This is a table of type bigram and their frequencies. Use it to search & browse the list to learn more about your study carrel.
bigram | frequency |
---|---|
new york | 263 |
railroad company | 214 |
long island | 132 |
greenfield railroad | 120 |
thousand dollars | 103 |
per day | 91 |
river tunnels | 90 |
pennsylvania railroad | 83 |
hoosac tunnel | 81 |
east river | 79 |
iron lining | 74 |
per cent | 74 |
north river | 73 |
soft ground | 65 |
compressed air | 56 |
york city | 55 |
air pressure | 52 |
company shall | 52 |
bottom heading | 51 |
haupt co | 49 |
concrete lining | 48 |
island railroad | 48 |
east end | 47 |
west end | 45 |
new jersey | 43 |
hundred thousand | 41 |
cutting edge | 41 |
per min | 40 |
island city | 38 |
one hundred | 37 |
per sq | 35 |
weehawken shaft | 35 |
terminal station | 34 |
western road | 33 |
chief engineer | 33 |
first avenue | 32 |
metal lining | 32 |
work done | 31 |
new england | 31 |
tunnel lining | 31 |
rock surface | 31 |
fitchburg railroad | 31 |
per ring | 31 |
center line | 30 |
capital stock | 29 |
shield chambers | 29 |
tunnel line | 28 |
shelburne falls | 28 |
central shaft | 28 |
tunnel extension | 27 |
two hundred | 27 |
west shaft | 27 |
linear foot | 27 |
hudson river | 26 |
per month | 26 |
per linear | 26 |
fifth avenue | 26 |
east side | 25 |
jersey city | 25 |
manhattan shaft | 25 |
land tunnels | 25 |
hoosac mountain | 25 |
resident engineer | 25 |
top heading | 25 |
another portion | 25 |
per cu | 24 |
feet per | 24 |
average time | 24 |
western railroad | 24 |
bergen hill | 24 |
york side | 24 |
ninth avenue | 24 |
hereby authorized | 24 |
rock bottom | 23 |
feet wide | 23 |
lineal feet | 23 |
per annum | 23 |
seventh avenue | 23 |
first day | 22 |
per shift | 22 |
west side | 22 |
thousand lineal | 22 |
twin tunnel | 22 |
th street | 22 |
north adams | 21 |
one thousand | 21 |
manhattan side | 21 |
bore segments | 21 |
five years | 20 |
free air | 20 |
york tunnel | 20 |
open cut | 20 |
river division | 19 |
town tunnels | 19 |
railroad corporations | 19 |
rapid transit | 19 |
cubic yard | 19 |
per cubic | 19 |
sunnyside yard | 19 |
scrip shall | 19 |
railroad corporation | 19 |
cast iron | 18 |
eastern railroad | 18 |
dollars per | 18 |
five per | 18 |
eighteen hundred | 18 |
sinking fund | 17 |
time taken | 17 |
tenth avenue | 17 |
mixed rock | 17 |
track tunnel | 17 |
six hundred | 17 |
feet high | 17 |
atlantic avenue | 17 |
two sections | 17 |
deerfield river | 16 |
southern vermont | 16 |
center heading | 16 |
state scrip | 16 |
time per | 16 |
broken plates | 16 |
five thousand | 16 |
five hundred | 16 |
one time | 16 |
bulkhead wall | 16 |
vermont railroad | 16 |
feet material | 16 |
per lin | 16 |
air per | 16 |
per foot | 15 |
lowell railroad | 15 |
jersey side | 15 |
cost per | 15 |
two tunnels | 15 |
river tunnel | 15 |
thousand feet | 15 |
road east | 15 |
horse power | 15 |
rock cover | 15 |
northern line | 15 |
intermediate shaft | 14 |
early part | 14 |
driven tunnels | 14 |
tunnel work | 14 |
civil engineers | 14 |
maine railroad | 14 |
duct bench | 14 |
rock cut | 14 |
flatbush avenue | 14 |
heading method | 14 |
rock section | 14 |
fifty thousand | 14 |
per minute | 14 |
table part | 14 |
two millions | 14 |
hill tunnels | 14 |
average progress | 13 |
twenty thousand | 13 |
soft material | 13 |
cubic yards | 13 |
boston railroad | 13 |
bolting time | 13 |
american society | 13 |
three miles | 13 |
ten per | 13 |
twin tunnels | 13 |
steam shovel | 13 |
bench concrete | 13 |
concrete arch | 13 |
york central | 13 |
eight hundred | 12 |
typical cross | 12 |
greater part | 12 |
muck loaded | 12 |
april th | 12 |
state engineer | 12 |
pump chamber | 12 |
normal air | 12 |
portland cement | 12 |
plate lxxiv | 12 |
tunnel superintendent | 12 |
average cost | 12 |
assistant engineer | 12 |
full face | 12 |
state control | 12 |
three hundred | 12 |
working chamber | 12 |
central railroad | 12 |
east avenue | 12 |
air cylinders | 12 |
one million | 12 |
solid rock | 12 |
subaqueous tunnels | 12 |
either side | 11 |
pennsylvania tunnel | 11 |
river bulkhead | 11 |
working force | 11 |
brick arch | 11 |
top charges | 11 |
company may | 11 |
bolt holes | 11 |
general electric | 11 |
breast boards | 11 |
sixth avenue | 11 |
one end | 11 |
three years | 11 |
bay ridge | 11 |
lineal foot | 11 |
plate xiii | 11 |
terminal railroad | 11 |
latter part | 11 |
total time | 11 |
state management | 11 |
lock bulkhead | 11 |
resident engineers | 11 |
street surface | 11 |
massachusetts railroad | 10 |
flat cars | 10 |
one tunnel | 10 |
ninth avenues | 10 |
railroad tracks | 10 |
exploration drift | 10 |
right angles | 10 |
hour shift | 10 |
two lines | 10 |
mixed bottom | 10 |
tunnel excavation | 10 |
second street | 10 |
lower part | 10 |
table showing | 10 |
progress made | 10 |
six feet | 10 |
plate xii | 10 |
four feet | 10 |
plate lxii | 10 |
unavoidable delays | 10 |
plate lix | 10 |
whole length | 10 |
total cost | 10 |
ten years | 10 |
terminal facilities | 10 |
pressure air | 10 |
shield chamber | 10 |
whole time | 10 |
may th | 10 |
upper part | 10 |
december th | 10 |
short distance | 10 |
average rate | 10 |
two miles | 10 |
heading oct | 10 |
fourteen feet | 10 |
cutting edges | 10 |
intercepting arch | 10 |
seven miles | 10 |
per yard | 10 |
plate lxxiii | 10 |
railroad commissioners | 10 |
cast steel | 10 |
mica schist | 10 |
hour shifts | 9 |
three thousand | 9 |
shall take | 9 |
per mile | 9 |
middle heading | 9 |
way ducts | 9 |
iron tunnel | 9 |
plate lxx | 9 |
hrs min | 9 |
tunnel railroad | 9 |
typical working | 9 |
per hour | 9 |
grout pipes | 9 |
single track | 9 |
working face | 9 |
million dollars | 9 |
deerfield dam | 9 |
plate lx | 9 |
majority bill | 9 |
per hours | 9 |
state treasurer | 9 |
avenue improvement | 9 |
railroad system | 9 |
track tunnels | 9 |
blacksmith shop | 9 |
shield method | 9 |
lined tunnels | 9 |
full size | 9 |
previously described | 9 |
connecting railroad | 9 |
cheap transportation | 9 |
rock center | 9 |
third streets | 9 |
ordinary cast | 9 |
amount paid | 9 |
north side | 9 |
act shall | 9 |
commonwealth shall | 9 |
feet long | 9 |
well known | 9 |
plate lviii | 9 |
present time | 9 |
june th | 9 |
york connecting | 9 |
river shafts | 9 |
taper rings | 9 |
part rock | 8 |
south tunnel | 8 |
