College and Research Libraries FERDINAND F. LEIMKUHLER and MICHAEL D. COOPER Cost Accounting and Analysis for University Libraries The approach to library planning studied in this paper is the use of accounting models to measure library costs and implement program budgets. A cost-flow model for a university li?rary is develop~d a~d tested with historical data from the General Ltbrary at the Untverstty of California, Berkeley. Various comparisons of an .exploratory na- ture are made of the unit costs and total costs for dtfferent parts of the Berkeley system. THE CosT-FLow AccouNTING MoDEL THERE DOES NOT APPEAR to be any uni- form method by which libraries account for their internal costs. Considerable at- tention is given to the development of budgets along organizational lines and to the control of expenditures for labor and materials. But these data are not used to measure the cost of performing some function or rendering some service in the manner of industrial cost ac- counting. For example, in order to esti- mate the cost of holding a journal and to compare it with the cost of using a regional lending service, Williams 4 had to develop his own basic data in four libraries by means of interviews and other sampling techniques. In their re- Dr. Leimkuhler is D ean of the School of Industrial Engineering, Purdue University, Lafayette, Indiana, and Dr. Cooper is as- sistant professor at the School of Librarian- ship, University of California, Berkeley. This work was supported by a Ford Foundation grant no. 68-267 (Research Projects in University Administration) to the Office of the Vice-President-Planning and Analysis, University of California, Berkeley. Copies of the full rep01t may be obtained from . Dr. Cooper. cent study of the M.I.T. Libraries, Raf- fel and Shishko3 had to augment the existing data base considerably in order to estimate the cost of various library functions and programs. In addition, the papers of Penner2 and Landau1 pro- vide a good review of previous cost studies. A basic notion in the development of a cost control system is the idea of a "cost center" for which there is a clear definition of function and responsibili- ty. The cost cent~rs serve as focal points in the system for the collection and evaluation of cost data. There appear to be two major kinds of cost centers in libraries: processing centers and service centers. The processing centers serve an intermediate role in the flow of re- sources to the service centers, and all of their costs are passed on to the service units. The service centers can include branch libraries or specialized facilities within a central library. These units of- fer a schedule of services to certain users at certain "prices" which together comprise the output of the library. A library program may be identified with a single service unit or may cut across several or all units. Shishko divided the mission of the M.I.T. Libraries between research and instruction without subdi- I 449 450 I College & Research Libraries • Nove1nber 1971 viding it by subject area. In a branch li- brary system most branches would con- tribute to both research and instruction- al programs and their individual output would have to be divided under the two main headings, if this is desired. In ac- counting for costs and developing costs of service estimates it is important that these figures be related to a true deci- sion-making function in the organiza- tion; that is, they should have a quality called "accountability." It is meaning- less to develop numbers about which nothing can be done. A simplified cost accounting plan for modelling the flow of cost through a li- brary organization is shown in Figure 1. This plan incorporates the notion of standard cost as a measure of perform- ance. The standard costs are based on the number of items processed, ac- quired, or held by the library unit. Oth- er measures of performance could be used to gauge the flow of costs. These standards should be evaluated each year and modified accordingly so as to pro- vide the best estimate of what is expect- ed for the next year. "Variance" ac- counts can be used to collect the differ- ence between what is expected and ac- tually occurs; that is, between standard cost and "full" cost. This