T K 3?75 N 6 1909 MAIN bO 15=! 19O9 RATIONAL ELECTRICAL CODE INSTALLATION RULES (Except Marine Work) lioqal Board of Fire Underwriters RL.ECTRIC WIRING AND ARPA.RA.TUS As Recommended by the >ERWRITERS' NATIONAL ELECTRIC ASSOCIATION SUPPLEMENT. For satisfactory work only approved fittings should be used. The Supplement to the National Electrical Code, containing a list of approved elec- trical fittings, is designed to aid wiremen hy show- ing them in advance just what will fce approved by the Underwriters. Fittings not listed should not be used without special approval, which will be freely given on application, if the device is found to be reliable. The Supplement will be revised semi-annually. 19O9 |"NATIONAL ELECTRICAL CODE INSTALLATION RULES (Except Marine Work) OF THE National Board of Fire Underwriter!) eres 4,000,000 oh ... 2,000,000 800,000 400,000 200,000 100,000 50,000 25 000 ins. 12,500 The test must be made with all cut-outs and safety devices in place. If the lamp sockets, receptacles, electroliers, etc., are also connected, only one half of the resistances specified in the table will be required. 67. Soldering Fluid, SECTION. Compensator coils for three-wire systems. (See Re- active Coils.) Concealed "knob and tube" work 24 (q) to 24 (it) Conductors. (See Wires.) Conduit wiring ..24 (n) to 24 (p) Conduits, metal, Installation of 25 Constant-current systems 18 to 20 Constant-potential systems, general rules 21 to 23 Converters. (See Transformers.) Cranes, Electric 34 A Crossing of constant-potential pole-lines, over 5,000 volts 12 A (d) Cut-outs, Installation of 17 &21 Cut-outs must protect all wires of the circuit 17 (a) Cut-outs, Number of lights allowed to one. ..21 (d) & 31 (a) Cut-outs, where required 1 (d), 2 (d), 8 (c), 21 (a), 21 (6; & 29 (a) Damp places 14 (/), 17 (c),24 (i) to 24 (&) & 27 (6) Decorative lighting systems ...." 31 Distance between conductors, inside work.. .18 (d),24 (h), 24(j),24(r) &35(e) Distance between conductors, outside work........ ...12 (ofl ranees to buildings :....12 (g) & 64 i Dynamo Rooms 12 A (c) & 12 A (d) (2) Drip loops at entrances to buildings 12 (g) & 64 (d) 1 to 7 Economy coils for arc lamps Electric gas lighting 65 Electric heaters Electrolytic corrosion of underground metal work.. .12 (n) Electro-magnetic devices for switches not approved 20 (c) Emergency switches note to 22 (a) Enclosed arc lamps 19 (c) & 29 (c) Equalizers, Installation of * Extra-high constant-potential systems 38 & 39 Fan motors hung from ceilings 8 (g) Feeders, Railway 33 (/) Fished wires 24 (c) & 24 (*) Fittings, List of approved. (See inside of front cover.) Fixture canopies 24 (w) & 26 (a) Fixtures 26 Fixture Wiring 24 (v) to 24 (y) Flexible cord, Use of 28 Flexible tubing, where permitted 14 (d), 24 (s) & 24 () Foreign currents, Protection against 64 Formula for soldering fluid 67 Fuses, Installation of 1 (d), 17&21 INDEX. 09 NUMBER AND SECTION, Gas lighting, Electric 65 General plan of arrangement of rules page 4 General suggestions for electric work page 5 Generators 1 Ground connections for lightning arresters 5 (c) Ground connections for low-potential circuits 13 A, (c) to (g) Ground detectors, where required 1 (a) Ground plates, Construction of 13 A (g} Ground return wires, trolley systems 12 (n) Grounded trolley circuits, Light and power from 34 Grounding dynamo and motor frames ..l(c) &8 )a) Grounding interior conduits 25 (/) Grounding low-potential circuits 13 A Grounding sheaths of cables 12 (i) Grounds, testing for 7 Guard irons or wires, Use of 12 (d), 12 (wi), 12 A, (d) Guard strips, inside work, where required, 18 (e) &24 (e) Heaters, Electric 23 High constant potential systems 35 to 37 Incandescent lamps as resistances 4 (6) & 29 (6) Incandescent lamps in series : 20, 21 (d), 31 & 37 Incandescent lamps, where inflammable gases exist 27 (a) Induction coils. (See Reactive coils. 