | | CD 42149 2162 46 | | NNP 42149 2162 47 A A NNP 42149 2162 48 | | HYPH 42149 2162 49 | | NNP 42149 2162 50 | | CD 42149 2162 51 | | CD 42149 2162 52 | | CD 42149 2162 53 |P |p CD 42149 2162 54 | | CD 42149 2162 55 | | CD 42149 2162 56 | | CD 42149 2162 57 D| d| NN 42149 2162 58 G g NN 42149 2162 59 | | NNP 42149 2162 60 i i PRP 42149 2162 61 | | CD 42149 2162 62 | | CD 42149 2162 63 o| o| NNP 42149 2162 64 | | CD 42149 2162 65 | | NNP 42149 2162 66 |r |r NNP 42149 2162 67 | | NNP 42149 2162 68 | | NNP 42149 2162 69 | | CD 42149 2162 70 r| r| NN 42149 2162 71 r r DT 42149 2162 72 | | NNP 42149 2162 73 r r NNP 42149 2162 74 | | CD 42149 2162 75 | | CD 42149 2162 76 f| f| NN 42149 2162 77 | | NNP 42149 2162 78 | | NNP 42149 2162 79 |e |e NNPS 42149 2162 80 | | NNP 42149 2162 81 | | NNP 42149 2162 82 S| s| VB 42149 2162 83 i| i| NNP 42149 2162 84 o o NNP 42149 2162 85 | | NNP 42149 2162 86 | | NNP 42149 2162 87 | | CD 42149 2162 88 | | CD 42149 2162 89 | | NNP 42149 2162 90 | | NNP 42149 2162 91 |s |s NNP 42149 2162 92 | | NNP 42149 2162 93 | | NNP 42149 2162 94 h| h| NNP 42149 2162 95 l| l| NN 42149 2162 96 u u NNP 42149 2162 97 | | NNP 42149 2162 98 T T NNP 42149 2162 99 |T |t CD 42149 2162 100 | | NNP 42149 2162 101 i| i| JJ 42149 2162 102 | | NNP 42149 2162 103 | | NNP 42149 2162 104 |s |s NNP 42149 2162 105 | | NNP 42149 2162 106 | | NNP 42149 2162 107 i| i| RB 42149 2162 108 l| l| NNP 42149 2162 109 t t NNP 42149 2162 110 | | NNP 42149 2162 111 r r NNP 42149 2162 112 |o |o NNP 42149 2162 113 | | CD 42149 2162 114 r| r| NNP 42149 2162 115 Section Section NNP 42149 2162 116 | | NNP 42149 2162 117 | | NNP 42149 2162 118 |u |u NNP 42149 2162 119 | | CD 42149 2162 120 | | CD 42149 2162 121 e| e| JJ 42149 2162 122 i| i| NNP 42149 2162 123 i i PRP 42149 2162 124 | | VBD 42149 2162 125 a a DT 42149 2162 126 |t |t NNP 42149 2162 127 | | CD 42149 2162 128 o| o| NN 42149 2162 129 between between IN 42149 2162 130 |Length |Length NNP 42149 2162 131 | | NNP 42149 2162 132 |r |r JJ 42149 2162 133 |Method |Method NNS 42149 2162 134 of of IN 42149 2162 135 | | CD 42149 2162 136 l| l| JJ 42149 2162 137 n| n| NNP 42149 2162 138 n n NNP 42149 2162 139 | | NNP 42149 2162 140 n n CC 42149 2162 141 |a |a NNP 42149 2162 142 | | NNP 42149 2162 143 n| n| NN 42149 2162 144 rings ring VBZ 42149 2162 145 |in |in CD 42149 2162 146 feet| feet| CD 42149 2162 147 Material Material NNP 42149 2162 148 |e |e NNPS 42149 2162 149 |Excavation |Excavation NNP 42149 2162 150 | | NNP 42149 2162 151 d| d| NN 42149 2162 152 g| g| NNP 42149 2162 153 g g NNP 42149 2162 154 | | NNP 42149 2162 155 s s NNP 42149 2162 156 |l |l NNP 42149 2162 157 | | NNP 42149 2162 158 ---+-----------+-------+--------------+----+------------+--+--+---+---+--| ---+-----------+-------+--------------+----+------------+--+--+---+---+--| NNP 42149 2162 159 { { -LRB- 42149 2162 160 | | CD 42149 2162 161 28 28 CD 42149 2162 162 - - HYPH 42149 2162 163 42 42 CD 42149 2162 164 | | CD 42149 2162 165 37.5|Rock 37.5|rock CD 42149 2162 166 |12 |12 CD 42149 2162 167 |[B]Breast |[B]Breast NNP 42149 2162 168 |13| |13| NNP 42149 2162 169 4| 4| CD 42149 2162 170 1| 1| CD 42149 2162 171 1 1 CD 42149 2162 172 |19| |19| NN 42149 2162 173 O o NN 42149 2162 174 { { -LRB- 42149 2162 175 | | CD 42149 2162 176 43 43 CD 42149 2162 177 - - HYPH 42149 2162 178 58 58 CD 42149 2162 179 | | CD 42149 2162 180 40.0|Rock 40.0|rock CD 42149 2162 181 & & CC 42149 2162 182 gravel gravel NN 42149 2162 183 |12 |12 NNP 42149 2162 184 | | NNP 42149 2162 185 " " `` 42149 2162 186 |19| |19| NN 42149 2162 187 2| 2| CD 42149 2162 188 2| 2| CD 42149 2162 189 2 2 CD 42149 2162 190 |25| |25| JJ 42149 2162 191 r r NN 42149 2162 192 { { -LRB- 42149 2162 193 | | CD 42149 2162 194 59 59 CD 42149 2162 195 - - HYPH 42149 2162 196 153 153 CD 42149 2162 197 | | CD 42149 2162 198 237.5|Gravel 237.5|gravel CD 42149 2162 199 & & CC 42149 2162 200 sand sand NNP 42149 2162 201 |16 |16 NNP 42149 2162 202 | | NNP 42149 2162 203 " " '' 42149 2162 204 |25| |25| JJ 42149 2162 205 | | CD 42149 2162 206 1| 1| CD 42149 2162 207 4 4 CD 42149 2162 208 |30| |30| NN 42149 2162 209 d d NN 42149 2162 210 { { -LRB- 42149 2162 211 | | CD 42149 2162 212 154 154 CD 42149 2162 213 - - HYPH 42149 2162 214 170 170 CD 42149 2162 215 | | CD 42149 2162 216 42.5|Sand 42.5|sand CD 42149 2162 217 or or CC 42149 2162 218 silt silt NN 42149 2162 219 , , , 42149 2162 220 |18 |18 CD 42149 2162 221 | | NNP 42149 2162 222 " " `` 42149 2162 223 |26| |26| VBZ 42149 2162 224 | | CD 42149 2162 225 1| 1| CD 42149 2162 226 5 5 CD 42149 2162 227 |32| |32| NN 42149 2162 228 i i PRP 42149 2162 229 { { -LRB- 42149 2162 230 | | CD 42149 2162 231 | | CD 42149 2162 232 | | NNS 42149 2162 233 with with IN 42149 2162 234 piles pile NNS 42149 2162 235 | | NNP 42149 2162 236 | | NNP 42149 2162 237 | | CD 42149 2162 238 | | CD 42149 2162 239 | | CD 42149 2162 240 | | CD 42149 2162 241 | | CD 42149 2162 242 | | CD 42149 2162 243 n n CC 42149 2162 244 { { -LRB- 42149 2162 245 | | NNP 42149 2162 246 171 171 CD 42149 2162 247 - - HYPH 42149 2162 248 236 236 CD 42149 2162 249 | | CD 42149 2162 250 165.0|silt 165.0|silt CD 42149 2162 251 w/ w/ NNP 42149 2162 252 piles pile NNS 42149 2162 253 |22 |22 NNP 42149 2162 254 | | CD 42149 2162 255 " " `` 42149 2162 256 |22| |22| JJ 42149 2162 257 | | CD 42149 2162 258 1| 1| CD 42149 2162 259 3 3 CD 42149 2162 260 |26| |26| VBZ 42149 2162 261 a a DT 42149 2162 262 { { -LRB- 42149 2162 263 | | NNP 42149 2162 264 237 237 CD 42149 2162 265 - - HYPH 42149 2162 266 259 259 CD 42149 2162 267 | | CD 42149 2162 268 57.5|Silt 57.5|silt CD 42149 2162 269 |25 |25 CD 42149 2162 270 |[C]1 |[C]1 NNP 42149 2162 271 door door NN 42149 2162 272 |18| |18| CD 42149 2162 273 | | CD 42149 2162 274 1| 1| CD 42149 2162 275 3 3 CD 42149 2162 276 |22| |22| NN 42149 2162 277 r r NN 42149 2162 278 { { -LRB- 42149 2162 279 | | CD 42149 2162 280 260 260 CD 42149 2162 281 - - HYPH 42149 2162 282 625 625 CD 42149 2162 283 | | CD 42149 2162 284 915.0| 915.0| CD 42149 2162 285 " " '' 42149 2162 286 |27 |27 CD 42149 2162 287 | | CD 42149 2162 288 1 1 CD 42149 2162 289 " " '' 42149 2162 290 |18| |18| CD 42149 2162 291 | | CD 42149 2162 292 | | CD 42149 2162 293 4 4 CD 42149 2162 294 |22| |22| NN 42149 2162 295 y y NN 42149 2162 296 { { -LRB- 42149 2162 297 |-----------+-------+--------------+----+------------+--+--+---+---+--| |-----------+-------+--------------+----+------------+--+--+---+---+--| NNP 42149 2162 298 { { -LRB- 42149 2162 299 | | CD 42149 2162 300 28 28 CD 42149 2162 301 - - SYM 42149 2162 302 625 625 CD 42149 2162 303 |1,495.0| |1,495.0| NN 42149 2162 304 |25 |25 CD 42149 2162 305 | | CD 42149 2162 306 |19|.8|0.8|3.4|24| |19|.8|0.8|3.4|24| NN 42149 2162 307 ---+-----------+-------+--------------+----+------------+--+--+---+---+--| ---+-----------+-------+--------------+----+------------+--+--+---+---+--| HYPH 42149 2162 308 Hvy| hvy| IN 42149 2162 309 626 626 CD 42149 2162 310 - - HYPH 42149 2162 311 1,312|1,717.5|Silt 1,312|1,717.5|silt CD 42149 2162 312 |28 |28 CD 42149 2162 313 | | CD 42149 2162 314 |25| |25| JJ 42149 2162 315 | | CD 42149 2162 316 | | CD 42149 2162 317 8 8 CD 42149 2162 318 |33| |33| NN 42149 2162 319 ---+-----------+-------+--------------+----+------------+--+--+---+---+--| ---+-----------+-------+--------------+----+------------+--+--+---+---+--| NN 42149 2162 320 All| All| NNP 42149 2162 321 28 28 CD 42149 2162 322 - - SYM 42149 2162 323 1,312|3,212.5| 1,312|3,212.5| CD 42149 2162 324 |26 |26 CD 42149 2162 325 | | CD 42149 2162 326 |21| |21| NN 42149 2162 327 | | CD 42149 2162 328 | | CD 42149 2162 329 5 5 CD 42149 2162 330 |26| |26| NNS 42149 2162 331 = = SYM 42149 2162 332 = = SYM 42149 2162 333 = = SYM 42149 2162 334 + + SYM 42149 2162 335 = = SYM 42149 2162 336 = = SYM 42149 2162 337 = = SYM 42149 2162 338 = = SYM 42149 2162 339 = = SYM 42149 2162 340 = = SYM 42149 2162 341 = = SYM 42149 2162 342 = = SYM 42149 2162 343 = = SYM 42149 2162 344 = = NFP 42149 2162 345 = = SYM 42149 2162 346 + + SYM 42149 2162 347 = = SYM 42149 2162 348 = = SYM 42149 2162 349 = = SYM 42149 2162 350 = = SYM 42149 2162 351 = = SYM 42149 2162 352 = = NFP 42149 2162 353 = = SYM 42149 2162 354 + + SYM 42149 2162 355 = = SYM 42149 2162 356 = = SYM 42149 2162 357 = = SYM 42149 2162 358 = = SYM 42149 2162 359 = = SYM 42149 2162 360 = = SYM 42149 2162 361 = = SYM 42149 2162 362 = = SYM 42149 2162 363 = = SYM 42149 2162 364 = = SYM 42149 2162 365 = = SYM 42149 2162 366 = = SYM 42149 2162 367 = = NFP 42149 2162 368 = = SYM 42149 2162 369 + + SYM 42149 2162 370 = = SYM 42149 2162 371 = = SYM 42149 2162 372 = = NFP 42149 2162 373 = = SYM 42149 2162 374 + + SYM 42149 2162 375 = = SYM 42149 2162 376 = = SYM 42149 2162 377 = = SYM 42149 2162 378 = = SYM 42149 2162 379 = = SYM 42149 2162 380 = = SYM 42149 2162 381 = = SYM 42149 2162 382 = = SYM 42149 2162 383 = = SYM 42149 2162 384 = = SYM 42149 2162 385 = = NFP 42149 2162 386 = = SYM 42149 2162 387 + + SYM 42149 2162 388 = = SYM 42149 2162 389 = = SYM 42149 2162 390 + + SYM 42149 2162 391 = = SYM 42149 2162 392 = = SYM 42149 2162 393 + + SYM 42149 2162 394 = = SYM 42149 2162 395 = = SYM 42149 2162 396 = = SYM 42149 2162 397 + + SYM 42149 2162 398 = = SYM 42149 2162 399 = = SYM 42149 2162 400 = = SYM 42149 2162 401 + + SYM 42149 2162 402 = = SYM 42149 2162 403 =| =| ADD 42149 2162 404 TABLE TABLE NNS 42149 2162 405 27 27 CD 42149 2162 406 SUMMARY summary NN 42149 2162 407 PART PART VBN 42149 2162 408 2 2 CD 42149 2162 409 = = SYM 42149 2162 410 = = SYM 42149 2162 411 = = SYM 42149 2162 412 + + SYM 42149 2162 413 = = SYM 42149 2162 414 = = SYM 42149 2162 415 = = SYM 42149 2162 416 = = SYM 42149 2162 417 = = SYM 42149 2162 418 = = SYM 42149 2162 419 = = NFP 42149 2162 420 = = SYM 42149 2162 421 + + SYM 42149 2162 422 = = SYM 42149 2162 423 = = SYM 42149 2162 424 = = SYM 42149 2162 425 = = SYM 42149 2162 426 = = SYM 42149 2162 427 = = SYM 42149 2162 428 = = NFP 42149 2162 429 = = SYM 42149 2162 430 + + SYM 42149 2162 431 = = SYM 42149 2162 432 = = SYM 42149 2162 433 = = SYM 42149 2162 434 = = SYM 42149 2162 435 = = SYM 42149 2162 436 = = NFP 42149 2162 437 = = SYM 42149 2162 438 + + SYM 42149 2162 439 = = SYM 42149 2162 440 = = SYM 42149 2162 441 = = SYM 42149 2162 442 = = SYM 42149 2162 443 = = NFP 42149 2162 444 = = SYM 42149 2162 445 + + SYM 42149 2162 446 = = SYM 42149 2162 447 = = SYM 42149 2162 448 = = NFP 42149 2162 449 = = SYM 42149 2162 450 + + SYM 42149 2162 451 = = SYM 42149 2162 452 = = SYM 42149 2162 453 = = SYM 42149 2162 454 = = NFP 42149 2162 455 = = SYM 42149 2162 456 + + SYM 42149 2162 457 = = SYM 42149 2162 458 = = SYM 42149 2162 459 = = SYM 42149 2162 460 = = SYM 42149 2162 461 = = SYM 42149 2162 462 = = SYM 42149 2162 463 = = SYM 42149 2162 464 = = SYM 42149 2162 465 = = SYM 42149 2162 466 = = SYM 42149 2162 467 = = SYM 42149 2162 468 = = SYM 42149 2162 469 = = SYM 42149 2162 470 = = NFP 42149 2162 471 = = SYM 42149 2162 472 + + SYM 42149 2162 473 = = SYM 42149 2162 474 = = SYM 42149 2162 475 = = SYM 42149 2162 476 = = SYM 42149 2162 477 = = SYM 42149 2162 478 = = SYM 42149 2162 479 = = NFP 42149 2162 480 =| =| NNP 42149 2162 481 W W NNP 42149 2162 482 | | NNP 42149 2162 483 | | NNP 42149 2162 484 | | CD 42149 2162 485 | | CD 42149 2162 486 UNAVOIDABLE UNAVOIDABLE NNP 42149 2162 487 DELAYS DELAYS NNP 42149 2162 488 | | NNP 42149 2162 489 e e NNP 42149 2162 490 | | CD 42149 2162 491 | | CD 42149 2162 492 | | CD 42149 2162 493 AVERAGE average NN 42149 2162 494 TIME time NN 42149 2162 495 |(NOT |(not CD 42149 2162 496 INCLUDED include VBN 42149 2162 497 IN in IN 42149 2162 498 AVERAGE| AVERAGE| NNP 42149 2162 499 i i PRP 42149 2162 500 o| o| NNP 42149 2162 501 | | CD 42149 2162 502 | | NNS 42149 2162 503 PER per NN 42149 2162 504 RING ring NN 42149 2162 505 . . . 42149 2163 1 | | JJ 42149 2163 2 TIME TIME NNP 42149 2163 3 PER per IN 42149 2163 4 RING ring NN 42149 2163 5 ) ) -RRB- 42149 2163 6 . . . 42149 2164 1 | | NNP 42149 2164 2 g g NNP 42149 2164 3 f| f| NN 42149 2164 4 | | NNP 42149 2164 5 |-------+------+----+-----+---------------+--------| |-------+------+----+-----+---------------+--------| NNP 42149 2164 6 h h NNP 42149 2164 7 |Average |average NN 42149 2164 8 | | CD 42149 2164 9 Time Time NNP 42149 2164 10 | | NNP 42149 2164 11 | | NNP 42149 2164 12 | | CD 42149 2164 13 | | CD 42149 2164 14 | | CD 42149 2164 15 | | CD 42149 2164 16 | | CD 42149 2164 17 t t NN 42149 2164 18 i| i| JJ 42149 2164 19 No no NN 42149 2164 20 . . . 42149 2165 1 of of IN 42149 2165 2 |mucking,|Shoving| |mucking,|shoving| CD 42149 2165 3 | | NNP 42149 2165 4 | | CD 42149 2165 5 | | CD 42149 2165 6 | | CD 42149 2165 7 | | CD 42149 2165 8 r| r| NN 42149 2165 9 cubic cubic JJ 42149 2165 10 | | CD 42149 2165 11 per per IN 42149 2165 12 | | NNP 42149 2165 13 and and CC 42149 2165 14 | | NNP 42149 2165 15 Erec-| Erec-| NNP 42149 2165 16 | | HYPH 42149 2165 17 | | NNP 42149 2165 18 | | CD 42149 2165 19 | | CD 42149 2165 20 o| o| NN 42149 2165 21 yards yard NNS 42149 2165 22 | | CD 42149 2165 23 cubic cubic JJ 42149 2165 24 |mucking| |mucking| NNP 42149 2165 25 tion tion NN 42149 2165 26 |Lost| |Lost| NNP 42149 2165 27 | | NNP 42149 2165 28 | | NNP 42149 2165 29 Time Time NNP 42149 2165 30 | | NNP 42149 2165 31 n|per n|per NN 42149 2165 32 ring| ring| CD 42149 2165 33 yard yard NN 42149 2165 34 | | NNP 42149 2165 35 [ [ -LRB- 42149 2165 36 Z Z NNP 42149 2165 37 ] ] -RRB- 42149 2165 38 | | CD 42149 2165 39 [ [ -LRB- 42149 2165 40 A a NN 42149 2165 41 ] ] -RRB- 42149 2165 42 |time|Total| |time|total| NN 42149 2165 43 Items item NNS 42149 2165 44 |hrs |hrs VBP 42149 2165 45 min| min| NN 42149 2165 46 ---+--------+--------+-------+------+----+-----+---------------+--------| ---+--------+--------+-------+------+----+-----+---------------+--------| : 42149 2165 47 { { -LRB- 42149 2165 48 | | CD 42149 2165 49 48.7 48.7 CD 42149 2165 50 | | CD 42149 2165 51 0 0 CD 42149 2165 52 - - HYPH 42149 2165 53 25 25 CD 42149 2165 54 | | CD 42149 2165 55 20 20 CD 42149 2165 56 - - HYPH 42149 2165 57 33 33 CD 42149 2165 58 | | CD 42149 2165 59 4 4 CD 42149 2165 60 - - HYPH 42149 2165 61 21|0 21|0 CD 42149 2165 62 - - HYPH 42149 2165 63 12|25 12|25 CD 42149 2165 64 - - HYPH 42149 2165 65 06|First 06|first CD 42149 2165 66 bulkhead bulkhead NN 42149 2165 67 | | CD 42149 2165 68 80 80 CD 42149 2165 69 - - HYPH 42149 2165 70 00| 00| CD 42149 2165 71 O o NN 42149 2165 72 { { -LRB- 42149 2165 73 | | NNP 42149 2165 74 44.2 44.2 CD 42149 2165 75 | | CD 42149 2165 76 0 0 CD 42149 2165 77 - - HYPH 42149 2165 78 46 46 CD 42149 2165 79 | | CD 42149 2165 80 33 33 CD 42149 2165 81 - - HYPH 42149 2165 82 44 44 CD 42149 2165 83 | | CD 42149 2165 84 4 4 CD 42149 2165 85 - - HYPH 42149 2165 86 44|1 44|1 CD 42149 2165 87 - - HYPH 42149 2165 88 15|39 15|39 CD 42149 2165 89 - - HYPH 42149 2165 90 43|Second 43|second CD 42149 2165 91 bulkhead| bulkhead| NNP 42149 2165 92 156 156 CD 42149 2165 93 - - HYPH 42149 2165 94 00| 00| CD 42149 2165 95 r r NN 42149 2165 96 { { -LRB- 42149 2165 97 | | CD 42149 2165 98 39.0 39.0 CD 42149 2165 99 | | CD 42149 2165 100 0 0 CD 42149 2165 101 - - HYPH 42149 2165 102 12 12 CD 42149 2165 103 | | CD 42149 2165 104 8 8 CD 42149 2165 105 - - HYPH 42149 2165 106 06 06 CD 42149 2165 107 | | CD 42149 2165 108 2 2 CD 42149 2165 109 - - HYPH 42149 2165 110 23|0 23|0 CD 42149 2165 111 - - HYPH 42149 2165 112 30|10 30|10 CD 42149 2165 113 - - HYPH 42149 2165 114 59|Grouting 59|groute VBG 42149 2165 115 rock rock NN 42149 2165 116 | | CD 42149 2165 117 280 280 CD 42149 2165 118 - - HYPH 42149 2165 119 00| 00| CD 42149 2165 120 d d NN 42149 2165 121 { { -LRB- 42149 2165 122 | | CD 42149 2165 123 41.6 41.6 CD 42149 2165 124 | | CD 42149 2165 125 0 0 CD 42149 2165 126 - - HYPH 42149 2165 127 10 10 CD 42149 2165 128 | | CD 42149 2165 129 7 7 CD 42149 2165 130 - - SYM 42149 2165 131 10 10 CD 42149 2165 132 | | CD 42149 2165 133 1 1 CD 42149 2165 134 - - HYPH 42149 2165 135 59|0 59|0 CD 42149 2165 136 - - HYPH 42149 2165 137 0 0 CD 42149 2165 138 | | CD 42149 2165 139 9 9 CD 42149 2165 140 - - HYPH 42149 2165 141 09| 09| CD 42149 2165 142 sections| sections| CD 42149 2165 143 | | NNS 42149 2165 144 i i PRP 42149 2165 145 { { -LRB- 42149 2165 146 | | CD 42149 2165 147 | | NNP 42149 2165 148 | | CD 42149 2165 149 | | CD 42149 2165 150 | | CD 42149 2165 151 | | CD 42149 2165 152 |Blow |blow NN 42149 2165 153 - - HYPH 42149 2165 154 outs out NNS 42149 2165 155 | | CD 42149 2165 156 222 222 CD 42149 2165 157 - - HYPH 42149 2165 158 00| 00| CD 42149 2165 159 n n CC 42149 2165 160 { { -LRB- 42149 2165 161 | | CD 42149 2165 162 42.6 42.6 CD 42149 2165 163 | | CD 42149 2165 164 0 0 CD 42149 2165 165 - - HYPH 42149 2165 166 10 10 CD 42149 2165 167 | | CD 42149 2165 168 7 7 CD 42149 2165 169 - - HYPH 42149 2165 170 23 23 CD 42149 2165 171 | | CD 42149 2165 172 2 2 CD 42149 2165 173 - - HYPH 42149 2165 174 35|0 35|0 CD 42149 2165 175 - - HYPH 42149 2165 176 05|10 05|10 CD 42149 2165 177 - - HYPH 42149 2165 178 03|Shield 03|Shield NNP 42149 2165 179 repairs repair NNS 42149 2165 180 | | CD 42149 2165 181 326 326 CD 42149 2165 182 - - SYM 42149 2165 183 40| 40| CD 42149 2165 184 a a DT 42149 2165 185 { { -LRB- 42149 2165 186 | | CD 42149 2165 187 13.8 13.8 CD 42149 2165 188 | | CD 42149 2165 189 0 0 CD 42149 2165 190 - - HYPH 42149 2165 191 11 11 CD 42149 2165 192 | | CD 42149 2165 193 2 2 CD 42149 2165 194 - - HYPH 42149 2165 195 29 29 CD 42149 2165 196 | | CD 42149 2165 197 2 2 CD 42149 2165 198 - - HYPH 42149 2165 199 32|0 32|0 CD 42149 2165 200 - - HYPH 42149 2165 201 20| 20| CD 42149 2165 202 5 5 CD 42149 2165 203 - - SYM 42149 2165 204 21|Horz 21|horz CD 42149 2165 205 . . . 42149 2166 1 timbers timber NNS 42149 2166 2 | | NNP 42149 2166 3 69 69 CD 42149 2166 4 - - SYM 42149 2166 5 30| 30| CD 42149 2166 6 r r NN 42149 2166 7 { { -LRB- 42149 2166 8 | | CD 42149 2166 9 3.6 3.6 CD 42149 2166 10 | | CD 42149 2166 11 0 0 CD 42149 2166 12 - - HYPH 42149 2166 13 06 06 CD 42149 2166 14 | | CD 42149 2166 15 0 0 CD 42149 2166 16 - - HYPH 42149 2166 17 40 40 CD 42149 2166 18 | | CD 42149 2166 19 2 2 CD 42149 2166 20 - - HYPH 42149 2166 21 39|0 39|0 CD 42149 2166 22 - - SYM 42149 2166 23 14| 14| CD 42149 2166 24 3 3 CD 42149 2166 25 - - HYPH 42149 2166 26 33| 33| CD 42149 2166 27 Total Total NNP 42149 2166 28 |1,134 |1,134 NNP 42149 2166 29 - - HYPH 42149 2166 30 10| 10| CD 42149 2166 31 y y NNP 42149 2166 32 { { -LRB- 42149 2166 33 |--------+--------+-------+------+----+-----+---------------+--------| |--------+--------+-------+------+----+-----+---------------+--------| NNP 42149 2166 34 { { -LRB- 42149 2166 35 | | NNP 42149 2166 36 17.8 17.8 CD 42149 2166 37 | | CD 42149 2166 38 0 0 CD 42149 2166 39 - - HYPH 42149 2166 40 14 14 CD 42149 2166 41 | | CD 42149 2166 42 4 4 CD 42149 2166 43 - - HYPH 42149 2166 44 14 14 CD 42149 2166 45 | | CD 42149 2166 46 2 2 CD 42149 2166 47 - - HYPH 42149 2166 48 41|0 41|0 CD 42149 2166 49 - - HYPH 42149 2166 50 16| 16| CD 42149 2166 51 7 7 CD 42149 2166 52 - - SYM 42149 2166 53 11|Per 11|per CD 42149 2166 54 ring ring NN 42149 2166 55 | | CD 42149 2166 56 0 0 CD 42149 2166 57 - - HYPH 42149 2166 58 53| 53| CD 42149 2166 59 ---+--------+--------+-------+------+----+-----+---------------+--------| ---+--------+--------+-------+------+----+-----+---------------+--------| : 42149 2166 60 Hvy| Hvy| NNS 42149 2166 61 10.6 10.6 CD 42149 2166 62 | | CD 42149 2166 63 0 0 CD 42149 2166 64 - - HYPH 42149 2166 65 4 4 CD 42149 2166 66 | | CD 42149 2166 67 0 0 CD 42149 2166 68 - - HYPH 42149 2166 69 56 56 CD 42149 2166 70 | | CD 42149 2166 71 1 1 CD 42149 2166 72 - - HYPH 42149 2166 73 57|0 57|0 CD 42149 2166 74 - - HYPH 42149 2166 75 16| 16| CD 42149 2166 76 3 3 CD 42149 2166 77 - - HYPH 42149 2166 78 09| 09| CD 42149 2166 79 | | HYPH 42149 2166 80 | | NNP 42149 2166 81 ---+--------+--------+-------+------+----+-----+---------------+--------| ---+--------+--------+-------+------+----+-----+---------------+--------| : 42149 2166 82 All| All| NNP 42149 2166 83 14.1 14.1 CD 42149 2166 84 | | CD 42149 2166 85 0 0 CD 42149 2166 86 - - HYPH 42149 2166 87 10 10 CD 42149 2166 88 | | CD 42149 2166 89 2 2 CD 42149 2166 90 - - HYPH 42149 2166 91 28 28 CD 42149 2166 92 | | CD 42149 2166 93 2 2 CD 42149 2166 94 - - HYPH 42149 2166 95 18|0 18|0 CD 42149 2166 96 - - HYPH 42149 2166 97 15| 15| CD 42149 2166 98 5 5 CD 42149 2166 99 - - HYPH 42149 2166 100 01| 01| CD 42149 2166 101 | | HYPH 42149 2166 102 | | NNS 42149 2166 103 = = SYM 42149 2166 104 = = SYM 42149 2166 105 = = SYM 42149 2166 106 + + SYM 42149 2166 107 = = SYM 42149 2166 108 = = SYM 42149 2166 109 = = SYM 42149 2166 110 = = SYM 42149 2166 111 = = SYM 42149 2166 112 = = SYM 42149 2166 113 = = NFP 42149 2166 114 = = SYM 42149 2166 115 + + SYM 42149 2166 116 = = SYM 42149 2166 117 = = SYM 42149 2166 118 = = SYM 42149 2166 119 = = SYM 42149 2166 120 = = SYM 42149 2166 121 = = SYM 42149 2166 122 = = NFP 42149 2166 123 = = SYM 42149 2166 124 + + SYM 42149 2166 125 = = SYM 42149 2166 126 = = SYM 42149 2166 127 = = SYM 42149 2166 128 = = SYM 42149 2166 129 = = SYM 42149 2166 130 = = NFP 42149 2166 131 = = SYM 42149 2166 132 + + SYM 42149 2166 133 = = SYM 42149 2166 134 = = SYM 42149 2166 135 = = SYM 42149 2166 136 = = SYM 42149 2166 137 = = NFP 42149 2166 138 = = SYM 42149 2166 139 + + SYM 42149 2166 140 = = SYM 42149 2166 141 = = SYM 42149 2166 142 = = NFP 42149 2166 143 = = SYM 42149 2166 144 + + SYM 42149 2166 145 = = SYM 42149 2166 146 = = SYM 42149 2166 147 = = SYM 42149 2166 148 = = NFP 42149 2166 149 = = SYM 42149 2166 150 + + SYM 42149 2166 151 = = SYM 42149 2166 152 = = SYM 42149 2166 153 = = SYM 42149 2166 154 = = SYM 42149 2166 155 = = SYM 42149 2166 156 = = SYM 42149 2166 157 = = SYM 42149 2166 158 = = SYM 42149 2166 159 = = SYM 42149 2166 160 = = SYM 42149 2166 161 = = SYM 42149 2166 162 = = SYM 42149 2166 163 = = SYM 42149 2166 164 = = NFP 42149 2166 165 = = SYM 42149 2166 166 + + SYM 42149 2166 167 = = SYM 42149 2166 168 = = SYM 42149 2166 169 = = SYM 42149 2166 170 = = SYM 42149 2166 171 = = SYM 42149 2166 172 = = SYM 42149 2166 173 = = NFP 42149 2166 174 =| =| ADD 42149 2166 175 [ [ -LRB- 42149 2166 176 Z z NN 42149 2166 177 ] ] -RRB- 42149 2166 178 Including include VBG 42149 2166 179 time time NN 42149 2166 180 for for IN 42149 2166 181 jacks jack NNS 42149 2166 182 . . . 42149 2167 1 [ [ -LRB- 42149 2167 2 A a NN 42149 2167 3 ] ] -RRB- 42149 2167 4 Including include VBG 42149 2167 5 bolting bolting NN 42149 2167 6 time time NN 42149 2167 7 . . . 42149 2168 1 [ [ -LRB- 42149 2168 2 B b NN 42149 2168 3 ] ] -RRB- 42149 2168 4 Excavating excavating NN 42149 2168 5 ahead ahead RB 42149 2168 6 of of IN 42149 2168 7 shield shield NN 42149 2168 8 . . . 42149 2169 1 [ [ -LRB- 42149 2169 2 C C NNP 42149 2169 3 ] ] -RRB- 42149 2169 4 Shoving shove VBG 42149 2169 5 shield shield NN 42149 2169 6 into into IN 42149 2169 7 silt silt NN 42149 2169 8 with with IN 42149 2169 9 ... ... : 42149 2169 10 doors door NNS 42149 2169 11 open open JJ 42149 2169 12 . . . 42149 2170 1 The the DT 42149 2170 2 average average JJ 42149 2170 3 time time NN 42149 2170 4 taken take VBN 42149 2170 5 for for IN 42149 2170 6 each each DT 42149 2170 7 operation operation NN 42149 2170 8 at at IN 42149 2170 9 all all PDT 42149 2170 10 the the DT 42149 2170 11 working work VBG 42149 2170 12 faces face NNS 42149 2170 13 is be VBZ 42149 2170 14 given give VBN 42149 2170 15 in in IN 42149 2170 16 Table Table NNP 42149 2170 17 28 28 CD 42149 2170 18 . . . 42149 2171 1 The the DT 42149 2171 2 work work NN 42149 2171 3 has have VBZ 42149 2171 4 been be VBN 42149 2171 5 subdivided subdivide VBN 42149 2171 6 into into IN 42149 2171 7 the the DT 42149 2171 8 different different JJ 42149 2171 9 kinds kind NNS 42149 2171 10 of of IN 42149 2171 11 ground ground NN 42149 2171 12 encountered encounter VBN 42149 2171 13 . . . 42149 2172 1 The the DT 42149 2172 2 progress progress NN 42149 2172 3 , , , 42149 2172 4 as as IN 42149 2172 5 shown show VBN 42149 2172 6 by by IN 42149 2172 7 the the DT 42149 2172 8 amount amount NN 42149 2172 9 of of IN 42149 2172 10 work work NN 42149 2172 11 done do VBN 42149 2172 12 each each DT 42149 2172 13 month month NN 42149 2172 14 by by IN 42149 2172 15 each each DT 42149 2172 16 shield shield NN 42149 2172 17 , , , 42149 2172 18 is be VBZ 42149 2172 19 given give VBN 42149 2172 20 in in IN 42149 2172 21 Table table NN 42149 2172 22 29 29 CD 42149 2172 23 . . . 42149 2173 1 TABLE TABLE NNS 42149 2173 2 28.--SHIELD 28.--shield NN 42149 2173 3 - - HYPH 42149 2173 4 DRIVEN drive VBN 42149 2173 5 TUNNEL TUNNEL NNP 42149 2173 6 WORK.--TOTAL work.--total NN 42149 2173 7 NUMBER number NN 42149 2173 8 OF of IN 42149 2173 9 RINGS ring NNS 42149 2173 10 ERECTED erect VBN 42149 2173 11 AND and CC 42149 2173 12 SHIFTS shifts VB 42149 2173 13 WORKED work VBN 42149 2173 14 BY by IN 42149 2173 15 ALL all DT 42149 2173 16 FOUR four CD 42149 2173 17 SHIELDS SHIELDS NNP 42149 2173 18 IN in IN 42149 2173 19 CONTRACTS CONTRACTS NNP 42149 2173 20 GY GY NNP 42149 2173 21 - - HYPH 42149 2173 22 WEST WEST NNP 42149 2173 23 AND and CC 42149 2173 24 GJ GJ NNP 42149 2173 25 , , , 42149 2173 26 AND and CC 42149 2173 27 THE the DT 42149 2173 28 AVERAGE average JJ 42149 2173 29 SIZE size NN 42149 2173 30 OF of IN 42149 2173 31 GANG gang NN 42149 2173 32 , , , 42149 2173 33 AMOUNT amount NN 42149 2173 34 OF of IN 42149 2173 35 EXCAVATION excavation NN 42149 2173 36 AND and CC 42149 2173 37 TIME time NN 42149 2173 38 TAKEN TAKEN NNS 42149 2173 39 PER per IN 42149 2173 40 RING ring NN 42149 2173 41 FOR for IN 42149 2173 42 THE the DT 42149 2173 43 VARIOUS various NN 42149 2173 44 OPERATIONS OPERATIONS NNP 42149 2173 45 INVOLVED involve VBN 42149 2173 46 IN in IN 42149 2173 47 BUILDING BUILDING NNP 42149 2173 48 TUNNEL TUNNEL NNP 42149 2173 49 IN in IN 42149 2173 50 EACH each NN 42149 2173 51 OF of IN 42149 2173 52 THE the DT 42149 2173 53 SEVERAL several JJ 42149 2173 54 KINDS kind NNS 42149 2173 55 OF of IN 42149 2173 56 GROUND ground NN 42149 2173 57 ENCOUNTERED ENCOUNTERED NNP 42149 2173 58 ; ; : 42149 2173 59 ALSO also RB 42149 2173 60 THE the DT 42149 2173 61 EXTENT EXTENT NNP 42149 2173 62 AND and CC 42149 2173 63 NATURE nature NN 42149 2173 64 OF of IN 42149 2173 65 ALL all PDT 42149 2173 66 THE the DT 42149 2173 67 UNAVOIDABLE UNAVOIDABLE NNP 42149 2173 68 DELAYS delay NNS 42149 2173 69 . . . 42149 2174 1 TABLE TABLE NNP 42149 2174 2 28 28 CD 42149 2174 3 PART part NN 42149 2174 4 1 1 CD 42149 2174 5 = = SYM 42149 2174 6 = = SYM 42149 2174 7 = = SYM 42149 2174 8 + + SYM 42149 2174 9 = = SYM 42149 2174 10 = = SYM 42149 2174 11 = = SYM 42149 2174 12 = = SYM 42149 2174 13 = = SYM 42149 2174 14 = = SYM 42149 2174 15 = = SYM 42149 2174 16 = = SYM 42149 2174 17 = = SYM 42149 2174 18 = = SYM 42149 2174 19 = = SYM 42149 2174 20 = = SYM 42149 2174 21 = = SYM 42149 2174 22 = = SYM 42149 2174 23 = = SYM 42149 2174 24 = = SYM 42149 2174 25 = = SYM 42149 2174 26 = = NFP 42149 2174 27 = = SYM 42149 2174 28 + + SYM 42149 2174 29 = = SYM 42149 2174 30 = = SYM 42149 2174 31 = = SYM 42149 2174 32 = = NFP 42149 2174 33 = = SYM 42149 2174 34 + + SYM 42149 2174 35 = = SYM 42149 2174 36 = = SYM 42149 2174 37 = = SYM 42149 2174 38 = = SYM 42149 2174 39 = = SYM 42149 2174 40 = = SYM 42149 2174 41 = = NFP 42149 2174 42 = = SYM 42149 2174 43 + + SYM 42149 2174 44 = = SYM 42149 2174 45 = = SYM 42149 2174 46 = = SYM 42149 2174 47 = = SYM 42149 2174 48 = = NFP 42149 2174 49 = = SYM 42149 2174 50 + + SYM 42149 2174 51 = = SYM 42149 2174 52 = = SYM 42149 2174 53 + + SYM 42149 2174 54 = = SYM 42149 2174 55 = = SYM 42149 2174 56 = = NFP 42149 2174 57 = = SYM 42149 2174 58 + + SYM 42149 2174 59 = = SYM 42149 2174 60 = = SYM 42149 2174 61 = = NFP 42149 2174 62 = = SYM 42149 2174 63 + + SYM 42149 2174 64 = = SYM 42149 2174 65 = = SYM 42149 2174 66 = = NFP 42149 2174 67 = = SYM 42149 2174 68 + + SYM 42149 2174 69 = = SYM 42149 2174 70 = = SYM 42149 2174 71 = = NFP 42149 2174 72 = = SYM 42149 2174 73 + + SYM 42149 2174 74 = = SYM 42149 2174 75 = = SYM 42149 2174 76 = = SYM 42149 2174 77 =| =| ADD 42149 2174 78 | | CD 42149 2174 79 | | CD 42149 2174 80 | | CD 42149 2174 81 | | CD 42149 2174 82 |A |a CD 42149 2174 83 | | CD 42149 2174 84 AVE AVE NNP 42149 2174 85 . . . 42149 2174 86 NO no UH 42149 2174 87 . . . 42149 2175 1 | | NNP 42149 2175 2 W| w| CD 42149 2175 3 | | CD 42149 2175 4 | | NNP 42149 2175 5 | | NNP 42149 2175 6 |v |v NNP 42149 2175 7 | | NNP 42149 2175 8 OF OF NNP 42149 2175 9 MEN MEN NNP 42149 2175 10 | | NNP 42149 2175 11 e| e| NNP 42149 2175 12 | | CD 42149 2175 13 | | NNP 42149 2175 14 | | CD 42149 2175 15 | | CD 42149 2175 16 | | CD 42149 2175 17 IN IN NNP 42149 2175 18 GANG gang NN 42149 2175 19 | | , 42149 2175 20 i| i| JJ 42149 2175 21 | | CD 42149 2175 22 | | NNP 42149 2175 23 | | NNP 42149 2175 24 |a |a NNP 42149 2175 25 + + SYM 42149 2175 26 ----+----+----+----+----+ ----+----+----+----+----+ NNP 42149 2175 27 g| g| NNP 42149 2175 28 | | NNP 42149 2175 29 | | NNP 42149 2175 30 | | NNP 42149 2175 31 |i |i NNP 42149 2175 32 | | NNP 42149 2175 33 | | NNP 42149 2175 34 | | CD 42149 2175 35 | | NNP 42149 2175 36 A A NNP 42149 2175 37 | | HYPH 42149 2175 38 | | NNP 42149 2175 39 h| h| JJ 42149 2175 40 | | NNP 42149 2175 41 | | NNP 42149 2175 42 | | NNP 42149 2175 43 |r |r NNP 42149 2175 44 | | NNP 42149 2175 45 | | NNP 42149 2175 46 D D NNP 42149 2175 47 | | NNP 42149 2175 48 G G NNP 42149 2175 49 | | NNP 42149 2175 50 i i PRP 42149 2175 51 | | CD 42149 2175 52 | | CD 42149 2175 53 t| t| JJ 42149 2175 54 | | CD 42149 2175 55 | | NNP 42149 2175 56 |Total |Total NNP 42149 2175 57 | | NNP 42149 2175 58 | | NNP 42149 2175 59 | | NNP 42149 2175 60 r r NNP 42149 2175 61 | | NNP 42149 2175 62 r r NNP 42149 2175 63 | | NNP 42149 2175 64 r r NNP 42149 2175 65 | | CD 42149 2175 66 | | CD 42149 2175 67 | | CD 42149 2175 68 | | CD 42149 2175 69 | | CD 42149 2175 70 | | NNP 42149 2175 71 |p |p NNP 42149 2175 72 | | NNP 42149 2175 73 S S NNP 42149 2175 74 | | NNP 42149 2175 75 i i PRP 42149 2175 76 | | NNP 42149 2175 77 o o NNP 42149 2175 78 | | NNP 42149 2175 79 | | CD 42149 2175 80 | | CD 42149 2175 81 o| o| NN 42149 2175 82 |Total| |total| NN 42149 2175 83 Total Total NNP 42149 2175 84 |number|r |number|r NNP 42149 2175 85 | | NNP 42149 2175 86 h h NNP 42149 2175 87 | | NNP 42149 2175 88 l l NNP 42149 2175 89 | | NNP 42149 2175 90 u u NNP 42149 2175 91 | | NNP 42149 2175 92 t t NNP 42149 2175 93 | | NNP 42149 2175 94 T T NNP 42149 2175 95 | | CD 42149 2175 96 f| f| NN 42149 2175 97 | | CD 42149 2175 98 | | CD 42149 2175 99 | | NNP 42149 2175 100 |e |e NNPS 42149 2175 101 | | NNP 42149 2175 102 i i PRP 42149 2175 103 | | NNP 42149 2175 104 l l NNP 42149 2175 105 | | NNP 42149 2175 106 t t NNP 42149 2175 107 | | NNP 42149 2175 108 r r NNP 42149 2175 109 | | NNP 42149 2175 110 o o NNP 42149 2175 111 | | NNP 42149 2175 112 | | CD 42149 2175 113 Description description NN 42149 2175 114 | | NNS 42149 2175 115 No no NN 42149 2175 116 . . . 42149 2176 1 | | NNS 42149 2176 2 No no NN 42149 2176 3 . . . 42149 2177 1 | | NNP 42149 2177 2 of of IN 42149 2177 3 |s |s NNP 42149 2177 4 | | NNP 42149 2177 5 e e NNP 42149 2177 6 | | NNP 42149 2177 7 i i PRP 42149 2177 8 | | VBD 42149 2177 9 i i PRP 42149 2177 10 | | VBD 42149 2177 11 a a DT 42149 2177 12 | | NNP 42149 2177 13 t t NN 42149 2177 14 | | NNP 42149 2177 15 i| i| JJ 42149 2177 16 | | NNP 42149 2177 17 | | NNP 42149 2177 18 | | NNP 42149 2177 19 |s |s NNP 42149 2177 20 | | NNP 42149 2177 21 l l NNP 42149 2177 22 | | NNP 42149 2177 23 n n CC 42149 2177 24 | | NNP 42149 2177 25 n n CC 42149 2177 26 | | NNP 42149 2177 27 n n CC 42149 2177 28 | | NNP 42149 2177 29 a a DT 42149 2177 30 | | CD 42149 2177 31 r| r| NN 42149 2177 32 of of IN 42149 2177 33 | | CD 42149 2177 34 of of IN 42149 2177 35 | | NNP 42149 2177 36 of of IN 42149 2177 37 |8-hour|u |8-hour|u NNP 42149 2177 38 | | NNP 42149 2177 39 d d NNP 42149 2177 40 | | NNP 42149 2177 41 g g NNP 42149 2177 42 | | NNP 42149 2177 43 g g NNP 42149 2177 44 | | NNP 42149 2177 45 s s NNP 42149 2177 46 | | NNP 42149 2177 47 l l NNP 42149 2177 48 | | NNP 42149 2177 49 o| o| NNP 42149 2177 50 | | CD 42149 2177 51 | | NNP 42149 2177 52 | | NNP 42149 2177 53 |r |r NNP 42149 2177 54 |----+----+----+----+----+ |----+----+----+----+----+ NNP 42149 2177 55 n| n| NN 42149 2177 56 Material Material NNP 42149 2177 57 |rings| |rings| NNP 42149 2177 58 feet foot NNS 42149 2177 59 . . . 42149 2178 1 |shifts|e |shifts|e DT 42149 2178 2 |Unit|Unit|Unit|Unit|Unit| |unit|unit|unit|unit|unit| NN 42149 2178 3 ---+-------------------+-----+--------+------+--+----+----+----+----+----+ ---+-------------------+-----+--------+------+--+----+----+----+----+----+ : 42149 2178 4 { { -LRB- 42149 2178 5 |Rock |rock NN 42149 2178 6 . . . 42149 2179 1 | | CD 42149 2179 2 165| 165| CD 42149 2179 3 412.5| 412.5| CD 42149 2179 4 597 597 CD 42149 2179 5 |16| |16| CD 42149 2179 6 18 18 CD 42149 2179 7 | | CD 42149 2179 8 9 9 CD 42149 2179 9 |0.25| |0.25| CD 42149 2179 10 1 1 CD 42149 2179 11 | | CD 42149 2179 12 28 28 CD 42149 2179 13 | | CD 42149 2179 14 O o NN 42149 2179 15 { { -LRB- 42149 2179 16 |Rock |rock NN 42149 2179 17 and and CC 42149 2179 18 earth earth NN 42149 2179 19 and and CC 42149 2179 20 | | CD 42149 2179 21 177| 177| CD 42149 2179 22 442.5| 442.5| CD 42149 2179 23 500 500 CD 42149 2179 24 |14| |14| JJ 42149 2179 25 22 22 CD 42149 2179 26 | | CD 42149 2179 27 5 5 CD 42149 2179 28 |0.3 |0.3 CD 42149 2179 29 | | CD 42149 2179 30 2 2 CD 42149 2179 31 | | CD 42149 2179 32 30 30 CD 42149 2179 33 | | CD 42149 2179 34 r r NN 42149 2179 35 { { -LRB- 42149 2179 36 | | HYPH 42149 2179 37 rock rock NN 42149 2179 38 and and CC 42149 2179 39 gravel.| gravel.| NNP 42149 2179 40 | | NNP 42149 2179 41 | | NNP 42149 2179 42 | | CD 42149 2179 43 | | CD 42149 2179 44 | | CD 42149 2179 45 | | CD 42149 2179 46 | | CD 42149 2179 47 | | CD 42149 2179 48 | | CD 42149 2179 49 d d NN 42149 2179 50 { { -LRB- 42149 2179 51 |Sand |sand NN 42149 2179 52 and and CC 42149 2179 53 gravel gravel NN 42149 2179 54 | | NNP 42149 2179 55 188| 188| CD 42149 2179 56 470.0| 470.0| CD 42149 2179 57 241 241 CD 42149 2179 58 |13| |13| JJ 42149 2179 59 24 24 CD 42149 2179 60 | | CD 42149 2179 61 |0.6 |0.6 CD 42149 2179 62 | | NNP 42149 2179 63 3 3 CD 42149 2179 64 | | CD 42149 2179 65 27 27 CD 42149 2179 66 | | NNS 42149 2179 67 i i PRP 42149 2179 68 { { -LRB- 42149 2179 69 | | NNP 42149 2179 70 ( ( -LRB- 42149 2179 71 unobstructed unobstructed JJ 42149 2179 72 ) ) -RRB- 42149 2179 73 , , , 42149 2179 74 NJ| NJ| NNP 42149 2179 75 | | NNP 42149 2179 76 | | NNP 42149 2179 77 | | CD 42149 2179 78 | | CD 42149 2179 79 | | CD 42149 2179 80 | | CD 42149 2179 81 | | CD 42149 2179 82 | | CD 42149 2179 83 | | CD 42149 2179 84 n n CC 42149 2179 85 { { -LRB- 42149 2179 86 |Sand |sand NN 42149 2179 87 and and CC 42149 2179 88 silt silt NN 42149 2179 89 ( ( -LRB- 42149 2179 90 with| with| NNP 42149 2179 91 171| 171| CD 42149 2179 92 427.5| 427.5| CD 42149 2179 93 199 199 CD 42149 2179 94 |22| |22| JJ 42149 2179 95 23 23 CD 42149 2179 96 | | CD 42149 2179 97 |1.0 |1.0 CD 42149 2179 98 | | CD 42149 2179 99 3 3 CD 42149 2179 100 | | CD 42149 2179 101 27 27 CD 42149 2179 102 | | CD 42149 2179 103 a a DT 42149 2179 104 { { -LRB- 42149 2179 105 | | CD 42149 2179 106 piles pile NNS 42149 2179 107 . . . 42149 2180 1 ) ) -RRB- 42149 2180 2 | | CD 42149 2180 3 | | CD 42149 2180 4 | | CD 42149 2180 5 | | CD 42149 2180 6 | | CD 42149 2180 7 | | CD 42149 2180 8 | | CD 42149 2180 9 | | CD 42149 2180 10 | | CD 42149 2180 11 | | CD 42149 2180 12 r r NN 42149 2180 13 { { -LRB- 42149 2180 14 |Silt |silt NN 42149 2180 15 under under IN 42149 2180 16 R. R. NNP 42149 2180 17 R. R. NNP 42149 2180 18 | | NNP 42149 2180 19 396| 396| CD 42149 2180 20 990.0| 990.0| CD 42149 2180 21 355 355 CD 42149 2180 22 |19| |19| NN 42149 2180 23 27 27 CD 42149 2180 24 | | CD 42149 2180 25 | | CD 42149 2180 26 | | CD 42149 2180 27 3 3 CD 42149 2180 28 | | CD 42149 2180 29 30 30 CD 42149 2180 30 | | CD 42149 2180 31 y y NN 42149 2180 32 { { -LRB- 42149 2180 33 | | CD 42149 2180 34 tracks track NNS 42149 2180 35 , , , 42149 2180 36 NY| NY| NNP 42149 2180 37 | | NNP 42149 2180 38 | | NNP 42149 2180 39 | | CD 42149 2180 40 | | CD 42149 2180 41 | | CD 42149 2180 42 | | CD 42149 2180 43 | | CD 42149 2180 44 | | CD 42149 2180 45 | | CD 42149 2180 46 { { -LRB- 42149 2180 47 |Rip |Rip NNS 42149 2180 48 - - HYPH 42149 2180 49 rap rap NN 42149 2180 50 and and CC 42149 2180 51 silt silt NN 42149 2180 52 | | NNP 42149 2180 53 77| 77| CD 42149 2180 54 192.5| 192.5| CD 42149 2180 55 193 193 CD 42149 2180 56 |23| |23| CD 42149 2180 57 26 26 CD 42149 2180 58 | | CD 42149 2180 59 | | CD 42149 2180 60 | | CD 42149 2180 61 4 4 CD 42149 2180 62 | | CD 42149 2180 63 30 30 CD 42149 2180 64 | | CD 42149 2180 65 | | CD 42149 2180 66 under under IN 42149 2180 67 bulkhead.| bulkhead.| NNP 42149 2180 68 | | NNP 42149 2180 69 | | NNP 42149 2180 70 | | CD 42149 2180 71 | | CD 42149 2180 72 | | CD 42149 2180 73 | | CD 42149 2180 74 | | CD 42149 2180 75 | | CD 42149 2180 76 | | NNS 42149 2180 77 i i PRP 42149 2180 78 { { -LRB- 42149 2180 79 | | NNP 42149 2180 80 |-----+--------+------+--+----+----+----+----+----| |-----+--------+------+--+----+----+----+----+----| NNP 42149 2180 81 r r NN 42149 2180 82 { { -LRB- 42149 2180 83 |Total |total JJ 42149 2180 84 mixed mix VBN 42149 2180 85 and and CC 42149 2180 86 | | CD 42149 2180 87 | | NNP 42149 2180 88 | | CD 42149 2180 89 | | CD 42149 2180 90 | | CD 42149 2180 91 | | CD 42149 2180 92 | | CD 42149 2180 93 | | CD 42149 2180 94 | | CD 42149 2180 95 | | CD 42149 2180 96 o o NN 42149 2180 97 { { -LRB- 42149 2180 98 | | CD 42149 2180 99 difficult difficult JJ 42149 2180 100 ground.|1,174| ground.|1,174| , 42149 2180 101 2,935.0|2,085 2,935.0|2,085 CD 42149 2180 102 |17| |17| CD 42149 2180 103 22 22 CD 42149 2180 104 | | CD 42149 2180 105 4 4 CD 42149 2180 106 |0.3 |0.3 CD 42149 2180 107 | | CD 42149 2180 108 3 3 CD 42149 2180 109 | | CD 42149 2180 110 29 29 CD 42149 2180 111 | | CD 42149 2180 112 n n CC 42149 2180 113 { { -LRB- 42149 2180 114 |-------------------+-----+--------+------+--+----+----+----+----+----+ |-------------------+-----+--------+------+--+----+----+----+----+----+ CD 42149 2180 115 { { -LRB- 42149 2180 116 |Silt |silt NN 42149 2180 117 -- -- : 42149 2180 118 ordinary ordinary JJ 42149 2180 119 iron|1,302| iron|1,302| NNP 42149 2180 120 3,255.0| 3,255.0| NNP 42149 2180 121 676 676 CD 42149 2180 122 |25| |25| JJ 42149 2180 123 22 22 CD 42149 2180 124 | | CD 42149 2180 125 | | CD 42149 2180 126 | | CD 42149 2180 127 4 4 CD 42149 2180 128 | | CD 42149 2180 129 26 26 CD 42149 2180 130 | | CD 42149 2180 131 ---+-------------------+-----+--------+------+--+----+----+----+----+----+ ---+-------------------+-----+--------+------+--+----+----+----+----+----+ HYPH 42149 2180 132 Hvy|Silt hvy|silt NN 42149 2180 133 -- -- : 42149 2180 134 heavy heavy JJ 42149 2180 135 iron iron NN 42149 2180 136 . . . 42149 2181 1 |2,209| |2,209| NNP 42149 2181 2 5,522.5| 5,522.5| NNP 42149 2181 3 791 791 CD 42149 2181 4 |26| |26| VBZ 42149 2181 5 25 25 CD 42149 2181 6 | | CD 42149 2181 7 | | CD 42149 2181 8 | | CD 42149 2181 9 8 8 CD 42149 2181 10 | | CD 42149 2181 11 33 33 CD 42149 2181 12 | | CD 42149 2181 13 ---+-------------------+-----+--------+------+--+----+----+----+----+----+ ---+-------------------+-----+--------+------+--+----+----+----+----+----+ : 42149 2181 14 |Silt |silt NN 42149 2181 15 -- -- : 42149 2181 16 ord ord NN 42149 2181 17 and and CC 42149 2181 18 heavy| heavy| DT 42149 2181 19 | | NNP 42149 2181 20 | | NNP 42149 2181 21 | | CD 42149 2181 22 | | CD 42149 2181 23 | | CD 42149 2181 24 | | CD 42149 2181 25 | | CD 42149 2181 26 | | CD 42149 2181 27 | | CD 42149 2181 28 |iron |iron CD 42149 2181 29 under under IN 42149 2181 30 river river NN 42149 2181 31 . . . 42149 2182 1 |3,511| |3,511| NNP 42149 2182 2 8,777.5|1,467 8,777.5|1,467 CD 42149 2182 3 |26| |26| VBZ 42149 2182 4 24 24 CD 42149 2182 5 | | CD 42149 2182 6 | | CD 42149 2182 7 | | CD 42149 2182 8 6 6 CD 42149 2182 9 | | CD 42149 2182 10 30 30 CD 42149 2182 11 | | CD 42149 2182 12 |-------------------+-----+--------+------+--+----+----+----+----+----+ |-------------------+-----+--------+------+--+----+----+----+----+----+ CD 42149 2182 13 |Grand |Grand NNS 42149 2182 14 total total NN 42149 2182 15 . . . 42149 2183 1 |4,685|11,712.5|3,552 |4,685|11,712.5|3,552 NNP 42149 2183 2 |21| |21| NNP 42149 2183 3 23 23 CD 42149 2183 4 | | CD 42149 2183 5 2 2 CD 42149 2183 6 |0.2 |0.2 CD 42149 2183 7 | | CD 42149 2183 8 4 4 CD 42149 2183 9 | | CD 42149 2183 10 29 29 CD 42149 2183 11 | | NNS 42149 2183 12 = = SYM 42149 2183 13 = = SYM 42149 2183 14 = = SYM 42149 2183 15 + + SYM 42149 2183 16 = = SYM 42149 2183 17 = = SYM 42149 2183 18 = = SYM 42149 2183 19 = = SYM 42149 2183 20 = = SYM 42149 2183 21 = = SYM 42149 2183 22 = = SYM 42149 2183 23 = = SYM 42149 2183 24 = = SYM 42149 2183 25 = = SYM 42149 2183 26 = = SYM 42149 2183 27 = = SYM 42149 2183 28 = = SYM 42149 2183 29 = = SYM 42149 2183 30 = = SYM 42149 2183 31 = = SYM 42149 2183 32 = = SYM 42149 2183 33 = = NFP 42149 2183 34 = = SYM 42149 2183 35 + + SYM 42149 2183 36 = = SYM 42149 2183 37 = = SYM 42149 2183 38 = = SYM 42149 2183 39 = = NFP 42149 2183 40 = = SYM 42149 2183 41 + + SYM 42149 2183 42 = = SYM 42149 2183 43 = = SYM 42149 2183 44 = = SYM 42149 2183 45 = = SYM 42149 2183 46 = = SYM 42149 2183 47 = = SYM 42149 2183 48 = = NFP 42149 2183 49 = = SYM 42149 2183 50 + + SYM 42149 2183 51 = = SYM 42149 2183 52 = = SYM 42149 2183 53 = = SYM 42149 2183 54 = = SYM 42149 2183 55 = = NFP 42149 2183 56 = = SYM 42149 2183 57 + + SYM 42149 2183 58 = = SYM 42149 2183 59 = = SYM 42149 2183 60 + + SYM 42149 2183 61 = = SYM 42149 2183 62 = = SYM 42149 2183 63 = = NFP 42149 2183 64 = = SYM 42149 2183 65 + + SYM 42149 2183 66 = = SYM 42149 2183 67 = = SYM 42149 2183 68 = = NFP 42149 2183 69 = = SYM 42149 2183 70 + + SYM 42149 2183 71 = = SYM 42149 2183 72 = = SYM 42149 2183 73 = = NFP 42149 2183 74 = = SYM 42149 2183 75 + + SYM 42149 2183 76 = = SYM 42149 2183 77 = = SYM 42149 2183 78 = = NFP 42149 2183 79 = = SYM 42149 2183 80 + + SYM 42149 2183 81 = = SYM 42149 2183 82 = = SYM 42149 2183 83 = = NFP 42149 2183 84 =| =| ADD 42149 2183 85 TABLE TABLE VBZ 42149 2183 86 28 28 CD 42149 2183 87 PART part CD 42149 2183 88 2 2 CD 42149 2183 89 = = SYM 42149 2183 90 = = SYM 42149 2183 91 = = NFP 42149 2183 92 = = SYM 42149 2183 93 + + SYM 42149 2183 94 = = SYM 42149 2183 95 = = SYM 42149 2183 96 = = NFP 42149 2183 97 = = SYM 42149 2183 98 + + SYM 42149 2183 99 = = SYM 42149 2183 100 = = SYM 42149 2183 101 = = SYM 42149 2183 102 = = SYM 42149 2183 103 = = SYM 42149 2183 104 = = NFP 42149 2183 105 = = SYM 42149 2183 106 + + SYM 42149 2183 107 = = SYM 42149 2183 108 = = SYM 42149 2183 109 = = SYM 42149 2183 110 = = SYM 42149 2183 111 = = SYM 42149 2183 112 = = SYM 42149 2183 113 = = NFP 42149 2183 114 = = SYM 42149 2183 115 + + SYM 42149 2183 116 = = SYM 42149 2183 117 = = SYM 42149 2183 118 = = SYM 42149 2183 119 = = SYM 42149 2183 120 = = SYM 42149 2183 121 = = NFP 42149 2183 122 = = SYM 42149 2183 123 + + SYM 42149 2183 124 = = SYM 42149 2183 125 = = SYM 42149 2183 126 = = SYM 42149 2183 127 = = SYM 42149 2183 128 = = SYM 42149 2183 129 = = NFP 42149 2183 130 = = SYM 42149 2183 131 + + SYM 42149 2183 132 = = SYM 42149 2183 133 = = SYM 42149 2183 134 = = SYM 42149 2183 135 = = SYM 42149 2183 136 = = SYM 42149 2183 137 = = SYM 42149 2183 138 = = SYM 42149 2183 139 = = SYM 42149 2183 140 = = SYM 42149 2183 141 = = SYM 42149 2183 142 = = SYM 42149 2183 143 = = NFP 42149 2183 144 = = SYM 42149 2183 145 + + SYM 42149 2183 146 = = SYM 42149 2183 147 = = SYM 42149 2183 148 = = SYM 42149 2183 149 = = SYM 42149 2183 150 = = SYM 42149 2183 151 = = SYM 42149 2183 152 = = SYM 42149 2183 153 =| =| ADD 42149 2183 154 | | CD 42149 2183 155 | | CD 42149 2183 156 | | CD 42149 2183 157 | | CD 42149 2183 158 | | CD 42149 2183 159 | | CD 42149 2183 160 | | CD 42149 2183 161 | | CD 42149 2183 162 | | CD 42149 2183 163 | | CD 42149 2183 164 | | CD 42149 2183 165 | | CD 42149 2183 166 | | CD 42149 2183 167 | | CD 42149 2183 168 | | CD 42149 2183 169 | | CD 42149 2183 170 | | CD 42149 2183 171 | | CD 42149 2183 172 | | CD 42149 2183 173 | | CD 42149 2183 174 | | CD 42149 2183 175 | | CD 42149 2183 176 | | CD 42149 2183 177 AVE AVE NNP 42149 2183 178 . . . 42149 2184 1 UNAVOIDABLE UNAVOIDABLE NNP 42149 2184 2 | | NNP 42149 2184 3 | | CD 42149 2184 4 | | CD 42149 2184 5 | | NNS 42149 2184 6 DELAY DELAY NNS 42149 2184 7 PER per IN 42149 2184 8 | | NNP 42149 2184 9 | | NNP 42149 2184 10 | | NNP 42149 2184 11 AVERAGE average NN 42149 2184 12 TIME time NN 42149 2184 13 PER per NN 42149 2184 14 RING ring NN 42149 2184 15 . . . 42149 2185 1 | | NNS 42149 2185 2 WORKING working NN 42149 2185 3 FACE face VBP 42149 2185 4 . . . 42149 2186 1 | | NNS 42149 2186 2 Cu Cu NNP 42149 2186 3 . . . 42149 2187 1 |Time|------------------------+-------+-------------+--------| |Time|------------------------+-------+-------------+--------| NNP 42149 2187 2 yd yd NNP 42149 2187 3 . . . 42149 2188 1 |per |per NNP 42149 2188 2 |Shoving| |Shoving| NNP 42149 2188 3 | | NNP 42149 2188 4 | | NNP 42149 2188 5 | | CD 42149 2188 6 | | CD 42149 2188 7 Time Time NNP 42149 2188 8 | | CD 42149 2188 9 per per IN 42149 2188 10 |cu |cu CD 42149 2188 11 . . . 42149 2189 1 | | NNP 42149 2189 2 and and CC 42149 2189 3 | | CD 42149 2189 4 | | NNP 42149 2189 5 Lost Lost NNP 42149 2189 6 | | CD 42149 2189 7 | | NNP 42149 2189 8 Items Items NNPS 42149 2189 9 |--------| |--------| NNP 42149 2189 10 ring|yd ring|yd NN 42149 2189 11 . . . 42149 2190 1 |mucking|Erecting| |mucking|Erecting| : 42149 2190 2 time time NN 42149 2190 3 | | NNP 42149 2190 4 Total Total NNP 42149 2190 5 |not |not NNP 42149 2190 6 included include VBD 42149 2190 7 |Ave |ave NN 42149 2190 8 unit| unit| NNP 42149 2190 9 ----+----+-------+--------+-------+-------| ----+----+-------+--------+-------+-------| NNP 42149 2190 10 in in IN 42149 2190 11 previous previous JJ 42149 2190 12 |--------| |--------| NNP 42149 2190 13 Unit|Unit|Hrs Unit|Unit|Hrs NNP 42149 2190 14 Min|Hrs min|hrs NN 42149 2190 15 Min Min NNP 42149 2190 16 |Hrs |hrs NN 42149 2190 17 Min|Hrs min|hrs NN 42149 2190 18 Min| Min| NNP 42149 2190 19 figures figure NNS 42149 2190 20 |Hrs |hrs VBP 42149 2190 21 Min Min NNP 42149 2190 22 | | NNP 42149 2190 23 | | NNP 42149 2190 24 | | NNP 42149 2190 25 K K NNP 42149 2190 26 | | NNP 42149 2190 27 L L NNP 42149 2190 28 | | NNP 42149 2190 29 M M NNP 42149 2190 30 | | HYPH 42149 2190 31 | | NNP 42149 2190 32 | | CD 42149 2190 33 | | CD 42149 2190 34 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| CD 42149 2190 35 51 51 CD 42149 2190 36 |0 |0 NN 42149 2190 37 - - HYPH 42149 2190 38 27| 27| CD 42149 2190 39 25 25 CD 42149 2190 40 15| 15| CD 42149 2190 41 3 3 CD 42149 2190 42 41 41 CD 42149 2190 43 | | CD 42149 2190 44 0 0 CD 42149 2190 45 02| 02| CD 42149 2190 46 28 28 CD 42149 2190 47 58|1st 58|1st CD 42149 2190 48 Bulkhead Bulkhead NNP 42149 2190 49 |136 |136 CD 42149 2190 50 00 00 CD 42149 2190 51 | | CD 42149 2190 52 45 45 CD 42149 2190 53 |0 |0 NN 42149 2190 54 - - : 42149 2190 55 26| 26| CD 42149 2190 56 19 19 CD 42149 2190 57 31| 31| CD 42149 2190 58 2 2 CD 42149 2190 59 55 55 CD 42149 2190 60 | | CD 42149 2190 61 0 0 CD 42149 2190 62 11| 11| CD 42149 2190 63 22 22 CD 42149 2190 64 37| 37| CD 42149 2190 65 2d 2d CD 42149 2190 66 " " '' 42149 2190 67 |147 |147 CD 42149 2190 68 54 54 CD 42149 2190 69 | | CD 42149 2190 70 | | CD 42149 2190 71 | | CD 42149 2190 72 | | CD 42149 2190 73 | | CD 42149 2190 74 | | CD 42149 2190 75 | | CD 42149 2190 76 | | CD 42149 2190 77 | | CD 42149 2190 78 39 39 CD 42149 2190 79 |0 |0 NN 42149 2190 80 - - : 42149 2190 81 12| 12| CD 42149 2190 82 7 7 CD 42149 2190 83 31| 31| CD 42149 2190 84 2 2 CD 42149 2190 85 24 24 CD 42149 2190 86 | | CD 42149 2190 87 0 0 CD 42149 2190 88 20| 20| CD 42149 2190 89 10 10 CD 42149 2190 90 15|Grouting 15|grouting CD 42149 2190 91 |246 |246 CD 42149 2190 92 00 00 CD 42149 2190 93 | | CD 42149 2190 94 | | CD 42149 2190 95 | | CD 42149 2190 96 | | CD 42149 2190 97 | | CD 42149 2190 98 | | CD 42149 2190 99 | | CD 42149 2190 100 | | CD 42149 2190 101 | | CD 42149 2190 102 43 43 CD 42149 2190 103 |0 |0 NN 42149 2190 104 - - : 42149 2190 105 09| 09| CD 42149 2190 106 6 6 CD 42149 2190 107 46| 46| CD 42149 2190 108 2 2 CD 42149 2190 109 24 24 CD 42149 2190 110 | | CD 42149 2190 111 0 0 CD 42149 2190 112 09| 09| CD 42149 2190 113 9 9 CD 42149 2190 114 19|Blow 19|blow CD 42149 2190 115 - - HYPH 42149 2190 116 outs out NNS 42149 2190 117 | | CD 42149 2190 118 91 91 CD 42149 2190 119 11 11 CD 42149 2190 120 | | CD 42149 2190 121 | | CD 42149 2190 122 | | CD 42149 2190 123 | | CD 42149 2190 124 | | CD 42149 2190 125 | | CD 42149 2190 126 | | CD 42149 2190 127 | | CD 42149 2190 128 | | CD 42149 2190 129 42 42 CD 42149 2190 130 |0 |0 NN 42149 2190 131 - - : 42149 2190 132 06| 06| CD 42149 2190 133 4 4 CD 42149 2190 134 09| 09| CD 42149 2190 135 2 2 CD 42149 2190 136 51 51 CD 42149 2190 137 | | CD 42149 2190 138 0 0 CD 42149 2190 139 10| 10| CD 42149 2190 140 7 7 CD 42149 2190 141 10|Miscellaneous|230 10|miscellaneous|230 CD 42149 2190 142 33 33 CD 42149 2190 143 | | CD 42149 2190 144 | | CD 42149 2190 145 | | CD 42149 2190 146 | | CD 42149 2190 147 | | CD 42149 2190 148 | | CD 42149 2190 149 | | CD 42149 2190 150 | | CD 42149 2190 151 | | CD 42149 2190 152 43 43 CD 42149 2190 153 |0 |0 NN 42149 2190 154 - - : 42149 2190 155 21| 21| CD 42149 2190 156 14 14 CD 42149 2190 157 47| 47| CD 42149 2190 158 3 3 CD 42149 2190 159 41 41 CD 42149 2190 160 | | CD 42149 2190 161 1 1 CD 42149 2190 162 34| 34| CD 42149 2190 163 20 20 CD 42149 2190 164 02|Total 02|total CD 42149 2190 165 |851 |851 CD 42149 2190 166 38 38 CD 42149 2190 167 | | CD 42149 2190 168 | | CD 42149 2190 169 | | CD 42149 2190 170 | | CD 42149 2190 171 | | CD 42149 2190 172 | | CD 42149 2190 173 | | CD 42149 2190 174 | | CD 42149 2190 175 | | CD 42149 2190 176 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| NNP 42149 2190 177 | | CD 42149 2190 178 | | NNP 42149 2190 179 | | CD 42149 2190 180 | | CD 42149 2190 181 | | CD 42149 2190 182 | | CD 42149 2190 183 | | CD 42149 2190 184 | | CD 42149 2190 185 43 43 CD 42149 2190 186 |0 |0 , 42149 2190 187 - - : 42149 2190 188 18| 18| CD 42149 2190 189 11 11 CD 42149 2190 190 02| 02| CD 42149 2190 191 2 2 CD 42149 2190 192 54 54 CD 42149 2190 193 | | CD 42149 2190 194 0 0 CD 42149 2190 195 16| 16| CD 42149 2190 196 14 14 CD 42149 2190 197 12| 12| CD 42149 2190 198 | | CD 42149 2190 199 | | CD 42149 2190 200 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| NFP 42149 2190 201 12 12 CD 42149 2190 202 |0 |0 NN 42149 2190 203 - - HYPH 42149 2190 204 07| 07| CD 42149 2190 205 1 1 CD 42149 2190 206 20| 20| CD 42149 2190 207 2 2 CD 42149 2190 208 35 35 CD 42149 2190 209 | | CD 42149 2190 210 0 0 CD 42149 2190 211 14| 14| CD 42149 2190 212 4 4 CD 42149 2190 213 12| 12| CD 42149 2190 214 | | CD 42149 2190 215 | | CD 42149 2190 216 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| NFP 42149 2190 217 12 12 CD 42149 2190 218 |0 |0 NN 42149 2190 219 - - HYPH 42149 2190 220 05| 05| CD 42149 2190 221 0 0 CD 42149 2190 222 58| 58| CD 42149 2190 223 1 1 CD 42149 2190 224 44 44 CD 42149 2190 225 | | CD 42149 2190 226 0 0 CD 42149 2190 227 10| 10| CD 42149 2190 228 2 2 CD 42149 2190 229 52| 52| CD 42149 2190 230 | | CD 42149 2190 231 | | CD 42149 2190 232 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| NNP 42149 2190 233 | | CD 42149 2190 234 | | NNP 42149 2190 235 | | CD 42149 2190 236 | | CD 42149 2190 237 | | CD 42149 2190 238 | | CD 42149 2190 239 | | CD 42149 2190 240 | | CD 42149 2190 241 12 12 CD 42149 2190 242 |0 |0 NN 42149 2190 243 - - : 42149 2190 244 06| 06| CD 42149 2190 245 1 1 CD 42149 2190 246 09| 09| CD 42149 2190 247 2 2 CD 42149 2190 248 05 05 CD 42149 2190 249 | | CD 42149 2190 250 0 0 CD 42149 2190 251 12| 12| CD 42149 2190 252 3 3 CD 42149 2190 253 26| 26| CD 42149 2190 254 | | CD 42149 2190 255 | | CD 42149 2190 256 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| : 42149 2190 257 20 20 CD 42149 2190 258 |0 |0 NN 42149 2190 259 - - : 42149 2190 260 11| 11| CD 42149 2190 261 3 3 CD 42149 2190 262 33| 33| CD 42149 2190 263 2 2 CD 42149 2190 264 15 15 CD 42149 2190 265 | | CD 42149 2190 266 0 0 CD 42149 2190 267 13| 13| CD 42149 2190 268 6 6 CD 42149 2190 269 01| 01| CD 42149 2190 270 | | HYPH 42149 2190 271 | | CD 42149 2190 272 ----+----+-------+--------+-------+-------+-------------+--------| ----+----+-------+--------+-------+-------+-------------+--------| : 42149 2190 273 Average average JJ 42149 2190 274 delay delay NN 42149 2190 275 per per IN 42149 2190 276 ring--0 ring--0 NN 42149 2190 277 hrs hrs UH 42149 2190 278 . . . 42149 2191 1 44 44 CD 42149 2191 2 min min NN 42149 2191 3 . . . 42149 2192 1 Average average JJ 42149 2192 2 rings ring NNS 42149 2192 3 built build VBN 42149 2192 4 by by IN 42149 2192 5 one one CD 42149 2192 6 shield shield NN 42149 2192 7 = = SYM 42149 2192 8 1,146¼. 1,146â¼. CD 42149 2193 1 Average average JJ 42149 2193 2 time time NN 42149 2193 3 per per IN 42149 2193 4 ring ring NN 42149 2193 5 . . . 42149 2194 1 6 6 CD 42149 2194 2 hr hr NN 42149 2194 3 01 01 CD 42149 2194 4 min min NN 42149 2194 5 Delays Delays NNPS 42149 2194 6 . . . 42149 2195 1 44 44 CD 42149 2195 2 min min NNP 42149 2195 3 ----------- ----------- NFP 42149 2195 4 Total total JJ 42149 2195 5 time time NN 42149 2195 6 per per IN 42149 2195 7 ring ring NN 42149 2195 8 . . . 42149 2196 1 6 6 CD 42149 2196 2 hr hr NNP 42149 2196 3 45 45 CD 42149 2196 4 min min NN 42149 2196 5 NOTE.--The note.--the IN 42149 2196 6 " " `` 42149 2196 7 unavoidable unavoidable JJ 42149 2196 8 delays delay NNS 42149 2196 9 " " '' 42149 2196 10 included include VBN 42149 2196 11 in in IN 42149 2196 12 this this DT 42149 2196 13 table table NN 42149 2196 14 do do VBP 42149 2196 15 not not RB 42149 2196 16 embrace embrace VB 42149 2196 17 the the DT 42149 2196 18 periods period NNS 42149 2196 19 during during IN 42149 2196 20 which which WDT 42149 2196 21 the the DT 42149 2196 22 work work NN 42149 2196 23 was be VBD 42149 2196 24 at at IN 42149 2196 25 complete complete JJ 42149 2196 26 or or CC 42149 2196 27 partial partial JJ 42149 2196 28 standstill standstill NN 42149 2196 29 due due IN 42149 2196 30 to to IN 42149 2196 31 experiments experiment NNS 42149 2196 32 and and CC 42149 2196 33 observations observation NNS 42149 2196 34 , , , 42149 2196 35 shortage shortage NN 42149 2196 36 of of IN 42149 2196 37 iron iron NN 42149 2196 38 due due JJ 42149 2196 39 to to IN 42149 2196 40 change change NN 42149 2196 41 of of IN 42149 2196 42 design design NN 42149 2196 43 , , , 42149 2196 44 and and CC 42149 2196 45 holidays holiday NNS 42149 2196 46 . . . 42149 2197 1 K K NNP 42149 2197 2 - - HYPH 42149 2197 3 Including include VBG 42149 2197 4 time time NN 42149 2197 5 for for IN 42149 2197 6 jacks jack NNS 42149 2197 7 . . . 42149 2198 1 L L NNP 42149 2198 2 - - HYPH 42149 2198 3 Including include VBG 42149 2198 4 time time NN 42149 2198 5 spent spend VBN 42149 2198 6 by by IN 42149 2198 7 the the DT 42149 2198 8 whole whole JJ 42149 2198 9 gang gang NN 42149 2198 10 on on IN 42149 2198 11 bolting bolt VBG 42149 2198 12 ; ; : 42149 2198 13 in in IN 42149 2198 14 addition addition NN 42149 2198 15 to to IN 42149 2198 16 this this DT 42149 2198 17 there there EX 42149 2198 18 was be VBD 42149 2198 19 a a DT 42149 2198 20 small small JJ 42149 2198 21 gang gang NN 42149 2198 22 which which WDT 42149 2198 23 spent spend VBD 42149 2198 24 its -PRON- PRP$ 42149 2198 25 whole whole JJ 42149 2198 26 time time NN 42149 2198 27 bolting bolting NN 42149 2198 28 . . . 42149 2199 1 M M NNP 42149 2199 2 - - HYPH 42149 2199 3 Chiefly Chiefly NNP 42149 2199 4 due due JJ 42149 2199 5 to to IN 42149 2199 6 breakdowns breakdown NNS 42149 2199 7 of of IN 42149 2199 8 hydraulic hydraulic JJ 42149 2199 9 lines line NNS 42149 2199 10 and and CC 42149 2199 11 erector erector NN 42149 2199 12 . . . 42149 2200 1 _ _ NNP 42149 2200 2 Air Air NNP 42149 2200 3 Pressure._--The Pressure._--The NNP 42149 2200 4 air air NN 42149 2200 5 pressure pressure NN 42149 2200 6 varied vary VBN 42149 2200 7 from from IN 42149 2200 8 17 17 CD 42149 2200 9 to to TO 42149 2200 10 37 37 CD 42149 2200 11 lb lb RB 42149 2200 12 . . . 42149 2201 1 Behind behind IN 42149 2201 2 the the DT 42149 2201 3 river river NN 42149 2201 4 line line NN 42149 2201 5 it -PRON- PRP 42149 2201 6 averaged average VBD 42149 2201 7 17 17 CD 42149 2201 8 lb lb RB 42149 2201 9 . . . 42149 2202 1 and and CC 42149 2202 2 under under IN 42149 2202 3 the the DT 42149 2202 4 river river NN 42149 2202 5 26 26 CD 42149 2202 6 lb lb IN 42149 2202 7 . . . 42149 2203 1 Behind behind IN 42149 2203 2 the the DT 42149 2203 3 river river NN 42149 2203 4 lines line NNS 42149 2203 5 the the DT 42149 2203 6 pressure pressure NN 42149 2203 7 was be VBD 42149 2203 8 generally generally RB 42149 2203 9 kept keep VBN 42149 2203 10 about about RB 42149 2203 11 equal equal JJ 42149 2203 12 to to IN 42149 2203 13 the the DT 42149 2203 14 water water NN 42149 2203 15 head head NN 42149 2203 16 at at IN 42149 2203 17 the the DT 42149 2203 18 crown crown NN 42149 2203 19 , , , 42149 2203 20 except except IN 42149 2203 21 where where WRB 42149 2203 22 at at IN 42149 2203 23 Weehawken Weehawken NNP 42149 2203 24 , , , 42149 2203 25 as as IN 42149 2203 26 previously previously RB 42149 2203 27 described describe VBN 42149 2203 28 , , , 42149 2203 29 this this DT 42149 2203 30 was be VBD 42149 2203 31 impossible impossible JJ 42149 2203 32 . . . 42149 2204 1 In in IN 42149 2204 2 the the DT 42149 2204 3 silt silt NN 42149 2204 4 the the DT 42149 2204 5 pressure pressure NN 42149 2204 6 was be VBD 42149 2204 7 much much RB 42149 2204 8 lower low JJR 42149 2204 9 than than IN 42149 2204 10 the the DT 42149 2204 11 hydrostatic hydrostatic JJ 42149 2204 12 head head NN 42149 2204 13 at at IN 42149 2204 14 the the DT 42149 2204 15 crown crown NN 42149 2204 16 , , , 42149 2204 17 but but CC 42149 2204 18 if if IN 42149 2204 19 it -PRON- PRP 42149 2204 20 became become VBD 42149 2204 21 necessary necessary JJ 42149 2204 22 to to TO 42149 2204 23 make make VB 42149 2204 24 an an DT 42149 2204 25 excavation excavation NN 42149 2204 26 ahead ahead RB 42149 2204 27 of of IN 42149 2204 28 the the DT 42149 2204 29 shield shield NN 42149 2204 30 , , , 42149 2204 31 for for IN 42149 2204 32 example example NN 42149 2204 33 at at IN 42149 2204 34 the the DT 42149 2204 35 junction junction NN 42149 2204 36 of of IN 42149 2204 37 the the DT 42149 2204 38 shields shield NNS 42149 2204 39 , , , 42149 2204 40 the the DT 42149 2204 41 air air NN 42149 2204 42 pressure pressure NN 42149 2204 43 required require VBN 42149 2204 44 was be VBD 42149 2204 45 about about RB 42149 2204 46 equal equal JJ 42149 2204 47 to to IN 42149 2204 48 the the DT 42149 2204 49 weight weight NN 42149 2204 50 of of IN 42149 2204 51 the the DT 42149 2204 52 overlying overlying NN 42149 2204 53 material material NN 42149 2204 54 , , , 42149 2204 55 namely namely RB 42149 2204 56 , , , 42149 2204 57 the the DT 42149 2204 58 water water NN 42149 2204 59 and and CC 42149 2204 60 the the DT 42149 2204 61 silt silt NN 42149 2204 62 , , , 42149 2204 63 as as IN 42149 2204 64 the the DT 42149 2204 65 silt silt NN 42149 2204 66 , , , 42149 2204 67 which which WDT 42149 2204 68 weighed weigh VBD 42149 2204 69 from from IN 42149 2204 70 97 97 CD 42149 2204 71 to to TO 42149 2204 72 106 106 CD 42149 2204 73 lb lb RB 42149 2204 74 . . . 42149 2205 1 per per IN 42149 2205 2 cu cu NNP 42149 2205 3 . . . 42149 2206 1 ft ft NNP 42149 2206 2 . . NNP 42149 2206 3 and and CC 42149 2206 4 averaged average VBD 42149 2206 5 100 100 CD 42149 2206 6 lb lb RB 42149 2206 7 . . . 42149 2207 1 per per IN 42149 2207 2 cu cu NNP 42149 2207 3 . . . 42149 2208 1 ft ft NNP 42149 2208 2 . . NNP 42149 2208 3 , , , 42149 2208 4 acted act VBD 42149 2208 5 like like IN 42149 2208 6 a a DT 42149 2208 7 fluid fluid NN 42149 2208 8 . . . 42149 2209 1 TABLE TABLE NNP 42149 2209 2 29.--MONTHLY 29.--MONTHLY VBZ 42149 2209 3 PROGRESS progress NN 42149 2209 4 OF of IN 42149 2209 5 SHIELD SHIELD NNP 42149 2209 6 - - HYPH 42149 2209 7 DRIVEN DRIVEN NNP 42149 2209 8 TUNNEL TUNNEL NNP 42149 2209 9 WORK work NN 42149 2209 10 . . . 