time spent | 8 |
erie railroad | 8 |
large quantity | 8 |
full width | 8 |
river bridge | 8 |
amount earned | 8 |
mean high | 8 |
two years | 8 |
work will | 8 |
plant depreciation | 8 |
thirty years | 8 |
per sec | 8 |
number progress | 8 |
one half | 8 |
five miles | 8 |
miles long | 8 |
grade crossings | 8 |
two men | 8 |
railroad companies | 8 |
nine hundred | 8 |
western line | 8 |
east heading | 8 |
passenger traffic | 8 |
hydrostatic head | 8 |
south shaft | 8 |
plate lxviii | 8 |
electric conduits | 8 |
materials delivered | 8 |
far enough | 8 |
rock excavation | 8 |
eastern terminus | 8 |
table summary | 8 |
completed tunnel | 8 |
steam cylinders | 8 |
great west | 8 |
transportation tax | 8 |
gross earnings | 8 |
cortlandt street | 8 |
caulking pockets | 8 |
summary part | 8 |
powder used | 8 |
weehawken side | 8 |
intermediate shafts | 8 |
various operations | 8 |
sliding platform | 8 |
land tunnel | 8 |
one side | 8 |
directors voted | 8 |
engineering staff | 8 |
poling boards | 8 |
force employed | 8 |
distance piece | 8 |
mortgage bonds | 8 |
plate lxiv | 8 |
eleventh avenue | 8 |
permanent shafts | 8 |
river railroad | 8 |
years ago | 8 |
two tracks | 8 |
part earth | 8 |
traveling stage | 8 |
top headings | 8 |
short lengths | 8 |
tunnel section | 8 |
near greenfield | 8 |
hundred feet | 8 |
february th | 8 |
four hundred | 8 |
avenue shafts | 8 |
green river | 8 |
queens borough | 8 |
masonry lining | 8 |
last year | 7 |
large part | 7 |
third street | 7 |
commissioners shall | 7 |
state board | 7 |
second air | 7 |
river line | 7 |
tunnel will | 7 |
three months | 7 |
pressure compressors | 7 |
october th | 7 |
general foreman | 7 |
actually paid | 7 |
four tunnels | 7 |
motive power | 7 |
high water | 7 |
whole amount | 7 |
rock tunnels | 7 |
driven tunnel | 7 |
bottom headings | 7 |
specifications required | 7 |
rear end | 7 |
private corporation | 7 |
easterly line | 7 |
tunnel lines | 7 |
part thereof | 7 |
described later | 7 |
field office | 7 |
double track | 7 |
chief office | 7 |
take effect | 7 |
francis mason | 7 |
final position | 7 |
first section | 7 |
north tunnel | 7 |
estimated cost | 7 |
west line | 7 |
north shaft | 7 |
springing line | 7 |
heavy timbering | 7 |
per shield | 7 |
act authorizing | 7 |
electric locomotives | 7 |
bulkhead line | 7 |
office administration | 7 |
machine drills | 7 |
track level | 7 |
great value | 7 |
actual cost | 7 |
heading nov | 7 |
eight feet | 7 |
great care | 7 |
march th | 7 |
two shafts | 7 |
took place | 7 |
last ring | 7 |
great enterprise | 7 |
sump segment | 7 |
private property | 7 |
bridge company | 7 |
twenty per | 7 |
city station | 7 |
heading feb | 7 |
shield doors | 7 |
expanded metal | 7 |
refuge niches | 7 |
fine sand | 7 |
new line | 7 |
two thousand | 7 |
civil engineer | 7 |
construction company | 7 |
width heading | 7 |
thirty feet | 7 |
first street | 6 |
whole work | 6 |
tunnel invert | 6 |
seven thousand | 6 |
ten thousand | 6 |
six thousand | 6 |
river lines | 6 |
total weight | 6 |
strong enough | 6 |
city lots | 6 |
steel bolts | 6 |
transactions paper | 6 |
engineers instituted | 6 |
cement grout | 6 |
without caulking | 6 |
river bed | 6 |
avenue terminal | 6 |
total length | 6 |
island shaft | 6 |
field charges | 6 |
steam locomotives | 6 |
instituted transactions | 6 |
st ave | 6 |
reinforcing rods | 6 |
one shield | 6 |
november th | 6 |
also used | 6 |
great northern | 6 |
electric motor | 6 |
thousand eight | 6 |
heavy cast | 6 |
meadows division | 6 |
rock sections | 6 |
steel rods | 6 |
hand labor | 6 |
invert concrete | 6 |
island reef | 6 |
east new | 6 |
outside diameter | 6 |
total field | 6 |
segmental timbering | 6 |
eighth avenues | 6 |
interest thereon | 6 |
sized twin | 6 |
single tunnel | 6 |
tunnels fig | 6 |
special legislation | 6 |
water power | 6 |
time total | 6 |
engineering construction | 6 |
contracting company | 6 |
finally adopted | 6 |
five feet | 6 |
ordinary iron | 6 |
manhattan railroad | 6 |
total average | 6 |
present location | 6 |
four miles | 6 |
eighty thousand | 6 |
set apart | 6 |
ten feet | 6 |
four years | 6 |
hundred dollars | 6 |
table gives | 6 |
council shall | 6 |
six months | 6 |
tunnel shall | 6 |
sliding platforms | 6 |
new shaft | 6 |
laying mandrel | 6 |
table shows | 6 |
including time | 6 |
state credit | 6 |
full page | 6 |
total labor | 6 |
passenger yard | 6 |
tunnel transport | 6 |
passenger station | 6 |
driven westward | 6 |
loan act | 6 |
radial joints | 6 |
pennsylvania station | 6 |
front street | 6 |
chapter two | 6 |
island shafts | 6 |
center lines | 6 |
construction work | 6 |
alvah crocker | 6 |
freight traffic | 6 |
grand total | 6 |
alfred noble | 6 |
every ft | 6 |
york station | 6 |
page image | 6 |
three per | 6 |
plate lxi | 6 |
first air | 6 |
boston freight | 6 |
multiple ducts | 6 |
two feet | 6 |
day work | 6 |
shield advanced | 6 |
general plan | 6 |
large number | 6 |
twenty feet | 6 |
export trade | 6 |
rock middle | 6 |
eastern end | 6 |
six per | 6 |
unfinished portion | 6 |
hoisting engines | 6 |
heavy traffic | 6 |
rubble masonry | 6 |
whole line | 6 |
drilling machines | 6 |
short time | 6 |
cents per | 6 |
two million | 6 |
linear feet | 6 |
leading end | 6 |
shall receive | 6 |
yellow pine | 6 |
average force | 6 |
thirty per | 6 |
tunnels east | 6 |
per square | 6 |
ph oe | 6 |
shall become | 6 |
ground encountered | 6 |
end heading | 6 |
july th | 6 |
satisfactory evidence | 6 |
heavy iron | 6 |
pressure compressor | 6 |
iron workers | 6 |
freight yard | 6 |
grand trunk | 6 |
heading sept | 5 |
state ownership | 5 |
block lagging | 5 |
one year | 5 |
work included | 5 |
built without | 5 |
monthly estimates | 5 |
general laws | 5 |
heading mar | 5 |
speedy completion | 5 |
trustees shall | 5 |
general way | 5 |
railroad leading | 5 |
underground portions | 5 |
water used | 5 |
tunnel company | 5 |
land damages | 5 |
whole gang | 5 |
rails shall | 5 |
plate xxxv | 5 |
part ave | 5 |
pushing back | 5 |
standard section | 5 |
evidence shall | 5 |
cut sections | 5 |
one power | 5 |
surface transport | 5 |
iron company | 5 |
lower ft | 5 |
three feet | 5 |
building tunnel | 5 |
payments made | 5 |
lowest point | 5 |
weehawken tunnels | 5 |
shield jacks | 5 |
three days | 5 |
four months | 5 |
external diameter | 5 |
heading jan | 5 |