1 ) Inside work 14 to 39 Insulated platforms, at high-potential machines, 1 (c) & 8 (a) Insulating joints, when required 26 (a) Insulation of future canopies, when required 26 (a) Insulation of trolley wires 12 (k) Insulation resistance of completed systems 66 Insulator spacing, inside work 24 (ft), 24 (j), 24 (r) & 35 (c) Joint pole crossing, high pressure line 12 A (d), 2 Joints, in conductors 12 (/) & 14 (c) Junction boxes, conduit, Installation of..24 A (/) & 25 (g) Knob and Tube work 24 (q) to 24 (u] Knots in flexible cord, required in sockets and rosettes 28(5-) Lumps. (See Arc Lamps and Incandescent Lamps.) Lighting and power from railway wires... 34 Lightning arresters, Installation of 5 Low constant-potential systems 24 to 34 Lugs for terminal connections, when required 14 (c) 100 INDEX. NUMBER AND SECTION. Mercury vapor lamps 29 A Motor enclosures 8 (/) Motor equipments, 550 volt, voltage allowed at genera- tor or transformer note before 24 Motors 8 Moulding, metal, Installation of 25 A Moulding, on brick walls 24 (I) Moulding, Wires in 24 (fc) to 24 (m) Moving picture machines, Construction of 65 A Multiple-series systems, when permitted 8 (e), 20 (c) & 29 (a) Oily waste 6 (6) Open wiring 24 (g) to -24 (k) Outlet boxes or plates, Conduit, when required. ..24 A (b) & 25 (d) Outline Wiring 31 B Outside work .12, 12 A, 13, 13 A & 64 Pendants for use in hazardous places 28 (d) Pipe-hangers for incandescent lamps 27 (a) Pole-lines, Constant-potential, over 5,000 volts 12 A Pole-lines, High-pressure, near buildings 12 A (e) Portable lamps, Installation of 28 (d) Power, transformer and switch stations Ito7 Protection for gas outlet pipes 26 (a) Protection for motor equipments 8 (d) Protection for outlet wires 24 () & 26 (a) Protection for wires on side walls or columns 18 (e). 24 (e) & 35 (d) Protective devices on signal circuits, Construction of 64 (m) Protective devices on signal circuits, Installation of 64 (g) to 64 (J) Railway power plants 9 Railway wires. (See Trolley Wires.) Receptacles. (See Sockets.) Resistance boxes. (See Rheostats.) Resistances used with constant-potential arc lamps, 29(6) Rheostats, Installation ot 4, 8 (c) & 8 (d) Roof wiring 12 Rosettes, Use of 2l(rf) Running-boards, Construction of 18(e) Running-boards, where required 18 (e),24 (e) & 35 (d) Screen of wires, at cross-over in high-pressure pole line* over 5,000 volts 12 A(rf) (3) Series arc lamps Is* Series incandescent lamps 20 & 37 ' INDEX. 101 NUMBER AND SECTION. Series-multiple systems, when permitted 8 (e) &20 (c) Service -wires, Underground 15(a), 15(c), 15(d) Signaling systems 64 Sockets, Installation of 27 Soldering fluid, Formula for 67 Soldering stranded wires 14 (c) & 19 (d) Spark arresters, when required 19 (c) & 29 (c) Static electricity, due $o belt friction 1 (c) & 8 (a) Stations and dynamo rooms I to 7 Stiff pendants for incandescent lamps 27 (a) Storage battery rooms 10 Strips for protecting inside wires. (See Guard Strips.) Switchboards 3 Switches, Electro-magnetic, not approved 20 (c) Switches, Emergency note to 22 (a) Switches, Flush, Installation of 22 (d) Switches for constant-current systems 18 (6) Switches in damp places 17 (c) Switches, Indicating, when required 8 (c), 23 (6) Switches, Installation of 17 &22 Switches must disconnect all wires of circuit 17 (a) Switches, Service 18 (6),22(a) Switches, Single-pole, when permitted 8(c) &22(c. Switches, Snap, when preferred 22 (6) Switches, Time 17 (d} Systems, Constant-current ... ..18 to 20 Systems, Constant-potential, general rules 21to23 Systems, Extra-high constant-potential 38&S9 Systems, High constant-potential 35 to3' Systems, Low constant-potential. 