Erection and Inspection of Iron and Steel Constructions WRITTEN FOR THE USE OF ARCHITECTS, ENGINEERS AND BUILDERS AND FOR CIVIL SERVICE CANDIDATES FOR THE POSI- TION OF INSPECTOR OF IRON AND STEEL By L. M. BERNFELD, C. E. v\ Former Inspector of Iron and Steel Construction for the Bureau of Buildings, New York City. PRICE, $2.00 PUBLISHED BY THE CHIEF PUBLISHING COMPANY NEW YORK 1913 Copyright 1913 BY L. M. BKRNFKIvD NEW YORK mj> motfjer to tofjoge untireb bebotion 3f lavjjelp otoe tpfjatelier little 3 map possess in ebu= cation, feinbnesig anb intellectual am= Ijition, tfjis; fcoofe is; mos(t affectionately bebicateb. CONTENTS PART ONE. CHAPTER I. Definitions and General Introduction. Stresses and strains. Elastic limit and ultimate strength. Modulus of elasticity. Factors of safety. Working unit stresses. Coefficient of linear expansion. CHAPTER II. Practical Problems on Stresses and Strains. Table of properties of Cast Iron, Wrought Iron and Steel. Thirty- one problems with answers or completely solved. CHAPTER III. The Manufacture of Iron and Steel. CAST IRON. Definition. Manufacture. The blast furnace. Classi- fication. Properties. Fracture of good and poor cast iron. Effects of carbon, manganese, phosphorus, silicon and sulphur. Common defects in cast iron. Blowholes, honeycomb, cavities, shrinkage, warp- ing, cold shuts, surface defects. Inspection of cast iron. Laboratory. tosts. Shop inspection. Shop inspection of cast iron water pipes. Advantages and disadvantages of cast iron. WROUGHT IRON. Definition. Manufacture. The puddling process. Properties. Effects of cold rolling, annealing and impurities. Frac- tures of good and bad wrought iron. Cold short and red short iron. Common defects in wrought iron. Inspection of wrought iron. Lab- oratory tests. Advantages and disadvantages of wrought iron. STEEL. Definition. Manufacture. The Crucible process. The Open Tic-art h process. The Bessemer process. Properties. High, 'medium and low carbon steel. Effects of carbon, manganese, phosphorus, sili- con and sulphur. Fracture of good and bad steel. Nickel steel. Cast, steel. Common defects in steel. Blow holes, pipes, burns, cracks, laps, seams, stars, cobbles. Inspection of steel. Laboratory tests. Tensile test. Cold bending. Hot bending. Drifting, harden- ing, forging, welding and quenching tests. CHAPTER IV. Shop and Mill Inspection of Iron and Steel. Shop operations. Straightening, punching, reaming, riveting, facing, boring, fitting up. painting. Marking. Special operations and their effects upon iron and steel. Heating. Welding. Forging. Harden- ing. Tempering. Annealing. Punching and Shearing. Upsetting. Caulking. CHAPTER V. Rivetitio. Definition. Material. Manufacture. Length of rivets. Form of rivets. Fitting connections. Drift pin and drifting. Effects of drifting. Riveters and their output. Tools used in riveting. Dolly bar. snap, buster. Steamboat ratchet. Heating rivets. Rules for good riveting. Hand riveting. Machine riveting. Machine vs. hand riveting. Shop and field rivets. Rivets vs. bolts. Riveting column splices. Specifications. Deceitful work and its detection. Testing rivets. Loose rivets and defective rivets. CHAPTER VI. Specifications. General outline. Specifications regulating quality, shopwork. erec- tion and inspection. Manufacturer's Standard specifications. Com- plete specifications for a loft building. CHAPTER VII. Field Inspection of Minor Structures. Work of iron inspectors in the field. Inspection of store front alterations. Inspection before setting. Wrought iron beams. Sec- ond hand material. Separators. Common defects and their results. Strapping of iron work. Defective strapping. Templates. Size of templates for steel beams. Defective templates. Wall anchors. Store front alterati- us involving columns. Common defects and vio- lations of the law. CHAPTER VIII. Hoisting Iron Work in the Field. Definitions. Cranes and Derricks. Shear-poles. Setting derricks. Power for derricks. Stresses in derricks. CHAPTER IX. Iron in Retaining Walls and Footings. Three kinds of retaining walls. Piers for columns. Bearing capac- ity. Inspection of piers. Piers in caissons. Grillage. Bolting grill- age beams. Setting and grouting. CHAPTER X. Cast Iron Bases and Their Inspection. Method of testing in the field. Repeated inspections. Setting cast iron bases. CHAPTER XL Cast Iron and Steel Columns. CAST IRON COLUMNS. Eccentricity. Cracked columns. Deceitful work. Correct remedies. Honeycomb and sand holes. Their detec- tion. Milling. Use of shims. Painting. Bolting, Plumbing up STEEL COLUMNS. Lengths, Temporary bolting. Erection and temporary bracing. Riveting. Milling. Incorrect lengths and reme- dies for same. CHAPTER XII. Beams and Girders. Their uses. Wall beams. Floor beams. Tie beams. Struts. Con- nections. Connections of beams to. steel columns. Connections of beams to cast iron columns. CHAPTER XIII. Sidewalk Beams. Uses. Loading. Framing. Defective work. Incorrect elevation. Slope. Wrong setting. Anchors and plates. Vault framing. Old vaults. Requirements of City ordinances. Hoist guides. CHAPTER XIV. Stairways and Fire Escapes. Erection and inspection of stairways. Definitions. Outside fire escapes. Buildings requiring fire escapes. Supervision by the Bureau of Buildings. Regulations of the Bureau of Fire Preven- tion for construction of fire escapes. Location. Balconies. Railings. Stairways, Brackets, Drop ladders. Goose neck ladders. Scuttle ladders. Painting. CHAPTER XV. Roof Tanks. . Uses. House tanks. Gravity tanks. Pressure tanks. Location. Beams supporting tanks. Capacity of tanks. Tank towers and bolting. Wind braces and anchorage. Saddles. PART TWO. CHAPTER XVI. Permit to Build. How to obtain a permit. Plans and specifications. Permits for new buildings. Permits for alterations. Slip applications. Approval of plans. Complete application for erection of brick buildings with over sixty questions fully answered. CHAPTER XVIL The. Building Code. List of sections relating to iron work. Full text of sections of the Code relating to iron and steel specifications, erection and inspection. CHAPTER XVIII. Building Code Index. For a quick reference to sections relating to iron work. CHAPTER XIX. Special Regulations of the Bureau of Buildings. Projections beyond building line. Ornamental columns, steps, mould- ings, rustications, marquises and awnings. Electric signs. Moving picture booths. CHAPTER XX. Extracts From the State Labor Laws and the Sanitary Code. Relating to construction of iron and steel work. Inspection of scaf- folding, ropes, blocks, pulleys and tackles. Accidents. Penalties. Insecure scaffolding. Planking. The Sanitary code. Malfeasance and Nonfeasance. CHAPTER XXL Extracts From the Rules and Regulations of the Bureau of Buildings. Relative to Iron Inspectors. Hours of duty. Violations of Law. Reports. Complaints. Inspections. Use of official badge; CHAPTER XXIL Reports. General remarks. Daily journal reports. Reports on violations of law. Reports in full form. Digests of reports on violations of Labor Laws. Digests of over fifty reports on violations of provisions of the laws relating to iron work. Special reports in full form. Report 011 complaint. Report on encumbering fire exit. Dismissing a violation. Report on working without a permit. Report for dis- missal of a violation. Report on defective ladders. Report on dan- gerous construction. Report on defective work about to be covered up. Final report of completion of work. Monthly report of progress of steel work on an important building. CHAPTER XXIII. Questions and Answers. For previous Civil Service examinations for Inspector of Iron and Steel construction. First paper questions : Technical. Arithmetic. Second paper questions : Technical. Arithmetic. Report. First paper answers : Technical. Arithmetic. Second paper answers : Technical. Arithmetic. Report. PART THREE. CHAPTER XXIV. Explanation of Tables. Wire and sheet metal gauges. Determining gauges. Shearing and bearing value of rivets. Length of rivets. Properties of American Standard and Special beams. Definitions. Moment of Inertia. Radius of Gyration: Section Modulus. Properties of American Standard and Special channels. Properties of Standard and Special Angles. Properties of Bethlehem I Beams and Bethlehem Girder Beams. Comparison with standard beams. Properties of Bethlehem H Columns. Advantages and disadvantages. Safe loads for beams, channels and angles. Uniform loads. Concen- trated loads. Design of beams. Safe loads on channels set flatwise. Safe loads for Cast Iron Columns. Design of cast iron columns. Design of steel columns. Safe loads for standard shapes used as struts. Maximum unsup- ported length for various shapes. Cylindrical tanks and their capacity. Conversion tables. Decimals of an inch for each 1-32. Decimals of a foot for each 1-16. CHAPTER XXV. Tables. Twenty ready reference tables for field use. INDEX. PREFACE The purpose of this publication is three fold : First : To present before practical builders some essen- tial technical facts, necessary to a better understanding of the qualities and defects of Iron and Steel as used in construction work. Second : To form a ready reference book for Architects, Engineers and Inspectors, for use in the field, in figuring the strength of beams, columns, and connections. Third : It will prove a valuable aid to students in engi- neering and to candidates for Civil Service Examinations for the position of Inspector of Iron and Steel Constructions. Some of the information following is extracted from ex- cellent volumes on architecture, metallurgy, fabrication, de- signing, erection and superintendence. Much of the material, however, is entirely original, being based upon results of ac- tual inspections made by the author in his former capacity. Lupescu M. Bernfeld. New York City, December, 1912. Erection and Inspection of Iron and Steel Constructions PART I CHAPTER I. Definitions and General Introduction. STRESSES. Place a brick on end and rest on top of the brick a weight of 200 pounds. (Fig. i) This weight causes a downward pressure against the brick. In the same time there is developed in the brick an internal resistance of 200 tbs. acting against the weight and keeping the same in equili- brium ; otherwise the weight would crush the brick and move downward. The weight represents an external force acting upon the brick. The internal resistance developed in the brick by this weight is called a "stress." We can therefore say, that : "A stress is an internal resistance which balances an external force." An exterior force acting on a body tends to produce a deformation or change in the shape of the body. We call "Strain or deformation" the change in shape or the distortion caused in a body by an external force acting upon it. Three kinds of simple or direct stresses may be produced by external forces ; these are : Tension, caused by forces stretching or tending to pull a body apart. Compression, caused by forces tending to push together or shorten a body. Shear, caused by forces tending to cut across. In all cases unit stress is the stress per unit* area. For instance: If a brick 2x4x8% in. stands on one end and a weight of 240 pounds is- rested on it, the unit compressive stress equals 30 pounds per sq. in. In the same way, if a weight of 2,000 pounds is hung from a rope having a cross-section of J/ sq. in., the unit ten- sile stress equals 2,000-^-^/2=4,000 pounds per sq. in. Consider two plates riveted together, as in Fig. 2. When the plates are in tension, they tend to shear the rivet or cut it across the area between the two plates. Let the tension in each plate be 2,209 ^ s - The cross-sectional area of a Y^ in. rivet is 3. i4Xdiam. =3. 14X34=4418 square ins. The total shear tending to cut the rivet across is 2,209 pounds. This shear divided by the cross-section resisting it is the unit shear. We therefore have : Unit shear =2 209-^-. 44 18=5,000 pounds per square inch. Elastic Limit and Ultimate Strength. When a gradual- ly increasing force is applied to a bar, the deformation of the ERECTION AND INSPECTION OF bar increases in proportion to the force within certain limits. For instance: If a steel bar one sq. in. in cross-section and 100 in. long is subjected to a gradually increasing tensile force, it elongates as shown in this table : with a tension of 6000 Ibs. the bar elongates .02 in. 12000 ' 18000 3 24000 ' 30000 " 36000 " Notice that the elongation was so far proportional with the stress ; when the stress was doubled, the deformation also .04 .06 .08 .10 .12 W-200 Ibs 200 200 aoo ibs. Fig. 1. doubled. However, with a tension of 42,000 lt>s. the bar elongates .15 in. or .16 in., or in other words, the deformation increases faster than the force applied. Elastic Limit is that unit stress at which the deformation begins to increase in a faster ratio than the stress. When a body is stressed below the elastic limit, upon removing the force, the body will spring back to its original shape and length. When a body is stressed above the elastic limit, upon removing the force the body does not acquire its original shape and length, but it remains permanently de- IRON AND STEEL CONSTRUCTIONS formed or it acquires a permanent Set. This shows that stressing a body beyond its elastic limit is injurious to the elasticity and strength of the body and should never be al- lowed in practice. Returning to the above illustration, if the tensile force is Fig. 2 Single Shear. Fig. 3 Double Shear. increased beyond 42,000 Ibs., the bar will elongate more and more until finally rupture of the bar takes place. Ultimate strength is the unit stress which occurs just be- fore rupture, and it is the highest unit stress that a bar can bear. The ultimate strength varies with different materials, and is from two to four times the elastic limit. For some materials the ultimate strength is higher in compression than in tension. Unit strain or unit deformation is the deformation per unit length. For instance, in the above table, with a stress of 30,000 Ibs. the total elongation in 100 in. was .10 in. and the unit strain or elongation per inch of length of the bar was .io-^-ioo=.ooi in. Since up to the elastic limit the deforma- tion is nearly uniform throughout the bar, the elongation in any portion of the bar, i. e., in 8 in. will equal 8X.ooi = .oo8 in. Modulus of Elasticity is a number which results by divid- ing unit stress by unit strain and is a constant number for stresses below the elastic limit. For instance, in the last table with 6,000 Ibs., per sq. in. of bar area or with a unit 4 ERECTION AND INSPECTION OF stress of 6,000 Ibs. per sq. in. the unit elongation was .0002 in. and the modulus of elasticity for this bar is equal to 6,ooo-f- .0002=30,000,000. With a unit stress of 12,000 Ibs. per sq. in. the unit elongation = .0004 in. and this gives a modulus of elasticity equal to 12000 ^-.0004 =30 mil. This shows that the modulus of elasticity is constant below the elastic limit. The modulus of elasticity is used in figuring out deformations when the stresses are given and vice-versa. Factor of safety is the number obtained by dividing the ultimate unit strength by the actual unit stress. For instance : A one inch square steel bar supports in tension a load of 5> oo Ibs.. If the ultimate strength or breaking load is 65,000 Ibs. per sq. in. then the factor of safety =65000^5000=13. The factors of safety must be greater for varying loads than for steady loads. In table on page 5 usual factors of safety are given for steady loads such as in buildings ; for varying stresses as in bridges and for shock as in machinery. Working Unit Stress is the ultimate strength divided by the factor of safety. For instance : Let four be the factor of safety for steel fixed by law or by specifications. If the ulti- mate strength in tension is 65,000, the working or allowable unit stress equals 65000-^4=16250 Ibs. per sq. in. A flat bar 2 in. X i in. section for instance, will not be loaded in tension with more than 2X16250=32500 tbs. The working unit stresses are higher for dead loads than for variable or moving loads or for impact. The working stress must always be considerably lower than the elastic limit to prevent injury to the material through over-straining. Coefficient of linear expansion is the increase per unit length of a bar when the temperature of the bar is increased by one degree Fahrenheit. For instance, a steel bar a foot long at 40 F. becomes 1.0000065 ft. at 41 F. The increase per degree of a unit length is therefore .0000065 f r steel. This number is the coefficient of linear expansion for steel. The definitions given in this chapter are of great im- portance and the reader is advised to thoroughly master them before proceeding any further. CHAPTER II. Practical Problems on Stresses and Strains. To further illustrate the meaning of the various terms defined so far and the relations existing between them, sev- eral practical problems are here given. In all problems that follow the values given in the following table shall be used : Pounds Melting Elastic Limit Ultimate Strength per point pounds per sq. in. in pounds per sq. in. cu. ft. Fahren- Tension Com- Tension Compres- Shear heit pression sion Cast Iron 450 000F (H KK) 20000 K)0 25000 >00 35000 20000 90000 20000 50000 50000 40000 65000 65000 50000 Wrought Iron. Steel 4SO 3()00F. 25( 490 9 500F 35( Ultimate Coefficient elongation of per cent, expansion! Modulus of elasticity Factors of Safety Steady Varying loads loads Shocks Cast Iron 5 0000062 15 mil. 25 mil. 30 mil. 6 14 20 4 6 10 4 6 10 Wrought Iron. Steel 30. .0000067 9 5 0000065 1. A square steel bar 2. in. on each side is subject to a tension of 80,000 Ibs. To find the unit tensile strength and the factor of safety. Area of cross-section of bar =2X2=4 sq. in. Unit ten- sile stress =80000-^4=20000 tbs. per sq. in. The factor of safety equals ultimate strength per sq. in. given in the table as 65000, divided by the actual unit stress ; hence : Factor of safety =65000-^-20000=3.25 or a little over 3. 2. A round cast iron bar 2 in. diam. carries in tension 18850 Ibs. Find the unit tensile strength and the factor of safety. Area of cross section of bar =7854Xdiam.Xdiam.= .7854=2X2=3.14 sq. in. Unit tensile stress = 18850^3.14 =6000 tbs. per sq. in. approximately. Factor of safety =20000 -^6000=3 T /3- As the factor of safety for cast iron is gen- erally not less than 6, the bar is unsafely loaded. 6 ERECTION AND INSPECTION OF 3. A cast iron block 12X12X2 rests flat on a concrete pier. A column erected on top of this block carries 28800 Ibs. Assuming that the block distributes the column load uni- formly upon the concrete pier, find the pressure in Ibs. per sq. in. on top of the pier. Area of bottom of block =12X12 = 144 sq. in. Unit pressure on concrete =28800-=- 144=200 Ibs. per sq. in. 4. A wrought iron square bar is to carry in tension 40,- ooo Ibs. with a factor of safety of five. Find its cross section. Ultimate strength for wrought iron in tension = 50000 Ibs. per sq. in. Since the factor of safety is five, the allowable working load =5 0000-=- 5 =10000 tbs. per sq. in. Total required area = 40000 Ibs. -f- 10000 Ibs. = 4 sq. in. The bar will therefore be a 2 in. square wrought iron bar. 5. A square steel block is to carry a column load of 115,200 Ibs. The block rests on a concrete pier. Find the area of the block so that the pressure upon the concrete pier shall not exceed 200 Ibs. per sq. in. Ans. : The block must be not less than 2 ft. o in. X 2 ft. o in. on bottom. 6. Find the diam. of a round steel bar to carry in ten- sion 240,000 Ibs., with a factor of safety of four. Ans. : 4.3 in., Use a bar 4 5/16 in. diam. 7. A cast iron square block is to carry 210,000 Ibs. in compression. The allowable working stress is 15,000 Ibs. Find the area of the block and the factor of safety. Ans. : Area = 14 sq. in. ; factor = 6. 8. A square steel block is to carry 280,000 Ibs. in com- pression. What should be its size in order that the unit stress may be one third of the elastic limit? Ans. : 24 sq. ins., or a square about 5 in. X 5 in. 9. A bar of cast iron 3 in. diameter ruptures under a ten- sion of 141,372 pounds. What is its ultimate strength in pounds per sq. inch? Ans. : 20,000 Ibs. per sq. in. 10. A load of 250,000 Ibs. is to be carried in tension by means of a round bar. If the factor of safety is five; design a cast iron round bar to support the above load. Design also a wrought iron and a steel round bar, using the same factor of safety. Ans.: Diameters are 8.91 ins. for cast iron; 5.64 ins. for wrought iron ; 4.95 ins. for steel. 11. What force will be required to rupture in tension a Y$ in. round steel bar? Ans.: 28,717 pounds or about 14 tons. 12. A cast iron bar one square inch in cross-section weighs 3.1 tbs. per foot. Find the length of a vertical bar IRON AND STEEL CONSTRUCTIONS which ruptures under its own weight when hung on its upper end? Ans. : 6450 ft. 13. In a shearing machine a flat steel bar 2 in. X y 2 in. was sheared exactly at right angles to its length. Find the shearing force? Ans.: 50,000 pounds or about 25 tons. 14. Find the ultimate strength in shear for a 24 m - diam. steel rivet, also ^, J/ and %? Ans.: 22,090 Ibs. ; 15,340 tbs. ; 9820 Ibs. ; 5525 Ibs. 15. The allowable shearing stress on steel rivets is 10,000 Ibs. per sq. in. What is the factor of safety for shear? Ans.: 5. 16. How much load could four 24 in. steel rivets carry in direct shear with a factor of safety of five? Ans.: 17,672 pounds or Sj/2 tons. 44m L. -i Section through. Webs rn .4* Fig. 4 Cast Iron Column resting on two Steel Beams. 17. A cast iron column rests in the middle of two 12 in. steel beams, 6 feet long (Fig. 4). If the beams get an equal share of the load and the column carries 18 tons how many 24 in. bolts are required in each end connection of the two 12 in. beams? Ans.: As shown in the figure, there will be a load of 4^2 tons or 9,000 pounds at. the end of each beam. A Y in. bolt will carry in shear 70% of the amount carried on a 24 in. shop rivet, or 70% of 4418 = 3000 pounds approxi- mately. It will, therefore, be necessary to provide not less than three 24 m - bolts in the ends of each beam. 8 ERECTION AND INSPECTION OF 18. A derrick rests at the middle of two 15 in. beams. There are two temporary ^4 m - bolts in each end of each beam. Should the derrick be used to hoist 16 tons of steel at once? Explain fully? Ans. : The cross-sectional area of a 54 in. bolt is .4418 sq. in. The ultimate shearing strength for steel bolts = 50,000 tbs. Using a factor of safety = 6 on ac- count of varying loads used with derricks, we get : unit working stress=5o,ooo-^6=8333 tbs. per sq. in. and 8333 X .4418=3680 Ibs. per 54 m - rivet The load for 54 i n - bolts = 70% of 3680 = 2576 Ibs. per 54 m - bolt For two ^4 in. bolts Fig. 5. you get 2X2576=5152 Ibs. The load at each end of beams equals four tons or 8000 tbs. The derrick, therefore, should not be used for 16 tons at a time. To allow for shock and overloading, all the bolt holes in ends of beams should be rilled in with good temporary bolts in all connections under and near the derrick. IRON AND STEEL CONSTRUCTIONS 9 19. A steel rod is to carry a stress of 32,500 tbs. in ten- sion or compression. Find its diameter when used in a bridge as a hanger, when used in a building as a tie, and when used as a piston rod in a steam engine? Ans. : The ultimate strength for steel in either tension or compression is 65,000 fibs, per sq. in. For bridge work where the loads are varying, use a factor of safety of six. In building work with practical- ly steady work, use a factor of four. When the rod is sub- ject to shocks, as in an engine, use a factor of safety of ten. The answers are : 2 ins. ; i^ ins. ; 2 9/16 ins. Fig. 6 Steel Flue and Anchor. 20. A steel bar 2X^2 inches in section is ruptured under a tension of 64,000 tbs. What tension will rupture a 2X1/4 m - bar of the same material? Ans. : 160,000 pounds. 21. W'hat tensile force is required to stretch a wrought iron bar 4X24 from 25' o" to 25' and 5/16 in.? Ans.: Unit stress We have : Modulus of elasticity = - Unit strain From which : Unit stress Modulus of elasticity X unit strain an d Unit stress Unit strain = - Modulus of elesticity For wrought iron the Modulus of elasticity = 25,000,00*0. The elongation in 25 ft. is 5/16 in. The unit elongation io ERECTION AND INSPECTION OF or elongation per one inch = 5/16 -f- 300 ins. = 1/960 in. and this is the unit strain. Unit stress = 25,000,000 X 1/960 = 26,042 Ibs. per sq. in. Area of cross section of bar = 4 X H = 3 sq. in. Required tensile force = 3 X 26,042 = 78,126 Ibs. 22. Find the compressive force which will shorten a block of cast iron 8 inches square from 4 ft. to 3 ft. lift ins. Ans. : 5,000,000 Ibs. 23. Find the unit stress which will stretch a steel bar one-tenth of one per cent, of its length. Ans. : 30,000 Ibs. per sq. in. 24. What tensile force is required to stretch a steel bar 8 in. by ^4 i n - from 30 ft. to 30 ft. and ft in.? Ans.: 187,500 pounds. 25. A steel bar 12 in. by ft in. and 28 ft. long was stretched in length to 28 ft. and J^ in. Find the tensile force. Ans. : 401,600 Ibs. 26. A steel block 6 in. by 6 in. and 4 ft. long was short- ened under compression to 3 ft. lift in. Find the unit strain, unit stress, total stress and per cent, shortening. Ans. : Unit strain = .0078 in. per in. of length. Unit stress = 232,000 Ibs. Total stress = 843,000 Ibs. Per cent, shortening, 78/160 of i per cent. 27. A steel bar io ft. long at 32 F. is heated to 500 F. Find the change in length due to expansion. Ans.: Elongation per foot per i F. = .0000065; elonga- tion per 500 32 or 468 F. = .0000065 X 468; elongation per io ft. = .0000065 X 468 X io = .0304 ft. or nearly ft in. 28. A vertical boiler flue 20 stories high is used to carry away furnace gases at a temperature of 500 F. Find the total expansion from 60 F. to 500 F. assuming each story 12 ft. 6 in. high. Ans.: 89/16 ins. approximately. 29. An outside steel flue 4 ft. diam. and 250 ft. high is used for gases varying in temperatur from 60 F. to 500 F. The flue is kept in place at each story by means of flat 2x^5 in. steel straps. The straps are larger on one side by ^ in. Find the expansion across the diameter. (Fig. 6). Length of circumference = 3.14 X 48 in. = 150.7 in. approximately. Expansion of circumference per degree F. =. 150.7 X .0000065 = oo 9795 ins. or, say, .00098. Expansion of circumference for (500-60) = .00098 X 440 = .431 ins. IRON AND STEEL CONSTRUCTIONS 11 Length of new circumference at 500 = 150.7 X 43 1 = 151.13 ins. Length of new diameter = 48.13 ins. The expansion in diameter is therefore about l /% in. and the y 2 in. clearance is not necessary, the hoop being able to resist the effect of this expansion, especially that the hoop will also expand to a certain extent. Flue straps should be made tight against the face of the flue. 30. A steel column is so placed in the boiler room of a building that it cannot expand. The column is 18 ft. long. Find the additional unit compression caused in this column by a change of temperature from 60 F. to 160 F. If the column was free to expand, the change in length for 100 F. or from 60 F. to 160 F. would be equal to 18 ft. X 100 X .0000065 X 12 in. = .1404 in. The force required to stretch this column .1404 in. is equal to the additional compression caused by not allowing the column to expand. .1404 Expansion per inch length = - = .00065 in. = 18 x 12 unit strain. Unit tensile stress causing this expansion equals 30,000,- ooo X unit strain =. 19,500 Ibs. per sq. in. This load comes on the column in addition to its load at 60 F. In general, however, structures expand as a whole and this reduces the effects of expansion upon any one column. 31. What force is required to punch a 13/16 in. hole in a y% in. steel plate? Also a 9/16 in. hole in a 5/16 in. steel plate ? Ans. : Circumference of a 13/16 in. hole = 2.55 in. Area to be sheared by the edges of the punch when passing through a ^ in. plate 2.55 X Y& = .96 sq. in. Shearing force = 50,000 Ibs. per sq. in. X -96 = 47,900 Ibs. Similarly for a 9/16 in. hole in a ^g in. plate the shearing force will be 27,500 Ibs. CHAPTER III. The Manufacture of Iron and Steel. CAST IRON. Cast Iron was first made in England at the beginning of the fifteenth century. Definition. Cast iron is a product of the blast furnace ; it is iron which is not malleable and which is produced by a process involving fusion. Manufacture. All iron is obtained from iron ores. The most common ores used for this purpose are : Hematite or red iron ore, containing about 70% iron. Limonite or brown iron ore, containing about 60% iron. Magnetite or black iron ore, containing about 60% iron. In addition, the ores contain various impurities, like alumina, manganese, phosphorus, silica, sulphur, etc. Part of these impurities separate from the iron and go into the slag during the process of melting the ores in the blast fur- nace. The product of the blast furnace is allowed to flow into channels dug in sand, where it cools off. The main channel is the "sow," while the branch channels are called the "pigs." Hence the name of pig iron. This pig iron is remelted in a cupola and poured into moulds forming castings. Classifications. Various grades of cast iron may be classified as follows : Pig Iron (Cast Irou) 1. Foundry Pig (Gray Cast Iron) Contains 6% to 4% Carbon. Names Properties and Uses : No. 1 No. 2 No. 3 Gray Gray Gray forge Dark gray fracture with metallic lustre and large crystals Specific gravity 7.1 to 7.2 Turns easy ; soft and tough. Used for castings. 