two single | 5 |
eighteen feet | 5 |
important part | 5 |
twisted rods | 5 |
axis level | 5 |
per thousand | 5 |
became necessary | 5 |
treasurer shall | 5 |
sliding hoods | 5 |
facing mixture | 5 |
large proportion | 5 |
tunnel sections | 5 |
single tunnels | 5 |
rock packing | 5 |
railroad station | 5 |
assistant engineers | 5 |
several kinds | 5 |
station building | 5 |
per lineal | 5 |
erector ram | 5 |
whole state | 5 |
east rivers | 5 |
industrial interests | 5 |
south side | 5 |
detailed description | 5 |
erecting iron | 5 |
approved april | 5 |
working chambers | 5 |
issue scrip | 5 |
bag batch | 5 |
one corporation | 5 |
upper platform | 5 |
extension project | 5 |
road shall | 5 |
running yard | 5 |
tube tunnels | 5 |
year eighteen | 5 |
voids outside | 5 |
first ring | 5 |
increased cost | 5 |
take possession | 5 |
also voted | 5 |
england states | 5 |
large quantities | 5 |
total amount | 5 |
railroad shall | 5 |
reinforced concrete | 5 |
twenty years | 5 |
transportation problem | 5 |
hydraulic jacks | 5 |
york shield | 5 |
new hampshire | 5 |
just east | 5 |
south tunnels | 5 |
previously mentioned | 5 |
iron tube | 5 |
field engineering | 5 |
island shields | 5 |
completed previously | 5 |
tunneling shields | 5 |
cable conduits | 5 |
blackwall tunnel | 5 |
original design | 5 |
hoisting apparatus | 5 |
cubic per | 5 |
excavating ahead | 5 |
grout ejected | 5 |
lost time | 5 |
half feet | 5 |
views showing | 5 |
water pressure | 5 |
machine shop | 5 |
freight terminal | 5 |
railroad facilities | 5 |
clay blanket | 5 |
placing concrete | 5 |
river front | 5 |
second section | 5 |
erector runner | 5 |
road west | 5 |
small gang | 5 |
working compartments | 5 |
almost entirely | 5 |
steel ring | 5 |
track system | 5 |
bore segment | 5 |
unit unit | 5 |
bench walls | 5 |
tenth avenues | 5 |
considerable portion | 5 |
large amount | 5 |
full section | 5 |
cover section | 5 |
two parts | 5 |
hundred horse | 5 |
three quarters | 5 |
minority bill | 5 |
survey lines | 5 |
burleigh machine | 5 |
least ft | 5 |
corporate management | 5 |
surface transportation | 5 |
permanent cast | 5 |
due regard | 5 |
general manager | 5 |
railroad traffic | 5 |
short posts | 5 |
steel plates | 5 |
street pier | 5 |
various kinds | 5 |
year one | 5 |
within ft | 5 |
may hereafter | 5 |
june st | 5 |
west shore | 5 |
westerly side | 5 |
already described | 5 |
retaining wall | 5 |
shall pay | 5 |
hydraulic fittings | 5 |
operations involved | 5 |
neat cement | 5 |
test holes | 5 |
like manner | 5 |
earth section | 5 |
heavy ground | 5 |
section gy | 5 |
permanent bench | 5 |
horizontal diameter | 5 |
time required | 5 |
payable semi | 5 |
connecting roads | 5 |
dollars shall | 5 |
per barrel | 5 |
trench mica | 4 |
point ft | 4 |
radial joint | 4 |
western shaft | 4 |
greater portion | 4 |
square twisted | 4 |
general supervision | 4 |
rod reinforcement | 4 |
work stopped | 4 |
second bulkhead | 4 |
heading july | 4 |
transit railroad | 4 |
foremen foremen | 4 |
union nut | 4 |
laying concrete | 4 |
railroad line | 4 |
entire length | 4 |
various points | 4 |
doors open | 4 |
will now | 4 |
six millions | 4 |
assistant tunnel | 4 |
pennsylvania system | 4 |
freezing process | 4 |
state trustees | 4 |
electric traction | 4 |
grout holes | 4 |
direct line | 4 |
avenue eastward | 4 |
personal credit | 4 |
tunnel passes | 4 |
general account | 4 |
great work | 4 |
detailed records | 4 |
middle drain | 4 |
within three | 4 |
house plant | 4 |
feet distant | 4 |
million seven | 4 |
bird says | 4 |
common shanties | 4 |
introductory paper | 4 |
manhattan shield | 4 |
might occur | 4 |
connecticut river | 4 |
united engineering | 4 |
mixed face | 4 |
materials used | 4 |
rock tunnel | 4 |
last named | 4 |
great state | 4 |
north manhattan | 4 |
pushed back | 4 |
driving shield | 4 |
pile met | 4 |
earth excavation | 4 |
depot buildings | 4 |
circumferential flanges | 4 |
moved ahead | 4 |
reaching new | 4 |
tunnel center | 4 |
carried forward | 4 |
plate xliii | 4 |
leg derricks | 4 |
tion lost | 4 |
tightening bolts | 4 |
inch pipe | 4 |
state bonds | 4 |
steam shovels | 4 |
different kinds | 4 |
succeeding papers | 4 |
west shafts | 4 |
yards cubic | 4 |
without timbering | 4 |
open material | 4 |
water pumps | 4 |
county commissioners | 4 |
trap rock | 4 |
plate lxvi | 4 |
permanent timbering | 4 |
following table | 4 |
excavation partially | 4 |
soft rock | 4 |
running order | 4 |
per running | 4 |
plate lxiii | 4 |
ft ft | 4 |
will probably | 4 |
previously referred | 4 |
faithful performance | 4 |
terminal yard | 4 |
air line | 4 |
beam ties | 4 |
minority report | 4 |
bench method | 4 |
thirty thousand | 4 |
manhattan island | 4 |
reserved fund | 4 |
final lines | 4 |
opposite sides | 4 |
mining cars | 4 |
corporation may | 4 |
spiral groove | 4 |
twenty miles | 4 |
mucking tion | 4 |
rock going | 4 |
temporary timbering | 4 |
second avenue | 4 |
working pressure | 4 |
annual meeting | 4 |
many places | 4 |
consulting engineer | 4 |
shaft sump | 4 |
fixed hood | 4 |
european tunnels | 4 |
plate headings | 4 |
cut section | 4 |
plate xiv | 4 |
plate lxvii | 4 |
vertical diameter | 4 |
grout pipe | 4 |
rated capacity | 4 |
ring taken | 4 |
northern railroad | 4 |
successful operation | 4 |
grout hole | 4 |
electric cables | 4 |
commissioners appointed | 4 |
low water | 4 |
rock bench | 4 |
political corruption | 4 |
every share | 4 |
driven ahead | 4 |
base line | 4 |
retaining walls | 4 |
per perch | 4 |
caulking groove | 4 |
dumping buckets | 4 |
weight weight | 4 |
station lin | 4 |
mean low | 4 |
manufactured goods | 4 |
four shields | 4 |
storrow says | 4 |
date thereof | 4 |
eighth avenue | 4 |
including bolting | 4 |
earth soft | 4 |
upper floor | 4 |
air lock | 4 |
six miles | 4 |
ten miles | 4 |
without breaking | 4 |
sized tunnel | 4 |
shall forthwith | 4 |
time hrs | 4 |
also shown | 4 |
fixed hoods | 4 |
continued efforts | 4 |
machinery west | 4 |
tunnel cars | 4 |
railway company | 4 |
brick masonry | 4 |
street shaft | 4 |
fund shall | 4 |
electric motors | 4 |
march st | 4 |
items hrs | 4 |
belt conveyor | 4 |
shoving shield | 4 |
per bent | 4 |
two rows | 4 |
circumferential reinforcement | 4 |
cement mortar | 4 |
new design | 4 |
erection labor | 4 |
loading platform | 4 |
actual amount | 4 |
sized single | 4 |