42149 2210 1 = = NFP 42149 2210 2 = = NFP 42149 2210 3 = = SYM 42149 2210 4 = = NFP 42149 2210 5 = = SYM 42149 2210 6 + + SYM 42149 2210 7 = = SYM 42149 2210 8 = = SYM 42149 2210 9 = = SYM 42149 2210 10 = = SYM 42149 2210 11 = = SYM 42149 2210 12 = = SYM 42149 2210 13 = = SYM 42149 2210 14 = = SYM 42149 2210 15 = = SYM 42149 2210 16 = = SYM 42149 2210 17 = = SYM 42149 2210 18 = = SYM 42149 2210 19 = = SYM 42149 2210 20 = = SYM 42149 2210 21 = = SYM 42149 2210 22 = = SYM 42149 2210 23 = = SYM 42149 2210 24 = = SYM 42149 2210 25 = = SYM 42149 2210 26 = = SYM 42149 2210 27 = = SYM 42149 2210 28 = = SYM 42149 2210 29 = = SYM 42149 2210 30 = = SYM 42149 2210 31 = = SYM 42149 2210 32 = = SYM 42149 2210 33 = = SYM 42149 2210 34 = = NFP 42149 2210 35 = = SYM 42149 2210 36 + + SYM 42149 2210 37 = = SYM 42149 2210 38 = = SYM 42149 2210 39 = = SYM 42149 2210 40 = = SYM 42149 2210 41 = = SYM 42149 2210 42 = = SYM 42149 2210 43 = = SYM 42149 2210 44 = = SYM 42149 2210 45 = = SYM 42149 2210 46 = = SYM 42149 2210 47 = = SYM 42149 2210 48 = = SYM 42149 2210 49 = = SYM 42149 2210 50 = = SYM 42149 2210 51 = = SYM 42149 2210 52 = = SYM 42149 2210 53 = = SYM 42149 2210 54 = = SYM 42149 2210 55 = = SYM 42149 2210 56 = = SYM 42149 2210 57 = = SYM 42149 2210 58 = = SYM 42149 2210 59 = = SYM 42149 2210 60 = = SYM 42149 2210 61 = = SYM 42149 2210 62 = = SYM 42149 2210 63 = = SYM 42149 2210 64 = = NFP 42149 2210 65 = = SYM 42149 2210 66 + + CC 42149 2210 67 | | NNP 42149 2210 68 North North NNP 42149 2210 69 Manhattan Manhattan NNP 42149 2210 70 . . . 42149 2211 1 | | NNP 42149 2211 2 South South NNP 42149 2211 3 Manhattan Manhattan NNP 42149 2211 4 . . . 42149 2212 1 | | JJ 42149 2212 2 + + CC 42149 2212 3 -----------------------------+----------------------+------+ -----------------------------+----------------------+------+ HYPH 42149 2212 4 | | NNP 42149 2212 5 Number Number NNP 42149 2212 6 of of IN 42149 2212 7 | | NNP 42149 2212 8 Station Station NNP 42149 2212 9 |Lin |lin NN 42149 2212 10 . . . 42149 2213 1 | | NNP 42149 2213 2 Number Number NNP 42149 2213 3 of of IN 42149 2213 4 | | NNP 42149 2213 5 Station Station NNP 42149 2213 6 |Lin |lin NN 42149 2213 7 . . . 42149 2214 1 | | CD 42149 2214 2 | | NNP 42149 2214 3 rings ring NNS 42149 2214 4 | | CD 42149 2214 5 of of IN 42149 2214 6 |ft |ft CD 42149 2214 7 . . . 42149 2215 1 | | NNS 42149 2215 2 rings ring NNS 42149 2215 3 | | CD 42149 2215 4 of of IN 42149 2215 5 |ft |ft CD 42149 2215 6 . . . 42149 2216 1 | | CD 42149 2216 2 | | NNP 42149 2216 3 erected erect VBD 42149 2216 4 . . . 42149 2217 1 | | CD 42149 2217 2 leading lead VBG 42149 2217 3 |for |for IN 42149 2217 4 | | CD 42149 2217 5 erected erect VBN 42149 2217 6 . . . 42149 2218 1 | | CD 42149 2218 2 leading lead VBG 42149 2218 3 |for |for IN 42149 2218 4 | | CD 42149 2218 5 + + SYM 42149 2218 6 -----------+ -----------+ NN 42149 2218 7 ring ring NN 42149 2218 8 . . . 42149 2219 1 |month.+-----------+ |month.+-----------+ NNP 42149 2219 2 ring ring NNP 42149 2219 3 . . . 42149 2220 1 |month.| |month.| NNP 42149 2220 2 |For |For NNP 42149 2220 3 | | CD 42149 2220 4 To to IN 42149 2220 5 | | CD 42149 2220 6 | | CD 42149 2220 7 |For |for JJ 42149 2220 8 |To |To NNP 42149 2220 9 | | NNP 42149 2220 10 | | NNP 42149 2220 11 | | NNP 42149 2220 12 Month|month|date Month|month|date NNP 42149 2220 13 | | NNP 42149 2220 14 | | NNP 42149 2220 15 |month|date |month|date NNP 42149 2220 16 | | CD 42149 2220 17 | | CD 42149 2220 18 | | CD 42149 2220 19 -----+-----+-----+----------+------+-----+-----+----------+------+ -----+-----+-----+----------+------+-----+-----+----------+------+ CD 42149 2220 20 1905 1905 CD 42149 2220 21 | | CD 42149 2220 22 | | NNP 42149 2220 23 | | CD 42149 2220 24 | | CD 42149 2220 25 | | CD 42149 2220 26 | | CD 42149 2220 27 | | CD 42149 2220 28 | | CD 42149 2220 29 | | NNP 42149 2220 30 May May NNP 42149 2220 31 | | CD 42149 2220 32 26 26 CD 42149 2220 33 | | CD 42149 2220 34 26|200 26|200 CD 42149 2220 35 + + CD 42149 2220 36 83.7| 83.7| CD 42149 2220 37 63.7 63.7 CD 42149 2220 38 | | CD 42149 2220 39 | | CD 42149 2220 40 | | CD 42149 2220 41 | | CD 42149 2220 42 | | NNP 42149 2220 43 June June NNP 42149 2220 44 | | CD 42149 2220 45 26 26 CD 42149 2220 46 | | CD 42149 2220 47 52|201 52|201 CD 42149 2220 48 + + SYM 42149 2220 49 49.0| 49.0| CD 42149 2220 50 65.3 65.3 CD 42149 2220 51 | | CD 42149 2220 52 | | CD 42149 2220 53 | | CD 42149 2220 54 | | CD 42149 2220 55 | | NNP 42149 2220 56 July July NNP 42149 2220 57 | | CD 42149 2220 58 28 28 CD 42149 2220 59 | | CD 42149 2220 60 80|202 80|202 CD 42149 2220 61 + + SYM 42149 2220 62 19.2| 19.2| CD 42149 2220 63 70.2 70.2 CD 42149 2220 64 | | CD 42149 2220 65 | | CD 42149 2220 66 | | CD 42149 2220 67 | | CD 42149 2220 68 | | NNP 42149 2220 69 Aug Aug NNP 42149 2220 70 | | CD 42149 2220 71 26 26 CD 42149 2220 72 | | CD 42149 2220 73 106|202 106|202 CD 42149 2220 74 + + CC 42149 2220 75 84.3| 84.3| CD 42149 2220 76 65.1 65.1 CD 42149 2220 77 | | CD 42149 2220 78 | | CD 42149 2220 79 | | CD 42149 2220 80 | | CD 42149 2220 81 | | NNP 42149 2220 82 Sept Sept NNP 42149 2220 83 | | NNP 42149 2220 84 21 21 CD 42149 2220 85 | | CD 42149 2220 86 127|203 127|203 CD 42149 2220 87 + + SYM 42149 2220 88 36.8| 36.8| CD 42149 2220 89 52.5 52.5 CD 42149 2220 90 | | CD 42149 2220 91 31 31 CD 42149 2220 92 | | CD 42149 2220 93 31|200 31|200 CD 42149 2220 94 + + CC 42149 2220 95 96.4| 96.4| CD 42149 2220 96 76.4 76.4 CD 42149 2220 97 | | NNP 42149 2220 98 Oct Oct NNP 42149 2220 99 | | NNP 42149 2220 100 25 25 CD 42149 2220 101 | | CD 42149 2220 102 152|203 152|203 CD 42149 2220 103 + + SYM 42149 2220 104 99.4| 99.4| CD 42149 2220 105 63.6 63.6 CD 42149 2220 106 | | CD 42149 2220 107 45 45 CD 42149 2220 108 | | CD 42149 2220 109 76|202 76|202 CD 42149 2220 110 + + SYM 42149 2220 111 09.2|112.8 09.2|112.8 NNP 42149 2220 112 | | NNP 42149 2220 113 Nov Nov NNP 42149 2220 114 | | NNP 42149 2220 115 31 31 CD 42149 2220 116 | | CD 42149 2220 117 183|204 183|204 CD 42149 2220 118 + + CC 42149 2220 119 76.9| 76.9| CD 42149 2220 120 77.5 77.5 CD 42149 2220 121 | | CD 42149 2220 122 31 31 CD 42149 2220 123 | | CD 42149 2220 124 107|202 107|202 CD 42149 2220 125 + + CC 42149 2220 126 86.5| 86.5| CD 42149 2220 127 77.3 77.3 CD 42149 2220 128 | | NNP 42149 2220 129 Dec Dec NNP 42149 2220 130 | | NNP 42149 2220 131 59 59 CD 42149 2220 132 | | CD 42149 2220 133 242|206 242|206 CD 42149 2220 134 + + SYM 42149 2220 135 24.6|147.7 24.6|147.7 NNP 42149 2220 136 | | CD 42149 2220 137 34 34 CD 42149 2220 138 | | CD 42149 2220 139 141|208 141|208 CD 42149 2220 140 + + SYM 42149 2220 141 71.8| 71.8| CD 42149 2220 142 85.3 85.3 CD 42149 2220 143 | | CD 42149 2220 144 1906 1906 CD 42149 2220 145 | | CD 42149 2220 146 | | CD 42149 2220 147 | | CD 42149 2220 148 | | CD 42149 2220 149 | | CD 42149 2220 150 | | CD 42149 2220 151 | | CD 42149 2220 152 | | CD 42149 2220 153 | | NNP 42149 2220 154 Jan Jan NNP 42149 2220 155 | | CD 42149 2220 156 94 94 CD 42149 2220 157 | | CD 42149 2220 158 336|208 336|208 CD 42149 2220 159 + + NNP 42149 2220 160 59.8|235.2 59.8|235.2 NNP 42149 2220 161 | | CD 42149 2220 162 27 27 CD 42149 2220 163 | | CD 42149 2220 164 168|304 168|304 CD 42149 2220 165 + + SYM 42149 2220 166 39.4| 39.4| CD 42149 2220 167 67.6 67.6 CD 42149 2220 168 | | NNP 42149 2220 169 Feb Feb NNP 42149 2220 170 | | NNP 42149 2220 171 78 78 CD 42149 2220 172 | | CD 42149 2220 173 414|210 414|210 CD 42149 2220 174 + + SYM 42149 2220 175 54.9|195.1 54.9|195.1 CD 42149 2220 176 | | CD 42149 2220 177 64 64 CD 42149 2220 178 | | CD 42149 2220 179 232|205 232|205 CD 42149 2220 180 + + SYM 42149 2220 181 99.6|160.2 99.6|160.2 NNP 42149 2220 182 | | CD 42149 2220 183 Mar Mar NNP 42149 2220 184 | | NNP 42149 2220 185 56 56 CD 42149 2220 186 | | CD 42149 2220 187 470|211 470|211 CD 42149 2220 188 + + CC 42149 2220 189 95.2|140.3 95.2|140.3 NNP 42149 2220 190 | | CD 42149 2220 191 96 96 CD 42149 2220 192 | | CD 42149 2220 193 328|208 328|208 CD 42149 2220 194 + + SYM 42149 2220 195 39.9|240.3 39.9|240.3 NNP 42149 2220 196 | | NNP 42149 2220 197 April| April| NNP 42149 2220 198 119 119 CD 42149 2220 199 | | CD 42149 2220 200 589|214 589|214 CD 42149 2220 201 + + CC 42149 2220 202 93.0|297.8 93.0|297.8 NNP 42149 2220 203 | | CD 42149 2220 204 84 84 CD 42149 2220 205 | | CD 42149 2220 206 412|210 412|210 CD 42149 2220 207 + + SYM 42149 2220 208 59.1|210.2 59.1|210.2 NNP 42149 2220 209 | | NNP 42149 2220 210 May May NNP 42149 2220 211 | | CD 42149 2220 212 129 129 CD 42149 2220 213 | | CD 42149 2220 214 718|218 718|218 CD 42149 2220 215 + + CC 42149 2220 216 15.7|322.7 15.7|322.7 NNP 42149 2220 217 | | NNP 42149 2220 218 70 70 CD 42149 2220 219 | | CD 42149 2220 220 482|212 482|212 CD 42149 2220 221 + + NNP 42149 2220 222 25.3|165.2 25.3|165.2 NNP 42149 2220 223 | | NNP 42149 2220 224 June June NNP 42149 2220 225 | | NNP 42149 2220 226 218 218 CD 42149 2220 227 | | CD 42149 2220 228 936|232 936|232 CD 42149 2220 229 + + NNP 42149 2220 230 60.9|545.2 60.9|545.2 NNP 42149 2220 231 | | NNP 42149 2220 232 140 140 CD 42149 2220 233 | | CD 42149 2220 234 622|215 622|215 CD 42149 2220 235 + + SYM 42149 2220 236 75.5|350.2 75.5|350.2 NNP 42149 2220 237 | | NNP 42149 2220 238 July July NNP 42149 2220 239 | | NNP 42149 2220 240 155 155 CD 42149 2220 241 |1,091|227 |1,091|227 CD 42149 2220 242 + + CC 42149 2220 243 48.5|387.6 48.5|387.6 CD 42149 2220 244 | | CD 42149 2220 245 82 82 CD 42149 2220 246 | | CD 42149 2220 247 704|217 704|217 CD 42149 2220 248 + + NNP 42149 2220 249 80.7|205.2 80.7|205.2 NNP 42149 2220 250 | | NNP 42149 2220 251 Aug Aug NNP 42149 2220 252 | | NNP 42149 2220 253 145 145 CD 42149 2220 254 |1,236|231 |1,236|231 NNP 42149 2220 255 + + NNP 42149 2220 256 11.2|362.7 11.2|362.7 NNP 42149 2220 257 | | CD 42149 2220 258 134 134 CD 42149 2220 259 | | CD 42149 2220 260 838|221 838|221 CD 42149 2220 261 + + CC 42149 2220 262 15.8|335.1 15.8|335.1 NNP 42149 2220 263 | | NNP 42149 2220 264 Sept Sept NNP 42149 2220 265 | | NNP 42149 2220 266 89 89 CD 42149 2220 267 |1,325|233 |1,325|233 NNP 42149 2220 268 + + CC 42149 2220 269 34.1|222.9 34.1|222.9 NNP 42149 2220 270 | | NNP 42149 2220 271 168 168 CD 42149 2220 272 |1,006|225 |1,006|225 NNP 42149 2220 273 + + CC 42149 2220 274 35.8|420.0 35.8|420.0 NNP 42149 2220 275 | | NNP 42149 2220 276 Oct Oct NNP 42149 2220 277 | | NNP 42149 2220 278 | | NNP 42149 2220 279 | | CD 42149 2220 280 | | CD 42149 2220 281 | | CD 42149 2220 282 105 105 CD 42149 2220 283 |1,111|227 |1,111|227 NNS 42149 2220 284 + + CC 42149 2220 285 98.6|262.8 98.6|262.8 NNP 42149 2220 286 | | NNP 42149 2220 287 Nov Nov NNP 42149 2220 288 | | NNP 42149 2220 289 | | NNP 42149 2220 290 | | NNP 42149 2220 291 | | CD 42149 2220 292 | | CD 42149 2220 293 7 7 CD 42149 2220 294 |1,118|228 |1,118|228 NN 42149 2220 295 + + CC 42149 2220 296 16.8| 16.8| CD 42149 2220 297 18.2 18.2 CD 42149 2220 298 | | NNS 42149 2220 299 = = SYM 42149 2220 300 = = SYM 42149 2220 301 = = SYM 42149 2220 302 = = NFP 42149 2220 303 = = SYM 42149 2220 304 + + SYM 42149 2220 305 = = SYM 42149 2220 306 = = SYM 42149 2220 307 = = SYM 42149 2220 308 = = NFP 42149 2220 309 = = SYM 42149 2220 310 + + SYM 42149 2220 311 = = SYM 42149 2220 312 = = SYM 42149 2220 313 = = SYM 42149 2220 314 = = NFP 42149 2220 315 = = SYM 42149 2220 316 + + SYM 42149 2220 317 = = SYM 42149 2220 318 = = SYM 42149 2220 319 = = SYM 42149 2220 320 = = SYM 42149 2220 321 = = SYM 42149 2220 322 = = SYM 42149 2220 323 = = SYM 42149 2220 324 = = SYM 42149 2220 325 = = NFP 42149 2220 326 = = SYM 42149 2220 327 + + SYM 42149 2220 328 = = SYM 42149 2220 329 = = SYM 42149 2220 330 = = SYM 42149 2220 331 = = SYM 42149 2220 332 = = NFP 42149 2220 333 = = SYM 42149 2220 334 + + SYM 42149 2220 335 = = SYM 42149 2220 336 = = SYM 42149 2220 337 = = SYM 42149 2220 338 = = NFP 42149 2220 339 = = SYM 42149 2220 340 + + SYM 42149 2220 341 = = SYM 42149 2220 342 = = SYM 42149 2220 343 = = SYM 42149 2220 344 = = NFP 42149 2220 345 = = SYM 42149 2220 346 + + SYM 42149 2220 347 = = SYM 42149 2220 348 = = SYM 42149 2220 349 = = SYM 42149 2220 350 = = SYM 42149 2220 351 = = SYM 42149 2220 352 = = SYM 42149 2220 353 = = SYM 42149 2220 354 = = SYM 42149 2220 355 = = NFP 42149 2220 356 = = SYM 42149 2220 357 + + SYM 42149 2220 358 = = SYM 42149 2220 359 = = SYM 42149 2220 360 = = SYM 42149 2220 361 = = SYM 42149 2220 362 = = NFP 42149 2220 363 = = SYM 42149 2220 364 + + SYM 42149 2220 365 = = SYM 42149 2220 366 = = SYM 42149 2220 367 = = SYM 42149 2220 368 = = NFP 42149 2220 369 = = SYM 42149 2220 370 + + SYM 42149 2220 371 = = SYM 42149 2220 372 = = SYM 42149 2220 373 = = SYM 42149 2220 374 = = SYM 42149 2220 375 = = SYM 42149 2220 376 = = SYM 42149 2220 377 = = SYM 42149 2220 378 = = SYM 42149 2220 379 = = SYM 42149 2220 380 = = SYM 42149 2220 381 = = SYM 42149 2220 382 = = SYM 42149 2220 383 = = SYM 42149 2220 384 = = SYM 42149 2220 385 = = SYM 42149 2220 386 = = SYM 42149 2220 387 = = SYM 42149 2220 388 = = SYM 42149 2220 389 = = SYM 42149 2220 390 = = SYM 42149 2220 391 = = SYM 42149 2220 392 = = SYM 42149 2220 393 = = SYM 42149 2220 394 = = SYM 42149 2220 395 = = SYM 42149 2220 396 = = SYM 42149 2220 397 = = SYM 42149 2220 398 = = NFP 42149 2220 399 = = SYM 42149 2220 400 + + SYM 42149 2220 401 = = SYM 42149 2220 402 = = SYM 42149 2220 403 = = SYM 42149 2220 404 = = SYM 42149 2220 405 = = SYM 42149 2220 406 = = SYM 42149 2220 407 = = SYM 42149 2220 408 = = SYM 42149 2220 409 = = SYM 42149 2220 410 = = SYM 42149 2220 411 = = SYM 42149 2220 412 = = SYM 42149 2220 413 = = SYM 42149 2220 414 = = SYM 42149 2220 415 = = SYM 42149 2220 416 = = SYM 42149 2220 417 = = SYM 42149 2220 418 = = SYM 42149 2220 419 = = SYM 42149 2220 420 = = SYM 42149 2220 421 = = SYM 42149 2220 422 = = SYM 42149 2220 423 = = SYM 42149 2220 424 = = SYM 42149 2220 425 = = SYM 42149 2220 426 = = SYM 42149 2220 427 = = NFP 42149 2220 428 = = SYM 42149 2220 429 + + SYM 42149 2220 430 = = SYM 42149 2220 431 = = SYM 42149 2220 432 = = SYM 42149 2220 433 = = SYM 42149 2220 434 = = SYM 42149 2220 435 = = SYM 42149 2220 436 = = SYM 42149 2220 437 = = SYM 42149 2220 438 | | NNP 42149 2220 439 North North NNP 42149 2220 440 Weehawken Weehawken NNP 42149 2220 441 . . . 42149 2221 1 | | NNP 42149 2221 2 South South NNP 42149 2221 3 Weehawken Weehawken NNP 42149 2221 4 . . . 42149 2222 1 | | CD 42149 2222 2 + + CC 42149 2222 3 -----------------------------+----------------------------+Average -----------------------------+----------------------------+Average HYPH 42149 2222 4 | | NNP 42149 2222 5 Number Number NNP 42149 2222 6 of of IN 42149 2222 7 | | NNP 42149 2222 8 Station Station NNP 42149 2222 9 |Lin |lin NN 42149 2222 10 . . . 42149 2223 1 | | NNP 42149 2223 2 Number Number NNP 42149 2223 3 of of IN 42149 2223 4 | | NNP 42149 2223 5 Station Station NNP 42149 2223 6 |Lin |lin NN 42149 2223 7 . . . 42149 2224 1 |progress |progress CD 42149 2224 2 | | CD 42149 2224 3 rings ring NNS 42149 2224 4 | | CD 42149 2224 5 of of IN 42149 2224 6 |ft |ft CD 42149 2224 7 . . . 42149 2225 1 | | NNS 42149 2225 2 rings ring NNS 42149 2225 3 | | CD 42149 2225 4 of of IN 42149 2225 5 |ft |ft CD 42149 2225 6 . . . 42149 2226 1 |per |per NNP 42149 2226 2 | | NNP 42149 2226 3 erected erect VBD 42149 2226 4 . . . 42149 2227 1 | | CD 42149 2227 2 leading lead VBG 42149 2227 3 |for |for IN 42149 2227 4 | | CD 42149 2227 5 erected erect VBN 42149 2227 6 . . . 42149 2228 1 | | NNP 42149 2228 2 leading lead VBG 42149 2228 3 |for |for IN 42149 2228 4 |shield |shield CD 42149 2228 5 + + SYM 42149 2228 6 -----------+ -----------+ NN 42149 2228 7 ring ring NN 42149 2228 8 . . . 42149 2229 1 |month.+-----------+ |month.+-----------+ NNP 42149 2229 2 ring ring NNP 42149 2229 3 . . . 42149 2230 1 |month|lin |month|lin NNP 42149 2230 2 . . . 42149 2231 1 ft ft NNP 42149 2231 2 . . NNP 42149 2231 3 |For |For NNP 42149 2231 4 | | CD 42149 2231 5 To to IN 42149 2231 6 | | CD 42149 2231 7 | | CD 42149 2231 8 |For |for JJ 42149 2231 9 |To |To NNP 42149 2231 10 | | JJ 42149 2231 11 | | NNP 42149 2231 12 |per |per NN 42149 2231 13 Month|month|date Month|month|date NNP 42149 2231 14 | | NNP 42149 2231 15 | | NNP 42149 2231 16 |month|date |month|date NNP 42149 2231 17 | | CD 42149 2231 18 | | CD 42149 2231 19 |month |month CD 42149 2231 20 . . . 42149 2232 1 -----+-----+-----+----------+------+-----+-----+----------+-----+-------- -----+-----+-----+----------+------+-----+-----+----------+-----+-------- NFP 42149 2232 2 1905 1905 CD 42149 2232 3 | | CD 42149 2232 4 | | NNP 42149 2232 5 | | CD 42149 2232 6 | | CD 42149 2232 7 | | CD 42149 2232 8 | | CD 42149 2232 9 | | CD 42149 2232 10 | | CD 42149 2232 11 | | NNP 42149 2232 12 May May NNP 42149 2232 13 | | NNP 42149 2232 14 | | NNP 42149 2232 15 | | CD 42149 2232 16 | | CD 42149 2232 17 | | CD 42149 2232 18 | | CD 42149 2232 19 | | CD 42149 2232 20 | | CD 42149 2232 21 | | CD 42149 2232 22 15.9 15.9 CD 42149 2232 23 June June NNP 42149 2232 24 | | NNP 42149 2232 25 24 24 CD 42149 2232 26 | | CD 42149 2232 27 24|260 24|260 CD 42149 2232 28 + + CC 42149 2232 29 76.6| 76.6| CD 42149 2232 30 59.3 59.3 CD 42149 2232 31 | | CD 42149 2232 32 12 12 CD 42149 2232 33 | | CD 42149 2232 34 12|260 12|260 CD 42149 2232 35 + + SYM 42149 2232 36 70.0| 70.0| CD 42149 2232 37 30.0| 30.0| CD 42149 2232 38 38.6 38.6 CD 42149 2232 39 July July NNP 42149 2232 40 | | NNP 42149 2232 41 12 12 CD 42149 2232 42 | | CD 42149 2232 43 36|260 36|260 CD 42149 2232 44 + + SYM 42149 2232 45 46.6| 46.6| CD 42149 2232 46 30.0 30.0 CD 42149 2232 47 | | CD 42149 2232 48 15 15 CD 42149 2232 49 | | CD 42149 2232 50 27|260 27|260 CD 42149 2232 51 + + SYM 42149 2232 52 32.4| 32.4| CD 42149 2232 53 37.6| 37.6| CD 42149 2232 54 34.4 34.4 CD 42149 2232 55 Aug Aug NNP 42149 2232 56 | | CD 42149 2232 57 15 15 CD 42149 2232 58 | | CD 42149 2232 59 51|260 51|260 CD 42149 2232 60 + + SYM 42149 2232 61 09.1| 09.1| CD 42149 2232 62 37.5 37.5 CD 42149 2232 63 | | CD 42149 2232 64 16 16 CD 42149 2232 65 | | CD 42149 2232 66 43|260 43|260 CD 42149 2232 67 + + SYM 42149 2232 68 07.4| 07.4| CD 42149 2232 69 25.0| 25.0| CD 42149 2232 70 31.9 31.9 CD 42149 2232 71 Sept Sept NNP 42149 2232 72 | | NNP 42149 2232 73 1 1 CD 42149 2232 74 | | CD 42149 2232 75 52|260 52|260 CD 42149 2232 76 + + SYM 42149 2232 77 06.6| 06.6| CD 42149 2232 78 2.5 2.5 CD 42149 2232 79 | | CD 42149 2232 80 18 18 CD 42149 2232 81 | | CD 42149 2232 82 61|259 61|259 CD 42149 2232 83 + + SYM 42149 2232 84 47.2| 47.2| CD 42149 2232 85 60.2| 60.2| CD 42149 2232 86 47.9 47.9 CD 42149 2232 87 Oct Oct NNP 42149 2232 88 | | NNP 42149 2232 89 10 10 CD 42149 2232 90 | | CD 42149 2232 91 62|259 62|259 CD 42149 2232 92 + + SYM 42149 2232 93 81.5| 81.5| CD 42149 2232 94 25.1 25.1 CD 42149 2232 95 | | CD 42149 2232 96 20 20 CD 42149 2232 97 | | CD 42149 2232 98 81|258 81|258 CD 42149 2232 99 + + SYM 42149 2232 100 97.2| 97.2| CD 42149 2232 101 50.0| 50.0| CD 42149 2232 102 62.9 62.9 CD 42149 2232 103 Nov Nov NNP 42149 2232 104 | | NNP 42149 2232 105 29 29 CD 42149 2232 106 | | CD 42149 2232 107 91|259 91|259 CD 42149 2232 108 + + SYM 42149 2232 109 09.0| 09.0| CD 42149 2232 110 72.5 72.5 CD 42149 2232 111 | | CD 42149 2232 112 39 39 CD 42149 2232 113 | | CD 42149 2232 114 120|257 120|257 CD 42149 2232 115 + + SYM 42149 2232 116 99.7| 99.7| CD 42149 2232 117 97.5| 97.5| CD 42149 2232 118 81.2 81.2 CD 42149 2232 119 Dec Dec NNP 42149 2232 120 | | NNP 42149 2232 121 46 46 CD 42149 2232 122 | | CD 42149 2232 123 137|257 137|257 CD 42149 2232 124 + + CC 42149 2232 125 94.0|115.0 94.0|115.0 NNP 42149 2232 126 | | CD 42149 2232 127 77 77 CD 42149 2232 128 | | CD 42149 2232 129 197|256 197|256 CD 42149 2232 130 + + SYM 42149 2232 131 07.1|192.6| 07.1|192.6| CD 42149 2232 132 135.1 135.1 CD 42149 2232 133 1906 1906 CD 42149 2232 134 | | CD 42149 2232 135 | | CD 42149 2232 136 | | CD 42149 2232 137 | | CD 42149 2232 138 | | CD 42149 2232 139 | | CD 42149 2232 140 | | CD 42149 2232 141 | | CD 42149 2232 142 | | NNP 42149 2232 143 Jan Jan NNP 42149 2232 144 | | NNP 42149 2232 145 77 77 CD 42149 2232 146 | | CD 42149 2232 147 214|256 214|256 CD 42149 2232 148 + + CC 42149 2232 149 01.4|192.6 01.4|192.6 NNP 42149 2232 150 | | NNP 42149 2232 151 73 73 CD 42149 2232 152 | | CD 42149 2232 153 270|254 270|254 CD 42149 2232 154 + + SYM 42149 2232 155 24.6|182.5| 24.6|182.5| CD 42149 2232 156 169.4 169.4 CD 42149 2232 157 Feb Feb NNP 42149 2232 158 | | NNP 42149 2232 159 133 133 CD 42149 2232 160 | | CD 42149 2232 161 347|252 347|252 CD 42149 2232 162 + + NNP 42149 2232 163 68.6|332.8 68.6|332.8 NNP 42149 2232 164 | | NNP 42149 2232 165 165 165 CD 42149 2232 166 | | CD 42149 2232 167 435|250 435|250 CD 42149 2232 168 + + SYM 42149 2232 169 11.7|412.9| 11.7|412.9| CD 42149 2232 170 275.2 275.2 CD 42149 2232 171 Mar Mar NNP 42149 2232 172 | | NNP 42149 2232 173 142 142 CD 42149 2232 174 | | CD 42149 2232 175 489|249 489|249 CD 42149 2232 176 + + CC 42149 2232 177 13.3|355.3 13.3|355.3 CD 42149 2232 178 | | CD 42149 2232 179 111 111 CD 42149 2232 180 | | CD 42149 2232 181 546|247 546|247 CD 42149 2232 182 + + SYM 42149 2232 183 34.0|277.7| 34.0|277.7| CD 42149 2232 184 253.4 253.4 CD 42149 2232 185 April| April| NNP 42149 2232 186 32 32 CD 42149 2232 187 | | CD 42149 2232 188 521|248 521|248 CD 42149 2232 189 + + SYM 42149 2232 190 33.3| 33.3| CD 42149 2232 191 80.0 80.0 CD 42149 2232 192 | | CD 42149 2232 193 78 78 CD 42149 2232 194 | | NNP 42149 2232 195 624|245 624|245 CD 42149 2232 196 + + SYM 42149 2232 197 38.9|195.1| 38.9|195.1| CD 42149 2232 198 195.7 195.7 CD 42149 2232 199 May May NNP 42149 2232 200 | | CD 42149 2232 201 121 121 CD 42149 2232 202 | | CD 42149 2232 203 642|245 642|245 CD 42149 2232 204 + + SYM 42149 2232 205 30.6|302.7 30.6|302.7 NNP 42149 2232 206 | | NNP 42149 2232 207 2 2 CD 42149 2232 208 | | CD 42149 2232 209 626|245 626|245 CD 42149 2232 210 + + SYM 42149 2232 211 33.9| 33.9| CD 42149 2232 212 5.0| 5.0| CD 42149 2232 213 198.9 198.9 CD 42149 2232 214 June June NNP 42149 2232 215 | | NNP 42149 2232 216 162 162 CD 42149 2232 217 | | CD 42149 2232 218 804|241 804|241 CD 42149 2232 219 + + SYM 42149 2232 220 25.3|405.3 25.3|405.3 NNP 42149 2232 221 | | CD 42149 2232 222 157 157 CD 42149 2232 223 | | CD 42149 2232 224 788|241 788|241 CD 42149 2232 225 + + SYM 42149 2232 226 41.1|392.8| 41.1|392.8| CD 42149 2232 227 423.4 423.4 CD 42149 2232 228 July July NNP 42149 2232 229 | | NNP 42149 2232 230 113 113 CD 42149 2232 231 | | CD 42149 2232 232 917|238 917|238 CD 42149 2232 233 + + CC 42149 2232 234 42.4|282.9 42.4|282.9 NNP 42149 2232 235 | | CD 42149 2232 236 118 118 CD 42149 2232 237 | | CD 42149 2232 238 901|238 901|238 CD 42149 2232 239 + + SYM 42149 2232 240 45.9|295.2| 45.9|295.2| CD 42149 2232 241 292.7 292.7 CD 42149 2232 242 Aug Aug NNP 42149 2232 243 | | CD 42149 2232 244 138 138 CD 42149 2232 245 |1,055|234 |1,055|234 NNP 42149 2232 246 + + NNP 42149 2232 247 97.1|345.3 97.1|345.3 NNP 42149 2232 248 | | NNP 42149 2232 249 140 140 CD 42149 2232 250 |1,041|234 |1,041|234 CD 42149 2232 251 + + CD 42149 2232 252 95.8|850.1| 95.8|850.1| NFP 42149 2232 253 348.3 348.3 CD 42149 2232 254 Sept Sept NNP 42149 2232 255 | | NNP 42149 2232 256 55 55 CD 42149 2232 257 |1,110|233 |1,110|233 CD 42149 2232 258 + + CD 42149 2232 259 59.5|137.6 59.5|137.6 CD 42149 2232 260 | | CD 42149 2232 261 177 177 CD 42149 2232 262 |1,218|230 |1,218|230 NNS 42149 2232 263 + + SYM 42149 2232 264 52.8|443.0| 52.8|443.0| CD 42149 2232 265 305.9 305.9 CD 42149 2232 266 Oct Oct NNP 42149 2232 267 | | NNP 42149 2232 268 1 1 CD 42149 2232 269 |1,111|233 |1,111|233 NNP 42149 2232 270 + + SYM 42149 2232 271 57.0| 57.0| CD 42149 2232 272 2.5 2.5 CD 42149 2232 273 | | CD 42149 2232 274 94 94 CD 42149 2232 275 |1,312|228 |1,312|228 CD 42149 2232 276 + + CD 42149 2232 277 16.8|236.0| 16.8|236.0| CD 42149 2232 278 125.3 125.3 CD 42149 2232 279 Nov Nov NNP 42149 2232 280 | | NNP 42149 2232 281 9 9 CD 42149 2232 282 |1,120|233 |1,120|233 NNP 42149 2232 283 + + CC 42149 2232 284 34.1| 34.1| CD 42149 2232 285 22.9 22.9 CD 42149 2232 286 | | CD 42149 2232 287 | | CD 42149 2232 288 | | CD 42149 2232 289 | | CD 42149 2232 290 | | CD 42149 2232 291 10.3 10.3 CD 42149 2232 292 -----+-----+-----+----------+------+-----+-----+----------+-----+-------- -----+-----+-----+----------+------+-----+-----+----------+-----+-------- NFP 42149 2232 293 A a NN 42149 2232 294 ½-in â½-in XX 42149 2232 295 . . . 42149 2233 1 air air NN 42149 2233 2 line line NN 42149 2233 3 was be VBD 42149 2233 4 taken take VBN 42149 2233 5 direct direct RB 42149 2233 6 from from IN 42149 2233 7 the the DT 42149 2233 8 working work VBG 42149 2233 9 chamber chamber NN 42149 2233 10 to to IN 42149 2233 11 the the DT 42149 2233 12 recording recording NN 42149 2233 13 gauges gauge NNS 42149 2233 14 in in IN 42149 2233 15 the the DT 42149 2233 16 engine engine NN 42149 2233 17 - - HYPH 42149 2233 18 room room NN 42149 2233 19 , , , 42149 2233 20 which which WDT 42149 2233 21 enabled enable VBD 42149 2233 22 the the DT 42149 2233 23 engine engine NN 42149 2233 24 - - HYPH 42149 2233 25 room room NN 42149 2233 26 force force NN 42149 2233 27 to to TO 42149 2233 28 keep keep VB 42149 2233 29 a a DT 42149 2233 30 constant constant JJ 42149 2233 31 watch watch NN 42149 2233 32 on on IN 42149 2233 33 the the DT 42149 2233 34 air air NN 42149 2233 35 conditions condition NNS 42149 2233 36 below below RB 42149 2233 37 . . . 42149 2234 1 To to TO 42149 2234 2 avoid avoid VB 42149 2234 3 undue undue JJ 42149 2234 4 rise rise NN 42149 2234 5 of of IN 42149 2234 6 pressure pressure NN 42149 2234 7 , , , 42149 2234 8 a a DT 42149 2234 9 safety safety NN 42149 2234 10 valve valve NN 42149 2234 11 was be VBD 42149 2234 12 set set VBN 42149 2234 13 on on IN 42149 2234 14 the the DT 42149 2234 15 air air NN 42149 2234 16 line line NN 42149 2234 17 at at IN 42149 2234 18 each each DT 42149 2234 19 lock lock NN 42149 2234 20 , , , 42149 2234 21 set set VBN 42149 2234 22 to to TO 42149 2234 23 blow blow VB 42149 2234 24 off off RP 42149 2234 25 if if IN 42149 2234 26 the the DT 42149 2234 27 air air NN 42149 2234 28 pressure pressure NN 42149 2234 29 rose rise VBD 42149 2234 30 above above IN 42149 2234 31 that that DT 42149 2234 32 desired desire VBD 42149 2234 33 . . . 42149 2235 1 The the DT 42149 2235 2 compressor compressor NN 42149 2235 3 plant plant NN 42149 2235 4 was be VBD 42149 2235 5 ample ample JJ 42149 2235 6 , , , 42149 2235 7 except except IN 42149 2235 8 , , , 42149 2235 9 as as IN 42149 2235 10 before before IN 42149 2235 11 described describe VBN 42149 2235 12 , , , 42149 2235 13 when when WRB 42149 2235 14 passing pass VBG 42149 2235 15 the the DT 42149 2235 16 gravel gravel NN 42149 2235 17 section section NN 42149 2235 18 at at IN 42149 2235 19 Weehawken Weehawken NNP 42149 2235 20 . . . 42149 2236 1 Records record NNS 42149 2236 2 were be VBD 42149 2236 3 kept keep VBN 42149 2236 4 of of IN 42149 2236 5 the the DT 42149 2236 6 air air NN 42149 2236 7 supply supply NN 42149 2236 8 , , , 42149 2236 9 and and CC 42149 2236 10 it -PRON- PRP 42149 2236 11 may may MD 42149 2236 12 be be VB 42149 2236 13 said say VBN 42149 2236 14 here here RB 42149 2236 15 that that IN 42149 2236 16 the the DT 42149 2236 17 quantity quantity NN 42149 2236 18 of of IN 42149 2236 19 free free JJ 42149 2236 20 air air NN 42149 2236 21 per per IN 42149 2236 22 man man NN 42149 2236 23 per per IN 42149 2236 24 hour hour NN 42149 2236 25 was be VBD 42149 2236 26 in in IN 42149 2236 27 general general JJ 42149 2236 28 between between IN 42149 2236 29 1,500 1,500 CD 42149 2236 30 and and CC 42149 2236 31 5,000 5,000 CD 42149 2236 32 cu cu NNS 42149 2236 33 . . . 42149 2237 1 ft ft NNP 42149 2237 2 . . NNP 42149 2237 3 , , , 42149 2237 4 though though IN 42149 2237 5 in in IN 42149 2237 6 the the DT 42149 2237 7 open open JJ 42149 2237 8 gravel gravel NN 42149 2237 9 where where WRB 42149 2237 10 the the DT 42149 2237 11 escape escape NN 42149 2237 12 was be VBD 42149 2237 13 great great JJ 42149 2237 14 it -PRON- PRP 42149 2237 15 was be VBD 42149 2237 16 for for IN 42149 2237 17 a a DT 42149 2237 18 time time NN 42149 2237 19 as as RB 42149 2237 20 much much JJ 42149 2237 21 as as IN 42149 2237 22 10,000 10,000 CD 42149 2237 23 cu cu NNS 42149 2237 24 . . . 42149 2238 1 ft ft IN 42149 2238 2 . . . 42149 2238 3 For for IN 42149 2238 4 more more JJR 42149 2238 5 than than IN 42149 2238 6 half half PDT 42149 2238 7 the the DT 42149 2238 8 silt silt NN 42149 2238 9 period period NN 42149 2238 10 it -PRON- PRP 42149 2238 11 was be VBD 42149 2238 12 kept keep VBN 42149 2238 13 between between IN 42149 2238 14 3,000 3,000 CD 42149 2238 15 and and CC 42149 2238 16 4,000 4,000 CD 42149 2238 17 cu cu NNS 42149 2238 18 . . . 42149 2239 1 ft ft NNP 42149 2239 2 . . NNP 42149 2239 3 , , , 42149 2239 4 but but CC 42149 2239 5 when when WRB 42149 2239 6 it -PRON- PRP 42149 2239 7 seemed seem VBD 42149 2239 8 proved prove VBN 42149 2239 9 beyond beyond IN 42149 2239 10 doubt doubt NN 42149 2239 11 that that IN 42149 2239 12 any any DT 42149 2239 13 quantity quantity NN 42149 2239 14 more more JJR 42149 2239 15 than than IN 42149 2239 16 2,000 2,000 CD 42149 2239 17 cu cu NNS 42149 2239 18 . . . 42149 2240 1 ft ft NNP 42149 2240 2 . . NNP 42149 2240 3 had have VBD 42149 2240 4 no no DT 42149 2240 5 beneficial beneficial JJ 42149 2240 6 effect effect NN 42149 2240 7 on on IN 42149 2240 8 health health NN 42149 2240 9 , , , 42149 2240 10 no no DT 42149 2240 11 attempt attempt NN 42149 2240 12 was be VBD 42149 2240 13 made make VBN 42149 2240 14 to to TO 42149 2240 15 deliver deliver VB 42149 2240 16 more more JJR 42149 2240 17 , , , 42149 2240 18 and and CC 42149 2240 19 on on IN 42149 2240 20 two two CD 42149 2240 21 separate separate JJ 42149 2240 22 occasions occasion NNS 42149 2240 23 for for IN 42149 2240 24 two two CD 42149 2240 25 consecutive consecutive JJ 42149 2240 26 weeks week NNS 42149 2240 27 it -PRON- PRP 42149 2240 28 ran run VBD 42149 2240 29 as as RB 42149 2240 30 low low JJ 42149 2240 31 as as IN 42149 2240 32 1,000 1,000 CD 42149 2240 33 cu cu NNS 42149 2240 34 . . . 42149 2241 1 ft ft NNP 42149 2241 2 . . NNP 42149 2241 3 without without IN 42149 2241 4 any any DT 42149 2241 5 increase increase NN 42149 2241 6 in in IN 42149 2241 7 the the DT 42149 2241 8 number number NN 42149 2241 9 of of IN 42149 2241 10 cases case NNS 42149 2241 11 of of IN 42149 2241 12 bends bend NNS 42149 2241 13 . . . 42149 2242 1 The the DT 42149 2242 2 amount amount NN 42149 2242 3 of of IN 42149 2242 4 CO_{2 CO_{2 NNP 42149 2242 5 } } -RRB- 42149 2242 6 in in IN 42149 2242 7 the the DT 42149 2242 8 air air NN 42149 2242 9 was be VBD 42149 2242 10 also also RB 42149 2242 11 measured measure VBN 42149 2242 12 daily daily RB 42149 2242 13 , , , 42149 2242 14 as as IN 42149 2242 15 the the DT 42149 2242 16 specifications specification NNS 42149 2242 17 called call VBD 42149 2242 18 for for IN 42149 2242 19 not not RB 42149 2242 20 more more JJR 42149 2242 21 than than IN 42149 2242 22 1 1 CD 42149 2242 23 part part NN 42149 2242 24 of of IN 42149 2242 25 CO_{2 CO_{2 NNP 42149 2242 26 } } -RRB- 42149 2242 27 per per IN 42149 2242 28 1,000 1,000 CD 42149 2242 29 parts part NNS 42149 2242 30 of of IN 42149 2242 31 air air NN 42149 2242 32 . . . 42149 2243 1 The the DT 42149 2243 2 average average NN 42149 2243 3 ranged range VBD 42149 2243 4 between between IN 42149 2243 5 0.8 0.8 CD 42149 2243 6 and and CC 42149 2243 7 1.5 1.5 CD 42149 2243 8 parts part NNS 42149 2243 9 per per IN 42149 2243 10 1,000 1,000 CD 42149 2243 11 , , , 42149 2243 12 though though IN 42149 2243 13 in in IN 42149 2243 14 exceptional exceptional JJ 42149 2243 15 cases case NNS 42149 2243 16 it -PRON- PRP 42149 2243 17 fell fall VBD 42149 2243 18 as as RB 42149 2243 19 low low JJ 42149 2243 20 as as IN 42149 2243 21 0.3 0.3 CD 42149 2243 22 and and CC 42149 2243 23 rose rise VBD 42149 2243 24 to to IN 42149 2243 25 4.0 4.0 CD 42149 2243 26 . . . 42149 2244 1 The the DT 42149 2244 2 air air NN 42149 2244 3 temperature temperature NN 42149 2244 4 in in IN 42149 2244 5 the the DT 42149 2244 6 tunnels tunnel NNS 42149 2244 7 usually usually RB 42149 2244 8 ranged range VBD 42149 2244 9 from from IN 42149 2244 10 55 55â CD 42149 2244 11 ° ° NNS 42149 2244 12 to to IN 42149 2244 13 60 60â CD 42149 2244 14 ° ° NNS 42149 2244 15 Fahr Fahr NNPS 42149 2244 16 . . NNP 42149 2244 17 , , , 42149 2244 18 which which WDT 42149 2244 19 was be VBD 42149 2244 20 the the DT 42149 2244 21 temperature temperature NN 42149 2244 22 also also RB 42149 2244 23 of of IN 42149 2244 24 the the DT 42149 2244 25 surrounding surround VBG 42149 2244 26 silt silt NN 42149 2244 27 , , , 42149 2244 28 though though IN 42149 2244 29 at at IN 42149 2244 30 times time NNS 42149 2244 31 , , , 42149 2244 32 in in IN 42149 2244 33 the the DT 42149 2244 34 earlier early JJR 42149 2244 35 parts part NNS 42149 2244 36 of of IN 42149 2244 37 the the DT 42149 2244 38 work work NN 42149 2244 39 when when WRB 42149 2244 40 grouting grout VBG 42149 2244 41 extensively extensively RB 42149 2244 42 in in IN 42149 2244 43 long long JJ 42149 2244 44 sections section NNS 42149 2244 45 of of IN 42149 2244 46 the the DT 42149 2244 47 tunnel tunnel NN 42149 2244 48 in in IN 42149 2244 49 rock rock NN 42149 2244 50 , , , 42149 2244 51 it -PRON- PRP 42149 2244 52 varied vary VBD 42149 2244 53 from from IN 42149 2244 54 85 85â CD 42149 2244 55 ° ° NNS 42149 2244 56 to to IN 42149 2244 57 110 110â CD 42149 2244 58 ° ° NNS 42149 2244 59 Fahr Fahr NNS 42149 2244 60 . . . 42149 2245 1 _ _ NNP 42149 2245 2 Grouting._--Grout grouting._--grout CD 42149 2245 3 of of IN 42149 2245 4 one one CD 42149 2245 5 part part NN 42149 2245 6 of of IN 42149 2245 7 Portland Portland NNP 42149 2245 8 cement cement NN 42149 2245 9 to to IN 42149 2245 10 one one CD 42149 2245 11 part part NN 42149 2245 12 of of IN 42149 2245 13 sand sand NN 42149 2245 14 by by IN 42149 2245 15 volume volume NN 42149 2245 16 was be VBD 42149 2245 17 forced force VBN 42149 2245 18 outside outside IN 42149 2245 19 the the DT 42149 2245 20 tunnel tunnel NN 42149 2245 21 lining line VBG 42149 2245 22 by by IN 42149 2245 23 air air NN 42149 2245 24 pressure pressure NN 42149 2245 25 through through IN 42149 2245 26 1½-in 1â½-in CD 42149 2245 27 . . . 42149 2246 1 tapped tap VBN 42149 2246 2 and and CC 42149 2246 3 plugged plug VBN 42149 2246 4 grout grout NN 42149 2246 5 holes hole NNS 42149 2246 6 formed form VBN 42149 2246 7 in in IN 42149 2246 8 each each DT 42149 2246 9 segment segment NN 42149 2246 10 for for IN 42149 2246 11 this this DT 42149 2246 12 purpose purpose NN 42149 2246 13 , , , 42149 2246 14 wherever wherever WRB 42149 2246 15 the the DT 42149 2246 16 ground ground NN 42149 2246 17 was be VBD 42149 2246 18 not not RB 42149 2246 19 likely likely JJ 42149 2246 20 to to TO 42149 2246 21 squeeze squeeze VB 42149 2246 22 in in RP 42149 2246 23 upon upon IN 42149 2246 24 the the DT 42149 2246 25 metal metal NN 42149 2246 26 lining lining NN 42149 2246 27 as as RB 42149 2246 28 soon soon RB 42149 2246 29 as as IN 42149 2246 30 this this DT 42149 2246 31 was be VBD 42149 2246 32 erected erect VBN 42149 2246 33 . . . 42149 2247 1 That that DT 42149 2247 2 is be VBZ 42149 2247 3 to to TO 42149 2247 4 say say VB 42149 2247 5 , , , 42149 2247 6 it -PRON- PRP 42149 2247 7 was be VBD 42149 2247 8 used use VBN 42149 2247 9 everywhere everywhere RB 42149 2247 10 up up IN 42149 2247 11 to to IN 42149 2247 12 the the DT 42149 2247 13 river river NN 42149 2247 14 line line NN 42149 2247 15 ; ; : 42149 2247 16 between between IN 42149 2247 17 river river NN 42149 2247 18 lines line NNS 42149 2247 19 it -PRON- PRP 42149 2247 20 was be VBD 42149 2247 21 not not RB 42149 2247 22 used use VBN 42149 2247 23 except except IN 42149 2247 24 at at IN 42149 2247 25 the the DT 42149 2247 26 New New NNP 42149 2247 27 York York NNP 42149 2247 28 bulkhead bulkhead NN 42149 2247 29 wall wall NN 42149 2247 30 in in IN 42149 2247 31 order order NN 42149 2247 32 to to TO 42149 2247 33 fill fill VB 42149 2247 34 voids void NNS 42149 2247 35 in in IN 42149 2247 36 the the DT 42149 2247 37 rip rip NN 42149 2247 38 - - HYPH 42149 2247 39 rap rap NN 42149 2247 40 , , , 42149 2247 41 and and CC 42149 2247 42 at at IN 42149 2247 43 the the DT 42149 2247 44 point point NN 42149 2247 45 of of IN 42149 2247 46 junction junction NN 42149 2247 47 of of IN 42149 2247 48 the the DT 42149 2247 49 shields shield NNS 42149 2247 50 where where WRB 42149 2247 51 the the DT 42149 2247 52 space space NN 42149 2247 53 between between IN 42149 2247 54 the the DT 42149 2247 55 metal metal NN 42149 2247 56 lining lining NN 42149 2247 57 and and CC 42149 2247 58 the the DT 42149 2247 59 shield shield NN 42149 2247 60 skins skin NNS 42149 2247 61 outside outside IN 42149 2247 62 it -PRON- PRP 42149 2247 63 was be VBD 42149 2247 64 grouted grout VBN 42149 2247 65 . . . 42149 2248 1 Cow Cow NNP 42149 2248 2 Bay Bay NNP 42149 2248 3 sand sand NN 42149 2248 4 was be VBD 42149 2248 5 used use VBN 42149 2248 6 , , , 42149 2248 7 and and CC 42149 2248 8 it -PRON- PRP 42149 2248 9 had have VBD 42149 2248 10 to to TO 42149 2248 11 be be VB 42149 2248 12 screened screen VBN 42149 2248 13 to to TO 42149 2248 14 remove remove VB 42149 2248 15 particles particle NNS 42149 2248 16 greater great JJR 42149 2248 17 than than IN 42149 2248 18 1/10 1/10 CD 42149 2248 19 in in IN 42149 2248 20 . . . 42149 2249 1 in in IN 42149 2249 2 diameter diameter NN 42149 2249 3 , , , 42149 2249 4 which which WDT 42149 2249 5 would would MD 42149 2249 6 choke choke VB 42149 2249 7 the the DT 42149 2249 8 valves valve NNS 42149 2249 9 . . . 42149 2250 1 For for IN 42149 2250 2 later later RB 42149 2250 3 grouting grout VBG 42149 2250 4 work work NN 42149 2250 5 , , , 42149 2250 6 namely namely RB 42149 2250 7 , , , 42149 2250 8 in in IN 42149 2250 9 the the DT 42149 2250 10 top top NN 42149 2250 11 of of IN 42149 2250 12 the the DT 42149 2250 13 concrete concrete JJ 42149 2250 14 lining line VBG 42149 2250 15 inside inside IN 42149 2250 16 the the DT 42149 2250 17 metal metal NN 42149 2250 18 lining lining NN 42149 2250 19 , , , 42149 2250 20 Rockaway Rockaway NNP 42149 2250 21 Beach Beach NNP 42149 2250 22 sand sand NN 42149 2250 23 was be VBD 42149 2250 24 used use VBN 42149 2250 25 . . . 42149 2251 1 This this DT 42149 2251 2 is be VBZ 42149 2251 3 very very RB 42149 2251 4 fine fine JJ 42149 2251 5 , , , 42149 2251 6 and and CC 42149 2251 7 did do VBD 42149 2251 8 not not RB 42149 2251 9 need need VB 42149 2251 10 screening screening NN 42149 2251 11 ; ; : 42149 2251 12 it -PRON- PRP 42149 2251 13 cost cost VBD 42149 2251 14 more more JJR 42149 2251 15 , , , 42149 2251 16 but but CC 42149 2251 17 the the DT 42149 2251 18 saving saving NN 42149 2251 19 of of IN 42149 2251 20 screening screening NN 42149 2251 21 and and CC 42149 2251 22 the the DT 42149 2251 23 non non NN 42149 2251 24 - - JJ 42149 2251 25 blocking blocking JJ 42149 2251 26 of of IN 42149 2251 27 valves valve NNS 42149 2251 28 , , , 42149 2251 29 etc etc FW 42149 2251 30 . . . 42149 2251 31 , , , 42149 2251 32 resulted result VBD 42149 2251 33 in in IN 42149 2251 34 a a DT 42149 2251 35 saving saving NN 42149 2251 36 . . . 42149 2252 1 The the DT 42149 2252 2 grout grout NN 42149 2252 3 was be VBD 42149 2252 4 mixed mix VBN 42149 2252 5 in in IN 42149 2252 6 a a DT 42149 2252 7 machine machine NN 42149 2252 8 shown show VBN 42149 2252 9 in in IN 42149 2252 10 Fig Fig NNP 42149 2252 11 . . . 42149 2253 1 2 2 LS 42149 2253 2 , , , 42149 2253 3 Plate Plate NNP 42149 2253 4 XLI XLI NNP 42149 2253 5 , , , 42149 2253 6 which which WDT 42149 2253 7 is be VBZ 42149 2253 8 a a DT 42149 2253 9 view view NN 42149 2253 10 of of IN 42149 2253 11 the the DT 42149 2253 12 grouting grout VBG 42149 2253 13 operation operation NN 42149 2253 14 . . . 42149 2254 1 The the DT 42149 2254 2 grout grout NN 42149 2254 3 pipes pipe NNS 42149 2254 4 were be VBD 42149 2254 5 not not RB 42149 2254 6 screwed screw VBN 42149 2254 7 directly directly RB 42149 2254 8 into into IN 42149 2254 9 the the DT 42149 2254 10 tapped tap VBN 42149 2254 11 hole hole NN 42149 2254 12 in in IN 42149 2254 13 the the DT 42149 2254 14 segments segment NNS 42149 2254 15 , , , 42149 2254 16 but but CC 42149 2254 17 a a DT 42149 2254 18 pipe pipe NN 42149 2254 19 containing contain VBG 42149 2254 20 a a DT 42149 2254 21 nipple nipple NN 42149 2254 22 and and CC 42149 2254 23 valve valve NN 42149 2254 24 was be VBD 42149 2254 25 screwed screw VBN 42149 2254 26 into into IN 42149 2254 27 the the DT 42149 2254 28 grout grout NN 42149 2254 29 hole hole NN 42149 2254 30 and and CC 42149 2254 31 the the DT 42149 2254 32 grout grout NN 42149 2254 33 pipe pipe NN 42149 2254 34 screwed screw VBD 42149 2254 35 to to IN 42149 2254 36 the the DT 42149 2254 37 pipe pipe NN 42149 2254 38 . . . 42149 2255 1 This this DT 42149 2255 2 prevented prevent VBD 42149 2255 3 the the DT 42149 2255 4 waste waste NN 42149 2255 5 of of IN 42149 2255 6 grout grout NN 42149 2255 7 , , , 42149 2255 8 enabled enable VBD 42149 2255 9 the the DT 42149 2255 10 valve valve NN 42149 2255 11 to to TO 42149 2255 12 be be VB 42149 2255 13 closed close VBN 42149 2255 14 and and CC 42149 2255 15 the the DT 42149 2255 16 grout grout NN 42149 2255 17 pipe pipe NN 42149 2255 18 disconnected disconnect VBD 42149 2255 19 , , , 42149 2255 20 and and CC 42149 2255 21 the the DT 42149 2255 22 pipe pipe NN 42149 2255 23 to to TO 42149 2255 24 be be VB 42149 2255 25 left leave VBN 42149 2255 26 in in IN 42149 2255 27 position position NN 42149 2255 28 until until IN 42149 2255 29 the the DT 42149 2255 30 grout grout NN 42149 2255 31 had have VBD 42149 2255 32 set set VBN 42149 2255 33 . . . 42149 2256 1 In in IN 42149 2256 2 the the DT 42149 2256 3 full full JJ 42149 2256 4 rock rock NN 42149 2256 5 section section NN 42149 2256 6 , , , 42149 2256 7 20 20 CD 42149 2256 8 or or CC 42149 2256 9 30 30 CD 42149 2256 10 rings ring NNS 42149 2256 11 were be VBD 42149 2256 12 put put VBN 42149 2256 13 in in RP 42149 2256 14 without without IN 42149 2256 15 grouting grouting NN 42149 2256 16 ; ; : 42149 2256 17 then then RB 42149 2256 18 the the DT 42149 2256 19 shield shield NN 42149 2256 20 was be VBD 42149 2256 21 stopped stop VBN 42149 2256 22 , , , 42149 2256 23 the the DT 42149 2256 24 last last JJ 42149 2256 25 two two CD 42149 2256 26 or or CC 42149 2256 27 three three CD 42149 2256 28 rings ring NNS 42149 2256 29 were be VBD 42149 2256 30 detached detach VBN 42149 2256 31 and and CC 42149 2256 32 pulled pull VBN 42149 2256 33 ahead ahead RB 42149 2256 34 by by IN 42149 2256 35 the the DT 42149 2256 36 shield shield NN 42149 2256 37 , , , 42149 2256 38 a a DT 42149 2256 39 masonry masonry NN 42149 2256 40 stop stop NN 42149 2256 41 - - HYPH 42149 2256 42 wall wall NNP 42149 2256 43 was be VBD 42149 2256 44 built build VBN 42149 2256 45 around around IN 42149 2256 46 the the DT 42149 2256 47 outside outside NN 42149 2256 48 of of IN 42149 2256 49 the the DT 42149 2256 50 last last JJ 42149 2256 51 ring ring NN 42149 2256 52 left leave VBD 42149 2256 53 in in RP 42149 2256 54 , , , 42149 2256 55 and and CC 42149 2256 56 the the DT 42149 2256 57 whole whole JJ 42149 2256 58 20 20 CD 42149 2256 59 or or CC 42149 2256 60 30 30 CD 42149 2256 61 rings ring NNS 42149 2256 62 were be VBD 42149 2256 63 grouted grout VBN 42149 2256 64 at at IN 42149 2256 65 one one CD 42149 2256 66 time time NN 42149 2256 67 . . . 42149 2257 1 In in IN 42149 2257 2 the the DT 42149 2257 3 landward landward NN 42149 2257 4 silt silt NN 42149 2257 5 and and CC 42149 2257 6 gravel gravel VB 42149 2257 7 each each DT 42149 2257 8 ring ring NN 42149 2257 9 had have VBD 42149 2257 10 to to TO 42149 2257 11 be be VB 42149 2257 12 grouted grout VBN 42149 2257 13 as as RB 42149 2257 14 soon soon RB 42149 2257 15 as as IN 42149 2257 16 the the DT 42149 2257 17 shield shield NN 42149 2257 18 had have VBD 42149 2257 19 left leave VBN 42149 2257 20 it -PRON- PRP 42149 2257 21 , , , 42149 2257 22 in in IN 42149 2257 23 order order NN 42149 2257 24 to to TO 42149 2257 25 avoid avoid VB 42149 2257 26 the the DT 42149 2257 27 flattening flattening NN 42149 2257 28 caused cause VBN 42149 2257 29 by by IN 42149 2257 30 the the DT 42149 2257 31 weight weight NN 42149 2257 32 coming come VBG 42149 2257 33 on on IN 42149 2257 34 the the DT 42149 2257 35 crown crown NN 42149 2257 36 while while IN 42149 2257 37 the the DT 42149 2257 38 sides side NNS 42149 2257 39 were be VBD 42149 2257 40 as as RB 42149 2257 41 yet yet RB 42149 2257 42 unsupported unsupported JJ 42149 2257 43 . . . 42149 2258 1 The the DT 42149 2258 2 grout grout NN 42149 2258 3 was be VBD 42149 2258 4 prevented prevent VBN 42149 2258 5 from from IN 42149 2258 6 reaching reach VBG 42149 2258 7 the the DT 42149 2258 8 tail tail NN 42149 2258 9 of of IN 42149 2258 10 the the DT 42149 2258 11 shield shield NN 42149 2258 12 by by IN 42149 2258 13 plugging plug VBG 42149 2258 14 up up RP 42149 2258 15 the the DT 42149 2258 16 space space NN 42149 2258 17 with with IN 42149 2258 18 empty empty JJ 42149 2258 19 cement cement NN 42149 2258 20 bags bag NNS 42149 2258 21 , , , 42149 2258 22 assisted assist VBN 42149 2258 23 by by IN 42149 2258 24 segmental segmental JJ 42149 2258 25 boards board NNS 42149 2258 26 held hold VBN 42149 2258 27 against against IN 42149 2258 28 the the DT 42149 2258 29 face face NN 42149 2258 30 of of IN 42149 2258 31 the the DT 42149 2258 32 leading lead VBG 42149 2258 33 ring ring NN 42149 2258 34 by by IN 42149 2258 35 U U NNP 42149 2258 36 - - HYPH 42149 2258 37 shaped shape VBN 42149 2258 38 clamps clamp NNS 42149 2258 39 , , , 42149 2258 40 fitting fit VBG 42149 2258 41 over over IN 42149 2258 42 the the DT 42149 2258 43 front front JJ 42149 2258 44 circumferential circumferential JJ 42149 2258 45 flange flange NN 42149 2258 46 of of IN 42149 2258 47 the the DT 42149 2258 48 ring ring NN 42149 2258 49 and and CC 42149 2258 50 the the DT 42149 2258 51 boards board NNS 42149 2258 52 , , , 42149 2258 53 and and CC 42149 2258 54 tightened tighten VBN 42149 2258 55 by by IN 42149 2258 56 wedges wedge NNS 42149 2258 57 . . . 42149 2259 1 The the DT 42149 2259 2 air air NN 42149 2259 3 pressure pressure NN 42149 2259 4 varied vary VBN 42149 2259 5 between between IN 42149 2259 6 70 70 CD 42149 2259 7 and and CC 42149 2259 8 100 100 CD 42149 2259 9 lb lb JJ 42149 2259 10 . . . 42149 2260 1 per per IN 42149 2260 2 sq sq NNP 42149 2260 3 . . . 42149 2261 1 in in IN 42149 2261 2 . . . 42149 2262 1 above above IN 42149 2262 2 normal normal JJ 42149 2262 3 . . . 42149 2263 1 The the DT 42149 2263 2 force force NN 42149 2263 3 consisted consist VBD 42149 2263 4 of of IN 42149 2263 5 one one CD 42149 2263 6 pipe pipe NN 42149 2263 7 - - HYPH 42149 2263 8 fitter fitter NN 42149 2263 9 and and CC 42149 2263 10 one one CD 42149 2263 11 or or CC 42149 2263 12 two two CD 42149 2263 13 laborers laborer NNS 42149 2263 14 employed employ VBD 42149 2263 15 part part NN 42149 2263 16 of of IN 42149 2263 17 their -PRON- PRP$ 42149 2263 18 time time NN 42149 2263 19 . . . 42149 2264 1 When when WRB 42149 2264 2 a a DT 42149 2264 3 considerable considerable JJ 42149 2264 4 length length NN 42149 2264 5 was be VBD 42149 2264 6 being be VBG 42149 2264 7 grouted grout VBN 42149 2264 8 at at IN 42149 2264 9 a a DT 42149 2264 10 time time NN 42149 2264 11 , , , 42149 2264 12 as as IN 42149 2264 13 in in IN 42149 2264 14 the the DT 42149 2264 15 full full JJ 42149 2264 16 rock rock NN 42149 2264 17 section section NN 42149 2264 18 , , , 42149 2264 19 many many JJ 42149 2264 20 laborers laborer NNS 42149 2264 21 were be VBD 42149 2264 22 employed employ VBN 42149 2264 23 for for IN 42149 2264 24 a a DT 42149 2264 25 short short JJ 42149 2264 26 period period NN 42149 2264 27 . . . 42149 2265 1 Transportation Transportation NNP 42149 2265 2 and and CC 42149 2265 3 Disposal Disposal NNP 42149 2265 4 . . . 42149 2266 1 The the DT 42149 2266 2 transportation transportation NN 42149 2266 3 and and CC 42149 2266 4 disposal disposal NN 42149 2266 5 will will MD 42149 2266 6 be be VB 42149 2266 7 described describe VBN 42149 2266 8 under under IN 42149 2266 9 the the DT 42149 2266 10 following follow VBG 42149 2266 11 headings heading NNS 42149 2266 12 : : : 42149 2266 13 Receipt Receipt NNP 42149 2266 14 and and CC 42149 2266 15 Unloading Unloading NNP 42149 2266 16 of of IN 42149 2266 17 Materials Materials NNP 42149 2266 18 , , , 42149 2266 19 Surface Surface NNP 42149 2266 20 Transportation Transportation NNP 42149 2266 21 , , , 42149 2266 22 Tunnel Tunnel NNP 42149 2266 23 Transportation Transportation NNP 42149 2266 24 , , , 42149 2266 25 Disposal Disposal NNP 42149 2266 26 . . . 42149 2267 1 _ _ NNP 42149 2267 2 Receipt Receipt NNP 42149 2267 3 and and CC 42149 2267 4 Unloading Unloading NNP 42149 2267 5 of of IN 42149 2267 6 Materials._--At Materials._--At NNS 42149 2267 7 the the DT 42149 2267 8 Manhattan Manhattan NNP 42149 2267 9 Shaft Shaft NNP 42149 2267 10 the the DT 42149 2267 11 contractor contractor NN 42149 2267 12 laid lay VBD 42149 2267 13 a a DT 42149 2267 14 spur spur NN 42149 2267 15 siding side VBG 42149 2267 16 into into IN 42149 2267 17 the the DT 42149 2267 18 yard yard NN 42149 2267 19 from from IN 42149 2267 20 the the DT 42149 2267 21 freight freight NN 42149 2267 22 tracks track NNS 42149 2267 23 of of IN 42149 2267 24 the the DT 42149 2267 25 New New NNP 42149 2267 26 York York NNP 42149 2267 27 Central Central NNP 42149 2267 28 Railroad Railroad NNP 42149 2267 29 , , , 42149 2267 30 which which WDT 42149 2267 31 immediately immediately RB 42149 2267 32 adjoins adjoin VBZ 42149 2267 33 the the DT 42149 2267 34 yard yard NN 42149 2267 35 on on IN 42149 2267 36 the the DT 42149 2267 37 west west NN 42149 2267 38 . . . 42149 2268 1 There there EX 42149 2268 2 was be VBD 42149 2268 3 also also RB 42149 2268 4 wharfage wharfage NN 42149 2268 5 on on IN 42149 2268 6 the the DT 42149 2268 7 river river NN 42149 2268 8 front front NN 42149 2268 9 about about RB 42149 2268 10 1,500 1,500 CD 42149 2268 11 ft ft NN 42149 2268 12 . . NN 42149 2268 13 away away RB 42149 2268 14 . . . 42149 2269 1 At at IN 42149 2269 2 the the DT 42149 2269 3 Weehawken Weehawken NNP 42149 2269 4 Shaft Shaft NNP 42149 2269 5 there there EX 42149 2269 6 were be VBD 42149 2269 7 four four CD 42149 2269 8 sidings siding NNS 42149 2269 9 from from IN 42149 2269 10 the the DT 42149 2269 11 Erie Erie NNP 42149 2269 12 Railroad Railroad NNP 42149 2269 13 and and CC 42149 2269 14 one one CD 42149 2269 15 from from IN 42149 2269 16 the the DT 42149 2269 17 West West NNP 42149 2269 18 Shore Shore NNP 42149 2269 19 Railroad Railroad NNP 42149 2269 20 . . . 42149 2270 1 Access access NN 42149 2270 2 to to IN 42149 2270 3 the the DT 42149 2270 4 river river NN 42149 2270 5 was be VBD 42149 2270 6 gained gain VBN 42149 2270 7 by by IN 42149 2270 8 a a DT 42149 2270 9 trestle trestle NN 42149 2270 10 direct direct JJ 42149 2270 11 from from IN 42149 2270 12 the the DT 42149 2270 13 yard yard NN 42149 2270 14 , , , 42149 2270 15 and and CC 42149 2270 16 Baldwin Baldwin NNP 42149 2270 17 Avenue Avenue NNP 42149 2270 18 adjoined adjoin VBD 42149 2270 19 the the DT 42149 2270 20 yard yard NN 42149 2270 21 . . . 42149 2271 1 All all PDT 42149 2271 2 the the DT 42149 2271 3 iron iron NN 42149 2271 4 lining lining NN 42149 2271 5 arrived arrive VBN 42149 2271 6 by by IN 42149 2271 7 railroad railroad NN 42149 2271 8 . . . 42149 2272 1 It -PRON- PRP 42149 2272 2 was be VBD 42149 2272 3 unloaded unload VBN 42149 2272 4 by by IN 42149 2272 5 derricks derrick NNS 42149 2272 6 , , , 42149 2272 7 and and CC 42149 2272 8 stacked stack VBD 42149 2272 9 so so IN 42149 2272 10 that that IN 42149 2272 11 it -PRON- PRP 42149 2272 12 was be VBD 42149 2272 13 convenient convenient JJ 42149 2272 14 for for IN 42149 2272 15 use use NN 42149 2272 16 in in IN 42149 2272 17 the the DT 42149 2272 18 tunnel tunnel NN 42149 2272 19 . . . 42149 2273 1 The the DT 42149 2273 2 Manhattan Manhattan NNP 42149 2273 3 derricks derrick NNS 42149 2273 4 were be VBD 42149 2273 5 a a DT 42149 2273 6 pair pair NN 42149 2273 7 of of IN 42149 2273 8 steel steel NN 42149 2273 9 ones one NNS 42149 2273 10 with with IN 42149 2273 11 39-ft 39-ft NNP 42149 2273 12 . . . 42149 2273 13 booms boom NNS 42149 2273 14 , , , 42149 2273 15 worked work VBN 42149 2273 16 by by IN 42149 2273 17 a a DT 42149 2273 18 30-h.p 30-h.p NNP 42149 2273 19 . . . 42149 2273 20 , , , 42149 2273 21 250-volt 250-volt CD 42149 2273 22 , , , 42149 2273 23 electric electric JJ 42149 2273 24 motor motor NN 42149 2273 25 . . . 42149 2274 1 There there EX 42149 2274 2 was be VBD 42149 2274 3 also also RB 42149 2274 4 a a DT 42149 2274 5 stiff stiff JJ 42149 2274 6 - - HYPH 42149 2274 7 leg leg NN 42149 2274 8 derrick derrick NN 42149 2274 9 with with IN 42149 2274 10 50-ft 50-ft NNP 42149 2274 11 . . . 42149 2274 12 boom boom NN 42149 2274 13 , , , 42149 2274 14 on on IN 42149 2274 15 a a DT 42149 2274 16 platform platform NN 42149 2274 17 near near IN 42149 2274 18 the the DT 42149 2274 19 shaft shaft NN 42149 2274 20 , , , 42149 2274 21 which which WDT 42149 2274 22 was be VBD 42149 2274 23 worked work VBN 42149 2274 24 by by IN 42149 2274 25 a a DT 42149 2274 26 40-h.p 40-h.p NNP 42149 2274 27 . . . 42149 2274 28 , , , 42149 2274 29 250-volt 250-volt CD 42149 2274 30 motor motor NN 42149 2274 31 . . . 42149 2275 1 At at IN 42149 2275 2 Weehawken Weehawken NNP 42149 2275 3 there there EX 42149 2275 4 were be VBD 42149 2275 5 two two CD 42149 2275 6 45-ft 45-ft NNS 42149 2275 7 . . . 42149 2275 8 boom boom NN 42149 2275 9 , , , 42149 2275 10 stiff stiff JJ 42149 2275 11 - - HYPH 42149 2275 12 leg leg NN 42149 2275 13 derricks derrick NNS 42149 2275 14 of of IN 42149 2275 15 2 2 CD 42149 2275 16 tons ton NNS 42149 2275 17 capacity capacity NN 42149 2275 18 , , , 42149 2275 19 one one CD 42149 2275 20 worked work VBD 42149 2275 21 by by IN 42149 2275 22 a a DT 42149 2275 23 42-h.p 42-h.p NNP 42149 2275 24 . . . 42149 2276 1 Lidgerwood lidgerwood NN 42149 2276 2 boiler boiler NN 42149 2276 3 and and CC 42149 2276 4 engine engine NN 42149 2276 5 , , , 42149 2276 6 and and CC 42149 2276 7 the the DT 42149 2276 8 other other JJ 42149 2276 9 by by IN 42149 2276 10 a a DT 42149 2276 11 25-h.p 25-h.p NNP 42149 2276 12 . . . 42149 2276 13 , , , 42149 2276 14 250-volt 250-volt CD 42149 2276 15 , , , 42149 2276 16 electric electric JJ 42149 2276 17 motor motor NN 42149 2276 18 . . . 42149 2277 1 These these DT 42149 2277 2 derricks derrick NNS 42149 2277 3 were be VBD 42149 2277 4 set set VBN 42149 2277 5 on on IN 42149 2277 6 elevated elevated JJ 42149 2277 7 trestles trestle NNS 42149 2277 8 near near IN 42149 2277 9 the the DT 42149 2277 10 Erie Erie NNP 42149 2277 11 Railroad Railroad NNP 42149 2277 12 sidings siding NNS 42149 2277 13 . . . 42149 2278 1 There there EX 42149 2278 2 was be VBD 42149 2278 3 a a DT 42149 2278 4 50-ft 50-ft NNP 42149 2278 5 . . . 42149 2278 6 stiff stiff JJ 42149 2278 7 - - HYPH 42149 2278 8 leg leg NN 42149 2278 9 derrick derrick NN 42149 2278 10 with with IN 42149 2278 11 a a DT 42149 2278 12 70-h.p 70-h.p CD 42149 2278 13 . . . 42149 2279 1 Lidgerwood lidgerwood NN 42149 2279 2 boiler boiler NN 42149 2279 3 and and CC 42149 2279 4 engine engine NN 42149 2279 5 near near IN 42149 2279 6 the the DT 42149 2279 7 cement cement NN 42149 2279 8 warehouse warehouse NN 42149 2279 9 on on IN 42149 2279 10 the the DT 42149 2279 11 West West NNP 42149 2279 12 Shore Shore NNP 42149 2279 13 Railroad Railroad NNP 42149 2279 14 . . . 42149 2280 1 The the DT 42149 2280 2 storage storage NN 42149 2280 3 area area NN 42149 2280 4 for for IN 42149 2280 5 iron iron NN 42149 2280 6 lining lining NN 42149 2280 7 was be VBD 42149 2280 8 1,800 1,800 CD 42149 2280 9 sq sq NN 42149 2280 10 . . . 42149 2281 1 ft ft NNP 42149 2281 2 . . NNP 42149 2281 3 at at IN 42149 2281 4 Manhattan Manhattan NNP 42149 2281 5 and and CC 42149 2281 6 63,000 63,000 CD 42149 2281 7 sq sq NN 42149 2281 8 . . . 42149 2282 1 ft ft NNP 42149 2282 2 . . NNP 42149 2282 3 at at IN 42149 2282 4 Weehawken Weehawken NNP 42149 2282 5 ; ; : 42149 2282 6 the the DT 42149 2282 7 maximum maximum JJ 42149 2282 8 quantity quantity NN 42149 2282 9 of of IN 42149 2282 10 lining lining NN 42149 2282 11 in in IN 42149 2282 12 storage storage NN 42149 2282 13 at at IN 42149 2282 14 any any DT 42149 2282 15 one one CD 42149 2282 16 time time NN 42149 2282 17 was be VBD 42149 2282 18 150 150 CD 42149 2282 19 rings ring NNS 42149 2282 20 at at IN 42149 2282 21 Manhattan Manhattan NNP 42149 2282 22 and and CC 42149 2282 23 1,200 1,200 CD 42149 2282 24 rings ring NNS 42149 2282 25 at at IN 42149 2282 26 Weehawken Weehawken NNP 42149 2282 27 . . . 42149 2283 1 The the DT 42149 2283 2 cement cement NN 42149 2283 3 , , , 42149 2283 4 which which WDT 42149 2283 5 was be VBD 42149 2283 6 issued issue VBN 42149 2283 7 and and CC 42149 2283 8 sold sell VBN 42149 2283 9 by by IN 42149 2283 10 the the DT 42149 2283 11 Company Company NNP 42149 2283 12 to to IN 42149 2283 13 the the DT 42149 2283 14 contractor contractor NN 42149 2283 15 , , , 42149 2283 16 was be VBD 42149 2283 17 kept keep VBN 42149 2283 18 in in IN 42149 2283 19 cement cement NN 42149 2283 20 warehouses warehouse NNS 42149 2283 21 ; ; : 42149 2283 22 that that IN 42149 2283 23 at at IN 42149 2283 24 the the DT 42149 2283 25 New New NNP 42149 2283 26 York York NNP 42149 2283 27 side side NN 42149 2283 28 was be VBD 42149 2283 29 at at IN 42149 2283 30 Eleventh Eleventh NNP 42149 2283 31 Avenue Avenue NNP 42149 2283 32 and and CC 42149 2283 33 38th 38th NNP 42149 2283 34 Street Street NNP 42149 2283 35 , , , 42149 2283 36 or or CC 42149 2283 37 some some DT 42149 2283 38 1,200 1,200 CD 42149 2283 39 ft ft NN 42149 2283 40 . . . 42149 2283 41 from from IN 42149 2283 42 the the DT 42149 2283 43 shaft shaft NN 42149 2283 44 , , , 42149 2283 45 to to TO 42149 2283 46 which which WDT 42149 2283 47 it -PRON- PRP 42149 2283 48 was be VBD 42149 2283 49 brought bring VBN 42149 2283 50 by by IN 42149 2283 51 team team NN 42149 2283 52 ; ; : 42149 2283 53 that that IN 42149 2283 54 at at IN 42149 2283 55 Weehawken Weehawken NNP 42149 2283 56 was be VBD 42149 2283 57 adjacent adjacent JJ 42149 2283 58 to to IN 42149 2283 59 the the DT 42149 2283 60 shaft shaft NN 42149 2283 61 , , , 42149 2283 62 with with IN 42149 2283 63 a a DT 42149 2283 64 2-ft 2-ft NN 42149 2283 65 . . . 42149 2283 66 gauge gauge NN 42149 2283 67 track track NN 42149 2283 68 throughout throughout IN 42149 2283 69 it -PRON- PRP 42149 2283 70 and and CC 42149 2283 71 directly directly RB 42149 2283 72 connected connect VBN 42149 2283 73 with with IN 42149 2283 74 the the DT 42149 2283 75 shaft shaft NN 42149 2283 76 elevator elevator NN 42149 2283 77 . . . 42149 2284 1 _ _ NNP 42149 2284 2 Surface Surface NNP 42149 2284 3 Transportation._--In transportation._--in NN 42149 2284 4 the the DT 42149 2284 5 early early JJ 42149 2284 6 days day NNS 42149 2284 7 the the DT 42149 2284 8 excavation excavation NN 42149 2284 9 was be VBD 42149 2284 10 handled handle VBN 42149 2284 11 in in IN 42149 2284 12 scale scale NN 42149 2284 13 - - HYPH 42149 2284 14 boxes box NNS 42149 2284 15 of of IN 42149 2284 16 1 1 CD 42149 2284 17 cu cu NNS 42149 2284 18 . . . 42149 2285 1 yd yd NNP 42149 2285 2 . . . 42149 2286 1 capacity capacity NN 42149 2286 2 which which WDT 42149 2286 3 were be VBD 42149 2286 4 hoisted hoist VBN 42149 2286 5 up up IN 42149 2286 6 the the DT 42149 2286 7 shafts shaft NNS 42149 2286 8 by by IN 42149 2286 9 a a DT 42149 2286 10 derrick derrick NN 42149 2286 11 , , , 42149 2286 12 but but CC 42149 2286 13 , , , 42149 2286 14 when when WRB 42149 2286 15 the the DT 42149 2286 16 iron iron NN 42149 2286 17 period period NN 42149 2286 18 began begin VBD 42149 2286 19 , , , 42149 2286 20 two two CD 42149 2286 21 - - HYPH 42149 2286 22 cage cage NN 42149 2286 23 elevators elevator NNS 42149 2286 24 were be VBD 42149 2286 25 put put VBN 42149 2286 26 in in RP 42149 2286 27 at at IN 42149 2286 28 each each DT 42149 2286 29 shaft shaft NN 42149 2286 30 . . . 