2. Forge Pig (White Cast Iron) Contains 4% to 2% Carbon. 1 No. 5 No. 4 White Mottled Light gray to silver white fracture and small crystals. Specific gravity 7.2 to 7.4 Hard to turn and brittle. Used for making wrought iron and steel. fe a A_^-l MM, charging floor ; DD, drawing floor ; H, hopper ; B, charging bell ; T, throat; K, shaft; H, hearth, A A, tuyeres or air blow- ing pipes; F, flue exit for gases; WW, cold water cooling pipes; I, iron ore; L, limestone ; C, coke ; S, cinder notch for drawing out the slag; P, tap hole for draw- ing out the metal. Fig. 7 The Blast Furnace. 14 ERECTION AND INSPECTION OF Nos. i and 2 are used exclusively for foundry purposes. No. 3, for both foundry and rolling mill ; finally, Nos. 4 and 5, for the rolling mill only. Mottled iron is iron with a white background, dotted with spots of graphitic carbon. Properties. In addition to carbon cast iron may contain about five per cent, of impurities like silicon, manganese, phosphorus, sulphur, etc. The gray cast iron is used for castings. The darker grades of gray cast iron make the smoother castings, but are more brittle. The lighter grades of gray cast iron make tough castings and very often contain blow holes. The white cast iron is hard, brittle and difficult to work, while the gray cast iron is soft, tough and easily worked. A fracture of good gray cast iron shows a light blueish gray color, a close grained texture and considerable metallic lustre. A fracture of poor cast iron presents a mottled surface, with patches of darker and brighter iron, or it may show crystalline patches. Air holes may also be present in frac- tures of very bad specimens. The quality of cast iron may be improved by long con- tinued fusion and by repeated melting up to about twelve times. Cold blast pig gives stronger iron, but more expensive than hot blast pig. Effects of Impurities. Carbon in cast iron decreases the specific gravity and the melting point. Other effects have been given under classification. Manganese increases hardness and shrinkage, it also in- creases the percentage of carbon that the iron may hold into combination. Phosphorus is readily taken up during the smelting process. Less than one per cent, of phosphorus in cast iron is beneficial, as it increases the fluidity and lessens the shrinkage. Over one per cent, of phosphorus seriously weak- ens the iron. Silicon in small quantity will usually increase the strength of the cast iron. A large amount makes the iron brittle and weak. Sulphur comes into the iron from the ores and from the coal used in the smelting process. Sulphur in castings should not exceed half of one per cent. Sulphur increases chill and shrinkage and decreases the strength, rendering castings unsound. Common Defects in Cast Iron. Blow holes and honey- comb are defects caused by confined air and may render castings unsound. Cavities and holes are caused by the IRON AND STEEL CONSTRUCTIONS 15 collection of foundry dirt and other impurities and by un- equal contraction during cooling. Internal stresses due to unequal contraction of the metal during cooling will often cause rupture, especially while the casting is struck a few sharp blows. Internal stresses may be avoided during the casting process by uncovering the thick parts first, so that they may cool just as quickly as the lighter parts. Other things being the same, the longer the cooling period the bet- ter the castings. Following defects are often found in cast iron columns : 1. Unequal thickness, due to the shifting of the core before the metal is poured into the mould. 2. Shrinkage cracks, due to unequal contraction during cooling. 3. Warping and bending, caused by unequal contraction during cooling or by handling the columns before they have sufficiently cooled. 4. Cold shuts. In long castings requiring the metal to be poured from both ends in the same time, it often hap- pens that the metal becomes too much chilled to properly mix and unite. This results in the formation of weak seams, known as "cold shuts." The surface defects of cast iron are swells, scales, blisters, cold shuts, etc. Inspection of Cast Iron. The work of inspecting iron in general may be divided as follows : a. Laboratory examination and tests. b. Mill inspection. c. Field inspection. Laboratory Inspection of cast iron consists in examining several test-bars poured from each melt. These test-bars are poured alternately before arid after the casting is poured. About one test-bar for each ton of castings is generally suffi- cient. Test-bars for tensile strength are about eighteen inches long, and usually turned down in a lathe in order to remove the exterior scale and enable a careful measurement of the diameter. They are then subject to increased tension in a testing machine until rupture occurs. The elongation of the bar is recorded for the various applied tensile stresses. Test- bars for bending cast iron are usually 3 inches wide by I inch thick, and are either 14 inches or 26 inches long; they are placed on supports 12 or 24 inches apart, with the narrow side vertical, and loaded on the center until broken. The deflection as well as the breaking load are noted. 16 ERECTION AND INSPECTION OF The Shop Inspection of structural cast iron, like bases, columns, etc., is very similar to the field inspection, and both will be treated together in a future chapter. We will make mention, however, with regard to the shop inspection of cast iron water pipes. Shop Inspection of Cast Iron Water Pipes. These are first subjected to a surface examination. Pipes with visible honeycomb and serious sand holes and blow holes are at once rejected. The same thing applies also to pipes with swells, scales and blisters on their interior faces. Honey- comb when not visible is easily located by the dull sound given by the pipe on tapping it with a hammer. The pipe is next subjected to a hydraulic pressure about twice as high as the pressure under which the pipe is to be used. While under pressure the pipe is carefully tapped all over with a hammer to discover air holes, flaws, etc. Each cast iron pipe has stamped on it the weight per foot. The weighing and marking of each piece is also inspected. All defective pipes are rejected. Advantages of Cast Iron. Cast iron has a high com- pressive strength, is durable and little affected by corrosion ; it can be cast readily in many useful shapes, and is cheaper than steel. Cast iroh retains its rigidity at a red heat. For these reasons cast iron is used for column footings, columns, water pipes, bed plates for machinery, boilers, etc. Disadvantages of Cast Iron. Cast iron is brittle, has a low tensile strength, and a low ductility and elongation. It is not so homogenous as steel and is therefore less reliable ; it also snaps under the action of water in fires, when the iron is red hot. Cast iron in building work gives connections which cannot be riveted, and must be bolted, thus causing lack of rigidity. For these reasons cast iron should not be used where subject to tensile* stress, heavy vibration, shocks or impact. WROUGHT IRON. Wrought iron is the' oldest known form of iron. It has been found in the pyramids of Egypt, and has probably re- sulted at first from the action of fire upon nearly pure iron ore. Definition. Wrought iron is metallic iron which has been manufactured by any process without fusion, and which contains less than 0.25 per cent, carbon. Manufacture. At present wrought iron is generally manufactured from forge pig by a method known as the IRON AND STEEL CONSTRUCTIONS 17 puddling process. The pig iron is subjected to the oxidizing flame of a blast in a reverbatory furnace. Here the iron loses some of its impurities through oxidation, and becomes soft like a paste. Operators known as puddlers, using special rakes, form this iron into paste-like balls called puddle balls or blooms, weighing about eighty pounds each. Each ball is then passed through a squeezer to expel cinder and part of the slag; then the ball is rolled into a "muck bar." Muck bars are cut to length, laid in piles, reheated, and rolled to "merchant bars." These are again cut to length, laid in piles, reheated, and rolled, giving "best iron." If the process is again repeated and the best iron is rolled once more, a grade known as "best best iron," or double refined iron, is produced. Properties. Wrought iron is a malleable metal, can be forged and welded, and will stand shocks. It can not be tempered, and can not be melted, except with great difficulty. Good wrought iron is tough and has a fine fibrous and close texture; if subjected, however, to repeated shocks and excess loads around the elastic limit, the texture changes from fibrous to crystalline, with a decrease in the strength of the metal. Best iron is about ten per cent, stronger than the mer- chant bar, due to the second rolling. Cold rolling decreases the ductility and the ultimate elongation and increases the elastic limit and the ultimate strength. The strength also increases with a higher per- centage of carbom Annealing decreases the ultimate strength and increases the elongation. The fracture of good wrought iron is fine, fibrous and close, with small crystals of uniform size and color, and with a silky lustre. The metal has a leaden gray color. The fracture of poor wrought iron shows coarse crystals, loose, open and blackish fibres and blotches of color. Flaws in the fractured surface indicate that the reheating, rolling and welding processes were imperfectly carried out. Wrought iron high in phosphorus is brittle when cold, hence the name, "cold short." Wrought iron containing sul- phur, arsenic and other impurities, is known as "red short," and will crack when bent at a red heat. Red short iron cannot be welded. Common Defects in Wrought Iron. i. Poor material, shown by a fracture with coarse crystals and loose fibres. 2. Flaws in the fracture, indicating "red short" iron. 3. Bright crystalline fracture and discolored spots, in- dicating "cold short" iron. iS ERECTION AND INSPECTION OF Inspection of Wrought Iron. Tests. The usual tests for wrought iron ore are as follows : 1. Cold bending test: A square bar 1/4." on each side and about 15" long is bent cold by means of pressure or with a hammer, to an angle of 90 in a curve whose radius is equal to twice the thickness of the bar. Rivet iron is bent on itself or through an angle of 180 while cold. No cracks should result. Wrought iron breaking under this test lacks both ductility and strength. 2. Hot bending test: Iron which is to be worked hot must bend sharply to 90 at a working heat without fracture. Iron showing cracks under these conditions is "red short," or high in impurities, and cannot be welded. 3. Nicking and bending: Specimens upon being nicked on one side and bent should show a fracture nearly fibrous. 4. Tensile strength is determined with a testing ma- chine from test pieces, usually about 18" long by i" wide, cut from the full-sized bar after the material is rolled. The thickness of the test piece will therefore be the same as that of the finished bar. The various stresses and the corre- sponding elongations are recorded. 5. In comparing several samples of wrought iron it is sometimes found convenient to multiply the tensile strength of each specimen by the corresponding ultimate elongation. The resulting product is a measure of the work required to rupture the bar. The best specimen will correspond to the highest product obtained in this way. Advantages. Wrought iron is a durable material, and can be readily worked into a large variety of forms when heated. Pure wrought iron is less affected by corrosion than steel. Unlike cast iron, wrought iron is malleable, and can therefore be made into plates. It is ductile, or can be made into wires, and it is about equally strong in tension and compression. For these reasons wrought iron may be used in places where subject to alternating compressive and tensile stresses, provided the unit stress is not excessive. It was much used for truss-members, columns, beams, girders, wall anchors, rivets, etc. At present it is largely replaced by soft steel. Disadvantages. Wrought iron is not as homogenous as steel, cannot be melted without difficulty, and is less stiff than steel, i. e., a wrought iron beam will deflect more than a steel beam of similar length and cross-section under the same load. Wrought iron is also less strong than steel. For all these reasons it is not used where great strength is required. IRON AND STEEL CONSTRUCTIONS 19 Even in ornamental iron work the lower carbon steel or soft steel has largely replaced wrought iron, due to the cheapness and the capability of the soft steel of being readily worked into various desired forms. STEEL. Steel, produced by a special method little used at present, was known from very old times and manufactured in Asia, where it was used especially for making high grade tools and war weapons. The Bessemer steel of to-day was invented by Bessemer in England. Definition. Steel is iron which is malleable and which is produced by any process with fusion. Manufacture. Steel contains less than two per cent, carbon, and can be manufactured from wrought iron by add- ing carbon to same, or from cast iron by removing part of the carbon. The most common processes of steel manu- facture at present are as follows: The Crucible Process. Blister steel or impure wrought iron is mixed with some flux and carbon in a closed crucible. The mixture is fused in the absence of air for several days. The best tool steel is thus obtained. The Open Hearth Process. Pig iron is fused in a Siemens furnace with enough wrought iron scrap to reduce the percentage of carbon to any desired amount. Most of the structural steel used for buildings and bridges is manu- factured by this process. The Bessemer Process. Air is blown through molten pig iron in a Bessemer converter until all the carbon is burned out. Then the desired percentage of carbon is ob- tained by throwing into the converter a sufficient amount of "Spiegeleisen," an iron compound containing a large per- centage of carbon. The molten steel is cast into moulds and rolled. Steel rails are largely manufactured in this way. Properties. Steel is a malleable metal, can be forged and welded, and will stand shocks. It can be tempered and can be melted. Good steel is flexible, has a fine texture and is a durable material. The higher the percentage of carbon the greater is the ultimate strength of steel and the lower the percentage elongation. The carbon contents also affects the temper and the welding qualities of steel. A high carbon steel takes a good temper and is hardly weldable, while a low carbon steel takes no temper but welds readily. 20 ERECTION AND INSPECTION OF The following table shows a comparison between several of the properties of the various grades of steel in common use and their carbon content : Tensile Strength Grade Per cent. Carbon. pounds per sq. in. High Carbon Steel Medium Steel Low Carbon Steel 1.0 to 0.3 0.4 to 0.2 0.3 to 0.05 70000 to 80000 60000 to 70000 50000 to 60000 Grade Temper. Welding. High Carbon Steel Medium Steel Low Carbon Steel Takes good temper Takes poor temper Takes no temper Welds difficultly Weldable Easily weldable High carbon steel is used in making tools and machinery. Kails and beams are generally rolled from medium steel, while the softer grades are used in making plates and rivets. In addition to carbon, steel contains a certain amount of impurities, like manganese, phosphorus, silicon, sulphur, etc. Manganese. A small amount of manganese is beneficial, as it partly counteracts the bad effects of sulphur and tends to prevent hot shortness. In addition, manganese in small quantity increases malleability, elongation, toughness and tensile strength. An excess of manganese is undesirable, as it tends to make the steel cold short. Phosphorus. This is the worst impurity that steel could contain. Even a small amount makes the steel hard and easy to break, reduces elongation and causes cold shortness. Silicon. A very small amount of silicon makes the steel solidify on cooling without agitation, thus preventing air holes. In addition, silicon increases the hardness and the tensile strength. Steel containing more than one-half of one per cent, of silicon is brittle and unforgeable. Sulphur. Even one-tenth of one per cent, makes the steel "red short," that is, the steel becomes brittle under the hammer or roller when hot. A small amount of man- ganese will partly counteract the injurious effects of sulphur. Fracture of Steel. Low carbon steel and thoroughly annealed higher grades show a fine and silky fracture, with an angular and irregular outline, provided the breakage is produced gradually. In other cases the fracture is partly granular and partly silky, or wholly granular. In cases of sudden rupture the fracture is generally cup-shaped, with an even surface, at right angles to the length of the piece, and with a granular texture. The color of good steel is light pearl gray. The fracture of poor steel is dull, sandy looking and without metallic lustre. The color may be yellowish. Burned steel has a granular fracture and a whitish hue. IRON AND STEEL CONSTRUCTIONS 21 Nickel steel is an alloy of steel containing about three per cent, of nickel. This makes the alloy very strong. Some bars have shown an ultimate tensile strength of over 250,000 pounds per square inch, and an elastic limit of over 100,000 pounds per square inch. Nickel steel is sometimes used in bridge work. It gives a higher strength than steel per pound of metal and it materially reduces the dead weight of the structure. Cast steel is produced from "scrap" steel made by any process, or from pig iron melted together with a certain amount of spiegeleisen, manganese, etc. The mixture is heated to about 1500 C. and then poured. Cast steel is hard and strong, but brittle when raised above a red heat. Small amounts of manganese and silicon reduce the size and number of blowholes, but render the castings more brittle. Steel castings contain generally from 0.25 to 0.50 per cent, of carbon and have an ultimate tensile strength from 60,000 to 100,000 pounds per square inch. Cast steel is extensively used for axle-boxes, cross-heads, base plates for machinery, and in some cases in building work for cast steel shoes or bases in place of cast iron bases. Common Defects in Steel. Blow holes or air holes are defects caused by confined air or by the escape of gases evolved during cooling. In steel ingots they occur generally near the outer surface of the same and toward the upper part of the ingot. Pipes are cavities caused by the outside of the ingot cooling more rapidly than the inside. This defect usually occurs within conical lines in the upper third of the ingot, and is discovered in an ingot by cutting off the metal near the upper part. If an ingot having pipes is rolled into shapes, the defect will show in the surface of the rolled material as a line of cavities. Burning occurs when a piece of steel is overheated. It is indicated by small cup-like holes called "pits." If a burning piece of steel is withdrawn from the fire it will throw off an abundance of sparks. Cinder spots result from fragments of fire brick, dirt or cinders which have been rolled into the metal. Cracks are due to rolled out blow holes. These cracks, although small in the beginning, may be the starting points for ultimate rupture. Steel with cracks should be rejected. Laps result from careless rolling or hammering. A por- tion of the steel is folded over itself, while at the same time the walls are sufficiently oxidized to prevent the parts from 22 ERECTION AND INSPECTION OF uniting. Laps or laminations run parallel with the length of the piece and continue for a considerable length. Laps can be easily noticed on the surface of the metal. Seams are open and elongated blow holes which have been brought to the surface during rolling, without being closed by the rolling process. They are usually not con- tinuous and only one to two inches long. Snakes consist of small lines twisting in all directions, and are due to foreign substances separating two masses of pure steel. Stars are bright spots in mid-section, which are formed when the pipe in the ingot is not completely cut away before rolling. Cobbles are irregularities which result when one side has been heated more than the other. Advantages. Good steel is a durable material. The low carbon varieties can be readily welded, and are fast replacing wrought iron in the manufacture of a large variety of ornamental work. Steel is slightly stronger in compres- sion than in tension, and is malleable and ductile. Steel wires can be made sufficiently small in diameter to be burned in the flame of an ordinary match. In general, the smaller the diameter the higher the ultimate tensile strength. Steel wire can be manufactured to stand 150 tons per square inch in tension. It is therefore used for cables in suspension bridges. Steel is more homogenous and more reliable than either wrought or cast iron. It also has greater strength and stiffness than wrought iron, and since the price of steel is about the same as that of wrought iron, steel has practically replaced wrought iron for structural purposes. A considerable amount of steel is used for railroad rails and for bridges and buildings. INSPECTION OF STEEL. Testing. Following are the tests generally employed to determine the quality and other properties of steel : i. Tensile tests are made to determine the tenacity and ductility of the metal. The tenacity is indicated by the elastic limit and the ultimate strength of the specimen. The ductility is measured by the per cent, elongation between two points marked with a pointer on the test piece before testing, and from the decrease or per cent, reduction of the cross section of the test piece. The common shape used for sheared plates is shown in Fig. 8. The middle portion is ij^ inches wide and of the .same thickness as the original plate. Points are marked IRON AND STEEL CONSTRUCTIONS 23 every inch on the central portion with a steel pointer. The distance between two points, one on each side of the fracture and 8 inches apart, is measured after the test, and the per cent, elongation in 8 inches is thus determined by care- fully measuring the dimensions of the cross-section at the point of rupture before and after the test. The reduced area is computed, and from this the per cent, reduction. .About 3'; R bout 3; About a" ] < * > 1 < Parallel Section A bout ^ About 18' Figr. 8 Test Piece. For shapes other than plates, similar test pieces are used, after same have been planed or turned parallel throughout their entire length. The elongation is measured in 8 inches of the original length. Rivet rounds and small bars are tested of full size as rolled. 2. Cold bending. Rivet or soft steel shall bend cold 180 degrees, and close flat upon itself without showing any cracks. For plates flat pieces one inch wide and of the original thickness may be used. 3. Hot bending. A piece of medium steel is heated to a cherry red, then cooled in water at 70 F. It is then bent 180 around a rod whose diameter equals the thickness of the test piece. No cracks should result. 4. Drifting test. Drive a drift pin through a punched hole in a plate, using a sledge hammer. Notice how much the hole can be enlarged without fracturing the metal. A hole for a y^ inch rivet in a steel plate, and with the center of the hole not nearer to the edge of the plate than i l /2 inches, shall be capable of passing a drift pin 1^4 inches diameter without fracture. 5. Hardening test. The specimen is heated to a red heat, then plunged in water at freezing point. Then bend the bar, and compare the results with those obtained from 24 ERECTION AND INSPECTION OF similar pieces not hardened. The effect of hardening is thus ascertained. 6. Forging tests. This is used for rivet rods. One end of the rod is heated to a red heat, then flattened with a ham- mer. If any small cracks appear this indicates red shortness. 7. Welding test. A bar one square inch in cross-section is heated to a white heat, then upset and drawn down to the original thickness with a ten-pound hammer. Neither flux nor water should be used. The bar is then tested in tension. 8. Quenching test. Heat the steel bar to a cherry red and plunge in water at 80 F. Then bend the bar around the curve 1^2 times its diameter. No cracks should appear on the outer part of the bar. CHAPTER IV. Shop and Mill Inspection of Iron and Steel. Shop Operations. Following are the main operations to which iron and steel are subjected in a structural shop and to v.-hich the shop inspector should pay considerable attention : Straightening, marking off and punching, second straighten- ing, reaming, assembling, second reaming, riveting, facing, boring, finishing, fitting up, oiling, painting and shipping. The shop inspector must be provided with- a set of work- ing drawings, a bill of materials and a copy of the specifica- tions. He must also see that all material is straight before and after punching; otherwise the riveting will be deficient, with loose rivets caused by the spring of the bent parts. The in- spector should also examine the punch dies occasionally to see that the edges are sharp and unbroken and that the differ- ence in diameters between the upper and lower dies does not exceed 1/16 in. The shop inspector must examine all dimensions of fin- ished parts, must see that all rivets and bolt holes are in their proper places and must make sure that all field connec- tions match. He must see that all errors are corrected at the shop. Connections to be riveted in the field may be checked by assembling the parts in the shop, or by reaming both parts in succession to the same template. Drifting should be used only for bringing pieces together preparatory to riveting. After part of the rivets are in place, drifting may injure plates and rivets by causing distortion. Pieces should be kept together preparatory to riveting by means of a sufficient number of temporary bolts. The in- spector should also see that parts inaccessible after riveting are painted at least one coat of paint, and that all stiffeners fit tight and good. After riveting each rivet is tested to see that it is tightly driven and that the head is properly formed. In boring and facing the inspector must see that all pin holes are of the proper size and at the proper distance centre to centre. He must also see that the ends of pieces are prop- erly planed to the required bevels and that the lengths of milled end pieces are correct. 26 ERECTION AND INSPECTION OF The shop inspector marks for identification all the pieces approved by him. This is done by causing some mark or initial to be impressed on all parts approved by means of a special inspector's hammer. A circle of red paint around the mark will make it easily to locate. ADDITIONAL SHOP AND FIELD OPERATIONS AND THEIR EFFECT UPON IRON AND STEEL. Heating. Cast iron of average quality is slightly affected by heat below 900 F. At a red heat it looses only one third of its strength. Wrought iron and steel loose no sensible por- tion of their ultimate strength up to about 500 F., but be- yond this point the. strength decreases rapidly with the in- crease in temperature. At 800 F., both steel and wrought iron may lose one-fifth of their ultimate strength. Welding consists in joining together two pieces of metal with the aid of heat and that of hammering, and with or with- out the use of a flux. Wrough iron is the easiest iron to weld at a white heat. Steel is less weldable than wrought iron and it becomes less and less capable of welding, the higher its carbon content. Cast iron is not weldable. Weld- ing weakens the cross-section of a bar at the point of weld, and for this reason it is often specified that no welding shall be allowed in any steel that is used in main steel structures. A welded bar of steel or wrought iron may have in the weld as little as 60% of the strength of the original solid bar. Forging consists in raising a metal to a high temperature and hammering it into any desired form. The metal must not be overheated or burned. Overheating lowers both the tensile strength and the ductility. Steel is more affected by overheating and therefore requires more care than wrought iron. Either metal, however, when heated fully, should be quickly worked, as working at a cool stage is injurious. Steel or iron worked at a blue heat, or at about 600 F. becomes "blue short" or brittle, being too cold to be ham- mered. A simple way to tell when a bar or plate is too cold to be hammered, is to press against the metal a piece of wood or the end of the handle of the hammer. If the mark thus made on the metal will not glow, the piece must be reheated. Hardening consists in heating the metal to a red heat and then in cooling it rapidly, by plunging into oil, water, brine or molten lead. The quicker the heat is extracted the harder will the metal be'. Oil extracts the heat slower than water ; water extracts the heat slower than brine. Hardening increases the ultimate strength as shown by tests if the load IRON AND STEEL CONSTRUCTIONS 27 is slowly applied. Hardening also increases brittleness. In order to make the metal tough enough for use after harden- ing, it has to be subjected to the operation of "tempering." Steel with 40% carbon can be hardened sufficiently to cut soft iron and maintain an edge. Tempering consists in reheating a hardened piece of metal to a certain point and then allowing it to cool by plung- ing it into water. When a hardened steel bar is reheated, the hardness decreases as the heat increases. In the same time various colors due to oxides appear on the surface of the steel with increasing temperature and by means of these colors, the heating may be stopped at any desired point and the cor- responding hardening can thus be obtained. Beginning with the cold metal, the tempers of different colors are sometimes described as follows : Light straw Tr , , ^ * ^ Straw Used for files, lathe-tools, etc. Light brown T . , . , .,, Darfepr hmwn L| sed for dnlls > reamers, taps, etc. Used for axes, hatchets and tools. Darker brown Brownish blue or pigeon wing Light blue TT , . Dark blue Used for s P rm S s - Both tempering and hardening cause an increase in the elastic limit and ultimate resistance, and a decrease in ductil- ity. Both processes are generally used in making steel wire and tools, but very seldom in structural work. Annealing consists in heating a metal object throughout to a high and uniform temperature, and then allowing it to cool uniformly in the air. For annealing purposes the steel is generally heated above 1000 F. It is then allowed to cool in the air or under a muffle, or it is kept in the heating furnace, but the tempera- ture of the same is gradually reduced. This last method gives as slow a cooling process as may be desired. The object of annealing is to make the metal uniform in density throughout. When a piece of iron is hammered, bent, or upset, the uniform density of the metal is considerably changed at various points and internal stresses are the result. Annealing causes the various minute particles of metal to readjust themselves, thus reducing and perhaps totally ex- cluding internal stresses. All pieces that have been hammered, bent or upset, should be annealed. 