second delivery | 4 |
cubic mucking | 4 |
full rock | 4 |
january st | 4 |
legislature may | 4 |
day general | 4 |
tunnel enterprise | 4 |
time within | 4 |
muck cars | 4 |
fowler warehouse | 4 |
crushed stone | 4 |
probable cost | 4 |
per per | 4 |
oe nixville | 4 |
hackensack portal | 4 |
eight inches | 4 |
hydraulic pressure | 4 |
heading advanced | 4 |
backward stroke | 4 |
span twin | 4 |
railroad managers | 4 |
new route | 4 |
preliminary headings | 4 |
may elect | 4 |
broken plate | 4 |
general superintendent | 4 |
local business | 4 |
federal currency | 4 |
full volume | 4 |
september th | 4 |
hackensack meadows | 4 |
working gang | 4 |
timber used | 4 |
forward force | 4 |
east line | 4 |
station will | 4 |
state pensioners | 4 |
first bulkhead | 4 |
soft clay | 4 |
gy west | 4 |
unconditional subscriptions | 4 |
surface structures | 4 |
shaft sites | 4 |
nine feet | 4 |
fixed extensions | 4 |
railroad men | 4 |
removing hood | 4 |
engineer appointed | 4 |
longitudinal reinforcement | 4 |
great importance | 4 |
short description | 4 |
two months | 4 |
plate lxv | 4 |
hereinafter provided | 4 |
henry cartwright | 4 |
sliding extensions | 4 |
maiden lane | 4 |
exhaust valves | 4 |
month date | 4 |
square foot | 4 |
general type | 4 |
cut work | 4 |
exceeding five | 4 |
rolling stock | 4 |
neat line | 4 |
shall bear | 4 |
half way | 4 |
connected therewith | 4 |
high tide | 4 |
cement used | 4 |
lease shall | 4 |
trailing platform | 4 |
lost total | 4 |
vertical leads | 4 |
general resident | 4 |
set forth | 4 |
earth poling | 4 |
total per | 4 |
harrison transfer | 4 |
th avenue | 4 |
different times | 4 |
brick arches | 4 |
vertical breast | 4 |
required timbering | 4 |
able report | 4 |
new lines | 4 |
seventy thousand | 4 |
boards braced | 4 |
four thousand | 4 |
glendale cut | 4 |
three times | 4 |
st street | 4 |
large enough | 4 |
tar pitch | 4 |
storage bins | 4 |
mountain barrier | 4 |
four times | 4 |
samuel rea | 4 |
monthly progress | 4 |
steam railroad | 4 |
bulkhead walls | 4 |
total force | 4 |
per drill | 4 |
contiguous road | 4 |
steam cylinder | 4 |
high vertical | 4 |
top full | 4 |
memoir prepared | 4 |
plate xli | 4 |
foot per | 4 |
plate ix | 4 |
muck taken | 4 |
almost every | 4 |
making boston | 4 |
plant running | 4 |
trunk lines | 4 |
governor andrew | 4 |
greenfield corporation | 4 |
general scheme | 4 |
boston via | 4 |
total items | 4 |
avenue plant | 4 |
fifteen years | 4 |
chief assistant | 4 |
inner edge | 4 |
pocket iron | 4 |
timber trestle | 4 |
ring yard | 4 |
civil engineering | 4 |
schist center | 4 |
heading dec | 4 |
per yd | 4 |
structural steel | 4 |
seven hundred | 4 |
splicing chambers | 4 |
distance east | 4 |
deemed necessary | 3 |
elevated railroad | 3 |
first used | 3 |
full height | 3 |
cost records | 3 |
fairly try | 3 |
hand drilling | 3 |
bolted together | 3 |
par value | 3 |
form carriages | 3 |
cameron pumps | 3 |
narrow limits | 3 |
engine oil | 3 |
competing lines | 3 |
york district | 3 |
time tunnel | 3 |
fifty cents | 3 |
liberal policy | 3 |
half mile | 3 |
let us | 3 |
upper bent | 3 |
hydraulic power | 3 |
finally decided | 3 |
next day | 3 |
joint standing | 3 |
within ten | 3 |
one foreman | 3 |
transverse bulkhead | 3 |
much easier | 3 |
rate per | 3 |
working platform | 3 |
feet deep | 3 |
ground within | 3 |
dumped directly | 3 |
way duct | 3 |
four single | 3 |
broken stone | 3 |
steam engine | 3 |
mechanical ventilation | 3 |
gates machine | 3 |
four drills | 3 |
partly constructed | 3 |
five courses | 3 |
lineal yard | 3 |
time mr | 3 |
ten days | 3 |
great expense | 3 |
south caisson | 3 |
total total | 3 |
plate xxxix | 3 |
frequent intervals | 3 |
chief engineers | 3 |
great trunk | 3 |
herman haupt | 3 |
hours min | 3 |
power pumps | 3 |
nearly completed | 3 |
vehicular traffic | 3 |
entire road | 3 |
transfer station | 3 |
fill vacancies | 3 |
date timber | 3 |
concrete cars | 3 |
average amount | 3 |
rock disappeared | 3 |
great extent | 3 |
circumferential joint | 3 |
domestic trade | 3 |
railroad across | 3 |
finished excavation | 3 |
sound rock | 3 |
correct abuses | 3 |
lower bent | 3 |
freight house | 3 |
hardly necessary | 3 |
plate xxxii | 3 |
rock face | 3 |
tunnels driven | 3 |
rings containing | 3 |
duct laying | 3 |
dollars authorized | 3 |
pier lines | 3 |
rodding mandrel | 3 |
forward ends | 3 |
may deem | 3 |
plate xxx | 3 |
power conduits | 3 |
wire rope | 3 |
york contracting | 3 |
steel lining | 3 |
low pressure | 3 |
somewhat less | 3 |
beyond doubt | 3 |
next fifteen | 3 |
station west | 3 |
drift excavated | 3 |
local traffic | 3 |
th day | 3 |
meeting duly | 3 |
progress attained | 3 |
yard tunnel | 3 |
state will | 3 |
tunnel inspectors | 3 |
tunnel might | 3 |
station site | 3 |
th streets | 3 |
small cameron | 3 |
whole period | 3 |
analyzed cost | 3 |
third house | 3 |
original contract | 3 |
two main | 3 |
maximum speed | 3 |
two bottom | 3 |
timber work | 3 |
electric generators | 3 |
took possession | 3 |
manhattan borough | 3 |
northerly line | 3 |
may fill | 3 |
first pair | 3 |
one point | 3 |
east th | 3 |
madison avenue | 3 |
annual report | 3 |
much greater | 3 |
direct tunnel | 3 |
eleven segments | 3 |
paper mill | 3 |
rental equal | 3 |
two segments | 3 |
independent line | 3 |
one plant | 3 |
directly chargeable | 3 |
simultaneous blasting | 3 |
hoisting engine | 3 |
net income | 3 |
leased railroad | 3 |
popular feeling | 3 |
house document | 3 |
annular space | 3 |
first step | 3 |
south manhattan | 3 |
two steam | 3 |
fifteen hundred | 3 |
thirty miles | 3 |
general charge | 3 |
mixing plant | 3 |
fair share | 3 |
will render | 3 |
first ten | 3 |
contract plans | 3 |
net weight | 3 |
shoved ahead | 3 |
loose rock | 3 |
previous paper | 3 |
fifteen feet | 3 |
excavated materials | 3 |
serrell co | 3 |
cut feb | 3 |
holes drilled | 3 |
stockholders thereof | 3 |
tunnel segments | 3 |
paid prior | 3 |
plate heading | 3 |
concrete form | 3 |
council may | 3 |
thousand shares | 3 |
one face | 3 |
within five | 3 |
steel rails | 3 |
vent pipes | 3 |
rather wet | 3 |
main features | 3 |
soon found | 3 |
cubic run | 3 |
different sections | 3 |
packed stone | 3 |
general labor | 3 |
serious difficulties | 3 |
herbert deans | 3 |
delivery thereof | 3 |
excessive loss | 3 |
railroad trains | 3 |