42149 2287 1 They -PRON- PRP 42149 2287 2 were be VBD 42149 2287 3 worked work VBN 42149 2287 4 by by IN 42149 2287 5 a a DT 42149 2287 6 single single JJ 42149 2287 7 , , , 42149 2287 8 friction friction NN 42149 2287 9 - - HYPH 42149 2287 10 drum drum NN 42149 2287 11 , , , 42149 2287 12 Lidgerwood lidgerwood NN 42149 2287 13 , , , 42149 2287 14 steam steam NN 42149 2287 15 hoisting hoist VBG 42149 2287 16 engine engine NN 42149 2287 17 of of IN 42149 2287 18 40 40 CD 42149 2287 19 h.p h.p NNP 42149 2287 20 . . . 42149 2288 1 All all DT 42149 2288 2 materials material NNS 42149 2288 3 of of IN 42149 2288 4 construction construction NN 42149 2288 5 were be VBD 42149 2288 6 loaded load VBN 42149 2288 7 on on IN 42149 2288 8 cars car NNS 42149 2288 9 on on IN 42149 2288 10 the the DT 42149 2288 11 surface surface NN 42149 2288 12 at at IN 42149 2288 13 the the DT 42149 2288 14 point point NN 42149 2288 15 where where WRB 42149 2288 16 they -PRON- PRP 42149 2288 17 were be VBD 42149 2288 18 stored store VBN 42149 2288 19 , , , 42149 2288 20 and and CC 42149 2288 21 hauled haul VBD 42149 2288 22 on on IN 42149 2288 23 these these DT 42149 2288 24 to to IN 42149 2288 25 the the DT 42149 2288 26 elevators elevator NNS 42149 2288 27 , , , 42149 2288 28 sent send VBD 42149 2288 29 down down RP 42149 2288 30 the the DT 42149 2288 31 shaft shaft NN 42149 2288 32 , , , 42149 2288 33 and and CC 42149 2288 34 taken take VBN 42149 2288 35 along along RP 42149 2288 36 the the DT 42149 2288 37 tunnels tunnel NNS 42149 2288 38 to to IN 42149 2288 39 the the DT 42149 2288 40 desired desire VBN 42149 2288 41 point point NN 42149 2288 42 without without IN 42149 2288 43 unloading unload VBG 42149 2288 44 . . . 42149 2289 1 The the DT 42149 2289 2 narrow narrow JJ 42149 2289 3 - - HYPH 42149 2289 4 gauge gauge NN 42149 2289 5 railway railway NN 42149 2289 6 on on IN 42149 2289 7 the the DT 42149 2289 8 surface surface NN 42149 2289 9 and and CC 42149 2289 10 in in IN 42149 2289 11 the the DT 42149 2289 12 tunnel tunnel NN 42149 2289 13 was be VBD 42149 2289 14 of of IN 42149 2289 15 2-ft 2-ft CD 42149 2289 16 . . . 42149 2289 17 gauge gauge NN 42149 2289 18 with with IN 42149 2289 19 20-lb 20-lb CD 42149 2289 20 . . . 42149 2290 1 rails rail NNS 42149 2290 2 . . . 42149 2291 1 About about IN 42149 2291 2 70 70 CD 42149 2291 3 flat flat JJ 42149 2291 4 cars car NNS 42149 2291 5 and and CC 42149 2291 6 50 50 CD 42149 2291 7 mining mining NN 42149 2291 8 cars car NNS 42149 2291 9 were be VBD 42149 2291 10 used use VBN 42149 2291 11 at at IN 42149 2291 12 each each DT 42149 2291 13 shaft shaft NN 42149 2291 14 . . . 42149 2292 1 On on IN 42149 2292 2 the the DT 42149 2292 3 surface surface NN 42149 2292 4 at at IN 42149 2292 5 Manhattan Manhattan NNP 42149 2292 6 these these DT 42149 2292 7 were be VBD 42149 2292 8 moved move VBN 42149 2292 9 by by IN 42149 2292 10 hand hand NN 42149 2292 11 , , , 42149 2292 12 but but CC 42149 2292 13 at at IN 42149 2292 14 Weehawken Weehawken NNP 42149 2292 15 , , , 42149 2292 16 where where WRB 42149 2292 17 distances distance NNS 42149 2292 18 were be VBD 42149 2292 19 greater great JJR 42149 2292 20 , , , 42149 2292 21 two two CD 42149 2292 22 electric electric JJ 42149 2292 23 locomotives locomotive NNS 42149 2292 24 on on IN 42149 2292 25 the the DT 42149 2292 26 overhead overhead JJ 42149 2292 27 trolley trolley NN 42149 2292 28 system system NN 42149 2292 29 were be VBD 42149 2292 30 used use VBN 42149 2292 31 . . . 42149 2293 1 _ _ NNP 42149 2293 2 Tunnel Tunnel NNP 42149 2293 3 Transportation._--The transportation._--the CD 42149 2293 4 mining mining NN 42149 2293 5 cars car NNS 42149 2293 6 shown show VBN 42149 2293 7 in in IN 42149 2293 8 Fig Fig NNP 42149 2293 9 . . . 42149 2294 1 19 19 CD 42149 2294 2 were be VBD 42149 2294 3 of of IN 42149 2294 4 1¼ 1â¼ CD 42149 2294 5 cu cu NNS 42149 2294 6 . . . 42149 2295 1 yd yd NNP 42149 2295 2 . . . 42149 2296 1 capacity capacity NN 42149 2296 2 . . . 42149 2297 1 The the DT 42149 2297 2 short short JJ 42149 2297 3 wheel wheel NN 42149 2297 4 base base NN 42149 2297 5 and and CC 42149 2297 6 unbalanced unbalanced JJ 42149 2297 7 loading loading NN 42149 2297 8 caused cause VBD 42149 2297 9 a a DT 42149 2297 10 good good JJ 42149 2297 11 many many JJ 42149 2297 12 upsets upset NNS 42149 2297 13 , , , 42149 2297 14 but but CC 42149 2297 15 they -PRON- PRP 42149 2297 16 were be VBD 42149 2297 17 compact compact JJ 42149 2297 18 , , , 42149 2297 19 easily easily RB 42149 2297 20 handled handle VBN 42149 2297 21 , , , 42149 2297 22 and and CC 42149 2297 23 could could MD 42149 2297 24 be be VB 42149 2297 25 dumped dump VBN 42149 2297 26 from from IN 42149 2297 27 either either DT 42149 2297 28 side side NN 42149 2297 29 or or CC 42149 2297 30 end end NN 42149 2297 31 . . . 42149 2298 1 [ [ -LRB- 42149 2298 2 Illustration illustration NN 42149 2298 3 : : : 42149 2298 4 MUCK MUCK NNP 42149 2298 5 CAR CAR NNP 42149 2298 6 ( ( -LRB- 42149 2298 7 AS as IN 42149 2298 8 USED use VBN 42149 2298 9 IN in IN 42149 2298 10 RIVER river NN 42149 2298 11 TUNNELS tunnels NN 42149 2298 12 ) ) -RRB- 42149 2298 13 CAPACITY CAPACITY NNP 42149 2298 14 5,000 5,000 CD 42149 2298 15 LBS LBS NNP 42149 2298 16 . . . 42149 2299 1 OR or CC 42149 2299 2 1¼ 1â¼ CD 42149 2299 3 CU CU NNP 42149 2299 4 . . . 42149 2300 1 YD YD NNP 42149 2300 2 . . . 42149 2301 1 FIG FIG NNP 42149 2301 2 . . . 42149 2302 1 19 19 CD 42149 2302 2 . . . 42149 2302 3 ] ] -RRB- 42149 2303 1 The the DT 42149 2303 2 flat flat JJ 42149 2303 3 cars car NNS 42149 2303 4 shown show VBN 42149 2303 5 in in IN 42149 2303 6 Fig Fig NNP 42149 2303 7 . . . 42149 2304 1 20 20 CD 42149 2304 2 were be VBD 42149 2304 3 of of IN 42149 2304 4 3 3 CD 42149 2304 5 tons ton NNS 42149 2304 6 capacity capacity NN 42149 2304 7 , , , 42149 2304 8 and and CC 42149 2304 9 could could MD 42149 2304 10 hold hold VB 42149 2304 11 two two CD 42149 2304 12 tunnel tunnel NN 42149 2304 13 segments segment NNS 42149 2304 14 . . . 42149 2305 1 As as IN 42149 2305 2 the the DT 42149 2305 3 working work VBG 42149 2305 4 face face NN 42149 2305 5 was be VBD 42149 2305 6 down down RB 42149 2305 7 grade grade NN 42149 2305 8 from from IN 42149 2305 9 the the DT 42149 2305 10 shafts shaft NNS 42149 2305 11 , , , 42149 2305 12 the the DT 42149 2305 13 in in IN 42149 2305 14 - - HYPH 42149 2305 15 bound bind VBN 42149 2305 16 cars car NNS 42149 2305 17 were be VBD 42149 2305 18 run run VBN 42149 2305 19 by by IN 42149 2305 20 gravity gravity NN 42149 2305 21 . . . 42149 2306 1 For for IN 42149 2306 2 out out RB 42149 2306 3 - - HYPH 42149 2306 4 bound bind VBN 42149 2306 5 cars car NNS 42149 2306 6 a a DT 42149 2306 7 cable cable NN 42149 2306 8 haulage haulage NN 42149 2306 9 system system NN 42149 2306 10 was be VBD 42149 2306 11 used use VBN 42149 2306 12 , , , 42149 2306 13 consisting consist VBG 42149 2306 14 of of IN 42149 2306 15 double double JJ 42149 2306 16 - - HYPH 42149 2306 17 cylinder cylinder NN 42149 2306 18 , , , 42149 2306 19 Lidgerwood lidgerwood NN 42149 2306 20 , , , 42149 2306 21 single single JJ 42149 2306 22 friction friction NN 42149 2306 23 - - HYPH 42149 2306 24 drum drum NN 42149 2306 25 , , , 42149 2306 26 hoisting hoist VBG 42149 2306 27 engines engine NNS 42149 2306 28 ( ( -LRB- 42149 2306 29 No no UH 42149 2306 30 . . . 42149 2307 1 32 32 CD 42149 2307 2 ) ) -RRB- 42149 2307 3 of of IN 42149 2307 4 6 6 CD 42149 2307 5 h.p h.p NNP 42149 2307 6 . . NNP 42149 2307 7 , , , 42149 2307 8 with with IN 42149 2307 9 cylinders cylinder NNS 42149 2307 10 5 5 CD 42149 2307 11 in in IN 42149 2307 12 . . . 42149 2308 1 in in IN 42149 2308 2 diameter diameter NN 42149 2308 3 and and CC 42149 2308 4 6 6 CD 42149 2308 5 in in RB 42149 2308 6 . . . 42149 2309 1 stroke stroke NN 42149 2309 2 and and CC 42149 2309 3 drums drum VBZ 42149 2309 4 10 10 CD 42149 2309 5 in in RB 42149 2309 6 . . . 42149 2310 1 in in IN 42149 2310 2 diameter diameter NN 42149 2310 3 . . . 42149 2311 1 These these DT 42149 2311 2 were be VBD 42149 2311 3 handily handily RB 42149 2311 4 moved move VBN 42149 2311 5 from from IN 42149 2311 6 point point NN 42149 2311 7 to to IN 42149 2311 8 point point NN 42149 2311 9 , , , 42149 2311 10 but but CC 42149 2311 11 , , , 42149 2311 12 as as IN 42149 2311 13 there there EX 42149 2311 14 was be VBD 42149 2311 15 no no DT 42149 2311 16 tail tail NN 42149 2311 17 rope rope NN 42149 2311 18 , , , 42149 2311 19 several several JJ 42149 2311 20 men man NNS 42149 2311 21 had have VBD 42149 2311 22 to to TO 42149 2311 23 be be VB 42149 2311 24 used use VBN 42149 2311 25 to to TO 42149 2311 26 pull pull VB 42149 2311 27 the the DT 42149 2311 28 cable cable NN 42149 2311 29 back back RB 42149 2311 30 to to IN 42149 2311 31 the the DT 42149 2311 32 face face NN 42149 2311 33 . . . 42149 2312 1 After after IN 42149 2312 2 the the DT 42149 2312 3 second second JJ 42149 2312 4 air air NN 42149 2312 5 - - HYPH 42149 2312 6 lock lock NN 42149 2312 7 bulkhead bulkhead NN 42149 2312 8 walls wall NNS 42149 2312 9 had have VBD 42149 2312 10 been be VBN 42149 2312 11 built build VBN 42149 2312 12 , , , 42149 2312 13 a a DT 42149 2312 14 continuous continuous JJ 42149 2312 15 - - HYPH 42149 2312 16 cable cable NN 42149 2312 17 system system NN 42149 2312 18 , , , 42149 2312 19 worked work VBD 42149 2312 20 electrically electrically RB 42149 2312 21 , , , 42149 2312 22 was be VBD 42149 2312 23 put put VBN 42149 2312 24 in in IN 42149 2312 25 each each DT 42149 2312 26 tunnel tunnel NN 42149 2312 27 between between IN 42149 2312 28 the the DT 42149 2312 29 first first JJ 42149 2312 30 and and CC 42149 2312 31 second second JJ 42149 2312 32 air air NN 42149 2312 33 - - HYPH 42149 2312 34 locks lock NNS 42149 2312 35 . . . 42149 2313 1 The the DT 42149 2313 2 engine engine NN 42149 2313 3 consisted consist VBD 42149 2313 4 of of IN 42149 2313 5 an an DT 42149 2313 6 electric electric JJ 42149 2313 7 motor motor NN 42149 2313 8 driving drive VBG 42149 2313 9 a a DT 42149 2313 10 3-ft 3-ft NN 42149 2313 11 . . . 42149 2313 12 6-in 6-in CD 42149 2313 13 . . . 42149 2314 1 drum drum VB 42149 2314 2 hoist hoist NN 42149 2314 3 around around IN 42149 2314 4 which which WDT 42149 2314 5 a a DT 42149 2314 6 ¾-in ¾-in NNP 42149 2314 7 . . . 42149 2315 1 steel steel NN 42149 2315 2 wire wire NN 42149 2315 3 cable cable NN 42149 2315 4 passed pass VBD 42149 2315 5 three three CD 42149 2315 6 times time NNS 42149 2315 7 . . . 42149 2316 1 The the DT 42149 2316 2 cable cable NN 42149 2316 3 was be VBD 42149 2316 4 led lead VBN 42149 2316 5 around around IN 42149 2316 6 a a DT 42149 2316 7 sheave sheave NN 42149 2316 8 , , , 42149 2316 9 down down IN 42149 2316 10 the the DT 42149 2316 11 tunnel tunnel NN 42149 2316 12 on on IN 42149 2316 13 the the DT 42149 2316 14 right right JJ 42149 2316 15 side side NN 42149 2316 16 of of IN 42149 2316 17 the the DT 42149 2316 18 in in RB 42149 2316 19 - - HYPH 42149 2316 20 bound bind VBN 42149 2316 21 track track NN 42149 2316 22 , , , 42149 2316 23 and and CC 42149 2316 24 returned return VBD 42149 2316 25 on on IN 42149 2316 26 the the DT 42149 2316 27 left left JJ 42149 2316 28 side side NN 42149 2316 29 of of IN 42149 2316 30 the the DT 42149 2316 31 out out RB 42149 2316 32 - - HYPH 42149 2316 33 bound bind VBN 42149 2316 34 track track NN 42149 2316 35 . . . 42149 2317 1 It -PRON- PRP 42149 2317 2 was be VBD 42149 2317 3 then then RB 42149 2317 4 carried carry VBN 42149 2317 5 around around IN 42149 2317 6 a a DT 42149 2317 7 set set NN 42149 2317 8 of of IN 42149 2317 9 sheaves sheaf NNS 42149 2317 10 , , , 42149 2317 11 where where WRB 42149 2317 12 a a DT 42149 2317 13 tension tension NN 42149 2317 14 of of IN 42149 2317 15 1,000 1,000 CD 42149 2317 16 lb lb XX 42149 2317 17 . . . 42149 2318 1 was be VBD 42149 2318 2 supplied supply VBN 42149 2318 3 by by IN 42149 2318 4 a a DT 42149 2318 5 suspended suspend VBN 42149 2318 6 weight weight NN 42149 2318 7 which which WDT 42149 2318 8 acted act VBD 42149 2318 9 on on IN 42149 2318 10 a a DT 42149 2318 11 sheave sheave NN 42149 2318 12 with with IN 42149 2318 13 a a DT 42149 2318 14 sliding sliding JJ 42149 2318 15 axle axle NN 42149 2318 16 on on IN 42149 2318 17 the the DT 42149 2318 18 tension tension NN 42149 2318 19 carriage carriage NN 42149 2318 20 . . . 42149 2319 1 The the DT 42149 2319 2 cable cable NN 42149 2319 3 was be VBD 42149 2319 4 supported support VBN 42149 2319 5 throughout throughout IN 42149 2319 6 its -PRON- PRP$ 42149 2319 7 length length NN 42149 2319 8 on on IN 42149 2319 9 8-in 8-in NN 42149 2319 10 . . . 42149 2320 1 pulleys pulley NNS 42149 2320 2 set set VBN 42149 2320 3 in in IN 42149 2320 4 the the DT 42149 2320 5 floor floor NN 42149 2320 6 at at IN 42149 2320 7 50-ft 50-ft NNP 42149 2320 8 . . . 42149 2320 9 intervals interval NNS 42149 2320 10 . . . 42149 2321 1 All all PDT 42149 2321 2 the the DT 42149 2321 3 guide guide NN 42149 2321 4 sheaves sheaf NNS 42149 2321 5 were be VBD 42149 2321 6 36 36 CD 42149 2321 7 in in IN 42149 2321 8 . . . 42149 2322 1 in in IN 42149 2322 2 diameter diameter NN 42149 2322 3 . . . 42149 2323 1 [ [ -LRB- 42149 2323 2 Illustration illustration NN 42149 2323 3 : : : 42149 2323 4 FLAT flat JJ 42149 2323 5 CAR car NN 42149 2323 6 FOR for IN 42149 2323 7 TUNNEL TUNNEL NNP 42149 2323 8 SEGMENTS SEGMENTS NNP 42149 2323 9 CAPACITY CAPACITY NNP 42149 2323 10 6,000 6,000 CD 42149 2323 11 LBS LBS NNP 42149 2323 12 . . . 42149 2324 1 FIG FIG NNP 42149 2324 2 . . . 42149 2325 1 20 20 CD 42149 2325 2 . . . 42149 2325 3 ] ] -RRB- 42149 2326 1 Each each DT 42149 2326 2 car car NN 42149 2326 3 was be VBD 42149 2326 4 attached attach VBN 42149 2326 5 to to IN 42149 2326 6 the the DT 42149 2326 7 cable cable NN 42149 2326 8 by by IN 42149 2326 9 a a DT 42149 2326 10 grip grip NN 42149 2326 11 at at IN 42149 2326 12 its -PRON- PRP$ 42149 2326 13 side side NN 42149 2326 14 . . . 42149 2327 1 This this DT 42149 2327 2 was be VBD 42149 2327 3 fastened fasten VBN 42149 2327 4 and and CC 42149 2327 5 unfastened unfasten VBN 42149 2327 6 by by IN 42149 2327 7 hand hand NN 42149 2327 8 , , , 42149 2327 9 but but CC 42149 2327 10 was be VBD 42149 2327 11 automatically automatically RB 42149 2327 12 released release VBN 42149 2327 13 just just RB 42149 2327 14 before before IN 42149 2327 15 reaching reach VBG 42149 2327 16 the the DT 42149 2327 17 turn turn NN 42149 2327 18 in in IN 42149 2327 19 the the DT 42149 2327 20 cable cable NN 42149 2327 21 near near IN 42149 2327 22 each each DT 42149 2327 23 lock lock NN 42149 2327 24 . . . 42149 2328 1 This this DT 42149 2328 2 system system NN 42149 2328 3 could could MD 42149 2328 4 haul haul VB 42149 2328 5 without without IN 42149 2328 6 difficulty difficulty NN 42149 2328 7 an an DT 42149 2328 8 unbalanced unbalanced JJ 42149 2328 9 load load NN 42149 2328 10 of of IN 42149 2328 11 10 10 CD 42149 2328 12 muck muck JJ 42149 2328 13 cars car NNS 42149 2328 14 , , , 42149 2328 15 spaced spaced NNP 42149 2328 16 100 100 CD 42149 2328 17 ft ft NN 42149 2328 18 . . NNP 42149 2328 19 apart apart RB 42149 2328 20 , , , 42149 2328 21 up up RB 42149 2328 22 a a DT 42149 2328 23 2 2 CD 42149 2328 24 % % NN 42149 2328 25 grade grade NN 42149 2328 26 . . . 42149 2329 1 The the DT 42149 2329 2 cable cable NN 42149 2329 3 operated operate VBD 42149 2329 4 over over IN 42149 2329 5 about about RB 42149 2329 6 1,000 1,000 CD 42149 2329 7 ft ft NN 42149 2329 8 . . NNP 42149 2329 9 of of IN 42149 2329 10 tunnel tunnel NNP 42149 2329 11 , , , 42149 2329 12 the the DT 42149 2329 13 motor motor NN 42149 2329 14 being be VBG 42149 2329 15 placed place VBN 42149 2329 16 at at IN 42149 2329 17 the the DT 42149 2329 18 top top NN 42149 2329 19 of of IN 42149 2329 20 the the DT 42149 2329 21 grade grade NN 42149 2329 22 . . . 42149 2330 1 The the DT 42149 2330 2 driving drive VBG 42149 2330 3 motor motor NN 42149 2330 4 was be VBD 42149 2330 5 of of IN 42149 2330 6 the the DT 42149 2330 7 semi semi JJ 42149 2330 8 - - JJ 42149 2330 9 armored armored JJ 42149 2330 10 , , , 42149 2330 11 8-pole 8-pole CD 42149 2330 12 , , , 42149 2330 13 series series NN 42149 2330 14 - - HYPH 42149 2330 15 wound wind VBN 42149 2330 16 type type NN 42149 2330 17 , , , 42149 2330 18 rated rate VBN 42149 2330 19 at at IN 42149 2330 20 25 25 CD 42149 2330 21 h.p h.p NNP 42149 2330 22 . . NNP 42149 2330 23 , , , 42149 2330 24 635 635 CD 42149 2330 25 rev rev NNP 42149 2330 26 . . . 42149 2331 1 per per IN 42149 2331 2 min min NNP 42149 2331 3 . . NNP 42149 2331 4 , , , 42149 2331 5 and and CC 42149 2331 6 using use VBG 42149 2331 7 direct direct JJ 42149 2331 8 current current NN 42149 2331 9 at at IN 42149 2331 10 220 220 CD 42149 2331 11 volts volt NNS 42149 2331 12 . . . 42149 2332 1 The the DT 42149 2332 2 speed speed NN 42149 2332 3 of of IN 42149 2332 4 handling handle VBG 42149 2332 5 the the DT 42149 2332 6 cars car NNS 42149 2332 7 was be VBD 42149 2332 8 limited limit VBN 42149 2332 9 by by IN 42149 2332 10 their -PRON- PRP$ 42149 2332 11 having have VBG 42149 2332 12 to to TO 42149 2332 13 pass pass VB 42149 2332 14 through through IN 42149 2332 15 the the DT 42149 2332 16 air air NN 42149 2332 17 - - HYPH 42149 2332 18 locks lock NNS 42149 2332 19 on on IN 42149 2332 20 a a DT 42149 2332 21 single single JJ 42149 2332 22 track track NN 42149 2332 23 . . . 42149 2333 1 As as RB 42149 2333 2 many many JJ 42149 2333 3 as as IN 42149 2333 4 106 106 CD 42149 2333 5 cars car NNS 42149 2333 6 have have VBP 42149 2333 7 been be VBN 42149 2333 8 hauled haul VBN 42149 2333 9 each each DT 42149 2333 10 way way NN 42149 2333 11 in in IN 42149 2333 12 one one CD 42149 2333 13 8-hour 8-hour CD 42149 2333 14 shift shift NN 42149 2333 15 . . . 42149 2334 1 _ _ NNP 42149 2334 2 Disposal._--At disposal._--at NN 42149 2334 3 Manhattan Manhattan NNP 42149 2334 4 the the DT 42149 2334 5 tunnel tunnel NN 42149 2334 6 muck muck NN 42149 2334 7 was be VBD 42149 2334 8 carried carry VBN 42149 2334 9 from from IN 42149 2334 10 the the DT 42149 2334 11 elevator elevator NN 42149 2334 12 over over IN 42149 2334 13 the the DT 42149 2334 14 upper upper JJ 42149 2334 15 level level NN 42149 2334 16 of of IN 42149 2334 17 the the DT 42149 2334 18 yard yard NN 42149 2334 19 trestle trestle NN 42149 2334 20 and and CC 42149 2334 21 dumped dump VBN 42149 2334 22 into into IN 42149 2334 23 bins bin NNS 42149 2334 24 on on IN 42149 2334 25 the the DT 42149 2334 26 33d 33d NNP 42149 2334 27 Street Street NNP 42149 2334 28 side side NN 42149 2334 29 , , , 42149 2334 30 whence whence NN 42149 2334 31 it -PRON- PRP 42149 2334 32 was be VBD 42149 2334 33 teamed teamed JJ 42149 2334 34 to to IN 42149 2334 35 the the DT 42149 2334 36 public public JJ 42149 2334 37 dump dump NN 42149 2334 38 at at IN 42149 2334 39 30th 30th NNP 42149 2334 40 Street Street NNP 42149 2334 41 and and CC 42149 2334 42 North North NNP 42149 2334 43 River River NNP 42149 2334 44 . . . 42149 2335 1 At at IN 42149 2335 2 Weehawken Weehawken NNP 42149 2335 3 the the DT 42149 2335 4 rock rock NN 42149 2335 5 excavation excavation NN 42149 2335 6 was be VBD 42149 2335 7 removed remove VBN 42149 2335 8 by by IN 42149 2335 9 the the DT 42149 2335 10 Erie Erie NNP 42149 2335 11 Railroad Railroad NNP 42149 2335 12 on on IN 42149 2335 13 flat flat JJ 42149 2335 14 cars car NNS 42149 2335 15 on on IN 42149 2335 16 which which WDT 42149 2335 17 it -PRON- PRP 42149 2335 18 was be VBD 42149 2335 19 dumped dump VBN 42149 2335 20 by by IN 42149 2335 21 the the DT 42149 2335 22 tunnel tunnel NN 42149 2335 23 contractor contractor NN 42149 2335 24 , , , 42149 2335 25 but but CC 42149 2335 26 all all PDT 42149 2335 27 the the DT 42149 2335 28 silt silt NN 42149 2335 29 muck muck NN 42149 2335 30 was be VBD 42149 2335 31 teamed team VBN 42149 2335 32 away away RB 42149 2335 33 to to IN 42149 2335 34 some some DT 42149 2335 35 marshy marshy JJ 42149 2335 36 ground ground NN 42149 2335 37 where where WRB 42149 2335 38 dumping dumping JJ 42149 2335 39 privileges privilege NNS 42149 2335 40 were be VBD 42149 2335 41 obtained obtain VBN 42149 2335 42 . . . 42149 2336 1 The the DT 42149 2336 2 typical typical JJ 42149 2336 3 forces force NNS 42149 2336 4 employed employ VBN 42149 2336 5 on on IN 42149 2336 6 transportation transportation NN 42149 2336 7 were be VBD 42149 2336 8 as as IN 42149 2336 9 follows follow VBZ 42149 2336 10 : : : 42149 2336 11 _ _ NNP 42149 2336 12 Receipt Receipt NNP 42149 2336 13 and and CC 42149 2336 14 Unloading Unloading NNP 42149 2336 15 of of IN 42149 2336 16 Material material NN 42149 2336 17 : : : 42149 2336 18 Surface Surface NNP 42149 2336 19 Transportation Transportation NNP 42149 2336 20 and and CC 42149 2336 21 Disposal Disposal NNP 42149 2336 22 . . . 42149 2336 23 _ _ NNP 42149 2336 24 At at IN 42149 2336 25 Manhattan Manhattan NNP 42149 2336 26 Shaft Shaft NNP 42149 2336 27 , , , 42149 2336 28 on on IN 42149 2336 29 10-hour 10-hour CD 42149 2336 30 shifts shift NNS 42149 2336 31 : : : 42149 2336 32 2 2 CD 42149 2336 33 Engineers engineer NNS 42149 2336 34 on on IN 42149 2336 35 derricks derrick NNS 42149 2336 36 . . . 42149 2337 1 @ @ NFP 42149 2337 2 $ $ $ 42149 2337 3 3.00 3.00 CD 42149 2337 4 per per IN 42149 2337 5 day day NN 42149 2337 6 . . . 42149 2338 1 2 2 CD 42149 2338 2 Foremen foreman NNS 42149 2338 3 . . . 42149 2338 4 " " '' 42149 2339 1 3.25 3.25 CD 42149 2339 2 " " `` 42149 2339 3 " " `` 42149 2339 4 15 15 CD 42149 2339 5 Laborers laborer NNS 42149 2339 6 loading loading NN 42149 2339 7 and and CC 42149 2339 8 unloading unloading NN 42149 2339 9 iron iron NN 42149 2339 10 . . . 42149 2339 11 " " '' 42149 2340 1 1.75 1.75 CD 42149 2340 2 " " `` 42149 2340 3 " " `` 42149 2340 4 7 7 CD 42149 2340 5 Laborers Laborers NNPS 42149 2340 6 on on IN 42149 2340 7 disposal disposal NN 42149 2340 8 . . . 42149 2340 9 " " '' 42149 2341 1 1.75 1.75 CD 42149 2341 2 " " `` 42149 2341 3 " " `` 42149 2341 4 6 6 CD 42149 2341 5 Teams team NNS 42149 2341 6 . . . 42149 2341 7 " " '' 42149 2342 1 7.50 7.50 CD 42149 2342 2 " " `` 42149 2342 3 " " `` 42149 2342 4 At at IN 42149 2342 5 Weehawken Weehawken NNP 42149 2342 6 Shaft Shaft NNP 42149 2342 7 , , , 42149 2342 8 on on IN 42149 2342 9 10-hour 10-hour CD 42149 2342 10 shifts shift NNS 42149 2342 11 : : : 42149 2342 12 3 3 CD 42149 2342 13 Engineers engineer NNS 42149 2342 14 on on IN 42149 2342 15 derricks derrick NNS 42149 2342 16 and and CC 42149 2342 17 locomotives locomotive NNS 42149 2342 18 . . . 42149 2343 1 @ @ NFP 42149 2343 2 $ $ $ 42149 2343 3 3.00 3.00 CD 42149 2343 4 per per IN 42149 2343 5 day day NN 42149 2343 6 . . . 42149 2344 1 16 16 CD 42149 2344 2 Laborers laborer NNS 42149 2344 3 loading load VBG 42149 2344 4 and and CC 42149 2344 5 unloading unloading NN 42149 2344 6 iron iron NN 42149 2344 7 . . . 42149 2344 8 " " '' 42149 2345 1 1.75 1.75 CD 42149 2345 2 " " `` 42149 2345 3 " " `` 42149 2345 4 3 3 CD 42149 2345 5 Foremen Foremen NNP 42149 2345 6 . . . 42149 2345 7 " " '' 42149 2346 1 3.50 3.50 CD 42149 2346 2 " " `` 42149 2346 3 " " `` 42149 2346 4 11 11 CD 42149 2346 5 Laborers laborer NNS 42149 2346 6 on on IN 42149 2346 7 disposal disposal NN 42149 2346 8 . . . 42149 2346 9 " " '' 42149 2347 1 1.75 1.75 CD 42149 2347 2 " " `` 42149 2347 3 " " `` 42149 2347 4 6 6 CD 42149 2347 5 Teams Teams NNPS 42149 2347 6 on on IN 42149 2347 7 disposal disposal NN 42149 2347 8 . . . 42149 2347 9 " " '' 42149 2348 1 6.50 6.50 CD 42149 2348 2 " " `` 42149 2348 3 " " `` 42149 2348 4 Tunnel Tunnel NNP 42149 2348 5 Transportation transportation NN 42149 2348 6 ( ( -LRB- 42149 2348 7 Including include VBG 42149 2348 8 Shaft Shaft NNP 42149 2348 9 Elevator Elevator NNP 42149 2348 10 ) ) -RRB- 42149 2348 11 : : : 42149 2348 12 Shaft shaft NN 42149 2348 13 elevators elevator NNS 42149 2348 14 and and CC 42149 2348 15 to to TO 42149 2348 16 and and CC 42149 2348 17 from from IN 42149 2348 18 the the DT 42149 2348 19 first first JJ 42149 2348 20 air air NN 42149 2348 21 - - HYPH 42149 2348 22 lock lock NN 42149 2348 23 on on IN 42149 2348 24 10-hour 10-hour CD 42149 2348 25 shift shift NN 42149 2348 26 : : : 42149 2348 27 2 2 CD 42149 2348 28 Engineers engineer NNS 42149 2348 29 . . . 42149 2349 1 @ @ NFP 42149 2349 2 $ $ $ 42149 2349 3 3.00 3.00 CD 42149 2349 4 per per IN 42149 2349 5 day day NN 42149 2349 6 . . . 42149 2350 1 2 2 CD 42149 2350 2 Signalmen Signalmen NNP 42149 2350 3 . . . 42149 2350 4 " " '' 42149 2351 1 2.00 2.00 CD 42149 2351 2 " " `` 42149 2351 3 " " `` 42149 2351 4 1 1 CD 42149 2351 5 Foreman Foreman NNP 42149 2351 6 . . . 42149 2351 7 " " '' 42149 2352 1 3.00 3.00 CD 42149 2352 2 " " `` 42149 2352 3 " " `` 42149 2352 4 12 12 CD 42149 2352 5 Laborers laborer NNS 42149 2352 6 . . . 42149 2352 7 " " '' 42149 2353 1 1.75 1.75 CD 42149 2353 2 " " '' 42149 2353 3 " " `` 42149 2353 4 Between between IN 42149 2353 5 first first JJ 42149 2353 6 lock lock NN 42149 2353 7 and and CC 42149 2353 8 working working NN 42149 2353 9 face face NN 42149 2353 10 , , , 42149 2353 11 on on IN 42149 2353 12 8-hour 8-hour CD 42149 2353 13 shifts shift NNS 42149 2353 14 , , , 42149 2353 15 the the DT 42149 2353 16 force force NN 42149 2353 17 varied vary VBD 42149 2353 18 : : : 42149 2353 19 From from IN 42149 2353 20 1 1 CD 42149 2353 21 to to IN 42149 2353 22 3 3 CD 42149 2353 23 ( ( -LRB- 42149 2353 24 average average JJ 42149 2353 25 2 2 CD 42149 2353 26 ) ) -RRB- 42149 2353 27 Hoist hoist NN 42149 2353 28 engineers engineer NNS 42149 2353 29 @ @ NFP 42149 2353 30 $ $ $ 42149 2353 31 3.00 3.00 CD 42149 2353 32 per per IN 42149 2353 33 day day NN 42149 2353 34 . . . 42149 2354 1 From from IN 42149 2354 2 0 0 CD 42149 2354 3 to to IN 42149 2354 4 2 2 CD 42149 2354 5 ( ( -LRB- 42149 2354 6 average average JJ 42149 2354 7 1 1 CD 42149 2354 8 ) ) -RRB- 42149 2354 9 Lockman Lockman NNP 42149 2354 10 " " `` 42149 2354 11 2.75 2.75 CD 42149 2354 12 " " '' 42149 2354 13 " " '' 42149 2354 14 From from IN 42149 2354 15 1 1 CD 42149 2354 16 to to IN 42149 2354 17 2 2 CD 42149 2354 18 ( ( -LRB- 42149 2354 19 average average JJ 42149 2354 20 2 2 CD 42149 2354 21 ) ) -RRB- 42149 2354 22 Trackmen Trackmen NNP 42149 2354 23 " " `` 42149 2354 24 3.00 3.00 CD 42149 2354 25 " " '' 42149 2354 26 " " '' 42149 2354 27 From from IN 42149 2354 28 2 2 CD 42149 2354 29 to to IN 42149 2354 30 7 7 CD 42149 2354 31 ( ( -LRB- 42149 2354 32 average average JJ 42149 2354 33 4 4 CD 42149 2354 34 ) ) -RRB- 42149 2354 35 Cablemen Cablemen NNP 42149 2354 36 ( ( -LRB- 42149 2354 37 pulling pull VBG 42149 2354 38 back back RB 42149 2354 39 cable cable NN 42149 2354 40 ) ) -RRB- 42149 2354 41 " " `` 42149 2354 42 3.00 3.00 CD 42149 2354 43 " " '' 42149 2354 44 " " `` 42149 2354 45 _ _ NNP 42149 2354 46 Pumping._--The pumping._--the CD 42149 2354 47 water water NN 42149 2354 48 was be VBD 42149 2354 49 taken take VBN 42149 2354 50 out out IN 42149 2354 51 of of IN 42149 2354 52 the the DT 42149 2354 53 invert invert NN 42149 2354 54 by by IN 42149 2354 55 a a DT 42149 2354 56 4-in 4-in NN 42149 2354 57 . . . 42149 2355 1 blow blow NN 42149 2355 2 - - HYPH 42149 2355 3 pipe pipe NN 42149 2355 4 which which WDT 42149 2355 5 was be VBD 42149 2355 6 always always RB 42149 2355 7 kept keep VBN 42149 2355 8 up up IN 42149 2355 9 to to IN 42149 2355 10 a a DT 42149 2355 11 point point NN 42149 2355 12 near near IN 42149 2355 13 the the DT 42149 2355 14 shield shield NN 42149 2355 15 and and CC 42149 2355 16 discharged discharge VBD 42149 2355 17 into into IN 42149 2355 18 the the DT 42149 2355 19 sump sump NN 42149 2355 20 near near IN 42149 2355 21 the the DT 42149 2355 22 shaft shaft NN 42149 2355 23 . . . 42149 2356 1 When when WRB 42149 2356 2 the the DT 42149 2356 3 air air NN 42149 2356 4 pressure pressure NN 42149 2356 5 was be VBD 42149 2356 6 removed remove VBN 42149 2356 7 and and CC 42149 2356 8 the the DT 42149 2356 9 blow blow NN 42149 2356 10 - - HYPH 42149 2356 11 pipe pipe NN 42149 2356 12 device device NN 42149 2356 13 , , , 42149 2356 14 consequently consequently RB 42149 2356 15 , , , 42149 2356 16 was be VBD 42149 2356 17 unavailable unavailable JJ 42149 2356 18 , , , 42149 2356 19 small small JJ 42149 2356 20 Cameron Cameron NNP 42149 2356 21 pumps pump NNS 42149 2356 22 , , , 42149 2356 23 driven drive VBN 42149 2356 24 by by IN 42149 2356 25 compressed compress VBN 42149 2356 26 air air NN 42149 2356 27 , , , 42149 2356 28 and and CC 42149 2356 29 having have VBG 42149 2356 30 a a DT 42149 2356 31 capacity capacity NN 42149 2356 32 of of IN 42149 2356 33 about about RB 42149 2356 34 140 140 CD 42149 2356 35 gal gal NN 42149 2356 36 . . . 42149 2357 1 per per IN 42149 2357 2 hour hour NN 42149 2357 3 , , , 42149 2357 4 were be VBD 42149 2357 5 used use VBN 42149 2357 6 , , , 42149 2357 7 one one PRP 42149 2357 8 being be VBG 42149 2357 9 set set VBN 42149 2357 10 up up RP 42149 2357 11 wherever wherever WRB 42149 2357 12 it -PRON- PRP 42149 2357 13 was be VBD 42149 2357 14 necessary necessary JJ 42149 2357 15 to to TO 42149 2357 16 keep keep VB 42149 2357 17 the the DT 42149 2357 18 invert invert NNP 42149 2357 19 dry dry JJ 42149 2357 20 ; ; : 42149 2357 21 for for IN 42149 2357 22 example example NN 42149 2357 23 , , , 42149 2357 24 at at IN 42149 2357 25 points point NNS 42149 2357 26 where where WRB 42149 2357 27 caulking caulking NN 42149 2357 28 was be VBD 42149 2357 29 in in IN 42149 2357 30 progress progress NN 42149 2357 31 . . . 42149 2358 1 _ _ NNP 42149 2358 2 Lighting._--The Lighting._--The NNP 42149 2358 3 tunnels tunnel NNS 42149 2358 4 were be VBD 42149 2358 5 lighted light VBN 42149 2358 6 by by IN 42149 2358 7 electricity electricity NN 42149 2358 8 , , , 42149 2358 9 the the DT 42149 2358 10 current current JJ 42149 2358 11 being be VBG 42149 2358 12 supplied supply VBN 42149 2358 13 , , , 42149 2358 14 at at IN 42149 2358 15 a a DT 42149 2358 16 pressure pressure NN 42149 2358 17 of of IN 42149 2358 18 250 250 CD 42149 2358 19 volts volt NNS 42149 2358 20 , , , 42149 2358 21 from from IN 42149 2358 22 the the DT 42149 2358 23 dynamos dynamo NNS 42149 2358 24 in in IN 42149 2358 25 the the DT 42149 2358 26 contractor contractor NN 42149 2358 27 's 's POS 42149 2358 28 power power NN 42149 2358 29 - - HYPH 42149 2358 30 house house NN 42149 2358 31 . . . 42149 2359 1 Two two CD 42149 2359 2 0000 0000 CD 42149 2359 3 wire wire NN 42149 2359 4 cables cable NNS 42149 2359 5 were be VBD 42149 2359 6 used use VBN 42149 2359 7 as as RB 42149 2359 8 far far RB 42149 2359 9 as as IN 42149 2359 10 the the DT 42149 2359 11 second second JJ 42149 2359 12 air air NN 42149 2359 13 - - HYPH 42149 2359 14 locks lock NNS 42149 2359 15 , , , 42149 2359 16 about about RB 42149 2359 17 1,650 1,650 CD 42149 2359 18 ft ft NN 42149 2359 19 . . . 42149 2359 20 from from IN 42149 2359 21 the the DT 42149 2359 22 power power NN 42149 2359 23 - - HYPH 42149 2359 24 house house NN 42149 2359 25 , , , 42149 2359 26 on on IN 42149 2359 27 each each DT 42149 2359 28 side side NN 42149 2359 29 ; ; : 42149 2359 30 and and CC 42149 2359 31 beyond beyond IN 42149 2359 32 that that DT 42149 2359 33 point point NN 42149 2359 34 , , , 42149 2359 35 to to IN 42149 2359 36 the the DT 42149 2359 37 junction junction NN 42149 2359 38 of of IN 42149 2359 39 the the DT 42149 2359 40 shields shield NNS 42149 2359 41 ( ( -LRB- 42149 2359 42 about about RB 42149 2359 43 1,750 1,750 CD 42149 2359 44 ft ft NN 42149 2359 45 . . NNP 42149 2359 46 ) ) -RRB- 42149 2359 47 , , , 42149 2359 48 00 00 NFP 42149 2359 49 and and CC 42149 2359 50 0 0 CD 42149 2359 51 wires wire NNS 42149 2359 52 were be VBD 42149 2359 53 used use VBN 42149 2359 54 . . . 42149 2360 1 These these DT 42149 2360 2 cables cable NNS 42149 2360 3 also also RB 42149 2360 4 carried carry VBD 42149 2360 5 the the DT 42149 2360 6 current current NN 42149 2360 7 for for IN 42149 2360 8 the the DT 42149 2360 9 cable cable NN 42149 2360 10 haulage haulage NN 42149 2360 11 system system NN 42149 2360 12 . . . 42149 2361 1 Two two CD 42149 2361 2 rows row NNS 42149 2361 3 of of IN 42149 2361 4 16-c.p 16-c.p CD 42149 2361 5 . . . 42149 2362 1 lamps lamps NNP 42149 2362 2 , , , 42149 2362 3 provided provide VBN 42149 2362 4 with with IN 42149 2362 5 reflectors reflector NNS 42149 2362 6 , , , 42149 2362 7 were be VBD 42149 2362 8 used use VBN 42149 2362 9 in in IN 42149 2362 10 each each DT 42149 2362 11 tunnel tunnel NN 42149 2362 12 ; ; : 42149 2362 13 one one CD 42149 2362 14 row row NN 42149 2362 15 was be VBD 42149 2362 16 along along IN 42149 2362 17 the the DT 42149 2362 18 side side NN 42149 2362 19 just just RB 42149 2362 20 above above IN 42149 2362 21 the the DT 42149 2362 22 axis axis NN 42149 2362 23 , , , 42149 2362 24 with with IN 42149 2362 25 the the DT 42149 2362 26 lights light NNS 42149 2362 27 at at IN 42149 2362 28 about about IN 42149 2362 29 30-ft 30-ft NNP 42149 2362 30 . . . 42149 2362 31 intervals interval NNS 42149 2362 32 ; ; : 42149 2362 33 the the DT 42149 2362 34 other other JJ 42149 2362 35 along along IN 42149 2362 36 the the DT 42149 2362 37 crown crown NN 42149 2362 38 , , , 42149 2362 39 with with IN 42149 2362 40 the the DT 42149 2362 41 lamps lamp NNS 42149 2362 42 halfway halfway RB 42149 2362 43 between between IN 42149 2362 44 the the DT 42149 2362 45 side side NN 42149 2362 46 lamps lamp NNS 42149 2362 47 , , , 42149 2362 48 also also RB 42149 2362 49 at at IN 42149 2362 50 30-ft 30-ft NNP 42149 2362 51 . . . 42149 2362 52 intervals interval NNS 42149 2362 53 . . . 42149 2363 1 At at IN 42149 2363 2 points point NNS 42149 2363 3 where where WRB 42149 2363 4 work work NN 42149 2363 5 was be VBD 42149 2363 6 in in IN 42149 2363 7 progress progress NN 42149 2363 8 three three CD 42149 2363 9 groups group NNS 42149 2363 10 of of IN 42149 2363 11 5 5 CD 42149 2363 12 lights light NNS 42149 2363 13 each each DT 42149 2363 14 were be VBD 42149 2363 15 used use VBN 42149 2363 16 . . . 42149 2364 1 The the DT 42149 2364 2 tunnels tunnel NNS 42149 2364 3 as as IN 42149 2364 4 a a DT 42149 2364 5 whole whole NN 42149 2364 6 were be VBD 42149 2364 7 well well RB 42149 2364 8 lighted light VBN 42149 2364 9 , , , 42149 2364 10 and and CC 42149 2364 11 in in IN 42149 2364 12 consequence consequence NN 42149 2364 13 work work NN 42149 2364 14 of of IN 42149 2364 15 all all DT 42149 2364 16 kinds kind NNS 42149 2364 17 was be VBD 42149 2364 18 much much RB 42149 2364 19 helped help VBN 42149 2364 20 . . . 42149 2365 1 _ _ NNP 42149 2365 2 Period Period NNP 42149 2365 3 No no UH 42149 2365 4 . . . 42149 2366 1 2._--_Caulking 2._--_Caulking NNP 42149 2366 2 and and CC 42149 2366 3 Grummeting._--_November grummeting._--_november CD 42149 2366 4 , , , 42149 2366 5 1906 1906 CD 42149 2366 6 , , , 42149 2366 7 to to IN 42149 2366 8 June June NNP 42149 2366 9 , , , 42149 2366 10 1907._--After 1907._--after CD 42149 2366 11 the the DT 42149 2366 12 metal metal NN 42149 2366 13 lining lining NN 42149 2366 14 had have VBD 42149 2366 15 been be VBN 42149 2366 16 built build VBN 42149 2366 17 completely completely RB 42149 2366 18 across across IN 42149 2366 19 the the DT 42149 2366 20 river river NN 42149 2366 21 in in IN 42149 2366 22 both both DT 42149 2366 23 tunnels tunnel NNS 42149 2366 24 , , , 42149 2366 25 the the DT 42149 2366 26 work work NN 42149 2366 27 of of IN 42149 2366 28 making make VBG 42149 2366 29 it -PRON- PRP 42149 2366 30 water water NN 42149 2366 31 - - HYPH 42149 2366 32 tight tight JJ 42149 2366 33 was be VBD 42149 2366 34 taken take VBN 42149 2366 35 up up RP 42149 2366 36 . . . 42149 2367 1 This this DT 42149 2367 2 consisted consist VBD 42149 2367 3 in in IN 42149 2367 4 caulking caulk VBG 42149 2367 5 into into IN 42149 2367 6 the the DT 42149 2367 7 joints joint NNS 42149 2367 8 between between IN 42149 2367 9 the the DT 42149 2367 10 plates plate NNS 42149 2367 11 a a DT 42149 2367 12 mixture mixture NN 42149 2367 13 of of IN 42149 2367 14 sal sal NN 42149 2367 15 - - HYPH 42149 2367 16 ammoniac ammoniac NN 42149 2367 17 and and CC 42149 2367 18 iron iron NN 42149 2367 19 borings boring NNS 42149 2367 20 which which WDT 42149 2367 21 set set VBD 42149 2367 22 up up RP 42149 2367 23 into into IN 42149 2367 24 a a DT 42149 2367 25 hard hard JJ 42149 2367 26 rusty rusty JJ 42149 2367 27 mass mass NN 42149 2367 28 , , , 42149 2367 29 and and CC 42149 2367 30 in in IN 42149 2367 31 taking take VBG 42149 2367 32 out out RP 42149 2367 33 each each DT 42149 2367 34 bolt bolt NN 42149 2367 35 and and CC 42149 2367 36 placing place VBG 42149 2367 37 around around IN 42149 2367 38 the the DT 42149 2367 39 shank shank NN 42149 2367 40 under under IN 42149 2367 41 the the DT 42149 2367 42 washer washer NN 42149 2367 43 at at IN 42149 2367 44 each each DT 42149 2367 45 end end NN 42149 2367 46 a a DT 42149 2367 47 grummet grummet NN 42149 2367 48 made make VBN 42149 2367 49 of of IN 42149 2367 50 yarn yarn NN 42149 2367 51 soaked soak VBN 42149 2367 52 in in IN 42149 2367 53 red red JJ 42149 2367 54 lead lead NN 42149 2367 55 . . . 42149 2368 1 These these DT 42149 2368 2 grummets grummet NNS 42149 2368 3 were be VBD 42149 2368 4 made make VBN 42149 2368 5 by by IN 42149 2368 6 the the DT 42149 2368 7 contractor contractor NN 42149 2368 8 on on IN 42149 2368 9 the the DT 42149 2368 10 works work NNS 42149 2368 11 , , , 42149 2368 12 and and CC 42149 2368 13 consisted consist VBD 42149 2368 14 of of IN 42149 2368 15 three three CD 42149 2368 16 or or CC 42149 2368 17 four four CD 42149 2368 18 strands strand NNS 42149 2368 19 of of IN 42149 2368 20 twisted twist VBN 42149 2368 21 hemp hemp NNP 42149 2368 22 yarn yarn NN 42149 2368 23 , , , 42149 2368 24 known know VBN 42149 2368 25 as as IN 42149 2368 26 " " `` 42149 2368 27 lath lath NNP 42149 2368 28 yarn yarn NN 42149 2368 29 , , , 42149 2368 30 " " '' 42149 2368 31 making make VBG 42149 2368 32 up up RP 42149 2368 33 a a DT 42149 2368 34 rope rope NN 42149 2368 35 - - HYPH 42149 2368 36 like like JJ 42149 2368 37 cross cross NN 42149 2368 38 - - NN 42149 2368 39 section section NN 42149 2368 40 about about RB 42149 2368 41 ¼ ¼ NNS 42149 2368 42 in in RB 42149 2368 43 . . . 42149 2369 1 in in IN 42149 2369 2 diameter diameter NN 42149 2369 3 . . . 42149 2370 1 Usually usually RB 42149 2370 2 , , , 42149 2370 3 one one CD 42149 2370 4 of of IN 42149 2370 5 these these DT 42149 2370 6 under under IN 42149 2370 7 each each DT 42149 2370 8 washer washer NN 42149 2370 9 was be VBD 42149 2370 10 enough enough JJ 42149 2370 11 , , , 42149 2370 12 but but CC 42149 2370 13 in in IN 42149 2370 14 wet wet JJ 42149 2370 15 gravel gravel NN 42149 2370 16 , , , 42149 2370 17 or or CC 42149 2370 18 where where WRB 42149 2370 19 bolts bolt NNS 42149 2370 20 were be VBD 42149 2370 21 obliquely obliquely RB 42149 2370 22 in in IN 42149 2370 23 the the DT 42149 2370 24 bolt bolt NN 42149 2370 25 - - HYPH 42149 2370 26 holes hole NNS 42149 2370 27 , , , 42149 2370 28 two two CD 42149 2370 29 were be VBD 42149 2370 30 used use VBN 42149 2370 31 at at IN 42149 2370 32 each each DT 42149 2370 33 end end NN 42149 2370 34 . . . 42149 2371 1 After after IN 42149 2371 2 pulling pull VBG 42149 2371 3 the the DT 42149 2371 4 grummets grummet NNS 42149 2371 5 in in IN 42149 2371 6 , , , 42149 2371 7 all all PDT 42149 2371 8 the the DT 42149 2371 9 nuts nut NNS 42149 2371 10 were be VBD 42149 2371 11 pulled pull VBN 42149 2371 12 up up RP 42149 2371 13 tight tight RB 42149 2371 14 by by IN 42149 2371 15 wrenches wrench NNS 42149 2371 16 about about RB 42149 2371 17 3 3 CD 42149 2371 18 ft ft NN 42149 2371 19 . . NN 42149 2371 20 long long RB 42149 2371 21 , , , 42149 2371 22 with with IN 42149 2371 23 two two CD 42149 2371 24 men man NNS 42149 2371 25 on on IN 42149 2371 26 one one CD 42149 2371 27 wrench wrench NN 42149 2371 28 . . . 42149 2372 1 Bolts bolt NNS 42149 2372 2 were be VBD 42149 2372 3 not not RB 42149 2372 4 passed pass VBN 42149 2372 5 as as RB 42149 2372 6 tight tight RB 42149 2372 7 unless unless IN 42149 2372 8 the the DT 42149 2372 9 nut nut NN 42149 2372 10 resisted resist VBD 42149 2372 11 the the DT 42149 2372 12 weight weight NN 42149 2372 13 of of IN 42149 2372 14 an an DT 42149 2372 15 average average JJ 42149 2372 16 man man NN 42149 2372 17 on on IN 42149 2372 18 a a DT 42149 2372 19 2½-ft 2â½-ft CD 42149 2372 20 . . . 42149 2372 21 wrench wrench NN 42149 2372 22 . . . 42149 2373 1 Before before IN 42149 2373 2 putting put VBG 42149 2373 3 in in RP 42149 2373 4 the the DT 42149 2373 5 caulking caulking NN 42149 2373 6 mixture mixture NN 42149 2373 7 , , , 42149 2373 8 the the DT 42149 2373 9 joints joint NNS 42149 2373 10 were be VBD 42149 2373 11 carefully carefully RB 42149 2373 12 scraped scrape VBN 42149 2373 13 out out RP 42149 2373 14 with with IN 42149 2373 15 a a DT 42149 2373 16 special special JJ 42149 2373 17 tool tool NN 42149 2373 18 , , , 42149 2373 19 cleaned clean VBN 42149 2373 20 with with IN 42149 2373 21 cotton cotton NN 42149 2373 22 waste waste NN 42149 2373 23 , , , 42149 2373 24 and and CC 42149 2373 25 washed wash VBD 42149 2373 26 with with IN 42149 2373 27 a a DT 42149 2373 28 stream stream NN 42149 2373 29 of of IN 42149 2373 30 water water NN 42149 2373 31 . . . 42149 2374 1 The the DT 42149 2374 2 usual usual JJ 42149 2374 3 mixture mixture NN 42149 2374 4 for for IN 42149 2374 5 sides side NNS 42149 2374 6 and and CC 42149 2374 7 invert invert NNP 42149 2374 8 was be VBD 42149 2374 9 about about RB 42149 2374 10 2 2 CD 42149 2374 11 lb lb RB 42149 2374 12 . . . 42149 2375 1 of of IN 42149 2375 2 sal sal NNP 42149 2375 3 - - HYPH 42149 2375 4 ammoniac ammoniac NNP 42149 2375 5 and and CC 42149 2375 6 1 1 CD 42149 2375 7 lb lb RB 42149 2375 8 . . . 42149 2376 1 of of IN 42149 2376 2 sulphur sulphur NNP 42149 2376 3 to to IN 42149 2376 4 250 250 CD 42149 2376 5 lb lb RB 42149 2376 6 . . . 42149 2377 1 of of IN 42149 2377 2 iron iron NN 42149 2377 3 filings filing NNS 42149 2377 4 or or CC 42149 2377 5 borings boring NNS 42149 2377 6 . . . 42149 2378 1 In in IN 42149 2378 2 the the DT 42149 2378 3 arch arch NN 42149 2378 4 , , , 42149 2378 5 4 4 CD 42149 2378 6 lb lb IN 42149 2378 7 . . . 42149 2379 1 of of IN 42149 2379 2 sal sal NNP 42149 2379 3 - - HYPH 42149 2379 4 ammoniac ammoniac NNP 42149 2379 5 and and CC 42149 2379 6 3 3 CD 42149 2379 7 lb lb RB 42149 2379 8 . . . 42149 2380 1 of of IN 42149 2380 2 sulphur sulphur NNP 42149 2380 3 to to IN 42149 2380 4 125 125 CD 42149 2380 5 lb lb RB 42149 2380 6 . . . 42149 2381 1 of of IN 42149 2381 2 filings filing NNS 42149 2381 3 was be VBD 42149 2381 4 the the DT 42149 2381 5 mixture mixture NN 42149 2381 6 . . . 42149 2382 1 A a DT 42149 2382 2 small small JJ 42149 2382 3 hand hand NN 42149 2382 4 - - HYPH 42149 2382 5 hammer hammer NN 42149 2382 6 was be VBD 42149 2382 7 used use VBN 42149 2382 8 to to TO 42149 2382 9 drive drive VB 42149 2382 10 the the DT 42149 2382 11 caulking caulking NN 42149 2382 12 tool tool NN 42149 2382 13 , , , 42149 2382 14 but but CC 42149 2382 15 , , , 42149 2382 16 in in IN 42149 2382 17 the the DT 42149 2382 18 sides side NNS 42149 2382 19 and and CC 42149 2382 20 invert invert NN 42149 2382 21 , , , 42149 2382 22 air air NN 42149 2382 23 hammers hammer NNS 42149 2382 24 were be VBD 42149 2382 25 used use VBN 42149 2382 26 with with IN 42149 2382 27 some some DT 42149 2382 28 advantage advantage NN 42149 2382 29 . . . 42149 2383 1 The the DT 42149 2383 2 success success NN 42149 2383 3 of of IN 42149 2383 4 work work NN 42149 2383 5 of of IN 42149 2383 6 this this DT 42149 2383 7 kind kind NN 42149 2383 8 depends depend VBZ 42149 2383 9 entirely entirely RB 42149 2383 10 on on IN 42149 2383 11 the the DT 42149 2383 12 thoroughness thoroughness NN 42149 2383 13 with with IN 42149 2383 14 which which WDT 42149 2383 15 the the DT 42149 2383 16 mixture mixture NN 42149 2383 17 is be VBZ 42149 2383 18 hammered hammer VBN 42149 2383 19 in in RB 42149 2383 20 ; ; : 42149 2383 21 and and CC 42149 2383 22 the the DT 42149 2383 23 inspection inspection NN 42149 2383 24 , , , 42149 2383 25 which which WDT 42149 2383 26 was be VBD 42149 2383 27 of of IN 42149 2383 28 an an DT 42149 2383 29 exceedingly exceedingly RB 42149 2383 30 monotonous monotonous JJ 42149 2383 31 nature nature NN 42149 2383 32 , , , 42149 2383 33 called call VBD 42149 2383 34 for for IN 42149 2383 35 the the DT 42149 2383 36 greatest great JJS 42149 2383 37 care care NN 42149 2383 38 and and CC 42149 2383 39 watchfulness watchfulness NN 42149 2383 40 on on IN 42149 2383 41 the the DT 42149 2383 42 part part NN 42149 2383 43 of of IN 42149 2383 44 the the DT 42149 2383 45 Company Company NNP 42149 2383 46 's 's POS 42149 2383 47 forces force NNS 42149 2383 48 , , , 42149 2383 49 especially especially RB 42149 2383 50 in in IN 42149 2383 51 the the DT 42149 2383 52 pocket pocket NN 42149 2383 53 iron iron NN 42149 2383 54 , , , 42149 2383 55 where where WRB 42149 2383 56 each each DT 42149 2383 57 bolt bolt NN 42149 2383 58 had have VBD 42149 2383 59 to to TO 42149 2383 60 be be VB 42149 2383 61 removed remove VBN 42149 2383 62 , , , 42149 2383 63 the the DT 42149 2383 64 caulking caulking NN 42149 2383 65 done do VBN 42149 2383 66 at at IN 42149 2383 67 the the DT 42149 2383 68 bottom bottom NN 42149 2383 69 of of IN 42149 2383 70 the the DT 42149 2383 71 pockets pocket NNS 42149 2383 72 put put VBN 42149 2383 73 in in RP 42149 2383 74 , , , 42149 2383 75 the the DT 42149 2383 76 bolts bolt NNS 42149 2383 77 replaced replace VBD 42149 2383 78 ; ; : 42149 2383 79 and and CC 42149 2383 80 the the DT 42149 2383 81 rest rest NN 42149 2383 82 of of IN 42149 2383 83 the the DT 42149 2383 84 pockets pocket NNS 42149 2383 85 filled fill VBN 42149 2383 86 . . . 42149 2384 1 The the DT 42149 2384 2 results result NNS 42149 2384 3 have have VBP 42149 2384 4 been be VBN 42149 2384 5 satisfactory satisfactory JJ 42149 2384 6 , , , 42149 2384 7 as as IN 42149 2384 8 the the DT 42149 2384 9 leakage leakage NN 42149 2384 10 under under IN 42149 2384 11 normal normal JJ 42149 2384 12 air air NN 42149 2384 13 and and CC 42149 2384 14 prior prior RB 42149 2384 15 to to IN 42149 2384 16 placing place VBG 42149 2384 17 the the DT 42149 2384 18 concrete concrete NN 42149 2384 19 averaged average VBN 42149 2384 20 about about RB 42149 2384 21 0.14 0.14 CD 42149 2384 22 gal gal NN 42149 2384 23 . . . 42149 2385 1 per per IN 42149 2385 2 lin lin NNP 42149 2385 3 . . . 42149 2386 1 ft ft NNP 42149 2386 2 . . NNP 42149 2386 3 of of IN 42149 2386 4 tunnel tunnel NN 42149 2386 5 per per IN 42149 2386 6 24 24 CD 42149 2386 7 hours hour NNS 42149 2386 8 , , , 42149 2386 9 which which WDT 42149 2386 10 is be VBZ 42149 2386 11 about about RB 42149 2386 12 0.0035 0.0035 CD 42149 2386 13 gal gal NNP 42149 2386 14 . . . 42149 2387 1 per per IN 42149 2387 2 lin lin NNP 42149 2387 3 . . . 42149 2388 1 ft ft NNP 42149 2388 2 . . NNP 42149 2388 3 of of IN 42149 2388 4 joint joint JJ 42149 2388 5 per per IN 42149 2388 6 24 24 CD 42149 2388 7 hours hour NNS 42149 2388 8 . . . 42149 2389 1 With with IN 42149 2389 2 each each DT 42149 2389 3 linear linear JJ 42149 2389 4 foot foot NN 42149 2389 5 of of IN 42149 2389 6 joint joint NN 42149 2389 7 is be VBZ 42149 2389 8 included include VBN 42149 2389 9 the the DT 42149 2389 10 leakage leakage NN 42149 2389 11 from from IN 42149 2389 12 1.27 1.27 CD 42149 2389 13 bolts bolt NNS 42149 2389 14 . . . 42149 2390 1 Afterward afterward RB 42149 2390 2 , , , 42149 2390 3 when when WRB 42149 2390 4 the the DT 42149 2390 5 concrete concrete JJ 42149 2390 6 lining lining NN 42149 2390 7 was be VBD 42149 2390 8 in in IN 42149 2390 9 , , , 42149 2390 10 the the DT 42149 2390 11 leakage leakage NN 42149 2390 12 was be VBD 42149 2390 13 found find VBN 42149 2390 14 to to TO 42149 2390 15 be be VB 42149 2390 16 about about RB 42149 2390 17 0.05 0.05 CD 42149 2390 18 to to TO 42149 2390 19 0.06 0.06 CD 42149 2390 20 gal gal NNP 42149 2390 21 . . . 42149 2391 1 per per IN 42149 2391 2 lin lin NNP 42149 2391 3 . . . 42149 2392 1 ft ft NNP 42149 2392 2 . . NNP 42149 2392 3 of of IN 42149 2392 4 tunnel tunnel NN 42149 2392 5 per per IN 42149 2392 6 24 24 CD 42149 2392 7 hours hour NNS 42149 2392 8 , , , 42149 2392 9 which which WDT 42149 2392 10 compares compare VBZ 42149 2392 11 favorably favorably RB 42149 2392 12 with with IN 42149 2392 13 the the DT 42149 2392 14 records record NNS 42149 2392 15 of of IN 42149 2392 16 other other JJ 42149 2392 17 lined line VBN 42149 2392 18 tunnels tunnel NNS 42149 2392 19 . . . 42149 2393 1 The the DT 42149 2393 2 typical typical JJ 42149 2393 3 gang gang NN 42149 2393 4 employed employ VBN 42149 2393 5 on on IN 42149 2393 6 this this DT 42149 2393 7 work work NN 42149 2393 8 was be VBD 42149 2393 9 as as IN 42149 2393 10 follows follow VBZ 42149 2393 11 : : : 42149 2393 12 _ _ NNP 42149 2393 13 In in IN 42149 2393 14 Pocket Pocket NNP 42149 2393 15 Iron Iron NNP 42149 2393 16 : : : 42149 2393 17 _ _ NNP 42149 2393 18 1 1 CD 42149 2393 19 General General NNP 42149 2393 20 foreman foreman NN 42149 2393 21 @ @ NFP 42149 2393 22 $ $ $ 42149 2393 23 5.00 5.00 CD 42149 2393 24 per per IN 42149 2393 25 day day NN 42149 2393 26 . . . 42149 2394 1 1 1 CD 42149 2394 2 Mixer Mixer NNP 42149 2394 3 " " `` 42149 2394 4 3.00 3.00 CD 42149 2394 5 " " '' 42149 2394 6 " " `` 42149 2394 7 1 1 CD 42149 2394 8 Nipper Nipper NNP 42149 2394 9 " " `` 42149 2394 10 3.00 3.00 CD 42149 2394 11 " " '' 42149 2394 12 " " '' 42149 2394 13 5 5 CD 42149 2394 14 Caulkers Caulkers NNPS 42149 2394 15 " " `` 42149 2394 16 3.00 3.00 CD 42149 2394 17 " " '' 42149 2394 18 " " '' 42149 2394 19 10 10 CD 42149 2394 20 Grummeters grummeter NNS 42149 2394 21 " " `` 42149 2394 22 3.00 3.00 CD 42149 2394 23 " " '' 42149 2394 24 " " `` 42149 2394 25 _ _ NNP 42149 2394 26 In in IN 42149 2394 27 Pocketless Pocketless NNP 42149 2394 28 Iron Iron NNP 42149 2394 29 : : : 42149 2394 30 _ _ NNP 42149 2394 31 1 1 CD 42149 2394 32 General General NNP 42149 2394 33 foreman foreman NN 42149 2394 34 @ @ NFP 42149 2394 35 $ $ $ 42149 2394 36 5.00 5.00 CD 42149 2394 37 per per IN 42149 2394 38 day day NN 42149 2394 39 . . . 42149 2395 1 1 1 CD 42149 2395 2 Mixer Mixer NNP 42149 2395 3 " " `` 42149 2395 4 3.00 3.00 CD 42149 2395 5 " " '' 42149 2395 6 " " `` 42149 2395 7 1 1 CD 42149 2395 8 Nipper Nipper NNP 42149 2395 9 " " `` 42149 2395 10 3.00 3.00 CD 42149 2395 11 " " '' 42149 2395 12 " " '' 42149 2395 13 3 3 CD 42149 2395 14 Caulkers Caulkers NNPS 42149 2395 15 " " `` 42149 2395 16 3.00 3.00 CD 42149 2395 17 " " '' 42149 2395 18 " " `` 42149 2395 19 12 12 CD 42149 2395 20 Grummeters grummeter NNS 42149 2395 21 " " `` 42149 2395 22 3.00 3.00 CD 42149 2395 23 " " '' 42149 2395 24 " " `` 42149 2395 25 The the DT 42149 2395 26 average average JJ 42149 2395 27 amount amount NN 42149 2395 28 of of IN 42149 2395 29 caulking caulk VBG 42149 2395 30 and and CC 42149 2395 31 grummeting grummeting NN 42149 2395 32 done do VBN 42149 2395 33 per per IN 42149 2395 34 shift shift NN 42149 2395 35 with with IN 42149 2395 36 such such PDT 42149 2395 37 a a DT 42149 2395 38 gang gang NN 42149 2395 39 was be VBD 42149 2395 40 ( ( -LRB- 42149 2395 41 with with IN 42149 2395 42 pocketless pocketless NN 42149 2395 43 grooves groove NNS 42149 2395 44 ) ) -RRB- 42149 2395 45 , , , 42149 2395 46 348 348 CD 42149 2395 47 lin lin NNP 42149 2395 48 . . . 42149 2396 1 ft ft NNP 42149 2396 2 . . NNP 42149 2396 3 of of IN 42149 2396 4 joint joint JJ 42149 2396 5 and and CC 42149 2396 6 445 445 CD 42149 2396 7 bolts bolt NNS 42149 2396 8 grummeted grummete VBN 42149 2396 9 ; ; : 42149 2396 10 and and CC 42149 2396 11 in in IN 42149 2396 12 pocket pocket NN 42149 2396 13 iron iron NN 42149 2396 14 : : : 42149 2396 15 126 126 CD 42149 2396 16 lin lin NN 42149 2396 17 . . . 42149 2397 1 ft ft NNP 42149 2397 2 . . NNP 42149 2397 3 of of IN 42149 2397 4 joint joint JJ 42149 2397 5 and and CC 42149 2397 6 160 160 CD 42149 2397 7 bolts bolt NNS 42149 2397 8 grummeted grummete VBN 42149 2397 9 . . . 42149 2398 1 The the DT 42149 2398 2 caulking caulking NN 42149 2398 3 and and CC 42149 2398 4 grummeting grummeting NN 42149 2398 5 work work NN 42149 2398 6 was be VBD 42149 2398 7 finished finish VBN 42149 2398 8 in in IN 42149 2398 9 June June NNP 42149 2398 10 , , , 42149 2398 11 1907 1907 CD 42149 2398 12 , , , 42149 2398 13 this this DT 42149 2398 14 completing complete VBG 42149 2398 15 the the DT 42149 2398 16 second second JJ 42149 2398 17 period period NN 42149 2398 18 . . . 42149 2399 1 _ _ NNP 42149 2399 2 Period Period NNP 42149 2399 3 No no UH 42149 2399 4 . . . 42149 2400 1 3._--_Experiments 3._--_experiment NNS 42149 2400 2 , , , 42149 2400 3 Tests Tests NNP 42149 2400 4 , , , 42149 2400 5 and and CC 42149 2400 6 Observations._--_April observations._--_april CD 42149 2400 7 , , , 42149 2400 8 1907 1907 CD 42149 2400 9 , , , 42149 2400 10 to to IN 42149 2400 11 April April NNP 42149 2400 12 , , , 42149 2400 13 1908._--The 1908._--the CD 42149 2400 14 third third JJ 42149 2400 15 period period NN 42149 2400 16 , , , 42149 2400 17 that that DT 42149 2400 18 of of IN 42149 2400 19 tests test NNS 42149 2400 20 and and CC 42149 2400 21 observations observation NNS 42149 2400 22 in in IN 42149 2400 23 connection connection NN 42149 2400 24 with with IN 42149 2400 25 the the DT 42149 2400 26 question question NN 42149 2400 27 of of IN 42149 2400 28 foundations foundation NNS 42149 2400 29 , , , 42149 2400 30 is be VBZ 42149 2400 31 dealt deal VBN 42149 2400 32 with with IN 42149 2400 33 in in IN 42149 2400 34 another another DT 42149 2400 35 paper paper NN 42149 2400 36 . . . 42149 2401 1 It -PRON- PRP 42149 2401 2 occupied occupy VBD 42149 2401 3 from from IN 42149 2401 4 April April NNP 42149 2401 5 , , , 42149 2401 6 1907 1907 CD 42149 2401 7 , , , 42149 2401 8 to to IN 42149 2401 9 November November NNP 42149 2401 10 , , , 42149 2401 11 1908 1908 CD 42149 2401 12 . . . 42149 2402 1 The the DT 42149 2402 2 results result NNS 42149 2402 3 of of IN 42149 2402 4 the the DT 42149 2402 5 information information NN 42149 2402 6 then then RB 42149 2402 7 gathered gather VBD 42149 2402 8 was be VBD 42149 2402 9 that that IN 42149 2402 10 it -PRON- PRP 42149 2402 11 was be VBD 42149 2402 12 not not RB 42149 2402 13 thought think VBN 42149 2402 14 advisable advisable JJ 42149 2402 15 to to TO 42149 2402 16 go go VB 42149 2402 17 on on RP 42149 2402 18 with with IN 42149 2402 19 the the DT 42149 2402 20 foundations foundation NNS 42149 2402 21 . . . 42149 2403 1 _ _ NNP 42149 2403 2 Period Period NNP 42149 2403 3 No no UH 42149 2403 4 . . . 42149 2404 1 4._--_Capping 4._--_capping CD 42149 2404 2 Pile Pile NNP 42149 2404 3 Bores Bores NNP 42149 2404 4 , , , 42149 2404 5 Sinking Sinking NNP 42149 2404 6 Sumps Sumps NNP 42149 2404 7 , , , 42149 2404 8 and and CC 42149 2404 9 Building Building NNP 42149 2404 10 Cross Cross NNP 42149 2404 11 - - NNP 42149 2404 12 Passages._--_April Passages._--_April NNP 42149 2404 13 , , , 42149 2404 14 1908 1908 CD 42149 2404 15 , , , 42149 2404 16 to to IN 42149 2404 17 November November NNP 42149 2404 18 , , , 42149 2404 19 1908._--In 1908._--in CD 42149 2404 20 order order NN 42149 2404 21 to to TO 42149 2404 22 reduce reduce VB 42149 2404 23 the the DT 42149 2404 24 leakage leakage NN 42149 2404 25 from from IN 42149 2404 26 the the DT 42149 2404 27 bore bore NN 42149 2404 28 segments segment NNS 42149 2404 29 to to IN 42149 2404 30 the the DT 42149 2404 31 least least JJS 42149 2404 32 possible possible JJ 42149 2404 33 amount amount NN 42149 2404 34 before before IN 42149 2404 35 placing place VBG 42149 2404 36 the the DT 42149 2404 37 concrete concrete JJ 42149 2404 38 lining lining NN 42149 2404 39 , , , 42149 2404 40 it -PRON- PRP 42149 2404 41 was be VBD 42149 2404 42 decided decide VBN 42149 2404 43 to to TO 42149 2404 44 remove remove VB 42149 2404 45 the the DT 42149 2404 46 plugs plug NNS 42149 2404 47 and and CC 42149 2404 48 replace replace VB 42149 2404 49 them -PRON- PRP 42149 2404 50 with with IN 42149 2404 51 flat flat JJ 42149 2404 52 cover cover NN 42149 2404 53 - - HYPH 42149 2404 54 plates plate NNS 42149 2404 55 ; ; : 42149 2404 56 these these DT 42149 2404 57 have have VBP 42149 2404 58 been be VBN 42149 2404 59 described describe VBN 42149 2404 60 before before RB 42149 2404 61 , , , 42149 2404 62 together together RB 42149 2404 63 with with IN 42149 2404 64 the the DT 42149 2404 65 filling filling NN 42149 2404 66 of of IN 42149 2404 67 Bore Bore NNP 42149 2404 68 Segments Segments NNP 42149 2404 69 No no UH 42149 2404 70 . . . 42149 2405 1 2 2 CD 42149 2405 2 with with IN 42149 2405 3 mortar mortar NN 42149 2405 4 to to TO 42149 2405 5 reduce reduce VB 42149 2405 6 the the DT 42149 2405 7 leakage leakage NN 42149 2405 8 around around IN 42149 2405 9 the the DT 42149 2405 10 distance distance NN 42149 2405 11 piece piece NN 42149 2405 12 . . . 42149 2406 1 During during IN 42149 2406 2 this this DT 42149 2406 3 period period NN 42149 2406 4 the the DT 42149 2406 5 turnbuckles turnbuckle NNS 42149 2406 6 to to TO 42149 2406 7 reinforce reinforce VB 42149 2406 8 the the DT 42149 2406 9 broken broken JJ 42149 2406 10 plates plate NNS 42149 2406 11 were be VBD 42149 2406 12 put put VBN 42149 2406 13 in in RP 42149 2406 14 , , , 42149 2406 15 and and CC 42149 2406 16 the the DT 42149 2406 17 sump sump NN 42149 2406 18 sunk sink VBN 42149 2406 19 at at IN 42149 2406 20 the the DT 42149 2406 21 lowest low JJS 42149 2406 22 point point NN 42149 2406 23 of of IN 42149 2406 24 the the DT 42149 2406 25 tunnel tunnel NN 42149 2406 26 . . . 42149 2407 1 These these DT 42149 2407 2 sumps sump NNS 42149 2407 3 have have VBP 42149 2407 4 been be VBN 42149 2407 5 described describe VBN 42149 2407 6 in in IN 42149 2407 7 a a DT 42149 2407 8 previous previous JJ 42149 2407 9 part part NN 42149 2407 10 of of IN 42149 2407 11 this this DT 42149 2407 12 paper paper NN 42149 2407 13 ; ; : 42149 2407 14 they -PRON- PRP 42149 2407 15 were be VBD 42149 2407 16 put put VBN 42149 2407 17 down down RP 42149 2407 18 without without IN 42149 2407 19 trouble trouble NN 42149 2407 20 . . . 42149 2408 1 As as RB 42149 2408 2 much much RB 42149 2408 3 as as IN 42149 2408 4 possible possible JJ 42149 2408 5 of of IN 42149 2408 6 the the DT 42149 2408 7 concrete concrete JJ 42149 2408 8 lining lining NN 42149 2408 9 was be VBD 42149 2408 10 put put VBN 42149 2408 11 in in RP 42149 2408 12 before before IN 42149 2408 13 the the DT 42149 2408 14 lining lining NN 42149 2408 15 castings casting NNS 42149 2408 16 were be VBD 42149 2408 17 taken take VBN 42149 2408 18 into into IN 42149 2408 19 the the DT 42149 2408 20 tunnel tunnel NN 42149 2408 21 , , , 42149 2408 22 as as IN 42149 2408 23 the the DT 42149 2408 24 space space NN 42149 2408 25 inside inside RB 42149 2408 26 was be VBD 42149 2408 27 very very RB 42149 2408 28 restricted restrict VBN 42149 2408 29 . . . 42149 2409 1 The the DT 42149 2409 2 first first JJ 42149 2409 3 lining lining NN 42149 2409 4 casting casting NN 42149 2409 5 was be VBD 42149 2409 6 bolted bolt VBN 42149 2409 7 to to IN 42149 2409 8 the the DT 42149 2409 9 flat flat JJ 42149 2409 10 flanges flange NNS 42149 2409 11 of of IN 42149 2409 12 the the DT 42149 2409 13 sump sump NN 42149 2409 14 segment segment NN 42149 2409 15 , , , 42149 2409 16 the the DT 42149 2409 17 bolts bolt NNS 42149 2409 18 holding hold VBG 42149 2409 19 the the DT 42149 2409 20 latter latter JJ 42149 2409 21 to to IN 42149 2409 22 the the DT 42149 2409 23 adjacent adjacent JJ 42149 2409 24 segments segment NNS 42149 2409 25 were be VBD 42149 2409 26 removed remove VBN 42149 2409 27 , , , 42149 2409 28 and and CC 42149 2409 29 the the DT 42149 2409 30 whole whole NN 42149 2409 31 was be VBD 42149 2409 32 forced force VBN 42149 2409 33 down down RP 42149 2409 34 with with IN 42149 2409 35 two two CD 42149 2409 36 of of IN 42149 2409 37 the the DT 42149 2409 38 old old JJ 42149 2409 39 shield shield NN 42149 2409 40 jacks jack NNS 42149 2409 41 , , , 42149 2409 42 taking take VBG 42149 2409 43 a a DT 42149 2409 44 bearing bearing NN 42149 2409 45 on on IN 42149 2409 46 the the DT 42149 2409 47 tunnel tunnel NN 42149 2409 48 . . . 42149 2410 1 The the DT 42149 2410 2 two two CD 42149 2410 3 together together RB 42149 2410 4 exerted exert VBD 42149 2410 5 a a DT 42149 2410 6 pressure pressure NN 42149 2410 7 of of IN 42149 2410 8 about about RB 42149 2410 9 150 150 CD 42149 2410 10 tons ton NNS 42149 2410 11 . . . 