28 ERECTION AND INSPECTION OF Punching and Shearing. In both these operations the metal is subject to shearing forces, and therefore the effects are practically the same. Punching and shearing in iron and steel cause an increase in the elastic limit with lower ductility and lower ultimate strength ; consequently both processes in- jure the strength of the metal. In punching and shearing minute cracks are started at the edges of the metal. These cracks are injurious as they may extend within a short time and become dangerous before being discovered. They also reduce the ultimate strength. In the same time the disturbance caused by shearing hardens the sheared edges and this explains the loss of ductility and the increase in elastic limit. It is evident from the nature of the shearing process, that thinner plates will be less injured than heavier plates. Also, if punches, dies and shears are maintained in a sharp condition the metal will be more cleanly cut and there will be less cracks started. The injurious effects caused by punching and shearing can be removed by annealing, reaming or drilling. For ream- ing and drilling, the rivet holes are punched y% in. smaller in diameter than the finished holes; then by means of a cutting tool or a drill 1/16 in. is removed all around the hole. In case of sheared plates remove 1/16 in. all along the sheared edges. Reaming removes almost entirely the injurious effects caused by punching or shearing and in this respect is superious to an- nealing. Wrought iron and soft steel are less affected by punching and shearing than the higher carbon steel. Upsetting is the operation of thickening an iron bar by hammering back against its end. Upsetting" is used in mak- ing eye bar heads. The end of the bar is hammered, then flattened, and finally a pin hole is drilled through. In riveting the shank or body of the rivet is upset to fill the hole com- pletely and then to form the new head from the remaining metal. In all cases of upsetting the metal to be upset must be heated and worked at a temperature high enough to cause a flow without bending or folding. With proper care upset- ting gives satisfactory results. Caulking. When two pieces of metal are riveted to- gether, the operation of hammering down the edges of one of the pieces in such a manner as to make them slightly pene- trate into the other piece is called caulking. (Fig. 9). Caulking is an approved process in boiler and tank work and is applied to both rivets and plates, in order to secure wa- ter tight joints. For this purpose a narrow, blunt chisel-like IRON AND STEEL CONSTRUCTIONS 29 tool called a caulking tool is used. This tool is about 3/16 in. thick at the end and ij^ in. wide, with the edge ground to an angle of 80. In case of boiler plates these are usually planed on edge to a bevel of about 75 to 80 to facilitate the forcing down of the edge. As shown in the diagram the effect of caulking is to burr down the plate at the joint, forming a metal to metal joint, care being taken not to damage the plate below the tool, or spring the joint open. Usually both 9 Caulking. edges C and D are caulked, and the rivet heads also, if they leak as at R. Caulking has no legitimate use in structural work. It is used to make loose rivets appear tight, instead of cutting out and replacing such rivets. It is also used when the edges of the rivet head are not quite close to the plates, or when an opening exists between the plates themselves. The edge of the rivet head is usually hammered down until it in- dents and slightly penetrates the surface of the plate. This makes a loose rivet appear tight when tested with a hammer. Close inspection should detect and condemn such rivets. CHAPTER. V. Riveting. A Rivet is a pin of metal consisting of a "head" and a "shank" or cylindrical body which is driven through two or more pieces of metal, and then the point is bent or spread and beat down fast, to prevent its being drawn out. Material. Rivets are usually made of soft steel or wrought iron. Copper rivets are sometimes used where iron would corrode too quickly. The steel used for rivets will generally have an ultimate tensile strength between 52,000 and 60,000 tbs. per sq. in. In such steel the carbon may run down to .06 per cent, with the sulphur between .02 and .03 per cent, and phosphorus even lower. Rivet steel must be ductile and tough and must stand well the effects of variations in temperature. Wrought iron rivets are less affected by tem- perature than steel rivets. In driving field rivets or in riveting done after the parts to be riveted are in place, the usual method is to heat the rivets in a portable forge resting upon a tem- porary platform made of planks, and then each rivet is thrown through the air to the riveters at the various points where riveting is being done. While the rivet is thrown through the air it partly cools off. Steel rivets may thus cool down to a point where good riveting can no longer be obtained, while if the steel rivet is heated in the forge to a slightly higher temperature and then thrown through the air, the rivet is often injured and the steel composing it is red short or liable to crack at a red heat. Wrought iron is less liable to injury from overheating and is less affected by the drop in temperature immediately after leaving the forge. For these reasons wrought iron rivets are preferable to steel rivets for field riveting. Manufacture. Rivets are made either by hand or by machinery. They are indicated by means of their length and diameter. The length of a rivet is the length of its shank when cold, and does not include the head. The size most commonly used is 4 in. diam. rivet. In order to allow the hot rivet to enter holes easily the holes are punched 13/16 in. diam. for a ^4 in. rivet and in general 1/16 in. larger than the diameter of the cold rivet. The hot rivet should not drop into the hole. It should require slight pressure to put it in. The diameter of the rivet holes must not be less than the thickness of the plate, other- SHOP. Two run heads CountersunK Far Side, Near Side Both Sides Flattened to g" Far side Nearside BothSides Flattened to V Far Side NearSide Both Sides Flattened to I" Far Side Nearside Both Sides F I E LD Two full heads. Count ersumK Far Side NearSide Both Sides ( ( Fig 10 Rivet Sigrns. 32 ERECTION AND INSPECTION OF wise the punch in the shop is liable to crush. For plates less than y% in. y^ in. rivets are commonly used ; for plates y& in. and aver, either y^ in. or % in. rivets are used. The length of the rivet depends on the grip or total thickness of the parts joined by the rivet, and on the number of pieces to be joined by the same rivets. A hot rivet has a tendency to fill up any slight openings between the plates through which it passes. Hence to find the length of the cold rivet add to the grip about 1/32 in. for each opening between plates; then add about ijHs times the diameter of the rivet for the new head and about 8% for filling up the hole which is slightly larger than the rivet. For instance, to join two ^4 m - plates with y^ in. rivets we need for : Inches. Grip i l / 2 Opening between plates .... 1/32 New rivet head, i^jx4 I 7/32 to this add about 8% or 7/32 in. and this gives in all about 3 in. as the required length of shank for the cold rivet. The same value could be obtained from a table at the end of the volume which gives the length of rivet shanks to the nearest Y% of an inch. For countersunk rivets add only one half the diameter of the rivet for the new head. No rivets should be used which are too short ; such rivets do not leave sufficient material for the new head and the usual result is loose rivets. Rivets that are too long require additional hammering and are hard to make tight. Form of Rivets. There are in use several forms of rivets. These forms are generally indicated on drawings by the conventional signs shown in Fig. 10. The diameter of a head of a rivet, when such head is fin- ished with a tool called a "snap," should be about one and a half to twice the diameter of the shank. The height of the head of a snap finished rivet should be about three-fifths the diameter of the shank. Fitting Connections. Before riveting the two or more parts which are joined by this process have to be brought close together and in such a relative position that the cor- responding rivet holes should match as nearly perfect as pos- sible. In connections taking in a large number of rivets, like column splices or large gusset plates, the various pieces are made to match by hammering the buckled or bent parts with a sledge hammer and then by placing temporary bolts through about thirty per cent, of the rivet holes. When IRON AND STEEL CONSTRUCTIONS 33 these bolts are made tight, all the holes in the connection will match, if the shop punching was carefully done. With careless punching some of the holes may not fall fair any- where from 1/32 in, to % m - an d more. In such cases the holes are made fair by reaming, using either hand reaming or machine reaming. Where the rivet grip is to be two or more inches machine reaming is essential. It is a common practice in building work where holes do not match by 1/16 in. or a little more, to drive a drift pin through the holes and make them match. A drift pin is a round piece of steel made slightly taper- ing, and should be used only for easily bringing pieces to- gether preparatory to riveting. The drift pin may also be used in correcting burrs and in smoothing out holes. It should not be used, however, to enlarge a hole. Forcing a drift pin through a hole injures the metal, causing a harden- ing of the material around the hole, with a corresponding increase in the elastic limit and a decrease in ductility. This is considered injurious, and good specifications prohibit the use of drift pins for enlarging holes. Instead of this, ream- ing should be used whenever possible. For this purpose compressed air reamers are employed on many good struc- tures. The action of these reamers is similar to that of a drill of large diameter, and the holes are made perfectly smooth. In some cases it will be found that one or more holes have been omitted by mistake in some of the parts to be riveted. This can be remedied only by drilling through the blind hole. It also may happen that the men in the shop have punched more holes than required. In good work any hole which is not to be filled in by a rivet or bolt is plugged up with lead. This prevents corrosion to a certain extent; it also fills up the cross section, which is desirable in com- pression members. Riveters. The work of fitting up connections is partly done by "fitters" and partly by the riveting gang. A riveting gang consists usually of four men, i. e., heater, passer, holder up, and riveter. Such a gang will drive about 250 rivets in a day of eight hours. Each man gets about five dollars a day, and adding to this the cost of supervision and of the mate- rials, together with the depreciation of tools, etc., the cost of field rivets will not be far from ten cents apiece. Where two or more riveting gangs are employed there is usually a boss riveter and fitter, at about six dollars a day, who is responsible to his superintendent for the work done by the riveting gangs and fitters. Tools and Instruments Used in Riveting. Following are the essential parts of a riveting outfit : 34 ERECTION AND INSPECTION OF The forge for heating rivets. A dolly bar for backing up the old rivet head while the new one is being formed. The dolly is a round iron bar, with one end hollowed out, or cup-shaped, in such a manner as to fit the rivet head. A dolly bar weighs from 15 to 25 pounds. The snap is a hollowed out or cup-shaped hammer used for forging the heads. The forging hammer is used in hand riveting for upset- ting the shank or the red hot rivet and for roughly shaping a new head. Forging hammers usually weigh about five pounds each. In hand riveting, after the new head has been shaped roughly with the hammer, one of the men, usually the rivet "passer," holds a snap against the rough rivet head while the riveter strikes a few good blows on this snap. This gives the rivet head a spherical form. A portable air compressor, popularly known as a "gun," is used for riveting in work where machine riveting is re- quired. The shape of the driving hammer is similar to that of the snap. Hence no extra snap is used in machine rivet- ing, the rivet head being formed and made spherical in one operation. The buster is a blunt-faced hammer having a cutting edge used in shearing off the heads of rivets. After the head of a defective rivet has been cut off, the balance of the rivet is driven out from the hole by means of a special hammer having a tapering head. This hammer is known as the backing-out punch. Drift pin is a. round piece of steel, slightly tapered, and used for the purpose of drawing pieces together so as to make the holes match preparatory to riveting. Each rivet- ing gang is provided with several drift pins. A ten-pound sledge hammer is used in straightening out all lugs and splice plates which have been buckled or dis- torted during shipping or during erection. The sledge hammer is further used in connection with backing out punches, busters, etc. It is also used with snaps to form cup-shaped rivet heads, and for this reason it is some- times referred to as the cupping hammer. The ratchet is a portable hand drill used for making holes on the job where same have been omitted. The steamboat ratchet is a turn-buckle device to which cables are attached. It is used for bringing up or pulling columns into a plumb position. We may add to this list bolts, rivets, washers, fillers, and other minor parts. Each gang is further provided with IRON AND STEEL CONSTRUCTIONS 35 several planks for a temporary scaffold and with ropes or chains for fastening their scaffold to the steel work. Heating Rivets. Good riveting depends to a consider- able extent upon the care used in heating. Rivets carelessly heated may burn ; this greatly reduces the strength of the rivet. In addition, after the rivet is driven there is no way of telling whether the rivet was burnt or not, as the head may look good while the shank is weak and brittle. Steel rivets should be heated uniformly to a dull red ; the orange color must not be passed. The rivets should be put in place as soon as they reach this temperature and should be worked as quickly as possible. No steel rivet should be worked at a blue heat. With machine driven rivets the point of the rivet is often heated more than the head. This facilitates the upsetting and flowing of the rivet metal into the hole. When the riveting is done by hand the pressure made to bear upon the rivet through successive blows is considerably smaller. Hence the rivet should be heated uniformly, or the head should be even hotter than the point, otherwise the blows which will upset the rivet and make it fill the hole near the point will have little effect at the other end, and the rivet may not quite fill the hole near the original head. Iron rivets can be heated without serious injury even to a "wash" or "waste" heat, which is reached when the slag in the metal begins to soak out. Like steel rivets, iron rivets should not be worked at a blue heat. The following additional rules if followed will con- tribute towards good riveting: 1. The forge used for heating the rivets should be placed as near to the point of use as practicable. 2. Only a few rivets should be placed in the fire at a time, otherwise some are liable to be left in too long and be burnt. 3. When the rivets are too long it sometimes happens that the heater will burn the points on purpose, just to shorten the shank. This is bad practice and should never be allowed. 4. Re-driving cold rivets injures the heads and should be prohibited. 5. Caulking of rivet heads may injure both the rivet and the plate, and has no excuse in structural work. It is used to make loose rivets appear tight, and should not be permitted. All caulked rivets should be cut out and re- placed. 36 ERECTION AND INSPECTION OF 6." Rivets should not be heated several times, nor should they be allowed to remain too long in the forge. In both cases a chemical action of decarbonization and oxidation takes place, and this may injure the rivet when prolonged. Riveting may be defined as the process of passing a hot rivet through holes in pieces to be united and of forging another head from the projecting shank. It is generally per- formed by means of air, steam or water power machines, or by hand. Hand Riveting. In this kind of work the red hot rivet is passed through the hole; it is then held up in place by means of the iron bar called "dolly." This bar is hollowed out at one end in the form of a cup that fits on the rivet head. The dolly is pressed against the rivet head by one of the men, the "holder up," and in the same time the shank is upset by the riveter, who uses a forging hammer with a flat face. The end of the rivet is roughly hammered to a convex point. It is then finished or rounded up, just as the rivet loses its red heat, by placing a "snap," or hollowed steel tool, against the rivet head, and by striking a few blows with a heavy sledge hammer. Machine riveting is performed by pneumatic, steam or hydraulic riveting machines. It is better and generally cheaper than hand riveting. The practically steady pressure brought by the machine upon the rivet enlarges the shank and squeezes it into the hole, thus thoroughly filling up all the irregularities of the hole, in addition to forming the new head. Machine driven rivets can be easily distinguished from hand driven rivets. In the first case the rivet head is smooth and more regular, with exception of a slight burr which is often found on the new head and which is due to the die having caught the rivet a little off the centre. Further- more, machine driven rivets will generally fill up all the irregularities of the hole; when such rivets have to be cut out, after chipping off one head, the Jpalance of the rivet can be pushed out only by means of a pin and hammer, and with great difficulty, while in some instances the rivet will have to be drilled out. In hand riveting when one head is cut off the shank can be driven out easily, or it will actually drop out. This shows how little hand riveting fills up the irregularities of the hole as compared to machine work. Hand driven rivets also have their heads covered with marks made by the hammer and by the shifting of the snap during forging. IRON AND STEEL CONSTRUCTIONS 37 In comparing machine with hand riveting, we may note the following points to the advantage of machine work : 1. In machine riveting the holes are better filled. 2. The rivet is more quickly headed, due to a larger pressure, hence there are, as a rule, less loose rivets than with hand riveting. 3. The work is more uniform and more reliable. 4. Machine riveting is generally cheaper. Shop and Field Rivets. Hand riveting done in the shop is generally stronger and better than field riveting done in the same manner. With machine riveting and good super- vision there is little difference if any between shop and field work. Some specifications require ten per cent, more field rivets than shop rivets for the same connection, when driven by machine in the field, and twenty-five per cent, more when driven by hand. Machine rivets are more uniform in strength than hand driven rivets. There are several causes which tend to make shop rivet- ing better than field work : 1. Parts to be riveted together can be handled more conveniently in the shop. 2. The heating of the rivets is done under more favor- able conditions and close to the riveting machine. 3. Powerful stationary riveting machines are some- times used. These are definite in their action and results and will generally turn out better work than the portable field riveting machines. 4. The conditions of inspecting the work in the shop are more favorable. This results in better inspection. 5. The stock of rivets kept in the shop is, as a rule, considerably larger than that kept on the job. This avoids the use of short rivets when the rivets of proper length do not arrive on time, as it sometimes happens in field work. The New. York Building Code allows for steel rivets in shear a unit stress of 10,000 pounds per square inch for shop rivets, and only 8,000 pounds per square inch for field rivets. This gives for a ^-inch shop rivet 4418 pounds shearing re- sistance, while the corresponding value for field work would only be 3534 pounds. With "good field riveting, however, 4000 pounds per ^-inch. rivet in shear may be safely as- sumed. Rivets vs. Bolts. Good riveting is better than bolting for the following reasons : 38 ERECTION AND INSPECTION OF 1. The rivet is forced into the hole and fills it com- pletely. This adds strength in the case of compression members. 2. Riveting furnishes a more rigid connection than bolting. For this consideration riveting is generally used in column splices. 3. The rivet heads upon cooling draw the riveted parts more firmly together. 4. Each rivet filling its hole, moisture cannot work its way into the joint; thus deterioration through rust around a rivet is prevented or delayed. 5. Stresses are likely to be more evenly distributed among a number of rivets than among the same number of bolts. To illustrate this, consider a hanger A (Fig. n) con- nected to the web of a channel B by means of two 24-inch Fig:. 11 Bolted Hanger. bolts. The bolt C was first put in. The second bolt hole in the plate was punched 1/16 of an inch too high. The lower hole was elongated and the bolt D was put in, but as shown in the diagram this bolt takes no load in shear and hence the upper bolt may be overloaded. The only use of bolt D is to slightly prevent the downward motion of the hanger through the friction caused by making this bolt tight. By using rivets, although the lower holes do not match, the upset shanks will completely fill the hole spaces, and both rivets will share more evenly in resisting the shear due to the load supported by the hanger. It often happens that splices in columns along the walls cannot be conveniently riveted on account of lack of room. In such cases the adjoining wall may sometimes be broken off for one or two feet next to the column splice, thus mak- ing riveting possible. Where the adjoining walls are weak, and where breaking into them may render such walls unsafe, as many of the holes as are not accessible for riveting IRON AND STEEL CONSTRUCTIONS 39 are either provided with 24-inch bolts or else such holes are "plugged up" by driving through them red hot rivets and then upsetting the shank by means of a small hand hammer, or by using one end of a dolly bar. Where bolts are used they should b made tight, and then the thread of each bolt should be checked or distorted in order to prevent the loosen- ing of the bolt. From what was stated before, it is obvious that rivets in plugged up holes, although not good looking and with a non-snapped head, are often preferable to -)4-mcri bolts in i3/i6-inch holes. Specifications. Riveting is more expensive than bolting, but riveted joints lend to a steel structure the rigidity which is essential to the safety and durability of the finished build- ing. Where rigidity is lacking, the ceilings may crack, the walls may open, and the whole structure may become un- safe and useless in a comparatively short time. The atten- tion paid to rigidity depends mainly upon the purpose and the proportions of the structure. A very narrow and tall building will have to have strong, rigid joints to resist the effect of wind pressure. A structure used for manufacturing purposes where heavy machinery is employed requires rigid connections to resist the effect of accumulated vibrations due to repeated pounding of such machinery. For buildings used for printing presses or similar heavy machinery the specifications usually require all connections to be riveted. In loft and office buildings it is customary to have all column splices and all connections of beams to columns or beams to beams within 3'-o" from a column, riveted ; all other connections bolted. There is nothing in the New York Build- ing Code that requires riveted field connections in structural work, with the exception of a minor restriction shown in the difference between the allowable working stresses for field rivets and field bolts. The Building Code allows, i. e., in shear : For field rivets, 8000 pounds per square inch, which amounts to 3534 pounds for a ^4-inch rivet. For field bolts, 7000 pounds per square inch, which amounts to 3372 pounds for a }4- mcn -bolt. The rivets and bolts being steel. This shows that about 14 per cent, more field bolts than field rivets are required in a connection to comply with the law. In the case of a twelve-story loft building where this condition was fulfilled with regard to column splices, and where the iron erector was given the choice between bolting and riveting at the same price, he chose bolting. Bolting 40 ERECTION AND INSPECTION OF column splices in anything like a twelve-story loft is con- sidered poor practice and should not be encouraged. Faking Riveting Work. Poor field riveting may naturally be expected from men who just start into this kind of work and who have little experience in overcoming difficulties and new conditions which constantly arise before them. Most or the defective work, however, is due to carelessness, lack of active supervision and unreasonable speed, caused by a de- sire of some gang to turn out more work than other gangs in the same time, or by the compelling action of some fore- men or superintendents, who will discharge a gang doing first rate work when the number of rivets driven in a given time falls below their expectation. Poor work is sometimes due to defective tools, to holes not matching correctly, to driving rivets through such holes without reaming, and to using rivets of improper lengths. Defective work may also be caused through careless heating, slow and careless driv- ing, improper backing up and so on. Most of these faults are manifested in the finished rivets, either through unsatisfactory size and shape of the new rivet head or through the loose condition of the rivet. Faking generally consists in making a loose rivet appear tight under a hammer test. Here are some of the common ways: 1. By going around the head -of the rivet with a caulking tool. This will make the rivet sound all right, and the mark due to caulking will generally not be noticed unless carefully looked for. 2. By driving over the cold rivet heads, using a smaller snap. 3. By hammering or in any way deforming the original heads of the cold rivets. There is absolutely no reason for such action, and any such rivets should be regarded with suspicion. 