will undoubtedly | 3 |
firm material | 3 |
plate vii | 3 |
temporary shaft | 3 |
charles herbert | 3 |
map showing | 3 |
min hrs | 3 |
reading railroad | 3 |
center compartments | 3 |
air required | 3 |
local conditions | 3 |
thousand four | 3 |
driven eastward | 3 |
feet inches | 3 |
contiguous railroad | 3 |
aforesaid shall | 3 |
engineer assistant | 3 |
entire scheme | 3 |
thence running | 3 |
engineer shall | 3 |
two instances | 3 |
shield work | 3 |
live load | 3 |
easterly side | 3 |
raker bench | 3 |
morton street | 3 |
western side | 3 |
two shifts | 3 |
preliminary borings | 3 |
amount equal | 3 |
pocketless iron | 3 |
last three | 3 |
bad ground | 3 |
following prices | 3 |
sump segments | 3 |
new haven | 3 |
air cylinder | 3 |
five days | 3 |
total number | 3 |
traffic capacity | 3 |
sharp curves | 3 |
fifty miles | 3 |
patrick fitzgerald | 3 |
equal rights | 3 |
remaining excavation | 3 |
double tunnel | 3 |
average per | 3 |
good rock | 3 |
day per | 3 |
business center | 3 |
pile supports | 3 |
cement warehouses | 3 |
bench forms | 3 |
one store | 3 |
shall deliver | 3 |
face forms | 3 |
arch concrete | 3 |
river gas | 3 |
pneumatic drills | 3 |
william meier | 3 |
work required | 3 |
fifty dollars | 3 |
several occasions | 3 |
side trees | 3 |
may well | 3 |
several months | 3 |
longitudinal section | 3 |
extra heavy | 3 |
hydraulic erector | 3 |
within half | 3 |
present year | 3 |
english lime | 3 |
adams railroad | 3 |
ending december | 3 |
iron without | 3 |
grade line | 3 |
manner described | 3 |
two separate | 3 |
tunnels begun | 3 |
duct feet | 3 |
transverse polings | 3 |
two electric | 3 |
short length | 3 |
gauge track | 3 |
oil used | 3 |
partially completed | 3 |
railroad management | 3 |
general methods | 3 |
good faith | 3 |
plate xxxviii | 3 |
third section | 3 |
neat lines | 3 |
month assistant | 3 |
undisturbed material | 3 |
first removed | 3 |
broken segments | 3 |
cars standing | 3 |
lamson goodnow | 3 |
field staff | 3 |
commercial interests | 3 |
november st | 3 |
standing committee | 3 |
stock subscription | 3 |
baldwin avenue | 3 |
months ending | 3 |
excavation center | 3 |
railroads reaching | 3 |
general arrangement | 3 |
rods used | 3 |
lining castings | 3 |
various types | 3 |
great cost | 3 |
sixth chapter | 3 |
typical sections | 3 |
obtained permission | 3 |
end enlargement | 3 |
final rodding | 3 |
incorporated member | 3 |
varied greatly | 3 |
dividing wall | 3 |
four cylinders | 3 |
dimensions fourteen | 3 |
subaqueous shield | 3 |
concrete wall | 3 |
much better | 3 |
town movement | 3 |
saw cuts | 3 |
see appendix | 3 |
two points | 3 |
date month | 3 |
shield showing | 3 |
yearly rental | 3 |
hard material | 3 |
executive council | 3 |
passenger trains | 3 |
first driven | 3 |
explosive agent | 3 |
thirty dollars | 3 |
consolidated company | 3 |
curve substituted | 3 |
thought best | 3 |
different methods | 3 |
wet sand | 3 |
various parts | 3 |
one operation | 3 |
two compressors | 3 |
cut excavation | 3 |
promptly handed | 3 |
ke may | 3 |
business transactions | 3 |
inside expenditures | 3 |
two columns | 3 |
arch forms | 3 |
common powder | 3 |
easterly end | 3 |
heading timbered | 3 |
state house | 3 |
harrison yard | 3 |
back end | 3 |
natural terminus | 3 |
exclusively appropriated | 3 |
exporting city | 3 |
hundred men | 3 |
close contact | 3 |
good results | 3 |
feed pumps | 3 |
borne commerce | 3 |
state shall | 3 |
lines leading | 3 |
direct communication | 3 |
without pockets | 3 |
tunnel legislation | 3 |
shall certify | 3 |
general features | 3 |
tappan wentworth | 3 |
outside circumference | 3 |
overlying material | 3 |
inches stroke | 3 |
streets opposite | 3 |
always kept | 3 |
red lead | 3 |
forward end | 3 |
every effort | 3 |
first part | 3 |
escaping air | 3 |
west supplementary | 3 |
built across | 3 |
feet drilled | 3 |
private corporations | 3 |
sectional sliding | 3 |
great difficulty | 3 |
hundred miles | 3 |
ransome mixers | 3 |
continuous railroad | 3 |
bolts grummeted | 3 |
average length | 3 |
used per | 3 |
home market | 3 |
steel without | 3 |
weehawken land | 3 |
low tide | 3 |
public service | 3 |
nine miles | 3 |
bore plug | 3 |
plate viii | 3 |
directly connected | 3 |
bill provides | 3 |
thomas doane | 3 |
boston advertiser | 3 |
surface labor | 3 |
easily handled | 3 |
traffic facilities | 3 |
long time | 3 |
dear sir | 3 |
another paper | 3 |
large volume | 3 |
drill steel | 3 |
raw material | 3 |
excavation done | 3 |
gates drill | 3 |
city shafts | 3 |
pilot tunnel | 3 |
northern massachusetts | 3 |
gauge railway | 3 |
bench aug | 3 |
appointed chief | 3 |
political influence | 3 |
plug cover | 3 |
total penetration | 3 |
hereby appropriated | 3 |
soon became | 3 |
manual laborers | 3 |
pulled forward | 3 |
without delay | 3 |
temporary platform | 3 |
give access | 3 |
recent years | 3 |
hill tunnel | 3 |
ko may | 3 |
lower platform | 3 |
overhead platform | 3 |
passed april | 3 |
will go | 3 |
great britain | 3 |
last fall | 3 |
one mile | 3 |
special construction | 3 |
shall also | 3 |
bad rock | 3 |
averaged lb | 3 |
john fiske | 3 |
dam across | 3 |
fifty feet | 3 |
enough air | 3 |
face walls | 3 |
one trustee | 3 |
street tunnels | 3 |
proposed tunnel | 3 |
ordinary pocketless | 3 |
hereby repealed | 3 |
shall hold | 3 |
remedy defects | 3 |
survey stations | 3 |
duct ft | 3 |
passenger track | 3 |
line will | 3 |
degree curves | 3 |
entire width | 3 |
long enough | 3 |
tunnel north | 3 |
manhattan tunnel | 3 |
pile bore | 3 |
elevated railway | 3 |
light charges | 3 |
general view | 3 |
sliding hood | 3 |
weehawken rock | 3 |
dredging plane | 3 |
december st | 3 |
iron rings | 3 |
assumed center | 3 |
station yard | 3 |
two days | 3 |
adjacent buildings | 3 |
full depth | 3 |
bottom lift | 3 |
permanent work | 3 |
figures relating | 3 |
six pounds | 3 |
labor cost | 3 |
extended westward | 3 |
fiske barnard | 3 |
one element | 3 |
main items | 3 |
six years | 3 |
deem expedient | 3 |
twenty dollars | 3 |
ordinary railroad | 3 |
entirely satisfactory | 3 |
thence eastward | 3 |
enforce requirements | 3 |
iron segments | 3 |
two short | 3 |
proper management | 3 |
plan showing | 3 |
light iron | 3 |
technical training | 3 |
reference type | 3 |
iron section | 3 |
passed july | 3 |
per ft | 3 |
described elsewhere | 3 |