is a common and useful way to maintain control over costs and to generate management-by- exception reports. In Figure 1 only one variance account is shown for each cate- gory, but in practice one may develop separate variance measures for the amount and the unit cost of a flow. For example, if labor is casted at different wage rates for different kinds of labor hours used, it would be possible to maintain separate variance accounts for the wage rate and the labor hours to ex- plain total labor variance. Standard cost- ing assumes that the cost is directly pro- portional to the basis for unit cost; however, routine corrections can be made to account for any predictable bias from the variance figures. A CosT MonEL OF THE BERKELEY LIBRARIES The cost accounting plan in Figure 1 was applied to the Libraries of the Uni- versity of California at Berkeley in or- der to show how costs are generated and flow through the system to the various branch and special libraries. The result- ing simplified cost model of the Berke- ley Libraries is shown in Figure 2. No variance accounts are included in this model, since it is based on the cost his- tory of a single year. However, variance accounts and standard costing could be introduced. The model conforms closely to the organizational structure of the Berkeley Libraries except in the case of the Serials and Documents Department, where a division had to be made be- tween their function as a central proc- essing unit and their function as a spe- cial service unit for readers. A similar division was made at the branch li- braries to separate the cost of selecting and accessioning new items from the cost of maintaining and providing ser- vice fron1 the shelved collection. The main kinds of costs in the model are the direct costs for materials and la- bor and the indirect costs for space and overhead. The costs of space and uni- versity overhead do not enter into the ordinary budget estimates of operating costs, but they are important parts of the total cost of operating libraries and cannot be ignored. All space for the li- braries was casted at the same unit price except for the depository space, and the university overhead was applied at a uniform rate. This permitted the devel- opment of a total labor, space, and overhead figure for each organizational unit of the library. The main distinction in the flow of materials is between monographs and serials, and between purchased items and gift and exchange items, although the latter distinction is dropped after acquisition processing. For serials, a dis- Cost Accounting and Analysis I 451 Materials Materials Materials Processinq T Variance Variance Units - Actual Cost ~Cost (~~~~~·~~quire~) Processing Labor Processing Labor ~ Actual ~ STD (ACQ) Facilities Facilities X Variance STD (ACQ) X STD (ACQ) Service Units X X STD Cost of Service X ExpF __ A_c_tu_a_l _ =r: STD (Collecti on Size ) X Service Labor Variance Variance Summary Service Labor T=- -A-ct_u_al_ ~ STD (Collection Size) Jlf X t Figure 1 FLow OF LIBRARY CosTs IN A SIMPLIFIED STANDARD CosT AccouNTING PLAN tinction is maintained between new items and continuing items because of the difference in cataloging treatment. The total number of items and their distribution through the system are based on data from the annual reports of the Berkeley Libraries for the year July 1, 1967, to June 30, 1968 ( 1967/ 1968), although in some instances it was necessary to develop estimates from the Libraries' files of orders. DIRECT CosTs: MATERIALs Materials costs for the Berkeley li- brary are limited to two classes of items: monographs and serials. Any type of li- brary material for which a standing or- der can be placed is considered a serial. Through the budgeting process each branch library is allocated money for purchase of monographs. For each branch a branch fund is maintained from which all disbursements are made. In all, more than 150 funds are used for materials purchasing for the Gen- eral Library. Each order for a monograph may call for the receipt of one or more volumes. A random smnpling procedure was un- dertaken to determine the number of volumes per order. Eighteen hundred orders from thirteen funds were ex- amined. From this data, the number of volumes per order was determined to be 1.20. Certain funds such as those used to buy back sets and serials and dupli- cate copies of high usage monographs had significantly different ratios-2.20 for both. For these funds, the latter factor was used. Table 1 summarizes the number of monographs acquired during the fiscal year 1967/ 1968. The average price per monograph for the Berkeley General Library was $7 .44, for a total of 81,350 items acquired. The number of items acquired by the branches was 21 percent of the total, while expenditures were 20 percent of the total ( $605,588). 