4. By placing the snap sideways upon the rivet and striking it a few good blows with a sledge hammer. The snap is usually applied below the head, where it cuts a ridge in the plate and makes the rivet appear tight by forcing part of the plate metal under the head. A similar action takes place in machine riveting when, after driving all rivets in a given splice, the riveter goes over loose rivets with his riveting machine and re-drives the cold rivet heads. This usually results into forming a groove or circle all around the rivet head. In few cases such a groove or a snap mark as above described may be formed in driving IRON AND STEEL CONSTRUCTIONS 41 a perfectly tight rivet, and due judgment is necessary in con- demning defective rivets. It is a good policy to dismiss any gang of riveters which persistently continues to do poor work. Testing Rivets. Complete rivet testing involves a test of the rivet metal for tensile strength, bending and ductility. In addition, the riveting inspector must observe the following points: 1. The rivet holes must match correctly. 2. All rivets must be heated properly. 3. Each rivet must be of sufficient length to fill the hole completely. 4. The edges of the rivet heads must be free from caulk- ing marks. 5. The plate metal around the head should be free from any ridge or impress. 6. Both rivet heads should fit tight against the plates. 7. The rivet heads should be free from cracks. 8. The rivet heads should be concentric. 9. The rivet heads should be of full size. r* Loose rivets are easily detected by means of one or two blows struck with a one-pound hammer upon the rivet head. In case of rivets driven horizontally in a column splice, for instance, strike one blow downward against the head of the rivet at an angle of about 60 degrees to the length of the rivet ; then strike a symmetrical blow upward. If the rivet is loose a jar or rattle will be produced. By holding one finger against one head while the other head is struck with the hammer even the slightest jar can be easily detected. In absence of a hammer, any piece of iron, even a cold rivet, may be used to perform this test. Rivets are easier to examine before being painted ; for this reason it is customary in good work not to paint any column splices until all rivets have been approved by the inspector. CHAPTER VI. Specifications. Plans and specifications for each particular construction must be the inspectors and builders' guides for the quality of the materials used as well as for the grade of workmanship required. Specifications must be definite, concise and clear, and must not contain anything contrary to law. In most cases the specifications are separate from the plans ; for small jobs, however, the entire specifications may be written on one or all of the plans. Good specifications will carefully take up all the requirements of the architect or engineer in relation to the quality of material, shop-work and erection, as well as shop and field inspection. Following are some of the main points to be considered in drawing up specifications : 1. QUALITY OF MATERIALS. This includes : (a) Finish. All material should be free from surface defects and should possess an excellent finish. (b) Weight. Any member lacking in weight more than 2^2 per cent, may be rejected. (c) Manufacture. All steel to be made by the open hearth process; all material should be uniform; all cast iron satisfactory. (d) Physical Properties. Rivets should be made of soft or low carbon steel. All other steel should be of the medium grade. Specify the number of test specimens required for the various physical tests, the elastic limit, the ultimate strength and the per cent, elongation. Specify how test specimens should be collected and tested. (e) Chemical Properties. Steel having a definite chem- ical composition will usually have certain definite physical properties. Where the physical requirements are specified in detail, do not specify also the chemical composition. Arbi- trary physical and chemical requirements can not always be obtained in the same specimens. The most that could be done is to specify that certain deleterious substances like phos- phorus and sulphur should not exceed a certain percentage. 2. SHOPWORK. This takes in: (a) Correct Dimensions. All members must be of cor- IRON AND STEEL CONSTRUCTIONS 43 rect length in accordance with plans approved by the archi- tect. (b) Punching. The diameter of the die should not ex- ceed the diameter of the punch by more than i/i6-inch. (c) Straightening. Before assembling each piece should be made straight. (d) Assembling. A sufficient number of temporary bolts should be used. (e) Reaming. To be performed to make all holes true before riveting. (f) Riveting. To be done right, and all defective rivets to be replaced. (g) Painting. All metal to be cleaned from rust before painting. Specify the paint 'to be used. 3. ERECTION. This should cover : (a) Safety. All accident liabilities to be taken by the builder. (b) Bracing. All necessary temporary bracing and guy- ing to be provided. (c) Connections. All connections, whether riveted or bolted, to be in accordance with the plans and specifications. (d) Overloading. Floors or other parts of the structure should at no time be overloaded. (e) Painting. All accessible parts to be properly painted with the kind of paint specified for the purpose. (f) Workmanship. To be in accordance with good prac- tice, and satisfactory to the architect. 4. SHOP AND FIELD INSPECTION. Here should be provided that : (a) All reasonable facilities should be provided for in- spectors for the performance of their duties. (b) Rejection. The architect's inspector should have the authority to reject defective materials and workmanship. (c) Any disputes as to the meaning of the specifications between the architect's inspector and the builder should be referred at once to the architect for final consideration. The following specifications take up the physical and chemical properties of steel and cast iron, together with the requirements relating to finish, manufacture and variations in weight: 44 ERECTION AND INSPECTION OF MANUFACTURER'S STANDARD SPECIFICATIONS. Revised to February 6, 1903. STRUCTURAL STEEL. 1. Process of Manufacture. Steel may be made by either the Open Hearth or Bessemer Process. 2. Testing and Inspection. All tests and inspections shall be made at the place of manufacture prior to shipment. 3. Test Pieces. The tensile strength, limit of elasticity and ductility shall be determined from a standard test piece cut from the finished material. The standard shape of the test piece for sheared plates shall be as shown by. the follow- ing sketch : See Fig. 8. On tests cut from other material the test piece may be either the same as for sheared plates, or it may be planed or turned parallel throughout its entire length, and in all cases where possible two opposite sides of the test piece shall be the rolled surfaces. The elongation shall be measured on an original length of 8 inches, except as modified in section 12, paragraph c. Rivet rounds and small bars shall be tested of full size as rolled. Two test pieces shall be taken from each melt or blow of finished material, one for tension and one for bending; but in case either test develops flaws, or the tensile test piece breaks outside of the middle third of its gauged length, it may be discarded and another test piece substituted therefor. 4. Annealed Test Pieces. Material which is to be used without annealing or further treatment shall be tested in the condition in which it comes from the rolls. When material is to be annealed -or otherwise treated before use, the speci- men representing such material shall be similarly treated before testing. 5. Marking. Every finished piece of steel shall be stamped with the blow or melt number, and steel for pins shall have the blow or melt number stamped on the ends. Rivet and lacing steel, and small pieces for pin plates and stiffeners, may be shipped in bundles securely wired to- gether, with the blow or melt number on a metal tag attached. 6. Finish. Finished bars shall be free from injurious seams, flaws or cracks, and have a workmanlike finish. 7. Chemical Properties. Steel for buildings, train sheds, highway bridges and similar structures shall not contain more than 0.10% of phosphorus. Steel for railway bridges shall not contain more than 0.08% of phosphorus. IRON AND STEEL CONSTRUCTIONS 45 8 Physical Properties. Structural Steel shall be of three grades, RIVET, RAILWAY and MEDIUM. 9. Rivet Steel. Ultimate strength, 48,000 to 58,000 pounds per sq. inch. Elastic limit, not less than one-half the ultimate strength. 1,400.000 Percentage of elongation, - Ultimate strength. Bending test, 180 degrees flat on itself, without fracture on outside of bent portion. 10. Steel for Railway Bridges. Ultimate strength, 55,- ooo to 65,000 pounds per sq. inch. Elastic limit, not less than one-half the ultimate strength. 1,400.000 Percentage of elongation, - Ultimate strength. Bending test, 180 degrees to a diameter equal to thickness of piece tested, without fracture on outside of bent portion. 11. Medium Steel. Ultimate strength, 60,000 to 70,000 pounds per sq. inch. Elastic limit not less than one-half the ultimate strength. 1,400.000 Percentage of elongation, - Ultimate strength. Bending test, 180 degrees to a diameter equal to thick- ness of piece tested, without fracture on outside of bent portion. 12. Modifications in Elongation for Thin and Thick Ma- terial. For material less than 5/16 inch, and more than ^ inch in thickness, the following modifications shall be made in the requirements for elongation : a. For each increase of J/s inch in thickness above $4 inch, a deduction of i% shall be made from specified elonga- tion, except that the minimum elongation shall be 20% for eye-bar material and 18% for other structural material. b. For each decrease of 1/16 inch in thickness below 5/16 inch, a deduction of 2.y 2 per cent, shall be made from the specified elongation. c. In rounds of ^ inch or less in diameter, the elonga- tion shall be measured in a length equal to eight times the diameter of section tested. d. For pins made from any of the before-mentioned grades of steel, the required elongation shall be 5 P er cent, less than that specified for each grade, as determined on a test piece, the center of which shall be one inch from the sur- face of the bar. 46 ERECTION AND INSPECTION OF 13. Variation in Weight. The variation in cross-sec- tion or weight of more than 2^/2 per cent, from that specified will be sufficient cause for rejection, except in the case of sheared plates which will be covered by the following per- missible variations : a. Plates 12^ pounds per sq. foot or heavier, up to 100 inches wide, when ordered to weight, shall not average more than 2^/2 per cent, variation above or 2^/2 per cent, below the theoretical weight. When 100 inches wide and over, 5% above or 5% below the theoretical weight. b. Plates under 12^ pounds per sq. foot when ordered to weight, shall not average a greater variation than the fol- lowing: Up to 75 inches wide, 2.y 2 per cent, above or 2^/2 per cent, below the theoretical weight; 75 inches wide up to 100 inches wide 5% above or 3% below the theoretical weight. When 100 inches wide and over, 10 per cent, above or 3 per cent, below the theoretical weight. c. For all plates ordered to gauge, there will be per- mitted an average excess of weight over that corresponding to the dimensions on the order, equal in amount to that speci- fied in the following table : Table of Allowances for Overweight for Rectangular Plates When Ordered to Gauge. Plates will be considered up to gauge if measuring not over i/ioo inch less than the ordered gauge. The weight of i cubic inch of rolled steel is assumed to be 0.2833 pound. PLATES % IN. AND OVER IN THICKNESS. Width of Plate Plate. Up to 75 Inches. 75 to 100 Ins. Over 100 to 115 Over 115 Inches. In Inches. Per cent. Per cent. ins. Per cent. Per cent. % 10 14 18 . A 8 12 16 % 7 10 13 17 ft 6 8 10 13 % 5 7 9 12 & 4% 6% 8% 11 % 4 6 8 10 over % 3% 5 6V 2 9 IRON AND STEEL CONSTRUCTIONS 47 PLATES UNDER IN. IN THICKNESS. Thickness of Plate. In Inches. Width of Plate Up to 50 Inches. Per Cent. 50 to 70 inches. Per Cent. Over 70 inches. Per Cent. Vs up to 5/32 5/32 up to T 3 ff T 3 ,? up to i/i 10 8% 7 15 i2y 2 10 20 17 15 STRUCTURAL CAST IRON. Except when chilled iron is specified, all castings shall be tough gray iron, free from injurious cold-shuts or blow holes, true to pattern and of a workmanlike finish. Sample pieces, one inch square, cast from the same heat of metal in sand moulds, shall be capable of sustaining on a clear span of 4 feet 8 inches, a central load of 500 pounds when tested in the rough bar. Still another set of specifications is here given. This set is more suitable for building construction and represents the main points taken from several specifications used on actual work and forming part of the iron man's contract. The ar- rangement of the various sections follows closely the outline given in the beginning of this chapter. SPECIFICATIONS FOR MANUFACTURING, FABRI- CATING, INSPECTION AND ERECTION OF STRUCTURAL STEEL for the Loft Building at the S. W. Corner iSth St. and 4th Ave., N. Y. City. John Doe, Owner. H. Smart, Architect. V. R. Wise, Engineer. GENERAL. Site Examination. The iron contractor is to see the site, and to estimate for everything necessary to complete his work on the building, as shown on plans as herein specified. Drawings and Specifications. Any iron work shown on the plans and not particularly called for in the specifications, or any iron work called for in the specifications, and not shown on the plans, must be put in the same as if it were 48 ERECTION AND INSPECTION OF both shown and called for. In fact, these specifications and the accompanying drawings are intended to explain and com- plete each other and include everything necessary and re- quisite for the proper completion of the iron work in this building, notwithstanding that every item necessarily in- volved in the work is not particularly mentioned. Extras and Omissions. No omissions and no additional work shall be undertaken, except upon written order signed by the architect and approved by the owner. The cost of such omission or additional work must be agreed upon before commencing same. Work Contrary to Plans and Specifications. Any work not in accord with these specifications and the accompanying plans must be taken out and replaced at the contractor's ex- pense by work complying in all details with these plans and specifications. Shop Drawings. The contractor shall submit to the architect or engineer for approval, all shop drawings and de- tails. The approval of these, however, is only as to strength and does not relieve the contractor from responsibility for his dimensions. DIMENSIONS. The contractor must verify all figures on drawings before laying out the work ; figured dimensions are to be used in preference to scale measurements ; scale drawings and details in preference to small scale plans. The contractor will be held responsible for the correctness of all dimensions at the building. Errors. Any error or omission and any discrepancy of any kind should be referred to the architect for correction as soon as discovered. Sizes. The work covered by the contract is completely shown on the accompanying plans and these specifications ; all sizes and weights of beams girders and columns are marked on the plans and the column schedule. Changes. The contractor may, if he so desires, simplify the sizes of column sections by increasing their weight. He may replace standard beams by special beams of greater strength and weight when this will save time in delivery. He may also change splicing points indicated on the column schedule. Any of these changes, however, must not be made without the written approval of the engineer. Official Requirements. The contractor shall comply with all State and Municipal Laws and Ordinances relating to building construction. The contractor must conform to the IRON AND STEEL CONSTRUCTIONS 49 Building Code whether each item is specifically mentioned and shown or not. Damages. The contractor shall be responsible for all damages and injuries that may occur to persons, animals, ve- hicles or adjoining property, from whatever cause, during the progress and in connection with his work. Personal Attention. The contractor is to give his per- sonal attention to the work and shall have a competent fore- man on the job at all times. Tackle. The contractor shall furnish all planks, ladders, scaffolding materials and appliances necessary to complete his work to the true intent and meaning of the plans and specifications. Bond. The contractor will be required to furnish a bond through a recognized Surety Co., or two approved bondsmen, for the amount of fifty (50%) per cent, of this contract, to guarantee the faithful performance of this agreement. Deliveries. Shall be made in the order required for erec- tion, and at the time specified in the contract. If deliveries are not made at the time agreed upon, the architect may pur- chase materials in the open mraket at such terms and for such deliveries as in his opinion shall meet the requirements of construction. The cost of such material so purchased and of its delivery to the job shall be deducted from the amount due under the contract. QUALITY OF MATERIAL. General. All cast iron and structural steel should be the best of its kind, both as regards quality of material and pro- cess of manufacture. Finish. All finished material shall be straight, of correct section, and shall have smooth, clean, surfaces, free from cracks, seems, buckles or other defects. Weight. A variation of three (3%) per cent, for cast iron and two and one a half (2 T / 2 %) per cent, for steel from the estimated weights will be allowed in the finished material. Additional weight in excess of these allowances will not be paid for. Any single member or piece of material which weighs less than the estimated weight by more than the above allowance, may be condemned at the discretion of the archi- tect. MANUFACTURE. Castings. All castings shall be of good foundry mixture. Only such scrap iron as may be approved by the architect or 50 ERECTION AND INSPECTION OF his inspector shall be mixed with the metal used for castings. All castings shall be clean, tough gray iron, free from blow- holes, honeycombs, cold-shuts, cinders, sand, shrinking- cracks or other defects, correct as to pattern, neat as to finish and not warped. All castings shall be allowed to cool slowly in the sand to avoid shrinkage strains. Castings of incorrect dimensions and warped castings may be rejected at the dis- cretion of the architect. Steel. All steel shall be manufactured by the Open- hearth process, and shall be uniform in quality. Chemical an- alyses for each furnace heat must be made by the rolling mills and checked by the inspector. No steel shall contain more than .08 per cent, of phosphorus, nor over .06 of sulphur. Rivet 'Steel shall be "soft" steel. All other steel shall be of "medium" grade complying with tests below specified. Tests. Cast Iron. Two specimens, each i in. sq. shall be cast in sand molds for each furnace heat. One of these specimens shall be turned to a diameter of )4 in. for about five inches. It shall then be broken under tension and it shall develop an ultimate tensile strength of at least 18,000 pounds per square inch. The other specimen shall be supported hori- zontally on two knife edges 12 inches apart. In this position the specimen shall be capable of sustaining a central concen- tration of 2,500 pounds, with a deflection of not less than 3/16 of an inch. Castings shall not break when struck with a sledge ham- mer. A blow from a hammer upon the edge of any casting shall show an indentation without crushing or chipping off the metal. Steel. Two specimens cut from finished materials of each furnace heat must be furnished by the rolling mill. Such specimens and all material rolled from the same melt shall be marked for indentification with the number of the original furnace melt. Each specimen shall be I in. wide, 18 in. long and of the same thickness as the rolled material. One speci- men s.hall be broken in tension in a testing machine and shall show an ultimate strength of 54,000 to 64,000 tbs. per sq. in. for "medium" steel and 50,000 to 58,000 ibs. per sq. in. for "soft" steel. Its elastic limit shall not be less than 32,000 pounds per sq. inch and a minimum elongation of not less than 25% in eight inches. If the first specimen fails to develop the required strength and elongation, three other specimens may be tested at the discretion of the inspector, and if two of these specimens do not fulfill the above requirements, all material rolled from the corresponding furnace melt shall be con- demned. The second specimen shall have one end heated to a IRON AND STEEL CONSTRUCTIONS 51 cherry red, quenched in water and bent ; the other eiul bent cold. Both bends shall be 180 flat and shall not develop any flaws. SHOPWORK. General. All workmanship shall be first class in all re- spects and in accordance with the best shop practice. Shop Drawings. All working shop drawings shall agree with the plans furnished by the architect and must be signed by the architect before work commences. The shop, however, must make good, without charge, any errors resulting from not following the architect's plans and errors of clearance or connections. The architect shall be furnished with not less than two sets of working plans and two sets of order lists of materials. Dimensions. All members must be of correct length, in accordance with plans approved by the architect. Punching. All rivet holes shall be laid out by means of a template, accurately spaced and in a true line. The diameter of the die should not exceed the diameter of the punch by more than 1/16 inch for material j/2 inch thick or less, nor 3/32 inch for thicker material. All rivet holes shall be clean cut and free from cracks and burrs. Burrs shall be removed by ream- ing. The diameter of the finished hole shall not exceed the diameter of the rivet by more than 1/16 inch. Straightening. All material must be straightened before and after punching. Assembling. Before riveting, built members shall be pro- vided with a sufficient number of bolts to prevent bending or warping during riveting. Drifting. No drifting of holes will be allowed under any conditions. Holes that do not match shall be corrected by reaming or by new r material, or by both, at the discretion of the architect. Reaming. Shall be used to make holes match. Built-up girders shall have rivet holes punched */6 inch smaller, and then the holes shall be reamed to full size with the parts held in position. Riveting. Rivets shall be of soft steel and driven by ma- chine whenever practicable. Rivets shall be used for all column splices- and for all connections within three feet from each column; other work may be bolted or riveted, at the contractor's pleasure. All rivets and bolts must be ->4 inch diameter throughout the building, except in special cases 5 2 ERECTION AND INSPECTION OF where it is necessary to use other sizes. The pitch of rivets shall never be less than iJ/ inches nor more than 6 inches, while the minimum distance from the center of any rivet to the'edge of the shape shall be 1^4 inches. Rivets should not be used in tension. An excess of 25 per cent, in the num- ber of rivets shall be allowed in all connections to be riveted in the field. The rivets shall completely fill the holes, with full heads concentric with the holes and in full contact with the sur- faces of the metal. All rivet heads shall be neat, cup-shaped, free from cracks on edges, and shall not be burned. All burned, loose or otherwise defective rivets will be condemned and will have to be removed at the expense of the contractor. Any injury caused to the material in removing defective rivets may serve to condemn the injured parts. Painting. Before any painting is done in the shop all scale, dust, dirt and foreign matter of any kind must be re- moved from the structural steel. Cast iron work shall not be painted until delivered on the job, reinspected, and approved. All covered surfaces, surfaces in contact and surfaces enclosed on all sides by riveted members must receive one good coat of paint after the pieces are punched and before they are assembled. All steel work must receive one complete coat of paint before it can be taken from the shops or exposed to the weather. All faced ends of columns and other planed surfaces must be coated with white lead and tallow before, leaving the shop. After erection, all surfaces, including cast iron, shall be painted one thorough field coat. All painting shall be done on dry surfaces, and no painting shall be done in w r et or freez- ing weather. The field coat of paint must be of a different color than the shop coat. The paint used must be one of the following : Red lead and boiled linseed oil, mixed in proportion of 23 pounds of lead to I gallon of oil. Graphite paint No. 26, manufactured by Chicago Graphite Co., or any other paint approved by the architect. Bases. Cast iron bases must be provided for all columns where shown on plans, and must conform with approved de- tail drawings. All bases must be planed smooth on top and must be of the required height. The ribs must be arranged in each case so that 'the entire cross-section of the column shall be directly supported from the bottom of the base. The holes for the bolts connecting the columns to the bases must be drilled to a template and in exact position. Other holes and grouting holes may be cored. IRON AND STEEL CONSTRUCTIONS 53 Cast Iron Columns. All cast iron columns shall be of exact height, with bearing surfaces at right angles to the axis of the column. The ends shall be planed accurately and smooth. Connection-holes shall be exactly spaced and drilled to a template. The top and bottom flanges shall be reinforced by ample fillets-and shall be not less than one inch in thickness when finished. Steel columns shall be made in double story lengths ex- cept where otherwise indicated on the column schedule. Col- umns built of several sections shall be riveted together with ^4 inch diameter rivets spaced not more than 6 inches on centres nor more than 16 times the thickness of the thinnest plate. At splices and in the vicinity of beams and girder con- nections the rivets shall be spaced 3 inches for the full depth of connections. In riveting up built columns due care must be taken to keep them straight and free from twists. All columns shall be milled at each end to a smooth bearing- surface at right angles to the length of the column. Column Splices. Unless otherwise specified by the archi- tect, all column splices shall be made by riveting splice-plates on the sides of each column with not less than twelve rivets in each column. All splice-plates shall be y* inch thick, except where the metal of the columns connected is less than % inch thick, when the splice-plates may be % inch thick. Where the outside depth of one column is less than the other by more than 1/16 inch on each side, the clearance must be taken up with fillers of the same width and punched the same as the splice-plates. Rivet holes in columns and corresponding holes in splice-plates must match accurately. All columns will have 3/4 inch cap plates. The point at which the change in. section is made shall generally be two feet above the finished floors. Beams. Any beam that is longer than required for its special place shall be rejected. Where beams connect to beams a clearance not exceeding l /% inch at each end will be allowed. Where beams connect to columns the clearance shall not exceed l / inch at each end. All beam connections, whenever possible, shall be made by means of standard con- nections, as shown in the Carnegie Handbook, and with the same number of rivets. Any other standard approved by the architect may be used. Wherever the details of the columns will permit, beams and girders connecting to columns shall have not less than eight rivets at each end, four in the top flange and four in the bottom flange. Unless otherwise noted, all beams and lintels are indicated to their approximate lengths and positions by single lines on the floor plans. 