42149 2411 1 The the DT 42149 2411 2 plugs plug NNS 42149 2411 3 in in IN 42149 2411 4 the the DT 42149 2411 5 bottom bottom NN 42149 2411 6 of of IN 42149 2411 7 the the DT 42149 2411 8 sump sump NN 42149 2411 9 segment segment NN 42149 2411 10 were be VBD 42149 2411 11 taken take VBN 42149 2411 12 out out RP 42149 2411 13 , , , 42149 2411 14 and and CC 42149 2411 15 pipes pipe NNS 42149 2411 16 were be VBD 42149 2411 17 put put VBN 42149 2411 18 in in RP 42149 2411 19 , , , 42149 2411 20 through through IN 42149 2411 21 which which WDT 42149 2411 22 the the DT 42149 2411 23 silt silt NN 42149 2411 24 squeezed squeeze VBD 42149 2411 25 up up RP 42149 2411 26 into into IN 42149 2411 27 the the DT 42149 2411 28 tunnel tunnel NN 42149 2411 29 and and CC 42149 2411 30 relieved relieve VBD 42149 2411 31 the the DT 42149 2411 32 pressure pressure NN 42149 2411 33 on on IN 42149 2411 34 the the DT 42149 2411 35 sump sump NN 42149 2411 36 segment segment NN 42149 2411 37 . . . 42149 2412 1 If if IN 42149 2412 2 the the DT 42149 2412 3 silt silt NN 42149 2412 4 did do VBD 42149 2412 5 not not RB 42149 2412 6 flow flow VB 42149 2412 7 freely freely RB 42149 2412 8 , , , 42149 2412 9 a a DT 42149 2412 10 water water NN 42149 2412 11 - - HYPH 42149 2412 12 jet jet NN 42149 2412 13 was be VBD 42149 2412 14 used use VBN 42149 2412 15 . . . 42149 2413 1 The the DT 42149 2413 2 sump sump NN 42149 2413 3 was be VBD 42149 2413 4 kept keep VBN 42149 2413 5 plumb plumb VBN 42149 2413 6 by by IN 42149 2413 7 regulating regulate VBG 42149 2413 8 the the DT 42149 2413 9 jacks jack NNS 42149 2413 10 . . . 42149 2414 1 In in IN 42149 2414 2 this this DT 42149 2414 3 way way NN 42149 2414 4 the the DT 42149 2414 5 sump sump NN 42149 2414 6 was be VBD 42149 2414 7 sunk sink VBN 42149 2414 8 , , , 42149 2414 9 adding add VBG 42149 2414 10 lining lining NN 42149 2414 11 sections section NNS 42149 2414 12 one one CD 42149 2414 13 by by IN 42149 2414 14 one one CD 42149 2414 15 , , , 42149 2414 16 and and CC 42149 2414 17 finally finally RB 42149 2414 18 putting put VBG 42149 2414 19 on on RP 42149 2414 20 the the DT 42149 2414 21 top top JJ 42149 2414 22 segment segment NN 42149 2414 23 , , , 42149 2414 24 which which WDT 42149 2414 25 was be VBD 42149 2414 26 composed compose VBN 42149 2414 27 of of IN 42149 2414 28 three three CD 42149 2414 29 pieces piece NNS 42149 2414 30 . . . 42149 2415 1 The the DT 42149 2415 2 time time NN 42149 2415 3 taken take VBN 42149 2415 4 to to TO 42149 2415 5 sink sink VB 42149 2415 6 one one CD 42149 2415 7 sump sump NN 42149 2415 8 was be VBD 42149 2415 9 about about RB 42149 2415 10 4 4 CD 42149 2415 11 days day NNS 42149 2415 12 , , , 42149 2415 13 working work VBG 42149 2415 14 one one CD 42149 2415 15 8-hour 8-hour CD 42149 2415 16 shift shift NN 42149 2415 17 per per IN 42149 2415 18 day day NN 42149 2415 19 , , , 42149 2415 20 and and CC 42149 2415 21 not not RB 42149 2415 22 counting count VBG 42149 2415 23 the the DT 42149 2415 24 time time NN 42149 2415 25 taken take VBN 42149 2415 26 to to TO 42149 2415 27 set set VB 42149 2415 28 up up RP 42149 2415 29 the the DT 42149 2415 30 jacks jack NNS 42149 2415 31 and and CC 42149 2415 32 bracing bracing NN 42149 2415 33 . . . 42149 2416 1 The the DT 42149 2416 2 sinking sinking NN 42149 2416 3 of of IN 42149 2416 4 each each DT 42149 2416 5 section section NN 42149 2416 6 took take VBD 42149 2416 7 from from IN 42149 2416 8 4 4 CD 42149 2416 9 to to IN 42149 2416 10 6 6 CD 42149 2416 11 hours hour NNS 42149 2416 12 . . . 42149 2417 1 The the DT 42149 2417 2 air air NN 42149 2417 3 pressure pressure NN 42149 2417 4 was be VBD 42149 2417 5 25 25 CD 42149 2417 6 lb lb RB 42149 2417 7 . . . 42149 2418 1 and and CC 42149 2418 2 the the DT 42149 2418 3 hydrostatic hydrostatic JJ 42149 2418 4 head head NN 42149 2418 5 41 41 CD 42149 2418 6 lb lb RB 42149 2418 7 . . . 42149 2419 1 per per IN 42149 2419 2 sq sq NNP 42149 2419 3 . . . 42149 2420 1 in in IN 42149 2420 2 . . . 42149 2421 1 The the DT 42149 2421 2 force force NN 42149 2421 3 was be VBD 42149 2421 4 1 1 CD 42149 2421 5 assistant assistant JJ 42149 2421 6 superintendent superintendent NN 42149 2421 7 at at IN 42149 2421 8 $ $ $ 42149 2421 9 6.00 6.00 CD 42149 2421 10 per per IN 42149 2421 11 day day NN 42149 2421 12 , , , 42149 2421 13 1 1 CD 42149 2421 14 foreman foreman NN 42149 2421 15 at at IN 42149 2421 16 $ $ $ 42149 2421 17 4.50 4.50 CD 42149 2421 18 , , , 42149 2421 19 and and CC 42149 2421 20 6 6 CD 42149 2421 21 laborers laborer NNS 42149 2421 22 at at IN 42149 2421 23 $ $ $ 42149 2421 24 3.00 3.00 CD 42149 2421 25 per per IN 42149 2421 26 day day NN 42149 2421 27 . . . 42149 2422 1 _ _ NNP 42149 2422 2 Cross Cross NNP 42149 2422 3 - - JJ 42149 2422 4 Passages._--It Passages._--It NNP 42149 2422 5 was be VBD 42149 2422 6 during during IN 42149 2422 7 this this DT 42149 2422 8 period period NN 42149 2422 9 that that IN 42149 2422 10 the the DT 42149 2422 11 five five CD 42149 2422 12 cross cross NN 42149 2422 13 - - NNS 42149 2422 14 passages passage NNS 42149 2422 15 previously previously RB 42149 2422 16 mentioned mention VBN 42149 2422 17 were be VBD 42149 2422 18 built build VBN 42149 2422 19 . . . 42149 2423 1 In in IN 42149 2423 2 the the DT 42149 2423 3 case case NN 42149 2423 4 of of IN 42149 2423 5 those those DT 42149 2423 6 in in IN 42149 2423 7 the the DT 42149 2423 8 rock rock NN 42149 2423 9 , , , 42149 2423 10 careful careful JJ 42149 2423 11 excavation excavation NN 42149 2423 12 was be VBD 42149 2423 13 needed need VBN 42149 2423 14 so so IN 42149 2423 15 as as IN 42149 2423 16 to to TO 42149 2423 17 avoid avoid VB 42149 2423 18 breaking break VBG 42149 2423 19 the the DT 42149 2423 20 iron iron NN 42149 2423 21 lining lining NN 42149 2423 22 . . . 42149 2424 1 Drilling drilling NN 42149 2424 2 was be VBD 42149 2424 3 done do VBN 42149 2424 4 from from IN 42149 2424 5 both both DT 42149 2424 6 ends end NNS 42149 2424 7 , , , 42149 2424 8 the the DT 42149 2424 9 holes hole NNS 42149 2424 10 were be VBD 42149 2424 11 closely closely RB 42149 2424 12 spaced space VBN 42149 2424 13 , , , 42149 2424 14 and and CC 42149 2424 15 about about RB 42149 2424 16 2 2 CD 42149 2424 17 ft ft NN 42149 2424 18 . . NNP 42149 2424 19 6 6 CD 42149 2424 20 in in IN 42149 2424 21 . . . 42149 2425 1 deep deep JJ 42149 2425 2 , , , 42149 2425 3 and and CC 42149 2425 4 light light JJ 42149 2425 5 charges charge NNS 42149 2425 6 of of IN 42149 2425 7 powder powder NN 42149 2425 8 were be VBD 42149 2425 9 used use VBN 42149 2425 10 . . . 42149 2426 1 The the DT 42149 2426 2 heading heading NN 42149 2426 3 , , , 42149 2426 4 5 5 CD 42149 2426 5 by by IN 42149 2426 6 7 7 CD 42149 2426 7 ft ft NN 42149 2426 8 . . NNP 42149 2426 9 in in IN 42149 2426 10 cross cross NN 42149 2426 11 - - NN 42149 2426 12 section section NN 42149 2426 13 , , , 42149 2426 14 was be VBD 42149 2426 15 thus thus RB 42149 2426 16 excavated excavate VBN 42149 2426 17 in in IN 42149 2426 18 five five CD 42149 2426 19 lengths length NNS 42149 2426 20 , , , 42149 2426 21 with with IN 42149 2426 22 24 24 CD 42149 2426 23 holes hole NNS 42149 2426 24 to to IN 42149 2426 25 a a DT 42149 2426 26 length length NN 42149 2426 27 , , , 42149 2426 28 and and CC 42149 2426 29 about about RB 42149 2426 30 23 23 CD 42149 2426 31 lin lin NN 42149 2426 32 . . . 42149 2427 1 ft ft NNP 42149 2427 2 . . NNP 42149 2427 3 of of IN 42149 2427 4 hole hole NN 42149 2427 5 per per IN 42149 2427 6 yard yard NN 42149 2427 7 . . . 42149 2428 1 About about RB 42149 2428 2 5.3 5.3 CD 42149 2428 3 lb lb RB 42149 2428 4 . . . 42149 2429 1 of of IN 42149 2429 2 powder powder NNP 42149 2429 3 per per IN 42149 2429 4 cu cu XX 42149 2429 5 . . . 42149 2430 1 yd yd NNP 42149 2430 2 . . . 42149 2431 1 was be VBD 42149 2431 2 used use VBN 42149 2431 3 . . . 42149 2432 1 The the DT 42149 2432 2 sides side NNS 42149 2432 3 , , , 42149 2432 4 top top NN 42149 2432 5 , , , 42149 2432 6 and and CC 42149 2432 7 bottom bottom NN 42149 2432 8 were be VBD 42149 2432 9 then then RB 42149 2432 10 drilled drill VBN 42149 2432 11 at at IN 42149 2432 12 a a DT 42149 2432 13 very very RB 42149 2432 14 sharp sharp JJ 42149 2432 15 angle angle NN 42149 2432 16 to to IN 42149 2432 17 the the DT 42149 2432 18 face face NN 42149 2432 19 and and CC 42149 2432 20 the the DT 42149 2432 21 excavation excavation NN 42149 2432 22 was be VBD 42149 2432 23 trimmed trim VBN 42149 2432 24 to to IN 42149 2432 25 the the DT 42149 2432 26 right right JJ 42149 2432 27 size size NN 42149 2432 28 . . . 42149 2433 1 This this DT 42149 2433 2 widening widen VBG 42149 2433 3 out out RP 42149 2433 4 took take VBD 42149 2433 5 about about RP 42149 2433 6 7½ 7½ NNP 42149 2433 7 ft ft NN 42149 2433 8 . . NN 42149 2433 9 of of IN 42149 2433 10 hole hole NN 42149 2433 11 per per IN 42149 2433 12 cu cu XX 42149 2433 13 . . . 42149 2434 1 yd yd NNP 42149 2434 2 . . NNP 42149 2434 3 , , , 42149 2434 4 and and CC 42149 2434 5 0.9 0.9 CD 42149 2434 6 lb lb IN 42149 2434 7 . . . 42149 2435 1 of of IN 42149 2435 2 powder powder NNP 42149 2435 3 . . . 42149 2436 1 In in IN 42149 2436 2 the the DT 42149 2436 3 passages passage NNS 42149 2436 4 in in IN 42149 2436 5 silt silt NN 42149 2436 6 the the DT 42149 2436 7 excavation excavation NN 42149 2436 8 had have VBD 42149 2436 9 to to TO 42149 2436 10 be be VB 42149 2436 11 12 12 CD 42149 2436 12 ft ft NN 42149 2436 13 . . NN 42149 2436 14 wide wide JJ 42149 2436 15 and and CC 42149 2436 16 13 13 CD 42149 2436 17 ft ft NN 42149 2436 18 . . NN 42149 2436 19 8 8 CD 42149 2436 20 in in IN 42149 2436 21 . . . 42149 2437 1 high high JJ 42149 2437 2 to to TO 42149 2437 3 give give VB 42149 2437 4 enough enough JJ 42149 2437 5 room room NN 42149 2437 6 inside inside IN 42149 2437 7 the the DT 42149 2437 8 timbers timber NNS 42149 2437 9 . . . 42149 2438 1 The the DT 42149 2438 2 plates plate NNS 42149 2438 3 at at IN 42149 2438 4 one one CD 42149 2438 5 end end NN 42149 2438 6 of of IN 42149 2438 7 the the DT 42149 2438 8 passage passage NN 42149 2438 9 were be VBD 42149 2438 10 first first RB 42149 2438 11 removed remove VBN 42149 2438 12 . . . 42149 2439 1 An an DT 42149 2439 2 air air NN 42149 2439 3 pressure pressure NN 42149 2439 4 of of IN 42149 2439 5 17 17 CD 42149 2439 6 lb lb NN 42149 2439 7 . . . 42149 2440 1 was be VBD 42149 2440 2 carried carry VBN 42149 2440 3 , , , 42149 2440 4 which which WDT 42149 2440 5 was be VBD 42149 2440 6 enough enough JJ 42149 2440 7 to to TO 42149 2440 8 keep keep VB 42149 2440 9 the the DT 42149 2440 10 silt silt NN 42149 2440 11 from from IN 42149 2440 12 squeezing squeeze VBG 42149 2440 13 in in RB 42149 2440 14 and and CC 42149 2440 15 yet yet RB 42149 2440 16 left leave VBN 42149 2440 17 it -PRON- PRP 42149 2440 18 soft soft JJ 42149 2440 19 enough enough RB 42149 2440 20 to to TO 42149 2440 21 be be VB 42149 2440 22 chopped chop VBN 42149 2440 23 with with IN 42149 2440 24 a a DT 42149 2440 25 spade spade NN 42149 2440 26 . . . 42149 2441 1 A a DT 42149 2441 2 top top JJ 42149 2441 3 heading heading NN 42149 2441 4 , , , 42149 2441 5 of of IN 42149 2441 6 full full JJ 42149 2441 7 width width NN 42149 2441 8 and and CC 42149 2441 9 6 6 CD 42149 2441 10 ft ft NN 42149 2441 11 . . NN 42149 2441 12 8 8 CD 42149 2441 13 in in IN 42149 2441 14 . . . 42149 2442 1 high high JJ 42149 2442 2 , , , 42149 2442 3 was be VBD 42149 2442 4 first first RB 42149 2442 5 taken take VBN 42149 2442 6 out out RP 42149 2442 7 , , , 42149 2442 8 and and CC 42149 2442 9 the the DT 42149 2442 10 roof roof NN 42149 2442 11 was be VBD 42149 2442 12 sheathed sheathe VBN 42149 2442 13 with with IN 42149 2442 14 2-in 2-in CD 42149 2442 15 . . . 42149 2443 1 boards board NNS 42149 2443 2 held hold VBN 42149 2443 3 by by IN 42149 2443 4 10 10 CD 42149 2443 5 by by IN 42149 2443 6 10-in 10-in CD 42149 2443 7 . . . 42149 2444 1 head head NN 42149 2444 2 trees tree NNS 42149 2444 3 at at IN 42149 2444 4 3-ft 3-ft CD 42149 2444 5 . . . 42149 2444 6 centers center NNS 42149 2444 7 , , , 42149 2444 8 with with IN 42149 2444 9 10 10 CD 42149 2444 10 by by IN 42149 2444 11 10-in 10-in CD 42149 2444 12 . . . 42149 2445 1 side side NN 42149 2445 2 trees tree NNS 42149 2445 3 . . . 42149 2446 1 The the DT 42149 2446 2 lower low JJR 42149 2446 3 7 7 CD 42149 2446 4 ft ft NN 42149 2446 5 . . NN 42149 2446 6 of of IN 42149 2446 7 bench bench NNP 42149 2446 8 was be VBD 42149 2446 9 then then RB 42149 2446 10 taken take VBN 42149 2446 11 out out RP 42149 2446 12 , , , 42149 2446 13 a a DT 42149 2446 14 tight tight JJ 42149 2446 15 floor floor NN 42149 2446 16 of of IN 42149 2446 17 6 6 CD 42149 2446 18 by by IN 42149 2446 19 6-in 6-in CD 42149 2446 20 . . . 42149 2447 1 cross cross JJ 42149 2447 2 - - NN 42149 2447 3 timber timber NNP 42149 2447 4 was be VBD 42149 2447 5 put put VBN 42149 2447 6 in in RP 42149 2447 7 , , , 42149 2447 8 and and CC 42149 2447 9 also also RB 42149 2447 10 longer long RBR 42149 2447 11 side side NN 42149 2447 12 trees tree NNS 42149 2447 13 , , , 42149 2447 14 the the DT 42149 2447 15 head head NN 42149 2447 16 trees tree NNS 42149 2447 17 being be VBG 42149 2447 18 temporarily temporarily RB 42149 2447 19 held hold VBN 42149 2447 20 by by IN 42149 2447 21 two two CD 42149 2447 22 longitudinal longitudinal JJ 42149 2447 23 10 10 CD 42149 2447 24 by by IN 42149 2447 25 10-in 10-in CD 42149 2447 26 . . . 42149 2448 1 stringers stringer NNS 42149 2448 2 blocked block VBD 42149 2448 3 in in IN 42149 2448 4 place place NN 42149 2448 5 . . . 42149 2449 1 The the DT 42149 2449 2 bulk bulk NN 42149 2449 3 of of IN 42149 2449 4 the the DT 42149 2449 5 space space NN 42149 2449 6 between between IN 42149 2449 7 the the DT 42149 2449 8 side side NN 42149 2449 9 trees tree NNS 42149 2449 10 was be VBD 42149 2449 11 filled fill VBN 42149 2449 12 with with IN 42149 2449 13 10 10 CD 42149 2449 14 by by IN 42149 2449 15 10-in 10-in CD 42149 2449 16 . . . 42149 2450 1 posts post NNS 42149 2450 2 and and CC 42149 2450 3 blocking block VBG 42149 2450 4 . . . 42149 2451 1 The the DT 42149 2451 2 plates plate NNS 42149 2451 3 at at IN 42149 2451 4 the the DT 42149 2451 5 other other JJ 42149 2451 6 end end NN 42149 2451 7 of of IN 42149 2451 8 the the DT 42149 2451 9 passage passage NN 42149 2451 10 were be VBD 42149 2451 11 then then RB 42149 2451 12 taken take VBN 42149 2451 13 out out RP 42149 2451 14 from from IN 42149 2451 15 the the DT 42149 2451 16 other other JJ 42149 2451 17 tunnel tunnel NN 42149 2451 18 . . . 42149 2452 1 After after IN 42149 2452 2 the the DT 42149 2452 3 excavation excavation NN 42149 2452 4 was be VBD 42149 2452 5 out out RB 42149 2452 6 , , , 42149 2452 7 the the DT 42149 2452 8 outer outer NN 42149 2452 9 reinforced reinforce VBN 42149 2452 10 concrete concrete JJ 42149 2452 11 lining lining NN 42149 2452 12 was be VBD 42149 2452 13 built build VBN 42149 2452 14 . . . 42149 2453 1 Rough rough JJ 42149 2453 2 forms form NNS 42149 2453 3 were be VBD 42149 2453 4 used use VBN 42149 2453 5 , , , 42149 2453 6 as as IN 42149 2453 7 the the DT 42149 2453 8 interior interior JJ 42149 2453 9 surfaces surface NNS 42149 2453 10 of of IN 42149 2453 11 the the DT 42149 2453 12 passages passage NNS 42149 2453 13 were be VBD 42149 2453 14 to to TO 42149 2453 15 be be VB 42149 2453 16 rendered render VBN 42149 2453 17 with with IN 42149 2453 18 a a DT 42149 2453 19 water water NN 42149 2453 20 - - HYPH 42149 2453 21 proofing proof VBG 42149 2453 22 cement cement NN 42149 2453 23 . . . 42149 2454 1 A a DT 42149 2454 2 few few JJ 42149 2454 3 grout grout NN 42149 2454 4 pipes pipe NNS 42149 2454 5 were be VBD 42149 2454 6 built build VBN 42149 2454 7 in in IN 42149 2454 8 , , , 42149 2454 9 and and CC 42149 2454 10 all all DT 42149 2454 11 voids void NNS 42149 2454 12 outside outside IN 42149 2454 13 the the DT 42149 2454 14 concrete concrete NN 42149 2454 15 were be VBD 42149 2454 16 grouted grout VBN 42149 2454 17 . . . 42149 2455 1 Grouting grout VBG 42149 2455 2 was be VBD 42149 2455 3 also also RB 42149 2455 4 done do VBN 42149 2455 5 through through IN 42149 2455 6 the the DT 42149 2455 7 regular regular JJ 42149 2455 8 grout grout NN 42149 2455 9 holes hole NNS 42149 2455 10 of of IN 42149 2455 11 the the DT 42149 2455 12 metal metal NN 42149 2455 13 lining line VBG 42149 2455 14 around around IN 42149 2455 15 the the DT 42149 2455 16 openings opening NNS 42149 2455 17 . . . 42149 2456 1 In in IN 42149 2456 2 the the DT 42149 2456 3 case case NN 42149 2456 4 of of IN 42149 2456 5 the the DT 42149 2456 6 most most RBS 42149 2456 7 westerly westerly JJ 42149 2456 8 of of IN 42149 2456 9 the the DT 42149 2456 10 cross cross NN 42149 2456 11 - - NNS 42149 2456 12 passages passage NNS 42149 2456 13 at at IN 42149 2456 14 Weehawken Weehawken NNP 42149 2456 15 , , , 42149 2456 16 which which WDT 42149 2456 17 was be VBD 42149 2456 18 in in IN 42149 2456 19 badly badly RB 42149 2456 20 seamed seam VBN 42149 2456 21 rock rock NN 42149 2456 22 carrying carry VBG 42149 2456 23 much much JJ 42149 2456 24 water water NN 42149 2456 25 , , , 42149 2456 26 a a DT 42149 2456 27 steel steel NN 42149 2456 28 inter inter RB 42149 2456 29 - - JJ 42149 2456 30 lining lining JJ 42149 2456 31 , , , 42149 2456 32 rather rather RB 42149 2456 33 smaller small JJR 42149 2456 34 than than IN 42149 2456 35 the the DT 42149 2456 36 concrete concrete NN 42149 2456 37 , , , 42149 2456 38 was be VBD 42149 2456 39 put put VBN 42149 2456 40 in in RB 42149 2456 41 . . . 42149 2457 1 The the DT 42149 2457 2 space space NN 42149 2457 3 between between IN 42149 2457 4 the the DT 42149 2457 5 concrete concrete NN 42149 2457 6 and and CC 42149 2457 7 the the DT 42149 2457 8 steel steel NN 42149 2457 9 was be VBD 42149 2457 10 left leave VBN 42149 2457 11 open open JJ 42149 2457 12 , , , 42149 2457 13 so so IN 42149 2457 14 that that DT 42149 2457 15 water water NN 42149 2457 16 coming come VBG 42149 2457 17 through through IN 42149 2457 18 the the DT 42149 2457 19 concrete concrete JJ 42149 2457 20 lining lining NN 42149 2457 21 was be VBD 42149 2457 22 stopped stop VBN 42149 2457 23 by by IN 42149 2457 24 the the DT 42149 2457 25 steel steel NN 42149 2457 26 plate plate NN 42149 2457 27 . . . 42149 2458 1 This this DT 42149 2458 2 water water NN 42149 2458 3 was be VBD 42149 2458 4 led lead VBN 42149 2458 5 back back RB 42149 2458 6 to to IN 42149 2458 7 the the DT 42149 2458 8 shield shield NN 42149 2458 9 chamber chamber NN 42149 2458 10 in in IN 42149 2458 11 a a DT 42149 2458 12 special special JJ 42149 2458 13 drain drain NN 42149 2458 14 laid lay VBN 42149 2458 15 in in IN 42149 2458 16 the the DT 42149 2458 17 bench bench NN 42149 2458 18 of of IN 42149 2458 19 the the DT 42149 2458 20 river river NN 42149 2458 21 tunnel tunnel NN 42149 2458 22 and and CC 42149 2458 23 behind behind IN 42149 2458 24 the the DT 42149 2458 25 ducts duct NNS 42149 2458 26 . . . 42149 2459 1 From from IN 42149 2459 2 the the DT 42149 2459 3 shield shield NN 42149 2459 4 chamber chamber NN 42149 2459 5 the the DT 42149 2459 6 water water NN 42149 2459 7 ran run VBD 42149 2459 8 with with IN 42149 2459 9 the the DT 42149 2459 10 rest rest NN 42149 2459 11 of of IN 42149 2459 12 the the DT 42149 2459 13 drainage drainage NN 42149 2459 14 from from IN 42149 2459 15 the the DT 42149 2459 16 Weehawken Weehawken NNP 42149 2459 17 Land Land NNP 42149 2459 18 Tunnels Tunnels NNPS 42149 2459 19 to to IN 42149 2459 20 the the DT 42149 2459 21 Weehawken Weehawken NNP 42149 2459 22 Shaft Shaft NNP 42149 2459 23 sump sump NN 42149 2459 24 . . . 42149 2460 1 [ [ -LRB- 42149 2460 2 Illustration illustration NN 42149 2460 3 : : : 42149 2460 4 TYPICAL TYPICAL NNP 42149 2460 5 CROSS cros VBN 42149 2460 6 - - HYPH 42149 2460 7 SECTIONS sections NN 42149 2460 8 SHOWING show VBG 42149 2460 9 SUCCESSIVE successive JJ 42149 2460 10 STAGES stage NNS 42149 2460 11 IN in IN 42149 2460 12 PLACING placing NN 42149 2460 13 CONCRETE concrete CC 42149 2460 14 IN in IN 42149 2460 15 RIVER river NN 42149 2460 16 TUNNELS tunnel NNS 42149 2460 17 FIG fig NN 42149 2460 18 . . . 42149 2461 1 21 21 CD 42149 2461 2 . . . 42149 2461 3 ] ] -RRB- 42149 2462 1 _ _ NNP 42149 2462 2 Period Period NNP 42149 2462 3 No no UH 42149 2462 4 . . . 42149 2463 1 5._--_Placing 5._--_place VBG 42149 2463 2 the the DT 42149 2463 3 Concrete Concrete NNP 42149 2463 4 Lining._--_November Lining._--_November NNP 42149 2463 5 , , , 42149 2463 6 1908 1908 CD 42149 2463 7 , , , 42149 2463 8 to to IN 42149 2463 9 June June NNP 42149 2463 10 , , , 42149 2463 11 1909._--During 1909._--during CD 42149 2463 12 the the DT 42149 2463 13 fifth fifth JJ 42149 2463 14 period period NN 42149 2463 15 the the DT 42149 2463 16 concrete concrete JJ 42149 2463 17 lining lining NN 42149 2463 18 was be VBD 42149 2463 19 put put VBN 42149 2463 20 in in RP 42149 2463 21 . . . 42149 2464 1 This this DT 42149 2464 2 lining lining NN 42149 2464 3 was be VBD 42149 2464 4 placed place VBN 42149 2464 5 in in IN 42149 2464 6 stages stage NNS 42149 2464 7 , , , 42149 2464 8 as as IN 42149 2464 9 follows follow VBZ 42149 2464 10 : : : 42149 2464 11 First first RB 42149 2464 12 , , , 42149 2464 13 the the DT 42149 2464 14 invert invert NN 42149 2464 15 ; ; : 42149 2464 16 second second LS 42149 2464 17 , , , 42149 2464 18 the the DT 42149 2464 19 duct duct NN 42149 2464 20 bench bench NN 42149 2464 21 ; ; : 42149 2464 22 third third RB 42149 2464 23 , , , 42149 2464 24 the the DT 42149 2464 25 arch arch JJ 42149 2464 26 ; ; : 42149 2464 27 fourth fourth JJ 42149 2464 28 , , , 42149 2464 29 the the DT 42149 2464 30 ducts duct NNS 42149 2464 31 ; ; : 42149 2464 32 and and CC 42149 2464 33 fifth fifth JJ 42149 2464 34 , , , 42149 2464 35 the the DT 42149 2464 36 face face NN 42149 2464 37 of of IN 42149 2464 38 the the DT 42149 2464 39 bench bench NN 42149 2464 40 . . . 42149 2465 1 This this DT 42149 2465 2 division division NN 42149 2465 3 can can MD 42149 2465 4 be be VB 42149 2465 5 seen see VBN 42149 2465 6 by by IN 42149 2465 7 reference reference NN 42149 2465 8 to to IN 42149 2465 9 Fig Fig NNP 42149 2465 10 . . . 42149 2466 1 21 21 CD 42149 2466 2 . . . 42149 2467 1 All all PDT 42149 2467 2 the the DT 42149 2467 3 work work NN 42149 2467 4 was be VBD 42149 2467 5 started start VBN 42149 2467 6 on on IN 42149 2467 7 the the DT 42149 2467 8 landward landward NN 42149 2467 9 ends end NNS 42149 2467 10 and and CC 42149 2467 11 carried carry VBD 42149 2467 12 toward toward IN 42149 2467 13 the the DT 42149 2467 14 middle middle NN 42149 2467 15 of of IN 42149 2467 16 the the DT 42149 2467 17 river river NN 42149 2467 18 from from IN 42149 2467 19 both both DT 42149 2467 20 sides side NNS 42149 2467 21 . . . 42149 2468 1 Except except IN 42149 2468 2 where where WRB 42149 2468 3 the the DT 42149 2468 4 Weehawken Weehawken NNP 42149 2468 5 force force NN 42149 2468 6 passed pass VBD 42149 2468 7 the the DT 42149 2468 8 lowest low JJS 42149 2468 9 point point NN 42149 2468 10 of of IN 42149 2468 11 the the DT 42149 2468 12 tunnel tunnel NN 42149 2468 13 , , , 42149 2468 14 which which WDT 42149 2468 15 is be VBZ 42149 2468 16 at at IN 42149 2468 17 Station Station NNP 42149 2468 18 241 241 CD 42149 2468 19 or or CC 42149 2468 20 nearly nearly RB 42149 2468 21 900 900 CD 42149 2468 22 ft ft NN 42149 2468 23 . . . 42149 2468 24 to to IN 42149 2468 25 the the DT 42149 2468 26 west west NN 42149 2468 27 of of IN 42149 2468 28 the the DT 42149 2468 29 middle middle NN 42149 2468 30 of of IN 42149 2468 31 the the DT 42149 2468 32 river river NN 42149 2468 33 , , , 42149 2468 34 all all PDT 42149 2468 35 the the DT 42149 2468 36 work work NN 42149 2468 37 was be VBD 42149 2468 38 down down RB 42149 2468 39 grade grade NN 42149 2468 40 . . . 42149 2469 1 Before before IN 42149 2469 2 any any DT 42149 2469 3 concrete concrete NN 42149 2469 4 was be VBD 42149 2469 5 placed place VBN 42149 2469 6 , , , 42149 2469 7 the the DT 42149 2469 8 surface surface NN 42149 2469 9 of of IN 42149 2469 10 the the DT 42149 2469 11 iron iron NN 42149 2469 12 was be VBD 42149 2469 13 cleaned clean VBN 42149 2469 14 with with IN 42149 2469 15 scrapers scraper NNS 42149 2469 16 and and CC 42149 2469 17 wire wire NN 42149 2469 18 brushes brush NNS 42149 2469 19 , , , 42149 2469 20 and and CC 42149 2469 21 washed wash VBN 42149 2469 22 with with IN 42149 2469 23 water water NN 42149 2469 24 . . . 42149 2470 1 Any any DT 42149 2470 2 leaks leak NNS 42149 2470 3 in in IN 42149 2470 4 the the DT 42149 2470 5 caulking caulking NN 42149 2470 6 and and CC 42149 2470 7 grummeting grummeting NN 42149 2470 8 ( ( -LRB- 42149 2470 9 finished finish VBN 42149 2470 10 by by IN 42149 2470 11 June June NNP 42149 2470 12 , , , 42149 2470 13 1907 1907 CD 42149 2470 14 , , , 42149 2470 15 and and CC 42149 2470 16 therefore therefore RB 42149 2470 17 all all DT 42149 2470 18 more more JJR 42149 2470 19 than than IN 42149 2470 20 12 12 CD 42149 2470 21 months month NNS 42149 2470 22 old old JJ 42149 2470 23 ) ) -RRB- 42149 2470 24 were be VBD 42149 2470 25 repaired repair VBN 42149 2470 26 . . . 42149 2471 1 All all PDT 42149 2471 2 the the DT 42149 2471 3 grout grout NN 42149 2471 4 hole hole NN 42149 2471 5 plugs plug NNS 42149 2471 6 were be VBD 42149 2471 7 examined examine VBN 42149 2471 8 , , , 42149 2471 9 and and CC 42149 2471 10 the the DT 42149 2471 11 plugs plug NNS 42149 2471 12 in in IN 42149 2471 13 any any DT 42149 2471 14 leaking leak VBG 42149 2471 15 ones one NNS 42149 2471 16 were be VBD 42149 2471 17 taken take VBN 42149 2471 18 out out RP 42149 2471 19 , , , 42149 2471 20 smeared smear VBN 42149 2471 21 with with IN 42149 2471 22 red red JJ 42149 2471 23 lead lead NN 42149 2471 24 , , , 42149 2471 25 and and CC 42149 2471 26 replaced replace VBD 42149 2471 27 . . . 42149 2472 1 The the DT 42149 2472 2 leakage leakage NN 42149 2472 3 in in IN 42149 2472 4 the the DT 42149 2472 5 caulking caulking NN 42149 2472 6 was be VBD 42149 2472 7 due due JJ 42149 2472 8 to to IN 42149 2472 9 the the DT 42149 2472 10 fact fact NN 42149 2472 11 that that IN 42149 2472 12 the the DT 42149 2472 13 tunnel tunnel NN 42149 2472 14 had have VBD 42149 2472 15 been be VBN 42149 2472 16 settling settle VBG 42149 2472 17 slightly slightly RB 42149 2472 18 during during IN 42149 2472 19 the the DT 42149 2472 20 whole whole JJ 42149 2472 21 12 12 CD 42149 2472 22 months month NNS 42149 2472 23 of of IN 42149 2472 24 pile pile NN 42149 2472 25 tests test NNS 42149 2472 26 , , , 42149 2472 27 and and CC 42149 2472 28 , , , 42149 2472 29 therefore therefore RB 42149 2472 30 , , , 42149 2472 31 had have VBD 42149 2472 32 opened open VBN 42149 2472 33 some some DT 42149 2472 34 of of IN 42149 2472 35 the the DT 42149 2472 36 joints joint NNS 42149 2472 37 . . . 42149 2473 1 After after IN 42149 2473 2 the the DT 42149 2473 3 caulking caulking NN 42149 2473 4 had have VBD 42149 2473 5 been be VBN 42149 2473 6 repaired repair VBN 42149 2473 7 and and CC 42149 2473 8 the the DT 42149 2473 9 surface surface NN 42149 2473 10 thoroughly thoroughly RB 42149 2473 11 cleaned clean VBN 42149 2473 12 , , , 42149 2473 13 the the DT 42149 2473 14 flanges flange NNS 42149 2473 15 were be VBD 42149 2473 16 covered cover VBN 42149 2473 17 with with IN 42149 2473 18 neat neat JJ 42149 2473 19 cement cement NN 42149 2473 20 ( ( -LRB- 42149 2473 21 put put VBN 42149 2473 22 on on RP 42149 2473 23 dry dry JJ 42149 2473 24 or or CC 42149 2473 25 poured pour VBN 42149 2473 26 on on RP 42149 2473 27 in in IN 42149 2473 28 the the DT 42149 2473 29 form form NN 42149 2473 30 of of IN 42149 2473 31 thick thick JJ 42149 2473 32 grout grout NN 42149 2473 33 ) ) -RRB- 42149 2473 34 just just RB 42149 2473 35 before before IN 42149 2473 36 the the DT 42149 2473 37 concrete concrete NN 42149 2473 38 was be VBD 42149 2473 39 placed place VBN 42149 2473 40 . . . 42149 2474 1 _ _ NNP 42149 2474 2 Invert Invert NNP 42149 2474 3 Concrete._--The Concrete._--The NNP 42149 2474 4 form form NN 42149 2474 5 used use VBN 42149 2474 6 for for IN 42149 2474 7 the the DT 42149 2474 8 landward landward NN 42149 2474 9 type type NN 42149 2474 10 of of IN 42149 2474 11 concrete concrete NN 42149 2474 12 , , , 42149 2474 13 that that RB 42149 2474 14 is is RB 42149 2474 15 , , , 42149 2474 16 the the DT 42149 2474 17 one one NN 42149 2474 18 with with IN 42149 2474 19 a a DT 42149 2474 20 middle middle JJ 42149 2474 21 drain drain NN 42149 2474 22 , , , 42149 2474 23 consisted consist VBD 42149 2474 24 of of IN 42149 2474 25 a a DT 42149 2474 26 frame frame NN 42149 2474 27 made make VBN 42149 2474 28 of of IN 42149 2474 29 a a DT 42149 2474 30 pair pair NN 42149 2474 31 of of IN 42149 2474 32 trussed truss VBN 42149 2474 33 steel steel NN 42149 2474 34 rails rail NNS 42149 2474 35 on on IN 42149 2474 36 each each DT 42149 2474 37 side side NN 42149 2474 38 of of IN 42149 2474 39 the the DT 42149 2474 40 tunnel tunnel NN 42149 2474 41 and and CC 42149 2474 42 connected connect VBN 42149 2474 43 at at IN 42149 2474 44 intervals interval NNS 42149 2474 45 with with IN 42149 2474 46 6 6 CD 42149 2474 47 by by IN 42149 2474 48 6-in 6-in CD 42149 2474 49 . . . 42149 2475 1 cross cross NN 42149 2475 2 - - NNS 42149 2475 3 timbers timber NNS 42149 2475 4 ; ; : 42149 2475 5 two two CD 42149 2475 6 " " `` 42149 2475 7 wing wing NN 42149 2475 8 forms form NNS 42149 2475 9 " " '' 42149 2475 10 were be VBD 42149 2475 11 hung hang VBN 42149 2475 12 from from IN 42149 2475 13 this this DT 42149 2475 14 frame frame NN 42149 2475 15 by by IN 42149 2475 16 adjustable adjustable JJ 42149 2475 17 arms arm NNS 42149 2475 18 . . . 42149 2476 1 These these DT 42149 2476 2 wings wing NNS 42149 2476 3 formed form VBD 42149 2476 4 the the DT 42149 2476 5 curved curved JJ 42149 2476 6 sides side NNS 42149 2476 7 of of IN 42149 2476 8 the the DT 42149 2476 9 invert invert NN 42149 2476 10 , , , 42149 2476 11 the the DT 42149 2476 12 lip lip NN 42149 2476 13 , , , 42149 2476 14 and and CC 42149 2476 15 the the DT 42149 2476 16 form form NN 42149 2476 17 for for IN 42149 2476 18 the the DT 42149 2476 19 middle middle JJ 42149 2476 20 drain drain NN 42149 2476 21 . . . 42149 2477 1 The the DT 42149 2477 2 whole whole JJ 42149 2477 3 form form NN 42149 2477 4 was be VBD 42149 2477 5 supported support VBN 42149 2477 6 on on IN 42149 2477 7 three three CD 42149 2477 8 wheels wheel NNS 42149 2477 9 , , , 42149 2477 10 two two CD 42149 2477 11 on on IN 42149 2477 12 the the DT 42149 2477 13 rear rear JJ 42149 2477 14 end end NN 42149 2477 15 running run VBG 42149 2477 16 on on IN 42149 2477 17 a a DT 42149 2477 18 rail rail NN 42149 2477 19 laid lay VBN 42149 2477 20 on on IN 42149 2477 21 the the DT 42149 2477 22 finished finished JJ 42149 2477 23 concrete concrete NN 42149 2477 24 , , , 42149 2477 25 and and CC 42149 2477 26 the the DT 42149 2477 27 third third JJ 42149 2477 28 in in IN 42149 2477 29 front front NN 42149 2477 30 attached attach VBN 42149 2477 31 to to IN 42149 2477 32 the the DT 42149 2477 33 frame frame NN 42149 2477 34 by by IN 42149 2477 35 a a DT 42149 2477 36 carriage carriage NN 42149 2477 37 and and CC 42149 2477 38 running run VBG 42149 2477 39 on on IN 42149 2477 40 a a DT 42149 2477 41 rail rail NN 42149 2477 42 temporarily temporarily RB 42149 2477 43 laid lay VBN 42149 2477 44 on on IN 42149 2477 45 the the DT 42149 2477 46 iron iron NN 42149 2477 47 lining lining NN 42149 2477 48 . . . 42149 2478 1 The the DT 42149 2478 2 form form NN 42149 2478 3 was be VBD 42149 2478 4 braced brace VBN 42149 2478 5 from from IN 42149 2478 6 the the DT 42149 2478 7 iron iron NN 42149 2478 8 lining lining NN 42149 2478 9 by by IN 42149 2478 10 6 6 CD 42149 2478 11 by by IN 42149 2478 12 6-in 6-in CD 42149 2478 13 . . . 42149 2479 1 blocks block NNS 42149 2479 2 . . . 42149 2480 1 For for IN 42149 2480 2 the the DT 42149 2480 3 soft soft JJ 42149 2480 4 - - HYPH 42149 2480 5 ground ground NN 42149 2480 6 type type NN 42149 2480 7 of of IN 42149 2480 8 invert invert NN 42149 2480 9 , , , 42149 2480 10 namely namely RB 42149 2480 11 , , , 42149 2480 12 the the DT 42149 2480 13 one one NN 42149 2480 14 without without IN 42149 2480 15 the the DT 42149 2480 16 middle middle JJ 42149 2480 17 drain drain NN 42149 2480 18 , , , 42149 2480 19 a a DT 42149 2480 20 form form NN 42149 2480 21 of of IN 42149 2480 22 the the DT 42149 2480 23 same same JJ 42149 2480 24 general general JJ 42149 2480 25 type type NN 42149 2480 26 was be VBD 42149 2480 27 used use VBN 42149 2480 28 , , , 42149 2480 29 except except IN 42149 2480 30 that that IN 42149 2480 31 the the DT 42149 2480 32 form form NN 42149 2480 33 for for IN 42149 2480 34 the the DT 42149 2480 35 middle middle JJ 42149 2480 36 drain drain NN 42149 2480 37 was be VBD 42149 2480 38 removed remove VBN 42149 2480 39 . . . 42149 2481 1 After after IN 42149 2481 2 the the DT 42149 2481 3 form form NN 42149 2481 4 had have VBD 42149 2481 5 been be VBN 42149 2481 6 in in IN 42149 2481 7 use use NN 42149 2481 8 for for IN 42149 2481 9 some some DT 42149 2481 10 time time NN 42149 2481 11 , , , 42149 2481 12 " " '' 42149 2481 13 key key JJ 42149 2481 14 pieces piece NNS 42149 2481 15 " " '' 42149 2481 16 ( ( -LRB- 42149 2481 17 made make VBN 42149 2481 18 of of IN 42149 2481 19 strips strip NNS 42149 2481 20 of of IN 42149 2481 21 wood wood NN 42149 2481 22 about about RB 42149 2481 23 1 1 CD 42149 2481 24 ft ft NN 42149 2481 25 . . NNP 42149 2481 26 3 3 CD 42149 2481 27 in in IN 42149 2481 28 . . . 42149 2482 1 in in IN 42149 2482 2 length length NN 42149 2482 3 and and CC 42149 2482 4 3 3 CD 42149 2482 5 by by IN 42149 2482 6 3 3 CD 42149 2482 7 in in IN 42149 2482 8 . . . 42149 2483 1 in in IN 42149 2483 2 cross cross JJ 42149 2483 3 - - NN 42149 2483 4 section section NN 42149 2483 5 ) ) -RRB- 42149 2483 6 were be VBD 42149 2483 7 nailed nail VBN 42149 2483 8 circumferentially circumferentially RB 42149 2483 9 on on IN 42149 2483 10 the the DT 42149 2483 11 under under JJ 42149 2483 12 side side NN 42149 2483 13 of of IN 42149 2483 14 the the DT 42149 2483 15 wings wing NNS 42149 2483 16 at at IN 42149 2483 17 2-ft 2-ft CD 42149 2483 18 . . . 42149 2483 19 intervals interval NNS 42149 2483 20 . . . 42149 2484 1 This this DT 42149 2484 2 was be VBD 42149 2484 3 done do VBN 42149 2484 4 because because IN 42149 2484 5 , , , 42149 2484 6 at at IN 42149 2484 7 the the DT 42149 2484 8 time time NN 42149 2484 9 , , , 42149 2484 10 it -PRON- PRP 42149 2484 11 was be VBD 42149 2484 12 not not RB 42149 2484 13 known know VBN 42149 2484 14 whether whether IN 42149 2484 15 ballasted ballasted JJ 42149 2484 16 tracks track NNS 42149 2484 17 or or CC 42149 2484 18 some some DT 42149 2484 19 form form NN 42149 2484 20 of of IN 42149 2484 21 rigid rigid JJ 42149 2484 22 concrete concrete JJ 42149 2484 23 track track NN 42149 2484 24 construction construction NN 42149 2484 25 would would MD 42149 2484 26 be be VB 42149 2484 27 adopted adopt VBN 42149 2484 28 , , , 42149 2484 29 and and CC 42149 2484 30 , , , 42149 2484 31 if if IN 42149 2484 32 the the DT 42149 2484 33 latter latter JJ 42149 2484 34 , , , 42149 2484 35 it -PRON- PRP 42149 2484 36 was be VBD 42149 2484 37 desirable desirable JJ 42149 2484 38 not not RB 42149 2484 39 to to TO 42149 2484 40 have have VB 42149 2484 41 the the DT 42149 2484 42 surface surface NN 42149 2484 43 smooth smooth JJ 42149 2484 44 . . . 42149 2485 1 The the DT 42149 2485 2 concrete concrete NN 42149 2485 3 was be VBD 42149 2485 4 received receive VBN 42149 2485 5 in in IN 42149 2485 6 cars car NNS 42149 2485 7 at at IN 42149 2485 8 the the DT 42149 2485 9 rear rear JJ 42149 2485 10 end end NN 42149 2485 11 of of IN 42149 2485 12 the the DT 42149 2485 13 form form NN 42149 2485 14 and and CC 42149 2485 15 dumped dump VBD 42149 2485 16 on on IN 42149 2485 17 a a DT 42149 2485 18 temporary temporary JJ 42149 2485 19 platform platform NN 42149 2485 20 . . . 42149 2486 1 It -PRON- PRP 42149 2486 2 was be VBD 42149 2486 3 then then RB 42149 2486 4 loaded load VBN 42149 2486 5 into into IN 42149 2486 6 wheel wheel NN 42149 2486 7 - - HYPH 42149 2486 8 barrows barrow NNS 42149 2486 9 on on IN 42149 2486 10 the the DT 42149 2486 11 runways runway NNS 42149 2486 12 , , , 42149 2486 13 as as IN 42149 2486 14 shown show VBN 42149 2486 15 in in IN 42149 2486 16 Fig Fig NNP 42149 2486 17 . . . 42149 2487 1 22 22 CD 42149 2487 2 . . . 42149 2488 1 The the DT 42149 2488 2 concrete concrete NN 42149 2488 3 was be VBD 42149 2488 4 thrown throw VBN 42149 2488 5 from from IN 42149 2488 6 the the DT 42149 2488 7 barrows barrow NNS 42149 2488 8 into into IN 42149 2488 9 the the DT 42149 2488 10 invert invert NN 42149 2488 11 , , , 42149 2488 12 where where WRB 42149 2488 13 it -PRON- PRP 42149 2488 14 was be VBD 42149 2488 15 spaded spade VBN 42149 2488 16 and and CC 42149 2488 17 tamped tamp VBN 42149 2488 18 . . . 42149 2489 1 In in IN 42149 2489 2 cases case NNS 42149 2489 3 where where WRB 42149 2489 4 there there EX 42149 2489 5 was be VBD 42149 2489 6 steel steel NN 42149 2489 7 - - HYPH 42149 2489 8 rod rod NN 42149 2489 9 reinforcement reinforcement NN 42149 2489 10 , , , 42149 2489 11 the the DT 42149 2489 12 concrete concrete NN 42149 2489 13 was be VBD 42149 2489 14 first first RB 42149 2489 15 brought bring VBN 42149 2489 16 up up RP 42149 2489 17 to to IN 42149 2489 18 the the DT 42149 2489 19 level level NN 42149 2489 20 of of IN 42149 2489 21 the the DT 42149 2489 22 underside underside NN 42149 2489 23 of of IN 42149 2489 24 these these DT 42149 2489 25 rods rod NNS 42149 2489 26 , , , 42149 2489 27 which which WDT 42149 2489 28 came come VBD 42149 2489 29 between between IN 42149 2489 30 the the DT 42149 2489 31 wings wing NNS 42149 2489 32 ; ; : 42149 2489 33 the the DT 42149 2489 34 rods rod NNS 42149 2489 35 were be VBD 42149 2489 36 laid lay VBN 42149 2489 37 in in IN 42149 2489 38 place place NN 42149 2489 39 , , , 42149 2489 40 and and CC 42149 2489 41 then then RB 42149 2489 42 more more JJR 42149 2489 43 concrete concrete NN 42149 2489 44 was be VBD 42149 2489 45 placed place VBN 42149 2489 46 over over IN 42149 2489 47 the the DT 42149 2489 48 rods rod NNS 42149 2489 49 and and CC 42149 2489 50 brought bring VBD 42149 2489 51 up up RP 42149 2489 52 to to IN 42149 2489 53 the the DT 42149 2489 54 level level NN 42149 2489 55 of of IN 42149 2489 56 the the DT 42149 2489 57 bottom bottom NN 42149 2489 58 of of IN 42149 2489 59 the the DT 42149 2489 60 wings wing NNS 42149 2489 61 . . . 42149 2490 1 Where where WRB 42149 2490 2 there there EX 42149 2490 3 was be VBD 42149 2490 4 no no DT 42149 2490 5 reinforcement reinforcement NN 42149 2490 6 , , , 42149 2490 7 the the DT 42149 2490 8 concrete concrete NN 42149 2490 9 was be VBD 42149 2490 10 brought bring VBN 42149 2490 11 up up RP 42149 2490 12 in in IN 42149 2490 13 one one CD 42149 2490 14 lift lift NN 42149 2490 15 . . . 42149 2491 1 [ [ -LRB- 42149 2491 2 Illustration illustration NN 42149 2491 3 : : : 42149 2491 4 CONCRETE CONCRETE NNP 42149 2491 5 FORM FORM NNP 42149 2491 6 STANDARD standard NN 42149 2491 7 IN in IN 42149 2491 8 RIVER river NN 42149 2491 9 TUNNELS tunnel NNS 42149 2491 10 FIG fig NN 42149 2491 11 . . . 42149 2492 1 22 22 CD 42149 2492 2 . . . 42149 2492 3 ] ] -RRB- 42149 2493 1 After after IN 42149 2493 2 this this DT 42149 2493 3 was be VBD 42149 2493 4 finished finish VBN 42149 2493 5 , , , 42149 2493 6 the the DT 42149 2493 7 concrete concrete NN 42149 2493 8 behind behind IN 42149 2493 9 the the DT 42149 2493 10 wings wing NNS 42149 2493 11 was be VBD 42149 2493 12 placed place VBN 42149 2493 13 , , , 42149 2493 14 thoroughly thoroughly RB 42149 2493 15 spaded spade VBN 42149 2493 16 and and CC 42149 2493 17 tamped tamp VBD 42149 2493 18 , , , 42149 2493 19 and and CC 42149 2493 20 , , , 42149 2493 21 where where WRB 42149 2493 22 there there EX 42149 2493 23 were be VBD 42149 2493 24 longitudinal longitudinal JJ 42149 2493 25 reinforcing reinforce VBG 42149 2493 26 rods rod NNS 42149 2493 27 , , , 42149 2493 28 these these DT 42149 2493 29 were be VBD 42149 2493 30 put put VBN 42149 2493 31 in in RP 42149 2493 32 at at IN 42149 2493 33 their -PRON- PRP$ 42149 2493 34 proper proper JJ 42149 2493 35 level level NN 42149 2493 36 . . . 42149 2494 1 Where where WRB 42149 2494 2 there there EX 42149 2494 3 were be VBD 42149 2494 4 circumferential circumferential JJ 42149 2494 5 rods rod NNS 42149 2494 6 , , , 42149 2494 7 the the DT 42149 2494 8 16-ft 16-ft NNP 42149 2494 9 . . . 42149 2494 10 rods rod NNS 42149 2494 11 had have VBD 42149 2494 12 already already RB 42149 2494 13 been be VBN 42149 2494 14 put put VBN 42149 2494 15 in in RP 42149 2494 16 when when WRB 42149 2494 17 the the DT 42149 2494 18 lower low JJR 42149 2494 19 part part NN 42149 2494 20 of of IN 42149 2494 21 the the DT 42149 2494 22 concrete concrete NN 42149 2494 23 was be VBD 42149 2494 24 placed place VBN 42149 2494 25 . . . 42149 2495 1 As as IN 42149 2495 2 the the DT 42149 2495 3 invert invert NN 42149 2495 4 was be VBD 42149 2495 5 being be VBG 42149 2495 6 finished finish VBN 42149 2495 7 off off RB 42149 2495 8 , , , 42149 2495 9 the the DT 42149 2495 10 8-ft 8-ft NNP 42149 2495 11 . . . 42149 2495 12 rods rod NNS 42149 2495 13 were be VBD 42149 2495 14 embedded embed VBN 42149 2495 15 and and CC 42149 2495 16 tied tie VBN 42149 2495 17 in in IN 42149 2495 18 position position NN 42149 2495 19 . . . 42149 2496 1 The the DT 42149 2496 2 longitudinal longitudinal JJ 42149 2496 3 rods rod NNS 42149 2496 4 were be VBD 42149 2496 5 held hold VBN 42149 2496 6 in in IN 42149 2496 7 place place NN 42149 2496 8 at at IN 42149 2496 9 the the DT 42149 2496 10 leading lead VBG 42149 2496 11 end end NN 42149 2496 12 of of IN 42149 2496 13 each each DT 42149 2496 14 length length NN 42149 2496 15 of of IN 42149 2496 16 arch arch NN 42149 2496 17 by by IN 42149 2496 18 the the DT 42149 2496 19 wooden wooden JJ 42149 2496 20 bulkhead bulkhead NN 42149 2496 21 , , , 42149 2496 22 through through IN 42149 2496 23 which which WDT 42149 2496 24 holes hole NNS 42149 2496 25 were be VBD 42149 2496 26 drilled drill VBN 42149 2496 27 in in IN 42149 2496 28 the the DT 42149 2496 29 proper proper JJ 42149 2496 30 position position NN 42149 2496 31 . . . 42149 2497 1 At at IN 42149 2497 2 the the DT 42149 2497 3 rear rear JJ 42149 2497 4 end end NN 42149 2497 5 they -PRON- PRP 42149 2497 6 were be VBD 42149 2497 7 tied tie VBN 42149 2497 8 to to IN 42149 2497 9 the the DT 42149 2497 10 rods rod NNS 42149 2497 11 projecting project VBG 42149 2497 12 from from IN 42149 2497 13 the the DT 42149 2497 14 previous previous JJ 42149 2497 15 length length NN 42149 2497 16 . . . 42149 2498 1 The the DT 42149 2498 2 quantity quantity NN 42149 2498 3 of of IN 42149 2498 4 water water NN 42149 2498 5 used use VBN 42149 2498 6 in in IN 42149 2498 7 mixing mix VBG 42149 2498 8 the the DT 42149 2498 9 invert invert JJ 42149 2498 10 concrete concrete NN 42149 2498 11 needed need VBD 42149 2498 12 very very RB 42149 2498 13 nice nice JJ 42149 2498 14 adjustment adjustment NN 42149 2498 15 ; ; : 42149 2498 16 if if IN 42149 2498 17 too too RB 42149 2498 18 wet wet JJ 42149 2498 19 , , , 42149 2498 20 the the DT 42149 2498 21 middle middle NN 42149 2498 22 would would MD 42149 2498 23 bulge bulge VB 42149 2498 24 and and CC 42149 2498 25 rise rise VB 42149 2498 26 when when WRB 42149 2498 27 the the DT 42149 2498 28 weight weight NN 42149 2498 29 of of IN 42149 2498 30 the the DT 42149 2498 31 sides side NNS 42149 2498 32 came come VBD 42149 2498 33 on on IN 42149 2498 34 it -PRON- PRP 42149 2498 35 ; ; : 42149 2498 36 and and CC 42149 2498 37 , , , 42149 2498 38 if if IN 42149 2498 39 too too RB 42149 2498 40 dry dry JJ 42149 2498 41 , , , 42149 2498 42 it -PRON- PRP 42149 2498 43 would would MD 42149 2498 44 not not RB 42149 2498 45 pack pack VB 42149 2498 46 properly properly RB 42149 2498 47 between between IN 42149 2498 48 the the DT 42149 2498 49 flanges flange NNS 42149 2498 50 of of IN 42149 2498 51 the the DT 42149 2498 52 iron iron NN 42149 2498 53 lining lining NN 42149 2498 54 . . . 42149 2499 1 The the DT 42149 2499 2 difficulties difficulty NNS 42149 2499 3 as as IN 42149 2499 4 to to IN 42149 2499 5 this this DT 42149 2499 6 were be VBD 42149 2499 7 often often RB 42149 2499 8 increased increase VBN 42149 2499 9 by by IN 42149 2499 10 the the DT 42149 2499 11 flow flow NN 42149 2499 12 of of IN 42149 2499 13 accumulated accumulate VBN 42149 2499 14 leakage leakage NN 42149 2499 15 water water NN 42149 2499 16 from from IN 42149 2499 17 the the DT 42149 2499 18 tunnel tunnel NN 42149 2499 19 behind behind IN 42149 2499 20 on on IN 42149 2499 21 the the DT 42149 2499 22 concrete concrete NN 42149 2499 23 while while IN 42149 2499 24 it -PRON- PRP 42149 2499 25 was be VBD 42149 2499 26 being be VBG 42149 2499 27 put put VBN 42149 2499 28 in in RB 42149 2499 29 . . . 42149 2500 1 To to TO 42149 2500 2 prevent prevent VB 42149 2500 3 this this DT 42149 2500 4 , , , 42149 2500 5 a a DT 42149 2500 6 temporary temporary JJ 42149 2500 7 dam dam NN 42149 2500 8 of of IN 42149 2500 9 sand sand NN 42149 2500 10 bags bag NNS 42149 2500 11 was be VBD 42149 2500 12 always always RB 42149 2500 13 built build VBN 42149 2500 14 across across IN 42149 2500 15 the the DT 42149 2500 16 last last JJ 42149 2500 17 length length NN 42149 2500 18 of of IN 42149 2500 19 finished finish VBN 42149 2500 20 invert invert JJ 42149 2500 21 concrete concrete NN 42149 2500 22 before before IN 42149 2500 23 beginning begin VBG 42149 2500 24 a a DT 42149 2500 25 new new JJ 42149 2500 26 length length NN 42149 2500 27 . . . 42149 2501 1 A a DT 42149 2501 2 sump sump NN 42149 2501 3 hole hole NN 42149 2501 4 , , , 42149 2501 5 about about RB 42149 2501 6 4 4 CD 42149 2501 7 by by IN 42149 2501 8 1 1 CD 42149 2501 9 ft ft NN 42149 2501 10 . . . 42149 2501 11 and and CC 42149 2501 12 1 1 CD 42149 2501 13 ft ft NN 42149 2501 14 . . RB 42149 2501 15 deep deep JJ 42149 2501 16 , , , 42149 2501 17 was be VBD 42149 2501 18 left leave VBN 42149 2501 19 every every DT 42149 2501 20 800 800 CD 42149 2501 21 ft ft NN 42149 2501 22 . . NN 42149 2501 23 along along IN 42149 2501 24 the the DT 42149 2501 25 tunnel tunnel NN 42149 2501 26 , , , 42149 2501 27 and and CC 42149 2501 28 a a DT 42149 2501 29 small small JJ 42149 2501 30 Cameron Cameron NNP 42149 2501 31 pump pump NN 42149 2501 32 was be VBD 42149 2501 33 put put VBN 42149 2501 34 there there RB 42149 2501 35 to to TO 42149 2501 36 pump pump VB 42149 2501 37 out out RP 42149 2501 38 the the DT 42149 2501 39 water water NN 42149 2501 40 . . . 42149 2502 1 The the DT 42149 2502 2 invert invert JJ 42149 2502 3 forms form NNS 42149 2502 4 were be VBD 42149 2502 5 left leave VBN 42149 2502 6 in in IN 42149 2502 7 place place NN 42149 2502 8 about about RB 42149 2502 9 12 12 CD 42149 2502 10 hours hour NNS 42149 2502 11 after after IN 42149 2502 12 the the DT 42149 2502 13 pour pour NN 42149 2502 14 was be VBD 42149 2502 15 finished finish VBN 42149 2502 16 . . . 42149 2503 1 The the DT 42149 2503 2 average average JJ 42149 2503 3 time time NN 42149 2503 4 taken take VBN 42149 2503 5 to to TO 42149 2503 6 fill fill VB 42149 2503 7 a a DT 42149 2503 8 length length NN 42149 2503 9 of of IN 42149 2503 10 30 30 CD 42149 2503 11 feet foot NNS 42149 2503 12 was be VBD 42149 2503 13 7 7 CD 42149 2503 14 hours hour NNS 42149 2503 15 , , , 42149 2503 16 the the DT 42149 2503 17 form form NN 42149 2503 18 was be VBD 42149 2503 19 then then RB 42149 2503 20 left leave VBN 42149 2503 21 12 12 CD 42149 2503 22 hours hour NNS 42149 2503 23 , , , 42149 2503 24 and and CC 42149 2503 25 it -PRON- PRP 42149 2503 26 took take VBD 42149 2503 27 2 2 CD 42149 2503 28 hours hour NNS 42149 2503 29 to to TO 42149 2503 30 set set VB 42149 2503 31 it -PRON- PRP 42149 2503 32 up up RP 42149 2503 33 anew anew RB 42149 2503 34 . . . 42149 2504 1 The the DT 42149 2504 2 total total JJ 42149 2504 3 time time NN 42149 2504 4 for for IN 42149 2504 5 one one CD 42149 2504 6 length length NN 42149 2504 7 , , , 42149 2504 8 therefore therefore RB 42149 2504 9 , , , 42149 2504 10 was be VBD 42149 2504 11 21 21 CD 42149 2504 12 hours hour NNS 42149 2504 13 , , , 42149 2504 14 equal equal JJ 42149 2504 15 to to IN 42149 2504 16 34 34 CD 42149 2504 17 ft ft NN 42149 2504 18 . . NN 42149 2504 19 per per IN 42149 2504 20 24 24 CD 42149 2504 21 hours hour NNS 42149 2504 22 . . . 42149 2505 1 At at IN 42149 2505 2 one one CD 42149 2505 3 place place NN 42149 2505 4 , , , 42149 2505 5 a a DT 42149 2505 6 45-ft 45-ft NNP 42149 2505 7 . . . 42149 2505 8 form form NN 42149 2505 9 was be VBD 42149 2505 10 used use VBN 42149 2505 11 , , , 42149 2505 12 and and CC 42149 2505 13 this this DT 42149 2505 14 gave give VBD 42149 2505 15 an an DT 42149 2505 16 average average JJ 42149 2505 17 speed speed NN 42149 2505 18 of of IN 42149 2505 19 45 45 CD 42149 2505 20 ft ft NN 42149 2505 21 . . NN 42149 2505 22 per per IN 42149 2505 23 24 24 CD 42149 2505 24 hours hour NNS 42149 2505 25 . . . 42149 2506 1 An an DT 42149 2506 2 attempt attempt NN 42149 2506 3 was be VBD 42149 2506 4 made make VBN 42149 2506 5 to to TO 42149 2506 6 build build VB 42149 2506 7 the the DT 42149 2506 8 invert invert JJ 42149 2506 9 concrete concrete NN 42149 2506 10 without without IN 42149 2506 11 forms form NNS 42149 2506 12 ( ( -LRB- 42149 2506 13 seeing see VBG 42149 2506 14 that that IN 42149 2506 15 a a DT 42149 2506 16 rough rough JJ 42149 2506 17 finish finish NN 42149 2506 18 was be VBD 42149 2506 19 desired desire VBN 42149 2506 20 , , , 42149 2506 21 as as IN 42149 2506 22 previously previously RB 42149 2506 23 explained explain VBN 42149 2506 24 , , , 42149 2506 25 to to TO 42149 2506 26 form form VB 42149 2506 27 a a DT 42149 2506 28 key key NN 42149 2506 29 for for IN 42149 2506 30 possible possible JJ 42149 2506 31 sub sub JJ 42149 2506 32 - - JJ 42149 2506 33 track track NN 42149 2506 34 concrete concrete NN 42149 2506 35 ) ) -RRB- 42149 2506 36 , , , 42149 2506 37 but but CC 42149 2506 38 it -PRON- PRP 42149 2506 39 proved prove VBD 42149 2506 40 a a DT 42149 2506 41 failure failure NN 42149 2506 42 . . . 42149 2507 1 The the DT 42149 2507 2 typical typical JJ 42149 2507 3 working work VBG 42149 2507 4 force force NN 42149 2507 5 ( ( -LRB- 42149 2507 6 excluding exclude VBG 42149 2507 7 transport transport NN 42149 2507 8 ) ) -RRB- 42149 2507 9 was be VBD 42149 2507 10 as as IN 42149 2507 11 follows follow VBZ 42149 2507 12 : : : 42149 2507 13 1 1 CD 42149 2507 14 Foreman foreman NN 42149 2507 15 @ @ CC 42149 2507 16 $ $ $ 42149 2507 17 3.25 3.25 CD 42149 2507 18 per per IN 42149 2507 19 shift shift NN 42149 2507 20 . . . 42149 2508 1 2 2 CD 42149 2508 2 Spaders Spaders NNPS 42149 2508 3 " " `` 42149 2508 4 2.00 2.00 CD 42149 2508 5 " " '' 42149 2508 6 " " `` 42149 2508 7 9 9 CD 42149 2508 8 Laborers laborer NNS 42149 2508 9 " " '' 42149 2508 10 1.75 1.75 CD 42149 2508 11 " " '' 42149 2508 12 " " `` 42149 2508 13 The the DT 42149 2508 14 average average JJ 42149 2508 15 time time NN 42149 2508 16 taken take VBN 42149 2508 17 to to TO 42149 2508 18 lay lay VB 42149 2508 19 a a DT 42149 2508 20 30-ft 30-ft NNP 42149 2508 21 . . . 42149 2508 22 length length NNP 42149 2508 23 of of IN 42149 2508 24 invert invert NNP 42149 2508 25 was be VBD 42149 2508 26 7 7 CD 42149 2508 27 hours hour NNS 42149 2508 28 ; ; : 42149 2508 29 the the DT 42149 2508 30 two two CD 42149 2508 31 spaders spader NNS 42149 2508 32 remained remain VBD 42149 2508 33 one one CD 42149 2508 34 hour hour NN 42149 2508 35 extra extra RB 42149 2508 36 , , , 42149 2508 37 smoothing smooth VBG 42149 2508 38 off off RP 42149 2508 39 the the DT 42149 2508 40 surface surface NN 42149 2508 41 . . . 42149 2509 1 For for IN 42149 2509 2 setting set VBG 42149 2509 3 the the DT 42149 2509 4 form form NN 42149 2509 5 , , , 42149 2509 6 the the DT 42149 2509 7 force force NN 42149 2509 8 was be VBD 42149 2509 9 : : : 42149 2509 10 1 1 CD 42149 2509 11 Foreman foreman NN 42149 2509 12 @ @ NFP 42149 2509 13 $ $ $ 42149 2509 14 4.50 4.50 CD 42149 2509 15 per per IN 42149 2509 16 shift shift NN 42149 2509 17 . . . 42149 2510 1 5 5 CD 42149 2510 2 Carpenters Carpenters NNPS 42149 2510 3 " " `` 42149 2510 4 3.25 3.25 CD 42149 2510 5 " " '' 42149 2510 6 " " `` 42149 2510 7 6 6 CD 42149 2510 8 Carpenters Carpenters NNPS 42149 2510 9 ' ' POS 42149 2510 10 helpers helper NNS 42149 2510 11 " " `` 42149 2510 12 2.25 2.25 CD 42149 2510 13 " " '' 42149 2510 14 " " `` 42149 2510 15 The the DT 42149 2510 16 average average JJ 42149 2510 17 time time NN 42149 2510 18 taken take VBN 42149 2510 19 to to TO 42149 2510 20 erect erect VB 42149 2510 21 a a DT 42149 2510 22 form form NN 42149 2510 23 was be VBD 42149 2510 24 2 2 CD 42149 2510 25 hours hour NNS 42149 2510 26 , , , 42149 2510 27 1 1 CD 42149 2510 28 carpenter carpenter NN 42149 2510 29 and and CC 42149 2510 30 1 1 CD 42149 2510 31 helper helper NN 42149 2510 32 remaining remain VBG 42149 2510 33 until until IN 42149 2510 34 the the DT 42149 2510 35 concrete concrete NN 42149 2510 36 was be VBD 42149 2510 37 finished finish VBN 42149 2510 38 . . . 42149 2511 1 _ _ NNP 42149 2511 2 Duct Duct NNP 42149 2511 3 Bench Bench NNP 42149 2511 4 Concrete._--The Concrete._--The NNP 42149 2511 5 duct duct NN 42149 2511 6 bench bench NN 42149 2511 7 ( ( -LRB- 42149 2511 8 as as IN 42149 2511 9 described describe VBN 42149 2511 10 previously previously RB 42149 2511 11 ) ) -RRB- 42149 2511 12 is be VBZ 42149 2511 13 the the DT 42149 2511 14 portion portion NN 42149 2511 15 of of IN 42149 2511 16 the the DT 42149 2511 17 concrete concrete NN 42149 2511 18 on on IN 42149 2511 19 which which WDT 42149 2511 20 the the DT 42149 2511 21 ducts duct NNS 42149 2511 22 are be VBP 42149 2511 23 laid lay VBN 42149 2511 24 . . . 42149 2512 1 The the DT 42149 2512 2 exact exact JJ 42149 2512 3 height height NN 42149 2512 4 of of IN 42149 2512 5 the the DT 42149 2512 6 steps step NNS 42149 2512 7 was be VBD 42149 2512 8 found find VBN 42149 2512 9 by by IN 42149 2512 10 trial trial NN 42149 2512 11 , , , 42149 2512 12 so so IN 42149 2512 13 as as IN 42149 2512 14 to to TO 42149 2512 15 bring bring VB 42149 2512 16 the the DT 42149 2512 17 top top NN 42149 2512 18 of of IN 42149 2512 19 the the DT 42149 2512 20 ducts duct NNS 42149 2512 21 into into IN 42149 2512 22 the the DT 42149 2512 23 proper proper JJ 42149 2512 24 position position NN 42149 2512 25 with with IN 42149 2512 26 regard regard NN 42149 2512 27 to to IN 42149 2512 28 the the DT 42149 2512 29 top top NN 42149 2512 30 and and CC 42149 2512 31 the the DT 42149 2512 32 face face NN 42149 2512 33 of of IN 42149 2512 34 the the DT 42149 2512 35 bench bench NN 42149 2512 36 . . . 42149 2513 1 Both both DT 42149 2513 2 kinds kind NNS 42149 2513 3 of of IN 42149 2513 4 duct duct NN 42149 2513 5 bench bench NN 42149 2513 6 forms form NNS 42149 2513 7 were be VBD 42149 2513 8 of of IN 42149 2513 9 the the DT 42149 2513 10 same same JJ 42149 2513 11 general general JJ 42149 2513 12 type type NN 42149 2513 13 . . . 42149 2514 1 A a DT 42149 2514 2 drawing drawing NN 42149 2514 3 of of IN 42149 2514 4 one one CD 42149 2514 5 of of IN 42149 2514 6 them -PRON- PRP 42149 2514 7 is be VBZ 42149 2514 8 shown show VBN 42149 2514 9 on on IN 42149 2514 10 Plate Plate NNP 42149 2514 11 XLII XLII NNP 42149 2514 12 . . . 42149 2515 1 The the DT 42149 2515 2 form form NN 42149 2515 3 consisted consist VBD 42149 2515 4 of of IN 42149 2515 5 a a DT 42149 2515 6 skeleton skeleton NN 42149 2515 7 framework framework NN 42149 2515 8 running run VBG 42149 2515 9 on on IN 42149 2515 10 wheels wheel NNS 42149 2515 11 on on IN 42149 2515 12 a a DT 42149 2515 13 track track NN 42149 2515 14 at at IN 42149 2515 15 the the DT 42149 2515 16 level level NN 42149 2515 17 of of IN 42149 2515 18 the the DT 42149 2515 19 temporary temporary JJ 42149 2515 20 transportation transportation NN 42149 2515 21 tracks track NNS 42149 2515 22 . . . 42149 2516 1 The the DT 42149 2516 2 vertical vertical JJ 42149 2516 3 faces face NNS 42149 2516 4 of of IN 42149 2516 5 the the DT 42149 2516 6 steps step NNS 42149 2516 7 were be VBD 42149 2516 8 formed form VBN 42149 2516 9 by by IN 42149 2516 10 boards board NNS 42149 2516 11 supported support VBN 42149 2516 12 from from IN 42149 2516 13 the the DT 42149 2516 14 uprights upright NNS 42149 2516 15 by by IN 42149 2516 16 adjustable adjustable JJ 42149 2516 17 arms arm NNS 42149 2516 18 . . . 42149 2517 1 The the DT 42149 2517 2 horizontal horizontal JJ 42149 2517 3 surfaces surface NNS 42149 2517 4 were be VBD 42149 2517 5 formed form VBN 42149 2517 6 by by IN 42149 2517 7 leveling level VBG 42149 2517 8 off off RP 42149 2517 9 the the DT 42149 2517 10 concrete concrete NN 42149 2517 11 with with IN 42149 2517 12 a a DT 42149 2517 13 shovel shovel NN 42149 2517 14 at at IN 42149 2517 15 the the DT 42149 2517 16 top top NN 42149 2517 17 of of IN 42149 2517 18 the the DT 42149 2517 19 vertical vertical JJ 42149 2517 20 boards board NNS 42149 2517 21 . . . 42149 2518 1 Where where WRB 42149 2518 2 the the DT 42149 2518 3 sheets sheet NNS 42149 2518 4 of of IN 42149 2518 5 expanded expand VBN 42149 2518 6 metal metal NN 42149 2518 7 used use VBN 42149 2518 8 for for IN 42149 2518 9 bonding bonding NN 42149 2518 10 came come VBD 42149 2518 11 at at IN 42149 2518 12 a a DT 42149 2518 13 step step NN 42149 2518 14 , , , 42149 2518 15 the the DT 42149 2518 16 lower low JJR 42149 2518 17 edge edge NN 42149 2518 18 of of IN 42149 2518 19 the the DT 42149 2518 20 boards board NNS 42149 2518 21 forming form VBG 42149 2518 22 the the DT 42149 2518 23 back back NN 42149 2518 24 of of IN 42149 2518 25 the the DT 42149 2518 26 step step NN 42149 2518 27 was be VBD 42149 2518 28 placed place VBN 42149 2518 29 1 1 CD 42149 2518 30 in in IN 42149 2518 31 . . . 42149 2519 1 above above IN 42149 2519 2 the the DT 42149 2519 3 one one CD 42149 2519 4 forming form VBG 42149 2519 5 the the DT 42149 2519 6 front front NN 42149 2519 7 of of IN 42149 2519 8 it -PRON- PRP 42149 2519 9 ; ; : 42149 2519 10 but but CC 42149 2519 11 , , , 42149 2519 12 when when WRB 42149 2519 13 the the DT 42149 2519 14 expanded expand VBN 42149 2519 15 metal metal NN 42149 2519 16 came come VBD 42149 2519 17 in in IN 42149 2519 18 the the DT 42149 2519 19 middle middle NN 42149 2519 20 of of IN 42149 2519 21 a a DT 42149 2519 22 step step NN 42149 2519 23 , , , 42149 2519 24 a a DT 42149 2519 25 slot slot NN 42149 2519 26 1 1 CD 42149 2519 27 in in IN 42149 2519 28 . . . 42149 2520 1 wide wide JJ 42149 2520 2 was be VBD 42149 2520 3 left leave VBN 42149 2520 4 at at IN 42149 2520 5 that that DT 42149 2520 6 point point NN 42149 2520 7 to to TO 42149 2520 8 accommodate accommodate VB 42149 2520 9 it -PRON- PRP 42149 2520 10 . . . 42149 2521 1 A a DT 42149 2521 2 platform platform NN 42149 2521 3 was be VBD 42149 2521 4 formed form VBN 42149 2521 5 on on IN 42149 2521 6 the the DT 42149 2521 7 top top NN 42149 2521 8 of of IN 42149 2521 9 the the DT 42149 2521 10 framework framework NN 42149 2521 11 for for IN 42149 2521 12 the the DT 42149 2521 13 form form NN 42149 2521 14 , , , 42149 2521 15 and and CC 42149 2521 16 on on IN 42149 2521 17 this this DT 42149 2521 18 a a DT 42149 2521 19 car car NN 42149 2521 20 forming form VBG 42149 2521 21 a a DT 42149 2521 22 sort sort NN 42149 2521 23 of of IN 42149 2521 24 traveling travel VBG 42149 2521 25 stage stage NN 42149 2521 26 was be VBD 42149 2521 27 run run VBN 42149 2521 28 . . . 42149 2522 1 There there EX 42149 2522 2 was be VBD 42149 2522 3 ample ample JJ 42149 2522 4 room room NN 42149 2522 5 to to TO 42149 2522 6 maintain maintain VB 42149 2522 7 traffic traffic NN 42149 2522 8 on on IN 42149 2522 9 a a DT 42149 2522 10 single single JJ 42149 2522 11 track track NN 42149 2522 12 through through IN 42149 2522 13 the the DT 42149 2522 14 form form NN 42149 2522 15 . . . 42149 2523 1 A a DT 42149 2523 2 photograph photograph NN 42149 2523 3 of of IN 42149 2523 4 the the DT 42149 2523 5 form form NN 42149 2523 6 is be VBZ 42149 2523 7 shown show VBN 42149 2523 8 in in IN 42149 2523 9 Fig Fig NNP 42149 2523 10 . . . 42149 2524 1 1 1 LS 42149 2524 2 , , , 42149 2524 3 Plate plate NN 42149 2524 4 XLIII XLIII NNP 42149 2524 5 . . . 