452 I College & Research Libraries • November 1971 M h A onograp cqu1s1t1ons enera Library Monographs Branch ibrary Accessio ns 4,589 Duplicate Monographs (Monos) 81 ,35 0 Mono ... bO'-" ~ 'C3g"' ~o.2~ u.=: ........ CI)C)~ 5,879 7.44 48 2,682 55.881 5,217 6.42 13 96 7.38 3,550 9.10 15 309 20.60 930 12.92 9 231 25.67 6,358 9.66 76 2,848 37.472 2,373 13.11 22 535 24.32 4,065 8.31 9 85 9.44 21,620 4.63 28 455 16.25 9,878 5.37 40 351 8.78 8,670 12.16 55 2,118 38.51 NA NA NA NA NA 11,925 7.62 28 1,376 49.14 2,706 9.95 14 188 13.43 9,607 6.54 32 360 11.25 1,857 3.99 22 374 23.38 11,922 9.48 14 171 12.21 1,716 8.80 2 12 6.00 3,284 10.49 13 259' 19.92 7,522 7.71 26 441 16.96 2,347 5.52 10 71 7.10 121,426 6.95 476 12,962 27.23 484,162 7.59 499 6,550 13.13 605,588 7.44 975 19,512 20.01 general assistance. INDIRECT CosTs: OVERHEAD AND SPACE The cost of library building space is estimated to be about $5.00 per square foot per year. This figure is intended to represent current replacement value of the building space including equipment and fixtures and the cost of utilities and maintenance. The simplified m ethod used to make this estimate is shown be- low. The numbers used were obtained from the studies by Raffel and Shishko3 and Williams ,4 and from consultation with the Berkeley and University Archi- tects Offices, the Berkeley Grounds and Building Office, and the University Real Estate. Office. These numbers, however, 454 I College & Research Libraries • November 1971 TABLE 2 SIZE O F THE GENERAL LIBRARY Ju E 30, 1968 Branch Library Agriculture Art/ Anthropology Astronomy /Math / Stat Biochemistry Biology Chemistry Earth Sciences East Asiatic Education / Psychology Engineering Entomology Environm ental Design Forestry Graduate Social Sciences Library School Music Optometry Physics Public Health Social Welfare/ Crim Branch Total Main Building Total General Library 1 Includes 22,692 d ocuments. Volumes 63,799 27,024 24,574 5,427 144,090 18,342 42,199 241 ,811 65,455 63,162 8,579 50,728 20,281 39,014 25,520 70,360 2,872 15,276 41,111 12,857 982,481 2 200 562 3:183:043 2 A serial title is considered as an item. Title TABLE 3 SALARY SCHEDULE Professional Librarian I Librarian II Librarian III Librarian IV Librarian V Non professional Library Assistant I Library Assistant II Library Assist ant III Gen eral Assistance Clerk 1967 / 1968 Mean Salary ( $) P er Yea r $ 7,075 8,450 9,975 11,575 13,725 5,250 6,078 7,044 4, 650 are not to be considered as official or certified figures in any sense, but only as representative cost figures for the purpose of analysis. The annual cost for the Richmond Inter-Campus Library Facility ICLF ( N) is estimated to be about $2.50 per square foot per year to cover the cost of pur- Ratio of Volumes Current Serials Total Items 2 to Serials 2,437 66,236 26.18 1,158 28,182 23.34 827 25,401 29.71 140 5,567 38.76 3,221 147,311 44.73 335 18,677 54.75 977 43,176 43.19 1,237 243,048 19.55 1,385 66,840 47.26 1,638 64,800 38.56 246 8,825 34.87 1,293 52,021 39.23 1,334 21,615 15.20 2,616 41,630 14.91 2,014 27,534 12.67 197 70,557 357.16 82 2,954 35.02 190 15,466 80.40 906 42,017 45.38 275 13,132 46.75 22,508 1,004,989 43.65 44,07,51 2,244,637 49.93 66,583 3,249,626 47.81 chase, remodeling, equip1nent, utilities, and maintenance. Tables 4 and 5 sum- marize the space costs for the General Library. In addition to direct labor costs, the library incurs expenses for fringe bene- fits and salary administrative overhead for its employees. Discussions with the University Office of the Vice President for Planning and Analysis indicated that administrative overhead is approxi- mately 10 percent of direct labor cost. Salary administrative