54 ERECTION AND INSPECTION OF Beam Connections. All beams resting on walls must be securely anchored by means of approved anchors built into the wall. Under ends of all wall bearing beams steel tem- plates shall be provided to distribute the load on the wall. Separators. Separators must be provided for all double beams. Where double beams of the same size take unequal loads, milled cast iron separators fitting tight against the flanges of beams shall be provided. Other separators may be of heavy gas pipe with % inch bolts made tight. All separators are shown in detail on plans. Tie-rods. Tie-rods ^4 inch in diameter must be provided on all floors, and ^ inch in diameter in roof, as shown on plans. Each tie-rod must be made with two nuts, one on each end. Bent tie-rods must be rejected. General. The purpose and intention of these specifica- tions is to provide for complete work, including all necessary details and connections requisite for erection and safety, and for the development of the full strength of the structure Such details are to be considered as specified, and are to be provided by the iron contractor without extra charge. ERECTION. Safety. All erection work shall be done in a safe and careful manner, and all the provisions of the State Labor Laws and City Ordinances relating to safety and erection of build- ings shall be complied with. Accidents. The contractor is to take upon himself all accident liabilities resulting from the erection of the iron work. Bracing. Whenever the masonry is more than three tiers behind the steel work the contractor must put in temporary timber braces or steel cables or guys to keep all the iron work plumb until the walls are in place. This must be done to the entire satisfaction of the architect. Setting Iron. In handling and setting iron pieces due care should be exercised to prevent beams and columns from falling, in order to avoid bending and heavy shocks. In driving and bending iron, wooden mauls should be used in preference to iron hammers whenever possible. Bases. All bases for columns must be set to exact centre and to exact height, and no variation greater than 1/16 inch from the correct position will be allowed. The masonry con- tractor will bed all bases in position. Columns. All columns must be set plumb and in proper line, and not less than 50 per cent, of all holes in column IRON AND STEEL CONSTRUCTIONS 55 splices must be filled in with 3/ mcn temporary bolts as soon as each column is in place. Beams. All beams must be set level unless otherwise indicated on plans. The elevation of wall beams and lintels is indicated on plans. Derrick. The mast of the derrick must at all times be securely tied with steel guy ropes properly anchored. All beam and column connections immediately under the derrick shall be fully bolted before any iron is hoisted. The block under the mast shall be kept in place by solid timber braces and steel ropes. All iron work must be hoisted in a safe man- ner to avoid accidents. Overloading. All possible cases of overloading must be avoided, and loads stressing any piece beyond the allowable working stresses will not be allowed. Beams supporting the derrick shall be shored at the mid-length with solid timber posts supported by beams on the tier below the derrick, in order to avoid overloading. INSPECTION. General. Before the commencement of casting or roll- ing the manufacturer must give the inspector due notice to that effect. All facilities should be given throughout the manufacturing processes for an adequate inspection. All pieces must be inspected by daylight, and all material shall be turned over for inspection on all sides at the request of the inspector. Identification. All pieces must be marked for identifica- tion with the number of the original furnace heat, except that for pieces used to carry small loads the inspector may waive this requirement. All rejected material shall also be identified by permanent marks. Stock. No stock material will be allowed as a substitute for new rolled material except in case of pieces used to carry small loads or when the material was tested and identified as above, and the inspector can judge as to its quality from undoubted records. Records. Manufacturers shall keep open for the in- spector all books or records giving information as to the quality of materials, and shall furnish the inspector with records of chemical analyses and copies of shipping invoices. Manufacturers will give at least two days' notice before each shipment to the architect or his inspector. Manufac- turers will also provide all reasonable facilities for a proper inspection. 56 ERECTION AND INSPECTION OF Costs. Manufacturers shall furnish the inspector all test specimens, the use of testing machines, and all labor neces- sary to handle the material for inspection. Where shipments are made without inspection, or when due notice or proper inspection facilities have not been furnished, the additional cost of subsequent inspection will be borne by the manu- facturer. General Responsibility. Manufacturers, mills, foundries and shops are required to furnish satisfactory materials strictly in accordance with the plans and specifications, regard- less of inspection, acceptance, or failure to inspect certain pieces of material. CHAPTER VII. Field Inspection of Minor Iron and Steel Structures. In approaching the subject of field inspection of iron and steel it was found advisable to state in a few words the kind of work expected from an iron inspector in the field. The inspec- tion of minor structures like small alterations has next been described, starting with simple store front alterations with and without column supports. The more complex work, that of inspecting tall structures, will be taken up for convenience under several separate head- ings in the chapters following. The work of an Iron Inspector in the field depends largely upon the stage the structure has reached at the time of the inspection. The following classification indicates in a general way the kind of work to be performed by the inspector : 1. To examine materials as to their sizes, shapes, work- manship and other qualities. 2. To see that all the materials agree with the approved plans and with the building laws. 3. To mark rejected materials for identification and to see that no rejected material is used in the structure. 4. To inspect the workmanship of the iron framing and to condemn bad work, thus promoting good workman- ship. 5. To see that the erection is carried on safely and without danger to life and limb, and that the State Labor Laws or any similar laws or ordinances for protection of life and limb are not violated during any time while the con- struction work is in progress. 6. To inspect the derricks, guys and, in general, all the rigging in order to avoid accidents. 7. To see that no part of the structure is overloaded. 8. To see that the structure is properly braced and guyed during erection. INSPECTION OF STORE FRONT ALTERATIONS. Examining Materials Before Setting. Many errors can 1>e conveniently avoided by examining the iron and steel 58 ERECTION AND INSPECTION OF upon delivery and before the same is set in place. While such an examination is desirable in all cases, it can usually be performed by the architect's or the owner's inspector, who is at the job all the time and who can therefore check up and inspect the materials as they are delivered. This inspection is especially important in store front alterations. Store Front Alterations. This group of alterations in- cludes the partial transformation of dwellings or similar houses into commercial buildings by removing part of the front brick work to provide large show windows, -and by supporting the masonry above these windows by means of iron or steel girders or beams ; it also comprises the removal of piers of masonry in actual stores to allow room for larger show windows. In both these cases the brick walls are usually shored up, the iron beams placed in their proper place, and the shoring removed as quickly as possible to avoid business losses. The iron beams should be examined while in the street and before setting, because after erection the beams may not be easily accessible. Also, the beams may be covered up quickly, before being inspected, and if the beams are condemned it is very hard to replace them after the shoring has been removed. Following points should receive careful consideration : 1. Wrought iron beams are substituted for steel beams of equal depth. The wrought iron beams can easily be identified by the fibrous appearance of the metal and by their heavy web and clumsy cross-section, which contrasts easily with the slender cross-section of standard steel beams. There are few wrought iron beams rolled to-day, as steel beams have greater stiffness and therefore greater load carry- ing capacity than wrought iron beams of equal weight. The only serious objections against wrought iron beams are their lower strength and their greater deflection as com- pared to steel beams. For small spans and dead loads the deflection may not be an important factor; as for strength the wrought iron beams are generally 20 per cent, weaker than steel beams of equal weight, and a careful refiguring by the architect or by the plan examiner of the loads to be carried by the wrought iron beams may bring the beams in question within the requirements of the law. 2. Second-hand Material. Nothing in the law prevents the use of second-hand material provided same is in good condition. Second-hand box girders and thin webbed beams heavily painted may have their webs badly corroded and IRON AND STEEL CONSTRUCTIONS 59 full of holes. Such iron should be struck with a heavy ham- mer or a crowbar enough strong blows to establish beyond question the condition of the thinner metal under the coat of paint. Examine the web also for holes filled in with paint ; if there are enough of these holes to materially reduce the cross-section and weaken the girder the same should be rejected. 3. Separators. Double wall beams should be provided with separators not further apart than five feet. (Section 117, Building Code.) Beams 12 inches and over must have two bolts in each separator. This may be taken to mean that cast iron or steel plate separators must be used for beams 12 inches and over, or else two bolts could not be provided in each separator. Separators are used either for keeping the beams in proper positions at definite distances apart, or for the purpose of equalizing the loads carried by each beam when the load is applied eccentrically. Sep- arators also increase the stability of each beam, lessening the tendency to overturning; they also stiffen the webs and prevent crippling in the web. Tig. 12 Grillage. Fig. 12 shows a column footing with standard one-inch gas pipe separators in the two lower sets of beams. The 12-inch beams have two pipe separators, one over the other, as required. All these pipe separators keep the grillage 6o ERECTION AND INSPECTION OF beams in the proper relative position until the grillage is filled in and covered up with concrete. The most reliable kind of separator is the one built of steel plate and knee angles, as shown under the column. The angles are riveted in the shop to the steel plate, then the other leg of each angle is riveted to one beam when the beams are not too heavy to handle together, otherwise the separator is shipped loose and bolted in the field. Tig. 13 Gas Pipe and Cast Iron Separators. Fig. 13 shows the common gas pipe separator used in double wall beams to increase the stability of the iron beams and to prevent them from spreading apart. Fig. 13 also shows the common or standard type of cast iron separator. Either this separator or a plate and angles separator should be used when the load is applied eccen- trically, as in the diagram. The outside beam carries part of the wall load only, while the inside beam carries both wall and floor load. The two wall beams will not act together like one girder unless proper separators are used to tie the beams to one another. Pipe separators should not be used in such cases. The standard cast iron separator must be milled around the edges to fill in closely against the webs and flanges of the beams. Fig. I4a shows a separator made of ^-inch plate and a steel flat bent to suit and properly bolted. Fig. I4b shows channel separators. Fig. I4c shows separators made of 24-inch rods with double nuts at each end. IRON AND STEEL CONSTRUCTIONS 61 4. Common Defects in Separators : Separators not provided within 5' o" center to center distance. Using only one bolt in a 1 2-inch beam separator, instead of two, as required. Omitting separators. Using ^4-inch bolts without pipes. Using pipes that are too short in length. Figr. 14 Good and Defective Separators. Using pipes with rough edges instead of sawing same off to a smooth edge. Using deceitful short bolts instead of through bolts. Fig. I4d. Using bolts too short or too long. Fig. 146. Using bolts less than ^4-inch diameter in i3/i6-inch holes. Using hook bolts instead of standard head bolts. Fig. I4f. 5. Results of Defective Separators: In one instance separators have been omitted in 1 2-inch front wall channels. The channels were about 30 feet long and had shop punched holes for separators. Fig. I4g. Brick work and terra cotta were set for a height of two stories before providing separators. The channels began to spread, as shown dotted. Attempts were made to drive a ^-inch hook bolt in the inside and to catch the outside channel through a i3/i6-inch separator bolt. Two stories of brick work had to be removed, also the terra cotta, and straight separators with sawed off pipes had to be provided. Hook bolts cannot be made sufficiently tight, and they should never be used. Short bolts may cause leaving out the nut in the threaded ends. Long bolts may not be made tight, due to lack of 62 ERECTION AND INSPECTION OF thread length. Iron washers may be used with the long bolts, but short bolts should not be allowed. In one case the excess length of some long bolts has been packed up with wooden washers. This is bad construction, as the wood may rot, thus leaving the double beams with loose separators. 6. Strapping of Iron Work. The steel beams support- ing the walls of a building should be strapped or tied to the inner parts of the building so as to secure absolute stability. This is usually done by providing steel straps as shown in Fig. 15, under each brick pier between windows, and in all cases not less than three straps for a front of about 25 to 30 feet. Each strap is made of a steel flat i^/ox^ inches and long enough to catch over four joists and to be bent up will be necessary at the anchored end. Fig:. 15 Wall Beams and Ties. Each strap is nailed to each joist at crossing points to prevent the strap from falling down, holes having been provided in the straps for this purpose. Packing should be provided at P, if necessary, to fill in the space between the strap and the last joist. The strap may be made to catch the outside beam or it may be passed in between the beams as shown in the figure. The last method avoids disturbances in the arrangement of the face brick. When the beams are too close together a notch may be made in the flange of one of the beams to make room^for the strap. IRON AND STEEL CONSTRUCTIONS 63 W^hen the top of the wooden beams is lower than the bottom of the steel beams, the straps may be placed under the steel beams and over the wooden beams w r ith equally good results. Whenever possible the straps should be placed so as to avoid breaking through plastered ceilings which would have been left undisturbed otherwise. The front beams may also be tied in by means of an angle or channel bolted to such front beams (Fig. I5b) and made to run alongside the floor construction to some interior wall or pier and anchored into same. This arrangement is conveniently used when the wooden floor joists run fore and aft or at right angles to the steel beams supporting the wall. If the tie beam does not carry any load no template will be necessary at "the anchored end. Fig:. 16 Box-Girder tied to Wooden Beam. a, 8 in. x 10 in. main wooden beam on a long span. b, 6x3 %x% angles with % in. bolts, e, separators. Another arrangement is given in Fig. 16. It shows through bolt strapping of a double-beam steel box girder to 8xio inch wood beams running fore and aft. There are two strap angles, each with two bolts through the timber and one through the girder. 7. Usual Defects in Strapping: Omitting straps. Using straps less than i^x^ inch cross-section. Using short straps which do not catch on four beams. The inner end of each strap is not bent vertically beyond the fourth beam. Straps are loose and do not fit, no packing being pro- vided. In this case either pack the inner end of the strap with wooden pieces or pack the outer end with iron wedges, or even a piece of a round iron bar or a piece of an angle 64 ERECTION AND INSPECTION OF placed against the beam so as to fill up the space between the strap and the beam. 8. Templates. Where iron wall girders rest on masonry templates are provided under the ends of such girders to uniformly distribute the pressure. The sizes of templates required by the Code are as follows : For girders over 12 ft. span, stone templates 10 inches thick. For girders under 12 ft. span, stone templates 5 inches thick. For lintels over 6 ft. span, stone templates 5 inches thick. For lintels under 6 ft. span no template is required, but each end must bear 5 inches on the wall. Steel plates of equal strength may be used instead of stone templates. In addition all wall bearing beams must have iron or stone templates and wall anchors, except beams less than 6 inches in depth when spaced not over 30 inches centre to centre. Steel templates should be well grouted, so as to bind well to the masonry. The sizes generally used are as follows : For 3, 4, 5 and 6 inch beams, 6x6x%. For 7 and 8 inch beams, 8x8x^/2. For 9, 10 and 12 inch beams, TOXIOX^. For 15, 18, 20 and 24 inch beams, 12x12x^4. Where larger size templates are required, grillage beams with separators may be used instead of templates to dis- tribute the load on the masonry. All templates must be placed flush on edge with the inner face of the wall, as in Fig. i7a. Where the plate is placed too far in, the iron beam upon deflecting may crush the wall at the inner edge. See Fig. I7b. When the templates are rectangular and of sufficient thickness, they should be placed with their longer edge along the inner edge of the wall. In some cases box girders with a wide bottom plate are used. These plates can not be considered as equivalent to templates, no matter how much they bear on the wall. A template when well set forms part of the wall and sticks to it, thus tending to uniformly distribute the load over the pier area. This template does not deflect with the girder, as shown in Fig. I7c, which represents the side elevation of a box girder made of two 10 inch beams and two ^2 inch plates. On the other hand, if the template is omitted the bottom plate of the girder will deflect with the girder and will bring a concentrated load along the very edge of the wall, as in Fig. I7b. IRON AND STEEL CONSTRUCTIONS 65 9. Usual Defects in Templates: Omitting templates. Using stone templates of less thickness than required by the Code. Placing the templates inside the wall and beyond the inner edge of the wall. Placing templates too low and raising the end of the girder to the proper level by means of wood or slate wedges. Using small templates and thus overloading the masonry. Using thin templates, which tend to bend under the super-imposed load. Using cracked and otherwise defective stone templates or cast iron, plates. lid Fig. 17 Templates and Wall Anchors. When the templates are too low the difference should be made up by using thin steel plates on top of the original low plates, and of the same length and width as the main template. Or the template may be raised to the proper elevation by means of small wooden wedges forced under- neath and the space under the template filled in with good cement mortar. When this has set sufficiently the wedges are pulled out and the openings thus left are filled in with grout. No load should be placed upon the steel . template until the mortar underneath it has completely set. 66 ERECTION AND INSPECTION OF 10. Wall Anchors. The main purpose of wall anchors is to secure greater stability for the walls. There is a large variety of anchors used for the purpose and some are shown in Fig. 17. A good anchor must have a large area in contact with the mortar, hence the round anchor shown in Fig i/d is commonly used. This anchor is made of a 24-inch round bar and should be about 12 inches long. It is often specified in government work and is also known as a government anchor. The plain bolt anchor, Fig. 176, is easily obtainable. The bolt anchor and riveted anchor have the advantage that, being once put in place, they can not be removed by other mechanics as easily as the so-called government anchor" before the masons brick these anchors in. Anchors which are not put in ahead of time by the iron setters are liable to be left out by the masons. Fig. I7f shows a ^4-inch round anchor sometimes em- ployed in connection with beams used in pairs. The riveted two-angle anchor shown in Fig I7g is espe- cially good for sidewalk beams; they tie the street retaining wall to the main building and can not be removed before bricking in. The common wall anchor, Fig. 17!!, should be used in all cases when the iron work is about 12 inches or more from the outside face of the wall. Not less than 4 inches should be allowed between the anchor and the face of the wall. This is the anchor commonly used in tall buildings, and is usually made of a 24~ mcn bolt with a 6x6x5/16 plate. Fig. 17! shows an excellent form of through wall anchor. The 24~ mcn bolt passes through the whole thickness of the wall and is provided on the outside with either an iron star or a large washer. In alteration work, whenever a wall is broken into for the purpose of resting an iron beam on same, it is good practice to disturb the old work as little as possible. Hence in such cases the double-angle anchor, either, riveted or bolted, is preferable. Little advantage is gained, however, in such work with any kind of an anchor, as upon patching up the wall around the beam in general only the patchwork will stick to the beam and anchor, while the main wall will adhere very little to the new material unless unusual care and good workmanship are secured. Under such conditions, if the building is only a few stories in height, and when the wall is not an xterior wall, a straight beam end without an anchor, resting on the wall -and surrounded with good Port- land cement mortar and brickwork, may be found preferable.. IRON AND STEEL CONSTRUCTIONS 67 STORE FRONT ALTERATIONS INVOLVING COLUMNS. This is a very common form of store front alteration. Instead of resting the front wall girders on party walls or on brick piers, the two ends of these girders rest on top of columns of iron or steel. The columns must be of the right weight and size, must be plumb and straight. They must rest on base plates of dimensions approved in the original plan. They must be bolted on top with not less than four ^-inch bolts in each column. The beams must agree in size and weight with the ap- proved plans; must have separators not further apart than 5 feet centre to centre, and must be well strapped. All iron- work must be painted before and after erection. The common defects mentioned in relation to beams in the previous chapter are often found, also, in these alterations. In addition, we shall mention faults found in columns and their connections : 1. Lightweight iron. Iron heavier than called for in the approved plans, but the shapes and materials are contrary to approved- plans. For instance : Using built-up columns instead of Bethlehem columns. Using cast iron columns instead of steel columns. Using standard beams for columns instead of Bethlehem columns of equal weight. This is one of the most dangerous changes when made without first figuring out the load that can be safely carried by the new columns. To make this point clearer consider the following figures : An 8 inch Bethlehem column weighing 32 pounds per foot is good for 55 tons when 12 feet long. A 6 inch round cast iron column ^-inch metal, weighing 39.2 pounds per foot, is good for 66.4 tons when 12 feet long. A 5 inch round cast iron column ^-inch metal, weighing 31.7 pounds per foot, is good for 52 tons when 12 -feet long. A 12 inch standard I-beam 31.5 pounds per foot is good for 32.1 tons when 12 feet long. It is easily seen what might happen when a 6 inch cast iron column is replaced by an 8 inch Bethlehem steel column, or when a 5 inch cast iron column is replaced by a 12 inch standard steel beam. 2. Steel plates and stone blocks under the bottom of the column are defective, of smaller area and less thickness than required in the approved plans. 68 ERECTION AND INSPECTION OF 3. Omitting plates on top of open back cast iron col- umns. These plates make the load more uniformly distributed and shall not be omitted. They are required by the Build- ing Code. 4. Erecting unpainted columns and placing brickwork around same before painting. 5. Using bolts less than ^4-inch diameter in the top flanges of columns in connections of beams to columns. Using less than four ^4-inch diameter bolts in the top flanges of cast iron columns, same being contrary to the Code. 6. Using ^-inch bolts in defective 13/16 holes instead of reaming out the holes and using 24-inch bolts. 7. Leaving out part or all the bolts. Figr. 18 Columns and Straps. a, 8x10x1 in. cast iron column supporting two 12 in. steel beams; b, 10 in. Bethlehem column strap- ped with % in. rod through wall. 8. In some cases second-hand cast iron columns with- out top flanges have been used. The lack of flanges can be remedied by an arrangement shown in Fig. i8a. A steel knee angle with one line of through bolts and one line of tap bolts may be used. A plate is put on top and then the beams are drilled to fit and are bolted with ^-inch bolts. The diagram shows a column next to an adjoining wall. Other columns may have one steel knee angle on each side. 9. The steel or iron columns may be out of plumb ; the steel beams may project beyond the party line. All beams projecting beyond the party line should be cut short and all columns shall be plumb. The beams on top of the iron columns are strapped to the wood joists as before stated. If the work is done right PLRN TC Front Elevation. . 19 Store Front Framing: anchored through wall. ;c ERECTION AND INSPECTION OF this will also help keeping the columns plumb. In case of fire, however, the wood joists may burn and the beam straps may become useless. For this reason in good work ^4 m - round anchors are used, passing through each column every 4 feet or so in height, and then into the side or party wall, as in Fig. i8b. All spaces around these anchors are then filled in with a good cement mortar. One more type of store front construction will be con- sidered. Fig. 19 shows the side and front elevation and the top view of a common show window extending two stories above the ground. The steel frames for such show windows must be well anchored to the main building. The uprights are usually made of steel angles, which are tied to the main structure by channels or angles. Whenever possible such ties should be bolted to the ironwork of the main building. In the figure, however, is shown a case where no iron work was within reach, and the whole window frame is tied to the front brick wall. The 4 inch channels carry the roof and intermediate floor construction. They are provided with anchors made of K inch round bars passing through the wall and through 6x6 steel plates on the inner face of the wall. The other end of the anchor is welded to a i^x^ flat piece, through which two ^-inch bolts are passed into the 4 inch channels. Or the whole anchor may be made in one piece from a I inch round bar. In either case a thread is cut into the anchor and a nut is provided, as shown in the side elevation. As the 4 inch channels carry the roof and floor, steel templates have been provided under their wall-bearing ends. See Fig. 19 Plan. The 3x3 inch angles carry no load except, perhaps, the weight of some window panes. The purpose of these angles is to break up the unsupported length of the main angle uprights and to stiffen the whole frame. These angles form a continuous band all around the steel frame and should be anchored to the wall with clip angles as shown. The main uprights must be properly bolted and provided with a suitable shoe and plate at the bottom. The common defects encountered in this kind of work are as follows : 1. Anchors through wall are omitted, and the floor- carrying channels simply rest a few inches on the brick work. This must not be allowed. Where the anchor strikes into a partition or an interior brick wall the anchor may be placed on a slant, or it may be bent to avoid the partition, if necessary. 2. Omitting templates under floor-carrying beams. IRON AND STEEL CONSTRUCTIONS 71 3. Omitting intermediate bracing angles. 4. Defective bolting. 5. Providing no shoe at the bottom of the main uprights. 6. Omitting plate under the main uprights. 7. Using lighter material than called for in -the approved plans. 8. Erecting unpainted iron or omitting a second coat of field paint. CHAPTER VIII. Hoisting Iron Work. KINDS OF HOISTS. Before any columns are set in their final position one or more derricks are installed on the premises for hoisting the iron. A hoist is any machine used for raising and lowering weights. There are several kinds of hoists : 1. Cranes. A crane is a hoist which in addition to rais- ing the load can also be made to move it in a horizontal direction. (See Fig. 20.) A crane consist chiefly in a revolv- ing vertical post or mast, a projecting jib or boom, and a stay for sustaining the outer end of the jib. The stay may be either a tie or a strut. The post, jib and stay do not change their relative positions. 