42149 2525 1 The the DT 42149 2525 2 concrete concrete NN 42149 2525 3 , , , 42149 2525 4 for for IN 42149 2525 5 the the DT 42149 2525 6 most most JJS 42149 2525 7 part part NN 42149 2525 8 , , , 42149 2525 9 was be VBD 42149 2525 10 received receive VBN 42149 2525 11 at at IN 42149 2525 12 the the DT 42149 2525 13 form form NN 42149 2525 14 in in IN 42149 2525 15 ¾-cu ¾-cu NNP 42149 2525 16 . . . 42149 2526 1 yd yd NNP 42149 2526 2 . . . 42149 2527 1 dumping dump VBG 42149 2527 2 buckets bucket NNS 42149 2527 3 . . . 42149 2528 1 The the DT 42149 2528 2 buckets bucket NNS 42149 2528 3 were be VBD 42149 2528 4 lifted lift VBN 42149 2528 5 by by IN 42149 2528 6 the the DT 42149 2528 7 rope rope NN 42149 2528 8 from from IN 42149 2528 9 a a DT 42149 2528 10 small small JJ 42149 2528 11 hoisting hoisting NN 42149 2528 12 engine engine NN 42149 2528 13 . . . 42149 2529 1 This this DT 42149 2529 2 rope rope NN 42149 2529 3 passed pass VBD 42149 2529 4 over over RP 42149 2529 5 a a DT 42149 2529 6 pulley pulley NN 42149 2529 7 attached attach VBN 42149 2529 8 to to IN 42149 2529 9 the the DT 42149 2529 10 crown crown NN 42149 2529 11 of of IN 42149 2529 12 the the DT 42149 2529 13 tunnel tunnel NN 42149 2529 14 and and CC 42149 2529 15 dumped dump VBD 42149 2529 16 into into IN 42149 2529 17 the the DT 42149 2529 18 traveling travel VBG 42149 2529 19 stage stage NN 42149 2529 20 on on IN 42149 2529 21 the the DT 42149 2529 22 top top NN 42149 2529 23 of of IN 42149 2529 24 the the DT 42149 2529 25 form form NN 42149 2529 26 . . . 42149 2530 1 In in IN 42149 2530 2 this this DT 42149 2530 3 the the DT 42149 2530 4 concrete concrete NN 42149 2530 5 was be VBD 42149 2530 6 moved move VBN 42149 2530 7 along along RB 42149 2530 8 to to IN 42149 2530 9 the the DT 42149 2530 10 point point NN 42149 2530 11 where where WRB 42149 2530 12 it -PRON- PRP 42149 2530 13 was be VBD 42149 2530 14 to to TO 42149 2530 15 be be VB 42149 2530 16 deposited deposit VBN 42149 2530 17 , , , 42149 2530 18 and and CC 42149 2530 19 there there RB 42149 2530 20 it -PRON- PRP 42149 2530 21 was be VBD 42149 2530 22 thrown throw VBN 42149 2530 23 out out RP 42149 2530 24 by by IN 42149 2530 25 shovels shovel NNS 42149 2530 26 into into IN 42149 2530 27 the the DT 42149 2530 28 form form NN 42149 2530 29 below below RB 42149 2530 30 . . . 42149 2531 1 For for IN 42149 2531 2 a a DT 42149 2531 3 portion portion NN 42149 2531 4 of of IN 42149 2531 5 the the DT 42149 2531 6 period period NN 42149 2531 7 , , , 42149 2531 8 while while IN 42149 2531 9 the the DT 42149 2531 10 duct duct NN 42149 2531 11 bench bench NN 42149 2531 12 concrete concrete NN 42149 2531 13 was be VBD 42149 2531 14 being be VBG 42149 2531 15 laid lay VBN 42149 2531 16 , , , 42149 2531 17 it -PRON- PRP 42149 2531 18 was be VBD 42149 2531 19 not not RB 42149 2531 20 necessary necessary JJ 42149 2531 21 to to TO 42149 2531 22 maintain maintain VB 42149 2531 23 a a DT 42149 2531 24 track track NN 42149 2531 25 for for IN 42149 2531 26 traffic traffic NN 42149 2531 27 through through IN 42149 2531 28 the the DT 42149 2531 29 form form NN 42149 2531 30 and and CC 42149 2531 31 , , , 42149 2531 32 during during IN 42149 2531 33 that that DT 42149 2531 34 period period NN 42149 2531 35 , , , 42149 2531 36 the the DT 42149 2531 37 concrete concrete NN 42149 2531 38 for for IN 42149 2531 39 the the DT 42149 2531 40 lower low JJR 42149 2531 41 step step NN 42149 2531 42 was be VBD 42149 2531 43 placed place VBN 42149 2531 44 from from IN 42149 2531 45 below below IN 42149 2531 46 the the DT 42149 2531 47 form form NN 42149 2531 48 , , , 42149 2531 49 the the DT 42149 2531 50 concrete concrete NN 42149 2531 51 being be VBG 42149 2531 52 first first RB 42149 2531 53 dumped dump VBN 42149 2531 54 on on IN 42149 2531 55 a a DT 42149 2531 56 temporary temporary JJ 42149 2531 57 stage stage NN 42149 2531 58 at at IN 42149 2531 59 the the DT 42149 2531 60 lower low JJR 42149 2531 61 track track NN 42149 2531 62 level level NN 42149 2531 63 . . . 42149 2532 1 Owing owe VBG 42149 2532 2 to to IN 42149 2532 3 the the DT 42149 2532 4 horizontal horizontal JJ 42149 2532 5 faces face NNS 42149 2532 6 of of IN 42149 2532 7 the the DT 42149 2532 8 steps step NNS 42149 2532 9 being be VBG 42149 2532 10 uncovered uncover VBN 42149 2532 11 , , , 42149 2532 12 there there EX 42149 2532 13 was be VBD 42149 2532 14 a a DT 42149 2532 15 tendency tendency NN 42149 2532 16 for for IN 42149 2532 17 the the DT 42149 2532 18 concrete concrete NN 42149 2532 19 there there RB 42149 2532 20 to to TO 42149 2532 21 rise rise VB 42149 2532 22 when when WRB 42149 2532 23 concrete concrete NN 42149 2532 24 was be VBD 42149 2532 25 placed place VBN 42149 2532 26 in in IN 42149 2532 27 the the DT 42149 2532 28 steps step NNS 42149 2532 29 above above RB 42149 2532 30 . . . 42149 2533 1 For for IN 42149 2533 2 this this DT 42149 2533 3 part part NN 42149 2533 4 of of IN 42149 2533 5 the the DT 42149 2533 6 work work NN 42149 2533 7 , , , 42149 2533 8 also also RB 42149 2533 9 , , , 42149 2533 10 it -PRON- PRP 42149 2533 11 was be VBD 42149 2533 12 necessary necessary JJ 42149 2533 13 to to TO 42149 2533 14 see see VB 42149 2533 15 that that IN 42149 2533 16 the the DT 42149 2533 17 concrete concrete NN 42149 2533 18 was be VBD 42149 2533 19 not not RB 42149 2533 20 mixed mix VBN 42149 2533 21 too too RB 42149 2533 22 wet wet JJ 42149 2533 23 , , , 42149 2533 24 for for IN 42149 2533 25 , , , 42149 2533 26 when when WRB 42149 2533 27 that that DT 42149 2533 28 was be VBD 42149 2533 29 the the DT 42149 2533 30 case case NN 42149 2533 31 , , , 42149 2533 32 the the DT 42149 2533 33 concrete concrete NN 42149 2533 34 in in IN 42149 2533 35 the the DT 42149 2533 36 upper upper JJ 42149 2533 37 steps step NNS 42149 2533 38 was be VBD 42149 2533 39 very very RB 42149 2533 40 apt apt JJ 42149 2533 41 to to TO 42149 2533 42 flow flow VB 42149 2533 43 out out RP 42149 2533 44 at at IN 42149 2533 45 the the DT 42149 2533 46 top top NN 42149 2533 47 of of IN 42149 2533 48 the the DT 42149 2533 49 lower low JJR 42149 2533 50 one one NN 42149 2533 51 . . . 42149 2534 1 At at IN 42149 2534 2 the the DT 42149 2534 3 same same JJ 42149 2534 4 time time NN 42149 2534 5 , , , 42149 2534 6 there there EX 42149 2534 7 was be VBD 42149 2534 8 the the DT 42149 2534 9 standing stand VBG 42149 2534 10 objection objection NN 42149 2534 11 to to IN 42149 2534 12 the the DT 42149 2534 13 mixture mixture NN 42149 2534 14 being be VBG 42149 2534 15 too too RB 42149 2534 16 dry dry JJ 42149 2534 17 , , , 42149 2534 18 namely namely RB 42149 2534 19 , , , 42149 2534 20 the the DT 42149 2534 21 responsibility responsibility NN 42149 2534 22 of of IN 42149 2534 23 getting get VBG 42149 2534 24 a a DT 42149 2534 25 sufficient sufficient JJ 42149 2534 26 amount amount NN 42149 2534 27 of of IN 42149 2534 28 spading spade VBG 42149 2534 29 and and CC 42149 2534 30 tamping tamping NN 42149 2534 31 done do VBN 42149 2534 32 . . . 42149 2535 1 Particulars particular NNS 42149 2535 2 of of IN 42149 2535 3 the the DT 42149 2535 4 exact exact JJ 42149 2535 5 quantity quantity NN 42149 2535 6 of of IN 42149 2535 7 water water NN 42149 2535 8 used use VBN 42149 2535 9 are be VBP 42149 2535 10 given give VBN 42149 2535 11 later later RB 42149 2535 12 in in IN 42149 2535 13 describing describe VBG 42149 2535 14 " " `` 42149 2535 15 Mixing Mixing NNP 42149 2535 16 . . . 42149 2535 17 " " '' 42149 2536 1 Fig fig NN 42149 2536 2 . . . 42149 2537 1 2 2 LS 42149 2537 2 , , , 42149 2537 3 Plate plate NN 42149 2537 4 XLIII XLIII NNP 42149 2537 5 , , , 42149 2537 6 illustrates illustrate VBZ 42149 2537 7 the the DT 42149 2537 8 process process NN 42149 2537 9 of of IN 42149 2537 10 laying lay VBG 42149 2537 11 . . . 42149 2538 1 In in IN 42149 2538 2 the the DT 42149 2538 3 section section NN 42149 2538 4 of of IN 42149 2538 5 the the DT 42149 2538 6 tunnel tunnel NN 42149 2538 7 in in IN 42149 2538 8 which which WDT 42149 2538 9 there there EX 42149 2538 10 were be VBD 42149 2538 11 circumferential circumferential JJ 42149 2538 12 reinforcement reinforcement NN 42149 2538 13 rods rod NNS 42149 2538 14 in in IN 42149 2538 15 the the DT 42149 2538 16 duct duct NN 42149 2538 17 bench bench NN 42149 2538 18 , , , 42149 2538 19 the the DT 42149 2538 20 rods rod NNS 42149 2538 21 were be VBD 42149 2538 22 in in IN 42149 2538 23 place place NN 42149 2538 24 before before IN 42149 2538 25 the the DT 42149 2538 26 laying laying NN 42149 2538 27 commenced commence VBN 42149 2538 28 , , , 42149 2538 29 as as IN 42149 2538 30 they -PRON- PRP 42149 2538 31 had have VBD 42149 2538 32 been be VBN 42149 2538 33 placed place VBN 42149 2538 34 with with IN 42149 2538 35 the the DT 42149 2538 36 invert invert JJ 42149 2538 37 concrete concrete NN 42149 2538 38 . . . 42149 2539 1 The the DT 42149 2539 2 circumferential circumferential JJ 42149 2539 3 reinforcing reinforce VBG 42149 2539 4 rods rod NNS 42149 2539 5 in in IN 42149 2539 6 the the DT 42149 2539 7 arch arch NN 42149 2539 8 came come VBD 42149 2539 9 down down RP 42149 2539 10 into into IN 42149 2539 11 the the DT 42149 2539 12 upper upper JJ 42149 2539 13 part part NN 42149 2539 14 of of IN 42149 2539 15 the the DT 42149 2539 16 duct duct NN 42149 2539 17 bench bench NN 42149 2539 18 concrete concrete NN 42149 2539 19 ; ; : 42149 2539 20 these these DT 42149 2539 21 rods rod NNS 42149 2539 22 were be VBD 42149 2539 23 put put VBN 42149 2539 24 in in IN 42149 2539 25 position position NN 42149 2539 26 and and CC 42149 2539 27 tied tie VBN 42149 2539 28 to to IN 42149 2539 29 the the DT 42149 2539 30 iron iron NN 42149 2539 31 lining lining NN 42149 2539 32 in in IN 42149 2539 33 the the DT 42149 2539 34 crown crown NN 42149 2539 35 at at IN 42149 2539 36 the the DT 42149 2539 37 same same JJ 42149 2539 38 time time NN 42149 2539 39 as as IN 42149 2539 40 the the DT 42149 2539 41 duct duct NN 42149 2539 42 bench bench NN 42149 2539 43 concrete concrete NN 42149 2539 44 was be VBD 42149 2539 45 being be VBG 42149 2539 46 finished finish VBN 42149 2539 47 off off RB 42149 2539 48 . . . 42149 2540 1 Openings opening NNS 42149 2540 2 for for IN 42149 2540 3 the the DT 42149 2540 4 manholes manhole NNS 42149 2540 5 were be VBD 42149 2540 6 left leave VBN 42149 2540 7 in in IN 42149 2540 8 the the DT 42149 2540 9 duct duct NN 42149 2540 10 bench bench NN 42149 2540 11 at at IN 42149 2540 12 the the DT 42149 2540 13 regular regular JJ 42149 2540 14 stationing stationing NN 42149 2540 15 . . . 42149 2541 1 The the DT 42149 2541 2 average average JJ 42149 2541 3 time time NN 42149 2541 4 taken take VBN 42149 2541 5 to to TO 42149 2541 6 fill fill VB 42149 2541 7 a a DT 42149 2541 8 length length NN 42149 2541 9 of of IN 42149 2541 10 35 35 CD 42149 2541 11 ft ft NN 42149 2541 12 . . NNP 42149 2541 13 was be VBD 42149 2541 14 about about RB 42149 2541 15 6 6 CD 42149 2541 16 hours hour NNS 42149 2541 17 ; ; : 42149 2541 18 the the DT 42149 2541 19 form form NN 42149 2541 20 was be VBD 42149 2541 21 then then RB 42149 2541 22 left leave VBN 42149 2541 23 in in IN 42149 2541 24 position position NN 42149 2541 25 for for IN 42149 2541 26 about about RB 42149 2541 27 8 8 CD 42149 2541 28 hours hour NNS 42149 2541 29 -- -- : 42149 2541 30 usually usually RB 42149 2541 31 enough enough RB 42149 2541 32 to to TO 42149 2541 33 let let VB 42149 2541 34 the the DT 42149 2541 35 concrete concrete NN 42149 2541 36 set set VBN 42149 2541 37 properly properly RB 42149 2541 38 -- -- : 42149 2541 39 and and CC 42149 2541 40 then then RB 42149 2541 41 moved move VBD 42149 2541 42 ahead ahead RB 42149 2541 43 ; ; : 42149 2541 44 it -PRON- PRP 42149 2541 45 then then RB 42149 2541 46 took take VBD 42149 2541 47 about about RB 42149 2541 48 3 3 CD 42149 2541 49 hours hour NNS 42149 2541 50 to to TO 42149 2541 51 set set VB 42149 2541 52 it -PRON- PRP 42149 2541 53 up up RP 42149 2541 54 again again RB 42149 2541 55 ready ready JJ 42149 2541 56 to to TO 42149 2541 57 continue continue VB 42149 2541 58 work work NN 42149 2541 59 . . . 42149 2542 1 The the DT 42149 2542 2 total total JJ 42149 2542 3 time time NN 42149 2542 4 for for IN 42149 2542 5 a a DT 42149 2542 6 length length NN 42149 2542 7 , , , 42149 2542 8 therefore therefore RB 42149 2542 9 , , , 42149 2542 10 was be VBD 42149 2542 11 about about RB 42149 2542 12 17 17 CD 42149 2542 13 hours hour NNS 42149 2542 14 , , , 42149 2542 15 equal equal JJ 42149 2542 16 to to IN 42149 2542 17 an an DT 42149 2542 18 average average JJ 42149 2542 19 progress progress NN 42149 2542 20 of of IN 42149 2542 21 about about RB 42149 2542 22 49 49 CD 42149 2542 23 ft ft NN 42149 2542 24 . . NNP 42149 2542 25 per per IN 42149 2542 26 day day NN 42149 2542 27 . . . 42149 2543 1 The the DT 42149 2543 2 average average JJ 42149 2543 3 force force NN 42149 2543 4 engaged engage VBD 42149 2543 5 in in IN 42149 2543 6 duct duct NN 42149 2543 7 bench bench NN 42149 2543 8 concrete concrete NN 42149 2543 9 ( ( -LRB- 42149 2543 10 not not RB 42149 2543 11 including include VBG 42149 2543 12 transport transport NN 42149 2543 13 ) ) -RRB- 42149 2543 14 was be VBD 42149 2543 15 : : : 42149 2543 16 1 1 CD 42149 2543 17 Foreman foreman NN 42149 2543 18 @ @ CC 42149 2543 19 $ $ $ 42149 2543 20 3.25 3.25 CD 42149 2543 21 per per IN 42149 2543 22 day day NN 42149 2543 23 . . . 42149 2544 1 2 2 CD 42149 2544 2 Spaders Spaders NNPS 42149 2544 3 " " `` 42149 2544 4 2.00 2.00 CD 42149 2544 5 " " '' 42149 2544 6 " " `` 42149 2544 7 9 9 CD 42149 2544 8 Laborers laborer NNS 42149 2544 9 " " '' 42149 2544 10 1.75 1.75 CD 42149 2544 11 " " '' 42149 2544 12 " " `` 42149 2544 13 _ _ NNP 42149 2544 14 Arch Arch NNP 42149 2544 15 Concrete._--By concrete._--by NN 42149 2544 16 far far RB 42149 2544 17 the the DT 42149 2544 18 greater great JJR 42149 2544 19 part part NN 42149 2544 20 of of IN 42149 2544 21 the the DT 42149 2544 22 arch arch JJ 42149 2544 23 work work NN 42149 2544 24 was be VBD 42149 2544 25 put put VBN 42149 2544 26 in in RP 42149 2544 27 with with IN 42149 2544 28 traveling travel VBG 42149 2544 29 centers center NNS 42149 2544 30 before before IN 42149 2544 31 the the DT 42149 2544 32 face face NN 42149 2544 33 of of IN 42149 2544 34 the the DT 42149 2544 35 bench bench NN 42149 2544 36 was be VBD 42149 2544 37 built build VBN 42149 2544 38 , , , 42149 2544 39 in in IN 42149 2544 40 which which WDT 42149 2544 41 case case NN 42149 2544 42 the the DT 42149 2544 43 whole whole NN 42149 2544 44 of of IN 42149 2544 45 the the DT 42149 2544 46 arch arch NN 42149 2544 47 was be VBD 42149 2544 48 built build VBN 42149 2544 49 at at IN 42149 2544 50 once once RB 42149 2544 51 . . . 42149 2545 1 A a DT 42149 2545 2 short short JJ 42149 2545 3 length length NN 42149 2545 4 of of IN 42149 2545 5 arch arch NN 42149 2545 6 at at IN 42149 2545 7 each each DT 42149 2545 8 end end NN 42149 2545 9 of of IN 42149 2545 10 the the DT 42149 2545 11 tunnel tunnel NN 42149 2545 12 was be VBD 42149 2545 13 built build VBN 42149 2545 14 after after IN 42149 2545 15 the the DT 42149 2545 16 face face NN 42149 2545 17 of of IN 42149 2545 18 the the DT 42149 2545 19 bench bench NN 42149 2545 20 , , , 42149 2545 21 in in IN 42149 2545 22 which which WDT 42149 2545 23 case case NN 42149 2545 24 the the DT 42149 2545 25 haunches haunch NNS 42149 2545 26 or or CC 42149 2545 27 lower low JJR 42149 2545 28 5 5 CD 42149 2545 29 ft ft NN 42149 2545 30 . . NNP 42149 2545 31 were be VBD 42149 2545 32 laid lay VBN 42149 2545 33 first first RB 42149 2545 34 and and CC 42149 2545 35 the the DT 42149 2545 36 upper upper JJ 42149 2545 37 part part NN 42149 2545 38 of of IN 42149 2545 39 the the DT 42149 2545 40 arch arch NN 42149 2545 41 later later RB 42149 2545 42 . . . 42149 2546 1 The the DT 42149 2546 2 first first JJ 42149 2546 3 traveling travel VBG 42149 2546 4 centers center NNS 42149 2546 5 were be VBD 42149 2546 6 used use VBN 42149 2546 7 on on IN 42149 2546 8 the the DT 42149 2546 9 New New NNP 42149 2546 10 York York NNP 42149 2546 11 side side NN 42149 2546 12 , , , 42149 2546 13 and and CC 42149 2546 14 were be VBD 42149 2546 15 50 50 CD 42149 2546 16 ft ft NN 42149 2546 17 . . NN 42149 2546 18 long long RB 42149 2546 19 . . . 42149 2547 1 The the DT 42149 2547 2 laggings lagging NNS 42149 2547 3 were be VBD 42149 2547 4 of of IN 42149 2547 5 4-in 4-in CD 42149 2547 6 . . . 42149 2548 1 yellow yellow JJ 42149 2548 2 pine pine NNP 42149 2548 3 , , , 42149 2548 4 built build VBN 42149 2548 5 up up RP 42149 2548 6 in in IN 42149 2548 7 panels panel NNS 42149 2548 8 10 10 CD 42149 2548 9 ft ft NN 42149 2548 10 . . NNP 42149 2548 11 long long JJ 42149 2548 12 and and CC 42149 2548 13 16 16 CD 42149 2548 14 in in IN 42149 2548 15 . . . 42149 2549 1 wide wide JJ 42149 2549 2 for for IN 42149 2549 3 the the DT 42149 2549 4 sides side NNS 42149 2549 5 , , , 42149 2549 6 and and CC 42149 2549 7 solely solely RB 42149 2549 8 longitudinal longitudinal JJ 42149 2549 9 lagging lagging NNP 42149 2549 10 5 5 CD 42149 2549 11 ft ft NN 42149 2549 12 . . NNP 42149 2549 13 long long RB 42149 2549 14 for for IN 42149 2549 15 the the DT 42149 2549 16 key key NN 42149 2549 17 . . . 42149 2550 1 It -PRON- PRP 42149 2550 2 was be VBD 42149 2550 3 pretty pretty RB 42149 2550 4 certain certain JJ 42149 2550 5 that that IN 42149 2550 6 the the DT 42149 2550 7 results result NNS 42149 2550 8 to to TO 42149 2550 9 be be VB 42149 2550 10 obtained obtain VBN 42149 2550 11 from from IN 42149 2550 12 forms form NNS 42149 2550 13 of of IN 42149 2550 14 such such PDT 42149 2550 15 a a DT 42149 2550 16 length length NN 42149 2550 17 would would MD 42149 2550 18 not not RB 42149 2550 19 be be VB 42149 2550 20 satisfactory satisfactory JJ 42149 2550 21 , , , 42149 2550 22 and and CC 42149 2550 23 this this DT 42149 2550 24 was be VBD 42149 2550 25 pointed point VBN 42149 2550 26 out out RP 42149 2550 27 to to IN 42149 2550 28 the the DT 42149 2550 29 contractor contractor NN 42149 2550 30 , , , 42149 2550 31 who who WP 42149 2550 32 , , , 42149 2550 33 however however RB 42149 2550 34 , , , 42149 2550 35 obtained obtain VBD 42149 2550 36 permission permission NN 42149 2550 37 to to TO 42149 2550 38 use use VB 42149 2550 39 them -PRON- PRP 42149 2550 40 on on IN 42149 2550 41 trial trial NN 42149 2550 42 . . . 42149 2551 1 Grout grout NN 42149 2551 2 pipes pipe NNS 42149 2551 3 were be VBD 42149 2551 4 built build VBN 42149 2551 5 in in IN 42149 2551 6 , , , 42149 2551 7 as as IN 42149 2551 8 it -PRON- PRP 42149 2551 9 was be VBD 42149 2551 10 not not RB 42149 2551 11 likely likely JJ 42149 2551 12 that that IN 42149 2551 13 the the DT 42149 2551 14 concrete concrete NN 42149 2551 15 could could MD 42149 2551 16 be be VB 42149 2551 17 packed pack VBN 42149 2551 18 tightly tightly RB 42149 2551 19 into into IN 42149 2551 20 the the DT 42149 2551 21 upper upper JJ 42149 2551 22 part part NN 42149 2551 23 of of IN 42149 2551 24 the the DT 42149 2551 25 lining lining NN 42149 2551 26 . . . 42149 2552 1 [ [ -LRB- 42149 2552 2 Illustration illustration NN 42149 2552 3 : : : 42149 2552 4 PLATE plate NN 42149 2552 5 XLIII xliii NN 42149 2552 6 . . . 42149 2553 1 TRANS trans UH 42149 2553 2 . . . 42149 2554 1 AM AM NNP 42149 2554 2 . . . 42149 2555 1 SOC SOC NNP 42149 2555 2 . . . 42149 2556 1 CIV CIV NNP 42149 2556 2 . . . 42149 2557 1 ENGRS ENGRS NNP 42149 2557 2 . . . 42149 2558 1 VOL VOL NNP 42149 2558 2 . . . 42149 2559 1 LXVIII LXVIII NNP 42149 2559 2 , , , 42149 2559 3 No no UH 42149 2559 4 . . . 42149 2560 1 1155 1155 CD 42149 2560 2 . . . 42149 2561 1 HEWETT HEWETT NNP 42149 2561 2 AND and CC 42149 2561 3 BROWN BROWN NNP 42149 2561 4 ON ON NNP 42149 2561 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 2561 6 R. R. NNP 42149 2561 7 R. R. NNP 42149 2561 8 TUNNELS TUNNELS NNP 42149 2561 9 : : : 42149 2561 10 NORTH NORTH NNP 42149 2561 11 RIVER river NN 42149 2561 12 TUNNELS tunnel NNS 42149 2561 13 . . . 42149 2562 1 FIG FIG NNP 42149 2562 2 . . . 42149 2563 1 1 1 LS 42149 2563 2 . . . 42149 2563 3 ] ] -RRB- 42149 2564 1 [ [ -LRB- 42149 2564 2 Illustration illustration NN 42149 2564 3 : : : 42149 2564 4 PLATE plate NN 42149 2564 5 XLIII xliii NN 42149 2564 6 . . . 42149 2565 1 TRANS trans UH 42149 2565 2 . . . 42149 2566 1 AM AM NNP 42149 2566 2 . . . 42149 2567 1 SOC SOC NNP 42149 2567 2 . . . 42149 2568 1 CIV CIV NNP 42149 2568 2 . . . 42149 2569 1 ENGRS ENGRS NNP 42149 2569 2 . . . 42149 2570 1 VOL VOL NNP 42149 2570 2 . . . 42149 2571 1 LXVIII LXVIII NNP 42149 2571 2 , , , 42149 2571 3 No no UH 42149 2571 4 . . . 42149 2572 1 1155 1155 CD 42149 2572 2 . . . 42149 2573 1 HEWETT HEWETT NNP 42149 2573 2 AND and CC 42149 2573 3 BROWN BROWN NNP 42149 2573 4 ON ON NNP 42149 2573 5 PENNSYLVANIA PENNSYLVANIA NNP 42149 2573 6 R. R. NNP 42149 2573 7 R. R. NNP 42149 2573 8 TUNNELS TUNNELS NNP 42149 2573 9 : : : 42149 2573 10 NORTH NORTH NNP 42149 2573 11 RIVER river NN 42149 2573 12 TUNNELS tunnel NNS 42149 2573 13 . . . 42149 2574 1 FIG FIG NNP 42149 2574 2 . . . 42149 2575 1 2 2 LS 42149 2575 2 . . . 42149 2575 3 ] ] -RRB- 42149 2576 1 After after IN 42149 2576 2 about about RB 42149 2576 3 300 300 CD 42149 2576 4 lin lin NN 42149 2576 5 . . . 42149 2577 1 ft ft NNP 42149 2577 2 . . NNP 42149 2577 3 of of IN 42149 2577 4 arch arch NNP 42149 2577 5 had have VBD 42149 2577 6 been be VBN 42149 2577 7 built build VBN 42149 2577 8 with with IN 42149 2577 9 these these DT 42149 2577 10 forms form NNS 42149 2577 11 , , , 42149 2577 12 a a DT 42149 2577 13 test test NN 42149 2577 14 hole hole NN 42149 2577 15 was be VBD 42149 2577 16 cut cut VBN 42149 2577 17 out out RP 42149 2577 18 and and CC 42149 2577 19 large large JJ 42149 2577 20 voids void NNS 42149 2577 21 were be VBD 42149 2577 22 found find VBN 42149 2577 23 , , , 42149 2577 24 and and CC 42149 2577 25 , , , 42149 2577 26 to to TO 42149 2577 27 confirm confirm VB 42149 2577 28 this this DT 42149 2577 29 , , , 42149 2577 30 another another DT 42149 2577 31 hole hole NN 42149 2577 32 was be VBD 42149 2577 33 cut cut VBN 42149 2577 34 , , , 42149 2577 35 and and CC 42149 2577 36 similar similar JJ 42149 2577 37 conditions condition NNS 42149 2577 38 observed observe VBN 42149 2577 39 . . . 42149 2578 1 The the DT 42149 2578 2 results result NNS 42149 2578 3 were be VBD 42149 2578 4 so so RB 42149 2578 5 unsatisfactory unsatisfactory JJ 42149 2578 6 that that IN 42149 2578 7 orders order NNS 42149 2578 8 were be VBD 42149 2578 9 given give VBN 42149 2578 10 that that IN 42149 2578 11 the the DT 42149 2578 12 use use NN 42149 2578 13 of of IN 42149 2578 14 longitudinal longitudinal JJ 42149 2578 15 key key NN 42149 2578 16 lagging lagging NN 42149 2578 17 should should MD 42149 2578 18 be be VB 42149 2578 19 discontinued discontinue VBN 42149 2578 20 , , , 42149 2578 21 and and CC 42149 2578 22 cross cross NN 42149 2578 23 or or CC 42149 2578 24 block block NN 42149 2578 25 lagging lag VBG 42149 2578 26 used use VBN 42149 2578 27 instead instead RB 42149 2578 28 . . . 42149 2579 1 These these DT 42149 2579 2 block block NN 42149 2579 3 laggings lagging NNS 42149 2579 4 were be VBD 42149 2579 5 6 6 CD 42149 2579 6 in in IN 42149 2579 7 . . . 42149 2580 1 in in IN 42149 2580 2 length length NN 42149 2580 3 ( ( -LRB- 42149 2580 4 in in IN 42149 2580 5 the the DT 42149 2580 6 direction direction NN 42149 2580 7 of of IN 42149 2580 8 the the DT 42149 2580 9 tunnel tunnel NN 42149 2580 10 ) ) -RRB- 42149 2580 11 and and CC 42149 2580 12 2 2 CD 42149 2580 13 ft ft NN 42149 2580 14 . . NN 42149 2580 15 in in IN 42149 2580 16 width width NN 42149 2580 17 ; ; , 42149 2580 18 at at IN 42149 2580 19 the the DT 42149 2580 20 same same JJ 42149 2580 21 time time NN 42149 2580 22 , , , 42149 2580 23 the the DT 42149 2580 24 system system NN 42149 2580 25 of of IN 42149 2580 26 grout grout NN 42149 2580 27 pipes pipe NNS 42149 2580 28 was be VBD 42149 2580 29 changed change VBN 42149 2580 30 . . . 42149 2581 1 This this DT 42149 2581 2 will will MD 42149 2581 3 be be VB 42149 2581 4 described describe VBN 42149 2581 5 later later RB 42149 2581 6 under under RB 42149 2581 7 " " `` 42149 2581 8 Grouting grout VBG 42149 2581 9 . . . 42149 2581 10 " " '' 42149 2582 1 It -PRON- PRP 42149 2582 2 was be VBD 42149 2582 3 soon soon RB 42149 2582 4 found find VBN 42149 2582 5 that that IN 42149 2582 6 with with IN 42149 2582 7 block block NN 42149 2582 8 lagging lag VBG 42149 2582 9 a a DT 42149 2582 10 better well JJR 42149 2582 11 job job NN 42149 2582 12 could could MD 42149 2582 13 be be VB 42149 2582 14 made make VBN 42149 2582 15 of of IN 42149 2582 16 packing pack VBG 42149 2582 17 the the DT 42149 2582 18 concrete concrete NN 42149 2582 19 up up RP 42149 2582 20 into into IN 42149 2582 21 the the DT 42149 2582 22 keys key NNS 42149 2582 23 , , , 42149 2582 24 but but CC 42149 2582 25 the the DT 42149 2582 26 time time NN 42149 2582 27 taken take VBN 42149 2582 28 to to IN 42149 2582 29 " " `` 42149 2582 30 key key VB 42149 2582 31 up up RB 42149 2582 32 " " '' 42149 2582 33 a a DT 42149 2582 34 50-ft 50-ft NNP 42149 2582 35 . . . 42149 2582 36 length length NN 42149 2582 37 was be VBD 42149 2582 38 so so RB 42149 2582 39 great great JJ 42149 2582 40 that that IN 42149 2582 41 the the DT 42149 2582 42 rest rest NN 42149 2582 43 of of IN 42149 2582 44 the the DT 42149 2582 45 arch arch NN 42149 2582 46 had have VBD 42149 2582 47 set set VBN 42149 2582 48 by by IN 42149 2582 49 the the DT 42149 2582 50 time time NN 42149 2582 51 the the DT 42149 2582 52 key key NN 42149 2582 53 was be VBD 42149 2582 54 finished finish VBN 42149 2582 55 . . . 42149 2583 1 Despite despite IN 42149 2583 2 a a DT 42149 2583 3 lot lot NN 42149 2583 4 of of IN 42149 2583 5 practice practice NN 42149 2583 6 , , , 42149 2583 7 this this DT 42149 2583 8 was be VBD 42149 2583 9 the the DT 42149 2583 10 case case NN 42149 2583 11 , , , 42149 2583 12 even even RB 42149 2583 13 in in IN 42149 2583 14 the the DT 42149 2583 15 unreinforced unreinforced JJ 42149 2583 16 type type NN 42149 2583 17 . . . 42149 2584 1 When when WRB 42149 2584 2 the the DT 42149 2584 3 reinforcing reinforce VBG 42149 2584 4 rods rod NNS 42149 2584 5 were be VBD 42149 2584 6 met meet VBN 42149 2584 7 , , , 42149 2584 8 the the DT 42149 2584 9 time time NN 42149 2584 10 for for IN 42149 2584 11 keying keying NN 42149 2584 12 up up RP 42149 2584 13 became become VBD 42149 2584 14 still still RB 42149 2584 15 greater great JJR 42149 2584 16 , , , 42149 2584 17 and and CC 42149 2584 18 therefore therefore RB 42149 2584 19 the the DT 42149 2584 20 contractor contractor NN 42149 2584 21 was be VBD 42149 2584 22 directed direct VBN 42149 2584 23 to to TO 42149 2584 24 shorten shorten VB 42149 2584 25 the the DT 42149 2584 26 forms form NNS 42149 2584 27 to to IN 42149 2584 28 20-ft 20-ft NNP 42149 2584 29 . . . 42149 2584 30 lengths length NNS 42149 2584 31 . . . 42149 2585 1 A a DT 42149 2585 2 typical typical JJ 42149 2585 3 working work VBG 42149 2585 4 force force NN 42149 2585 5 for for IN 42149 2585 6 a a DT 42149 2585 7 50-ft 50-ft NNP 42149 2585 8 . . . 42149 2585 9 length length NNP 42149 2585 10 was be VBD 42149 2585 11 : : : 42149 2585 12 1 1 CD 42149 2585 13 Foreman foreman NN 42149 2585 14 @ @ CC 42149 2585 15 $ $ $ 42149 2585 16 3.25 3.25 CD 42149 2585 17 per per IN 42149 2585 18 day day NN 42149 2585 19 . . . 42149 2586 1 4 4 CD 42149 2586 2 Spaders Spaders NNPS 42149 2586 3 " " `` 42149 2586 4 2.00 2.00 CD 42149 2586 5 " " '' 42149 2586 6 " " `` 42149 2586 7 12 12 CD 42149 2586 8 Laborers laborer NNS 42149 2586 9 " " `` 42149 2586 10 1.75 1.75 CD 42149 2586 11 " " '' 42149 2586 12 " " `` 42149 2586 13 Details detail NNS 42149 2586 14 of of IN 42149 2586 15 the the DT 42149 2586 16 20-ft 20-ft NNP 42149 2586 17 . . . 42149 2586 18 forms form NNS 42149 2586 19 are be VBP 42149 2586 20 shown show VBN 42149 2586 21 on on IN 42149 2586 22 Plate Plate NNP 42149 2586 23 XLIV XLIV NNP 42149 2586 24 . . . 42149 2587 1 The the DT 42149 2587 2 lower low JJR 42149 2587 3 4 4 CD 42149 2587 4 ft ft NN 42149 2587 5 . . NN 42149 2587 6 of of IN 42149 2587 7 lagging lagging NNP 42149 2587 8 was be VBD 42149 2587 9 built build VBN 42149 2587 10 on on IN 42149 2587 11 swinging swinge VBG 42149 2587 12 arms arm NNS 42149 2587 13 , , , 42149 2587 14 which which WDT 42149 2587 15 could could MD 42149 2587 16 be be VB 42149 2587 17 loosened loosen VBN 42149 2587 18 to to TO 42149 2587 19 allow allow VB 42149 2587 20 the the DT 42149 2587 21 centers center NNS 42149 2587 22 to to TO 42149 2587 23 be be VB 42149 2587 24 dropped drop VBN 42149 2587 25 and and CC 42149 2587 26 moved move VBD 42149 2587 27 ahead ahead RB 42149 2587 28 . . . 42149 2588 1 The the DT 42149 2588 2 rest rest NN 42149 2588 3 of of IN 42149 2588 4 the the DT 42149 2588 5 lagging lagging NN 42149 2588 6 was be VBD 42149 2588 7 built build VBN 42149 2588 8 up up RP 42149 2588 9 in in IN 42149 2588 10 panels panel NNS 42149 2588 11 10 10 CD 42149 2588 12 ft ft NN 42149 2588 13 . . NNP 42149 2588 14 long long JJ 42149 2588 15 and and CC 42149 2588 16 1 1 CD 42149 2588 17 ft ft NN 42149 2588 18 . . NNP 42149 2588 19 4 4 CD 42149 2588 20 in in IN 42149 2588 21 . . . 42149 2589 1 high high JJ 42149 2589 2 . . . 42149 2590 1 The the DT 42149 2590 2 ribs rib NNS 42149 2590 3 rested rest VBD 42149 2590 4 on on IN 42149 2590 5 a a DT 42149 2590 6 longitudinal longitudinal JJ 42149 2590 7 timber timber NN 42149 2590 8 on on IN 42149 2590 9 each each DT 42149 2590 10 side side NN 42149 2590 11 ; ; : 42149 2590 12 these these DT 42149 2590 13 were be VBD 42149 2590 14 blocked block VBN 42149 2590 15 up up RP 42149 2590 16 from from IN 42149 2590 17 the the DT 42149 2590 18 top top JJ 42149 2590 19 step step NN 42149 2590 20 of of IN 42149 2590 21 the the DT 42149 2590 22 duct duct NN 42149 2590 23 bench bench NN 42149 2590 24 concrete concrete NN 42149 2590 25 . . . 42149 2591 1 When when WRB 42149 2591 2 the the DT 42149 2591 3 form form NN 42149 2591 4 was be VBD 42149 2591 5 set set VBN 42149 2591 6 , , , 42149 2591 7 or or CC 42149 2591 8 when when WRB 42149 2591 9 it -PRON- PRP 42149 2591 10 was be VBD 42149 2591 11 released release VBN 42149 2591 12 , , , 42149 2591 13 it -PRON- PRP 42149 2591 14 was be VBD 42149 2591 15 moved move VBN 42149 2591 16 ahead ahead RB 42149 2591 17 on on IN 42149 2591 18 rollers roller NNS 42149 2591 19 placed place VBN 42149 2591 20 under under IN 42149 2591 21 it -PRON- PRP 42149 2591 22 . . . 42149 2592 1 The the DT 42149 2592 2 concrete concrete NN 42149 2592 3 was be VBD 42149 2592 4 received receive VBN 42149 2592 5 at at IN 42149 2592 6 the the DT 42149 2592 7 form form NN 42149 2592 8 in in IN 42149 2592 9 ¾-cu ¾-cu NNP 42149 2592 10 . . . 42149 2593 1 yd yd NNP 42149 2593 2 . . . 42149 2594 1 dumping dump VBG 42149 2594 2 buckets bucket NNS 42149 2594 3 ; ; : 42149 2594 4 from from IN 42149 2594 5 the the DT 42149 2594 6 flat flat JJ 42149 2594 7 cars car NNS 42149 2594 8 on on IN 42149 2594 9 which which WDT 42149 2594 10 they -PRON- PRP 42149 2594 11 were be VBD 42149 2594 12 run run VBN 42149 2594 13 , , , 42149 2594 14 these these DT 42149 2594 15 were be VBD 42149 2594 16 hoisted hoist VBN 42149 2594 17 to to IN 42149 2594 18 the the DT 42149 2594 19 level level NN 42149 2594 20 of of IN 42149 2594 21 the the DT 42149 2594 22 lower low JJR 42149 2594 23 platform platform NN 42149 2594 24 of of IN 42149 2594 25 the the DT 42149 2594 26 arch arch JJ 42149 2594 27 form form NN 42149 2594 28 . . . 42149 2595 1 At at IN 42149 2595 2 this this DT 42149 2595 3 level level NN 42149 2595 4 the the DT 42149 2595 5 concrete concrete NN 42149 2595 6 was be VBD 42149 2595 7 dumped dump VBN 42149 2595 8 on on IN 42149 2595 9 a a DT 42149 2595 10 traveling travel VBG 42149 2595 11 car car NN 42149 2595 12 or or CC 42149 2595 13 stage stage NN 42149 2595 14 , , , 42149 2595 15 and and CC 42149 2595 16 moved move VBD 42149 2595 17 in in IN 42149 2595 18 that that DT 42149 2595 19 to to IN 42149 2595 20 the the DT 42149 2595 21 point point NN 42149 2595 22 on on IN 42149 2595 23 the the DT 42149 2595 24 form form NN 42149 2595 25 where where WRB 42149 2595 26 it -PRON- PRP 42149 2595 27 was be VBD 42149 2595 28 to to TO 42149 2595 29 be be VB 42149 2595 30 placed place VBN 42149 2595 31 . . . 42149 2596 1 For for IN 42149 2596 2 the the DT 42149 2596 3 lower low JJR 42149 2596 4 part part NN 42149 2596 5 of of IN 42149 2596 6 the the DT 42149 2596 7 arch arch NN 42149 2596 8 , , , 42149 2596 9 the the DT 42149 2596 10 concrete concrete NN 42149 2596 11 was be VBD 42149 2596 12 thrown throw VBN 42149 2596 13 directly directly RB 42149 2596 14 into into IN 42149 2596 15 the the DT 42149 2596 16 form form NN 42149 2596 17 from from IN 42149 2596 18 this this DT 42149 2596 19 traveling travel VBG 42149 2596 20 stage stage NN 42149 2596 21 , , , 42149 2596 22 but but CC 42149 2596 23 , , , 42149 2596 24 for for IN 42149 2596 25 the the DT 42149 2596 26 upper upper JJ 42149 2596 27 part part NN 42149 2596 28 , , , 42149 2596 29 it -PRON- PRP 42149 2596 30 was be VBD 42149 2596 31 first first RB 42149 2596 32 thrown throw VBN 42149 2596 33 on on IN 42149 2596 34 the the DT 42149 2596 35 upper upper JJ 42149 2596 36 platform platform NN 42149 2596 37 of of IN 42149 2596 38 the the DT 42149 2596 39 arch arch NN 42149 2596 40 . . . 42149 2597 1 The the DT 42149 2597 2 hoisting hoisting NN 42149 2597 3 was be VBD 42149 2597 4 done do VBN 42149 2597 5 by by IN 42149 2597 6 a a DT 42149 2597 7 small small JJ 42149 2597 8 Lidgerwood Lidgerwood NNP 42149 2597 9 compressed compress VBN 42149 2597 10 - - HYPH 42149 2597 11 air air NN 42149 2597 12 hoister hoister NN 42149 2597 13 , , , 42149 2597 14 and and CC 42149 2597 15 set set VB 42149 2597 16 up up RP 42149 2597 17 on on IN 42149 2597 18 an an DT 42149 2597 19 overhead overhead JJ 42149 2597 20 platform platform NN 42149 2597 21 across across IN 42149 2597 22 the the DT 42149 2597 23 tunnel tunnel NN 42149 2597 24 . . . 42149 2598 1 The the DT 42149 2598 2 pulley pulley NN 42149 2598 3 over over IN 42149 2598 4 which which WDT 42149 2598 5 the the DT 42149 2598 6 cable cable NN 42149 2598 7 from from IN 42149 2598 8 the the DT 42149 2598 9 hoister hoister NN 42149 2598 10 passed pass VBN 42149 2598 11 was be VBD 42149 2598 12 attached attach VBN 42149 2598 13 to to IN 42149 2598 14 the the DT 42149 2598 15 iron iron NN 42149 2598 16 lining lining NN 42149 2598 17 near near IN 42149 2598 18 one one CD 42149 2598 19 end end NN 42149 2598 20 of of IN 42149 2598 21 the the DT 42149 2598 22 form form NN 42149 2598 23 , , , 42149 2598 24 and and CC 42149 2598 25 the the DT 42149 2598 26 traveling travel VBG 42149 2598 27 stage stage NN 42149 2598 28 ran run VBD 42149 2598 29 back back RB 42149 2598 30 from from IN 42149 2598 31 the the DT 42149 2598 32 arch arch JJ 42149 2598 33 form form NN 42149 2598 34 on on IN 42149 2598 35 a a DT 42149 2598 36 trailer trailer NN 42149 2598 37 , , , 42149 2598 38 shown show VBN 42149 2598 39 on on IN 42149 2598 40 Plate Plate NNP 42149 2598 41 XLIV XLIV NNP 42149 2598 42 . . . 42149 2599 1 When when WRB 42149 2599 2 it -PRON- PRP 42149 2599 3 was be VBD 42149 2599 4 impossible impossible JJ 42149 2599 5 to to TO 42149 2599 6 hang hang VB 42149 2599 7 a a DT 42149 2599 8 pulley pulley NN 42149 2599 9 -- -- : 42149 2599 10 owing owe VBG 42149 2599 11 to to IN 42149 2599 12 the the DT 42149 2599 13 concrete concrete NN 42149 2599 14 arch arch NN 42149 2599 15 having have VBG 42149 2599 16 been be VBN 42149 2599 17 built build VBN 42149 2599 18 at at IN 42149 2599 19 the the DT 42149 2599 20 point point NN 42149 2599 21 where where WRB 42149 2599 22 the the DT 42149 2599 23 trailer trailer NN 42149 2599 24 stood stand VBD 42149 2599 25 -- -- : 42149 2599 26 an an DT 42149 2599 27 = = SYM 42149 2599 28 A=-frame a=-frame CD 42149 2599 29 was be VBD 42149 2599 30 built build VBN 42149 2599 31 on on IN 42149 2599 32 the the DT 42149 2599 33 trailer trailer NN 42149 2599 34 , , , 42149 2599 35 and and CC 42149 2599 36 the the DT 42149 2599 37 pulley pulley NN 42149 2599 38 was be VBD 42149 2599 39 attached attach VBN 42149 2599 40 to to IN 42149 2599 41 that that DT 42149 2599 42 . . . 42149 2600 1 In in IN 42149 2600 2 laying lay VBG 42149 2600 3 the the DT 42149 2600 4 lower low JJR 42149 2600 5 part part NN 42149 2600 6 of of IN 42149 2600 7 the the DT 42149 2600 8 arch arch NN 42149 2600 9 , , , 42149 2600 10 about about RB 42149 2600 11 1 1 CD 42149 2600 12 ft ft NN 42149 2600 13 . . NN 42149 2600 14 of of IN 42149 2600 15 lagging lagging NNP 42149 2600 16 ( ( -LRB- 42149 2600 17 including include VBG 42149 2600 18 the the DT 42149 2600 19 swinging swinge VBG 42149 2600 20 arms arm NNS 42149 2600 21 ) ) -RRB- 42149 2600 22 was be VBD 42149 2600 23 first first RB 42149 2600 24 set set VBN 42149 2600 25 , , , 42149 2600 26 the the DT 42149 2600 27 other other JJ 42149 2600 28 panels panel NNS 42149 2600 29 being be VBG 42149 2600 30 pulled pull VBN 42149 2600 31 up up RP 42149 2600 32 toward toward IN 42149 2600 33 the the DT 42149 2600 34 top top NN 42149 2600 35 of of IN 42149 2600 36 the the DT 42149 2600 37 arch arch NN 42149 2600 38 . . . 42149 2601 1 When when WRB 42149 2601 2 that that DT 42149 2601 3 was be VBD 42149 2601 4 filled fill VBN 42149 2601 5 , , , 42149 2601 6 the the DT 42149 2601 7 next next JJ 42149 2601 8 panel panel NN 42149 2601 9 above above RB 42149 2601 10 was be VBD 42149 2601 11 lowered lower VBN 42149 2601 12 into into IN 42149 2601 13 place place NN 42149 2601 14 , , , 42149 2601 15 and and CC 42149 2601 16 the the DT 42149 2601 17 work work NN 42149 2601 18 continued continue VBD 42149 2601 19 . . . 42149 2602 1 As as IN 42149 2602 2 the the DT 42149 2602 3 concrete concrete NN 42149 2602 4 rose rise VBD 42149 2602 5 toward toward IN 42149 2602 6 the the DT 42149 2602 7 key key NN 42149 2602 8 , , , 42149 2602 9 it -PRON- PRP 42149 2602 10 was be VBD 42149 2602 11 packed pack VBN 42149 2602 12 up up RP 42149 2602 13 to to IN 42149 2602 14 a a DT 42149 2602 15 radial radial JJ 42149 2602 16 surface surface NN 42149 2602 17 , , , 42149 2602 18 so so IN 42149 2602 19 that that IN 42149 2602 20 the the DT 42149 2602 21 arch arch NN 42149 2602 22 would would MD 42149 2602 23 not not RB 42149 2602 24 be be VB 42149 2602 25 unduly unduly RB 42149 2602 26 weakened weaken VBN 42149 2602 27 if if IN 42149 2602 28 the the DT 42149 2602 29 sides side NNS 42149 2602 30 set set VBN 42149 2602 31 before before IN 42149 2602 32 the the DT 42149 2602 33 key key NN 42149 2602 34 was be VBD 42149 2602 35 placed place VBN 42149 2602 36 . . . 42149 2603 1 All all PDT 42149 2603 2 the the DT 42149 2603 3 time time NN 42149 2603 4 , , , 42149 2603 5 great great JJ 42149 2603 6 care care NN 42149 2603 7 was be VBD 42149 2603 8 taken take VBN 42149 2603 9 to to TO 42149 2603 10 see see VB 42149 2603 11 that that IN 42149 2603 12 the the DT 42149 2603 13 concrete concrete NN 42149 2603 14 was be VBD 42149 2603 15 carefully carefully RB 42149 2603 16 packed pack VBN 42149 2603 17 into into IN 42149 2603 18 the the DT 42149 2603 19 segments segment NNS 42149 2603 20 of of IN 42149 2603 21 the the DT 42149 2603 22 metal metal NN 42149 2603 23 lining lining NN 42149 2603 24 . . . 42149 2604 1 The the DT 42149 2604 2 quantity quantity NN 42149 2604 3 of of IN 42149 2604 4 water water NN 42149 2604 5 used use VBN 42149 2604 6 in in IN 42149 2604 7 the the DT 42149 2604 8 concrete concrete NN 42149 2604 9 was be VBD 42149 2604 10 carefully carefully RB 42149 2604 11 regulated regulate VBN 42149 2604 12 , , , 42149 2604 13 more more RBR 42149 2604 14 being be VBG 42149 2604 15 used use VBN 42149 2604 16 in in IN 42149 2604 17 the the DT 42149 2604 18 lower low JJR 42149 2604 19 than than IN 42149 2604 20 in in IN 42149 2604 21 the the DT 42149 2604 22 upper upper JJ 42149 2604 23 parts part NNS 42149 2604 24 of of IN 42149 2604 25 the the DT 42149 2604 26 arch arch NN 42149 2604 27 . . . 42149 2605 1 In in IN 42149 2605 2 places place NNS 42149 2605 3 where where WRB 42149 2605 4 there there EX 42149 2605 5 were be VBD 42149 2605 6 no no DT 42149 2605 7 reinforcing reinforce VBG 42149 2605 8 rods rod NNS 42149 2605 9 , , , 42149 2605 10 the the DT 42149 2605 11 width width NN 42149 2605 12 of of IN 42149 2605 13 the the DT 42149 2605 14 concrete concrete JJ 42149 2605 15 key key NN 42149 2605 16 was be VBD 42149 2605 17 the the DT 42149 2605 18 length length NN 42149 2605 19 of of IN 42149 2605 20 the the DT 42149 2605 21 block block NN 42149 2605 22 lagging lag VBG 42149 2605 23 , , , 42149 2605 24 namely namely RB 42149 2605 25 , , , 42149 2605 26 2 2 CD 42149 2605 27 ft ft NN 42149 2605 28 . . . 42149 2605 29 Where where WRB 42149 2605 30 there there EX 42149 2605 31 was be VBD 42149 2605 32 circumferential circumferential JJ 42149 2605 33 reinforcement reinforcement NN 42149 2605 34 , , , 42149 2605 35 the the DT 42149 2605 36 key key NN 42149 2605 37 had have VBD 42149 2605 38 to to TO 42149 2605 39 be be VB 42149 2605 40 more more JJR 42149 2605 41 than than IN 42149 2605 42 5 5 CD 42149 2605 43 ft ft NN 42149 2605 44 . . NN 42149 2605 45 wide wide RB 42149 2605 46 , , , 42149 2605 47 in in IN 42149 2605 48 order order NN 42149 2605 49 to to TO 42149 2605 50 take take VB 42149 2605 51 the the DT 42149 2605 52 5-ft 5-ft NN 42149 2605 53 . . . 42149 2605 54 closure closure NN 42149 2605 55 rods rod NNS 42149 2605 56 used use VBN 42149 2605 57 in in IN 42149 2605 58 the the DT 42149 2605 59 key key NN 42149 2605 60 . . . 42149 2606 1 This this DT 42149 2606 2 naturally naturally RB 42149 2606 3 increased increase VBD 42149 2606 4 the the DT 42149 2606 5 time time NN 42149 2606 6 of of IN 42149 2606 7 keying key VBG 42149 2606 8 very very RB 42149 2606 9 much much RB 42149 2606 10 . . . 42149 2607 1 On on IN 42149 2607 2 the the DT 42149 2607 3 places place NNS 42149 2607 4 where where WRB 42149 2607 5 the the DT 42149 2607 6 5-ft 5-ft NNP 42149 2607 7 . . . 42149 2607 8 longitudinal longitudinal JJ 42149 2607 9 laggings lagging NNS 42149 2607 10 were be VBD 42149 2607 11 used use VBN 42149 2607 12 , , , 42149 2607 13 it -PRON- PRP 42149 2607 14 was be VBD 42149 2607 15 impossible impossible JJ 42149 2607 16 to to TO 42149 2607 17 fill fill VB 42149 2607 18 the the DT 42149 2607 19 flanges flange NNS 42149 2607 20 of of IN 42149 2607 21 the the DT 42149 2607 22 metal metal NN 42149 2607 23 lining line VBG 42149 2607 24 much much RB 42149 2607 25 higher high JJR 42149 2607 26 than than IN 42149 2607 27 their -PRON- PRP$ 42149 2607 28 undersides underside NNS 42149 2607 29 . . . 42149 2608 1 As as IN 42149 2608 2 the the DT 42149 2608 3 concrete concrete NN 42149 2608 4 used use VBN 42149 2608 5 in in IN 42149 2608 6 the the DT 42149 2608 7 key key NN 42149 2608 8 had have VBD 42149 2608 9 to to TO 42149 2608 10 be be VB 42149 2608 11 much much RB 42149 2608 12 drier dry JJR 42149 2608 13 than than IN 42149 2608 14 that that DT 42149 2608 15 used use VBN 42149 2608 16 elsewhere elsewhere RB 42149 2608 17 , , , 42149 2608 18 it -PRON- PRP 42149 2608 19 was be VBD 42149 2608 20 not not RB 42149 2608 21 easy easy JJ 42149 2608 22 to to TO 42149 2608 23 get get VB 42149 2608 24 a a DT 42149 2608 25 good good JJ 42149 2608 26 surface surface NN 42149 2608 27 . . . 42149 2609 1 This this DT 42149 2609 2 trouble trouble NN 42149 2609 3 was be VBD 42149 2609 4 overcome overcome VBN 42149 2609 5 by by IN 42149 2609 6 putting put VBG 42149 2609 7 a a DT 42149 2609 8 thin thin JJ 42149 2609 9 layer layer NN 42149 2609 10 of of IN 42149 2609 11 mortar mortar NN 42149 2609 12 on on IN 42149 2609 13 the the DT 42149 2609 14 laggings lagging NNS 42149 2609 15 just just RB 42149 2609 16 before before IN 42149 2609 17 the the DT 42149 2609 18 concrete concrete NN 42149 2609 19 was be VBD 42149 2609 20 put put VBN 42149 2609 21 in in RB 42149 2609 22 . . . 42149 2610 1 The the DT 42149 2610 2 overhead overhead JJ 42149 2610 3 conductor conductor NN 42149 2610 4 pockets pocket NNS 42149 2610 5 were be VBD 42149 2610 6 a a DT 42149 2610 7 great great JJ 42149 2610 8 hindrance hindrance NN 42149 2610 9 to to IN 42149 2610 10 the the DT 42149 2610 11 placing placing NN 42149 2610 12 of of IN 42149 2610 13 the the DT 42149 2610 14 key key JJ 42149 2610 15 concrete concrete NN 42149 2610 16 , , , 42149 2610 17 especially especially RB 42149 2610 18 where where WRB 42149 2610 19 the the DT 42149 2610 20 iron iron NN 42149 2610 21 was be VBD 42149 2610 22 below below IN 42149 2610 23 true true JJ 42149 2610 24 grade grade NN 42149 2610 25 . . . 42149 2611 1 Whenever whenever WRB 42149 2611 2 an an DT 42149 2611 3 especially especially RB 42149 2611 4 troublesome troublesome JJ 42149 2611 5 one one NN 42149 2611 6 was be VBD 42149 2611 7 met meet VBN 42149 2611 8 , , , 42149 2611 9 a a DT 42149 2611 10 special special JJ 42149 2611 11 grout grout NN 42149 2611 12 pipe pipe NN 42149 2611 13 was be VBD 42149 2611 14 put put VBN 42149 2611 15 in in RP 42149 2611 16 to to TO 42149 2611 17 fill fill VB 42149 2611 18 up up RP 42149 2611 19 unavoidable unavoidable JJ 42149 2611 20 holes hole NNS 42149 2611 21 by by IN 42149 2611 22 grouting grout VBG 42149 2611 23 after after IN 42149 2611 24 the the DT 42149 2611 25 concrete concrete NN 42149 2611 26 had have VBD 42149 2611 27 set set VBN 42149 2611 28 . . . 42149 2612 1 All all PDT 42149 2612 2 the the DT 42149 2612 3 circumferential circumferential JJ 42149 2612 4 reinforcing reinforce VBG 42149 2612 5 rods rod NNS 42149 2612 6 were be VBD 42149 2612 7 bent bent JJ 42149 2612 8 in in IN 42149 2612 9 the the DT 42149 2612 10 tunnel tunnel NN 42149 2612 11 by by IN 42149 2612 12 bending bend VBG 42149 2612 13 them -PRON- PRP 42149 2612 14 around around IN 42149 2612 15 a a DT 42149 2612 16 curved curved JJ 42149 2612 17 form form NN 42149 2612 18 of of IN 42149 2612 19 less less JJR 42149 2612 20 diameter diameter NN 42149 2612 21 than than IN 42149 2612 22 the the DT 42149 2612 23 required require VBN 42149 2612 24 bend bend NN 42149 2612 25 . . . 42149 2613 1 This this DT 42149 2613 2 generally generally RB 42149 2613 3 left leave VBD 42149 2613 4 them -PRON- PRP 42149 2613 5 all all DT 42149 2613 6 right right RB 42149 2613 7 in in IN 42149 2613 8 the the DT 42149 2613 9 middle middle NN 42149 2613 10 of of IN 42149 2613 11 their -PRON- PRP$ 42149 2613 12 length length NN 42149 2613 13 , , , 42149 2613 14 but but CC 42149 2613 15 with with IN 42149 2613 16 their -PRON- PRP$ 42149 2613 17 end end NN 42149 2613 18 portions portion NNS 42149 2613 19 too too RB 42149 2613 20 straight straight RB 42149 2613 21 ; ; : 42149 2613 22 in in IN 42149 2613 23 such such JJ 42149 2613 24 cases case NNS 42149 2613 25 the the DT 42149 2613 26 ends end NNS 42149 2613 27 were be VBD 42149 2613 28 bent bent JJ 42149 2613 29 again again RB 42149 2613 30 . . . 42149 2614 1 All all DT 42149 2614 2 rods rod NNS 42149 2614 3 were be VBD 42149 2614 4 compared compare VBN 42149 2614 5 with with IN 42149 2614 6 a a DT 42149 2614 7 template template NN 42149 2614 8 before before IN 42149 2614 9 being be VBG 42149 2614 10 passed pass VBN 42149 2614 11 for for IN 42149 2614 12 use use NN 42149 2614 13 . . . 42149 2615 1 The the DT 42149 2615 2 arch arch JJ 42149 2615 3 forms form NNS 42149 2615 4 were be VBD 42149 2615 5 left leave VBN 42149 2615 6 up up RP 42149 2615 7 for for IN 42149 2615 8 48 48 CD 42149 2615 9 hours hour NNS 42149 2615 10 after after IN 42149 2615 11 keying keying NN 42149 2615 12 was be VBD 42149 2615 13 finished finish VBN 42149 2615 14 . . . 42149 2616 1 Levels level NNS 42149 2616 2 taken take VBN 42149 2616 3 after after IN 42149 2616 4 striking strike VBG 42149 2616 5 the the DT 42149 2616 6 forms form NNS 42149 2616 7 showed show VBD 42149 2616 8 that that IN 42149 2616 9 no no DT 42149 2616 10 appreciable appreciable JJ 42149 2616 11 settlement settlement NN 42149 2616 12 occurred occur VBD 42149 2616 13 . . . 42149 2617 1 An an DT 42149 2617 2 average average JJ 42149 2617 3 gang gang NN 42149 2617 4 for for IN 42149 2617 5 a a DT 42149 2617 6 20-ft 20-ft NNP 42149 2617 7 . . . 42149 2617 8 length length NN 42149 2617 9 of of IN 42149 2617 10 arch arch NN 42149 2617 11 was be VBD 42149 2617 12 : : : 42149 2617 13 1 1 CD 42149 2617 14 Foreman foreman NN 42149 2617 15 @ @ CC 42149 2617 16 $ $ $ 42149 2617 17 3.25 3.25 CD 42149 2617 18 per per IN 42149 2617 19 shift shift NN 42149 2617 20 . . . 42149 2618 1 2 2 CD 42149 2618 2 Spaders Spaders NNPS 42149 2618 3 " " `` 42149 2618 4 2.00 2.00 CD 42149 2618 5 " " '' 42149 2618 6 " " '' 42149 2618 7 10 10 CD 42149 2618 8 Laborers laborer NNS 42149 2618 9 " " `` 42149 2618 10 1.75 1.75 CD 42149 2618 11 " " '' 42149 2618 12 " " `` 42149 2618 13 Table table NN 42149 2618 14 30 30 CD 42149 2618 15 shows show VBZ 42149 2618 16 the the DT 42149 2618 17 progress progress NN 42149 2618 18 attained attain VBN 42149 2618 19 under under IN 42149 2618 20 various various JJ 42149 2618 21 conditions condition NNS 42149 2618 22 . . . 42149 2619 1 Whenever whenever WRB 42149 2619 2 the the DT 42149 2619 3 face face NN 42149 2619 4 of of IN 42149 2619 5 the the DT 42149 2619 6 bench bench NN 42149 2619 7 concrete concrete NN 42149 2619 8 was be VBD 42149 2619 9 constructed construct VBN 42149 2619 10 before before IN 42149 2619 11 the the DT 42149 2619 12 arch arch NN 42149 2619 13 , , , 42149 2619 14 the the DT 42149 2619 15 latter latter JJ 42149 2619 16 was be VBD 42149 2619 17 built build VBN 42149 2619 18 in in IN 42149 2619 19 two two CD 42149 2619 20 separate separate JJ 42149 2619 21 portions portion NNS 42149 2619 22 , , , 42149 2619 23 that that RB 42149 2619 24 is is RB 42149 2619 25 , , , 42149 2619 26 the the DT 42149 2619 27 bottom bottom NN 42149 2619 28 5 5 CD 42149 2619 29 ft ft NN 42149 2619 30 . . NN 42149 2619 31 , , , 42149 2619 32 or or CC 42149 2619 33 " " `` 42149 2619 34 haunches haunch NNS 42149 2619 35 " " '' 42149 2619 36 of of IN 42149 2619 37 the the DT 42149 2619 38 arch arch NN 42149 2619 39 , , , 42149 2619 40 as as IN 42149 2619 41 they -PRON- PRP 42149 2619 42 were be VBD 42149 2619 43 termed term VBN 42149 2619 44 , , , 42149 2619 45 were be VBD 42149 2619 46 built build VBN 42149 2619 47 on on IN 42149 2619 48 each each DT 42149 2619 49 side side NN 42149 2619 50 and and CC 42149 2619 51 the the DT 42149 2619 52 rest rest NN 42149 2619 53 of of IN 42149 2619 54 the the DT 42149 2619 55 arch arch NN 42149 2619 56 later later RB 42149 2619 57 . . . 42149 2620 1 This this DT 42149 2620 2 involved involve VBD 42149 2620 3 the the DT 42149 2620 4 use use NN 42149 2620 5 of of IN 42149 2620 6 two two CD 42149 2620 7 separate separate JJ 42149 2620 8 sets set NNS 42149 2620 9 of of IN 42149 2620 10 forms form NNS 42149 2620 11 , , , 42149 2620 12 namely namely RB 42149 2620 13 , , , 42149 2620 14 for for IN 42149 2620 15 the the DT 42149 2620 16 haunch haunch NN 42149 2620 17 and and CC 42149 2620 18 for for IN 42149 2620 19 the the DT 42149 2620 20 arch arch NN 42149 2620 21 . . . 42149 2621 1 Not not RB 42149 2621 2 very very RB 42149 2621 3 much much RB 42149 2621 4 arch arch JJ 42149 2621 5 was be VBD 42149 2621 6 built build VBN 42149 2621 7 in in IN 42149 2621 8 this this DT 42149 2621 9 way way NN 42149 2621 10 , , , 42149 2621 11 and and CC 42149 2621 12 , , , 42149 2621 13 as as IN 42149 2621 14 the the DT 42149 2621 15 methods method NNS 42149 2621 16 were be VBD 42149 2621 17 in in IN 42149 2621 18 principle principle NN 42149 2621 19 precisely precisely RB 42149 2621 20 the the DT 42149 2621 21 same same JJ 42149 2621 22 as as IN 42149 2621 23 those those DT 42149 2621 24 used use VBN 42149 2621 25 when when WRB 42149 2621 26 all all PDT 42149 2621 27 the the DT 42149 2621 28 arch arch NN 42149 2621 29 was be VBD 42149 2621 30 built build VBN 42149 2621 31 in in IN 42149 2621 32 one one CD 42149 2621 33 operation operation NN 42149 2621 34 , , , 42149 2621 35 no no DT 42149 2621 36 detailed detailed JJ 42149 2621 37 description description NN 42149 2621 38 is be VBZ 42149 2621 39 needed need VBN 42149 2621 40 . . . 42149 2622 1 No no DT 42149 2622 2 provision provision NN 42149 2622 3 was be VBD 42149 2622 4 made make VBN 42149 2622 5 in in IN 42149 2622 6 the the DT 42149 2622 7 contract contract NN 42149 2622 8 for for IN 42149 2622 9 grouting grout VBG 42149 2622 10 the the DT 42149 2622 11 concrete concrete NN 42149 2622 12 arch arch NN 42149 2622 13 , , , 42149 2622 14 but but CC 42149 2622 15 it -PRON- PRP 42149 2622 16 soon soon RB 42149 2622 17 became become VBD 42149 2622 18 evident evident JJ 42149 2622 19 that that IN 42149 2622 20 by by IN 42149 2622 21 ordinary ordinary JJ 42149 2622 22 methods method NNS 42149 2622 23 the the DT 42149 2622 24 top top JJ 42149 2622 25 part part NN 42149 2622 26 of of IN 42149 2622 27 the the DT 42149 2622 28 concrete concrete NN 42149 2622 29 could could MD 42149 2622 30 not not RB 42149 2622 31 be be VB 42149 2622 32 packed pack VBN 42149 2622 33 solid solid JJ 42149 2622 34 against against IN 42149 2622 35 the the DT 42149 2622 36 iron iron NN 42149 2622 37 segments segment NNS 42149 2622 38 , , , 42149 2622 39 especially especially RB 42149 2622 40 in in IN 42149 2622 41 the the DT 42149 2622 42 keys key NNS 42149 2622 43 . . . 42149 2623 1 As as IN 42149 2623 2 it -PRON- PRP 42149 2623 3 was be VBD 42149 2623 4 imperative imperative JJ 42149 2623 5 to to TO 42149 2623 6 have have VB 42149 2623 7 the the DT 42149 2623 8 arch arch NN 42149 2623 9 perfectly perfectly RB 42149 2623 10 solid solid JJ 42149 2623 11 , , , 42149 2623 12 it -PRON- PRP 42149 2623 13 was be VBD 42149 2623 14 determined determined JJ 42149 2623 15 to to TO 42149 2623 16 fill fill VB 42149 2623 17 these these DT 42149 2623 18 unavoidable unavoidable JJ 42149 2623 19 gaps gap NNS 42149 2623 20 with with IN 42149 2623 21 a a DT 42149 2623 22 1:1 1:1 NNP 42149 2623 23 Portland Portland NNP 42149 2623 24 cement cement NN 42149 2623 25 grout grout NN 42149 2623 26 , , , 42149 2623 27 at at IN 42149 2623 28 the the DT 42149 2623 29 same same JJ 42149 2623 30 time time NN 42149 2623 31 making make VBG 42149 2623 32 every every DT 42149 2623 33 effort effort NN 42149 2623 34 to to TO 42149 2623 35 reduce reduce VB 42149 2623 36 the the DT 42149 2623 37 spaces space NNS 42149 2623 38 to to IN 42149 2623 39 a a DT 42149 2623 40 minimum minimum NN 42149 2623 41 . . . 42149 2624 1 This this DT 42149 2624 2 made make VBD 42149 2624 3 it -PRON- PRP 42149 2624 4 necessary necessary JJ 42149 2624 5 to to TO 42149 2624 6 build build VB 42149 2624 7 grout grout NN 42149 2624 8 pipes pipe NNS 42149 2624 9 into into IN 42149 2624 10 the the DT 42149 2624 11 concrete concrete NN 42149 2624 12 as as IN 42149 2624 13 it -PRON- PRP 42149 2624 14 was be VBD 42149 2624 15 put put VBN 42149 2624 16 in in RB 42149 2624 17 . . . 42149 2625 1 The the DT 42149 2625 2 first first JJ 42149 2625 3 type type NN 42149 2625 4 of of IN 42149 2625 5 grout grout NN 42149 2625 6 pipe pipe NN 42149 2625 7 arrangement arrangement NN 42149 2625 8 is be VBZ 42149 2625 9 shown show VBN 42149 2625 10 as as IN 42149 2625 11 Type Type NNP 42149 2625 12 _ _ NNP 42149 2625 13 A A NNP 42149 2625 14 _ _ NNP 42149 2625 15 , , , 42149 2625 16 in in IN 42149 2625 17 Fig Fig NNP 42149 2625 18 . . . 42149 2626 1 23 23 CD 42149 2626 2 . . . 42149 2627 1 This this DT 42149 2627 2 was be VBD 42149 2627 3 used use VBN 42149 2627 4 with with IN 42149 2627 5 the the DT 42149 2627 6 longitudinal longitudinal JJ 42149 2627 7 key key JJ 42149 2627 8 laggings lagging NNS 42149 2627 9 ; ; : 42149 2627 10 when when WRB 42149 2627 11 this this DT 42149 2627 12 method method NN 42149 2627 13 was be VBD 42149 2627 14 found find VBN 42149 2627 15 to to TO 42149 2627 16 be be VB 42149 2627 17 no no DT 42149 2627 18 good good JJ 42149 2627 19 , , , 42149 2627 20 and and CC 42149 2627 21 cross cross NN 42149 2627 22 - - NNS 42149 2627 23 laggings lagging NNS 42149 2627 24 were be VBD 42149 2627 25 used use VBN 42149 2627 26 , , , 42149 2627 27 the the DT 42149 2627 28 system system NN 42149 2627 29 shown show VBN 42149 2627 30 as as IN 42149 2627 31 Type Type NNP 42149 2627 32 _ _ NNP 42149 2627 33 B B NNP 42149 2627 34 _ _ NNP 42149 2627 35 , , , 42149 2627 36 in in IN 42149 2627 37 Fig Fig NNP 42149 2627 38 . . . 42149 2628 1 23 23 CD 42149 2628 2 , , , 42149 2628 3 was be VBD 42149 2628 4 adopted adopt VBN 42149 2628 5 , , , 42149 2628 6 in in IN 42149 2628 7 which which WDT 42149 2628 8 vents vent NNS 42149 2628 9 were be VBD 42149 2628 10 provided provide VBN 42149 2628 11 to to TO 42149 2628 12 let let VB 42149 2628 13 out out RP 42149 2628 14 the the DT 42149 2628 15 air air NN 42149 2628 16 during during IN 42149 2628 17 grouting grout VBG 42149 2628 18 . . . 42149 2629 1 The the DT 42149 2629 2 expense expense NN 42149 2629 3 of of IN 42149 2629 4 these these DT 42149 2629 5 pipes pipe NNS 42149 2629 6 was be VBD 42149 2629 7 high high JJ 42149 2629 8 , , , 42149 2629 9 and and CC 42149 2629 10 the the DT 42149 2629 11 contractor contractor NN 42149 2629 12 obtained obtain VBD 42149 2629 13 permission permission NN 42149 2629 14 to to TO 42149 2629 15 use use VB 42149 2629 16 sheet sheet NN 42149 2629 17 - - HYPH 42149 2629 18 iron iron NN 42149 2629 19 tubes tube NNS 42149 2629 20 , , , 42149 2629 21 which which WDT 42149 2629 22 , , , 42149 2629 23 however however RB 42149 2629 24 , , , 42149 2629 25 were be VBD 42149 2629 26 found find VBN 42149 2629 27 to to TO 42149 2629 28 be be VB 42149 2629 29 unsuitable unsuitable JJ 42149 2629 30 , , , 42149 2629 31 so so IN 42149 2629 32 that that IN 42149 2629 33 the the DT 42149 2629 34 screwed screw VBN 42149 2629 35 pipes pipe NNS 42149 2629 36 were be VBD 42149 2629 37 used use VBN 42149 2629 38 again again RB 42149 2629 39 . . . 42149 2630 1 The the DT 42149 2630 2 contractor contractor NN 42149 2630 3 next next RB 42149 2630 4 obtained obtain VBD 42149 2630 5 permission permission NN 42149 2630 6 to to TO 42149 2630 7 try try VB 42149 2630 8 dispensing dispense VBG 42149 2630 9 altogether altogether RB 42149 2630 10 with with IN 42149 2630 11 the the DT 42149 2630 12 vent vent NN 42149 2630 13 pipes pipe NNS 42149 2630 14 , , , 42149 2630 15 and and CC 42149 2630 16 so so RB 42149 2630 17 Type Type NNP 42149 2630 18 _ _ NNP 42149 2630 19 C C NNP 42149 2630 20 _ _ NNP 42149 2630 21 , , , 42149 2630 22 in in IN 42149 2630 23 Fig Fig NNP 42149 2630 24 . . . 42149 2631 1 23 23 CD 42149 2631 2 was be VBD 42149 2631 3 evolved evolve VBN 42149 2631 4 . . . 42149 2632 1 This this DT 42149 2632 2 , , , 42149 2632 3 of of IN 42149 2632 4 course course NN 42149 2632 5 , , , 42149 2632 6 was be VBD 42149 2632 7 found find VBN 42149 2632 8 to to TO 42149 2632 9 be be VB 42149 2632 10 worse bad JJR 42149 2632 11 than than IN 42149 2632 12 any any DT 42149 2632 13 of of IN 42149 2632 14 the the DT 42149 2632 15 other other JJ 42149 2632 16 systems system NNS 42149 2632 17 , , , 42149 2632 18 as as IN 42149 2632 19 the the DT 42149 2632 20 imprisoned imprison VBN 42149 2632 21 air air NN 42149 2632 22 made make VBD 42149 2632 23 it -PRON- PRP 42149 2632 24 impossible impossible JJ 42149 2632 25 to to TO 42149 2632 26 force force VB 42149 2632 27 grout grout NN 42149 2632 28 in in IN 42149 2632 29 . . . 42149 2633 1 Several several JJ 42149 2633 2 other other JJ 42149 2633 3 modifications modification NNS 42149 2633 4 were be VBD 42149 2633 5 made make VBN 42149 2633 6 , , , 42149 2633 7 and and CC 42149 2633 8 are be VBP 42149 2633 9 shown show VBN 42149 2633 10 in in IN 42149 2633 11 Fig Fig NNP 42149 2633 12 . . . 42149 2634 1 23 23 CD 42149 2634 2 . . . 42149 2635 1 It -PRON- PRP 42149 2635 2 was be VBD 42149 2635 3 then then RB 42149 2635 4 decided decide VBN 42149 2635 5 to to TO 42149 2635 6 devise devise VB 42149 2635 7 as as IN 42149 2635 8 perfect perfect VB 42149 2635 9 a a DT 42149 2635 10 system system NN 42149 2635 11 as as IN 42149 2635 12 possible possible JJ 42149 2635 13 , , , 42149 2635 14 without without IN 42149 2635 15 allowing allow VBG 42149 2635 16 the the DT 42149 2635 17 question question NN 42149 2635 18 of of IN 42149 2635 19 cost cost NN 42149 2635 20 to to TO 42149 2635 21 be be VB 42149 2635 22 the the DT 42149 2635 23 ruling rule VBG 42149 2635 24 factor factor NN 42149 2635 25 , , , 42149 2635 26 and and CC 42149 2635 27 to to TO 42149 2635 28 use use VB 42149 2635 29 that that DT 42149 2635 30 system system NN 42149 2635 31 throughout throughout IN 42149 2635 32 . . . 