overhead ranges between 9 and 13 percent of direct la- bor, depending on job title. This study assumed that administrative overhead was 10 p ercent. Thus, fringe b enefits plus administration total 20 percent. Within the library itself, the costs of the librarian's office, the business office, the personnel office, and the space used by these departments were considered as part of the library overhead charge. In addition, supplies and general ex- Cost Accounting and Analysis I 455 TABLE 4 LABOR AND SPACE CosTs-MAIN LIBRARY 196711968 Total Direct Total Total Annual Salary Assignable Space Cost Expenditures Square Feet at $5.00/ Main Library Unit TotalFTE ( $) (ASF) Square Foot Acquisitions Departm ent 66.75 481,763 13,793 68,965 Bancroft Library 35.075 249,3.55 31,599 157,995 Business Office 17.375 105,742 4,358 21,790 Catalog Department 76.75 500,420 6,375 31,875 Catalogs (Public) 9,899 49,495 Documents Department 26 .045 162,584 31,064 155,320 General Reference Service 17.25 128,369 3,066 15,330 Inter-Campus Library 3.50 16,875 55,840 139,6002 Facility North ( ICLF) Depository Librarians Office 6.75 83,89P 1,566 7,830 Library Pers . Office 3.375 23,470 447 2,235 Library Photo. Service 23.50 141,285 4,665 23,325 Loan D epartment 88.125 464,667 100,901 504,505 Morrison Library 3.745 20,708 5,487 27,435 Reading Rooms 16,748 83,740 Serials Department 69.125 381 ,007 31 ,440 157,200 Storage Selection 1.25 5,813 Undergrad. Library 4.50 32,906 4,791 23,955 Selection Project Total Main Library 443.115 2,798,855 322,039 1,470,595 1 Estimated. 2 Total annual cost of $2 .50 per square foot. TABLE 5 LABOR AND SPACE CosTs-BRANcH LIBRARIES 1967/1968 Total Direct T otal Annual Salary Space Cost Expenditure Total at $5.00/ Branch Library Total FTE ( $ ) ASF Squa re Foot Agriculture 4.805 33,009 7,746 38,730 Art/ Anthropology 4.045 24,387 5,307 26,535 Astronomy /Math/Stat 3.94 23,783 4,009 20,045 Biochemistry .512 4,014 1,503 7,515 Biology 14.225 81 ,617 21,480 107,400 Chemistry 3.08 19,276 11,025 55,125 Earth Sciences 3.08 20,104 5,782 28,910 East Asiatic 18.875 153,834 13,698 68,490 Education/Psyc. 13.50 84,532 13.,308 66,540 Engineering 5.875 35,498 6,125 30,625 Entomology 1.52 9,947 1,796 8,980 Environmental Des. 8.08 54,376 14,522 72,610 Forestry 4.97 37,436 5,319 26,595 Grad. Soc. Sci. 11.69 77,415 23,713 118,565 Library School 2.75 17,679 3,321 16,605 Music 6.375 44,096 8,858 44, 290 Optometry 1.03 6,897 1,014 5,070 Physics 3.58 23,958 4,833 24,165 Public Health 5.64 36,149 7,873 39,365 Social Welfare 3.20 17,439 4,205 21,025 ~-- Total Branch Library 120.772 805,446 165,437 827,185 Total Main Library 443.115 2,798,855 322,039 1,470,595 TOTAL 563.887 3,604,301 487,476 2,297,780 456 I College & Research Libraries • November 1971 Cost of on-campus or nearby real estate Total building construction project cost Total building and site cost $12.00 per gross sq. ft. 38.00 per gross sq. ft. Assignable space factor with 80 percent utilization Effective cost of assignable space $50.00 per gross sq. ft. 1.25 $62.50 per sq. ft. 4.00 per sq. ft. Cost of fixtures, furniture, shelving, etc. Total initial cost of space and furnishings Capital recovery factor $66.50 per sq. ft. 0.06 Equivalent annual cost of space and furnishings Annual cost of utilities and maintenance $ 3.99 per sq. ft. per yr. ~per sq. ft. per yr. Total annual cost for library building space penses as well as equipment and fixtures were included in the overhead charge and allocated to library units on a salary basis. The overhead charges for these departments and items amounted to 21 percent. The total overhead charge for library units was 41 percent ( 20 per- cent + 21 percent). PROCESSING CosT CENTERS: AcQUISITION AND CATALOGING CosTs As materials are introduced into the processing centers of the library, they undergo transformations which ulti- mately result in items ready for circula- tion. Figure 2 shows the flow of items through the processing centers, and Ta- ble 6 indicates unit costs. The mono- graphs and/ or serials enter at each processing center. To these "raw materi- als" is added a labor, space, and over- head charge. Thus, as a unit passes out of the processing center, a value is add- ed corresponding to the cost of process- ing the