purpose shall | 3 |
timbering face | 3 |
nearly three | 3 |
will come | 3 |
became evident | 3 |
tunnels near | 3 |
seventh avenues | 3 |
demands made | 3 |
master mechanic | 3 |
whole force | 3 |
two directors | 3 |
shall annually | 3 |
little doubt | 3 |
street lines | 3 |
reasonable manner | 3 |
lower portion | 3 |
steel rod | 3 |
tunnel route | 3 |
inner edges | 3 |
tunnel westward | 3 |
real estate | 3 |
will follow | 3 |
removal labor | 3 |
natural cover | 3 |
plate lxxi | 3 |
whole thereof | 3 |
release valve | 3 |
equal amount | 3 |
main line | 3 |
transit subway | 3 |
great public | 3 |
air supply | 3 |
tunnel transportation | 3 |
shall sell | 3 |
fourth avenue | 3 |
small shaft | 3 |
salt water | 3 |
bench total | 3 |
west heading | 3 |
compressor plant | 3 |
plate xxix | 3 |
water per | 3 |
plate lxxii | 3 |
crown level | 3 |
pump chambers | 3 |
heavy type | 3 |
hoist engineer | 3 |
without great | 3 |
ki may | 3 |
scrip delivered | 3 |
drills mounted | 3 |
manhattan ledge | 3 |
cotton duck | 3 |
two pieces | 3 |
direct connection | 3 |
size sufficient | 3 |
massachusetts railroads | 3 |
tons per | 3 |
good idea | 3 |
tunnels extending | 3 |
total quantity | 3 |
steel beams | 3 |
railroad policy | 3 |
much less | 3 |
island side | 3 |
standard cross | 3 |
circumferential flange | 3 |
made without | 3 |
west portal | 3 |
seven dollars | 3 |
form part | 3 |
shall consist | 3 |
upper surface | 3 |
simple matter | 3 |
called section | 3 |
main divisions | 3 |
several towns | 2 |
railroad iron | 2 |
minimum height | 2 |
great purpose | 2 |
heavy drilling | 2 |
state furnishes | 2 |
brought together | 2 |
side polings | 2 |
dollars subscribed | 2 |
floor template | 2 |
level track | 2 |
large numbers | 2 |
wall forms | 2 |
causeway street | 2 |
entire work | 2 |
thomson avenue | 2 |
entirely stopped | 2 |
perforating machines | 2 |
practical knowledge | 2 |
shows one | 2 |
city will | 2 |
four faces | 2 |
much water | 2 |
shield rams | 2 |
poor rock | 2 |
direct current | 2 |
long posts | 2 |
new one | 2 |
rust joints | 2 |
duct steps | 2 |
aggregate length | 2 |
men working | 2 |
rock dividing | 2 |
great commercial | 2 |
bay sand | 2 |
one month | 2 |
third avenue | 2 |
surface railway | 2 |
water enough | 2 |
lagging used | 2 |
important question | 2 |
freight station | 2 |
bill reported | 2 |
york land | 2 |
hydraulic screwing | 2 |
building cross | 2 |
good deal | 2 |
erie railroads | 2 |
electric shunt | 2 |
preceding section | 2 |
minimum quantity | 2 |
timber staging | 2 |
stillman company | 2 |
rock cutting | 2 |
another ring | 2 |
gang handled | 2 |
perpetual control | 2 |
treacherous nature | 2 |
coarse sand | 2 |
western freight | 2 |
annual salary | 2 |
twisted steel | 2 |
several places | 2 |
head trees | 2 |
first put | 2 |
modern high | 2 |
greatly enlarged | 2 |
continuous line | 2 |
total timber | 2 |
railroad development | 2 |
iron linings | 2 |
eight per | 2 |
second vice | 2 |
charles river | 2 |
five horses | 2 |
double cottage | 2 |
work shall | 2 |
side bench | 2 |
upper portion | 2 |
obtained subscriptions | 2 |
building concrete | 2 |
diagram showing | 2 |
many important | 2 |
also prepared | 2 |
machinery central | 2 |
bore plugs | 2 |
minor modifications | 2 |
four competing | 2 |
riveted steel | 2 |
straight line | 2 |
equal signs | 2 |
increased progress | 2 |
two shields | 2 |
length average | 2 |
helping hand | 2 |
summit avenue | 2 |
directors also | 2 |
spoil buckets | 2 |
one pier | 2 |
track conduits | 2 |
former acts | 2 |
business manager | 2 |
cow bay | 2 |
thoroughly grouted | 2 |
piston moves | 2 |
legal right | 2 |
muck buckets | 2 |
may fairly | 2 |
general considerations | 2 |
additional borings | 2 |
without removing | 2 |
proved entirely | 2 |
large terminal | 2 |
without taking | 2 |
exceeding fifty | 2 |
laborers watchmen | 2 |
shield repairs | 2 |
bulkhead removed | 2 |
piles piles | 2 |
natural part | 2 |
shall prescribe | 2 |
small forms | 2 |
block laggings | 2 |
shield parts | 2 |
storrow visited | 2 |
borings made | 2 |
certify separately | 2 |
medical officer | 2 |
one line | 2 |
grout machine | 2 |
tons capacity | 2 |
air without | 2 |
points west | 2 |
must lie | 2 |
thorough ventilation | 2 |
shoreward side | 2 |
contract company | 2 |
complete fittings | 2 |
total expenditure | 2 |
tension ducts | 2 |
upper plates | 2 |
fully completed | 2 |
permanent plant | 2 |
avenue shaft | 2 |
one witness | 2 |
doors closed | 2 |
longitudinal flange | 2 |
six layers | 2 |
adequate facilities | 2 |
unnecessary delay | 2 |
masonry retaining | 2 |
assistant store | 2 |
steel segments | 2 |
substitute bonds | 2 |
heavy segments | 2 |
average quantity | 2 |
early completion | 2 |
posts resting | 2 |
protracted discussion | 2 |
pay one | 2 |
vote passed | 2 |
adams bank | 2 |
prime cost | 2 |
middle wall | 2 |
contract price | 2 |
per cost | 2 |
ring erected | 2 |
intelligent reader | 2 |
construct tunnels | 2 |
soundings showed | 2 |
general elevation | 2 |
completed work | 2 |
company lying | 2 |
companies interested | 2 |
mining methods | 2 |
box frame | 2 |
resistless torrents | 2 |
secure efficiency | 2 |
excavated ahead | 2 |
satisfactory results | 2 |
alps tunnel | 2 |
iron men | 2 |
shield began | 2 |
steel side | 2 |
thirds vote | 2 |
pipes built | 2 |
two lifts | 2 |
successful working | 2 |
telegraph ducts | 2 |
old foundry | 2 |
top ft | 2 |
raise money | 2 |
paul hill | 2 |
machinery general | 2 |
via albany | 2 |
chief tunnel | 2 |
gas pipes | 2 |
plate xl | 2 |
arch rings | 2 |
nearly six | 2 |
years hence | 2 |
fully described | 2 |
first set | 2 |
whole loan | 2 |
railroad bridge | 2 |
platforms will | 2 |
determining monthly | 2 |
naturally appoint | 2 |
eight degree | 2 |
within seven | 2 |
main form | 2 |
twin twin | 2 |
description will | 2 |
materials furnished | 2 |
rock reef | 2 |
concrete work | 2 |
heading driven | 2 |
proposed shield | 2 |
furnish air | 2 |
pressure varied | 2 |
transport gang | 2 |
actual construction | 2 |
central station | 2 |
extended beyond | 2 |
tunnel scheme | 2 |
still standing | 2 |
port morris | 2 |
lower elevation | 2 |
large voids | 2 |
head line | 2 |
extended investigation | 2 |
final estimates | 2 |
much rock | 2 |
personal interest | 2 |
bound track | 2 |
conflicting opinions | 2 |
city terminal | 2 |