42149 2636 1 In in IN 42149 2636 2 this this DT 42149 2636 3 system system NN 42149 2636 4 , , , 42149 2636 5 shown show VBN 42149 2636 6 as as IN 42149 2636 7 Type Type NNP 42149 2636 8 _ _ NNP 42149 2636 9 S S NNP 42149 2636 10 _ _ NNP 42149 2636 11 , , , 42149 2636 12 in in IN 42149 2636 13 Fig Fig NNP 42149 2636 14 . . . 42149 2637 1 23 23 CD 42149 2637 2 , , , 42149 2637 3 most most JJS 42149 2637 4 of of IN 42149 2637 5 the the DT 42149 2637 6 vent vent NN 42149 2637 7 pipes pipe NNS 42149 2637 8 were be VBD 42149 2637 9 contained contain VBN 42149 2637 10 in in IN 42149 2637 11 the the DT 42149 2637 12 concrete concrete NN 42149 2637 13 , , , 42149 2637 14 and and CC 42149 2637 15 their -PRON- PRP$ 42149 2637 16 size size NN 42149 2637 17 was be VBD 42149 2637 18 independent independent JJ 42149 2637 19 of of IN 42149 2637 20 the the DT 42149 2637 21 thickness thickness NN 42149 2637 22 of of IN 42149 2637 23 the the DT 42149 2637 24 arch arch NN 42149 2637 25 , , , 42149 2637 26 so so IN 42149 2637 27 that that IN 42149 2637 28 they -PRON- PRP 42149 2637 29 were be VBD 42149 2637 30 easily easily RB 42149 2637 31 fixed fix VBN 42149 2637 32 in in IN 42149 2637 33 position position NN 42149 2637 34 and and CC 42149 2637 35 not not RB 42149 2637 36 subject subject JJ 42149 2637 37 to to IN 42149 2637 38 disturbance disturbance NN 42149 2637 39 while while IN 42149 2637 40 placing place VBG 42149 2637 41 the the DT 42149 2637 42 concrete concrete NN 42149 2637 43 . . . 42149 2638 1 This this DT 42149 2638 2 system system NN 42149 2638 3 was be VBD 42149 2638 4 used use VBN 42149 2638 5 for for IN 42149 2638 6 about about RB 42149 2638 7 80 80 CD 42149 2638 8 % % NN 42149 2638 9 of of IN 42149 2638 10 the the DT 42149 2638 11 total total JJ 42149 2638 12 length length NN 42149 2638 13 of of IN 42149 2638 14 the the DT 42149 2638 15 tunnel tunnel NN 42149 2638 16 , , , 42149 2638 17 and and CC 42149 2638 18 proved prove VBD 42149 2638 19 entirely entirely RB 42149 2638 20 satisfactory satisfactory JJ 42149 2638 21 . . . 42149 2639 1 The the DT 42149 2639 2 machine machine NN 42149 2639 3 used use VBD 42149 2639 4 for for IN 42149 2639 5 grouting grout VBG 42149 2639 6 was be VBD 42149 2639 7 the the DT 42149 2639 8 same same JJ 42149 2639 9 as as IN 42149 2639 10 that that DT 42149 2639 11 used use VBD 42149 2639 12 for for IN 42149 2639 13 grouting grout VBG 42149 2639 14 outside outside IN 42149 2639 15 the the DT 42149 2639 16 metal metal NN 42149 2639 17 lining lining NN 42149 2639 18 . . . 42149 2640 1 TABLE TABLE NNP 42149 2640 2 30.--AVERAGE 30.--average CD 42149 2640 3 TIME time NN 42149 2640 4 TAKEN TAKEN NNS 42149 2640 5 FOR for IN 42149 2640 6 VARIOUS various NN 42149 2640 7 OPERATIONS OPERATIONS NNP 42149 2640 8 CONNECTED connect VBN 42149 2640 9 WITH with IN 42149 2640 10 BUILDING building NN 42149 2640 11 CONCRETE concrete NN 42149 2640 12 ARCHES ARCHES NNP 42149 2640 13 IN in IN 42149 2640 14 SUBAQUEOUS subaqueous NN 42149 2640 15 TUNNELS TUNNELS NNP 42149 2640 16 . . . 42149 2641 1 = = NFP 42149 2641 2 = = NFP 42149 2641 3 = = SYM 42149 2641 4 = = SYM 42149 2641 5 = = SYM 42149 2641 6 = = SYM 42149 2641 7 = = SYM 42149 2641 8 = = SYM 42149 2641 9 = = NFP 42149 2641 10 = = SYM 42149 2641 11 + + SYM 42149 2641 12 = = SYM 42149 2641 13 = = SYM 42149 2641 14 = = SYM 42149 2641 15 = = SYM 42149 2641 16 = = SYM 42149 2641 17 = = SYM 42149 2641 18 = = SYM 42149 2641 19 = = SYM 42149 2641 20 = = SYM 42149 2641 21 = = SYM 42149 2641 22 = = SYM 42149 2641 23 = = NFP 42149 2641 24 = = SYM 42149 2641 25 + + SYM 42149 2641 26 = = SYM 42149 2641 27 = = SYM 42149 2641 28 = = SYM 42149 2641 29 = = SYM 42149 2641 30 = = SYM 42149 2641 31 = = SYM 42149 2641 32 = = NFP 42149 2641 33 = = SYM 42149 2641 34 + + SYM 42149 2641 35 = = SYM 42149 2641 36 = = SYM 42149 2641 37 = = SYM 42149 2641 38 = = SYM 42149 2641 39 = = SYM 42149 2641 40 = = SYM 42149 2641 41 = = SYM 42149 2641 42 = = SYM 42149 2641 43 = = SYM 42149 2641 44 = = SYM 42149 2641 45 = = SYM 42149 2641 46 = = SYM 42149 2641 47 = = SYM 42149 2641 48 = = SYM 42149 2641 49 = = NFP 42149 2641 50 = = SYM 42149 2641 51 + + SYM 42149 2641 52 = = SYM 42149 2641 53 = = SYM 42149 2641 54 = = SYM 42149 2641 55 = = SYM 42149 2641 56 = = SYM 42149 2641 57 = = SYM 42149 2641 58 = = SYM 42149 2641 59 = = NFP 42149 2641 60 = = SYM 42149 2641 61 + + SYM 42149 2641 62 = = SYM 42149 2641 63 = = SYM 42149 2641 64 = = SYM 42149 2641 65 = = SYM 42149 2641 66 = = SYM 42149 2641 67 = = SYM 42149 2641 68 = = SYM 42149 2641 69 = = NFP 42149 2641 70 = = SYM 42149 2641 71 + + CC 42149 2641 72 Average average JJ 42149 2641 73 |Type |type NN 42149 2641 74 of of IN 42149 2641 75 |Length |Length NNS 42149 2641 76 |Time |Time NNP 42149 2641 77 , , , 42149 2641 78 in in IN 42149 2641 79 hours hour NNS 42149 2641 80 , , , 42149 2641 81 |Time |Time NNP 42149 2641 82 , , , 42149 2641 83 |Time |Time NNP 42149 2641 84 , , , 42149 2641 85 | | CD 42149 2641 86 time time NN 42149 2641 87 |reinforcement|of |reinforcement|of CD 42149 2641 88 |moving |moving CD 42149 2641 89 and and CC 42149 2641 90 |in |in CD 42149 2641 91 hours,|in hours,|in NNP 42149 2641 92 hours,| hours,| VBG 42149 2641 93 in in IN 42149 2641 94 hours hour NNS 42149 2641 95 , , , 42149 2641 96 | | JJ 42149 2641 97 |section,|erecting |section,|erecte VBG 42149 2641 98 forms form NNS 42149 2641 99 . . . 42149 2642 1 |placing |placing CD 42149 2642 2 |placing |placing SYM 42149 2642 3 | | CD 42149 2642 4 form form NN 42149 2642 5 stood| stood| IN 42149 2642 6 |in |in CD 42149 2642 7 | | CD 42149 2642 8 |concrete |concrete CD 42149 2642 9 |concrete |concrete CD 42149 2642 10 | | NNS 42149 2642 11 after after IN 42149 2642 12 | | CD 42149 2642 13 |feet |feet CD 42149 2642 14 . . . 42149 2643 1 | | NNP 42149 2643 2 |in |in CD 42149 2643 3 arch arch NN 42149 2643 4 . . . 42149 2644 1 |in |in CD 42149 2644 2 key key NN 42149 2644 3 . . . 42149 2645 1 | | NNS 42149 2645 2 filing filing NN 42149 2645 3 . . . 42149 2646 1 | | NNP 42149 2646 2 | | CD 42149 2646 3 | | CD 42149 2646 4 | | CD 42149 2646 5 | | CD 42149 2646 6 | | CD 42149 2646 7 | | CD 42149 2646 8 | | CD 42149 2646 9 | | CD 42149 2646 10 | | CD 42149 2646 11 | | CD 42149 2646 12 | | CD 42149 2646 13 ----------+-------------+--------+----------------+---------+---------+ ----------+-------------+--------+----------------+---------+---------+ CD 42149 2646 14 70 70 CD 42149 2646 15 | | NNS 42149 2646 16 { { -LRB- 42149 2646 17 A A NNP 42149 2646 18 | | CD 42149 2646 19 } } -RRB- 42149 2646 20 50 50 CD 42149 2646 21 | | CD 42149 2646 22 20 20 CD 42149 2646 23 | | CD 42149 2646 24 15 15 CD 42149 2646 25 | | CD 42149 2646 26 15.40 15.40 CD 42149 2646 27 | | CD 42149 2646 28 | | CD 42149 2646 29 { { -LRB- 42149 2646 30 day day NN 42149 2646 31 work work NN 42149 2646 32 | | NNP 42149 2646 33 } } -RRB- 42149 2646 34 | | NNP 42149 2646 35 _ _ NNP 42149 2646 36 _ _ NNP 42149 2646 37 _ _ NNP 42149 2646 38 _ _ NNP 42149 2646 39 _ _ NNP 42149 2646 40 _ _ NNP 42149 2646 41 /\ /\ NNP 42149 2646 42 _ _ NNP 42149 2646 43 _ _ NNP 42149 2646 44 _ _ NNP 42149 2646 45 _ _ NNP 42149 2646 46 _ _ NNP 42149 2646 47 _ _ NNP 42149 2646 48 | | NNP 42149 2646 49 | | NNP 42149 2646 50 | | NNP 42149 2646 51 | | CD 42149 2646 52 | | NNS 42149 2646 53 |/ |/ VBZ 42149 2646 54 \| \| CD 42149 2646 55 | | CD 42149 2646 56 | | CD 42149 2646 57 | | CD 42149 2646 58 { { -LRB- 42149 2646 59 A a NN 42149 2646 60 | | NNP 42149 2646 61 } } -RRB- 42149 2646 62 |Moving |moving CD 42149 2646 63 Erecting| Erecting| NNP 42149 2646 64 | | NNP 42149 2646 65 | | NNP 42149 2646 66 | | CD 42149 2646 67 { { -LRB- 42149 2646 68 day day NN 42149 2646 69 work work NN 42149 2646 70 | | CD 42149 2646 71 } } -RRB- 42149 2646 72 20 20 CD 42149 2646 73 | | CD 42149 2646 74 2 2 CD 42149 2646 75 3 3 CD 42149 2646 76 | | CD 42149 2646 77 8.30 8.30 CD 42149 2646 78 | | CD 42149 2646 79 2.40 2.40 CD 42149 2646 80 | | CD 42149 2646 81 | | CD 42149 2646 82 | | CD 42149 2646 83 | | CD 42149 2646 84 | | CD 42149 2646 85 | | CD 42149 2646 86 | | CD 42149 2646 87 53 53 CD 42149 2646 88 | | NNS 42149 2646 89 { { -LRB- 42149 2646 90 B B NNP 42149 2646 91 | | NNP 42149 2646 92 } } -RRB- 42149 2646 93 | | NNP 42149 2646 94 | | CD 42149 2646 95 | | CD 42149 2646 96 | | CD 42149 2646 97 | | CD 42149 2646 98 { { -LRB- 42149 2646 99 day day NN 42149 2646 100 work work NN 42149 2646 101 | | CD 42149 2646 102 } } -RRB- 42149 2646 103 20 20 CD 42149 2646 104 | | CD 42149 2646 105 2 2 CD 42149 2646 106 3 3 CD 42149 2646 107 | | CD 42149 2646 108 10.40 10.40 CD 42149 2646 109 | | CD 42149 2646 110 11.20 11.20 CD 42149 2646 111 | | CD 42149 2646 112 | | CD 42149 2646 113 | | CD 42149 2646 114 | | CD 42149 2646 115 | | CD 42149 2646 116 | | CD 42149 2646 117 | | CD 42149 2646 118 58 58 CD 42149 2646 119 | | NNS 42149 2646 120 { { -LRB- 42149 2646 121 C C NNP 42149 2646 122 | | NNP 42149 2646 123 } } -RRB- 42149 2646 124 | | NNP 42149 2646 125 | | NNP 42149 2646 126 | | CD 42149 2646 127 | | CD 42149 2646 128 | | CD 42149 2646 129 { { -LRB- 42149 2646 130 day day NN 42149 2646 131 work work NN 42149 2646 132 | | CD 42149 2646 133 } } -RRB- 42149 2646 134 20 20 CD 42149 2646 135 | | CD 42149 2646 136 2 2 CD 42149 2646 137 3 3 CD 42149 2646 138 | | CD 42149 2646 139 11.00 11.00 CD 42149 2646 140 | | CD 42149 2646 141 7.20 7.20 CD 42149 2646 142 | | CD 42149 2646 143 | | CD 42149 2646 144 | | CD 42149 2646 145 | | CD 42149 2646 146 | | CD 42149 2646 147 | | CD 42149 2646 148 | | CD 42149 2646 149 58 58 CD 42149 2646 150 | | NNS 42149 2646 151 { { -LRB- 42149 2646 152 D D NNP 42149 2646 153 | | NNP 42149 2646 154 } } -RRB- 42149 2646 155 | | NNP 42149 2646 156 | | CD 42149 2646 157 | | CD 42149 2646 158 | | CD 42149 2646 159 | | CD 42149 2646 160 { { -LRB- 42149 2646 161 day day NN 42149 2646 162 work work NN 42149 2646 163 | | CD 42149 2646 164 } } -RRB- 42149 2646 165 20 20 CD 42149 2646 166 | | CD 42149 2646 167 2 2 CD 42149 2646 168 3 3 CD 42149 2646 169 | | CD 42149 2646 170 9.30 9.30 CD 42149 2646 171 | | CD 42149 2646 172 4.35 4.35 CD 42149 2646 173 | | CD 42149 2646 174 | | CD 42149 2646 175 | | CD 42149 2646 176 | | CD 42149 2646 177 | | CD 42149 2646 178 | | CD 42149 2646 179 | | CD 42149 2646 180 53 53 CD 42149 2646 181 | | NNS 42149 2646 182 { { -LRB- 42149 2646 183 D D NNP 42149 2646 184 | | NNP 42149 2646 185 } } -RRB- 42149 2646 186 | | NNP 42149 2646 187 | | CD 42149 2646 188 | | CD 42149 2646 189 | | CD 42149 2646 190 | | CD 42149 2646 191 { { -LRB- 42149 2646 192 day day NN 42149 2646 193 work work NN 42149 2646 194 | | CD 42149 2646 195 } } -RRB- 42149 2646 196 20 20 CD 42149 2646 197 | | CD 42149 2646 198 2 2 CD 42149 2646 199 3 3 CD 42149 2646 200 | | CD 42149 2646 201 6.15 6.15 CD 42149 2646 202 | | CD 42149 2646 203 2.05 2.05 CD 42149 2646 204 | | CD 42149 2646 205 | | CD 42149 2646 206 | | CD 42149 2646 207 | | CD 42149 2646 208 | | CD 42149 2646 209 | | CD 42149 2646 210 | | CD 42149 2646 211 53 53 CD 42149 2646 212 | | NNS 42149 2646 213 { { -LRB- 42149 2646 214 Sub Sub NNP 42149 2646 215 - - HYPH 42149 2646 216 Type Type NNP 42149 2646 217 | | NNP 42149 2646 218 } } -RRB- 42149 2646 219 20 20 CD 42149 2646 220 | | CD 42149 2646 221 2 2 CD 42149 2646 222 3 3 CD 42149 2646 223 | | CD 42149 2646 224 6.00 6.00 CD 42149 2646 225 | | CD 42149 2646 226 3.00 3.00 CD 42149 2646 227 | | CD 42149 2646 228 | | NNS 42149 2646 229 No no NN 42149 2646 230 . . . 42149 2647 1 1 1 CD 42149 2647 2 | | CD 42149 2647 3 } } -RRB- 42149 2647 4 | | NNP 42149 2647 5 | | NNP 42149 2647 6 | | CD 42149 2647 7 | | CD 42149 2647 8 | | NN 42149 2647 9 piece piece NN 42149 2647 10 work work NN 42149 2647 11 | | NNP 42149 2647 12 } } -RRB- 42149 2647 13 | | NNP 42149 2647 14 | | CD 42149 2647 15 | | CD 42149 2647 16 | | NNS 42149 2647 17 = = SYM 42149 2647 18 = = SYM 42149 2647 19 = = SYM 42149 2647 20 = = SYM 42149 2647 21 = = SYM 42149 2647 22 = = SYM 42149 2647 23 = = SYM 42149 2647 24 = = SYM 42149 2647 25 = = NFP 42149 2647 26 = = SYM 42149 2647 27 + + SYM 42149 2647 28 = = SYM 42149 2647 29 = = SYM 42149 2647 30 = = SYM 42149 2647 31 = = SYM 42149 2647 32 = = SYM 42149 2647 33 = = SYM 42149 2647 34 = = SYM 42149 2647 35 = = SYM 42149 2647 36 = = SYM 42149 2647 37 = = SYM 42149 2647 38 = = SYM 42149 2647 39 = = NFP 42149 2647 40 = = SYM 42149 2647 41 + + SYM 42149 2647 42 = = SYM 42149 2647 43 = = SYM 42149 2647 44 = = SYM 42149 2647 45 = = SYM 42149 2647 46 = = SYM 42149 2647 47 = = SYM 42149 2647 48 = = NFP 42149 2647 49 = = SYM 42149 2647 50 + + SYM 42149 2647 51 = = SYM 42149 2647 52 = = SYM 42149 2647 53 = = SYM 42149 2647 54 = = SYM 42149 2647 55 = = SYM 42149 2647 56 = = SYM 42149 2647 57 = = SYM 42149 2647 58 = = SYM 42149 2647 59 = = SYM 42149 2647 60 = = SYM 42149 2647 61 = = SYM 42149 2647 62 = = SYM 42149 2647 63 = = SYM 42149 2647 64 = = SYM 42149 2647 65 = = NFP 42149 2647 66 = = SYM 42149 2647 67 + + SYM 42149 2647 68 = = SYM 42149 2647 69 = = SYM 42149 2647 70 = = SYM 42149 2647 71 = = SYM 42149 2647 72 = = SYM 42149 2647 73 = = SYM 42149 2647 74 = = SYM 42149 2647 75 = = NFP 42149 2647 76 = = SYM 42149 2647 77 + + SYM 42149 2647 78 = = SYM 42149 2647 79 = = SYM 42149 2647 80 = = SYM 42149 2647 81 = = SYM 42149 2647 82 = = SYM 42149 2647 83 = = SYM 42149 2647 84 = = SYM 42149 2647 85 = = NFP 42149 2647 86 = = SYM 42149 2647 87 + + SYM 42149 2647 88 = = SYM 42149 2647 89 = = SYM 42149 2647 90 = = SYM 42149 2647 91 = = SYM 42149 2647 92 = = SYM 42149 2647 93 = = SYM 42149 2647 94 = = SYM 42149 2647 95 = = SYM 42149 2647 96 = = NFP 42149 2647 97 = = SYM 42149 2647 98 + + SYM 42149 2647 99 = = SYM 42149 2647 100 = = SYM 42149 2647 101 = = SYM 42149 2647 102 = = SYM 42149 2647 103 = = SYM 42149 2647 104 = = SYM 42149 2647 105 = = SYM 42149 2647 106 = = NFP 42149 2647 107 = = SYM 42149 2647 108 + + SYM 42149 2647 109 = = SYM 42149 2647 110 = = SYM 42149 2647 111 = = SYM 42149 2647 112 = = SYM 42149 2647 113 = = SYM 42149 2647 114 = = SYM 42149 2647 115 = = SYM 42149 2647 116 = = SYM 42149 2647 117 = = SYM 42149 2647 118 = = NFP 42149 2647 119 = = SYM 42149 2647 120 + + SYM 42149 2647 121 = = SYM 42149 2647 122 = = SYM 42149 2647 123 = = SYM 42149 2647 124 = = SYM 42149 2647 125 = = SYM 42149 2647 126 = = SYM 42149 2647 127 = = SYM 42149 2647 128 = = SYM 42149 2647 129 = = SYM 42149 2647 130 = = NFP 42149 2647 131 = = SYM 42149 2647 132 + + SYM 42149 2647 133 = = SYM 42149 2647 134 = = SYM 42149 2647 135 = = SYM 42149 2647 136 = = SYM 42149 2647 137 = = SYM 42149 2647 138 = = SYM 42149 2647 139 = = SYM 42149 2647 140 = = SYM 42149 2647 141 = = SYM 42149 2647 142 = = SYM 42149 2647 143 = = NFP 42149 2647 144 = = NFP 42149 2647 145 Average average JJ 42149 2647 146 |Time |Time NNP 42149 2647 147 , , , 42149 2647 148 |Total |total JJ 42149 2647 149 Time time NN 42149 2647 150 |Total |total JJ 42149 2647 151 time time NN 42149 2647 152 |Remarks |remark NNS 42149 2647 153 . . . 42149 2648 1 time time NN 42149 2648 2 |in |in CD 42149 2648 3 hours,|in hours,|in NNP 42149 2648 4 hours hour NNS 42149 2648 5 , , , 42149 2648 6 |in |in CD 42149 2648 7 hours hour NNS 42149 2648 8 , , , 42149 2648 9 | | VBN 42149 2648 10 in in IN 42149 2648 11 hours hour NNS 42149 2648 12 , , , 42149 2648 13 |placing |placing CD 42149 2648 14 |for |for NNP 42149 2648 15 moving,|per moving,|per NNP 42149 2648 16 linear linear JJ 42149 2648 17 | | HYPH 42149 2648 18 form form NN 42149 2648 19 stood|concrete stood|concrete NNP 42149 2648 20 |erecting |erecting CD 42149 2648 21 , , , 42149 2648 22 |foot |foot CD 42149 2648 23 , , , 42149 2648 24 | | CD 42149 2648 25 after after IN 42149 2648 26 |in |in CD 42149 2648 27 key key JJ 42149 2648 28 |and |and IN 42149 2648 29 filling|for filling|for CD 42149 2648 30 moving,| moving,| JJ 42149 2648 31 filing filing NN 42149 2648 32 . . . 42149 2649 1 |and |and JJ 42149 2649 2 arch arch NNP 42149 2649 3 | | NNP 42149 2649 4 |erecting |erecting CD 42149 2649 5 , , , 42149 2649 6 | | NNP 42149 2649 7 | | CD 42149 2649 8 | | CD 42149 2649 9 |and |and JJ 42149 2649 10 filling| filling| CD 42149 2649 11 ----------+---------+-----------+-----------+------------ ----------+---------+-----------+-----------+------------ CD 42149 2649 12 70 70 CD 42149 2649 13 | | CD 42149 2649 14 30.40 30.40 CD 42149 2649 15 | | CD 42149 2649 16 50.40 50.40 CD 42149 2649 17 | | CD 42149 2649 18 1.01 1.01 CD 42149 2649 19 | | CD 42149 2649 20 | | CD 42149 2649 21 | | CD 42149 2649 22 | | CD 42149 2649 23 | | CD 42149 2649 24 | | CD 42149 2649 25 | | CD 42149 2649 26 | | CD 42149 2649 27 | | CD 42149 2649 28 | | CD 42149 2649 29 | | CD 42149 2649 30 | | CD 42149 2649 31 | | CD 42149 2649 32 | | CD 42149 2649 33 11.10 11.10 CD 42149 2649 34 | | CD 42149 2649 35 16.10 16.10 CD 42149 2649 36 | | CD 42149 2649 37 0.50 0.50 CD 42149 2649 38 | | CD 42149 2649 39 | | CD 42149 2649 40 | | CD 42149 2649 41 | | CD 42149 2649 42 | | CD 42149 2649 43 53 53 CD 42149 2649 44 | | CD 42149 2649 45 | | CD 42149 2649 46 | | CD 42149 2649 47 |Includes |includes SYM 42149 2649 48 | | CD 42149 2649 49 22.10 22.10 CD 42149 2649 50 | | CD 42149 2649 51 27.00 27.00 CD 42149 2649 52 | | CD 42149 2649 53 1.35 1.35 CD 42149 2649 54 |placing |placing CD 42149 2649 55 rods rod NNS 42149 2649 56 | | CD 42149 2649 57 | | CD 42149 2649 58 | | CD 42149 2649 59 | | CD 42149 2649 60 58 58 CD 42149 2649 61 | | CD 42149 2649 62 | | CD 42149 2649 63 | | CD 42149 2649 64 | | CD 42149 2649 65 | | CD 42149 2649 66 18.20 18.20 CD 42149 2649 67 | | CD 42149 2649 68 23.20 23.20 CD 42149 2649 69 | | CD 42149 2649 70 1.16 1.16 CD 42149 2649 71 | | CD 42149 2649 72 do do VBP 42149 2649 73 . . . 42149 2650 1 | | NNP 42149 2650 2 | | NNP 42149 2650 3 | | CD 42149 2650 4 | | CD 42149 2650 5 58 58 CD 42149 2650 6 | | CD 42149 2650 7 | | CD 42149 2650 8 | | CD 42149 2650 9 | | CD 42149 2650 10 | | CD 42149 2650 11 14.25 14.25 CD 42149 2650 12 | | CD 42149 2650 13 19.25 19.25 CD 42149 2650 14 | | CD 42149 2650 15 0.91 0.91 CD 42149 2650 16 | | CD 42149 2650 17 do do VBP 42149 2650 18 . . . 42149 2651 1 | | NNP 42149 2651 2 | | NNP 42149 2651 3 | | CD 42149 2651 4 | | CD 42149 2651 5 53 53 CD 42149 2651 6 | | CD 42149 2651 7 | | CD 42149 2651 8 | | CD 42149 2651 9 | | CD 42149 2651 10 | | CD 42149 2651 11 8.20 8.20 CD 42149 2651 12 | | CD 42149 2651 13 13.20 13.20 CD 42149 2651 14 | | CD 42149 2651 15 0.05 0.05 CD 42149 2651 16 | | NNS 42149 2651 17 do do NN 42149 2651 18 . . . 42149 2652 1 | | NNP 42149 2652 2 | | NNP 42149 2652 3 | | CD 42149 2652 4 | | CD 42149 2652 5 53 53 CD 42149 2652 6 | | CD 42149 2652 7 9.00 9.00 CD 42149 2652 8 | | CD 42149 2652 9 14.00 14.00 CD 42149 2652 10 | | CD 42149 2652 11 0.70 0.70 CD 42149 2652 12 | | NNS 42149 2652 13 do do VBP 42149 2652 14 . . . 42149 2653 1 | | NNP 42149 2653 2 | | CD 42149 2653 3 | | CD 42149 2653 4 | | CD 42149 2653 5 | | CD 42149 2653 6 | | CD 42149 2653 7 | | CD 42149 2653 8 | | NNS 42149 2653 9 = = SYM 42149 2653 10 = = SYM 42149 2653 11 = = SYM 42149 2653 12 = = SYM 42149 2653 13 = = SYM 42149 2653 14 = = SYM 42149 2653 15 = = SYM 42149 2653 16 = = SYM 42149 2653 17 = = NFP 42149 2653 18 = = SYM 42149 2653 19 + + SYM 42149 2653 20 = = SYM 42149 2653 21 = = SYM 42149 2653 22 = = SYM 42149 2653 23 = = SYM 42149 2653 24 = = SYM 42149 2653 25 = = SYM 42149 2653 26 = = SYM 42149 2653 27 = = NFP 42149 2653 28 = = SYM 42149 2653 29 + + SYM 42149 2653 30 = = SYM 42149 2653 31 = = SYM 42149 2653 32 = = SYM 42149 2653 33 = = SYM 42149 2653 34 = = SYM 42149 2653 35 = = SYM 42149 2653 36 = = SYM 42149 2653 37 = = SYM 42149 2653 38 = = SYM 42149 2653 39 = = NFP 42149 2653 40 = = SYM 42149 2653 41 + + SYM 42149 2653 42 = = SYM 42149 2653 43 = = SYM 42149 2653 44 = = SYM 42149 2653 45 = = SYM 42149 2653 46 = = SYM 42149 2653 47 = = SYM 42149 2653 48 = = SYM 42149 2653 49 = = SYM 42149 2653 50 = = SYM 42149 2653 51 = = NFP 42149 2653 52 = = SYM 42149 2653 53 + + SYM 42149 2653 54 = = SYM 42149 2653 55 = = SYM 42149 2653 56 = = SYM 42149 2653 57 = = SYM 42149 2653 58 = = SYM 42149 2653 59 = = SYM 42149 2653 60 = = SYM 42149 2653 61 = = SYM 42149 2653 62 = = SYM 42149 2653 63 = = NFP 42149 2653 64 = = NFP 42149 2653 65 = = NFP 42149 2653 66 [ [ -LRB- 42149 2653 67 Illustration illustration NN 42149 2653 68 : : : 42149 2653 69 FIG FIG NNP 42149 2653 70 . . . 42149 2654 1 23 23 CD 42149 2654 2 . . . 42149 2654 3 ] ] -RRB- 42149 2655 1 The the DT 42149 2655 2 only only JJ 42149 2655 3 compressed compress VBN 42149 2655 4 air air NN 42149 2655 5 available available JJ 42149 2655 6 was be VBD 42149 2655 7 the the DT 42149 2655 8 high high JJ 42149 2655 9 - - HYPH 42149 2655 10 pressure pressure NN 42149 2655 11 supply supply NN 42149 2655 12 , , , 42149 2655 13 at at IN 42149 2655 14 about about RB 42149 2655 15 90 90 CD 42149 2655 16 lb lb RB 42149 2655 17 . . . 42149 2656 1 ; ; : 42149 2656 2 a a DT 42149 2656 3 reducing reduce VBG 42149 2656 4 valve valve NN 42149 2656 5 , , , 42149 2656 6 to to TO 42149 2656 7 lower lower VB 42149 2656 8 this this DT 42149 2656 9 pressure pressure NN 42149 2656 10 to to IN 42149 2656 11 30 30 CD 42149 2656 12 lb lb RB 42149 2656 13 . . . 42149 2657 1 was be VBD 42149 2657 2 used use VBN 42149 2657 3 between between IN 42149 2657 4 the the DT 42149 2657 5 air air NN 42149 2657 6 line line NN 42149 2657 7 and and CC 42149 2657 8 the the DT 42149 2657 9 grouting grout VBG 42149 2657 10 machine machine NN 42149 2657 11 . . . 42149 2658 1 This this DT 42149 2658 2 was be VBD 42149 2658 3 thought think VBN 42149 2658 4 to to TO 42149 2658 5 be be VB 42149 2658 6 about about RB 42149 2658 7 as as RB 42149 2658 8 high high JJ 42149 2658 9 a a DT 42149 2658 10 pressure pressure NN 42149 2658 11 as as IN 42149 2658 12 the the DT 42149 2658 13 green green JJ 42149 2658 14 concrete concrete NN 42149 2658 15 arch arch NN 42149 2658 16 would would MD 42149 2658 17 stand stand VB 42149 2658 18 , , , 42149 2658 19 and and CC 42149 2658 20 , , , 42149 2658 21 even even RB 42149 2658 22 as as IN 42149 2658 23 it -PRON- PRP 42149 2658 24 was be VBD 42149 2658 25 , , , 42149 2658 26 at at IN 42149 2658 27 one one CD 42149 2658 28 point point NN 42149 2658 29 a a DT 42149 2658 30 section section NN 42149 2658 31 about about RB 42149 2658 32 2 2 CD 42149 2658 33 ft ft NN 42149 2658 34 . . . 42149 2658 35 by by IN 42149 2658 36 1 1 CD 42149 2658 37 ft ft NNP 42149 2658 38 . . NNP 42149 2658 39 was be VBD 42149 2658 40 blown blow VBN 42149 2658 41 out out RP 42149 2658 42 . . . 42149 2659 1 A a DT 42149 2659 2 rough rough JJ 42149 2659 3 traveling travel VBG 42149 2659 4 stage stage NN 42149 2659 5 resting rest VBG 42149 2659 6 on on IN 42149 2659 7 the the DT 42149 2659 8 bottom bottom JJ 42149 2659 9 step step NN 42149 2659 10 of of IN 42149 2659 11 the the DT 42149 2659 12 duct duct NN 42149 2659 13 bench bench NN 42149 2659 14 concrete concrete NN 42149 2659 15 was be VBD 42149 2659 16 used use VBN 42149 2659 17 as as IN 42149 2659 18 a a DT 42149 2659 19 working working NN 42149 2659 20 platform platform NN 42149 2659 21 . . . 42149 2660 1 In in IN 42149 2660 2 the the DT 42149 2660 3 earlier early JJR 42149 2660 4 stages stage NNS 42149 2660 5 of of IN 42149 2660 6 the the DT 42149 2660 7 work work NN 42149 2660 8 the the DT 42149 2660 9 grouting grouting NN 42149 2660 10 was be VBD 42149 2660 11 carried carry VBN 42149 2660 12 on on RP 42149 2660 13 in in IN 42149 2660 14 a a DT 42149 2660 15 rather rather RB 42149 2660 16 haphazard haphazard NN 42149 2660 17 manner manner NN 42149 2660 18 , , , 42149 2660 19 but but CC 42149 2660 20 , , , 42149 2660 21 when when WRB 42149 2660 22 the the DT 42149 2660 23 last last JJ 42149 2660 24 system system NN 42149 2660 25 of of IN 42149 2660 26 grout grout NN 42149 2660 27 and and CC 42149 2660 28 vent vent NN 42149 2660 29 pipes pipe NNS 42149 2660 30 was be VBD 42149 2660 31 adopted adopt VBN 42149 2660 32 ; ; : 42149 2660 33 the the DT 42149 2660 34 work work NN 42149 2660 35 was be VBD 42149 2660 36 undertaken undertake VBN 42149 2660 37 systematically systematically RB 42149 2660 38 , , , 42149 2660 39 and and CC 42149 2660 40 was be VBD 42149 2660 41 carried carry VBN 42149 2660 42 out out RP 42149 2660 43 as as IN 42149 2660 44 follows follow VBZ 42149 2660 45 : : : 42149 2660 46 Two two CD 42149 2660 47 20-ft 20-ft NNS 42149 2660 48 . . . 42149 2660 49 lengths length NNS 42149 2660 50 of of IN 42149 2660 51 arch arch NN 42149 2660 52 were be VBD 42149 2660 53 grouted grout VBN 42149 2660 54 at at IN 42149 2660 55 one one CD 42149 2660 56 time time NN 42149 2660 57 , , , 42149 2660 58 and and CC 42149 2660 59 , , , 42149 2660 60 in in IN 42149 2660 61 order order NN 42149 2660 62 to to TO 42149 2660 63 prevent prevent VB 42149 2660 64 the the DT 42149 2660 65 grout grout NN 42149 2660 66 from from IN 42149 2660 67 flowing flow VBG 42149 2660 68 along along IN 42149 2660 69 the the DT 42149 2660 70 arch arch NN 42149 2660 71 and and CC 42149 2660 72 blocking block VBG 42149 2660 73 the the DT 42149 2660 74 pipes pipe NNS 42149 2660 75 in in IN 42149 2660 76 the the DT 42149 2660 77 next next JJ 42149 2660 78 lengths length NNS 42149 2660 79 , , , 42149 2660 80 a a DT 42149 2660 81 bulkhead bulkhead NN 42149 2660 82 of of IN 42149 2660 83 plaster plaster NN 42149 2660 84 was be VBD 42149 2660 85 made make VBN 42149 2660 86 at at IN 42149 2660 87 the the DT 42149 2660 88 end end NN 42149 2660 89 of of IN 42149 2660 90 every every DT 42149 2660 91 second second JJ 42149 2660 92 length length NN 42149 2660 93 to to TO 42149 2660 94 confine confine VB 42149 2660 95 the the DT 42149 2660 96 grout grout NN 42149 2660 97 . . . 42149 2661 1 After after IN 42149 2661 2 a a DT 42149 2661 3 section section NN 42149 2661 4 had have VBD 42149 2661 5 been be VBN 42149 2661 6 grouted grout VBN 42149 2661 7 , , , 42149 2661 8 test test NN 42149 2661 9 holes hole NNS 42149 2661 10 were be VBD 42149 2661 11 drilled drill VBN 42149 2661 12 every every DT 42149 2661 13 50 50 CD 42149 2661 14 ft ft NN 42149 2661 15 . . NN 42149 2661 16 along along IN 42149 2661 17 the the DT 42149 2661 18 crown crown NN 42149 2661 19 to to TO 42149 2661 20 see see VB 42149 2661 21 that that IN 42149 2661 22 all all PDT 42149 2661 23 the the DT 42149 2661 24 voids void NNS 42149 2661 25 were be VBD 42149 2661 26 filled fill VBN 42149 2661 27 ; ; : 42149 2661 28 if if IN 42149 2661 29 not not RB 42149 2661 30 , , , 42149 2661 31 holes hole NNS 42149 2661 32 were be VBD 42149 2661 33 drilled drill VBN 42149 2661 34 in in IN 42149 2661 35 the the DT 42149 2661 36 arch arch NN 42149 2661 37 , , , 42149 2661 38 both both CC 42149 2661 39 for for IN 42149 2661 40 grouting grouting NN 42149 2661 41 and and CC 42149 2661 42 for for IN 42149 2661 43 vents vent NNS 42149 2661 44 , , , 42149 2661 45 and and CC 42149 2661 46 the the DT 42149 2661 47 faulty faulty JJ 42149 2661 48 section section NN 42149 2661 49 was be VBD 42149 2661 50 re re VBN 42149 2661 51 - - VBN 42149 2661 52 grouted grout VBN 42149 2661 53 . . . 42149 2662 1 An an DT 42149 2662 2 average average NN 42149 2662 3 of of IN 42149 2662 4 ¾ ¾ NNP 42149 2662 5 bbl bbl NNP 42149 2662 6 . . . 42149 2663 1 of of IN 42149 2663 2 cement cement NN 42149 2663 3 and and CC 42149 2663 4 an an DT 42149 2663 5 equal equal JJ 42149 2663 6 quantity quantity NN 42149 2663 7 of of IN 42149 2663 8 sand sand NN 42149 2663 9 was be VBD 42149 2663 10 used use VBN 42149 2663 11 per per IN 42149 2663 12 linear linear JJ 42149 2663 13 foot foot NN 42149 2663 14 of of IN 42149 2663 15 tunnel tunnel NN 42149 2663 16 . . . 42149 2664 1 The the DT 42149 2664 2 average average JJ 42149 2664 3 amount amount NN 42149 2664 4 put put VBN 42149 2664 5 in in RP 42149 2664 6 by by IN 42149 2664 7 one one CD 42149 2664 8 machine machine NN 42149 2664 9 per per IN 42149 2664 10 shift shift NN 42149 2664 11 was be VBD 42149 2664 12 15 15 CD 42149 2664 13 bbl bbl NN 42149 2664 14 . . . 42149 2664 15 , , , 42149 2664 16 and and CC 42149 2664 17 therefore therefore RB 42149 2664 18 the the DT 42149 2664 19 average average JJ 42149 2664 20 length length NN 42149 2664 21 of of IN 42149 2664 22 tunnel tunnel NN 42149 2664 23 grouted grout VBN 42149 2664 24 per per IN 42149 2664 25 machine machine NN 42149 2664 26 per per IN 42149 2664 27 shift shift NN 42149 2664 28 was be VBD 42149 2664 29 20 20 CD 42149 2664 30 ft ft NN 42149 2664 31 . . . 42149 2665 1 The the DT 42149 2665 2 typical typical JJ 42149 2665 3 working working JJ 42149 2665 4 force force NN 42149 2665 5 was be VBD 42149 2665 6 : : : 42149 2665 7 1 1 CD 42149 2665 8 Foreman foreman NN 42149 2665 9 @ @ NFP 42149 2665 10 $ $ $ 42149 2665 11 3.75 3.75 CD 42149 2665 12 per per IN 42149 2665 13 shift shift NN 42149 2665 14 1 1 CD 42149 2665 15 Laborer Laborer NNP 42149 2665 16 running running NN 42149 2665 17 grout grout NN 42149 2665 18 machine machine NN 42149 2665 19 " " `` 42149 2665 20 2.00 2.00 CD 42149 2665 21 " " '' 42149 2665 22 " " '' 42149 2665 23 2 2 CD 42149 2665 24 Laborers laborer NNS 42149 2665 25 handling handle VBG 42149 2665 26 cement cement NN 42149 2665 27 and and CC 42149 2665 28 sand sand NN 42149 2665 29 . . . 42149 2665 30 " " '' 42149 2666 1 1.75 1.75 CD 42149 2666 2 " " `` 42149 2666 3 " " `` 42149 2666 4 1 1 CD 42149 2666 5 Laborer Laborer NNP 42149 2666 6 tending tending NN 42149 2666 7 valve valve NN 42149 2666 8 and and CC 42149 2666 9 grout grout NN 42149 2666 10 pipes pipe NNS 42149 2666 11 " " `` 42149 2666 12 1.75 1.75 CD 42149 2666 13 " " '' 42149 2666 14 " " '' 42149 2666 15 After after IN 42149 2666 16 the the DT 42149 2666 17 grouting grouting NN 42149 2666 18 was be VBD 42149 2666 19 finished finish VBN 42149 2666 20 , , , 42149 2666 21 the the DT 42149 2666 22 arches arch NNS 42149 2666 23 were be VBD 42149 2666 24 rubbed rub VBN 42149 2666 25 over over IN 42149 2666 26 with with IN 42149 2666 27 wire wire NN 42149 2666 28 brushes brush NNS 42149 2666 29 to to TO 42149 2666 30 take take VB 42149 2666 31 off off RP 42149 2666 32 discoloration discoloration NN 42149 2666 33 , , , 42149 2666 34 and and CC 42149 2666 35 rough rough JJ 42149 2666 36 places place NNS 42149 2666 37 at at IN 42149 2666 38 the the DT 42149 2666 39 junctions junction NNS 42149 2666 40 of of IN 42149 2666 41 adjoining adjoining JJ 42149 2666 42 lengths length NNS 42149 2666 43 or or CC 42149 2666 44 left leave VBN 42149 2666 45 by by IN 42149 2666 46 the the DT 42149 2666 47 block block NN 42149 2666 48 laggings lagging NNS 42149 2666 49 were be VBD 42149 2666 50 bush bush NNP 42149 2666 51 - - HYPH 42149 2666 52 hammered hammer VBN 42149 2666 53 . . . 42149 2667 1 _ _ NNP 42149 2667 2 Face face NN 42149 2667 3 of of IN 42149 2667 4 Bench Bench NNP 42149 2667 5 Concrete._--The Concrete._--The NNP 42149 2667 6 form form NN 42149 2667 7 used use VBN 42149 2667 8 for for IN 42149 2667 9 this this DT 42149 2667 10 portion portion NN 42149 2667 11 of of IN 42149 2667 12 the the DT 42149 2667 13 work work NN 42149 2667 14 is be VBZ 42149 2667 15 shown show VBN 42149 2667 16 on on IN 42149 2667 17 Plate Plate NNP 42149 2667 18 XLV XLV NNP 42149 2667 19 . . . 42149 2668 1 It -PRON- PRP 42149 2668 2 consisted consist VBD 42149 2668 3 of of IN 42149 2668 4 a a DT 42149 2668 5 central central JJ 42149 2668 6 framework framework NN 42149 2668 7 traveling travel VBG 42149 2668 8 on on IN 42149 2668 9 wheels wheel NNS 42149 2668 10 , , , 42149 2668 11 and and CC 42149 2668 12 , , , 42149 2668 13 from from IN 42149 2668 14 the the DT 42149 2668 15 framework framework NN 42149 2668 16 , , , 42149 2668 17 two two CD 42149 2668 18 vertical vertical JJ 42149 2668 19 forms form NNS 42149 2668 20 were be VBD 42149 2668 21 suspended suspend VBN 42149 2668 22 , , , 42149 2668 23 one one CD 42149 2668 24 on on IN 42149 2668 25 each each DT 42149 2668 26 side side NN 42149 2668 27 , , , 42149 2668 28 and and CC 42149 2668 29 equal equal JJ 42149 2668 30 in in IN 42149 2668 31 height height NN 42149 2668 32 to to IN 42149 2668 33 the the DT 42149 2668 34 whole whole JJ 42149 2668 35 height height NN 42149 2668 36 of of IN 42149 2668 37 the the DT 42149 2668 38 bench bench NN 42149 2668 39 . . . 42149 2669 1 Adjusting adjust VBG 42149 2669 2 screws screw NNS 42149 2669 3 were be VBD 42149 2669 4 fitted fit VBN 42149 2669 5 at at IN 42149 2669 6 intervals interval NNS 42149 2669 7 both both CC 42149 2669 8 at at IN 42149 2669 9 top top NN 42149 2669 10 and and CC 42149 2669 11 bottom bottom NN 42149 2669 12 , , , 42149 2669 13 and and CC 42149 2669 14 thus thus RB 42149 2669 15 the the DT 42149 2669 16 position position NN 42149 2669 17 of of IN 42149 2669 18 the the DT 42149 2669 19 face face NN 42149 2669 20 forms form NNS 42149 2669 21 could could MD 42149 2669 22 be be VB 42149 2669 23 adjusted adjust VBN 42149 2669 24 accurately accurately RB 42149 2669 25 . . . 42149 2670 1 The the DT 42149 2670 2 face face NN 42149 2670 3 forms form NNS 42149 2670 4 were be VBD 42149 2670 5 built build VBN 42149 2670 6 very very RB 42149 2670 7 carefully carefully RB 42149 2670 8 of of IN 42149 2670 9 3-in 3-in CD 42149 2670 10 . . . 42149 2671 1 tongued tongue VBN 42149 2671 2 and and CC 42149 2671 3 grooved groove VBD 42149 2671 4 yellow yellow JJ 42149 2671 5 pine pine NN 42149 2671 6 , , , 42149 2671 7 and and CC 42149 2671 8 one one CD 42149 2671 9 50-ft 50-ft NNP 42149 2671 10 . . . 42149 2671 11 form form NN 42149 2671 12 was be VBD 42149 2671 13 used use VBN 42149 2671 14 for for IN 42149 2671 15 3,000 3,000 CD 42149 2671 16 ft ft NN 42149 2671 17 . . NN 42149 2671 18 of of IN 42149 2671 19 tunnel tunnel NN 42149 2671 20 without without IN 42149 2671 21 having have VBG 42149 2671 22 the the DT 42149 2671 23 face face NN 42149 2671 24 renewed renew VBN 42149 2671 25 . . . 42149 2672 1 Great great JJ 42149 2672 2 care care NN 42149 2672 3 was be VBD 42149 2672 4 taken take VBN 42149 2672 5 to to TO 42149 2672 6 set set VB 42149 2672 7 these these DT 42149 2672 8 forms form NNS 42149 2672 9 true true JJ 42149 2672 10 to to IN 42149 2672 11 line line NN 42149 2672 12 and and CC 42149 2672 13 grade grade NN 42149 2672 14 , , , 42149 2672 15 as as IN 42149 2672 16 the the DT 42149 2672 17 appearance appearance NN 42149 2672 18 of of IN 42149 2672 19 the the DT 42149 2672 20 tunnel tunnel NN 42149 2672 21 would would MD 42149 2672 22 have have VB 42149 2672 23 been be VBN 42149 2672 24 ruined ruin VBN 42149 2672 25 by by IN 42149 2672 26 any any DT 42149 2672 27 irregularity irregularity NN 42149 2672 28 . . . 42149 2673 1 Joints joint NNS 42149 2673 2 between between IN 42149 2673 3 successive successive JJ 42149 2673 4 lengths length NNS 42149 2673 5 were be VBD 42149 2673 6 finished finish VBN 42149 2673 7 with with IN 42149 2673 8 a a DT 42149 2673 9 = = NFP 42149 2673 10 V=-groove v=-groove NN 42149 2673 11 . . . 42149 2674 1 The the DT 42149 2674 2 concrete concrete NN 42149 2674 3 was be VBD 42149 2674 4 received receive VBN 42149 2674 5 at at IN 42149 2674 6 the the DT 42149 2674 7 form form NN 42149 2674 8 in in IN 42149 2674 9 dumping dump VBG 42149 2674 10 buckets bucket NNS 42149 2674 11 ; ; : 42149 2674 12 these these DT 42149 2674 13 were be VBD 42149 2674 14 hoisted hoist VBN 42149 2674 15 to to IN 42149 2674 16 the the DT 42149 2674 17 top top NN 42149 2674 18 of of IN 42149 2674 19 the the DT 42149 2674 20 form form NN 42149 2674 21 by by IN 42149 2674 22 a a DT 42149 2674 23 Lidgerwood Lidgerwood NNP 42149 2674 24 hoister hoister NN 42149 2674 25 fixed fix VBN 42149 2674 26 to to IN 42149 2674 27 a a DT 42149 2674 28 trailer trailer NN 42149 2674 29 . . . 42149 2675 1 The the DT 42149 2675 2 concrete concrete NN 42149 2675 3 was be VBD 42149 2675 4 placed place VBN 42149 2675 5 in in IN 42149 2675 6 the the DT 42149 2675 7 form form NN 42149 2675 8 by by IN 42149 2675 9 shoveling shovel VBG 42149 2675 10 it -PRON- PRP 42149 2675 11 from from IN 42149 2675 12 the the DT 42149 2675 13 traveling travel VBG 42149 2675 14 stage stage NN 42149 2675 15 down down IN 42149 2675 16 chutes chute NNS 42149 2675 17 fitted fit VBN 42149 2675 18 to to IN 42149 2675 19 its -PRON- PRP$ 42149 2675 20 side side NN 42149 2675 21 . . . 42149 2676 1 The the DT 42149 2676 2 quantity quantity NN 42149 2676 3 of of IN 42149 2676 4 water water NN 42149 2676 5 to to TO 42149 2676 6 be be VB 42149 2676 7 used use VBN 42149 2676 8 in in IN 42149 2676 9 the the DT 42149 2676 10 mixture mixture NN 42149 2676 11 needed need VBD 42149 2676 12 careful careful JJ 42149 2676 13 regulation regulation NN 42149 2676 14 . . . 42149 2677 1 The the DT 42149 2677 2 first first JJ 42149 2677 3 few few JJ 42149 2677 4 batches batch NNS 42149 2677 5 in in IN 42149 2677 6 the the DT 42149 2677 7 bottom bottom NN 42149 2677 8 had have VBD 42149 2677 9 to to TO 42149 2677 10 be be VB 42149 2677 11 very very RB 42149 2677 12 wet wet JJ 42149 2677 13 , , , 42149 2677 14 and and CC 42149 2677 15 were be VBD 42149 2677 16 made make VBN 42149 2677 17 with with IN 42149 2677 18 less less JJR 42149 2677 19 stone stone NN 42149 2677 20 than than IN 42149 2677 21 the the DT 42149 2677 22 upper upper JJ 42149 2677 23 portion portion NN 42149 2677 24 , , , 42149 2677 25 in in IN 42149 2677 26 order order NN 42149 2677 27 that that IN 42149 2677 28 the the DT 42149 2677 29 concrete concrete NN 42149 2677 30 would would MD 42149 2677 31 pack pack VB 42149 2677 32 solidly solidly RB 42149 2677 33 around around IN 42149 2677 34 the the DT 42149 2677 35 niche niche NN 42149 2677 36 box box NNP 42149 2677 37 forms form NNS 42149 2677 38 and and CC 42149 2677 39 other other JJ 42149 2677 40 awkward awkward JJ 42149 2677 41 corners corner NNS 42149 2677 42 . . . 42149 2678 1 The the DT 42149 2678 2 forms form NNS 42149 2678 3 for for IN 42149 2678 4 the the DT 42149 2678 5 ladders ladder NNS 42149 2678 6 and and CC 42149 2678 7 refuge refuge NN 42149 2678 8 niches niche NNS 42149 2678 9 were be VBD 42149 2678 10 fastened fasten VBN 42149 2678 11 to to IN 42149 2678 12 the the DT 42149 2678 13 face face NN 42149 2678 14 of of IN 42149 2678 15 the the DT 42149 2678 16 bench bench NN 42149 2678 17 forms form NNS 42149 2678 18 by by IN 42149 2678 19 bolts bolt NNS 42149 2678 20 which which WDT 42149 2678 21 could could MD 42149 2678 22 be be VB 42149 2678 23 loosened loosen VBN 42149 2678 24 before before IN 42149 2678 25 the the DT 42149 2678 26 main main JJ 42149 2678 27 form form NN 42149 2678 28 was be VBD 42149 2678 29 moved move VBN 42149 2678 30 ahead ahead RB 42149 2678 31 , , , 42149 2678 32 and and CC 42149 2678 33 in in IN 42149 2678 34 this this DT 42149 2678 35 way way NN 42149 2678 36 the the DT 42149 2678 37 ladder ladder NN 42149 2678 38 and and CC 42149 2678 39 niche niche NN 42149 2678 40 forms form NNS 42149 2678 41 were be VBD 42149 2678 42 left leave VBN 42149 2678 43 in in IN 42149 2678 44 position position NN 42149 2678 45 for for IN 42149 2678 46 some some DT 42149 2678 47 time time NN 42149 2678 48 after after IN 42149 2678 49 the the DT 42149 2678 50 main main JJ 42149 2678 51 form form NN 42149 2678 52 was be VBD 42149 2678 53 removed remove VBN 42149 2678 54 . . . 42149 2679 1 At at IN 42149 2679 2 first first RB 42149 2679 3 the the DT 42149 2679 4 forms form NNS 42149 2679 5 were be VBD 42149 2679 6 kept keep VBN 42149 2679 7 in in IN 42149 2679 8 place place NN 42149 2679 9 for for IN 42149 2679 10 36 36 CD 42149 2679 11 hours hour NNS 42149 2679 12 after after IN 42149 2679 13 finishing finish VBG 42149 2679 14 a a DT 42149 2679 15 length length NN 42149 2679 16 , , , 42149 2679 17 but but CC 42149 2679 18 , , , 42149 2679 19 after after IN 42149 2679 20 a a DT 42149 2679 21 little little JJ 42149 2679 22 experience experience NN 42149 2679 23 , , , 42149 2679 24 24 24 CD 42149 2679 25 hours hour NNS 42149 2679 26 was be VBD 42149 2679 27 found find VBN 42149 2679 28 to to TO 42149 2679 29 be be VB 42149 2679 30 enough enough JJ 42149 2679 31 . . . 42149 2680 1 In in IN 42149 2680 2 the the DT 42149 2680 3 summer summer NN 42149 2680 4 , , , 42149 2680 5 when when WRB 42149 2680 6 the the DT 42149 2680 7 rise rise NN 42149 2680 8 of of IN 42149 2680 9 temperature temperature NN 42149 2680 10 quickened quicken VBD 42149 2680 11 the the DT 42149 2680 12 set set NN 42149 2680 13 , , , 42149 2680 14 the the DT 42149 2680 15 time time NN 42149 2680 16 was be VBD 42149 2680 17 brought bring VBN 42149 2680 18 down down RP 42149 2680 19 to to IN 42149 2680 20 18 18 CD 42149 2680 21 hours hour NNS 42149 2680 22 . . . 42149 2681 1 The the DT 42149 2681 2 average average JJ 42149 2681 3 time time NN 42149 2681 4 taken take VBN 42149 2681 5 for for IN 42149 2681 6 a a DT 42149 2681 7 50-ft 50-ft NNP 42149 2681 8 . . . 42149 2681 9 length length NNP 42149 2681 10 was be VBD 42149 2681 11 : : : 42149 2681 12 Laying lay VBG 42149 2681 13 concrete concrete JJ 42149 2681 14 4½ 4â½ CD 42149 2681 15 hours hour NNS 42149 2681 16 . . . 42149 2682 1 Interval interval NN 42149 2682 2 for for IN 42149 2682 3 setting set VBG 42149 2682 4 18 18 CD 42149 2682 5 " " `` 42149 2682 6 Moving move VBG 42149 2682 7 forms form NNS 42149 2682 8 ahead ahead RB 42149 2682 9 and and CC 42149 2682 10 resetting reset VBG 42149 2682 11 5 5 CD 42149 2682 12 " " '' 42149 2682 13 ------- ------- NFP 42149 2682 14 Total total JJ 42149 2682 15 27½ 27â½ CD 42149 2682 16 hours hour NNS 42149 2682 17 . . . 42149 2683 1 The the DT 42149 2683 2 typical typical JJ 42149 2683 3 working working NN 42149 2683 4 gang gang NN 42149 2683 5 was be VBD 42149 2683 6 : : : 42149 2683 7 _ _ NNP 42149 2683 8 Laying Laying NNP 42149 2683 9 Concrete Concrete NNP 42149 2683 10 . . . 42149 2683 11 _ _ NNP 42149 2683 12 1 1 CD 42149 2683 13 Foreman Foreman NNP 42149 2683 14 @ @ CC 42149 2683 15 $ $ $ 42149 2683 16 3.25 3.25 CD 42149 2683 17 per per IN 42149 2683 18 shift shift NN 42149 2683 19 . . . 42149 2684 1 2 2 CD 42149 2684 2 Spaders Spaders NNPS 42149 2684 3 " " `` 42149 2684 4 2.00 2.00 CD 42149 2684 5 " " '' 42149 2684 6 " " `` 42149 2684 7 8 8 CD 42149 2684 8 Laborers laborer NNS 42149 2684 9 " " '' 42149 2684 10 1.75 1.75 CD 42149 2684 11 " " '' 42149 2684 12 " " `` 42149 2684 13 _ _ NNP 42149 2684 14 Moving Moving NNP 42149 2684 15 and and CC 42149 2684 16 Setting Setting NNP 42149 2684 17 Forms Forms NNPS 42149 2684 18 . . . 42149 2684 19 _ _ NNP 42149 2684 20 1 1 CD 42149 2684 21 Foreman Foreman NNP 42149 2684 22 @ @ CC 42149 2684 23 $ $ $ 42149 2684 24 4.00 4.00 CD 42149 2684 25 per per IN 42149 2684 26 shift shift NN 42149 2684 27 . . . 42149 2685 1 10 10 CD 42149 2685 2 Laborers laborer NNS 42149 2685 3 " " `` 42149 2685 4 1.75 1.75 CD 42149 2685 5 " " '' 42149 2685 6 " " '' 42149 2685 7 After after IN 42149 2685 8 the the DT 42149 2685 9 forms form NNS 42149 2685 10 were be VBD 42149 2685 11 removed remove VBN 42149 2685 12 , , , 42149 2685 13 any any DT 42149 2685 14 rough rough JJ 42149 2685 15 places place NNS 42149 2685 16 at at IN 42149 2685 17 the the DT 42149 2685 18 lower low JJR 42149 2685 19 edge edge NN 42149 2685 20 , , , 42149 2685 21 where where WRB 42149 2685 22 the the DT 42149 2685 23 concrete concrete NN 42149 2685 24 joins join VBZ 42149 2685 25 the the DT 42149 2685 26 " " `` 42149 2685 27 lip lip NN 42149 2685 28 , , , 42149 2685 29 " " '' 42149 2685 30 were be VBD 42149 2685 31 bush bush NNP 42149 2685 32 - - HYPH 42149 2685 33 hammered hammer VBN 42149 2685 34 ; ; : 42149 2685 35 no no DT 42149 2685 36 other other JJ 42149 2685 37 cleaning cleaning NN 42149 2685 38 work work NN 42149 2685 39 was be VBD 42149 2685 40 done do VBN 42149 2685 41 . . . 42149 2686 1 _ _ NNP 42149 2686 2 Duct Duct NNP 42149 2686 3 Laying Laying NNP 42149 2686 4 and and CC 42149 2686 5 Rodding._--The rodding._--the CD 42149 2686 6 design design NN 42149 2686 7 and and CC 42149 2686 8 location location NN 42149 2686 9 of of IN 42149 2686 10 the the DT 42149 2686 11 ducts duct NNS 42149 2686 12 have have VBP 42149 2686 13 already already RB 42149 2686 14 been be VBN 42149 2686 15 described describe VBN 42149 2686 16 . . . 42149 2687 1 It -PRON- PRP 42149 2687 2 will will MD 42149 2687 3 have have VB 42149 2687 4 been be VBN 42149 2687 5 seen see VBN 42149 2687 6 that that IN 42149 2687 7 the the DT 42149 2687 8 duct duct NN 42149 2687 9 - - HYPH 42149 2687 10 bench bench NN 42149 2687 11 concrete concrete NN 42149 2687 12 was be VBD 42149 2687 13 laid lay VBN 42149 2687 14 in in IN 42149 2687 15 steps step NNS 42149 2687 16 , , , 42149 2687 17 on on IN 42149 2687 18 which which WDT 42149 2687 19 the the DT 42149 2687 20 ducts duct NNS 42149 2687 21 were be VBD 42149 2687 22 laid lay VBN 42149 2687 23 , , , 42149 2687 24 hence hence RB 42149 2687 25 the the DT 42149 2687 26 maintenance maintenance NN 42149 2687 27 of of IN 42149 2687 28 the the DT 42149 2687 29 grade grade NN 42149 2687 30 and and CC 42149 2687 31 line line NN 42149 2687 32 in in IN 42149 2687 33 the the DT 42149 2687 34 ducts duct NNS 42149 2687 35 was be VBD 42149 2687 36 an an DT 42149 2687 37 easy easy JJ 42149 2687 38 matter matter NN 42149 2687 39 . . . 42149 2688 1 The the DT 42149 2688 2 only only JJ 42149 2688 3 complication complication NN 42149 2688 4 was be VBD 42149 2688 5 the the DT 42149 2688 6 expanded expand VBN 42149 2688 7 metal metal NN 42149 2688 8 bonds bond NNS 42149 2688 9 , , , 42149 2688 10 which which WDT 42149 2688 11 were be VBD 42149 2688 12 bent bend VBN 42149 2688 13 up up RP 42149 2688 14 out out IN 42149 2688 15 of of IN 42149 2688 16 the the DT 42149 2688 17 way way NN 42149 2688 18 of of IN 42149 2688 19 the the DT 42149 2688 20 arch arch JJ 42149 2688 21 forms form NNS 42149 2688 22 and and CC 42149 2688 23 straightened straighten VBD 42149 2688 24 out out RP 42149 2688 25 again again RB 42149 2688 26 after after IN 42149 2688 27 the the DT 42149 2688 28 arch arch JJ 42149 2688 29 forms form NNS 42149 2688 30 had have VBD 42149 2688 31 passed pass VBN 42149 2688 32 . . . 42149 2689 1 The the DT 42149 2689 2 materials material NNS 42149 2689 3 , , , 42149 2689 4 such such JJ 42149 2689 5 as as IN 42149 2689 6 ducts duct NNS 42149 2689 7 , , , 42149 2689 8 sand sand NN 42149 2689 9 , , , 42149 2689 10 and and CC 42149 2689 11 cement cement NN 42149 2689 12 , , , 42149 2689 13 were be VBD 42149 2689 14 brought bring VBN 42149 2689 15 into into IN 42149 2689 16 the the DT 42149 2689 17 tunnel tunnel NN 42149 2689 18 by by IN 42149 2689 19 the the DT 42149 2689 20 regular regular JJ 42149 2689 21 transportation transportation NN 42149 2689 22 gang gang NN 42149 2689 23 . . . 42149 2690 1 The the DT 42149 2690 2 mortar mortar NN 42149 2690 3 was be VBD 42149 2690 4 mixed mix VBN 42149 2690 5 in in IN 42149 2690 6 a a DT 42149 2690 7 wooden wooden JJ 42149 2690 8 trough trough NN 42149 2690 9 about about RB 42149 2690 10 10 10 CD 42149 2690 11 ft ft NN 42149 2690 12 . . NN 42149 2690 13 long long JJ 42149 2690 14 , , , 42149 2690 15 2 2 CD 42149 2690 16 ft ft NN 42149 2690 17 . . NNP 42149 2690 18 6 6 CD 42149 2690 19 in in IN 42149 2690 20 . . . 42149 2691 1 wide wide JJ 42149 2691 2 and and CC 42149 2691 3 8 8 CD 42149 2691 4 in in IN 42149 2691 5 . . . 42149 2692 1 deep deep JJ 42149 2692 2 . . . 42149 2693 1 After after IN 42149 2693 2 the the DT 42149 2693 3 single single JJ 42149 2693 4 - - HYPH 42149 2693 5 way way NN 42149 2693 6 ducts duct NNS 42149 2693 7 had have VBD 42149 2693 8 been be VBN 42149 2693 9 laid lay VBN 42149 2693 10 , , , 42149 2693 11 all all PDT 42149 2693 12 the the DT 42149 2693 13 joints joint NNS 42149 2693 14 were be VBD 42149 2693 15 plastered plaster VBN 42149 2693 16 with with IN 42149 2693 17 mortar mortar NN 42149 2693 18 , , , 42149 2693 19 in in IN 42149 2693 20 order order NN 42149 2693 21 to to TO 42149 2693 22 prevent prevent VB 42149 2693 23 any any DT 42149 2693 24 foreign foreign JJ 42149 2693 25 substance substance NN 42149 2693 26 from from IN 42149 2693 27 entering enter VBG 42149 2693 28 the the DT 42149 2693 29 ducts duct NNS 42149 2693 30 . . . 42149 2694 1 This this DT 42149 2694 2 was be VBD 42149 2694 3 not not RB 42149 2694 4 necessary necessary JJ 42149 2694 5 with with IN 42149 2694 6 the the DT 42149 2694 7 multiple multiple JJ 42149 2694 8 duct duct NN 42149 2694 9 , , , 42149 2694 10 as as IN 42149 2694 11 the the DT 42149 2694 12 joints joint NNS 42149 2694 13 were be VBD 42149 2694 14 wrapped wrap VBN 42149 2694 15 with with IN 42149 2694 16 cotton cotton NN 42149 2694 17 duck duck NN 42149 2694 18 . . . 42149 2695 1 The the DT 42149 2695 2 ducts duct NNS 42149 2695 3 were be VBD 42149 2695 4 laid lay VBN 42149 2695 5 on on IN 42149 2695 6 a a DT 42149 2695 7 laying lay VBG 42149 2695 8 mandrel mandrel NN 42149 2695 9 , , , 42149 2695 10 and and CC 42149 2695 11 , , , 42149 2695 12 as as RB 42149 2695 13 soon soon RB 42149 2695 14 as as IN 42149 2695 15 possible possible JJ 42149 2695 16 after after IN 42149 2695 17 the the DT 42149 2695 18 concrete concrete NN 42149 2695 19 was be VBD 42149 2695 20 laid lay VBN 42149 2695 21 around around IN 42149 2695 22 a a DT 42149 2695 23 set set NN 42149 2695 24 of of IN 42149 2695 25 ducts duct NNS 42149 2695 26 , , , 42149 2695 27 they -PRON- PRP 42149 2695 28 were be VBD 42149 2695 29 " " `` 42149 2695 30 rodded rodde VBN 42149 2695 31 " " '' 42149 2695 32 with with IN 42149 2695 33 a a DT 42149 2695 34 rodding rodding NN 42149 2695 35 mandrel mandrel NN 42149 2695 36 . . . 42149 2696 1 Not not RB 42149 2696 2 many many JJ 42149 2696 3 obstructions obstruction NNS 42149 2696 4 were be VBD 42149 2696 5 met meet VBN 42149 2696 6 , , , 42149 2696 7 and and CC 42149 2696 8 these these DT 42149 2696 9 were be VBD 42149 2696 10 usually usually RB 42149 2696 11 some some DT 42149 2696 12 stray stray NN 42149 2696 13 laying lay VBG 42149 2696 14 mandrel mandrel NN 42149 2696 15 which which WDT 42149 2696 16 had have VBD 42149 2696 17 been be VBN 42149 2696 18 left leave VBN 42149 2696 19 in in RP 42149 2696 20 by by IN 42149 2696 21 mistake mistake NN 42149 2696 22 , , , 42149 2696 23 or or CC 42149 2696 24 collections collection NNS 42149 2696 25 of of IN 42149 2696 26 mortar mortar NN 42149 2696 27 where where WRB 42149 2696 28 the the DT 42149 2696 29 plastering plastering NN 42149 2696 30 of of IN 42149 2696 31 the the DT 42149 2696 32 single single JJ 42149 2696 33 - - HYPH 42149 2696 34 way way NN 42149 2696 35 joints joint NNS 42149 2696 36 had have VBD 42149 2696 37 been be VBN 42149 2696 38 defective defective JJ 42149 2696 39 . . . 42149 2697 1 In in IN 42149 2697 2 the the DT 42149 2697 3 657,000 657,000 CD 42149 2697 4 duct duct NN 42149 2697 5 ft ft NNP 42149 2697 6 . . NN 42149 2697 7 of of IN 42149 2697 8 conduit conduit NN 42149 2697 9 in in IN 42149 2697 10 the the DT 42149 2697 11 river river NN 42149 2697 12 tunnels tunnel NNS 42149 2697 13 only only RB 42149 2697 14 eight eight CD 42149 2697 15 serious serious JJ 42149 2697 16 obstructions obstruction NNS 42149 2697 17 were be VBD 42149 2697 18 met meet VBN 42149 2697 19 . . . 42149 2698 1 That that IN 42149 2698 2 the the DT 42149 2698 3 work work NN 42149 2698 4 was be VBD 42149 2698 5 of of IN 42149 2698 6 exceptionally exceptionally RB 42149 2698 7 high high JJ 42149 2698 8 quality quality NN 42149 2698 9 is be VBZ 42149 2698 10 shown show VBN 42149 2698 11 by by IN 42149 2698 12 the the DT 42149 2698 13 fact fact NN 42149 2698 14 that that IN 42149 2698 15 a a DT 42149 2698 16 heavy heavy JJ 42149 2698 17 3-in 3-in NN 42149 2698 18 . . . 42149 2699 1 lead lead JJ 42149 2699 2 cable cable NN 42149 2699 3 has have VBZ 42149 2699 4 been be VBN 42149 2699 5 passed pass VBN 42149 2699 6 through through RP 42149 2699 7 from from IN 42149 2699 8 manhole manhole NNP 42149 2699 9 to to IN 42149 2699 10 manhole manhole NNP 42149 2699 11 ( ( -LRB- 42149 2699 12 450 450 CD 42149 2699 13 ft ft NN 42149 2699 14 . . . 42149 2699 15 ) ) -RRB- 42149 2699 16 in in IN 42149 2699 17 6 6 CD 42149 2699 18 min min NNP 42149 2699 19 . . NNP 42149 2699 20 , , , 42149 2699 21 and and CC 42149 2699 22 the the DT 42149 2699 23 company company NN 42149 2699 24 , , , 42149 2699 25 engaged engage VBD 42149 2699 26 to to TO 42149 2699 27 lay lay VB 42149 2699 28 the the DT 42149 2699 29 cables cable NNS 42149 2699 30 in in IN 42149 2699 31 these these DT 42149 2699 32 ducts duct NNS 42149 2699 33 , , , 42149 2699 34 broke break VBD 42149 2699 35 all all PDT 42149 2699 36 its -PRON- PRP$ 42149 2699 37 previous previous JJ 42149 2699 38 records record NNS 42149 2699 39 for for IN 42149 2699 40 laying lay VBG 42149 2699 41 , , , 42149 2699 42 not not RB 42149 2699 43 only only RB 42149 2699 44 for for IN 42149 2699 45 tunnel tunnel NN 42149 2699 46 work work NN 42149 2699 47 , , , 42149 2699 48 but but CC 42149 2699 49 also also RB 42149 2699 50 in in IN 42149 2699 51 the the DT 42149 2699 52 open open NN 42149 2699 53 . . . 42149 2700 1 Fig fig NN 42149 2700 2 . . . 42149 2701 1 1 1 LS 42149 2701 2 , , , 42149 2701 3 Plate Plate NNP 42149 2701 4 XXXV XXXV NNP 42149 2701 5 , , , 42149 2701 6 shows show VBZ 42149 2701 7 a a DT 42149 2701 8 collection collection NN 42149 2701 9 of of IN 42149 2701 10 the the DT 42149 2701 11 tools tool NNS 42149 2701 12 and and CC 42149 2701 13 arrangements arrangement NNS 42149 2701 14 used use VBN 42149 2701 15 in in IN 42149 2701 16 laying lay VBG 42149 2701 17 and and CC 42149 2701 18 rodding rodding NN 42149 2701 19 ducts duct NNS 42149 2701 20 . . . 42149 2702 1 The the DT 42149 2702 2 typical typical JJ 42149 2702 3 working working JJ 42149 2702 4 force force NN 42149 2702 5 was be VBD 42149 2702 6 : : : 42149 2702 7 _ _ NNP 42149 2702 8 Laying Laying NNP 42149 2702 9 Multiple Multiple NNP 42149 2702 10 Ducts Ducts NNPS 42149 2702 11 . . . 42149 2702 12 _ _ NNP 42149 2702 13 1 1 CD 42149 2702 14 Foreman Foreman NNP 42149 2702 15 @ @ CC 42149 2702 16 $ $ $ 42149 2702 17 3.50 3.50 CD 42149 2702 18 per per IN 42149 2702 19 shift shift NN 42149 2702 20 . . . 42149 2703 1 9 9 CD 42149 2703 2 Laborers laborer NNS 42149 2703 3 " " `` 42149 2703 4 1.75 1.75 CD 42149 2703 5 " " '' 42149 2703 6 " " `` 42149 2703 7 _ _ NNP 42149 2703 8 Laying Laying NNP 42149 2703 9 Single Single NNP 42149 2703 10 - - HYPH 42149 2703 11 Way way NN 42149 2703 12 Ducts Ducts NNPS 42149 2703 13 . . . 42149 2703 14 _ _ NNP 42149 2703 15 1 1 CD 42149 2703 16 Foreman Foreman NNP 42149 2703 17 @ @ CC 42149 2703 18 $ $ $ 42149 2703 19 3.50 3.50 CD 42149 2703 20 per per IN 42149 2703 21 shift shift NN 42149 2703 22 . . . 42149 2704 1 8 8 CD 42149 2704 2 Laborers laborer NNS 42149 2704 3 " " `` 42149 2704 4 1.75 1.75 CD 42149 2704 5 " " '' 42149 2704 6 " " `` 42149 2704 7 _ _ NNP 42149 2704 8 Rodding Rodding NNP 42149 2704 9 Multiple Multiple NNP 42149 2704 10 Ducts Ducts NNPS 42149 2704 11 . . . 42149 2704 12 _ _ NNP 42149 2704 13 1 1 CD 42149 2704 14 Foreman Foreman NNP 42149 2704 15 @ @ CC 42149 2704 16 $ $ $ 42149 2704 17 3.50 3.50 CD 42149 2704 18 per per IN 42149 2704 19 shift shift NN 42149 2704 20 . . . 42149 2705 1 5 5 CD 42149 2705 2 Laborers laborer NNS 42149 2705 3 " " `` 42149 2705 4 1.75 1.75 CD 42149 2705 5 " " '' 42149 2705 6 " " `` 42149 2705 7 _ _ NNP 42149 2705 8 Rodding Rodding NNP 42149 2705 9 Single Single NNP 42149 2705 10 - - HYPH 42149 2705 11 Way Way NNP 42149 2705 12 Ducts Ducts NNPS 42149 2705 13 . . . 42149 2705 14 _ _ NNP 42149 2705 15 1 1 CD 42149 2705 16 Foreman Foreman NNP 42149 2705 17 @ @ CC 42149 2705 18 $ $ $ 42149 2705 19 3.50 3.50 CD 42149 2705 20 per per IN 42149 2705 21 shift shift NN 42149 2705 22 . . . 42149 2706 1 5 5 CD 42149 2706 2 Laborers laborer NNS 42149 2706 3 " " `` 42149 2706 4 1.75 1.75 CD 42149 2706 5 " " '' 42149 2706 6 " " `` 42149 2706 7 The the DT 42149 2706 8 average average JJ 42149 2706 9 progress progress NN 42149 2706 10 per per IN 42149 2706 11 10-hour 10-hour CD 42149 2706 12 shift shift NN 42149 2706 13 with with IN 42149 2706 14 such such JJ 42149 2706 15 gangs gang NNS 42149 2706 16 was be VBD 42149 2706 17 : : : 42149 2706 18 Laying lay VBG 42149 2706 19 multiple multiple JJ 42149 2706 20 ducts duct NNS 42149 2706 21 4,000 4,000 CD 42149 2706 22 duct duct NN 42149 2706 23 ft ft IN 42149 2706 24 . . . 42149 2707 1 Laying lay VBG 42149 2707 2 single single JJ 42149 2707 3 - - HYPH 42149 2707 4 way way NN 42149 2707 5 ducts duct VBZ 42149 2707 6 1,745 1,745 CD 42149 2707 7 " " '' 42149 2707 8 " " `` 42149 2707 9 Rodding rodde VBG 42149 2707 10 multiple multiple JJ 42149 2707 11 ducts duct NNS 42149 2707 12 4,040 4,040 CD 42149 2707 13 " " `` 42149 2707 14 " " `` 42149 2707 15 Rodding rodde VBG 42149 2707 16 single single JJ 42149 2707 17 - - HYPH 42149 2707 18 way way NN 42149 2707 19 ducts duct VBZ 42149 2707 20 2,532 2,532 CD 42149 2707 21 " " `` 42149 2707 22 " " `` 42149 2707 23 No no DT 42149 2707 24 detailed detailed JJ 42149 2707 25 description description NN 42149 2707 26 need nee MD 42149 2707 27 be be VB 42149 2707 28 given give VBN 42149 2707 29 of of IN 42149 2707 30 the the DT 42149 2707 31 concreting concreting NN 42149 2707 32 of of IN 42149 2707 33 the the DT 42149 2707 34 cross cross NN 42149 2707 35 - - NNS 42149 2707 36 passages passage NNS 42149 2707 37 , , , 42149 2707 38 pump pump NN 42149 2707 39 chambers chamber NNS 42149 2707 40 , , , 42149 2707 41 sumps sumps NNP 42149 2707 42 , , , 42149 2707 43 and and CC 42149 2707 44 other other JJ 42149 2707 45 small small JJ 42149 2707 46 details detail NNS 42149 2707 47 , , , 42149 2707 48 the the DT 42149 2707 49 design design NN 42149 2707 50 of of IN 42149 2707 51 which which WDT 42149 2707 52 has have VBZ 42149 2707 53 been be VBN 42149 2707 54 previously previously RB 42149 2707 55 shown show VBN 42149 2707 56 . . . 42149 2708 1 The the DT 42149 2708 2 concrete concrete NN 42149 2708 3 was be VBD 42149 2708 4 finished finish VBN 42149 2708 5 on on IN 42149 2708 6 June June NNP 42149 2708 7 1st 1st NN 42149 2708 8 , , , 42149 2708 9 1909 1909 CD 42149 2708 10 . . . 42149 2709 1 _ _ NNP 42149 2709 2 Period Period NNP 42149 2709 3 No no UH 42149 2709 4 . . . 42149 2710 1 6._--_Final 6._--_final CD 42149 2710 2 Cleaning Cleaning NNP 42149 2710 3 Up._--_June up._--_june CD 42149 2710 4 , , , 42149 2710 5 1909 1909 CD 42149 2710 6 , , , 42149 2710 7 to to IN 42149 2710 8 November November NNP 42149 2710 9 , , , 42149 2710 10 1909._--As 1909._--as CD 42149 2710 11 soon soon RB 42149 2710 12 as as IN 42149 2710 13 all all PDT 42149 2710 14 the the DT 42149 2710 15 concrete concrete NN 42149 2710 16 was be VBD 42149 2710 17 finished finish VBN 42149 2710 18 , , , 42149 2710 19 the the DT 42149 2710 20 work work NN 42149 2710 21 of of IN 42149 2710 22 cleaning clean VBG 42149 2710 23 up up RP 42149 2710 24 the the DT 42149 2710 25 invert invert NN 42149 2710 26 was be VBD 42149 2710 27 begun begin VBN 42149 2710 28 . . . 42149 2711 1 A a DT 42149 2711 2 large large JJ 42149 2711 3 quantity quantity NN 42149 2711 4 of of IN 42149 2711 5 dà dà NNP 42149 2711 6 © © NNP 42149 2711 7 bris bris NNP 42149 2711 8 littered litter VBD 42149 2711 9 the the DT 42149 2711 10 tunnels tunnel NNS 42149 2711 11 , , , 42149 2711 12 and and CC 42149 2711 13 it -PRON- PRP 42149 2711 14 was be VBD 42149 2711 15 economical economical JJ 42149 2711 16 to to TO 42149 2711 17 remove remove VB 42149 2711 18 it -PRON- PRP 42149 2711 19 as as RB 42149 2711 20 quickly quickly RB 42149 2711 21 as as IN 42149 2711 22 possible possible JJ 42149 2711 23 . . . 42149 2712 1 The the DT 42149 2712 2 remaining remain VBG 42149 2712 3 forms form NNS 42149 2712 4 were be VBD 42149 2712 5 first first RB 42149 2712 6 removed remove VBN 42149 2712 7 , , , 42149 2712 8 and and CC 42149 2712 9 hoisting hoist VBG 42149 2712 10 engines engine NNS 42149 2712 11 , , , 42149 2712 12 supported support VBN 42149 2712 13 on on IN 42149 2712 14 cross cross JJ 42149 2712 15 - - JJ 42149 2712 16 timber timber NN 42149 2712 17 laid lay VBN 42149 2712 18 across across IN 42149 2712 19 the the DT 42149 2712 20 benches bench NNS 42149 2712 21 , , , 42149 2712 22 were be VBD 42149 2712 23 set set VBN 42149 2712 24 up up RP 42149 2712 25 in in IN 42149 2712 26 the the DT 42149 2712 27 middle middle NN 42149 2712 28 of of IN 42149 2712 29 the the DT 42149 2712 30 tunnel tunnel NN 42149 2712 31 at at IN 42149 2712 32 about about IN 42149 2712 33 500-ft 500-ft CD 42149 2712 34 . . . 42149 2712 35 intervals interval NNS 42149 2712 36 . . . 