item. For purposes of the model, mono- graphs are considered to be acquired from two sources-purchases and gifts. Purchased monographs enter the system at a cost of $7.44 per item. Gift mono- graphs enter at zero cost per item. To the direct material cost for purchased monographs is added a labor and space charge of $3.04 per item. The $3.04 is the cost for the Administrative and Processing Divisions of the Acquisitions $ 4.99 per sq. ft. per yr. Department, plus overhead. New monographs enter the cataloging department from the Gifts Division and the normal acquisition ordering procedure. Once in the cataloging de- partment, a labor, space, and overhead charge of $5.40 per monograph is add- ed. Binding, selection, and other miscel- laneous charges are also added. A monograph acquired by a branch has a final cost of $25.00, while a mono- graph acquired by the main library costs $19.85. Similar flows can be observed for seri- als and documents. A paid serial has an TABLE 6 UNIT CosTs Monographs Serials Purchase Price Selection $ 7.44 $20.00 Main Library Branch Library Acquisition Labor and Space Cataloging Labor and Space Serials Check-In Labor and Space Miscellaneous Binding Postage, Insurance, Taxes Total 0 2.84 4.00 3.04 5.40 1.54 .15 Main Library Branch Library 19.85 25.01 2.84 4.00 2.65 49.61 3.04 5.03 .15 33.87 39.03 o Columns do not add to total since not all units are processed by all departments. initial subscription cost of $20.00. Af- ter cataloging for a new serial and proc- essing (check in/ entering) for all seri- als, the branch cost is raised to $39.03 and the main library cost becomes $33.87. Miscellaneous charges include binding expenditures as well as postage, insur- ance, and taxes on acquisitions. Binding charges are made up of the cost to op- erate the bindery, the Bindery Prepara- tion Division, and the Binding Pickup Department. Including space and over- head charges, this amounts to $337,197 for 55,880 items bound (excluding mending). When the total expenditure is divided between monographs and se- rials in the ratio 20,899 to 34,981 ( 1 to 1.67) and the resulting cost divided by the total monograph and serial items processed, a cost of $1.54 per mono- graph and $5.03 per serial results. These amounts represent proportional charges for future binding that a processed item incurs. In addition to binding and postage charges, a received serial has added to it a charge reflecting its check-in cost. This amounts to $3.24 per serial title per yeaT. SERVICE CosT CENTERS: MAIN LIBRARY AND BRANCH LIBRARIES CosTs Once the labor and space costs have been established for the processing functions, it is then possible to deter- mine the service costs and the total li- brary costs. Tables 7 and 8 summarize the total library cost for the system. Out of a total of $8.3 million, $3.7 million ( 46 percent) is spent in the process of acquisition of materials. Of this, only $1.2 million ( 14 percent) is for the pur- chase of raw 1naterials, i.e., monographs and serials. Total acquisition cost of $3.7 million has three components: materials cost, la- bor cost, and space cost. Materials are either monographs or serials, and enter the system at a unit price of $7.44 and Cost Accounting and Analysis I 457 $20.00, respectively. Gift items enter at zero cost. Acquisition labor cost includes the cost of all units involved in process- ing the items; i.e., acquisitions process- ing, cataloging, serials processing, docu- ments processing, and branch process- ing. The space cost is that associated with each of the processing units. Branch labor acquisition cost was de- termined by means of interviews with each branch librarian. The librarian was asked to indicate what percentage of time each employee spent in the ac- quisitions process. This time was in- tended to reflect the cost of selection of materials, typing of orders, and other associated tasks. The cost of branch processing of items (cataloging, filing, etc.) was estimated from a survey of three branch libraries. Service labor and service space costs reflect the cost of providing service to the patron. This is in distinction to the total processing cost which reflects the cost of obtaining and processing raw materials. CoMPARISON OF THE CosTs oF