2. Derricks. A derrick (Fig. 21) differs from a crane chiefly in the fact that the stay is always a tie, consisting of a rope or chain, which may be shortened or lengthened at will, thus raising or lowering the free end of the jib or boom. This in turn revolves about an axis passing through its lower end and attached near the foot of the mast. In a derrick the post, "boom and stay change their relative positions. The boom can be made to raise loads vertically at higher eleva- tions than in the case of cranes. For this reason derricks are generally used in hoisting iron in constructions. 3. Shear-poles with guys consist of two masts brought" together at the top, and tied at the top with one or more guys (Fig. 22). This device is used for hoisting small loads only. On large jobs steel derricks, with mast and boom made of several sections of angles and lattice work, are generally used. Steel masts and booms are usually over 100 feet long. Wooden masts and booms are of all sizes, generally less than 100 feet in length. A large boom reaches far out into the street and covers a greater range of the building at the same time. The first time a derrick is set on a job the erector will drive five or six iron bars or hooks around the edges of the lot. These hooks are called the dead men,' and are used to I tt * I . 5 11>g 8J8 S^+j 3 C/5 74 ERECTION AND INSPECTION OF anchor the guy ropes that hold the mast in place. Good dead men are made from steel rope coiled around several times and strongly clamped together. A round J^-inch bar one foot long passes through this coil. The whole is placed in the concrete under the grillage or in between heavy grillage beams, with exception of one end of the loop which projects outside. This is used to anchor the end of the guy rope. In some cases, where another building on the adjoining lot has some exposed column or other good points of anchorage the erector may take advantage of such points and use them as dead men with the consent of the owners concerned. After the dead men, the block is set in the desired place and spiked to prevent sliding. Heavy 12x12 pieces about 8 to 10 feet long may be required under the block to distribute the load. The mast is then tied on top with all guy ropes while the mast is still on the ground in a horizontal position. Then the mast is raised to a plumb position over the block, by cleverly manipulating the guy ropes and by shoring or by using a small hand der- rick. All guy ropes are -provided with turn buckles; by means of these the ropes are all set in tension and the mast is made plumb. Then the boom is raised in place by means of a rope tied to the top of the boom and passing over the pulley near the top of the mast. A pin is passed through the lower end of the boom and the derrick is set. After the erectors have set as much of the iron as could be set from one position of the derrick, the latter is raised. All hands help in raising the derrick, and some heavy der- ricks have thus been raised in two or three hours by ten or twelve men. The beams upon which the derrick is to rest are carefully and completely bolted at their ends. If these beams are not sufficiently strong, and as a precaution against overloading, 12x12 in. wooden blocks or sticks are provided vertically under the derrick beams, reaching from under the new position of the derrick to the iron beams of the tier below. Using the boom as a vertical post, the mast is raised, usually two tiers at a time. The mast is then guyed and plumbed, and the block under the mast is securely tied in place in its new position. Using now the mast and its pulley on top, the boom is raised to the same floor and placed with the lower end in its pin connection as before. The derrick is then completely set. Where two or more derricks are used on a job, each one in turn may be used to raise the others. This saves consid- erable time and labor. As an interesting suggestion it may be mentioned that in one instance a seventeen-story building IRON AND STEEL CONSTRUCTIONS . 75 was erected next to a twenty-story building by using only a boom placed on top of the twenty-story building. Some derricks are run by electricity supplied from the street distributing lines. Most of the derricks, however, are run by steam used in full stroke engines. Where electricity is used there is no coal to be stored up, no ashes nor smoke. No fuel is wasted during lunch hours or after the work is stopped for the day. Electric derricks should be used espe- cially in small, narrow buildings, where it is difficult to back up teams for coal or for other materials. Stresses in Derricks. Consider a derrick in the position when the load is exactly opposite one of the guys G. (Fig. 21.). In practice the two pulleys shown near the top of the mast are placed on the same axle. Let W be the load in pounds. Then, the total stress in the boom J is W X ^~lbs. where b = length of boom in feet, and n = distance in feet from the pin at the bottom of the boom to the near end of the tie T. Total tensile strength in T = W X -jrlbs. P Total stress in guy-rope G = W X - m Total compression in the mast P = W + stress in guy- h rope X - s Stresses in Shear Poles. Consider the two masts DL and DM replaced by a single mast in centre, DC. Also, let us take up first the case of the shear-pole with only one guy-rope on centre, like DG. Let W = total load in pounds and a, b, p, n, k distances, as shown in the figure and expressed in feet, viz. : a == GH; b == DC; n == DH;k = CG and p = perpen- dicular distance from C to DG. We then have : ab Total stress in DC = pounds nk a-k Total stress in DG W - - pounds P The stress in either mast will be found by multiplying DL one-half the stress in DC by DC ;6 ERECTION AND INSPECTION OF Where two guy ropes are used, the stress in either guy- rope will be found by multiplying one-half the stress in DG length of one guy-rope in feet. by DG Ropes. Guys for shear-poles are often made of hemp or Manilla rope. A hemp rope one inch in diameter has an ulti- mate strength of about 6000 pounds, and a safe working strength of about 800 pounds. Manilla ropes are slightly stronger. Guys for derricks are usually made of iron or steel wires twisted into strands, which in turn are twisted into wire ropes. Iron ropes one inch in diameter have an ultimate strength of about 35,000 pounds, and a safe working strength of about 6000 pounds. Steel ropes one inch in diam- eter have an ultimate strength of about 50,000 pounds, and a working strength of about 8000 pounds. DERRICK ACCIDENTS. Here are a few of the most common derrick accidents : 1. Defective Anchorage. The dead man may slide out. An accident of this sort is likely to take place after a heavy rain, where the dead men have been placed into soft ground. In one instance two men were killed when the derrick upset due to the loosening of one dead man. 2. Slipping of the Block. The block under the mast may not be safely anchored against sliding. This may cause the derrick to upset. 3. Overloading. This kind of accidents are very serious. They often cause the mast to fall through the floor upon which it rests, and to get clear down to the cellar. In one case an overloaded derrick on the second tier fell into the cellar, tearing away connection angles and com- pletely wrecking the panel below it. Steel beams were so badly twisted that they had to be entirely replaced, and two men were injured. 4. Defective Ropes. Overloading may also be due to the use of defective hoisting ropes, when such ropes are used to carry excessive loads. In a 20 story building several erectors were busy trying to bring a column in a vertical position preparatory to setting it on the 8th tier. As soon as the column was vertical but not in place, the sling broke and the column fell from the 8th story to the cellar. It broke through the planks on the 8th tier r IRON AND STEEL CONSTRUCTIONS 77 twisted several beams, crashed through three tiers of rilled in floor arches and injured seven people, some of them very se- verely. 5. Insecure Pulley. As mentioned before, there is a pul- ley fastened to the block at the bottom of the derrick, and the rope from the engine passes under it. It may happen that the pulley gets loose, as it did in an accident, investigated by the author. The pulley jumped off the block while the derrick was loaded (Fig. 23). In. an instant the rope between the drum and the top of the mast became one straight line throw- ing the sidewalk bridge over 12 feet up in the air. Two per- sons were crossing the bridge at the time; one jumped off, the other was thrown up and fell directly over the engine. Fig. 23 Derrick Accident. Pulley PP grot loose R, Retaining wall; S, Sidewalk; B, B, Sidewalk Bridge; E. Hoisting Engine. 6. Engine Breakdown. Perhaps the most dangerous ac- cidents may result from defects which will set the engine out of order while a load is partly on its way up. In one instance the load was just about 2 feet above the bridge when the piston cylinder burst. The steel fell on the bridge with no consequences. In the case of a 20 story building about four tons of steel were hoisted up to the i8th tier, and the engineer was ready to boom in the load when a cog in a gear wheel got out of order and allowed one rope to unwind. This rope governed the boom motion. With a thunder like that of an explosion 78 ERECTION AND INSPECTION OF the 80 ft. steel boom crashed against the steel work of the i8th tier and sheared itself into two halves. The upper part turned a half circle in the air and stuck in between the beams of the I5th tier. The lower half was a useless mass of junk on the iSth tier. As for the load of steel, it fell into the street next to the edge of the side-walk shed and buried itself for over two feet into the asphalt pavement near the curb. All the iron in the street was so badly twisted that it had to be replaced. Several beams near the i8th tier were also partly deformed. None of the columns -already erected were seri- ously damaged. 7. The Engineer. Serious accidents could also happen when the engineer running the derrick is not sober. Every- body around the building would then be in danger. 8. Ignorance and Misjudgment. Many accidents are due to these causes. An example will illustrate this group : Fig. 24 Derrick Accident. Boom, made longer by using several boards. Before and after booming out. In erecting a 20 story building by using two derricks, it was found that the boom of neither of them would take in a certain corner column. The booms were too short. The fore- man stretched one boom (Fig. 24) by tying to it a bundle of four planks about 18 feet long. He then tied a rope to the new end of the boom and attempted to hoist in this manner a IRON AND STEEL CONSTRUCTIONS 79 column weighing three tons. The boom of course buckled and was out of commission in an instant. A new and larger derrick was finally used. From what was previously stated it appears that derrick accidents are at times very serious and most regretable. It is incumbent upon the inspector as well as upon the erection superintendent of each job, to carefully examine all parts and accessories of each derrick as often as possible, in order to avoid accidents and injuries to men and structures. CHAPTER IX. Iron in Retaining Walls and Footings. RETAINING WALLS. In the erection of tall buildings, as soon as the excavations will allow, and as early as possible, sheath piling is driven along the sidewalk and the material is removed to make room for a retaining wall. There are three kinds of retailing walls in common use: The most usual is the brick retaining wall. The Code re- quires that such walls shall be laid in cement mortar, like all the walls below curb, and the width of the retaining wall at the base must not be less than J4 f the height of the wall. No iron is used in this kind of retaining walls. The most graceful retaining walls which in the same time are stronger and take up less room in the cellar, are the rein- forced concrete walls. One inch reinforcing bars spaced about 18 inches on centres vertically, and cross bars about 2 ft. on centres and about I inch thick are commonly used. Of course in walls reaching 30 to 40 feet, brick work may be out of ques- tion and the concrete wall will be designed in the usual way. The only objection to concrete retaining walls is the need of forms and the time lost in the setting of the concrete. A third form of retaining walls often reaching over 30 ft. is sometimes used. This consists of heavy channels, placed vertically against the embankment about four feet apart, and braced against the main structure by means of steel beams, and with circular brick arches in between. PIERS FOR COLUMNS. For tall buildings in general the column piers are carried down to rock, using caissons if necessary. Where the rock is not far from the proposed cellar bottom, the walls between columns are also started on rock. Where caissons are used or where the rock is too low, steel beams are placed from col- umn pier to column pier, and then the brick wall is started on top of these beams. Where the ground is soft and the rock is not within economic distance from the surface spread footings or piles may be used. For lighter structures the piers may be left out, and the columns may rest directly on a spread footing carried by the IRON AND STEEL CONSTRUCTIONS 81 soil at the bottom of the excavation. Where no piers are used the Building Code allows a bearing capacity of : 1 ton per square foot on soft clay. 2 tons per square foot on clay and sand in layers, wet and springy. 3 tons per square foot on loam, clay, or fine sand, firm and dry. 4 tons per square foot on coarse sand, stiff gravel or hard clay. These values are allowed where no tests are made. In all doubtful cases or w r here the owner wants a larger bearing allowance the Building Department will make tests at the ex- pense of the owner. These tests are generally carried out as follows : Upon a timber platform constructed for the purpose, the load per square foot which is proposed to impose upon the soil ivS first applied and allowed to remain undisturbed for at least forty-eight hours. During this time measurements are being taken once each twenty-four hours or oftener in order to deter- mine the settlement, if any. After forty-eight hours 50 per cent of the first load is added, and the total load is left undis- turbed for at least six days, careful measurements and read- ing being taken once in twenty-four hours, or oftener, in order to determine the settlement. The test is not considered satis- factory or the result acceptable unless the proposed safe load shows no appreciable settlement for at least two days and the total test load shows no settlement for at least four days. The accepted safe load shall not exceed two-thirds of the final test load. Piers. Before a pier is built, the pier hole must be in- spected and approved. Where piers have to go down to solid rock, a man gets into the pier hole and sounds the bottom with a crow bar. Good rock is known by its general appearance and by a fairly clear ringing sound which it gives when struck with a bar. All soft spots must be cleaned out before the pier hole is approved. In some cases, although very seldom, these tests fail to indicate to the inspector whether solid rock, or simply a large boulder has been struck, unless great care is exercised. Sometimes piers have been erected on top of old sewers or old well holes. These are dangerous cases and mostly met with in smaller buildings where the excavations are not car- ried far below curb. After the pier bottoms have been approved, they are filled in with a mixture not poorer than I cement, 2 sand, and 4 82 ERECTION AND INSPECTION OF broken stone or gravel. This is required by the Building Code. Each pier must be brought to the proper elevation on top,, and must be allowed to set hard before placing any load on top of it. If after setting the piers come too high, on account of in- correct levelling, the top of the piers are cut down to within ^/\ in- below the bottom of the column footing, whether it be a cast iron base or a grillage. This $4 inch space allows for proper grouting. In one case about fifty piers came -too low by from 2 to 4 inches, all due to the leveler's mistake in starting from a wrong bench mark. Wooden forms had to be built around each pier, after the pier surface was made very rough ; water was abundantly supplied to flush the pier and then a rich con- crete was dumped on top to the required elevation. In order to make absolutely certain that these instructions were car- ried out, the builder cut down not less than one foot from the top of each pier. This insured a real rough surface of contact between the new and the old work. For piers carried down to rock in caissons, the Code al- lows fifteen tons per square foot. For piers carried down to rock in open trenches or in sheet piling, only eight tons per square foot is allowed. This difference is due to the fact that in caisson work the caisson helps making a pier of a uniform cross section. The caisson will keep the mass together until set, and even then the caisson as a rule is left in place, and this adds some more strength to the pier. On the other hand in open trenches the pier may be irregular in cross-section, and the grout between stones may be lost by absorption into the soil, making the pier useless near the edges. For piers carried down in caissons to gravel or hard clay, the Building Code allows ten tons per square foot. Loads as high as 30 tons per sq. ft. may be allowed on good rock, where the piers are reinforced near the top by two or more rows of horizontal J^ in. steel round bars, placed about six inches on centres and about six inches apart verti- cally. GRILLAGE. Rolled beams, channels or girders are gen- erally used to distribute the column loads upon the top of the piers. The Building Code requires that all grillage beams shall be provided with proper bolts and separators, to keep them in place at a proper distance apart. It is also specified that all grillage must be inclosed and filled in solid with con- crete. This is usually done by setting the grillage on wooden wedges, at the proper elevation and about % in to Y\ in. above the pier. A form is then built around the grillage and the IRON AND STEEL CONSTRUCTIONS 83 concrete poured in. Where the beams are too close together, grout, or fine gravel concrete will have to be used to fill in the spaces in between the beams. Separators are placed to keep the beams properly spaced. In the same time separators stiffen the web of the beams and for this reason they are generally placed directly under the column. The separators for grillage are mostly one inch gas pipe cut to length, and pro- vided with 24 in. bolts. Other means for stiffening the webs, of grilliage beams and for preventing them from crippling un- der the load, is to use heavier standard beams with thicker webs, or two channels back to back with a plate in between and riveted together, or even stiffener angles against the webs of grillage beams like in an ordinary plate girder. Where two layers of grilliage are used under a column, the upper grillage in good work is bolted to the lower grillage. Some engineers insist however, that a space of about ^ in. should be left between the two grillage layers for grouting. Of course a grout of one part cement and one sand in such a thin layer will stand about six thousands Ibs. per sq. inch before being crushed into powder and the objection that this grout will be crushed under the load may be disregarded. The reason for grouting in between rather than having the gril- lages in contact is that rolled sections are seldom of exactly the same depth. In fact their depth will vary in some cases more than }/% in. Consider now a column footing made of a lower and an upper grillage with no grout in between the two, and with the upper grillage consisting of three I beams. If, for instance, the middle beam of this upper grillage is not of full depth by l /% in., such a beam will be useless, because it will not carry any load until the other two beams, overloaded as they may be, will cripple in the web for l /% in. Grouting in between the two layers would tend to avoid these. CHAPTER X. Cast Iron Bases and Their Inspection. DETAILS OF A CAST IRON BASE. The main parts of a cast iron base are as follows : The Barrel, is the central part of the base, and has the form of a closed chamber, usually circular or rectangular. The rectangular form is shown in the base in Fig. 25. The upper part of the barrel is covered by the Top Flange of the base, upon which rests the column. This top flange is provided with a hole in the centre, for grouting purposes. This grouting hole is cored, and is at least 3 inches in diameter. In addition there are four bolt holes near the corners of the top flange. These holes are very accurately drilled and are used in achoring the column to the base by means of J4 m - or r m - diam. bolts. The lower part of the barrel rests on the Bottom Flange of the base. This flange spreads the load over the pier area. Like the top flange, the bottom flange is provided with a 3 in. grouting hole in the centre, and with a number of i l / 2 in. diam. grouting holes all around the barrel. All these holes are cored, not drilled. The barrel and the two flanges are tied together into one solid mass by means of a number of Ribs. These ribs are at least i in. in thickness, and the longer ribs at corners are usual- ly of greater thickness than the interior ribs. All around the edges of the bottom flange, the cast iron bases are usually provided with a vertical rim, about 3 inches in height and at least one inch in thickness. This rim is known as the Compensation Flange. It greatly increases the load carrying capacity of the base, and stiffens the joints be- tween ribs and the bottom flange. TESTING CAST IRON BASES. In the case of small loads the bases may rest on a steel plate on top of a pier, or even directly on the concrete pier as in Fig. 25. These bases are often dumped into the excavation before the derrick is set. They are tested by tapping with a hammer. Good bases will stand the hardest blows a man could deliver with a light sledge hammer. The same method of testing applies also to cast iron columns. Good castings give a clear ringing sound on tap- ping. The casting is gray, soft, with small crystals and is Fig. 25 Details of a Cast Iron Base. T Top Flange. B Bottom Flange. K Barrel. C Compensation Flange. R Ribs. G Grouting Holes. WW Wooden Wedges. MM Bricks. Arrows indicate the flow of grout. 86 ERECTION AND INSPECTION OF easily indented. Sand holes or blow holes are detected by a dullness in the sound. Cracked bases give also a characteristic sound which is easily distinguished. Warped bases are likely to have internal stresses due to unequal contraction or to other defects in manufacture and should be rejected; the same applies to bases of incorrect dimensions. Repeated Inspections. Cast iron work must be repeatedly inspected. Bases which have been approved upon delivery may be cracked in handling. In one case bases were made to slide on two timber guides running from the sidewalk to the bottom of the excava- tion. One base left the guides and struck a boulder. Luckily the base was smashed. Should the base have been cracked only, it is doubtful whether the particular iron foreman would have had the honesty to notify the inspector to this effect. He would have probably taken chances. As it was", a new base had to be obtained, bitt this caused several days delay in that part of the job. In another case in a 12 story building, a steel beam fell down into the cellar and broke part of a base and more than half of the lower flange of a heavy 15 inch case iron column. The structure already eight stories high, had to be shored up and the column replaced. SETTING CAST IRON BASES. Bases resting directly on grillage are bolted on top with four ^ m - bolts to the steel or cast iron columns as in Fig. 25. Four pairs of wooden wedges are placed under the base when it rests directly on the pier. The base is centred and raised to the proper height. The clearance between base and pier should not exceed ^4 inch. Next a mixture of one part cement to one or two parts sand is prepared and this grout is poured through the top of the barrel, whence it penetrates under the base, comes out through the grout holes and overflows the compen- sation flange. Bricks are placed on edge all around the base to stop the grout from spreading. Common Defects in Setting. It sometimes happens that the holes in the bottom of the column do not match with the holes in the top flange of the cast iron base. A drift pin can not be used to enlarge the holes and make them match, as this may crack the casting. In poor work, one of these methods is followed : 1. Omitting bolts altogether. 2. Using bolts of smaller diameter and with or without washers. IRON AND STEEL CONSTRUCTIONS 87 3. Using bent bolts. In good work such holes are made to match by enlarging the opening by means of a hand or a compressed air reamer. After the holes have been lined up, the proper size bolts are put in. Bolts without nuts and loose bolts are very common on jobs which are poorly supervised. CHAPTER XL Cast Iron and Steel Columns. The columns mostly used in tall buildings are steel col- umns. During the past few years there have still been erected several loft buildings with cast iron columns, some of them being twelve stories in height. Steel columns usually come in two story lengths. This gives added stiffness and saves some field work. Cast iron col- umns are generally one story long in order to avoid cold shuts in castings. A longer column will also be more liable to be rejected due to defects near either end or near the centre. CAST IRON COLUMNS are tested by tapping with a hammer just as in the case of cast iron bases. The most common defects found in cast iron columns are as follows : i. Eccentricity. In casting the column, the core has shifted. This makes the column heavier on one side and lighter on the other. Eccentricity is easily detected by drill- ing several y% inch test holes and by measuring the thickness of the column at several points. All closed cast iron columns must have test holes as required by the Code. These test holes are drilled in the shop, generally about three in number, and about two feet from the bottom flange. The Building Department has the right to demand extra test holes to be drilled in columns or bases at doubtful points. The eccentricity can be easily detected in a round col- umn without test holes, by causing such column to be rolled on top of two smooth edges slightly sloping downward. These may be two steel beams laid nearly horizontally. With eccentric columns the rolling is irregular. If the column has a tendency to settle along a certain side, drill a test hole in the part exactly opposite and measure the thickness of the metal. This will give the thickness of the lighter part of the column. The Code prescribes that in case of eccentric columns whenever the core has shifted more than one-fourth the thickness of the shell, the strength shall be computed assum- ing the thickness of the metal all around, equal to the thick- ness of the thinnest part, and the column shall be condemned if this computation shows the strength to be less than re- quired by the Code. I jnri rfp CJ I,. I, .1. 8 * 1 -0 (T u CV B C\J (D (D Q) 90 ERECTION AND INSPECTION OF 2. Cracked Columns. Deceitful and Correct Remedies. Columns are often cracked in cooling or in shipping. Dis- honest foundry men will sometimes fill in the cracks with paint. Cracked columns are discovered by sounding with a hammer. Some times part of a flange or lug may be broken off in setting, as in Fig. 26a. Such defects may be remedied by sawing off the broken lug at the root, and by providing a steel knee angle in place of the original lug. This angle may be bolted to the body of the column by means of ^4 m - tap bolts, and one or two through bolts as shown in Fig. 26b, will prevent the steel angle from pulling away from the col- umn. In the case of column to column connections where cast iron columns are used, the Building Code requires not less than four ^4 m - bolts in each column connection. Where a flange is chipped off so that a portion containing a bolt hole is missing, and when no injury to the main column body has been caused, a heavy steel angle about 6x4x^ in. can be bolt- ed with two 24 m - tap bolts as in Fig. 27. The steel angle has a 13/16 hole in the outstanding leg for a.^4 m - bolt. One more instance of cracked columns will be mentioned. A cast iron column was being lowered in the cellar, in order to rest it on top of a cast iron base. During the lowering of the column, the cog that controlled the drum of a hand der- rick slipped out, and let the column strike the base a power- ful blow. The flange of the column broke. Where such things are liable to happen, both column and base should be carefully inspected for cracks, by striking a few good blows with a sledge hammer. 3. Honeycomb. Columns that are badly honeycombed and all columns that 'have blowholes or other imperfections which reduce the cross-section of the column at any point by more than 10% should be rejected according to the Code*. Dishonest foundrymen will sometimes fill in the column in such spots with molten lead. This is a very low and danger- ous practice and cannot be sufficiently condemned. Careful tapping with a hammer will generally locate such spots by a difference in the sound. 