42149 2713 1 Work work NN 42149 2713 2 was be VBD 42149 2713 3 carried carry VBN 42149 2713 4 on on IN 42149 2713 5 day day NN 42149 2713 6 and and CC 42149 2713 7 night night NN 42149 2713 8 , , , 42149 2713 9 and and CC 42149 2713 10 about about RB 42149 2713 11 169 169 CD 42149 2713 12 ft ft NN 42149 2713 13 . . NN 42149 2713 14 of of IN 42149 2713 15 single single JJ 42149 2713 16 tunnel tunnel NN 42149 2713 17 was be VBD 42149 2713 18 cleared clear VBN 42149 2713 19 per per IN 42149 2713 20 10-hour 10-hour CD 42149 2713 21 shift shift NN 42149 2713 22 . . . 42149 2714 1 Work work NN 42149 2714 2 was be VBD 42149 2714 3 begun begin VBN 42149 2714 4 on on IN 42149 2714 5 May May NNP 42149 2714 6 28th 28th NN 42149 2714 7 , , , 42149 2714 8 and and CC 42149 2714 9 finished finish VBD 42149 2714 10 on on IN 42149 2714 11 July July NNP 42149 2714 12 15th 15th NN 42149 2714 13 , , , 42149 2714 14 1909 1909 CD 42149 2714 15 . . . 42149 2715 1 For for IN 42149 2715 2 part part NN 42149 2715 3 of of IN 42149 2715 4 the the DT 42149 2715 5 time time NN 42149 2715 6 it -PRON- PRP 42149 2715 7 was be VBD 42149 2715 8 carried carry VBN 42149 2715 9 on on IN 42149 2715 10 at at IN 42149 2715 11 two two CD 42149 2715 12 points point NNS 42149 2715 13 in in IN 42149 2715 14 each each DT 42149 2715 15 tunnel tunnel NN 42149 2715 16 , , , 42149 2715 17 working work VBG 42149 2715 18 toward toward IN 42149 2715 19 the the DT 42149 2715 20 two two CD 42149 2715 21 shafts shaft NNS 42149 2715 22 , , , 42149 2715 23 but but CC 42149 2715 24 when when WRB 42149 2715 25 the the DT 42149 2715 26 work work NN 42149 2715 27 in in IN 42149 2715 28 the the DT 42149 2715 29 Weehawken Weehawken NNP 42149 2715 30 Shaft Shaft NNP 42149 2715 31 , , , 42149 2715 32 which which WDT 42149 2715 33 was be VBD 42149 2715 34 being be VBG 42149 2715 35 done do VBN 42149 2715 36 at at IN 42149 2715 37 the the DT 42149 2715 38 same same JJ 42149 2715 39 time time NN 42149 2715 40 , , , 42149 2715 41 blocked block VBD 42149 2715 42 egress egress NN 42149 2715 43 from from IN 42149 2715 44 that that DT 42149 2715 45 point point NN 42149 2715 46 , , , 42149 2715 47 all all DT 42149 2715 48 material material NN 42149 2715 49 was be VBD 42149 2715 50 sent send VBN 42149 2715 51 out out RP 42149 2715 52 by by IN 42149 2715 53 the the DT 42149 2715 54 Manhattan Manhattan NNP 42149 2715 55 Shaft Shaft NNP 42149 2715 56 . . . 42149 2716 1 The the DT 42149 2716 2 total total JJ 42149 2716 3 quantity quantity NN 42149 2716 4 of of IN 42149 2716 5 material material NN 42149 2716 6 removed remove VBN 42149 2716 7 was be VBD 42149 2716 8 5,350 5,350 CD 42149 2716 9 cu cu NNS 42149 2716 10 . . . 42149 2717 1 yd yd NNP 42149 2717 2 . . NNP 42149 2717 3 , , , 42149 2717 4 or or CC 42149 2717 5 about about RB 42149 2717 6 0.44 0.44 CD 42149 2717 7 cu cu NNS 42149 2717 8 . . . 42149 2718 1 yd yd NNP 42149 2718 2 . . . 42149 2719 1 per per IN 42149 2719 2 lin lin NNP 42149 2719 3 . . . 42149 2720 1 ft ft NNP 42149 2720 2 . . NNP 42149 2720 3 of of IN 42149 2720 4 tunnel tunnel NNP 42149 2720 5 . . . 42149 2721 1 The the DT 42149 2721 2 average average JJ 42149 2721 3 force force NN 42149 2721 4 per per IN 42149 2721 5 shift shift NN 42149 2721 6 was be VBD 42149 2721 7 : : : 42149 2721 8 _ _ NNP 42149 2721 9 In in IN 42149 2721 10 Tunnel Tunnel NNP 42149 2721 11 . . . 42149 2721 12 _ _ NNP 42149 2721 13 3 3 CD 42149 2721 14 Foremen Foremen NNP 42149 2721 15 @ @ CC 42149 2721 16 $ $ $ 42149 2721 17 3.25 3.25 CD 42149 2721 18 per per IN 42149 2721 19 shift shift NN 42149 2721 20 1 1 CD 42149 2721 21 Hoist hoist NN 42149 2721 22 engineer engineer NN 42149 2721 23 " " `` 42149 2721 24 3.00 3.00 CD 42149 2721 25 " " '' 42149 2721 26 " " `` 42149 2721 27 1 1 CD 42149 2721 28 Signalman Signalman NNP 42149 2721 29 " " `` 42149 2721 30 2.00 2.00 CD 42149 2721 31 " " '' 42149 2721 32 " " '' 42149 2721 33 38 38 CD 42149 2721 34 Laborers laborer NNS 42149 2721 35 " " `` 42149 2721 36 1.75 1.75 CD 42149 2721 37 " " '' 42149 2721 38 " " `` 42149 2721 39 _ _ NNP 42149 2721 40 On On NNP 42149 2721 41 the the DT 42149 2721 42 Surface Surface NNP 42149 2721 43 . . . 42149 2721 44 _ _ NNP 42149 2721 45 1 1 CD 42149 2721 46 Foreman Foreman NNP 42149 2721 47 @ @ CC 42149 2721 48 $ $ $ 42149 2721 49 3.25 3.25 CD 42149 2721 50 per per IN 42149 2721 51 shift shift NN 42149 2721 52 1 1 CD 42149 2721 53 Hoist hoist NN 42149 2721 54 engineer engineer NN 42149 2721 55 " " `` 42149 2721 56 3.00 3.00 CD 42149 2721 57 " " '' 42149 2721 58 " " `` 42149 2721 59 1 1 CD 42149 2721 60 Signalman Signalman NNP 42149 2721 61 " " `` 42149 2721 62 2.00 2.00 CD 42149 2721 63 " " '' 42149 2721 64 " " `` 42149 2721 65 12 12 CD 42149 2721 66 Laborers laborer NNS 42149 2721 67 " " `` 42149 2721 68 1.75 1.75 CD 42149 2721 69 " " '' 42149 2721 70 " " '' 42149 2721 71 After after IN 42149 2721 72 the the DT 42149 2721 73 cleaning cleaning NN 42149 2721 74 out out RP 42149 2721 75 had have VBD 42149 2721 76 been be VBN 42149 2721 77 done do VBN 42149 2721 78 , , , 42149 2721 79 the the DT 42149 2721 80 contractor contractor NN 42149 2721 81 's 's POS 42149 2721 82 main main JJ 42149 2721 83 work work NN 42149 2721 84 was be VBD 42149 2721 85 finished finish VBN 42149 2721 86 . . . 42149 2722 1 However however RB 42149 2722 2 , , , 42149 2722 3 quite quite PDT 42149 2722 4 a a DT 42149 2722 5 considerable considerable JJ 42149 2722 6 force force NN 42149 2722 7 was be VBD 42149 2722 8 employed employ VBN 42149 2722 9 , , , 42149 2722 10 up up IN 42149 2722 11 to to IN 42149 2722 12 November November NNP 42149 2722 13 , , , 42149 2722 14 1909 1909 CD 42149 2722 15 , , , 42149 2722 16 in in IN 42149 2722 17 doing do VBG 42149 2722 18 various various JJ 42149 2722 19 incidental incidental JJ 42149 2722 20 jobs job NNS 42149 2722 21 , , , 42149 2722 22 such such JJ 42149 2722 23 as as IN 42149 2722 24 the the DT 42149 2722 25 installation installation NN 42149 2722 26 of of IN 42149 2722 27 permanent permanent JJ 42149 2722 28 ventilation ventilation NN 42149 2722 29 conduits conduit NNS 42149 2722 30 and and CC 42149 2722 31 nozzles nozzle NNS 42149 2722 32 at at IN 42149 2722 33 the the DT 42149 2722 34 intercepting intercept VBG 42149 2722 35 arch arch NN 42149 2722 36 near near IN 42149 2722 37 the the DT 42149 2722 38 Manhattan Manhattan NNP 42149 2722 39 Shaft Shaft NNP 42149 2722 40 , , , 42149 2722 41 the the DT 42149 2722 42 erection erection NN 42149 2722 43 of of IN 42149 2722 44 a a DT 42149 2722 45 head head NN 42149 2722 46 - - HYPH 42149 2722 47 house house NN 42149 2722 48 over over IN 42149 2722 49 the the DT 42149 2722 50 Manhattan Manhattan NNP 42149 2722 51 Shaft Shaft NNP 42149 2722 52 , , , 42149 2722 53 and and CC 42149 2722 54 collecting collect VBG 42149 2722 55 and and CC 42149 2722 56 putting put VBG 42149 2722 57 in in RP 42149 2722 58 order order NN 42149 2722 59 all all PDT 42149 2722 60 the the DT 42149 2722 61 miscellaneous miscellaneous JJ 42149 2722 62 portable portable JJ 42149 2722 63 plant plant NN 42149 2722 64 , , , 42149 2722 65 which which WDT 42149 2722 66 was be VBD 42149 2722 67 either either CC 42149 2722 68 sold sell VBN 42149 2722 69 or or CC 42149 2722 70 returned return VBN 42149 2722 71 to to IN 42149 2722 72 store store NN 42149 2722 73 , , , 42149 2722 74 sorting sort VBG 42149 2722 75 all all DT 42149 2722 76 waste waste NN 42149 2722 77 materials material NNS 42149 2722 78 , , , 42149 2722 79 such such JJ 42149 2722 80 as as IN 42149 2722 81 lumber lumber NN 42149 2722 82 , , , 42149 2722 83 piping piping NN 42149 2722 84 , , , 42149 2722 85 and and CC 42149 2722 86 scraps scrap NNS 42149 2722 87 of of IN 42149 2722 88 all all DT 42149 2722 89 kinds kind NNS 42149 2722 90 , , , 42149 2722 91 and and CC 42149 2722 92 , , , 42149 2722 93 in in IN 42149 2722 94 general general JJ 42149 2722 95 , , , 42149 2722 96 restoring restore VBG 42149 2722 97 the the DT 42149 2722 98 sites site NNS 42149 2722 99 of of IN 42149 2722 100 the the DT 42149 2722 101 working working NN 42149 2722 102 yards yard NNS 42149 2722 103 to to IN 42149 2722 104 their -PRON- PRP$ 42149 2722 105 original original JJ 42149 2722 106 condition condition NN 42149 2722 107 . . . 42149 2723 1 Concrete Concrete NNP 42149 2723 2 Mixing Mixing NNP 42149 2723 3 . . . 42149 2724 1 The the DT 42149 2724 2 plant plant NN 42149 2724 3 used use VBN 42149 2724 4 in in IN 42149 2724 5 mixing mix VBG 42149 2724 6 the the DT 42149 2724 7 concrete concrete NN 42149 2724 8 for for IN 42149 2724 9 the the DT 42149 2724 10 land land NN 42149 2724 11 tunnels tunnel NNS 42149 2724 12 was be VBD 42149 2724 13 pulled pull VBN 42149 2724 14 down down RP 42149 2724 15 and and CC 42149 2724 16 re re VB 42149 2724 17 - - VBN 42149 2724 18 erected erect VBN 42149 2724 19 before before IN 42149 2724 20 the the DT 42149 2724 21 concrete concrete JJ 42149 2724 22 work work NN 42149 2724 23 in in IN 42149 2724 24 the the DT 42149 2724 25 river river NN 42149 2724 26 tunnels tunnel NNS 42149 2724 27 was be VBD 42149 2724 28 begun begin VBN 42149 2724 29 . . . 42149 2725 1 At at IN 42149 2725 2 the the DT 42149 2725 3 New New NNP 42149 2725 4 York York NNP 42149 2725 5 shaft shaft NN 42149 2725 6 two two CD 42149 2725 7 new new JJ 42149 2725 8 bins bin NNS 42149 2725 9 for for IN 42149 2725 10 sand sand NN 42149 2725 11 and and CC 42149 2725 12 stone stone NN 42149 2725 13 were be VBD 42149 2725 14 built build VBN 42149 2725 15 , , , 42149 2725 16 bringing bring VBG 42149 2725 17 the the DT 42149 2725 18 total total JJ 42149 2725 19 capacity capacity NN 42149 2725 20 up up IN 42149 2725 21 to to TO 42149 2725 22 950 950 CD 42149 2725 23 cu cu NNS 42149 2725 24 . . . 42149 2726 1 yd yd NNP 42149 2726 2 . . . 42149 2727 1 Two two CD 42149 2727 2 No no UH 42149 2727 3 . . . 42149 2728 1 6 6 CD 42149 2728 2 Ransome ransome NN 42149 2728 3 mixers mixer NNS 42149 2728 4 , , , 42149 2728 5 driven drive VBN 42149 2728 6 electrically electrically RB 42149 2728 7 by by IN 42149 2728 8 30-h.p 30-h.p NNS 42149 2728 9 . . . 42149 2729 1 General General NNP 42149 2729 2 Electric Electric NNP 42149 2729 3 motors motor NNS 42149 2729 4 , , , 42149 2729 5 using use VBG 42149 2729 6 current current NN 42149 2729 7 from from IN 42149 2729 8 the the DT 42149 2729 9 contractor contractor NN 42149 2729 10 's 's POS 42149 2729 11 generators generator NNS 42149 2729 12 , , , 42149 2729 13 were be VBD 42149 2729 14 set set VBN 42149 2729 15 up up RP 42149 2729 16 on on IN 42149 2729 17 a a DT 42149 2729 18 special special JJ 42149 2729 19 platform platform NN 42149 2729 20 in in IN 42149 2729 21 the the DT 42149 2729 22 intercepting intercept VBG 42149 2729 23 arch arch NN 42149 2729 24 . . . 42149 2730 1 At at IN 42149 2730 2 Manhattan Manhattan NNP 42149 2730 3 the the DT 42149 2730 4 sand sand NN 42149 2730 5 and and CC 42149 2730 6 stone stone NN 42149 2730 7 were be VBD 42149 2730 8 received receive VBN 42149 2730 9 from from IN 42149 2730 10 the the DT 42149 2730 11 bins bin NNS 42149 2730 12 in in IN 42149 2730 13 chutes chute NNS 42149 2730 14 at at IN 42149 2730 15 a a DT 42149 2730 16 small small JJ 42149 2730 17 hopper hopper NN 42149 2730 18 built build VBN 42149 2730 19 on on IN 42149 2730 20 the the DT 42149 2730 21 permanent permanent JJ 42149 2730 22 upper upper JJ 42149 2730 23 platform platform NN 42149 2730 24 of of IN 42149 2730 25 the the DT 42149 2730 26 intercepting intercept VBG 42149 2730 27 arch arch NN 42149 2730 28 . . . 42149 2731 1 Bottom bottom NN 42149 2731 2 - - HYPH 42149 2731 3 dumping dump VBG 42149 2731 4 cars car NNS 42149 2731 5 , , , 42149 2731 6 divided divide VBN 42149 2731 7 by by IN 42149 2731 8 a a DT 42149 2731 9 partition partition NN 42149 2731 10 into into IN 42149 2731 11 two two CD 42149 2731 12 portions portion NNS 42149 2731 13 , , , 42149 2731 14 arranged arrange VBD 42149 2731 15 to to TO 42149 2731 16 hold hold VB 42149 2731 17 the the DT 42149 2731 18 proper proper JJ 42149 2731 19 quantities quantity NNS 42149 2731 20 of of IN 42149 2731 21 sand sand NN 42149 2731 22 and and CC 42149 2731 23 stone stone NN 42149 2731 24 for for IN 42149 2731 25 a a DT 42149 2731 26 4-bag 4-bag NNP 42149 2731 27 batch batch NN 42149 2731 28 of of IN 42149 2731 29 concrete concrete NN 42149 2731 30 , , , 42149 2731 31 were be VBD 42149 2731 32 run run VBN 42149 2731 33 on on IN 42149 2731 34 a a DT 42149 2731 35 track track NN 42149 2731 36 on on IN 42149 2731 37 this this DT 42149 2731 38 upper upper JJ 42149 2731 39 platform platform NN 42149 2731 40 , , , 42149 2731 41 filled fill VBN 42149 2731 42 with with IN 42149 2731 43 the the DT 42149 2731 44 proper proper JJ 42149 2731 45 quantities quantity NNS 42149 2731 46 of of IN 42149 2731 47 sand sand NN 42149 2731 48 and and CC 42149 2731 49 stone stone NN 42149 2731 50 , , , 42149 2731 51 and and CC 42149 2731 52 then then RB 42149 2731 53 run run VB 42149 2731 54 back back RB 42149 2731 55 and and CC 42149 2731 56 dumped dump VBN 42149 2731 57 into into IN 42149 2731 58 the the DT 42149 2731 59 hoppers hopper NNS 42149 2731 60 of of IN 42149 2731 61 the the DT 42149 2731 62 mixer mixer NN 42149 2731 63 . . . 42149 2732 1 After after IN 42149 2732 2 mixing mix VBG 42149 2732 3 , , , 42149 2732 4 the the DT 42149 2732 5 batch batch NN 42149 2732 6 was be VBD 42149 2732 7 run run VBN 42149 2732 8 down down IN 42149 2732 9 chutes chute NNS 42149 2732 10 into into IN 42149 2732 11 the the DT 42149 2732 12 tunnel tunnel NN 42149 2732 13 cars car NNS 42149 2732 14 standing stand VBG 42149 2732 15 on on IN 42149 2732 16 the the DT 42149 2732 17 track track NN 42149 2732 18 below below RB 42149 2732 19 . . . 42149 2733 1 The the DT 42149 2733 2 water water NN 42149 2733 3 was be VBD 42149 2733 4 brought bring VBN 42149 2733 5 in in IN 42149 2733 6 pipes pipe NNS 42149 2733 7 from from IN 42149 2733 8 the the DT 42149 2733 9 public public JJ 42149 2733 10 supply supply NN 42149 2733 11 . . . 42149 2734 1 It -PRON- PRP 42149 2734 2 was be VBD 42149 2734 3 measured measure VBN 42149 2734 4 in in IN 42149 2734 5 barrels barrel NNS 42149 2734 6 by by IN 42149 2734 7 a a DT 42149 2734 8 graduated graduate VBN 42149 2734 9 scale scale NN 42149 2734 10 within within IN 42149 2734 11 the the DT 42149 2734 12 barrels barrel NNS 42149 2734 13 . . . 42149 2735 1 The the DT 42149 2735 2 water water NN 42149 2735 3 was be VBD 42149 2735 4 not not RB 42149 2735 5 put put VBN 42149 2735 6 into into IN 42149 2735 7 the the DT 42149 2735 8 mixer mixer NN 42149 2735 9 until until IN 42149 2735 10 the the DT 42149 2735 11 sand sand NN 42149 2735 12 and and CC 42149 2735 13 stone stone NN 42149 2735 14 had have VBD 42149 2735 15 all all DT 42149 2735 16 run run VBN 42149 2735 17 out out IN 42149 2735 18 of of IN 42149 2735 19 the the DT 42149 2735 20 mixer mixer NNP 42149 2735 21 hopper hopper NN 42149 2735 22 . . . 42149 2736 1 The the DT 42149 2736 2 mixture mixture NN 42149 2736 3 was be VBD 42149 2736 4 revolved revolve VBN 42149 2736 5 for for IN 42149 2736 6 about about RB 42149 2736 7 1½ 1½ NNP 42149 2736 8 min min NN 42149 2736 9 . . . 42149 2736 10 , , , 42149 2736 11 or or CC 42149 2736 12 about about IN 42149 2736 13 20 20 CD 42149 2736 14 complete complete JJ 42149 2736 15 revolutions revolution NNS 42149 2736 16 . . . 42149 2737 1 At at IN 42149 2737 2 Weehawken Weehawken NNP 42149 2737 3 Shaft Shaft NNP 42149 2737 4 the the DT 42149 2737 5 mixing mixing NN 42149 2737 6 plant plant NN 42149 2737 7 was be VBD 42149 2737 8 entirely entirely RB 42149 2737 9 rebuilt rebuild VBN 42149 2737 10 . . . 42149 2738 1 Four four CD 42149 2738 2 large large JJ 42149 2738 3 bins bin NNS 42149 2738 4 , , , 42149 2738 5 two two CD 42149 2738 6 for for IN 42149 2738 7 sand sand NN 42149 2738 8 and and CC 42149 2738 9 two two CD 42149 2738 10 for for IN 42149 2738 11 stone stone NN 42149 2738 12 , , , 42149 2738 13 were be VBD 42149 2738 14 built build VBN 42149 2738 15 in in IN 42149 2738 16 the the DT 42149 2738 17 shaft shaft NN 42149 2738 18 . . . 42149 2739 1 Together together RB 42149 2739 2 , , , 42149 2739 3 they -PRON- PRP 42149 2739 4 held hold VBD 42149 2739 5 430 430 CD 42149 2739 6 cu cu NNS 42149 2739 7 . . . 42149 2740 1 yd yd NNP 42149 2740 2 . . . 42149 2741 1 of of IN 42149 2741 2 stone stone NNP 42149 2741 3 and and CC 42149 2741 4 400 400 CD 42149 2741 5 cu cu NNS 42149 2741 6 . . . 42149 2742 1 yd yd NNP 42149 2742 2 . . . 42149 2743 1 of of IN 42149 2743 2 sand sand NN 42149 2743 3 . . . 42149 2744 1 The the DT 42149 2744 2 sand sand NN 42149 2744 3 and and CC 42149 2744 4 stone stone NN 42149 2744 5 were be VBD 42149 2744 6 dumped dump VBN 42149 2744 7 directly directly RB 42149 2744 8 into into IN 42149 2744 9 the the DT 42149 2744 10 bins bin NNS 42149 2744 11 from from IN 42149 2744 12 the the DT 42149 2744 13 cars car NNS 42149 2744 14 on on IN 42149 2744 15 the the DT 42149 2744 16 trestle trestle NN 42149 2744 17 which which WDT 42149 2744 18 ran run VBD 42149 2744 19 from from IN 42149 2744 20 the the DT 42149 2744 21 wharf wharf NN 42149 2744 22 to to IN 42149 2744 23 the the DT 42149 2744 24 shaft shaft NN 42149 2744 25 . . . 42149 2745 1 The the DT 42149 2745 2 materials material NNS 42149 2745 3 were be VBD 42149 2745 4 run run VBN 42149 2745 5 through through IN 42149 2745 6 chutes chute NNS 42149 2745 7 directly directly RB 42149 2745 8 from from IN 42149 2745 9 the the DT 42149 2745 10 bins bin NNS 42149 2745 11 to to IN 42149 2745 12 the the DT 42149 2745 13 hoppers hopper NNS 42149 2745 14 of of IN 42149 2745 15 the the DT 42149 2745 16 mixers mixer NNS 42149 2745 17 , , , 42149 2745 18 where where WRB 42149 2745 19 they -PRON- PRP 42149 2745 20 were be VBD 42149 2745 21 measured measure VBN 42149 2745 22 . . . 42149 2746 1 Two two CD 42149 2746 2 No no UH 42149 2746 3 . . . 42149 2747 1 6 6 CD 42149 2747 2 Ransome ransome NN 42149 2747 3 mixers mixer NNS 42149 2747 4 , , , 42149 2747 5 electrically electrically RB 42149 2747 6 driven drive VBN 42149 2747 7 , , , 42149 2747 8 were be VBD 42149 2747 9 used use VBN 42149 2747 10 here here RB 42149 2747 11 , , , 42149 2747 12 as as IN 42149 2747 13 at at IN 42149 2747 14 New New NNP 42149 2747 15 York York NNP 42149 2747 16 , , , 42149 2747 17 and and CC 42149 2747 18 , , , 42149 2747 19 as as IN 42149 2747 20 there there RB 42149 2747 21 , , , 42149 2747 22 the the DT 42149 2747 23 water water NN 42149 2747 24 was be VBD 42149 2747 25 led lead VBN 42149 2747 26 into into IN 42149 2747 27 measuring measure VBG 42149 2747 28 tanks tank NNS 42149 2747 29 before before IN 42149 2747 30 being be VBG 42149 2747 31 let let VBD 42149 2747 32 into into IN 42149 2747 33 the the DT 42149 2747 34 mixer mixer NN 42149 2747 35 . . . 42149 2748 1 The the DT 42149 2748 2 quantity quantity NN 42149 2748 3 of of IN 42149 2748 4 water water NN 42149 2748 5 used use VBN 42149 2748 6 in in IN 42149 2748 7 the the DT 42149 2748 8 various various JJ 42149 2748 9 parts part NNS 42149 2748 10 of of IN 42149 2748 11 the the DT 42149 2748 12 concrete concrete JJ 42149 2748 13 cross cross NN 42149 2748 14 - - NN 42149 2748 15 section section NN 42149 2748 16 , , , 42149 2748 17 for for IN 42149 2748 18 a a DT 42149 2748 19 4-bag 4-bag NNP 42149 2748 20 batch batch NN 42149 2748 21 consisting consist VBG 42149 2748 22 of of IN 42149 2748 23 1 1 CD 42149 2748 24 bbl bbl NN 42149 2748 25 . . . 42149 2749 1 ( ( -LRB- 42149 2749 2 380 380 CD 42149 2749 3 lb lb RB 42149 2749 4 . . . 42149 2749 5 ) ) -RRB- 42149 2750 1 of of IN 42149 2750 2 cement cement NN 42149 2750 3 , , , 42149 2750 4 8.75 8.75 CD 42149 2750 5 cu cu NNP 42149 2750 6 . . . 42149 2751 1 ft ft NNP 42149 2751 2 . . NNP 42149 2751 3 of of IN 42149 2751 4 sand sand NN 42149 2751 5 , , , 42149 2751 6 and and CC 42149 2751 7 17.5 17.5 CD 42149 2751 8 cu cu NNS 42149 2751 9 . . . 42149 2752 1 ft ft NNP 42149 2752 2 . . NNP 42149 2752 3 of of IN 42149 2752 4 stone stone NNP 42149 2752 5 , , , 42149 2752 6 is be VBZ 42149 2752 7 given give VBN 42149 2752 8 in in IN 42149 2752 9 Table table NN 42149 2752 10 31 31 CD 42149 2752 11 . . . 42149 2753 1 TABLE TABLE NNS 42149 2753 2 31.--QUANTITY 31.--quantity CD 42149 2753 3 OF of IN 42149 2753 4 WATER WATER NNP 42149 2753 5 PER PER NNP 42149 2753 6 4-BAG 4-bag CD 42149 2753 7 BATCH batch NN 42149 2753 8 OF of IN 42149 2753 9 CONCRETE concrete RB 42149 2753 10 , , , 42149 2753 11 IN in IN 42149 2753 12 U.S. U.S. NNP 42149 2753 13 GALLONS GALLONS NNP 42149 2753 14 . . . 42149 2754 1 = = NFP 42149 2754 2 = = NFP 42149 2754 3 = = SYM 42149 2754 4 = = SYM 42149 2754 5 = = SYM 42149 2754 6 = = SYM 42149 2754 7 = = SYM 42149 2754 8 = = SYM 42149 2754 9 = = SYM 42149 2754 10 = = SYM 42149 2754 11 = = SYM 42149 2754 12 = = SYM 42149 2754 13 = = SYM 42149 2754 14 = = SYM 42149 2754 15 = = SYM 42149 2754 16 = = SYM 42149 2754 17 = = SYM 42149 2754 18 = = SYM 42149 2754 19 = = SYM 42149 2754 20 = = SYM 42149 2754 21 = = SYM 42149 2754 22 = = SYM 42149 2754 23 = = SYM 42149 2754 24 = = SYM 42149 2754 25 = = NFP 42149 2754 26 = = SYM 42149 2754 27 + + SYM 42149 2754 28 = = SYM 42149 2754 29 = = SYM 42149 2754 30 = = SYM 42149 2754 31 = = SYM 42149 2754 32 = = SYM 42149 2754 33 = = SYM 42149 2754 34 = = SYM 42149 2754 35 = = SYM 42149 2754 36 = = NFP 42149 2754 37 = = SYM 42149 2754 38 + + SYM 42149 2754 39 = = SYM 42149 2754 40 = = SYM 42149 2754 41 = = SYM 42149 2754 42 = = SYM 42149 2754 43 = = SYM 42149 2754 44 = = SYM 42149 2754 45 = = SYM 42149 2754 46 = = SYM 42149 2754 47 = = NFP 42149 2754 48 = = SYM 42149 2754 49 + + SYM 42149 2754 50 = = SYM 42149 2754 51 = = SYM 42149 2754 52 = = SYM 42149 2754 53 = = SYM 42149 2754 54 = = SYM 42149 2754 55 = = SYM 42149 2754 56 = = SYM 42149 2754 57 = = SYM 42149 2754 58 = = NFP 42149 2754 59 = = NFP 42149 2754 60 Portion portion NN 42149 2754 61 of of IN 42149 2754 62 cross cross NN 42149 2754 63 - - NN 42149 2754 64 section section NN 42149 2754 65 . . . 42149 2755 1 | | NNP 42149 2755 2 Maximum Maximum NNP 42149 2755 3 . . . 42149 2756 1 | | NNP 42149 2756 2 Minimum Minimum NNP 42149 2756 3 . . . 42149 2757 1 | | NNP 42149 2757 2 Average Average NNP 42149 2757 3 . . . 42149 2758 1 --------------------------+----------+----------+---------- --------------------------+----------+----------+---------- : 42149 2758 2 Invert Invert NNP 42149 2758 3 | | NNP 42149 2758 4 40 40 CD 42149 2758 5 | | CD 42149 2758 6 20 20 CD 42149 2758 7 | | CD 42149 2758 8 26 26 CD 42149 2758 9 Duct Duct NNP 42149 2758 10 bench bench NN 42149 2758 11 | | NNP 42149 2758 12 36 36 CD 42149 2758 13 | | CD 42149 2758 14 21 21 CD 42149 2758 15 | | CD 42149 2758 16 27 27 CD 42149 2758 17 Arch Arch NNP 42149 2758 18 ( ( -LRB- 42149 2758 19 excluding exclude VBG 42149 2758 20 key key JJ 42149 2758 21 ) ) -RRB- 42149 2758 22 | | NNP 42149 2758 23 37 37 CD 42149 2758 24 | | CD 42149 2758 25 19 19 CD 42149 2758 26 | | CD 42149 2758 27 25 25 CD 42149 2758 28 Key key NN 42149 2758 29 of of IN 42149 2758 30 arch arch JJ 42149 2758 31 | | CD 42149 2758 32 27 27 CD 42149 2758 33 | | CD 42149 2758 34 15 15 CD 42149 2758 35 | | CD 42149 2758 36 20 20 CD 42149 2758 37 Face face NN 42149 2758 38 of of IN 42149 2758 39 bench bench NN 42149 2758 40 | | NNP 42149 2758 41 31 31 CD 42149 2758 42 | | CD 42149 2758 43 22 22 CD 42149 2758 44 | | CD 42149 2758 45 27 27 CD 42149 2758 46 = = SYM 42149 2758 47 = = SYM 42149 2758 48 = = SYM 42149 2758 49 = = SYM 42149 2758 50 = = SYM 42149 2758 51 = = SYM 42149 2758 52 = = SYM 42149 2758 53 = = SYM 42149 2758 54 = = SYM 42149 2758 55 = = SYM 42149 2758 56 = = SYM 42149 2758 57 = = SYM 42149 2758 58 = = SYM 42149 2758 59 = = SYM 42149 2758 60 = = SYM 42149 2758 61 = = SYM 42149 2758 62 = = SYM 42149 2758 63 = = SYM 42149 2758 64 = = SYM 42149 2758 65 = = SYM 42149 2758 66 = = SYM 42149 2758 67 = = SYM 42149 2758 68 = = SYM 42149 2758 69 = = SYM 42149 2758 70 = = NFP 42149 2758 71 = = SYM 42149 2758 72 + + SYM 42149 2758 73 = = SYM 42149 2758 74 = = SYM 42149 2758 75 = = SYM 42149 2758 76 = = SYM 42149 2758 77 = = SYM 42149 2758 78 = = SYM 42149 2758 79 = = SYM 42149 2758 80 = = SYM 42149 2758 81 = = NFP 42149 2758 82 = = SYM 42149 2758 83 + + SYM 42149 2758 84 = = SYM 42149 2758 85 = = SYM 42149 2758 86 = = SYM 42149 2758 87 = = SYM 42149 2758 88 = = SYM 42149 2758 89 = = SYM 42149 2758 90 = = SYM 42149 2758 91 = = SYM 42149 2758 92 = = NFP 42149 2758 93 = = SYM 42149 2758 94 + + SYM 42149 2758 95 = = SYM 42149 2758 96 = = SYM 42149 2758 97 = = SYM 42149 2758 98 = = SYM 42149 2758 99 = = SYM 42149 2758 100 = = SYM 42149 2758 101 = = SYM 42149 2758 102 = = SYM 42149 2758 103 = = NFP 42149 2758 104 = = NFP 42149 2758 105 The the DT 42149 2758 106 maximum maximum JJ 42149 2758 107 quantities quantity NNS 42149 2758 108 were be VBD 42149 2758 109 used use VBN 42149 2758 110 when when WRB 42149 2758 111 the the DT 42149 2758 112 stone stone NN 42149 2758 113 was be VBD 42149 2758 114 dry dry JJ 42149 2758 115 and and CC 42149 2758 116 contained contain VBN 42149 2758 117 more more JJR 42149 2758 118 than than IN 42149 2758 119 the the DT 42149 2758 120 usual usual JJ 42149 2758 121 proportion proportion NN 42149 2758 122 of of IN 42149 2758 123 fine fine JJ 42149 2758 124 material material NN 42149 2758 125 , , , 42149 2758 126 the the DT 42149 2758 127 minimum minimum JJ 42149 2758 128 quantity quantity NN 42149 2758 129 when when WRB 42149 2758 130 the the DT 42149 2758 131 sand sand NN 42149 2758 132 was be VBD 42149 2758 133 wet wet JJ 42149 2758 134 after after IN 42149 2758 135 rain rain NN 42149 2758 136 . . . 42149 2759 1 The the DT 42149 2759 2 resulting result VBG 42149 2759 3 volumes volume NNS 42149 2759 4 of of IN 42149 2759 5 one one CD 42149 2759 6 batch batch NN 42149 2759 7 , , , 42149 2759 8 for for IN 42149 2759 9 various various JJ 42149 2759 10 kinds kind NNS 42149 2759 11 of of IN 42149 2759 12 stone stone NN 42149 2759 13 , , , 42149 2759 14 are be VBP 42149 2759 15 given give VBN 42149 2759 16 in in IN 42149 2759 17 Table Table NNP 42149 2759 18 32 32 CD 42149 2759 19 . . . 42149 2760 1 TABLE TABLE NNP 42149 2760 2 32.--VOLUME 32.--volume CD 42149 2760 3 OF of IN 42149 2760 4 CONCRETE CONCRETE NNP 42149 2760 5 PER per IN 42149 2760 6 BATCH BATCH NNP 42149 2760 7 , , , 42149 2760 8 WITH with IN 42149 2760 9 VARIOUS various NN 42149 2760 10 KINDS kind NNS 42149 2760 11 OF of IN 42149 2760 12 STONE STONE NNP 42149 2760 13 . . . 42149 2761 1 = = NFP 42149 2761 2 = = NFP 42149 2761 3 = = SYM 42149 2761 4 = = SYM 42149 2761 5 = = SYM 42149 2761 6 = = SYM 42149 2761 7 = = NFP 42149 2761 8 = = SYM 42149 2761 9 + + SYM 42149 2761 10 = = SYM 42149 2761 11 = = SYM 42149 2761 12 = = SYM 42149 2761 13 = = SYM 42149 2761 14 = = SYM 42149 2761 15 = = SYM 42149 2761 16 = = SYM 42149 2761 17 = = SYM 42149 2761 18 = = SYM 42149 2761 19 = = NFP 42149 2761 20 = = SYM 42149 2761 21 + + SYM 42149 2761 22 = = SYM 42149 2761 23 = = SYM 42149 2761 24 = = SYM 42149 2761 25 = = SYM 42149 2761 26 = = SYM 42149 2761 27 = = SYM 42149 2761 28 = = SYM 42149 2761 29 = = SYM 42149 2761 30 = = SYM 42149 2761 31 = = SYM 42149 2761 32 = = SYM 42149 2761 33 = = SYM 42149 2761 34 = = SYM 42149 2761 35 = = SYM 42149 2761 36 = = NFP 42149 2761 37 = = SYM 42149 2761 38 + + SYM 42149 2761 39 = = SYM 42149 2761 40 = = SYM 42149 2761 41 = = SYM 42149 2761 42 = = SYM 42149 2761 43 = = SYM 42149 2761 44 = = SYM 42149 2761 45 = = SYM 42149 2761 46 = = SYM 42149 2761 47 = = SYM 42149 2761 48 = = NFP 42149 2761 49 = = SYM 42149 2761 50 + + SYM 42149 2761 51 = = SYM 42149 2761 52 = = SYM 42149 2761 53 = = SYM 42149 2761 54 = = SYM 42149 2761 55 = = SYM 42149 2761 56 = = SYM 42149 2761 57 = = SYM 42149 2761 58 = = SYM 42149 2761 59 = = SYM 42149 2761 60 = = SYM 42149 2761 61 = = SYM 42149 2761 62 = = SYM 42149 2761 63 = = SYM 42149 2761 64 = = SYM 42149 2761 65 = = SYM 42149 2761 66 = = SYM 42149 2761 67 = = SYM 42149 2761 68 =| =| ADD 42149 2761 69 | | CD 42149 2761 70 | | NNP 42149 2761 71 Resulting Resulting NNP 42149 2761 72 | | CD 42149 2761 73 | | CD 42149 2761 74 | | CD 42149 2761 75 DESCRIPTION description NN 42149 2761 76 OF of IN 42149 2761 77 STONE STONE NNP 42149 2761 78 . . . 42149 2762 1 |volume |volume CD 42149 2762 2 per per IN 42149 2762 3 | | NNP 42149 2762 4 | | NNP 42149 2762 5 Mixture.|-----------+----------------| mixture.|-----------+----------------| JJ 42149 2762 6 barrel barrel NN 42149 2762 7 of of IN 42149 2762 8 | | NNP 42149 2762 9 Remarks Remarks NNPS 42149 2762 10 . . . 42149 2763 1 | | NNP 42149 2763 2 | | CD 42149 2763 3 | | CD 42149 2763 4 |cement |cement CD 42149 2763 5 , , , 42149 2763 6 in in IN 42149 2763 7 | | NNP 42149 2763 8 | | NNP 42149 2763 9 | | NNP 42149 2763 10 Passed pass VBN 42149 2763 11 | | NNP 42149 2763 12 Retained retain VBN 42149 2763 13 on on IN 42149 2763 14 | | CD 42149 2763 15 cubic cubic JJ 42149 2763 16 | | CD 42149 2763 17 | | CD 42149 2763 18 | | CD 42149 2763 19 screen screen NN 42149 2763 20 . . . 42149 2764 1 | | NNS 42149 2764 2 screen screen NN 42149 2764 3 . . . 42149 2765 1 | | CD 42149 2765 2 yards yard NNS 42149 2765 3 . . . 42149 2766 1 | | CD 42149 2766 2 | | CD 42149 2766 3 --------+-----------+----------------+-----------+------------------| --------+-----------+----------------+-----------+------------------| NN 42149 2766 4 1:2½:5 1:2â½:5 CD 42149 2766 5 | | CD 42149 2766 6 1½-in 1â½-in CD 42149 2766 7 . . . 42149 2767 1 | | NNP 42149 2767 2 3/8-in 3/8-in NNP 42149 2767 3 . . . 42149 2768 1 | | NNP 42149 2768 2 0.815 0.815 CD 42149 2768 3 | | NNS 42149 2768 4 Measured measure VBN 42149 2768 5 in in IN 42149 2768 6 air air NN 42149 2768 7 | | CD 42149 2768 8 1:2½:5 1:2â½:5 CD 42149 2768 9 | | CD 42149 2768 10 2½-in 2â½-in CD 42149 2768 11 . . . 42149 2769 1 |Run |Run NNS 42149 2769 2 of of IN 42149 2769 3 crusher crusher NN 42149 2769 4 . . . 42149 2770 1 | | CD 42149 2770 2 0.827 0.827 CD 42149 2770 3 | | NNP 42149 2770 4 " " '' 42149 2770 5 " " '' 42149 2770 6 " " '' 42149 2770 7 | | CD 42149 2770 8 1:2½:5 1:2â½:5 CD 42149 2770 9 | | CD 42149 2770 10 -- -- : 42149 2770 11 |General |general NN 42149 2770 12 average.| average.| NNP 42149 2770 13 0.808[D]|Measured 0.808[d]|measured CD 42149 2770 14 from from IN 42149 2770 15 plan| plan| NNP 42149 2770 16 1:2½:5 1:2â½:5 CD 42149 2770 17 | | CD 42149 2770 18 2-in 2-in CD 42149 2770 19 . . . 42149 2771 1 | | CD 42149 2771 2 1½-in 1â½-in CD 42149 2771 3 . . . 42149 2772 1 | | NNP 42149 2772 2 0.768[E]| 0.768[E]| NNP 42149 2772 3 " " '' 42149 2772 4 " " '' 42149 2772 5 " " '' 42149 2772 6 | | NNP 42149 2772 7 = = SYM 42149 2772 8 = = SYM 42149 2772 9 = = SYM 42149 2772 10 = = SYM 42149 2772 11 = = SYM 42149 2772 12 = = SYM 42149 2772 13 = = NFP 42149 2772 14 = = SYM 42149 2772 15 + + SYM 42149 2772 16 = = SYM 42149 2772 17 = = SYM 42149 2772 18 = = SYM 42149 2772 19 = = SYM 42149 2772 20 = = SYM 42149 2772 21 = = SYM 42149 2772 22 = = SYM 42149 2772 23 = = SYM 42149 2772 24 = = SYM 42149 2772 25 = = NFP 42149 2772 26 = = SYM 42149 2772 27 + + SYM 42149 2772 28 = = SYM 42149 2772 29 = = SYM 42149 2772 30 = = SYM 42149 2772 31 = = SYM 42149 2772 32 = = SYM 42149 2772 33 = = SYM 42149 2772 34 = = SYM 42149 2772 35 = = SYM 42149 2772 36 = = SYM 42149 2772 37 = = SYM 42149 2772 38 = = SYM 42149 2772 39 = = SYM 42149 2772 40 = = SYM 42149 2772 41 = = SYM 42149 2772 42 = = NFP 42149 2772 43 = = SYM 42149 2772 44 + + SYM 42149 2772 45 = = SYM 42149 2772 46 = = SYM 42149 2772 47 = = SYM 42149 2772 48 = = SYM 42149 2772 49 = = SYM 42149 2772 50 = = SYM 42149 2772 51 = = SYM 42149 2772 52 = = SYM 42149 2772 53 = = SYM 42149 2772 54 = = NFP 42149 2772 55 = = SYM 42149 2772 56 + + SYM 42149 2772 57 = = SYM 42149 2772 58 = = SYM 42149 2772 59 = = SYM 42149 2772 60 = = SYM 42149 2772 61 = = SYM 42149 2772 62 = = SYM 42149 2772 63 = = SYM 42149 2772 64 = = SYM 42149 2772 65 = = SYM 42149 2772 66 = = SYM 42149 2772 67 = = SYM 42149 2772 68 = = SYM 42149 2772 69 = = SYM 42149 2772 70 = = SYM 42149 2772 71 = = SYM 42149 2772 72 = = SYM 42149 2772 73 = = NFP 42149 2772 74 =| =| ADD 42149 2772 75 [ [ -LRB- 42149 2772 76 D d NN 42149 2772 77 ] ] -RRB- 42149 2772 78 Average average NN 42149 2772 79 for for IN 42149 2772 80 whole whole NN 42149 2772 81 of of IN 42149 2772 82 River River NNP 42149 2772 83 Tunnel Tunnel NNP 42149 2772 84 section section NN 42149 2772 85 . . . 42149 2773 1 [ [ -LRB- 42149 2773 2 E e NN 42149 2773 3 ] ] -RRB- 42149 2773 4 Average average JJ 42149 2773 5 from from IN 42149 2773 6 7,400 7,400 CD 42149 2773 7 cu cu NNS 42149 2773 8 . . . 42149 2774 1 yd yd NNP 42149 2774 2 . . . 42149 2775 1 in in IN 42149 2775 2 Land Land NNP 42149 2775 3 Tunnel Tunnel NNP 42149 2775 4 section section NN 42149 2775 5 . . . 42149 2776 1 The the DT 42149 2776 2 sand sand NN 42149 2776 3 used use VBD 42149 2776 4 was be VBD 42149 2776 5 practically practically RB 42149 2776 6 the the DT 42149 2776 7 same same JJ 42149 2776 8 for for IN 42149 2776 9 the the DT 42149 2776 10 whole whole NN 42149 2776 11 of of IN 42149 2776 12 the the DT 42149 2776 13 river river NN 42149 2776 14 tunnel tunnel NN 42149 2776 15 section section NN 42149 2776 16 , , , 42149 2776 17 and and CC 42149 2776 18 was be VBD 42149 2776 19 supposed suppose VBN 42149 2776 20 to to TO 42149 2776 21 be be VB 42149 2776 22 equal equal JJ 42149 2776 23 to to IN 42149 2776 24 " " `` 42149 2776 25 Cow Cow NNP 42149 2776 26 Bay Bay NNP 42149 2776 27 " " '' 42149 2776 28 sand sand NN 42149 2776 29 . . . 42149 2777 1 The the DT 42149 2777 2 result result NN 42149 2777 3 of of IN 42149 2777 4 the the DT 42149 2777 5 mechanical mechanical JJ 42149 2777 6 analysis analysis NN 42149 2777 7 of of IN 42149 2777 8 the the DT 42149 2777 9 sand sand NN 42149 2777 10 is be VBZ 42149 2777 11 shown show VBN 42149 2777 12 on on IN 42149 2777 13 Plate Plate NNP 42149 2777 14 XLVI XLVI NNP 42149 2777 15 . . . 42149 2778 1 The the DT 42149 2778 2 stone stone NN 42149 2778 3 was be VBD 42149 2778 4 all all DT 42149 2778 5 trap trap NN 42149 2778 6 rock rock NN 42149 2778 7 . . . 42149 2779 1 For for IN 42149 2779 2 the the DT 42149 2779 3 early early JJ 42149 2779 4 part part NN 42149 2779 5 of of IN 42149 2779 6 the the DT 42149 2779 7 work work NN 42149 2779 8 it -PRON- PRP 42149 2779 9 consisted consist VBD 42149 2779 10 of of IN 42149 2779 11 stone stone NN 42149 2779 12 which which WDT 42149 2779 13 would would MD 42149 2779 14 pass pass VB 42149 2779 15 a a DT 42149 2779 16 2-in 2-in NN 42149 2779 17 . . . 42149 2780 1 ring ring VB 42149 2780 2 and and CC 42149 2780 3 be be VB 42149 2780 4 retained retain VBN 42149 2780 5 on on IN 42149 2780 6 a a DT 42149 2780 7 1½-in 1â½-in NN 42149 2780 8 . . . 42149 2781 1 ring ring NN 42149 2781 2 , , , 42149 2781 3 in in IN 42149 2781 4 fact fact NN 42149 2781 5 , , , 42149 2781 6 the the DT 42149 2781 7 same same JJ 42149 2781 8 as as IN 42149 2781 9 used use VBN 42149 2781 10 for for IN 42149 2781 11 the the DT 42149 2781 12 land land NN 42149 2781 13 tunnels tunnel NNS 42149 2781 14 . . . 42149 2782 1 This this DT 42149 2782 2 was be VBD 42149 2782 3 found find VBN 42149 2782 4 to to TO 42149 2782 5 be be VB 42149 2782 6 too too RB 42149 2782 7 coarse coarse JJ 42149 2782 8 , , , 42149 2782 9 and and CC 42149 2782 10 for for IN 42149 2782 11 a a DT 42149 2782 12 time time NN 42149 2782 13 it -PRON- PRP 42149 2782 14 was be VBD 42149 2782 15 mixed mix VBN 42149 2782 16 with with IN 42149 2782 17 an an DT 42149 2782 18 equal equal JJ 42149 2782 19 quantity quantity NN 42149 2782 20 of of IN 42149 2782 21 fine fine JJ 42149 2782 22 gravel gravel NN 42149 2782 23 or or CC 42149 2782 24 fine fine JJ 42149 2782 25 crushed crush VBN 42149 2782 26 stone stone NN 42149 2782 27 . . . 42149 2783 1 As as RB 42149 2783 2 soon soon RB 42149 2783 3 as as IN 42149 2783 4 it -PRON- PRP 42149 2783 5 could could MD 42149 2783 6 be be VB 42149 2783 7 arranged arrange VBN 42149 2783 8 , , , 42149 2783 9 run run VBN 42149 2783 10 - - HYPH 42149 2783 11 of of IN 42149 2783 12 - - HYPH 42149 2783 13 crusher crusher NN 42149 2783 14 stone stone NN 42149 2783 15 was be VBD 42149 2783 16 used use VBN 42149 2783 17 , , , 42149 2783 18 everything everything NN 42149 2783 19 larger large JJR 42149 2783 20 than than IN 42149 2783 21 2½ 2½ NNP 42149 2783 22 in in IN 42149 2783 23 . . . 42149 2784 1 being be VBG 42149 2784 2 excluded exclude VBN 42149 2784 3 . . . 42149 2785 1 About about RB 42149 2785 2 three three CD 42149 2785 3 - - HYPH 42149 2785 4 quarters quarter NNS 42149 2785 5 of of IN 42149 2785 6 the the DT 42149 2785 7 river river NN 42149 2785 8 tunnel tunnel NN 42149 2785 9 concrete concrete NN 42149 2785 10 was be VBD 42149 2785 11 put put VBN 42149 2785 12 in in RP 42149 2785 13 with with IN 42149 2785 14 run run NN 42149 2785 15 - - HYPH 42149 2785 16 of of IN 42149 2785 17 - - HYPH 42149 2785 18 crusher crusher NN 42149 2785 19 stone stone NN 42149 2785 20 . . . 42149 2786 1 The the DT 42149 2786 2 force force NN 42149 2786 3 was be VBD 42149 2786 4 : : : 42149 2786 5 _ _ NNP 42149 2786 6 At at IN 42149 2786 7 Manhattan Manhattan NNP 42149 2786 8 . . . 42149 2786 9 _ _ NNP 42149 2786 10 1 1 CD 42149 2786 11 Foreman Foreman NNP 42149 2786 12 @ @ CC 42149 2786 13 $ $ $ 42149 2786 14 3.00 3.00 CD 42149 2786 15 per per IN 42149 2786 16 shift shift NN 42149 2786 17 4 4 CD 42149 2786 18 Men Men NNPS 42149 2786 19 on on IN 42149 2786 20 sand sand NN 42149 2786 21 and and CC 42149 2786 22 stone stone NN 42149 2786 23 cars car NNS 42149 2786 24 " " `` 42149 2786 25 1.75 1.75 CD 42149 2786 26 " " '' 42149 2786 27 " " `` 42149 2786 28 4 4 CD 42149 2786 29 Men Men NNPS 42149 2786 30 handling handling NN 42149 2786 31 cement cement NN 42149 2786 32 " " `` 42149 2786 33 1.75 1.75 CD 42149 2786 34 " " '' 42149 2786 35 " " '' 42149 2786 36 2 2 CD 42149 2786 37 Men Men NNPS 42149 2786 38 dumping dumping NN 42149 2786 39 mixers mixer NNS 42149 2786 40 " " `` 42149 2786 41 1.75 1.75 CD 42149 2786 42 " " '' 42149 2786 43 " " '' 42149 2786 44 _ _ NNP 42149 2786 45 At at IN 42149 2786 46 Weehawken Weehawken NNP 42149 2786 47 . . . 42149 2786 48 _ _ NNP 42149 2786 49 1 1 CD 42149 2786 50 Foreman Foreman NNP 42149 2786 51 @ @ CC 42149 2786 52 $ $ $ 42149 2786 53 3.00 3.00 CD 42149 2786 54 per per IN 42149 2786 55 shift shift NN 42149 2786 56 2 2 CD 42149 2786 57 Men man NNS 42149 2786 58 hauling haul VBG 42149 2786 59 cement cement NN 42149 2786 60 " " `` 42149 2786 61 1.75 1.75 CD 42149 2786 62 " " '' 42149 2786 63 " " '' 42149 2786 64 2 2 CD 42149 2786 65 Men Men NNPS 42149 2786 66 dumping dumping NN 42149 2786 67 mixers mixer NNS 42149 2786 68 " " `` 42149 2786 69 1.75 1.75 CD 42149 2786 70 " " '' 42149 2786 71 " " `` 42149 2786 72 The the DT 42149 2786 73 average average JJ 42149 2786 74 quantity quantity NN 42149 2786 75 of of IN 42149 2786 76 concrete concrete NN 42149 2786 77 mixed mix VBN 42149 2786 78 per per IN 42149 2786 79 10-hour 10-hour CD 42149 2786 80 shift shift NN 42149 2786 81 was be VBD 42149 2786 82 about about RB 42149 2786 83 117 117 CD 42149 2786 84 batches batch NNS 42149 2786 85 , , , 42149 2786 86 or or CC 42149 2786 87 about about RB 42149 2786 88 90 90 CD 42149 2786 89 cu cu NNS 42149 2786 90 . . . 42149 2787 1 yd yd NNP 42149 2787 2 . . . 42149 2788 1 The the DT 42149 2788 2 maximum maximum JJ 42149 2788 3 output output NN 42149 2788 4 of of IN 42149 2788 5 one one CD 42149 2788 6 of of IN 42149 2788 7 the the DT 42149 2788 8 mixers mixer NNS 42149 2788 9 was be VBD 42149 2788 10 about about RB 42149 2788 11 168 168 CD 42149 2788 12 batches batch NNS 42149 2788 13 , , , 42149 2788 14 or or CC 42149 2788 15 129 129 CD 42149 2788 16 cu cu NNS 42149 2788 17 . . . 42149 2789 1 yd yd NNP 42149 2789 2 . . . 42149 2790 1 per per IN 42149 2790 2 10-hour 10-hour CD 42149 2790 3 shift shift NN 42149 2790 4 . . . 42149 2791 1 Transportation transportation NN 42149 2791 2 . . . 42149 2792 1 _ _ NNP 42149 2792 2 Surface Surface NNP 42149 2792 3 Transportation._--At transportation._--at NN 42149 2792 4 Manhattan Manhattan NNP 42149 2792 5 the the DT 42149 2792 6 stone stone NN 42149 2792 7 and and CC 42149 2792 8 sand sand NN 42149 2792 9 were be VBD 42149 2792 10 received receive VBN 42149 2792 11 in in IN 42149 2792 12 scows scow NNS 42149 2792 13 at at IN 42149 2792 14 the the DT 42149 2792 15 wharf wharf NN 42149 2792 16 on on IN 42149 2792 17 the the DT 42149 2792 18 river river NN 42149 2792 19 front front NN 42149 2792 20 . . . 42149 2793 1 For for IN 42149 2793 2 the the DT 42149 2793 3 first first JJ 42149 2793 4 part part NN 42149 2793 5 of of IN 42149 2793 6 the the DT 42149 2793 7 work work NN 42149 2793 8 , , , 42149 2793 9 the the DT 42149 2793 10 wharf wharf NN 42149 2793 11 at at IN 42149 2793 12 32d 32d NNPS 42149 2793 13 Street Street NNP 42149 2793 14 and and CC 42149 2793 15 North North NNP 42149 2793 16 River River NNP 42149 2793 17 was be VBD 42149 2793 18 used use VBN 42149 2793 19 , , , 42149 2793 20 and and CC 42149 2793 21 while while IN 42149 2793 22 that that DT 42149 2793 23 was be VBD 42149 2793 24 in in IN 42149 2793 25 use use NN 42149 2793 26 the the DT 42149 2793 27 material material NN 42149 2793 28 was be VBD 42149 2793 29 unloaded unload VBN 42149 2793 30 from from IN 42149 2793 31 the the DT 42149 2793 32 scows scow NNS 42149 2793 33 into into IN 42149 2793 34 scale scale NN 42149 2793 35 - - HYPH 42149 2793 36 boxes box NNS 42149 2793 37 by by IN 42149 2793 38 a a DT 42149 2793 39 grab grab NN 42149 2793 40 - - HYPH 42149 2793 41 bucket bucket NN 42149 2793 42 running running NN 42149 2793 43 on on IN 42149 2793 44 an an DT 42149 2793 45 overhead overhead JJ 42149 2793 46 cable cable NN 42149 2793 47 , , , 42149 2793 48 and and CC 42149 2793 49 then then RB 42149 2793 50 teamed team VBD 42149 2793 51 to to IN 42149 2793 52 the the DT 42149 2793 53 shaft shaft NN 42149 2793 54 . . . 42149 2794 1 For for IN 42149 2794 2 the the DT 42149 2794 3 latter latter JJ 42149 2794 4 part part NN 42149 2794 5 of of IN 42149 2794 6 the the DT 42149 2794 7 work work NN 42149 2794 8 , , , 42149 2794 9 the the DT 42149 2794 10 wharf wharf NN 42149 2794 11 used use VBN 42149 2794 12 was be VBD 42149 2794 13 at at IN 42149 2794 14 38th 38th NNP 42149 2794 15 Street Street NNP 42149 2794 16 and and CC 42149 2794 17 North North NNP 42149 2794 18 River River NNP 42149 2794 19 , , , 42149 2794 20 where where WRB 42149 2794 21 facilities facility NNS 42149 2794 22 for for IN 42149 2794 23 unloading unloading NN 42149 2794 24 were be VBD 42149 2794 25 given give VBN 42149 2794 26 to to IN 42149 2794 27 the the DT 42149 2794 28 contractor contractor NN 42149 2794 29 by by IN 42149 2794 30 the the DT 42149 2794 31 Pennsylvania Pennsylvania NNP 42149 2794 32 Railroad Railroad NNP 42149 2794 33 Company Company NNP 42149 2794 34 which which WDT 42149 2794 35 was be VBD 42149 2794 36 the the DT 42149 2794 37 permanent permanent JJ 42149 2794 38 lessee lessee NN 42149 2794 39 of of IN 42149 2794 40 the the DT 42149 2794 41 piers pier NNS 42149 2794 42 . . . 42149 2795 1 The the DT 42149 2795 2 material material NN 42149 2795 3 was be VBD 42149 2795 4 unloaded unload VBN 42149 2795 5 into into IN 42149 2795 6 scale scale NN 42149 2795 7 - - HYPH 42149 2795 8 boxes box NNS 42149 2795 9 by by IN 42149 2795 10 a a DT 42149 2795 11 grab grab NN 42149 2795 12 - - HYPH 42149 2795 13 bucket bucket NN 42149 2795 14 operated operate VBN 42149 2795 15 by by IN 42149 2795 16 a a DT 42149 2795 17 derrick derrick NN 42149 2795 18 , , , 42149 2795 19 and and CC 42149 2795 20 teamed team VBD 42149 2795 21 to to IN 42149 2795 22 the the DT 42149 2795 23 shaft shaft NN 42149 2795 24 . . . 42149 2796 1 When when WRB 42149 2796 2 the the DT 42149 2796 3 scale scale NN 42149 2796 4 - - HYPH 42149 2796 5 boxes box NNS 42149 2796 6 arrived arrive VBD 42149 2796 7 at at IN 42149 2796 8 the the DT 42149 2796 9 shaft shaft NN 42149 2796 10 they -PRON- PRP 42149 2796 11 were be VBD 42149 2796 12 lifted lift VBN 42149 2796 13 from from IN 42149 2796 14 the the DT 42149 2796 15 trucks truck NNS 42149 2796 16 by by IN 42149 2796 17 derricks derrick NNS 42149 2796 18 and and CC 42149 2796 19 dumped dump VBN 42149 2796 20 into into IN 42149 2796 21 the the DT 42149 2796 22 bins bin NNS 42149 2796 23 . . . 42149 2797 1 At at IN 42149 2797 2 Weehawken Weehawken NNP 42149 2797 3 all all PDT 42149 2797 4 the the DT 42149 2797 5 stone stone NN 42149 2797 6 and and CC 42149 2797 7 sand sand NN 42149 2797 8 , , , 42149 2797 9 with with IN 42149 2797 10 the the DT 42149 2797 11 exception exception NN 42149 2797 12 of of IN 42149 2797 13 the the DT 42149 2797 14 stone stone NN 42149 2797 15 crushed crush VBN 42149 2797 16 on on IN 42149 2797 17 the the DT 42149 2797 18 work work NN 42149 2797 19 , , , 42149 2797 20 was be VBD 42149 2797 21 received receive VBN 42149 2797 22 by by IN 42149 2797 23 water water NN 42149 2797 24 at at IN 42149 2797 25 the the DT 42149 2797 26 North North NNP 42149 2797 27 slip slip NN 42149 2797 28 . . . 42149 2798 1 Here here RB 42149 2798 2 it -PRON- PRP 42149 2798 3 was be VBD 42149 2798 4 unloaded unload VBN 42149 2798 5 by by IN 42149 2798 6 a a DT 42149 2798 7 2-cu 2-cu CD 42149 2798 8 . . . 42149 2799 1 yd yd NNP 42149 2799 2 . . . 42149 2800 1 grab grab NN 42149 2800 2 - - HYPH 42149 2800 3 bucket bucket NN 42149 2800 4 and and CC 42149 2800 5 dumped dump VBN 42149 2800 6 into into IN 42149 2800 7 3-cu 3-cu NN 42149 2800 8 . . . 42149 2801 1 yd yd NNP 42149 2801 2 . . . 42149 2802 1 side side NN 42149 2802 2 - - HYPH 42149 2802 3 tipping tip VBG 42149 2802 4 cars car NNS 42149 2802 5 , , , 42149 2802 6 which which WDT 42149 2802 7 were be VBD 42149 2802 8 hauled haul VBN 42149 2802 9 by by IN 42149 2802 10 a a DT 42149 2802 11 small small JJ 42149 2802 12 steam steam NN 42149 2802 13 locomotive locomotive JJ 42149 2802 14 over over IN 42149 2802 15 the the DT 42149 2802 16 trestle trestle NN 42149 2802 17 to to IN 42149 2802 18 the the DT 42149 2802 19 shaft shaft NN 42149 2802 20 , , , 42149 2802 21 where where WRB 42149 2802 22 they -PRON- PRP 42149 2802 23 were be VBD 42149 2802 24 dumped dump VBN 42149 2802 25 directly directly RB 42149 2802 26 into into IN 42149 2802 27 the the DT 42149 2802 28 bins bin NNS 42149 2802 29 . . . 42149 2803 1 Before before IN 42149 2803 2 beginning begin VBG 42149 2803 3 the the DT 42149 2803 4 concrete concrete JJ 42149 2803 5 lining lining NN 42149 2803 6 , , , 42149 2803 7 the the DT 42149 2803 8 2-ft 2-ft NNP 42149 2803 9 . . . 42149 2803 10 gauge gauge NN 42149 2803 11 railway railway NNP 42149 2803 12 , , , 42149 2803 13 which which WDT 42149 2803 14 had have VBD 42149 2803 15 been be VBN 42149 2803 16 used use VBN 42149 2803 17 for for IN 42149 2803 18 the the DT 42149 2803 19 surface surface NN 42149 2803 20 transportation transportation NN 42149 2803 21 during during IN 42149 2803 22 the the DT 42149 2803 23 driving driving NN 42149 2803 24 of of IN 42149 2803 25 the the DT 42149 2803 26 iron iron NN 42149 2803 27 - - HYPH 42149 2803 28 lined line VBN 42149 2803 29 tunnels tunnel NNS 42149 2803 30 , , , 42149 2803 31 was be VBD 42149 2803 32 taken take VBN 42149 2803 33 up up RP 42149 2803 34 and and CC 42149 2803 35 replaced replace VBN 42149 2803 36 by by IN 42149 2803 37 a a DT 42149 2803 38 3-ft 3-ft NN 42149 2803 39 . . . 42149 2803 40 gauge gauge NN 42149 2803 41 track track NN 42149 2803 42 consisting consist VBG 42149 2803 43 largely largely RB 42149 2803 44 of of IN 42149 2803 45 30-lb 30-lb NNP 42149 2803 46 . . . 42149 2804 1 rails rail NNS 42149 2804 2 . . . 42149 2805 1 The the DT 42149 2805 2 cars car NNS 42149 2805 3 were be VBD 42149 2805 4 3-cu 3-cu CD 42149 2805 5 . . . 42149 2806 1 yd yd NNP 42149 2806 2 . . . 42149 2807 1 side side NN 42149 2807 2 - - HYPH 42149 2807 3 dumping dumping NN 42149 2807 4 , , , 42149 2807 5 with with IN 42149 2807 6 automatic automatic JJ 42149 2807 7 swinging swinging NN 42149 2807 8 sides side NNS 42149 2807 9 . . . 42149 2808 1 Two two CD 42149 2808 2 steam steam NN 42149 2808 3 locomotives locomotive NNS 42149 2808 4 which which WDT 42149 2808 5 were be VBD 42149 2808 6 being be VBG 42149 2808 7 stored store VBN 42149 2808 8 at at IN 42149 2808 9 Weehawken Weehawken NNP 42149 2808 10 ( ( -LRB- 42149 2808 11 part part NN 42149 2808 12 of of IN 42149 2808 13 the the DT 42149 2808 14 plant plant NN 42149 2808 15 from from IN 42149 2808 16 another another DT 42149 2808 17 contract contract NN 42149 2808 18 ) ) -RRB- 42149 2808 19 , , , 42149 2808 20 were be VBD 42149 2808 21 used use VBN 42149 2808 22 for for IN 42149 2808 23 hauling haul VBG 42149 2808 24 the the DT 42149 2808 25 cars car NNS 42149 2808 26 in in IN 42149 2808 27 place place NN 42149 2808 28 of of IN 42149 2808 29 the the DT 42149 2808 30 electric electric JJ 42149 2808 31 ones one NNS 42149 2808 32 used use VBN 42149 2808 33 with with IN 42149 2808 34 the the DT 42149 2808 35 2-ft 2-ft NNP 42149 2808 36 . . . 42149 2808 37 gauge gauge NN 42149 2808 38 railway railway NNP 42149 2808 39 . . . 42149 2809 1 _ _ NNP 42149 2809 2 Tunnel Tunnel NNP 42149 2809 3 Transport._--The Transport._--The NNP 42149 2809 4 track track NN 42149 2809 5 used use VBN 42149 2809 6 in in IN 42149 2809 7 the the DT 42149 2809 8 tunnel tunnel NN 42149 2809 9 was be VBD 42149 2809 10 of of IN 42149 2809 11 2-ft 2-ft CD 42149 2809 12 . . . 42149 2809 13 gauge gauge NN 42149 2809 14 , , , 42149 2809 15 laid lay VBN 42149 2809 16 with with IN 42149 2809 17 the the DT 42149 2809 18 20-lb 20-lb CD 42149 2809 19 . . . 42149 2810 1 rails rail NNS 42149 2810 2 previously previously RB 42149 2810 3 used use VBN 42149 2810 4 in in IN 42149 2810 5 driving drive VBG 42149 2810 6 the the DT 42149 2810 7 iron iron NN 42149 2810 8 - - HYPH 42149 2810 9 lined line VBN 42149 2810 10 tunnels tunnel NNS 42149 2810 11 . . . 42149 2811 1 The the DT 42149 2811 2 mining mining NN 42149 2811 3 cars car NNS 42149 2811 4 ( ( -LRB- 42149 2811 5 previously previously RB 42149 2811 6 mentioned mention VBN 42149 2811 7 in in IN 42149 2811 8 describing describe VBG 42149 2811 9 the the DT 42149 2811 10 driving driving NN 42149 2811 11 of of IN 42149 2811 12 the the DT 42149 2811 13 iron iron NN 42149 2811 14 - - HYPH 42149 2811 15 lined line VBN 42149 2811 16 tunnels tunnel NNS 42149 2811 17 ) ) -RRB- 42149 2811 18 were be VBD 42149 2811 19 used use VBN 42149 2811 20 for for IN 42149 2811 21 transporting transport VBG 42149 2811 22 the the DT 42149 2811 23 invert invert JJ 42149 2811 24 concrete concrete NN 42149 2811 25 , , , 42149 2811 26 although although IN 42149 2811 27 , , , 42149 2811 28 for for IN 42149 2811 29 most most JJS 42149 2811 30 of of IN 42149 2811 31 the the DT 42149 2811 32 work work NN 42149 2811 33 , , , 42149 2811 34 dumping dump VBG 42149 2811 35 buckets bucket NNS 42149 2811 36 carried carry VBN 42149 2811 37 on on IN 42149 2811 38 flat flat JJ 42149 2811 39 cars car NNS 42149 2811 40 were be VBD 42149 2811 41 used use VBN 42149 2811 42 . . . 42149 2812 1 Several several JJ 42149 2812 2 haulage haulage NN 42149 2812 3 systems system NNS 42149 2812 4 were be VBD 42149 2812 5 considered consider VBN 42149 2812 6 for for IN 42149 2812 7 this this DT 42149 2812 8 work work NN 42149 2812 9 , , , 42149 2812 10 but but CC 42149 2812 11 not not RB 42149 2812 12 one one CD 42149 2812 13 of of IN 42149 2812 14 them -PRON- PRP 42149 2812 15 was be VBD 42149 2812 16 thought think VBN 42149 2812 17 to to TO 42149 2812 18 be be VB 42149 2812 19 flexible flexible JJ 42149 2812 20 enough enough RB 42149 2812 21 to to TO 42149 2812 22 be be VB 42149 2812 23 used use VBN 42149 2812 24 with with IN 42149 2812 25 the the DT 42149 2812 26 constantly constantly RB 42149 2812 27 changing change VBG 42149 2812 28 conditions condition NNS 42149 2812 29 , , , 42149 2812 30 and and CC 42149 2812 31 it -PRON- PRP 42149 2812 32 was be VBD 42149 2812 33 eventually eventually RB 42149 2812 34 decided decide VBN 42149 2812 35 to to TO 42149 2812 36 move move VB 42149 2812 37 all all PDT 42149 2812 38 the the DT 42149 2812 39 cars car NNS 42149 2812 40 by by IN 42149 2812 41 hand hand NN 42149 2812 42 , , , 42149 2812 43 because because IN 42149 2812 44 , , , 42149 2812 45 practically practically RB 42149 2812 46 all all PDT 42149 2812 47 the the DT 42149 2812 48 work work NN 42149 2812 49 being be VBG 42149 2812 50 down down RB 42149 2812 51 grade grade NN 42149 2812 52 , , , 42149 2812 53 the the DT 42149 2812 54 full full JJ 42149 2812 55 cars car NNS 42149 2812 56 could could MD 42149 2812 57 be be VB 42149 2812 58 run run VBN 42149 2812 59 down down RP 42149 2812 60 by by IN 42149 2812 61 gravity gravity NN 42149 2812 62 and and CC 42149 2812 63 the the DT 42149 2812 64 empty empty JJ 42149 2812 65 ones one NNS 42149 2812 66 pushed push VBN 42149 2812 67 back back RB 42149 2812 68 by by IN 42149 2812 69 hand hand NN 42149 2812 70 . . . 42149 2813 1 Two two CD 42149 2813 2 men man NNS 42149 2813 3 were be VBD 42149 2813 4 allotted allot VBN 42149 2813 5 to to IN 42149 2813 6 each each DT 42149 2813 7 car car NN 42149 2813 8 , , , 42149 2813 9 and and CC 42149 2813 10 were be VBD 42149 2813 11 able able JJ 42149 2813 12 to to TO 42149 2813 13 keep keep VB 42149 2813 14 the the DT 42149 2813 15 traffic traffic NN 42149 2813 16 moving move VBG 42149 2813 17 in in IN 42149 2813 18 a a DT 42149 2813 19 manner manner NN 42149 2813 20 that that WDT 42149 2813 21 would would MD 42149 2813 22 have have VB 42149 2813 23 been be VBN 42149 2813 24 perhaps perhaps RB 42149 2813 25 impossible impossible JJ 42149 2813 26 with with IN 42149 2813 27 any any DT 42149 2813 28 system system NN 42149 2813 29 of of IN 42149 2813 30 mechanical mechanical JJ 42149 2813 31 haulage haulage NN 42149 2813 32 . . . 42149 2814 1 This this DT 42149 2814 2 system system NN 42149 2814 3 was be VBD 42149 2814 4 apparently apparently RB 42149 2814 5 justified justify VBN 42149 2814 6 by by IN 42149 2814 7 the the DT 42149 2814 8 results result NNS 42149 2814 9 , , , 42149 2814 10 for for IN 42149 2814 11 the the DT 42149 2814 12 whole whole JJ 42149 2814 13 cost cost NN 42149 2814 14 of of IN 42149 2814 15 the the DT 42149 2814 16 tunnel tunnel NN 42149 2814 17 transport transport NN 42149 2814 18 , , , 42149 2814 19 over over IN 42149 2814 20 an an DT 42149 2814 21 average average JJ 42149 2814 22 haul haul NN 42149 2814 23 of of IN 42149 2814 24 about about IN 42149 2814 25 2,000 2,000 CD 42149 2814 26 ft ft NN 42149 2814 27 . . NNP 42149 2814 28 , , , 42149 2814 29 was be VBD 42149 2814 30 only only RB 42149 2814 31 about about RB 42149 2814 32 50 50 CD 42149 2814 33 cents cent NNS 42149 2814 34 per per IN 42149 2814 35 cu cu XX 42149 2814 36 . . . 42149 2815 1 yd yd NNP 42149 2815 2 . . NNP 42149 2815 3 , , , 42149 2815 4 which which WDT 42149 2815 5 will will MD 42149 2815 6 be be VB 42149 2815 7 found find VBN 42149 2815 8 to to TO 42149 2815 9 compare compare VB 42149 2815 10 favorably favorably RB 42149 2815 11 with with IN 42149 2815 12 mechanical mechanical JJ 42149 2815 13 haulage haulage NN 42149 2815 14 on on IN 42149 2815 15 similar similar JJ 42149 2815 16 work work NN 42149 2815 17 elsewhere elsewhere RB 42149 2815 18 , , , 42149 2815 19 provided provide VBN 42149 2815 20 full full JJ 42149 2815 21 allowance allowance NN 42149 2815 22 is be VBZ 42149 2815 23 made make VBN 42149 2815 24 for for IN 42149 2815 25 the the DT 42149 2815 26 use use NN 42149 2815 27 of of IN 42149 2815 28 the the DT 42149 2815 29 plant plant NN 42149 2815 30 and and CC 42149 2815 31 power power NN 42149 2815 32 . . . 42149 2816 1 _ _ NNP 42149 2816 2 Force Force NNP 42149 2816 3 Employed._--The Employed._--The NNP 42149 2816 4 average average JJ 42149 2816 5 force force NN 42149 2816 6 employed employ VBN 42149 2816 7 on on IN 42149 2816 8 transport transport NN 42149 2816 9 , , , 42149 2816 10 both both CC 42149 2816 11 on on IN 42149 2816 12 the the DT 42149 2816 13 surface surface NN 42149 2816 14 and and CC 42149 2816 15 in in IN 42149 2816 16 the the DT 42149 2816 17 tunnel tunnel NN 42149 2816 18 , , , 42149 2816 19 is be VBZ 42149 2816 20 shown show VBN 42149 2816 21 in in IN 42149 2816 22 Table table NN 42149 2816 23 33 33 CD 42149 2816 24 . . . 42149 2817 1 Costs cost NNS 42149 2817 2 . . . 42149 2818 1 During during IN 42149 2818 2 the the DT 42149 2818 3 work work NN 42149 2818 4 , , , 42149 2818 5 careful careful JJ 42149 2818 6 records record NNS 42149 2818 7 of of IN 42149 2818 8 the the DT 42149 2818 9 actual actual JJ 42149 2818 10 cost cost NN 42149 2818 11 to to IN 42149 2818 12 the the DT 42149 2818 13 contractor contractor NN 42149 2818 14 of of IN 42149 2818 15 carrying carry VBG 42149 2818 16 out out RP 42149 2818 17 this this DT 42149 2818 18 work work NN 42149 2818 19 were be VBD 42149 2818 20 kept keep VBN 42149 2818 21 by by IN 42149 2818 22 the the DT 42149 2818 23 Company Company NNP 42149 2818 24 's 's POS 42149 2818 25 forces force NNS 42149 2818 26 ; ; : 42149 2818 27 these these DT 42149 2818 28 costs cost NNS 42149 2818 29 include include VBP 42149 2818 30 all all DT 42149 2818 31 direct direct JJ 42149 2818 32 charges charge NNS 42149 2818 33 , , , 42149 2818 34 such such JJ 42149 2818 35 as as IN 42149 2818 36 labor labor NN 42149 2818 37 and and CC 42149 2818 38 materials material NNS 42149 2818 39 , , , 42149 2818 40 and and CC 42149 2818 41 all all DT 42149 2818 42 indirect indirect JJ 42149 2818 43 charges charge NNS 42149 2818 44 such such JJ 42149 2818 45 as as IN 42149 2818 46 head head NNP 42149 2818 47 office office NN 42149 2818 48 , , , 42149 2818 49 plant plant NN 42149 2818 50 depreciation depreciation NN 42149 2818 51 , , , 42149 2818 52 insurance insurance NN 42149 2818 53 , , , 42149 2818 54 etc etc FW 42149 2818 55 . . FW 42149 2818 56 , , , 42149 2818 57 but but CC 42149 2818 58 do do VBP 42149 2818 59 not not RB 42149 2818 60 include include VB 42149 2818 61 the the DT 42149 2818 62 cost cost NN 42149 2818 63 of of IN 42149 2818 64 any any DT 42149 2818 65 financing financing NN 42149 2818 66 , , , 42149 2818 67 of of IN 42149 2818 68 which which WDT 42149 2818 69 the the DT 42149 2818 70 Company Company NNP 42149 2818 71 had have VBD 42149 2818 72 no no DT 42149 2818 73 information information NN 42149 2818 74 . . . 42149 2819 1 TABLE TABLE NNP 42149 2819 2 33.--AVERAGE 33.--average CD 42149 2819 3 FORCE force NN 42149 2819 4 PER per NN 42149 2819 5 SHIFT SHIFT NNS 42149 2819 6 FOR for IN 42149 2819 7 TRANSPORTATION transportation NN 42149 2819 8 IN in IN 42149 2819 9 TWO two CD 42149 2819 10 TUNNELS tunnel NNS 42149 2819 11 . . . 