CrncuLATION, HoLDING, AND ACQUISITION Several measures have been selected for use in evaluating the performance of the library and aiding in planning and analysis. If the total cost for the branch service operations is divided by the total number of items held, a mea- sure of the holding and acquisition cost per item is obtained. Figure 3 plots this relationship for the branch libraries. The plot exhibits a declining cost per item held as the number of items held by the library increases. Evidently some economies of scale are present. The smallest branch library, Optometry, has the second highest cost among all branches ( $7.05). (Libraries cited are circled in subsequent figures to aid the reader in interpreting the data.) The Graduate Social Science Library has the 458 I College & Research Libraries • November 1971 TABLE 7 ToTAL LIBRARY CosT-BRANCH LIBRARIEs 1967/1968 Service Service TotaP' Total Labor Space Processing Library Branch Cost Cost Cost Cost Agriculture 21,372 37,749 115,916 175,037 Art/ Anthropology 18,886 25,931 66,572 111,389 Astronomy /Math / Stat 23,938 19,674 42,553 86,165 Biochemistry 3,997 7,450 7,364 18,811 Biology 84,942 106,226 143,041 334,209 Chemistry 23,129 54,967 17,850 95,946 Earth Sciences 16,859 28,462 51,007 96,328 East Asiatic 171,330 66,714 165,330 403,374 Education/Psychology 93,595 65,543 102,532 261,670 Engineering 31,657 29,908 82,706 144,271 Entomology 12,131 8,906 9,601 30,638 Environmental Design 53,969 71,728 91,641 217,338 Forestry 40,311 26,109 59,216 125,636 Graduate Social Sciences 77,108 117,313 140,752 335,173 Library School 5,646 15,854 90,856 112,356 Music 50,456 43,833 70,476 164,765 Optometry 7,515 4,984 8,325 20,824 Physics 29,777 24,009 15,666 69,452 Public H ealth 36,078 38,785 61,061 135,924 Social Welfare 19,022 20,808 21,934 61 ,764 Branch Total 821,718 814,953 1,364,399 3,001 ,070 Main Total 1,618,531 1,282,612 2,425,481 5,328,624 TOTAL 2,440,249 2,097,565 3,789,880 8,327,694 0 Includ es materials, labor, space, and overh ead cos ts connected with n onservice activities. TABLE 8 ToTAL LIBRARY CosT-MAIN LIBRARY 1967/ 1968 Total Service Service Materials Total Labor Space Acquisition Library Unit Cost Cost Cost Cost Central Collection Loan Department $ 435,940 $ 430,115 Public Catalog 49,495 Reading Rooms 83,740 Reference Department 181,000 14,050 Reserve Book Room 196,224 49,240 Humanities Grad. Service 23,045 25,150 Bancroft Library 301 ,310 125,360 Rare Books Room 33,249 30,495 Mark Twain Collection 17,030 2,140 Morrison Library 29,198 27,435 Serials Department 49,425 43,482 Newspapers Room 48,799 95,870 Undergrad. Library Project $ 76,783 Documents Department 61,469 128,790 353,586 Maps Room 10,640 16,325 Library Photo Service 199,212 23,325 I CLF ( N) D epository 23,794 139,600 Storage Selection 8,196 Subtotal 1,618 ,531 1,284,612 430,369 Main Library Materials Acquisition 1,995,112 Total $1,618,531 $1,284,612 $2,425,481 $5,328,624 Cost Accounting and Analysis I 459 12 10 .GSSL 8 a; :r: E • OPT .,.... ::::::! o- w Q) ·~l 0 1- I ....- :::::1 LL ED c .,.... Q) 8 N (/) 4- 4- ttl • +J MUS (/) >, 6 ENG S- ttl • PH S- .0 • FOR • __: AG ~ •A/A u c 4 ttl • AMS S- co • PHY • sw tHEM • tsL ES 2 • ENT • OPT • BIOCHEM 0 40,000 80,000 120,000 160,000 200,000 240,000 260,000 Volumes Held in June 1968 Figure 6 VoLUMEs-FTE BY BRANCH LIBRARY acquisition. The cost for the remam1ng branch libraries seems to stabilize in the $1.20 to $2.70 range. CoMPARISONS oF L ABOR AND SPACE CosTs Nearly $3.6 million out of $8.3 mil- lion was spent for direct labor in the General Library in 1967/1968. Since this constitutes a relatively large expend- iture, it is important to try to develop tools for detecting significant changes in staffing needs. The relation between FTE and the number of volumes held is presented in Figure 6. As the number of volumes 462 I College & Research Libraries • November 1971 C() 1.0 160,000 140,000 120,00 ~ 100,000 I ~ 1.0 m !:: . ....... "'C QJ +-' tO ,...... ::l u s... ........ u Vl E QJ +-' • ENT • 0 A/A •ENG 0 AMS • PHY • CHEM . . LSL PH • GSSL . E/P ED • BIOL O+---~O~. P~T~-------+-------4--------~------+-------4-------~ 0 2 4 6 8 10 12 14 Branch Library Staff Size in Full-Time Equivalence Figure 7 FTE-CrncULATION held increases, FTE staff increases. This relationship may be due to the manner in which staff is allocated to the branch- es. When FTE and circulation by branch are compared (Figure 7), the same in- creasing pattern emerges. If a curve were fitted to the data of Figure 6, it would seem that the Graduate Social Sciences library and the Education/ Psychology library fall in line with the staffing-circulation relationships of the other branches. Interviews with the Art/ Anthropolo- gy and Astronomy /Mathematics/Statis- tics librarians have indicated a shortage in FTE for the amount of circulation of their respective branches. This seems to be confirn1ed by Figure 7. In addi- tion, the graph indicates that Agricul- Cost Accounting and Analysis I 463 160,000 140,000 120,000 ~ 100,000 0"1 (!) s::::: ::I '"":) s::::: .,.... 80,000 -o @ EP Qj MUS • :::z:: • Vl ® AG E ENG (!) ~ 60,00 • ED • ES PH 40,000 • GSSL 0 •LsL A/A A.Ms ·FoR 20,00 •S\~ • PHY • CHEM •ENT esiOCHEM • OPT 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 Stack Space in Square Feet Figure 8 STACK CAPACITY ture, Biology, and Forestry are over- staffed for the amount of circulation. The storage of materials constitutes a second area in which planning and control must be exercised. Since facili- ties cannot be constructed in short peri- ods of time, management must be in a position to predict when a branch will no longer be able to store all the items it would like. The stack capacity (in square feet) for each of the branches is plotted against the total items held by that branch in Figure 8. From the graph it is apparent that the Chemistry and Graduate Social Sciences library have room for expansion while Art/ Anthro- pology, Engineering, and Music seem to be relatively crowded. SuMMARY A cost-flow accounting model has been presented and data from the University of California Berkeley General Library 464 I College & Research Libraries • November 1971 has been used to illustrate the model's applicability. Unit and total cost com- parisons have been made and evaluative tools have been proposed for use in li- brary management. From the analysis, a number of conclusions can be drawn. With respect to circulation, holding, and acquisition costs, it appears that a lower cost per item held is found in branch libraries having a large number of items. In addition, branch libraries with a circulation in the range of 50,000 to 70,000 are found to have the mini- mum cost per unit of circulation. The analysis also indicates that smaii branch libraries spend more of their resources on acquisition of material than they de- vote to labor. Analyses of labor and space costs also yield useful planning information. From these costs it is possible to detect staffing needs and staffing patterns. This is done by determining the relationship between FTE and circulation and FTE and items held for the branch libraries. In addition, by determining the relation between volumes held and stock capaci- ty across ali branches, the librarian is in a position to see where construction re- sources can be used most effectively, or where coiiection weeding might take place. AcKNOWLEDGMENTs The authors acknowledge the gen- erous assistance of Dr. James E. Skip- per, university librarian, for making available all necessary data for the cost analysis. ~1rs. Helen M. Worden, associ- ate university librarian, was especially helpful in clarifying many of the prob- lems incurred in the analysis of the Berkeley library. Miss Coralia Serafim conducted the survey of branch librari- ans. Dr. Robert M. Hayes and Dr. Pat- rick Wilson made valuable suggestions to preliminary drafts of this document. BIBLIOGRAPHY AND REFERENCES 1. Landau, Herbert B. "The Cost Analysis of Document Surrogation: A Literature Re- view," American Documentation 20:302- 10 (Oct. 1969). 2 . Penner, Rudolph J. "The Practice of Charg- ing Users for Information Services: A State of the Art Report," Journal of the American Society for Information Science 21 : 67-7 4 (Jan.-Feb. 1970). 3. Raffel, Jeffrey, and Shisko, Robert. System- atic Analysis of University Libraries. M.I.T. Press, 1969. 4. vVilliams, Gordon. Library Co st Models: Owning Versus Borrou;ing Serial Publica- tions. Center for Research Libraries: Chi- cago, 1968. PB 182 304.