24 to 34 Systems, Multiple- series 8 (e) & 20 (c) Systems, Series-multiple 8 (e) and 20 (c) Systems, Signaling 64 Telegraph, telephone and signaling circuits 64 Testing for grounds 7 Testing for insulation resistance of completed systems, Theatre wiring 31 A Three-pole cross-over for high-pressure line 12 A (d-1) Tie wires 12 (a) &14 (6j Transformers, grounding of secondaries 13 A(6i Transformers, Installation of, inside 11 and 36 Transformers, Installation of, outside 13 Transformer stations Ito7 Transmission lines, constant-potential, over 5,000 volts 12 A Trolley circuits, Grounded, Light and power from 34 Trolley wires 120') to 12 (m) Tubes, Insulating. (See Bushings.) Tubing, Flexible. (See Flexible Tubing.) 102 INDEX. NUMBER AHD SECTION. "Voltmeter, Switchboard, circuit for ........................... 2 (d) Waste, oily ...................................................................... 6(6) Waterproof construction ............................. 24 (f) to 24 (k) Waterproof pendants ................................................. 27 (6) Wire, Netting required on arc lamps ........... 19 (c) & 29 (c) Wires, Carrying capacity table ....................................... 16 Wires, Car Work ............................................................ 32 Wires, Concealed "knob and tube "work. ..24 (q) to 24 (u) Wires, Conduit work ................................ 24 (n) to 24 (p) Wires, Constant-current systems .................................. 18 Wires in stations and dynamo rooms .......................... 2 (e) Wires, Spacing, inside work ......... 18 (d),24 (A), 24 (j), 24 (r) & 35 (c) Wires, Spacing, outside work .................. 12 (6), 12 A (c) & 12 A (d-2) Wires, Extra-high constant-potential systems ...... .38 & 39 Wires, Fished ............... ................................... 24 (c)&24 (s) Wires, Fixture work ....................................... 24(u) to 24 (y) Wires, Ground- re turn, trolley systems ..................... 12 (n) Wires, High constant-potential systems ........................ 35 Wires, Inside work, general rules .................................. 14 Wires, Inside work, protection in crossing wires and pipes .................................................................... 14 (e) Wires, Low constant-potential systems .......................... 24 Wires, Moulding -work .................................... 24 (I) &24(w) Wires, of high-pressure pole lines near buildings, 12 A (e) Wires on roofs .................................................................... 12 Wires, Open work, damp places ..... 14 (/) &24 (i) to 24 (K) Wires, Openwork, dry places ....................... 24 (g) &24 (h) Wires, Outside ............................................. 12 and 12 A Wires, Service ......................................... 12 (a), 12 (g), 64 (d) Wires, Signal ................................................................... 64 Wires, Stranded ............................................ 14 (c) & 19 (d) Wires, Tie ....................................... 12 (a) and 14 (6) Wires, Trolley, installation of ..................... 12 (j) to 12 (TO) Wires, Trolley, Light and power from ........................... 34 Wires, Twin when permitted Wires, Twin when pe Wires, Underground .............................................. 12 (i) & 15 Wires, when considered exposed to moisture ......... 24 (./) vyiring, General suggestions for .............................. P a ge 5 Information regarding tests mac these rules can be obtained by ad Underwriters' Laboratories, Chicago, \ Q.O "775 M- THE UNIVERSITY OF CALIFORNIA LIBRARY