rods embedded | 2 |
shall withhold | 2 |
scheme adopted | 2 |
side drains | 2 |
five members | 2 |
way conduits | 2 |
required leads | 2 |
passing around | 2 |
moved forward | 2 |
laid april | 2 |
western traffic | 2 |
shield erection | 2 |
full complement | 2 |
heavy brick | 2 |
cut away | 2 |
good many | 2 |
transfer yard | 2 |
cut near | 2 |
take care | 2 |
mechanical haulage | 2 |
manhattan will | 2 |
harrington farm | 2 |
president since | 2 |
general shall | 2 |
screw plug | 2 |
river silt | 2 |
railroad officers | 2 |
five cross | 2 |
blade ft | 2 |
contract june | 2 |
shop containing | 2 |
completed twenty | 2 |
january th | 2 |
comparatively easy | 2 |
railroad purposes | 2 |
two drifts | 2 |
fully realized | 2 |
coupling nuts | 2 |
trestle used | 2 |
transit passenger | 2 |
cheaper rate | 2 |
rapid railroad | 2 |
arch later | 2 |
short section | 2 |
cooling surface | 2 |
landward side | 2 |
ditch boxes | 2 |
steel patch | 2 |
entire construction | 2 |
top center | 2 |
constructed without | 2 |
conditions authorized | 2 |
oe nix | 2 |
shield forward | 2 |
men employed | 2 |
air compressed | 2 |
present session | 2 |
much lower | 2 |
legislature authorized | 2 |
dollars annually | 2 |
disinterested hands | 2 |
many cases | 2 |
least equal | 2 |
subsequent career | 2 |
hours per | 2 |
steam plant | 2 |
first contract | 2 |
shall make | 2 |
also required | 2 |
schist bench | 2 |
total material | 2 |
dumping mixers | 2 |
square leather | 2 |
near first | 2 |
original plans | 2 |
five dollars | 2 |
reader will | 2 |
face method | 2 |
will contain | 2 |
married miss | 2 |
intimate relations | 2 |
lower one | 2 |
lake navigation | 2 |
sundry assessments | 2 |
took hours | 2 |
amount due | 2 |
increased expenditures | 2 |
general outline | 2 |
showing method | 2 |
hoosac river | 2 |
near east | 2 |
great bulk | 2 |
varying character | 2 |
surface inspectors | 2 |
first described | 2 |
inner waters | 2 |
five million | 2 |
three low | 2 |
air escaping | 2 |
reserved annually | 2 |
proportionate amount | 2 |
open joints | 2 |
far less | 2 |
western states | 2 |
vitrified conduits | 2 |
air passed | 2 |
duplex pump | 2 |
large sums | 2 |
without repairs | 2 |
heading quartz | 2 |
sum equal | 2 |
street open | 2 |
brass plugs | 2 |
cenis tunnel | 2 |
nevertheless true | 2 |
general average | 2 |
materials passed | 2 |
shift hoist | 2 |
platform rams | 2 |
public schools | 2 |
continued without | 2 |
company becomes | 2 |
shall visit | 2 |
intimate acquaintance | 2 |
engineering operations | 2 |
tunnel terminal | 2 |
total area | 2 |
also provided | 2 |
completely excavated | 2 |
new contract | 2 |
narrowed twin | 2 |
mixed middle | 2 |
foregoing figures | 2 |
contract drawings | 2 |
made water | 2 |
outside expenditures | 2 |
office engineer | 2 |
first type | 2 |
mechanical engineer | 2 |
exhaust steam | 2 |
first work | 2 |
new location | 2 |
line west | 2 |
strenuous opposition | 2 |
arch form | 2 |
town outlet | 2 |
equivalent pressure | 2 |
years without | 2 |
track railroad | 2 |
smooth surface | 2 |
york harbor | 2 |
three rings | 2 |
natural cement | 2 |
careful consideration | 2 |
facilities connected | 2 |
amount expended | 2 |
carefully made | 2 |
near newark | 2 |
street traffic | 2 |
four dollars | 2 |
henry japp | 2 |
shaft sunk | 2 |
showing proposed | 2 |
trestle work | 2 |
preceding estimate | 2 |
say nothing | 2 |
careful handling | 2 |
thence along | 2 |
short sections | 2 |
train service | 2 |
rust borings | 2 |
work just | 2 |
whole height | 2 |
three sections | 2 |
conduit trench | 2 |
murray hill | 2 |
well advanced | 2 |
public money | 2 |
three hydraulic | 2 |
relative positions | 2 |
laws passed | 2 |
situated within | 2 |
coupons attached | 2 |
blocking placed | 2 |
arch ribs | 2 |
properly care | 2 |
considerable settlement | 2 |
front ends | 2 |
final acceptance | 2 |
now part | 2 |
center drain | 2 |
river side | 2 |
slide back | 2 |
sliding joints | 2 |
tunnel per | 2 |
tunnel south | 2 |
much trouble | 2 |
ground surface | 2 |
still greater | 2 |
machines broken | 2 |
transportation facilities | 2 |
floor level | 2 |
obtained therefore | 2 |
engineering organization | 2 |
bound traffic | 2 |
cenis drill | 2 |
serrell resigned | 2 |
wall met | 2 |
within four | 2 |
clay composed | 2 |
gravel section | 2 |
tidal oscillation | 2 |
back pressure | 2 |
test oil | 2 |
two faces | 2 |
one additional | 2 |
surveys ordered | 2 |
blake manufacturing | 2 |
every railroad | 2 |
also high | 2 |
led back | 2 |
reinforcement consists | 2 |
alleged danger | 2 |
leased roads | 2 |
drilling machine | 2 |
practically finished | 2 |
present condition | 2 |
standard height | 2 |
payments required | 2 |
center wall | 2 |
paving brick | 2 |
linear linear | 2 |
moved along | 2 |
sliding inside | 2 |
corporate stock | 2 |
minimum rental | 2 |
first connection | 2 |
every point | 2 |
seven feet | 2 |
useful information | 2 |
crusher stone | 2 |
vertical jack | 2 |
track section | 2 |
found advisable | 2 |
foregoing statement | 2 |
first pile | 2 |
steel cutting | 2 |
carefully worked | 2 |
western one | 2 |
office staff | 2 |
great tunnel | 2 |
transfer across | 2 |
freight depot | 2 |
methods adopted | 2 |
additional track | 2 |
considerable loss | 2 |
railroad loan | 2 |
plant finally | 2 |
eight horse | 2 |
breaking bulk | 2 |
ratchet drive | 2 |
vitrified earthenware | 2 |
thousand five | 2 |
greenville freight | 2 |
senate document | 2 |
damages incurred | 2 |
north rivers | 2 |
hole drilled | 2 |
nashua railroad | 2 |
railroad charter | 2 |
single friction | 2 |
manhattan beach | 2 |
mile ascending | 2 |
might arise | 2 |
whole power | 2 |
combined capacity | 2 |
removing obstructions | 2 |
within one | 2 |
original intention | 2 |
also president | 2 |
first plate | 2 |
city within | 2 |
powerful corporation | 2 |
leg derrick | 2 |
chief points | 2 |
contractor found | 2 |
grand central | 2 |
bottom jacks | 2 |
bottom plates | 2 |
engineering contract | 2 |
warehouse foundation | 2 |
freight facilities | 2 |
main header | 2 |
flat span | 2 |
general organization | 2 |
shall locate | 2 |
sum required | 2 |
george gibbs | 2 |
machine per | 2 |
mechanical analysis | 2 |
first lock | 2 |
pennsylvania company | 2 |
first meeting | 2 |
ram moving | 2 |
standard cast | 2 |
estimates shall | 2 |