42149 2820 1 = = NFP 42149 2820 2 = = NFP 42149 2820 3 = = SYM 42149 2820 4 = = SYM 42149 2820 5 = = SYM 42149 2820 6 = = SYM 42149 2820 7 = = NFP 42149 2820 8 = = SYM 42149 2820 9 + + SYM 42149 2820 10 = = SYM 42149 2820 11 = = SYM 42149 2820 12 = = SYM 42149 2820 13 = = SYM 42149 2820 14 = = SYM 42149 2820 15 = = SYM 42149 2820 16 = = SYM 42149 2820 17 = = SYM 42149 2820 18 = = SYM 42149 2820 19 = = SYM 42149 2820 20 = = SYM 42149 2820 21 = = SYM 42149 2820 22 = = SYM 42149 2820 23 = = SYM 42149 2820 24 = = SYM 42149 2820 25 = = SYM 42149 2820 26 = = NFP 42149 2820 27 = = SYM 42149 2820 28 + + SYM 42149 2820 29 = = SYM 42149 2820 30 = = SYM 42149 2820 31 = = SYM 42149 2820 32 = = NFP 42149 2820 33 = = SYM 42149 2820 34 + + SYM 42149 2820 35 = = SYM 42149 2820 36 = = SYM 42149 2820 37 = = SYM 42149 2820 38 = = SYM 42149 2820 39 = = SYM 42149 2820 40 = = SYM 42149 2820 41 = = SYM 42149 2820 42 = = SYM 42149 2820 43 = = NFP 42149 2820 44 = = SYM 42149 2820 45 + + SYM 42149 2820 46 = = SYM 42149 2820 47 = = SYM 42149 2820 48 = = SYM 42149 2820 49 = = SYM 42149 2820 50 = = SYM 42149 2820 51 = = SYM 42149 2820 52 = = SYM 42149 2820 53 = = SYM 42149 2820 54 = = SYM 42149 2820 55 = = SYM 42149 2820 56 = = NFP 42149 2820 57 = = SYM 42149 2820 58 + + SYM 42149 2820 59 = = SYM 42149 2820 60 = = SYM 42149 2820 61 = = SYM 42149 2820 62 = = SYM 42149 2820 63 = = SYM 42149 2820 64 = = SYM 42149 2820 65 = = SYM 42149 2820 66 = = SYM 42149 2820 67 = = SYM 42149 2820 68 = = NFP 42149 2820 69 = = NFP 42149 2820 70 + + CC 42149 2820 71 Location|Grade location|grade NN 42149 2820 72 |Rate |rate DT 42149 2820 73 | | NN 42149 2820 74 WORK work VB 42149 2820 75 IN in IN 42149 2820 76 PROGRESS PROGRESS NNP 42149 2820 77 | | NNP 42149 2820 78 | | NNP 42149 2820 79 | | NNP 42149 2820 80 |----------+------------+-----------+ |----------+------------+-----------+ NNP 42149 2820 81 | | NNP 42149 2820 82 | | NNP 42149 2820 83 | | CD 42149 2820 84 Two two CD 42149 2820 85 |Two |two JJ 42149 2820 86 arches arch NNS 42149 2820 87 , , , 42149 2820 88 |Four |four NN 42149 2820 89 arches| arches| NNP 42149 2820 90 | | NNP 42149 2820 91 | | CD 42149 2820 92 | | NNP 42149 2820 93 inverts invert VBZ 42149 2820 94 |two |two NN 42149 2820 95 inverts,| inverts,| NNS 42149 2820 96 and and CC 42149 2820 97 one one CD 42149 2820 98 | | CD 42149 2820 99 | | CD 42149 2820 100 | | CD 42149 2820 101 | | CD 42149 2820 102 and and CC 42149 2820 103 two two CD 42149 2820 104 |and |and JJ 42149 2820 105 two two CD 42149 2820 106 duct| duct| NNP 42149 2820 107 face face NN 42149 2820 108 of of IN 42149 2820 109 | | NNP 42149 2820 110 | | CD 42149 2820 111 | | CD 42149 2820 112 | | CD 42149 2820 113 duct duct NN 42149 2820 114 | | CD 42149 2820 115 benches bench NNS 42149 2820 116 | | CD 42149 2820 117 bench bench NN 42149 2820 118 | | NNP 42149 2820 119 | | CD 42149 2820 120 | | CD 42149 2820 121 | | CD 42149 2820 122 benches bench NNS 42149 2820 123 | | CD 42149 2820 124 | | CD 42149 2820 125 | | CD 42149 2820 126 --------+------------------+-----+----------+------------+-----------+ --------+------------------+-----+----------+------------+-----------+ NFP 42149 2820 127 { { -LRB- 42149 2820 128 |Foreman |foreman CD 42149 2820 129 |$3.00| |$3.00| VBP 42149 2820 130 2 2 CD 42149 2820 131 | | CD 42149 2820 132 2 2 CD 42149 2820 133 | | CD 42149 2820 134 2 2 CD 42149 2820 135 | | CD 42149 2820 136 Tunnel Tunnel NNP 42149 2820 137 { { -LRB- 42149 2820 138 |Laborer |Laborer NNP 42149 2820 139 | | NNP 42149 2820 140 1.75| 1.75| CD 42149 2820 141 24 24 CD 42149 2820 142 | | CD 42149 2820 143 28 28 CD 42149 2820 144 | | CD 42149 2820 145 70 70 CD 42149 2820 146 | | CD 42149 2820 147 { { -LRB- 42149 2820 148 |Switchmen |switchmen CD 42149 2820 149 | | CD 42149 2820 150 2.00| 2.00| CD 42149 2820 151 | | CD 42149 2820 152 2 2 CD 42149 2820 153 | | CD 42149 2820 154 2 2 CD 42149 2820 155 | | CD 42149 2820 156 { { -LRB- 42149 2820 157 |Hoisting |hoiste VBG 42149 2820 158 engineers| engineers| NN 42149 2820 159 3.00| 3.00| CD 42149 2820 160 2 2 CD 42149 2820 161 | | CD 42149 2820 162 4 4 CD 42149 2820 163 | | CD 42149 2820 164 5 5 CD 42149 2820 165 | | CD 42149 2820 166 { { -LRB- 42149 2820 167 |Foreman |foreman CD 42149 2820 168 | | CD 42149 2820 169 3.00| 3.00| CD 42149 2820 170 1 1 CD 42149 2820 171 | | CD 42149 2820 172 1 1 CD 42149 2820 173 | | CD 42149 2820 174 2 2 CD 42149 2820 175 | | CD 42149 2820 176 Surface{|Laborers surface{|laborer NNS 42149 2820 177 | | CD 42149 2820 178 1.75| 1.75| CD 42149 2820 179 8 8 CD 42149 2820 180 | | CD 42149 2820 181 8 8 CD 42149 2820 182 | | CD 42149 2820 183 15 15 CD 42149 2820 184 | | CD 42149 2820 185 { { -LRB- 42149 2820 186 |Teams |team NNS 42149 2820 187 | | CD 42149 2820 188 6.50| 6.50| VBD 42149 2820 189 1 1 CD 42149 2820 190 | | CD 42149 2820 191 1 1 CD 42149 2820 192 | | CD 42149 2820 193 2 2 CD 42149 2820 194 | | NNS 42149 2820 195 = = SYM 42149 2820 196 = = SYM 42149 2820 197 = = SYM 42149 2820 198 = = SYM 42149 2820 199 = = SYM 42149 2820 200 = = SYM 42149 2820 201 = = NFP 42149 2820 202 = = SYM 42149 2820 203 + + SYM 42149 2820 204 = = SYM 42149 2820 205 = = SYM 42149 2820 206 = = SYM 42149 2820 207 = = SYM 42149 2820 208 = = SYM 42149 2820 209 = = SYM 42149 2820 210 = = SYM 42149 2820 211 = = SYM 42149 2820 212 = = SYM 42149 2820 213 = = SYM 42149 2820 214 = = SYM 42149 2820 215 = = SYM 42149 2820 216 = = SYM 42149 2820 217 = = SYM 42149 2820 218 = = SYM 42149 2820 219 = = SYM 42149 2820 220 = = NFP 42149 2820 221 = = SYM 42149 2820 222 + + SYM 42149 2820 223 = = SYM 42149 2820 224 = = SYM 42149 2820 225 = = SYM 42149 2820 226 = = NFP 42149 2820 227 = = SYM 42149 2820 228 + + SYM 42149 2820 229 = = SYM 42149 2820 230 = = SYM 42149 2820 231 = = SYM 42149 2820 232 = = SYM 42149 2820 233 = = SYM 42149 2820 234 = = SYM 42149 2820 235 = = SYM 42149 2820 236 = = SYM 42149 2820 237 = = NFP 42149 2820 238 = = SYM 42149 2820 239 + + SYM 42149 2820 240 = = SYM 42149 2820 241 = = SYM 42149 2820 242 = = SYM 42149 2820 243 = = SYM 42149 2820 244 = = SYM 42149 2820 245 = = SYM 42149 2820 246 = = SYM 42149 2820 247 = = SYM 42149 2820 248 = = SYM 42149 2820 249 = = SYM 42149 2820 250 = = NFP 42149 2820 251 = = SYM 42149 2820 252 + + SYM 42149 2820 253 = = SYM 42149 2820 254 = = SYM 42149 2820 255 = = SYM 42149 2820 256 = = SYM 42149 2820 257 = = SYM 42149 2820 258 = = SYM 42149 2820 259 = = SYM 42149 2820 260 = = SYM 42149 2820 261 = = SYM 42149 2820 262 = = NFP 42149 2820 263 = = SYM 42149 2820 264 + + SYM 42149 2820 265 Field Field NNP 42149 2820 266 Engineering Engineering NNP 42149 2820 267 Staff Staff NNP 42149 2820 268 . . . 42149 2821 1 The the DT 42149 2821 2 field field NN 42149 2821 3 staff staff NN 42149 2821 4 may may MD 42149 2821 5 be be VB 42149 2821 6 considered consider VBN 42149 2821 7 as as IN 42149 2821 8 divisible divisible JJ 42149 2821 9 into into IN 42149 2821 10 five five CD 42149 2821 11 main main JJ 42149 2821 12 divisions division NNS 42149 2821 13 : : : 42149 2821 14 ( ( -LRB- 42149 2821 15 _ _ NNP 42149 2821 16 A_).--Construction A_).--Construction NNP 42149 2821 17 , , , 42149 2821 18 including include VBG 42149 2821 19 alignment alignment NN 42149 2821 20 , , , 42149 2821 21 ( ( -LRB- 42149 2821 22 _ _ NNP 42149 2821 23 B_).--Cost B_).--Cost NNP 42149 2821 24 records record NNS 42149 2821 25 , , , 42149 2821 26 ( ( -LRB- 42149 2821 27 _ _ NNP 42149 2821 28 C_).--Testing C_).--Testing NNP 42149 2821 29 of of IN 42149 2821 30 cement cement NN 42149 2821 31 and and CC 42149 2821 32 other other JJ 42149 2821 33 materials material NNS 42149 2821 34 of of IN 42149 2821 35 construction construction NN 42149 2821 36 , , , 42149 2821 37 ( ( -LRB- 42149 2821 38 _ _ NNP 42149 2821 39 D_).--Photography D_).--Photography NNP 42149 2821 40 , , , 42149 2821 41 ( ( -LRB- 42149 2821 42 _ _ NNP 42149 2821 43 E_).--Despatch E_).--Despatch NNP 42149 2821 44 - - HYPH 42149 2821 45 boat boat NN 42149 2821 46 service service NN 42149 2821 47 . . . 42149 2822 1 ( ( -LRB- 42149 2822 2 _ _ NNP 42149 2822 3 A_).--_Construction A_).--_Construction NNP 42149 2822 4 _ _ NNP 42149 2822 5 ( ( -LRB- 42149 2822 6 _ _ NNP 42149 2822 7 Inspection Inspection NNP 42149 2822 8 and and CC 42149 2822 9 Alignment Alignment NNP 42149 2822 10 _ _ NNP 42149 2822 11 ) ) -RRB- 42149 2822 12 _ _ NNP 42149 2822 13 Staff._--A Staff._--A NNS 42149 2822 14 comparatively comparatively RB 42149 2822 15 large large JJ 42149 2822 16 staff staff NN 42149 2822 17 was be VBD 42149 2822 18 maintained maintain VBN 42149 2822 19 by by IN 42149 2822 20 the the DT 42149 2822 21 Company Company NNP 42149 2822 22 , , , 42149 2822 23 and and CC 42149 2822 24 to to IN 42149 2822 25 this this DT 42149 2822 26 two two CD 42149 2822 27 causes cause NNS 42149 2822 28 contributed contribute VBD 42149 2822 29 . . . 42149 2823 1 In in IN 42149 2823 2 the the DT 42149 2823 3 first first JJ 42149 2823 4 place place NN 42149 2823 5 , , , 42149 2823 6 the the DT 42149 2823 7 contractor contractor NN 42149 2823 8 maintained maintain VBD 42149 2823 9 no no DT 42149 2823 10 field field NN 42149 2823 11 engineering engineering NN 42149 2823 12 staff staff NN 42149 2823 13 , , , 42149 2823 14 because because IN 42149 2823 15 , , , 42149 2823 16 early early RB 42149 2823 17 in in IN 42149 2823 18 the the DT 42149 2823 19 proceedings proceeding NNS 42149 2823 20 , , , 42149 2823 21 it -PRON- PRP 42149 2823 22 was be VBD 42149 2823 23 arranged arrange VBN 42149 2823 24 that that IN 42149 2823 25 the the DT 42149 2823 26 Company Company NNP 42149 2823 27 would would MD 42149 2823 28 carry carry VB 42149 2823 29 out out RP 42149 2823 30 all all PDT 42149 2823 31 this this DT 42149 2823 32 work work NN 42149 2823 33 , , , 42149 2823 34 and and CC 42149 2823 35 thus thus RB 42149 2823 36 avoid avoid VB 42149 2823 37 the the DT 42149 2823 38 overlapping overlapping NN 42149 2823 39 , , , 42149 2823 40 confusion confusion NN 42149 2823 41 , , , 42149 2823 42 and and CC 42149 2823 43 lack lack NN 42149 2823 44 of of IN 42149 2823 45 definite definite JJ 42149 2823 46 responsibility responsibility NN 42149 2823 47 which which WDT 42149 2823 48 often often RB 42149 2823 49 ensues ensue VBZ 42149 2823 50 when when WRB 42149 2823 51 two two CD 42149 2823 52 engineering engineering NN 42149 2823 53 forces force NNS 42149 2823 54 are be VBP 42149 2823 55 working work VBG 42149 2823 56 over over IN 42149 2823 57 the the DT 42149 2823 58 same same JJ 42149 2823 59 ground ground NN 42149 2823 60 . . . 42149 2824 1 Even even RB 42149 2824 2 had have VBD 42149 2824 3 the the DT 42149 2824 4 contractor contractor NN 42149 2824 5 maintained maintain VBD 42149 2824 6 an an DT 42149 2824 7 engineering engineering NN 42149 2824 8 force force NN 42149 2824 9 , , , 42149 2824 10 it -PRON- PRP 42149 2824 11 would would MD 42149 2824 12 have have VB 42149 2824 13 been be VBN 42149 2824 14 necessary necessary JJ 42149 2824 15 for for IN 42149 2824 16 the the DT 42149 2824 17 Company Company NNP 42149 2824 18 to to TO 42149 2824 19 check check VB 42149 2824 20 most most JJS 42149 2824 21 of of IN 42149 2824 22 the the DT 42149 2824 23 contractor contractor NN 42149 2824 24 's 's POS 42149 2824 25 work work NN 42149 2824 26 . . . 42149 2825 1 In in IN 42149 2825 2 the the DT 42149 2825 3 second second JJ 42149 2825 4 place place NN 42149 2825 5 , , , 42149 2825 6 this this DT 42149 2825 7 work work NN 42149 2825 8 gave give VBD 42149 2825 9 rise rise NN 42149 2825 10 to to IN 42149 2825 11 a a DT 42149 2825 12 number number NN 42149 2825 13 of of IN 42149 2825 14 special special JJ 42149 2825 15 surveys survey NNS 42149 2825 16 , , , 42149 2825 17 tests test NNS 42149 2825 18 , , , 42149 2825 19 borings boring NNS 42149 2825 20 , , , 42149 2825 21 and and CC 42149 2825 22 observations observation NNS 42149 2825 23 of of IN 42149 2825 24 various various JJ 42149 2825 25 kinds kind NNS 42149 2825 26 , , , 42149 2825 27 most most JJS 42149 2825 28 of of IN 42149 2825 29 which which WDT 42149 2825 30 were be VBD 42149 2825 31 kept keep VBN 42149 2825 32 up up RP 42149 2825 33 as as IN 42149 2825 34 a a DT 42149 2825 35 part part NN 42149 2825 36 of of IN 42149 2825 37 the the DT 42149 2825 38 regular regular JJ 42149 2825 39 routine routine JJ 42149 2825 40 work work NN 42149 2825 41 , , , 42149 2825 42 and and CC 42149 2825 43 this this DT 42149 2825 44 necessitated necessitate VBD 42149 2825 45 a a DT 42149 2825 46 staff staff NN 42149 2825 47 . . . 42149 2826 1 Also also RB 42149 2826 2 , , , 42149 2826 3 for for IN 42149 2826 4 a a DT 42149 2826 5 whole whole JJ 42149 2826 6 year year NN 42149 2826 7 , , , 42149 2826 8 active active JJ 42149 2826 9 progressive progressive JJ 42149 2826 10 work work NN 42149 2826 11 was be VBD 42149 2826 12 at at IN 42149 2826 13 a a DT 42149 2826 14 standstill standstill NN 42149 2826 15 while while IN 42149 2826 16 the the DT 42149 2826 17 pile pile NN 42149 2826 18 tests test NNS 42149 2826 19 were be VBD 42149 2826 20 going go VBG 42149 2826 21 on on RP 42149 2826 22 . . . 42149 2827 1 ( ( -LRB- 42149 2827 2 _ _ NNP 42149 2827 3 B_).--_Cost B_).--_Cost NNP 42149 2827 4 Records Records NNPS 42149 2827 5 Staff._--A staff._--a NN 42149 2827 6 distinct distinct JJ 42149 2827 7 feature feature NN 42149 2827 8 was be VBD 42149 2827 9 made make VBN 42149 2827 10 of of IN 42149 2827 11 keeping keep VBG 42149 2827 12 as as RB 42149 2827 13 accurately accurately RB 42149 2827 14 as as IN 42149 2827 15 possible possible JJ 42149 2827 16 detailed detailed JJ 42149 2827 17 records record NNS 42149 2827 18 of of IN 42149 2827 19 the the DT 42149 2827 20 actual actual JJ 42149 2827 21 cost cost NN 42149 2827 22 to to IN 42149 2827 23 the the DT 42149 2827 24 contractor contractor NN 42149 2827 25 of of IN 42149 2827 26 carrying carry VBG 42149 2827 27 out out RP 42149 2827 28 the the DT 42149 2827 29 work work NN 42149 2827 30 . . . 42149 2828 1 A a DT 42149 2828 2 small small JJ 42149 2828 3 staff staff NN 42149 2828 4 of of IN 42149 2828 5 clerks clerk NNS 42149 2828 6 , , , 42149 2828 7 retained retain VBN 42149 2828 8 solely solely RB 42149 2828 9 for for IN 42149 2828 10 this this DT 42149 2828 11 purpose purpose NN 42149 2828 12 , , , 42149 2828 13 tabulated tabulate VBD 42149 2828 14 and and CC 42149 2828 15 recorded record VBD 42149 2828 16 the the DT 42149 2828 17 information information NN 42149 2828 18 furnished furnish VBN 42149 2828 19 by by IN 42149 2828 20 the the DT 42149 2828 21 members member NNS 42149 2828 22 of of IN 42149 2828 23 the the DT 42149 2828 24 construction construction NN 42149 2828 25 staff staff NN 42149 2828 26 . . . 42149 2829 1 About about RB 42149 2829 2 $ $ $ 42149 2829 3 12,000 12,000 CD 42149 2829 4 , , , 42149 2829 5 altogether altogether RB 42149 2829 6 , , , 42149 2829 7 was be VBD 42149 2829 8 spent spend VBN 42149 2829 9 in in IN 42149 2829 10 salaries salary NNS 42149 2829 11 in in IN 42149 2829 12 this this DT 42149 2829 13 department department NN 42149 2829 14 , , , 42149 2829 15 and and CC 42149 2829 16 it -PRON- PRP 42149 2829 17 may may MD 42149 2829 18 be be VB 42149 2829 19 considered consider VBN 42149 2829 20 an an DT 42149 2829 21 extremely extremely RB 42149 2829 22 wise wise JJ 42149 2829 23 investment investment NN 42149 2829 24 , , , 42149 2829 25 for for IN 42149 2829 26 , , , 42149 2829 27 not not RB 42149 2829 28 only only RB 42149 2829 29 is be VBZ 42149 2829 30 the the DT 42149 2829 31 information information NN 42149 2829 32 thus thus RB 42149 2829 33 obtained obtain VBN 42149 2829 34 of of IN 42149 2829 35 great great JJ 42149 2829 36 value value NN 42149 2829 37 and and CC 42149 2829 38 interest interest NN 42149 2829 39 in in IN 42149 2829 40 itself -PRON- PRP 42149 2829 41 , , , 42149 2829 42 but but CC 42149 2829 43 it -PRON- PRP 42149 2829 44 also also RB 42149 2829 45 puts put VBZ 42149 2829 46 the the DT 42149 2829 47 Company Company NNP 42149 2829 48 in in IN 42149 2829 49 an an DT 42149 2829 50 excellent excellent JJ 42149 2829 51 position position NN 42149 2829 52 should should MD 42149 2829 53 any any DT 42149 2829 54 claim claim NN 42149 2829 55 or or CC 42149 2829 56 discussion discussion NN 42149 2829 57 arise arise VB 42149 2829 58 with with IN 42149 2829 59 the the DT 42149 2829 60 contractor contractor NN 42149 2829 61 . . . 42149 2830 1 ( ( -LRB- 42149 2830 2 _ _ NNP 42149 2830 3 C_).--_Cement C_).--_Cement NNP 42149 2830 4 - - HYPH 42149 2830 5 Testing testing NN 42149 2830 6 Department._--As department._--as NN 42149 2830 7 the the DT 42149 2830 8 Company Company NNP 42149 2830 9 furnished furnish VBD 42149 2830 10 the the DT 42149 2830 11 cement cement NN 42149 2830 12 to to IN 42149 2830 13 the the DT 42149 2830 14 contractor contractor NN 42149 2830 15 , , , 42149 2830 16 it -PRON- PRP 42149 2830 17 became become VBD 42149 2830 18 incumbent incumbent JJ 42149 2830 19 to to TO 42149 2830 20 make make VB 42149 2830 21 careful careful JJ 42149 2830 22 tests test NNS 42149 2830 23 of of IN 42149 2830 24 the the DT 42149 2830 25 quality quality NN 42149 2830 26 . . . 42149 2831 1 A a DT 42149 2831 2 cement cement NN 42149 2831 3 - - HYPH 42149 2831 4 testing testing NN 42149 2831 5 laboratory laboratory NN 42149 2831 6 was be VBD 42149 2831 7 established establish VBN 42149 2831 8 at at IN 42149 2831 9 the the DT 42149 2831 10 Manhattan Manhattan NNP 42149 2831 11 Shaft Shaft NNP 42149 2831 12 offices office NNS 42149 2831 13 , , , 42149 2831 14 under under IN 42149 2831 15 the the DT 42149 2831 16 charge charge NN 42149 2831 17 of of IN 42149 2831 18 a a DT 42149 2831 19 cement cement NN 42149 2831 20 inspector inspector NN 42149 2831 21 who who WP 42149 2831 22 was be VBD 42149 2831 23 furnished furnish VBN 42149 2831 24 with with IN 42149 2831 25 assistants assistant NNS 42149 2831 26 for for IN 42149 2831 27 sampling sampling NN 42149 2831 28 , , , 42149 2831 29 shipping shipping NN 42149 2831 30 , , , 42149 2831 31 and and CC 42149 2831 32 testing testing NN 42149 2831 33 cement cement NN 42149 2831 34 . . . 42149 2832 1 All all DT 42149 2832 2 materials material NNS 42149 2832 3 used use VBN 42149 2832 4 on on IN 42149 2832 5 the the DT 42149 2832 6 work work NN 42149 2832 7 , , , 42149 2832 8 such such JJ 42149 2832 9 as as IN 42149 2832 10 bricks brick NNS 42149 2832 11 , , , 42149 2832 12 sand sand NN 42149 2832 13 , , , 42149 2832 14 stone stone NN 42149 2832 15 , , , 42149 2832 16 water water NN 42149 2832 17 - - HYPH 42149 2832 18 proofing proofing NN 42149 2832 19 , , , 42149 2832 20 etc etc FW 42149 2832 21 . . . 42149 2832 22 , , , 42149 2832 23 were be VBD 42149 2832 24 tested test VBN 42149 2832 25 here here RB 42149 2832 26 , , , 42149 2832 27 with with IN 42149 2832 28 the the DT 42149 2832 29 exception exception NN 42149 2832 30 of of IN 42149 2832 31 metals metal NNS 42149 2832 32 , , , 42149 2832 33 which which WDT 42149 2832 34 were be VBD 42149 2832 35 under under IN 42149 2832 36 the the DT 42149 2832 37 charge charge NN 42149 2832 38 of of IN 42149 2832 39 a a DT 42149 2832 40 metal metal NN 42149 2832 41 inspector inspector NN 42149 2832 42 reporting report VBG 42149 2832 43 directly directly RB 42149 2832 44 to to IN 42149 2832 45 the the DT 42149 2832 46 head head NN 42149 2832 47 office office NN 42149 2832 48 . . . 42149 2833 1 This this DT 42149 2833 2 department department NN 42149 2833 3 cost cost VBD 42149 2833 4 about about RB 42149 2833 5 $ $ $ 42149 2833 6 10,000 10,000 CD 42149 2833 7 for for IN 42149 2833 8 salaries salary NNS 42149 2833 9 and and CC 42149 2833 10 $ $ $ 42149 2833 11 3,000 3,000 CD 42149 2833 12 for for IN 42149 2833 13 apparatus apparatus NN 42149 2833 14 and and CC 42149 2833 15 supplies supply NNS 42149 2833 16 , , , 42149 2833 17 or or CC 42149 2833 18 about about RB 42149 2833 19 $ $ $ 42149 2833 20 13,000 13,000 CD 42149 2833 21 , , , 42149 2833 22 in in IN 42149 2833 23 all all DT 42149 2833 24 . . . 42149 2834 1 There there EX 42149 2834 2 were be VBD 42149 2834 3 800,000 800,000 CD 42149 2834 4 bbl bbl NN 42149 2834 5 . . . 42149 2835 1 of of IN 42149 2835 2 cement cement NN 42149 2835 3 tested test VBN 42149 2835 4 , , , 42149 2835 5 and and CC 42149 2835 6 samples sample NNS 42149 2835 7 from from IN 42149 2835 8 2,100,000 2,100,000 CD 42149 2835 9 brick brick NN 42149 2835 10 . . . 42149 2836 1 A a DT 42149 2836 2 large large JJ 42149 2836 3 amount amount NN 42149 2836 4 of of IN 42149 2836 5 useful useful JJ 42149 2836 6 information information NN 42149 2836 7 has have VBZ 42149 2836 8 resulted result VBN 42149 2836 9 from from IN 42149 2836 10 the the DT 42149 2836 11 work work NN 42149 2836 12 of of IN 42149 2836 13 this this DT 42149 2836 14 laboratory laboratory NN 42149 2836 15 . . . 42149 2837 1 ( ( -LRB- 42149 2837 2 _ _ NNP 42149 2837 3 D_).--_Photography._--It D_).--_Photography._--It NNP 42149 2837 4 was be VBD 42149 2837 5 desired desire VBN 42149 2837 6 to to TO 42149 2837 7 keep keep VB 42149 2837 8 a a DT 42149 2837 9 complete complete JJ 42149 2837 10 photographic photographic JJ 42149 2837 11 record record NN 42149 2837 12 of of IN 42149 2837 13 the the DT 42149 2837 14 progress progress NN 42149 2837 15 of of IN 42149 2837 16 the the DT 42149 2837 17 work work NN 42149 2837 18 , , , 42149 2837 19 and and CC 42149 2837 20 therefore therefore RB 42149 2837 21 a a DT 42149 2837 22 photographer photographer NN 42149 2837 23 was be VBD 42149 2837 24 appointed appoint VBN 42149 2837 25 , , , 42149 2837 26 with with IN 42149 2837 27 office office NN 42149 2837 28 room room NN 42149 2837 29 at at IN 42149 2837 30 the the DT 42149 2837 31 Manhattan Manhattan NNP 42149 2837 32 Shaft Shaft NNP 42149 2837 33 . . . 42149 2838 1 The the DT 42149 2838 2 photographer photographer NN 42149 2838 3 took take VBD 42149 2838 4 all all PDT 42149 2838 5 the the DT 42149 2838 6 progress progress NN 42149 2838 7 photographs photograph NNS 42149 2838 8 on on IN 42149 2838 9 the the DT 42149 2838 10 work work NN 42149 2838 11 of of IN 42149 2838 12 the the DT 42149 2838 13 North North NNP 42149 2838 14 River River NNP 42149 2838 15 Division Division NNP 42149 2838 16 , , , 42149 2838 17 made make VBD 42149 2838 18 photographic photographic JJ 42149 2838 19 reductions reduction NNS 42149 2838 20 of of IN 42149 2838 21 all all DT 42149 2838 22 drawings drawing NNS 42149 2838 23 and and CC 42149 2838 24 plans plan NNS 42149 2838 25 , , , 42149 2838 26 made make VBD 42149 2838 27 lantern lantern JJ 42149 2838 28 slides slide NNS 42149 2838 29 of of IN 42149 2838 30 all all DT 42149 2838 31 negatives negative NNS 42149 2838 32 of of IN 42149 2838 33 a a DT 42149 2838 34 more more RBR 42149 2838 35 important important JJ 42149 2838 36 nature nature NN 42149 2838 37 , , , 42149 2838 38 and and CC 42149 2838 39 , , , 42149 2838 40 in in IN 42149 2838 41 addition addition NN 42149 2838 42 , , , 42149 2838 43 during during IN 42149 2838 44 the the DT 42149 2838 45 period period NN 42149 2838 46 of of IN 42149 2838 47 compressed compress VBN 42149 2838 48 air air NN 42149 2838 49 , , , 42149 2838 50 analyzed analyze VBD 42149 2838 51 the the DT 42149 2838 52 samples sample NNS 42149 2838 53 of of IN 42149 2838 54 compressed compress VBN 42149 2838 55 air air NN 42149 2838 56 , , , 42149 2838 57 brought bring VBD 42149 2838 58 into into IN 42149 2838 59 the the DT 42149 2838 60 office office NN 42149 2838 61 for for IN 42149 2838 62 the the DT 42149 2838 63 purpose purpose NN 42149 2838 64 , , , 42149 2838 65 for for IN 42149 2838 66 the the DT 42149 2838 67 amount amount NN 42149 2838 68 of of IN 42149 2838 69 CO_{2 CO_{2 NNP 42149 2838 70 } } -RRB- 42149 2838 71 present present JJ 42149 2838 72 . . . 42149 2839 1 About about RB 42149 2839 2 $ $ $ 42149 2839 3 8,000 8,000 CD 42149 2839 4 was be VBD 42149 2839 5 spent spend VBN 42149 2839 6 on on IN 42149 2839 7 this this DT 42149 2839 8 department department NN 42149 2839 9 . . . 42149 2840 1 ( ( -LRB- 42149 2840 2 _ _ NNP 42149 2840 3 E_).--_Despatch E_).--_Despatch NNP 42149 2840 4 - - HYPH 42149 2840 5 Boat Boat NNP 42149 2840 6 Service._--To service._--to NN 42149 2840 7 provide provide VBP 42149 2840 8 access access NN 42149 2840 9 to to IN 42149 2840 10 the the DT 42149 2840 11 New New NNP 42149 2840 12 Jersey Jersey NNP 42149 2840 13 side side NN 42149 2840 14 , , , 42149 2840 15 a a DT 42149 2840 16 despatch despatch NN 42149 2840 17 boat boat NN 42149 2840 18 was be VBD 42149 2840 19 purchased purchase VBN 42149 2840 20 . . . 42149 2841 1 This this DT 42149 2841 2 boat boat NN 42149 2841 3 was be VBD 42149 2841 4 at at IN 42149 2841 5 first first JJ 42149 2841 6 ( ( -LRB- 42149 2841 7 June June NNP 42149 2841 8 , , , 42149 2841 9 1904 1904 CD 42149 2841 10 ) ) -RRB- 42149 2841 11 chartered charter VBD 42149 2841 12 , , , 42149 2841 13 and and CC 42149 2841 14 in in IN 42149 2841 15 May May NNP 42149 2841 16 , , , 42149 2841 17 1905 1905 CD 42149 2841 18 , , , 42149 2841 19 was be VBD 42149 2841 20 bought buy VBN 42149 2841 21 outright outright RB 42149 2841 22 , , , 42149 2841 23 and and CC 42149 2841 24 ran run VBD 42149 2841 25 on on IN 42149 2841 26 regular regular JJ 42149 2841 27 schedules schedule NNS 42149 2841 28 , , , 42149 2841 29 day day NN 42149 2841 30 and and CC 42149 2841 31 night night NN 42149 2841 32 . . . 42149 2842 1 It -PRON- PRP 42149 2842 2 continued continue VBD 42149 2842 3 in in IN 42149 2842 4 the the DT 42149 2842 5 service service NN 42149 2842 6 until until IN 42149 2842 7 April April NNP 42149 2842 8 , , , 42149 2842 9 1909 1909 CD 42149 2842 10 , , , 42149 2842 11 when when WRB 42149 2842 12 it -PRON- PRP 42149 2842 13 was be VBD 42149 2842 14 given give VBN 42149 2842 15 up up RP 42149 2842 16 , , , 42149 2842 17 as as IN 42149 2842 18 the the DT 42149 2842 19 tunnels tunnel NNS 42149 2842 20 were be VBD 42149 2842 21 so so RB 42149 2842 22 far far RB 42149 2842 23 completed complete VBN 42149 2842 24 that that IN 42149 2842 25 they -PRON- PRP 42149 2842 26 provided provide VBD 42149 2842 27 easy easy JJ 42149 2842 28 access access NN 42149 2842 29 to to IN 42149 2842 30 New New NNP 42149 2842 31 Jersey Jersey NNP 42149 2842 32 . . . 42149 2843 1 The the DT 42149 2843 2 cost cost NN 42149 2843 3 of of IN 42149 2843 4 the the DT 42149 2843 5 boat boat NN 42149 2843 6 ( ( -LRB- 42149 2843 7 second second JJ 42149 2843 8 - - HYPH 42149 2843 9 hand hand NN 42149 2843 10 ) ) -RRB- 42149 2843 11 was be VBD 42149 2843 12 about about IN 42149 2843 13 $ $ $ 42149 2843 14 3,000 3,000 CD 42149 2843 15 . . . 42149 2844 1 It -PRON- PRP 42149 2844 2 was be VBD 42149 2844 3 then then RB 42149 2844 4 thoroughly thoroughly RB 42149 2844 5 overhauled overhaul VBN 42149 2844 6 and and CC 42149 2844 7 the the DT 42149 2844 8 cabin cabin NN 42149 2844 9 remodeled remodel VBD 42149 2844 10 . . . 42149 2845 1 The the DT 42149 2845 2 monthly monthly JJ 42149 2845 3 cost cost NN 42149 2845 4 , , , 42149 2845 5 when when WRB 42149 2845 6 working work VBG 42149 2845 7 a a DT 42149 2845 8 12-hour 12-hour CD 42149 2845 9 shift shift NN 42149 2845 10 , , , 42149 2845 11 was be VBD 42149 2845 12 $ $ $ 42149 2845 13 270 270 CD 42149 2845 14 for for IN 42149 2845 15 manning manning NN 42149 2845 16 , , , 42149 2845 17 $ $ $ 42149 2845 18 65 65 CD 42149 2845 19 for for IN 42149 2845 20 supplies supply NNS 42149 2845 21 , , , 42149 2845 22 and and CC 42149 2845 23 $ $ $ 42149 2845 24 64 64 CD 42149 2845 25 for for IN 42149 2845 26 coal coal NN 42149 2845 27 . . . 42149 2846 1 On on IN 42149 2846 2 two two CD 42149 2846 3 12-hour 12-hour CD 42149 2846 4 shifts shift NNS 42149 2846 5 , , , 42149 2846 6 the the DT 42149 2846 7 monthly monthly JJ 42149 2846 8 cost cost NN 42149 2846 9 was be VBD 42149 2846 10 $ $ $ 42149 2846 11 533 533 CD 42149 2846 12 for for IN 42149 2846 13 manning manning NN 42149 2846 14 , , , 42149 2846 15 $ $ $ 42149 2846 16 100 100 CD 42149 2846 17 for for IN 42149 2846 18 supplies supply NNS 42149 2846 19 , , , 42149 2846 20 and and CC 42149 2846 21 $ $ $ 42149 2846 22 96 96 CD 42149 2846 23 for for IN 42149 2846 24 coal coal NN 42149 2846 25 . . . 42149 2847 1 About about IN 42149 2847 2 100,000 100,000 CD 42149 2847 3 passengers passenger NNS 42149 2847 4 were be VBD 42149 2847 5 carried carry VBN 42149 2847 6 during during IN 42149 2847 7 the the DT 42149 2847 8 boat boat NN 42149 2847 9 's 's POS 42149 2847 10 period period NN 42149 2847 11 of of IN 42149 2847 12 service service NN 42149 2847 13 , , , 42149 2847 14 and and CC 42149 2847 15 the the DT 42149 2847 16 total total JJ 42149 2847 17 cost cost NN 42149 2847 18 was be VBD 42149 2847 19 about about IN 42149 2847 20 $ $ $ 42149 2847 21 37,500 37,500 CD 42149 2847 22 . . . 42149 2848 1 For for IN 42149 2848 2 the the DT 42149 2848 3 major major JJ 42149 2848 4 part part NN 42149 2848 5 of of IN 42149 2848 6 the the DT 42149 2848 7 period period NN 42149 2848 8 embraced embrace VBN 42149 2848 9 by by IN 42149 2848 10 this this DT 42149 2848 11 paper paper NN 42149 2848 12 , , , 42149 2848 13 B. B. NNP 42149 2848 14 H. H. NNP 42149 2848 15 M. M. NNP 42149 2848 16 Hewett Hewett NNP 42149 2848 17 , , , 42149 2848 18 M. M. NNP 42149 2848 19 Am Am NNP 42149 2848 20 . . . 42149 2849 1 Soc Soc NNP 42149 2849 2 . . . 42149 2850 1 C. C. NNP 42149 2850 2 E. E. NNP 42149 2850 3 , , , 42149 2850 4 served serve VBD 42149 2850 5 as as IN 42149 2850 6 General General NNP 42149 2850 7 Resident Resident NNP 42149 2850 8 Engineer Engineer NNP 42149 2850 9 , , , 42149 2850 10 in in IN 42149 2850 11 charge charge NN 42149 2850 12 of of IN 42149 2850 13 the the DT 42149 2850 14 Field Field NNP 42149 2850 15 Work Work NNP 42149 2850 16 as as IN 42149 2850 17 a a DT 42149 2850 18 whole whole NN 42149 2850 19 . . . 42149 2851 1 W. W. NNP 42149 2851 2 L. L. NNP 42149 2851 3 Brown Brown NNP 42149 2851 4 , , , 42149 2851 5 M. M. NNP 42149 2851 6 Am Am NNP 42149 2851 7 . . . 42149 2852 1 Soc Soc NNP 42149 2852 2 . . . 42149 2853 1 C. C. NNP 42149 2853 2 E. E. NNP 42149 2853 3 , , , 42149 2853 4 was be VBD 42149 2853 5 at at IN 42149 2853 6 first first JJ 42149 2853 7 Resident Resident NNP 42149 2853 8 Engineer Engineer NNP 42149 2853 9 of of IN 42149 2853 10 the the DT 42149 2853 11 work work NN 42149 2853 12 constructed construct VBN 42149 2853 13 from from IN 42149 2853 14 the the DT 42149 2853 15 Manhattan Manhattan NNP 42149 2853 16 Shaft Shaft NNP 42149 2853 17 , , , 42149 2853 18 while while IN 42149 2853 19 H. H. NNP 42149 2853 20 F. F. NNP 42149 2853 21 D. D. NNP 42149 2853 22 Burke Burke NNP 42149 2853 23 , , , 42149 2853 24 M. M. NNP 42149 2853 25 Am Am NNP 42149 2853 26 . . . 42149 2854 1 Soc Soc NNP 42149 2854 2 . . . 42149 2855 1 C. C. NNP 42149 2855 2 E. E. NNP 42149 2855 3 , , , 42149 2855 4 was be VBD 42149 2855 5 Resident Resident NNP 42149 2855 6 Engineer Engineer NNP 42149 2855 7 of of IN 42149 2855 8 the the DT 42149 2855 9 work work NN 42149 2855 10 constructed construct VBN 42149 2855 11 from from IN 42149 2855 12 the the DT 42149 2855 13 Weehawken Weehawken NNP 42149 2855 14 Shaft Shaft NNP 42149 2855 15 . . . 42149 2856 1 After after IN 42149 2856 2 the the DT 42149 2856 3 meeting meeting NN 42149 2856 4 of of IN 42149 2856 5 the the DT 42149 2856 6 shields shield NNS 42149 2856 7 , , , 42149 2856 8 Mr. Mr. NNP 42149 2856 9 Burke Burke NNP 42149 2856 10 left leave VBD 42149 2856 11 to to TO 42149 2856 12 take take VB 42149 2856 13 up up RP 42149 2856 14 another another DT 42149 2856 15 appointment appointment NN 42149 2856 16 , , , 42149 2856 17 and and CC 42149 2856 18 from from IN 42149 2856 19 that that DT 42149 2856 20 time time NN 42149 2856 21 Mr. Mr. NNP 42149 2856 22 Brown Brown NNP 42149 2856 23 acted act VBD 42149 2856 24 as as IN 42149 2856 25 Resident Resident NNP 42149 2856 26 Engineer Engineer NNP 42149 2856 27 . . . 42149 2857 1 It -PRON- PRP 42149 2857 2 may may MD 42149 2857 3 be be VB 42149 2857 4 said say VBN 42149 2857 5 , , , 42149 2857 6 without without IN 42149 2857 7 reflecting reflect VBG 42149 2857 8 in in IN 42149 2857 9 any any DT 42149 2857 10 way way NN 42149 2857 11 on on IN 42149 2857 12 the the DT 42149 2857 13 manufacturers manufacturer NNS 42149 2857 14 , , , 42149 2857 15 that that IN 42149 2857 16 the the DT 42149 2857 17 high high JJ 42149 2857 18 standard standard NN 42149 2857 19 of of IN 42149 2857 20 all all PDT 42149 2857 21 the the DT 42149 2857 22 metal metal NN 42149 2857 23 materials material NNS 42149 2857 24 also also RB 42149 2857 25 testified testify VBD 42149 2857 26 to to IN 42149 2857 27 the the DT 42149 2857 28 efficient efficient JJ 42149 2857 29 inspection inspection NN 42149 2857 30 conducted conduct VBN 42149 2857 31 under under IN 42149 2857 32 the the DT 42149 2857 33 direction direction NN 42149 2857 34 of of IN 42149 2857 35 Mr. Mr. NNP 42149 2857 36 J. J. NNP 42149 2857 37 C. C. NNP 42149 2857 38 Naegeley Naegeley NNP 42149 2857 39 . . . 42149 2858 1 It -PRON- PRP 42149 2858 2 is be VBZ 42149 2858 3 impossible impossible JJ 42149 2858 4 to to TO 42149 2858 5 close close VB 42149 2858 6 this this DT 42149 2858 7 brief brief JJ 42149 2858 8 account account NN 42149 2858 9 of of IN 42149 2858 10 these these DT 42149 2858 11 tunnels tunnel NNS 42149 2858 12 without without IN 42149 2858 13 recording record VBG 42149 2858 14 the the DT 42149 2858 15 invaluable invaluable JJ 42149 2858 16 services service NNS 42149 2858 17 at at IN 42149 2858 18 all all DT 42149 2858 19 times time NNS 42149 2858 20 rendered render VBN 42149 2858 21 by by IN 42149 2858 22 the the DT 42149 2858 23 members member NNS 42149 2858 24 of of IN 42149 2858 25 the the DT 42149 2858 26 Company Company NNP 42149 2858 27 's 's POS 42149 2858 28 field field NN 42149 2858 29 staff staff NN 42149 2858 30 . . . 42149 2859 1 Where where WRB 42149 2859 2 all all DT 42149 2859 3 worked work VBD 42149 2859 4 with with IN 42149 2859 5 one one CD 42149 2859 6 common common JJ 42149 2859 7 aim aim NN 42149 2859 8 it -PRON- PRP 42149 2859 9 might may MD 42149 2859 10 seem seem VB 42149 2859 11 invidious invidious JJ 42149 2859 12 to to TO 42149 2859 13 single single JJ 42149 2859 14 out out RP 42149 2859 15 names name NNS 42149 2859 16 , , , 42149 2859 17 but but CC 42149 2859 18 special special JJ 42149 2859 19 credit credit NN 42149 2859 20 is be VBZ 42149 2859 21 due due JJ 42149 2859 22 to to IN 42149 2859 23 the the DT 42149 2859 24 following follow VBG 42149 2859 25 Assistant Assistant NNP 42149 2859 26 Engineers Engineers NNPS 42149 2859 27 : : : 42149 2859 28 Messrs. Messrs. NNPS 42149 2859 29 H. H. NNP 42149 2859 30 E. E. NNP 42149 2859 31 Boardman Boardman NNP 42149 2859 32 , , , 42149 2859 33 Assoc Assoc NNP 42149 2859 34 . . . 42149 2860 1 M. M. NNP 42149 2860 2 Am Am NNP 42149 2860 3 . . . 42149 2861 1 Soc Soc NNP 42149 2861 2 . . . 42149 2862 1 C. C. NNP 42149 2862 2 E. E. NNP 42149 2862 3 , , , 42149 2862 4 W. W. NNP 42149 2862 5 H. H. NNP 42149 2862 6 Lyon Lyon NNP 42149 2862 7 , , , 42149 2862 8 H. H. NNP 42149 2862 9 U. U. NNP 42149 2862 10 Hitchcock Hitchcock NNP 42149 2862 11 , , , 42149 2862 12 E. E. NNP 42149 2862 13 R. R. NNP 42149 2862 14 Peckens Peckens NNP 42149 2862 15 , , , 42149 2862 16 H. H. NNP 42149 2862 17 J. J. NNP 42149 2863 1 Wild wild JJ 42149 2863 2 , , , 42149 2863 3 Assoc Assoc NNP 42149 2863 4 . . . 42149 2864 1 M. M. NNP 42149 2864 2 Am Am NNP 42149 2864 3 . . . 42149 2865 1 Soc Soc NNP 42149 2865 2 . . . 42149 2866 1 C. C. NNP 42149 2866 2 E. E. NNP 42149 2866 3 , , , 42149 2866 4 J. J. NNP 42149 2866 5 F. F. NNP 42149 2866 6 Sullivan Sullivan NNP 42149 2866 7 , , , 42149 2866 8 Assoc Assoc NNP 42149 2866 9 . . . 42149 2867 1 M. M. NNP 42149 2867 2 Am Am NNP 42149 2867 3 . . . 42149 2868 1 Soc Soc NNP 42149 2868 2 . . . 42149 2869 1 C. C. NNP 42149 2869 2 E. E. NNP 42149 2869 3 , , , 42149 2869 4 and and CC 42149 2869 5 R. R. NNP 42149 2869 6 T. T. NNP 42149 2869 7 Robinson Robinson NNP 42149 2869 8 , , , 42149 2869 9 Assoc Assoc NNP 42149 2869 10 . . . 42149 2870 1 M. M. NNP 42149 2870 2 Am Am NNP 42149 2870 3 . . . 42149 2871 1 Soc Soc NNP 42149 2871 2 . . . 42149 2872 1 C. C. NNP 42149 2872 2 E. E. NNP 42149 2872 3 Mr. Mr. NNP 42149 2872 4 C. C. NNP 42149 2872 5 E. E. NNP 42149 2872 6 Price Price NNP 42149 2872 7 was be VBD 42149 2872 8 in in IN 42149 2872 9 charge charge NN 42149 2872 10 of of IN 42149 2872 11 the the DT 42149 2872 12 cement cement NN 42149 2872 13 tests test NNS 42149 2872 14 throughout throughout IN 42149 2872 15 the the DT 42149 2872 16 entire entire JJ 42149 2872 17 period period NN 42149 2872 18 , , , 42149 2872 19 and and CC 42149 2872 20 brought bring VBD 42149 2872 21 to to IN 42149 2872 22 his -PRON- PRP$ 42149 2872 23 work work NN 42149 2872 24 not not RB 42149 2872 25 only only RB 42149 2872 26 ability ability NN 42149 2872 27 but but CC 42149 2872 28 enthusiasm enthusiasm NN 42149 2872 29 . . . 42149 2873 1 Mr. Mr. NNP 42149 2873 2 H. H. NNP 42149 2873 3 D. D. NNP 42149 2873 4 Bastow Bastow NNP 42149 2873 5 was be VBD 42149 2873 6 in in IN 42149 2873 7 charge charge NN 42149 2873 8 of of IN 42149 2873 9 the the DT 42149 2873 10 photographic photographic JJ 42149 2873 11 work work NN 42149 2873 12 , , , 42149 2873 13 and and CC 42149 2873 14 Mr. Mr. NNP 42149 2873 15 A. A. NNP 42149 2873 16 L. L. NNP 42149 2873 17 Heyer Heyer NNP 42149 2873 18 of of IN 42149 2873 19 the the DT 42149 2873 20 cost cost NN 42149 2873 21 account account NN 42149 2873 22 records record NNS 42149 2873 23 , , , 42149 2873 24 in in IN 42149 2873 25 which which WDT 42149 2873 26 he -PRON- PRP 42149 2873 27 was be VBD 42149 2873 28 ably ably RB 42149 2873 29 seconded second VBN 42149 2873 30 by by IN 42149 2873 31 Mr. Mr. NNP 42149 2873 32 A. A. NNP 42149 2873 33 P. P. NNP 42149 2873 34 Gehling Gehling NNP 42149 2873 35 , , , 42149 2873 36 who who WP 42149 2873 37 , , , 42149 2873 38 after after IN 42149 2873 39 Mr. Mr. NNP 42149 2873 40 Heyer Heyer NNP 42149 2873 41 's 's POS 42149 2873 42 departure departure NN 42149 2873 43 , , , 42149 2873 44 finished finish VBD 42149 2873 45 the the DT 42149 2873 46 records record NNS 42149 2873 47 and and CC 42149 2873 48 brought bring VBD 42149 2873 49 them -PRON- PRP 42149 2873 50 into into IN 42149 2873 51 their -PRON- PRP$ 42149 2873 52 final final JJ 42149 2873 53 shape shape NN 42149 2873 54 . . . 42149 2874 1 The the DT 42149 2874 2 organization organization NN 42149 2874 3 of of IN 42149 2874 4 the the DT 42149 2874 5 Company Company NNP 42149 2874 6 's 's POS 42149 2874 7 field field NN 42149 2874 8 engineering engineering NN 42149 2874 9 staff staff NN 42149 2874 10 is be VBZ 42149 2874 11 shown show VBN 42149 2874 12 graphically graphically RB 42149 2874 13 by by IN 42149 2874 14 Fig Fig NNP 42149 2874 15 . . . 42149 2875 1 24 24 CD 42149 2875 2 . . . 42149 2876 1 FIELD FIELD NNP 42149 2876 2 ORGANIZATION organization NN 42149 2876 3 OF of IN 42149 2876 4 THE the DT 42149 2876 5 O'ROURKE O'ROURKE NNP 42149 2876 6 ENGINEERING ENGINEERING NNP 42149 2876 7 CONSTRUCTION CONSTRUCTION NNP 42149 2876 8 COMPANY COMPANY NNP 42149 2876 9 FOR for IN 42149 2876 10 THE the DT 42149 2876 11 BUILDING building NN 42149 2876 12 OF of IN 42149 2876 13 THE the DT 42149 2876 14 PENNSYLVANIA PENNSYLVANIA NNP 42149 2876 15 RAILROAD RAILROAD VBD 42149 2876 16 TUNNELS tunnel NNS 42149 2876 17 INTO into VBP 42149 2876 18 NEW NEW NNP 42149 2876 19 YORK YORK NNP 42149 2876 20 CITY CITY NNP 42149 2876 21 -- -- : 42149 2876 22 NORTH NORTH NNP 42149 2876 23 RIVER RIVER NNP 42149 2876 24 DIVISION DIVISION NNP 42149 2876 25 . . . 42149 2877 1 SECTIONS SECTIONS NNP 42149 2877 2 GY GY NNP 42149 2877 3 EAST EAST NNP 42149 2877 4 , , , 42149 2877 5 GY GY NNP 42149 2877 6 WEST WEST NNP 42149 2877 7 SUPPLEMENTARY SUPPLEMENTARY NNP 42149 2877 8 , , , 42149 2877 9 GY GY NNP 42149 2877 10 WEST WEST NNP 42149 2877 11 , , , 42149 2877 12 AND and CC 42149 2877 13 CO CO NNP 42149 2877 14 . . . 42149 2877 15 GENERAL GENERAL NNP 42149 2877 16 SUPERINTENDENT SUPERINTENDENT NNP 42149 2877 17 . . . 42149 2878 1 | | NNP 42149 2878 2 + + NNP 42149 2878 3 ------------------------+-------+--+ ------------------------+-------+--+ NNP 42149 2878 4 | | NNP 42149 2878 5 | | NNP 42149 2878 6 | | NNS 42149 2878 7 ( ( -LRB- 42149 2878 8 General General NNP 42149 2878 9 , , , 42149 2878 10 Surface Surface NNP 42149 2878 11 and and CC 42149 2878 12 Office Office NNP 42149 2878 13 ) ) -RRB- 42149 2878 14 ( ( -LRB- 42149 2878 15 Excavation excavation NN 42149 2878 16 | | NNP 42149 2878 17 ---------------+------------- ---------------+------------- NN 42149 2878 18 of of IN 42149 2878 19 Land Land NNP 42149 2878 20 | | NNP 42149 2878 21 | | NNP 42149 2878 22 Tunnels Tunnels NNP 42149 2878 23 ) ) -RRB- 42149 2878 24 | | NNP 42149 2878 25 ASSISTANT ASSISTANT NNP 42149 2878 26 GENERAL GENERAL NNP 42149 2878 27 SUPERINTENDENT SUPERINTENDENT NNP 42149 2878 28 | | NNP 42149 2878 29 | | NNP 42149 2878 30 | | NNP 42149 2878 31 GENERAL GENERAL NNP 42149 2878 32 | | HYPH 42149 2878 33 | | NNP 42149 2878 34 ROCK ROCK NNP 42149 2878 35 SUPT SUPT NNP 42149 2878 36 | | CD 42149 2878 37 + + SYM 42149 2878 38 ------------+------------+ ------------+------------+ . 42149 2878 39 | | NNP 42149 2878 40 | | CD 42149 2878 41 | | CD 42149 2878 42 | | CD 42149 2878 43 | | NNP 42149 2878 44 Tunnel Tunnel NNP 42149 2878 45 | | NNP 42149 2878 46 FIELD FIELD NNP 42149 2878 47 SURFACE surface NN 42149 2878 48 DESPATCH DESPATCH NNP 42149 2878 49 Supts Supts NNPS 42149 2878 50 | | NNP 42149 2878 51 OFFICE OFFICE NNP 42149 2878 52 BOAT BOAT NNP 42149 2878 53 Tunnel Tunnel NNP 42149 2878 54 | | NNP 42149 2878 55 Foreman Foreman NNP 42149 2878 56 | | NNP 42149 2878 57 Civil Civil NNP 42149 2878 58 Head Head NNP 42149 2878 59 Captain Captain NNP 42149 2878 60 Foremen Foremen NNP 42149 2878 61 | | NNP 42149 2878 62 Engineer Engineer NNP 42149 2878 63 Carpenter Carpenter NNP 42149 2878 64 Engineer Engineer NNP 42149 2878 65 Timbermen Timbermen NNP 42149 2878 66 | | NNP 42149 2878 67 Inspectors Inspectors NNP 42149 2878 68 Foreman Foreman NNP 42149 2878 69 Deck Deck NNP 42149 2878 70 Hands Hands NNP 42149 2878 71 Timbermen Timbermen NNP 42149 2878 72 | | NNP 42149 2878 73 Bookkeepers Bookkeepers NNP 42149 2878 74 Carpenter Carpenter NNP 42149 2878 75 Timbermen Timbermen NNP 42149 2878 76 's 's POS 42149 2878 77 | | NNP 42149 2878 78 Paymaster Paymaster NNP 42149 2878 79 Carpenters Carpenters NNPS 42149 2878 80 Helpers Helpers NNPS 42149 2878 81 | | NNP 42149 2878 82 Head Head NNP 42149 2878 83 Carpenters Carpenters NNPS 42149 2878 84 ' ' POS 42149 2878 85 Foremen foreman NNS 42149 2878 86 | | NNP 42149 2878 87 Storekeeper Storekeeper NNP 42149 2878 88 Helpers Helpers NNPS 42149 2878 89 Drillers Drillers NNPS 42149 2878 90 | | NNP 42149 2878 91 Storekeepers Storekeepers NNPS 42149 2878 92 Blacksmiths Blacksmiths NNP 42149 2878 93 Drillers Drillers NNPS 42149 2878 94 | | NNP 42149 2878 95 Timekeepers Timekeepers NNPS 42149 2878 96 Blacksmiths Blacksmiths NNPS 42149 2878 97 ' ' POS 42149 2878 98 Foremen foreman NNS 42149 2878 99 | | NNP 42149 2878 100 Telephone Telephone NNP 42149 2878 101 Helpers Helpers NNP 42149 2878 102 Muckers Muckers NNP 42149 2878 103 | | NNP 42149 2878 104 Operators Operators NNP 42149 2878 105 Foreman Foreman NNP 42149 2878 106 Pipe Pipe NNP 42149 2878 107 Fitters Fitters NNPS 42149 2878 108 | | NNP 42149 2878 109 Office Office NNP 42149 2878 110 Boys Boys NNPS 42149 2878 111 Laborers Laborers NNPS 42149 2878 112 Pipe Pipe NNP 42149 2878 113 Fitters Fitters NNPS 42149 2878 114 ' ' POS 42149 2878 115 | | NNP 42149 2878 116 Messengers Messengers NNP 42149 2878 117 Laborers Laborers NNPS 42149 2878 118 Helpers Helpers NNPS 42149 2878 119 | | NNP 42149 2878 120 Janitors Janitors NNP 42149 2878 121 Disposal Disposal NNP 42149 2878 122 Electricians Electricians NNPS 42149 2878 123 | | NNP 42149 2878 124 Trimmers Trimmers NNP 42149 2878 125 Hoist Hoist NNP 42149 2878 126 | | NNP 42149 2878 127 Teamsters Teamsters NNP 42149 2878 128 Engineers Engineers NNPS 42149 2878 129 | | NNP 42149 2878 130 Signalmen Signalmen NNP 42149 2878 131 | | NNP 42149 2878 132 Muckers Muckers NNP 42149 2878 133 | | NNP 42149 2878 134 Nippers Nippers NNP 42149 2878 135 | | NNP 42149 2878 136 Water Water NNP 42149 2878 137 Boys Boys NNPS 42149 2878 138 | | NNP 42149 2878 139 | | NNP 42149 2878 140 | | NNP 42149 2878 141 -------------+--------+-------------------------+--------+----------+ -------------+--------+-------------------------+--------+----------+ NNP 42149 2878 142 | | NNP 42149 2878 143 | | NNP 42149 2878 144 | | CD 42149 2878 145 | | NNS 42149 2878 146 ( ( -LRB- 42149 2878 147 Shield Shield NNP 42149 2878 148 Tunnel Tunnel NNP 42149 2878 149 Driving driving NN 42149 2878 150 ) ) -RRB- 42149 2878 151 ( ( -LRB- 42149 2878 152 Masonry Masonry NNP 42149 2878 153 ( ( -LRB- 42149 2878 154 Power Power NNP 42149 2878 155 ( ( -LRB- 42149 2878 156 Medical Medical NNP 42149 2878 157 | | NNP 42149 2878 158 Lining Lining NNP 42149 2878 159 - - HYPH 42149 2878 160 Rock Rock NNP 42149 2878 161 Plant Plant NNP 42149 2878 162 ) ) -RRB- 42149 2878 163 Supervision Supervision NNP 42149 2878 164 ) ) -RRB- 42149 2878 165 GENERAL GENERAL NNP 42149 2878 166 TUNNEL TUNNEL NNP 42149 2878 167 SUPERINTENDENT SUPERINTENDENT NNP 42149 2878 168 and and CC 42149 2878 169 River River NNP 42149 2878 170 | | NNP 42149 2878 171 | | NNP 42149 2878 172 | | NNS 42149 2878 173 Tunnels Tunnels NNPS 42149 2878 174 ) ) -RRB- 42149 2878 175 MASTER master NN 42149 2878 176 CHIEF chief NN 42149 2878 177 MED MED NNP 42149 2878 178 ASSISTANT ASSISTANT NNP 42149 2878 179 SUPERINTENDENTS superintendent NNS 42149 2878 180 | | NNP 42149 2878 181 MECHANIC MECHANIC NNP 42149 2878 182 OFFICER OFFICER NNP 42149 2878 183 | | NNP 42149 2878 184 | | NNP 42149 2878 185 | | CD 42149 2878 186 | | CD 42149 2878 187 | | CD 42149 2878 188 | | CD 42149 2878 189 | | CD 42149 2878 190 + + CC 42149 2878 191 --------+------------+---------+ --------+------------+---------+ HYPH 42149 2878 192 | | NNP 42149 2878 193 Foreman Foreman NNP 42149 2878 194 | | NNP 42149 2878 195 EXCAVATION EXCAVATION NNP 42149 2878 196 | | NNP 42149 2878 197 | | NNP 42149 2878 198 GENERAL GENERAL NNP 42149 2878 199 | | HYPH 42149 2878 200 Electrician Electrician NNP 42149 2878 201 | | NNP 42149 2878 202 | | NNP 42149 2878 203 IRON IRON NNP 42149 2878 204 LINING lining NN 42149 2878 205 CAULKING CAULKING NNP 42149 2878 206 AND and CC 42149 2878 207 | | NNP 42149 2878 208 | | NNP 42149 2878 209 Electricians Electricians NNP 42149 2878 210 | | NNP 42149 2878 211 General General NNP 42149 2878 212 | | NNP 42149 2878 213 GRUMMETING GRUMMETING NNP 42149 2878 214 | | NNP 42149 2878 215 | | NNP 42149 2878 216 Engineers Engineers NNPS 42149 2878 217 | | NNP 42149 2878 218 Foremen Foremen NNP 42149 2878 219 Foremen Foremen NNP 42149 2878 220 | | NNP 42149 2878 221 Pipefitters Pipefitters NNP 42149 2878 222 | | NNP 42149 2878 223 Foreman Foreman NNP 42149 2878 224 Resident Resident NNP 42149 2878 225 Foremen Foremen NNP 42149 2878 226 Erector Erector NNP 42149 2878 227 Foremen Foremen NNP 42149 2878 228 Pipefitters Pipefitters NNPS 42149 2878 229 ' ' POS 42149 2878 230 | | NNP 42149 2878 231 Machinist Machinist NNP 42149 2878 232 Doctor Doctor NNP 42149 2878 233 Drillers Drillers NNP 42149 2878 234 Runners Runners NNP 42149 2878 235 Caulkers Caulkers NNPS 42149 2878 236 Helpers Helpers NNP 42149 2878 237 | | NNP 42149 2878 238 Machinists Machinists NNPS 42149 2878 239 Drillers Drillers NNPS 42149 2878 240 Ironmen Ironmen NNPS 42149 2878 241 Grummeters Grummeters NNPS 42149 2878 242 Electricians Electricians NNPS 42149 2878 243 | | NNP 42149 2878 244 Machinists Machinists NNPS 42149 2878 245 ' ' POS 42149 2878 246 Powdermen Powdermen NNP 42149 2878 247 Boltmen Boltmen NNP 42149 2878 248 Electricians'| electricians'| VBP 42149 2878 249 Helpers Helpers NNP 42149 2878 250 Foremen Foremen NNP 42149 2878 251 Helpers Helpers NNPS 42149 2878 252 | | NNP 42149 2878 253 Firemen Firemen NNP 42149 2878 254 Timbermen Timbermen NNP 42149 2878 255 Trackmen Trackmen NNP 42149 2878 256 | | NNP 42149 2878 257 Oilers Oilers NNP 42149 2878 258 Timbermen Timbermen NNP 42149 2878 259 Lockmen Lockmen NNP 42149 2878 260 | | NNP 42149 2878 261 Pumpmen Pumpmen NNP 42149 2878 262 Foremen Foremen NNP 42149 2878 263 Transport Transport NNP 42149 2878 264 | | NNP 42149 2878 265 Hoist Hoist NNP 42149 2878 266 Engineers Engineers NNPS 42149 2878 267 Muckers Muckers NNP 42149 2878 268 Foreman Foreman NNP 42149 2878 269 | | NNP 42149 2878 270 Signalmen Signalmen NNP 42149 2878 271 Muckers Muckers NNP 42149 2878 272 Transport Transport NNP 42149 2878 273 | | NNP 42149 2878 274 Shieldmen Shieldmen NNP 42149 2878 275 Laborers Laborers NNPS 42149 2878 276 | | NNP 42149 2878 277 Laborers Laborers NNPS 42149 2878 278 Watchmen Watchmen NNP 42149 2878 279 | | NNP 42149 2878 280 Nippers Nippers NNP 42149 2878 281 | | NNP 42149 2878 282 Water Water NNP 42149 2878 283 Boys Boys NNPS 42149 2878 284 | | NNP 42149 2878 285 GENERAL GENERAL NNP 42149 2878 286 CONCRETE CONCRETE NNP 42149 2878 287 SUPERINTENDENT SUPERINTENDENT NNP 42149 2878 288 | | NNP 42149 2878 289 TUNNEL TUNNEL NNP 42149 2878 290 SUPERINTENDENTS superintendent NNS 42149 2878 291 | | CD 42149 2878 292 + + CC 42149 2878 293 -----------+------------+----------------++-----------+ -----------+------------+----------------++-----------+ HYPH 42149 2878 294 | | NNP 42149 2878 295 | | NNP 42149 2878 296 | | CD 42149 2878 297 | | CD 42149 2878 298 | | CD 42149 2878 299 CONCRETE CONCRETE NNP 42149 2878 300 BRICKWORK BRICKWORK NNP 42149 2878 301 DUCTS DUCTS NNP 42149 2878 302 WATER water NN 42149 2878 303 - - HYPH 42149 2878 304 PROOFING PROOFING NNP 42149 2878 305 GENERAL GENERAL NNP 42149 2878 306 Foremen Foremen NNPS 42149 2878 307 Foremen Foremen NNP 42149 2878 308 Foremen Foremen NNP 42149 2878 309 Foremen Foremen VBZ 42149 2878 310 Pipefitters Pipefitters NNPS 42149 2878 311 Carpenters Carpenters NNPS 42149 2878 312 Bricklayers Bricklayers NNP 42149 2878 313 Duct duct NN 42149 2878 314 - - HYPH 42149 2878 315 layers layer NNS 42149 2878 316 Waterproofers Waterproofers NNPS 42149 2878 317 Pipefitters Pipefitters NNPS 42149 2878 318 ' ' POS 42149 2878 319 Carpenters Carpenters NNPS 42149 2878 320 ' ' POS 42149 2878 321 Bricklayers bricklayer NNS 42149 2878 322 ' ' POS 42149 2878 323 Helpers Helpers NNPS 42149 2878 324 Helpers Helpers NNPS 42149 2878 325 Laborers Laborers NNPS 42149 2878 326 Electricians Electricians NNPS 42149 2878 327 Mixer Mixer NNP 42149 2878 328 Carpenters Carpenters NNPS 42149 2878 329 Electricians Electricians NNPS 42149 2878 330 ' ' POS 42149 2878 331 Foremen Foremen NNP 42149 2878 332 Carpenters Carpenters NNPS 42149 2878 333 ' ' POS 42149 2878 334 Helpers Helpers NNP 42149 2878 335 Mixer Mixer NNP 42149 2878 336 Helpers Helpers NNPS 42149 2878 337 Transport Transport NNP 42149 2878 338 Laborers Laborers NNP 42149 2878 339 Foremen Foremen NNP 42149 2878 340 Concrete Concrete NNP 42149 2878 341 Transport Transport NNP 42149 2878 342 Laborers Laborers NNP 42149 2878 343 Laborers Laborers NNPS 42149 2878 344 Watchmen Watchmen NNP 42149 2878 345 FIG FIG NNP 42149 2878 346 . . . 42149 2879 1 24 24 CD 42149 2879 2 . . . 42149 2880 1 _ _ NNP 42149 2880 2 Contractor Contractor NNP 42149 2880 3 's 's POS 42149 2880 4 Organization._--The organization._--the CD 42149 2880 5 contracting contracting NN 42149 2880 6 firm firm NN 42149 2880 7 which which WDT 42149 2880 8 did do VBD 42149 2880 9 the the DT 42149 2880 10 work work NN 42149 2880 11 described describe VBN 42149 2880 12 in in IN 42149 2880 13 this this DT 42149 2880 14 paper paper NN 42149 2880 15 was be VBD 42149 2880 16 the the DT 42149 2880 17 O'Rourke O'Rourke NNP 42149 2880 18 Engineering Engineering NNP 42149 2880 19 Construction Construction NNP 42149 2880 20 Company Company NNP 42149 2880 21 , , , 42149 2880 22 of of IN 42149 2880 23 New New NNP 42149 2880 24 York York NNP 42149 2880 25 City City NNP 42149 2880 26 . . . 42149 2881 1 The the DT 42149 2881 2 President President NNP 42149 2881 3 of of IN 42149 2881 4 this this DT 42149 2881 5 Company Company NNP 42149 2881 6 was be VBD 42149 2881 7 John John NNP 42149 2881 8 F. F. NNP 42149 2881 9 O'Rourke O'Rourke NNP 42149 2881 10 , , , 42149 2881 11 M. M. NNP 42149 2881 12 Am Am NNP 42149 2881 13 . . . 42149 2882 1 Soc Soc NNP 42149 2882 2 . . . 42149 2883 1 C. C. NNP 42149 2883 2 E. E. NNP 42149 2883 3 , , , 42149 2883 4 the the DT 42149 2883 5 Vice Vice NNP 42149 2883 6 - - HYPH 42149 2883 7 President President NNP 42149 2883 8 was be VBD 42149 2883 9 F. F. NNP 42149 2883 10 J. J. NNP 42149 2883 11 Gubelman Gubelman NNP 42149 2883 12 , , , 42149 2883 13 Assoc Assoc NNP 42149 2883 14 . . . 42149 2884 1 M. M. NNP 42149 2884 2 Am Am NNP 42149 2884 3 . . . 42149 2885 1 Soc Soc NNP 42149 2885 2 . . . 42149 2886 1 C. C. NNP 42149 2886 2 E. E. NNP 42149 2886 3 The The NNP 42149 2886 4 General General NNP 42149 2886 5 Superintendent Superintendent NNP 42149 2886 6 was be VBD 42149 2886 7 Mr. Mr. NNP 42149 2886 8 George George NNP 42149 2886 9 B. B. NNP 42149 2886 10 Fry Fry NNP 42149 2886 11 , , , 42149 2886 12 assisted assist VBN 42149 2886 13 by by IN 42149 2886 14 J. J. NNP 42149 2886 15 F. F. NNP 42149 2886 16 Sullivan Sullivan NNP 42149 2886 17 , , , 42149 2886 18 Assoc Assoc NNP 42149 2886 19 . . . 42149 2887 1 M. M. NNP 42149 2887 2 Am Am NNP 42149 2887 3 . . . 42149 2888 1 Soc Soc NNP 42149 2888 2 . . . 42149 2889 1 C. C. NNP 42149 2889 2 E. E. NNP 42149 2889 3 The the DT 42149 2889 4 duties duty NNS 42149 2889 5 of of IN 42149 2889 6 General General NNP 42149 2889 7 Tunnel Tunnel NNP 42149 2889 8 Superintendent Superintendent NNP 42149 2889 9 fell fall VBD 42149 2889 10 to to IN 42149 2889 11 Mr. Mr. NNP 42149 2889 12 Patrick Patrick NNP 42149 2889 13 Fitzgerald Fitzgerald NNP 42149 2889 14 . . . 42149 2890 1 The the DT 42149 2890 2 generally generally RB 42149 2890 3 pleasant pleasant JJ 42149 2890 4 relations relation NNS 42149 2890 5 existing exist VBG 42149 2890 6 between between IN 42149 2890 7 the the DT 42149 2890 8 Company Company NNP 42149 2890 9 and and CC 42149 2890 10 the the DT 42149 2890 11 contractor contractor NN 42149 2890 12 's 's POS 42149 2890 13 forces force NNS 42149 2890 14 did do VBD 42149 2890 15 much much RB 42149 2890 16 to to TO 42149 2890 17 facilitate facilitate VB 42149 2890 18 its -PRON- PRP$ 42149 2890 19 execution execution NN 42149 2890 20 . . . 42149 2891 1 The the DT 42149 2891 2 organization organization NN 42149 2891 3 of of IN 42149 2891 4 the the DT 42149 2891 5 Contractor Contractor NNP 42149 2891 6 's 's POS 42149 2891 7 field field NN 42149 2891 8 staff staff NN 42149 2891 9 is be VBZ 42149 2891 10 shown show VBN 42149 2891 11 on on IN 42149 2891 12 Fig Fig NNP 42149 2891 13 . . . 42149 2892 1 25 25 CD 42149 2892 2 . . . 42149 2893 1 PENNSYLVANIA PENNSYLVANIA NNP 42149 2893 2 TUNNEL TUNNEL NNP 42149 2893 3 AND and CC 42149 2893 4 TERMINAL TERMINAL NNP 42149 2893 5 RAILROAD RAILROAD NNP 42149 2893 6 COMPANY company NN 42149 2893 7 . . . 42149 2894 1 NORTH NORTH NNP 42149 2894 2 RIVER RIVER NNP 42149 2894 3 DIVISION DIVISION NNS 42149 2894 4 . . . 42149 2895 1 SECTIONS SECTIONS NNP 42149 2895 2 GY GY NNP 42149 2895 3 EAST EAST NNP 42149 2895 4 , , , 42149 2895 5 GY GY NNP 42149 2895 6 WEST WEST NNP 42149 2895 7 SUPPLEMENTARY SUPPLEMENTARY NNP 42149 2895 8 , , , 42149 2895 9 GY GY NNP 42149 2895 10 WEST WEST NNP 42149 2895 11 , , , 42149 2895 12 GJ GJ NNP 42149 2895 13 , , , 42149 2895 14 AND and CC 42149 2895 15 I -PRON- PRP 42149 2895 16 , , , 42149 2895 17 _ _ NNP 42149 2895 18 I. I. NNP 42149 2896 1 E. E. NNP 42149 2896 2 _ _ NNP 42149 2896 3 , , , 42149 2896 4 FROM from IN 42149 2896 5 10TH 10th CD 42149 2896 6 AVENUE AVENUE NNP 42149 2896 7 , , , 42149 2896 8 MANHATTAN MANHATTAN NNP 42149 2896 9 , , , 42149 2896 10 TO to IN 42149 2896 11 THE the DT 42149 2896 12 WEEHAWKEN WEEHAWKEN NNP 42149 2896 13 SHAFT SHAFT NNS 42149 2896 14 , , , 42149 2896 15 FIELD FIELD NNP 42149 2896 16 ENGINEERING ENGINEERING NNP 42149 2896 17 STAFF STAFF NNP 42149 2896 18 ORGANIZATION organization NN 42149 2896 19 . . . 42149 2897 1 GENERAL GENERAL NNP 42149 2897 2 RESIDENT RESIDENT NNP 42149 2897 3 ENGINEER ENGINEER NNP 42149 2897 4 | | NNP 42149 2897 5 + + NNP 42149 2897 6 -----------------+------------+------------+---------+----+ -----------------+------------+------------+---------+----+ NNP 42149 2897 7 | | NNP 42149 2897 8 | | NNP 42149 2897 9 | | CD 42149 2897 10 | | CD 42149 2897 11 | | CD 42149 2897 12 | | NNS 42149 2897 13 ( ( -LRB- 42149 2897 14 Material material NN 42149 2897 15 Testing Testing NNP 42149 2897 16 ) ) -RRB- 42149 2897 17 ( ( -LRB- 42149 2897 18 Photography Photography NNP 42149 2897 19 ) ) -RRB- 42149 2897 20 | | NNP 42149 2897 21 ( ( -LRB- 42149 2897 22 Cost cost NN 42149 2897 23 Records Records NNPS 42149 2897 24 ) ) -RRB- 42149 2897 25 |(Office |(office NN 42149 2897 26 ) ) -RRB- 42149 2897 27 Cement Cement NNP 42149 2897 28 Inspector Inspector NNP 42149 2897 29 Photographer Photographer NNP 42149 2897 30 | | NNP 42149 2897 31 Recording Recording NNP 42149 2897 32 Clerk Clerk NNP 42149 2897 33 | | NNP 42149 2897 34 Clerks Clerks NNP 42149 2897 35 Asst Asst NNP 42149 2897 36 Cement Cement NNP 42149 2897 37 | | NNP 42149 2897 38 Asst Asst NNP 42149 2897 39 Recording Recording NNP 42149 2897 40 |Messengers |Messengers NNPS 42149 2897 41 Inspectors Inspectors NNPS 42149 2897 42 | | NNP 42149 2897 43 Clerks Clerks NNP 42149 2897 44 | | NNS 42149 2897 45 ( ( -LRB- 42149 2897 46 Construction Construction NNP 42149 2897 47 ) ) -RRB- 42149 2897 48 | | NNP 42149 2897 49 | | NNS 42149 2897 50 ( ( -LRB- 42149 2897 51 Despatch Despatch NNP 42149 2897 52 Boat Boat NNP 42149 2897 53 ) ) -RRB- 42149 2897 54 + + NFP 42149 2897 55 ----------------+ ----------------+ NNP 42149 2897 56 Captain Captain NNP 42149 2897 57 | | NNP 42149 2897 58 Engineers Engineers NNP 42149 2897 59 RESIDENT RESIDENT NNP 42149 2897 60 ENGINEERS engineer NNS 42149 2897 61 Deckhands deckhand NNS 42149 2897 62 ( ( -LRB- 42149 2897 63 Two two CD 42149 2897 64 during during IN 42149 2897 65 driving driving NN 42149 2897 66 of of IN 42149 2897 67 Shield shield NN 42149 2897 68 - - HYPH 42149 2897 69 driven drive VBN 42149 2897 70 Messengers Messengers NNP 42149 2897 71 Tunnels Tunnels NNP 42149 2897 72 , , , 42149 2897 73 and and CC 42149 2897 74 one one CD 42149 2897 75 subsequently subsequently RB 42149 2897 76 . . . 42149 2897 77 ) ) -RRB- 42149 2898 1 | | JJ 42149 2898 2 + + SYM 42149 2898 3 ---------------------+---+------------------+ ---------------------+---+------------------+ HYPH 42149 2898 4 | | NNP 42149 2898 5 | | CD 42149 2898 6 | | NNS 42149 2898 7 ( ( -LRB- 42149 2898 8 Inspection inspection NN 42149 2898 9 ) ) -RRB- 42149 2898 10 ( ( -LRB- 42149 2898 11 Alignment Alignment NNP 42149 2898 12 ) ) -RRB- 42149 2898 13 ( ( -LRB- 42149 2898 14 Office Office NNP 42149 2898 15 ) ) -RRB- 42149 2898 16 Assistant Assistant NNP 42149 2898 17 Engineers Engineers NNPS 42149 2898 18 Assistant Assistant NNP 42149 2898 19 Engineers Engineers NNPS 42149 2898 20 Draftsmen Draftsmen NNP 42149 2898 21 Chief Chief NNP 42149 2898 22 Tunnel Tunnel NNP 42149 2898 23 Chiefs Chiefs NNPS 42149 2898 24 of of IN 42149 2898 25 Parties Parties NNPS 42149 2898 26 Field Field NNP 42149 2898 27 Office Office NNP 42149 2898 28 Inspector Inspector NNP 42149 2898 29 Instrumentmen Instrumentmen NNP 42149 2898 30 Clerks Clerks NNP 42149 2898 31 Tunnel Tunnel NNP 42149 2898 32 Inspectors Inspectors NNPS 42149 2898 33 Rodmen Rodmen NNP 42149 2898 34 Cement Cement NNP 42149 2898 35 Surface Surface NNP 42149 2898 36 Inspectors Inspectors NNPS 42149 2898 37 Chainmen Chainmen NNP 42149 2898 38 Warehousemen Warehousemen NNP 42149 2898 39 Clerks Clerks NNPS 42149 2898 40 Laborers Laborers NNP 42149 2898 41 Janitors Janitors NNPS 42149 2898 42 FIG FIG NNP 42149 2898 43 . . . 42149 2899 1 25 25 CD 42149 2899 2 In in IN 42149 2899 3 conclusion conclusion NN 42149 2899 4 , , , 42149 2899 5 the the DT 42149 2899 6 writers writer NNS 42149 2899 7 can can MD 42149 2899 8 not not RB 42149 2899 9 forego forego VB 42149 2899 10 the the DT 42149 2899 11 pleasure pleasure NN 42149 2899 12 of of IN 42149 2899 13 expressing express VBG 42149 2899 14 their -PRON- PRP$ 42149 2899 15 deep deep JJ 42149 2899 16 obligation obligation NN 42149 2899 17 to to IN 42149 2899 18 Samuel Samuel NNP 42149 2899 19 Rea Rea NNP 42149 2899 20 , , , 42149 2899 21 M. M. NNP 42149 2899 22 Am Am NNP 42149 2899 23 . . . 42149 2900 1 Soc Soc NNP 42149 2900 2 . . . 42149 2901 1 C. C. NNP 42149 2901 2 E. E. NNP 42149 2901 3 , , , 42149 2901 4 as as IN 42149 2901 5 representing represent VBG 42149 2901 6 the the DT 42149 2901 7 Management Management NNP 42149 2901 8 of of IN 42149 2901 9 the the DT 42149 2901 10 Company Company NNP 42149 2901 11 , , , 42149 2901 12 to to IN 42149 2901 13 the the DT 42149 2901 14 Chief Chief NNP 42149 2901 15 Engineer Engineer NNP 42149 2901 16 , , , 42149 2901 17 Charles Charles NNP 42149 2901 18 M. M. NNP 42149 2901 19 Jacobs Jacobs NNP 42149 2901 20 , , , 42149 2901 21 M. M. NNP 42149 2901 22 Am Am NNP 42149 2901 23 . . . 42149 2902 1 Soc Soc NNP 42149 2902 2 . . . 42149 2903 1 C. C. NNP 42149 2903 2 E. E. NNP 42149 2903 3 , , , 42149 2903 4 and and CC 42149 2903 5 to to IN 42149 2903 6 James James NNP 42149 2903 7 Forgie Forgie NNP 42149 2903 8 , , , 42149 2903 9 M. M. NNP 42149 2903 10 Am Am NNP 42149 2903 11 . . . 42149 2904 1 Soc Soc NNP 42149 2904 2 . . . 42149 2905 1 C. C. NNP 42149 2905 2 E. E. NNP 42149 2905 3 , , , 42149 2905 4 Chief Chief NNP 42149 2905 5 Assistant Assistant NNP 42149 2905 6 Engineer Engineer NNP 42149 2905 7 , , , 42149 2905 8 for for IN 42149 2905 9 their -PRON- PRP$ 42149 2905 10 permission permission NN 42149 2905 11 to to TO 42149 2905 12 write write VB 42149 2905 13 this this DT 42149 2905 14 paper paper NN 42149 2905 15 , , , 42149 2905 16 and and CC 42149 2905 17 also also RB 42149 2905 18 to to IN 42149 2905 19 all all PDT 42149 2905 20 the the DT 42149 2905 21 members member NNS 42149 2905 22 of of IN 42149 2905 23 the the DT 42149 2905 24 field field NN 42149 2905 25 office office NN 42149 2905 26 staff staff NN 42149 2905 27 for for IN 42149 2905 28 their -PRON- PRP$ 42149 2905 29 great great JJ 42149 2905 30 and and CC 42149 2905 31 unfailing unfailing JJ 42149 2905 32 assistance assistance NN 42149 2905 33 in in IN 42149 2905 34 its -PRON- PRP$ 42149 2905 35 preparation preparation NN 42149 2905 36 . . .