4. Sand Holes are often bored, tapped and plugged with a headless steel bolt, which is left in the column. In many cases a piece of wrought iron is heated to a white heat and hammered over or into the sand hole. This is more commonly met with in cast iron bases. Sandholes and blow- holes give a dull sound on tapping. Test holes should be drilled in doubtful spots. IRON AND STEEL CONSTRUCTIONS 91 5. Milling. Use of Shims. All cast iron columns must have their ends milled to bear and at right angles to the length of the column. Where this is not the case, shims should be used. Good specifications prohibit the use of shims, because shims concentrate the load at points, and occasional- ly crack the flange ; but mostly because shims cause eccentric loading on the column below. In a 12 story structure where only cast iron columns were used the specifications prohibited the use of shims. As the workmanship of the foundry was inferior, many columns could not be made plumb, due to the incorrect milling, and some that were kept plumb by iron floor beams bolted to such columns, would only touch the lower column on edge. See Fig. 28. This brought the whole load eccentrically on the lower column, causing excessive bending. Wedges were or- dered to be put in at the high end, although contrary to speci- fications, but just to cause less eccentricity at the low end, and to make the load of the column above come nearer the centre of the lower column. Where shims have to be used, they should not be nails, but steel plates or wedges. Steel plates 1/16 in. thick, four to six inches wide and of a length nearly equal to the diameter of the flange may be found suitable. Two or more such plates can be used together, one on top of the other, when necessary. 6. Painting. In good jobs the ends of cast iron col- umns after being milled, are treated with white lead and tal- low. Otherwise all cast iron work must be delivered un- painted and must not be painted until inspected and approved by the Building Department. The inspector may order any cast iron work that was painted before approval, to be wash- ed with kerosene, benzine or other dissolvent, for the pur- pose of removing the paint and uncovering the metal for in- spection. After inspection, all iron work must receive at least one field coat. This is usually done in cast iron work after the columns are in place. 7. Bolting. Cast iron structures are generally inferior to steel structures mainly on account of having bolted con- nections. These connections do not possess the rigidity of- fered by riveted connections in steel work. As it is, however, unusual attention must be given to bolting in cast iron work. All bolts must be of sufficient length to grip the full dept of the nut. All bolts must be tight. All bolts in column flanges must be ^4 in. diameter; and no bolts should be less than ^4 m - diameter when used in 13/16 in. holes. 92 ERECTION AND INSPECTION OF No bolts should be omitted. Where holes do not match, a drift pin cannot be used as it may crack the cast iron. The hole should, therefore, be reamed out with a hand or a com- pressed air reamer or drill. 8. Plumbing Up. All columns should be made plumb and kept plumb by means of guy ropes with turn-buckles. These guy ropes running transversely from wall columns to interior columns, will also strengthen the structure during construction against wind pressure. As an additional measure of precaution, the brick walls and floor arches should be carried up as quickly as possible. The guy ropes may be removed from floors where the masonry has been completed, and has set sufficiently. STEEL COLUMNS. 1. Lengths. These are generally made in two and three story lengths. The three story columns are mostly used as the last sections near the top of the buildings. While such columns save some splices and field riveting and give a stronger job, they would be too heavy and too difficult to handle, if used in the lower stories. 2. Temporary Bolts. All steel columns are set approxi- mately plumb; temporary bolts are next provided in the col- umn splices. It is customary to demand not less than 50% of temporary bolts in connections which are to be riveted. These temporary bolts : (1) Increase the resistance of the structure against wind pressure and are therefore more necessary in long columns and in tall, narrow structures. (2) They make field connections to match and to come fair before riveting. 3. Erection and Temporary Bracing. Whenever prac- ticable columns are erected in panels of four, and the beams in between are set in place to tie them together. In addition columns in outside panels are tied with diagonal steel ropes to the first or second floor immediately below. These ropes are provided with turn-buckles and are used to draw the columns into a plumb position. Such ropes greatly increase the resistance of the structure against wind pressure. For this reason more diagonal braces are required in taller and narrower buildings. The columns are next made plumb and then the splices are riveted. To insure plenty of work on hand for the rivet- ers, the iron superintendent will often have several splices temporarily bolted, along any vertical line of columns, thus IRON AND STEEL CONSTRUCTIONS 93 keeping the erectors considerably ahead of the riveters. When the number of unriveted or open splices becomes too large the structure may be endangered through lack of rigid- ity ; in fact it may be blown out of plumb. To avoid such ac- cidents it is customary to allow not more than three open splices along any column, in structures that are well tied with longitudinal steel ropes. 4. Riveting. Riveting splices may proceed from any column ; some engineers, however, will start with the outside columns. Column splices are usually riveted in all tall build- ings, while beam connections are either bolted or riveted. It is interesting to note, that there is nothing in the building code compelling an architect to specify the use of rivets, when he desires to use bolts, except that about 20% more bolts are required for field work by making the allow- able unit stresses for bolts smaller than for rivets. Now bolting column splices is half as expensive as riveting, and in the case of a new twelve story loft all column splices as well as beam connections were bolted. v The iron contractor had his choice between bolting and riveting; hence he preferred bolting which was much cheaper. This however is not good practice and the usual specifications should state that all col- umn splices as well as beam connections within three feet from a column should be riveted ; other connections may be either bolted or riveted. In a twelve story building intended to be used as a print- ing establishment, all connections have been riveted. 5. Splice Plates. Before riveting column splices, it is very important that the splice plates should be straight and that all holes should match. Bent splices prevent the forma- tion of tight rivets. This is due to a spring action in the steel plate when bent. Plates slightly bent through handling, or while in transit, may be straightened out before riveting by means of a few blows with a heavy sledge hammer. 6. Milling. According to the Building Code all col- umns must be milled at their ends at right angles to their axes. Milling can be performed with wonderful accuracy and up to 1/500 of an inch if necessary. Where milling is not carefully performed, columns will bear on one edge only (see Fig. 29), causing dangerous eccentric loads and additional bending in the columns below. 7. Incorrect Lengths and Remedies for Same. Another case of a similar nature results where a column is cut too short (see Fig. 30), or where the field holes in the splice plates are punched too high. In such cases the upper column 94 ERECTION AND INSPECTION OF will not bear at all upon the lower and clear daylight may be seen between the two columns, while all the load is carried by the splices. These conditions may be remedied in one of the follow- ing ways : (a) By shiming or wedging. Wedges of proper size may be driven in between the column ends. This, how- ever, tends to concentrate the load at points instead of dis- tributing it uniformly. Wedges should not be used in good work, (b) By providing the splice plates with sufficient rivets to safely carry the load, or by providing additional splice plates, as in Fig. 31. In this case first find from the Table of Loads or the Column Schedule for the particular structure under consideration, the load carried by the upper column. Then find out if the upper column bears partly on the lower column. For every square inch of full bearing al- low 16,000 Ibs. as per Building Code. The balance of the load must be taken up by additional rivets in shear. For in- stance : let the load on the upper column in Fig. 3ia be 72 tons. By sticking the blade of a penknife in between the ends of the two columns it is found that the upper column bears only on the part shown in black in Fig. 3ib. Let us say that this area is about 4 square inches. This will transmit in bear- ing at 16,000 Ibs. per sq. in. 4X16,000 Ibs., or 32 tons. The 16 rivets in the upper half of the splice will carry 16X2=32 tons in shear. We have so far accounted for 64 tons. Addi- tional means must be provided for the remaining 8 tons up to 72 tons. Two y% in. plates may be used, one on each side of the splice as shown on the inside of the column in Fig. 313. This will place the new rivets in double shear, and carry eas- ily the 8 additional tons. Instead of using inside fish plates as in this case, extra rivets may be provided in the original splice plates, and where the loads are heavy additional one inch diam. rivets may be used in the splice plates instead of % in. rivets, (c) Where the columns are correctly milled and the holes in splice plates have been punched too high, the upper column may be lowered until it fully bears on top of the lower column. The operation requires careful manipula- tion, (d) When the gap between the two columns is uniform in width, a rectangular steel plate of sufficient thickness to fill the opening may be driven in between the two column ends, in such manner as to make both the upper and the lower col- umn to come in full contact with this plate, as shown in Fig. 32a. 8. Butt Plates. Such plates are generally used in all cases where the column section changes, and are known as butt plates or bed plates. Following are common defects in butt plates : IRON AND STEEL CONSTRUCTIONS 95 a. When the plates are shipped loose, some may get lost on the way, and shims may be substituted in order not to delay the erection work ; or else the plates are left out. Both these methods should be condemned. b. The plates may get mixed up. In this way plates slightly larger than necessary are driven with quite some trouble in some splices, while plates too small to cover the lower column section are used in other places, where the larger butt plates should have been used. Butt plates should cover the lower column completely and should extend in between splice plates from splice to splice. In good jobs butt plates must not run shorter than 1/16 inch at either end. When the clearance between the edge of the butt plate and the splice plate is larger than 1/16 inch, the butt plate should be pulled out and replaced. Most of the above defects can be easily avoided, and bet- ter work can be obtained in a shorter time, when the butt plates are shipped to the job bolted to the lower end of the column. This is shown in Fig. 32. The bottom view repre- sents (Fig. 32b) the cross section of two H-Columns, the upper column being of smaller section than the lower one. Fig. 32a shows a butt plate between the two columns and two angles riveted to the web of the upper column and to the butt plate. 9. Filler Plates. When the depth of the upper col- umn is less than the depth of the lower column, the differ- ence in depth is made up by providing packing known as filler plates. These filler plates make possible tight riveting; they also stiffen the column splice, and when they are fairly thick and well riveted to the upper column, the fillers "may be milled even on the bottom with the main column section and they will help distributing the load of the upper column upon the top of the lower column. Fig. 32a. shows two fillers FF between the upper column and the splice plate. There are four of these fillers in this splice, and the fillers do not bear upon the bed plate. In good work instead of two such fillers like FF only one wide filler taking in the whole width of the upper column is used. Furthermore these fillers are milled to bear and they extend above the splice plate for about three inches, or enough to have the fillers riveted in the shop with a couple of rivets to the upper column. Where this is not done, the fillers are shipped bolted to the upper column, and very often they get lost on the way and are left out. This is bad practice and should not be allowed. CHAPTER XII. Beams and Girders* USES. Beams and girders are used in steel structures in a great variety of forms for many purposes. We may distin- guish several classes of beams : (a) Wall Beams. These are beams carrying walls and are usually referred to as wall beams or wall girders. They may be single beams or Bethlehem H. sections, or they may be standard beams provided with a plate on top or on bottom to support the masonry. Many wall beams are made of double standard beams with separators in between them and bolted together. In some other cases plain built up girders or even box girders may be used to support brick walls. (b) Floor Beams. These are used to carry floor arches and they usually frame either in between columns or in be- tween other beams. (c) Tie Beams are used mainly for the purpose of tieing in the columns to one another and to the walls. These beams generally carry no load and are often replaced by channels, angles, rods or plates. Very often one beam belongs in the same time to two or more of these groups, and its connections at each end must be designed accordingly. '(d) Struts. All beams stiffen the structure. In tall build- ings it is sometimes found necessary to figure some of the floor beams in between columns as struts. Such beams are made sufficiently heavy to take up wind pressure in addition to floor loads. CONNECTIONS. Beam connections are generally fig- ured for shear and for bearing; in special cases the connections are investigated for their resistance to bending caused by ec- centricity, for crippling or tearing across in between rivets and for resistance to stresses caused by wind pressure. In or- der to reduce costs, it is customary to use the same type of a connection throughout a whole structure whenever possible. This establishes then a typical or standard set of connections. Some structural plants have their own standard connections and they employ same on all jobs, whenever possible. Any connection which is not standard should be drawn to a larger scale and filed with the plans for approval. The standard con- IRON AND STEEL CONSTRUCTIONS 97 nections for steel beams framing into steel columns or girders are different from the standard connections of beams framing into cast iron columns. Standard Connections for Steel Beams to Steel Columns and Girders. While there is no such thing as a universal standard, the variations between different standard connec- tions are small. The connections adopted by the Carnegie Steel Co. are in common use in this country and have been se- lected by the author as an illustration of standard connec- tions. These connections are figured allowing a working unit stress of 20,000 Ibs. per square inch for bearing, and 10,000 Ibs. per square inch for shear. In most cases it will be found that the number of rivets provided is ample. There are rare instances, however, where the standard connections are not sufficiently strong, as in the case of beams on short spans loaded to their fu)l capacity. The following table gives the minimum spans of I -Beams and Channels for which stand- ard connection angles may be safely used, with the beams loaded to their full capacity. The same connections may be used for all greater spans. For spans shorter than given in this table, and for beams fully loaded, additional rivets may be found necessary. TABLE OF MINIMUM SPANS. For which standard connections may be safely used with beams uniformly loaded to their full capacity, figured with an allowable fibre stress of 16,000 Ibs. per sq. in. in the beams. Span Shape in feet Span Shape in feet Span Shape in feet 3 in, 3 in. 4 in. 4 in. 5 in. 5 in. 6 in. 6 in. 7 in. 7 in. 5.5 Ibs. 1.7 7.5 Ibs. 12 7.5 Ibs. 2.8 10.5 Ibs. 2.2 9.75 Ibs. 41 14.75 Ibs. 3.7 12.25 Ibs. 56 17. IT. Ibs. 5.3 15.00 Ibs. 4.9 20 Ibs. 3.6 8 in. 8 in. 9 in. 9 in. 10 in. 10 in. 12 in. 12 in. 15 in. 15 in. 18 Ibs. 6.2 25.25 Ibs. 5.1 21.0 Ibs. 7.7 35.0 Ibs. 7.5 25.0 Ibs. 9.3 40.0 Ibs. 9.6 31.5 Ibs. 7.3 40 Ibs. 8.2 42 Ibs. 10.2 60 Ibs. 10.8 15. in. 15 in. 18 in. 18 in. 20 in. 20 in. 20 in. 24 in. 24 in I 80 Ibs. 14.5 100 Ibs. 18.1 55 Ibs. 13.7 70 Ibs. 12.4 65 Ibs. 13.9 80 Ibs. 14.8 100 Ibs. 16.7 80 Ibs. 17.7 100 Ibs. 17.1 Shape Span in feet 3 in. Channel 4.0 Ibs. 1.1 3 in. Channel 6.0 Ibs. 0.8 4 in. Channel 5.25 Ibs. 1.9 4 in. Channel T.L'o Ibs. 1.4 5 in. Channel 6.5 Ibs. 2.8 5 in. Channel 11.5 Ibs. 2.5 6 in. Channel 8.0 Ibs. 3.9 6 in. Channel 155 Ibs. 3.9 7 in. Channel 9.75 Ibs. 3.4 7 in. Channel 19.75 Ibs. 2.9 Shape Span in feet 8 iu. Channel 11.25 Ibs. 4.4 8 in. Channel 21.25 Ibs. 36 9 in. Channel 13.25 Ibs. 5.4 9 in. Channel 25.00 Ibs. 4.7 10 in. Channel 15.0 n.s. i; <; 10 in. Channel 35.0 Ibs. 7.0 12 in. Channel 20.5 Ibs. .1.4 12 in. Channel 40.0 Ibs. 66 15 in. Channel 33.0 Ibs. 7.4 15 in. Channel 55.0 Ibs. 8.7 The minimum spans given in the above table may be found approximately by the following rules : For 3Wav\d4w.lat\clS 2-fe Gx4x%-0'-3'H For 5 in. && <> o U fe x V-OrSV ,ndS . . tor (VJ, ^Ji ( " ' ' J cJ = i $ -b 6 * 4 , 3 /8-0-7 For I? ; I s and 1. -li 6 4 For I5\. I -. i, 1 t | / "N 1 I r^ . j I fa m ( ro V7 r J ^ i - / D, i \ c ' ro f / N = ro r ' i t ro i \/o \ ) r i For 1 8 in. and SO m.. - is 4 x Fo v S4in,3 Fig. 33. Standard Connections for Steel. All shop rivets % in. diam. All holes for field rivets 13-16 in. diam. IRON AND STEEL CONSTRUCTIONS 99 Minimum span in feet for I-Beams = fa X depth of beam in inches. Minimum span in feet for Channels = } /2 X depth of channel in inches. Standard Connections for Steel Beams to Cast Iron Col- umns. Cast iron is weak in bending. It it therefore necessary that heavy lugs should be used under the seat of each beam. It is equally important to see that the end of the beam rests on the seat. Following is a set of standard connections for beams framing into cast iron columns. These connections are in common use. CVJ
5OO
Wrought iron field rivets 6,000
Wrought iron field bolts 5>5oo
Cast iron 3,000
With Across
Fibre. Fibre.
Yellow pine 70 500
White pine 40 250
Spruce 50 320
Oak 100 600
Locust 100 720
Hemlock 40 275
Chestnut 150
Safe Extreme Fibre Stresses (Bending).
Rolled steel beams 16,000
Rolled steel pins, rivets and bolts 20,000
Riveted steel beams (net flange section) 14,000
Rolled wrought iron beams 12,000
Rolled wrought iron pins, rivets and bolts. . . . 15,000
Riveted wrought iron beams (net flange sec-
tion) 12,000
Cast iron, compression side. . 16,000
Cast iron, tension side 3,ooo
Yellow pine 1,200
White pine 800
Spruce 800
Oak i ,000
Locust i ,200
Hemlock 600
Chestnut 800
Granite 180
Greenwich stone 150
Gneiss ( New York City) " 150
Limestone 150
Slate 400
Marble 120
Sandstone 100
Bluestone (North River) 300
iS2 ERECTION AND INSPECTION OF
Concrete (Portland) cement, i; sand, 2;
stone, 4 30
Concrete (Portland) cement, i; sand, 2;
stone, 5 20
Concrete (Rosendale, or equal) cement, i ;
sand, 2 ; stone, 4 16
Concrete (Rosendale, or equal) cement, i ;
sand, 2 ; stone, 5 10
Brick (common) 50
Brickwork (in cement) 30
Wind Pressure.
Sec. 140. All structures exposed to wind shall be de-
signed to resist a horizontal wind pressure of thirty pounds
for every square foot of surface thus exposed, from the.
ground to the top of same, including roof, in any direction.
In no case shall the overturning moment due to wind pressure
exceed seventy-five per centum of the moment of stability
of the structure. In all structures exposed to wind, if the
resisting moments of the ordinary materials of construction,,
such as masonry, partitions, floors and connections are not
sufficient to resist the moment of distortion due to wind
pressure, taken in any direction on any part of the structure,,
additional bracing shall be introduced sufficient to make up
the difference in the moments. In calculations for wind
bracing, the working stresses set forth in this Code may
be increased by fifty per centum. In buildings under 100
feet in height, provided the height does not exceed four
times the average width of the base, the wind pressure
may be disregarded.
Appeals and Modifications of Law The Board of Buildings.
Sec. .148. Each Commissioner of Buildings shall have
power, with the approval of the Board, to vary or modify
any rule or regulation of the Board, or the provisions of
Chapter 12 of the Greater New York Charter, or of any
existing law or ordinance relating to the construction, altera-
tion or removal of any building or structure erected or to-
be erected within his jurisdiction, pursuant to the provisions
of Section 650 of the Greater New York Charter.
Board of Examiners.
Sec. 149. The Board of Examiners for the Boroughs of
Manhattan and The Bronx shall be constituted as prescribed
IRON AND STEEL CONSTRUCTIONS 153
by Section 649 of the Greater New York Charter. Each of
said examiners shall take the usual oath of office before
entering upon his duties. No member of said Board shall
pass upon any question in which he is pecuniarily interested.
The said Board shall meet as often as once in each week,,
upon notice from the Commissioner of Buildings.
The members of said Board of Examiners, and the Clerk
of said Board, shall each be entitled to and shall receive
ten dollars for each attendance at a meeting of said Board,
to be paid by the Comptroller from the annual appropriation
to be made therefor upon the voucher of the Commissioner
of Buildings for the Boroughs of Manhattan and The Bronx.
Violations and Penalties Courts Having Jurisdiction.
Sec. 150. The owner or owners of any building, struc-
ture or part thereof, or wall, or any platform, staging or
flooring to be used for standing or seating purposes where
any violation of this Code shall be placed, or shall exist,
and any architect, builder, plumber, carpenter or mason who
may be employed or assist in the commission of any such
violation, and any and all persons who shall violate any of
the provisions of this Code, or fail to comply therewith, or
any requirement thereof, or who shall violate or fail to com-
ply with any order or regulation made thereunder, or who
shall build in violation of any detailed statement of specifica-
tions or plans, submitted and approved thereunder, or of
any certificate or permit issued thereunder, shall severally,
for each and every such violation and non-compliance, re-
spectively, forfeit and pay a penalty in the sum of fifty
dollars. Except that any such person who shall violate any
of the provisions of this Code as to the construction of
chimneys, fire-places, flues, hot-air pipes and furnaces, or who
shall violate any of the provisions of this Code, with refer-
ence to the framing or trimming of timbers, girders, beams, or
other woodwork in proximity to chimney flues or fire-places,
shall forfeit and pay a penalty in the sum of one hundred
dollars. But if any said violation shall be removed or be
in process of removal within ten days after the service of
a. notice as hereinafter prescribed, the liability of such a
penalty shall cease, and the Corporation Counsel, on request
of the Commissioner of Buildings having jurisdiction, shall
discontinue any action pending to recover the same, upon
such removal or the completion thereof within a reasonable
time. Any and all of the afore-mentioned persons who hav-
ing been served with a notice as hereinafter prescribed, to
remove any violation, or comply with any requirement of
154 ERECTION AND INSPECTION OF
this Code, or with any order or regulation made thereunder,
shall fail to comply with said notice within ten days after such
service or shall continue to violate any requirement of this
Code in the respect named in said notice shall pay a penalty
of two hundred and fifty dollars. For the recovery of any
said penalty or penalties an action may be brought in any
municipal court, or court of record, in said city in the name
of the City of New York. * * *
Officers of Department May Enter Buildings.
Sec. 160. All the officials of the Department of Build-
ings, so far as it may be necessary for the performance of
their respective duties, have the right to enter any building
or premises in said city upon showing their badge of office.
CHAPTER XVIII.
Building Code Memo for Reference to Important
Points.
General.
Sec. 4. Work contrary to approved plans ; working with-
out a permit.
Fireproofing.
Sec. 105. Public buildings and all buildings over 75 ft.
to be fireproof. Fireproof buildings defined.
Sec. 106. Testing floor arches; fireproofing beams.
Section 107. All interior iron columns to have not less
than 2" of fireproofing and all lugs and brackets not less
than %" of fireproofing.
Sec. no. Where walls are carried on steel, all columns
to have not less than 8 in. of fireproofing on the outside
face and not less than 4 in. on the inside faces.
All girders carrying brick walls to have not less than
4 in. of fireproofing, except flange edges and projections,
which must have not less than 2 in.
Grillage.
Sec. 25. Grillage; all metal in foundations and all metal
below water level to be protected from rust by concrete,
paint, asphaltum or in other approved manner.
Sec. 26. Grillage beams to be provided with bolts and
separators and to be filled solid in between with concrete.
Sec. 129. Iron or steel under water to be enclosed in
concrete.
Cast Iron.
Sec. 21. Cast iron shall be good foundry mixture.
Sec. 112. Cast iron columns, minimum 5x% inches thick.
Column joints to have not less than 4 bolt holes. Flanges
and brackets not less than I inch thick. Shell thickness
not less than 1/12 diameter or greatest lateral dimension
of cross-section. Imperfections not to reduce sectional area
by more than 10 per cent. Where core has shifted more
than one-fourth the thickness of the shell, compute the
strength of column assuming thinnest side to be uniform
all around. Columns without open sides or back to have
Y% inch test hole. Shoes under columns planed on top.
Sec. 114. Party wall columns to be not less in thickness
than the party wall ; and not less in depth than the thickness
of the wall to be supported above.
156 ERECTION AND INSPECTION OF
Sec. 115. Plates between joints of open back columns.
Sec. 129. Cast iron columns not to be painted before
inspection.
Steel and Wrought Iron.
Sec. 21. Steel and wrought iron to be of good quality.
Sec. in. Steel and wrought iron columns; workmanship,
least thickness of metal, etc.
Sec. 116. Steel and iron girders; spacing and size of
rivets ; use of web stirTeners.
Sec. 120. Rolled steel and iron beams to be free from
defects.
Framing.
Sec. 120. Beams resting on girders to be bolted to same.
Sec. 122. All iron work to be properly framed and
connected together and to the walls. Defective work.
Sec. 123. Good riveting required.
Sec. 125. Trusses to be rigid and well braced.
Sec. 126. All connections in trusses to be riveted.
Separators, Lintels, Anchors, Tie Rods, Templates, Etc.
Sec. 41. Exterior piers to be anchored to steel frames
at each tier.
Sec. 42. Iron lintels to have not less than five inches
bearing at each end. Stone or metal templates not required
for spans less than six feet.
Sec. 61. Wooden posts to have iron cap and base plates.
Sec. 117. Iron beams used in pairs to form a girder to
have separators not more than 5 ft. apart. Beams 12 in. and
over to have 2 bolts in each separator.
Sec. 118. Cast lintels to span not more than 16 ft. and
to be not less than j^j-inch thick all over.
Sec. 119. Cast iron templates or 10 in. stone templates
to be used under girders over 12 ft. long resting on brick,
For spans less than 12 ft. the stone template may be 5 in.
thick.
Sec. 1 20. Tie rods; spacing not to exceed 8 feet; spacing
not to exceed eight times the depth of the beams.
Sec. 121. Templates to be sufficiently large to avoid
excessive pressure on masonry.
Painting.
Sec. 129. Iron or steel under water to be enclosed in
concrete. All structural metal work shall be cleaned and
painted one coat of paint. After erection all work shall be
painted at least one additional coat. Cast iron columns not
to be painted before inspection.
CHAPTER XIX.
Special Regulations of the Bureau of Buildings.
It often happens that the Building Code does not cover
specifically certain kinds of work going on within the limits
of a borough. Any additional regulations may be established
within a borough by the Superintendent. Violating such reg-
ulations is just as serious as violating any provisions of the
Code.