high rates | 2 |
two types | 2 |
ablest railroad | 2 |
signalmen muckers | 2 |
height permissible | 2 |
also made | 2 |
gy east | 2 |
manner provided | 2 |
construction purposes | 2 |
thick stream | 2 |
working exclusively | 2 |
rodding single | 2 |
two steel | 2 |
business shall | 2 |
iron built | 2 |
manner similar | 2 |
approach cut | 2 |
work progressed | 2 |
hollow piston | 2 |
single erector | 2 |
pile bores | 2 |
top lift | 2 |
open sand | 2 |
new facilities | 2 |
easy access | 2 |
deeply interested | 2 |
york railroad | 2 |
neighboring buildings | 2 |
must continue | 2 |
water entering | 2 |
eight years | 2 |
rock surfaces | 2 |
railroad scheme | 2 |
state line | 2 |
grading three | 2 |
contract lines | 2 |
various railroad | 2 |
waste paper | 2 |
disintegrated rock | 2 |
parts received | 2 |
detailed cost | 2 |
seven jacks | 2 |
drill shift | 2 |
per acre | 2 |
provide equipment | 2 |
central wall | 2 |
acts inconsistent | 2 |
passenger service | 2 |
make soundings | 2 |
damage done | 2 |
much larger | 2 |
public expenditure | 2 |
tunnels will | 2 |
pearson contract | 2 |
associate member | 2 |
lamps used | 2 |
shield diaphragm | 2 |
built around | 2 |
great railroad | 2 |
general design | 2 |
gustav lindenthal | 2 |
water boys | 2 |
longitudinal key | 2 |
red sand | 2 |
machinery deerfield | 2 |
two additional | 2 |
full use | 2 |
form used | 2 |
died february | 2 |
two sets | 2 |
suitable persons | 2 |
cost less | 2 |
roof bars | 2 |
good condition | 2 |
every senator | 2 |
general court | 2 |
extending westward | 2 |
manufacturing company | 2 |
street extended | 2 |
station area | 2 |
segmental bents | 2 |
contracting firm | 2 |
survey station | 2 |
showing condition | 2 |
great variety | 2 |
four shafts | 2 |
amazing folly | 2 |
many difficulties | 2 |
annually passed | 2 |
laborers loading | 2 |
will equal | 2 |
vermont central | 2 |
five shafts | 2 |
national work | 2 |
sufficient detail | 2 |
thereof shall | 2 |
miles west | 2 |
inner bent | 2 |
gave good | 2 |
boat service | 2 |
following words | 2 |
charles woodbury | 2 |
whole subject | 2 |
make money | 2 |
last two | 2 |
will cost | 2 |
center medium | 2 |
two pumps | 2 |
state printers | 2 |
concrete forms | 2 |
years since | 2 |
lias lime | 2 |
traffic will | 2 |
avenue structures | 2 |
contract may | 2 |
state must | 2 |
cincinnati southern | 2 |
half millions | 2 |
telegraph cables | 2 |
complete ring | 2 |
private capital | 2 |
closing open | 2 |
will show | 2 |
center soft | 2 |
previously noted | 2 |
concrete back | 2 |
eminent engineers | 2 |
terminal improvement | 2 |
seven layers | 2 |
good ground | 2 |
greenfield road | 2 |
supply air | 2 |
may prove | 2 |
per man | 2 |
shoved together | 2 |
three gentlemen | 2 |
charter contains | 2 |
ruling type | 2 |
shaft elevator | 2 |
side benches | 2 |
concrete cradles | 2 |
special forms | 2 |
hoist engineers | 2 |
much higher | 2 |
recording clerk | 2 |
well understood | 2 |
yards placed | 2 |
mixed ground | 2 |
inventive genius | 2 |
soft mud | 2 |
land section | 2 |
equal quantity | 2 |
bottom compartment | 2 |
leading ring | 2 |
weehawken shield | 2 |
excavation proceeded | 2 |
iron may | 2 |
permanently closed | 2 |
shown graphically | 2 |
plate xxviii | 2 |
skin plates | 2 |
shields broke | 2 |
plans contemplated | 2 |
working one | 2 |
common term | 2 |
transit trains | 2 |
intelligent man | 2 |
timber trestles | 2 |
iron delivered | 2 |
albany board | 2 |
mechanical draftsman | 2 |
various pieces | 2 |
greenfield route | 2 |
italian engineers | 2 |
deceased members | 2 |
without changing | 2 |
convenient point | 2 |
york state | 2 |
amount named | 2 |
much decayed | 2 |
built within | 2 |
badly broken | 2 |
operations connected | 2 |
showing complete | 2 |
will increase | 2 |
dated june | 2 |
circumferential rods | 2 |
various divisions | 2 |
atrocious swindle | 2 |
tunnel commissioners | 2 |
corporations whose | 2 |
adjustable arms | 2 |
avenue elevated | 2 |
fifteen miles | 2 |
overhead conductor | 2 |
station construction | 2 |
dated january | 2 |
direct rail | 2 |
skilful commissioners | 2 |
state assumed | 2 |
compressor running | 2 |
thirty days | 2 |
certain towns | 2 |
rapidly advanced | 2 |
maximum resistance | 2 |
passengers will | 2 |
railroads leading | 2 |
contractor furnished | 2 |
albany railroad | 2 |
railroad extension | 2 |
freight agents | 2 |
turbine wheels | 2 |
assistant superintendent | 2 |
elevated railroads | 2 |
french territory | 2 |
whether mr | 2 |
fresh air | 2 |
forty feet | 2 |
chapter one | 2 |
deans entered | 2 |
terms following | 2 |
way connected | 2 |
whose duty | 2 |
drill holes | 2 |
special meeting | 2 |
south passenger | 2 |
tunnel tunnel | 2 |
typical tunnel | 2 |
three residencies | 2 |
upper gallery | 2 |
work adopted | 2 |
proper quantities | 2 |
per powder | 2 |
james forgie | 2 |
town station | 2 |
amount put | 2 |
new avenue | 2 |
eight weeks | 2 |
plate iv | 2 |
panels ft | 2 |
brass bar | 2 |
crayon sketch | 2 |
greatest care | 2 |
austin street | 2 |
constructed within | 2 |
current year | 2 |
arrangement shown | 2 |
brief account | 2 |
uniform thickness | 2 |
one director | 2 |
took min | 2 |
now receiving | 2 |
transit subways | 2 |
next four | 2 |
segments fig | 2 |
trustee shall | 2 |
franchise granted | 2 |
cars shown | 2 |
many years | 2 |
still exist | 2 |
unloading iron | 2 |
excavation east | 2 |
feet east | 2 |
bound cars | 2 |
two ends | 2 |
subaqueous tunneling | 2 |
respective divisions | 2 |
rockaway beach | 2 |
manufacturing interest | 2 |
great measure | 2 |
western end | 2 |
pocketless type | 2 |
containing two | 2 |
man per | 2 |
also authorized | 2 |
first two | 2 |
two portions | 2 |
track construction | 2 |
concrete arches | 2 |
needed timbering | 2 |
descending grade | 2 |
transverse section | 2 |
massachusetts alone | 2 |
felt throughout | 2 |
manhattan crossing | 2 |
three pieces | 2 |
air shortage | 2 |
freight yards | 2 |
conditions met | 2 |
heretofore made | 2 |
cement inspector | 2 |
principal sum | 2 |
restricted area | 2 |
air plant | 2 |
road near | 2 |
annual payments | 2 |
also drilled | 2 |
concrete inside | 2 |
sections gy | 2 |
lidgerwood boiler | 2 |
silt displaced | 2 |
adjoining plates | 2 |
hudson schist | 2 |
may accrue | 2 |
new requirements | 2 |
shore line | 2 |
corporation surrendered | 2 |