Regulations made by the Superintendent are generally
printed for distribution. Following are examples of special
rules and regulations in force in Manhattan Borough :
PROJECTIONS BEYOND BUILDING LINE.
(Bulletin No. i, January 3, 1911.)
NOTICE IS HEREBY GIVEN that on and after this
date no building plans not already on file in this department,
or in the Tenement House Department, will be approved by
the Bureau of Buildings for the Borough of Manhattan
which provide for an encroachment by any part of the build-
ing beyond the building or lot lines at any point less than
ten feet above the curb grade, except that :
(a) Non-supporting columns or pilasters, including their
mouldings and bases, may project not more than two and
one-half per cent, of the width of the street, and in no case
more than two feet beyond the building line.
(b) Steps leading up or down at entrances, and included
between ornamental columns, pilasters or check pieces at
least three feet high, at the sides of such entrances, pro-
vided they do not exceed, together or separately, one-fifth
of the width of the lot, may project not more than two and
one-half per cent, of the width of the street, and in no case
more than eighteen inches beyond the building line.
(c) Mouldings or ornamentations of a decorative char-
acter, and base courses, including the water-table, not ex-
ceeding five feet in height above the curb grade, may project
not more than one and one-fourth per cent, of the width of
the street, and in no case more than ten inches beyond the
building line.
158 ERECTION AND INSPECTION OF
(d) Rustications may project not more than four inches
beyond the building line.
Marquises or awnings, supported wholly from the build-
ing, will be permitted where they do not extend more than
two and one-half feet on either side of an entrance, provided
they are constructed of iron and glass or other incombustible
material, and are properly drained.
ELECTRIC SIGNS.
(Amended ordinance of the Board of Aldermen, approved 'by
the Mayor, July 24, 1912.)
Section I. Any letter, word, model, sign, device or repre-
sentation used in the nature of an advertisement, announce-
ment or direction illuminated by electricity, erected on any
building in the City of New York, and extending beyond the
building line, shall be deemed to be an electric sign.
Section 2. Electric signs are permitted in the City of
New York and the City Clerk is empowered to issue licenses
therefor under the following terms and conditions, to wit:
A. Upon the payment by the applicant of an annual
license fee of ten cents for each square foot of sign space or
part of square foot of such sign space displayed on such
electric sign, to be computed and collected by the City Clerk
of the City of New York. The square feet of sign space
on one side of an electric sign, however, shall be -deemed to
be the entire number of square feet of sign space for the
purpose of computing the license fee herein referred to and
required to be paid.
B. That no electric sign shall extend more than eight
feet from the building line in the City of New York.
C. That no electric sign shall be less than ten feet in
the clear above the level of the sidewalk beneath such sign.
D. That electric signs shall be constructed entirely of
metal or other incombustible material, except the insulation
thereof, including the uprights, supports and braces for the
same, and shall be properly and firmly attached to the build-
ing, and shall be so constructed as not to be or become
dangerous.
E. That no electric sign shall be so erected as to ob-
struct or prevent free ingress and egress to any window or
fire escape on any building in the City of New York.
F. That prior to the erection of any electric sign in the
City of New York, a license therefor must be obtained from
the Clerk of the City of New York, and before the issuance
of any license herein by said City Clerk for the said electric
IRON AND STEEL CONSTRUCTIONS 159
sign, the applicant shall first file with the Superintendent of
Buildings of the borough wherein the said electric sign is to
be erected, plans and statements of the proposed electric sign
and method of attachment of same to the building.
MOVING PICTURE BOOTHS.
(Bulletin 32, 1911.)
Booths enclosing cinematograph or similar apparatus.
Such booths shall be at least seven feet in height. If
one machine is to be operated in such booth the floor space
shall not be less than forty-eight square feet. If more than
one machine is to be operated therein, an additional twenty-
four square feet shall be provided for each such additional
machine. Such booths shall be constructed with a frame-
work of iron angles not less than one and one-quarter inches
by one and one-quarter inches by three-sixteenths of an inch
thick, the adjacent iron members being joined firmly with
angle plates of iron. The iron members of the framework
shall be spaced not more than four feet apart on the sides and
not more than three feet apart on the front and back and
top of such booth. The asbestos board shall completely cover
the sides, top and all joints of such booth. The sheets shall
be at least one-quarter of an inch in thickness and shall be
securely attached to the iron framework by means of iron
bolts or rivets. The floor space occupied by the booth shall
also be covered with asbestos board not less than three-
eighths of an inch in thickness. There shall be provided for
the booth a door not less than two feet wide and six feet
high, consisting of an angle iron frame covered with sheets
of asbestos board one-quarter of an inch thick, and attached
to the framework of the booth by hinges, in such a manner
that the door shall be kept closed at all times when not used
for ingress or egress. The operating windows, one for each
machine to be operated therein and one for the operator
thereof, shall be no larger than reasonably necessary to
secure the desired service, and shutters of asbestos board
shall be provided for each window. When the windows are
open, the shutters shall be so suspended and arranged that
they will automatically close the window openings, upon
the operating of some suitable fusible or mechanical releasing
device.
No apparatus for projecting moving pictures shall be
operated until a certificate has been obtained from the Super-
intendent of Buildings that the booth enclosing the same is
in accordance with the law.
CHAPTER XX.
Extracts from the State Labor Law and the
Sanitary Code.
EXTRACTS FROM THE STATE LABOR LAWS.
Following are some of the main provisions of the State
labor laws, which are partly enforced by the inspectors of
the Bureau of Buildings. Violations of these provisions are
reported to the Superintendent of Buildings, who in turn
notifies the State Labor Bureau. This last authority prose-
cutes all labor law violations.
Chapter 36 of the Laws of 1909, constituting Chapter 31
of the Consolidated Laws, as amended to October I, 1911.
Scaffolding for Use of Employees.
Sec. 18. A person employing or directing another to
perform labor of any kind in the erection, repairing, altering
or painting of a house, building or structure shall not furnish
or erect, or cause to be furnished or erected for the per-
formance of such labor, scaffolding, hoists, stays, ladders or
other mechanical contrivances which are unsafe, unsuitable
or improper, and which are not so constructed, placed and
operated as to give proper protection to the life and limb
of a person so employed or engaged.
Scaffolding or staging swung or suspended from an over-
head support, or erected with stationary supports, more than
twenty feet from the ground or floor, except scaffolding
wholly within the interior of a building and which covers
the entire floor space of any room therein, shall have a safety
rail of suitable material, properly bolted, secured and braced,
rising at least thirty-four inches above the floor or main por-
tions of such scaffolding or staging and extending along the
entire length of the outside and the ends thereof, with such
openings as may be necessary for the delivery of materials,
and properly attached thereto, and such scaffolding or staging
shall be so fastened as to prevent the same from swaying
from the building or structure.
IRON AND STEEL CONSTRUCTIONS 161
Inspection of Scaffolding, Ropes, Blocks, Pulleys and Tackles
in Cities.
Sec. 19. Whenever complaint is made to the Commis-
sioner of Labor that the scaffolding or the slings, hangers,
blocks, pulleys, stays, braces, ladders, irons or ropes of any
swinging or stationary scaffolding used in the construction,
alteration, repairing, painting, cleaning or pointing of build-
ings within the limits of a city are unsafe or liable to prove
dangerous to the life or limb of any person, such Commis-
sioner of Labor shall immediately cause an inspection to be
made of 'such scaffolding, or the slings, hangers, blocks, pul-
leys, stays, braces, ladders, irons or other % parts connected
therewith. If, after examination, such scaffolding or any of
such parts is found to be dangerous to life or limb, the Com-
missioner of Labor shall prohibit the use thereof, and require
the same to be altered and reconstructed so as to avoid such
danger. The Commissioner of Labor or deputy factory in-
spector making the examination shall attach a certificate to
the scaffolding, or the slings, hangers, irons, ropes or other
parts thereof, examined by him, stating that he has made
such examination, and that he has found it safe or unsafe, as
the case may be. If he declares it unsafe, he shall at once, in
writing, notify the person responsible for its erection of the
fact, and warn him against the use thereof. * * * All
swinging and stationary scaffolding shall be so constructed
as to bear four times the maximum weight required to be
dependent therefrom or placed thereon when in use, and not
more than four men shall be allowed on any swinging scaf-
folding at one time.
Protection of Persons Employed on Buildings in Cities.
Sec. 20. All contractors and owners, when constructing
buildings in cities, where the plans and specifications require
the floors to be arched between the beams thereof, or where
the floors or filling in between the floors are of fireproof ma-
terial or brickwork, shall complete the flooring or filling in as
the building progresses, to not less than within three tiers
of beams below that on which the ironwork is being erected.
If the plans and specifications of such buildings do not re-
quire filling in between the beams of floors with brick or fire-
proof material all contractors for carpenter work, in the course
of construction, shall lay the under-flooring thereof on each
story as the building progresses, to not less than within two
stories below the one to which such building has been erected.
162 ERECTION AND INSPECTION OF
Where double floors are not to be used, such contractor shall
keep planked over the floor two stories below the story where
the work is being performed. If the floor beams are of iron
or steel, the contractors for the iron or steel work of build-
ings in course of construction or the owners of such build-
ings shall thoroughly plank over the entire tier of iron or
steel beams on which the structural iron or steel work is being
erected, except such spaces as may be reasonably required
for the proper construction of such iron or steel work, and
for the raising or lowering of materials to be used in the"
construction of such building, or such spaces as may be
designated by the plans and specifications for stairways and
elevator shafts. If elevators, elevating machines or hod-
hoisting apparatus are used within a building in the course
of construction, for the purpose of lifting materials to be
used in such construction, the contractors or owners shall
cause the shafts or openings in each floor to be enclosed or
fenced in on all sides by a barrier at least eight feet in height,
except on two sides which may be used for taking off and
putting on materials, and those sides shall be guarded by an
adjustable barrier not less than three nor more than four
feet from the floor and not less than two feet from the edge
of such shaft or opening. If a building in course of con-
struction is five stories or more in height, no lumber or timber
needed for such construction shall be hoisted or lifted on the
outside of such building. The chief officer in any city charged
with the enforcement of the building laws of such city and
the Commissioner of Labor are hereby charged with enforcing
the provisions of this section and sections 18 and 19, and said
chief officer in any city charged with the enforcement of the
building laws of such city shall have the same powers for
the enforcement of these sections as are vested in the Com-
missioner of Labor.
Accidents to be Reported.
Sec. 2oa. The person in charge of any building, construc-
tion, excavating or engineering work of any description, in-
cluding the work of repair, alteration, painting or renovating,
shall keep a correct record of all deaths, accidents or injuries
sustained by any person working thereon, in such form as
may be required by the Commissioner of Labor. Such record
shall be open to the inspection of the Commissioner of Labor
and a copy thereof shall be furnished to the said Commis-
sioner on demand. Within forty-eight hours after the time
of the accident, death or injury, a report thereof shall be made
IRON AND STEEL CONSTRUCTIONS 163
in writing to the Commissioner of Labor, stating as fully as
possible the cause of the death or injury, and the place where
the injured person has been sent, with such other or further
information relative thereto as may be required by the said
Commissioner, who may investigate the causes thereof and
require such precautions to be taken as will prevent the re-
currence of similar happenings.
Penalties for Violation of Foregoing Provisions of the
Labor Law: Penal Law, Article 120, Laws 1909, Chapter 88.
Negligently Furnishing Insecure Scaffolding.
Sec. 1276. A person or corporation employing or direct-
ing another to do or perform any labor in the erection, re-
pairing, altering or painting, any house, building or structure
within the State, who knowingly or negligently furnishes or
erects or causes to be furnished or erected for the performance
of such labor, unsafe, unsuitable or improper scaffolding,
hoists, stays, ladders or other mechanical contrivances; or who
hinders or obstructs any officer detailed to inspect the same,'
destroys or defaces any notice posted thereon, or permits the
use thereof after the same has been declared unsafe by such
officer, is guilty of a misdemeanor.
Neglect to Complete or Plank Floors of Buildings Constructed
in Cities.
Sec. 1277. A person constructing a building in a city, as
owner or contractor, who violates the provisions of Article 2
of the Labor Law, relating to the completing or laying of
floors, or the planking of such floors or tiers of beams as the
work of construction progresses, is guilty of misdemeanor,
and upon conviction therefor shall be punished by a fine for
each offense of not less than twenty-five nor more than two
hundred dollars.
EXTRACTS FROM THE SANITARY CODE.
In some instances where the Building Code does not
specifically cover defective and unsafe work, Sec. 8 of the
ordinance known as the Sanitary Code may also be enforced
by the Superintendent of Buildings. The Sanitary Code is
based on Chapter XIX. of the Laws of 1897 and Chapter XIX.
of the Laws of 1901. Section 8 of this Code is a most sweep-
ing provision, covering all defective work. This* section fol-
lows :
1 64 ERECTION AND INSPECTION OF
Misfeasance and Nonfeasance.
Sec. 8. No person shall carelessly or negligently do or
devise or contribute to the doing of any act or thing dangerous
to the life, or detrimental to the health of any human being;
nor shall any person knowingly do or advise or contribute
to the doing of any such act or thing (not actually authorized
by law), except with justifiable motives, and for adequate
reasons ; nor shall any person omit to do any act, or to take
any precaution, reasonable and proper, to prevent or remove
danger or detriment to the life or health or any human being.
CHAPTER XXI.
Extracts from the Rules and Regulations of the
Bureau of Buildings.
The following extracts are given here for the benefit of
candidates for the positions of Building Inspectors. From
these rules and regulations a careful reader can get an approx-
imate idea of the nature of the work performed by Inspectors.
In a well organized Bureau of Buildings, as i. e. the Man-
hattan Bureau of Buildings, there are at least six kinds of
inspectors, namely:
Inspectors of iron and steel construction.
Inspectors of masonry and carpentry.
District inspectors.
Inspectors of plumbing.
Inspectors of elevators.
Inspectors of plastering.
Each inspector has a definite district assigned to him.
The district inspectors look after small alterations for
which a permit is issued in a form known as "Slip Applica-
tion." They also report cases where work is started without
a permit, and unsafe cases.
Inspectors of masonry and carpentry have charge of all
new buildings and main alterations, for which a regular permit
is issued. They also take care of demolitions and file unsafes
on adjoining premises when necessary.
Both district and masonry inspectors report to the chief
inspector about all iron work requiring inspection. These
reports are made in writing upon blanks furnished for the
purpose and are turned over to the iron inspectors.
It may also be noted that there is nothing in the rules
that prevents an inspector from doing work for private con-
cerns after the office hours. Nevertheless, it is taken as
granted that an inspector working after hours with a builder
will not be qualified to pass an independent judgment on
jobs belonging to the same builder.
While inspectors should give during their regular inspec-
tion work intelligent advice on difficult points of construction
whenever possible, they should consider as a matter of honor
and of personal integrity demanded by the dignity of their
official position, not to accept any outside work, or anything
else that might impair their judgment in making inspections
of building work.
166 ERECTION AND INSPECTION OF
EXTRACTS
FROM THE RULES AND REGULATIONS OF THE
BUREAU OF BUILDINGS
of
THE CITY OF NEW YORK
For the Borough of Manhattan.
I. Assistant Superintendent of Buildings. Duties.
The Assistant Superintendent of Buildings shall perform
such duties as may be imposed upon him by the Superin-
tendent of Buildings.
II. Chief Inspector. Duties, Responsibility, Etc.
The Chief Inspector of Buildings shall, when so author-
ized, be charged with the same duties as the Superintendent
of Buildings during his absence, and with the performance of
such work as the Superintendent may prescribe.
The Chief Inspector of Buildings shall be directly re-
sponsible to the Superintendent for the proper conduct and
management of the Bureau, and he is charged with the prompt
execution and enforcement of all laws, rules, regulations and
orders of the Superintendent.
III. Inspectors. Hours of Reporting, Etc.
Inspectors will report to the Chief Inspector of Build-
ings, at the office of the Department, at 8:30 A. M. each day,
except Sundays or legal holidays, unless otherwise ordered,
prepared to hand in the reports of the operations of the pre-
vious day in their respective districts, and upon receiving
such instructions as may be given them will immediately
proceed to the performance of duty within their respective
districts, or to such special duty as may be assigned them.
Leaving District.
Unless by permission, no Inspector will leave his district
during working hours.
Daily Journal.
Each Inspector is required to keep a journal, which must
be signed by the Inspector at the completion of the day's
IRON AND STEEL CONSTRUCTIONS 167
work, in which must be entered a list of the papers received
and turned in, the time of leaving the office, and the buildings
visited each day, whether new buildings or buildings being
altered, unsafe buildings or buildings requiring fire-escapes
or proper means of exit. The time of visit and condition
of the work must be noted in the journal, which must be
signed by the Inspector.
Books for the purpose will be furnished by the Bureau,
and will be the property of the Bureau, and must be sur-
rendered by the Inspector when leaving the Bureau.
Reports must be in writing on the forms provided by the
Bureau, and be promptly presented.
Violations, Etc.
In cases of violations, the nature thereof must be clearly
stated, as well as the number of the section or sections of
the law violated, and, as the forms are printed and easily un-
derstood, it is expected that there will be no necessity for
returning them to the Inspector for correction. No reports
will be received unless properly made and written in ink.
Any Inspector who does not feel qualified to properly make
a report of a violation, fire-escape or unsafe building, etc.,
will receive instructions upon application.
Copies of the Law.
The Inspectors will be provided with copies of the laws
relating to the construction of buildings in this city, and it
is expected that they will become thoroughly familiar with the
provisions of the same.
Daily Inspections.
All buildings in process of erection or alteration in the
respective districts must be examined daily to see if they are
being altered or erected in conformity to the laws and accord-
ing to the terms and conditions of the plans and specifications
for said construction or alteration, and also the terms and
conditions of the plans and specifications for plumbing and
drainage, as submitted and approved.
Violations of the Law Bad Materials, Etc.
Should the Inspector find a building or buildings being
erected or altered without permit, he will so report and prefer
a complaint against the persons so violating the law. Build-
i68 ERECTION AND INSPECTION OF
ings in which bad materials are used will be reported, and
the Inspector will state in his report how much, if any, of
the wall or walls in which such materials were used must
be taken down.
Should the parties using bad materials fail to cause the
removal of the same within twenty-four hours, tney must be
reported by the Inspector for prosecution.
Complaints.
All complaints referred to the Inspectors must be exam-
ined and reported on immediately on the form provided for
that purpose.
False Reports.
Making false reports, or failing to comply with these
rules and regulations on the part of any Inspector will be
deemed sufficient ground for his removal.
Ironwork.
Inspectors are required to the report to the Chief In-
spector what ironwork is to be used on any and every build-
ing in their districts ; also when the same is ready for inspec-
tion, and make a violation case when any ironwork is being
used before said inspection and approval.
Prompt Report of Violations.
Should an inspector find a building or buildings being
erected or altered with unlawful construction, with or with-
out a permit, he will so report as soon as possible, that the
Superintendent may take proper action to prevent the same.
Badge of Office.
Inspectors are required, while on duty, to wear on the
left side of their outer garment, and exposed to view, their
badge of office, and any Inspector who shall loan his official
badge to any person whatever will be dismissed from the
service of the Bureau.
Hours of Duty.
Inspectors are expected to be on duty from 8:30 A. M.
to 5 P. M., except on Saturdays, when they shall be on duty
IRON AND STEEL CONSTRUCTIONS 169
from 8:30 A. M. to 12 M., and except when otherwise ordered
by the Superintendent of Buildings.
Entries in Daily Journals.
All visitations to new buildings and alterations to build-
ings and all other matters entered in Inspectors' journals
must be entered with the "Sun Copying Pencil," thus making
such entries indelible. Any entries made in any -other manner
w r ill be deemed sufficient grounds for the immediate dismissal
of the offender. Said pencils may be obtained on application.
Violations of the Law.
All violations of every nature reported by the several
Inspectors must be from a personal investigation, and they
must be personally acquainted with all the facts in each case,
and not rely on information given by others.
Entries in Note-Books.
Inspectors are required to state, in the entry in their
note-books, of visitations to buildings, the floor or floors they
examined at the time of such visitations.
Inspections.
Any Inspector of Plumbing making an inspection of
plumbing, and any Special, Building, Iron or Elevator In-
spector making any inspection, upon a request, either verbal
or contained in any communication, not received from the
Bureau direct, will at once be dismissed.
All requests, verbal or written, for such inspections, re-
ceived from any other source, must be forwarded to the
Superintendent of Buildings at once.
Taking Papers From Office.
No official paper may be taken from the office without
permission, excepting Inspectors' copies.
Official Communications.
The officers and employees of this Bureau are forbidden
to write letters of endorsement or recommendation of any
form of construction, mechanism, or device which may be
used in any part of a building, to owners, manufacturers,
i;o ERECTION AND INSPECTION OF
patentees or other interested persons. The penalty for a
violation of this rule will be instant dismissal.
All official communications, or communications in any
manner relating to the official business of the Bureau,
whether verbal or written, shall be made through the Super-
intendent of Buildings.
Private Interests.
While in the service of this Bureau its officers and
subordinates shall not make use of or apply any portion of
the time they may be required to devote to the performance
of the duties devolved upon them, or any information they
may have acquired therein, or any authority or power with
which they may be clothed, in or for the furtherance of any
private or corporate interests or purposes whatever.
Physical Disability.
It is made the duty of all employees, in case of physical
or other disability preventing their prompt appearance for
duty at the required time, to report that fact to their imme-
diate superior in time to enable the substitution of another
to perform their duties, if necessary.
Luncheon.
One hour shall be allowed to each employee for noon-
day luncheon or dinner in such manner as shall not interfere
with the business of the Bureau.
Business Transacted Confidential.
The public business transacted in and the records of
the office shall be treated as strictly confidential by the several
officers and employees of the Bureau, and shall not be com-
municated except as may be directed by the Superintendent
of Buildings.
Taking Applications From Office.
Under no circumstances will any application or drawing
for the erection or alteration of any building be allowed to
be taken from this office.
Letters to Employees.
All letters addressed to employees relative to business
connected with this Bureau must be referred to the Super-
IRON AND STEEL CONSTRUCTIONS 171
intendent of Buildings before any action is taken thereon by
the parties to whom the same are addressed.
Car-Fare Bills.
All car-fare bills not handed in by the 4th day of the
month, at the latest, will not be forwarded to the Finance
Department for payment.
Improper Use of Official Badge.
Any and all employees of this Bureau who shall make use
of his or their position or official badge for the purpose of
obtaining admission for himself or others to any place of
amusement during the time of performance, or for obtaining
tickets for the same, will be fined or dismissed at the discretion
of the Superintendent of Buildings.
CHAPTER XXII.
Reports.
GENERAL REMARKS. The inspection of premises by
a municipal inspector is an official act and is permanently re-
corded. This record may be an entry in an official note book
or journal, or may be represented into greater details by means
of violations, unsafes, or by special reports.
The Journal, or individual district note book is city prop-
erty. Brief reports are here entered by the inspector on the
premises, and in order to make these reports permanent, either
ink or indelible pencil may be used. A journal report takes
generally one or two lines, and consists of the following in-
formation :
The official number of the permit to build, classified as
N. B. (new buildings) or Alt. (alterations), i. e. N. B. 73-12
means the 73rd set of plans for new buildings approved by the
Bureau of Buildings of a certain Borough in year 1912.
The location of the premises inspected.
The time of arrival at, and the departure of the inspector
from the given premises.
An entry of number and kind of materials approved.
An inspection report indicating in all cases the actual
condition of the work, orders issued by the inspector to the
builders, and any other items of special interest.
A day's entries in an iron inspector's Journal will look
something like page 173.
The number of daily inspections, for an iron inspector, is
generally between 12 and 20 and depends largely upon the
nature of the work and the proximity of the jobs to one an-
other and to the main office. The average time for inspections
for a number of inspectors in a given day in 1911 was 20 min-
utes for a new building and 10 minutes for an alteration.
Violation Reports are of various kinds, depending upon
the nature of the violation committed. All violation reports
are made out on printed violation forms. A complete violation
will read like the following:
March 7th, 1913.
To the Superintendent of Buildings for the Borough of Man-
hattan :
Sir:
I respectfully report that, on March 6th, I examined the
premises and building situated on the front of the lot on the
IRON AND STEEL CONSTRUCTIONS
173
8
_: 53
1 It
O.-MC3CC C*
*
S -S 5 M "+:
52 2 o ^o -
as . ^ 5 5 a-^
19 =9 H * $
s -
o
h .
bc c-r e c S^ fiS ct: o^3 a
o o 53 S "42 o C 53 S 53 C tj*> B
2 r-s ^ r-
i i a 1 i . 3 I
^
g,- o
o
J
^S S.
iH
rH
h
00 05
d
^3
O
BB8
Q
. G
If ^
THURS
LOCATI
|
a
Wai S
S
|1
TH
C-l
||